HomeMy WebLinkAbout1902824110020-11192015tc:C poC
566.52
DRAINAGE IMPERVIOUS SURFACE
COMPARISON:
L..
EXISTING CONDITION vs PROPOSED CONDITION
' I
EXISTING
(SF)
PROPOSED (SF)
HOUSE FOOTPRINT =
1,277
1,730
DRIVEWAY =
742
863
SIDEWALKS/STOOPS =
558
21
PATIO/DECK =
206
150
SHED =
62
62
TOTAL IMPERVIOUS SURFACE =
2,845
2,826
IMPERVIOUS SURFACE DECREASE
=
19 SF
(EXISTING vs PROPOSED)
L-------
0'7 %
AREA TO FRONT YARD =
2,845
2,826
AREA TO REAR YARD =
0
0
,3ara,3e floor,
569,0
Proposed Wall� • '����`
- peak-
No,
eakNo, 542 i gob.
SILT FENCE ;,
.(01
1}
--------- '---- -N
1 i7W
ROCK
CONSTRUCTION
ENTRANCE
I
SILT FENCE
`_....
/
.....
_......
- __..........._ _...
.....
._-
INSTALL INLET
PROTECTION I N 'I
CATCH BASIN '
( � I
l �
i
NOTES:
ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1
OR CA -2 COURSE AGGREGATE. (WASHED)
A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
ROCK CONSTRUCTION ENTRANCE DETAIL
Proposed impervious surface is 19 sf less
than existing condition.
Storm water runoff and volume reduction
is therefore not required for this project.
LEGAL DESCRIPTION
LOT 4, BLOCK 1,
ELMWOOD TERRACE,
HENNEPIN COUNTY, MINNESOTA
PROJECT LOCATION
PART OF SECTION 19,
TOWNSHIP 28, RANGE 24,
HENNEPIN COUNTY, MINNESOTA
SITE LEGEND:
Existing Property Line
................................... .......... I........................ Existing Adjacent Property Line
------,t __-- Existing Contour w/Eley. Text
------### ----- Proposed Contour w/Elev. Text
Proposed Building
■M■■■■N■■■NE■ Proposed Silt Fence 0 10 20 30
=° Proposed Inlet Protection
EROS/ON CONTROL NOTES
1. All devices necessary to control erosion and sediment (I.E.
perimeter silt fence, rock construction entrances, swoles,
ponds, berms, ETC.) shall be installed prior to any other
construction operations.
2. Temporary erosion control soil stabilization shall be completed
within 72 hours of disturbed areas that are to remain fallow
and in an unfinished temporary condition. Temporary
stabilization to be completed in compliance with MnDOT 2575
fir' ^ I I I I I i specifications.
3. After completion of final grading, exposed soils must be
permanently stabilized within 72 hours. Stabilization shall
consist of disc -anchored seed & mulch or sod as allowed by
674„'' ��� I II I I j ; 7° City, or as proposed on City approved landscape plan for the
SILT FENCE I I I; I I project.
I I I I II! !r 4. The site must be kept in a well drained condition at all
I
® 1,5G,98Measure times. The contractor shall be responsible for temporary
_ _ V. =,\,T- \ �`�� ditches, or her means necessary to ensure proper drainage.
h of er
■ ■ ■ j j ' ■ ■'r� 1� i ■ ■ ■�� ■'■ ■ ■ ■ ■, �� -X / _ I, / The building pad must be provided with a positive outflow.
�
............... X-- x x: R. x _ } ........ _.__ X x k , I
1 I / �/ /.. This work shall be incidental to the grading contract.
i 1 5. Entering/exiting of the site shall occur only at rock
X /j construction entrance to reduce tracking of dirt onto paved
streets. Sediment tracked onto streets during working hours
ssm MISS INS i �il:.� I I ( , must be reclaimed via street scraping and sweeping at the
6.2
I I I'� I end of each working day.
.• �T j,t- f `I I I 6. Temporary dewatering pump out to be discharged to
\, Q Q1~ 1 I , constructed Temporary Dewatering Discharge per detail this
r
i � � •�(I 1 sheet, or sediment filter bag constructed of min. Boz
NI r i I I' I non -woven filter fabric, to provide silt and sediment removal
from storwater prior to discharge to appropriate drainage
area.
O `-I I POLLUTION PREVENTION NOTES
Mc t:` ef >;
1. Solid waste: collected sediment, asphalt and concrete millings,
TEMP0 RARY ( floating debris, paper, plastic, fabric, construction debris and
Proposed � � � � other wastes must be disposed of properly off-site and must
\� comply with MPCA requirements.
STOCKPILE
` 2. Hazardous materials: oils, gasoline, paint, and any hazardous
substance must be properly stored, including secondary
Residence , �I
STOCKPILE T,-� .� containment, to prevent spills, leaks or otherdischarge.
l \ ' Restricted access to storage areas must be d to prevent
(dimensions to main Hoar} ' ��/ �;� X vandalism. Storage and disposal must be in compliance with
/ �- SILT FEN C E MPCA regulations.
Re5ldence
No, 5429
raqo floor,
- .4
2" x 2" WOOD POSTS FILTER FABRIC
4.0' O.C. (MI APPROVED
FENCE
OR APPROVED EQUAL)
MIN. 30' - MAX. 36"
ABOVE GRADE
DIRECTION OF I I
DRAINAGE
BACKFILL 6" x 6" TRENCH
lz
N I I UNDISTURBED SOIL
SILT FENCE NOTES
CG -23 HIGH-FLOW
INLET INSERT .
3. External washingof trucks or other construction vehicles is not
allowed on site. No engine degreasing is allowed on site.
r 4. No concrete washouts are allowed on site.
L
VEG/TAT/ON GROUND COVER SCHEDULE
Permanent turf ground cover shall include all disturbed areas be
n ell
covered with a minimum 4" topsoil and sodded or seeded as
0- `fix < allowed by City, or as proposed on City approved landscape
plan for the project.
r�� ` 2. Temporary ground cover shall be MnDOT seed mix 150 shall be
x_...........,� ... _ X X _................. x .......-...� X _ r
I ■ ■ ■ N. ■ ■ ■ ■ ■ ■ ■ ■ ■ �� ■ ■I■ ■ ■ ■ ■ ■ applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied
_ at 2 tons/ac and disc anchored in areas not covered by sod
it i 47.10 / / / - ` or erosion blanket.
-- r0 A M¢a.5 ure / / , ' 55.E .
I / / / // // / 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200
SILT FENCE i ki6' f'l t i / / hG'd lbs/ac. Disc fertilizer into top 3" of soil. Specification
reference is MnDOT 2575.
4. Dormant seed mix shall be used after November 1 or when
temperatures do not exceed 40" F, using some rates specified
above. No seed shall be placed on snow or ice greater than
2" in depth.
5. Any seeded areas that do not become established with
vegetation shall be reseeded at Contractor's expense.
6. Erosion blanket shall be installed in seed areas with ground
surface slopes of 5H: 1 V or steeper.
DEFLECTOR
PLATE
OVERFLOW ,#2 -
TOP OF CURB BOX
OVERFLOW # I -
CENTER OF FILTER
ASSEMBLY
1. SILT FENCE SHALL BE BLACK IN COLOR. NOTES:
2. DIG A 6"X6" TRENCH ALONG THE INTENDED FENCE LINE, OR MACHINE SLICE TO 6" DEPTH.
3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 1) CONTRACTOR OPTION TO USE WIMCO INLET
4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. PROTECTION INSERT OR EQUAL.
5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC
6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED.
SILT FENCE DETAIL
INLET PROTECTION DETAIL
GRAPHIC SCALE IN FEE
Survey Data By: Benchmark:
Lot Surveys Company Top nut of hydrant at NE
7601 73rd Avenue North corner of Halifax Avenue
Minneapolis, MN 55428 and 54th.
763-560-3093 Elevation = 877.0 feet
GENERAL GRADING NOTES:
1. Specifications applicable for this project: Current standard
specifications for the City of Edina; the latest Minnesota Department
of Transportation Specifications for Highway Construction; and all
NPDES requirements except where modified by these documents.
2. OSHA requirements shall be followed for all work on this project.
3. The Contractor shall notify "Gopher State One Call" 48 hours prior to
any excavation (1-800-252-1166.)
4. The Grading Contractor shall verify all locations and elevations of
underground utilities with utility companies prior to any construction,
and immediately notify the Engineer of any conflicts.
5. Final Plat shall govern for easements and lot dimensions.
6. Any erosion control items necessary to protect adjacent properties shall
be constructed prior to the start of excavation or grading work.
7. Erosion control maintenance shall be performed by the Grading
Contractor, and removed as per the Contract Documents or as
directed by the Owner, followed by all necessary restoration of
disturbed area.
8. The Grading contractor shall provide positive drainage on the site at all
times. Grading tolerances shall be 0.10' for hard surface areas.
Grading tolerances for the remainder of the site shall be 0.25'.
9. The Grading Contractor shall keep public streets, parking lots, and
travel ways clear of soil and debris. Daily cleaning at the
construction entrance shall be performed, especially at the end of
each day's work.
EROSION CONTROL INSTALLATION SCHEDULE
1. Silt fence shall be installed or restored prior to any construction. Silt fence
shall be located as shown to intercept runoff. The area located beyond the
perimeter silt fence shall not be disturbed during construction.
2. Rock Construction Entrance shall be installed prior to grading operations.
3. All storm sewer inlets shall have inlet protection inserts installed.
Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter"
inlet protection devices as manufactured by WIMCO (or approved equal)
and installed per manufacture's recommendations.
4. All erosion contra' 'r,stallations shall remain in place and be mai.ntclned in
good condition by tree contractor until the site has been re -vegetated, at
which time it shall be removed by the contractor. For proposed paved surface
areas, the contractor may remove necessary silt fencing to construct roadway,
while maintaining adequate erosion control in adjacent areas.
5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil
for disturbed areas to be re -vegetated.
6. The contractor shall schedule site grading, utility installation and site
construction so that the general site can be mulched and sodded or
re -seeded as soon as possible soon after disturbance. Areas that will not be
subject to construction traffic shall be seed and mulched or sodded within 72
hours of final grading.
EROSION CONTROL MAINTENANCE SCHEDULE
1. Erosion control measures shall be inspected by the contractor's representative
and maintained by the contractor every Friday and within 24 hours after any
rainfall event larger than 1/2" until the project is completed. Maintenance
requirements are as follows: silt fence - 1/3 height of fence or damaged,
remove sediment and/or repair fence within 24 hours; rock entrance -
refresh as necessary to conform to detail; inlet protection inserts - remove
sediment after each rain event, clean or replace filter when clogged; surface
water - drain and stabilize, within 72 hours of discovery; street sweeping -
remove all sediment tracked onto paved surfaces within 24 hours or as
directed by City Engineer.
2. Replacement - Fabric shall be replaced promptly when it decomposes or
becomes ineffective before the barrier is no longer necessary.
3. Any sediment remaining in place after silt fence is no longer required shall be
dressed to conform with the existing grade, prepared, and seeded with
appropriate seed mix, as directed by the engineer.
4. Removal of the silt fence- Silt fences shall be removed when they have
served their useful purpose, but not before the upward sloping area has been
permanently stabilized.
RESPONSIBLE PARTY
Contact information for the responsible party for erosion
control is:
CITY DESIGN + BUILD, LLC - General Contractor
Chris Molooly - Project Coordinator
612-363-0633 phone
chris@cityhomeslic.com
i, Nal CH na MM is OMAN iwwrio[
S lY ewom qua toot NO W MOM CM
TEMPORARY DEWATERING DISCHARGE DETAIL
CLIENT:
I
L..
57/.5
' I
BUILD, LLC
4220 Crocker Ave
top wall
I
.....
I
I
CO
I
CID
I
Rif
I
i
-
" Cantilever
�
I
Q
SILT FENCE
`_....
/
.....
_......
- __..........._ _...
.....
._-
INSTALL INLET
PROTECTION I N 'I
CATCH BASIN '
( � I
l �
i
NOTES:
ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1
OR CA -2 COURSE AGGREGATE. (WASHED)
A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
ROCK CONSTRUCTION ENTRANCE DETAIL
Proposed impervious surface is 19 sf less
than existing condition.
Storm water runoff and volume reduction
is therefore not required for this project.
LEGAL DESCRIPTION
LOT 4, BLOCK 1,
ELMWOOD TERRACE,
HENNEPIN COUNTY, MINNESOTA
PROJECT LOCATION
PART OF SECTION 19,
TOWNSHIP 28, RANGE 24,
HENNEPIN COUNTY, MINNESOTA
SITE LEGEND:
Existing Property Line
................................... .......... I........................ Existing Adjacent Property Line
------,t __-- Existing Contour w/Eley. Text
------### ----- Proposed Contour w/Elev. Text
Proposed Building
■M■■■■N■■■NE■ Proposed Silt Fence 0 10 20 30
=° Proposed Inlet Protection
EROS/ON CONTROL NOTES
1. All devices necessary to control erosion and sediment (I.E.
perimeter silt fence, rock construction entrances, swoles,
ponds, berms, ETC.) shall be installed prior to any other
construction operations.
2. Temporary erosion control soil stabilization shall be completed
within 72 hours of disturbed areas that are to remain fallow
and in an unfinished temporary condition. Temporary
stabilization to be completed in compliance with MnDOT 2575
fir' ^ I I I I I i specifications.
3. After completion of final grading, exposed soils must be
permanently stabilized within 72 hours. Stabilization shall
consist of disc -anchored seed & mulch or sod as allowed by
674„'' ��� I II I I j ; 7° City, or as proposed on City approved landscape plan for the
SILT FENCE I I I; I I project.
I I I I II! !r 4. The site must be kept in a well drained condition at all
I
® 1,5G,98Measure times. The contractor shall be responsible for temporary
_ _ V. =,\,T- \ �`�� ditches, or her means necessary to ensure proper drainage.
h of er
■ ■ ■ j j ' ■ ■'r� 1� i ■ ■ ■�� ■'■ ■ ■ ■ ■, �� -X / _ I, / The building pad must be provided with a positive outflow.
�
............... X-- x x: R. x _ } ........ _.__ X x k , I
1 I / �/ /.. This work shall be incidental to the grading contract.
i 1 5. Entering/exiting of the site shall occur only at rock
X /j construction entrance to reduce tracking of dirt onto paved
streets. Sediment tracked onto streets during working hours
ssm MISS INS i �il:.� I I ( , must be reclaimed via street scraping and sweeping at the
6.2
I I I'� I end of each working day.
.• �T j,t- f `I I I 6. Temporary dewatering pump out to be discharged to
\, Q Q1~ 1 I , constructed Temporary Dewatering Discharge per detail this
r
i � � •�(I 1 sheet, or sediment filter bag constructed of min. Boz
NI r i I I' I non -woven filter fabric, to provide silt and sediment removal
from storwater prior to discharge to appropriate drainage
area.
O `-I I POLLUTION PREVENTION NOTES
Mc t:` ef >;
1. Solid waste: collected sediment, asphalt and concrete millings,
TEMP0 RARY ( floating debris, paper, plastic, fabric, construction debris and
Proposed � � � � other wastes must be disposed of properly off-site and must
\� comply with MPCA requirements.
STOCKPILE
` 2. Hazardous materials: oils, gasoline, paint, and any hazardous
substance must be properly stored, including secondary
Residence , �I
STOCKPILE T,-� .� containment, to prevent spills, leaks or otherdischarge.
l \ ' Restricted access to storage areas must be d to prevent
(dimensions to main Hoar} ' ��/ �;� X vandalism. Storage and disposal must be in compliance with
/ �- SILT FEN C E MPCA regulations.
Re5ldence
No, 5429
raqo floor,
- .4
2" x 2" WOOD POSTS FILTER FABRIC
4.0' O.C. (MI APPROVED
FENCE
OR APPROVED EQUAL)
MIN. 30' - MAX. 36"
ABOVE GRADE
DIRECTION OF I I
DRAINAGE
BACKFILL 6" x 6" TRENCH
lz
N I I UNDISTURBED SOIL
SILT FENCE NOTES
CG -23 HIGH-FLOW
INLET INSERT .
3. External washingof trucks or other construction vehicles is not
allowed on site. No engine degreasing is allowed on site.
r 4. No concrete washouts are allowed on site.
L
VEG/TAT/ON GROUND COVER SCHEDULE
Permanent turf ground cover shall include all disturbed areas be
n ell
covered with a minimum 4" topsoil and sodded or seeded as
0- `fix < allowed by City, or as proposed on City approved landscape
plan for the project.
r�� ` 2. Temporary ground cover shall be MnDOT seed mix 150 shall be
x_...........,� ... _ X X _................. x .......-...� X _ r
I ■ ■ ■ N. ■ ■ ■ ■ ■ ■ ■ ■ ■ �� ■ ■I■ ■ ■ ■ ■ ■ applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied
_ at 2 tons/ac and disc anchored in areas not covered by sod
it i 47.10 / / / - ` or erosion blanket.
-- r0 A M¢a.5 ure / / , ' 55.E .
I / / / // // / 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200
SILT FENCE i ki6' f'l t i / / hG'd lbs/ac. Disc fertilizer into top 3" of soil. Specification
reference is MnDOT 2575.
4. Dormant seed mix shall be used after November 1 or when
temperatures do not exceed 40" F, using some rates specified
above. No seed shall be placed on snow or ice greater than
2" in depth.
5. Any seeded areas that do not become established with
vegetation shall be reseeded at Contractor's expense.
6. Erosion blanket shall be installed in seed areas with ground
surface slopes of 5H: 1 V or steeper.
DEFLECTOR
PLATE
OVERFLOW ,#2 -
TOP OF CURB BOX
OVERFLOW # I -
CENTER OF FILTER
ASSEMBLY
1. SILT FENCE SHALL BE BLACK IN COLOR. NOTES:
2. DIG A 6"X6" TRENCH ALONG THE INTENDED FENCE LINE, OR MACHINE SLICE TO 6" DEPTH.
3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 1) CONTRACTOR OPTION TO USE WIMCO INLET
4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. PROTECTION INSERT OR EQUAL.
5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC
6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED.
SILT FENCE DETAIL
INLET PROTECTION DETAIL
GRAPHIC SCALE IN FEE
Survey Data By: Benchmark:
Lot Surveys Company Top nut of hydrant at NE
7601 73rd Avenue North corner of Halifax Avenue
Minneapolis, MN 55428 and 54th.
763-560-3093 Elevation = 877.0 feet
GENERAL GRADING NOTES:
1. Specifications applicable for this project: Current standard
specifications for the City of Edina; the latest Minnesota Department
of Transportation Specifications for Highway Construction; and all
NPDES requirements except where modified by these documents.
2. OSHA requirements shall be followed for all work on this project.
3. The Contractor shall notify "Gopher State One Call" 48 hours prior to
any excavation (1-800-252-1166.)
4. The Grading Contractor shall verify all locations and elevations of
underground utilities with utility companies prior to any construction,
and immediately notify the Engineer of any conflicts.
5. Final Plat shall govern for easements and lot dimensions.
6. Any erosion control items necessary to protect adjacent properties shall
be constructed prior to the start of excavation or grading work.
7. Erosion control maintenance shall be performed by the Grading
Contractor, and removed as per the Contract Documents or as
directed by the Owner, followed by all necessary restoration of
disturbed area.
8. The Grading contractor shall provide positive drainage on the site at all
times. Grading tolerances shall be 0.10' for hard surface areas.
Grading tolerances for the remainder of the site shall be 0.25'.
9. The Grading Contractor shall keep public streets, parking lots, and
travel ways clear of soil and debris. Daily cleaning at the
construction entrance shall be performed, especially at the end of
each day's work.
EROSION CONTROL INSTALLATION SCHEDULE
1. Silt fence shall be installed or restored prior to any construction. Silt fence
shall be located as shown to intercept runoff. The area located beyond the
perimeter silt fence shall not be disturbed during construction.
2. Rock Construction Entrance shall be installed prior to grading operations.
3. All storm sewer inlets shall have inlet protection inserts installed.
Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter"
inlet protection devices as manufactured by WIMCO (or approved equal)
and installed per manufacture's recommendations.
4. All erosion contra' 'r,stallations shall remain in place and be mai.ntclned in
good condition by tree contractor until the site has been re -vegetated, at
which time it shall be removed by the contractor. For proposed paved surface
areas, the contractor may remove necessary silt fencing to construct roadway,
while maintaining adequate erosion control in adjacent areas.
5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil
for disturbed areas to be re -vegetated.
6. The contractor shall schedule site grading, utility installation and site
construction so that the general site can be mulched and sodded or
re -seeded as soon as possible soon after disturbance. Areas that will not be
subject to construction traffic shall be seed and mulched or sodded within 72
hours of final grading.
EROSION CONTROL MAINTENANCE SCHEDULE
1. Erosion control measures shall be inspected by the contractor's representative
and maintained by the contractor every Friday and within 24 hours after any
rainfall event larger than 1/2" until the project is completed. Maintenance
requirements are as follows: silt fence - 1/3 height of fence or damaged,
remove sediment and/or repair fence within 24 hours; rock entrance -
refresh as necessary to conform to detail; inlet protection inserts - remove
sediment after each rain event, clean or replace filter when clogged; surface
water - drain and stabilize, within 72 hours of discovery; street sweeping -
remove all sediment tracked onto paved surfaces within 24 hours or as
directed by City Engineer.
2. Replacement - Fabric shall be replaced promptly when it decomposes or
becomes ineffective before the barrier is no longer necessary.
3. Any sediment remaining in place after silt fence is no longer required shall be
dressed to conform with the existing grade, prepared, and seeded with
appropriate seed mix, as directed by the engineer.
4. Removal of the silt fence- Silt fences shall be removed when they have
served their useful purpose, but not before the upward sloping area has been
permanently stabilized.
RESPONSIBLE PARTY
Contact information for the responsible party for erosion
control is:
CITY DESIGN + BUILD, LLC - General Contractor
Chris Molooly - Project Coordinator
612-363-0633 phone
chris@cityhomeslic.com
i, Nal CH na MM is OMAN iwwrio[
S lY ewom qua toot NO W MOM CM
TEMPORARY DEWATERING DISCHARGE DETAIL
CLIENT:
_ -
L..
2g011
DESIGN +
BUILD, LLC
4220 Crocker Ave
I
952-920-8250
.....
I
CO
..................
CID
I
Rif
Landing
�= =-,
► ,�
withCM
j 0
Q
planter
..
/
J
CC
I
L-------
I !V
�
IW-
J
ZUNION
Co
IN
iti4'iitl■■Ion NONE '
i■■■■■■■■
■Ti■■■■ ■ ■
=w
Co
SILT FENCE
`_....
/
.....
_......
- __..........._ _...
.....
._-
INSTALL INLET
PROTECTION I N 'I
CATCH BASIN '
( � I
l �
i
NOTES:
ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1
OR CA -2 COURSE AGGREGATE. (WASHED)
A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
ROCK CONSTRUCTION ENTRANCE DETAIL
Proposed impervious surface is 19 sf less
than existing condition.
Storm water runoff and volume reduction
is therefore not required for this project.
LEGAL DESCRIPTION
LOT 4, BLOCK 1,
ELMWOOD TERRACE,
HENNEPIN COUNTY, MINNESOTA
PROJECT LOCATION
PART OF SECTION 19,
TOWNSHIP 28, RANGE 24,
HENNEPIN COUNTY, MINNESOTA
SITE LEGEND:
Existing Property Line
................................... .......... I........................ Existing Adjacent Property Line
------,t __-- Existing Contour w/Eley. Text
------### ----- Proposed Contour w/Elev. Text
Proposed Building
■M■■■■N■■■NE■ Proposed Silt Fence 0 10 20 30
=° Proposed Inlet Protection
EROS/ON CONTROL NOTES
1. All devices necessary to control erosion and sediment (I.E.
perimeter silt fence, rock construction entrances, swoles,
ponds, berms, ETC.) shall be installed prior to any other
construction operations.
2. Temporary erosion control soil stabilization shall be completed
within 72 hours of disturbed areas that are to remain fallow
and in an unfinished temporary condition. Temporary
stabilization to be completed in compliance with MnDOT 2575
fir' ^ I I I I I i specifications.
3. After completion of final grading, exposed soils must be
permanently stabilized within 72 hours. Stabilization shall
consist of disc -anchored seed & mulch or sod as allowed by
674„'' ��� I II I I j ; 7° City, or as proposed on City approved landscape plan for the
SILT FENCE I I I; I I project.
I I I I II! !r 4. The site must be kept in a well drained condition at all
I
® 1,5G,98Measure times. The contractor shall be responsible for temporary
_ _ V. =,\,T- \ �`�� ditches, or her means necessary to ensure proper drainage.
h of er
■ ■ ■ j j ' ■ ■'r� 1� i ■ ■ ■�� ■'■ ■ ■ ■ ■, �� -X / _ I, / The building pad must be provided with a positive outflow.
�
............... X-- x x: R. x _ } ........ _.__ X x k , I
1 I / �/ /.. This work shall be incidental to the grading contract.
i 1 5. Entering/exiting of the site shall occur only at rock
X /j construction entrance to reduce tracking of dirt onto paved
streets. Sediment tracked onto streets during working hours
ssm MISS INS i �il:.� I I ( , must be reclaimed via street scraping and sweeping at the
6.2
I I I'� I end of each working day.
.• �T j,t- f `I I I 6. Temporary dewatering pump out to be discharged to
\, Q Q1~ 1 I , constructed Temporary Dewatering Discharge per detail this
r
i � � •�(I 1 sheet, or sediment filter bag constructed of min. Boz
NI r i I I' I non -woven filter fabric, to provide silt and sediment removal
from storwater prior to discharge to appropriate drainage
area.
O `-I I POLLUTION PREVENTION NOTES
Mc t:` ef >;
1. Solid waste: collected sediment, asphalt and concrete millings,
TEMP0 RARY ( floating debris, paper, plastic, fabric, construction debris and
Proposed � � � � other wastes must be disposed of properly off-site and must
\� comply with MPCA requirements.
STOCKPILE
` 2. Hazardous materials: oils, gasoline, paint, and any hazardous
substance must be properly stored, including secondary
Residence , �I
STOCKPILE T,-� .� containment, to prevent spills, leaks or otherdischarge.
l \ ' Restricted access to storage areas must be d to prevent
(dimensions to main Hoar} ' ��/ �;� X vandalism. Storage and disposal must be in compliance with
/ �- SILT FEN C E MPCA regulations.
Re5ldence
No, 5429
raqo floor,
- .4
2" x 2" WOOD POSTS FILTER FABRIC
4.0' O.C. (MI APPROVED
FENCE
OR APPROVED EQUAL)
MIN. 30' - MAX. 36"
ABOVE GRADE
DIRECTION OF I I
DRAINAGE
BACKFILL 6" x 6" TRENCH
lz
N I I UNDISTURBED SOIL
SILT FENCE NOTES
CG -23 HIGH-FLOW
INLET INSERT .
3. External washingof trucks or other construction vehicles is not
allowed on site. No engine degreasing is allowed on site.
r 4. No concrete washouts are allowed on site.
L
VEG/TAT/ON GROUND COVER SCHEDULE
Permanent turf ground cover shall include all disturbed areas be
n ell
covered with a minimum 4" topsoil and sodded or seeded as
0- `fix < allowed by City, or as proposed on City approved landscape
plan for the project.
r�� ` 2. Temporary ground cover shall be MnDOT seed mix 150 shall be
x_...........,� ... _ X X _................. x .......-...� X _ r
I ■ ■ ■ N. ■ ■ ■ ■ ■ ■ ■ ■ ■ �� ■ ■I■ ■ ■ ■ ■ ■ applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied
_ at 2 tons/ac and disc anchored in areas not covered by sod
it i 47.10 / / / - ` or erosion blanket.
-- r0 A M¢a.5 ure / / , ' 55.E .
I / / / // // / 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200
SILT FENCE i ki6' f'l t i / / hG'd lbs/ac. Disc fertilizer into top 3" of soil. Specification
reference is MnDOT 2575.
4. Dormant seed mix shall be used after November 1 or when
temperatures do not exceed 40" F, using some rates specified
above. No seed shall be placed on snow or ice greater than
2" in depth.
5. Any seeded areas that do not become established with
vegetation shall be reseeded at Contractor's expense.
6. Erosion blanket shall be installed in seed areas with ground
surface slopes of 5H: 1 V or steeper.
DEFLECTOR
PLATE
OVERFLOW ,#2 -
TOP OF CURB BOX
OVERFLOW # I -
CENTER OF FILTER
ASSEMBLY
1. SILT FENCE SHALL BE BLACK IN COLOR. NOTES:
2. DIG A 6"X6" TRENCH ALONG THE INTENDED FENCE LINE, OR MACHINE SLICE TO 6" DEPTH.
3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 1) CONTRACTOR OPTION TO USE WIMCO INLET
4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. PROTECTION INSERT OR EQUAL.
5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC
6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED.
SILT FENCE DETAIL
INLET PROTECTION DETAIL
GRAPHIC SCALE IN FEE
Survey Data By: Benchmark:
Lot Surveys Company Top nut of hydrant at NE
7601 73rd Avenue North corner of Halifax Avenue
Minneapolis, MN 55428 and 54th.
763-560-3093 Elevation = 877.0 feet
GENERAL GRADING NOTES:
1. Specifications applicable for this project: Current standard
specifications for the City of Edina; the latest Minnesota Department
of Transportation Specifications for Highway Construction; and all
NPDES requirements except where modified by these documents.
2. OSHA requirements shall be followed for all work on this project.
3. The Contractor shall notify "Gopher State One Call" 48 hours prior to
any excavation (1-800-252-1166.)
4. The Grading Contractor shall verify all locations and elevations of
underground utilities with utility companies prior to any construction,
and immediately notify the Engineer of any conflicts.
5. Final Plat shall govern for easements and lot dimensions.
6. Any erosion control items necessary to protect adjacent properties shall
be constructed prior to the start of excavation or grading work.
7. Erosion control maintenance shall be performed by the Grading
Contractor, and removed as per the Contract Documents or as
directed by the Owner, followed by all necessary restoration of
disturbed area.
8. The Grading contractor shall provide positive drainage on the site at all
times. Grading tolerances shall be 0.10' for hard surface areas.
Grading tolerances for the remainder of the site shall be 0.25'.
9. The Grading Contractor shall keep public streets, parking lots, and
travel ways clear of soil and debris. Daily cleaning at the
construction entrance shall be performed, especially at the end of
each day's work.
EROSION CONTROL INSTALLATION SCHEDULE
1. Silt fence shall be installed or restored prior to any construction. Silt fence
shall be located as shown to intercept runoff. The area located beyond the
perimeter silt fence shall not be disturbed during construction.
2. Rock Construction Entrance shall be installed prior to grading operations.
3. All storm sewer inlets shall have inlet protection inserts installed.
Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter"
inlet protection devices as manufactured by WIMCO (or approved equal)
and installed per manufacture's recommendations.
4. All erosion contra' 'r,stallations shall remain in place and be mai.ntclned in
good condition by tree contractor until the site has been re -vegetated, at
which time it shall be removed by the contractor. For proposed paved surface
areas, the contractor may remove necessary silt fencing to construct roadway,
while maintaining adequate erosion control in adjacent areas.
5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil
for disturbed areas to be re -vegetated.
6. The contractor shall schedule site grading, utility installation and site
construction so that the general site can be mulched and sodded or
re -seeded as soon as possible soon after disturbance. Areas that will not be
subject to construction traffic shall be seed and mulched or sodded within 72
hours of final grading.
EROSION CONTROL MAINTENANCE SCHEDULE
1. Erosion control measures shall be inspected by the contractor's representative
and maintained by the contractor every Friday and within 24 hours after any
rainfall event larger than 1/2" until the project is completed. Maintenance
requirements are as follows: silt fence - 1/3 height of fence or damaged,
remove sediment and/or repair fence within 24 hours; rock entrance -
refresh as necessary to conform to detail; inlet protection inserts - remove
sediment after each rain event, clean or replace filter when clogged; surface
water - drain and stabilize, within 72 hours of discovery; street sweeping -
remove all sediment tracked onto paved surfaces within 24 hours or as
directed by City Engineer.
2. Replacement - Fabric shall be replaced promptly when it decomposes or
becomes ineffective before the barrier is no longer necessary.
3. Any sediment remaining in place after silt fence is no longer required shall be
dressed to conform with the existing grade, prepared, and seeded with
appropriate seed mix, as directed by the engineer.
4. Removal of the silt fence- Silt fences shall be removed when they have
served their useful purpose, but not before the upward sloping area has been
permanently stabilized.
RESPONSIBLE PARTY
Contact information for the responsible party for erosion
control is:
CITY DESIGN + BUILD, LLC - General Contractor
Chris Molooly - Project Coordinator
612-363-0633 phone
chris@cityhomeslic.com
i, Nal CH na MM is OMAN iwwrio[
S lY ewom qua toot NO W MOM CM
TEMPORARY DEWATERING DISCHARGE DETAIL
CLIENT:
CITY
HOMES
DESIGN +
BUILD, LLC
4220 Crocker Ave
Edina, MIN 55416
952-920-8250
6
CO
Z
Rif
a J
. 'f"
Z a
j 0
Q
J
CC
m
cc
C
�
IW-
ZUNION
Co
IN
U
UNION
=w
Co
Z
0 O
CION.
o
0
tQ O
N W
oc
W
It
o
00
40 �
q) N
N
I V)
p(0 C
W O Cp Ln 0
W
Z ti
o
y o
w l o xQ)
A I mm o�>
C'
t/1�
1v q)
O
N W i+ N U
W
L O
[� O U
Q j)
_c c ° r/' 1
�'
00 0 0 3
I c
o
v
,
m
q)
3 rS S
� LL
a
W
J
!U!��
�l
Q II
U
j
W -.
n
/®
/
X
(n N
� o
i"J,
O
-
'
�
O
N
N
00
m
�
m
e►
m
QEli
Q
�
Z
v
Q
Q
C
U
FILE NO.
00577
Storm
Water and
Erosion
Control Plan