Loading...
HomeMy WebLinkAbout3111721410015-05302014CIMB MAILBOX —XC— CHAIN LINK FENCE El UTILITY PEDESTAL LIGHT POLE — XW— WOOD FENCE PROPOSED ELEVATIONS: FIRST FLOOR = 882.06 TOP OF FOUNDATION = 880.50 GARAGE FLOOR = 880.10 BASEMENT FLOOR (WO) = 871.68 NOTE: SEE BUILDING PLANS FOR ARCHITECTURAL DIMENSIONS. CONTRACTOR SHALL VERIFY DIMENSION & EXTENT OF BUILDING PAD SOILS CORRECTION. SET BACK REQUIREMENTS: — 37.1' (FRONT SETBACK IS THE AVERAGE OF THE FRONT STREET SETBACKS ON THE DWELLING UNITS ON THE TWO ABUTTING LOTS) — 5' GARAGE SIDE SETBACK — 17.5' HOUSE SIDE (10' SIDE HOUSE TO PROPERTY LINE. THE REQUIRED SIDE YARD SETBACK SHALL BE INCREASED BY 6 INCHES FOR EACH FOOT THE BUILDING EXCEEDS 15%) — 25' REAR HOUSE TO PROPERTY LINE SURVEYOR: Stonebrooke Engineering, Inc. 12279 Nicollet Ave. S. Burnsville, MN 55337 Phone: 952-402-9202 Fax: 952-403-6803 www.stonebrookeengineering.com 34.80 la/W2,41_70/17 245--32 W777 5925 KIA-7/7 Z,4/17n; HOUSE I Pr (c) c1)\ N cot 8ii\ 0)• 1 to •6 Nco CO .„./ I Kt, CO r, EXISTING 1 ROCKS 0 ln \ I I I 0 . ROCKS n / / / / \ \ N ROCKS LEGAL DESCRIPTION: Lot 24, Block 3, KILLARNEY SHORES, according to the plat thereof, on file and of record in the Office of the Hennepin County Recorder. Co* RIM ELEV 878.58 TOP BACK OF CURB MB t. a) a Co , BITUMINOUS \DRIVEWAY \ (878.30).4 (879.20) (879.30) (du_ 14; ± (879 1 MAPLE co 24"A PROPOSED DRIVEWAY 3.2% 50.27' 34 71 -411 AS—BUILT FOUNDATION ELEV=879.50j AS—BUILT FOUNDATION ELEV=880.48 LOT 23 BLOCK 3 ELEV=879.734!, AS—BU LT 1 FOUNDATION 0' -411.n I I .1 / ILO / ILO AS—BUILT FOUNDATION ELEV=880.48 ' LOT 25 BLOCK 3 AS—BUILT FOUNDATION ELEV=879.50 (r) 7.00' AS—BUILT FOUNDATION ELEV=880.48 Oc (2 < CL 0 AS—BUILT FOUNDATION ELEV=880.48 N89'44142"VV, 13(11 111" (C49) AS—BUILT FOUNDATION ELEV=880.48 \In189'441427Wi'130.,f6 \\ \ 1 Q;\ EXISTING HOUSE AS—BUILT FOUNDATION, ELEV=874.97 (G49) 0 AS—BUILT FOUNDATION ELEV=880.48 / /! n wboD RETAINING *2" J7 3 AS—BUILT FOUNDATION ELEV=871.85 AS—BUILT FOUNDATION ELEV=876.87 Lu z4 ▪ BLOCK 3 00 WOOD A K RETAINING 7WAL 0 Ui 5325 \hew LA. / Pelz,pArt- * lbool% LIN elAK HEDGE PLANT BED HEDGE' (870.1 0) iri IM ELEV Iz 69.59 "BIRCH \ LOT 9 BLOCK 3 r\ I \ I \ \ PBLA-F EDN ol LOT 8 \ BLOCK z/ LOT AREA SQUARE FOOTAGE: DECIDUOUS TREE 12365 SQUARE FEET CONIFEROUS TREE CONCRETE SURFACE APPROXIMATE SQUARE FOOTAGE*: PROPOSED BUILDING AREA = 2387 PROPOSED DRIVEWAY AREA = 1301 REV. NO DATE BY CHK DESCRIPTION I HEREBY CERTIFY THAT THIS SURVEY, PLAN, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. ItANE Aaron J. Manes Stonebrooke Engineering Responsible Solutions SCALE 10 FEET 20 LJESI(,NLD AiM CHECKED AJM DRAWN )PG UM 0S-30-2014 KILLARNEY SHORES FOUNDATION AS-BUILT LOT 24, BLOCK 3 SHEET 1 OF 1 LEGEND • MONUMENT FOUND O IRON PIPE MONUMENT SET • WOOD HUB SET DENOTES DRAINAGE ARROW EXISTING SPOT ELEVATION PROPOSED ELEVATION AS-BUILT ELEVATION PROPOSED CONTOURS EXISTING CONTOURS FIRE HYDRANT CATCH BASIN SEWER MANHOLES 11027.761 / Ma y 30 , 20 1 4 — 9: 40 a m — S: \ PR O J E C TS \ SU R V E Y \ 03 1 6 _ Cu s to m _ Ho m e s _ LL C V il l a m e y S ho r e s Va dd _ fi l e A Vie w La n e PR _ F A. dw g 11. 2,1,1Vi.rAi'ET,