HomeMy WebLinkAboutComm NewBldgSub epr 04112017SP-026-B Page 1 of 2
I:\Building\SafetyPoliciesInformation\2017\Website\Comm NewBldgSub epr 04112017.
Use with electronic submittals only
Purpose: Establish submission requirements at the time of permit application to enable accurate, timely review.
Scope: All new commercial buildings and commercial building additions
Instructions: A licensed design professional must check the items submitted in the space provided and include a copy
of the signed form with all plan submittals. The Building Inspections Department can be reached at 952.826.0372 from 7:00am-4:30pm, Monday through Friday.
Site Address: ___________________________________________________________________________________
Required for
Approval
Check if
Submitted General Items
Yes 1.Service Availability Charge (SAC) determination application submitted to
Metropolitan Council Environmental Services
May be required Check With Bldg
Dept 2.Edina City Council approval Case # ___________________
Yes 3.Watershed District permit: Minnehaha or Nine Mile Creek.
Yes 4.Survey prepared by a MN licensed surveyor
Yes 5.Tree survey and protection plan Ordinance No. 2014-25
Yes 6.Completed Minnesota Energy Code (MEC) lighting power budget
requirements in accordance with the 2015 MN Energy Code
Yes 7.Completed Minnesota Energy Code (MEC) exterior envelope energycalculations in accordance with the 2015 MN Energy Code
Yes 8.Completed Special Structural Testing and Inspection Schedule (Note:
SST&IS required for all med gas installations) (Guidelines)
Yes 9.Geotechnical Report
Yes 10.800 Mhz radio coverage requirements in accordance with Edina CityCode Chapter 10 Article XV
Yes
11.Completed contact list with names, phone numbers, email addresses and
physical addresses of building owner, contractor, tenants and all designprofessionals
Required for
Approval
Check if
Submitted Plan Requirements
Yes 12.Plans and specifications
Yes 13.Civil Plans to include Erosion Control Drainage and Utility Plans
Yes 14.All sheets are signed by the appropriate design professional (electronicsignature is ok)
Title sheet or first plan sheet includes:
Yes 15.Name and address of building
EDINA BUILDING SAFETY POLICY/INFORMATION1Application Submittal Requirements – New Building,
Building Addition
subject
2015 MSBC 1300.0130
code reference
Inspections Department
department approval
SP-0026epr-B2
policy number
04/11/2017
revision date
06/30/2015
effective date
1 of 2
page number 1. All Building Safety sheets adopted by Fire Department and Inspections Department. 2. Sheet numbers with B suffix developed by Inspections Dept. Sheet numbers with F suffix developed by Fire Dept.
SP-026-B Page 2 of 2
Required for Approval Check if Submitted Plan Requirements
Code analysis includes:
Yes 16.Description of occupancy/use
Yes 17.IBC occupancy classification: Section 302.
Yes 18.IBC construction type classification: Section 602.
Yes 19.Number of square feet in space and on building floor
Yes 20.Number of stories above and below grade: Section 504.
Yes 21.Allowable area: Section 503.
Yes 22.Occupant load: Section 1004.
Yes 23.Number of required exits and provided exits: Section 1021.
Yes 24.Indicate: Sprinklers certified, cert letter received, sprinklers not certified,sprinklers partial or no sprinklers.
Yes 25.Common path of egress travel, use right angles: Section 1014.3.
Yes 26. Separated/non-separated uses with supporting information: Section 508.
Yes 27.Plumbing fixture count: Section 2902.
Building key plan includes:
Yes 28.Exit path to the exterior and to the public way
Yes 29.Occupancy classification of adjacent tenants: Section 302.
Yes 30.Location of space in building
Yes 31.Direction indicator (North, South, East or West) with arrow
Floor plans include:
Yes 32.Scale each plan and/or detail. Include linear or bar scales at all details.
Yes 33.Rooms marked with number and room name or use
Yes 34.Fire-rated and smoke-rated assemblies: Sections 706 – 711.
Other items:
Yes 35.Reflected ceiling plan with exit signs and emergency lighting located
Yes 36. Material specifications
Yes 37.Room finish schedule
Yes 38.Door and hardware schedules, including all locking arrangements
Yes 39.Details of all required accessible components including data on required
20% accessible upgrades: Section 1112.7.
Yes 40.Furniture/fixture/equipment layout plan
Plans may need to be reviewed and approved by the Planning, Engineering and Health Departments in addition to the Fire and
Building Inspections Departments. Plan review time will vary, but in all cases permit applicants should allow a minimum of three weeks of plan review time after application and completed submittals have been forwarded to the Building Inspections
Department.
I acknowledge that the items checked on the list above are included on or with the submitted plans:
Licensed Design Professional Signature ____________________________________________________________________
Print Name ___________________________________________________________________________________________
Work Phone _______________________ Cell Phone _______________________
Email _____________________________________________________________
Company Name ____________________________________________________
Address ______________________________________ Zip _________________
Date ________________
I:\Building\SafetyPoliciesInformation\2017\Website\Comm NewBldgSub epr 04112017.