Laserfiche WebLink
-- MINUTES <br />OF THE REGULAR 3IEETING OF THE <br />EDINA CITY COUNCIL HELD AT CITY HALL <br />AUGUST 5, 1985 <br />216 <br />Answering rollcall were 3iembers Bredesen, Kelly, Richards, Turner and Mayor <br />Courtney. <br />SENIOR COMMUNITY SERVICE OFFICERS COMMENDED. <br />Harmon, Erik hundson and Brandon Deshler, Senior Community Service Officers, <br />Chief Craig Swanson introduced Rose <br />advising that they have been with the Police Department over two years. <br />that all three have completed their preparatory courses for entry into law enforce- <br />ment and commended them for their conscientious and superior work in the Department. <br />They were presented silver pens bearing the Edina Logo. <br />the Council extended their thanks and appreciation to these employees. <br />MINUTES of tfie Regular and Special Meetings of July 1, 1985 were approved as <br />submitted by motion of Member Turner, seconded by Member Kelly. <br />Ayes: Bredesen, Kelly, Richards, Turner, Courtney <br />Motiog carried. <br />He noted <br />I The City Manager and <br />IMPROVEMENT NO. BA-262 (W. 44TH STREET FROM BROOKSIDE AV TO T.H. 100) RECONFIRMED. <br />~ Affidavits of Notice were presented by Clerk, approved and ordered placed on file. <br />Engineer Fran Hoffman recalled that the Council at its meeting of May 21, 1984, <br />approved Improvement No. BA-262 for construction of permanent street surfacing, <br />concrete curb and gutter and sidewalk on W. 44th Street from Brookside Avenue to <br />T.H. 100 and bridge replacement over Minnehaha Creek, subject to receipt of all <br />approvals necessary from the Minnesota aepartment of Transportation, Minnehaha <br />Creek Watershed District and the Department of Natural Resources and Corps of <br />Engineers. <br />subject to reconfirmation of the Council. <br />the project. <br />with concrete curb and gutter the entire distance from the So0 Line Railroad to <br />T.H. 100. Additionally, a concrete sidewalk adjacent to the curb would be con- <br />structed on the north side of the roadway which would be maintained by the City. <br />The street would be 28' wide from Brookside Avenue to T.H. 100 with parking <br />restricted on both sides. <br />of Municipal State Aid Funds. <br />placement of the current structure at the Minnehaha Creek. <br />would have sidewalk on both sides of the street. <br />is $323,404.87 with an estimated $17,810.00 to be assessed. The balance of the <br />funds will come from State Aid Funds. Mr. Hoffman advised that the estimated cost <br />of$17,810.00 would be proposed to be assessed at $20.00 per assessable foot for <br />single family residential units. If approved, construction of this improvement <br />would be accomplished in 1985 or early 1986. <br />in 1986 with the initial installment due in 1987. This improvement is proposed <br />to be assessed over a ten-year period, with interest not to exceed the amount <br />allowed by law. <br />Lots 1 and 2, Block 3, Arden Park 3rd Addition; Lots 1, 2 and 3, Block 4, Arden <br />Park 3rd Addition; Lots 7, 8 and 17, Aud. Sub'd. No. 176; and Lots 10 and 11, <br />Thielen's Brookside Add'n. <br />thanks and appreciation to the Council and to Mr. 'Hoffman for their extra efforts <br />in dealing with the concerns of the residents of W. 44th Street regarding this <br />project. <br />ing resolution and moved its adoption: <br />BE IT RESOLVED by the Council of the City of Edina, Minnesota that this Council <br />heretofore caused.notice of hearing to be duly published and mailed to owners of <br />each parcel within the area proposed to be assessed on the following proposed <br />improvement: <br />1. CONSTRUCTION OF PERMANENT STJEET SURFACING WITH CONCRETE CURB AND GUTTER, <br />SIDEWALK AND BRIDGE REPLACEMENT IMPROVEMENT NO. BA-262 IN THE FOLLOWING: <br />West 44th Street from Brookside Terrace to T.H. 100 <br />All required approvals have been obtained and the project can proceed, <br />Mr. Hoffman than presented a review of <br />The proposed project consists of constructing a new bituminous surface <br />These dimensions are minimum widths required for use <br />The major portion of the project would include re- <br />The new structure <br />The estimated cost of the project <br />Assessments would then be levied <br />The area proposed to be assessed for a portion of the cost includes <br />James Welna, 5139 W. 44th Street, expressed his <br />No further comment being heard, Member Bredesen introduced the follow- <br />RESOLUTION RECONFIRMING IMPROVEMENT NO. BA-262 <br />I and at the hearing held at the time and place specified in said notice, the Council <br />has duly considered the views of all persons interested, and being fully advised <br />of the pertinent facts, does hereby determine to proceed with the construction of <br />said improvement as described in the published notices of said hearing, including <br />all proceedings which may be necessary in eminent domain for the acquisition of <br />necessary easements and rights for construction and maintenance of such improve- <br />ment; that said improvement is hereby designated and shall be referred to in all <br />subsequent proceedings as PERMANENT STREET SURFACING WITH CONCRETE CURB AND GUTTER, <br />SIDEWALK AND BRIDGE REPLACEMENT IMPROVEMENT NO. BA-262 and the area to be specially <br />assessed for a portion of the cost of the proposed improvement shall include <br />Lots 1 and 2, Block 3, Arden Park 3rd Add'n.; Lots 1, 2 and 3, Block 4, Arden <br />Park 3rd Add'n.; Lots 7, 8 and 17, Aud. Sub'd. No. 176; and Lots 10 and 11, <br />Thielen's Brookside Add'n. <br />Motion for adoption of the resolution was seconded by Member Turner.