Laserfiche WebLink
23 <br />MINUTES OF THE REGULAR MEETING OF THE <br />EDINA VILLAGE COUNCIL, HELD MONDAY, FEBRUARY 5, 1968 <br />, <br />Members answering rollcall were Councilman Courtney, Johnson, Shaw, VanValkenburg, <br />and Mayor Bredesen. 1 <br />MINUTES s.f January 5 were approved as submitted by motion of Councilman VanValkenburg, <br />-seconded by Councilman Johnson and carried. <br />roved as corrected by motion of Councilman Johnson, seconded by Councilman VanValken- <br />burg and carried. Councilman Johnson's correction was that with reference to the Eden <br />Prairie Village interconnection sewer agreement, Eden Prairie would be "charged" rath- <br />er than "credited" $25,000 . <br />PUBLIC HEARINGS CONDUCTED ON NUMEROUS STREET AND ALLEY SURFACING IMPROVEMENTS, Affi- <br />davits of Publication in the Edina Courier on January 25 and February 1 and of Mailing <br />on January 26, 1968, were presented by Clerk, approved as to form and ordered placed <br />on file. <br />-proposed improvements and action taken by Council as hereinafter recorded: <br />A. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE AND GUTTER in <br />Estimated project cost.was presented by Mr. Hyde at $32,111.58, proposed to be assess- <br />ed against-2,981.01 assessable feet at $10.77 per assessab1.e foot. Mr. Edward Rippie, <br />5824 Olinger Road, was assured by Mr, Hite that bituminous with curb and gutter would <br />provide a satisfactory surface on the steep hill on.Olinger Road. No further discus- <br />sion was heard, <br />B. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN THE <br />Minutes of January 15,. 1968, were app- <br />Pursuant to due notice given, Public Hearings were conducted on the following <br />I <br />Olinger Road from County Road #158 to Olinger Blvd. <br />u3 <br />€- u3 a FOLLOWING :. u w <br />(See Resolution Ordering Improvement later in Minutes.) <br />Amy Drive from Olinger Road to Sun Road <br />Sun Road from Olinger Blvd. to Arbour Lane <br />Olinger Blvd. from South line of Scenic View 1st Addftion to Olinger Road <br />Olinger Circle <br />Mr. Hyde presented estimated project cost at $67,861.65 proposed to be assessed a- <br />gainst 67 assessable lots at $1,012.86 per lot or against 6,259.23 feet at $.10.84 <br />per assessable foot. <br />Ordering Improvement later in Minutes,) <br />C. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER in <br />Mr. Hyde presented estimated project cost at $11,805.94, proposed to be assessed <br />were made from the audience. <br />D. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER in <br />Mr. Hyde presented estimated project cost at $8,577.60 proposed to be assessed either <br />against nine assessable lots at $953.07 or against 853.19 assessable feet at $10.05 <br />per foot. No comments were made from the audience. <br />ment later in Minutes.) . <br />No comments were made from the audience. (See Resolution <br />.- Beard Place from Beard Avenue to West 62nd Street <br />-. against 950.37 feet. at an estimated cost of $12.42 per assessable foot.. No comments <br />(See Resolution Ordering Improvement later in Minutes.) <br />Polar Circle from County Road #158 to cul-de-sac <br />I <br />(See Resolution Ordering Improve- <br />-E. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN THE . FOLLOWING : <br />Cherokee Trail from South line of Cherokee Hills 4th Addition to North.line of . Cherokee Hills 4th Addition <br />Mr, Hyde presented estimated project cost at $9,458.62, proposed to be assessed <br />either against ten assessable lots at $945.86 per assessable lot or against 926.21 <br />Resolution Ordering Improvement later in Minutes.1 <br />F. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER in <br />-assessable feet at $10.21 per foot. No comments were made from the audience. (See . <br />Uest 53rd Streei from Grandview Lane to Vest line of Replat of part of Grandview <br />Plateau - Mr. Hyae presented total estimated project cost at $4,706.74, advising that it is <br />proposed to assess $400 against Lot 6, Block 2, Replat of Part of Grandview Plateau <br />and against Parcel 5400, Sec. 28, T. 117, R.21 and that $3,906.74 is proposed to be <br />assessed against Parcel 800, Sec. 28, T. 117, R. 21. No comments were made from the <br />audience. (See Resolution.Ordering Improvement later in Minutes.) <br />G. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN <br />Valley View Road from Rosemary Lane to Mark Terrace Drive (South) . <br />Mr. Hyde presented estimated total project cost at $113,589.88, proposed to be assess <br />ed against 4,582.92 assessable feet at an estimated cost of $10.00 per foot. The por- <br />tion of the project to be assessed was estimated at $45,829.20, with the state aid <br />share estimated at'$67,760,68. <br />presented which would assess 36 assessable lots at an estimated cost of $1,273.03 <br />per lot. Mr. Hite pointed out that because some of the irregular shaped lots near <br />to the roadway have access to Valley View Road.through easements, it is proposed to <br />assess these lots at the normal rate.of assessment. Mr. Hite further advised that <br />I <br />An alternate method of spreading the assessment was