Loading...
HomeMy WebLinkAbout1902824430066-10032013suiLDING DEPARNE OCT 02 2013 CITY OF ED/NA GRAPHIC SCALE 20 0 10 20 40 ( IN FEET ) Manhole (15989.8 / DENOTES EXISTING SPOT ELEVATION DENOTES PROPOSED SPOT ELEVATION DENOTES EXISTING CONTOUR LINE DENOTES PROPOSED CONTOUR LINE DENOTES PROPOSED STORM FLOW DENOTES PROPOSED STRAW LOGS 944.8 _ _960.0 946 SF' - SF' 61st Street West X X890.9 890.6 - -PROPOSED NEW CURB, OLD APRON - DRIVE AIVD GARAGE TO BE REMOVED .11, BUILDING COVERAGE: House 1,811 square feet Lot 6,664 square feet Coverage 27.18% 4,Eā€¢ 891.9 133 84 S 89°15'5 -893.2 A89 35.46 \ 353 92.4 130337 19/28/24 LANDMARK BUILDING CONTRACTORS ADVANCE SURVEYING & ENGINEERING CO. LEGEND 5300 S. Hwy. No. 101 Minnetonka, MN 55345 Phone (952) 474 7964 Fax (952) 225 0502 www.advsur.com SURVEY FOR: LANDMARK BUILDING CONTRACTORS SURVEYED & DRAFTED: June 18, 2013 REVISED: September 6, 2013 to show proposed dwelling, related improvements, grading, drainage & erosion control details. REVISED: September 10ā€ž2013 to fit 11 x 17 format. REVISED: September 26, 2013 to show more grading, drainage & erosion control info. REVISED: October 2,2013 to show building coverage. LEGAL DESCRIPTION: Lot 1, Block 22, Fairfax, Hennepin County, Minnesota. SCOPE OF WORK: 1. Showing the length and direction of boundary lines of the above legal description. 2. Showing the location of existing improvements we deemed important. 2. Setting new monuments or verifying old monuments to mark the corners of the property. 3. Showing the topography of the site. The elevations shown relate only to the benchmark provided on this survey. Use that benchmark and check at least one other feature shown on the map when determining other elevations for use on this site. 4. Showing your proposal to build a new home and related improvements per your plans, for 89 your review and for the review of such governmental agencies as may have jurisdiction over your project before you make decisions based on this survey. STANDARD SYMBOLS & CONVENTIONS: " ā€¢ " Denotes 1/2" ID pipe with plastic plug bearing State License Number 9235, set, unless otherwise noted. EROSION CONTROL 0 7 91.3 - - 133. 45 X892.3 3.1 - X892.0 89 Benchmark: _ Top of manhole 890.2 991.2 90.6 990.8 91-Concrete _Curb 891.1 -4 --- - --"X$91ā€ž4 t - X891.8_ _ Fence -------- ---__-- 394916-' I. All exposed soil areas, including temporary stockpiles, must be stabilized as soon as possible, but in no case later than 14 days after construction activity in that portion of the site has temporarily or permanently ceased. Stabilize with temporary seed and straw mulch applied at 2 tons per acre. 2. Straw logs shall be installed at the locations shown on the plan and around any stockpiles. Straw logs shall be inspected and maintained weekly (and within 24 hours of a 0.5 inch rainfall event) until final seeding and mulching or sodding of lot. 3. A rock construction entrance shall be installed and maintained at the location shown on the plan. 4. Contractor or permitee shall provide and maintain inlet protection on all storm drain inlets that will receive sediment laden flow as a result of this project. Inlet protection and maintenance shall remain in place until all sources with potential for discharge into the inlet have been stabilized. Inlet protection may be removed from a particular inlet if a specific safety concern, such as flooding, has been identified. The permitee must receive written correspondence from the City of Edina verifying the need for removal. Permitee shall conduct a visual inspection to determine which inlets need protection. 5. If down grade sediment practices are overloaded, additional up grade erosion control measures shall be installed to reduce loading. 6. Dust control is the responsibility of the permit holder. The permit holder must eliminate dust problems upon receiving notice from the Building Official that there is a dust problem. 7. Street cleaning shall occur daily or oftener if needed. 8. Permit holder shall inspect and maintain sediment and erosion control devises (ie: st y logs and inlet protection) weekly (or within 24 hours of al5" or greater rainfall). 141. Sediment must be removed when kin 1/3 the height of the sediment and erosion control device. CERTIFICATION: I hereby certify that this plan, specification, report or survey was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer and Licensed Land Surveyor under the laws of the state of Minnesota. Signature: cyrrtiv1, LW. Opookrz, Typed Name: James H. Parker Date: September 26, 2013 Reg. No. 9235 Garage PROPOSED DWELLING FIRST FLOOR = 894.19 TOP FOUND. = 894.00 GAR. FLOOR = 893.60 LOW FLOOR = 884.30 891. 892.3- id L 1 \ \ I \ PROPOSED" WINDOW % WELLS-- 83.1 I A Edge %- N. conc\ 893.5 892.5 X892.8 STORM 6 1 00 ai9-4a.ielcvic /7-4,53 o WATER & EROSION CONTROL PLAN 130338 2013 10 02 A JP