HomeMy WebLinkAbout3011721310077-12192015STORM WATER POLLUTION PREVENTION PLAN NOTES: 1. GRADING CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO CONSTRUCTION 2. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND SPECIFICATIONS, WHICH MAY INCLUDE SILT FENCE, SEDIMENTATION BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND SERVICEABLE IN THE FOLLOWING ORDER: A. ROCK CONSTRUCTION ENTRANCES A MINIMUM OF 50 FEET. B. SILT FENCE. C. COMMON EXCAVATION AND EMBANKMENT (GRADING ) D. SEED AND MULCH OR SOD. E. BIO_ ROLL BARRIERS IN FINISHED GRADED AREAS. F. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER WORK. 3. GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY AND NPDES PHASE II PERMITTING REQUIREMENTS AS WELL AS EROSION CONTROL MEASURES AS MAY BE SHOWN ON THESE PLANS OR SPECIFICATIONS. GRADING CONTRACTOR SHALL IMPLEMENT ANY ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED TO PROTECT ADJACENT PROPERTY. 4. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE GRADING CONTRACTOR WHEN DIRECTED BY THE ENGINEER. THE GRADING CONTRACTOR SHALL THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. 5. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER SO THAT CERTIFICATION OF ALL CONTROLLED FILLS WILL BE FURNISHED TO THE OWNER DURING AND UPON COMPLETION OF THE PROJECT. 6. ALL DISTURBED AREAS, EXCEPT AREAS TO BE PAVED AND/OR SPECIFICALLY DESIGNED BY A LANDSCAPE PLAN, SHALL BE COVERED WITH A MINIMUM 4" OF TOP SOIL. ALL DISTURBED AREAS SHALL BE SEEDED & MULCHED AT THE PRESCRIBED RATES WITHIN 72 HOURS OF FINAL GRADING UNLESS OTHERWISE NOTED. SEED MIX: MNDOT NO. 50B 50#/ACRE MULCH TYPE 1 2 TONS ACRE (DISK ANCHORED) FERTILIZER: 150#/ACRE RATE OF APPLICATION 20-10-10 ALL EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE WITHIN 200 LINEAL FEET OF ANY SURFACE WATER, MUST HAVE TEMPORARY EROSION PROTECTION OR PERMANENT COVER FOR THE EXPOSED SOIL AREAS YEAR ROUND, ACCORDING TO THE FOLLOWING TABLE OF SLOPES AND TIME FRAMES. TYPE OF SLOPE TIME (Maximum time an area can remain open when the area is not actively being worked) STEEPER THAN 3:1 7 DAYS 10:1 TO 3:1 14 DAYS FLATTER THAN 10:1 21 DAYS 7. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS SHOWN ON THE PLAN WERE TAKEN FROM A PLAN FURNISHED BY OWNER. 8. CONTRACTORS GRADING AND EROSION CONTROL OPERATIONS SHALL TAKE PLACE WITHIN THE CONSTRUCTION LIMITS. 9. IT IS REQUIRED THAT SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES BE CLEANED DAILY FROM PAVED ROADWAY SURFACES THROUGHOUT THE DURATION OF CONSTRUCTION. 10. PROVIDE TEMPORARY SEDIMENTATION BASINS AS DIRECTED BY THE ENGINEER. 11. ALL REQUIREMENTS OF THE LOCAL WATERSHED DISTRICT SHALL BE SATISFIED PER THE APPROVED PERMIT. 12. ALL EROSION & SEDIMENT CONTROL MEASURES SHOWN ON THIS PLAN AND IMPLEMENTED IN THE FIELD AS DIRECTED BY THE ENGINEER SHALL CONFORM TO THE MPCA 'S "PROTECTING WATER QUALITY IN URBAN AREAS: BEST MANAGEMENT PRACTICES FOR MINNESOTA". 13. DEWATERING AND/OR BASIN DRAINING DISCHARGE SHALL BE DIRECTED TO SEDIMENTATION BASINS WHEREVER POSSIBLE. ALL DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FORM EROSION & SCOUR THROUGH USE OF APPROVED ENERGY DISSIPATION DEVICES. 14. ALL SOLID WASTE/ CONSTRUCTION DEBRIS SHALL BE DISPOSED OF IN ACCORDANCE WITH MPCA REQUIREMENTS. HAZARDOUS MATERIALS SHALL BE STORED/ DISPOSED OF IN COMPLIANCE WITH MPCA REGULATIONS 15. CONTRACTOR SHALL USE RAPID STABILIZATON METHODS PER MnDOT 2573 AS NEEDED DURING THE COURSE OF THE WORK TO MAINTAIN CONFORMANCE WITH THE CITY AND NPDES II PERMIT REQUIREMENTS. THIS WORK SHALL CONSIST OF OPERATIONS NECESSARY TO RAPIDLY STABILIZE SMALL CRITICAL AREAS, TO PREVENT OFF SITE SEDIMENTATION AND/OR TO COMPLY WITH PERMIT REQUIREMENTS. THE WORK MAY BE PREFORMED AT ANY TIME DURING THE CONTRACT AND DURING NORMAL WORKING HOURS. THIS WORK WILL BE CONDUCTED ON SMALL AREAS THAT MAY OR MAY NOT BE ACCESSIBLE WITH NORMAL EQUIPMENT. THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE MnDOT STANDARD SPECIFICATIONS, THE DETAILS SHOWN IN THE PLANS, AND THE FOLLOWING: THERE ARE FIVE STABILIZATION METHODS APPROVED FOR THESE OPERATIONS. THESE METHODS MAY BE CONDUCTED INDEPENDENTLY OR IN COMBINATION. METHOD #1: APPLY TYPE 1 MULCH AND DISC ANCHOR METHOD #2: APPLY TYPE 1 MULCH AND TACK WITH TYPE 5 HYDRAULIC SOIL STABILIZER METHOD #3: HYDROSPREAD SEED,FERTILIZER AND TYPE 6 HYDRAULIC SOIL STABILIZER METHOD #4: HAND INSTALL SEED, FERTILIZER AND EROSION CONTROL BLANKET CATEGORY 3 METHOD #5: PLACE GEOTEXTILE AND RIP RAP CLASS II IN VARIOUS CONFIGURATIONS THESE EFFORTS WILL BE INCIDENTAL TO THE EROSION CONTROL BID ITEM. 16. CHANGE OF COVERAGE:FOR STORM WATER DISCHARGES FROM CONSTRUCTION PROJECTS WHERE THE OWNER OR OPERATOR CHANGES, (E.G.,AN ORIGINAL DEVELOPER SELLS PORTIONS OF THE PROPERTY TO VARIOUS BUILDERS) THE NEW OWNER OR OPERATOR MUST SUBMIT A SUBDIVISION REGISTRATION WITHIN 7 DAYS OF ASSUMING OPERATIONAL CONTROL OF THE SITE, COMMENCING WORK ON THEIR PORTION OF THE SITE , OR OF THE LEGAL TRANSFER, SALE OR CLOSING ON THE PROPERTY. 17. INDIVIDUAL SITE BUILDERS SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL NECESSARY EROSION CONTROL MEASURES AS MAY BE REQUIRED. REQUIRED ECM'S SHALL CONSIST OF BUT NOT BE LIMITED TO THE FOLLOWING: A. STAKED FIBER LOG ROLLS AT BACK OF ALL CURB EXCEPT AT CONSTRUCTION/DRIVEWAY ENTRANCE. B. SILT FENCE ON ALL DOWN GRADIENT SLOPES FROM CONSTRUCTION AREA. SILT FENCE SHALL HAVE THE BOTTOM DUG IN WITH SOIL FIRMLY COMPACTED. C. ROCK CONSTRUCTION ENTRANCE HAVING 1" TO 2" CLEAR ROCK OVER GEOTEXTILE FABRIC. D. STREET CLEANING AS MAY BE REQUIRED SHOULD VEHICLE TRACKING OCCUR. INDIVIDUAL SITE BUILDERS ARE REQUIRED TO MAINTAIN ECM'S UNTIL SUCH TIME AS INDIVIDUAL YARDS/VEGETATION ARE ESTABLISHED. 18. CONTRACTOR SHALL PROVIDE A TEMPORARY SEDIMENTATION BASIN ON SITE FOR CONSTRUCTION WASH OUT USE. TEMPORARY BASIN SHALL BE LOCATED AS TO PROVIDE EASY ACCESS FOR CONSTRUCTION VEHICLES AND CONCRETE TRUCKS AS NECESSARY. 19. INLET SEDIMENTATION CONTROL IS TO BE PROVIDED TO ALL STORM SEWER CATCH BASINS THROUGHOUT CONSTRUCTION. MEASURES APPLIED SHALL COMPLY WITH BEST MANAGEMENT PRACTICES FOR MINNESOTA AND APPLICATIONS OF NPDES PHASE II AS APPROPRIATE FOR PHASE OF CONSTRUCTION. STORM WATER POLLUTION PREVENTION PLAN SCHEDULE OF INSTALLATION & MAINTENANCE LTEM. INSTALLATION INSPECTION & MAINTENANCE REMOVAL INSPECT & MAINT. AFTER TRIBUTARY PRIOR TO COMMENCEMENT AFTER EACH RUN-OFF DRAINAGE AREA IS SILT FENCE OF EARTHWORK OPERATIONS. EVENT. REMOVE SEDIMENTS RESTORED. AS REQUIRED. ROCK CONST. PRIOR TO COMMENCEMENT INSPECT REGULARLY. PRIOR TO PAVING. ENTRANCE OF EARTHWORK OPERATIONS. MAINTAIN AS NEEDED. SEED &MULCH AFTER FINAL GRADING INSPECT & MAINTAIN NO REMOVAL AFTER HEAVY RAINS. NECESSARY. OPERATIONS. REPLACE WASH-OUT AREAS IMMEDIATELY. INLET PROTECTION UPON INLET CONSTRUCTION WHEN 1/3 CAPACITY OF AFTER TRIBUTARY AREAS BMP IS REACHED ARE FULLY RESTORED NOTE: CONTRACTOR IS RESPONSIBLE FOR INSTALLATION, MAINTENANCE AND REMOVAL OF ALL APPLICABLE EROSION & SEDIMENT CONTROL ITEMS. WIRE MESH REINFORCEMENT -7 (OPTIONAL) METAL OR WOOD POST OR STAKE ENGINEERING FABRIC FABRIC ANCHORAGE TRENCH BACKFILL WITH TAMPED NATURAL SOIL DIRECTION OF �! RUNOFF �6 INCH MINIMUM 2' -NATURAL MIN. SOIL-. :..: '.6.: INGFi :MlNfkilllMl. NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES. TYPICAL INSTALLATION FOR SILT FENCE (SECTION 6.3, MPCA'S "BEST MANAGEMENT PRACTICES") EROSION & SEDIMENT CONTROL PLAN FOR: PROPERTY ADDRESS: 5110 Kelsey Terrace, Edina, Minnesota. LEGAL DESCRIPTION: Lot 12, Block 2, PARKWOOD KNOLLS 27TH ADDITION, Hennepin County, Minnesota. Q0 Q W E T 1" X 2" X 18" LONG WOODEN STAKES AT 1' 0" SPACING MAXIMUM. STAKES SHALL BE DRIVEN THROUGH THE BACK HALF OF THE BIOROLL AT AN ANGLE OF 45 DEGREES WITH THE TOP OF THE STAKE POINTING UPSTREAM. PROVIDE 8" TO 10" OF EMBEDMENT DEPTH. STRAW OR WOOD FIBER —j 6" TO 7" DIA. ROLL ENCLOSED IN PLASTIC OR POLYESTER NETTING FLOW Is, I " �D2 I I 1 1 1 1 I F I AIG D R A � I MF"T �?s --INSTALL BIOROLLS IN SWALES AS NEEDED Room on MEN ' ' ' ' I�` �,•���C INSTALL & MAINTAIN - x , -I m SILT FENCE AT \ \ 40 / ? f \ GRADING LIMITS •• ,��,, / / ' � ------INSTALL & MAINTAIN SILT FENCE AT Cb U ! 14 I YI■ ""T; ' ' Owl i. E A S E� E N T - ---- I � `• r�oe ..--- � , l I 8" - 10" EMBEDMENT DEPTH BIOROLL STAKING DETAIL GENERAL DESIGN GUIDELINES STORM FREQUENCY: 2 YR. - 24 HR. MAX. FLOW VELOCITY: 1.5 FT./SECOND MAX. DITCH GRADE: 1.5% - 3% MAX. DRAINAGE AREA: 2 ACRE BIOROLL DITCH CHECK �imc vv ur% vvuuu rIOLn 6" TO 7" DIA. ROLL ENCLOSED IN PLASTIC OR POLYESTER NETTING BIOROLL CATCH BASIN CHECK awl 0 •�■� GRADING LIMITS s�,1,_-\ .O 6 ,--INSTALL INLET CB S DIMENT PROTECTION V 3pObIt Cb ♦♦ L � 1 W j -hyo �' - �._ poSF°�°/ 30 I T ` i; �_\rs i 4 _to o ''` �..Sj ♦ / y BUl .00--- -/� - - rl�_ N7 I I I �N SEI I � =008 ' - Wig_\ ■ 56 1 "�' „ 2� v \ ACk , of ` 24 33 �S8 �., ■ A V 7 o ion ♦ , _ VA T I u, \ " i ` �;}ni *9� ♦ o 9S. S 1t 59/6 `ANT H 1 t 0 vv \ `AND UnU '301<42 , 954 l_ ♦ \ / ib JF 953`.., _- .9v^ \\ 9`s2-, \ \`v \ \ l 10 h � l , INSTALL & MAINTAIN- <~ SILT FENCE AT GRADING LIMITS 5 DESIGNED: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS 4 DO PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AMANDERSON � D ��O Anderson Engineering of Minnesota, LLC A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE 136051st Avenue North 3 STATE OF MINNESOTA. 100 2 DRAWN: PRINT NAME: TR GAMBAMMENGINEERING LE SuiDOPlymm ouuthth , MN 55441 1 / CHECKED BY: SIGNATURE: ENGINEERING • ARCHITECTURE • LAND SURVEYING 763-4124000 (o) 763412-4090 (f) N0. DATE DESCRIPTION OF REVISIONSTG DATE 12-18-15 LICENSE # 23137 ENVIRONMENTAL SERVICES • LANDSCAPE ARCHITECTURE www.ae-mn.com LJ IV V o :) �� w 4 aftt •�■ law ■•■ v'' 4 `\ -- INSTALL TEMP. ROCK CONST. / P, ENTRANCE rn -r(:D \ W'q�R S / �? N SAN/ AR Sf 7 w JJJ� U VV CALL 48 HOURS BEFORE DIGGING: DIAL 811- N WE S 1 1 I 5l to L/ I�� � 0 20 40 SCALE IN FEET COMM. NO. PLOTTED: 14202 12/15/2015 EROSION CONTROL PLAN 5110 KELSEY TERRACE DRAWING NO. 14215 S-1 SHEET 2 OF 2 SHEETS i CALL 48 HOURS BEFORE DIGGING: DIAL 811- N WE S 1 1 I 5l to L/ I�� � 0 20 40 SCALE IN FEET COMM. NO. PLOTTED: 14202 12/15/2015 EROSION CONTROL PLAN 5110 KELSEY TERRACE DRAWING NO. 14215 S-1 SHEET 2 OF 2 SHEETS