SEDIMENT AND EROSION CONTROL NOTES
CONSTRUCTION SEQUENCING
1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE
2. INSTALLATION OF SILT FENCE OR BIO-ROLL AROUND SITE
3. DEMOLITION OF EXISTING STRUCTURES IF ANY.
4. CLEAR AND GRUB.
5. STRIP AND STOCKPILE TOPSOIL
6. ROUGH GRADING OF SITE
7. STABIUZE DENUDED AREAS AND STOCKPILES
8. EXCAVATE FOR NEW HOME FOUNDATION
9. CONSTRUCT & BACKFILL FOUNDATION
10 CONSTRUCT NEW STRUCTURE
11. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR
SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
EROSION PREVENTION
THE CONTRACTOR IS RESPONSIBLE FOR PLANING FOR AND IMPLEMENTING APPROPRIATE CONSTRUCTION
PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING. AND OTHER CONSTRUCTION
PRACTICES THAT MINIMIZE EROSION.
ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT IN
NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE
HAS TEMPORARILY OR PERMANENTLY CEASED.
THE NORMAL ViL I IED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT
DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE,
MUST BE STABILIZED WITHIN 20 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF
DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 20 LINEAL FEET MUST BE
COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER.
STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES OR SWALES
MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER AND CONSTRUCTION IN
THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED.
TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT
SYSTEM (WITH PROPERLY DESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES ETC.) DO NOT NEED
TO BE STABIUZED. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING
USED AS A SEDIMENT CONTAINMENT SYSTEM.
PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24
HOURS AFTER CONNECTION TO A SURFACE WATER.
SEDIMENT CONTROL
SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, INCLUDING
CURB AND GLITTER SYSTEMS AND STORM SEWER INLETS.
SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFORE
ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN IN PLACE
UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED.
AU_ STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL
ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED.
TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER 11-1-ECTIVE SEDIMENT CONTROLS, AND
CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORM WATER CONVEYANCES SUCH AS CURB AND
GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE
STORM WATER.
VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE MUST BE MINIMIZED BY A ROCK
CONSTRUCTION ENTRANCE. STREET SWEEPING MUST BE USED IF THE ROCK ENTRANCE IS NOT
ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET.
INSPEC11ONS AND MAINTENANCE
THE CONTRACTOR IS RESPONSIBLE AT ALL TIMES FOR THE MAINTENANCE AND PROPER OPERATION OF
EROSION AND SEDIMENT CONTROL FACILITIES. THE CONTRACTOR SHALL AT A MINIMUM, INSPECT.
MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES
AND SOIL STABILIZATION MEASURES.
BASED ON INSPECTION RESULTS THE CONTRACTOR MAY AND SHALL MODIFY THE EROSION AND
SEDIMENT CONTROL PLAN IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM
WATER RUNOFF.
STORM WATER
FINAL GRADING OF THE LOT SHALL PROMOTE SHEET DRAINING AND AVOID CONCENTRATION OF STORM
WATER FLOWS.
FINAL GRADING SHALL MAINTAIN THE EXISTING STORM WATER DRAINAGE PATTERNS TO THE EXTENT
POSSIBLE AND PRACTICAL AS TO NOT CAUSE ANY DAMAGE TO ADJACENT PROPERTIES.
STORMWATER, SEDIMENT & EROSION CONTROL CONTACT:
PENNANT CONSTRUCTION LLC
DEREK BOISCLAIR
612747.8780
16538 81ST AVE N
MAPLE GROVE, MN 55311
NOTES:
SEE SURVEY, BY HY-LAND SURVEYING. P.A. FOR OMCIAL PROPOSED HOME ELEVATIONS
EXISTING DRAINAGE PATTERNS DRAINING OFF SITE SHALL NOT BE ALTERED.
*10.707.1.7ZW
5#10-Weilal
DENOTES DIRECTION OF DRAINAGE
x000.0 DENOTES EXISTING ELEVATION
C ) DENOTES PROPOSED ELEVATION
DENOTES EXISTING FENCE
C10-1•
INLET PROTECTION 'O CO w Jw CO
03
CO 0
0
DENOTES SILT FENCE
DENOTES ROCK
CONSTRUCTION ENTRANCE
390" !Bo( (0-x- I
AN. x 1 78.7 n)
0 C920.8D iv 1 . -
— — o 1
(-Ti 1 0-1 b ------
O N.) 01 °b
x _ OD - -- '(I
O
7
0 I/,. X <
I° 0
CD I
.__,
(to
CD a)
m n
1
::.--:=--1.-`,(----'-- Nal .,
ii,q
co \ \
(o
co
45.0 plat - No I' Y m I
"-Z.': j • u N, _ _ _ _
N Cegh\-- 144.64 /(meas.) \O°22'58"E_ -------- _EIT;2' por .....ff • e• •
11•••
on°
strouccKtio... ,,
....----'/
49.7
oura5 uti W-LWAY Ei i
PERIVIrPREQUIRED c•c„) 0 CONTACT EaNEERING
952-826-0371
TRACY AVENUE
&sof* 121 3t, 5700 W
LH_J
000-oaaao o oco o 00 co0000c00-000e0f--
172.50 (meas.) N0°33'06"W
(92
40'0"
III
(1) 0
U
I I I 0
Cf) o iiiu
- I 0 .c5Pco
ntrance 414 •••
600 •
, o
'D
*61/4, 0
---5 \
crA
-CD \ -0 CO
D
• 01 /
w CMS MULTI n
-A
(.0
n
SI LT FENCE
-1(0
0 -- (0
1" -=- 10'
5'-o" 0 10,-0
(D 0 -s
-Z c
-f-, (C) D
c)
Os) CO
X
0 0
CD
CD WADE 1.111J• 11111• 1•1,1•17M
46.7 //
2'0"
co
3'0"
-4 CO 0 -4 Ty)
•
I\D
CD
CD
ISSUE/SUBMITTAL SUMMARY
DESCRIPTION
CITY SUBMITTAL
DATE
1/2114
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION.
OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.
STORM WATER
MANAGEMENT & EROSION
CONTROL PLAN
1.0
5700 WEST 70TH STREET
EDINA, MINNESOTA
LDK HOMES MATTHEW R PAVEK P. E.
DATE 12/2014 UCENSE NO. 44283