Loading...
HomeMy WebLinkAbout0411621320046-03202013-041" = EXISTING SPOT ELEVATION. X(998.0) = PROPOSED SPOT ELEVATION 40) b WOOD FENCE 20 40 60 SCALE IN FEET ,•• DIRECTION SURFACE DRAINAGE COH CANTILEVERED OVERHANG OHL OVERHEAD UTILITY LINE GFE GARAGE FLOOR ELEVATION FFE FINISH FLOOR ELEVATION NOTE — SURFACE STRUCTURES ARE APPROXIMATE DUE TO SNOW COVER 10.7 -13.71 - 14.3 kr) c) 25 REAR SBL — -- 5 S I DE S B L ( G AR A G E ) 32.0 4Di2)CD -17e) 15.0 EXISTING HOUSE e"\* -- PROPOSED ADDITIONS cf, MATCH EXISTING () FLOOR ELEVATIONS (VERIFY) NO SIGNIFICANT GRADING z\I CONSTRUCTION )\1 VERIFY ALL DIMENSIONS (9) AND ELEVATIONS W/ STUCTURE HARDCOVER EXISTING IS REQUIRED FOR PROPOSED PLANS iLrt_fl °,41000,4 44414) /17211%. c==3 \b„c, RO W P I N E T R E E S SAN MH Ii 4 EXISTING HOUSE 8.0 BENCHMARK TNHYD ELEV = 882.84 CONC CURB \ 105° 34.0 FFE=88r.0 X 18'5 72.7 GFE=884.7 \ 50 'FRONT OSLin SBL STONE RET WALV , 1.3- COH 1 2') — oc0" B84 HOUSE = 1485 SF PATIO = 350 SF — AHC = 150 SF TOTAL = 1685 SF/ 12.0% .ezt La n d In k R. C a r da r e l le Su rv e y o r 0 FL Y I N G C LO UD D R I VE N PR AI R I E , M N 5 5 34 4 —94 1 - 30 31 • ••n •• • W • lI , •• • • 4 . •• n • n B UI L D IN G PE R M IT SU R V EY fo r P OU L A D I AN RE SI DE N C E 1 •- n • I n •n • • BO O K PA G E 19 / 13 PR O PO SE D AD DT N I HE R E B Y C ER T I FY TH A T TH I S S UR V EY W AS P RE P AR E D BY M E O R AI DE R MY DIR EC T S U PE RV IS IO N AN D TH A T I A , A D UL Y RE G IS TE R ED A 6 SU R VE Y O R U ND E R T E L A WS O F T E M IN NE S O T A . FR A N K '. ' EL ' /R EG . N 0 . 6 5 0 8 1 LN W - - J I 1/ 4 / PR O J E CT NO . ro ,,,E; CA .. ,-- ,— 1 0 CC < a o ct) I R=-- 1538.06 211=-02 0361 28' L 70:0 1 i CO EXISTING HOUSE FFE=889.7 3.Q 52.0 LEGAL DESCRIPTION: LOT 14, BLOCK 4, BROOKVIEW HEIGHTS 1ST ADDITION, HENNEPIN CO., MN. ADDRESS — 5157 DANENS DRIVE EDINA, MN. 55439 PID#04— 116-21-32-0046 Cu, LOT AREA = 14200 SF/ 0.32 AC ' I X 25% = 3550 SF STRUCTURE HCA SURVEY IS SUBJECT TO CHANGE PER ,o TITLE OR EASEMENT INFORMATION PROPOSED ADDITION = 375 SF SHED = 225 SF TOTAL = 600 SF / 4.2% EXISTING AND PROPOSED = 2085SF / 14.7%