Laserfiche WebLink
3/18/68 .i' <br />Mr. Hite noted that this sanitary sewer would be connected to the trunk sewer which <br />Eden Prairie is considering some time after 1972. <br />of the improvements would be prohibitive in the event that Eden Prairie were not <br />fnvolved. Mr. Hite <br />indicated that because there is some question as to the capacity of the Edina trunk <br />sewer in the event that multiple dwellings are constructed in western Edina, the <br />Planning Commission has been requested to withhold mulciple zoning in that area. <br />Only three Counci.1 Members being present, Councilman Johnson's motion that the <br />hearing he continued to the meeting of April 1, was seconded by Councilman Court- <br />ney and carried. <br />E. CONSTRUCTION OF WATERMAIN P-WM-229 AND APPURTENANCES IN THE FOLLOWING: <br />West 70th Street from 1310 feet East of France Ave. to York Ave. <br />F. CONSTRUCTION OF GRADING AND GRAVELING P-C-96 IN THE FOLLOWING: <br />He further noted that the cost <br />Discussion ensued as to the capaciity of the Edina trunk sewer. <br />." I <br />- West 70th Street from France Avenue to Xe.rxes Avenue <br />York Avenue from West 69th Street to Vest 70th Street. <br />Improvements listed under E and F. above being assessed against the same properties, <br />hearings were conducted simultaneously. <br />ject cost for Watermain P-229 at $7,488.88, proposed to be assessed against 1,071.5 <br />feet at an estimated cost of $6.99 per assessable foot. <br />mated project cost of P-C-96. at $81,692.00, proposed to be assessed against 5,291.80 <br />estimated assessable feet at an estimated cost of $15.15 per assessable foot. <br />Hite indicated that this is presently zoned R-1 but long range plans are for off- <br />ice, industrial or multiple zoning. <br />cilman Johnson's motion continuing the hearing to April 1, 1968, was seconded by <br />Councilman Courtney and carried. <br />G. CONSTRUCTION OF SANITARY SEWER AND STORM SEWER IMPROVEMENT NO. P-269 AND APPUR- <br />Mr. Hyde presented total estimated pro- <br />He presented total esti- <br />Mr. <br />Only three Council Members being present, Coun- <br />e <br />TENANCES IN <br />Nordic Circle. <br />Nordic Circle. <br />H. CONSTRUCTION OF WATERMAIN IMPROVEMENT NO. P-226 AND APPURTENANCES IN <br />Improvements P-SS-269 and P-WM-226 listed above affectfng the same properties, <br />public hearings were conducted concurrently. Mr. Hyde presented total estimated <br />project cost for Sanitary Sewer and Storm Sewer P-SS-269 at $16,729.28, proposed <br />to be assessed against 8 assessable lots of $2,091.16 per lot. Estimated const- <br />ruction cost of Watermain P-226 was presented by Mr. Hyde at $8,969.80, proposed <br />to be assessed at an estimated cost of $1,121.22 against 8 assessable lots. Mr. <br />Hyde noted that these improvements will serve Nordic Drive and the temporary kin- <br />dergarten buildings. Mr. Hite advised that petitions have been received and that <br />both improvements can, therefore, be approved by 3/5 rollcall vote. (See resolu: <br />tion Ordering Improvements later in Minutes.) <br />I. CONSTRUCTION OF SANITARY SEWER P-265 AND APPURTENANCES IN THE FOLLOWING: <br />I <br />-". <br />Lee Valley Circle from West 70th Street Southbrly and Westerly 750 feet f <br />or -. <br />Lee Valley Circle from West 70th Street to West 70th Street. <br />-I <br />J. CONSTRUCTION OF WATERMAIN P-227 AND APPURTENANCES IN <br />Items I and 3 being assessed against the same properties, both hearings were con- <br />ducted simultaneously. <br />tary Sewer P-265 at $14,985.59, proposed to be assessed against ten estimated <br />assessable lots at $1,498.56 per lot.. <br />No. P-227 was presented at $9,294.88, proposed to be assessed against an estimated <br />ten assessable lots at an estimated cost of $929.49 per assessable lot. Mr. S. <br />W. Carbon, 7009 Lee Valley Circle, noted that an additional lot should be ass- <br />essed. <br />approved, but that if it is approved the assessmentsshould be spread over eleven <br />lots. Mr..Hite further noted that a petition hadvbeen received which represents <br />seven out of'eleven property owners. <br />lution Ordering Improvements later in Minutes.) <br />R. GONSTRUCTION OF SANITARY SEWER P-267 AND APPURTENANCES IN THE FOLLOWING: <br />Mr. Hyde presented total estimated project cost of Sani- <br />Total estimated project cost for Watermain <br />He was advised by Mr. Hite that the division of Lot 3 had not as yet been <br />No further discussion was heard. See Reso- I 1- <br />Gleason Road from North line of Lot 2,eBlock 1, Schey's Park View 3rd Addi- <br />tion -to -Loch Moor Drive. <br />Gleason Road from Schey Drive to Loch Moor Drive. <br />L. CONSTRUCTION OF STREET IMPROVEMENT P-C-95 in 1 <br />Improvements listed under K and L above being assessed against the same properties, <br />hearings were conducted concurrently. <br />cost for Sanitary Sewer P-267 at $9,195.55, proposed to be assessed against ten <br />estimated assessable lots at an estimated cost of $919.56 per assessable lot. <br />Total estimated project cost for Grading and Graveling Improvement P-C-95 was pre- <br />sented by Mr. Hyde at $38,633.11, proposed to be assessed against an estimated <br />2,558.19 feet at $15.10 per estimated assessable foot. Mr. Hyde further noted <br />Mr. Hyde presented total estimated project <br />'