EXISTING HOUSE
GARAGE FLOOR=940.9
HOUSE IS 35.7' FROM ROW (NOT SHOV
NO Driving!
NO TRESPASSING
on adjoining properties
940.9
LEGAL DESCRIPTION
Lot 10 and North Half of Lot 11, Block
940.6
6, NORMANDALE SECOND ADDITION.
940.7
- HOUSE PLACMENT & ELEV. SET BY CONTRACTOR.
- FINISHED GRADE ELEVATIONS ARE TO FINISHED
SURFACE WITFI TURF ESTABLISHMENT.
- FINISHED GRADE 10 FEET FROM PROPOSED BUILDING
SHALL BE 0.5 FEET LOWER THAN THE FINISHED GRADE
AT THE BUILDING.
- CONTRACTOR TO VERIFY HOUSE DIMENSIONS,
SANITARY SEWER INVERT AND BASEMENT DEPTHS.
- BEARING'S SHOWN ARE ON ASSUMED DATUM.
- BEARING'S & ELEV. SHOWN ARE ON ASSUMED DATUM.
- FIELD SURVEY CONDUCTED ON APRIL 12TH, 2013.
This survey was prepared without the benefit of title
work. Easements, appurtenances, and encumbrances
may exist in addition to those shown hereon. This
survey is subject to revision upon receipt of a title
insurance commitment or attorneys title opinion.
BUILDING PERMIT SURVEY
FOR: CUSTOM RENOVATIONS
ADDRESS: 6336 MILDRED AVENUE, EDINA
940.9
C
tri
940.7
20
I hereby certify that this plan, survey or report was prepared by
me or under my direct supervision and that I am a duly Licensed
Lan Surveyor under the lows of the State of Minnesota.
Revised: 6-25-13 (add prey ff)
OSHUA P. SCHNEIDER Date: 5-30-13 Reg. No. 44655
CI\Land Projects 2008\13193bs-Normandate 2nd Add\dwg\13193hs.dwg
cDcx:)=xDc) DENOTES EXISTING WALL
• DENOTES IRON MONUMENT FOUND
O DENOTES IRON MONUMENT SET
1011.2 DENOTES EXISTING ELEVATION.
ohw DENOTES OVERHEAD WIRE
DENOTES EXISTING FENCE
DENOTES UTILITY POLE NORTH cO_D
_C
940.8
DENOTES BITUMINOUS
DENOTES CONCRETE
( IN FEET )
NOTES 1 inch = 20 ft.
(1)
01
940.7
941.5 FND1 /20PEN
940.7
_C 0
940.8
_C
X940.4 X940.5
6/25/2013 9146115 AM CDT
AREA CALCULATIONS
TOTAL LOT = ±10,140 sq. ft.
Proposed House = ±2,292 Sq. Ft
Proposed Porch = ±204 Sq. Ft.
Proposed Driveway = ±836 Sq. F
940.3 940.6 'Y\ I in
ohW
40.7
940.2
„South
[48.33 042. z) Lri 35.72
942.1 942.0 Li-)
C
x X X
942.2 Caitib7.40 Tda (4/1)(-/-
X 940.3
Line of the NEorth Half of Lot 11 /
N89°41'04"E
N89°41'06"E
940.4
CD
40.00
0.00
cNi
X941.4
MAP 24
941.2
12.50
940.9 940.8 X
•
t.
PROPOSED ELEVATIONS
GARAGE FLOOR = 942.5
TOP OF BLOCK = 942.9
LOWEST FLOOR = 934.9
FIRST FLOOR = 944.5
PREVIOUS FIRST FLOOR = 945.5
48.33 x -6 4 0.: 4 ......... .. 36.89
x
d2 1
•..*.?40.5
940.50
942
064,
...... .. . .....
941.0 •••....
X 941,6
38.00
EXISTING HOUSE
GARAGE FLOOR=942.2
35.83
.....
06
135.27
7.50
10.33
. 942::2
942.1
cNI
943.3
(1)
X942.5
943.6 ' x •
(..:o
-- 35.8
i9 Sire) 939.8 FNDLS9235
(0.1' S & OF COR)
•
941.2
\940.8
BE
44.tto V
•-1,5) 04' (16'9‘1,•a .0053
1/0 lit If 12.Iq7
04), 47 04,7 336 Avidit6,0
JOB#13193HS et LAND SURVEYING
10 II I2 13 J4 15 16 17 18 19 110 111 112 113 04 115 16 117 18 119 120
Blaine, MN 55449
763-238-6278 js.acrelandsurvemmail.com
941.2
941.2
940.5
Cr HACK 20
940.5
0
sY/
/ 940.4 TC
('r) /9C40E6 T ND BE
71"
940.8
TC END BE
TC
941.0
940.8
TC
TC
940.1
RIM: 41.02
INV: 30.27
A
A
941.0
SMH 10.75INV
TC
M• •
NO TRESPASSING
NO Excaw2tincri
03
X 940.3
0
940.8
X
North Half of Lot 11/
X 941.4
EXISTING HOUSE
GARAGE FLOOR=942.2
o64,
942.1 35.8 941.2 .
940.3
63 3 m/L,06e /2/72._
cro23D DENOTES PROPOSED ELEVATION
/ DENOTES DIRECTION OF DRAINAGE
IS1 DENOTES METAL OFFSET SPIKE
PROPOSED ELEVATIONS
GARAGE FLOOR = 942.5
TOP OF BLOCK = 942.9
LOWEST FLOOR = 934.9
FIRST FLOOR 944.5
c)c)c)cxipo DENOTES EXISTING WALL
• DENOTES IRON MONUMENT FOUND
O DENOTES IRON MONUMENT SET
1011.2 DENOTES EXISTING ELEVATION.
ohw DENOTES OVERHEAD WIRE
DENOTES EXISTING FENCE
DENOTES SILT FENCE
DENOTES UTILITY POLE
DENOTES BITUMINOUS
NORTH 0 20
( IN FEET )
1 inch = 20 ft.
FCRE LAND SURVEYING
Blahs, MN 55449
1
II
6336 MILDRED AVENUE
EDINA, MINNESOTA
CUSTOM RENOVATIONS &
BUILDERS, LLC
763-238-6278 js.acrelandsurveyogmail.com
0 11 12 13 14 15 16 17 113 19 110 III 112 113 114 115 1 13 Ii 11E1
CivilSite
ell It 0 ILO P
4931 W. 35TH ST. SUITE 200 ST. LOUIS PARK, MN 55416 CivilSiteGroup.com Matt Pavek Pat Sarver
763-213-3944 952-250-2003
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
5/30/13 CM( SUBMITTAL
•
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEE/ PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OE MINNESOTA.
7262,
MATTHEW R PAVEK RE.
DATE 5.30-13 000550 50. 44263
STORM WATER
MANAGEMENT &
EROSION CONTROL PLAN
1.0
941.5 END1/20PEN
940.7
940.7
940.9
40.7 --
I 940.7 olnw
(jb 06,
1-••n
louth Line of the
0 Se
N89°41'06"E
940.8 940.4
X 940.4 X 940.5
1 II I NI- I r
X 940.4
940,6'
N8941'04"E
CD 4,
0,54,
0
MAP 24
941.2
12.50
...940.5
940.9 940.8 .' ..... .
X X J‘i 942 942.7
94-1 48.33 X 94a 4 ....... r.940.5 . 36.89
38.00
35.83
942.1
48.33
942.2
10.33
943.3
CA" X942.5
9435'.)
x
X
-- 35.8 ---
35.72
940.0
940.5
X
JUN ll.O 2013
MI
L
D
P
E
D
A
V
E
.
939.7 TC
940.1
g4 CA) A7
Imo
940GI f;T:1
TC BE
940.8
BE RIM: 41.02
INV: 930.27
940.3 TO
re;
941.0
SMH 10.75INV
940.9
X 940.6
X 946
1.35.2.7....
939.8 FNDLS9235
(0.1' S OF C
941.1
942.0
940.7 940.2
AREA CALCULATIONS
TOTAL LOT = ±10,140 sq. ft.
Proposed House = ±2,292 Sq. Ft.
Proposed Porch = ±204 Sq. Ft.
Proposed Driveway = ±836 Sq. Ft.
HOUSE
I's -I-
I I I I L_ I
EXISTING HOUSE
GARAGE FLOOR=940.9
IS 35.7' FROM ROW (NOT SHOWN HEREON)
x
941.0
X940.1
940.5 HACK
,EDIMENT AND EROSION CONTROL NOTES
CONSTRUCTION SEQUENCING
1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE
2. INSTALLATION OF SILT FENCE OR BIO-ROLL AROUND SITE
3. DEMOLITION OF EXISTING STRUCTURES IF ANY.
4. CLEAR AND GRUB.
5. STRIP AND STOCKPILE TOPSOIL
6. ROUGH GRADING OF SITE
7. STABILIZE DENUDED AREAS AND STOCKPILES
8. EXCAVATE FOR NEW HOME FOUNDATION
B. CONSTRUCT & BACKFILL FOUNDATION
10 CONSTRUCT NEW STRUCTURE
11. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR
SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
EROSION PREVENTION
THE CONTRACTOR IS RESPONSIBLE FOR PLANING FOR AND IMPLEMENTING APPROPRIATE CONSTRUCTION PHASING,
VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE
EROSION.
ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT IN NO CASE LATER
THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR
PERMANENTLY CEASED.
THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER
FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE, MUST BE STABILIZED WITHIN
20 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER.
STABILIZATION OF THE LAST 20 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A
SURFACE WATER.
STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES OR SWALES MUST BE
COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER AND CONSTRUCTION IN THAT PORTION OF THE
DITCH HAS TEMPORARILY OR PERMANENTLY CEASED.
TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH
PROPERLY DESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES ETC.) DO NOT NEED TO BE STABILIZED. THESE
AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM.
PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER
CONNECTION TO A SURFACE WATER.
SEDIMENT CONTROL
SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, INCLUDING CURB AND
GUTTER SYSTEMS AND STORM SEWER INLETS.
SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFORE ANY UPGRADIENT
LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION HAS BEEN
ESTABLISHED.
ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL ALL SOURCES
WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED.
TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE DR OTHER EFFECTIVE SEDIMENT CONTROLS, AND CANNOT BE
PLACED IN SURFACE WATERS, INCLUDING STORM WATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR
CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE STORM WATER.
VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE MUST BE MINIMIZED BY A ROCK CONSTRUCTION
ENTRANCE. STREET SWEEPING MUST BE USED IF THE ROCK ENTRANCE IS NOT ADEQUATE TO PREVENT SEDIMENT FROM
BEING TRACKED ONTO THE STREET.
INSPECTIONS AND MAINTENANCE
THE CONTRACTOR IS RESPONSIBLE AT ALL TIMES FOR THE MAINTENANCE AND PROPER OPERATION OF EROSION AND
SEDIMENT CONTROL FACILITIES. THE CONTRACTOR SHALL AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL
DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL STABILIZATION MEASURES.
BASED ON INSPECTION RESULTS THE CONTRACTOR MAY AND SHALL MODIFY THE EROSION AND SEDIMENT CONTROL
PLAN IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER RUNOFF.
STORM WATER
FINAL GRADING OF THE LOT SHALL PROMOTE SHEET DRAINING AND AVOID CONCENTRATION OF STORM WATER FLOWS.
FINAL GRADING SHALL MAINTAIN THE EXISTING STORM WATER DRAINAGE PATTERNS TO THE EXTENT POSSIBLE AND
PRACTICAL AS TO NOT CAUSE ANY DAMAGE TO ADJACENT PROPERTIES.
STORMWATER, SEDIMENT de EROSION CONTROL CONTACT:
Shane Batchelor
Custom Renovations & Builders, LLC
2817 Anthony Lone S #100
Minneapolis, MN 55418
Cell: 651-276-0209