HomeMy WebLinkAbout3111721410015-05302014CIMB MAILBOX
—XC— CHAIN LINK FENCE
El UTILITY PEDESTAL
LIGHT POLE
— XW— WOOD FENCE
PROPOSED ELEVATIONS:
FIRST FLOOR = 882.06
TOP OF FOUNDATION = 880.50
GARAGE FLOOR = 880.10
BASEMENT FLOOR (WO) = 871.68
NOTE:
SEE BUILDING PLANS FOR
ARCHITECTURAL DIMENSIONS.
CONTRACTOR SHALL VERIFY
DIMENSION & EXTENT OF
BUILDING PAD SOILS CORRECTION.
SET BACK REQUIREMENTS:
— 37.1' (FRONT SETBACK IS THE AVERAGE OF THE
FRONT STREET SETBACKS ON THE DWELLING UNITS
ON THE TWO ABUTTING LOTS)
— 5' GARAGE SIDE SETBACK
— 17.5' HOUSE SIDE (10' SIDE HOUSE TO PROPERTY
LINE. THE REQUIRED SIDE YARD SETBACK SHALL BE
INCREASED BY 6 INCHES FOR EACH FOOT THE
BUILDING EXCEEDS 15%)
— 25' REAR HOUSE TO PROPERTY LINE
SURVEYOR:
Stonebrooke Engineering, Inc.
12279 Nicollet Ave. S.
Burnsville, MN 55337
Phone: 952-402-9202
Fax: 952-403-6803
www.stonebrookeengineering.com
34.80
la/W2,41_70/17 245--32 W777
5925 KIA-7/7 Z,4/17n;
HOUSE
I Pr (c) c1)\ N cot 8ii\
0)• 1 to •6
Nco
CO .„./ I
Kt, CO r,
EXISTING
1
ROCKS
0 ln
\
I
I
I
0 .
ROCKS n
/
/ / /
\ \ N
ROCKS
LEGAL DESCRIPTION:
Lot 24, Block 3, KILLARNEY SHORES,
according to the plat thereof, on file and of record
in the Office of the Hennepin County Recorder.
Co*
RIM ELEV
878.58
TOP BACK
OF CURB
MB
t.
a)
a Co
, BITUMINOUS
\DRIVEWAY
\
(878.30).4
(879.20)
(879.30) (du_ 14; ± (879
1 MAPLE
co
24"A
PROPOSED
DRIVEWAY
3.2%
50.27'
34 71
-411
AS—BUILT
FOUNDATION
ELEV=879.50j
AS—BUILT
FOUNDATION
ELEV=880.48
LOT 23
BLOCK 3
ELEV=879.734!,
AS—BU LT 1
FOUNDATION 0'
-411.n I
I
.1 /
ILO / ILO
AS—BUILT
FOUNDATION
ELEV=880.48 '
LOT 25
BLOCK 3
AS—BUILT
FOUNDATION
ELEV=879.50
(r)
7.00'
AS—BUILT
FOUNDATION
ELEV=880.48
Oc (2 < CL 0
AS—BUILT
FOUNDATION
ELEV=880.48
N89'44142"VV, 13(11
111" (C49)
AS—BUILT
FOUNDATION
ELEV=880.48
\In189'441427Wi'130.,f6 \\
\ 1 Q;\
EXISTING
HOUSE
AS—BUILT
FOUNDATION,
ELEV=874.97
(G49)
0
AS—BUILT
FOUNDATION
ELEV=880.48
/ /!
n
wboD
RETAINING *2"
J7 3
AS—BUILT
FOUNDATION
ELEV=871.85
AS—BUILT
FOUNDATION
ELEV=876.87 Lu z4
▪ BLOCK 3
00
WOOD
A K
RETAINING
7WAL
0 Ui
5325 \hew LA. / Pelz,pArt- * lbool%
LIN
elAK
HEDGE
PLANT
BED
HEDGE'
(870.1 0)
iri
IM ELEV
Iz 69.59 "BIRCH \
LOT 9
BLOCK 3
r\
I \
I \
\
PBLA-F EDN ol
LOT 8 \
BLOCK
z/
LOT AREA SQUARE FOOTAGE:
DECIDUOUS TREE 12365 SQUARE FEET
CONIFEROUS TREE
CONCRETE SURFACE
APPROXIMATE SQUARE FOOTAGE*:
PROPOSED BUILDING AREA = 2387
PROPOSED DRIVEWAY AREA = 1301
REV. NO DATE BY CHK DESCRIPTION I HEREBY CERTIFY THAT THIS SURVEY, PLAN, OR REPORT WAS PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA.
ItANE Aaron J. Manes
Stonebrooke
Engineering Responsible Solutions SCALE
10
FEET
20
LJESI(,NLD
AiM
CHECKED
AJM
DRAWN
)PG
UM 0S-30-2014 KILLARNEY SHORES
FOUNDATION AS-BUILT
LOT 24, BLOCK 3
SHEET
1 OF
1
LEGEND
• MONUMENT FOUND
O IRON PIPE MONUMENT SET
• WOOD HUB SET
DENOTES DRAINAGE ARROW
EXISTING SPOT ELEVATION
PROPOSED ELEVATION
AS-BUILT ELEVATION
PROPOSED CONTOURS
EXISTING CONTOURS
FIRE HYDRANT
CATCH BASIN
SEWER MANHOLES
11027.761
/
Ma
y
30
,
20
1
4
—
9:
40
a
m
—
S: \
PR
O
J
E
C
TS
\
SU
R
V
E
Y
\
03
1
6
_
Cu
s
to
m
_
Ho
m
e
s
_
LL
C
V
il
l
a
m
e
y
S
ho
r
e
s Va
dd
_
fi
l
e
A Vie
w
La
n
e
PR
_
F A.
dw
g
11. 2,1,1Vi.rAi'ET,