Loading...
HomeMy WebLinkAboutResolution No. 2016-074 Site Plan 7600 Metro Blvd Edina School j I�1NA,rtt o e RESOLUTION NO. 2016-74 RESOLUTION APPROVING A SITE PLAN TO CONSTRUCT A NEW TRANSPORTATION FACILITY AT 7600 METRO BOULEVARD FOR THE EDINA PUBLIC SHOOOLS BE IT RESOLVED by the City Council of the City of Edina, Minnesota, as follows: Section I. BACKGROUND. 1.01 Wold Architects on behalf of Edina Public Schools, is requesting construction of a new 77,500 square foot transportation center at the vacant property located at 7600 Metro Boulevard. The office portion of the building would be 5,400 square feet; the maintenance area, 12,000 square feet; and the bus storage area 60,000 square feet. 1.02 The legal description of the subject property is: See attached Exhibit A 1.02 The School District recently purchased this property with the intent to relocate the existing transportation center, located in the Grandview area to the subject property. This property was recently subdivided off from portion of the property occupied by Film Tec. 1.03 Access to the site is available off 76,h Street and Edina Industrial Boulevard. A 10-foot tall black chain link security fence is proposed to protect the site. 1.04 The proposed plans meet all minimum Zoning Ordinance Requirements. 1.05 On July 27, 2016, the Planning Commission recommended approval of the proposed Site Plan subject to findings and conditions. Vote: 8 Ayes and 0 Nays. 1.06 On August 16, 2016 the City Council held a public hearing and reviewed the applications. Section 2. FINDINGS 2.01 The proposal meets all Edina City Code standards for a Site Plan. 2.02 The proposed use is allowed in the PID, Planned industrial district, and would generate less traffic than a traditional office or light industrial land uses. CITY OF EDINA 4801 West 50th Street-Edina,Minnesota 55424 www.EdinaMN.gov-952-927-8861 - Fax 952-826-0390 RESOLUTION NO. 2016-74 Page Two Section 3. DECISION NOW THEREFORE, it is hereby resolved by the City Council of the City of Edina, approval of the proposed Site Plan subject to the following conditions: I. Subject to staff approval, the site must be developed and maintained in substantial conformance with the following plans, unless modified by the conditions below: • Site plan date stamped August 16, 2016. • Grading plan date stamped August 16, 2016. • Landscaping plan date stamped August 16, 2016. • Building elevations date stamped July I, 2016. • Building materials board as presented at the Planning Commission July 270, and City Council meeting August 16. 2. Prior the issuance of a building permit, a final landscape plan must be submitted, subject to staff approval. Landscape plan must meet all minimum Zoning Ordinance requirements, including the planting of three additional trees. Additionally, a performance bond, letter-of-credit, or cash deposit must be submitted for one and one-half times the cost amount for completing the required landscaping, screening, or erosion control measures. Spacing of the coniferous trees shall be increased along the west lot line. 3. The property owner is responsible for replacing any required landscaping that dies. 4. Submit a copy of the Nine Mile Creek Watershed District permit. The City may require revisions to the approved plans to meet the district's requirements. S. Subject to the conditions outlined in the city engineer's memo dated July 22, 2016. RESOLUTION NO. 2016-74 Page Two Adopted by the City Council of the City of Edina, Minnesota, o August 16, 2016. ATTEST: Debra A. Mangen, Jk James B. Hovland, Mayor City er STATE OF MINNESOTA ) COUNTY OF HENNEPIN )SS CITY OF EDINA ) CERTIFICATE OF CITY CLERK I, the undersigned duly appointed and acting City Clerk for the City of Edina do hereby certify that the attached and foregoing Resolution was duly adopted by the Edina City Council at its Regular Meeting of August 16, 2016, and as recorded in the Minutes of said Regular Meeting. WITNESS my hand and seal of said City this day of 2016 City Clerk r f Exhibit A Propotied 1✓et;al Descriptions Proposed Parcel A. Lots 3,4, 10, 11 and that part of Lots 5 and 12,Block 7,Edina Interchange Center,3-lannepin.C.ounty, Minnesota,lying westerly of a line described as follows: COnimencing at the riorth\vest corner of saict,Lot 3;thence on an assumed bearing;of.North 89 degrees 32 minutes 23 seconds East,along the north line of said Lots 3,4,and 5,a distance of'465.11 feet to the point of beginning of the line to be described; thence South 00 degrees 27 minute:,37 seconds Ewst, parallel with the westerly lines of said Lots 3 and 10,a distance of 109.09 feet;thence South 89 degrees 32 minutes 23 seconds West a distance of.5.35 feet;thence South 00 degrees 27 uninufes 37 seconds Least a distance of 12.77 feet;thence North 89 degrees 32 ininutes 23 seconds Past a distance of 5.35 feet; thence South 00 degrees 27'inhiates 37 seconds East a distance of 748..13 feet to the south line of.said Lot 12 and there terminating. i i 1 . f