HomeMy WebLinkAbout2002824240098-01242014 (2)STORM WATER & EROSION CONTROL PLAN PROJECT NO. 15381.00 SEDIMENT* EROSION CONTROL NOTES
I . All exposed 5011 areas, including temporary
stockpiles, must be stabilized as soon as possible
but in no case later than I 4 days after
construction activity in that portion of the site has
temporarily or permanently ceased. Stabilize with
temporary seed and straw mulch applied at 2 tons
per acres.
2. Silt fence shall be installed and at the locations
shown on the plan and around any stockpiles. Silt
fence shall be inspected and maintained weekly
(and within 24 hrs of a 0.5" rainfall) until final
seeding and mulching (or sodding) of lot.
000.0
(000.0)
(890.67)
(092.35)
(891.00)
(882.33)
X
875.8
1
881.4
878.6
LOT AREA: 8958 SQ.FT.
X. HOUSE AREA: I ,405 5Q.FT.
X. PORCH AREA: 2 I 0 SQ.FT.
X. DRIVEWAY AREA: I ,052 SQ.FT.
COVERAGE =2,667 SQ. FT. 29.8%
ADDRESS: 5624 ABBOTT AVENUE SOUTH
SCALE : 1" = 20'
Legal Description:
LOT 1, BLOCK 8,
BROOKLINE ADDITION,
HENNEPIN COUNTY, MINNESOTA
FD IP •
578.7
855.3
585.1 885.2
881 . I
57.72
881 . I
0 00) -aE
00) oc
dui NCO
X
850.1
•ND IF
88 I .7
/ 892.1
892.1
28.90
31.77
2. Final grading on the lot shall minimize
concentrated flow and shall promote sheet flow to
the front and the rear. Final drainage patterns
• a) shown are similar to the existing conditions of the
lot. a) co L14,
.014 OZLi-• 00g
,s7e Aeee-t,/- 6t te qç
I hereby certify that this plan was prepared by me or under
my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
FD IF
891.2
888.2 6 6 XU)
888.6 °3
888.5
PREPARED FOR:
DONNAY HOMES
FD 11' 877.4 859.4
29.74
DENOTES EXISTING ELEVATION
DENOTES PROPOSED ELEVATION
INDICATES DIRECTION OF
SURFACE DRAINAGE
= FINISHED GARAGE FLOOR ELEVATION
= MAIN FLOOR ELEVATION
=TOP OF FOUNDATION ELEVATION
= BASEMENT FLOOR ELEVATION
EXISTING
HOUSE
No. 5620
MAIN FLOOR
E LEV. =890.82
0 .1j (t)
E o0
▪
88 1 .0 49.65
859.1 03
TUCKUNDER
GARAGE 3. A rock construction entrance shall be installed
and maintained at the location shown on the plan. 29.49
859.2 889.0 to 888.6
1111
4. Contractor or Permitee shall provide and
maintain inlet protection on all storm drain inlets
that will receive sediment laden flow as a result of
construction. Inlet protection and maintenance
shall remain in place until all sources with potential
for discharge into the inlet have been stabilized.
Inlet protection may be removed from a particular
inlet if a specific safety concern (such as flooding)
has been identified. The permitee must receive
written correspondence from the City of Edina
verifying the need for removal. Permitee shall
conduct a visual inspection to determine which
inlets need protection.
S8946637"t 879.3 879.4x.....„ 127.68 IL -at. 8: I
8\55. 889.3
889.1 889.2 888
LOT AKA: 8,958 SQ. FT
HOUSE AREA: 2, I 69 SQ. FT
PORCH AREA: 94 SQ. FT
DECK AKA: 184 SQ. FT
DRIVEWAY AREA : 911 SQ. FT
COVERAGE =3,358 SQ. FT. 37.5%
578.3 879.0 128.07 091 70 -&9 11 580.2
36.40
853.8
x /03 6.0 84.0 N. 24.50
q 883.0
582.04
30"A5H
881.30681.
(881 ni .4
X 0
0
z 00 Et o
879.5
590.6 X
N
CO 2.2%
co
o 16.00
6.00 `I:
6 U)
880.8 I GARAGE
PROPOSED
HOUSE
MAIN FLOOR
892.35
880.3
878.5)<
x 890.3 5. If down gradient sediment practices are
overloaded, additional up gradient erosion control
practices will be installed to reduce loading.
DECK
_ 1.11
LI- I 3.50 31.11
C. Dust control is the responsibility of the permit
holder. The permit holder must eliminate dust
problems upon receiving notice from the Building
Official that there is a dust problem.
i-
880.4 u)11
in g
x
cc, LOT 1 , ro
890.4 581.2
1.00 x
890.7 590.5 •I r• f•
In 4 I I I I IA L. I... I 'I.
7. MINNEHAHA CREEK WATERSHED DISTRICT.
(952) 64 I -4532
890.5) 28.63 1 12"131KCH151.57
879.5
44.00
(881 • 5"MAPLE
884.7 a 891.0 ..-
28.4O ,'t 890.7
•• x
8. Street cleaning shall occur daily or as needed.
CO 6 STORM WATER
This Stormwater Management Plan (in narrative
form) must detail how stormwater will be controlled
to prevent damage to adjacent property and
adverse impacts to the public storrnwater drainage
system.
68.57
• EXISTING
HOUSE
No. 5625
MAIN FLOOR
ELEV.-893.54
X 1 . Permit holder shall inspect and maintain sediment
and erosion control devices (ie: silt fence and inlet
protection) weekly (or within 24 hrs of a 1/2" or
more rainfall). Sediment must be removed when it
,54 the height of the sediment and erosion control
device.
880.0 575.9
890.5 0
co
ENGINEERING
CONSULTING ENGINEERS,
_ROBE PLANNERS and LAND SURVEYORS
tNGINEERING
COMPANY, INC.
1000 EAST 146th ST., STE. 240, BURNSVILLE, MN 55337 PH (952)432-3000
'AV lit
C31 / Date Reg. No. CJ J % 4 V