HomeMy WebLinkAbout2911721210008-03312015 (2)ADVANCE SURVEYING & ENGINEERING CO.
5300 S. Hwy. No. 101 Minnetonka, MN 55345 Phone (952) 474 7964 Fax (952) 225 0502 WWW.ADVSUR.COM
SURVEY FOR: DENALI HOMES
SURVEYED: December 15, 2.014 DRAFTED: December 18, 2014
REVISED: January 14, 2015, to show trees.
REVISED: February 17, 2015, to show changed house and grading.
REVISED: March 6, 2015, to show revised building dimension and basement floor.
LEGAL DESCRIPTION:
Lot 2, Block 1, Sandy Pines, Hennepin County, Minnesota.
SCOPE OF WORK & LIMITATIONS:
1. Showing the length and direction of boundary lines of the above legal
description. The scope of our services does not include determining what
you own, which is a legal matter. Please check the legal description with
your records or consult with competent legal counsel, if necessary, to
make sure that it is correct, and that any matters of record, such as
easements, that you wish shown on the survey, have been shown.
2. Showing the location of existing improvements we deemed important.
3. Setting new monuments or verifying old monuments to mark the
corners of the property.
4. Showing elevations on the site at selected locations to give some
indication of the topography of the site. The elevations shown relate only
to the benchmark provided on this survey. Use that benchmark and check
at least one other feature shown on the survey when determining other
elevations for use on this site.
5. Showing your proposal to build a new home on the property, related
improvements, grading, drainage and erosion control details for your
review and approval and for the review and approval of such
governmental agencies as may have jurisdiction over your project before
you use this survey to make decisions.
6. This plan is to revise a plan prepared by others to show recent small
revisions in home size and to correct existing topographic information but
the scope of our services did not include redoing the work of the engineer
who designed the approved storm water management for this site.
7. There are easements that affect this property and we have not, at this
point, been furnished with documents to establish where such easements
lie and to that extent, the survey is subject to revision when such
documents are furnished.
STANDARD SYMBOLS & CONVENTIONS:
" • " Denotes found iron pipe, unless otherwise noted.
CERTIFICATION:
I hereby certify that this plan, specification, report or survey was prepared by me or
under my direct supervision and that I am a duly Licensed Professional Engineer and
Licensed Land Surveyor under the laws of the state of Minnesota.
Signature: Jovrrw1-v ,Tl.. PcVLA,yi, Typed Name: James H. Parker
Date: March 6, 2015 Reg. No. 9235
BEFORE DEMOLITION AND GRADING BEGIN:
:.
o�
o�
0
rnio
w
01
O
Z
0
1. Install silt fence around the perimeter of the construction area as shown on this plan.
2. Install. inlet protection at inlets to the storm server system that receive stornx water from areas to be disturbed on
this site using Read [.train Top Slake Mod 1 R,0 23 tflts rough openingfor 2x.1' inlet), Road E)ra1n Top Slab
iNfod�:l RO 27 (fits: rough opening for 2 -7" inlet), or'Road Diain Toy .slab Model €.:.t 05 (['its �,eenah
Casting v,%ith i5 -1/4'x17-3/4" dimensions) manufactured by WINIC0, 799 Theis Drive, Shakopee, NIN.
55379, Phone (952) 213-3055.
3. Sediment control measures must remain in place until final stabilization has been established and then shall be removed.
Sediment controls may be removed to accommodate short term construction activity but must be replaced before the next
rain.
4. A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer of 1 to 2 inch
rock extending at least 50 feet from the street into the site and shall be underlain with permeable geotextile fabric. The
entrance shall be maintained during construction by top dressing or washing toprevent tracking or flow of sediments onto
public streets, walks or alleys. Potential entrances that are not so protected shall be closed by fencing to prevent
unprotected exit from the site.
DURING CONSTRUCTION:
5. When dirt stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment laden runoff and
if the piles or other disturbed areas are to remain in place for more than 14 days, they shall be seeded with Minnesota Department
of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray mulch.
6.
7. A dumpster shall be placed on the site for prompt disposal of construction debris. These dumpsters shall be serviced regularly to
prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from the site shall in accordance with
Minnesota Pollution Control Agency requirements.
8. A separate container shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in accordance with
MPGA requirements.
9. Concrete truck washout shall be in the plastic lined ditch shown on this plan for "CONCRETE WASHOUT" and dispose of
washings as solid waste.
10. Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and repaired as
necessary to provide downstream protection.
11. Streets, alleys, sidewalks and other public ways shall be inspected daily and if litter or soils has been deposited it shall promptly
be removed. The contact person for this site is Eric Olsen, Denali Homes; 952 292 3081; erik(o)denalicustomhomes.com
12. If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock entrance areas.
13. Moisture shall be applied to disturbed areas to control dust as needed.
14. Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained.
15. If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile areas so that the
double silt fence around these areas can filter the water before it leaves the site.
16. Temporary erosion control shall be installed no later than 14 days after the site is first disturbed and shall consist of broadcast
seeding with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray
mulch.
SITE WORK COMPLETION:
17. When final grading has been completed but before placement of seed or sod an "as built" survey shall be done per Edina's
requirements to insure that grading was properly done.
18. When any remedial grading has been completed, sod or seeding shall be completed including any erosion control blankets for
steep areas.
19. When turf is established, silt fence and inlet protection and other erosion control devices shall be disposed of and adjacent streets,
alleys and walks shall be cleaned as needed to deliver a site that is erosion resistant and clean.
OVERFLOW
ELEV.=889.9
0��
6821 ; 8.,
58
8 F
S 89'32'48" E
--319.84--
EXISTING
DWELLING
898.2 X
--------------------61.0 30" TREE
I
MANHOLE
ELEV.=892.7
X887.8
X887.1
X887.2
EXISTING
DWELLING
X891.5 - _ _ �}•�
J
i
MANHOLE
ELEV.=893.0
Tj0A1 �A K
NHCF
CITY BENCHMARK (TNH)
y ELEV.=894.5(1V1EAS/NGVD29)
ELEV.=894.45(CITY)
,STORff#,r4TER ff,4.X4OLNEVT
81110t4(31)'EPAMUEW
titR� 3 I M5
GI"fY OF FDJ%A
PI.D.iZq-117- 2I-ZI-000B
GRAPHIC SCALE
20 0 10 20 40
( IN FEET )
Freln / r ' 135-1i� -N63 ANNAWAY & NEW Halr,�
EROSIO V CONTROL PLAN 150082 2015 03 OS A. TR