Loading...
HomeMy WebLinkAbout(543) Bituminous Roadway Patching (9+ Yrs)SCENARIO 1 -PATCH IN MIDDLE OF DRIVE LANE EXISTING CURB AND GUmR ORIGINAL ~EXCAVATION u® .;.· ·1 .;· SAWCUT AND REMOVE PAVEMENT SCENARIO 2 -PATCH ACROSS DRIVE LANES EXISTING CURB AND GUmR NQIES;_ ORIGINAL EXCAVATION ® -- -- .... ' .. ·,· ' .. · . . -~ · .. · .~ • • ·': • ~I • I . . ., .· ........ · ' ,.., . ,t'' SCENARIO 3 -PATCH IN WHEEL PATH ' ...... ' • :·,,• ' ;; '~-·:." ': .> ... ;, • ~ .1 ,·' J : " _, .. SAWCUT AND REMOVE PAVEMENT SAWCUT AND ..i----REMOVE PAVEMENT LONGITUDINAL SAWCUTS SHALL BE IN CENTER OF ADJOINING DRIVE LANES ····"'.• .. \,·,,.·: G) THE DETAILS OF THIS PLATE SHALL APPLY TO ANY BITUMINOUS ROADWAY NOT RECONSTRUCTED OR OVERLAYED IN THE LAST 8 YEARS. @ ORIGINAL EXCAVATION SHALL BE REPAIRED PER EDINA STANDARD PLATE 540. @ PATCH SHALL BE SAWCUT AND REPLACED FULL DEPTH WITH TYPE SP9.5 WEARING COURSE MIXTURE (SPWEA340B), MATCHING EXISTING PAVEMENT THICKNESS, PLACED IN MULTIPLE LIFTS (2.5" MAX.). @ INSPECTION AND ACCEPTANCE OF PATCH BY CITY ENGINEER REQUIRED. CITY OF EDINA ENGINEERING & PUBLIC WORKS DEPTS. BITUMINOUS ROADWAY PATCHING (9+ YEARS) APPROVED: CITY ENGINEER REVISED: 01-17 STANDARD PLATE 543