CONSTRUCTION SEQUENCING
UN -COMPACTED. METHODS TO PRESERVE TOPSOIL INCLUDE
PATRICK MOONEY
PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER
v-
RUNOFF.
ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS
—DENOTES
STRIPPING AND STOCKPILING TOPSOIL PRIOR TO GRADING OR
GUARDIAN HOMES, LLC
DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE
U.
0
SITE HAS TEMPORARILY OR PERMANENTLY CEASED,
1. INSTALLATION OF SILT FENCE OR BIO -ROLL AROUND SITE
EXCAVATION OPERATIONS.
PATRICK@GUARDIANHOMESMN.COM
AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED,
ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER
INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS
~'
2. DEMOLITION OF EXISTING STRUCTURES IF ANY.
FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE
612-919-6617 -
INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 20 LINEAL
DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH
FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING
MPGA REGULATIONS.
3. CLEAR AND GRUB.
INSPECTIONS AND MAINTENANCE
EROSION. DISCHARGE OF THE BACKWASH WATER TO SANITARY
STORMWATER
STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY
r`
�
4. CONSTRUCT NEW STRUCTURE
DAYS AFTER CONNECTING TO A SURFACE WATER AND
AVOID CONCENTRATION OF STORM WATER FLOWS.
CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY
OR PERMANENTLY CEASED.
FINAL GRADING SHALL MAINTAIN THE EXISTING STORM WATER
C
5. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE
THE CONTRACTOR IS RESPONSIBLE AT ALL TIMES FOR THE
TO NOT CAUSE ANY DAMAGE TO ADJACENT PROPERTIES.
USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLY
THE PERMITEE MUST MINIMIZE SOIL COMPACTION AND, UNLESS
MINIMIZING SOIL COMPACTION IS
DESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES ETC.) DO
NOT NEED TO BE STABILIZED. THESE AREAS MUST BE STABILIZED
SITE IS STABILIZED BY EITHER SEED OR SOD/LANDSCAPING, REMOVE
MAINTENANCE AND PROPER OPERATION OF EROSION AND SEDIMENT
NOT REQUIRED WHERE THE FUNCTION OF THE SPECIFIC AREA OF
'
DENOTES TREE
THE SITE DICTATES THAT IT BE COMPACTED. METHODS FOR
PROTECTION DEVICE
SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
CONTROL FACILITIES. THE CONTRACTOR SHALL AT A MINIMUM,
'
INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL
��;!
EROSION PREVENTION
EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL
E �' `
.
'
THE CONTRACTOR IS RESPONSIBLE FOR PLANING FOR AND
STABILIZATION MEASURES.
IRON �..�-^
�
lot"
IMPLEMENTING APPROPRIATE CONSTRUCTION PHASING,
BASED ON INSPECTION RESULTS THE CONTRACTOR MAY AND SHALL
VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND
MODIFY THE EROSION AND SEDIMENT CONTROL PLAN IN ORDER TO
OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION.
PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER
N
RUNOFF.
ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS
—DENOTES
POSSIBLE TO LIMIT SOIL EROSION BUT IN NO CASE LATER THAN 14
POLLUTION PREVENTION
DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE
U.
0
SITE HAS TEMPORARILY OR PERMANENTLY CEASED,
CONCRETE WASHOUT - SHALL OCCUR OFF-SITE
THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR
HAZARDOUS WASTE STORAGE AND HANDLING - OIL, GASOLINE, PAINT
PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM
AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED,
ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER
INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS
AROUND THE SITE, MUST BE STABILIZED WITHIN 20 LINEAL FEET
OR OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS
FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE
MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE AND
INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 20 LINEAL
DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH
FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING
MPGA REGULATIONS.
TO A SURFACE WATER.
0
EROSION. DISCHARGE OF THE BACKWASH WATER TO SANITARY
STORMWATER
STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY
SEWER IS ALLOWED WITH PERMISSION OF THE SANITARY SEWER
AUTHORITY
OR PERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14
FINAL GRADING OF THE LOT SHALL PROMOTE SHEET DRAINING AND
DAYS AFTER CONNECTING TO A SURFACE WATER AND
AVOID CONCENTRATION OF STORM WATER FLOWS.
CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY
OR PERMANENTLY CEASED.
FINAL GRADING SHALL MAINTAIN THE EXISTING STORM WATER
DRAINAGE PATTERNS TO THE EXTENT POSSIBLE AND PRACTICAL AS
TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING
TO NOT CAUSE ANY DAMAGE TO ADJACENT PROPERTIES.
USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLY
THE PERMITEE MUST MINIMIZE SOIL COMPACTION AND, UNLESS
MINIMIZING SOIL COMPACTION IS
DESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES ETC.) DO
NOT NEED TO BE STABILIZED. THESE AREAS MUST BE STABILIZED
WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT
CONTAINMENT SYSTEM.
PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR
PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER
CONNECTION TO A SURFACE WATER.
SEDIMENT CONTROL
SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM
ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER
SYSTEMS AND STORM SEWER INLETS.
NOTES:
SEE SURVEY, BY HARRY S. JOHNSON CO, INC„ DATED 8/14/2015 FOR PROPOSED HOME ELEVATIONS &
GRADES
EXISTING DRAINAGE PATTERNS DRAINING OFF SITE SHALL NOT BE ALTERED.
DRAINAGE TO THE EAST & WEST SHALL BE DIRECTED TO THE STREET TO THE SOUTH.
PROPOSED IMPERVIOUS AREA IS GREATER THAN EXISTING, HOWEVER NEWLY CREATED IMPERVIOUS
SURFACES SHALL BE DIRECTED TOWARDS THE STREET. LESS TOTAL AREA AND LESS IMPERVIOUS
AREA WILL RUNOFF TO ADJACENT PROPERTIES IN THE PROPOSED SCENARIO.
SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL
DOWN GRADIENT PERIMETERS BEFORE ANY UPGRADIENT LAND IMPERVIOUS CALCULATIONS:
DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN IN EXISTING IMPERVIOUS SURFACE = 2,539 SF
PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED. PROPOSED IMPERVIOUS SURFACE = 2,831 SF
ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE
BMPS DURING CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL
FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED.
TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER
EFFECTIVE SEDIMENT CONTROLS, AND CANNOT BE PLACED IN
SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH
AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES
UNLESS THERE IS A BYPASS IN PLACE FOR THE STORMWATER.
VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE
MUST BE MINIMIZED BY A ROCK CONSTRUCTION ENTRANCE. STREET
SWEEPING MUST BE USED IF THE ROCK ENTRANCE IS NOT
ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE
STREET.
TEMPORARY DE -WATERING - DEWATERING OR BASIN DRAINING (E.G.,
PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE)
RELATED TO THE CONSTRUCTION ACTIVITY THAT MAY HAVE TURBID
OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO
A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE
PROJECT SITE WHENEVER POSSIBLE. IF THE WATER CANNOT BE
DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE
SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE
ADVER ELY AFFECT STABILIZED CONSTRUCTION...E.NTRANCE._ _
BMP S SUCH THAT THE DISCHARGE DOES NOT S
THE RECEIVING WATER, DOWNSTREAM LANDOWNERS OR WETLANDS.
t
cor
THE CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS ARE
N
J
ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE
—DENOTES
DIRECTION O F DRAINAGE
DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP,
LO
r-+
U.
0
SAND BAGS, PLASTIC SHEATHING OR OTHER ACCEPTED ENERGY
DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL
�L
o'��
DENOTES EXISTING ELEVATION.
MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS
(40 o
Z
SUSPENDED SOLIDS.
X
DENOTES EXISTING FENCE
FILTER BACKWASH WATERS MUST BE HAULED AWAY FOR DISPOSAL,
SILT FENCEIBIO-ROLLS
DENOTES SILT FENCE
RETURNED TO THE BEGINNING OF THE TREATMENT PROCESS, OR
a
04
INCORPORATE INTO THE SITE IN A MANNER THAT DOES NOT CAUSE
m
0
EROSION. DISCHARGE OF THE BACKWASH WATER TO SANITARY
SEWER IS ALLOWED WITH PERMISSION OF THE SANITARY SEWER
AUTHORITY
' '
DENOTES INLET
PROTECTION DEVICE
SOIL COMPACTION PRECAUTIONS
THE PERMITEE MUST MINIMIZE SOIL COMPACTION AND, UNLESS
MINIMIZING SOIL COMPACTION IS
INFEASIBLE, PRESERVE TOPSOIL.
NOT REQUIRED WHERE THE FUNCTION OF THE SPECIFIC AREA OF
'
DENOTES TREE
THE SITE DICTATES THAT IT BE COMPACTED. METHODS FOR
PROTECTION DEVICE
MINIMIZING COMPACTION INCLUDE THE USE OF TRACKED
,
EQUIPMENT, AND STAYING OFF OF AREAS TO BE LEFT
o:z
ER STATE ONE CALL
.GOPHERSTATEONECALL.ORG
(800) 252-1166 TOLL FREE Alp"61
(651) 454-0002 LOCAL
1" =10'-0"
5'-0" 0 10'-0"
/
PROPOSED
WALL --' 898,
40
lop Iso SILT FENCE/BIO-ROLLS
tT"y�
\ , X011 • /
Ir .: 14.0 �� � � CD
I w 1 O Ay l 00 00 O' ;
N
31
_
0 13.5 7.
f
` 3 4.0
_ PROP.
PATIO
oo PROPOSED HOUSE & GARAGE 0
O v ��
2 22..0` PROP.
STAIRSJJ,
3C7—
e / 25.5 3
i
— J
.0 99
-- r
oIn
I
' > ° , 1' rn
(}d-
i
TREE PROTECTION, TYi,.
t
cor
J
N
J
W
o)
LO
r-+
U.
0
z
_ 50
CDv
F z
IJ_.
(40 o
Z
Lc) W00
a
SILT FENCEIBIO-ROLLS
/
PROPOSED
WALL --' 898,
40
lop Iso SILT FENCE/BIO-ROLLS
tT"y�
\ , X011 • /
Ir .: 14.0 �� � � CD
I w 1 O Ay l 00 00 O' ;
N
31
_
0 13.5 7.
f
` 3 4.0
_ PROP.
PATIO
oo PROPOSED HOUSE & GARAGE 0
O v ��
2 22..0` PROP.
STAIRSJJ,
3C7—
e / 25.5 3
i
— J
.0 99
-- r
oIn
I
' > ° , 1' rn
(}d-
i
TREE PROTECTION, TYi,.
n �D ..I S OP
}
P
HL, E
z.
N !
X
I , � 1
� I
} I (7) ! I
1�'
I` -1 E FL -00R4 1
L -LE'. . -77
TREE TO
js4 BE REMOVED
1
7
Vit! I J C)
--m101
(C
u
SET _ -�- cp
... _�� �•
IRON
SILT FENCE/BIO-ROLLS
r
C} • ~� -- INLET PROTECTION AT S
<RbK CONSTRUCTION NEAREST DOWNSTREAM
ENTRANCE, TYP. CATCH BASINS (2)
_.
\X
BITUMINOUS c
Q0 .
56w
/
/
H(Slil BENCHMARE
TOP OF N AI f_
L,._.ELEV. 97.3
�,.mr _
.1�
IK oaa a� dl o09�
:>
z. qqb
G R O V P
4931 W. 35TH ST. SUITE 200
ST. LOUIS PARK, MN 55416
CivilSiteGroup.com
Matt Pavek Pat Sarver
763-213-3944 952-250-2003
W
J
N
J
W
W
LO
r-+
U.
0
z
_ 50
CDv
F z
(40 o
Z
n �D ..I S OP
}
P
HL, E
z.
N !
X
I , � 1
� I
} I (7) ! I
1�'
I` -1 E FL -00R4 1
L -LE'. . -77
TREE TO
js4 BE REMOVED
1
7
Vit! I J C)
--m101
(C
u
SET _ -�- cp
... _�� �•
IRON
SILT FENCE/BIO-ROLLS
r
C} • ~� -- INLET PROTECTION AT S
<RbK CONSTRUCTION NEAREST DOWNSTREAM
ENTRANCE, TYP. CATCH BASINS (2)
_.
\X
BITUMINOUS c
Q0 .
56w
/
/
H(Slil BENCHMARE
TOP OF N AI f_
L,._.ELEV. 97.3
�,.mr _
.1�
IK oaa a� dl o09�
:>
z. qqb
G R O V P
4931 W. 35TH ST. SUITE 200
ST. LOUIS PARK, MN 55416
CivilSiteGroup.com
Matt Pavek Pat Sarver
763-213-3944 952-250-2003
F-
0
w
O
a.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA.
Ma thew R. Pavek
DATE 8/31/15 LICENSE NO. 44263
ISSUE/SUBMITTAL SUMMARY
REVISION SUMMARY
STORM WATER
MANAGEMENT &
EROSION CONTROL
PLAN
C1.0
W
J
W
J
F
W
�
2
z
_ 50
F z
(40 o
Z
Lc) W00
a
a
04
D
to
q
0
F-
0
w
O
a.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA.
Ma thew R. Pavek
DATE 8/31/15 LICENSE NO. 44263
ISSUE/SUBMITTAL SUMMARY
REVISION SUMMARY
STORM WATER
MANAGEMENT &
EROSION CONTROL
PLAN
C1.0