HomeMy WebLinkAbout2911721242008-03242016FL0I30PLAIN ID(CAVAIION • 215 CY Utility Esrht. (per plot),
)1
'4.. 7:14, tfk,
• • 0, \
VW *X se•
oe " %11W+,:wio,
•••• "V't, •C • "An4-•
lfi."• •n•A%
.0•1••,• •••n
••••'• , . • -•n•• • "
.4°'*'41'' 4' 4 ite•r??' • 44 • c•s, ‘40, 444
14" • **. ••••:,"
WETLAND
902 SILT FENCE-(1115):TYP:
9
FLOODRAIN FILL CY
=
955
- .8 90
/,,PtEA ,^)/-1 A r% BE
v
5058.001-Pro osed.dw SINN
"IIIA 111111 II A.... 630' ,c) Alki• e'Cir oz,arr• r• ii.,...., /
litetitib":"Atn
f'409410014n41411• ilree..,4061pAili
117•20441.`".4.04Vg 41,4147401401.41•11414 .,.z.• • ',0401SOSOSOZ411.01 6 , 4.4?-r,-,,,r- `t...4.04-tt
;t.-' .44.1.0:70.41,,,, ) -*SIVelln .41.,
4 "lt '''),
BUILDING DEpAnTmENT
6qaLt _1\ec2.\c-\Q-c\,&? 24 2016
gl ii r0 ( a Li- 200 `F CITY OF EDINA
2" CLEAR
ROCK (MIN.)
6" MIN.
SILT FENCE
ANCHOR W/ METAL
T- POST OR WOOD
2"X2" STAKE
FILTER FABRIC (36" MAX. HEIGHT)
OPENING IN FABRIC WEAVE < 212 pm
UNDISTURBED SOIL
DIRECTION OF FLOW
6"X6" TRENCH
(COMPACTED BACKFILL)
NOTES:
DIG A 6"X6" TRENCH ALONG THE INTENDED SILT FENCE LINE.
. DRIVE ALL ANCHOR POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH.
. POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART.
. LAY OUT SILT FENCE ALONG THE UPHILL SIDE OF THE ANCHOR POSTS AND BACK FILL 6"X6" TRENCH.
. SECURELY ATTACH SILT FENCE TO ANCHOR POSTS W/ MINIMUM OF THREE ATTACHMENTS PER POST.
. SEE MN DOT SPECIFICATIONS 2573 84 3886.
ROCK CONSTRUCTION ENTRANCE
1.
2
3
4
5
6 EROSION CONTROL PLAN STORMWATER MANAGEMENT AND BFK
IFS
11/12/2015
DESIGNED 8,
ISSUE DATE:
DRAWN BY:
REVISIONS
S.
6.
I hereby certify that this plan, specification or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under Me
laws of the State of Minnesota
Veinal Man F. Kanto, P.E.
Slgflatural /d
Date: 11/12/15 License 0: 25817
/7
1
EROSION CONTROL NOTES
1. Silt fence, bio rolls and/or catch basin inlet
protection devices shall be installed prior to any
land disturbing activity.
2. Rock construction entrances shall be installed prior
to any land disturbing activity or after existing
driveway is removed.
3. Any sediment or refuse that reaches the existing
street or adjacent property shall be removed
immediately and measures shall be taken to prevent
further sedimentation offsite.
4. All silt fences, bio rolls and catch basin inlet
protection devises must be repaired, replaced, or
supplemented when they become nonfunctional or
the sediment reaches of the height of the device.
Repairs shall be made within 24 hours of discovery,
or as soon as field conditions allow.
5. Rock construction entrance must be repaired or
replaced when the rock becomes inundated with
sediment and/or excessive sediment is being tracked
from the site. Repairs shall be made within 24
hours of discovery, or as soon as field conditions
allow.
6. Topsoil amendments shall consist of 2" of rnndot
grade 2 compost blended with upper 6" topsoil.
7. Hazardous materials and hazardous waste shall be
stored in appropriate sealed containers at all times
while not in use. Hazardous wastes generated at
the site must be managed and disposed of in
compliance with MPCA rules.
8. Contractors must provide a lined containment area
for all liquid and solid wastes generated by washout
operations on the site. The liquid and solid
washout wastes must not contact the ground and
the washout area must not allow runoff. Liquid and
solid wastes must be disposed of in compliance with
MPCA rules. Contractors may remove soiled
equipment from the site for washing.
9. All refuse generated by the work must be placed in
a dumpster or other container designated for refuse.
Refuse containers must be serviced on a regular
basis, as needed. Contractors- much pick up all
refuse that is blown or placed onto adjacent
properties. Dumpsters must be removed within 10
days of completion of work.
LEGEND
/So/Denotes Proposed Contour
0 Denotes Existing Contour
0 Denotes Proposed Wetland Buffer Sign
Denotes Proposed Silt Fence
NOTE: STORM WATER AND EROSION CONTROL
INSPECTIONS SHALL BE COMPLETED ONCE
EVERY 7 DAYS OR WITHIN 24 HOURS OF A
RAINFALL OF 0.5 INCHES OR GREATER.
0 10 zo 40
( IN FEET)