HomeMy WebLinkAbout2016-12-20 HRA Regular MeetingAgenda
H ousing and Redevelopment Authority Meeting
City of Edina, Minnesota
Edin a City Hall Cou n cil Cham be rs
Tuesday, December 20, 2016
7:00 PM
I.Call to Order
II.Roll Call
III.Approva l of Meeting Agenda
IV.Adoption of Consent Agenda
All a genda items listed on the consent agenda are considered routine and will
be ena cted by one motion. There will be no separate discussion of such items
unless requested to be remov ed from the Consent Agenda by a
Commissioner of the HRA. In such cases the item will be remov ed from the
Consent Agenda and considered immediately following the a doption of the
Consent Agenda. (Favorable rollcall v ote of majority of HRA Commissioners
present to approve.)
A.Approv e Minutes of December 7, 2016 Regular HRA Meeting
B.Pentagon Park Stormwater Ma nagement Plan Cooperative Agreement
V.Resolution 2016-07: Naming Buhl Investors/Saturday Properties as Preferred
Dev elopment Partner for 3930 West 49-1/2 Street and Adjacent Parcels
VI.Adjournment
The Edina Housing a nd Redevelopment Authority wants all pa rticipants to be
comforta ble being pa rt of the public process. If you need assistance in the way of
hearing ampli:cation, an interpreter, large-print documents or something else,
please call 952-927-8861 72 hours in advance of the meeting.
Date: Dec ember 20, 2016 Agenda Item #: IV.A.
To:Chair & Commissioners of the Edina HRA Item Type:
Minutes
From:Deb ra A. Mangen, City Clerk
Item Activity:
Subject:Ap p ro ve Minutes o f December 7, 2016 R egular HRA
Meeting
Edina Housing and Redevelopment
Authority
Established 1974
CITY O F EDINA
HOUSING & REDEVELOPMENT AUT HORITY
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
ACTION REQUESTED:
Approve minutes as presented.
INTRODUCTION:
ATTACHMENTS:
Description
Draft Minutes December 6, 2016 HRA Meeting
Page 1
MINUTES
OF THE EDINA HOUSING AND REDEVELOPMENT AUTHORITY
DECEMBER 7, 2016
12:37 A.M.
I. CALL TO ORDER
Chair Hovland called the HRA meeting to order at 12:37 A.M. on December 7, 2016.
II. ROLLCALL
Answering rollcall were Commissioners Brindle, Staunton, Stewart, Swenson and Chair Hovland.
III. APPROVAL OF MEETING AGENDA
Motion made by Commissioner Stewart, seconded by Commissioner Brindle approving
the Meeting Agenda.
Ayes: Brindle, Staunton, Stewart, Swenson, Hovland
Motion carried.
IV. CONSENT AGENDA ADOPTED
Commissioner Swenson seconded by Commissioner Staunton approving the consent
agenda as follows:
IV. A. Approve minutes of November 14, 2016 HRA Work Session and November
15, 2016 Regular HRA Meeting
B. Approve Professional Service Agreement: Grandview Green Preliminary Study
with Architectural Field Office LLC for a maximum cost of $65,000.00
V. PUBLIC HEARING: REVIEW OF 2017 HRA BUDGET, RESOLUTION NO. 2016-06:
SETTING 2017 TAX LEVY AND ADOPTING 2017 OPERATING BUDGET
Chair Hovland noted Finance Director Roggeman had included the HRA proposed budget and
tax levy during his City Council presentation. He opened the Public hearing for comments on
the proposed HRA 2017 Operating Budget and Tax Levy.
No one appeared to speak.
Commissioner Brindle made a motion to close the public hearing. Commissioner
Swenson seconded by the motion.
Ayes: Brindle, Staunton, Stewart, Swenson, Hovland
Motion carried.
Commissioner Swenson made a motion seconded by Commissioner Brindle to
adopt Resolution No. 2016-06 setting the 0217 Tax Levy and adopting the 2017
Operating Budget.
Ayes: Brindle, Staunton, Stewart, Swenson, Hovland
Motion carried.
VI. ADJOURNMENT
Chair Hovland declared the meeting adjourned at 12:42 A.M. December 7, 2016.
Respectfully submitted,
Scott Neal, Executive Director
Date: Dec ember 20, 2016 Agenda Item #: IV.B.
To:Chair & Commissioners of the Edina HRA Item Type:
R ep o rt / Rec o mmendation
From:Ro s s Bintner P.E., Engineering S ervic es Manager
Item Activity:
Subject:Pentagon P ark Sto rmwater Management P lan
Co o p erative Agreement
Action
Edina Housing and Redevelopment
Authority
Established 1974
CITY O F EDINA
HOUSING & REDEVELOPMENT AUT HORITY
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
ACTION REQUESTED:
Motion approving Cooperative Agreement for P entagon P ark Area Stormwater Management P lan.
INTRODUCTION:
T he attached report describes change in flood risk affecting an area northeast of highways 494 and 100 and a
proposed agreement with the Nine Mile Creek Watershed District and City of Bloomington to study the issue and
create a regional stormwater management plan.
ATTACHMENTS:
Description
Staff Report
Cooperative Agreement for Pentagon Park Stormwater Management Plan
May 6, 2016 Revis ed Atlas 14 Flood Ris k Management Elevations Letter to Nine Mile
Pentagon Revival LLC Letter to City on Revis ed Flood Elevation
Nine Mile Waters hed 77th Street Area 1% Probability Flood Inundation Map
December 20, 2016
Chair and Members of the Edina Housing and Redevelopment Authority
Bill Neuendorf, Economic Development Manager
Ross Bintner P.E., Engineering Services Manager
Pentagon Park Stormwater Management Plan Cooperative Agreement
Information / Background:
The Nine Mile Creek Watershed District updated flood risk models in 2015, using new NOAA Atlas 14 1%
probability (100-year) flood event. As a result of this change the commercial area northeast of highways
494 and 100 has recently been shown to be at increased risk for the 1% probability event. For more detail
see attached flood inundation map.
In a May 6, 2016 letter, staff requested assistance from Nine Mile Creek District and asked the District to
take an active role in planning and communicating the management of flood risk for this area. In response,
the District proposes the attached cooperative agreement and scope of service, with costs to be split: 50%
Nine Mile Watershed District; 33.5% Edina; and 16.5% Bloomington. This cost split approximates the
drainage area and benefitting property balance between the cities. The scope of service would create a
regional stormwater management plan developed with input from the cities, and private property owners.
Staff proposes paying this cost from the Pentagon Park TIF District through the Housing and Redevelopment
Authority (HRA.) The cost proposed is not to exceed $20,000. The work would begin immediately and be
completed by summer 2017.
Attachments:
Cooperative Agreement for Pentagon Park Stormwater Management Plan and Exhibits
May 6, 2016 Revised Atlas 14 Flood Risk Management Elevations Letter to Nine Mile
Pentagon Revival LLC Letter to City on Revised Flood Elevation
Nine Mile Watershed 77th Street Area 1% Probability Flood Inundation Map
1
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
COOPERATIVE AGREEMENT
Among Nine Mile Creek Watershed District, Housing and Redevelopment Authority of
Edina, City of Bloomington Pentagon Park Stormwater Management Plan
This agreement is made by and among the Housing and Redevelopment Authority
of Edina, a Minnesota housing and redevelopment authority with purposes and powers
set out in Minnesota Statutes chapter 469 (Edina HRA); the City of Bloomington, a
statutory city and body corporate and politic of the State of Minnesota (Bloomington);
and the Nine Mile Creek Watershed District, a watershed organization with purposes and
powers set out in Minnesota Statutes chapters 103B and 103D (NMCWD), for purposes of
joint development of a regional stormwater and flood management plan for the shared
Pentagon Park/Border Basin catchment area.
WHEREAS the 700-acre Pentagon Park/Border Basin area, depicted in Exhibit A
and referred to hereinafter as “Pentagon Park,” lies entirely within the Nine Mile Creek
watershed, in part in Bloomington and in part within the boundaries of the City of Edina,
and includes significant tracts of public land, as well as a number of privately owned
parcels;
WHEREAS Pentagon Park is an important commercial, office and industrial
district for both Edina HRA and Bloomington, and is a focus for critical and extensive
ongoing redevelopment planning efforts by both cities;
WHEREAS the topographic and drainage conditions of Pentagon Park make it
susceptible to stormwater inundation and flooding, and rain events of increasing
intensity and volume – as described by the National Weather Service’s Atlas 14 rainfall
data – will add to the challenge of sustainably redeveloping the area in compliance with
applicable regulatory requirements, including but not limited to NMCWD’s stormwater-
management and floodplain-protection standards;
WHEREAS NMCWD has developed a stormwater hydraulic model that can be
used to generate stormwater flow volume and rate information, flood elevations,
floodplain delineations and related data (the Model) for application to watershed-wide
planning, as well as to the evaluation of the local consequences of redevelopment and
public infrastructure projects, and at the direction of the NMCWD Board of Managers,
the NMCWD engineer utilized the Model to develop preliminary flood-elevation
information for Pentagon Park;
WHEREAS the NMCWD engineer and staff has presented the results of the
modeling analysis to staff at both Edina HRA and Bloomington;
WHEREAS in response to a request from Edina HRA staff, the NMCWD Board of
2
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
Managers directed NMCWD staff and its engineer, Barr Engineering, to develop a scope
of work that includes evaluation, in consultation with Edina HRA and Bloomington, of
flood- management and regional stormwater-management scenarios, as well as
development of regional redevelopment design guidelines and a regional stormwater-
management plan (all told, the Project), and the resulting November 9, 2016, scope of
work is attached hereto and incorporated herein as Exhibit B; and
WHEREAS Bloomington, Edina HRA and NMCWD are authorized by Minnesota
Statutes section 471.59 to enter into this cooperative agreement for the Project.
Agreement
NOW, THEREFORE, BLOOMINGTON, EDINA HRA AND NMCWD enter into this
agreement to document their mutual understanding as to the scope of the Project and
facilitate communication and cooperation to successfully complete the Project.
1. Conduct of the Project a. NMCWD will enter a professional-services contract with Barr Engineering for
completion of the tasks specified and the submission of work product
described in Exhibit B. Notwithstanding the foregoing, NMCWD makes no
warranty to Edina HRA or Bloomington regarding the NMCWD engineer’s or
any other party’s performance in completing the Project. b. The professional-services contract between NMCWD and Barr Engineering for
the Project will identify Edina HRA and Bloomington each as an intended
beneficiary of the Project, will extend the duty of care, insurance and
indemnification requirements to NMCWD, Edina HRA and Bloomington, and
will state that Edina HRA, Bloomington and NMCWD jointly share the right to
use the work product and rights in the event of a breach of the contract by
Barr Engineering.
c. NMCWD, in collaboration with the representatives of each of Edina HRA
and Bloomington identified in section 4, below, will direct Barr
Engineering’s completion of the Project. Edina HRA and Bloomington
each will have input in the conduct of the Project through the structured
meetings and review opportunities described in Exhibit B. Each party to
this agreement will be provided with reasonable opportunity to review,
comment on, request changes to and approve work product, except that
no single party may materially revise or amend the scope of work to be
completed under the terms of this agreement. NMCWD retains its
discretion as the principal contracting party to direct the performance of
the Project and to administer the contract with Barr Engineering. Any
written communication between any party to this agreement and Barr
Engineering related to the subject matter of this agreement will be
concurrently copied to the other parties.
3
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
d. NMCWD, Bloomington and Edina HRA will facilitate Barr Engineering’s
performance of the Project by all reasonable means within their administrative
capacity. If Barr Engineering requires entry onto public or private property for
the purpose of the Project, Edina HRA or Bloomington, as appropriate, will use
its good offices to assist in securing any necessary permissions. e. The parties to this agreement will use the work product of the Project in good
faith to explore stormwater-management and flood-management practices,
designs, projects and other such opportunities, to be pursued jointly and
individually. However, nothing in this agreement obligates any of NMCWD,
Bloomington or Edina HRA to any specific further undertaking or any
commitment of funds beyond the funding of and participation in the Project
as set forth herein.
f. The exercise of regulatory authority by the NMCWD Board of Managers and, as
delegated, NMCWD staff may not be and is not modified in any way by this
agreement. NMCWD’s participation in the Project notwithstanding, no
representation or warranty is made as to whether specific land-disturbing
activities undertaken in reliance on the work products of the Project will
comply with NMCWD rules. Further, NMCWD does not warrant and will not
be liable for the actions of or failure to act by any third-party regulatory entity.
2. Cost Sharing a. NMCWD will pay the costs of completion of the scope of work in Exhibit B in
accordance with its contract with Barr Engineering and applicable state law. b. Work product created for the Project will acknowledge financial support from
each of NMCWD, Bloomington and Edina HRA. c. Within 30 days of written notification from NMCWD of NMCWD’s payment of
a Barr Engineering invoice for the Project, Edina HRA will reimburse NMCWD
33.5 percent of the invoice amount, up to an aggregate total for the Project not
to exceed $20,000.
d. Within 30 days of written notification from NMCWD of NMCWD’s payment of
a Barr Engineering invoice for the Project, Bloomington will reimburse
NMCWD 16.5 percent of the invoice amount, up to an aggregate total for the
Project not to exceed $9,800.
e. Each party will pay the internal and incidental costs of its participation in the
Project not otherwise specified as subject to cost-sharing as specified in herein,
including but not limited to costs of staff time and materials for participation
in and facilitation of the Project.
3. Independent relationship; liability. This agreement does not create a joint powers
board or organization within the meaning of Minnesota Statutes section 471.59, and
no party agrees to be responsible for the acts or omissions of the any other pursuant to
4
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
subdivision 1(a) of the statute. Only contractual remedies are available for the failure
of a party to fulfill the terms of this agreement. NMCWD, Bloomington and Edina
HRA enter this agreement solely for the purposes of the Project. Accordingly, with
respect to any and all activity undertaken pursuant to this agreement, NMCWD,
Bloomington and Edina HRA each will hold harmless, defend and indemnify the
others, their officers, employees and agents for all claims, damages, liabilities, losses
and expenses asserted against either or both of the other parties at any time by a third
party, including any governmental body, arising from, in whole or in part by any
negligent act or omission or willful misconduct of the indemnifying party, the
indemnifying party’s officers, agents, employees or subcontractors.. The parties to this
agreement are not liable for the acts or omissions of either or both of the other parties
to this agreement. This agreement creates no right in and waives no immunity,
defense or liability limitation with respect to any third party. The parties do not waive
any the limitation of liability provided under Minnesota Statutes chapter 466.
4. The representatives of the parties with respect to this agreement are as follows:
NMCWD:
Administrator
Nine Mile Creek Watershed District
ranhorn@ninemilecreek.org
952-835-2078
12800 Gerard Dr.
Eden Prairie MN 55346
Edina HRA:
Engineering Services Manager
City of Edina
RBitner@EdinaMN.gov
952-903-5713
7450 Metro Blvd
Edina MN 55439
Bloomington:
Water Resources Engineer
City of Bloomington
bgruidl@BloomingtonMN.gov
952-563-4557
1800 W. Old Shakopee Road
Bloomington MN 55431
5. Data Practices. All data created, collected, received, maintained or disseminated for
any purpose in the course of this agreement is governed by the Data Practices Act,
5
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
Minnesota Statutes chapter 13, any other applicable state statute, or any state rules
adopted to implement the act, as well as federal regulations on data privacy.
6. Entire agreement. This agreement contains the complete and entire agreement
among the parties relating to the subject matter hereof, and supersedes all prior
negotiations, agreements, representations and understandings, if any, among the
parties respecting such matters. The recitals stated at the outset are incorporated into
and are a part of the agreement.
7. Waiver. The waiver by NMCWD, Edina HRA or Bloomington of any breach or failure
to comply with any provision of this agreement by either or both of the other parties
will not be construed as nor will it constitute a continuing waiver of such provision or
a waiver of any other breach of or failure to comply with any other provision of this
agreement.
8. Term; termination. This agreement is effective on execution by all three parties and
will terminate one year from the date of execution of the latest amendment hereto or
on the written agreement of all three parties.
IN WITNESS WHEREOF, the parties have caused the agreement to be duly executed
intending to be bounded thereby.
(Signature page follows.)
6
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
CITY OF BLOOMINGTON
_______________________________ Date: _____________________
By _____________________________
Its _____________________
_______________________________ Date: _____________________
By _____________________________
Its _____________________
Approved as to form & execution:
_____________________________
Bloomington City Attorney
HOUSING AND REDEVELOPMENT AUTHORITY OF EDINA
_______________________________ Date: _____________________
By _____________________________
Its _____________________
_______________________________ Date: _____________________
By _____________________________
Its _____________________
Approved as to form & execution:
_____________________________
Edina City Attorney
NINE MILE CREEK WATERSHED DISTRICT
_______________________________ Date: _____________________
By Randy Anhorn
Its administrator
Approved as to form & execution:
_____________________________
NMCWD counsel
7
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
Exhibit A
Pentagon Park/Border Basin Study Area
8
Nine Mile Creek Watershed District-Housing and Redevelopment Authority of Edina-City of Bloomington
Pentagon Park study
Exhibit B
Scope of Work – Pentagon Park/Border Basin Regional Stormwater Management
November 9, 2016
Edina
Bloomington
Richfield
Lake Edina
§¨¦494
§¨¦494
100
100
456731456717
Yo
r
k
A
v
e
S
Fr
a
n
c
e
A
v
e
W 78th St
W 70th St
We
s
t
S
h
o
r
e
D
r
W 77th St
Dunberry La
Co
r
n
e
l
i
a
D
r
W 69th St
Pa
r
k
l
a
w
n
A
v
e
Wo
o
d
d
a
l
e
A
v
e
W American Blvd
Xe
r
x
e
s
A
v
e
S
Hibiscus Ave
Hazelton Rd
Gilford Dr
Mavelle Dr
Fr
a
n
c
e
A
v
e
S
Pi
c
t
u
r
e
D
r
Ly
n
m
a
r
L
a
Fonde
l
l
D
r
Co
m
p
u
t
e
r
A
v
e
Edina Industrial Blvd
Viking Dr
Cr
e
s
t
o
n
R
d
Ga
l
l
a
g
h
e
r
D
r
Po
i
n
t
D
r
Ellsw
o
r
t
h
D
r
Wa
s
h
b
u
r
n
A
v
e
S
Ke
l
l
o
g
A
v
e
Dunh
a
m
D
r
Sedum La
Ke
l
l
o
g
g
A
v
e
Clare
m
o
r
e
D
r
Gl
o
u
c
h
e
s
t
e
r
D
r
Da
w
s
o
n
L
a
Br
i
s
t
o
l
B
l
v
d
Yo
r
k
T
e
r
Sou
t
h
d
a
l
e
R
d
Oa
k
l
a
w
n
A
v
e
Andover Rd
Be
l
t
l
i
n
e
H
w
y
Belvidere La
He
a
t
h
e
r
t
o
n
T
r
Gl
o
u
c
h
e
s
t
e
r
A
v
e
W 72nd St
Judson
L
a
Sa
n
d
e
l
l
A
v
e
Val
l
e
y
V
i
e
w
R
d
Clar
e
m
o
r
e
C
t
Yo
r
k
A
v
e
S
He
a
t
h
e
r
t
o
n
T
r
Xe
r
x
e
s
A
v
e
S
W 70th St W 70th St
W Ameri
c
a
n
B
l
v
d
Fr
a
n
c
e
A
v
e
W 70th St
Oa
k
l
a
w
n
A
v
e
Ba
r
r
F
o
o
t
e
r
:
A
r
c
G
I
S
1
0
.
4
.
1
,
2
0
1
6
-
0
7
-
0
5
1
4
:
0
1
F
i
l
e
:
I
:
\
C
l
i
e
n
t
\
N
i
n
e
_
M
i
l
e
_
C
r
e
e
k
_
W
D
\
W
o
r
k
_
O
r
d
e
r
s
\
P
e
n
t
a
g
o
n
_
P
a
r
k
_
U
p
d
a
t
e
s
\
M
a
p
s
\
M
e
e
t
i
n
g
s
\
A
t
l
a
s
_
1
4
_
U
p
d
a
t
e
_
I
n
u
n
d
a
t
i
o
n
_
M
a
p
p
i
n
g
.
m
x
d
U
s
e
r
:
b
a
l
I
800 0 800
Feet
EXHIBIT A
Pentagon Park/Border Basin Study AreaNine Mile Creek Watershed DistrictHennepin County, Minnesota
Creek Centerline
Municipal Boundary
District Legal Boundary
Tributary Drainage Area
Nine Mile Creek
Centennial Lakes
Border Basin
Study Area
Study Area Parcels
Edina
Eden Prairie
Bloomington
Minnetonka
Richfield
Hopkins
Barr Engineering Co. 4300 MarketPointe Drive, Suite 200, Minneapolis, MN 55435 952.832.2600 www.barr.com
Edina
Eden Prairie
Bloomington
Minnetonka
Richfield
Hopkins
The red box shows the Pentagon
Park/Border Basin area in relation to the
Nine Mile Creek watershed.
November 9, 2016
Randy Anhorn
District Administrator
Nine Mile Creek Watershed District
12800 Gerard Drive
Eden Prairie, MN 55346
Re: Proposed Scope of Work: Pentagon Park/Border Basin Regional Stormwater Management
Plan
Dear Mr. Anhorn:
Thank you for requesting us to assist the Nine Mile Creek Watershed District (NMCWD) with this project.
This letter outlines a proposed scope of work, budget, and schedule to evaluate regional flood and
stormwater management options for the Pentagon Park/Border Basin area. The proposed scope of work
includes development of planning level cost estimates for up to three flood improvement alternatives and
preparation of stormwater management guidelines for future redevelopment in the Pentagon Park/Border
Basin area of Edina and Bloomington.
Background
The Pentagon Park/Border Basin Area is a commercial, office and industrial park area located just north of
Interstate 494 and east of Trunk Highway 100 within the cities of Edina and Bloomington. The area is
bounded on the north by the former Fred Richards Golf Course. The watershed tributary to the Pentagon
Park/Border Basin Area is approximately 700 acres, including
the Centennial Lakes watershed. There are two primary flow
paths through the area. Approximately 200 acres are tributary
to the ponds on the former Fred Richards Golf Course on the
north side of the Pentagon Park area, and 400+ acres are
tributary to the Border Basin (South Pond) located west of the
intersection of West 77th Street and Minnesota Drive along
the Edina/Bloomington border. Stormwater from both of
these ponding areas, and from the direct Pentagon Park
watershed, is collected by a 97-inch x 154-inch reinforced
concrete arch pipe that discharges to Nine Mile Creek
approximately 900 feet downstream of the West 77th Street
crossing of the creek.
Much of the Pentagon Park/Border Basin area is low-lying and becomes inundated during large storm
events. Results from the Atlas 14 hydrologic and hydraulic model update completed by the District in
November 9, 2016
Page 2
G:\ENG\ADMIN\AGENCIES\WATERSHED DISTRICTS\NINE MILE CREEK\2017 Pentagon & Border Basin\161220 Agreemt - Ex B scope 11-9-16.docx
2016 indicate that 100-year flood management elevations in the Pentagon Park area are considerably
higher than previously established flood elevations (ranging from 0.4 to 2.2 feet higher). Figure 6 from
Barr’s January 20, 2016 memorandum to the NMCWD Board (Atlas 14 Revised Flood Management
Elevations) shows the 100-year flood inundation in the Pentagon Park area (enclosed).
On May 6, 2016, the NMCWD received a letter (enclosed) from the City of Edina requesting that the
NMCWD assist the City with addressing flood management issues resulting from the revised Atlas 14
flood management elevations and reaffirming the modeling methodology used to determine the Atlas 14
flood elevations. Although not specifically addressed in the May 6, 2016 letter, City staff has since
requested assistance from the NMCWD in addressing increased flood management elevations in the
Pentagon Park area. Significant portions of the Pentagon Park area are either currently undergoing
redevelopment or will be redeveloped in upcoming years, so addressing the situation in a timely manner
is important to the City and the District.
At the NMCWD May 18, 2016 Board meeting, the Managers discussed Edina’s May 6, 2016 letter and
directed District staff and consultants to reaffirm the Pentagon Park Area modeling methodology and
results and continue to work with the City in developing a plan for addressing the potential flooding
issues in this area. Since then, Barr has reviewed the XP-SWMM model for the Pentagon Park area and
completed updates to the model to reflect the most recent elevation data available (2011 LiDAR data
from the Minnesota Department of Natural Resources). NMCWD and Barr staff attended a meeting on
July 6, 2016 with City of Edina staff to discuss stormwater management issues in the Pentagon Park area
and potential options for addressing these issues as the area redevelops. At the NMCWD July 20, 2016
Board meeting, the Managers directed staff to prepare a scope of work for addressing flooding and
stormwater management issues in the Pentagon Park Area resulting from the updated Atlas 14
precipitation frequency estimates and the proposed redevelopment. District and Barr staff attended a
meeting with City of Bloomington staff on August 5, 2016 to discuss the Atlas 14 flood management
elevations in the area and potential impacts to redevelopment.
Project Understanding
The Pentagon Park/Border Basin Area receives runoff from a drainage area of approximately 700 acres,
including portions of Edina, Richfield, and Bloomington. Portions of this area have historically been
inundated during large rainfall events due to the large drainage area, the low-lying nature of the area and
limited discharge capacity to the creek during large rainfall events due to tailwater impacts. 100-year
flood management elevations have increased since the Atlas 14 precipitation frequency estimates were
incorporated in the NMCWD’s hydrologic and hydraulic model.
Significant portions of the Pentagon Park/Border Basin Area are expected to undergo redevelopment in
the near future. This includes the former Fred Richards Golf Course, for which a master plan development
process is underway by the City of Edina Parks Department. The recent increase in flood management
elevations in this area resulting from the Atlas 14 precipitation frequency estimates will pose a challenge
November 9, 2016
Page 3
G:\ENG\ADMIN\AGENCIES\WATERSHED DISTRICTS\NINE MILE CREEK\2017 Pentagon & Border Basin\161220 Agreemt - Ex B scope 11-9-16.docx
to redevelopment efforts, including significant site building constraints and regulatory restrictions that
may, in some cases, hinder redevelopment potential.
Given the increased flood risks and active redevelopment, the cities of Edina and Bloomington have
requested assistance from the NMCWD to develop a regional flood and stormwater management plan for
this area to identify options to alleviate flood risk and guide stormwater management for future
redevelopment. The plan will include consideration of storing additional stormwater upstream and/or on
the former Fred Richards golf course, planning for regional stormwater management opportunities, and
developing site development best practices to guide stormwater management as redevelopment occurs.
Although agreements are not formally in place, the intention is to pursue this project as a partnership
between the NMCWD and the cities of Edina and Bloomington.
Scope of Work
The proposed scope of work has been organized into six project tasks, which are described in further
detail below. Four stakeholder meetings (described in Task 6) will be held throughout the project.
Task 1 – Problem Definition
As previously described, Barr has already begun evaluating the flooding issue in the Pentagon
Park/Border Basin area to gain a better understanding of the problem, including the following tasks:
• Conducting a comparison of peak 100-year flood elevations within the study area using
precipitation frequency estimates from the U.S. Weather Bureau Technical Paper (TP) 40 (1961)
and the National Oceanic and Atmospheric Administration (NOAA) Atlas 14 (2013), including
preparation of maps showing approximate inundation areas.
• Conducting meetings with staff from the NMCWD and cities of Edina and Bloomington staff to
present and discuss the flood comparison and related concerns, share information regarding
future redevelopment in the study area, and discuss the scope of a regional flood and stormwater
management plan.
• Updating relevant portions of the existing conditions XP-SWMM model used in the update of the
Nine Mile Creek flood profile to reflect the most recent topography dataset and building
footprints within the Pentagon Park/Border Basin study area.
As part of this proposed scope of work, Barr will further define the problem, including the following
tasks:
1. Summarizing the runoff volume contributed to the redevelopment area by the upstream area.
2. Summarizing the peak flows to and from the Pentagon Park/Border Basin area.
3. Summarizing the peak flood elevation and inundation volume for each parcel within the
redevelopment area for the 10- and 100-year frequency storm events.
4. Compiling a comparison of these elevations to existing structures within the redevelopment
area.
5. Reviewing historic aerial photos to determine historic wetland areas within the study area.
November 9, 2016
Page 4
G:\ENG\ADMIN\AGENCIES\WATERSHED DISTRICTS\NINE MILE CREEK\2017 Pentagon & Border Basin\161220 Agreemt - Ex B scope 11-9-16.docx
Task 2 –Evaluation of Flood Improvement Scenarios
Task 2 encompasses identification and evaluation of improvement scenarios to decrease flood elevations
within the Pentagon Park/Border Basin area. The NMCWD will work closely with city staffs through a series
of meetings to evaluate the feasibility, effectiveness, and downstream impacts of identified improvement
scenarios. Potential scenarios may include:
a. Increased storage in the upstream contributing area
b. Diversion of runoff from the upstream contributing area to a different creek outfall
c. Increased regional storage within the redevelopment area
d. Restoration of historic wetlands within the study area to attenuate flow rates
e. Increased outflow conveyance at the downstream end of the redevelopment area
This work task includes the following activities:
1. Evaluating the effectiveness of preliminary flood improvement scenarios using the NMCWD XP-
SWMM model.
2. Refining improvement scenarios based on stakeholder feedback (Stakeholder Meeting #1),
including additional modeling and summarizing the results.
3. Preparing planning-level opinions of probable cost for construction for up to three flood
improvement scenarios.
Task 3 – Evaluation of Regional Stormwater Treatment Scenarios
Task 3 encompasses identification and evaluation of options to provide regional stormwater treatment
within the Pentagon Park/Border Basin area, including volume control and water quality treatment.
Regional stormwater treatment would allow developers to “buy in” to regional treatment systems in lieu
of designing and implementing systems for each individual parcel amid complicated site constraints. This
work task includes the following activities:
1. Identifying and evaluating opportunities for regional stormwater volume control and water
quality treatment, such as infiltration opportunities and/or stormwater storage and re-use.
Preliminary ideas will be identified and discussed at Stakeholder Meeting #2.
2. Quantifying volume control and water quality treatment benefits using P8, the MIDS calculator, or
other appropriate models.
3. Discussing and addressing potential conflicts and pathways for conformance with NMCWD rules.
4. Refining regional stormwater volume control and water quality treatment scenarios based on
Stakeholder Meeting #3.
5. Preparing planning-level opinions of probable cost for construction for up to two regional
stormwater treatment scenarios.
Task 4 – Prepare Regional Redevelopment Design Guidelines
This work task includes development of regional redevelopment design guidelines that identify specific
stormwater management requirements and/or options for future private redevelopment within the
Pentagon Park/Border Basin study area. The design guidelines will include discussion on implementation
November 9, 2016
Page 5
G:\ENG\ADMIN\AGENCIES\WATERSHED DISTRICTS\NINE MILE CREEK\2017 Pentagon & Border Basin\161220 Agreemt - Ex B scope 11-9-16.docx
of and conformance with the District’s stormwater management rules. Draft redevelopment design
guidelines will be presented to stakeholders, including city staff and interested private development
representatives, and finalized based on stakeholder feedback.
Task 5 – Prepare Regional Stormwater Management Plan/Report
Task 5 includes development of a regional stormwater management plan, documenting the analysis and
recommendations for flood improvements and regional stormwater management. The plan will also
discuss/document management policies and maintenance agreements. This work task includes the
following activities:
1. A draft regional stormwater management plan document for review by stakeholders
2. A finalized regional stormwater management plan
Task 6 – Stakeholder Involvement
This work task includes conducting four stakeholder meetings, which will be held at Barr Engineering Co.
The meetings are summarized further below
1. Conducting Stakeholder Meeting #1 with NMCWD and City staff to present problem background
and description, discuss analysis and results of preliminary flood improvement scenarios and
solicit feedback on refinements to flood improvement scenarios.
2. Conducting Stakeholder Meeting #2 with NMCWD and City staff to discuss modeling results and
cost estimates for evaluated improvement scenarios. The meeting will also include discussion
regarding regional stormwater treatment options for future redevelopment within the study area
and preparation of redevelopment design guidelines that align with the regional stormwater
management plan.
3. Conducting Stakeholder Meeting #3 with NMCWD, City staff, and interested private development
representatives to discuss regional treatment opportunities within the study area and preparation
of redevelopment design guidelines.
4. Conducting Stakeholder Meeting #4 with NMCWD, City staff, and interested private development
representatives to review and provide feedback on draft report and draft redevelopment design
guidelines.
5. Conduct presentation to NMCWD Board of Managers
6. Conduct study sessions (2) with Bloomington and Edina City Councils
November 9, 2016
Page 6
G:\ENG\ADMIN\AGENCIES\WATERSHED DISTRICTS\NINE MILE CREEK\2017 Pentagon & Border Basin\161220 Agreemt - Ex B scope 11-9-16.docx
Project Schedule and Meetings
Table 1 outlines the proposed project schedule. Work shall commence immediately upon agreement
to this scope of work.
Table 1. Proposed project schedule.
Task Name Estimated Completion Date
Stakeholder Meeting #1 November 2016
Stakeholder Meeting #2 January 2017
Stakeholder Meeting #3 March 2017
Completion of Draft Regional Redevelopment Design Guidelines &
Draft Regional Stormwater Management Plan/Report April 2017
Stakeholder Meeting #4 April 2017
Study Sessions with City Councils May 2017
Completion of Final Regional Redevelopment Design Guidelines & Draft
Regional Stormwater Management Plan/Report
May 2017
Project Budget
The estimated cost to complete the proposed scope of work is $ 56,500. The scope of work and cost
estimate can be revised at any time as the project proceeds. The proposed work described will be
conducted on a time and expenses basis.
Table 2. Proposed project budget
Task
No. Task Name Estimated
Hours Estimated Budget
1 Problem Definition 50 $4,500
2 Evaluation of Flood Improvement Scenarios 106 $12,000
3 Evaluation of Regional Stormwater Treatment
Scenarios 80 $9,500
4 Prepare Regional Redevelopment Design Guidelines 90 $9,000
5 Prepare Regional Stormwater Management
Plan/Report 70 $7,500
6 Stakeholder Involvement (4 meetings) 110 $14,000
Subtotal 506 $56,500
November 9, 2016
Page 7
G:\ENG\ADMIN\AGENCIES\WATERSHED DISTRICTS\NINE MILE CREEK\2017 Pentagon & Border Basin\161220 Agreemt - Ex B scope 11-9-16.docx
Thank you for the opportunity to assist the District, Cities, and private developers/property owners
with this important project. Please contact Janna Kieffer if you have any questions about this
proposal at (952) 832-2785 or jkieffer@barr.com.
Sincerely,
Robert Obermeyer P.E.
Vice President
Barr Engineering Co.
Enclosures
May 6, 2016
Board of Managers, Nine Mile Creek Watershed District
c/o Kevin Bigalke, District Administrator
Kbigalke@ninemilecreek.org <via email only>
12800 Gerard Drive
Eden Prairie, MN
RE: Revised Atlas 14 flood risk management elevations
Dear Board of Managers,
District staff recently shared a May 14, 2015 memorandum you received describing Atlas 14 revised risk
assumptions, modeling methodology, and revised flood management elevations. This modeling effort, and
revised flood risk management elevations has potentially significant consequences to public and private
redevelopment along Nine Mile Creek and in adjoining areas subject to creek backwater flooding. This letter
will describe concerns related to the modeling and development of revised management elevations and asks the
District to take an active role to plan and communicate the management of flood and flow, clarify its rules, and
reaffirm the modeling methodology used to define flood risk management elevations.
In review of the May 14, 2015 Atlas 14 memo, I note the following concerns: 1) The District utilized upstream
city models, including Edina’s XP-SWMM model, updating topographic information in only the Braemar Branch
to refine storage and overflow elevation. 2) In the absence of hydrologic guidance from NOAA, the District
used rainfall distribution recommended by MnDOT to develop a conservative ‘nested distribution’
methodology. 3) While creek elevation management was the focus of the memo, maps showing 100-year
inundation extent were provided that define split, and upstream flow paths, both overland and backing though
local systems, the management of which I presume would have a material effect on flood flow and elevation,
but for which no management regime currently exists in District rules.
In response to these concerns, I ask the District to consider the following: 1) Review and affirm the level of
accuracy in modeling is sufficient to set management elevation, particularly in areas that upstream city models
were used, but not updated to the same standard used in the creek model. 2) Review and affirm the
assumptions used to develop rainfall distributions. 3) Provide comparison of management elevations before and
after modeling 4) Provide assistance in communicating change in management elevations to property owners
with development proposals in progress. 5) Consider providing best practices for site development, site level
design guidance for acutely affected redevelopment sites, and alternatives to providing rate control for 100 year
events. 6) Consider implications and future management of split flow and upstream flow paths both overland
and through pipe networks.
Thank you for the consideration of these concerns. I am available to describe or clarify the issues and requests
presented in this letter at your next board meeting, or at any time with District staff.
Sincerely,
Ross Bintner P.E.
Environmental Engineer
Cc: Chad Millner P.E. – Director of Engineering <all cc via email>
Cary Teague – Community Development Director
Bill Neuendorf – Economic Development Manager
Bryan Gruidl – Water Resource Manager, City of Bloomington
Janna Kieffer P.E. – Barr Engineering
G:\ENG\ADMIN\AGENCIES\WATERSHED DISTRICTS\NINE MILE CREEK\2017 Watershed Plan update\160506 Flood planning Letter.docx
PENTAGON REVIVAL, LLC
2424 KENNEDY STREET NE, MINNEAPOLIS, MINNESOTA 55413 612.371.0123
April 22, 2016
Ross Bintner
City of Edina, Engineering Department
7450 Metro Boulevard
Edina, MN 55439
RE: Revised Nine Mile Creek Watershed District Flood Management Elevations
Via email and US Mail
Dear Ross,
In response to recently learning of the Nine Mile Creek Watershed District (NMCWD) updated flood
management elevations, we are interested in working with the City of Edina and NMCWD to better
understand the potential impact of meeting redevelopment goals at the former Pentagon Park site.
After reviewing the March 8, 2016 City of Edina comments in response to the May 14, 2015 Barr
Engineering memorandum and related figures prepared for the NMCWD, we have some questions. As it
relates to common goals for the redevelopment of Pentagon Park, we are interested in working with the
City of Edina and NMCWD to better understand integrated planning opportunities. And specifically, the
land use options that can serve as flood storage in 100-year precipitation events, preferred stormwater
management strategies for the area, verification of the elevations to better delineate the impact, and
the effect to related properties of raising 77th Street West above the flood elevation.
We ask the City of Edina to reach out to NMCWD and ask for technical assistance so that together we
can approach the understanding of impacts and opportunities of the revised flood management
elevations to the area.
Sincerely,
nstin mitten
Penta n Revival, LLC
Director of Sustainability, Development Manager
CC: Cary Teague, City of Edina, Community Development Manager
Bill Neuendorf, City of Edina, Economic Development Manager
Kevin Bigalke, Administrator, Nine Mile Creek Watershed District
Scott Tankenoff, Pentagon Revival, LLC
Creek Centerline
Edina CWRMP 100-year
Inundation Extents
100-Year Floodplain Management
Inundation Extent (1)
a x-1
Municipal Boundary
ri District Legal Boundary
(1) Based on Atlas 14 precipitation
Label Explanation:
... j
Atlas 14 Peak Elevation
Rounded to the Nearest
0.1 Feet (NGVD29)
1114 Toffte r I
•
Feet
200 0 200 400 600
FT5-ta fT1' Ff..18 15„
FIGURE 1
77th Street and Fred Richards GC Area
100-Year Inundation Extents
Nine Mile Creek Watershed District
Hennepin County, Minnesota
9i1MilleCreek BARR
W A T E R S NED D S T R I C
Date: Dec ember 20, 2016 Agenda Item #: V.
To:Chair & Commissioners of the Edina HRA Item Type:
R ep o rt / Rec o mmendation
From:Bill Neuendorf, Econo mic Development Manager
Item Activity:
Subject:Res o lutio n 2016-07: Naming Buhl Inves to rs /S aturd ay
Pro p erties as P referred Development P artner for 3930
Wes t 49-1/2 S treet and Adjac ent Parc els
Action
Edina Housing and Redevelopment
Authority
Established 1974
CITY O F EDINA
HOUSING & REDEVELOPMENT AUT HORITY
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
ACTION REQUESTED:
Approve Resolution 2016-07 and authorize staff to begin negotiations with development partner.
INTRODUCTION:
T his item pertains to the potential redevelopment of publicly-owned parcels located in the 50th and France
Commercial District. T his item pertains only to the potential real estate transaction. T he land use approvals are
considered by the P lanning Commission and City Council separately from the real estate transaction.
ATTACHMENTS:
Description
3930 pref dvlp prtnr - s taff report
Res 2016-07 nambing Buhl-Saturday for 3930
Summary of 3930 Propos als Oct 2016
3930 RFP - Aug 2016
Housing & Redevelopment Authority
Established 1974 December 20, 2016
Members of the Edina Housing & Redevelopment Authority
Bill Neuendorf, Economic Development Manager
Resolution 2016-07: Naming Buhl Investors/Saturday Properties as Preferred
Development Partner for 3930 West 49-1/2 Street and Adjacent Parcels
Information /
Background:
In August 2016, the Edina Housing and Redevelopment Authority (HRA) issued a Request
for Proposal (RFP) to redevelop vacant property located at 3930 W. 49-1/2 Street. This
property was purchased by the HRA in 2013 with the intent of creating additional public
parking for the commercial district.
Prospective developers were encouraged to provide creative ways to deliver public parking
while also adding street life, vibrancy and new business opportunities. Interested
developers were encouraged to consider including other adjacent properties to increase the
impact of the redevelopment effort on W. 49-1/2 Street. A copy of the RFP is attached.
Four development teams submitted proposals, summaries of which are attached. The teams
include:
Development Team Brief Description of Proposal
John Laurent Associates Public parking, retail space and condominiums
Good Neighbor Consortium Public parking, retail space, office space and public
park
Buhl Investors / Saturday Public parking, retail space, apartments and public
STAFF REPORT Page 2
Properties plaza
KM2 Development / Doran
Companies
Public parking, retail space and apartments
Invitations to present and discuss their proposals were extended to each development
team. Three teams presented their concepts to the Edina HRA at the November 14, 2016
Work Session. One team (Laurent Associates) declined the invitation and asked to be
withdrawn from consideration. The three remaining developers delivered their
presentations during the Work Session. Upon conclusion, the Edina HRA transitioned to a
“closed session” to discuss the potential sale of real estate.
After comparing the potential outcomes with the potential challenges of the three
proposals, it is recommended that the Edina HRA name the Buhl Investors / Saturday
Properties team as the preferred development partner for the site(s).
The Buhl Investors / Saturday Properties team submitted an ambitious proposal that was
responsive to the goals identified in the RFP. Their proposal has the potential to enhance
the pedestrian experience, improve parking conditions, eliminate an aging and unsightly
parking structure, create new business opportunities and return properties to the tax rolls.
Collectively, this concept could transform the 3900 block of West 49-1/2 Street into an
integral part of the 50th and France business district and expand the desirability of 50th and
France for the next generation.
The selection of a “preferred development partner” initiates the real estate negotiation
process as well as the development review process. This is the first step forward in a lengthy
process.
In the months ahead, staff of the Edina HRA intends to negotiate a Term Sheet that
identifies key points of the potential business agreement and real estate transaction. Key
points of discussion are anticipated to include: purchase price, parking ownership,
pedestrian easements, construction phasing, and public financing. Legal professionals from
Dorsey & Whitney and financial advisors from Ehlers Associates will assist staff in the
preparation of the Term Sheet. A preliminary traffic impact overview will be conducted by
SRF Consultants who prepared a comprehensive study of northeast Edina in 2006.
STAFF REPORT Page 3
Simultaneously, the development team will begin the process of vetting their design
concept through the City’s full development review process. This will include a
neighborhood meeting, and sketch plan reviews with Planning Commission and City
Council.
Please note that the selection of a preferred partner is not intended to imply that the initial
proposal will be accepted and approved. If the development team and the HRA are unable
to reach agreeable terms, the project will not move forward.
Resolution 2016-07 has been prepared to formally document the intentions of the Edina
HRA. Staff recommends that this Resolution be approved. Upon approval of the Resolution,
the staff and developer will begin negotiations. A check-in discussion with the full Edina
HRA is anticipated in February 2017.
HOUSING AND REDEVELOPMENT AUTHORITY
OF THE
CITY OF EDINA, MINNESOTA
RESOLUTION NO. 2016-07
NAMING BUHL INVESTORS/SATURDAY PROPERTIES AS PREFERRED
DEVELOPMENT PARTNER FOR 3930 WEST 49-1/2 STREET AND ADJACENT
PARCELS
WHEREAS, the Edina Housing and Redevelopment Authority (“Authority”) owns
property at various locations in the 50th and France commercial district which has been
acquired for the purpose of providing public parking for the shared use of employees
and customers.
WHEREAS, on August 17, 2016, the Authority issued a Request for Proposals to
acquire and redevelop certain land in the 50th and France commercial district, specifically
including the vacant parcel at 3930 West 49th Street, and
WHEREAS, the Authority received four responses to the Request for Proposals; and
WHEREAS, three of the four development teams accepted invitations and presented
their proposals for mixed-use redevelopment at the November 14, 2016 Authority Work
Session; and
WHEREAS, the team led by Buhl Investors and Saturday Properties presented a
proposal consisting of additional public parking, with new commercial space on the
street level and apartments on the upper levels as well as extensive new public plazas to
enhance the pedestrian-friendly shopping and dining experience at 50th and France; and
WHEREAS, after considering the potential outcomes of the proposals, pursuit of new
mixed use development on West 49-1/2 Street is a desirable goal to achieve further
improvements to the 50th and France commercial district; and
WHEREAS, based on the strength of the concept and team, staff recommends that
the development team led by Buhl Investors and Saturday Properties be named as the
preferred development partner for this project; and
WHEREAS, it is necessary to identify the business terms of a real estate transaction so
that the Authority can give its full review and consideration; and
WHEREAS, the parties will each be responsible for their own costs incurred during
the negotiations and the development partner will be responsible for costs incurred
related to any public incentive requested; and
WHEREAS, it is understood that any required land use approvals would be subject to
review and approval through the City of Edina’s standard processes, including public
meetings and public hearings with the Planning Commission and City Council.
NOW, THEREFORE, BE IT RESOLVED, the Housing and Redevelopment Authority
directs the following actions:
1) The team led by Buhl Investors and Saturday Properties is named as the preferred
development partner. This designation shall expire in 120 days if a Term Sheet
has not been completed.
2) The preferred development partner is authorized to prepare and present concept
plans showing potential redevelopment on the Authority’s property.
3) Staff is directed to negotiate a detailed term sheet based on the concept
submitted by Buhl Investors and Saturday Properties for further consideration by
the Authority.
4) Staff is authorized to engage legal and public finance advisors, as necessary to
prepare the term sheet.
5) Staff is further authorized to conduct a preliminary traffic study to investigate the
potential impact of redeveloping parcels owned by the Authority.
Dated: December 20, 2016
_______________________________________
James Hovland, Chair
ATTEST:
___________________________________
Ann Swenson, Secretary
STATE OF MINNESOTA)
COUNTY OF HENNEPIN) SS
CITY OF EDINA )
CERTIFICATE OF EXECUTIVE DIRECTOR
I, the undersigned duly appointed and acting Executive Director for the Edina Housing and Redevelopment
Authority do hereby certify that the attached and foregoing Resolution is a true and correct copy of the Resolution
duly adopted by the Edina Housing and Redevelopment Authority at its Regular Meeting of December 20, 2016,
and as recorded in the Minutes of said Regular Meeting.
WITNESS my hand and seal of said City this ______________ day of ___________________, ____________.
Scott Neal, Executive Director
Responses to RFP
3930 W. 49-1/2 Street
For HRA discussion
10-18-2016
KM2 / Doran Proposal Page 2
Overview
Brief Description
6-story mixed-use building with street level commercial space (including new
pharmacy with drive-thru window) and luxury apartments on the upper levels
to replace all existing buildings on the north side of W. 49-1/2 St.
Replacement public parking would be constructed below grade. Private parking
for residents would also be located below grade.
Land Transfer and Public Financing
City to transfer land to developer at no cost. Developer seeks Tax Increment
Financing to reimburse for costs of new public parking.
New Public
Parking
Stalls
New
Public
Space
New
Commercial
New
Residential
Parcels Included Estimated
Project
Cost
Yes
(+441)
Pocket
park
Yes
(40,000 SF)
Apartments
(187)
4916, 3918, 3930, 3944,
North Ramp, Clancy Lot
$73+
million
KM2 / Doran Proposal Page 3
Site Plan – Street Level
Center Ramp to
remain as-is
KM2 / Doran Proposal Page 4
Site Plan – Upper Levels
Foot print gets smaller
on the highest levels
KM2 / Doran Proposal Page 5
Perspective 1 – Looking NE from Halifax
KM2 / Doran Proposal Page 6
Perspective 2 – Looking NW from Pinehurst
John Laurent Proposal Page 7
Overview
Brief Description
5-story mixed-use building with street level commercial space and
condominiums on the upper levels.
New public parking and resident parking located below grade.
New Public
Parking
Stalls
New
Public
Space
New
Commercial
New
Residential
Parcels Included Estimated
Project
Cost
Yes
(+52)
Sidewalk
plaza
Yes
(27,000)
Condominiums
(32)
3930 $10
million
Land Transfer and Public Financing
Developer to purchase land from City/HRA.
John Laurent Proposal Page 8
Site Plan
Two levels of
underground parking
Page 8
John Laurent Proposal Page 9
Perspective 1 – Looking North
Buhl Investors / Saturday Properties Proposal Page 10
Overview
Brief Description
Vertical expansion of the existing North Ramp to 4-stories with horizontal
expansion on the vacant parcels with street level commercial space and
additional public parking above.
Reconstruction of the Center Ramp with 6-story mixed-use with street level
commercial, public plaza/woonerf and luxury apartments above. Replacement
public parking would be constructed below grade. Private parking for residents
would also be located below grade.
Land Transfer and Public Financing
Developer to purchase land from City/HRA. Developer seeks Tax Abatement to
reimburse for costs of new public parking.
New Public
Parking
Stalls
New
Public
Space
New
Commercial
New
Residential
Parcels Included Estimated
Project
Cost
Yes
(+305)
Center
Plaza
Yes
(30,500 SF)
Apartments
(131)
3930, 3944, North Ramp,
Center Ramp, Clancy Lot
$79
million
Buhl Investors / Saturday Properties Proposal Page 11
Site Plan – Street Level
Buhl Investors / Saturday Properties Proposal Page 12
Site Plan – Upper Levels
Buhl Investors / Saturday Properties Proposal Page 13
Perspective 1 – Looking West on 49-1/2 & France
Buhl Investors / Saturday Properties Proposal Page 14
Perspective 2
Mixed Use to Replace Center Ramp & Clancy Parking Lot
Restaurant with upper-level Parking to replace 3930 Building (above)
Good Neighbors / O’Brien Proposal Page 15
Overview
Brief Description
Vertical expansion of the existing North Ramp to 4-
stories and convert 3930 into pocket park. Construct
new 4-story mixed-use building on 3944 site with
street level commercial uses and office space above.
Land Transfer and Public Financing
Developer to lease land from City/HRA with up front
and annual payments. City to fundraise to construct
park.
New Public
Parking
Stalls
New
Public
Space
New
Commercial
New
Residential
Parcels Included Estimated
Project
Cost
Yes
(+84)
Pocket
Park
Yes
(28,000 SF)
None 3930, 3944 $15
million
Good Neighbors / O’Brien Proposal Page 16
Site Plan – Impacted Properties
Good Neighbors / O’Brien Proposal Page 17
Site Plan - Concept
Add 1 level to
North Ramp New office New public
park
Good Neighbors / O’Brien Proposal Page 18
Perspective 1 – Looking NW from Spalon
Good Neighbors / O’Brien Proposal Page 19
Perspective 2 – Looking NE from Halifax
Comparison of Four Proposals Page 20
Real Estate
Transaction
New Public
Parking
Stalls
New
Public
Space
New
Commer-
cial
New
Residen-tial
Parcels
Included
Est.
Project
Cost
KM2 /
Doran
Land Donation and
TIF for public
improvements
Yes
(+441)
Pocket
park
Yes
(40,000 SF)
Apartments
(187)
4916, 3918,
3930, 3944,
North Ramp,
Clancy Lot
$73+
million
J. L. Laurent
Associates
Traditional Sale Yes
(+52)
Sidewalk
plaza
Yes
(27,000)
Condominium
s
(32)
3930 $10
million
Buhl /
Saturday
Traditional sale and
tax abatement for
public improvements
Yes
(+305)
Center
Plaza
Yes
(30,500 SF)
Apartments
(131)
3930, 3944,
North Ramp,
Center Ramp,
Clancy Lot
$79
million
Good
Neighbors /
O’Brien
Long-term land lease
with fundraising for
public park
Yes
(+84)
Pocket
Park
Yes
(28,000 SF)
None 3930, 3944 $15
million
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 1
3930 West 49-1/2 Street
Edina, Minnesota
Request for Proposal – Property Redevelopment
Responses Due Friday September 30, 2016 (4:30 P.M.)
The Edina Housing and
Redevelopment Authority (HRA)
seeks proposals to acquire and
redevelop publicly-owned
property located in the 50th and
France Commercial Area. The
Edina HRA is seeking a qualified
and capable real estate developer
to deliver a new project that
includes new public parking and
new commercial space in a
manner that is successful in the
marketplace and complements
the character of 50th & France.
BACKGROUND
The City of Edina and the Edina HRA have been integrally involved with the 50th & France
Commercial Area for nearly 50 years. The first district parking ramp was constructed in 1968.
A plan to encourage stabilization and growth of the district was approved in 1974 and
streetscape and parking improvements were implemented over the subsequent decades.
50th & France, Edina’s downtown, is a vitally important community and business node. The City
strives to maintain the role of 50th & France as a neighborhood destination for premier
shopping, dining and entertainment with regional appeal.
SITE INFORMATION
Parcel Address: 3930 W. 49-1/2 St.
Parcel I. D. No: 18-028-2414-0026
Parcel Size: 0.37 acres
Zoning Designation: PCD-2
Site Conditions: Vacant lot; remediation completed in 2014
Recent Purchase Price: $2.65 million for a “clean” site (June 2013)
F
r
a
n
c
e
A
v
e
3930
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 2
ADJACENT PARCEL INFORMATION
The City of Edina and Edina HRA also own several adjacent parcels.
Parcel
Address: 3936-3940 W. 49-1/2 St. 3944 W. 49-1/2 St. 3925 W. 49-1/2 St.
Parcel I. D.
No:
18-028-2414-0030
18-028-2414-0034 18-028-2414-0035
18-028-2414-0036
18-028-2414-0032
18-028-2414-0120
18-028-2414-0123
18-028-2414-0023
Parcel Size: 0.57 + 0.15 = 0.72 acres 0.24 acres 0.34 + 0.46 + 0.27 + 0.23
+ 0.23 = 1.53 acres
Zoning: PCD-2 PCD-2 PCD-2
Current Site
Conditions:
North Parking Ramp,
constructed 1991 with
1997 expansion, 260
stalls
Vacant building;
acquired for public
parking expansion in
December 2014 for
$1.55 million
Center Parking Ramp
and Surface Parking Lot,
constructed 1976, 271
stalls
3930
North Parking Ramp
3936-40
Surface Parking
3925
Center Parking Ramp
3925
3
9
4
4
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 3
ZONING INFORMATION
Relevant excerpts from Edina’s zoning regulations are summarized below. The complete zoning
regulations (Chapter 36 of Edina City Code) are found here:
https://www.municode.com/library/mn/edina/codes/code_of_ordinances
Zoning District PDC-2 (Planned Commercial District)
Allowable Uses
(Chapter 36, Article 8, Division 8)
A wide variety of commercial services (retail, services,
restaurant, office, etc.) are allowed; multi-family housing is
also allowed on upper levels of a building
Maximum FAR
(Sec. 36-617(a)) 1.5
Maximum Height
(Sec. 36-617(c))
As required by setbacks, but not to exceed 4 stories or 48
feet, whichever is less
Required Parking
(1974 50th & France Plan)
Public ramps may be used to serve parking up to a
maximum 1.0 FAR. Sites approved with a higher FAR must
provide private parking on site for the portion of the
building larger than FAR 1.0.
Required Setbacks
(Sec. 36-617(b))
Front: to match adjacent setbacks
Side: not applicable
Rear: 25 feet or building height
Exterior Wall Finishes
(Sec. 36-618(11)a)
Allowable materials include: face brick, natural stone,
precast concrete units with decorative materials, metal
framed panels, glass and prefinished metals.
NOTE: Traditional materials (like standard size face brick with stone
accents are strongly preferred to maintain the existing character of
the 50th & France District)
Housing Density
(Amended Comp. Plan, Table 4.3) 30 units per acre
Housing Affordability
(2015 City Policy)
10% of units must be affordably-priced for projects with
greater than 20 units or alternate means must be provided
Deviations from Ch. 36
Standards
(Sec. 36-95)
Variances or rezoning (including PUD) may be considered
through the City of Edina’s standard development review
process.
Utility Connection Fees Standard utility fees (SAC, WAC, REC, etc) apply.
Storm Water
Most parcels in this area were not designed to meet
current storm water standards. Redevelopment parcels
must comply with requirements of Minnehaha Creek
Watershed District.
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 4
OTHER RELATED DEVELOPMENT INFORMATION
In recent years, the City of Edina and Edina HRA have explored alternatives for public parking.
2011 Walker
Parking Study
Identified the need for 140 to 200 additional parking stalls to better
serve the District. This accommodates anticipated demand during
regular business hours as well as the peak time during the peak holiday
season.
2012 North Ramp
Expansion Study –
East (3930)
Estimated that a total of 131 new parking spaces could be constructed
on three levels - 37 spaces on the ground floor with 47 spaces on the
second and third floors.
2012 North Ramp
Expansion Study –
West (3944)
Estimated that 27 to 52 new parking spaces could be constructed on
one or two levels, with 4,900 square feet of commercial space on the
street level.
2014 P-23
Feasibility Study
Identified the preference to expand public parking on upper or lower
levels and to encourage new commercial activity on the street level.
2015 KHA North
Ramp Expansion
Study
Confirmed that the existing North Ramp has the strength to
accommodate one additional level of parking, provided that a few
critical structural elements can be upgraded. This vertical expansion
could deliver approximately 75 new parking spaces. The estimated
cost of this work is $3.4 million, including design, construction, and
construction oversight.
Environmental
Clearance
The MN Pollution Control Agency (MPCA) provided a “No Further
Remediation” letter for the 3930 parcel after the building was razed
and remediation completed in 2014.
EXPECTATIONS OF ALL PROPOSALS
1) Compliance with Edina Comprehensive Plan and consistency with applicable portions of
Southdale Area Principles.
2) Increased taxable value.
3) Additional public parking stalls.
4) Commercial space on street level.
5) Inclusion of adjacent parcels, if possible, to add street life and commercial vibrancy on
West 49-1/2 Street
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 5
6) Proposals that include new housing must comply with Edina’s Affordable Housing Policy.
In short, 10% of the units must be affordably-priced to households earning no more than
60% of the Area Median Income or an equivalent monetary contribution must be
provided to construct these units elsewhere in Edina.
7) Upper levels are encouraged to align (vertically) with the adjacent North Parking Ramp.
The existing entrances to the North Ramp can also provide access to the 3930 site.
8) The faces of the proposed building adjacent to public streets must step back at the 2nd
or 3rd level and the building elevations must be well articulated to achieve a human-scale
that is consistent with the existing character of 50th and France.
9) Finish materials must be consistent with the existing character of 50th & France. Strong
preference is given to natural brick and stone. Synthetic materials, other than
miscellaneous trim, is discouraged.
10) Public sidewalks, at least 10 feet in width must be provided along all streets and should
match the existing brick pavers. Stamped and colored concrete will be considered, but
current preferences favor natural brick pavers. The sidewalk itself must be at least 6 feet
while the boulevard should be hardscaped with street trees and landscaping in character
with the streetscapes along West 50th Street.
11) The redeveloped site must include a plaza, podium, or similar space where public art can
be displayed.
12) Any impacted Metro Transit bus stop must be replaced and improved.
13) The parcel is anticipated to be sold for market-value. Land write-downs will only be
considered if 70 or more stalls of public parking are provided on the site.
14) Any impact or damage to the existing public parking facilities or public improvements in
the right-of-way must be repaired or replaced by the Developer.
15) Any loss of public parking stalls in the existing public parking facilities must be replaced
at a one per one (1:1) ratio.
16) Although a No Further Remediation letter has been received, the Developer is solely
responsible, if necessary, to remediate any environmental contaminants to the
satisfaction of the MN Pollution Control Agency or other regulating body.
17) The City may support and/or sponsor grant applications to outside agencies as deemed
necessary by the Developer.
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 6
DEVELOPER SELECTION AND APPROVAL PROCESS
A multi-step process will be used to identity the preferred developer and to secure required approvals
to proceed with a real estate transaction and construction.
Stage 1: Developer Selection Outcome:
Preferred
Developer
announced in
October-November
2016.
Staff will review all Proposals and invite up to three developers to
present to the HRA Board of Commissioners on Tuesday October 18,
2016 at 5:30 P.M. The Commissioners will discuss the merits of each
proposal in closed session and may identify a preferred developer with
which to negotiate a sales contract and redevelopment agreement.
Selection of a Preferred Developer does NOT guarantee that the original
proposal will be approved by the Planning Commission or Edina City
Council. All projects that require a variance or rezoning will be
considered through the City’s standard development review process.
Stage 2: Preparation of Transaction Documents Outcome: Parties
enter into a formal
agreement by
January 2017.
Staff and special legal counsel will work with the Preferred Developer to
prepare a sales contract and redevelopment agreement. The due
diligence period will be adequate for the Preferred Developer to fully
understand the site conditions and to present the project to the Edina
Planning Commission if any re-zoning or variances are necessary to
achieve the community’s and developer’s goals.
Stage 3: Due Diligence & Entitlement Period Outcome:
Preferred
Developer will
secure all local
approvals in
Spring/Summer
2017.
The Preferred Developer shall proceed with any activities necessary to
secure financing and entitlements for the project. Be aware that the
execution of a sales contract is NO GUARANTEE that the Planning
Commission or City Council will approve any specific site plan proposal from
the Developer. All requests for re-zoning, variances, or use of incremental taxes
must be go through the City’s procedural review process.
Stage 4: Real Estate Transaction & Construction Outcome: Closing
anticipated no later
than Fall 2017. The real estate transaction is anticipated to occur within two calendar
weeks of the final rezoning or site approvals. Construction should begin
within four weeks of the transaction.
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 7
SUBMISSION REQUIREMENTS
Interested entities (whether an individual, company, or team) should submit a Proposal that
includes the following information:
1) Name, mailing address, telephone number, and email address of the primary contact
person;
2) Identification of project team, including architect and contractor/construction manager;
3) Project list that identifies two or more completed projects of a similar nature or scale;
4) Brief narrative that describes the proposed project, its likely users, estimated start date,
completion date, full-occupancy date and approximate development cost;
5) Proposed purchase price for the land;
6) Rationale for purchase price, if less than market value
7) Identification of other parcels which will be included in the overall development
proposal;
8) Financial uses, including land acquisition, hard construction costs, and soft costs;
9) Financial sources, including equity, debt, and grants, if any;
10) If a financial gap exists, provide clarification regarding the gap and the need for a land
write-down; developer fees and estimated profitability must be identified if a land write-
down is proposed;
11) Preliminary site plan;
12) Conceptual elevations, floor plans and renderings to illustrate the proposed project;
13) Anticipated finish materials;
14) Identification of any variances, re-zoning, or amendments to Comprehensive Plan; and
15) Any other information that is critical to the City’s and HRA’s ability to evaluate the
proposal.
Respondents are encouraged to be thorough, yet concise. Submission is due by 4:30 P.M.
on Friday September 30, 2016. The Proposal must be submitted in electronic format
(email or flash drive preferred) with 10 printed hard copies delivered to:
Edina Housing and Redevelopment Authority
4801 West 50th Street
Edina, MN 55424
Attention: Bill Neuendorf, Economic Development Manager
3930 West 49-1/2 Street, Edina, Minnesota August 17, 2016
Request for Proposal – Property Redevelopment Page 8
SELECTION
All complete submittals will be evaluated by an ad-hoc selection team comprised of City staff
likely to be engaged in the development planning process. The selection team may also include
representatives from the 50th & France area.
Submittals will be evaluated on the following criteria:
• Compliance with height restriction and minimized impact to residential properties north
of the site (up to 15 points)
• Assembly of adjacent or nearby parcels (up to 10 points)
• Anticipated growth in taxable value (up to 10 points)
• Creation of new public parking (up to 20 points)
• Creation of new commercial space (up to 15 points)
• Creation of new market rate housing units (up to 10 points)
• Creation of public plaza or similar public areas (up to 5 points)
• Reduction of existing curb cuts and vehicle-pedestrian conflict points (up to 5 points)
• Capacity of team to complete project (up to 10 points)
Selected responders will be invited to give in-person presentations to the Edina HRA tentatively
scheduled on Tuesday October 18, 2016 at 5:30 P.M. The Edina HRA will discuss the merits in
closed session and follow up with the preferred respondent. Preparation of a sales contract and
redevelopment agreement is anticipated to begin shortly thereafter.
TERMS
This is a Request for Proposals and in no way obligates the responder to enter into a
relationship with the Edina HRA. Nor does this request obligate the Edina HRA to enter into a
relationship with any entity that responds, nor does it limit or restrict the Edina HRA’s right to
enter into a relationship with any entity that does not respond to this request.
In its sole discretion, the Edina HRA may pursue discussions with one or more entities
responding to this request, or none at all. The Edina HRA further reserves the right, in its sole
discretion, to cancel this Request for Proposal at any time for any reason. All costs associated
with responding to this request will be solely at the responder’s expense.
ADDITIONAL INFORMATION
In addition to this RFP, the Edina Zoning Code, Comprehensive Plan and Affordable Housing
Policy are available online at www.EdinaMN.gov. Any addendum to this RFP will be posted on
the City’s website at least one week prior to the submittal deadline.
Please direct questions about this Request for Proposal solely to Bill Neuendorf, Economic
Development Manager at 952-826-0407 or bneuendorf@EdinaMN.gov. Please do not contact
elected officials or other staff members. Responses will be provided and posted online to
questions received before 4:30 P.M. on Friday September 30, 2016.