Laserfiche WebLink
MINUTES <br />OF THE REGULAR MEETING OF THE <br />EDINA CITY COUNCIL HELD AT CITY HALL <br />MARCH 5, 1979 <br />Answering rollcall were members Bredesen, Richards, Schmidt and Courtney who <br />served as Mayor Pro Tem in the absence of Mayor Van Valkenburg. <br />67 <br />PUBLIC HEARINGS CONDUCTED ON PROPOSED IMPROVEMENTS. Affidavits of Notice were <br />presented by Clerk, approved as to form and ordered placed on file. Due notice <br />having been given, public hearings were conducted and action taken as herein- <br />after recorded, all improvements proposed to be constructed under Plan C <br />Developers Agreements : <br />A. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER <br />IMPROkTNENT NO. P-BA-2 35 IN THE FOLLOWING : <br />Ewing Circle from W. 55th Street to cul-de-sac <br />Mr. Rosland presented total estimated construction cost of $6,722.64, proposed to <br />be assessed against 357.50 assessable feet at an estimated cost of $18.80 per <br />assessable foot or against $1,344.52 per assessable lot. No objections being <br />heard, Councilwoman Schmidt's motion authorizing the improvement was seconded by <br />Councilman Richards. (See Resolution Ordering Improvement later in Minutes.) <br />B. CONSTRUCTION OF PERMANENT STREET SUR33ACING AND CONCRETE CURB AND GUTTER <br />IMPROVEMENT NO. P-BA-236 IN THE FOLLOWING: <br />Berne Circle from Olinger Road to Cul-de-sac <br />Mr. Rosland presented total estimated construction cost of $8,061.55, proposed go <br />be assessed against 499.03 assessable feet at an estimated cost of $16.15 per <br />assessable foot or against $1,151.65 per assessable lot. No objections being <br />heard, Councilwoman Schmidt's motion authorizing the improvement was seconded by <br />Councilman Bredesen. (See Resolution Ordering Improvement later in Minutes.) <br />C. CONSTRUCTION OF STREET SURFACING AND CONCRETE CURB AND GUTTER IFPROVEMENT NO. <br />P-BA-237 IN THE FOLLOWING: <br />Eimerick Drive in Brookview 'Heights 5th Addition <br />Mr. Rosland presented total estimated construction cost of $31,944.12, proposed <br />to be assessed against 1,621.38 assessable feet? at an estimated cost of $19.73 <br />per assessable foot or against $1,777.45 per assessable lot. <br />heard, Councilman Richards' motion authorizing the improvement was seconded by <br />Councilman Bredesen. <br />D. <br />No objections being <br />(See Resolution Ordering Improvement later in Minutes.) <br />CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCXETE CURB AND GUTTER <br />IMPROYEMENT NO. P-BA-238 IN THE FOLLOWING: <br />Willow Wood Raid from Brinwoods Estates to West line of Lot 4, Block 3, Larada <br />Larada Lane from North line of Parkwood Knolls Addition to Willow Wood Road <br />Lane <br />Mr. Rosland presented total estimated construction cost of $35,024.75, proposed <br />to be assessed against 1,605.19 assessable feet at a cost of $21.82 per assess- <br />able foor or against $2,918.73 per assessable lot. Mr. Hoffman advised that Lot <br />1, Block 1 and Lot 1, Block 2, Parkwood Knolls 14th Addition had not been <br />included in the project, but that he would contact owners to see if they wished <br />to have thsir road constructed at this time. <br />perties could be added to the project at a later time. No objections were heard, <br />whereupon Counci.lman Richards offered the following resolution and moved its <br />adopgion, with the understanding that Mr. Hoffman notify the owners of Lot 1, <br />Block 1, and Lot 1, Block 2, ParkJood Knolls 14th Addition, so that they will <br />have an opportunity to be included izl the improvement: <br />He suggested that these two pro- <br />RESOLUTION ORDERING STREET IMPROVEMENTS NUMBERS <br />EA-235, BA-236, BA-237 AND BA-238 <br />BE 1T.RESOLVED BY THE CITY COUNCIL OF THE CITY OF EDINA, MINNESOTA, that this <br />Council heretofore caused notice of hearing to be duly published and mailed to <br />owners of each parcel within the area proposed to be assessed on the following <br />proposed improvements : <br />1. CONSTRUCTION OF PEPPANENT STREET SURFACING AND CONCRETE CURB AND GUTTER <br />Ewing Circle froin W. 55th Street to Cul-de-sac <br />CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER <br />IMPROVEMENT NO P-EA-236 IN THE FCLLOWING: <br />Berne Circle from Olinger Road to Cul-de-sac <br />IMPROVEMENT NO. P-BA-235 IN THE FOLLOWING: <br />2. <br />3. CONSTRUCTION OF PERMANENT STREET SURFACING AND CONCRETE CURB AND GUTTER ' <br />IMPROVEMENT NO. 5'-EA-237 IN THE FOLLOiJING: <br />Limerick Erive in Brookview Heights 5th Addition <br />CONSTRUCTION OF PERMANENT STREET SURFACING RND CONCRETE CURB AND GUTTER <br />IMPROVEMENT NO. P-BA-238 IN THE FOLLOWING: <br />4. <br />Willow Wood Road from Brinwoods Estates to West line of Lot 4, Block 3, <br />Parkwood Knolls 20th Addition <br />Larada Lane from North Line of Parkwood Knolls Addition to Willow Wood Road <br />and at the hearing held at the time and place specified in said notice, the <br />Council has duly considered the views of all persons interested, and being <br />fully advised of the pertinBnt facts does hereby determine to proceed with the