EXISTING BUILDING COVERAGE
Building O Sq.Ft.
Patios & Decks O Sq.Ft.
\
Drainage and
Utility Easement \
Toe of Slop
-14\\\\\\\\\ `81 \\ \
`tor cs'2)
il\c°
\\
\ 94.
oc V se
-
tt,/
d
•
N 88°46'02" -E-'146.91
Catch Basin RIM=950.08 (953.2)
;JP
9.
t'ftA
tf
traA
55.
2\
\
\\
25' Sstblk
C.11 T.
95•/6
1-9 #6)\ 5 EA
Adjacent Garage
\ GAR. FLR.=953.20
REPLACEMENT HOUSING
day of July , 2013.
6-12.5--A-eLsE y
Vicky & Tim Barzen Residence
SERVICES CONSORTIUM, LLC
FErErxrnr
Total Building Coverage 0 Sq.Ft.
Lot Area 19,039 Sq.Ft.
X of Coverage = 0.0 X
Denotes iron monument
Denotes found monument
Denotes existing elev.
Denotes proposed elev.
Denotes surface drainage
PORCH*
NOTE: 80 Sq. Ft. of porch is within front setback
Proposed garage floor elev.=953.67
Proposed top of foundation elev.=954.00
Proposed lowest floor elev.=945.00
PROPOSED BUILDING COVERAGE
Building 4,176 Sq.Ft.
Patios & Decks 478-400 allowable= 78 Sq.Ft.
(5x50+150)
Total Building Coverage 4,254 Sq.Ft.
Lot Area 19,039 Sq.Ft.
of Coverage = 22.3Z
•
x 000.0
(000.0)
File No.
14128 DEMARS-GABRIEL
LAND SURVEYORS, INC.
6875 WASHINGTON AVE. SO.
SUITE 209
Edina, MN 55439
Phone:(952) 767-0487
Fax: (952) 767-0490
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Registered Land Surveyor under the
Laws of the State of Minnesota.
As surveyed by me this 22nd
David E. Crook
cc
Minn. Reg. No. 22414 .4 /237g
Book—Page
Scale
1 "=20'
,f). I t7 41. 1.1- 0037
/DIMENT AND EROSION CONTROL NOTES
ONSTRUCTION SEQUENCING
1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE
Z INSTALLATION OF SILT FENCE OR BID—ROLL AROUND SITE
3. DEMOLITION OF EXISTING STRUCTURES IF ANY.
4. CLEAR AND GRUB.
5. STRIP AND STOCKPILE TOPSOIL
6. ROUGH GRADING OF SITE
7. STABILIZE DENUDED AREAS AND STOCKPILES
B. EXCAVATE FOR NEW HOME FOUNDATION
9. CONSTRUCT & BACKFILL FOUNDATION
10 CONSTRUCT NEW STRUCTURE
11. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR
SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
LEGAL DESCRIPTION
LOT 2, BLOCK 2, PARKWOOD KNOLLS 26TH ADDITION
LOT INFORMATION
Proposed garage floor elev.=(953.67)
Proposed top of foundation elev.=(954.00)
Proposed basement floor elev.=(945.00)
EROSION PREVENTION
TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND
CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND
GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE
STORMWATER.
VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE MUST BE MINIMIZED BY A ROCK
CONSTRUCTION ENTRANCE. STREET SWEEPING MUST BE USED IF THE ROCK ENTRANCE IS NOT
ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET.
SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFORE
ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN IN PLACE
UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED.
ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL
ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED.
STABILJZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES OR SWALES
MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER AND CONSTRUCTION IN
THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED.
TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT
SYSTEM (WITH PROPERLY DESIGNED ROCK DITCH CHECKS, 810 ROLLS, SILT DIKES ETC.) DO NOT NEED
TO BE STABILIZED. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING
USED AS A SEDIMENT CONTAINMENT SYSTEM.
PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24
HOURS AFTER CONNECTION TO A SURFACE WATER.
SEDIMENT CONTROL
SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, INCLUDING
CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS.
ALL EXPOSED SOIL AREAS MUST BE STAB1UZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT IN
NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE
HAS TEMPORARILY OR PERMANENTLY CEASED.
THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT
DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE,
MUST BE STABILIZED WITHIN 20 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF
DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 20 LINEAL FEET MUST BE
COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER.
THE CONTRACTOR IS RESPONSIBLE FOR PLANING FOR AND IMPLEMENTING APPROPRIATE CONSTRUCTION
PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION
PRACTICES THAT MINIMIZE EROSION.
CONSTRUCTION
ENTRANCE
trA
v2t
MINIIMEN-1111 2.60 ret.
0' ;Mack (95131etV
BitangWg=
q53.Cti
INLET,
PROTECTION \ ,.. I
N 88°460 —146.91 \ \ \\\1:\\‘‘: \\ \
\
\\\\
\
\
\ 1%06 \ \ \ %
\''' I \ ‘1A \ \ Os t \ \ \ \ \ '
\ I \ ‘ \ t t
\ ln \\_%\ ' VI 4'\ \ ....A i faCI °\ \ . \ \%,
\,,,,§„ \ ii \\ \ \ \ ....c.
sfi \ \ __A ..,.... \ ,o, \ ‘ \ \ \ \ \4,a
-P3..i‘t"\ t \ \\ \ \ \
\ \ \ t% \ \\%\ \ \ \ \ AnS‘
S \ ‘ \\ .\ \ \\\ '
t \ \\ \ \
80
—
lb-
/fp P1 1 ' PROOSED
GARAGE' ,„
vt, /r IST I /
/ 1
N
• \ gbvk
Val
Adjacent Garage CAR. FLR.=-953.20
g
TA
NOTE:
ALL ELEVATIONS SHOWN ON THIS EROSION
CONTROL PLAN ARE REFERENCED FROM
THE SITE SURVEY. ALL GRADING AND
CONSTRUCTION SHALL BE PERFORMED
BASED ON GRADES AND DESIGNS FROM
THE OFFICIAL APPROVED SITE SURVEY,
BUILDING AND GRADING PLAN.
AUG 2 1 2013
INSPECTIONS AND MAINTENANCE
THE CONTRACTOR IS RESPONSIBLE AT ALL TIMES FOR THE MAINTENANCE AND PROPER OPERATION OF
EROSION AND SEDIMENT CONTROL FACILITIES. THE CONTRACTOR SHALL AT A MINIMUM, INSPECT,
MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES
AND SOIL STABILIZATION MEASURES.
BASED ON INSPECTION RESULTS THE CONTRACTOR MAY AND SHALL MODIFY THE EROSION AND
SEDIMENT CONTROL PLAN IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM
WATER RUNOFF.
N 41°23'52
3.6 LEGEND
x 000.0
(00o.o)
DENOTES EXISTING ELEVATION
DENOTES PROPOSED ELEVATION
DENOTES SURFACE DRAINAGE
FINAL GRADING SHALL MAINTAIN THE EXISTING STORM WATER DRAINAGE PATTERNS TO THE EXTENT
POSSIBLE AND PRACTICAL AS TO NOT CAUSE ANY DAMAGE TO ADJACENT PROPERTIES.
STORMWATER, SEDIMENT & EROSION CONTROL CONTACT;
REPLACEMENT HOUSING SERVICES CONSORTIUM, LLC
LON OBERPRILLER
612-325-7999 (MOBILE)
952-636-2665 (OFFICE)
5200 WILLSON ROAD, SUITE 150
EDINA, MN 55424
STORMWATER
FINAL GRADING OF THE LOT SHALL PROMOTE SHEET DRAINING AND AVOID CONCENTRATION OF STORM
WATER FLOWS.
0ay- 4
0, •;;01( 4454i0liO4A404
ia,,,100e.,040.410041:fn :00:0,00‘,00,35
1.11.1mimmIJ
x DENOTES EXISTING FENCE
DENOTES SILT FENCE
DENOTES CB INLET PROTECTION
DENOTES ROCK
CONSTRUCTION ENTRANCE
1" = 201-0"
•
10 —0" 0 20'—O
çiyi0i Site
4931 W. 35TH ST. SUITE 200
ST. LOUIS PARK MN 55416
CivilSiteGtoup.com
Matt Pavek Pat Sarver
763-213-3944 952-250-2003
DEMARS—GABRIEL
LAND SURVEYORS, INC.
6875 Washington Ave, So. Suite 209 Edina, MN 55439 Phone:(952) 559-0908 Fax: (952) 767-0490
REPLACEMENT HOUSING SERVICES CONSORTIUM, LLC
5285 Kelsey Terrace
EDINA MINNESOTA
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AMA DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
MATTHEW R PAVEK
DATE 0/20/2013 UcENSE No. 44263
0116/13 8120/13
DATE
ISSUE/SUBMITTAL SUMMARY
DESCRIPTION
CITY SUBMITTAL
CITY RESUBMITTAL
_
STORM WATER
MANAGEMENT & EROSION
CONTROL PLAN
1 . 0