HomeMy WebLinkAbout0511621340062-12112013Proposed Top of Block
Proposed Garage Floor
Proposed Lowest Floor
Type of Building -
HY LAND SURVEYING,
LAND SURVEYORS
11947 Idaho Ave. N.
Champlin, Minnesota 55316
PHONE (763) 323-1300
FAX (763) 323-7035
hylandsurvey@qwestoffice.net
§urtirgors Certificate
•o 919.4 fnc
919.2 X
919.2
10" Tree
919.0 36" Tree
X 919.1 919.5 Pine
919.8
920.0 x 24.3
0 TOB
.4: 920.9
GF 920.85
FF-922.20 919.9
9.2
1
client.
Signed
Milton E. Hyland, Minn. Reg. No. 20262
J(90 t---) )o
NOTE: PROPERTY CORNERS
SET BY DEVELOPERS SURVEYOR
"EXISTING"
LDK BUILDERS
• Denotes Iron Monument Found
O Denotes Iron Monument Set
O Denotes Wood Hub Set
For Excavation Only
x000.0 Denotes Existing Elevation
C-Th Denotes Proposed Elevation
Denotes Surface Drainage
Property Located In Part Of
SW 1/4, Sec. . 5, Twp. 116, R. 21.
ADDRESS: 9700 West 70th Street
P.A.@
INVOICE NO 33075
F.B. NO xxx
SCALE 1"= 30'
FNC 919.1
919.18
TC
PP
98.83 (meas.) N8852'46"E
FNC FNC Ove ead 'res 919.3 Fe e 918.6
W oi
26.6 41920.6
919.07 Concrete Curb TC
1.0 0
0 919.8 Z Inc
920.7
•
919.7 / / / / 0 • Inc
919.6
e4 r-
r-
921.0
920.01
BW
919.42
919
919.0
18" T ee g2 .2
Pho
920.7
Bituminous Drive
920.4
920.1
918.73 TC
-CB 919.14 919.08 TC 0
\
GO \
'CN1
•
/ 0 919.10
TC
6
TC CC .4- \ 919.02
1"- 919.00 ▪ TC CC
' Tree/
I i
20.51
918.84
TC CC
I
I
I
L
I \x
/
I /
TC BW 918.28
TC CB 918.37
Concrete Walk
919.26 TC
920.3
918.7
919.0 24" Tree
Oh.
.6
csi
-920- - Ti876
920.1 919.6
Pine
65.84 (meas) N8941'40"W wOverheadw Wires
CC CB
918.83
TC CC
Co 0
oi Ok 4,//
,?18.9B5WN44<-
918.63 TC EC
LO 98.18 plat
UTILITY EASEMENT
38.5
EXISTING
RESIDENCE 24.0
0. 17.8 Cs1 Walk
411/116 10" Trees
BW
919.23 69.70 plat
WEST 70TH STREET
feemirlk 12.183u -10b -7611% St. ki Ala) CONSTgucnbiki
OS1 DEC 11 2013
LOT 27, BLOCK 3, LA BUENA VISTA, HENNEPIN COUNTY, MINNESOTA.
This survey is certified only to the above named person or persons
and not to subsequent owners, mortgages or title insurers.
The only easements shown are from plats of record of information provided by
All building dimensions and floor elevations must be verified by client.
I hereby certify that this survey was prepared by me or under
my direct supervision, and that I am a duly Registered Land
Surveyor under the laws of the State of Minnesota.
Surveyed by us this 25TH day of NOVEMBER , 20 13
172.50 (meas.) \0°33'06"W
UT
imated-oriow
V4L%t PO. ,a. • ,a.
44:•.:•zn
SEDIMENT AND EROSION CONTROL NOTES
CONSTRUCTION SEQUENCING
1. INSTALL STABILIZED ROCK CONSTRUCRON ENTRANCE
2. INSTALLATION OF SILT FENCE OR BIO-ROLL AROUND SITE
3. DEMOLITION OF EXISTING STRUCTURES IF ANY.
4. CLEAR AND GRUB.
5. STRIP AND STOCKPILE TOPSOIL
6. ROUGH GRADING OF SITE
7. STABIUZE DENUDED AREAS AND STOCKPILES
8. EXCAVATE FOR NEW HOME FOUNDATION
9. CONSTRUCT & BACKFILL FOUNDATION
10 CONSTRUCT NEW STRUCTURE
11. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR
SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
EROSION PREVENTION
THE CONTRACTOR IS RESPONSIBLE FOR PLANING FOR AND IMPLEMENTING APPROPRIATE CONSTRUCTION
PHASING. VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION
PRACTICES THAT MINIMIZE EROSION.
ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO UMIT SOIL EROSION BUT IN
NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE
HAS TEMPORARILY OR PERMANENTLY CEASED.
THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT
DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE,
MUST BE STABILIZED WITHIN 20 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF
DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 20 LINEAL FEET MUST BE
COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER.
STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES OR SWALES
MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER AND CONSTRUCTION IN
THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED_
TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT
SYSTEM (WITH PROPERLY DESIGNED ROCK DITCH CHECKS, BIG ROLLS, SILT DIKES ETC.) DO NOT NEED
TO BE STABILIZED. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING
USED AS A SEDIMENT CONTAINMENT SYSTEM.
PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24
HOURS AFTER CONNECTION TO A SURFACE WATER.
SEDIMENT CONTROL
SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS. INCLUDING
CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS.
SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFORE
ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN IN PLACE
UNTIL ANAL STABILIZATION HAS BEEN ESTABLISHED.
ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL
ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED.
TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND
CANNOT BE PLACED IN SURFACE WATERS. INCLUDING STORM WATER CONVEYANCES SUCH AS CURB AND
GUTTER SYSTEMS. OR CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE
STORM WATER.
VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE MUST BE MINIMIZED BY A ROCK
CONSTRUCTION ENTRANCE. STREET SWEEPING MUST BE USED IF THE ROCK ENTRANCE IS NOT
ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET.
INSPECTIONS AND MAINTENANCE
THE CONTRACTOR IS RESPONSIBLE AT ALL TIMES FOR THE MAINTENANCE AND PROPER OPERATION OF
EROSION AND SEDIMENT CONTROL FACILITIES. THE CONTRACTOR SHALL AT A MINIMUM. INSPECT.
MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES
AND SOIL STABILIZATION MEASURES.
BASED ON INSPECTION RESULTS THE CONTRACTOR MAY AND SHALL MODIFY THE EROSION AND
SEDIMENT CONTROL PLAN IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE MA STORM
WATER RUNOFF.
STORM WATER
ANAL GRADING OF THE LOT SHALL PROMOTE SHEET DRAINING AND AVOID CONCENTRATION OF STORM
WATER FLOWS.
ANAL GRADING SHALL MAINTAIN TFIE EXISTING STORM WATER DRAINAGE PATTERNS TO THE EXTENT
POSSIBLE AND PRACTICAL AS TO NOT CAUSE ANY DAMAGE TO ADJACENT PROPERTIES.
STORMWATER, SEDIMENT St EROSION CONTROL CONTACT:
PENNANT CONSTRUCTION LLC
DEREK BOISCLAIR
612747.8780
16538 81ST AVE N
MAPLE GROVE, MN 55311
NOTES:
SEE SURVEY, BY NY-LAND SURVEYING. P.A. FOR OFFICIAL PROPOSED HOME
ELEVATIONS
EXISTING DRAINAGE PAT ItRNS DRAINING OFF SITE SHALL NOT BE ALTERED.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY TH LICENSED PROFESSIONAL ENGINEER UNDER E LAWS OF THE STATE OF MINNESOTA.
MATTHEW R PAVEK RE. DATE 1/2/2014 LICENSE NO. 44263
GROUP
4931 W. 35TH ST. SUITE 200
ST. LOUIS PARK MN 55416
Citn1SiteGroup.com
Matt Pavek Pat Sarver
763-213-3944 952-250.2003
(0 --1 uur, 0 Uti I /0k0.-..WAY [NI OA L 0 ,---- 0 PEMV1,1c_ PREQUIRED c-) b
CONTACT EfaNEERING fiEFF. (A
952-826-0371
ACY AV NUE
Awn/Hi 12-1X1‘, 5100
DEPAR MEM ;!
JAN 3 2014
(i.ATY OF ENP
q Jn
a
a
4
aJ
o
u
o
o
49.7
0
0
46.7 //
-NKr/
ubo
1 CD (D ,
Ii)
n Jr,
•
co INLET PROTECTION •c,40 co
n P mi co
DENOTES DIRECTION OF DRAINAGE
x000.0 DENOTES EXISTING ELEVATION
(=> DENOTES PROPOSED ELEVATION
Ei DENOTES EXISTING FENCE
DENOTES SILT FENCE
DENOTES ROCK
CONSTRUCTION ENTRANCE
CD
I
\II: /\ X I 0
0 -
-. . -
6\
/3 I
i ci % • ) ,
' • \ a -
ILU ' co1 1
\ X)/ \ Pop I (-1\9
s- Q>aCZ0 1 o \ x ‘ -
)( 9 .---------
L__
oc,
NJ
-u c3 070 C)
NJ 0
L_HA
I •= 7 '- l ''--F` Pe (0
1 45.0 plat •1' \( \ Co
j
- 17951-1-•-••006.0.TC60 C-615091\356:00(DCo_74:7- -144 64 /(1 meas.) \O° 2 2 ' 5 8 E -
PT ---
11
5 5 \
onstructio • '1, . , -
briS3
' 8- ntrance '• ul _--
01 .. .0(713 .-7.
111 • • • •
Iv
3'0"
CA IND
cy)
39'0"
C920.8)
Fri 0 10
cri
000gaaao o89000 0 • 0000 0 00 Pc° 036.1. .
(920,13)
40'0
"0
2'0"
.0
co
1=1•1(
NJ 0
SI LT FENCE
78.7 1\)_ T -
(1) ><" CD
('0
(.0 .t - •
CD •
0)
Z (Do
CD
CD 0 0_
="). co
0
(0 - co
I I. 1" = 10 - 0"
0 Th SL 4,1 ljIw CoNSrautnonl 5 -0 0 1 0 - 0
/I I
CITY SUBMITTAL 5700 WEST 70TH STREET
EDINA, MINNESOTA
ISSUE/SUBMITTAL SUMMARY DESCRIPTION STORM WATER
MANAGEMENT & EROSION
CONTROL PLAN
1.0
DATE I/2/14
LDK HOMES