Laserfiche WebLink
10/3 / 6 6 <br />Motion for adoption was seconded by Trust <br />ayes and no nays and the resolution was a <br />ATTEST : iL A, &L& <br />Village Clerk. - <br />SPECIAL ASSESSMENTS LEVIED ON NUMEROUS IMPROVEMENTS. <br />of Publication in the Edina-Morningside Courier on September L5.and of Nailing on <br />Clerk presented Affidavits <br />September 16, 1966, which affidavits were approved as to form and ordered placed <br />on file. <br />was taken by the Council as her6inafter recorded: <br />1 , SANITARY SEHER DPROVEMENT NO. 238 SPECIAL ASSESSMENT LEVIED. <br />from the east line of Bertelsen Addition to the east line of Tract A, R.L,S. #1129) <br />I4r, Hyde advised that this assessment hearing had been continued from September 19 <br />in order to change the cost of assessment from a connection basis to a square foot <br />basis. Revised assessment was proposed to be assessed against 515,200 square feet <br />at $0.01216 per assessable square foot, <br />and none had been received prior thereto. <br />assessment as revised was seconded by Trustee Tupa and carried. <br />Ordering Special Assessments later in Minutes.) <br />Pursuant to due notice given, public heapings were conducted and action <br />(Parklawn Ave. <br />No persons appeared.to register objections <br />%ustee VanVaLkenburg's motion approving <br />(See Resolution <br />2. <br />east line of Bertelsen Addition to east line of Tract .A, R.L,S. $1129) <br />WATERifiIN IIIIPROVEHENT NO , 201 SPECIAL ASSESSMENT LEVZED. (Parklawn Ave from <br />ldr. Hyde <br />advised that this Assessment Hearing had been continued from September 19, in order <br />to change the cost of assessment from a connection basis to a square foot basis. <br />Revised assessment was proposed to be assessed against 515,200 square feet at <br />$0, 01607 per assessable square foot. No persons .appeared to register objections <br />and none had been received prior thereto. Trustee VanValkenburg's motion for <br />approval of the assessment as revised was seconded by Trustee Tupa and carried. <br />(See Resolution Ordering Special Assessment later in Minutes,) <br />3. STREET IIWROVEI~NT NO, BA-77 SPECLAL ASSESSblENT LEVIED. (Schey Drive ;f-oom Demy <br />Hill Road north to Gleason Road) Mr, Hyde advised Council that this Assessment <br />Hearing had been continued from September 19 because of a dispute over $438.40. <br />He stated that the Scheys had paid for the entire cost with the exception of these <br />charges which represent a bill for,engineering and design on a retaining wall at <br />the corner of the property. <br />proposed, with the understanding that payment of the $438.40 be worked out with the <br />Schey's, was seconded by Trustee VanValkenburg and camied, <br />Special Assessment later in Minu&es. ) ~ <br />4. WATERULN IlllPROVEf4ENTS NO. 191 AND 192 SPECIAL ASSESSMENTS LEVIED.' (Arden Park <br />3rd Addition, Auditor's Subdivision $176, Beverly Hills, Brookside Terrace, Clevelands <br />Subdivision of Emma Abbott Park, Edina Terrace, Emma Abbott Park, Limback Addition, <br />Paul E..Olsop, Replat of Block 1, Emma Abbott Park, Replat of Lots 9 and LO, Brookside <br />Terrace, Thielen's Brookside) Mr. Hyde presented Tabulation of Assessment as folLows: <br />For Watermain 191 - (Trunk Main) Assessable Cost $27 ,100. 00, proposed to be. assessed <br />against 271 connections at $100.00 per, connection which was the same as the Improvement <br />Trustee Tupa's motion approving the assessment as c (See Resolution Ordex-ing <br />Hearing estimate. <br />proposed to be.assessed at $334,07 as against Improvement Hearing estimate of $367.85. <br />For Watermain 192 - (Lateral Hain) Assessable Cost $93,870.62, <br />Thielen Avenue Watermain 192B. - Permanent Street- Surfacing and Concrete Curb and <br />Gutter Replacement on one side of the street only in Thielen Avenue from klest 44th <br />Street north to dead end. <br />at $315.22 against 19 assessable connections as against Improvement Hearing estimate <br />of $268,24. Watermain No. 192C - Rutledge Avenue from Brookside Avenue to Nest 48th <br />Street, total construction cost of $3,71L,ll, proposed to be assessed against 13 <br />assessable connections at $285.47, as against $222,29 estimated assessment. <br />192A - Bituminous surface replacement on blest 49th Street from Thielen Avenue to <br />Brookside Avenue - Total construction cost, $1,427r35, proposed to be assessed <br />against five lots at $285.47 per lot. Hr. Raymond Denison, 4500 Rutledge Avenue!, <br />questioned assessment on his pDoperty and was told that he is not included in'any <br />of the street replacement. <br />Department particularly helpful 5nd courteous. <br />approval of the assessment, which motion was seconded by Trustee l.lacb1iLlan and <br />carried. <br />5. STORM SEWER IMPROVEMENT NO, 86 SPECIAL ASSESSNENT LEVIED. (On the pond northeast <br />of Lake Cornelia between the Crosstown Highway and the Village of Edina Swimming <br />Pool) <br />cost at $8,700.00, proposed to be assessed against 87 lots at $lOO;OO as against <br />Improvement Hearing Estimate of $60.30. <br />of assessment was seconded by Trustee Tupa and carried, <br />Special Assessment Levy later in Minutes,) <br />Total construction cost, $5,989.18, proposed to be assessed <br />Watemain - <br />He then advised Council that he had €ound the Engineering <br />Trustee VanValkenburg then moved <br />(See Resolution Ordering Special Assessment Levy later in Minutes.) <br />Tabulation of Assessment was presented by MI?. Hyde who gave total assessable <br />Trustee VanValkenburg's motion for approval <br />(See Resolution Ordering