HomeMy WebLinkAbout(525) Saw & Seal Bituminous Street= CURB do GUTTER FIGURE 1. NO MANHOLES IN THE INTERSECTION FIGURE 2. TWO MANHOLES IN THE INTERSECTION NOTE: 1. WHEN USING SAW AND SEAL IN AN URBAN SETTING WHERE CURB AND GUTTER IS PRESENT THE SAW CUTS SHOULD LINE UP WITH THE CONTROL JOINTS IN THE GUTTER SECTIONS WHENEVER POSSIBLE AT 30' INTERVALS, EVEN IF THIS RESULTS IN A SLIGHTLY SKEWED JOINT AS SHOWN IN FIGURES 1 AND 2. 2. IN INTERSECTIONS, SAWING SHOULD BE SIMILAR TO FIGURES 1 OR 2 DEPENDING ON WHETHER MANHOLES ARE PRESENT. 1 '/2-1 1 1 SEALANT MATERIAL BOND BREAKER TAPE 2-1/2" OR T/3* WHICHEVER IS GREATER * T/3 = ONE THIRD THE TOTAL OVERLAY THICKNESS (OVERLAY PROJECTS) OR ONE—THIRD THE TOTAL BITUMINOUS THICKNESS (NEW CONSTRUCTION PROJECTS). �0A.4,fl CITY OF EDINA REVISED: °eti� kp ENGINEERING SAW & SEAL BITUMINOUS STREET 04-09 m & PUBLIC STANDARD r� �0 WORKS PLATE DEPTS. APPROVED: CITY ENGINEER 525