Loading...
HomeMy WebLinkAbout1902824240001-08132014i 0 SILT FENCE r•.121 : r .� �. --------------------- SILT FENCE `_•• ! STOCKPILE e_ '. SILT FENCE .. �# TEMPORARY STOCKPILE 82.9 r I ' i 693,3 c:;G; r:'G Tower Street INSTALL INLET PROTECTION IN 1 CATCH BASIN AT SE CURB RETURN ON TOWER DRIVE AT FAIRFAX AVENUE INTERSECTION. %-:--.� .nom �w'�►(► R ■ W I -vlrp f'J STOCKPILE \, t� ;� SILT FENCE SILT FENCE �-�y •,� // / / //,�/ TEMPORARY ` STOCKPILE a f �I■ �: a u'' ^ y' PROPOSED SOIL f AMENDMENT ` i ' } AREA 1 236 SF• SEE DETAILS ON SHEET 2 •� j / L,� 3(/i .;r :%-; C.i[>�i < t V :� 1 i (`.'•:`i -...� 1 :;</ , J Al i �p tt............i0:...._.. -_. A;, ..' I` i � i N ------------ 9N " 4'� 4 1 J' �l � ........ ---- • i ........ j --.._._.. Y / c r t� LEGAL DESCRIPTION SEE SURVEY PROJECT LOCATION PART OF SECTION 19, TOWNSHIP 28, RANGE 24, HENNEPIN COUNTY, MINNESOTA. EROSION CONTROL NOTES 1. All devices necessary to control erosion and sediment (I.E. perimeter silt fence rock construction entrances sw p ales, ponds, berms, ETC.) shall be installed prior to any other construction operations. 2. Temporary erosion control soil stabilization shall be completed within 72 hours of disturbed areas that are to remain fallow and in an unfinished temporary condition. Temporary stabilization to be completed in compliance with MnDOT 2575 specifications. 3. After completion of final grading, exposed soils must be permanently stabilized within 72 hours. Stabilization shall consist of disc -anchored seed & mulch or sod as allowed by City, or as proposed on City approved landscape plan for the project. 4. The site must be kept in a well drained condition at all times. The contractor shall be responsible for temporary ditches, or other means necessary to ensure proper drainage. The building pad must be provided with a positive outflow. This work shall be incidental to the grading contract. 5. Entering/exiting of the site shall occur only at rock construction entrance to reduce tracking of dirt onto paved streets. Sediment tracked onto streets during working hours must be reclaimed via street scraping and sweeping at the end of each working day. 6. Temporary dewatering pump out to be discharged to constructed Temporary Dewatering Discharge per detail 'I -,is sheet, or sediment filter bag constructed of min. Boz non -woven filter fabric, to provide silt and sediment removal from storwoter prior to discharge to appropriate drainage area. NOTES: ROCK SIZE SHOULD BE 1' TO 2' IN SIZE SUCH AS MN/DOT CA -1 OR CA -2 COURSE AGGREGATE (WASHED) A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT MIGRATION OF THE UNDERLYING SOIL INTO THE STONE ROCK CONSTRUCTION ENTRANCE DETAIL 2' :2" WOOD POSTS SILT FENCE NOTES: SITE LEGEND: • Existing Property Line '------------------------------------------- Existing Adjacent Property Line .....................7#f` ` "" ".... ` ..--- Existing Contour w/Elev. Text ------ _- -- Proposed Contour w/Elev. Text MIN. 30" - MAX. 36' Proposed Building ■■■■■■■■■■■■■ Proposed Silt Fence �nuuy Proposed Inlet Protection POLLUTION PREVENTION NOTES 1. Solid waste: collected sediment, asphalt and concrete millings, floating debrisa er p p plastic, fabric, construction debris and other wastes must be disposed of properly off-site and must comply with MPCA requirements. 2. Hazardous materials: oils, gasoline, paint, and any hazardous substance must be properly stored, including secondary containment, to prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal must be in compliance with MPCA regulations. 3. External washing of trucks or other construction vehicles is not allowed on site. No engine degreasing is allowed on site. 4. No concrete washouts are allowed on site. VEGITA TION GROUND COVER SCHEDULE 1. Permanent turf ground cover shall include all disturbed areas be covered with a minimum 4" topsoil and sodded or seeded as allowed by City, or as proposed on City approved landscape plan for the project. 2. Temporary ground cover shall be MnDOT seed mix 150 shall be applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied at 2 tons/ac and disc anchored in areas not covered by sod or erosion blanket. 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200 lbs/ac. Disc fertilizer into top 3" of soil. Specification reference is MnDOT 2575. 4. Dormant seed mix shall be used after November 1 or when temperatures do not exceed 40" F, using some rates specified above. No seed shall be placed on snow or ice greater than 2" in depth. 5. Any seeded areas that do not become established with vegetation shall be reseeded at Contractor's expense. 6. Erosion blanket shall be installed in seed areas with ground surface slopes of 5H:1 V or steeper. FILTER FABRIC ' ( IRAFI-ENVIRO FENCE OR CASTING EXISTING CONDITION vs PROPOSED CONDITION l -DEFLECTOR 0R APPROVED EOUAL) (T N) Contractor, and removed as per the Contract Documents or as FLATS MIN. 30" - MAX. 36' Lot Surveys Company Top nut of hydrant at the DRIVEWAY = 732 ABOVE GRADE 7601 73rd Avenue North Northeast quadrant of Tower �w 8. The Grading contractor shall provide positive drainage on the site at all z Minneapolis, MN 55428 Drive & Concord Avenue. times. Grading tolerances shall be 0.10' for hard surface areas. OVERFLOW /2 - 2,527 763-560-3093 Elevation = 910.08 feetZ HARD SURFACE INCREASE TOP OF CURB BOX Or CG -23 HIGH-FLOW 47.3 i` BACKFILL 6' X 6' TRENCH INLET INSERT '^ co I� GENERAL GRADING NOTES: o Z a w 0 \ ` C 11,„ specifications for the City of Edina; the latest Minnesota Deportment shall be located as shown to intercept runoff. The area located beyond the = UNDISTURBED SOIL of Transportation Specifications for Highway Construction; and all NPDES requirements U 'o o Q except where modified by these documents. OVERFLOW #`- (� 2. OSHA requirements shall be followed for oil work on this project. Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter" CENTER OF FILTER 3. The Contractor shall notify "Gopher State One Call" 48 hours prior to Z, y o ASSEMBLY 1. SILT FENCE SHALL BE BLACK IN COLOR. 2. DIG A 6'X6' TRENCH ALONG THE INTENDED FENCE UNE, OR MACHINE SLICE TO 6- DEPTH. 3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE. AND BACK FILL 5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC. 6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED. SILT FENCE DETAIL NOTES: 1: INSTALL ON FLAT GRAD FOR OPTIMUM PERFORMANCE 2: 12' OIAMEiFR FILTER OCK MAY BE STACKED ONTO DOUBLE 12' DUMETEI SOCIB IN PYRAMIDAL CONFiGURATION FOR ADED HEIGHT. Y NOTES: 1) CONTRACTOR OPTION TO USE WIMCO INLET PROTECTION INSERT OR EQUAL. INLET PROTECTION DETAIL MAXIMUM DEPTH OF OLSCHAROE WATER IS 50% OF FLTER RIGHT HEIOHf r12' DIAMETER COMPOST FILTER SOCK 'ORARY DEWATERING INTO FILTER RING 12' DIAMETER COMPOST FILTER SOCK; 4 FT MWIMUM OVERLAP ON UPSLOPE SIDE OF FILTER RRLO; LAYOUT AT MINIMUM 6' DIAMETER CIRCLE TEMPORARY DEWATERING DISCHARGE DETAIL CLIENT. CITY HOMES DESIGN + BUILD, LLC 4220 Crocker Ave Edina, MIN 55416 952-920-8250 0 10 20 30 1 011111111000111 GRAPHIC SCALE IN FEET EXISTING CONDITION vs PROPOSED CONDITION 7. Erosion control maintenance shall be performed by the Grading Survey Data By: Benchmark: Contractor, and removed as per the Contract Documents or as HOUSE FOOTPRINT = 1,636 Lot Surveys Company Top nut of hydrant at the DRIVEWAY = 732 disturbed area. 7601 73rd Avenue North Northeast quadrant of Tower �w 8. The Grading contractor shall provide positive drainage on the site at all z Minneapolis, MN 55428 Drive & Concord Avenue. times. Grading tolerances shall be 0.10' for hard surface areas. TOTAL HARD SURFACE = 2,527 763-560-3093 Elevation = 910.08 feetZ HARD SURFACE INCREASE = 1,196 Or a c 47.3 0 Q 1,565 '^ co -J 1. GENERAL GRADING NOTES: o Z a w 0 Specifications applicable for this project: Current standard ` C 11,„ specifications for the City of Edina; the latest Minnesota Deportment shall be located as shown to intercept runoff. The area located beyond the = Q Z of Transportation Specifications for Highway Construction; and all NPDES requirements U 'o o Q except where modified by these documents. I (� 2. OSHA requirements shall be followed for oil work on this project. Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter" 3. The Contractor shall notify "Gopher State One Call" 48 hours prior to Z, y o '" z any excavation (1-800-252-1166.) 4. All erosion control ins�cllotions shall remain in place and be maintained in O 4. The Grading Contractor shall verify all locations and elevations of good condition by tn% cu.,itroctor until the site has been re-veyetated, ai "C _� F•, W underground utilities with utility companies prior to any construction, ��� , V areas, the contractor may remove necessary silt fencing to construct roadway, and immediately notify the Engineer of any conflicts. (0 W v o 5. Final Plat shall govern for easements and lot dimensions. 5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil W 6. Any erosion control items necessary to protect adjacent properties shall o 6. The contractor shall schedule site grading, utility installation and site be constructed prior- to the start of excavation or grading work. EXISTING CONDITION vs PROPOSED CONDITION 7. Erosion control maintenance shall be performed by the Grading EXISTING (SF) Contractor, and removed as per the Contract Documents or as HOUSE FOOTPRINT = 1,636 directed by the Owner, followed by all necessary restoration of DRIVEWAY = 732 disturbed area. SIDEWALKS/STOOPS = 159 8. The Grading contractor shall provide positive drainage on the site at all PATIO = 0 times. Grading tolerances shall be 0.10' for hard surface areas. TOTAL HARD SURFACE = 2,527 Grading tolerances for the remainder of the site shall be 0.25'. HARD SURFACE INCREASE = 1,196 9. The Grading Contractor shall keep public streets, parking lots, and a c 47.3 travel ways clear of soil and debris. Daily cleaning at the CX o c 1,565 construction entrance shall be performed, especially at the end of AREA TO REAR YARD = 962 each day's work. o Z a EROSION CONTROL INSTALLATION SCHEDULE Zr o c 1. Silt fence shall be installed or restored prior to any construction. Silt fenceW o -;5perimeter shall be located as shown to intercept runoff. The area located beyond the 3. silt fence shall not be disturbed during construction. U 'o o 2. Rock Construction Entrance shall be installed prior to grading operations. o '` 3. All storm sewer inlets shall have inlet protection inserts installed. o Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter" inlet protection devices as manufactured by WIMCO (or approved equal) Z, y o and installed per manufacture's recommendations. ° q, 4. All erosion control ins�cllotions shall remain in place and be maintained in o :j o good condition by tn% cu.,itroctor until the site has been re-veyetated, ai n raj which time it shall be removed by the contractor. For proposed paved surface ��� , V areas, the contractor may remove necessary silt fencing to construct roadway, o " while maintaining adequate erosion control in adjacent areas. v o 5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil for disturbed areas to be re -vegetated. o 6. The contractor shall schedule site grading, utility installation and site coo ° construction so that the general site can be mulched and sodded or '� w '� re -seeded as soon as possible soon after disturbance. Areas that will not be subject to construction traffic shall be seed and mulched or sodded within 72 hours of final grading. EROSION CONTROL MAINTENANCE SCHEDULE 1. Erosion control measures shall be inspected by the contractor's representative and maintained by the contractor every Friday and within 24 hours after any rainfall event larger than 1/2" until the project is completed. Maintenance requirements are as follows: silt fence - 1/3 height of fence or damaged, remove sediment and/or repair fence within 24 hours; rock entrance - refresh as necessary to conform to detail; inlet protection inserts - remove sediment after each rain event, clean or replace filter when clogged; surface water - drain and stabilize, within 72 hours of discovery; street sweeping - remove all sediment tracked onto paved surfaces within 24 hours or as directed by City Engineer. 2. Replacement - Fabric shall be replaced promptly when it decomposes or becomes ineffective before the barrier is no longer necessary. 3. Any sediment remaining in place after silt fence is no longer required shall be dressed to conform with the existing grade, prepared, and seeded with appropriate seed mix, as directed by the engineer. 4. Removal of the silt fence- Silt fences shall be removed when they have served their useful purpose, but not before the upward sloping area has been permanently stabilized. RESPONSIBLE PARTY Contact information for the responsible party for erosion Z control is: \ CITY DESIGN + BUILD, LLC - General Contractor Shawn Michlitsch - Project Manager 651-497-8062 mobile chnuin(Uir`itvhnmacllrrnm DRAINAGE AREA HARD SURFACE COMPARISON: EXISTING CONDITION vs PROPOSED CONDITION EXISTING (SF) PROPOSED (SF) HOUSE FOOTPRINT = 1,636 2,707 DRIVEWAY = 732 753 SIDEWALKS/STOOPS = 159 67 PATIO = 0 196 TOTAL HARD SURFACE = 2,527 3,723 HARD SURFACE INCREASE = 1,196 SF (EXISTING vs PROPOSED) 47.3 % AREA TO FRONT YARD = 1,565 2,218 AREA TO REAR YARD = 962 1,505 Rear yard area proposed hard surface is 543 sf larger than existing condition. Rear yard area storm water runoff and iolume reduction proposed by soil )mendment based on guidance from APCA Minnesota Storm Water Manual Ind other sources. 'roposed soil amendment area to Irovide runoff and volume control -quivalent to 1.14 inch rainfall event on 43 sf hard surface area. 0,236sf x 0.5inch / 543sf = 1.14inch) 00 d - r7 � Loo C3 Lo I U ZoLo�r7� o, A ImoI z _co din•� W I �O U� U ISI I WCL+ N I� :r - C: I� �CL 00 I D \ f 00 m W ai Q O � a. -112 Storm Water and Erosion Control Plan 13 -Fo l�• oa8.a�-a�.000 � U) 00m m LLJ 3 V W Q � LLJ O O U FILE NO. 00509 -112 Storm Water and Erosion Control Plan 13 -Fo l�• oa8.a�-a�.000 �