Loading...
HomeMy WebLinkAbout(545) Concrete Roadway RepairEXISTING INTEGRAL CURB AND GUmR EXISTING JOINTS SCENARIO 1 -QUARTER PANEL PATCH LATITUDINAL CENTER OF PANEL REMOVE AND REPLACE CONCRETE@ EXISTING INTEGRAL CURB AND GUmR LATITUDINAL CENTER OF PANEL EXISTING JOINTS SCENARIO 2 -HALF PANEL PATCH LONGITUDINA CENTER OF PANEL REMOVE AND REPLACE CONCRETE SCENARIO 3 -FULL PANEL PATCH EXISTING INTEGRAL CURB AND GUmR N.QIES:. LONGITUDINA CENTER OF PANEL G) THE DETAILS OF THIS PLATE SHALL APPLY TO ANY CONCRETE ROADWAY. @ ORIGINAL EXCAVATION SHALL BE REPAIRED PER EDINA STANDARD PLATE 540. @ EDGES OF REPAIR SHALL BE SAWCUT CLEAN THE FULL DEPTH OF EXISTING CONCRETE. II SAWCUT EXISTING I ....----PANEL OUTSIDE I OF REPAIR 2" I DEEP I TOOLED JOINT 2" DEEP TO MATCH SAWCUTTING @ 12" #4 EPOXY-COATED BAR SHALL BE INSTALL EVERY 18" ON ALL ADJOINING SIDES OF PATCH, EMBEDDED 6" IN EXISTING PANELS. @ CONCRETE SHALL CONFORM TO MnDOT SPEC. 2301, 2461, AND 2531. WHEN APPLICABLE, INTEGRAL CURB AND GUmR SHALL MATCH EXISTING STYLE. @ INSPECTION AND ACCEPTANCE OF REPAIR BY CITY ENGINEER REQUIRED. CITY OF EDINA ENGINEERING & PUBLIC WORKS DEPTS. CONCRETE ROADWAY REPAIR APPROVED: CITY ENGINEER REVISED: 01-17 STANDARD PLATE 545