Laserfiche WebLink
8/4/69 <br />F. CONSTRUCTION OF STOFN SJiNER AND APPURTENANCES IN THE FOUOWING: (P-St.S.121) <br />Sally Lane from South line of Indim Hills-ArrQwhead AdditiQn to.Apache Rd. <br />Easement line between Lots 16 qnd 17 ,. Block-2, Indian Hills-Arrowhead <br />Addition from East line of Addition Po Sally Lane . <br />Apache Road from Sally Lane to the Nest line of.Blocks 1 and 3, Indian <br />Hi 1 Is -Arrowhead Addition <br />Easement line from Apache Road North along IJest line of Block 1, 300' a <br />Mr. Hyde presented estimated project cost at $24,441.20, proposed to be assessed <br />against 28 assessable lots at an estimated cost of $872.90 per lot. No comments <br />were heard from the audience. (See Resolution Ordering Improvement later in <br />Minutes) . <br />Go. CONSTRUCTION OF GRAVELING &I3 STABILIZING IN THE FOLLOWING (P-C-105) <br />Sally Lane <br />Apache Road <br />Pawnee Road, all in Indian Hills-Arrowhead Addition <br />1-k- Hyde presented total estimated construction cost at $15.652.00; proposed . to be assessed against 26 assessable lots at an estimated cost of $602.00 per <br />assessable lot, No comments were heard from the audience. (See Resolution - <br />Ordering Improvement later in Minutes.) <br />H. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN <br />THE FOLLOIJING: (P-BA-159) <br />Sally Lane from South line of Indian Hills-Arrowhead Addition North to <br />Apache Road from Sally Lane to West line of Blocks 1 and 3, Indian Hills- <br />Pawnee Road from Apache Road to Indian Hills Road <br />3fr. Hyde presented estimated project cost at $22,479.58, proposed to be assessed <br />against 2,714.13 feet at an estimated cost of $8.28 per assessable foot, <br />comments were heard from the audience. <br />later in minutes.) <br />I. CONSTRUCTION OF NATERElAIN IEIPROVEMENT AND APPURTENANCES IN THE FOLLOWING: <br />(P-m-248) <br />Sally Lane from South line of Indian Hills-Arrowhead Addition to cul-de-sac <br />Apache Road from Sally Lane to IJest line of Blocks 1 and 3, Indian Hills- <br />Pawnee Road from Apache Road to Indian Hills Road <br />cul-de-sac <br />Arrowhead Addition <br />No <br />(See Resolution Ordering Improvement <br />Arrowhead Addition <br />Mr. Hyde presented total estimated project cost at $23,585.16, proposed to <br />be assessed against 28 assessable lots at an estimated cost of $842.33 per <br />assessable lot. No-comments were heard from the audience. (See Resolution <br />Ordering Improvement later in Minutes.) <br />J. CONSTRUCTION OF SANTTARY SEWER IMPROVEMENT XND APPURTENANCES IN THE°FOLLOMIhY;: <br />(PsSS-286) <br />On an easement line from County Road 18 to Apache Road <br />Sally Lane from South line of Indian Hills-Arrowhead Addition North to <br />Pawnee Road from Apache Road to Indian Hills Road <br />cul-de-sac <br />Nr. Hyde presented total estimated project cost at $2$,17,6.16, proposed to be <br />assessed against 28 assessable lots at an estimated cost of $934.86 per assess- <br />able lot. No comments were heard from the audience. <br />Improvement later in Minutes. <br />K. CONSTRUCTION OF STORM SEIJER INPROWDENT AND APPURTENANCES IN THE FOLLOVING: <br />(See Resolution Ordering <br />(P- ST. S- 122) <br />Hyde Park Drive from Hyde Park Circle to 50'2 East <br />Xr. Hyde presented total estimated project cost at $4;035.22, proposed to be <br />assessed against 11 assessable lots at $366.84 per lot. <br />from the audience. <br />L. CONSTRUCTION OF WATERMAIN IMPROVEMENT AND APPURTENANCES IN THE FOLLOWING: <br />(P-l?M-250) <br />Hyde Park Drive from Dewey Hill Road to 470'+ South <br />Hyde Park Circle from Hyde Park Drive to culzde-sac <br />No comments were heard <br />(See Resolution Ordering Improvement later in Minutes.) <br />Nr. Hyde presented total estimated project cost at $7,698.71, proposed to be. <br />assessed against 11 assessable lots at an estimated cost*of $699.88 per assess- <br />able lot. No comments were heard from the audience. <br />Improvement later in Minutes.) <br />M. <br />(See Resolution Ordering <br />CONSTRUCTION OF SANITARY SEWER AND APPURTENANCES IN THE FOLLOIJING:(P-SS-288) <br />Hyde Park Drive from Dewey Hill Road South 470' f <br />Hyde Park Circle from Hyde Park Drive to cul-de-sac <br />Mr. Hyde presented total estimated project cost at $9,934.79, proposed to be <br />assessed against 11 assessable lots at an estimated cost of $903.16 per lot. <br />comments were heard from the audience. (See*Resolution Ordering Improvement <br />later in Minutes.) <br />No