HomeMy WebLinkAboutAppendix C_MillPondSurveys_rawMill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
o viewing water/wildlife o swimming o socializing/entertaining
o canoeing/kayal.': E fishing E other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value nf the service compared with the price paid?
fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
po r fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied ,) dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to gEt an additional cutting (tor a total of three cuttings per year).
El maintaining the current strategy of harvesting twice per year.
n reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. 4-4°`0"6 Mit" qt'•) bigerCa--- eh)
ti4sCesk_ --rcs
4905 Browndale Ave
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
) ( fiar poor
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
/viewing w2.ter/wildlife Li swimming ilXocializing/entertaining
5/canoeing/kayaking/boating tAlshing g/other: Llia-I.Vs.iNti i&J LJJt J7L 7?(C?
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied ctsatisfj' 'ed neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
CI paying more to get an additional cutting (for a total of three cuttings per year).
L) maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
CI discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. 441 ti--, Pd N 0 NEWS fin ei\171 cog , ee0 teA / 0 6 Fl 1-LIAti //V
NO QC-PM Dtitt4 Stti&f, dti-mov Aj7 cS7)vz fguiffY
C17/, t. ke,s two Lei-,$, snry 1b '-'f 7/rt 461/tEld67- ok pi
(ft041/51/N41 0Q41- I /kJ 4-7/G4 Mrf/t7 .96E37j dal Het/ S PUT IVAI 69 kcea_
—7j17.c. L&A.J -700a v/4-01,iv 4 / ,A4-7eVa1-y 7 , -1-t_P /7 4 tuveri 64?
175. /1--(4.c,,i)iw /7 -74, ENGINEERING DEPARTMENT
cu _7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439 0,41/4. er'ic t t
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
.;k-a Dbseirut_ 41,,t_vv,es,64,c_ak IviwesA; ukAbe ecc,f(Jsk oua CP11/`-Z-- \\-
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. Ae#er ODN\A-144-(4441--4/13-v\- —5 su,e* ct.s 41:6
Veseard/L, ka-5
‘N,--erecLYek vy.,n \4‘ ._P-ofs' 4/st "-D6-4Q.C8 Edgebrook PI
4 cu-e. uoLeAcr vv\; (rfc6- .5 0 ogijg4009,1/4--40A tt ,food4DS
ccoE)d-sl SVIAQr
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife o swimming socializing/entertaining
LOt\ Sk \AA, canoeing/kayaking/boating o fishing n other: cJJ .e
2. Over Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
ve dissatis dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
n paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
• reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
o viewing water/wildlife o swimming o socializing/entertaining
o canoeing/kayaking/boating o fishing o other: —
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
Page --r 6014,CLV4A,C41- 41,14- u-65
4144, Ai4A-V.Pv-ik
4507 Browndale Ave
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife o swimming
(0 4-
-) (
0035110K' • '
o socializing/entertaining
canoeing/kayaking/boating o fishing E other:
— airy' 0,5.t-• ilipa...551He ii eta
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
'poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
ELeAunix, r profim — And 50 kve haAie //(y/atec
11441i ata/Led,1 eatottp a/6g -e& Se,tir/efie„,
/41/ Creek, a4114 60 It 446 aajo,90-0/ 11 sa%3e tee- 4( sw
1471,3a., ENGINEERING DEPARTMENT 20 -
7450 Metro Boulevard • Edina, Minnesota 55439 eiciii/tal P-(M-/ www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
6. Which of the following levels of service would you be in favor of?
U paying more to get an additional cutting (for a total of three cuttings per year).
U maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
)gt discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page' hrw kit hwe //o-a here. az kuit
op-
ea,r ereek76 a ddrernif Au
ala 2.7L Wfrid/W-7. 12-4'4/2/
it /5 a_ f 7OH4e6 — o 4) doesg M'
C(35eA) 6u-ehl ffo (WM the_ cre&_k E06;,,e_
LJL
eitar c,ts or we Awe
assess
á5S5 U3 u-el
A d
oh,I .,-(,(j the, 0,1, lawfs ct.u. 47at,e_ cud b(FiLicY- Ink did4u
-6;141--- h Ftt,h,6,e vivA41 — Aur 4,94-0-7Z-16
ainet 'ffifLyi %IQ/Pas-6u- La --11-0 hp-nwp/vi-tm.4.}
-(6w' i24have64
A
t#UI 62-tc( p,op94
Wuz i/t5e(cs
CI-F iii pt) nut ik " cio-e4firt 4/i sde.
hyL lo –4 0-plo /et(/*
0,1i2(fLJ
".& riJ )Lo
1/1.4j , ,
— (i/O-e`6- a-re av,06,./tt,54j
6°e-4y-it& eree-
fiow-ek rd2_4 (fion /47 44Siie, A5
Ara) (3
• toL,u,U_ / ,L) tiLL /ere) au:
paztit-ale 0.1,7L/A,s
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
o viewing water/wildlife o swimming o socializing/entertaining
o canoeing/kayaking/boating o fishing o other: d,_.)At cd...241
-3...,--,—.---e--6 --
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of he service compared with the price paid?
poor fai1 good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neut/ satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neuti satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
u paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
E reducing the frequency of harvesting to one time per year.
discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
ae> e-74>
4909 Browndale Ave
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
El viewing water/wildlife o swimming 13' socializing/entertaining
canoeing/kayaking/boating o fishing 17 other
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
Li paying more to get an additional cutting (for a total of three cuttings per year).
LI maintaining the current strategy of harvesting twice per year.
Li reducing the frequency of harvesting to one time per year.
Xdiscontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
Page. i
a ,61 .5,6,47
74z
4905 Sunnyside Rd
7z-zy
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
X viewing water/wildlife o swimming ,"socializing/entertaining
n canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfie neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
aintaining the current strategy of harvesting twice per year.
educing the frequency of harvesting to one time per year. a,yr •ae ..044
o discontinuing mechanical harvesting. t,62 A el/ 7
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
4917 Sunnyslope Rd E
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
0 -
ci7/k7f-
ar*
1.7117 TYe(444,,6-tee-;' 0, 5.
444 k q...qa14/ 4%, Volk,/ ,A€A1/e-- -ALAX
ern 5- ki Yc</ge,( 6, 441 &ve r 14 '7
(,041:0- oed.c yci,v,ve b_ervf oc_(.4(tf cti
A4 14 4 4/ a
5 76 rill i-ttaee-- flJT7f 07" eel/ Th b4€ -fp ex
C 1)15665
L-6---641(
Moi gM0ever
rY 52s,a,/k(a,
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
I. What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife swimming o socializing/entertaining
o canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
--, --
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
dt maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. ti vvLiftt
‘e.t4 Tr4-11.1-f
tot -ealleie Ave
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
1/viewing water/wildlife o swimming
n/Canoeing/kayaking/boating it/fishing
o socializing/entertaining
o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor :Ta good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied 5eutral ) satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
Er/naintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
1:1 discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. prse c51--s9 -Too 4-0.sLi,_,oc,-N r--1 a
4907 Sunnyside Rd
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1,2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
id viewing water/wildlife o swimming o socializing/entertaining
Veanoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
os5 rt7)} on J4.
3.- How would you rate the quality of the harvesting work over the last two years?
poor fair good) very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied
=—
dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied ( neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
q/maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
--10YY") 4+Z - 6C. r)C4 haN/C cick pfOrt41 anC)
are- c--k°r6cd otSifLADis 1M-cer .c.,13-'1' L+5513 Browndale Ave
bOf ri corrh ))0 -0-tr_r\ so _s-hook) eAiriviore
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Ecc:vvos-e_ ,,k,) dere, no-Hi)v-N6 4-c) co40) 6k_y_i64rn
5-routns c -)--)ne Joonks 9(7 6-ev,Dylac4)._r kive--
hy-Y1(4tti v).6uo (Pee*, Our i rnrre.chctlia>
bev"-s 6/) 6rou c- soffor4 )00,0_ u611--k
vY)°cYki +%1' iyalern9n4 onivi -)fccr)-\Ar\eorl- AD
pevL 1/-14 hdP srca4
"1- lcc)teur_._.e.wcmcyr, +kr--Y -rlSkliocsh:cd
C L) • d, w)d-e,
cv-0Cl so)ukcv) cAr ci))(DLAD losccak_.
4-(;) pcivn6 on wrap/4 Cci 0 5oryie..0(y...
1G° Pk,
)0ctAic Pc-ct(son
Ps" i-i0E.0 L-4,1 ryliriJo4) noklod S/nnircbr> Pl.crrhr&3
cjf S. ,S 47051S-iunnyside Rd
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife o swimming ft socializing/entertaining
o canoeing/kayaking/boating E fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good) very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
,— •
very dissatisfied dissatisfied neutral (atisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
Xmaintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
1.30-\--(" s Or 011 Ncc-
Jc k (,1 tk aye s
fCC
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
I. What are your primary activities on Mill Pond? Check all that apply.
X. viewing water/wildlife o swimming o socializing/entertaining
rX canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor
(fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied
dissatisfied ( neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied ( dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (tor a total of three cuttings per year).
)s("maintaining the current strategy of harvesting twice per year. C Cn5
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
Zt eeds 12-.) be_ ci re)? c8,-() Te-- r—t o
tl• jn \I 5 75:ifed Vsa - c+rf) kvN cz-vt..) vie,/ ( saktd)
pcxy r d C93 VA.) 1- 15
s 16.5-1 Is,' ,40 6 1
fc'eK " • C) sr 5 461 8)E9dg3ebiroo PI
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife o swimming o socializing/entertaining
X. canoeing/kayaking/boating 'xf fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good " excellent
3. How would you rate the quality of the harvesting Work over the last two years?
poor fair
( good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied , very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
4610 Browndale Ave
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
'IL viewing water/wildlife o swimming NA socializing/entertaining
7C canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two ars?
very dissatisfied dissatisfied satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
o paying more to get an additional cutting (for a total of three cuttings per year).
-ti....paintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
4807 Sunnyside Rd
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
• 'viewing water/wildlife Li swimming 01.-1-ocializing/entertaining
clyCanoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good
—
3. How would you rate the quality of the harvesting work over the last two years?
poor fair ji good very good
excellent
excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied (dissatisfied) neutral satisfied very satisfied _
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied cElissatis- fled) neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
u paying more to get an additional cutting (for a total of three cuttings per year).
Li maintaining the current strategy of harvesting twice per year.
•
k. NJ) w ‘1\iss
CI reducing the frequency of harvesting to one time per year. (p-eA V_a-A VS
Li discontinuing mechanical harvesting. 6-0-7\Q
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
4703 Sunnyside Rd °NI b S) vYLQ-As t/NNL (-
C(0 L\ -Qoarc c-LL)c_a q\10 .Cej
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439 NO0 www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
C.N.V cis bc, 5 020 k krjD t-vle
EPARTMENT -110 dI 16f,g,
fee (6,1,e e Ito vtio (pm •rg-53
ENGINEERING
Ct.%) hcje.54 if.54‘ t'6 i( P,o9 t(-5 1(001
tqJ 1L i (1° .rh( *( etter d k7‘c()
Ptipio 6.) t e it• cittedrel
1'6 e,e 0\
-riurifkur
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
491 Sunnyside Rd
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
izr viewing water/wildlife
(e.
J
r .74.) ci7 e
swimmin ,12--socializing/entertaining
What are your primary activities on Mill Pond? Check all that apply. '10 55 1
2rcanoeing/kayaking/boating ,o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid? Ike 4uteiwye dote
good very good c-t All 10140 r excellent
3. How would you rate the quality of the b9.rvescing work ,over the last twQ_yearsin co a(c- I+ 3 val ave5
poor I fair good very good excellent
How would you rate your level of satisfaction with the overall aquatic vegetdtion management, strategy in Mill 4.
Pond over the last two years? C-A0 T Vsd ct_ e. )06)(1--
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years? 6:- kr/ 1;-) c , Ael.0 hue 4 ( )'
.siot c tet ,-/K/ 4--1/0//9 Weg 444 very dissatisfied dissatisfied neutral satis ed very satisfied
fair
how V e Ve t- 6. Which of the following levels of service would you be in favor of?
▪ paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year. -II) "="14,-ev gore,- 0-
060,.)CO3 5 vdet ▪ reducing the frequency of harvesting to one time per year.
id it fro"e
poi O eit?-1- p o discontinuing mechanical harvesting. 16 C
hide WI
have any other comments, please include them in the space provided. You may also usethe back of this
page.
7. If you
it/tifek,
sce_,
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife o swimming o socializing/entertaining
`c_ canoeing/kayaking/boating ,/
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor, fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied _
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied = dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
0 paying more to get an additional cuttinglor-a-to
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
ik-ve re, ,Neow- h cy/ fl‘
)16Q-6Q-e. c;e4)76co.,e, t_aercz Arr. -A& e,e.ea-2----7e-lei 6/:7(Z(C49_
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
4804 Sunnyslope Rd E
4(91vJe-
o fishing o other:
dissatisfied neutral satisfied very satisfied
Cu •er- me-Le, ver- te-t'ofr)
tc‘ be
cT
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
1. What are your primary activities on Mill Pond? Check all that apply.
csi - viewing water/wildlife o swimming :1=1 socializing/entertaining
o other: ci canoeing/kayaking/boating ID fishing
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor ‘r.fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfie dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied rdissatisfie neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
1=1 (t) ay ing moiejo get an additional cutting (tor a total of three cuttings per year).
o maintaining the current strategy of harvesting twice pier year.
Li reducing the frequency of harvesting to one time per year.
Li discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. .4,..1‘ -Vt.e.n 11;- o
eptoe& %.t tit
A—cs r \114 -te
4808 Sunnyslope Rd W
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1,2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
\iX viewing water/wildlife o swimming Kt socializing/entertaining
"1 canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
yourate the overall value of the service compared with the price paid? v exi poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
elly_foor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over he last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regardin man g nt of Mill Pond....over_the, ast two years?
0
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
U paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
El discontinuing mechanical harvesting.
7. 13/1)&yl n AA,ore, 4-0 6,Gth slur
I you h ve an other comments, please inclu e them in th pace provided. You may al use the back of this
Page' tILt k6We, LOrocl Icic uA4 tL -tett
Wilv€ 064. -.00 t4,_ga-_15 Lit/ locuis.tf 1-14A-4 q4A-itx
ojAAKAkerr -u)ctS tQaautse ;L4-L9, Aqi-i-eti e.1" a. VOA) 4808 Sunnyslope Rd E
CrIy 1\) eAA-) •Vre; tkui 1-0 9/rblik\A.
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
)zi, viewing water/wildlife o swimming o socializing/entertaining
/ canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
- —
very dissatisfied dissatisfied neutral ) satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
i& paying moi e to get an additional cutting (for a total of three cuttings per yeal),
•
irr)
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
t`t- IAJI/vt kArl kS tv-e 4\74
1-60i1g,e7u acr-4
0 t. • ,0
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
4907 Sunnyslope Rd E
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
Nm viewing water/wildlife o swimming
\ socializing/entertaining
o canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
paying more to get an additional cutting (for a total of three cuttings per year).
Ei maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. \\:\ .‘.N\\ •S")%
N\A\N)\n;k\-‘, \\
4901 Sunnyslope Rd E
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
7. If you have any other comments, please include them in the space provided. You may also use the back of this
V e F. CR,15k-fcAcis1 +1/4.4.. c.ek- LA- e ct et_ 1..J0
c -k- k 04,-4>k . 0
5 Pt" "1' 1 ak,00n 4,4c- (0 A /./4_ Laitv-e-)-1-1 -x) t-A-e-eL)
n ck- c re ja).< y lobo) 5 iv Lszo...)ci.12Kunnysl0pe Rd W
V#\e-io1&t cQ k afJ e ALA. egv
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
1. What are your primary activities on Mill Pond? Check all that apply.
)< viewing water/wildlife o swimming ›Csocializing/entertaining
canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
ery dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral very satisfied
6. Which of the following levels of service would you be in favor of?
X, paying more to get an additional cutting (for a total of three cuttings per year).
U maintaining the current strategy of harvesting twice per year.
ii reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439 5ek.
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392 1cke
wtv?i,
-grim
Ni o yvv,CoNflut
\\
AP°
c...tA,10 are() 111A A"k,,-RA (etS o ift/ bt.
1-79 cua
5e. kv,-J-es tky krAre 4--e1 ts
IAA; ckotk, VO ( LA,
c't
PoN
OO 1.
af- okAe 'a u•-e-11. ?c(f).- okg
5 t''L't I S 11 00i\es.)
-Fcbi\A- tf--
t/t4.11
yo,R
utt4
Col\A,M, UNIC ak-; ON
vi
otA- s -V-e .,of or- C-Gt." '1n.)7
kel A / Cap/ € 5. (.de, 0,(fipecii-oik
oNJ kithou(dvcf0(.5K .biz
.1-62-1K -1-ire,cff
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
o viewing water/wildlife o swimming o socializing/entertaining
o canoeing/kayaking/boating o fishing El other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good ) very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied', very satisfied
6. Which of the following levels of service would you be in favor of?
DI paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
5657 Baltusrol Ct #3a
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
X viewing water/wildlife ;t1 swimming s4 socializing/entertaining
lyt: canoeing/kayaking/boating j fishing o other: _
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral-) satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
''')‹ paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
P.O. Box 535
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife o swimming o socializing/entertaining
o canoeing/kayaking/boating n fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied
dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of? ypaying more to get an additional cutting (for a total of three cuttings per year).
u maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
4518 Bt-owndale Ave
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
I. What are your primary activities on Mill Pond? Check all that apply.
/viewing water/wildlife o swimming o socializing/entertaining
p4anoeing/kayaking/boating E fishing /other: 5 (vviA
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied
dissatisfied (neuY satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied
satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
4520 Browndale Ave
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
X viewing water/wildlife D swimming socializing/entertaining
canoeing/kayaking/boating p 'fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied fdissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral very satisfied
6. Which of the following levels of service would you be in favor of?
_...)?<paying more to get an additional cutting (for a total of three cuttings per year),
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page
714( /NC (LFACE / V A QvArc_ WaerAno1/4) (s% ALSO DoE
To ril6 Bva-P -vp oF s61211t4E7vr rt* cizert 7gPa77o44
4603 Sunnyside Rd
ovElt_ -rt-fE YEA-g r'? Trx HAILP CtAtf errc;144 awriliktw
ENGINEERING DEPARTMENT ... IN EAtLy lloo ts• 17 5 ••• 7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392 p ve- Few- At
)12E 6 00 &
()V MLA- Poab
4905 Sunnyslope Rd E
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are y9ur primary activities on Mill Pond? Check all that apply.
vi wing water/wildlife swjjnming o socializing/entertaining
canoeing/kayaking/boating fishing El other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
fair good
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the la wo years?
dissatisfied neutral satisfied very satisfied
5. How wou d you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
paying more to get an additional cutting (for a total of three cuttings per year).
maintaining the current strategy of harvesting twice per year. .97
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
excellent
page.
/2Z)
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
)<viewing water/wildlife o swimming
›ccanoeing/kayaking/boating X fishing
x, socializing/entertaining
n other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
><.\.paying more to get an additional cutting (tor a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
4461 Waters Edge La
qp31 -C-411a4-cvoi
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
very satisfied
20/5
very satisfied
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
I. What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife o swimming o socializing/entertaining
7canoeing/kayaking/boating El fishing n other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
o/5
0 poor air good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
Cpfy) fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years? to/5
_,2 .91LI very-dissatisfied dissatisfied eiftral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
o /Lr v ry dissatisfi dissatisfied neutral satisfied
6. Which of the following levels of service would you be in favor of?
paying more to get an additional cutting (for a total of three cuttings per year). /29‘..a.4--eao
o maintaining the current strategy of harvesting twice per year. fi-g.54).
n reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
C.Ars-r4-7-.0—e -e0 (79L.e_
cz .14 C4-1-A4U0 re-e.s-u—OL
itft'*-2 o -2-4`A-g
4801 Sunnyslope Rd E
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
1t ,Jc,_,,„7D_174eA
7 o7 0/3,
7-g-e2--Ld 60-e4-e- Y I etge-A-e-&-ce /o6-e c+c,7
,ecn -eA //i_os /1-0-e,Z76420 6,0e0
7/4e--7- 7‘. ca-adze.
020/y, „zee_
/4_
,61-Z
ea-t/ 14- DAI
p44, °'°?4 21- 7 - A'04
S /,Y-ad ;Zg P46_ C-e-ale /ea-=x4 w-za/szQ_
/41' -6eft et4,1 -164 r s.2 /1/"i
pZhassi'° J21.71-e-taz-
ie'Lee) .,A4e ‘2101-7Z t124 eV-e404c ° 7‘---
vzs, 60-,4 ,ez,6 &-„4 „5"Lad-Lci ,
744_ z_a_p-i4
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September I, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
D viewing water/wildlife o swimming
/\.0 canoeing/kayaking/boating ,"fishing
socializing/entertaining
o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate t everall value of the service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
)
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two_years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
paying more to get an additional cutting (for a total of three cuttings per year),
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
Page' )1,_, aeLta, d/r2.
/MO 017t. aloo 4/7114—
7 Ritia, / 4913 Sunnyslope Rd E
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
0/viewing water/wildlife o swimming o socializing/entertaining
n canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
—)
poor fair , good very good excellent
_
3. How would you rate the quality of the harvesting work over the last two years?
., )poor fair ( good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
f''aying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. 1A) ie-----A--?-14)
r
— e 4707 Sunnyside Rd
LA. 4 P ?
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
I. What are your primary activities on Mill Pond? Check all that apply.
viewing water/wildlife
/swimming Vsocializing/entertaining
icanoeing/kayaking/boating 65/fishirig e(other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor fair good very good ) excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the ovei1Fãuatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied ) very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
/paying more to get an additional cutting (for a total of three cuttings per year).
D maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
ne,(40 6e_ WiDe(2-,
CoAn Lee-ax_te ( 1" 0-et irt 4612 Edgebrook PI
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
page.
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
I. What are your primary activities on Mill Pond? Check all that apply.
o viewing water/wildlife o swimming o socializing/entertaining
canoeing/kayaking/boating fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor ef)rr2 good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair 6od very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied issatIfLed neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied 6eutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
A"--p-;ing more to get an additional cutting (for a total of three cuttings per year).
E maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
gc G, (Ai 1 An A) /Cv.t. byg ir-AS. 4_71'‘-'-' '
4630 Edgebrook PI
th i‘k-171,---Ci 0 -1 - /).‹_ ve-fr c_
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
-1P"-•••,.
kc-oe kei)
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1,2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
X)viewing water/wildlife o swimming o socializing/entertaining
anoeing/kayaking/boating \Kifishing o other: 51-C('-- )
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service com ared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent 6
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied 4issatisfied2 neutral satisfied very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral 7 satisfied very satisfied
6. Which of the following levels of service would you be in favor o
ying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
o discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page.
ffOcj
5,citr\tf,-11)Q-- P-4
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
/viewing water/wildlife o swimming o socializing/entertaining
o canoeing/kayaking/boating o fishing El other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall value of the service compared with the price paid?
poor (, fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your level of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral satisfied; very satisfied
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied (satisfied./ neutral satisfied very satisfied
o payin ore to et an additional cutting (for a total of thl i C har cuttings per year)
6. Which of the following levels of service would you be in favor of? 1
. Otaidtd- C4'414(//
o redu,9ifig the requency of harvesting to one time per year. On kW) )ChTT°(12-6CDIIV
o maintain' the current strategy of harvesting twice per year.
i ‘clay-N_ ' I /
o dit/continuing m chanical harvesting. S A-Ci Tk eirctt.,._ °CC)2)2-' CS-12 P /
7. If you have any other comments, please include them in the space provided. You may also Use the back of this
---L- CAC) CA be-A l 65 OL ° U3 CL*P---17- -Pre))(Vi- :;t6,L,J, page. --,
VV.DYN LyCL-W.i.," -P-r-D‘LIL \i-V,A.k.---__ 0 LADV1/4--P-rS SA,l_0.1_)nc::C)
'eCU'A3'-(s 4509 Browndale Ave
(-----V .
ENGINEERING DEPARTMENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
Mill Pond Aquatic Vegetation Harvesting Survey
Please complete and return the survey in the included postage-paid envelope by September 1, 2015 to Edina Public
Works, 7450 Metro Boulevard, Edina 55439.
What are your primary activities on Mill Pond? Check all that apply.
)(viewing water/wildlife o swimming socializing/entertaining
• canoeing/kayaking/boating o fishing o other:
2. Over the past two years, the average annual cost for harvesting has been about $180 per property. How would
you rate the overall valu he service compared with the price paid?
poor fair good very good excellent
3. How would you rate the quality of the harvesting work over the last two years?
poor fair good very good excellent
4. How would you rate your leVel of satisfaction with the overall aquatic vegetation management strategy in Mill
Pond over the last two years?
very dissatisfied dissatisfied neutral
5. How would you rate your level of satisfaction with the overall contact between you and the City of Edina
regarding management of Mill Pond over the past two years?
very dissatisfied dissatisfied neutral satisfied very satisfied
6. Which of the following levels of service would you be in favor of?
paying more to get an additional cutting (for a total of three cuttings per year).
o maintaining the current strategy of harvesting twice per year.
o reducing the frequency of harvesting to one time per year.
Li discontinuing mechanical harvesting.
7. If you have any other comments, please include them in the space provided. You may also use the back of this
page. -141.-(44W14.) ks a_ rvitt_cii
14-44 e-a.)(‘ WutA-+ +1/a5 -t- 51-71 I mAid rt9 63 (11
i(1/1 p Lasf attAclis I/Lax-yes+ tjuks 4925 Sunnyslope Rd E
I s-eS ca)1-4-
ENGINEERING DEPA MENT
7450 Metro Boulevard • Edina, Minnesota 55439
www.EdinaMN.gov • 952-826-0371 • Fax 952-826-0392
very satisfied
cur- aA a_ <V-c-ou-rs utiek
‘r-cQyL c vale5 Las
5-4;4-15
orw-f- "1/4i-
bbef- kffo
qtA,
2.1, I