I <br />2/22/71 <br />that a storm sewer is not necessary, Mayor Bredesen pointed out that the <br />Engineers believe that there is a problem and that later installation would <br />mean ripping up and patching a good street. Following considerable dCscus- <br />sion, Councilman Johnson's motion authorizing installation of the proposed <br />watermain and street improvement without curb and ,gutter, with the understand- <br />ing that some storm sewer would be apbhorized before the watermain or street <br />improvement are constructed, was seconded. by Counci'lman Courtney'and carried. <br />(See Resolution Ordering Improvements later in Minutes .) <br />D. CONSTRUCTION OF SANITARY SEWER IMPROVEMENT P-SS-296 AND STREET,REPUCEMEk IN <br />THE FOLLOWING : <br />Mark Terrace Drive from Valley View Road to Mark Terrace Circle <br />CONSTRUCTION OF WATERMAIN IMPROVZMENT P-EM-264 AND APPURTENANCES IN T€E <br />FOLLOWING : <br />Mark Terrace Drive frDm Valle; View Road to Mark Terrace Circle <br />E. <br />Public hearings.dn improvements listed under D and E above were heard concur- <br />rently. Mr. Hyde recalled that these improvements had been before Council <br />previhusly as part of an area wide project, at which time it had'been deleted <br />from the improvement. He noted that this hearing has been called because - <br />septic tank pumping records maintained by the Health Departgent indicate that <br />the incidence of pumping at certain properties on Mark Terrace Drive is <br />increasing to a point wGere it ppears that sanitary sewer service should be <br />tion of the sanitary sewer, watermain is proposed at the same time. He pre- <br />sented total estimated.cost for the sanitary sewer at $26,480.37, proposed <br />a to be assessed against twelve assessable lots at $2,206.70 per lot. Total <br />1 estimated construction cost for the watermain .w.as given at $8,801.97, pro- <br />posed to be assessed against twelve lots at_ an estimated cost of $733.50-per <br />assessable lot. Mr. IJilliam S. Fredendall,-6917 Mark Terrace Drive, urged <br />that Council take positive action on both improvements; Mr. George Babcock,- <br />6916 Mark Terrace Drive, noted that the cost of the improvements as proposed, <br />including street repair, is considerably 1ower.than the original proposal. <br />In reply to a request that the projects be assessed over a tweqty year period, <br />it was pointed out that this 'assessment term will be considered at the assess- <br />ment hearing. <br />then seconded by Councilman Shaw and carried. <br />ment later in Minutes.) <br />F. CONSTRUCTION OF WATERMAIN IMPROVEMENT P-WM-266 AND APPURTENANCES IN THE <br />made available and that since t E: e street will be disturbed by the insfalla- <br />Councilman Johnson's motion authorizing the improvements'was <br />(See Resolution Ordering Improve- <br />FOLLOljING : <br />Cascade Lane <br />Laura Ave. from Cascade Lane to Moore Ave. <br />Moore Ave. from Laura Ave. to North Ave. <br />North Ave. from 150 feet South of Moore Ave. to W. 44th Street <br />W. 44th Street from North Ave. to Thielen Ave. <br />Mr. Hyde presented total estimated project cost at $37,770.33, proposed topbe <br />assessed against 26 assessable lots at an estimated cost of $1,452.71 per lot. <br />Mrs. Elizabeth Skelly, 4425 North Ave., was told by Mr. Dunn that Cascade <br />Lane has a thirty foot right-of-way and that every attempt will be made to <br />save the trees on the street. <br />by Councilman VanValkenburg and carried authorizing the improvement. (See <br />Resolution Ordering Improvement later in Minutes.) <br />Councilman Courtney's motion was then seconded <br />G. CQNSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN <br />THE FOLL&JING : (P-BG378) <br />Hyde Park Drive from Dewey Hill Road to 450' 3- South <br />Hyde Park Circle from Hyde Park Drive Vest to cul-de-sac <br />Mr. Hyde noted that sewer and water had been installed by. Developer's Agreement <br />and presented total estimated construction cost of the proposed street improve- <br />ment at $12,250.73, proposed to be assessed against an estimated 1,107.34 feet <br />at an estimated cost of. $11.06 per assessable foot. No objections being heard, <br />Councilman VanValkenburg's motion authorizing the improvement was seconded by <br />Councilman Courtney and carried. <br />in Minutes.) ' ' <br />H. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN <br />1 <br />(See Resolution Ordering Improvement later <br />THE FOLLOVING: (P-BA-179) <br />Aspen Road from the West line of-Gleason Fourth Addition Easterly to <br />cul-de-sac <br />Mr. Hyde presented total estimated project cost at $10,056.47, proposed to be <br />assessed against 578.30 estimated assessable feet at an estimated cost of <br />$17.39 per foot. <br />authorizing the improvement was seconded by Councilman Courtney and carried. <br />I. <br />Noting that Jqy Place is a semi-private alley, Mr. Hyde presented total esti- <br />mated construction cgg E..ZL~ $$,461.13, proposed to be assessed against 342.79 <br />estimated feet at a/cos& 0% He added that the <br />hearing is being held as a result of a petition.requesting the improvement. <br />i <br />No objections were heard, whereupon Councilman Shaw's motion <br />CONSTRUCTION OF PERMANENT .STREET IMPROVEMENT P-A-171 IN THE FOLLOI.JING: <br />Jay Place from Vest 50th Street to 330' 2 South <br />7.26 'per assessable foot.