Loading...
HomeMy WebLinkAbout190910_Edina infrastructure diagram3STOP 4 water treatmentplants 6,933 catch basins and stormwater manholes 1 underground storage tank 4 watertowers 5,093 sanitarysewer manholes Nearly 5,000 service valves136 miles of line 12 lift stations Dozens of clean water treatment structures 56 miles of sump drain 1,945 re hydrants 13,800 metered service connections 236 miles of line 18 wells 11/2018 About 250 water bodies Drinking WaterSupply LineSanitarySewer LineStormwaterSewer Line 199 miles of line 21 lift stations Aquifer (ground water) Ground watertreatment 654 outlets