Laserfiche WebLink
MINUTES OF THE REGULAR MEETING OF THE <br />EDINA. VILLAGE -COUNCIL- HELD AT VILLAGE HALL ON <br />.. --" . MONDAY,.AUGUST 4, 1969 <br />Members answering rollcall were Councilmen Shaw , VanValkenburg and Mayor <br />Bredesen. <br />MINUTES of July 7, 1969, were approved as submitted by motion of Councilman Shaw, <br />seconded by Councilman VanValkenburg and carried. <br />STORM SEWER P-120 CONTINUED TO AUGUST 18, 1969. Affidavits of Notice were pre- <br />sented by Clerk, approved as to form and ordered placed on file. Mr. Hyde <br />presented estimated project cost at $16,995.66 of which an estimated $11,693.01 <br />will be paid from State Aid Funds because of the benefits accruing to the future <br />reconstruction of Hansen Road. The $5,302.65 balance is proposed to be assessed <br />against 284,352 asaessab1.S square feet at an estimated cost of $0.0186 per square <br />foot. Mayor Bredesen noted that because only three Council members were presei&, <br />the improvement could not be authorized but invited.comments from the audience. <br />Mr. J. E.Stacey, 5728 Dale Avenue, said that he is already paying for one storm <br />sewer. He was told by Mr. Hyde that the proposed storm sewer drains to a dif- <br />ferent area than the first storm sewer and that he would not be assessed twice <br />for the same area. Comments favoring the proposed storm sewer were made by <br />Dr. Anita Smith, 5812 Hansen Road, Messrs. William Williamson, 5816 Hansen <br />Road, and George W. Demko, 5716 Hansen Road, and by an'unidentified lady. No <br />further comments were heard, whereupon Councilman VanValkenburg's motion continu- <br />ing the hearing until August 18, 1969, was seconded by Councilman Shaw and <br />carried. <br />NUMEROUS IMPROVEMENTS AUTHORIZED AT PUBLIC WRING. Affidavits of Notice were <br />presented by Clerk, approved as to form and ordered placed on file. <br />Bredesen noted that the following improvements had been petitipned and that <br />they could be authorized by 3/5 favorable vote of Council. Public hearings <br />were then conducted and action taken as hereinafter recorded: <br />A. CONSTRUCTION OF PEXMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN <br />Mayor <br />THE FOLLOWING : (P-BA- 16 1) <br />Kemrich Drive from Shannon Drive to East line of Kemrich Knolls Addition <br />Fleetwood Drive from Kemrich Drive to North line of Kemrich Knolls Addition <br />Lanham Lane from Kemrich Drive to North line of Kemrich Knolls Addition <br />Mr. Hyde presented ,construction cost of $24,851.76, proposed to be assessed <br />against 2,315.42 estimated feet at an estimated cost of $10.73 per assessable <br />foot. <br />thereto. (See Resolution Ordering Improvement later in Minutes.) <br />B. CONSTRUCTION OF PERMANENT STREET SURFACING AM) CONCRETE CURB AND GUTTER IN <br />No comments were heard from the audience and none had been received prior <br />THE FOLLOIilING: (P-BA-156) <br />Aspasia Circle from Larkspur Lane to cul-de-sac <br />Mr. Hyde presented total estimated project cost at F11,184.56, proposed to be <br />assessed against fourteen assessable lots at an estimated cost of $798.90 per <br />lot. <br />prior thereto. <br />C. <br />No protests were heard from the audience and none had been received <br />(See Resolution Ordering Improvement later in Minutes.) <br />CONSTRUCTION OF PERMANENT STREET'SURFACING AND CONCRETE CURB AND GUTTER IN <br />THE FOLLOWING : <br />Shannon Drive from Lee Valley Road Easterly, Northerly and Westedy, located <br />in Hondo 2nd Addition <br />Mr. Hyde presented total estimated construction cost at $21,595.85, proposed to <br />be assessed against 2,022.53 assessable feet at an estimated cost of $10.68 per <br />foot. <br />M. €',.Johnson questioning the assessment procedure of the Village. <br />tion Ordering Improvement later in Minutes.) <br />D. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN <br />No comments were heard from the audience, however a letter was noted from <br />(See Resolu- <br />THE FOLLOWING : (P- BA- 158) <br />Malibu Drive in Malibu Heights <br />Mr. Hyde presented total estimated project cost at $8,815.99, proposed to be <br />assessed against 1,313.09 assessable feet at an estimated cost of $6.71 per <br />assessable foot, No comments were heard from the audience. (See Resolution <br />Ordering Improvement later in Minutes.) <br />E. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER IN <br />THE FOLLOWING: (P-BA-162) <br />Darcy Lane in Scenic Valley Addition <br />Mr. Hyde presented toral estimated construction cost at $2,606.66, proposed to <br />be assessed against 130.04 assessable feet at $20.05 per foot or against three <br />lots at $868.89 per assessable lot. No comments were heard from the audience. <br />(See Resolution Ordering Improvement later in Minutes.)