Loading...
HomeMy WebLinkAbout2012-04-11 Planning Commission Meeting PacketsAGENDA REGULAR MEETING OF THE PLANNING COMMISSION CITY OF EDINA, MINNESOTA CITY COUNCIL CHAMBERS APRIL 11, 2012 7:00 PM I. CALL TO ORDER II. ROLL CALL III. APPROVAL OF MEETING AGENDA IV. ADOPTION OF BYLAWS V. APPROVAL OF CONSENT AGENDA A. Minutes of the regular meeting of the Edina Planning Commission March 28, 2012. VI. COMMUNITY COMMENT 3 During "Community Comment," the Planning Commission will invite residents to share new issues or concerns that haven't been considered in the past 30 days by the Commission or which aren't slated for future consideration. Individuals must limit their comments to three minutes. The Chair may limit the number of speakers on the some issue in the interest of time and topic. Generally speaking, items that are elsewhere on this morning's agenda may not be addressed during Community Comment. Individuals should not expect the Chair or Commission Members to respond to their comments today. Instead, the Commission might refer the matter to staff for consideration at a future meeting. VII. REPORTS/RECOMMENDATIONS A. GrandView District Development Framework. B. Sketch Plan Review — 7501 France Avenue — Construction of a freestanding coffee shop with a drive-through. , VIII. CORRESPONDENCE AND PETITIONS • Council Connection • Attendance IX. CHAIR AND COMMISSION MEMBER COMMENTS 9 X. STAFF COMMENTS XI. ADJOURNMENT 0 The City of Edina wants all residents to be comfortable being part of the public process. If you need assistance in the way of hearing amplification, an interpreter, large -print documents or something else, please call 952-927-886172 hours in advance of the meeting. Next Meeting of the Edina Planning Commission: April 11, 2012 CITY OF EDINA MEMO City Hall • Phone 9S2-927.8861��N/`'"t Fax 952-826-0389 * www.CityofEdina.com Qf v � Igt't��iy,xPt,w Date: April 11, 2012 To: Planning Commission From: Cary Teague, Community Development Director Re: Grandview District Development Framework The Planning Commission is asked to recommend approval of the attached Grandview District Development Framework, as recommended by the GrandView Steering Committee. Please note that edits were made to the following pages: 3, 30, 35, 36, 38, 50, 51, 52 and appendix. These edits were approved by the Steering Committee and are based on the public input given since Steering Committee approval, and at the February 22, 2012 Planning Commission meeting. City of Edina . 4801 W. 50th St. • Edina, MN 55424 GrandView District Development Framework U ,. . Edina, Minnesota. December 7, 2011 Revised January 17, 2012 Revised January 25, 2012 Revised January 31, 2012 Revised March 27, 2012 Revised April 5, 2012 Table of Contents Steering Committee Executive Summary 3 Ken Potts Kim Melin Peter Sussman Lisa Diehl 1. Hope for Change 5 Randy Halvorson Chris Rofidal Bob Kojetin David Davison 2. Thoughts and interactions 6 Steve Buss Gene Persha Bernie Beaver Mike PIatteter 3. Patterns for a Neighborhood Center 9 Richard Borland Larry Cheszler Peyton Robb Dan Gieseke 4. Moving Forward with a Purpose 45 Laura Giertsen Ellen Jones Diane Reinhart James Justice S. Appendix 57 Terry Ahlstrum Dick Ward Darcy Winter Paul Nelson Bill Neuendorf David Novak Tim McIlwain Linda Urban Bright Dornblaser Andy Brown Tom Mattison Ken and Adele Floren Suzanne Davison Michael Schroeder Greg Domke Sandy Fox Jim Smith Kevin Staunton, Chair Dick Crockett Michael Fischer Arne Cook Brett Johnson Tom Bonneville Collin Bredeson Kim Montgomery Deron Lindquist Tim Murphy Eric Bredesen `Ihomas Raeuchle Jim Baisch Tom Ruppert Consultant Team Cuningham Group Architecture, PA Close Landscape Architecture HR Green Community Design Group Springsted Inc. 4/05112 Executive Summary " the Development Framework presented here is part of a small area planning process required by EdinA Comprehensive Plan for those parts of our community (like the Grandview District) designated as Potential Antis of Change. It follows the 2010 Grandview District Small Area Guide Plan , process. that process — led by a group of community residents and business and property owners — resulted in adoption by the Edina City Council of seven Guiding Principles for the redevelopment of the GrandView District. 'lite process of crafting this Development Framework has been led by a 52 -member Steering Committee made up of residents of the community and owners of area businesses and properties. The 52 members of the Steering Committee have dedicated countless hours since April of 2011 listening to community members, considering options, and debating alternatives for the future of the District. 'Thanks to a grant from the Metropolitan Council, vve have had the good fortune to be supported in our efforts by a talented group of consulting experts. We have also been fortunate to have the patient support of City staff throughout the process. Our objective in creating this Development Framework is to build upon the seven Guiding Principles adopted by the City Council.. In the pages that follow, we share a vision of how to bring those Guiding Principles to life. While there arc many details essential to fulfilling that vision, our goals can be summarized as efforts to: 1. Create a place with a unique identity announced by signature elements likes • A central commons on the Public Works site with indoor and outdoor public space that connects the civic cornerstones of the District and serves the neighborhood and community needs; • A "gateway" at Highway 100 that announces the District as a special place, using elements like an iconic pedestrian and bicycle bridge spanning Highway 100; and • An innovative, cutting-edge approach to 21st -century sustainability:. 4105/12 2. Completely rethink and reorganize the District's transportation acture to: • Make the District accessible and inviting to pedestrians and cyclists; • Create connections between the different parts of the District; • Maintain automobile -friendly access to convenience retail; • Create separate pathways for pass-through" and "destination automobile traffic; and • Preserve future transit opportunities provided by the rail corridor in a way that ensures that the kinds of opportunities pursued in the future are consistent with the character we envision for the District and provide benefit to the surrounding neighborhood. 3. beverage public resources to make incremental value -creating changes that enhance the public realm and encourage voluntary private redevelopment consistent with the vision that improves the quality of the neighborhood for residents, businesses, and property owners. This Development Framework makes substantial progress in charting the path to be followed in redeveloping the Grandview District. By creating a vision that meets the seven Guiding Principles, it provides guidance to city officials, residents, business and property owners, and developers as opportunities for change emerge in the District. To ensure that the future redevelopment of the District is consistent with the vision articulated in this Framework, we recommend that it become part of the City's Comprehensive Plan. We want to be clear, however, that we recognize that the Framework (like the Comprehensive Plan) provides broad direction rather than detailed requirements. 'This Framework is intended to be a vision of the future rather than a blueprint. Achieving the vision will require, among other things: • A feasibility study that examines the costs and resources available to bear those costs; • An examination of the height and density necessary to make the vision financially feasible while ensuring that it results in the human scale and neighborhood character that is the essential to the Framework; • Developing a strategy to allow for a vibrant business and residential community by managing the mix of retail, office, residential, and public uses of land while maintaining the currently successful neighborhood service and convenience character; • A determination of a range of possible housing choices that support the character and experience of the District. • A community building/public green programming group should work to determine appropriate program and uses. We discuss these and other "next steps" in the Implementation section. Consistent with the "community -led" spirit of the initial stages of this process, we recommend that these "next steps" include active participation by community members, support of staff and leadership from the City Council. 4/(}5/12 Study Area Location C -=—No, Introduction Hope for Change has been the driving vision since the very beginning of this process that is now well into its second year of perspiration, participation, and planning, 'thousands of volunteer hours, countless meetings, and hundreds of discussions (large and small) have demonstrated that a committed group of citizen stakeholders, business leaders and owners, and elected and appointed officials believe that hope for change must be proactive„ progressive, and promoted. 'Ilse result will be not just be change for the salve of change, but directed energy, policy, and investment that will deliver a place for people to live, work, shop, and play in sustainable, memorable ways, 4/05/12 r. Mope for Change Concept Diagram from the Small Area Guide Pian Process, December 2010 '. 40rse far Change Guiding Principles The Seven Guiding Principles 1. Leverage publicly -owned parcels and civic presence to create a vibrant and connected District that serves as a catalyst for high quality, integrated public and private development. 2. Enhance the District's economic viability as a neighborhood center with regional connections, recognizing that meeting the needs of both businesses and residents will make the District a good place to do business. 3. Turn perceived barriers into opportunities. Consider layering development over supporting infrastructure and taking advantage of the natural topography of the area. 4. Design for the present and the future by pursuing logical increments of change using key parcels as stepping stones to a more vibrant, walkable, functional, attractive, and life -filled glace. 5. Organize parking as an effective resource for the District by linking community parking to public and private destinations while also providing parking that is convenient for businesses and customers. 6. Improve movement within and access to the District for people of all ages by facilitating multiple modes of transportation, and preserve future transit opportunities provided by the rail corridor. 7. Create an identity and unique sense of place that incorporates natural spaces into a high quality and sustainable development reflecting Edina's innovative development heritage - 4/05/12 Principles Related to the Concept Diagram i. Leverage publicly owned parcels 2. Meet the needs of businesses and residents 3.Tum barriers into opportunities 4. Pursue logical increments; crake vibrant walkable and attractive 5. Organize parking; provide convenience 6. Improve movement for all ages; facilitate multiple modes of movement 7. Identity and unique sense of place; be sustainable and innovative i. Hope for CNm9e History Before Edina became a village almost 125 years ago, a country market road crossed Minnehaha Creek at Edina Mills. Headed westward to the high ground, it branched out as Eden Prairie Road and Hopkins Road. In 1869, the Yancey family moved from Ohio and purchased 127 acres ofland including that high ground and most of the present Grandirew District. Civil War veteran Beverly C. his wife Ellen and their seven children were to become the most prominent pioneer black family of Edina over several decades and left a legacy of civic involvement. An observer described early Edina as an agricultural village, where there is a post off x, a mill, and a store, and proudly aspires to the dignity of a trading town. The numerous farms are well -cultivated, and are acrsrpied by intelligent people who appreciate education, and surround themselves with the accessories ofa refanedsodety." A renter of the early community was Minnehaha Grange No. 398, organized in 1873. The Grange Hall originated in a meeting at the Yancey family home in 1879 with a considerable number ofpersons desirous to form an association to build and own a hall hudding near Edina Mills `In 1888, the name Edina was voted upon in that building, which also served as the village hall until 1942. When moved for construction of St. Stephen's Church in 1935, a member of the Yancey family donated the neva site. In 1970, the Grange Hall was moved to the present Frank Topa Park in the GrandYiew District, later joined by the historic Cahill School. Changes in the district have been angaing including transportation and services. Members of the Yancey family platted Grand View Heights in 1910 and Tingdale Brother's Brookside in 1916. In 1913, the Dan Patch Line was cut through the high ground east of Brookside Avenue, providing passenger service to Minneapolis from 1915 to 1942. In 1927, new highway 1691212 (current Vernon Avenue) was cut through the District. Grading and paving businesses such as j. A. Danns and Son located to serve the growth, joined by motels and restaurants. Tho District expanded rapidly with western Edina following World War II.7he Edina directory of 1953 listed six often businesses in the District as including "Grandview" in their names• a cafe, market, two service station, hardware, and seed Historic GrandView Heights Plat and garden supply store. In 1947, Jerry Paulsen opened a meat counter in one of the localgraceries, a modest beginning to jerry! Enterprises, a longtime prominent presence in the District. It is encouraged to look to the history of the District in naming the proposed public amenities and new streets. 7be Yancey family in particular, due to their early ownership of the District and legacy of civic engagement, merits that honor at a prominent location such as the commons. Sources: 1. R. j. Baldwin, in Isaac Atwate ,% i (Munsell, 1895),p �1�263 as quoted in Pad D. Hesrerman,Histo Edina, Minnesota (Burgess Publishing,] 9") Edina Historical Society, p. 29. 2. Meeting minutes dated March 7,1879. Copy in tate Edina Historical Society files. 4/05/12 IS 2. Thoughts and Interactions 4/05/12 2, Thoughts and interactions Project Schedule and Process Part I: Discussion and Discovery Part I is about learning from and listening to the Steering Committee, Work Groups, and other stakeholders; analyzing the study area and understanding the work done to -date; appreciating the larger dynamics of the area; and clearly defining the opportunities. An initial Community Workshop is held to conduct work group discussions/downloacK and a public meeting/presentation is hosted by the Steering Committee and the Consulting Team. Part Il: Ideas and Options Part II focuses on developing ideas and options that address the specific issues raised by the Steering Committee, stakeholders, and the public process. The Consulting Team conducts a three-day Community Workshop (to be held in the study area) that will include Steering Committee meetings, focus group meetings, stakeholder interviews, team work sessions, and conclude with a public meeting/presentation. Part 111: Decide and Deliver Part III consolidates all the comments, ideas, and options into a preferred direction. This part includes a third Community Workshop and public meeting. The Consulting Team prepares a summary document that may be widely distributed via a variety of sources (i.e., print, web, etc.) and a Sketch -up 3D model of the area with preferred options. 017- t'Mmil mom Project Schedule: The project schedule was organized around three community workshops. Summary of Participation Process The Steering Committee and Executive Committee have worked closely with the ConsultingTeam to facilitate a process that focused on key issues, opportunities, and recommendations. The process worked with the Steering Committee that met on a regular basis to guide the Consulting Team. A sub -committee of Work Groups addressed Land Use/Community Design, Community Needs/Public Realm,Transportation/ Infrastructure and Real Estatc/Finance. These groups put an incredible amount of effort into initial background information and research, definition of issues, and discussion about ideas and options. A key component of the project was a series of CommunityWorkshops held in September, October and November, 2011, that hosted a range Of community stakeholders either in interviews, focus groups, program meetings and at public meetings. The community participation process included these primary groups of participants: Steering Committee, Executive Committee, work groups, City staff, focus groups (land owners, neighborhoods, public officials, school district, institutions, city departments, business operators, and others as identified during the process), Plan Commission members, City Council members and the Mayor. 4105/12 2, Thoughts and Interac an, The Public Participation Process: The publicparticipation process included Steering Committee meetings, work group meetings, public meetings, focus groups meetings, and program groups meetings throughout the fail of 2011. 3. Patterns for a Neighborhood Center 4/05/12 Introduction Neighborhood Center Principle #2 in the GrandView District Small Area Guide Plan is about "enhanc(ing) the District's economic viability as a neighborhood center with regional connections." The Guide Plan also suggests that"'Ihe District serves primarily as a neighborhood (rather than regional) center." Based on Steering Committee and Public input, this idea has broad appeal- But what do we mean by neighborhood center and how does that fit with specific expectations and outcomes for the GrandView District? "Neighborhood feel,""pedestrian friendly,"and "safe and connected"describe the desired character for the District, But the basis for these words lies in a clear vision for the bey elements, or systems, that define place ...and further set the framework for future and ongoing development at GrandView these elements include Land Use,Transporration and Movement, the Public Realm and Sustainability, and will be described and illustrated in more detail in this chapter. 3. Patterns for a:NOahborhood Centel Concept Diagrams Create "go to" and "stay at" uses Easy to get to; easy to get around Connect throughout 4/05112 .and Use Land use in the District is currently focused on convenience retail and service uses that are visible from Vernon Avenue. The majority of these uses are auto -oriented and are accessible from Vernon and Gus Young Lane. The exception is the Grandview Square development that includes residential, office, and civic uses organized around a central green space. The Comprehensive Flats identifies the Grandview Heights District as a mixed-use center character area, a potential "area of change" and guides future land as a mixed-use centcr. The Comprehensive Pian also says that "the District is in the process of evolving from a somewhat scattered auto -oriented district to a more integrated mixed of uses." The over -arching concept is to support the "go- to"uses (auto -oriented) while anticipating more "stay -at" uses (pedestrian -oriented), and to improve future use and built form around three key civic "centers": • City Hall • Library - Community Commons (civic building and green space) The future land use plan proposes a broader mix of uses arranged around a new central green space (Grandview Green) located on the public works site and fronting Arcadia. The plan emphasizes a mixed-use sub -area between Vernon/Eden/ 3. Patterns for a NaighWrbooU Cenu� Highway 100 and the rail corridor. Arcadia is seen as a more residential street with a range of condo, apartments, and multi-level townhouse types. Mixed-use and office buildings are anticipated and may be oriented to Vernon and/or south toward Eden and the Our Lady of Grace (OLG) fields, a significant open space that is a visual amenity to the greater district Vernon is assumed to remain more convenience - and service-oriented with improved pedestrian sidewaiks/connecrions, safer street crossings (especially to the adjacent neighborhood), bike lanes, and better organized/managed traffic flow and parking. Both Eden and Vernon are anticipated to employ Complete/Living Street principles that emphasize the place -qualities of Meets. Across Highway 100 to the east, the Vernon/50th/ Eden alignment culminates with City Hall; long term uses are assumed to accommodate a greater civictcommunity presence when/if the Highway 100 interchange is reconfigured as a split -diamond facility_ Goals • Develop and improve the district as three smaller "villages" that are connected physically and by a signature character and identity. • Recognize the need for a range of housing types and choices and address those markets that also reinforce the District vision. 4/05/12 is • Emphasize the connection to Minnehaha Creek • Create a recognized, visible arts identity and provide space/place for greater community arts users and producers. • Address needs of underserved populations (teens, singles, seniors, etc.). • Establish a community commons as a multi- purpose facility for a wide audience (e.g., whole body, whole life, health and wellness) and as a focall point and central gathering place that connects City Hall to the east with the Library to the southwest • Celebrate the 'Birthplace" of Edina, the !Milt, and record the oral history of Grandview Heights; tell the stories. • Emphasize a pedestrian -oriented sense of place that produces an appropriate scale and function, and preserves surrounding views. • Support economic growth and community stability by providing accessible and efficient connections between home, school, work, recreation, and business destinations through improved pedestrian and vehicular environments throughout the area. �yq § p f � 47�,Y# R;' Q It (t i R;' Q It Z� Land Use 4/05/12 1 Pattem.maw y #ood CeIMLIF m I Land Use Public Works Site The public works site is located in a central point of the District and is seen as the "commons" for how the District vision will be realized. Uses proposed include the community green space located on top of a parking garage that supports area businesses, civic uses, and serves as a Metro Transit park and ride structure; a community/civic building anchoring the green; and a variety of residential uses including condominiums, apartments, and townhouse building types. Townhouse units are envisioned to front Arcadia as a building type that can incrementally "step-up" the hill, providing a character unique to the District. Development 16 acres Site 28000 SF Public Green 24 units Condominium 62 units Apartments 50.000 SF Community/Gvic 16 units Townhouses Parking 200 spaces Parkandhide 206 spaces Community use Is8 spaces Multifamily 4/45/72 ?. Datternsfw a Neighborhood Cheer Public Works Site A form -based code can guide desired building use and frontage. NG A. KE ri Qt V) D A3 -I m CL :IRE 86 -C O R. Im N to a v 3, Pzzcms for a Nelqnbori)Gcc Center Land Use m N Bus Garage Site Looking Northeast 4105/12 Land Use Phase 1 From a land use perspective, a number of immediate steps can be taken to set the stage for new investment in the District. These include: • Policy changes to the Comprehensive Plan (the Small Area Pian is intended to update the Comprehensive Purr). • Potential zoning revisions that could include a form -based code to regulate desired public realm, building frontages, and building height. • Identification of Eden and Vernon as early candidates for application of Living Streets principles. • Policy direction that guides overall sustainability of the District, including consolidated reuse/ recycling, stormwater management, etc. • Policy direction that guides how new public and private investment may be supported with a variety of financing tools. The public works site (public green space and a community/civic building) and the bus garage site are the two key parcels that can "jump-start" the redevelopment process. In particular, the ability of the public works site to provide a fee simple, unencumbered asset will allow civic/community and private and public realm uses to be realized 4/OS/12 3, Platterns for a Neighborhood Genie. early, and will demonstrate the leverage identified in the Guiding Principles to support a variety of next steps. This could include a Metro Transit park and ride facility as away to provide a parking structure that would also serve as the Grandview Commons (community/civic building/public green). In similar fashion, the bus garage can be a major pivot point for how a number of land use decisions may play out and will act as a land use "connector" along Eden. This site may need to be readied for development sooner than the public works site in order to accommodate a series of land use transitions that will help the larger District vision implementation. A third component of an early phase would be the development of the Wanner site currently owned by Our Lady of Grace as potential residential, office, or retail uses. In support of these anticipated land use changes, new street configurations/alignments, circulation. patterns, and streetscape/pedestrian improvements along Eden will complete a bike and pedestrian network and support the anticipated land use changes with improved automobile circulation and management. RAE Y r. Pubtkworks 2. School sus Garage 3.Mew sridgerStreet 4.VYanner S. Jerry's site 6. Jeny's Site 7. CRy Raup Accen ,i. Patterns 4o= a Ne ghWrh000 Cen?er Land Use Ihe following chapter on implementation is included as one example of anticipating an initial, or Phase 1, increment and associated preliminary range of costs.'Ihese numbers are not detailed costs but represent one possible range of expenditures that are included here to illustrate levels of funding (and investment) of various components.'The Phase 1 diagram and following spreadsheets for the public works site, the bus garage site, and local street improvements will vary depending on actual funding sources, timing, program, and other factors (e.g., cost of materials and labor) that cannot be determined Fee at this time. See Appendix. Phase 1 A. Public Works Site • Community Commons: GrandView Crossing (street) GrandView Green Community/Civic building • Arcadia steps • CommunityfCivic building • Variety of residential building types • Structured parking • Park and ride structure B. Bus Garage Site • Multi-level parking • Retail/service/office use 4/05/12 C. Wanner Site • Townhouses fronting OLG open space D. Eden Avenue Streetscape • Bus stop integrated • Boulevard organizes intersection alignments E. Jerry's Streetscape • Pedestrian enhancements • Streetscape • Stormwater treatment Phase t diagram C wArf*riow PMP" 'j a c . . Public Realm Public realm refers to all land and area under the ownership of the city. This includes city streets and rights-of-way (ROW), parks and open space, and parcels of land or other assets that are used to provide individual and collective benefit and amenity to all residents and the general public. The greater value and power of the public realm is its ability to connect neighborhoods, businesses, schools, and parks and open space into a Luger whole greater than the sum of the individual elements. Streets and ROW make up a major (and connected) portion of the public realm and represent a sig ifscant opportunity to enhance and connect the community. It is critical to view streets, then, not as just conveyors for automobiles but also as multi -modal facilities that provide democratic accessibility for all and as form -givers and green space that increase the livability of the community. The result should be a greater sense of green throughout the District. 3, Patterns for a Neigis;wrhood Center Goats • AcknowIedge "no net loss,"yet aggressively seek new public space. • Improve the bike and pedestrian environment: make it safe and friendly, and include adequate parking area for bikes. • Create a community/civic building connected to GrandView Green (an outdoor public green space) that connects east and west and serves as an indoor/outdoor gathering space. • Create a prominent public realm of connected parks, green space, paths, plazas, and private open space — a legible green framework as the primary form giver. • Provide views within the District and maintain important viewsheds (such as the "grand view") for public use. • Plan for a safe, comfortable pedestrian environment that links public and private destinations north -south (neighborhoods, library, businesses) and east -west (neighborhoods, businesses, commons, City Hall). Images (top to bottom):Osaka,Jappwan Montreal. Canada, and New York New York. 4/05/12 8 n 3- Patterns fo., o NP40, norhood Cemex Folvealm 4 51stst -c At Ar 00, A" S2nd St 4$Ffl 10 6 em "toe" 4/05/12 9 V Public Realm / Open Space Diagram A. GrandView Conurbons & GrandView Steps C- GrandView Crossing 0. Arcadia Streetscape E Gus Young Streetscape F. Arcade Connection G. Vernon Streetscape H. Eden Streetscape Public Realm GrandView Commons For GrandView, the public works site provides a unique and singular opportunity to create a major new public realm amenity that will add interest to the area for all stakeholders, value to real estate, and provide a signature gathering place in the heart of the District. Beyond that, an even greater opportunity exists then to continuously link the businesses and destinations within the District to the surrounding neighborhoods and the city in general. This can begin immediately by simply investing in a safe and connected public sidewalk network, increment by increment. The larger vision of the public realm includes a community/civic building and GrandView Green, a connected network of public parks, public and private plazas, a new street (GrandView Crossing), sidewalk and streetscape improvements, and bike and pedestrian facilities. Ibis should include bridge enhancements on Eden over Highway IOQ, a pedestrian and bike bridge connecting the Commons with City Hall, and the potential to connect Eden and Brookside with local a bike path within the Canada Pacific Rail ROW. 3. ?attems for a Ne ghborhooa Center Montreal public green: This public green suggests the appropriate scale and character of GrandView Green. 4/05/12 I Patternb for a NeIgnborhood Center Grand\fiew Community Commons Diagram What/ Who Populates the Commons? GrandView Commons: GrandView Commons includes GrandView Crossing, Gmndlliew Green, and 2 new community/civic building. Banquet and Reception M o 14, al VANAM""i History/ Interpretive Meetings 4/05/12 Public Realm Vernon, Eden, Sherwood, Library The plan here is to focus on improving pedestrian connections between the Library/Senior Center and Jerry's, via a more street -like character that extends north from GrandView Square Street, including a well-defined pedestrian crossing at Eden. Sherwood is shown as a conversion for additional parking and may still allow movement through the area, though at a very reduced rate of speed. This conversion allows a small green space to connect the Library to Vernon. 1. Conversion of Eden Avenue would provide 50 additional parking spaces. 2. A small green space connects the Library to Vernon giving the civic building an "address" on Vernon. 3. Pedestrian crossings are created or enhanced to provide safe and visible locations (51st, 52nd, and 53rd Streets) on Vernon and to the west of the bus garage site on Link to cross the street. 4. The GrandView Square area is connected to Jerry's and beyond through the use of a streetscape that provides a well-defined pedestrian system as well as a more organized parking and circulation pattern. 5. Any additional street and block improvements (including curb cuts and /or traffic signals) should be considered after improvements have been made to Vernon and appropriate traffic and parking studies have been completed (also refer to potential alternatives in the appendix) 4/05/12 52M St 53rd St ' 3. Patterns for a Nedghborhma Center EEI ii! I J. a7 9 's74r-.tt Vernon, Gus Young, interlachen The pian recommends a number of street and traffic improvements that will provide greater predictability for the management of traffic, thereby creating a safer environment for bikes and pedestrians. ibis is made possible by building a new street (Grandview Crossing) and bridge (over the CP Rail corridor) that will connect Vernon east to Arcadia and then paired with Gus Young to create a one-wav street pattern. Anchoring the public realm is the GrandView Green, an approximately one-half + acre public space located on the north end of the public works site. 1. New street and bridge connection (GrandView Crossing), 2. GrandView Green public space and outdoor gathering area. 3. Gus Young (westbound)and Grandview Crossing (eastbound) are combined to create a one-way street pair. 4. Left turns from southbound Vernon to Gus Young are removed. 5. Improved pedestrian crossings on Vernon. 6. Complete Streets principles application would transfer Vernon into a 3 -lane section with bike lanes and pedestrian improvements. 7. Pedestrian plaza/bridgehead and future bike/ pedestrian bridge connection over Highway 100. S. Public steps of Arcadia. 3. Patterns for a Neighborhood Center , 5 GusYoamgCnift.;L- _��l } *1WOF City . Parking .' TM Ramp t .% CivK &tkldirg _ f r � i jonys -" t 4/05/12 �N., Public Realm City Hall With the future addition of the split -diamond interchange for Highway 100, the east side could see some significant changes with the public realm, land use, and improved pedestrian/bike environments. 1. Frontage mad associated with the split -diamond interchange. 2. Excess land from Minnesota Department of Transportation (MnDOT) could be used for underground parking (with a green roof deck) and future community/civic use. 3. Strategy would provide an improved/expanded FrankTupa Park and setting for the historic Cahill School and Grange Hall. 4. Grange Road alignment is "rationalized" to provide a more efficient parking layout and allow for a small civic green (5) in front of City Hall. 5. Pedestrian/bike bridge connects to west side of Highway 100. 6. Eden is shown as a "parking" street to provide additional supply for City Hall. 4/05/12 3. patterns fo- a Neighborhood Cente' 40 6 is z - C Transportation The Grandview area street and movement network is primarily composed of Vemon/50th Street (reliever/augmenter arterial), Eden (local street, state -aid facility) and the multiple ingress/ egress ramp system of Highway 100 (designated a principal arterial).There are other local streets, but most provide limited service (such as Summit Avenue) or access that dead ends (such as Brookside off Eden). "The highway interchange has several on and off ramps that, according to MnDOT, are redundant and/or unsafe. Vernon is a county facility that, south of InterIachen, has seen a reduction of average daily traffic over the past 10 years. Eden provides a secondary connection within the District east and west over Highway 100. Eden is designated the primary bike route through the District, Vernon and Interlachen are designated as secondary routes. There are two major recommendations that support the overall movement and transportation goals of the plan. First, the Framework proposes that the Highway 100 interchange be reconfigured into a split -diamond interchange to better manage through -traffic and to provide improved local access/circulation via frontage roads east and west of the highway. Over time, this would provide a more connected Iocal system (i.e., more local streets) with direct access to Highway 100 via the frontage roads. Second, the Framework proposes a new east -west street along the north half of the public works site (spanning the CP Rail corridor) connecting to Arcadia from Vernon, that would be paired with Gus Young Lane to provide a one-way 4/O5/t 2 3. F `.tG*sts for a NerghhorhoW Cents. circulation pattern. It would operate as one-way in (eastbound) from Vernon on the new GrandView Crossing, and one-way out (westbound) to Vernon/ Interlachen on Gus Young Lane.1his pattern would eliminate the Ieft hand turn from Vernon (southbound) to Gus Young Lane. Bike improvements would focus on more lane area and identification along Vernon and Eden, consistent with Living and Complete Streets principles. Over the long term, east -west bike and pedestrian access would be improved by adding a new bridge over Highway 100 that would connect the GrandView Commons to Tupa Park, City Hall, and the Minnehaha Creek mill area. In addition to more bike parking facilities in the District, the plan recommends an off-road option within the District: an at -grade bike path alongside the CP Rail ROW from Eden connecting to Brookside. Functional Class • Highway 100: Principal Arterial. • 50th Street: A Minor Augmenter. • Vernon Avenue: B Minor Connector. • Interlachen Boulevard: Major Collector. • Eden Avenue: Local Street. Traffic Volume • 13,000-23,000 AADT along West 50th Street/ Vernon Avenue. • 4000-8000 AADT along Eden Avenue. Goals - Support a more efficient, compact, and safe interchange access to Highway 100 from Vernon and Eden. • Create a more bike and pedestrian friendly environment by applying Complete Streets and Living Streets principles to Vernon, Eden, and the local street network. • Create an improved circulation and access network between public streets/parcels and private development/destinations. • Create an enhanced parking environment that, in part, depends on shared, centrally -located District parking supplies. • Partner with Metro Transit to implement a community -scale Park and Ride and bus turnaround loop in the area. • Complete the historical transition of Vernon from old Highway 169 to a local District street. • Identify and implement a demonstration project for "Complete/Living" streets principles. • Provide additional auto, bike, and pedestrian connections east and west in the District. • Maintain and improve parking, access, and circulation in the short term for convenience, retail, and service uses. • Complete the pedestrian and bike system. Make bikes and pedestrians a priority and allow for a safe crossing over Highway 100. • Take a leadership role related to the Highway 100 interchange. Build the `reason platform" for multi -modal access and gateways. • Preserve the CP Rail corridor for future, possible public transit, and non -motorized movement/ connection in the District. • Reduce congestion by providing safe travel choices that encourage non -motorized transportation options, increasing the overall capacity of the transportation network. Transportation District Street Framework 'The movement framework for the District begins with addressing policy issues like the adoption of the Living Streets principles and applying Hennepin County's Complete Streets policy, as well as considering larger and more long term ideas like reconstructing the Highway 100 interchange using a "split diamond"configuration. This approach accomplishes a number of objectives that meet the District Principles and provides an incremental approach to addressing change over time. The existing slip ramp location off the southbound ingress ramp would be retained but would be combined with an additional connection to Gus Young as part of the one way frontage road system. Traffic would be controlled at four signalized intersections. In the short term, there is an opportunity to begun implementing streetscape, bike, and pedestrian improvements. Another important recommendation is to implement the GrandView Crossing/Gus Young one-way street pair that will help manage traffic access and circulation in the upper core of the District. 3. Par erns for a Nvghno!hcod Centor s. � 9 A fI 4 hne u CompWeA_Mngstreetsiurt --nems x; Private stree"Cam 9plitdiammd humhange Newt anpronee bridges 4/05/12 L J Y :.:_ 3. Patterns frac a Neighborhood Center Transportation District Street Framework Existing Proposed 4/OS/12 Is, Fes' 4� 0 CL %A Transportation Parking • Consider the use of the current city parking ramp (located behind jerry's) to accommodate future park and ride patrons and general parking district supply, increase the capacity of this structure in the future if economically possible/ practical.. • 'Ihe public works site should be considered as a location for a Metro Transit park and ride facility as a way to provide parking to weekly commuters and to provide parking for a community/civic building, public green, residences and other uses. In addition, the top level (deck) of this structure is intended to serve as the GrandView Green, the major public realm amenity in the district. • Additional parking (structure) is proposed to the south and contiguous to Jerry's grocery store to provide better service access to the loading area and provide additional parking supply. 4/45/12 I Patterns for a Neighborhood Cute• Z t , IF P i i x parkjng beneath buUdings New access to eras** Surfaw lots P Existieg ramp --; DlrecUonoftnNfic Transportation Park and Ride Options evletro Transit operates the #587 Express route through the Grandview District before turning north on Highway 100 to downtown.'Ihey have a well documented market that they serve in southwest Edina, and board riders on a daily basis who are parking in front of the library, in the city ramp, and in front of a number of businesses.7hey are highly motivated to locate a "community" scale park and ride facility that would accommodate. no more than 200 cars. At least two sites have the potential to serve this need: the existing city ramp and a potential structure on the public works site. The existing city ramp is currently undergoing a construction project (new water treatment plant on the ground floor) and according to the city, this would make adding additional levels problematic. Access will also be an issue as well when the new Grandview Crossing is built. The city does think additional parking could be located over Brookside behind and east of Jerry's. Under the right conditions and with some minor improvements, the public works site could be converted into a park and ride lot tomorrow. This would be an interum solution (a similar scenario involving the site as an interim use for the Edina bus garage could also be considered).'Ihe advantage of locating a park and ride on the public works site is that it is a fee simple site that could be used with little change to existing conditions. In general, a park and ride could provide a surplus of parking during nights and weekends, and serve overflow parking in the District as well. 4/05/12 Pari€="as fo, a Nlogilbor tcpd Cen[=r A Use existing ramp 344 Access issues C New ramp in'doverieaf' rda long term 8 New ramp on pork watt site 280 Fee sagpie $87 Ezp M Route i UW" bus stops U 3. Vatte!ns for a Neigh b0rhoad Ctnte Transportation Vernon Avenue Right -Sizing South of the Interlachen intersection, Vernon Avenue ~would be reconfigured into a three lane, divided section that would better accommodate local traffic movement, provide a dedicated bike lane, and capture some of the ROW for pedestrian improvements and street crossings. bice bike nvatk=3 Gane L drive Zane— edian drive lane t lane boukward�lL'std�ew M 8 6' 12' j varies Ir LL! 5' 6' i r r r jq At.,..... ::MM��M►� ,.,�.,..„-n«��w�rr.. _ ��lr�wr+�R'.,=�;.,._.. .,Tr! Proposed Section for Vernon Avenue Existing Section for Vernon Avenue drive lane drive lane drive lane r..... ~ drive We tr 12' t2' 12' 4/05/12 8 Vernon Avenue Looking South:A new three lane section would allow additional space for biles and pedestrians, and provide controlled left tum lanes. Transportation Highway loo improvements A major proposal involves the short term and 1.00 long term configuration of the Highway H' interchange. The plan proposes a "split -diamond" arrangement that would manage access on and off the highway at signalized intersections. These intersections would be at Vernon and Eden, and would connect with parallel, one-way frontage roads. This configuration would allow regional traffic to clearly and safely access the highway and still move into the District with predictability and safety. Long term prospects might include the transfer or unused MnDOT ROW for local and community uses such as civic building sites, future bus rapid 7 transit support, parking, and open space. 4/05/12 3, Parzefns faf a Netin'--o'r1=1 Center W -k 15;0, OPEN, 0 a Long Term improvements Transportation Bicycle Improvements Bike lanes are shown for Vernon, a secondary bike route, and Eden, a primary bike route, through the District_7he lanes are shown with enhanced paint and striping as well as additional lane arta. A potential bike facility using the CP Rail right-of- way or adjacent land could connect Eden, at grade, to Brookside, thereby providing an off-road option to move through the District, 4/05/12 3. aatterns for a Neaghksorhooc Cense- bp OJJ •�`..-' °■ ;� fir. .�- . i 1 t Primary bike routes i i Semodary bike routes Trac{ fon CP ROPY) Transportation Bicycle Improvements Eden Avenue Existing Proposed Precedent 4/05/12 3. Patterns for a Neighborhood Censer Vernon between Eden and Interlachen Existing Proposed Precedent Vernon south of Eden Existing Proposed Sustainability One dictionary defines sustainability as: • The ability to be sustained, supported, upheld, or confirmed_ • The quality of not being harmful to the environment or depleting natural resources, and thereby supporting long term ecological balance. For Grandview, sustainability is about how the natural and manmade environments coexist in a way that limits and/or prohibits harmful impact on the environment now and for generations to come. But it also has meaning for how the community and businesses will be sustained, supported, and upheld. One is not isolated or independent from the other, a comprehensive, long term definition of sustainability should guide how the District and the community move forward with goals, recommendations, and actions. Recent Activities Sustainability is a broad and deep subject that is constantly being rcfined from principles and policies to products and practices to financing and implementation—perhaps so much so that it may seem difficult to determine where to begin and what next steps should be taken. For GrandVicw; it seems practical to review some of the recent decisions and actions the city has taken that will provide a foundation for how the District will grow, change, and redevelop. • Edina Energy & Environment Commission: Solar/wind ordinance amendments task force. City staff is reviewing proposed ordinance. 4/05/12 ?. Riverns for a Neighi»rhood Center, PACE Financing. The Edina City Council unanimously adopted the Edina Emerald Energy Program November 15, 2011, making it the first Minnesota city to take advantage of Property -Assessed Clean Energy (PACE) legislation. PACE, which was approved by the state Legislature in 2010, allows property owners to have the cost of energy efficiency and conservation improvements assessed to their property and paid alongside property taxes. GrandView Tire &Auto, 5415 70th Street West, used the tool for the necessary financing to install a 27 -kilowatt solar panel system on the already green auto shop's roof. Yew Public Works Facility: The public works building was built with sustainability in mind. It has geothermal heating and cooling and used recycled materials, and its landscape was designed to minimize the development's impact on the environment. A rain garden at the corner of 74th and Metro Boulevard holds and infiltrates water from sloping parking lots with curb cuts to direct the water to native grasses and plants. • City Hall: Installation of solar panel project in Fall of 2011. City Council Living Streets policy: Recommendation of the Edina Transportation Commission (ETC) to establish a comprehensive Living Streets Policy that integrated all modes of transportation and addressed issues such as traffic calming, stormwater management, promoting active living, community feel, improving walking and biking, and enhancing urban forests. If approved by the Council, the ETC would work in collaboration with staff to prepare the policy for the Council's future consideration. Mr. Sullivan reported a $15,000 grant was available to initiate the creation of this policy, which may cost S60,000-5100,000 to complete. Adoption of MinesotaGreenStep Cities program, 2011: On January 18, 2011, Edina passed a council resolution to become a member of the Minnesota GreenStep Cities program. Minnesota GreenStep Cities is a voluntary challenge, assistance, and recognition program to help cities achieve their sustainability goals through implementation of 28 best practices. Each best practice can be implemented by completing one or more specific actions from a list of four to eight actions. These actions are tailored to all Minnesota cities, focus on cost savings and energy use reduction, and encourage innovation. Sustainability Greenstep`s 28 Best Practices Buildings and Lighting 1. Efficient Existing Public Buildings: Work with utilities and others to assess and finance energy and sustainability improvements of existing structures. 2. Efficient Existing Private Buildings: Work with utilities and others to assess and finance energy and sustainability improvements of existing structures. 3. New Greta Buildings: Construct new buildings to meet or qualify for a green building standard. 4. Efficient Building & Street Lighting and Signals: Improve the efficiency of public and private lighting and signals. 5. Building Reuse: Create economic and regulatory incentives for redeveloping and repurposing existing buildings before building new. Land Use 6. Comprehensive Plan and Implementation: Adopt a Comprehensive Plan and tie regulatory ordinances to it. 7. Efficient City Growth: Promote financial and environmental sustainability by enabling and encouraging higher density housing and commercial land use. S. Mixed Uses: Develop efficient and healthy land patterns. 9. Efficient Highway -Oriented Development: Adopt commercial development and design standards for highway road corridors. 10. Conservation Design: Adopt development ordinances or processes that protect natural systems. 4/45/12 3, Pm: r rtI5fo! a Re1gf1 crhWdCenter Transportation 11. Complete Green Streets: Create a network of multi -modal green meets. 12. Mobility Options: Promote active living and alternatives to single -occupancy car travel. 13. Efficient City Fleets: Implement a city fleet investment, operations, and maintenance plan. 14. Demand -Side Travel Planning: Implement Travel Demand Management and Transit - Oriented Design. Environmental Management 15. Purchasing: Adopt environmentally preferable purchasing policies and practices. 16. Urban Forests: Increase city tree and plant cover. 17. Ecologic Stormwater Management: Minimi c the volume of and pollutants in rainwater runoff is. Parks andTrails: Enhance the efty's green infrastructure. 19. Surface Water Quality: Improve local water bodies. 20. Efficient Water and Wastewater Facilities: Assess and improve drinking water and wastewater facilities. 21. Septic Systems: Implement an effective management program for decentralized wastewater treatment systems. 22. Solid Waste Reduction: Increase waste reduction, reuse and recycling. 23. Local Air Quality: Prevent generation of local air contaminants. Economic and Community development 24. Benchmarks & Community Engagement: Adopt outcome measures for GreenStep and other city sustainability efforts, and engage community members in ongoing education, dialogue, and campaigns. 25. Green Business Development: Document the use of assistance programs for green business and job development. 26. Renewable Energy: Remove barriers to and encourage installation of renewable energy generation capacity: 27. Local Food: Strengthen local food and fiber production and access. 28. Business Synergies: Network/cluster businesses to achieve better energy, economic, and environmental outcomes. Sustainability Goals • Take a position on sustainability; be a model for citywide sustainability. • Define incentives to attract "Best -in -Class" development that deliver highest levels of sustainable design. • Take advantage of"free" resources: wind, rain, and sun. • Reduce heat island effect and create a pedestrian environment that is pleasant, shaded, and visually interesting. • Address stormwater runoff in all phases and facets of the District. Build on existing infrastructure. • Take advantage of available partnerships/funding. • Create District (not separate site) solutions. • Apply GreenStep Best Practices. Recommendations A number of recommendations should be considered for the District and emerge from what is being done by the City Council, Energy & Environment Commission, Transportation Commission, Planning Commission, other boards/ commissions, and various stakeholders. The GreenStep Cities best practices are an obvious start to how these apply to the District. Beyond that, it will be important to define the District in an organizational manner so that roles and responsibilities can be defined and actions coordinated. A good example would be how a 3. Patteins fo> a Neigh borboot Cent +r District committee on sustainability could begin to define the "CrandView Works"—a sustainable practices approach for how water, waste, and energy are addressed from a District point of view. For Grandview, there are three levels of approach and opportunity that build from what is being done today in the District (in some cases by individual businesses or owners) and lay the groundwork for a sustainable strategy: 1. Work from existing strengths and build the foundation • Respond to existing plans„ policies, and best practices already in place (local, county, and regional policies). - Educate District stakeholders about best practices, case studies, etc. • Establish a general communications structure and forum for what is being done. • Consider new policy to focus on redevelopment areas like Grandview with sustainability guidelines. • Stormwater management policy at the District level (works with both watersheds). • Pilot projects) for solar light installation (pedestrian and parking areas). 2. district Systems • Stormwater strategy under parking collection/ storage/treatment/reuse. • Recycle/reuse building materials (after demolition). • Grey water use. • Trash collection and recycling within the District beyond what is currently required by the city. • Consolidated organic recycling focused on restaurants in the area. - Generate alternative power for specific uses/ needs. • Green and white roofs. 3. Closed loops • Recycled stormwater into drinking water supply. • Recycled grey water into drinking water supply. • Off -the -grid. • Green buildings -Lem carbon. Sustainability Energy "►,� Center €: Mississippi River 3. Pat -terns for a Neighborllood Center :i' E y i �Lyj•'+'{'GVVR J� Xk J I ^\HeMbw `�a'ai • 4 4/05/12 4. Moving Forward with a Purpose 4/05/12 Implementation Strategy 1. Adopt the framework as a part of the Comprehensive Plan. As a policy document, the Comprehensive Plan offers the ability to guide future development in the Grandview District even in the absence of more definitive pians. ince adopted, the framework provides significant context for determining further directions and actions in the Grandview District. 2. Establish an Implementation Steering Committee using citizen volunteers to guide the effort, including providing direction for key remaining areas of the framework, with working groups as needed to support the work of the implementation Steering Committee. An over-riding objective of the Grandview District planning process is to utilize local citizens as experts in defining directions for an area identified in the Comprehensive Plan as a location where the potential for change exists. With significant investment of time, talent, and energy; in addition to the local knowledge that has been developed through the Small Area Guide process and the Small Area Plan process, it is logical that the process of planning using local citizens to guide the process should continue. 'the process to be pursued should, as in past efforts leading to the framework, be defined by the citizen volunteers. 4/Q5/t2 4. Mawng Poriaird zi Ptirpme 3. Evaluate the Grandview District small area planning process as a means of engaging citizens in local planning. As indicated in the Comprehensive Pian, several areas of potential change remain in the community. An objective review of the Grandview process will allow the city to determine whether it should be replicated, modified, or abandoned as a local planning tool. 4. Initiate a process led by the implementation Steering Committee to provide direction for key remaining areas of the framework. Remaining key decision points, many of which are interrelated but all of which must he defined in terms of the approved Framework, include: • Transportation elements • Density and height • Housing affordability • Financing • Design and development guidelines • Community Building 0 5. Set a plan for the evolution of the District. The planning process was established with the understanding that the Grandview District would redevelop incrementally in concert with a vision defined by the community: A key aspect of the plan, and one that can be best defined once several of the decision points in Step 4 (above) have been advanced, is to determine a logical, sustainable, and reasonably definitive plan for its evolution. 6. Provide regular updates to the City Council. A Steering Committee charged with guiding the further development of a plan for the Grandview District cannot act independently of other actions of the city, just as the area itself cannot evolve independent of the rest of the Edina community. With regular updates, the evolving pian can be assured that it aligns with other policies of the city. 4, Moving Forward with a Purpose Implementation Generalized Phasing Pian l� ':sem 1i ,3-ta.yeaa y. 1. Policy and Regulation This Framework recommends (consistent with A generalized phasing plan is shown that organizes the Comprehensive Pian) that the District evolve phasing into three simplified increments with the from a Community Commercial Node (pg. 4-31 understanding that a variety of conditions will Comprehensive Plan) into a mixed-use center. influence actual investment and implementation. However, the Pian also suggests a vision that may not be completely consistent with current zoning including how use, built form, and parking may be regulated. Concurrent with other implementation activities, zoning revisions, including the potential 4/05/12 M use of a form -based code and design guidelines will be addressed by the Implementation Steering Committee after approval of the Framework by the City Council. 2. Phasing, Development & Finance The following graphic begins the discussion about how to best arrange and prioritize the public land parcels (public works site and school bus garage site) so that new investment and redevelopment can occur in a timely manner and in response to market and community forces. Central in this discussion is the school bus garage site which, when a new garage site can be found, can include new commercial/office uses, replacement of existing uses, expansion of businesses in the district currently in need of more space (such as the municipal liquor store), and parking. This could help set the stage for how next steps could be accomplished including initial investment on the public works site, parking and circulation enhancements/additions, and Eden Avenue improvements. In addition, a community building / public green programming group should work during this phase to determine appropriate program and uses. Implementation Major Recommendations Immediate < 1 year 1 Development Framework approval 2 Policy for implementation/finance 3 Create Implementation Committee 4. Implementation Committee should address programming of community / civic building 5 Create sustainability guide from GreenStep b TIF District 7A Design Guidelines 7 Form -based code for mixed use center 8 Green building standards required for district 9 Prepare Phase 1 Master Plan 10 Address Lifecycle and affordable housing 4/05/12 1-5 Years Land Use 11 Bus Garage site redevelopment 12 Townhouse units on public works site 13 Residential on Warner site/OLG 14 Community / Civic building Public Realm 15 Grandview Green over parking structure 16 Arcadia Steps/and streetscape 17 CP Rail bike path from Eden to Brookside 18 Add tree lined streetscape and monument signs into Richmond Hills neighborhood TransportationJlnftastructure 19 Park n ride structure/green roof@public works site 20 Additional parking south of Jerrys 21 GrandView Crossing bridge & street 22 Eden Living Streets/streetscape 13 lane section 23 Eden Living Streets/Arcadia/Normandale 24 .New access from Eden to city ramp parking 25 Jerry's parking Streetscape 26 implement one-way pairs/remove left to G. Young 27 Reservation on public works site for rail transit use Sustainability 28 Grandview Works/Organics recycling center 29 Stormwater reuse & management policy 30 Solar pilot project for public lighting Implementation Major Recommendations 5-10 Years Land Use 31 Arcadia site redevelopment/include pocket park 32 Apt/condo units on public works site 33 Residential on Warner site/OLG/Phase 2 Public Realm 34 Small civic green at City Hail 35 Arcadia streetscape improvements Transportation/Infrastructure 36 Vernon Living Streets/streetscape/3 lane section 37 Dedicate right turn from Vernon to Interlachen 38 Reconfigure Eden as parking street@City Hall 39 Eden bridge pedestrian/bike enhancements 40 Vernon as primary bike route to GrandVicw Grassing 41 Consider `turn -back' of Vernon from County 42 Complete Streets: Library green space fronting Vernon 43 Reconfigure Eden as parking street Sustainability 44 Stormwater collection/treatment system 45 Grey water reusetirrigation, etc. 46 GmndView Works/gcothemUal at OLG fields 4/05/12 4, Moving For Jard with a Purpose 10+ Years Land Use 47 East frontage road site redevelopment 48 Civic development on excess MNDOT land Public Realm 49 Hwy 100 pedestrian/bike bridge 50 Green roof/space over underground parking 51 Add green space to Tupa Park 52 Include gateway walls/landscape w/interchange Transportation infrastructure 53 Hwy 110 split diamond interchange 54 Realignment of Grange Rd/Eden 55 Add Gus Young extension to frontage road Sustainability 56 Closed loop water supply system 57 Grandview Works/Alternative energy sources c ro till it[ JH I D I Alt 0! . . . . . . . . . . fit j 1 78 T 17 A F a 18 V -------------- ------- Implementation Financial Feasibility Feasibility of financing would include: (1) projections of anticipated costs associated with an initial Phase 1 plan and (2) options for revenues to pay those costs. This includes items such as street improvements, streetscape improvements, parking infrastructure, property acquisition (i.e., the bus garage), and community space (both potential "commons" or "public realm" space and "programming" or "community/civic center" space) At this point sial potential pools or "buckets" of revenue have been identified: 1. TIF, Abatement, and other statutory economic development tools; 2. Special Assessments; 3. Enhanced Property Tax revenues generated by private property development; 4. Other Public Sources of funds; 5. Non -Profit or Philanthropic Fundraising; and b. Citv Tax Revenues. 1.TIF, Abatement, and Other Statutory Economic Development Tools. Access some portion of existingTIF Funds; there may he an opportunity to use existingTIF funds. Determine the circumstances under which that is possible and the consequences ofdoing so. Create anew TIF district. TIF and Abatement tools provide opportunities to "capture" increased value and use it to finance some parts of redevelopment. Determine a sense of the potential 4/05/12 4, movo1q -(}rWalU Wd Th a Purpose numbers associated with these options and any limits on how the funds generated by the mechanisms can be spent. 2. Special Assessments and Related Tools. The City may assess properties that "benefit" from public improvements for the costs of these improvements up to the value of the benefit conferred by the improvements. Determine what types of costs are eligible to be recovered using this tool and on related tools that permit the creation of special districts to spread the ongoing costs of maintenance or other improvements. The 50th and France area may provide a model for this. 3. Enhanced Property Tax Revenues Generated by Private Development. This idea overlaps to a certain extent with #1 above (to the extent the enhanced value will be "captured" via TIF or Abatement). Obviously, the greatest increase of this type would be new development on parcels (like the Public Works and School Bus Garage sites). And consider the prospect of enhanced value emanating from redevelopment of sites (e:g., CSM, Eden 100, etc.) that are already on the tax rolls; having some models of what is reasonable to expect in this category is important. 4. other Public Sources of Funds. Consider the potential partnerships with other public entities that might be able to help with funding. The planning activities in this phase of the process have been funded by the Met Council; there Wright be a prospect of additional funds as planning and implementation move forward. Met Council representatives have also been dear in expressing interest in park and ride facilities. In addition to the Met Council, there are prospects for partnership with MnDO'T' (related to Highway 100) and Hennepin County (related to Vernon Avenue). To the extent that housing is a part of future redevelopment, there may be Regional, State, and/or Federal funds available to support those efforts. These any other prospective sources of "Other Public Funds" should be summarized and estimated. 5. Non -Profit and Philanthropic Fundraising. Consider that private contributions could help with funding. These potential sources of revenue fall into two categories: (1) funds from existing non-profit organizations interested in supporting particular development initiatives (e.g., housing, arts, etc.) and (2) fundraising campaigns created specifically for this effort. Determine what is reasonable to expect from each "bucket" and be able to determine whether the "gap" remaining after all other "buckets" are utilized can be filled by some kind of capital campaign. 6. City Tax Revenues. The other way to fill any retraining gap is with City tax revenues. Obviously, this is a decision for the City Council to make. It will be important to identify the size of the gap (if any) that will likely need to be filled by such funding. Implementation Possible Staging Questions 1. Interim use. Designation of City parking ramp for park and ride? 2. Disposition of School Bus Garage Site. Can City negotiate control? If so, when and what are the next steps? RFI? RFP? Negotiate existing user in the District to acquire and invest, 3. How can public works site be best utilized in the interim? As temporary (2-3 year) school bus garage operations? As surface park and ride until structure is built? RFI? RFP? Interim use could allow time for community building use✓need to be determined. 4. How to leverage adjacent parcels with timing of bus garage site redevelopment? 5. What is timing/feasibility of west side frontage road/southbound ramp configuration? How to advance that agenda in the short term (1-5 years). 6. Eden could / should be programmed for Living Streets improvements consistent with initial phases of development. 7. Feasibility of timing of street, bridge, and deck improvements. 4/05/12 4, Mowng ForwarC with a Ruracsc- W., -A' 2". CU Lrri a M oo i AmH 5. Appendix Implementation r., I C-11 A— Olen Fl= M, M .6's MI V. ITI T I FICT ZM72 4/05/12 SAppenciK Implementation A—ft 01— 4/05/12 I jr7 r -77i 4/05/12 S,AopenaN Implementation 4/05/12 P -11 A-.. M.. Development Program infrastructure and Streets LF AC Prk Spam Const$ Tax $ Sf/$ unit/sf unit cost lnhusbvctufe vemon(*) 950 $ 332,500.00 350 crosswalk 51 $ 25,000.00 roadway $ 1,500,000-00 Eden West(*) 395 $ 134,750.00 350 Eden East 200 S 70,000-00 350 crosswalk 3 $ 15,000.00 5000 roadway $ 1,500,000.00 Jerrys street 975 $ 306,250 $ 350 Gus Young ext(*) 150 $ 52,500 $ 350 OLG road 150 S 52,500.00 350 Bridges(EST) each GAfiew Crossing $ 750,000.00 est CP Rail $ 750,000.00 est subtotal $ 5,488,500.00 HWY 100 Split diamond (est) $10,000,000 Ped/Bike (est) $ 1,500,000.00 (-) -Does not include budgets for roadway impnwementslupdgmdeslmcmistmction - budgets are for fandscapelsoeetwapeonly 0 5, Aopendix Transportation 4,/05/12 10 5 I'M 5, Appendix Transportation Split Diamond N: N S 4/05/12 ,"L k � a � � W , ✓� aJ CL 0 N N Design Alternatives Arcadia and Gus Young 5,A.ppond4x Proposed illustrative Plan (p. 163 Alternative I Alternative 2 C:1 NQ N 4/05/12 is CITY OF EDINA MEMO 1Nn � City Hall , Phone 952-927-8861 Zq, Fax 9S2.826-0389 • www.Cityo(Edina.com ' U) �l� yC Date: April 11, 2012 To: Planning Commission From: Cary Teague, Community Development Director Re: Sketch Plan Review — 7501 France Avenue The Planning Commission is asked to consider a sketch plan request by Centennial Lakes Shopping Center to add a free standing 1,750 square foot coffee shop with a drive- through at the south side of the entrance to the shopping center (See narrative, site location and plans on pages Al A5.) This would replace the recently removed drive- through facility used by McDonald's. The building would be constructed to architecturally compliment the new Whole Foods Store by matching the brick, stone and metal work. The building would experience the most activity during the morning and noon hours, when the shopping center is not at its busiest time. As demonstrated on the following page, the project would comply with all minimum zoning ordinance requirements. A traffic study would need to be completed to determine impacts on adjacent roadways. City of Edina • 4601 W. 50th St. • Edina, MN 55424 City 1 Edina p �.n . tY ll/ 1Y� 1�1 �' .. "� r '+ ��i�ll!1( 3� ►r t w-:` . �I III�II it Nth\�t ItSII / ` It YY ii it/i 11*Ir � 1 t ,� �► {S S wr ww .. \'��M� ^ ■ i+. —�+� �'�"' � it �' I} ��t' ' l j.■�,� ■• rad � C` aw w •5M, 1■ i ii I/ TISO loll ii♦f4/r���, iiii�� r+��w.��N .•jll��at� v' r� �+��r � i �II11+r i� : .�.+«i."' �♦,� � �//Mr 1 � ` w� rti J�°°.°i r �♦�/ ; _ IU, �t�` ♦fain= ��ltr •C � „�*��w�4 r� � it t♦I�� �, I�ii� "''� ��,II\��Z'M.* :, Y, Ullf If~�tI►*p��4",,�w ♦I��I�{1'`1f. 'jjjj Y .. jY`i I.600111,11111'.tAAif 111111+1 {► „1� A� ♦i'A':i�� r r�i 1/ 1 iiiilu� -iii{ AU�>!1 toot I ` r 11111111 FFFF Ii r�♦+iw YII 111 =♦/i'oY of ♦♦+ ♦ ♦ ♦ ! tI= � Itii1iI1�C "�0'ts�'.,`'�i4• a� C 1 m :IIIIMIN AAS_. '..,.':►`:� milli t ��` '��aq�+�• - �� �� fir: '• AAS � ''' �,1= LSI. P10.3202824320400 V A� At roactiT �►�1R�ATIV & Centennial Lakes shopping center is proposing to add a free standing 1,750 SF coffee shop building at the Sip corner of the central entry off of France Avenue. The center Previously contained a drive through facility for McUonalds, but that has since been removed and parking was added in its place. The building fronts prance Avenue with an outdoor dining natio on the SW corner of the building. This building orientation will help to diminish the larger parking field along France Ave. Architecturally the building will compliment the new Whole Foods and new HomeGoods renovation, with the incorporation of matching brick, stone and metal work. The site plan features a drive through lane for seven vehicles with simple circulation through the site. The overall parking ratio remains at 5.511000. Coffee is viewed by the shopping center owner as a favorable, complimentary, use, as the coffee shops most active times are prior to loam, before the majority of other shops are open for business. Furthermore, the proposed use will provide additional landscaping opportunities especially in the widened turning radius. A traffic study is in the works and will be completed prior to making formal application. A3 wm