Loading...
HomeMy WebLinkAbout1802824410082-02162016e STORM WATER AND EROSION CONTROL PLAN 5113 Gorgas Ave. Edina, MN GENERAL GRADING NOTES: 1. Specifications applicable for this project: Current Standard Specifications for the City of Edina; the latest Minnesota Department of Transportation Specifications for Highway Construction. 2. OSHA requirements shall be followed for all work on this project. 3. The contractor shall notify "Gopher State One Call" 48 hours prior to any excavation. (1-800-252-1166) 4. The Grading Contractor shall held verify all locations and elevations of underground utilities with utility companies prior to any construction, and immediately notify the Engineer of any conflicts. 5. The Grading Contractor shall provide positive drainage on the site at all times. Grading tolerances shall be 0.10' for hard surface areas and 0.25 for green spaces. 6. Existing topsoil shall be salvaged to provide 4" topsoil coverage over all disturbed areas to be revegetated. 7. The building pad must be provided with a positive outflow. This work shall be incidental to the grading contract. 8. Any sediment remaining in place after the silt fence has been removed shall be dressed to conform with the existing grade, prepared and seeded or sodded as directed by the City Engineer. 9. No finished slope shall exceed 4H : IV unless otherwise noted. ,E5 D7 • 0 Denotes Existing Elevation CDDenotes Proposed Elevation --.1--,Denotes Surface Drainage Denotes Existing Contour Denotes Proposed Contour 0 0 Proposed Sift Fence per a Proposed Inlet Protection per lE) c) SILT FENCE INSTALLATION LEGEND EROSION CONTROL NOTES: 1. All erosion and sediment control BMPs (i.e. silt fence, bio-rolls, rock construction entrance, inlet protection, etc.) shall be installed prior to the commencement of any construction activity. 2. Inlet protection shall be installed at any inlet that may receive runoff from the disturbed areas of the project. 3. Install sediment control HMI's, such as silt fence, around all stockpiles. 4. All exposed soils, including stockpiles, shall be temporally stabilized per Mn/DOT Specification 2575 within 7 days after construction activity has temporally ceased. 5. All erosion and sediment control devices shall be maintained until all disturbed areas have been permanently stabilized. 6. Remove all soils and sediments tracked or otherwise deposited onto public pavement areas on a daily basis. 7. All erosion and sediment control BMPs shall be inspected every 7 days, or within 24 hours of all rain events greater than 0.5" in 24 hours. Corrective action required shall be initiated immediately. 8. Silt fence, bio-rolls and inlet protection devices most be repaired, replaced or supplemented when they become nonfunctional or the sediment reaches 1/3 the height of the device. These repairs must be made within 24 hours of discovery, or as soon as field conditions allow. 9. After final grading has been completed, exposed soils most be permanently stabilized within 72 hours. Permanent stabilization shall consist of 4 inches topsoil, and seed mulch and fertilizer applied by methods and rates recommended in Mn/DOT Specification 2575 and Mn/DOT Seeding Manual, or sod as approved by the City Engineer. The seed mix shall be Mn/DOT 25-151. 10. Inlet protection may be removed for a particular inlet if a specific safety concern (flooding / freezing) has been identified. The permitted must receive written correspondence from the City Engineer verifying the need for removal. 11. All erosion and sediment control devices shall be removed from the site after permanent stabilization has been established. SCALE IN FEET 1. 174 A V£11Fte£11 /1.1 11£ , Ens. rda tr£ pa£5 egp 6£1,0 AT T. ZIAZILIBEA,=.1 r£0 7,1 4. WO' 11£ U£AlL £1£ XL,. 11£ reCE lhr. F.% FIL .1,90£ F05,5 ££.1.E.„F4,70£p ro, • Mr .111.417 1,1: 11.1 1,01' MEI ;251t 7.711r511=VI07, WOW' " "'"'L 0 10 20 30 Proposed Rock Constmction Entrance pea E) yAle. NO GRADING SHALL BE DONE OUTSIDE OF SILT FENCE \ 2-5t. Frame 589.6, gf \ No.5 I 09 \\\\ \ ffe \ 590.0 859.4 • Rea to. F.B. No. 1985-49 inv. 84781 } CLIENT: STEPHEN LONGMAN BUILDERS, INC. 5113 West 58th Street Edina, MN 55436 Surveyor. The Gregory Group, Inc. d.b.a. Lot Surveys Company 7601 73rd Avenue N. Brooklyn Park, MN 55428 phone 763-560-3093 fax 763-560-3522 Attn: Greg Prasch Contractor: Stephen Longman Builders, Inc. 9401 Preston Place Eden Prairie, MN 55347 Attn: Steve Phone: 952-943-8226 Engineer: The Gregory Group, Inc. d.b.a. Lot Surveys Company 7601 73rd Avenue N. Brooldyn Park, MN 55428 phone 763-560-3093 fax 763-560-3522 Attn: Jeff Presch Benchmark: Top nut of hydrant located in the cul-de-sac of Gorges Ave. Elevation = 889.96 feet NGVD 29 PROPOSED ELEVATIONS: First Floor = 891.36 feet Top of Block = 890.5 feet Garage Floor= 890.0 feet Lowest Floor = 880.79 feet Sport Court = 875.0 feet Average Front Grade" 890.0 feet Contractor to confirm floor, wail 8 peak elevations prior to construction. LEGAL DESCRIPTION: The South 66 feet lying West of the East 135 feet of Lot 58, Auditor's Subdivision No. 172, Hennepin County, Minnesota. I hereby certify that this plan, specification, or report was prepared by mere under my direct supervision and that tame duly Licensed Professional Engineer under the laws of the State of Nlinnesota. Dated this 16th day of February, 2016. Signed REVISIONS: 3-IS-IC TREE PROTECTION FENCE I ---- Wood Fe ce c hne N 89°46'40" E 136.05 -_ ,-- ti-nalri-°08- -1/4-- T-• 1 Q3_n _1_9..5.)1 \ i-inir I o / / / / 59 , 0 -; _---- / 7 r -/ 4 1 i i '4" r •) s \\ § / 1 \ \ • 11'0" o IJkl o 0 , I io V\ Le z el N4 (.6 1 i ,k1 I / 0 ti- i 0 1 s) , , i co , ,, , ,... 01 -0 (,) \ i , 0") i 0 1 0 C ..c 1 I iio uo o 0- i (i) 0 0 - " i/,\ 0 / . r4 0 t cr- i7) 2 CI) ..t _1 R . 7'0" Ce NY 1 o 1 \ 12 1 _----P.-- ° 1 N\ 1 Pq egress well / \ 6 1 t n 110% - 1 1 t • I 1 -A4-1-- / ) Dtiv ew ay 26'0" 555.0 505.4 CS' cl? 055.5 GORGAS AVE, , I ediu siTz .011- irr• 911): .74-41,itree..kter 244" k :b• 'T (Is 559.0 559)7\ \\ \ \ \\\\NN N N\ \ . \ \ \\ I -St. Frame \ \ No.5 I I 7 \ ffe 55 S 89°4640' W 136.03 C3Ti -x-x-x- Chain Linkne 559.9 591.3 559.7 559.6 CATCH BASIN INLET PROTECTION INLET PROTECTION ABSTAIN STORY FILTER ASS [A POLYESTER SLEEVE INSERT TO BE USED SHALL BE A TOGO. LANCE INCHISTRES 'ROM ORAN' SME, OR APPROVED EQUAL TO PE UTEEEO El THE EXISTING ROADAAY CASTING. TO BE USED PI CONJUNCTION HYTH A NEENAH CASTING NO. 11-3067 TYPE DR, DL, OR TYPE V OR APPROVED EQUAL 0 ROCK CONSTRUCTION INSTALLATION 1° TO 2° WASHED ROCK ROCK SIZE SHOULD BE 1° TO 2. El SEE SUCH AS ICEDOT EA-1 Oft CA-2 COUREE AGGREGATE (WASHED) A GEoTEXTILE GARP° PAY BE USED ULCER THE ROCK TO PREVENT EGRAT10,1 Of THE ONDERLYC* SOL TNTO THE STONE / 31.3 - var-"-07 _9--74= - -7( I p "II SHEET 1 OF 1