Loading...
HomeMy WebLinkAbout2002824240098-01242014 (2)STORM WATER & EROSION CONTROL PLAN PROJECT NO. 15381.00 SEDIMENT* EROSION CONTROL NOTES I . All exposed 5011 areas, including temporary stockpiles, must be stabilized as soon as possible but in no case later than I 4 days after construction activity in that portion of the site has temporarily or permanently ceased. Stabilize with temporary seed and straw mulch applied at 2 tons per acres. 2. Silt fence shall be installed and at the locations shown on the plan and around any stockpiles. Silt fence shall be inspected and maintained weekly (and within 24 hrs of a 0.5" rainfall) until final seeding and mulching (or sodding) of lot. 000.0 (000.0) (890.67) (092.35) (891.00) (882.33) X 875.8 1 881.4 878.6 LOT AREA: 8958 SQ.FT. X. HOUSE AREA: I ,405 5Q.FT. X. PORCH AREA: 2 I 0 SQ.FT. X. DRIVEWAY AREA: I ,052 SQ.FT. COVERAGE =2,667 SQ. FT. 29.8% ADDRESS: 5624 ABBOTT AVENUE SOUTH SCALE : 1" = 20' Legal Description: LOT 1, BLOCK 8, BROOKLINE ADDITION, HENNEPIN COUNTY, MINNESOTA FD IP • 578.7 855.3 585.1 885.2 881 . I 57.72 881 . I 0 00) -aE 00) oc dui NCO X 850.1 •ND IF 88 I .7 / 892.1 892.1 28.90 31.77 2. Final grading on the lot shall minimize concentrated flow and shall promote sheet flow to the front and the rear. Final drainage patterns • a) shown are similar to the existing conditions of the lot. a) co L14, .014 OZLi-• 00g ,s7e Aeee-t,/- 6t te qç I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of FD IF 891.2 888.2 6 6 XU) 888.6 °3 888.5 PREPARED FOR: DONNAY HOMES FD 11' 877.4 859.4 29.74 DENOTES EXISTING ELEVATION DENOTES PROPOSED ELEVATION INDICATES DIRECTION OF SURFACE DRAINAGE = FINISHED GARAGE FLOOR ELEVATION = MAIN FLOOR ELEVATION =TOP OF FOUNDATION ELEVATION = BASEMENT FLOOR ELEVATION EXISTING HOUSE No. 5620 MAIN FLOOR E LEV. =890.82 0 .1j (t) E o0 ▪ 88 1 .0 49.65 859.1 03 TUCKUNDER GARAGE 3. A rock construction entrance shall be installed and maintained at the location shown on the plan. 29.49 859.2 889.0 to 888.6 1111 4. Contractor or Permitee shall provide and maintain inlet protection on all storm drain inlets that will receive sediment laden flow as a result of construction. Inlet protection and maintenance shall remain in place until all sources with potential for discharge into the inlet have been stabilized. Inlet protection may be removed from a particular inlet if a specific safety concern (such as flooding) has been identified. The permitee must receive written correspondence from the City of Edina verifying the need for removal. Permitee shall conduct a visual inspection to determine which inlets need protection. S8946637"t 879.3 879.4x.....„ 127.68 IL -at. 8: I 8\55. 889.3 889.1 889.2 888 LOT AKA: 8,958 SQ. FT HOUSE AREA: 2, I 69 SQ. FT PORCH AREA: 94 SQ. FT DECK AKA: 184 SQ. FT DRIVEWAY AREA : 911 SQ. FT COVERAGE =3,358 SQ. FT. 37.5% 578.3 879.0 128.07 091 70 -&9 11 580.2 36.40 853.8 x /03 6.0 84.0 N. 24.50 q 883.0 582.04 30"A5H 881.30681. (881 ni .4 X 0 0 z 00 Et o 879.5 590.6 X N CO 2.2% co o 16.00 6.00 `I: 6 U) 880.8 I GARAGE PROPOSED HOUSE MAIN FLOOR 892.35 880.3 878.5)< x 890.3 5. If down gradient sediment practices are overloaded, additional up gradient erosion control practices will be installed to reduce loading. DECK _ 1.11 LI- I 3.50 31.11 C. Dust control is the responsibility of the permit holder. The permit holder must eliminate dust problems upon receiving notice from the Building Official that there is a dust problem. i- 880.4 u)11 in g x cc, LOT 1 , ro 890.4 581.2 1.00 x 890.7 590.5 •I r• f• In 4 I I I I IA L. I... I 'I. 7. MINNEHAHA CREEK WATERSHED DISTRICT. (952) 64 I -4532 890.5) 28.63 1 12"131KCH151.57 879.5 44.00 (881 • 5"MAPLE 884.7 a 891.0 ..- 28.4O ,'t 890.7 •• x 8. Street cleaning shall occur daily or as needed. CO 6 STORM WATER This Stormwater Management Plan (in narrative form) must detail how stormwater will be controlled to prevent damage to adjacent property and adverse impacts to the public storrnwater drainage system. 68.57 • EXISTING HOUSE No. 5625 MAIN FLOOR ELEV.-893.54 X 1 . Permit holder shall inspect and maintain sediment and erosion control devices (ie: silt fence and inlet protection) weekly (or within 24 hrs of a 1/2" or more rainfall). Sediment must be removed when it ,54 the height of the sediment and erosion control device. 880.0 575.9 890.5 0 co ENGINEERING CONSULTING ENGINEERS, _ROBE PLANNERS and LAND SURVEYORS tNGINEERING COMPANY, INC. 1000 EAST 146th ST., STE. 240, BURNSVILLE, MN 55337 PH (952)432-3000 'AV lit C31 / Date Reg. No. CJ J % 4 V