HomeMy WebLinkAbout3211721130011-09092014BUILDING DEPARTMENT
SEF' - 2014 -
CITY JF EDINA►
INSTALL INLET
PROTECTION IN 2 CB )S
AT SE CURB RETURN
ON WARDEN AVE AT
TRACY AVE
2" x 2" WOOD POSTS F(ILTER FABRIC
RAFI-ENVIRO FENCE
4.0' O.C.[--,-ABOVE
PR ADE QUAL)
MIN. 30" - MAX. 36"
GRADE
DIRECTION OF I
DRAINAGE
BACKFILL 6" x 6" TRENCH
E UNDISTURBED SOIL
N
SILT FENCE NOTES:
1. SILT FENCE SHALL BE BLACK IN COLOR.
2. DIG A 6X6 TRENCH ALONG THE INTENDED
FENCE LINE OR MACHINE SLICE TO 6" DEPTH.
3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH.
4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL.
5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC.
6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED.
SILT FENCE DETAIL
STORM -
CASTING
(TYP)
CG -23 HIGH-FLOW
INLET INSERT - ,
PLATE
ASSEMBLY
OVERFLOW 12 -
TOP OF CURB BOX
so--
EROSION
-° BIO -ROLL
WARDEN AVEN U E "- 6" DIA.
EXISTING RECONSTRUCT
EROSION `��
SANITARY'APRON
BIO -ROLL �� WATER �.a
g 6" DIA.TC
SERVICES ----- . -
INLET
PROTECTION
TC IN
ELEV. = 908.52
!I in
■ N 909.15.
rAl
-' SILT FENCE 090" �
---�--' =------- ll ■ ,,.._•_.--• _-• )ROCK ■
INSTALL
NSTALL STANDARD NDARD
t_ CONSTRUCTION ')
IMPERVIOUS
■0a. ENTRANCE 09 PAVEMENT DRIVEWAY
' I
""0"""r •s '� AND SIDEWALK.
t,". -)i ����r� j -- i 1���
O SILT ��
1 ,.. / Lh 9i
FENCE �` - 6-
'= SILT FENCE
909.1
■ % / or
06.Ooo 11.7
1 .� �- .00 910.4 91(19 d9 0�4 y X10.6 9104 1 �.1•TEMPORARY 10 2 0.3•2 `�' STOCKPILE 910.6 I orI GARAGE FLR.
I ELEV. = 912.3 5
7-'/ _, 1 f
- 4 GSI RA GE I EX15 7-ING
M
_ -. O `� ' ` HOUSE
1 6, PROPOSED �/
13.7 _ �
906 3 0 � 911 �
,
ION 90 .6 - - -- _ i'\7
® y . _ _ HOUSE 1 1 . 09 , .
�.�
Y04- O 1
Ln
1
� 91 I . � 909.2
�D' TEMPORARY IJ
OVERFLOW #1- ■ ■
CENTER OF FILTER
ASSEMBLY C S T O C K P I L E
FABRIC
NOTES:
1) CONTRACTOR OPTION TO USE WIMCO INLET
PROTECTION INSERT OR EQUAL.
INLET PROTECTION DETAIL
AP_ ),5.96-1
902 �9 - 90 .6 1 10.3.. _ :_ 37.��4 ��
_ - 7T- 2.4 - _ 902.x• O
SILT / DECK .._
�•. 1 ,� .._. i 1�-- S I LT FENCE
JIM1 FENCEcio��- / / •, 1 r
9093
899.8 900.8// / •. �� �. 07.41
I z .90
SILT
'•, / // / / /FENCE ..■■ INSTALL POROUS
• .� / // ��,■■r■.•■ PAVEMENT PATIO,
` I •. � / � .••'���� � � I SEE SHEET 2 2
O �'� /' ,..•••3 °� T ,'F. 9,16.1 6, 5
I iU L WM:)r1GU RUUN
NOTES:
ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1
OR CA -2 COURSE AGGREGATE. (WASHED)
A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
'OCK CONSTRUCTION ENTRANCE DETAIL
1
� " A A •••• � PROPOSED SOIL '
•
1 ��a�R E AMENDMENT AREA
.r.1-- -RU- E _. PIC LF--- 1,250 S F, -
l
Ln UTIV ITY EASE SEE DETAILS ON
It
I
t
t
1
I 1(
ba
....,._. . _ ` SHEET 2--- '_777 966.0 N1189 5 / �� W 19J. 00 j ALJ
O I
0 I
PROJECT LOCATION
PART OF SECTION 32,
TOWNSHIP 117, RANGE 21,
HENNEPIN COUNTY, MINNESOTA.
LEGAL DESCRIPTION
LOT 8,
GREENLEAF MANOR,
HENNEPIN COUNTY, MINNESOTA.
SITE LEGEND:
•
Existing Property Line
-- -- --
Existing Adjacent Property Line
EXISTING CONDITION vs PROPOSED CONDITION
Existing Contour w/Elev. Text
------ ###
Proposed Contour w Elev. Text
EXISTING (SF)
Proposed Building
■mommommom■■■
Proposed Silt Fence
2,596
Proposed Inlet Protection
DRIVEWAY =
864
EROSION CONTROL NOTES
1. All devices necessary to control erosion and sediment (I.E.
perimeter silt fence, rock construction entrances, swales,
ponds, berms, ETC.) shall be installed prior to any other
construction operations.
2. Temporary erosion control soil stabilization shall be
completed within 72 hours of disturbed areas that are to
remain fallow and in an unfinished temporary condition.
Temporary stabilization to be completed in compliance
with MnDOT 2575 specifications.
3. After completion of final grading, exposed soils must be
permanently stabilized within 72 hours. Stabilization shall
consist of disc -anchored seed & mulch or sod as
allowed by City, or as proposed on City approved
landscape plan for the project.
4. The site must be kept in a well drained condition at all
times. The contractor shall be responsible for temporary
ditches or other means necessary to ensure proper
drainage. The building pad must be provided with a
positive outflow. This work shall be incidental to the
grading contract.
5. Entering/exiting of the site shall occur only at rock
construction entrance to reduce tracking of dirt onto
paved streets. Sediment tracked onto streets during
working hours must be reclaimed via street scraping and
sweeping at the end of each working day.
6. Temporary dewatering pump out to be discharged to a
sediment filter bag constructed of min. 8oz non -woven
filter fabric to provide silt and sediment removal from
storwater prior to discharge to appropriate drainage area.
POLLUTION PREVENTION NOTES
1. Solid waste: collected sediment, asphalt and concrete
millings, floating debris, paper, plastic, fabric, construction
debris and other wastes must be disposed of properly
off-site and must comply with MPCA requirements.
2. Hazardous materials: oils, gasoline, paint, and any
hazardous substance must be properly stored, including
secondary containment, to prevent spills, leaks or other
discharge. Restricted access to storage areas must be
provided to prevent vandalism. Storage and disposal
must be in compliance with MPCA regulations.
3. External washing of trucks or other construction vehicles _
is not allowed on site. No engine degreasing is allowed
on site.
4. No concrete washouts are allowed on site.
VEGITATION GROUND COVER SCHEDULE
1. Permanent turf ground cover shall include all disturbed
areas be covered with a minimum 4" topsoil and sodded
or seeded as allowed by City, or as proposed on City
approved landscape plan for the project.
2. Temporary ground cover shall be MnDOT seed mix 150
shall be applied at 100 lbs/ac. MnDOT Type 1 mulch
shall be applied at 2 tons/ac and disc anchored in areas
not covered by sod or erosion blanket.
3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied
at 200 lbs/ac. Disc fertilizer into top 3" of soil.
Specification reference is MnDOT 2575.
4. Dormant seed mix shall be used after November 1 or
when temperatures do not exceed 40' F, using some
rates specified above. No seed shall be placed on snow
or ice greater than 2" in depth.
5. Any seeded areas that do not become established with
vegetation shall be reseeded at Contractor's expense.
6. Erosion blanket shall be installed in seed areas with
ground surface slopes of 5HAV or steeper.
RESPONSIBLE PARTY
Contact information for the responsible party for erosion
control is:
CORNERSTONE HOMES, LLC - General Contractor
Gennodiy Sizonenko - Project Manager
612-598-5255 mobile
cornerstonehomes®hotmail.com
PROPOSED ELEVATIONS:
GARAGE FLOOR= 91 1.2
LOWEST FLOOR=903.5
FIRST FLOOR=913.0
TOP OF FOUNDATION=911.5
PEAK OF ROOF = 945.2
AVE. FRONT GRADE= 910.4
AVE. REAR GRADE= 906.3
VERIFY WITH CONTRACTOR BEFORE CONSTRUCTION
0 10 20 30
GRAPHIC SCALE IN FEET
Survey Data By:
Taylor an Surveyors
213 W. Broadway
PO Box 179
Monticello, MN 55362
763-295-3388
DRAINAGE HARD SURFACE
COMPARISON:
CORNERSTONE
EXISTING CONDITION vs PROPOSED CONDITION
LLC
5609 Warden
Avenue
EXISTING (SF)
PROPOSED (SF)
HOUSE FOOTPRINT =
1,745
2,596
DRIVEWAY =
864
1,280
.o
SIDEWALKS/STOOPS =
167
170
O
PATIO =
418
150
�►
SHED =
144
144
oft
SUB -TOTAL =
3,338
4,340
W
ADJUSTMENT VIA
W
POROUS PAVEMENT =
-150
TOTAL HARD SURFACE =
4,190
HARD SURFACE INCREASE
= 852
SF
(EXISTING vs PROPOSED)
25.5
O
AREA TO FRONT YARD =
1,826
2,515
AREA TO REAR YARD =
1,512
1,675
Benchmark:
Spot on top back of
curb at catch basin,
located near NE corner
of Lot 8.
Elevation = 909.15 feet
GENERAL GRADING NOTES:
1. Specifications applicable for this project: Current
standard specifications for the City of Edina; the
latest Minnesota Department of Transportation
Specifications for Highway Construction; and all
NPDES requirements except where modified by these
documents.
2. OSHA requirements shall be followed for all work on
this project.
3. The Contractor shall notify "Gopher State One Call"
48 hours prior to any excavation
(1-800-252-1166.)
4. The Grading Contractor shall verify all locations and
elevations of underground utilities with utility
companies prior to any construction, and
immediately notify the Engineer of any conflicts.
5. Final Plot shall govern for easements and lot
dimensions.
6. Any erosion control items necessary to protect
adjacent properties shall be constructed prior to the
start of excavation or grading work.
7. Erosion control maintenance formed b
e once shall be per y
the Grading Contractor, and removed as per the
Contract Documents or as directed by the Owner,
followed by all necessary restoration of disturbed
area.
8. The Grading contractor shall provide positive drainage
on the site at all times. Grading tolerances shall be
0.10' for hard surface areas. Grading tolerances
for the remainder of the site shall be 0.25'.
9. The Grading Contractor shall keep public streets,
parking lots, and travel ways clear of soil and
debris. Daily cleaning at the construction entrance
shall be performed, especially at the end of each
day's work.
EROSION CONTROL INSTALLATION SCHEDULE
1. Silt fence shall be installed or restored prior to any
construction. Silt fence shall be located as shown to
intercept runoff. The area located beyond the perimeter
silt fence shall riot be disturbed during construction.
2. Rock Construction Entrance shall be installed prior to
grading operations.
3. All storm sewer inlets shall have inlet protection
inserts installed. Inserts shall be "Rood rain -Top
Slob" or Road Drain -Curb dt Gutter" inlet protection
devices as manufactured by WIMCO (or approved
equal) and installed per manufacture's
recommendations.
4. All erosion control installations shall remain in place and
be maintained in good condition by the contractor until
the site has been re -vegetated, at which time it shall be
removed by the contractor. For proposed paved surface
areas, the contractor may remove necessary silt fencing
to construct roadway, while maintaining adequate erosion
control in adjacent areas.
5. Sufficient topsoil shall be stockpiled to allow for the
replacement of 4" topsoil for disturbed areas to be
re -vegetated.
6. The contractor shall schedule site grading, utility
installation and site construction so that the general site
can be mulched and sodded or re -seeded as soon as
possible soon after disturbance. Areas that will not be
subject to construction traffic shall be seed and mulched
or sodded within 72 hours of final grading.
EROSION CONTROL MAINTENANCE SCHEDULE
1. Erosion control measures shall be inspected by the
contractor's representative and maintained by the
contractor every Friday and within 24 hours after any
rainfall event larger than 1/2" until the project is
completed. Maintenance requirements are as follows: silt
fence - 1/3 height of fence or damaged, remove
sediment and/or repair fence within 24 hours; rock
entrance - refresh as necessary to conform to detail;
inlet protection inserts - remove sediment after each rain
event, clean or replace filter when clogged; surface water
- drain and stabilize, within 72 hours of discovery; street
sweeping - remove all sediment tracked onto paved
surfaces within 24 hours or as directed by City Engineer.
2. Replacement - Fabric shall be replaced promptly when it
decomposes or becomes ineffective before the barrier is
no longer necessary.
3. Any sediment remaining in place after silt fence is no
longer required shall be dressed to conform with the
existing grade, prepared, and seeded with appropriate
seed mix, as directed by the engineer.
4. Removal of the silt fence- Silt fences shall be removed
when they have served their useful purpose, but not
before the upward sloping area has been permanently
stabilized.
Porous pavement is proposed for rear yard
patio improvements in an effort to reduce
storm water runoff from the site adjacent
rear and side properties. Standard
impervious pavement is proposed for the
driveway and sidewalk in the front yard.
Rear yard area proposed hard surface is
163sf larger than existing condition. Rear
yard area storm water runoff and volume
reduction proposed by soil amendment based
on guidance from MPCA Minnesota Storm
Water Manual and other sources. Proposed
soil amendment area to provide runoff and
volume control equivalent to 3.9 inch rainfall
event on 163sf hard surface area. See
calculations on Sheet 2.
IT a4, 1 00 11
CLIENT:
CORNERSTONE
HOMES,
LLC
5609 Warden
Avenue
Edina, MN
55436
612-598-5255
4 0
d'
C
�
N
4 0
.o
0
O
V
�►
��„ Z
O O
oft
0
O
W
m
W
d'
N
4 0
O
�
�
m
O
m
W
O
O
V
O
O
O
U
FILE N0. 00499
-112
Storm Water and
e'sErosion Control Plan
1556oq wacde4l AL/C.