HomeMy WebLinkAboutJuly 16 2019 West 58th Street Reconstruction UpdateWest 58th Street Reconstruction Update
July 16, 2019
1
Project Pilot
Budget goal #4: Foster an inclusive and engaged community.
Strategy: Develop community engagement protocols based on the International Association for Public Participation (IAP2) Spectrum Model.
Council and staff commit to:
Make a plan
Do what we say we are going to do
Don’t change the rules
Make a decision
Tell people why
www.EdinaMN.gov
2
2
Participation Proposal
Proposal approval: December 4, 2018
Participation Level: Consult
Decision to be made: Plan elements for W. 58th Street reconstruction
www.EdinaMN.gov
3
Consult: We listen to aspirations and concerns of the public. We seek feedback on drafts and proposals, then share how the input influenced the decision.
3
Better Together Edina UPPPDATE
www.EdinaMN.gov
4
Max visitors per day: 402
New Registrations: 318
4
Participation Details
Stage 1: Use patterns, interests, and issues
Stage 2: Feedback on a concept
Additional Stage: Feedback on Alternatives
www.EdinaMN.gov
5
5
Participation Details
Balance of Values
Value all input at all stages
Participation is not everyone getting what they want
Big picture – long term view – Vision Edina
Opportunities for change are infrequent - every 50-years
Street reconstruction is the easiest
www.EdinaMN.gov
6
6
Design Considerations
Staff Comments
Existing street is not centered in right-of-way
Ped and Bike Master Plan – more emphasis on shared use paths
Users of share use paths – kids, families, “interested but concerned”
Remove bikes from the road for the most possible users
Reminder – needs to meet Municipal State Aid standards
www.EdinaMN.gov
7
7
Alternative Survey Results
www.EdinaMN.gov
8
8
Alternative Survey Results
www.EdinaMN.gov
9
9
Staff Recommendation
Alternative A
www.EdinaMN.gov
10
10
Justification for Alternative A
Narrow Vehicle Lanes
Least Amount of Property Impacts
Provides off-street bike and ped
Provides a buffer for pedestrians from vehicles – blvd
Space for enhanced landscaping and stormwater
Enhanced Crosswalk to Pamela Park
No to Limited Loss of Driveway Parking
www.EdinaMN.gov
11
11
58th Street West of Wooddale
Total Width is 38-ft
Alt. A is 36-ft
www.EdinaMN.gov
12
12
62nd Street West of France
Total Width is 41.5-ft
Alt. A is 36-ft
www.EdinaMN.gov
13
13
62nd Street West of France
www.EdinaMN.gov
14
14
Discussion Only
www.EdinaMN.gov
15
15
Impacts - East Half
www.EdinaMN.gov
16
16
Impacts – West Half
www.EdinaMN.gov
17
17
Driveway & Slope Analysis
15 random driveways
Measured approximate length
Assumed a 21-ft long minivan with 4-ft buffers between cars or garage and cars
Alternative A: 6-ft of property impacts
No loss of parking on driveways analyzed
58th Street Hill = 6.6% slope, Philbrook Ln Hill = 5.6%
www.EdinaMN.gov
18
18
Alternatives
Alt 58-1 and Alt 58-2
Resident created
Caution responding directly to these
Only from very few residents
Not the participation promise that was made
Promised: Budget goal #4: Foster an inclusive and engaged community.
www.EdinaMN.gov
19
19
Next Steps
Council Approves Concept Tonight
Begin estimating assessments
Start preliminary engineering report
Start design to determine impacts
Prepare for December 9 Public Hearing
www.EdinaMN.gov
20
20
Recommendation
Staff recommends approval of Alternative A with conditions noted in the staff report.
Questions?
www.EdinaMN.gov
21
21
Alternative 58-1
www.EdinaMN.gov
22
22
Alternative 58-2
www.EdinaMN.gov
23
23
Stages & Points of Participation
www.EdinaMN.gov
24
Public Participation plan was developed using the initial proposal.
Plan was developed with WSB consultant who focus on engagement.
24
Next Stage
www.EdinaMN.gov
25
25
Alternative B
www.EdinaMN.gov
26
26
Alternative C
www.EdinaMN.gov