HomeMy WebLinkAbout3311721230029-08302013PROPOSED:
LOT AREA: 11,411 SQ.FT.
HOUSE AREA: 2,619 SQ.Fc.
PORCH AREA: 174 SQ.FT.
TOTAL IMPERVIOUS AREA: 2,793 SQ.FT.
EXISTING:
LOT AREA: 11,411 SQ.FT.
HOUSE AREA: 2,377 SQ.FT.
PORCH AREA: 241 SQ.FT.
TOTAL IMPERVIOUS AREA: 2,618 SQ.FT.
COVERAGE = 24.5%
COVERAGE = 22.9%
0 r0 40 A 959" .951-I 0
0 OZ 0 -
0 1T 959.7
956.0
WOOD FENCE
c_9
957.8
Li]
c\I
CO
LC) 0
958.2
WOOD FENCE
958.9
-x
958.8
133.99 (NTS)
,
x 958.7
X
959.2
958.9
ED SPIc CODE AVE\JE ED SPIc
SCALE : 1" = 20'
960.0 DENOTES EXISTING ELEVATION
(958.0)
DENOTES PROPOSED ELEVATION
INDICATES DIRECTION OF
SURFACE DRAINAGE
(p58.34) = FINISHED GARAGE FLOOR ELEVATION
(958.67) = TOP OF FOUNDATION ELEVATION (GAR)
(960.67) = TOP OF FOUNDATION ELEVATION (HSE)
(952 00) = BASEMENT FLOOR ELEVATION
(961.82) = 1ST FLOOR ELEVATION (PROPOSED)
960.92 = 1ST FLOOR ELEVATION (ORIGINAL)
SEDIMENT tf EROSION CONTROL NOTES
1. All exposed soil areas, including temporary stockpiles, must be stabilized as soon as possible
but in no case later than I 4 days after construction activity in that portion of the site has
temporarily or permanently ceased. Stabilize with temporary seed and straw mulch applied at 2
tons per acres.
2. Silt fence shall be installed and at the locations shown on the plan and around any stockpiles.
Silt fence shall be inspected and maintained weekly (and within24 his of a 0.5" rainfall) until final
seeding and mulching (or sodding) of lot.
3. A rock construction entrance shall be installed and maintained at the location shown on the plan. T -
17.00 (960.0)
11_1
D Li
<
(V el- 0
<0°
)0(-
0-) I ST ELK
960.86
STORMWATER & EROSION CONTROL PLAN
a 5 2 x95
1 1 I
07. I 9 1
955.01 956.2 9517 1
1 1 H zwow
1
1195816 . x jrt I
Prl.LZ.1
I 560
35157 96
co
956.2 Lc)
9573
.3
960.21
\ I
0 I
425 -= 9583J SL 1 7. HUB=958.71 co- - -S1LTEENCE HUB=468.25-g58-:3 954•64
(960.0)
3.00 -
r),-)
a_ N:
174.50
cli
014.00 o
n. co
957.2x 956 8
N89°59-'1 'E
0 957.6134.01 gry
959.0 95)<8.7V-i 1TNVT'(960.0) CP I SPIc
SEDIMENT EKOSION CONTKOL CONTACT
Timberland homes - Chris Gores
(6 I 2) 363-4501
x 954.6
f-1 T ' (-1 X955.495 5
NOTE: RETAINING WALL
TO BE REMOVE
PER AGREEMEN1
WITH NEIGHBOR.
956.0 956 2 11/ PP
x 953.5
130/4VQ ON:0-4,0/7.
406 41?02.
C/7)1()Pkb/
4. Contractor or rermitee shall provide and maintain inlet protection on all storm drain inlets that
will receive sediment laden flow as a result of construction. Inlet protection and maintenance shall
remain in place until all sources with potential for discharge into the inlet have been stabilized.
Inlet protection may be removed from a particular inlet if a specific safety concern (such as
flooding) has been identified. The permitee must receive written correspondence from the City of
Edina verifying the need for removal. Permitee shall conduct a visual inspection to determine which
inlets need protection.
S. If down gradient sediment practices are overloaded, additional up gradient erosion control
practices will be installed to reduce loading.
6. Dust control is the responsibility of the permit holder. The permit holder must eliminate dust
problems upon receiving notice from the Building Official that there is a dust problem.
7. MINNEHAHA CREEK WATERSHED DISTRICT.
(952) 641-4532
8. Street cleaning shall occur daily or as needed.
STORMWATER
This Stormwater Management Man (in narrative form) must detail how stormwater will be controlled
to prevent damage to adjacent property and adverse impacts to the public stormwater drainage
system.
1
Legal Description:
LOT 9, BLOCK 2,
MELODY KNOLLS 3RD ADDITION,
HENNEPIN COUNTY, MINNESOTA
P. ROBE
tNGINEERING
PLANNERS and LAND SURVEYORS
CONSULTING ENGINEERS,
COMMNY, INC.
1000 EAST 14-6th ST., STE 240, BURNSVILLE, MN 55337 PH (952)432-3000
PROJECT NO. 15275.00
PREPARED FOR:
TIMBERLAND HOMES
1. rermit holder shall inspect and maintain sediment and erosion control devices (ie: silt fence and
inlet protection) weekly (or within 24 hrs of a 1/2" or more rainfall). Sediment must be removed
when it is ,1/3 the height of the sediment and erosion control device.
2. final grading on the lot shall minimize concentrated flow . Final drainage patterns shown are
similar to the existing conditions of the lot. Drainage is directed to the front and the rear along
the side lot lines.
LiJ
C2C LU 953.7 953.6 95/5.8 958.1 ecl L I I
134.50 959,7
I
1 958.11
M959.8 x-
•59.7
0 6 I I,
C.1
2.00
22.49
HUB=959.60
XI5TG
HOU5E
If)
19.50 -1
Lr- KNEE WALL-4.
26.00 tn (960.0)
x 959.6
SILTFENCE
(y)
16.66
'
LLJ
x959.8
(960.0)
959.7 CD 28.98
959.8 HUB=959.97 959.2 \
133.99 CP2 SPIC
S89°51'15"E UTILITY EA5MIENT
(-i Lx, 959.3 /z
x958.9
v.) u)Els
37.41
ADDRESS: 5721 BERNARD PLACE
REVISED 8-27- I 3. MOVED HOUSE 3 OFT NORTH
I hereby certify that this plan was prepared by me or under
my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Mi ne)o a 2-44T
Reg. No. E2,