Laserfiche WebLink
MINUTES <br />OF THE REGULAR MEETING OF THE <br />EDINA CITY COUNCIL HELD AT CITY HALL <br />JANUARY 26, 1987 <br />329 <br />Answering rollcall were Members Kelly, Richards, Smith, Turner and Mayor <br />Courtney. <br />CONSENT AGENDA ITEMS ADOPTED. <br />Member Smith fo adopt the consent agenda as presented. <br />Motion was made by Member Turner and seconded by <br />~ <br />Rollcall : <br />Ayes: Kelly, Richards, Smith, Turner, Courtney <br />Motion carried. <br />*COUNCIL MINUTES OF DECEMBER 1, 8 AND 15, 1986 APPROVED. Motion was made by Member <br />Turner and seconded by Member Smith to approve the minutes of the Regular Meetings <br />of December 1 and 15, 1986 and the Special Meeting of December 8, 1986. <br />Motion carried on rollcall vote, five ayes. <br />PUBLIC HEARINGS CONDUCTED; IMPROVEMENT NOS. BA-272, BA-273, BA-275, BA-276 AND <br />NOS. L-29, L-30 AND L-31 ORDERED. Affidavits of Notice were presented by Clerk, <br />approved and ordered placed on file. <br />were conducted and action taken as hereinafter set forth: <br />A. CONSTRUCTION OF PERMANENT STREET SURFACING WITH CONCRETE CURB AND GUTTER <br />Pursuant to due notice given, public hearings <br />IMPROVEMENT NO. P'BA-272 IN THE FOLLOWING: <br />Dearborn Court in Dearborn Addition and Blake Woods <br />Engineer Hoffman stated that the proposed improvement was petitioned for by the <br />developers of the Dearborn Addition and Blake Woods. <br />cost of $22,411.79 is proposed to be assessed against 10 assessable lots at an <br />estimated cost of $2,241.18 per lot. <br />a ten (10) year period with an annual rate of interest charged on the unpaid balance <br />not to exceed the amount allowed by law. Mr. Hoffman pointed out that Lots 1 and 2, <br />Block 1, of Dearborn Addition would not be included in the assessment because they <br />have previously paid an assessment on the Dearborn Addition. <br />heard and none had been received prior hereto. <br />Improvement No. P-BA-272 was seconded by Member Kelly. <br />Improvement later in Minutes.) <br />Total estimated construction <br />The assessment is proposed to be spread over <br />No objections were <br />Member Turner's motion approving <br />(See Resolution ordering <br />Ayes: Kelly, Richards, Smith, Turner, Courtney <br />Motion carried. <br />B. CONSTRUCTION OF PERMANENT STREET SURFACING WITH CONCRETE CURB AND GUTTER <br />IMPROVEMENT NO. P-BA-273 IN THE FOLLOWING: <br />&rim Terrace in Edina Oaks Addition <br />Engineer Hoffman stated that the proposed improvement was petitioned for by the <br />developer of Edina Oaks Addition. <br />is proposed to be assessed against 5 assessable lots at an estimated cost of <br />$2,284.50 per lot. <br />period with an annual rate of interest charged on the unpaid balance not to exceed <br />the amount allowed by law. <br />prior hereto. <br />by Member Kelly. <br />Total estimated construction cost of $11,422.51 <br />The assessment is proposed to be spread over a ten (10) year <br />No objections were heard and none had been received <br />Member Turner's motion approving Improvement No. P-BA 273 was seconded <br />(See Resolution Ordering Improvement later in Minutes.) <br />Ayes: Kelly, Richards, Smith, Turner, Courtney <br />Motion carried. <br />C. CONSTRUCTION OF PERMANENT STREET SURFACING WITH CONCRETE CURB AND GUTTER <br />IMPROVEMENT NO. P-BA-275 IN THE FOLLOWING: <br />Green Farms Road and Apple Lane in Parkwood Knolls 22nd Addition <br />Engineer Hoffman said that the proposed improvement was petitioned for by the <br />developer of Parkwood Knolls 22nd Addition. Total estimated construction cost <br />of $45,219.03 is proposed to be assessed against 16 assessable lots at an esti- <br />mated cost of $2,826.19 per lot. The assessment is proposed to be spread over <br />a ten (10) year period with an annual rate of interest charged on the unpaid <br />balance not to exceed the amount allowed by law. No objections were heard and <br />none had been received prior hereto. <br />No. P-BA-275 was seconded by Member Turner. <br />later in Minutes.)' <br />Ayes: Kelly, Richards, Smith, Turner, Courtney <br />Motion carried. <br />Member Kelly's motion approving Improvement <br />(See Resolution Ordering Improvement <br />D. CONSTRUCTION OF PERMANENT STREET SURFACING WITH CONCRETE CURB AND GUTTER <br />IMPROVEMENT NO. P-BA-276 IN THE FOLLOWING: <br />Green Farms Road, Green Farms Court, Interlachen Court and Interlachen <br />Road in Interlachen Heights Addition; also Interlachen Road from Ridge <br />Road to 1255 feet East <br />Engineer Hoffman stated that the proposed improvement was petitioned for by the <br />developer of Interlachen Heights Addition. The proposed project consists of a <br />new street with curb and gutter. <br />on Interlachen Road to meet existing curb and gutter east of Ridge Road. Total <br />estimated cost of construction of $80,455.83 is proposed to be assessed against <br />21 assessable lots at an estimated cost of $3,788.32 per lot. <br />abutting the extention of the curb and gutter are proposed to be assessed at <br />Additionally, curb and gutter will be added <br />The two lots