HomeMy WebLinkAbout0611621210008-02141983Building Permit Survey For
DICK ANDRON
Lot 2, Block 1, THE TIMBERS
904
7, , 5
APPROVED
Date
BY ceas.
City of Edina B!dg. Dept.
FILE NO.
Fol der
I hereby certify that this is a true and correct representation of a
survey of the boundaries of:
Lot 2, Block 1, THE TIMBERS, according to the recorded
plat thereof, Hennepin County, Minnesota.
and the location of the proposed building as shown. As surveyed by
me this 25th day of January, 1983.
945
Alvin R. Rehder, Land Surveyor
Minnesota Registration No. 13295
Revised: January 27, 1983 BENCH MARK:
Revised: February 9, 1983 Top of hydrant 5 feet east of
corner of Lot 3, Block 1, THE
Elevation = 907.34 feet.
Building Setback Line
0 7-
• 24 4:34k northeast
TIMBERS -
9 01
L_
Building
/ Setback
Line,
>5-is"ove
• PO. 45=c5,. 2
5.
/ /çx / p`'
/)
905.2
iff!p/-0/7Y"
xvi 01/1-
aTes,„
7,572 F
\O
8879
4
'
Scale: 1 inch = 30 feet
• Denotes iron monument found
o Denotes iron monument set
901.1 Denotes existing elevation
co/i)Denotes proposed elevation
Denotes surface drainage
Top of foundation elevation =
Garage floor elevation =
Basement floor elevation =
Note: Proposed elevations at all lot corners will
be the same as existing elevations.
Cib. W.a.1.9,t. t,t4-A;
Total area: 25,369 square feet (0,58 acres)
i
ISRAELSON AND ASSOCIATES, INC.
CONSULTING ENGINEERS - LAND SURVEYORS
SUITE 185, 9100 WEST BLOOMINGTON FREEWAY
BLOOMINGTON, MINNESOTA 55431
"/2
Manh.o/c
0
/nv. =4'512 97
JOB NO.
304-340
feet
feet
feet