HomeMy WebLinkAbout3111721210012-08212013PD IF
919.5
0)\
-7
/ 917.6
x 917.6
916.7
916.3
916.3
91
coot"
50.
x916.3
916.0
MH 6916.5
916.6
x916.6 916.2
Residential
Temporary Rock Construction Entrance/Exit
,/.- ...-' .thli,
'14'
1:11$1:141..
6" minimum thickness
1112" to 3" washed rock
Inch minimum
SILT FENCE MUST BE
INSTALLED PRIOR TO
DISTURBING
VEGETATION
Fabric anchorage
irii backiill with
tamped nalural eon Direction of
runoff Bow
Natural ea •
12' minimum
Non -woven geotextlle drainage /
fabric under
Failure to install the Construction Entrance
before disturbing the site soils and/or failure to
maintain the Construction Entrance will result in
vv.glancoarcrourinnh, fh (-iht
(optional) Engineeling labric
Metal or
post or slake
6 inch minimum
Note: Depending upon configuration, attach fabric to wire mesh with
hog rings, steel poste with tie wires, or wood posts with staples_
Figure 5.3-2: Typical Installation for alit lance
-15' Initial length -To front yard setback
line after backf III
908.1 908.1
908;3 /
0 GAR.
(f) 7 914.0 5<- 0 7
913.1
< < /\ 916. 0/
2r,t.i.J
/ no (.0
h ci co - x 913.2 / o 6
Cn
908.8
PP 908.4
0/
915.1/
/x 913.6
919:7, /58.21,
RUSSELL P. DAMLO
ASBUILT EXISTING C
CALL FOR INSPECTIONS @ 952 82(5
with PERMIT NUMBER and ADDRESS
000.0 DENOTES EXISTING ELEVATION- -
(000.o) DENOTES PROPOSED ELEVATI41
INDICATES DIRECTION OF
916.78
918.13
909.59
HARDCOVER
LOT AREA: 26,005 SQ.FT.
HOUSE AREA: 2,179 SQ.FT.
PORCH AREA: 256 SQ.FT.
TOTAL = 2,435 SQ.FT.
COVERAGE = 9.36%
12 0 PO 00-CLUMP
15CCC°/ 916.6 •
x 916.1
916.2
916.3 1-‘--
Condition of Demolition/Moving
• 4' construction fencing shall enclose existing basement
perimeter and excavations with slopes steeper than I :1. Attach
fencing to minimum 5' posts buried l' and spaced at maximum
10" on center.
3 Enclose stockpiled soils with properly installed silt fencing.
• Property must be restored within thirty (30) days of building
demolition/move - utilities abandoned at the property line with a
permit, foundation demolished with a separate permit, debris
removed, demolition excavation filled to match adjacent grade
and seed or sod placed and maintained at disturbed areas OR a
permit must be issued for a new structure within thirty (30) days
of the building demolition/move.
x 916.5
916.1
PROJECT NO. 15260.00
CERTIFICATE OF
PREPARED FOR:
DONNAY HOMES
Sill Fence and Construction Entrance
SURFACE DRAINAGE
= FINISHED GARAGE FLOOR EL-EVITFanilg dlation Wall Reinfor
MAIN FLOOR ELEVATION I:Foundation pre-backfill =
BASEMENT FLOOR ELEVATION Framing and Sheathing
_Insulation
-Lath
-Drywall
.w.._..Masonry Fireplace
Fna
Confirm property may be redeveloped
prior to demolition. A demolition permit
provides no a of permitted future
de)97 907.2 PP
PO IP
916.7 -\ 24" ELM
917.16 \916.2
912.\g160
\ •16.3
\ \
\45.1N15.
50" ELM
1910.0( 915.2e
908.7
907.7 x
17" APPLE
906.1
Q)
FENCE
910.3
916.4
7." 916.9 0
916.7
916.8
916.6
916.7
916.7
x907. co x906.8
905.1
09.4
• 36" OAK 908.8
9/29_1-4 - -608.
15
8" MEd 0" PINS I 2" PINS I 0' PINE
/ 12" PINE 905;"' 9404.7 e 904.8 904.2 5" PINE a 905.1 • 903.5 905.9 904.2
907.1
9.
DECK
2
08.7
90 .9 9085/
907.„.„9.308.0--9400;-iml 3" 9E0IN6 .„ .6
908.5
15-6
pORt\-- 910.
16.6
915.0 914.4 23.74
.914
*d-
7'0 0
908.8 0
0 0,908.6
x904.7
165.00 SO4"-
EAST
x903.1
I hereby certify that this is a true and correct representation
of a tract as shown and described hereon. As prepared by
me this 9Th day of JULY, 2013.
Minn. Reg. No. 19086
1 G" BIRCH
e916.9
916.9 un
931.Ll .socusr
916.
916.8 6.7
916.
-a 15" A511
905.9
x 905.3 905.0
903.6 914.0 FENCE 6 6 b9X KIVO0 /ee
x 902.9 x 9.072/fri 0 It /2-32-6(
,( ' (17.24.. 2- ( ° I 2--