Loading...
HomeMy WebLinkAboutJuly 16 2019 West 58th Street Reconstruction UpdateWest 58th Street Reconstruction Update July 16, 2019 1 Project Pilot Budget goal #4: Foster an inclusive and engaged community. Strategy: Develop community engagement protocols based on the International Association for Public Participation (IAP2) Spectrum Model. Council and staff commit to: Make a plan Do what we say we are going to do Don’t change the rules Make a decision Tell people why www.EdinaMN.gov 2 2 Participation Proposal Proposal approval: December 4, 2018 Participation Level: Consult Decision to be made: Plan elements for W. 58th Street reconstruction www.EdinaMN.gov 3 Consult: We listen to aspirations and concerns of the public. We seek feedback on drafts and proposals, then share how the input influenced the decision. 3 Better Together Edina UPPPDATE www.EdinaMN.gov 4 Max visitors per day: 402 New Registrations: 318 4 Participation Details Stage 1: Use patterns, interests, and issues Stage 2: Feedback on a concept Additional Stage: Feedback on Alternatives www.EdinaMN.gov 5 5 Participation Details Balance of Values Value all input at all stages Participation is not everyone getting what they want Big picture – long term view – Vision Edina Opportunities for change are infrequent - every 50-years Street reconstruction is the easiest www.EdinaMN.gov 6 6 Design Considerations Staff Comments Existing street is not centered in right-of-way Ped and Bike Master Plan – more emphasis on shared use paths Users of share use paths – kids, families, “interested but concerned” Remove bikes from the road for the most possible users Reminder – needs to meet Municipal State Aid standards www.EdinaMN.gov 7 7 Alternative Survey Results www.EdinaMN.gov 8 8 Alternative Survey Results www.EdinaMN.gov 9 9 Staff Recommendation Alternative A www.EdinaMN.gov 10 10 Justification for Alternative A Narrow Vehicle Lanes Least Amount of Property Impacts Provides off-street bike and ped Provides a buffer for pedestrians from vehicles – blvd Space for enhanced landscaping and stormwater Enhanced Crosswalk to Pamela Park No to Limited Loss of Driveway Parking www.EdinaMN.gov 11 11 58th Street West of Wooddale Total Width is 38-ft Alt. A is 36-ft www.EdinaMN.gov 12 12 62nd Street West of France Total Width is 41.5-ft Alt. A is 36-ft www.EdinaMN.gov 13 13 62nd Street West of France www.EdinaMN.gov 14 14 Discussion Only www.EdinaMN.gov 15 15 Impacts - East Half www.EdinaMN.gov 16 16 Impacts – West Half www.EdinaMN.gov 17 17 Driveway & Slope Analysis 15 random driveways Measured approximate length Assumed a 21-ft long minivan with 4-ft buffers between cars or garage and cars Alternative A: 6-ft of property impacts No loss of parking on driveways analyzed 58th Street Hill = 6.6% slope, Philbrook Ln Hill = 5.6% www.EdinaMN.gov 18 18 Alternatives Alt 58-1 and Alt 58-2 Resident created Caution responding directly to these Only from very few residents Not the participation promise that was made Promised: Budget goal #4: Foster an inclusive and engaged community. www.EdinaMN.gov 19 19 Next Steps Council Approves Concept Tonight Begin estimating assessments Start preliminary engineering report Start design to determine impacts Prepare for December 9 Public Hearing www.EdinaMN.gov 20 20 Recommendation Staff recommends approval of Alternative A with conditions noted in the staff report. Questions? www.EdinaMN.gov 21 21 Alternative 58-1 www.EdinaMN.gov 22 22 Alternative 58-2 www.EdinaMN.gov 23 23 Stages & Points of Participation www.EdinaMN.gov 24 Public Participation plan was developed using the initial proposal. Plan was developed with WSB consultant who focus on engagement. 24 Next Stage www.EdinaMN.gov 25 25 Alternative B www.EdinaMN.gov 26 26 Alternative C www.EdinaMN.gov 27 27