Laserfiche WebLink
.. i 16 MINUTES OF THE REGULAR MEETING OF THE <br />FEBRUARY 7, 1977 <br />EDINA CITY COUNCIL EIETAD AT CITY MTdL <br />, 7:OO P.M. <br />hswering rollcall were members Courtney, Richards, Schmidt, Shaw and Mayor Van <br />Valkenburg. <br />MINUTES of January 17 and 24, 1977, were approved as submitted by motion of <br />Councilwoman Schmidt, seconded by Councilman Cotlrtney. <br />Ayes: <br />Nays: None <br />Motion carried. <br />Courtney, Richards, Schmidt, Shaw, Van Valkenburg <br />PUBLIC HEARINGS CONDUCTED ON VARIOUS INPROVEMENTS. The following improvements <br />having been continued from the meeting of January 17, 1977, action was taken as <br />hereinafter recorded: <br />A. WATERHAIN IMPROVEMENT NO. P-IJM-322 IN THE FOLLOWING: <br />Westwood Court from Schaefer Road to Schaefer Road <br />Schaefer Road from the North line of *Parkwood Knolls Addition to Idylwood La. <br />Schaefer Road from View Lane to County Road 158 <br />Parkwood Road from Blake Road to Knoll Drive <br />Idylwood Lane from Blake Road to Schaefer Road <br />Knoll Drive from Blake Road to Schaefer Road <br />South Knoll Drive from Blake Road to Knoll Drive <br />Akers Lane from Parkwood Road to North line of Parkwood Knolls Addition <br />Schaefer Circle from Schaefer Road to Service Lot 7, Block 1, Parkwood Knolls <br />Addition <br />Hr. Hyde recalled that, at its meeting of January 17, 1977, the Council had <br />authorized this improvement with the exception of the Westwood Court portion, <br />and referred to letters from Dr. E. E. Praley, 6313 Westwood Court, Messzs:.James <br />Moran, 6312 Westwood Court, Paul D. Hagstrum, 6305 Westwoo& Court, Steyen P. <br />Ogdahl, 6316 Vestwood Court, and Barron B. Boe, 6320 Westwood Court, all express- <br />ing opposition to the improvement. Mr. Walter C. Nelson, 6308 Westwood Court had <br />written in favor of the improvement, Total estimated construction cost was given <br />at $263,819.46, proposed to be assessed against 94 assessable lots at an estimated <br />cost of $2,806.59 per lot. <br />. wood Court and Schaefer Road could connect to the Schaefer Road watermain. No <br />fxrther discussion being heard, Councilman Shawls mo tiort authorizing Vafermain <br />Izpovement No. P-WM-322 with the exception of the portidn on Westwood Court was <br />seconded by Councilman Courtney and carried. <br />later in Minutes.) <br />I Mr. Moran said that residents on the corner of West- <br />(See Resolution Ordering Improvement <br />B. WATERMAIN IMPROVENEXT NO. P-IM-324 IN THE FOLLOWING: <br />Doran Drive from Valley View Road to cul-de-sac <br />Hr. Dunn recalled that this improvement had been continued from January 17, 1977, <br />so that the staff-could check on the possibility of assessing a third house on <br />Doran Drive which is under construction. He explained that at the time he had <br />authorized the house at5612 Doran Drive to connect to another watermain, he had <br />no idea that the improvement now under consideration would be coming before <br />the Council4or hearing, and reiterated his recommendation that the improvement <br />be authorized as originally proposed, with the total estimated construction cost <br />of $3,246.40 proposed to be assessed against Lots 1 and 2, Block 2, Bach's Addi- <br />tion, at an estimated cost of $1,623.20 per lot. <br />heard, Councilman Courtney's motion authorizing the improvement was seconded by <br />Councilwoman Schmidt and carried. <br />linutes.) <br />No further coinments being <br />(See Resolution Ordering Improvement later iii <br />C* WATEWIN IMPROVEMENT NO. P-IiM-326 IN THE FOLLOWING: <br />Easement line from W. 44th St. North thru Lots 1.through 7, Auditor's Sub- <br />division 176. <br />Brookside Terrace from Motor Street to I?. 44th Street <br />Easement line from W. 44th Street North to Lot I, Auditor's Subdivision 176 <br />Hr. Dunn recalled that Watermain Improvement No. P-Wbi-326 and Sanitary Sewer <br />Improvement No, P-SS-342 both affected the same properties and had been heard <br />concurrently at the Council meeting on January 17, 1977, at which time they had <br />been continued to this meeting so that the Engineering Department could try to <br />develop an alternate route. Mr. Dunn said that he fully appreciated the posi- <br />tion of affected property owners, but that Lot 6is entitled to have sewer and <br />water so that it can be developed. Mr. Dunn recommended that the improvements <br />be constructed to the center of Lot 6 at this time so the vacant lot could be <br />serviced now and the improvements could be extended at a future time. He pre-- <br />sented total estimated construction cost for the new proposal at $3,304.98 for <br />the watermain and at $11,486, 16 for the sanitary sewer which costs are proposed <br />to be assessed against the property getting immediate service (Lot 6 and the <br />D- SANITARY SEFJER INPROVEMENT NO. P-SS-342 IN THE FOLLOWING: I