HomeMy WebLinkAbout2012-10-02 WORK SESSIONHEUORT NORBY
Golf Course Architects, LLC.
Braemar Golf Course Driving Ranee Renovation — Edina, Minnesota
Estimate to renovate the existing driving range facility including reconstruction of two holes on the Executive
9 -hole course
October 10, 2011
Range Construction
Low Ranae
High Ranee
Mobilization
15,000.00
18,000.00
Construction surveying for range and golf course
8,000.00
10,000.00
Silt fence and erosion control
15,000.00
20,000.00
Tree & brush removal
8,000.00
10,000.00
Demolition of range tee, fencing, lesson building, etc.
12,000.00
16,000.00
Strip and replace topsoil on range and golf course
16,000.00
18,000.00
Strip and replace amended soil mix on tee
3,000.00
5,000.00
Range tee with 4" amended soil mix (100,000 sf.)
45,000.00
55,000.00
Mass Grading of range and short- course holes
45,000.00
60,000.00
Wetland mitigation
30,000.00
60,000.00
Stormwater retention
12,000.00
18,000.00
Catch basins & sub- surface drainage
28,000.00
35,800.00
Target Greens, target bunkers and final shaping
8,000.00
12,000.00
Concrete tee line (5,000 sf.)
17,500.00
22,500.00
New synthetic practice mats (60 mats)
30,000.00
33,000.00
Asphalt cart parking area at lesson tee
30,000.00
40,000.00
Irrigation
90,000.00
120,000.00
Seed bluegrass tee (100,000 sf.)
7;000.00
7,500.00
Seed bluegrass fairway and rough (13 acres)
32,500.00
39,000.00
Sod bluegrass (2,000 sy.)
5,200.00
6,400.00
Straw mulch and disc anchor
11.700.00
13,000.00
Subtotal
$468,900.00
$619,200.00
Executive Golf Course Improvements
USGA or modified USGA putting greens (12,000 sf.)
74,000.00
90,000.00
Tee with 4" mix, laser level and seed
21,250.00
23,750.00
Irrigation
22,500.00
25,000.00
Finish shaping and grading
a,Guu.uu
i 2,000.00
Sod bluegrass bunker, green and tee surrounds
6,000.00
7,000.00
Drainage
8,000.00
15,000.00
Subtotal
$139,750.00
$172,750.00
Landscaping & Miscellaneous
Range Poles and netting (50 foot height)
68,000.00
170,000.00
Construct bridge on hole No.1
12,000.00
16,000.00
Lesson building (16'x30')
30,000.00
50,000.00
Tree replacement (12.a' 3.5" cal.)
5,600.00
6,600.00
Final design and engineering
70,000.00
95,000.00
Permitting
5,000.00
8,000.00
Subtotal
$190,600.00
$345,600.00
Total
$799.250.00
$1.137,550.00
Contingency
$0.00
$0.00
GRAND TOTAL $799,250.00 $1,137,550.00
AGENDA
CITY COUNCIL
WORK SESSION
CITY OF EDINA, MINNESOTA
COMMUNITY ROOM
OCTOBER 2, 2012
5:00 P.M.
CALL TO ORDER
II. ROLL CALL
III. 2013 -2017 CAPITAL IMPROVEMENT PROGRAM
IV. ADJOURNMENT
The City of Edina wants all residents to be comfortable being part of the public process. If you need assistance
in the way of hearing amplification, an interpreter, large -print documents or something else, please call 952-
927- 886172 hours in advance of the meeting.
SCHEDULE OF UPCOMING MEETINGS /DATES /EVENTS
Tues
Oct 2
Work Session — CIP Workshop
5:00 P.M.
COMMUNITY ROOM
Tues
Oct 2
Regular Meeting
7:00 P.M.
COUNCIL CHAMBERS
Tues
Oct 16
Work Session — Art Center Study /Business Meeting
5:00 P.M.
COMMUNITY ROOM
Tues
Oct 16
Regular Meeting
7:00 P.M.
COUNCIL CHAMBERS
Mon
Nov 5
Work Session — Human Services Funding /Liquor Ordinance
5:30 P.M.
COMMUNITY ROOM
Mon
Nov 5
Regular Meeting
7:00 P.M.
COUNCIL CHAMBERS
Tues
Nov 6
ELECTION DAY — Polls Open 7:00 A.M. until 8:00 P.M.
cri
Nov 9
Canvass of Election Returns
5:00 P.M.
COUNCIL CHAMBERS
Nov 12
VETERANS DAY HOLIDAY OBSERVED — City Hall Closed
in
Nov 20
Work Session — Finalize 2013 Work Plans
5:30 P.M.
COMMUNITY ROOM
Lies
Tues
Nov 20
Regular Meeting
7:00 P.M.
COUNCIL CHAMBERS
Tues
Dec 4
Work Session — Name Your Neighborhood
5:30 P.M.
COMMUNITY ROOM
Tues
Dec 4
Regular Meeting
7:00 P.M.
COUNCIL CHAMBERS
Dec 18
Work Session — Park Brd Work Group Donation /Naming Policy
5:30 P.M.
COMMUNITY ROOM
Tues
Tues
Dec 18
Regular Meeting
7:00 P.M.
COUNCIL CHAMBERS
REPORT/RECOMMENDATION
To:
MAYOR AND COUNCIL
Agenda Item Item No. WS I
From:
Eric Roggeman
Assistant Finance Director
❑ Action
® Discussion
❑ Information
Date: October 2, 2012
Subject:
Review 2013 -2017 Capital Improvement Plan
Recommendation:
See attached CIP for discussion at the worksession. No formal action is expected.
Info /Background:
You may notice some changes'to the CIP document this year. There is a revised introductory
section that better explains the process (pages 1 -7), there are priority rankings for projects,
departments have been adjusted slightly for the reorganization and to improve document layout,
and there are improved explanations of projects as well as ties to strategic objectives (pages
17 -150).
Attachments:
1. A detail inventory list of equipment included in the Equipment Replacement Program.
City staff believes this program is not fully funded and will run out of money in a few
years if no changes are made. While we are not recommending specific changes at this
time, we are trying to raise awareness of the issue in order to prepare for the 2014 -2015
budget process that will take place during the 2013 calendar year. Council requested
this detailed inventory when the issue was last discussed.
2. A full draft of the proposed 2013 -2017 Capital Improvement Plan (CIP) to be discussed.
CITY OF EDINA
Equipment Replacement Program Inventory List
All General Fund Departments
Original
Original
Replace
2011
PW
Finance
Purchase
Purchase
Amount
Replace
Annual
Balance
Description Number
Number
Year
Price
Life
- Trade in
Year
Need
Need
1 JDEdwards Payroll
2000
14
50,000
2014
3,571
39,286
2 Scala System
2001
-
10
14,000
2011
-
14,000
3 Remote Production Capability
2002
-
10
34,500
2012
3,450
31,050
4 Graphics
2003
-
10
70,000
2013
7,000
56,000
5 2004 Crown Vic
22164
3424
2003
28,331
10
10,000
2013
1,000
8,000
6 Mobile Switch System
2004
-
10
30,000
2014
3,000
21,000
7 Council Chamber Camera System
2004
-
10
70,000
2014
7,000
49,000
8 Council Chambers Monitors
2004
-
10
29,000
2014
2,900
20,300
9 Tightrope Cablecase System
2005
-
10
46,000
2015
4,600
27,600
10 VGA Routing Systems
2006
-
10
10,000
2016
1,000
5,000
11 Production Switcher
2007
-
10
80,000
2017
8,000
32,000
12 JDE Financial
2000
18
50,000
2018
2,778
30,556
13 Voting Stations - 208
1988
-
29
30,000
2017
1,034
23,793
14 Turning Point Technology
2008
3,000
10
3,500
2018
350
1,050
15 Voting Stations - 20
2000
3,913
30
5,000
2030
167
1,833
16 Voting Stations - 70
2008
13,650
30
15,000
2038
500
1,500
17 2005 Taurus
22112
3822
2005
11,947
10
15,000
2015
1,500
9,000
18 2005 Taurus
22113
3823
2005
11,947
10
15,000
2015
1,500
9,000
19 2010 Focus
22114
7177
2009
13,474
10
15,000
2019
1,500
3,000
20 Leica Survey
3818
2006
31,630
7
26,000
2013
3,714
18,571
21 Sokkia Set 4100
2259
1999
10,534
14
-
2013
-
-
^' 2005 Silverado
24231
3825
2005
15,175
10
25,000
2015
2,500
15,000
Autocad Softare
2005
18,000
10
20,000
2015
2,000
12,000
c4 2006 Ford F150
24232
4469
2008
16,746
8
25,000
2016
3,125
9,375
25 2003 GMC 2500 Van
24229
3375
2003
21,889
14
28,000
2017
2,000
16,000
26 Robotic Total
3427
2003
31,945
15
30,000
2018
2,000
16,000
27 Pavement Mgmt Software
4470
2006
29,075
12
30,000
2018
2,500
12,500
28 2005 Chevy Silverado
24230
3824
2008
15,175
10
15,000
2018
1,500
4,500
29 Survey Equipment
7298
2010
17,971
10
15,000
2020
1,500
1,500
30 2010 Ford Transit Con
24233
7299
2010
20,505
10
17,500
2020
1,750
1,750
31 2010 Ford Transit Con
24234
7300
2010
20,505
10
17,500
2020
1,750
1,750
32 1982 Oil distributor truc
25332
2420
1982
20,000
30
10,000
2012
333
9,667
33 1996 Ford L8000
25312
2423
1996
77,236
16
65,000
2012
4,063
60,938
34 Gilcrest 813RT Paver
25405
2459
1996
47,314
16
43,000
2012
2,688
40,313
35 1999 GMC Sierra
25319
2265
1999
50,000
14
48,500
2013
3,464
41,571
36 1992 Cat PSI 80
25456
1992
20,000
20
39,000
2012
1,950
37,050
37 Vibromax 263 Roller
25466
2467
1997
18,000
15
32,000
2012
2,133
29,867
38 1998 Ford LT8501 Dur
25315
2271
1998
110,000
14
145,000
2012
10,357
134,643
39 2006 Pelican Sweeper
25484
4472
2006
137,073
6
-
2012
-
-
40 Wacker Asphalt Roller
25476
3416
2003
11,167
9
12,000
2012
1,333
10,667
41 Gilcrest Asphalt paver
25477
3675
2003
32,323
9
29,585
2012
3,287
26,298
42 2000 Sterling Lt7500
25324
2269
2000
127,070
13
-
2013
-
-
43 Case 6034S Skid steel
25418
2554
2002
50,693
11
44,241
2013
4,022
36,197
44 2003 Chevy Silverado
25246
3415
2003
16,418
10
15,067
2013
1,507
12,054
45 Cat PS180 Roller
25458
2450
1993
22,000
20
35,000
2013
1,750
31,500
46 Wirtgen Cold Milling M,
25467
2470
1998
120,000
15
200,000
2013
13,333
173,333
47 Quipnet Towmaster Tr
25522
2471
1999
12,000
14
12,840
2013
917
11,006
2001 Chevy 1500
25282
2001
20,114
12
19,021
2013
1,585
15,851
2002 GMC 2500
25222
2001
26,487
13
25,841
2014
1,988
19,878
50 2004 Pelican Street Sv
25481
3731
2004
122,329
10
-
2014
-
-
51 1998 Chevy 3500
25219
1998
19,600
16
18,472
2014
1,155
15,009
G: \Budget \Equipment Inventory\Equipment replacement
for 2013 budget\Analysis 2012.xlsx
9/25/2012
CITY OF EDINA
Equipment Replacement Program Inventory List
All General Fund Departments
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
Original
Original
Replace
2011
PW
Finance
Purchase
Purchase
Amount
Replace
Annual
Balance
Description
Number
Number
Year
Price
Life
- Trade in
Year
Need
Need
52 Case Wheel Loader
25471
2477
2001
135,422
13
80,000
2014
6,154
61,538
53 2003 MT5 trackless
25475
3379
2003
71,900
11
90,000
2014
8,182
65,455
54 Case 90XT Skid Steer
25417
2475
2001
44,002
13
37,082
2014
2,852
28,525
55 2001 Trackless Tractoi
25470
2476
2001
76,591
13
90,000
2014
6,923
69,231
56 Sterling LT7500 13'
25328
2550
2002
123,205
12
170,000
2014
14,167
127,500
57 2000 Sterling Dump
25323
2267
2000
108,605
15
160,000
2015
10,667
117,333
58 Beuthling B400 Roller
25410
2438
1988
12,000
27
35,000
2015
1,296
29,815
59 2003 MTR Trackless T
25480
3730
2004
77,643
11
90,000
2015
8,182
57,273
60 2005 Chevy 2500
25247
3728
2004
13,871
11
12,342
2015
1,122
7,854
61 2003 GMC Sierra
25333
2551
2002
28,000
13
17,500
2015
1,346
12,115
62 BFXB60D Pickup
25333
2557
2002
-
13
-
2015
-
-
63 Case 6003S Wheel Lo
25473
2552
2002
106,953
14
64,439
2016
4,603
41,425
64 Bucket for wheel loade
25473
2555
2002
-
14
-
2016
-
-
65 2000 Sterling Lt7500
25325
2268
2000
114,080
16
160,000
2016
10,000
110,000
66 1998 Trackless MTST
25446
1998
51,600
18
90,000
2016
5,000
65,000
67 2003 Chevy Silverado
25245
2003
13,546
13
11,994
2016
923
7,381
68 2003 Case 721 D
25479
2004
152,864
12
123,564
2016
10,297
72,079
69 Etnyre Chip Spreader
25453
2445
1991
41,400
25
75,000
2016
3,000
60,000
70 1991 GMC T25 wrecke
30300
2273
1991
69,940
25
60,000
2016
2,400
48,000
71 2006 Silverado 3500
25300
3826
2005
22,939
11
21,995
2016
2,000
11,997
72 SW9 Powerboss Swee
25483
4471
2006
42,745
10
38,237
2016
3,824
19,119
73 2006 JLG PSESLIFT
25501
2010
9,993
6
9,193
2016
1,532
1,5'"
74 2001 Ingersoll 185WTF
25516
2474
2001
10,746
15
9,998
2016
667
6,E
75 L7500 Dump truck
25326
2276
2001
105,300
16
160,000
2017
10,000
100,OOu
76 L7500 Dump truck
25327
2275
2001
105,300
16
160,000
2017
10,000
100,000
77 2007 Chevy Silverado
25248
4474
2006
16,784
11
15,458
2017
1,405
7,026
78 2007 Chevy 2500 HD I
25249
4992
2007
19,478
10
17,841
2017
1,784
7,136
79 2002 Allu SM3 -23
25474
2002
40,257
15
38,074
2017
2,538
22,844
80 Case 821C Wheel Loa
25482
3847
2005
175,560
12
137,899
2017
11,492
68,950
81 Bomag TW500 Oil Disl
25542
4990
2007
17,551
10
16,280
2017
1,628
6,512
82 2007 ADDCO
25543
5046
2007
19,031
10
17,863
2017
1,786
7,145
83 Sterling LT7500
25329
2549
2002
112,165
16
160,000
2018
10,000
90,000
84 L7501 Dump truck
25334
3377
2003
132,457
15
170,000
2018
11,333
90,667
85 Sterling Grader
25334
3502
2003
-
15
-
2018
-
-
86 2008 Chevy uplander %
25200
5986
2008
17,906
10
16,660
2018
1,666
4,998
87 2008 Chevy Silverado
25201
5987
2008
27,350
10
15,474
2018
1,547
4,642
88 2005 Sterling LT75
25338
3684
2004
139,724
14
170,000
2018
12,143
85,000
89 Tandem 13'
25338
3726
2004
-
14
-
2018
-
-
90 2005 Sterling LT75
25340
3683
2004
139,724
14
170,000
2018
12,143
85,000
91 Tandem 13'
25340
3727
2004
-
14
-
2018
-
-
92 2007 Trackless MTST
25485
4991
2007
95,779
11
87,484
2018
7,953
31,812
93 1998 Chevy 1 ton
30301
2272
1998
33,062
20
27,000
2018
1,350
17,550
94 Sterling L8500
25343
3828
2005
135,551
13
125,039
2018
9,618
57,710
95 J -Craft Truck Body w/!
25343
3827
2005
-
13
-
2018
-
-
96 2008 Pelican Sweeper
25486
5985
2008
162,965
10
-
2018
-
-
97 Altec RW18 Planer
25489
7378
2011
15,123
7
14,182
2018
2,026
-
98 L7500 Dump truck
25335
3378
2003
121,715
16
160,000
2019
10,000
80,00
99 10' Box dump
25335
3563
2003
-
16
-
2019
-
100 L7501 Dump truck
25336
3376
2003
132,457
16
170,000
2019
10,625
85,0%,.
101 Sterling Grader
25336
3503
2003
-
16
-
2019
-
-
102 2009 Silverado
25301
7181
2009
20,248
10
19,165
2019
1,917
3,833
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
CITY OF EDINA
Equipment Replacement Program Inventory List
All General Fund Departments
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Hnalysis 2012.xlsx 9/25/2012
Original
Original
Replace
2011
PW
Finance
Purchase
Purchase
Amount
Replace
Annual
Balance
Description
Number
Number
Year
Price
Life
-Trade in
Year
Need
Need
103 Sterling LT8500
25344
4995
2007
161,965
12
170,000
2019
14,167
56,667
104 2007 Silverado 2500HI
25345
4996
2007
151,082
12
141,657
2019
11,805
47,219
105 KP810 truck body with
25345
4993
2007
-
12
-
2019
-
-
106 Sterling LT8500
25346
4994
2007
161,965
12
170,000
2019
14,167
56,667
107 2004 Clark C25C
25402
2010
10,250
9
9,467
2019
1,052
1,052
108 Snowquip XX 60" Sno%
25472
7249
2010
12,500
9
10,375
2019
1,153
1,153
109 GMC Street striping try
25478
3676
2003
133,000
16
122,310
2019
7,644
61,155
110 2009 Ventrac 4231
25547
7180
2009
27,831
10
27,000
2019
2,700
5,400
111 Rosco Spray patch tru(
25341
4972
2006
135,322
14
124,795
2020
8,914
44,570
112 2008 Silverado 3500
25347
5018
2007
35,000
13
34,450
2020
2,650
10,600
113 Model MS30 Rider Swo
30404
7294
2010
36,604
10
35,000
2020
3,500
3,500
114 3641 Snogo
25403
2461
1996
51,760
25
50,000
2021
2,000
30,000
115 2011 Ford F550 4X4
25303
7303
2010
69,464
11
64,326
2021
5,848
5,848
116 2011 Ford F550 Body;
25303
7360
2011
-
10
-
2021
-
-
117 L8500 Sterling
25349
6004
2008
168,267
13
160,045
2021
12,311
36,933
118 L8500 Sterling
25351
6005
2008
168,267
13
160,000
2021
12,308
36,923
119 7433S Case Loader
25487
7179
2009
184,030
12
146,912
2021
12,243
24,485
120 51" SnoQuip XX Blowe
25488
7389
2011
18,896
10
17,219
2021
1,722
-
121 51" SnoQuip XX Blowe
25491
7388
2011
17,827
10
16,074
2021
1,607
-
122 51" SnoQuip XX Blowe
25492
7305
2010
18,896
11
17,218
2021
1,565
1,565
123 Crafco SS125 Diesel h
25531
4473
2006
27,255
16
22,500
2022
1,406
7,031
'-' 2011 Ford F550 4X2
25353
7304
2010
100,272
13
92,291
2023
7,099
7,099
2008 Tomahawk Trail
25500
2008
1,598
15
54,408
2023
3,627
10,882
2012 International 7401
25348
7379
2011
179,352
13
171,906
2024
13,224
-
127 2012 International 7401
25355
7385
2011
194,028
13
182,609
2024
14,047
-
128 Miller Curbing Machine
25529
3729
2004
9,877
20
9,068
2024
453
3,174
129 Patch King 6 Ton Patcl
25343
3829
2005
-
20
-
2025
-
-
130 2011 Snowblast M8001
25490
7377
2011
93,777
20
90,341
2031
4,517
-
131 2005 Chevy Tahoe
26143
4475
2006
32,684
4
33,000
2010
-
33,000
132 2003 Chevy Impala
26161
3418
2003
18,188
7
15,000
2010
-
15,000
133 2007 Dodge Charger
26193
5017
2007
23,589
4
25,337
2011
-
25,337
134 PictureLink Photo Img - Jail
2004
21,179
7
22,000
2011
-
22,000
135 Index Fingerprint System
- Jail
2004
20,199
7
21,000
2011
-
21,000
136 2004 Chevy Malibu
26192
2004
19,200
7
19,200
2011
-
19,200
137 2005 Chevy Uplander
26183
3836
2005
17,547
7
18,000
2012
2,571
15,429
138 2005 Chevy Impala
26184
3837
2005
17,298
7
18,000
2012
2,571
15,429
139 2005 Chevy Impala
26185
3838
2005
19,448
7
20,000
2012
21857
17,143
140 2005 Chevy Impala
26186
3839
2005
17,298
7
18,000
2012
2,571
15,429
141 2005 Chevy Impala
26187
3840
2005
19,081
7
20,000
2012
2,857
17,143
142 2008 Chevy Silverado
26205
5996
2008
28,250
4
23,141
2012
5,785
17,356
143 Police Computer OSSI
Hardware
2008
166,629
4
166,629
2012
41,657
124,972
144 2006 Dodge Caravan
26189
4476
2006
17,827
7
18,000
2013
2,571
12,857
145 2006 Chevy Impala
26190
4477
2006
19,334
7
20,000
2013
2,857
14,286
146 2010 Ford Crown Victc
26106
7282
2010
22,927
3
23,000
2013
7,667
7,667
147 2010 Ford Crown Victc
26107
7283
2010
22,927
3
23,000
2013
7,667
7,667
148 2010 Ford Crown Victc
26102
7284
2010
22,927
3
23,000
2013
7,667
7,667
149 2009 Crown Vic
26197
2009
22,276
4
24,916
2013
6,229
12,458
ICOP Squad Video System
2009
118,273
4
120,000
2013
30,000
60,000
2007 Dodge Charger
26194
4999
2007
25,668
7
26,000
2014
3,714
14,857
152 2007 Expedition
26204
4998
2007
28,264
7
29,000
2014
4,143
16,571
153 15 Pro Laser III
2006
46,995
8
46,995
2014
5,874
29,372
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Hnalysis 2012.xlsx 9/25/2012
CITY OF EDINA
Equipment Replacement Program Inventory List
All General Fund Departments
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
Original
Original
Replace
2011
PW Finance
Purchase
Purchase
Amount
Replace
Annual
Balance
Description Number Number
Year
Price
Life
-Trade in
Year
Need
Need
154 Ricoh Aficio Copiers (2)
2007
24,437
7
26,000
2014
3,714
14,857
155 Mobiles & Portables (Dispatch)
2004
588,350
10
588,350
2014
58,835
411,845
1562011 Ford Crown Victc 26111
7364
2011
22,889
3
23,000
2014
7,667
-
157 2011 Ford Crown Victc 26114
7365
2011
22,889
3
23,000
2014
7,667
-
158 2011 Ford Crown Victc 26113
7366
2011
22,889
3
23,000
2014
7,667
-
159 2011 Ford Crown Victc 26115
7367
2011
22,889
3
23,000
2014
7,667
-
160 2011 Ford Crown Victc 26110
7368
2011
22,889
3
23,000
2014
7,667
-
161 2011 Ford Crown Victc 26994
7369
2011
22,863
3
23,000
2014
7,667
-
162 2011 Ford Crown Victc 26995
7370
2011
22,863
3
23,000
2014
7,667
-
163 2011 Ford Crown Victc 26191
7375
2011
22,146
3
23,000
2014
7,667
-
164 2011 Ford Crown Victc 26118
7384
2011
22,642
3
23,000
2014
7,667
-
165 800 MHZ Base Communications (Dispatch)
2004
354,450
11
365,000
2015
33,182
232,273
166 2006 Sebring 26195
5941
2008
14,347
7
15,000
2015
2,143
6,429
167 2008 Chevy Impala 26196
5988
2008
18,453
7
22,953
2015
3,279
9,837
168 2008 Chevy Trailblazei 26207
5989
2008
23,197
7
22,986
2015
3,284
9,851
169 2008 Chevy Trailblazei 26208
5997
2008
23,197
7
22,986
2015
3,284
9,851
170 55 Glock Pistols
2006
23,760
10
24,760
2016
2,476
12,380
171 Speed Trailer
2007
9,000
10
10,000
2017
1,000
4,000
172 15 Stalker Radars
2010
37,000
8
38,000
2018
4,750
4,750
173 1998 Ford E450 SD 26301
1998
20,000
20
20,000
2018
1,000
13,000
174 Police Computer OSSI Software
7225
2008
699,709
10
1,000,000
2018
100,000
300,000
175 2011 Chevy Equinox A 26163
7371
2011
21,039
7
22,000
2018
3,143
176 2011 Chevy Equinox 4 26164
7372
2011
20,576
7
22,000
2018
3,143
177 2011 Chevy Equinox 4 26165
7373
2011
20,576
7
22,000
2018
3,143
-
178 SLR Commander Rifle Project (19)
2009
24,732
10
24,732
2019
2,473
4,946
179 Dispatch Consoles /Fumiture
2004
43,000
15
44,290
2019
2,953
20,669
180 Security /Access Control /Cameras, etc.
2004
247,812
15
247,812
2019
16,521
115,646
181 Connectivity /Microwave (Dispatch)
2004
327,880
15
327,880
2019
21,859
153,011
182 In- Building Enhancements (Dispatch)
2004
250,000
15
250,000
2019
16,667
116,667
183 2008 Chevy Silverado- 26206
5998
2008
28,800
4
25,000
2012
6,250
18,750
184 2002 Ford Taurus 31170
2566
2002
14,204
12
16,500
2014
1,375
12,375
185 1989 Chevy Pickup Gr• 27244
2351
1989
14,567
15
20,000
2004
-
20,000
186 2003 GMC Sierra 27284
3425
2003
25,299
10
35,000
2013
3,500
28,000
187 LP12 Defib
3428
2003
21,264
10
40,000
2013
4,000
32,000
188 LP12 Defib
3429
2003
21,264
10
40,000
2013
4,000
32,000
189 LP12 Defib
3430
2003
21,264
10
40,000
2013
4,000
32,000
190 LP12 Defib
3431
2003
21,264
10
40,000
2013
4,000
32,000
191 Ford E350 Ambulance 27295
5939
2007
82,371
6
165,000
2013
27,500
110,000
192 Ford E350 27295
4810
2006
30,000
7
0
2013
-
-
193 Usar Lift bag kit
3663
2003
37,096
10
40,000
2013
4,000
32,000
194 Search camera
3666
2003
14,330
10
15,000
2013
1,500
12,000
195 Pneumatic air shore kit
3667
2003
45,000
10
45,000
2013
4,500
36,000
196 Accoustical listening device
3668
2003
13,770
10
15,000
2013
1,500
12,000
197 Misc Rescue Equipment
2004
100,000
10
120,000
2014
12,000
84,000
198 Thermal Imager
4484
2006
10,038
8
9,000
2014
1,125
5,625
199 Thermal Imager
2006
8
9,000
2014
1,125
5,625
200 Thermal Imager
2007
8
9,000
2015
1,125
4,500
201 Thermal Imager
2007
8
9,000
2015
1,125
4,5
202 2005 Ford Explorer 27285
3843
2005
24,477
10
35,000
2015
3,500
21,0G,
203 Ford E450 Ambulance 27392
7175
2009
108,211
6
165,000
2015
27,500
55,000
204 Hydraulic Rescue Equip x2
2005
40,000
10
55,000
2015
5,500
33,000
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
CITY OF EDINA
Equipment Replacement Program Inventory List
All General Fund Departments
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
Original
Original
Replace
2011
PW
Finance
Purchase
Purchase
Amount
Replace
Annual
Balance
Description Number
Number
Year
Price
Life
-Trade in
Year
Need
Need
205
2010 Ford E450 Ambu 27394
7241
2010
158,327
6
165,000
2016
27,500
27,500
206
2007 Chevy Tahoe 27286
5003
2007
37,977
10
35,000
2017
3,500
14,000
207
2007 Chevy Tahoe 27287
5004
2007
36,974
10
35,000
2017
3,500
14,000
208
2008 Chevy Silverado 27288
5002
2007
27,182
10
25,000
2017
2,500
10,000
209
Hydraulic Breaching & cutting
3671
2003
22,815
15
25,000
2018
1,667
13,333
210
2008 Chevy Tahoe 27289
6007
2008
33,130
10
35,000
2018
3,500
10,500
211
2008 Chevy Tahoe 27290
6006
2008
30,133
10
35,000
2018
3,500
10,500
212
1998 Pierce Quantum 27381
2365
1998
325,449
20
550,000
2018
27,500
357,500
213
Stryker Power 6500 Cot
7174
2009
11,222
10
13,000
2019
1,300
2,600
214
Stryker PowerPro Cot
_ 7289
2010
10,861
10
13,000
2020
1,300
1,300
215
Stryker PowerPro Cot
2010
10
13,000
2020
1,300
1,300
216
Mobile Air Cart Response
3852
2005
38,888
15
40,000
2020
2,667
16,000
217
Hydraulic Rescue Equip x2
2011
48,000
10
60,000
2021
6,000
-
218
2001 Pierce Aerial 27390
2366
2001
583,418
20
900,000
2021
45,000
450,000
219
H &H TC20 -2 Enclosed 27404
4485
2006
25,510
15
30,000
2021
2,000
10,000
220
2011 Chevy Tahoe 15( 27201
7361
2011
34,312
10
35,000
2021
3,500
-
221
2011 Chevy Tahoe 4xi 27202
7362
2011
34,312
10
35,000
2021
3,500
-
222
2011 Chevy Tahoe 4xi 27203
7363
2011
34,312
10
35,000
2021
3,500
-
223
2010 40 SCBA Pack & Bottles
2010
15
250,000
2025
16,667
16,667
224
2005 Pumper 27383
3844
2005
268,116
20
550,000
2025
27,500
165,000
225
Duramax Roundtop Trailer
7306
2010
22,530
15
30,000
2025
2,000
2,000
2011 Rosenbauer Firel 27382
7383
2011
420,966
20
600,000
2031
30,000
-
1976 Warning Siren - Valley View
1976
11,000
25
17,684
2001
-
17,684
k,-a
1978 Warning Siren - Overhold Pass
1978
11,000
25
18,000
2003
-
18,000
229
1983 Warning Siren - Eden Ave
1983
11,000
25
18,500
2008
-
18,500
230
1989 Warning Siren - 44th St.
2331
1989
5,800
25
16,000
2014
640
14,080
231
1993 Warning Siren - France Ave
2334
1993
5,800
25
16,000
2018
640
11,520
232
1995 Warning Siren - Blake Rd
2336
1995
5,800
25
16,000
2020
640
10,240
233
1997 Warning Siren - Hansen Rc
2337
1997
15,806
25
16,000
2022
640
8,960
234
2000 Warning Siren - Gleason /Dewey Hill
2000
15,806
25
16,000
2025
640
7,040
235
2004 Warning Siren - 70th St.
3735
2004
15,942
25
16,000
2029
640
4,480
236
2008 Warning Siren - 58th St.
2008
18,223
25
19,000
2033
760
2,280
237
2001 DC FWS Siren
7296
2010
17,684
25
18,000
2035
720
720
238
2001 DC FWS Siren - 5013 Vem(
7382
2011
17,887
25
18,000
2036
720
-
239
2000 Ford Taurus 29118
2388
2000
14,286
10
15,000
2010
-
15,000
240
2004 Ford Taurus 29119
3725
2004
12,089
10
18,000
2014
1,800
12,600
241
2007 Chevy Malibu 29113
5007
2007
12,806
10
20,000
2017
2,000
8,000
242
2007 Chevy Malibu 29114
5008
2007
12,806
10
20,000
2017
2,000
8,000
243
2007 Chevy Malibu 29115
5009
2007
12,806
10
20,000
2017
2,000
8,000
244
2009 Chevy Aveo 29120
6003
2008
11,729
10
20,000
2018
2,000
6,000
245
2010 Ford Focus 29121
7286
2010
13,529
10
22,000
2020
2,200
2,200
246
Large format printer
2012
10,000
10
10,000
2022
1,000
(1,000)
247
Copier /printer by Inspections
2012
10,000
10
10,000
2022
1,000
(1,000)
248
Xerox Copier
2396
1998
30,264
10
.25,000
2008
-
25,000
249
Ricoh 3260C Color Copier
5010
2007
25,462
10
25,000
2017
2,500
10,000
250
Telephone System
7224
2009
221,058
10
200,000
2019
20,000
40,000
251
1996 chevy pickup 47207
2523
1996
27,806
10
30,500
2006
-
30,500
1999 GMC Sierra 47378
2522
1999
27,199
10
30,000
2009
-
30,000
- ,
JD 6200 Tractor 47459
2500
1997
43,180
12
58,000
2009
-
58,000
254
Cushman 3whl truckst( 47654
2502
1999
10,451
10
12,000
2009
-
12,000
255
2000 GMC Sierra 47208
2520
2000
20,693
10
22,000
2010
-
22,000
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
CITY OF EDINA
Equipment Replacement Program Inventory List
All General Fund Departments
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
Original
Original
Replace
2011
PW
Finance
Purchase
Purchase
Amount
Replace
Annual
Balance
Description
Number
Number
Year
Price
Life
-Trade in
Year
Need
Need
256 Jacobsen HR9016 Moi
47452
2507
2000
64,414
10
65,000
2010
-
65,000
257 2001 Chevy ext cab
47298
2528
2001
20,134
10
22,000
2011
-
22,000
258 2001 Chevy
47299
2527
2001
15,903
10
23,000
2011
-
23,000
259 2002 GMC Sonoma
47211
2567
2002
22,111
10
23,000
2012
2,300
20,700
260 60" turf Sweeper
47523
2569
2002
21,083
10
20,000
2012
2,000
18,000
261 SMI 72000 Big Vac S%
47527
2570
2002
13,874
10
14,000
2012
1,400
12,600
262 Toro GM3500D Tracto
47648
3850
2005
24,621
7
25,000
2012
3,571
21,429
263 2003 Chevy S10
47212
3426
2003
15,688
10
20,000
2013
2,000
16,000
264 2004 Chevy Silverado
47381
3682
2004
26,059
10
30,000
2014
3,000
21,000
265 249S Wheel loader
47450
2505
1999
34,010
15
35,000
2014
2,333
28,000
266 2007 John Deere 1445
47657
5013
2007
18,863
7
18,000
2014
2,571
10,286
267 2005 Ford F150
47209
3845
2005
14,560
10
14,195
2015
1,420
8,517
268 2005 Chevy Silverado
47213
3846
2005
22,807
10
21,905
2015
2,191
13,143
269 GX345 Lawn tractor
47649
3851
2005
6,461
10
6,225
2015
623
3,735
270 2006 Chevy Colorado
47214
4488
2006
20,836
10
21,400
2016
2,140
10,700
271 2004 John Deere Traci
47468
3736
2004
39,134
12
50,355
2016
4,196
29,374
272 72" riding Mower
47471
4487
2006
10,221
10
10,000
2016
1,000
5,000
273 Jacobsen Truck Cart
47655
4489
2006
16,167
10
16,500
2016
1,650
8,250
274 JT0127 Jacobsen Truc
47679
7173
2009
20,052
7
20,000
2016
2,857
5,714
275 56031 KW 60" Lawn Tr
47503
7169
2009
14,824
7
15,000
2016
2,143
4,286
276 2007 Ford Ranger
47215
5016
2007
11,591
10
11,600
2017
1,160
4,640
277 2007 Silverado 1500
47216
5014
2007
24,237
10
20,000
2017
2,000
8,0-
278 2008 ford Ranger
47217
6000
2008'
11,848
10
11,600
2018
1,160
3,1,
279 2008 Chevy Silverado
47218
6001
2008
26,876
10
27,000
2018
2,700
8,10u
280 Sterling Log Loader
47380
2003
132,476
15
140,000
2018
9,333
74,667
281 Deere 5525 Utility Trac
47470
4490
2006
53,361
12
54,000
2018
4,500
22,500
282 Jacobsen Turfcat 6281
47475
7380
2011
21,099
7
16,000
2018
2,286
-
283 Cub Cadet 60" Mower
47504
7400
2011
13,999
7
14,000
2018
2,000
-
284 John Deere 1445 Fron*
47474
7381
2011
19,005
7
15,000
2018
2,143
-
285 Jacobsen HR9016 Moi
47502
7170
2009
76,300
10
80,000
2019
8,000
16,000
286 John Deere 5525 Traci
47472
5015
2007
54,570
12
41,000
2019
3,417
13,667
287 2009 Silverado 1500
47220
7171
2009
22,539
10
25,000
2019
2,500
5,000
288 2009 Silverado 1500
47219
7172
2009
22,567
10
25,000
2019
2,500
5,000
289 2010 Ford E250 Cargo
47221
7287
2010
17,989
10
20,000
2020
2,000
2,000
290 2010 Vermeer Brush Chipper
7288
2010
26,874
10
28,000
2020
2,800
2,800
291 Tennant 32" Floor ScrI
30403
7293
2010
15,237
10
16,000
2020
1,600
1,600
292 2011 Ford F450
47382
7376
2011
59,720
10
60,000
2021
6,000
-
293 2011 Ford XLT Ranges
47223
7386
2011
18,661
10
19,000
2021
1,900
-
294 2011 Ford Ranger 4x2
47222
7387
2011
14,215
10
15,000
2021
1,500
-
295 HR 9016 Jacobsen Tre
47454
3849
2005
64,529
20
65,000
2025
3,250
19,500
296 2010 Terex Track Loac
47473
7292
2010
36,353
15
40,000
2025
2,667
2,667
297 2011 Freightliner M21
47383
7374
2011
146,155
15
150,000
2026
10,000
-
GRAND TOTALS PER 12/31/11 INVENTORY
$15,319,918
$17,730,232
$1,519,856
$ 8,286,919
Actual Totals from 2011 Audit & 2012 Budget
$ 992,072
$ 2,321,050
Annual & Carry-over Amounts Equipment
Replacement Program is underfunded
by
$ 527,784
$ 5,965,8F^
G: \Budget \Equipment Inventory\Equipment replacement for 2013 budget\Analysis 2012.xlsx 9/25/2012
CITY OF EDINA. MINNESOTA
�ZrIA, �\ ';;O���
0
\moo�4
1888
Q:7_1 011
•
CAPITAL IMPROVEMENT PLAN
2013 -2017
EDINA CITY COUNCIL
Mayor
Councilmember
Councilmember
Councilmember
Councilmembe,r
James Hovland
Joni Bennett
Mary Brindle
Josh Sprague
Ann Swenson
CITY OF EDINA, MINNESOTA
TABLE OF CONTENTS
CAPITAL IMPROVEMENT PLAN
DESCRIPTION PAGE
INTRODUCTION
17
• Organization
1
• Policy
2
• Process
2
• Priorities
3
• Financing
3
• Use of estimates
7
CIP SUMMARY
• Construction Fund Balance 8
• Capital Improvement Plan Summary 9
DETAIL PROJECT DESCRIPTIONS
• Administration — Liquor Store
17
• Community Development & HRA
25
• Engineering
29
• General Government Functions
60
• Park & Recreation
69
• Parks — Aquatic Center
88
• Parks — Arena
95
• Parks — Art Center
106
• Parks — Centennial Lakes Park
109
• Parks — Edinborough Park
113
• Parks — Golf Course
133
• Public Safety. Functions
141
• Public Works
150
This page left blank intentionally.
ORGANIZATION
CITY OF EDINA, MINNESOTA
INTRODUCTION
CAPITAL IMPROVEMENT PLAN
The City of Edina operates under a "Plan B" council- manager form of government.
The City Council determines all matters of policy and appoints the City Manager.
The City Manager is responsible for implementing policies and carrying out the
business of City government.
City services are provided by a staff that includes about 270 regular full -time
employees, nearly 100 regular part-time employees and several hundred seasonal
workers (mostly in parks and recreation programs). Many volunteers assist the staff.
The customer service - oriented City is divided into the following departments and
offices: Administration, Communications & Technology Services, Community
Development, Engineering, Finance, Fire, Human Resources, Parks & Recreation,
Police and Public Works.
Staff work is guided Edina Vision 20/20, the City's strategic plan. The City's mission
is to provide effective and valued services, maintain a sound public. infrastructure,
offer premier public facilities and guide the development and redevelopment of
lands, all in a manner that sustains and improves the uncommonly high quality of life
enjoyed by our residents and businesses.
The City's vision is to be the preeminent place for living, learning, raising families
and doing business distinguished by:
• A livable environment
• Effective and valued city services
• A sound public infrastructure
• A balance of land uses, and
• Innovation
Page 1
CITY OF EDINA, MINNESOTA
INTRODUCTION
CAPITAL IMPROVEMENT PLAN
CAPITAL IMPROVEMENT PLAN (CIP) POLICY
The goal of the. City's CIP is to develop a comprehensive program for use by
decision makers to guide capital investments based on an assessment of the
community's needs, taking into account the best use of limited resources while
providing efficient and effective municipal services.
The City will develop a five -year plan for capital improvements and update it
annually. The CIP process includes analyzing projects contributing to the public
health and welfare, projects helping to maintain and improve the efficiency of the
existing systems, and projects that define a future need within the community.
The City will identify the estimated cost and potential funding sources for each
capital project proposal in the CIP. Purchase contracts for equipment and projects
included in the CIP must still be properly authorized according to the City's
Purchasing Policy.
The CIP will include equipment and projects from any City fund.
Adopted by City Council February 20, 2007
Revisions: March 20, 2007
December 15, 2009
PROCESS
The City implemented a two -year budget cycle process beginning with the 2012-
2013 operating budget. The objective is to take an alternating year approach to the
operating budget and CIP processes. While both the operating budget and CIP will
be reviewed every year, the majority of the planning, focus and effort will alternate
between the two.
During odd - numbered years, the City's focus will be on the operating budget. Extra
efforts are dedicated to citizen engagement processes and a two -year operating
budget, which will take effect on January 1 of the following even - numbered year.
The CIP is reviewed but only updated if necessary.
During even - numbered years, the City's focus will be on the CIP. Extra efforts are
dedicated to reviewing the projects in the CIP and prioritizing them based on
information available at the time. The operating budget is reviewed but only updated
if necessary.
Page 2
PRIORITIES
CITY OF EDINA, MINNESOTA
INTRODUCTION
CAPITAL IMPROVEMENT PLAN
While prioritization has always been part of the CIP process, the City implemented a
formal process that standardizes priorities across functions and departments,
beginning with the 2013 -2017 CIP. The prioritization process considers strategic
goals and objectives, which are set by the City Council and interpreted by City staff.
The recommended CIP and priorities are then submitted back to the City Council for
consideration, modification, and adoption.
The City uses a 7 -point prioritization scale that is represented as follows:
1. Critical
2.
3. Significant
4.
5. Important
6.
7. Desirable
The CIP prioritization process is completed once every two years, as described in
the preceding "Process" section. Typically most higher - priority projects are
scheduled to be completed first couple years of the CIP with the lower- priority
projects scheduled later in the 5 -year CIP timeline. However, the City recognizes
that circumstances and priorities can change over time and in some cases may
cause the timing of some projects to be moved forward or back after adoption of the
CIP. These changes are considered by the Council on a case -by -case basis.
FINANCING
Planning for capital improvements requires sound and economical financing. The
City of Edina is able to utilize several financing mechanisms ranging from cash
reserves to special - purpose funds as well as borrowing through bond sales. The
exact financing method for each improvement is based on the general policies,
jurisdictions and legal requirements. The final selection and scheduling of proposed
capital improvements is then based on the ability of the City to draw upon various
funds. The total cost for each project includes construction costs, administration
costs and interest.
Page 3
CITY OF EDINA, MINNESOTA
INTRODUCTION
CAPITAL IMPROVEMENT PLAN
In analyzing the financial viability of the capital improvements in the current plan, the
following methods of financing were examined:
1. Construction Fund — This fund is designed to provide a funding source for
capital improvements that otherwise would not have financing available.
Revenues for this fund are derived from such sources as investment income
and transfers from other funds. The City's Fund Balance Policy specifies that
this is the preferred destination for any unassigned fund balance in the
General Fund at the end of each year. Continuing this practice will provide
money for high - priority projects to move forward.
2. Equipment Replacement Program — This program is designed to provide a
funding source to replace all the equipment currently used by General Fund
departments when it is time to be replaced. This revolving fund is replenished
by a tax levy and allows the City to buy needed equipment without the
additional costs of issuing debt. Equipment purchased under this program
includes squad cars, fire trucks, plows, passenger cars and trucks, and even
lawn mowers, among other items.
3. Enterprise Funds — The City's enterprise funds include Utilities, Liquor,
Aquatic Center, Golf Course, Arena, Art Center, Edinborough Park, and
Centennial Lakes. Capital Improvements and equipment purchased in the
enterprise funds may be financed through revenues derived from user
charges for the respective services, when available.
When an enterprise fund does not have enough cash to pay for a specific
project, the City may decide to use money from another source (usually the
Construction Fund) or the City may decide to issue Enterprise Revenue
Bonds. See below for further description of these financing methods.
4. Tax Increment (TIF) Funds — These funds are derived from tax increment
districts including 50,n and France, Southeast Edina, Grandview, and 70th
Street and Cahill Road. In tax increment districts, property owners pay ad
valorem taxes at the full rate levied by the units of local government within the
taxing jurisdiction.
Page 4
CITY OF EDINA, MINNESOTA
INTRODUCTION
CAPITAL IMPROVEMENT PLAN
At the time the tax increment district is created, property values are "frozen ".
The units of local government receive taxes based on the frozen property
values. Any additional taxes paid by property owners based on the increase
in property values since the district was created is known as the "increment ".
The increment revenue is then used to finance physical improvements within
the district.
5. Pedestrian Bike Safety Fund — The City is considering setting up a new
fund for 2013 that would collect money from a utility franchise fee to be used
for projects that promote pedestrian and bike safety.
6. Special Assessments — Special assessments are based on the concept that
when land is benefited from a particular improvement, all or part of the costs
of the improvement should be levied against those properties to finance such
improvements.
Since it often takes several years for the City to collect special assessments,
the City may decide to issue bonds for cash flow purposes. See Public
Improvement Revolving Bonds for further description of this financing tool.
7. Municipal State Aid (MSA) — The Minnesota Department of Transportation
(MnDOT) provides funding assistance for improvements to those municipal
streets which are designated as part of its MSA system. Money for this fund is
supplied with a dedicated portion of revenues collected from road use and
gasoline taxes. Funds are released for improvements on those streets on the
system whose design and construction meet MSA standards. Funds may be
expended for any street on the MSA system at any time, and MSA funds may
be accumulated over several years.
8. Grants and Donations — The City sometimes receives external sources of
financing including grants and donations from the Federal, State, and other
local governments. We also may receive donations from local residents,
businesses or community organizations. It is the City's policy that all grants
and donations are approved by the City Council.
Page 6
CITY OF EDINA, MINNESOTA
INTRODUCTION
CAPITAL IMPROVEMENT PLAN
9. Bonds — The City may decide to sell bonds to pay the upfront costs of a
project when cash on hand is not sufficient for a project. There are many
different bond programs that the City uses, each with slightly different names.
A few of the programs the City uses most often are listed below.
• Enterprise Revenue Bonds — Most of the Enterprise Revenue Bonds
that the City issues pay for Utility Fund project costs, but the City may
issue Enterprise Revenue Bonds for any of our enterprises. These
bonds are designed to be repaid with revenues from the enterprise
facilities that benefit from the projects financed, therefore no levy is
required.
• Tax Increment Bonds — The City has previously issued Tax
Increment bonds to pay TIF project costs. The bonds are repaid with
the tax increment revenue that is generated by the district; therefore no
additional levy is required.
• Public Project Lease Revenue Bonds — These bonds are backed by
the full faith and credit of the City through an annual appropriation.
• Public Improvement Revolving (PIR) Bonds — PIR bonds are
generally issued for street improvement projects and are repaid with
special assessment receipts over a ten -year period. These bonds are
supported through special assessments, therefore no levy is required.
• General Obligation (GO) — There are several types of GO debt
available for the City to use. Although no new issues are included in
this plan, the City currently has park & recreation bonds and equipment
certificates outstanding. Both of these types of GO debt require a levy.
Page 6
CITY OF EDINA, MINNESOTA
INTRODUCTION
CAPITAL IMPROVEMENT PLAN
Current
$100,000
$90,000
o Enterprise Revenue
$80,000
DTax Increment $70,000
$60,000
13 Public Imp Revolving $50,000
$40,000
0Public Project $30'000
■General Obligation $20,000
$10,000
City of Edina Debt
and Projected (In Thousands)
2009 2010 2011 2012 2013 2014 2015 2016 2017
This chart shows the projected effect on the City as a whole if future debt is issued
according to this capital improvement plan. The General Obligation bonds category
shown here includes Capital Improvement bonds, park and recreation bonds and'
equipment certificates
ESTIMATES
The preparation of a 5 year CIP requires City staff to make material estimates about
project scope, costs of labor and materials, future interest rates and other items.
Many times these estimates come from staff experience, projections published in
other sources, vendor estimates, or a combination of several sources. Generally the
estimates for earlier years are more precise than later years. Actual results could
differ from such estimates.
Page 7
CITY OF EDINA, MINNESOTA
CONSTRUCTION FUND BALANCE
CAPITAL IMPROVEMENT PLAN
Projected Construction Fund Unreserved Fund Balance
$16,000,000
$12,000,000
$8,000,000
$4,000,000
$(4,000,000)
$(8,000,000)
2007
Construction Fund Assigned Balance Trend
Last Five Fiscal Years (Actual) and Next Five Fiscal Years (Estimate)
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
The charts above show the projected impact this CIP will have on the Construction Fund along with a
five -year history of Construction Fund balances. The current plan is affordable for 2013 -2014, after
that the projection shows the Construction Fund balance turning negative sometime during 2015. The
City intends to reassess and reprioritize during the next CIP planning process scheduled to occur in
fall 2014 and issue a new CIP for the years 2015 -2019.
Page 8
Estimate
Budget
Forecast
2012
2013
2014
2015
2016
2017
Revenues
Property taxes
$ 992,072
$ 992,072
$ 992,072
$ 992,072
$ 992,072
$ 992,072
Special Assessment
1,723,765
1,652,039
1,237,872
1,361,088
1,344,038
1,259,338
License and permits
25,000
25,000
25,000
25,000
25,000
25,000
Intergovernmental
50,000
300,000
2,580,000
880,000
1,050,000
1,260,000
Charges for service
50,000
50,000
50,000
50,000
50,000
50,000
Interest (1.5 %)
151,600
110,700
87,700
63,800
(3,200)
(32,100)
Total Revenues
2,992,437
3,129,811
4,972,644
3,371,960
3,457,910
3,554,310
Expenditures
General Government
259,500
381,000
396,900
1,368,900
587,900
255,000
Park 8 Rec
997,500
840,000
133,000
1,742,325
983,255
931,600
Public Safety
1,041,809
906,916
1,361,845
721,925
284,760
70,000
Public Works
7,454,236
6,555,254
7,385,395
6,443,842
6,918,420
6,511,415
Total Expenditures
9,753,045
8,683,170
9,277,140
10,276,992
8,774,335
7,768,015
Other Financing Sources /(Uses)
Transfers In /(Out)
822,395
(229,300)
(205,500)
(1,181,600)
(273,400)
(1,524,600)
PIR Bonds
3,131,700
4,251,000
2,917,200
3,619,200
3,662,100
3,361,800
Total Other Sources
3,954,095
4,021,700
2,711,700
2,437,600
3,388,700
1,837,200
Increase (Decrease)
$ (2,806,513)
$ (1,531,659)
$ (1,592,796)
$ (4,467,432)
$ (1,927,725)
$ (2,376,505)
Beginning Balance
$ 10,186,483
$ 7,379,970
$ 5,848,311
$ 4,255,515
$ (211,917)
$ (2,139,642)
Ending Balance
$ 7,379,970
$ 5,848,311
$ 4,255,515
$ (211,917)
$ (2,139,642)
$ (4,516,147)
$16,000,000
$12,000,000
$8,000,000
$4,000,000
$(4,000,000)
$(8,000,000)
2007
Construction Fund Assigned Balance Trend
Last Five Fiscal Years (Actual) and Next Five Fiscal Years (Estimate)
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
The charts above show the projected impact this CIP will have on the Construction Fund along with a
five -year history of Construction Fund balances. The current plan is affordable for 2013 -2014, after
that the projection shows the Construction Fund balance turning negative sometime during 2015. The
City intends to reassess and reprioritize during the next CIP planning process scheduled to occur in
fall 2014 and issue a new CIP for the years 2015 -2019.
Page 8
City of Edina, MN
Capital Improvement Plan
2013 thru 2017
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2013 2014 2015 2016 2017 Total
JAdministration - Liquor Stores
200,000
5,600,000
5,800,000
Community Development & HRA Total
200,000
50th: Store Remodel LIQ -02 -005
1
150,000
ENG -13 -005
Pedestrian and Bicyclist Safety Projects
150,000
York: Replace Rooftop HVAC LIQ -10 -004
2
Reconstruct 2nd Street South
40,000
Reconstruct: Valley View Road
40,000
Vernon: Replace Load Leveler Dock LIQ -10 -006
5
4
1,100,000
15,000
15,000
All Stores: Video & Software Upgrades LIQ -11 -004
5
1,100,000
1,100,000
60,000
60,000
Vernon: Replace Rooftop HVAC LIQ -11 -005
5
25,000
25,000
Vernon: Replace Entrance & Exit Doors LIQ -11 -006
5
30,000
30,000
Vernon Tasting Area LIQ -13 -001
5
25,000
25,000
LiquorSignage- Interior /Exterior LIQ-13 -002
3
80,000
80,000
Administration - Liquor Stores Total
230,000
65,000
130,000
425,000
Liquor Fund
230,000
65,000
130,000
425,000
Administration - Liquor Stores Total
230,000
65,000
130,000
425,000
Community Development & HRA
Promenade Phase III HRA -11 -002
5
2,000,000
2,000,000
France Ave and TH62 Reconstruction HRA -11 -003
1
600,000
600,000
Greater Southdale Area Transportation Study HRA -13 -001
2
200,000
200,000
Pedestrian Bridge over TH62 HRA -13 -002
1
3,000,000
3,000,000
Community Development & BRA Total
200,000
5,600,000
5,800,000
Tax Increment Funds
200,000
5,600,000
5,800,000
Community Development & HRA Total
200,000
5,600,000
5,800,000
Envineerin
Neighborhood Street Reconstruction Program
ENG -13 -001
Water Main Improvments
ENG -13 -002
Sanitary Sewer Main Improvements
ENG -13 -003
Storm Sewer - Pipe and Grading Improvements
ENG -13 -004
Piping Wells #15 and #9 to Treatment Plant No. 6
ENG -13 -005
Pedestrian and Bicyclist Safety Projects
ENG -13 -006
Bridge Rehabilitation: 78th St W and Gus Young Ln
ENG -13 -007
Reconstruct 2nd Street South
ENG -13 -008
Reconstruct: Valley View Road
ENG -13 -009
1 5,300,000
3,500,000
4,500,000
4,500,000
4,100,000
1 1,375,000
1,200,000
2,000,000
2,000,000
1,800,000
1 1,451,000
690,000
931,000
700,000
1,100,000
1 1,200,000
2,200,000
2,600,000
2,600,000
2,600,000
4
1,100,000
2 800,000
1,100,000
1,100,000
1,100,000
1,100,000
1 150,000
1 150,000
4
100,000
1,000,000
21,900,000
8,375,000
4,872,000
11,200,000
1,100,000
5,200,000
150,000
150,000
1,100,000
DRAFT Page 9 Tuesday, September 25, 2012
Department Project# Priority 2013 2014 2015 2016 2017 Total
Reconstruct Tracy Avenue
ENG -13 -010
5
11,887,000
13,505,000
200,000
1,100,000
1,300,000
2013 -2014 Flood Protection and Water Improvements
ENG -13 -011
4
30,000
35,000
250,000
50,000
315,000
2014 -2015 Flood Protection and Water Improvements
ENG -13 -012
4
50,000
275,000
325,000
2015 -2016 Flood Protection and Water Improvements
ENG -13 -013
5
50,000
275,000
325,000
Momingside Neighborhood Water Main Relining
ENG -13 -014
5
Municipal State Aid
200,000
100,000
300,000
Mill and Overlay: Benton Avenue
ENG -13 -015
5
5,770,000
Pedestrian Bike Safety Fund
450,000
450,000
Comprehensive Water Resource Management Plan
ENG -13 -016
5
1,100,000
5,200,000
45,000
45,000
Storm Water Pollution Prevention Plan
ENG -13 -017
4
45,000
4,240,000
22,465,000
Utility Fund - Sewer
45,000
NMWD Petition Projects - Phase 1
ENG -13 -018
4
971,000
180,000
140,000
-
320,000
Engineering Department Equipment Replacement
ENG -13 -019
nla
41,000
3,400,000
45,000
25,000 28,000
139,000
Concrete Rehab: Parklawn Ave. (France to W 77)
PW -00 -074
4
1,650,000
2,350,000
2,260,000
450,000
450,000
Reconstruct: W 54th St. (Wooddale to France)
PW -01 -012
1
150,000
950,000
13,735,000
13,296,000
1,100,000
Reconstruct: W 58th St (Wooddale to France)
PW -04 -001
4
150,000 950,000
1,100,000
Bridge: 54th Street Bridge
PW -05 -003
1
180,000
820,000
3
75,000
1,000,000
Mill & Overlay: Olinger Blvd (Vernon - Tracy)
PW -05-006
4
375,000
800,000
COM -13 -002
7
800,000
Remove Lift Station No.1
UT -03 -010
3
150,000
1,315,000
Communications and IT Equipment Replacement
COM -13 -003
150,000
New Water Treatment Plant (#5)
UT -07 -002
4
150,000
80,000
489,700
7,000,000
7,150,000
Piping Wells #5 and #18 to WTP #5
UT -08-008
1
100,000
75,000
75,000
375,000
100,000
Trunk Sanitary Sewer Lining
UT -08 -014
5
540,000
600,000
1,140,000
W 69th Street and York Ave Water Main Loop
UT -10 -011
5
150,000
30,000
150,000
Asset Management Update
UT -12 -008
4
75,000
30,000
60,000
60,000
225,000
Cooper Circle Pond Outlet
UT -12 -009
5
80,000
80,000
DRAFT Page 10 Tuesday, September 25, 2012
Engineering Total
11,887,000
13,505,000
13,396,000
13,060,000
19,208,000
71,056,000
Bonds - Public Improvement Revolving Bonds
150,000
100,000
50,000
70,000
370,000
Construction Fund
120,000
120,000
Equipment Replacement Program
41,000
45,000
25,000
28,000
139,000
Municipal State Aid
2,580,000
880,000
1,050,000
1,260,000
5,770,000
Pedestrian Bike Safety Fund
800,000
1,100,000
1,100,000
1,100,000
1,100,000
5,200,000
Special Assessments
5,300,000
3,640,000
4,640,000
4,645,000
4,240,000
22,465,000
Utility Fund - Sewer
2,166,000
1,470,000
971,000
890,000
1,120,000
6,617,000
Utility Fund - Storm
1,330,000
2,495,000
3,400,000
3,000,000
2,700,000
12,925,000
Utility Fund - Water
1,650,000
2,350,000
2,260,000
2,350,000
8,840,000
17,450,000
Engineering Total
11,557,000
13,735,000
13,296,000
13,110,000
19,358,000
71,056,000
General Government Functions
City of Edina Wireless Network
COM -13 -001
3
75,000
75,000
75,000
75,000
75,000
375,000
Gateway Signs
COM -13 -002
7
935,000
380,000
1,315,000
Communications and IT Equipment Replacement
COM -13 -003
nla
186,000
136,900
53,900
32,900
80,000
489,700
Citywide Fiber Optic Cabling
CW -02 -001
6
225,000
75,000
75,000
375,000
Electronic Document Management
GG -11 -004
5
65,000
65,000
25,000
155,000
Assessing Division Equipment Replacement
GG -13 -001
nla
30,000
30,000
DRAFT Page 10 Tuesday, September 25, 2012
Department Project# Priority 2013 2014 2015 2016 2017 Total
Election Equipment Replacement GG -13 -002 nla 30,000 30,000
HRIS1Payroll HR -13 -001 2 50,000 150,000 200,000
General Government Functions Total 376,000 426,900 1,343,900 562,900 260,000 2,969,700
Construction Fund
140,000
200,000
1,260,000
530,000 150,000
2,280,000
Equipment Replacement Program
20,000
186,000
171,900
83,900
32,900 110,000
584,700
Other - 2010 Unassigned Fund Balance
300,000
50,000
55,000
Park & Recreation Total
105,000
General Government Functions Total
1,692,325
376,000
426,900
1,343,900
562,900 260,000
2,969,700
Park & Recreation
Pamela Park: Renovate senior athletic field
PK -00 -033
7
1
40,000
330,000
330,000
Pamela Park: New athletic field
PK -07 -004
6
50,000
400,000
50,000
400,000
Lewis Park: Pathway lighting
PK -08 -006
5
30,000
52,000
Replace Pool Filters
30,000
Pamela Park: South Parking Lot Expansion
PK -10 -005
6
62,000
62,000
40,000
40,000
Pamela Park: North Parking Lot Expansion
PK -10 -006
6
DRAFT
45,000
45,000
Pamela Park: West Parking Lot Expansion
PK -10 -007
6
60,000
60,000
Bredesen Park: Comfort Station Renovation
PK -11 -006
5
75,000
75,000
Normandale Park: Replace Warming House /Shelter
PK -11 -007
6
650,000
650,000
VanValkenburg Park construction
PK -12 -002
7
600,000
600,000
Parks Department Equipment Replacement
PK -13 -001
nla
20,000
83,000
42,325
133,255 31,600
310,180
Utley Park: Bathrooms Renovation
PK -13 -002
1
80,000
80,000
Lake Edina Park: Pathway
PK -13-003
5
85,000
85,000
Highlands Park: Basketball Court
PK -13-004
7
25,000
25,000
Garden Park: Baseball Field
PK -13 -005
5
300,000
300,000
Wooddale Park: Playground Equipment
PK -13 -006
5
200,000
200,000
Weber Park: Playground Equipment
PK -13-007
5
200,000
200,000
Arden Park: Replace Shelter Building
PK -13-008
5
650,000
650,000
Strachauer Park: Playground Equipment
PK -13 -009
5
200,000
200,000
Parks Comprehensive Master Plan
PK -13 -010
7
100,000
100,000
Park &
Recreation Total
790,000
63,000
1,692,325
933,255 881,600
4,380,180
Construction Fund
470,000
1,650,000
800,000 850,000 3,770,000
Equipment Replacement Program
20,000
83,000
42,325
133,255 31,600 310,180
Grants & Donations
300,000
300,000
Park & Recreation Total
790,000
83,000
1,692,325
933,255 881,600 4,380,180
Parks - Aquatic Center
Replace Heaters
AQC -12 -002
1
40,000
40,000
Pool Deck Repairs
AQC -12 -003
2
50,000
50,000
Bathhouse Roof and Other Improvements
AQC -12 -004
2
52,000
52,000
Replace Pool Filters
AQC -12 -005
4
62,000
62,000
DRAFT
Page 11
Tuesday, September 25, 2012
Department Project# Priority 2013 2014 2015 2016 2017 Total
SCS Play Structure AQC -12-006 5 325,000 325,000
Main Pool Boiler AQC-13 -001 1 47,000 47,000
Large Slide AQC -13 -002 5 500,000 500,000
Parks - Aquatic Center Total 87,000 102,000 62,000 500,000 325,000 1,076,000
Aquatic Center Fund 87,000
102,000
62,000
500,000
325,000
1,076,000
Parks - Aquatic Center Total 87,000
102,000
62,000
500,000
325,000
1,076,000
Parks - Arena
Water System Repairs
A -10 -003
5
85,000
85,000
80,000
ART -11 -005 3
22,800
80,000
Replace Zamboni
A -12 -001
3
15,000
140,000
15,000
28,000 28,000
Parks - Art Center Total
140,000
Make -up Water Tanks
A -12 -002
1
35,000
Construction Fund
37,800
35,000
Low E Ceiling Replacement - West Arena
A -13 -001
4
75,000
85,000
122,800
75,000
Painting East Arena
A -13 -002
4
25,000
25,000
Ballet Room Remodel
A -13-003
3
25,000
25,000
Low E Ceiling Replacement - East Arena
A -13 -004
5
80,000
80,000
Bathroom/Locker Room Upgrades /Remodel
A -13 -005
5
100,000
100,000
Rubber Floor Replacement
A -13 -006
5
35,000
35,000
Arena Roof
A -13 -007
5
225,000
225,000
Parking Lot Resurfacing
A -13 -008
2
35,000
35,000
Parks - Arena Total
170,000
165,000
160,000
135,000
225,000
855,000
Construction Fund
170,000
165,000
160,000
135,000
225,000
855,000
Parks -Arena Total
170,000
165,000
160,000
135,000
225,000
855,000
Parks - Art Center
Parking Lot Expansion
ART -11 -004 7
2
85,000
85,000
HVAC
ART -11 -005 3
22,800
Replace HVAC Units
22,800
MaxSolutions Enterprise Acquisition
ART -13 -001 2
15,000
CLA3-001
15,000
28,000 28,000
Parks - Art Center Total
37,800
85,000
122,800
Construction Fund
37,800
85,000
122,800
Parks -Art Center Total
37,800
85,000
122,800
Parks - Centennial Lakes Park
Replace HVAC Units
CL -06 -005
2
25,000 25,000
Replace Park Sound System
CL -09-008
7
32,000 32,000
Replace HVAC Units
CL -12 -001
5
25,000 25,000
One -Ton Truck
CLA3-001
5
28,000 28,000
DRAFT Page 12 Tuesday, September 25, 2012
Department Project# Priority 2013
2014
2015
2016
2017
Total
Parks - Centennial Lakes Park Total
25,000
32,000
25,000
28,000
110,000
Construction Fund
25,000
32,000
25,000
28,000
110,000
Parks - Centennial Lakes Park Total
25,000
32,000
25,000
28,000
110,000
Parks - Edinboroumh Park
Replaster Pool
EP -00 -017
3
71,800
Braemar: Slit Drainage 3 Fairways
GC -12 -007 7
Braemar. Clubhouse Roof Replacement
71,800
Security Camera System
EP -08-007
5
GC -13 -001 5
Tee Renovation
43,100
Irrigation System Replacement Phase 1
43,100
Pool and Wall Tile
EP -08-021
3
200,000
189,500
155,000
160,000
189,500
Lift to Birthday Party Area
EP -09 -014
3
220,000
42,000
1,500,000
42,000
Track Floor
EP -09 -015
7
65,000
65,000
Concrete repairs
EP -09 -016
4
153,800
153,800
Adventure Peak Remodel
EP -09 -021
3
26,000
26,000
North Sidewalk
EP -10 -011
5
32,300
32,300
Track Air Conditioning
EP -11 -005
7
66,600
66,600
Adventure Peak Wave Slide
EP -11 -006
3
26,300
26,300
Exterior Entryway Doors
EP -11 -007
5
90,500
90,500
Interior Entryway Doors
EP -11 -008
5
67,900
67,900
Upstairs Restroom Remodel
EP -11 -009
6
30,800
30,800
Adventure Peak Renovation
EP -11 -010
5
33,100
33,100
Park Boiler
EP -12 -003
5
26,900
26,900
POS System.
EP -13 -001
5
28,300
28,300
Ramp to Track
EP -13 -002
5
41,000
41,000
Provide Larger Locker Rooms
EP -13 -003
1
582,000
582,000
Window Washing
EP -13 -004
3
26,300
26,300
Roof Repairs
EP -13 -005
5
110,400
110,400
Parks - Edinborough Park Total
266,600
892,100
264,700
143,500 186,700
1,753,600
Construction Fund 266,600 120,600 264,700 143,500 186,700 982,100
Edinborough Fund 771,500 771,500
Parks - Edinborough Park Total 266,600 892,100 264,700 143,500 186,700 1,753,600
Parks - Golf Course
Driving Range Expansion
GG-12 -005 7
Braemar. Carpeting
GC -12 -006 7
Braemar: Slit Drainage 3 Fairways
GC -12 -007 7
Braemar. Clubhouse Roof Replacement
GC -12 -008 5
Cart Path Repair /Expansion
GC -12 -009 3
Maintenance Equipment Replacement
GC -13 -001 5
Tee Renovation
GC -13 -003 4
Irrigation System Replacement Phase 1
GC -13 -004 5
DRAFT Page 13 Tuesday, September 25, 2012
1,000,000
1,000,000
25,000
25,000
50,000
50,000
80,000
80,000
160,000
25,000 25,000
75,000
75,000
200,000
145,000 155,000,
155,000
160,000
615,000
50,000
70,000
100,000
220,000
1,500,000
1,500,000
DRAFT Page 13 Tuesday, September 25, 2012
Department Project# Priority
2013
2014
2015
2016
2017
Total
PS -12 -008
Fire Department Equipment Replacement
PS -13 -001
Police Department Equipment Replacement
PS -13 -002
Inspections Division Equipment Replacement
PS -13 -003
Parks - Golf Course Total
PS -13 -004
FD Plan Review Software
PS -13 -005
CityWorks Code Enforcement Software
PS -13 -006
3,770,000
170,000
310,000
1,405,000
385,000
1,500,000
3,770,000
25,000
3
50,000
Parking Ramp Repairs
PW -13 -003
3
Construction Fund
Grants & Donations - Braemar Memorial Fund
Parks - Golf Course Total
Public Safety Functions
170,000
Police to Community Software
PS -11 -005
PD Alarm Billing Software
PS -12 -007
PD License Plate Reader
PS -12 -008
Fire Department Equipment Replacement
PS -13 -001
Police Department Equipment Replacement
PS -13 -002
Inspections Division Equipment Replacement
PS -13 -003
Health Division Equipment Replacement
PS -13 -004
FD Plan Review Software
PS -13 -005
CityWorks Code Enforcement Software
PS -13 -006
Public Safety Functions Total
Construction Fund
170,000
310,000
1,055,000
385,000
1,500,000
3,420,000
70,000 2,930,446
Public Safety Functions Total
906,916
350,000
70,000 3,345,446
GPS Electrical System
350,000
7
170,000
310,000
1,405,000
385,000
1,500,000
3,770,000
3
25,000
104,000
Bridge Repairs
PW -13 -002
1
25,000
3
50,000
Parking Ramp Repairs
PW -13 -003
3
30,000
50,000
5
40,000
PW -13 -004
nla
390,254
511,395
40,000
nla
475,000
154,000
273,000
165,000
95,000
1,162,000
n/a
251,916
923,345
448,925
24,760
10,000
1,658,946
nla
15,000
18,000
Well #6 Rehab Project
60,000
93,000
nla
16,500
Well #5 (West 69th Street)
UT -08 -009
4
16,500
3
250,000
UT -09-010
1
120,000
250,000
3
50,000
UT -10 -006
1
2,100,000
50,000
Well #9 Rehab Project
906,916
1,361,845
721,925
189,760
165,000
3,345,446
Construction Fund
165,000
250,000
415,000
Equipment Replacement Program
741,916
1,111,845 721,925 284,760
70,000 2,930,446
Public Safety Functions Total
906,916
1,361,845 721,925 284,760
70,000 3,345,446
GPS Electrical System
PWA 1 -006
7
Public Works
Public Works: Braemar Cold Storage: Improvements
PW -02 -006
7
50,000
Braemar Cold Storage - Fire Suppression
PW -08-004
3
70,000
GPS Electrical System
PWA 1 -006
7
30,000
Industrial Park Lighting
PW -13 -001
3
104,000
104,000
104,000
Bridge Repairs
PW -13 -002
1
100,000
170,000
100,000
Parking Ramp Repairs
PW -13 -003
3
30,000
30,000
30,000
Public Works Equipment Replacement
PW -13 -004
nla
390,254
511,395
314,842
Utilities Equipment Replacement
PW -13-005
3
260,000
237,000
465,000
Well #13 Rehab Project
PW -13-006
5
Well #17 Rehab Project
PW -13 -007
5
Well #6 Rehab Project
PW -13 -008
5
Well #5 (West 69th Street)
UT -08 -009
4
Well # 2 Rehab Project
UT -09-010
1
120,000
Water Meter Replacement Project
UT -10 -006
1
2,100,000
Well #9 Rehab Project
. UT -10-008
1
200,000
Well # 11 Rehab Project
UT -10 -009
3
120,000
Well #10 Rehab Project
UT -11 -006
4
120,000
Stone Water Lift Station #3 Rehab
UT -11 -007
1
200,000
104,000
100,000 100,000
30,000
664,420 563,415
270,000 80,000
120,000
120,000
120,000
120,000
50,000
70,000
30,000
416,000
570,000
120,000
2,444,326
1,312,000
120,000
120,000
120,000
120,000
120,000
2,100,000
200,000
120,000
120,000
200,000
DRAFT Page 14 Tuesday, September 25, 2012
` r
Department
Protect#
Priority
2013 2014 2015 2016 2017
Total
Sewer Camera and Cable Reel
UT -11 -008
3
40,000
40,000
Well No. 8
UT -12 -006
4
35,000
35,000
SCADA Radio System Upgrade
UT -12 -007
4
60,000
60,000
Public Works Total
3,509,254 1,372,395 1,213,842 1,528,420 863,415 8,487,326
�. Construction Fund;
304,000
304;000
`314 000
,234;000 -100 000' °',
-11,256,000
EquipmentjReplacement Program
390;254
511,395
314,842
664;420
563,415
-2;444;326
Utility Fui :d Sewer
173;000•
446,000"
104;000
40 000`-
757 000
Utility Futid 'Storm '
3;000!
X10 _ .
397;000
_
83,000
-
583 00 0
,Utility Fund Wa /er , , t
2539;000
160,000
=` 145,000 ;'
463,000
160 000
3;467,000
Public<WorksrTotol
3,509,254,
1,372,395 _
:1;213;842
1;528;420°
863,415
8,487,328
Grand Total 18,630,570 23,908,240 20,506,692 17,462,835 23,642,715 104,151,052
DRAFT Page 15 Tuesdcrv, September 25, 2012
This page left bank intentionally.
Page 16
Capital Improvement Plan
City of Edina, MN
Project # LIQ -02 -005
Project Name 50th: Store Remodel
Type Replace or repair
Useful Life Unassigned
Category Buildings
Description
2013 rhru 2017
Department Administration - Liquor Stores
Contact Liquor Stores
Priority 1 Critical
Status Active
Remodel interior of 50th liquor store to bring it up to date with current stores. Last remodeled in 1998.
Carpet and liquor shelves are in need of replacement.
Lighting needs to be redone to fit needs of current layout.
Emnlovee bathroom needs undatine.
Justification
Remodeling the 50th liquor store reflects the Vision 20/20 plan, objective #3, in providing capital investment in public facilities. By
remodeling we will align our Edina liquor brand to be more consistent with other stores.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 30,000 30,000
Construction/Maintenance 100,000 100,000
EquipNehicles /Furnishings 20,000 20,000
Total
150,000
150,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Liquor Fund 150,000 150,000
Total 150,000 150,000
DRAFT Page 17 Tuesdm, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a LIQ -10 -004
Project Name York: Replace Rooftop HVAC
Type Replace or repair
Useful Life 20 years
Category Buildings
2013 thru 2017
Department Administration -Liquor Stores
Contact Liquor Stores
Priority 2
Status Active
Description
Replace 2 rooftop HVAC units on the York store.
Current units were installed in 1996 and have reached their useful life, which is 15 -20 years. New units are more energy efficient and will
save on utility expenses right away.
Justification
By replacing the HVAC units we are aligning the liquor store with the city work plan in promoting environmental health by increasing energy
efficiency and working to keep the City of Edina a Green Step city.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 40,000 40,000
Total 40,000 40,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Liquor Fund 40,000 40,000
Total 40,000 40,000
DR,4FT Page 18 Tuesday, September 25, 2012
Project # LIQ =10 -006
Project Name Vernon: Replace Load Leveler Dock
Type Replace or repair
Useful Life
Category Buildings
Department Administration -Liquor Stores
Contact Liquor Stores
Priority 5Important
Description
Status Active
Replace mechanical leveling dock due to age.. Current dock was.built'in 2001 and repairs.are starting to happen on a more regular. basis.
Justification
By replacing dock it allows us to be more efficient in our jobs with less down -time with deliveries�due to repairs.
Expenditures Prior 2013 2014 2015 2016 2017 Future
Total
Con struction/Maintenance
15,000
15,000
Total 15,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future
15,000
Total
Liquor Fund
15,000
15,000
Total
15,000
15,000
DRAFT Page 19 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # LIQ -11 -004
Project Name All Stores: Video & Software Upgrades
2013 thru 2017
Type Replace or repair Department Administration - Liquor Stores
Useful Life Contact Liquor Stores
Category Equipment Priority 5Important
Status Active
Description
Replace all video equipment with newer IP type technology. Most current equipment will be going on 10 years old. Newer technology will
allow for better imaging and better access by liquor management and police.
Justification
Will allow us to better track the day to day activities of the stores and it will align us with other departments within the city using the same
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 60,000 60,000
Total 60,000 60,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Liquor Fund 60,000 60,000
Total 60,000 60,000
DRAFT Page 20 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # LIQ -11 -005
Project Name Vernon: Replace Rooftop HVAC
2013 thru 2017
Type Replace or repair Department Administration - Liquor Stores
Useful Life 20 years Contact Liquor Stores
Category Buildings Priority 5Important
Status Active
Description
Replace rooftop HVAC at Vernon store. It will be going on 15 years and is reaching end of life before costly repairs.
Justification
Replacing the HVAC unit will save us energy and money with a more efficient unit. It shows the community that we are environmentally
responsible in having our buildings and equipment run at peak performance.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 25,000 25,000
Total
25,000
25,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Liquor Fund 25,000 25,000
Total
25,000
25,000
DRAFT Page 21 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a LIQ -11 -006
Project Name Vernon: Replace Entrance & Exit Doors
2013 thru 2017
Type Replace or repair Department Administration - Liquor Stores
Useful Life Contact Liquor Stores
Category Buildings Priority 5Important
Status Active
Description
Replace interior and exterior doors at Vernon store due to age. Current doors were installed in 2000 and open and close around 800 times per
day 6 days,a week. Chemicals used during winter have eaten away at parts of doors over the years and repairs are becoming more frequent.
Justification
Takes advantage of newest technology in doors energy efficiency and safety standards.
Less customer interruption with properly working doors.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 30,000 30,000
Total 30,000 30,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Liquor Fund 30,000 30,000
Total 30,000 30,000
DRAFT Page 22 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # LIQ -13 -001
Project Name Vernon Tasting Area
2013 thru 2017
Type Expansion Department Administration - Liquor Stores
Useful Life Contact Liquor Stores
Category Buildings Priority 5Important
Status Active
Description
Redesign tasting area to make it more useful for customers and staff. Store was remodeled 10 years ago and we are looking to utilize the space
better for staff and customers.
Justification
Opening space more will allow customers to stop and sample product more easily without clogging main isle. Increasing customer knowledge
by sampling will in tum lead to increased sales.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 25,000 25,000
Total 25,000 25,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Liquor Fund 25,000 25,000
Total
25,000
25,000
DRAFT Page 23 Tuesdm,, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # LIQ -13 -002
Project Name Liquor Signage- Interior/Exterior
2013 thru 2017
Type Replace or repair Department Administration - Liquor Stores
Useful Life Contact Liquor Stores
Category Buildings Priority 3 Significant
Status Active
Description
Replace all interior and exterior signage with redesigned logo and graphics. Replace all outdoor signage with energy efficient LED lighting.
Justification
By changing the signage we will lower energy usage which is environmentally friendly. It will also lower our energy costs making our stores
more fiscally responsible.
It will allow us to be consistent in our branding of our three stores to our residents and community.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 80,000 .80,000
Total 80,000 80,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Liquor Fund 80,000 80,000
Total 80,000 80,000
DRAFT Page 24 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a E[RA -11 -002
Project Name Promenade Phase III
Type Expansion
Useful Life
Category Infrastructure
2013 thru 2017
Department Community Development & HR
Contact Engineering
Priority 5Important
Status Active
Description
Complete the westerly Promenade section south of Hazelton Road. The westerly section of pathway was placed as a bituminous pathway until
the properties to the west of the Promenade are redeveloped. The plan also includes a substantial water feature along this corridor.
Justification
Promenade Phase III supports the following Edina Vision 20/20 objectives:
- Maintain strong residential neighborhoods, and
- Take an active role in future redevelopment strategies.
The greater Southdale area is seeing increasing mixed -use development. Both the Promenade and Centennial Lakes have played a key role in
creating an environment that is attractive to both business and residential projects. Promenade Phase III was included in the 2007 Edina
Promenade - Urban Design Plan, which states "The Promenade is a vital and key link in Edina's pathway network system, which provides
internal circulation within the study area, as well as access from the adjoining neighborhoods and regional trail system." Following through
with the Promenade phased plan will support continued redevelopment through this corridor.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 2,000,000 2,000,000
Total
2,000,000
2,000,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Tax Increment Funds 2,000,000 2,000,000
Total
2,000,000
2,000,000
DRAFT Page 25 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # HRA -11 -003
Project Name France Ave and TH62 Reconstruction
Type Expansion
Useful Life
Category Infrastructure
2013 thru 2017
Department Community Development & HR
Contact Engineering
Priority 1 Critical
Status Active
Description
Hennepin County has developed an improved design of the interchange system at France Avenue and TH62 Interchange. The improvement
will reduce the potential for crashes at this interchange for the next 30 years. Hennepin County currently does not have funding for this
improvement programmed in their CIP.
Justification
France Avenue is an important commercial corridor in Edina. Providing adequate and safe access from TH62 to France Ave helps to support
Vision 20/20 objectives of-
- Accomodating the efficient movement of people and goods in and around Edina and
- Taking an active role in future redevelopment strategies
The France Avenue and TH62 Interchange is one of the most congested interchanges in the metropolitan area. This congestion leads to many
crashes at the intersections to the on ramps to TH62. This project would relieve the congestion at this interchange, therefore creating a safer
access throueh France Avenue and to and from TH62.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 600,000 600,000
Total 600,000 600,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Tax Increment Funds 600,000 600,000
Total 600,000 600,000
DRAFT Page 26 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, XW
Project # . ERA -13 -001
Project Name Greater Southdale Area Transportation Study
Type New
Useful Life
Category Infrastructure
2013 thru 2017
Department Community Development & HR
i
Contact Engineering
Priority 2
Status Active
implete an overall Transportation Study of the Southdale Area to include pedestrian, bicycle and
nsportation system.
:ed traffic movement within the
Justification
The greater.Southdale area is an important commercial and residential corridor for both Edina and surrounding communities. Conducting a
study of the transportation system will 1) assist the City in planning for future improvements, 2) enable the City to advocate more clearly for
improvements at the county, regional and state level, and 3) prepare the City to apply for external funding, should those funding sources
become available.
The transportation study supports the City's current focus in Living Streets, as well as the following Edina Vision 20/20 objectives:
- Accomodating the efficient movement of people and goods in and around Edina and
- Taking an active role in future redevelopment strategies
Expenditures
Prior 2013 2014
2015 2016 2017 Future Total
Planning /Design
200,000
200,000
Total
Funding Sources
200,000
Prior 2013 2014
200;000
2015 2016 2017 Future Total .
Tax Increment Funds
200,000
200,000
Total
200,000
200,000
DRAFT Page 27 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # HRA -13 -002
Project Name Pedestrian Bridge over TH62
2013 thru 2017
Type Replace or repair Department Community Development & HI
Useful Life Contact Engineering
Category Infrastructure Priority 1 Critical
Status Active
Description
[Replace pedestrian bridge over TH62 west of Valley View Road to be ADA compliant.
Justification
The current pedestrian bridge over TH62 is not ADA compliant. The location of this pedestrian bridge provides safe routes to both City park
facilities, such as Rosland Park and Aquatic Center and to Edina Schools, such as Southview Middle School. This improvement will enhance
the first phase of the Bike Boulevard project that will be implemented in fall of 2012.
Providing adequate and safe access for pedestrians and bicyclists helps to support Vision 20/20 objectives of-
Accomodating the efficient movement of people and goods in and around Edina.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 3,000,000 3,000,000
Total 3,000,000 3,000,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Tax Increment Funds 3,000,000 3,000,000
Total 3,000,000 3,000,000
DRAFT Page 28 Tuesday, September 25, 2012
Capital 1inprovement Plan 2013 thru 2017
City of Edina, MN
Project a ENG -13 -001
Project Name Neighborhood Street Reconstruction Program
Type Replace or repair Department Engineering
Useful Life Contact Engineering
Category Infrastructure Priority 1 Critical
Status Active
Description
These projects will provide for the reconstruction and rehabilitation of various local streets throughout the City. The recommended scheduling
is based on the age and condition of the watermain, sanitary sewer, storm sewer, and pavements. These ratings are used to rank the local
neighborhoods to determine potential future projects, which currently are:
2013: Mendelssohn A, Normandale, Braemar Hills B, St. Patricks Lane, Gleason Circle, and Lake Edina
2014: Clover Lane Addition, Hawkes Addition, Walnut Ridge, Edina Terrace, and Morningside
2015: Glen View Addition, Edina Highlands Lakeside, Holands, and Hyde Park
2016: Edina Bel -Air, Parkwood Knolls B, and Golf Terrace
2017: Townes Road, Birchcrest Addition, Colonial Court, Bekeley Heights, and Edina Valley Estates
Please note that the above neighborhood names are reflective of the largest Subdivision Plat name found for that particular area and does not
incorporated the neighborhood names that are currently being formulated by the Administration Department. Engineering will rename the
,projects, once neighborhood names are established.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure."
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 5,300,000 3,500,000 4,500,000 4,500,000 4,100,000 21,900,000
Total 5,300,000 3,500,000 4,500,000 4,500,000 4,100,000 21,900,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Special Assessments 5,300,000 3,500,000 4,500,000 4,500,000 4,100,000 21,900,000
Total 5,300,000 3,500,000 4,500,000 4,500,000 4,100,000 21,900,000
DRAFT Page 29 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -002
Project Name water Main Improvments
Type Replace or repair
Useful Life
Category Infrastructure
Department Engineering
Contact Engineering
Priority 1 Critical
2013 thru 2017
Status Active
Description
Update water system when reconstructing local neighborhood streets. See Project No. ENG -13 -001 for potential neighborhoods.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" by providing clean and
adequate water supply and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to
"continue to improve the aging infrastructure of the City."
The majority of the existing water system consists of unlined cast iron pipes. These pipes are more susceptible to failure than a lined ductile
iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide better water quality and water pressure.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 1,375,000 1,200,000 2,000,000 2,000,000 1,800,000 8,375,000
Total 1,375,000 1,200,000 2,000,000 2,000,000 1,800,000
8,375,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 1,375,000 1,200,000 2,000,000 2,000,000 1,800,000 8,375,000
Total 1,375,000 1,200,000 2,000,000 2,000,000 1,800,000 8,375,000
DRAFT Page 30 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -003
Project Name Sanitary,Sewer Main Improvements
Type Replace or repair Department Engineering
Useful Life Contact Engineering,
Category Infrastructure Priority I Critical
2013 thru 2017
Status Active
Description
The repair and replacement of sanitary sewer mains when reconstructing local. neighborhood streets. See°Project No. ENG -13 -001 for potential
neighborhoods. .
Most of the sanitary sewer system consists of clay pipe that was installed up to the 1970's. This type of pipe is more prone to failure than the
current PVC and concrete pipes. The clay pipe is typically more susceptible to'root intrusion that decreases pipe capacity and contribute to
Justification
The'need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and through "A Sound
Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of
the City."
Chapter 8 of the 2008 Edina Comprehensive Plan also requires "Improving infrastructure to reduce inflow and infiltration." The upgrade to
the sanitary sewer system will help reduce inflow and infiltration into the system due to deteriorating sanitary manholes, leaking pipe joints,
and leiikink manhole covers. These improvements reduce energy and treatment costs due to pumping and treating excess clear water.
'Expenditures Prior 2013. 1 2014 2015 •2016 2017 Future Total
Construction/Maintenance 1,451,000
690,000
931,000
700,000
1,100,000.
4;872,000
Total 1,451,000
690,000
931,000.
700,000.
1,100,000
4,872,000
Funding Sources Prior 2013
2014
2015
;2016.
2017 Future
Total
Utility Fund- Sewer 1,451,000
690,000
931,000
700,000
1,100,000
4,872,000
Total 1,451,000
690,000
931,000
'700,000
1,100,000
4,872,000
DRAFT Page 31 Tuesddy, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project 0 ENG -13 -004
Project Name Storm Sewer - Pipe and Grading Improvements
Type Replace or repair
Useful Life
Category Infrastructure
Department Engineering
Contact Engineering
Priority I Critical
Status Active
2013 thru 2017
Description
Fhe repair, replacement, and upgrading of the storm sewer system when reconstructing local neighborhood streets. See Project No. ENG -13-
)01 for potential neighborhoods. This includes the addition of sump drain pipe for roof drains and sump pump discharge pipes.
Justification
I'he need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and through "A Sound
'ublic Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of
he City."
Chapter 8 of the 2008 Edina Comprehensive Plan also requires "Improving infrastructure to reduce inflow and infiltration." The City
inspected all properties in the late 1990's and continues to inspect 20% of properties per year. The program identified all homes in the City
that have sump pumps and other easement water problems. Inflow and infiltration will continue to be reduced by incorporating maintenance of
drainage swales & ponds and installation of sump drain pipes. These storm sewer improvements will provide a conduit for clear water
discharges especially during the winter months.
This project also furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the
2011 City of Edina Comprehensive Water Resource Management Plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 1,200,000 2,200,000 2,600,000 2,600,000 2,600,000 11,200,000
Total 1,200,000 2,200,000 2,600,000 2,600,000 2,600,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future
Utility Fund - Storm 1,200,000 2,200,000 2,600,000 2,600,000 2,600,000
Total 1,200,000 2,200,000 2,600,000 2,600,000 2,600,000
11,200,000
Total
11,200,000
11,200,000
DRAFT Page 32 Tuesday, September 25, 2012
Capital Improvement Plan 2013 thru 2017
City of Edina, MN
Project # ENG -13 -005
Project Name Piping Wells #15 and #9 to Treatment Plant No. 6
Type New Department Engineering
Useful Life Contact Engineering
Category Infrastructure Priority 4
Status Active
Description
Install last segment of raw watermain from Wells # 15 and #9 to Water Treatment Plant No. 6. This project was bid out in late August of 2012
and the bids were over the estimate in the 2011 to 2015 Capital Improvement Program. Treatment Plant No. 6 is currently operating below the
4,000 GPM design. Connecting to these wells will complete the overall plan for this treatment plant.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure."
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 1,100,000 1,100,000
Total 1,100,000 1,100,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 1,100,000 1,100,000
Total 1,100,000 1,100,000
DRAFT Page 33 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a ENG -13 -006
Project Name Pedestrian and Bicyclist Safety Projects
Type New
Useful Life
Category Infrastructure
Department Engineering
Contact Engineering
Priority 2
Status Active
2013 thru 2017
Description
These projects will provide new sidewalks, bikeways, and lighting throughout the City. An overall study of the system will need to be
completed prior to prioritizing individual projects.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" by providing clean and
tdequate water supply and through "A Sound Public Infrastructure." The objectives of Edina's Vision 20/20 also support this initiative
: hrough "Maintain strong residential neighborhoods."
need is also emphasized in Chapter 12: Implementation of the 2008 Edina Comprehensive Plan to "Work in conjunction with
structure improvement projects to identify and implement sidewalk and bikeway networks within the City" and also "Diversify types of
oortation methods within the Citv."
Expenditures Prior 2013
2014
2015
2016
2017 Future
Total
Planning /Design 250,000
100,000
100,000
100,000
100,000
650,000
Construction/Maintenance 550,000
1,000,000
1,000,000
1,000,000
1,000,000
4,550,000
Total 800,000
1,100,000
1,100,000
1,100,000
1,100,000
5,200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Pedestrian Bike Safety Fund 800,000 1,100,000 1,100,000 1,100,000 1,100,000. 5,200,000
Total 800,000 1,100,000 1,100,000 1,100,000 1,100,000
5,200,000
DRAFT Page 34 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
2013 thru 2017
Project # ENG -13 -007
Project Name Bridge Rehabilitation: 78th St W and Gus Young Ln
Type Replace or repair
Useful Life
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 1 Critical
Status Active
These projects will rehabilitate the 78th Street West bridge and the Gus Young Lane bridge over the Canadian Pacific Railroad. These two
bridges were identified in the 2011 bridge inspection as requiring a more in depth repair. Our bridge consultant is performing a feasibility
study during the fall of 2012 to identify in detail the work to be completed in 2013.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate the efficient movement of people and goods in and around Edina."
IThis need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 20,000 20,000
Construction/Maintenance 150,000 150,000
Total 20,000 150,000 110,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Bonds - Public Improvement Re 20,000 150,000 170,000
Total 20,000 150,000 170,000
DRAFT Page 35 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -008
Project Name Reconstruct: 2nd Street South
Type Replace or repair Department Engineering
Useful Life Contact Engineering
Category Infrastructure Priority I Critical
2013 thru 2017
Status Active
Description
The City of Hopkins is planning to reconstruct the Hopkins side of 2nd Street South between Monroe Avenue and Harrison Avenue, which the
southerly half of this roadway is within the City of Edina. Reconstruction within the Edina side is to rehabilitate the storm sewer catch basins,
retain the existing curb and gutter, and replace the roadway section.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure."
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 150,000 150,000
Total 150,000 150,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 120,000
Utility Fund - Storm 30,000
Total
150,000
120,000
30,000
150,000
DR,4FT Page 36 Tuesday, September 25, 2012
Capital Improvement Plan 2013 rhru 2017
City of Edina, MN
Project # ENG -13 -009
Project Name Reconstruct: Valley View Road
Type Replace or repair Department Engineering
Useful Life Contact Engineering
Category Infrastructure Priority 4
Status Active
Description
This project will reconstruct Municipal State Aid designated Valley View Road from McCauley Trail South to Hilary Lane. This roadway will
provide for a new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with a
sidewalk will be included with this upgrade.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate the efficient movement of people and goods in and around Edina."
This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures
Prior 2013 2014
2015 2016
2017 Future Total
Planning /Design
100,000
200,000
300,000
Construction/Maintenance
800,000
800,000
Total
100,000
1,000,000
1,100,000
Funding Sources
Prior 2013 2014
2015 2016
2017 Future Total
Municipal State Aid
880,000
880,000
Special Assessments
140,000
140,000
Utility Fund - Sewer
20,000
20,000
Utility Fund - Storm
20,000
20,000
Utility Fund - Water
40,000
40,000
Total
1,100,000
1,100,000
DRAFT Page 37 Tuesdcnt September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -010
Project Name Reconstruct: Tracy Avenue
Type Replace or repair
Useful Life
Category Infrastructure
Department Engineering
Contact Engineering
Priority 5Important
Status Active
2013 thru 2017
Description
This project will reconstruct Municipal State Aid designated Tracy Avenue from TH62 to Benton Avenue. This roadway will provide for a
new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with sidewalk(s) will be
included with this upgrade. The bridge over TH62 is not included in this Capital Plan sheet.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate the efficient movement of people and goods in and around Edina."
This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 200,000 164,000 364,000
Construction/Maintenance 936,000 936,000
Total
200,000 1,100,000
1,300,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Municipal State Aid
700,000
700,000
Special Assessments
145,000
145,000
Utility Fund - Sewer
145,000
145,000
Utility Fund - Storm
90,000
90,000
Utility Fund - Water
220,000
220,000
Total
1,300,000
1,300,000
DRAFT Page 38 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina., MN
2013 thru 2017
Project # ENG -13 -011
Project Name 2013 -2014 Flood Protection and Water Improvements
Type Expansion
Useful Life
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 4
Status Active
The Edina Comprehensive Water Resource Management Plan (December 2011) prioritizes 46 construction projects (C 1 -46) and 16
engineering (EI -16) studies to improve focal flood protection and surface water quality. Most engineering studies will result in additional
construction project recommendations. This item proposes to study and design projects E1, E3, E5 -10, in 2013 and 2014. Estimated
construction costs will be programmed into the 2013 Capital Improvement Plan and will be constructed in 2015.
Projects are one of, or a mix of the following types: Maintenance and improvement of, conveyance and storage systems that reduce storm
runoff peak discharge rates and volumes and provide local flood protection, or treatment systems that remove sediment, phosphorus and
nitrogen and other particulate bound pollutants. Projects in this improvement are spread around the City.
Improvements such as grading, and plant material can have extremely long useful lives and can partially self - maintain. The project also
include durable infrastructure such as pumps, pipes and stone erosion treatments with variable lifespans ranging from 30 to 100 years.
Sediment capturing features such as ponds and sediment traps have highly variable useful lives, and depend more on maintenance to extend
lifecvcle.
Justification
This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011
City of Edina Comprehensive Water Resource Management Plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design
Construction/Maintenance
Total
30,000 35,000
250,000
30,000 35,000 250,000
65,000
250,000
315,000
Funding Sources
Prior 2013
2014
2015 2016
2017 Future Total
Utility Fund - Storm
30,000
35,000
250,000
315,000
Total
30,000
35,000
250,000
315,000
DRAFT Page 39 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
2013 thru 2017
Project # ENG -13 -012
Project Name 2014 -2015 Flood Protection and Water Improvements
Type Expansion Department Engineering
Useful Life Contact Engineering
Category Infrastructure Priority 4
Status Active
Description
The Edina Comprehensive Water Resource Management Plan (December 2011) prioritizes 46 construction projects (C1 -46) and 16
engineering (EI -16) studies to improve local flood protection and surface water quality. This item proposes to study project E12 and design
projects C3, C13 -16 in 2014 and construct them in 2015. This group of projects is in and around Braemar Golf Course.
Projects are one of, or a mix of the following types: Maintenance and improvement of; conveyance and storage systems that reduce storm
runoff peak discharge rates and volumes and provide local flood protection, or treatment systems that remove sediment, phosphorus and
nitrogen and other particulate bound pollutants.
Improvements such as grading, and plant material can have extremely long useful lives and can partially self - maintain. The project also
include durable infrastructure such as pumps, pipes and stone erosion treatments with variable lifespans ranging from 30 to 100 years.
Sediment capturing features such as ponds and sediment traps have highly variable useful lives, and depend more on maintenance to extend
lifecvcle.
Justification
This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011
City of Edina Comprehensive Water Resource Management Plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 50,000 50,000
Construction/Maintenance 275,000 275,000
TOW
50,000 275,000
325,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Storm 50,000 275,000 325,000
Total 50,000 275,000 325,000
DRAFT Page 40 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
2013 /hru 2017
Project # ENG -13 -013
Project Name 2015 -2016 Flood Protection and Water Improvements
Type Expansion
Useful Life
Category Infrastructure
Department Engineering
Contact Engineering
Priority 5Important
Status Active
Description
fhe Edina Comprehensive Water Resource Management Plan (December 2011) prioritizes 46 construction projects (C1 -46) and 16
;ngineering (E1 -16) studies to improve local flood protection and surface water quality. This item proposes to study project E12 and design
3rojects C 1,2,4 -6 in 2015 and construct them in 2016. This group of projects is in and around Fred Richards Golf Course and South East
s are one of, or a mix of the following types: Maintenance and improvement of; conveyance and storage systems that reduce storm
peak discharge rates and volumes and provide local flood protection, or treatment systems that remove sediment, phosphorus and
:n and other particulate bound pollutants.
,ments such as grading, and plant material can have extremely long useful lives and can partially self - maintain. The project also
durable infrastructure such as pumps, pipes and stone erosion treatments with variable lifespans ranging from 30 to 100 years.
it capturing features such as ponds and sediment traps have highly variable useful lives, and depend more on maintenance to extend
Justification I
Fhis project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011
'ity of Edina Comprehensive Water Resource Management Plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 50,000 50,000
Construction/Maintenance 275,000 275,000
Total 50,000 275,000 325,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Storm
TOW
50,000 275,000
50,000 275,000
325,000
325,000
DRAFT Page 41 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -014
Project Name Morningside Neighborhood Water Main Relining
Type Replace or repair
Useful Life
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 5Important
Status Active
2013 thru 2017
This project provides for cement lining of the water mains that have not been lined in the Morningside Neighborhood. These streets include
Oakdale Avenue, Lynn Avenue, Crocker Avenue, Grimes Avenue, Morningside Road, and Branson Street. Staff anticipates using the City of
Minneapolis's watermain lining contractor to perform the lining of the water mains. Scott Terrace and Alden Avenue are also scheduled to be
lined as part of the Neighborhood Street Reconstruction progam (ENG -13 -001).
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and through "A Sound
Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of
the Citv."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 200,000 100,000 300,000
Total 200,000 100,000 300,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 200,000 100,000 300,000
Total
200,000 100,000
300,000
DRAFT Page 42 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -015
Project Name Mill and Overlay: Benton Avenue
Type Replace or repair Department Engineering
Useful Life Contact Engineering
Category Infrastructure Priority 5Important
Status Active
Description
2013 thru 2017
This project involves inilling 2" of the distressed pavement and repaving a new surface of Municipal State .Aid designated Benton Avenue from
Hansen Road to.TH_100. This type of rehabilitation technique along with proper sealcoating will provide,approximately 20 additional years to
the life of the pavement.
.Justification'
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate ihe;efficient movement of people and goods in and around Edina:"
This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures `` Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 70,000 70,000
Construction/Maintenance 380,000 380,000
Total, 450,000 450,000
Funding Sources Prior 2013' 2014, 2015 2016 2017 Future Total
Bonds - Public Improvement Re 70,000 70,000
Municipal State Aid 380,000 380,000
Total 450,000 450,000
a
DR9FT Page 43 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
2013 thru 2017
Project # ENG -13 -016
Project Name Comprehensive Water Resource Management Plan
Type New
Useful Life
Category Infrastructure
Department Engineering
Contact Engineering
Priority 5Important
Status Active
Description
Surface water management plans typically are updated on a ten year cycle, with policy and flood prediction and water quality modeling
updates happening at a more frequent interval. This item would update the CWRMP through a major amendment that would include revised
policy and a revision of the water models used for decision making.
Justification
This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011
City of Edina Comprehensive Water Resource Management Plan.
Expenditures
Prior 2013 2014 2015 2016
2017 Future Total
Planning /Design
45,000
45,000
Total
Funding Sources
45,000
Prior 2013 2014 2015 2016
45,000
2017 Future Total
Utility Fund - Storm
45,000
45,000
Total
45,000
45,000
DRAFT Page 44 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -017
Project Name Storm Water Pollution Prevention Plan
Type New
Useful Life
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 4
Status Active
2013 thru 2017
In 2010 the Minnesota Pollution Control Agency began the process of revising the Municipal Separate Storm Sewer Systems (MS4) general
permit. The process is near completion and it is anticipated that the new permit will go into effect in 2013. This project meets the initial
requirements of the revised permit by planning and revising the Storm Water Pollution Prevention Plan (SWPPP.) This revision will be
prepared by an outside consultant with oversight of the Council, Staff and Advisory Commissions, and will be presented to the Council for
consideration. The revised MS4 permit is expected to put significant new regulatory burden on staff time and construction costs as described
in the 2011 Utility Rate Study.
Justification
This project meets the requirements of the newly revised state general permit for MS4 permit. Some of the unfunded mandates passed on by
the state overlap well with the comprehensive plan and the clean water and flood protection goals articulated in section 8.2 of the 2008
Comprehensive Plan, while many do not.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 45,000 45,000
Total
45,000
45,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utilitv Fund - Storm 45,000 45,000
Total
45,000
45,000
DRAFT Page 45 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ENG -13 -018
Project Name N %MD Petition Projects - Phase 1
Type New
Useful Life
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 4
Status Active
2013 thru 2017
In 2011 The City of Edina petitioned the Nine Mile Creek Watershed District (WD) to undertake a series of clean water and flood protection
projects in and tributary to Nine Mile Creek. The first phase of the project will work in the stream bed and nearby public areas to prevent
erosion and sedimentation from upstream area, ensure adequate flood flow capacity, provide resistance to scour and reduce nutrient flow to the
stream. The Feasibility report currently estimates this project costs at $2.4 million. The majority of the project costs are home by the
Watershed District, but the City is required to pay 75% of easement acquisition costs and 50% of ancillary (non -water quality related) project
costs. Easement acquisition is expected to take place in late 2014, and construction in early 2015. Improvements such as grading, and plant
material can have extremely long useful lives and can partially self - maintain. The project also include durable infrastructure such as pipes and
stone erosion treatments with variable lifesvans ranging from 30 to 100 vears.
Justification
This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011
City of Edina Comprehensive Water Resource Management Plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Land Acquisition 180,000 180,000
Construction/Maintenance 140,000 140,000
Total 180,000 140,000 320,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Storm 180,000 140,000 320,000
TOW 180,000 140,000 320,000
DRAFT Page 46 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
2013 thru 2017
Project a ENG -13 -019
Project Name Engineering Department Equipment Replacement
Type Replace or repair Department Engineering
Useful Life Contact Engineering
Category Equipment Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Engineering department's equipment includes several vehicles,
survey equipment and some software. Most of the vehicles have estimated useful lives of 10 years, the survey equipment varies between 7 -15
years, and the software is scheduled for 10 years.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 41,000 45,000 25,000 28,000 139,000
Total 41,000
45,000
25,000
28,000
139,000
Funding Sources Prior 2013 2014
2015
2016
2017 Future
Total
Equipment Replacement Progra 41,000
45,000
25,000
28,000
139,000
Total 41,000
45,000
25,000
28,000
139,000
DRAFT Page 47 Tuesday, September 25, 2012
Capital Improvement Plan 2013 thru 2017
rite of P-A;nn MN
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate the efficient movement of people and goods in and around Edina."
This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 50,000 50,000
Construction /Maintenance 400,000 400,000
Total 450,000 450,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Bonds - Public Improvement Re
50,000
50,000
Municipal State Aid
350,000
350,000
Utility Fund - Sewer
25,000
25,000
Utility Fund - Storm
15,000
15,000
Utility Fund - Water
10,000
10,000
Total
450,000
450,000
D24FT Page 48 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PW -01 -012
Project Name Reconstruct: W 54th St. (Wooddale to France)
Type Replace or repair
Useful Life Unassigned
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 1 Critical
Status Active
2013 thru 2017
This project will reconstruct Municipal State Aid designated 54th Street West from Wooddale Avenue to France Avenue. This roadway will
provide for a new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with
sidewalk(s) will be included with this upgrade. This project will be constructed in conjunction with the reconstruction of the bridge over
Minnehaha Creek.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure ". This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate the efficient movement of people and goods in and around Edina."
This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 150,000 158,000 308,000
Construction/Maintenance 792,000 792,000
Total 150,000 950,000 1,100,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Municipal State Aid
880,000
880,000
Special Assessments
140,000
140,000
Utility Fund - Sewer
20,000
20,000
Utility Fund - Storm
20,000
20,000
Utility Fund - Water
40,000
40,000
Total
1,100,000
1,100,000
DRAFT Page 49 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina. MN
Project # PW -04 -001
Project Name Reconstruct: W 58th St (Wooddale to France)
Type Replace or repair
Useful Life Unassigned
Category Infrastructure
Department Engineering
Contact Engineering
Priority 4
Status Active
2013 thru 2017
Description
This project will reconstruct Municipal State Aid designated 58th Street West from Wooddale Avenue to France Avenue. This roadway will
provide for a new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with
sidewalk(s) will be included with this upgrade.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate the efficient movement of people and goods in and around Edina."
This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the Ming infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 150,000 158,000 308,000
Construction/Maintenance 792,000 792,000
Total 150,000 950,000 1,100,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Municipal State Aid
880,000
880,000
Special Assessments
140,000
140,000
Utility Fund - Sewer
20,000
20,000
Utility Fund - Storm
20,000
20,000
Utility Fund - Water
40,000
40,000
Total
1,100,000
1,100,000
DRAFT Page 50 Tuesday, September 25, 2012
Capital Improvement Plan 2013 thru 2017
City of Edina, MN
Project # Pw -05 -.003
Project Name Bridge: 54th Street.Bridge
Type Replace or repair Department Engineering
Useful Life 100 years Contact Engineering
Category Infrastructure Priority'] Critical
Status Active
Description
This project will reconstruct the bridge over Minnehaha Creek. The bridge will be reconstructed in conjunction with the roadway
.,econstruction project, see ENG -12 -018.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
'Accommodate the efficient movement of people and'goods in and around Edina."
This need is also emphasized in the 2008 Edina Comprehensive Plan to . "continue to improve the aging infrastructure of the City."
Expenditures
Prior 2013
2014 2015
2016 2017 Future Total
Planning /Design
Construction /Maintenance
180,000
100,000
720,000
280,000
720,000
Total
Funding.Sources ,._
180,000
Prior 2013
820,000
2014 2015
1,000,000
2016 2017 Future Total,,
Municipal State Aid
1,000,000
1,000,000
Total
1,000,000
1;000,000
DRAFT Page 51 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
2013 thru 2017
Project 4 Pw -05 -006
Project Name Mill & Overlay: Olinger Blvd (Vernon - Tracy)
Type Replace or repair Department Engineering
Useful Life Contact Engineering
Category Infrastructure Priority 4
Status Active
Description
This project involves milling 2" of the distressed pavement and repaving a new surface of Municipal State Aid designated Olinger Road from
Vernon Avenue to Tracy Avenue. This type of rehabilitation technique along with proper sealcoating will provide approximately 20 additional
years to the life of the pavement.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and
"Accommodate the efficient movement of people and goods in and around Edina."
This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aeina infrastructure of the Citv."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 100,000 100,000
Construction/Maintenance 700,000 700,000
Total 800,000 800,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Bonds - Public Improvement Re 100,000 100,000
Municipal State Aid 700,000 700,000
Total 800,000 800,000
DRAFT Page 52 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -03 -010
Project Name Remove Lift Station No. 1
Type Replace or repair
Useful Life
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 3 Significant
Status Active
2013 thru 2017
The rehabilitation of Lift Station No. 1, located at 4041 Sunnyside Road, was originally in the 2009 to 2013 Capital Improvement Plan. Staff
had determined that the lift station could be eliminated if a gravity line was constructed draining to the south to the gravity line on Meadow
Road. The cost difference between reconstructing the lift station and eliminating the lift station by constructing a gravity line is $82,000; total
cost over 30 years is $219,000 due to operating and maintenance of the lift station.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public
Infrastructure."
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Land Acquisition 20,000 20,000
Construction/Maintenance 130,000 130,000
Total
150,000
150,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Sewer 150,000 150,000
Total
150,000
150,000
DRAFT Page 53 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a UT -07 -002
Project Name New Water Treatment Plant ( #5)
Type New
Useful Life 50 years
Category Infrastructure
Department Engineering
Contact Engineering
Priority 4
Status Active
2013 thru 2017
Description
Conduct feasibility / implementation study to construct Water Treatment Plant No. 5 north of Southdale Water Tower. The feasibility study
will provide staff with a timeframe of when this treatment plant needs to be online due to development in the greater Southdale Area. The
treatment plant will filter water from Well No. 5 and 18, see UT -08 -008.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" by providing clean and
adequate water supply and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to
"continue to improve the aging infrastructure of the City."
During the summer months, the majority of the water supplied in the City does not treat for iron or manganese. This unfiltered water in part
contributes to the aesthetic problems including red and/or brown water complaints. The new treatment plant will help reduce the amount of
complaints that we receive from the issue of aesthetic water complaints.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 150,000 150,000
Construction /Maintenance 7,000,000 7,000,000
Total 150,000 7,000,000 7,150,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 150,000 7,000,000 7,150,000
Total
150,000
7,000,000
7,150,000
DRAFT Page 54 Tuesday, September 25, 2012
Capital Improvement Plan 2013 thru 2017
City of Edina, MN
Project 4 UT -08 -008
Project Name Piping Wells #5 and #18 to WTP #5
Type New . Department Engineering
Useful Life 100 years Contact Engineering
Category Infrastructure Priority I Critical
Status Active
Description
Install last segment of raw watermain from Wells #5 and #8 to be treated at WTP #5. The first and second segments were installed during
West 70th Street Round -about and the Promenade projects. This will provide untreated water to the proposed Water Treatment Plant No. 5,
see UT -07 -002, located north of the Southdale Water Tower.
This proiect is anticipated to be constructed simultaneouslv with the France Avenue Intersection Enhancement proiect.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" by providing clean and
adequate water supply and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to
"continue to improve the aging infrastructure of the City."
During the summer months, the majority of the water supplied in the City is not treated for iron or manganese. This unfiltered water in part
contributes to the aesthetic problems including red and/or brown water complaints. The new treatment plant will help reduce the amount of
,complaints that we receive from the issue of aesthetic water complaints.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 450,000 100,000 550,000
Total 450,000 100,000 550,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 450,000 100,000 550,000
Total 450,000 100,000 550,000
DRAFT Page 55 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -08 -014
Project Name Trunk Sanitary Sewer Lining
Type Replace or repair
Useful Life
Category Infrastructure
Description
Department Engineering
Contact Engineering
Priority 5Important
Status Active
2013 thru 2017
During the fall and winter of 2012 Engineering, with help of a consultant, will have conducted a feasibility/implementation study to line an
existing trunk sanitary sewer along the Minnehaha Creek from West 50th Street to Xerxes Avenue and also along Nine Mile Creek. The study
will provide a phasing plan for a two year project to line these sanitary sewer trunk lines.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and through "A Sound
Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of
the City."
Chapter 8 of the 2008 Edina Comprehensive Plan also requires "Improving infrastructure to reduce inflow and infiltration." The upgrade to
this sanitary sewer trunk line will help reduce inflow and infiltration into the system.
Expenditures Prior
2013
2014 2015
2016 2017 Future Total
Construction /Maintenance 60,000
540,000
600,000
1,200,000
Total 60,000
540,000
600,000
1,200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Sewer 60,000 540,000 600,000 1,200,000
Total 60,000 540,000 600,000
1,200,000
DRAFT Page 56 Tuesday, Septemher 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -10 -011
Project Name W 69th Street and York Ave Water Main Loop
Type New
Useful Life 100 years
Category Infrastructure
Department Engineering
Contact Utility Supt.
Priority 5Important
Status Active
2013 thru 2017
Description
This project completes the water main loop from the easterly side of the 69th Street Apartments located on 69th Street West and Xerxes
Avenue to 70th Street West and York Avenue.
Justification
the need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and through "A Sound
Public Infrastructure ". This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of
he City."
goal of every water system is to provide redundancy of the system. This project provides the redundancy, which also provides enhanced fire
)ws and overall better Quality of water.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 150,000 150,000
Total 150,000 150,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Sewer 150,000 150,000
Total 150,000 150,000
DRAFT Page 57 Tuesday, September 25, 2012
Capital Improvement Plan 2013 thru 2017
City of Edina, MN
Project 4 UT -12 -008
Project Name Asset Management Update
Type Expansion Department Engineering
Useful Life Contact Engineering
Category Equipment Priority 4
Status Active
Description
This project provides for updating our current asset management system computer software to be more interactive with the public and mobile
with City staff.
The current system contains information on all infrastructure assets, such as water system, sanitary sewer system, storm sewer system, traffic
signs, street lights, etc. Staff can perform basic functions such as keeping track of the assets, request for service and work orders. The public
will be able to report an issue via their smart phone and the issue will be recorded directly into the system. City staff will then be able to
receive service requests and create work orders in the field vie smart phones, tablets, or laptops. Therefore becoming more efficient with their
daily tasks. These upgrades will also allow for the consolidation of software systems that we currently use to issue permits and the addition of
other systems such as fleet services, building management, etc.
Justification
The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment," "Effective and Valued
City Services," "A Sound Public Infrastructure," and "Innovation."
Expenditures
Prior
2013
2014
2015
2016 2017 Future
Total
EquipNehicles /Furnishings
62,000
75,000
30,000
60,000
60,000
287,000
Total
Funding Sources
62,000
Prior
75,000
2013
30,000
2014
60,000
2015
60,000
2016 2017 Future
287,000
Total
Utility Fund - Sewer
Utility Fund - Storm
Utility Fund - Water
21,000
20,000
21,000
25,000
25,000
25,000
10,000
10,000
10,000
20,000
20,000
20,000
20,000
20,000
20,000
96,000
95,000
96,000
TOW
62,000
75,000
30,000
60,000
60,000
287,000
DRAFT Page 58 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a UT -12 -009
Project Name Cooper Circle Pond Outlet
Type New
Useful Life
Category Infrastructure
Department Engineering
Contact Engineering
Priority 5Important
Status Active
2013 thru 2017
Description
Phis project provides for a storm sewer outlet from the landlocked Cooper Circle Pond. This storm sewer outlet will eliminate City staff from
seeding to pump this pond during periods of high water. Therefore, reducing the flooding potential around this pond.
Justification
i'he need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and through "A Sound
'ublic Infrastructure."
This project also furthers the goal of clean water and flood protection as articulated in Section 8.2 of the 2008 Comprehensive Plan and the
City of Edina Comprehensive Water Resource Management Plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 80,000 80,000
Total
80,000
80,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Storm 80,000 80,000
Total 80,000 80,000
DRAFT Page 59 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina. MN
Project a COM -13 -001
Project Name City of Edina Wireless Network
Type Expansion
Useful Life
Category Equipment
Description
2013 thru 2017
Department General Government Functions
Contact IT Manager
Priority 3 Significant
Status Active
To meet the demands of our customers, the Communications & Technology Services Department began working with LOGIS to develop a plan
to implement free wireless network and internet access (Wi -Fi) in 2012. The goal of the initial Edina wireless project was to establish Wi -Fi
coverage to be used by the public and City staff at Edina City Hall, Edina Art Center, Braemar Arena, Braemar Golf Course, Centennial Lakes
Park, Edinborough Park, Edina Senior Center and the Public Works & Park Maintenance Facility. Future expansion of the project is planned
to include additional City facilities and buildings, including fire stations and some parks.
Free wireless internet access has become so commonplace that people visiting City Hall and other City facilities expect it. As Wi -Fi capable
devices continue to become increasingly more prevalent in the daily lives of the public and City staff, offering this service adds a significant
benefit to the City's residents, customers and staff, and is in alignment with the City's Vision 20/20 plan.
Justification
one of the City Leadership Priorities in the 2012 Work Plan is "Improve Communications Tools." One of the objectives toward meeting that
;oal was to implement the "EdinaOpen" Wi -Fi system at City facilities.
of the obiectives of Edina's Vision 20/20 is to "Evaluate and
advancements to provide City services."
Expenditures
Prior 2013
2014
2015
2016
2017 Future
Total
EquipNehicles /Furnishings
75,000
75,000
75,000
75,000
75,000
375,000
Total
Funding Sources
75,000
Prior 2013
75,000
2014
75,000
2015
75,000
2016
75,000
2017 Future
375,000
Total
Construction Fund
75,000
75,000
75,000
75,000
75,000
375,000
TOW
75,000
75,000
75,000
75,000
75,000
375,000
DRAFT Page 60 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # COM -13 -002
Project Name Gateway Signs
Type New
Useful Life
Category Infrastructure
2013 thru 2017
Department General Government Functions
Contact Communications
Priority 7 Desirable
Status Active
Description
A gateway sign is often the first impression people have of a city, development, business park or other public place. A well planned and
executed gateway sign is important because it gives an immediate sense of a brand and denotes a sense of pride and caring, and makes visitors
feel welcome.
The City's Branding Committee and Communications & Technology Services Department recommends the placement of "Welcome to Edina"
gateway signs. Further, the committee and Communications & Technology Services Department recommends coordinating park and business
district signs. Business district signs are recommended for 50th & France (replacing the dated ones there), Southdale and Grandview. They
might also be considered for 44th & France and 70th & Cahill.
Should this project be approved, a consultant would be hired to design the signs, which would be fabricated and installed over the next few
years. Suggested order of implementation is gateway signs, large park signs, regular park signs, business district signs. Stone gateway signs
with lighting are estimated to be $125,000 to $175,000 each. Coordinating metal monument entrance signs for large parks such as Arneson
Acres, Braemar, Bredesen, Pamela, Rosland and Van Valkenburg parks are estimated to cost $10,000 to $20,000 each. Basic park signs are
estimated to cost $3,000 to $10,000 each.
Justification
One of the City Leadership Priorities in the 2012 Work Plan is "Improve Communications Tools." One of the objectives toward meeting that
goal is to implement branding standards.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 20,000 20,000
Construction/Maintenance 915,000 380,000 1,295,000
Total 935,000 380,000 1,315,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund
Total
935,000 380,000
935,000 380,000
1,315,000
1,315,000
DRAFT Page 61 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # COM -13 -003
Project Name Communications and IT Equipment Replacement
2013 thru 2017
Type Replace or repair Department General Government Functions
Useful Life Contact Communications
Category Equipment Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Communications & Technology department has a variety of
equipment including video production equipment, cameras, monitors, servers, switches and routers. Most of this type of electronic equipment
has a useful life between 5 -10 years.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 186,000 136,900 53,900 32,900 80,000 489,700
Total
Funding Sources
186,000 136,900 53,900 32,900 80,000
489,700
Prior 2013 2014 2015 2016 2017 Future Total
Equipment Replacement Progra 186,000 136,900 53,900 32,900 80,000 489,700
Total 186,000 136,900 53,900 32,900 80,000 489,700
DRAFT Page 62 Tuesday, Sep[ember 25, 2012
Capital Improvement Plan
City of Edina., MN
Project # CW-02_001
Project Name Citywide Fiber Optic Cabling
Type Expansion
Useful Life 30 years
Category Infrastructure
2013 thru 2017
Department General Government Functions
Contact IT Manager
Priority 6
Status Active
Description
The City's installed fiber optic network provides connectivity from City Hall.to remote City facilities and LOG IS,'faciIitating,voice and data
communication at very high speeds. Fiber optic technology is secure, reliable and fast, and has a useful life expectancy of approximately 30
years. Nearly all of the City's staffed facilities are now connected via fiber optic lines.
The City has used fiber optic technology. to replace traditional copper and leased circuit connections in order to improve bandwidth,
consolidate connectivity needs, and reduce or eliminate telephone and data communication expenses. By leveraging a single owned connection
method for multiple technology and;communication needs, the City has been able to eliminate expensive recurring T -I voice and data
connections, while dramatically improving performance and management of the City's voice and data network.
lowing completion of the remaining staffed facilities, the focus of fiber optic installations would be directed toward the Edina Police
)artment's precinct at Southdale Center, Fred Richards Executive Golf Course and the City's various warming house and comfort station
3tions, replacing "slow and costly telephone circuits used for security and access control systems, allowing for eased and consolidated
nagerrient of these systems. Additionally, fiber is envisioned to run to all of the City's lift stations, wells, water treatment facilities and
.er towers. Currently, those Utilities systems operate on SCADA radio systems, which are susceptible to wind, rain and ice storms that
ke the systems vulnerable. If fiber is run to those facilities, the Public Works Department would have redundancy in place that does not
st today.
City has used fiber optic technology to replace traditional copper and leased circuit connections in order to improve bandwidth,
olidate connectivity needs, and reduce or eliminate telephone and data. communication expenses. By leveraging a single owned connection
tod for multiple technology and communication needs, the City has been able to eliminate expensive recurring T -1 voice and data
sections, while dramatically improving performance and management of the City's voice and data network.
Justification
One of the City Leadership Priorities in the 2012 Work Plan is "Improve. Communications Tools."
One of the obiectives of Edina's Vision 20/20 is to "Evaluate and
advancements to provide Citv services."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 225,000 75,000 75,000 375,000
Total 225,000 75,000 75,000 375,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 225,000 75,000 75,000 375,000
Total 225,000 75,000 75,000 375,000
1
DRAFT Page 63 Tuesday, September 25, 2012
Capital Improvement Plan 2013 rhru 2017
City of Edina, MN
Project # GG -11 -004
Project Name Electronic Document Management
Type New
Useful Life
Category Equipment
Description
Department General Government Functions
Contact City Clerk
Priority 5Important
Status Active
Develop either a Request for Quote (RFQ) or Request for Proposal (RFP) to solicit vendors for implementing an Enterprise Document
Management System. Such a system would incorporate the following objects:
- Avoid duplication of information and records
- Reduce document production costs
- Increase productivity due to easy automated access
- Control access to sensitive records
- Protect vital records against security threats, disasters
- Preserve data integrity via controlled storage and delivery
- Share information across multiple departments and with the Public
- Records Retention and Records Destruction
Justification
Vision 20/20 Objective 2 states the City provides a level of services that sets Edina apart from other communities. Implementing a city-wide
electronic record management program will bring more efficiency to local government and accessibility of public data to the public. In
achieving this goal Edina will:
- Enhances service to internal and external customers of Edina
- Reduce the cost of storage space, supplies and search time
- Allow secure document back -up for off -site storage and-disaster recovery
- Improve workflow efficiency
Vision 20/20 Objective 7 states the City will evaluate and efficiently employ technological advancements to provide City services.
Implementing an enterprise document management system would enhance communication with constituents by allowing more electronic access
to our "archived" records.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 25,000 25,000
EquipNehicles /Furnishings 65,000 65,000 130,000
Total 65,000 65,000 25,000 155,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 65,000 65,000 25,000 155,000
TOW 65,000 65,000 25,000 155,000
DR,4FT Page 64 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a GG -13 -001
Project Name Assessing Division Equipment Replacement
2013 thru 2017
Type Replace or repair Department General Government Functions
Useful Life Contact
Category Equipment Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Assessing division currently has 3 vehicles that are part of the
equipment replacement program, each with an estimated useful life of 10 years.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Equipment Replacement Progra 30,000 30,000
TOW
30,000
30,000
DRAFT Page 65 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a GG -13 -002
Project Name Election Equipment Replacement
2013 thru 2017
Type Replace or repair Department General Government Functions
Useful Life Contact City Clerk
Category Equipment Priority n/a
Status Active
Description
teplace equipment according to the equipment replacement schedule. Elections equipment includes mostly voting stations.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Equipment Replacement Progra 30,000 30,000
Total 30,000 30,000
DRAFT Page 66 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina., MN
Project # HR 713 -001
Project Name JMI /Payroll
2013 thru 2017 .
Type Expansion Department General Government Functions
UsefulLife 10 years 'Contact
Category Equipment Priority 2
Status Active
Description
Implement an HRIS (Payroll system with the ability to manage employee information including compensation, benefit elections, electronic
time card entry, personnel files, performance information, and employee demographic information.
Justification
Each,year, the City hires approximately 10 -30 full -time employees and 500 new and returning seasonal employees. Approximately the same
number leaves employment each year. There are also numerous changes to individual compensation, benefits, and other information
throughout the.year., Our current system has been in place for well over a decade. It does not allow us to easily track, change, and access
informatiowin useable formats.
One of the goals for the newly created HR Department is to modernize and streamline HR services. Previously, most HR transactions (job
applications, time card entry, benefits elections, etc ) required extensive manual tracking. This made the process time consuming and
inefficient as well as reduced accuracy due to a lack of centralization of information. In 2012, the City launched an online job application. The
City is now working on the second phase which is online completion of new employee paperwork. The benefits to both systems include:
- Candidates can apply on line without obtaining and mailing in a paper copy.
- Candidates and returning employees will now only need to complete one application for
various positions.
- Rehires can easily`update their information online, instead of completing new
application materials each year.
Hiring managers and HR will work off of one system so there will be faster and more
streamlined tracking and evaluation of applications.
- The Onboarding system will reduce the number of forms required for new employees,
and allow hiring managers, HR, and payroll to more quickly and efficiently track and
process the many legal and logistical requirements for new employees.
In 2013 -2014, the City hopes to take . the next step in planning for a new HRIS/Payroll system including electronic timecards, compensation
administration, benefits administration, performance management and personnel files.
Expenditures Prior 2013, 2014 2015 2016 2017 Future Total
EquipNehicles/Furnishings 20,000 50,000 150,000 220,000
Total 20,000 50,000 150,000 220,000
Funding Sources Prior 2013. 2014 2015 2016 2017 Future Total
Construction Fund 60,000 60,000
Equipment. Replacement Progra 35,000 35,000
Other - 2010 Unassigned Fund 20,000 50,000 55,000 125,000
Total 20,000 50,000.. 150,000_ 220,000
DRAFT Page 67 Tuesday, September 15, 2012
Capital Improvement Plan 2013 thru 2017
City of Edina, MN
DRAFT Pale 68 Tuesday, September 25. 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -00 -033
Project Name Pamela Park: Renovate senior athletic field
Type Replace or repair
Useful Life Unassigned
Category Parks
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 7 Desirable
Status Active
Description
Re -grade the soccer field turf and provide new sand and peat mixture sub -soils and re- install the underground irrigation system.
Justification
This soccer field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The irrigation system is in keeping
with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced use of herbicides. Upgrading this field will
help to improve our facilities which are stressed beyond capacity.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These Droiects renuroose aeine infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 330,000 330,000
Total 330,000 330,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 330,000 330,000
Total
330,000
330,000
DRAFT Page 69 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -07 -004
Project Name Pamela Park: New athletic field
Type New
Useful Life
Category Parks
Description
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 6
Status Active
a new multi - purpose athletic field adjacent to the senior athletic field on the south end of Pamela Park.
Justification
is more demand for multi - purpose athletic fields than there is supply. The same multi - purpose athletic fields are used to support the
of football, soccer, lacrosse, rugby and ultimate frisbee.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 1 400,000 400,000
Total 400,000 400,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 400,000 400,000
Total 400,000 400,000
DR,4FT Page 70 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -08 -006
Project Name Lewis Park: Pathway lighting
Type New
Useful Life
Category Parks
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 5Important
Status Active
Description
Fhis project would include decorative pathway lighting fixtures along the pathway at Lewis Park.
Justification
The pathway around the perimeter of Lewis Park receives a tremendous amount of use on a year round basis. There are many elderly adults
that enjoy walking on the pathway year round. During the late fall through early spring the park pathway receives a lot of use during the hours
of darkness. Pathway lighting would enhance safety and further promote walking on the pathway on a year round basis.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 30,000 30,000
'rpm 30,000 30,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 30,000 30,000
Total
30,000
30,000
DRAFT Page 71 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project 4 PK -10 -005
Project Name Pamela Park: South Parking Lot Expansion
Type Expansion
Useful Life
Category Parks
2013 1hru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 6
Status Active
Description
The project involves expansion of the parking lot on the south end of Pamela Park. The redesign will include striping of the parking lot to
make more efficient use of existing parking. 20 -23 additional parking stalls are proposed to be added to the south parking lot.
Justification
On occasional evenings, there is not enough parking capacity to serve scheduled programs and as a result, park users are parking on the grass.
The new additional small rectangular athletic field is also expected to require some additional parking capacity.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 40,000 40,000
Total 40,000 40,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 40,000 40,000
Total
40,000
40,000
DRAFT Page 72 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -10 -006
Project Name Pamela Park: North Parking Lot Expansion
Type Expansion
Useful Life
Category Parks
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 6
Status Active
Description
This project proposes to improve the flow of traffic into the north parking lot (near the park shelter building), create more parking capacity
where possible and stripe the lot to make parking safer and more efficient.
Justification
The existing north parking lot does not have well defined parking stalls, which leads to an inefficient and unsafe parking lot. As a result, park
users park unlawfully on the grass. During high peak scheduled activities, there are not enough parking stalls to accommodate the demand.
Additional parking stalls will make the lot safer, more efficient and keep park patrons from parking on neighborhood streets.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 45,000 45,000
Total
45,000
45,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 45,000 45,000
Total 45,000 45,000
DRAFT Page 73 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -10 -007
Project Name Pamela Park: West Parking Lot Expansion
2013 thru 2017
Type Expansion Department Park & Recreation
Useful Life Contact Park & Recreation
Category Parks Priority 6
Status Active
Description
Pamela Park's west parking lot renovation includes removal of existing asphalt surface, developing a new sub -base, installing a new wear -
course of asphalt followed by a finish coat of asphalt and adding concrete curbing around the perimeter. The plan calls for an expansion
opportunity to add 37 more parking stalls to the west lot.
Justification
The west parking lot will be in need of total renovation in 2013. Concrete curbing is needed to deter people from parking on the grass or
driving through the park. Additional parking is needed to keep visitors from parking on the grass during peak use periods.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 60,000 60,000
Total
60,000
60,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 60,000 60,000
Total 60,000 60,000
DRAFT Page 74 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina., MN
Project # PK -11 -006
Project Name Bredesen Park: Comfort Station Renovation
Type Replace or repair
Useful Life
Category Buildings
2013 thru 2017
Department Park & Recreation
Contact Park &:Recreation
Priority 5Important
Status Active
Description
This project calls for complete renovation of the p lumbin g system -that scrves,th,e ,
men's and womens restroom facilities at the Bredesen Park
comfort station. The system will be redesigned which also involves relocating existing interior walls and underground piping..
Justification
The.plu'inbing system including the sanitary sewer design at the Bredesen Park comfort station has long been in need of anew design that will,
eliminate the continual and frequent expensive repairs.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide; capital investments that balance.need and affordability" and the Comprehensive Plan, discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013. 2014 2015 2016 2017 Future Total
Construction/Maintenance 75,000 75,000
Total 75,000 75,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 75,000 75,000
Total 75,000 75,000
DRAFT Page 75 Tuesday, September 25,, 2012
Capital Improvement Plan
City of Edina, MN
2013 thru 2017
Project # PK -11 -007
Project Name Normandale Park: Replace Warming House /Shelter
Type Replace or repair
Useful Life
Category Buildings
Department Park & Recreation
Contact Park & Recreation
Priority 6
Status Active
Description
This project involves replacement of the Normandale Park warming house /shelter building with a more modern design similar to the concept at
Weber Park and Cornelia School Park.
Justification
The Normandale Park shelter building was designed and built in the 1970's and no longer meets resident's needs and expectations. The
community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year
round basis, similar to the newer shelter buildings at Weber Park and Cornelia School Park.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 650,000 650,000
Total 650,000 650,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 650,000 650,000
Total
650,000
650,000
DRAFT Page 76 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -12 -002
Project Name VanValkenburg Park construction
Type New
Useful Life
Category Parks
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 7 Desirable
Status Active
Description
This project involves the development of the Van Valkenburg Park playground area that was designed by Brauer and Associates with input
from resident neighbors. The plan includes a small playground, park benches, a tennis court, a half -size basketball court, walking path and
landscaping. It is the area immediately next to the intersection of Interlachen Boulevard and Park Terrace (just east of the water tower).
Justification
After the completion of the homes and development along Interlachen Boulevard and Park Terrace, residents requested the development of city-
owned park land to serve as a mini -park. The next closest playground for neighborhood children is Alden Park which is approximately 1/3 of a
mile away from Van Valkenburg Park.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability".
Expenditures
Prior 2013 2014 2015 2016 2017 Future
Total
Con struction/Maintenance
600,000
600,000
Total
Funding Sources
600,000
Prior 2013 2014 2015 2016 2017 Future
600,000
Total
Construction Fund
600,000
600,000
Total
600,000
600,000
DRAFT Page 77 Tues&iay, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -001
Project Name Parks Department Equipment Replacement
Type Replace or repair
Useful Life
Category Equipment
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Parks department has a wide variety of equipment that includes
grass mowers and other parks maintenance equipment, passenger vehicles and heavy equipment. The expected useful life of this equipment
ranges from about 7 years for some of the mowers up to 10 years for most of the passenger vehicles. A few pieces of the heavy equipment are
expected to last up to 20 years.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehiclestFurnishings
20,000
83,000
42,325
133,255
31,600
310,180
Total
20,000
83,000
42,325
133,255
31,600
310,180
Funding Sources
Prior 2013
2014
2015
2016
2017 Future
Total
Equipment Replacement Progra 20,000 83,000 42,325 133,255 31,600 310,180
Total 20,000 83,000 42,325 133,255 31,600 310,180
DRAFT Page 78 Tuesday, Seplember 25, 2012
Capital Improvement Plan 2013 thru 2017
City of Edina, MN
Project # PK -13 -002
Project Name Utley Park: Bathrooms Renovation
Type Replace or repair Department Park & Recreation
Useful Life Contact Park & Recreation
Category Buildings Priority 1 Critical
Status Active
Description
This is for the renovation of the men's and women's restrooms at Utley Park to comply with ADA law to make the restroom facilities handicap
accessible, updated, more welcoming and user friendly. The renovations will be completed in unison with the renovations scheduled for the
adjoining utility well building structure.
Justification
The Utley Park bathroom facilities are over 40 years old and thus do not meet ADA requirements and are outdated not user friendly. These
undersized restrooms have the original bathroom fixtures, wall coverings, flooring and partitions. There is a non - accessible step to enter the
bathrooms that needs to be redesigned.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These oroiects renuruose aeins infrastructure and allow us to arovide a level of service that sets Edina apart from other communities.
Expenditures
Prior 2013 2014
2015 2016 2017 Future Total
Construction/Maintenance
80,000
80,000
'total
Funding Sources
80,000
Prior 2013 2014
80,000
2015 2016 2017 Future Total
Construction Fund
80,000
80,000
Total
80,000
80,000
DRAFT Page 79 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -003
Project Name Lake Edina Park: Pathway
2013 lhru 2017
Type New Department Park & Recreation
Useful Life Contact Park & Recreation
Category Parks Priority 5Important
Status Active
Description
this is for the construction of a new 10' wide asphalt pathway in Lake Edina Park that will create a connection for pedestrians and cyclists
)etween Parklawn and Kellogg.
Justification
There is a much needed safe hard - surface pathway connection for walkers and cyclists to travel between Kellogg and Parklawn Ave. This
project is in keeping with our Attitude and Interest Survey results which show the community's strong interest in more trails. This project also
lines up with Objective #I in the Vision 20/20 Plan where one of the strategies includes "Work to construct sidewalks adjoining State Aid
streets and to promote safe pedestrian travel." This new pathway will help connect neighborhoods and also serve as a safe route to school.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 85,000 85,000
Total 85,000 85,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 85,000 85,000
Total
85,000
85,000
DRAFT Page 80 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -004
Project Name Highlands Park: Basketball Court
2013 rhru 2017
Type New Department Park & Recreation
Useful Life Contact Park & Recreation
Category Parks Priority 7 Desirable
Status Active
Description
This is for the construction of a new;,half -size basketball court for the east side of Highlands Park.
Justification .
For many years, neighbors of the Highlands Park neighborhood have requested an outdoor basketball court.., The majority of the park is
consumed with scheduled soccer games and practices. The neighbors have long requested more park amenities for neighboring families and
their children for unscheduled play. A basketball court has been the most frequent request. A half- -size basketball court is favored over a full -
size court to detract from becoming a destination basketball court for adult games in a park that is already heavily used by residents throughout
Edina for scheduled athletic play. There are only six outdoor basketball courts within our 40 parks. This park improvement is in keeping with
Vision 20/20 that calls for "A Sound Public Infrastructure ... Edina streets, utilities, parks and public buildings are the essential components of
the foundation of our citv."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 25,000 25,000
Total 25,000 25,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 25,000 25,000
Total 25,000 25,000
DRAFT Page 81 Tuesday, September 25, 2012..
Capital Improvement Plan
City of Edina. MN
Project # PK -13 -005
Project Name Garden Park: Baseball Field
Type Expansion
Useful Life
Category Parks
Description
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 5Important
Status Active
This is a $300,000 project to completely renovate the Garden Park baseball field and add batting cages, dugouts, scoreboards, storage and
concessions. The project also requires the replacement of existing fencing and irrigation system. The Edina Baseball Association is offering to
donate $100,000 towards the project costs and the proposal is to apply for a $100,000 grant from the Hennepin Youth Sports Grant
administered by the Minnesota Amateur Snorts Commission.
Justification
Garden Park baseball field is in need of renovation mainly because the field has a very poor drainage system. The field remains wet and
ayable for a lengthy period following a rain event. The field has poor sub -soils and was originally filled will street and sidewalk
olition debris (concrete and rebar). The project engineer has designed a financially reasonable solution. This is the only other large
ball field venue for the oldest youth and adult baseball program. There is a strong desire in the baseball community to bring the Garden
baseball field up to the same standard as the Courtney Field #I baseball field which hosts the varsity boys baseball program.
20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
le capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
)roiects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 100,000 100,000
Grants & Donations 200,000 200,000
Total 300,000 300,000
DRAFT Page 82 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -006
Project Name Wooddale Park: Playground Equipment
Type Expansion
Useful Life
Category Parks
Description
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 5Important
Status Active
This is a $200,000 project to replace the existing playground equipment at Wooddale Park with a primarily barrier free designed playground
structure. A neighboring resident has offered to organize a fundraising effort to cover a large share of the replacement cost and also pursue a
$100,000 grant from the Hennepin Youth Sports Grant administered by the Minnesota Amateur Sports Commission. The success of
fundraising and success of receiving grant monies are unknowns and therefore staff proposes that a not to exceed project fund of $100,000 be
set aside from the construction fund as a fallback position for the 2013 Capital Improvement Plan.
Justification
There has been a past practice of encouraging residents to secure fundraising dollars as a means to place a park improvement higher on the
priority list. The construction of Fox Meadow Park and the most recent project at Braemar Arena (the Hornets Nest) are excellent examples of
how fundraising efforts have resulted in successful park improvement projects. This project is in keeping with Vision 20/20 as being an
"innovative" park improvement project that will result in an "effective and valued city service by providing a sound infrastructure in a park
setting that will lead to an enhancement of the sense of quality that Edina has and will enjoy."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 200,000 200,000
Total
200,000
200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 100,000 100,000
Grants & Donations 100,000 100,000
Total
200,000
200,000
DRAFT Page 83 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -007
Project Name weber Park: Playground Equipment
Type Replace or repair
Useful Life
Category Parks
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 5Important
Status Active
Description
this is a $200,000 project to replace the existing playground equipment at Weber Park which was installed in 1997.
Justification
There are 23 outdoor playground equipment structures throughout the park system and the Weber Park equipment will be 20 years old by the
year 2017. A budget of $200,000 is proposed in order to plan for a more accessible and barrier free design which is more costly due to the
preferred safety surface. This project is in keeping with Vision 20/20 as being an "innovative" park improvement project that will result in an
"effective and valued city service by providing a sound infrastructure in a park setting that will lead to an enhancement of the sense of quality
that Edina has and will enjoy."
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 200,000 200,000
Total 200,000 200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 200,000 200,000
Total 200,000 200,000
DRAFT Page 84 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -008
Project Name Arden Park: Replace Shelter Building
Type Replace or repair
Useful Life
Category Buildings
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 5Important
Status Active
Description
This $650,000 project involves replacement of the Arden Park shelter building with a more modern design similar to the concept at Weber
Park and Cornelia School Park.
Justification
The Arden Park shelter building was designed and built in 1974s and no longer meets resident's needs and expectations. The community has
expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis,
similar to the newer shelter buildings at Weber Park and Cornelia School Park.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These proiects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 650,000 650,000
Total
650,000
650,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 650,000 650,000
Total 650,000 650,000
DRAFT Page 85 Tuesday, Seplember 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -009
Project Name Strachauer Park: Playground Equipment
Type Replace or repair
Useful Life
Category Parks
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 5Important
Status Active
Description
This is a $200,000 project to replace the existing playground equipment at Strachauer Park which was installed in 1997.
Justification
There are 23 outdoor playground equipment structures throughout the park system and the Strachauer Park equipment will be almost 20 years
old by the year 2016. A budget of $200,000 is proposed in order to plan for a more accessible and barrier free design which is more costly due
to the preferred safety surface. This project is in keeping with Vision 20/20 as being an "innovative" park improvement project that will result
in an "effective and valued city service by providing a sound infrastructure in a park setting that will lead to an enhancement of the sense of
quality that Edina has and will enjoy."
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 200,000 200,000
Total 200,000 200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 200,000 200,000
Total 200,000 200,000
DRAFT Page 86 Tuesday, Sepiemher 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PK -13 -010
Project Name Parks Comprehensive Master Plan
Type New
Useful Life
Category Parks
2013 thru 2017
Department Park & Recreation
Contact Park & Recreation
Priority 7 Desirable
Status Active
Description
Phis comprehensive process will involve hiring a professional consulting firm to work with neighborhood groups, Park Board, City Council
ind staff and will take several months to complete.
Justification
Developing a comprehensive master plan for all parks addresses Edina's Vision 20/20 Plan primarily in Objective #3 which is "Provide capital
investments that balance need and affordability ". The master,plan process should result in an assessment of park and recreation needs and how
the parks should be renovated to meet those needs. These capital investment plans will balance the need and affordability in a manner that
continue to make Edina the preeminent place for living, learning, raising families and doing business.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 100,000 100,000
Total 100,000 100,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 100,000 100,000
Total
100,000
100,000
DRAFT Page 87 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina. MN
Project 4 AQC -12 -002
Project Name Replace Heaters
Type Replace or repair
Useful Life 10 years
Category Buildings
2013 thru 2017
Department Parks - Aquatic Center
Contact Park & Recreation
Priority 1 Critical
Status Active
Description I
teplace the water heaters in the bath house with higher efficiency heaters. Currently, we have two water heaters that heat water for the bath
louse. The expected useful life for the water heater is 10 -12 years.
Justification
was an approved 2012 CIP project that we moved to 2013. The water heaters were installed in 1997 and have exceeded the expected
it life. We had the water heaters assessed in 2011 and the recommendation was to replace in 1 -2 years. The water heater heats the
r for the bath house so is essential for operations.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Aquatic Center Fund 40,000 40,000
Total
40,000
40,000
DRAFT Page 88 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # AQC -12 -003
Project Name Pool Deck Repairs
Type Replace or repair
Useful Life
Category Parks
2013 thru 2017
Department Parks -Aquatic Center
Contact Park & Recreation
Priority 2
Status Active
Description
Replace deteriorating concrete in sections of the pool deck and around the area near the north trellis.
Justification
fiver the years, we have replaced deteriorating concrete in several sections. Some areas of the pool deck are still original and showing age.
We are seeing more cracks each season and are concerned that the deck will become a safety issue if not replaced. We have been patching
sections as needed but will eventually have to replace larger portions of the deck. In the area around the north trellis the pressure treated wood
)n the trellis is shrinking and splitting. Replacing the deteriorating concrete will keep the quality standards that are expected from an Edina
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These nroiects replace aeine infrastructure and allow us to Drovide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Aquatic Center Fund 50,000 50,000
Total 50,000 50,000
DRAFT Page 89 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # AQC -12 -004
Project Name Bathhouse Roof and Other Improvements
Type Replace or repair
Useful Life
Category Buildings
2013 thru 2017
Department Parks -Aquatic Center
Contact Park & Recreation
Priority 2
Status Active
Description
teplace the bath house roof, air conditioners and concession equipment.
Justification
The bath house was built in 1997 and the roof is the original. We have not had any leaking but the roof is showing age and starting to wear
thin.
The air conditioners and concession equipment have most likely reached useful life. We do annual preventative maintenance on all of the
concession equipment which has increased useful life. The convection oven, pizza spinner, and freezers are all showing signs of age and
costing us more each year to maintain and repair. We generate over $124,000 in revenue from concessions so having this equipment is
essential to operations.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These Droiects replace aaina infrastructure and allow us to Drovide a level of service that sets Edina apart from other communities.
Expenditures
Prior 2013 2014 2015
2016 2017 Future Total
Construction/Maintenance
52,000
52,000
Total
Funding Sources
52,000
Prior 2013 2014 2015
52,000
2016 2017 Future Total
Aquatic Center Fund
52,000
52,000
Total
52,000
52,000
DRAFT Page 90 Tuesday, September 25, 2012
Capital Improvement Plan 2013 thru 2017
City_ of Edina; MN
Project i$ AQC -12 -005
Project Name Replace Pool Filters
Type Replace or repair Department Parks - Aquatic Center
Useful Life 10 years Contact Park & Recreation.
Category Equipment Priority 4
Status Active
Description
Replace the pool filters in the main pool; plunge pool, and zero depth pool. The approximate useful life on a filter is 2 -1:5 years.
Justificarion
Poof filters "'are'needed'to keep the pool water clean and clear. The main job of -the filter is to protect the pool pump�from'any debris that may
have been.sucked into the main drain or through the skimmer. If this debris were to get into the pump, it could severely damage the motor or
potentially ruin the entire unit. The filters were installed in 1997 which exceeds the approximate useful life.
Vision•20 /20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These ro'ects're lace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 . 2016 2017 Future Total
EquipNehicles /Furnishirigs 62,000 62,000
Total 62,000 62,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Aquatic Center Fund 62,000 62,000
Total 62,000 62,000
DRAFT Page 91 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # AQC -12 -006
Project Name SCS Play Structure
Type Replace or repair
Useful Life
Category Parks
2013 thru 2017
Department Parks - Aquatic Center
Contact Park & Recreation
Priority 5Important
Status Active
Description
Replace the SCS play structure located in the zero depth pool. The play structure was installed in 1997 and is a heavily used attraction.
Justification
Vision 20/20 Objective 2 states the City provides services that sets Edina apart from other communities. The zero depth play structure is one
of the Aquatic Center's main attractions. This feature attracts people to Edina from all over the Twin Cities Metro area. It is one of the key
attractions that drive gate sales. The SCS Zero Depth Pool play structure was installed in 1997 and may need to be replaced due to heavy use.
Preventative maintenance has helped increased the longevity of the play structure but will need to be replaced in the next few years.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 325,000 325,000
Total 325,000 325,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Aquatic Center Fund 325,000 325,000
Total
325,000
325,000
DRAFT Page 92 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # AQC -13 -001
Project Name Main Pool Boiler
Type Replace or repair Department Parks - Aquatic Center
Useful Life 10 years Contact Park & Recreation
Category Buildings Priority 1 Critical
Status Active
Description
Replace the main pool boiler..T. ie useful life is expected to be, l0 years.
Justification
We have recently replaced the boilers'in the plunge pool (2012) and the zero depth pool (2011). All of the boilers were ori ginally purchased
around the same time (2002). The boiler is.expected to run 10 years with appropriate preventative maintenance. There is slight damage to the
tube bundle. .Gilbert Mechanical evaluated the condition of the boiler in August of 2012 after we closed the facility for the season. The tube
bundle and burners are in very poor condition. The recommendation was to replace the boiler with a dual boiler system. We need a boiler to
heat the water in the main pool.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects replace'aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures
Prior 2013 2014
2015 2016 2017 Future Total
EquipNehicles /Furnishings
47,000
47,000
Total
47,000
47,000
Funding Sources
Prior. 2013 2014
2015 2016 2017 Future Total
Aquatic Center Fund
47,000
47,000
Total
47,000
47,000
0
DRAFT Page 93 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # AQC -13 -002
Project Name Large Slide
Type Replace or repair
Useful Life
Category Parks
2013 thrtr 2017
Department Parks -Aquatic Center
Contact Park & Recreation
Priority 5Important
Status Active
Description
Replace the large tube slide. The slide is original and was installed in 2002. This feature is heavily used and starting to show wear and tear.
Justification
Vision 20/20 Objective 2 states the City provides services that sets Edina apart from other communities. The slide is one of the Aquatic
Center's main attractions. This feature attracts people to Edina from all over the Twin Cities Metro area. It is one of the key attractions that
drive gate sales. The gel coating on the slide is wearing thin from heavy use. There is color deterioration and the surface is increasingly
difficult to maintain. Replacing the slide in 2016:
-Will keep us competitive with other outdoor pool facilities.
- Create excitement in the community to come to the pool to use the improved slide.
-Will keep the quality standards that are expected from an Edina facility.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 500,000 500,000
Total 500,000 500,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Aquatic Center Fund 500,000 500,000
Total 500,000 500,000
DRAFT Page 94 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -10 -003
Project Name water System Repairs
Type Replace or repair
Useful Life
Category Buildings
Description
2013 thru 2017
Department Parks -Arena
Contact Park & Recreation
Priority 5Important
Status Active
current water softening equipment is outdated. This project would increase energy efficiency by saving in salt and water treatment costs.
Justification
majority of arenas use tap or sometimes well water to make and maintain ice. In certain regions this has been successful; however it
erally results in a poor quality sheet of ice. Untreated source water contains many minerals that are added to provide safe drinking water
are not conducive to the ice making and maintenance process. These same minerals migrate upwards and concentrate at the ice surface as a
A of the freezing process. The negative effect this has on the ice surface is compounded further with each additional flood and a
nomenon called 'sublimation' (where ice changes directly from a solid to a gas without first becoming a liquid). During this sublimation
;ess more minerals are deposited on the ice surface resulting in a snowy, scaly and slow ice surface. The Reverse Osmosis process is the
;t environmentally friendly method of demineralizing water. There are absolutely no chemicals and the end product is potable.
Water Systems Repairs that were included in the 2013 CIP is an item the Arena feels is important, however other projects have been
tified by Braemar Arena staff as a higher priority. Therefore we are moving this project to 2015. Water treatment helps keep the scale
n in the equipment which also lengthens the life span of the equipment.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These oroiects reourpose aeine infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 80,000 80,000
Total
80,000
80,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 80,000 80,000
Total 80,000 80,000
DRAFT Page 95 Tuesdcrv, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a A -12 -001
Project Name Replace Zamboni
Type Replace or repair
Useful Life 11 -20 years
Category Equipment
Description
2013 thru 2017
Department Parks -Arena
Contact Park & Recreation
Priority 3 Significant
Status Active
The desired useful life of a Zamboni is 10,000 hours, which equates to about 10 years. Braemar has historically held on to Zambonis for 13 -17
years. With the replacement of this Zamboni, our daily use fleet were purchased in 2010, 2012 and 2014. Our "back up" machine was
purchased in 2001. The next Zamboni replacement will be in 2020. This will continue to put us on a path to have reliable equipment. This
machine will replace the 1997 ice resurfacing machine.
Justification
Phis is a routine equipment replacement purchase. The 1997 zamboni will be 17 years old in 2014 and is due to be replaced.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 140,000 140,000
Total 140,000 140,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 140,000 140,000
Total
140,000
140,000
DRAFT Page 96 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -12 -002
Project Name Make -up Water Tanks
Type Replace or repair
Useful Life
Category Buildings
Description
2013 thru 2017
Department Parks -Arena
Contact Park & Recreation
Priority 1 Critical
Status Active
Make Up Water Tanks are a part of the ice refrigeration system. The Make Up Water Tanks hold treated water so when the cooling towers call
for water it is ready in the tank. Originally the Make Up Water Tanks were budgeted for 2015, however we need to move them up to 2013
because of a small leak in one, and the other two are also deteriorating. Our preventative maintenance company recommended replacement in
2013 due to current condition. The estimate has also been decreased with more accurate bids.
Justification
equipment is critical for the Ice Refrigeration system. The water that is leaking is treated, which means we are also losing chemicals
i losing water.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These proiects replace aeine infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 35,000 35,000
Total
35,000
35,000
DRAFT Page 97 Tuesdm, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a A -13 -001
Project Name Low E Ceiling Replacement - West Arena
Type Replace or repair
Useful Life
Category Buildings
2013 thru 2017
Department Parks - Arena
Contact Park & Recreation
Priority 4
Status Active
Description
.ow E Ceiling is panels that are hung the width of the sheet of ice. The intent of the Low E Ceiling is to provide energy efficiency, brighten
he space and provide a more appealing look. It has a life expectancy of approximately 20 years.
Justification
The Low E Ceiling installed in the West Arena is falling down. Last season we needed to remove 2 of the panels because they were hanging
down and pucks were getting stuck in them. Since the West Arena is our main rink for high school games, figure skating show, and large
special events, it is important to replace them as soon as possible. The Low E Ceiling panels were installed in 1994.
The West Arena went through a major renovation in 2010 and will receive some other valuable improvements as a part of the Hornets Nest
project in 2012. This will complete urgent repairs. The estimated annual savings is $17,000 per year.
Vision 20/20, Objective 2 states: 'Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 75,000 75,000
Total 75,000 75,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 75,000 75,000
Total 75,000 75,000
DRAFT Page 98 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -13 -002
Project Name Painting East Arena
Type Replace or repair
Useful Life
Category Buildings
2013 thru 2017
Department Parks -Arena
Contact Park & Recreation
Priority 4
Status Active
Description
Painting East Arena. The East Arena is known as the "barn" at Braemar. The grey concrete blocks make the arena the least desirable. We have
received multiple requests from both our figure skating and hockey community to paint the space to make it more welcoming. The East Arena
was enclosed in 1987. There have been very few improvements made to the space since that time.
Justification
This will help meet the goal of making Braemar Arena the premier facility. The East Arena is also where we see the most vandalism. If we
brighten the space and make it more desirable, it will receive less vandalism.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These proiects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 25,000 25,000
Total
25,000
25,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 25,000 25,000
Total
25,000
25,000
DRAFT Page 99 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -13 -003
Project Name Ballet Room Remodel
Type New
Useful Life
Category Buildings
Description
2013 thru 2017
Department Parks - Arena
Contact Park & Recreation
Priority 3 Significant
Status Active
The Ballet room is located between the East and the South Arenas. The Ballet room was constructed in 1998. For the past 14 years the Ballet
room has been used for the Figure Skating Club. The Arena is opening up the space for multi - purpose use. We will schedule Birthday Parties,
team meetings, facilitate dance classes and other fitness classes for our guests. The room is need of significant updates and improvements to
the floor, walls, window coverings, furniture and other media comvonents. This will increase fee based use of the space.
Justification
;mar Arena has had a goal of providing a high quality on ice experience for our guests. While that is our primary responsibility, we also
to improve other areas of the facility to increase revenues. We are only estimating $5,000 per year in additional revenues, however this
:e will be used by tournament coordinators. The Minnesota Hockey Advanced 15's is an example of one tournament that would utilize this
e. We are currently negotiating a 5 year contract. This tournament will generate $8,100 per year. They plan to use this space for coaches
scouts visiting from around the country.
sion 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
rovide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
ese Droiects reDuroose aging infrastructure and allow us to Drovide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013. 2014 2015 2016 2017 Future Total
Construction/Maintenance 25,000 25,000
TOW 25,000 25,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 25,000 25,000
Total 25,000 25,000
DRAFT Page 100 Tuesday, Seplember 25, 2012
Capital Improvement Plan 2013 thru 2017
City of Edina, MN
Project # A -13 -004
Project Name Low E Ceiling Replacement - East Arena
Type Replace or repair Department Parks - Arena
Useful Life Contact Park & Recreation
Category Buildings Priority 5Important
Status Active
Description
Low E Ceiling are panels that are strung the width of the sheet of ice. They intent of the Low E Ceiling is to provide energy efficiencies,
brighten the space and provide a more appealing look. The Low E Ceiling installed in the East Arena is falling down. For the visual appeal, as
well as providing energy efficiencies this project has been included on the C1P and included for 2015.
Justification
The East Arena Low E Ceiling Replacement is due for replacement in 2014. The estimated annual energy savings is $17,000 per year. The
replacement of the torn panels also improves the aesthetics of the arena.
Vision 20/20, Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses
maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart
from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 80,000 80,000
Total 80,000 80,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 80,000 80,000
Total 80,000 80,000
DRAFT Page 101 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -13 -005
Project Name Bathroom/Locker Room Upgrades/Remodel
Type Replace or repair
Useful Life
Category Buildings
Description
2013 thru 2017
Department Parks -Arena
Contact Park & Recreation
Priority 5Important
Status Active
project will remodel the West 1 and West 2 locker room rest rooms.
Justification
iy of the bathrooms /locker rooms in Braemar Arena are outdated. They receive significant use on a daily basis and are in need of upgrades
improvements. The project will include re- tiling, new partitions, counter tops, and mirrors. It will also make our lower East restrooms
:ssible. Currently there are two stalls that are not accessible. The floors are rubber and are difficult to clean. Tiling the floors with skate
rubber matting would be best.
the facility ages, it is important for us to continue to improve the Arena. Currently the upper West, lower East, lower West and lower South
all needed. The West 1 and West 2 locker rooms are also in need of significant improvements. These are very visible to our users and we
d to continue to invest in the improvement of our facilities.
20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
le capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
)roiects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 100,000 100,000
Total
100,000
100,000
DRAFT Page 102 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -13 -006
Project Name Rubber Floor Replacement
Type Replace or repair
Useful Life
Category Buildings
Description
2013 thru 2017
Department Parks -Arena
Contact Park & Recreation
Priority 5Important
Status Active
The East and South Arenas need new Rubber Flooring. The replacement would be in the main areas- lower tunnel corridors, locker rooms and
players benches /penalty boxes. The rubber floor allows for players to walk throughout the lower level of the facility with their skates on. The
rubber flooring throughout the South and East Arenas was installed in 1997. Previously the East Arena only lasted for 10 years and currently
the flooring is 15 years old. The flooring for the West arena and locker rooms was replaced in 2010. The flooring is wearing out in high traffic
areas and becomes difficult to clean with our floor scrubber.
Justification
Phis project provides for ongoing maintenance and upkeep of Braemar Arena.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 35,000 35,000
Total
35,000
35,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 35,000 35,000
Total
35,000
35,000
DRAFT Page 103 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -13 -007
Project Name Arena Roof
Type Replace or repair
Useful Life 11 -20 years
Category Buildings
Description
2013 1hru 2017
Department Parks -Arena
Contact Park & Recreation
Priority 5Important
Status Active
The current roof was installed in 1996. It is a rubber membrane roof with rock ballast. With improvements made in 2012, we were able to
increase the life of the roof by 5 years. In 2017 the roof will have well exceeded its expected life of 15 -18 years. We will be replacing the roof
over the main lobby, South Arena, and the East lobby. It is recommended to again replace the roof with the rubber membrane and rock. Since
our roof has been installed, there have been significant improvements in this product and it was recommended by two contractors.
Justification
Fhe roof has exceeded its life and is in need of replacement. Currently there are minimal leaks throughout the facility. In 2017 the roof will be
!I years old, far exceeding the 15 -18 year expected life.
ision 20/20, Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses
aintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart
im other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 225,000 225,000
Total 225,000 225,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 225,000 225,000
Total
225,000
225,000
DRAFT Page 104 Tuesday, September 15, 2012
Capital Improvement Plan
City of Edina, MN
Project # A -13 -008
Project Name Parking.Lot Resurfacing
2013 thru 2017
Type Replace or repair Department Parks - Arena
Useful Life Unassigned Contact Park & Recreation
Category Parks Priority 2
Status Active
Description .
This project is 6 resurface the lower level parking lot near the south arena. The parking lot was installed in 1997 and has not been resurfaced
since. It was recommended, the,City, of Edina engineering department to resurface this lot to avoid more significant repairs in the future.
Justification
The existing asphalt is deteriorated and at the end of its'life. Will avoid more expensive repairs in the future if we resurface in 2013.
Vision 20/20, Objective 3, states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses
maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart
from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 35,000 35,000
Total 35,000 35,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 35,000 35,000
Total : 35,000 35,000
DRAFT Page 105 Tuesday, Seplenber 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ART -11 -004
Project Name Parking Lot Expansion
2013 thrtr 2017
Type Expansion Department Parks -Art Center
Useful Life Contact
Category Parks Priority 7 Desirable
Status Active
Description
In May 2009, the Edina Engineering Department requested companies to provide bids to remove bituminous pavement and concrete sidewalk
tnd install new curb and gutter and re -pave a newly designed entry and exit system for the Edina Art Center Parking Lot. The bids were in
•esponse to a plan to change the Art Center parking lot from a single entry/exit driveway to a dual entry/exit system. In addition, expansion of
.he Art Center parking lot was proposed with 10 additional parking spaces. The dual entry/exit system would increase safety for persons and
vehicular property. Bids from the Engineering Department came in at $25,811.25, with bids from other companies coming in at $36,082.50/
637,467.50/ $42,597.50/ $36,328.75 / $33,210.50. These figures from May 27, 2009.1 am unable to locate information regarding the $85,000
amount request. Useful life is 20+ years.
nes were repainted in March 2012, and are slowly fading. We need painted lines to designate where cars should be parked to optimize the
-a. Replacement- and concrete repair and replacement for access sidewalks.
Justification
i of dual entry/exit driveways and expansion of parking lot with 10 new spots and redesign drop off area would allow for larger
ge usage and allow for easier customer access to the Edina Art Center. A major factor in the re- design is for the safety of patrons of the
During openings and receptions, attendees must park along the poorly lit frontage road and walk to the Center.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These proiects repurpose aizing infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 85,000 85,000
Total
85,000
85,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 85,000 85,000
Total
85,000
85,000
DRAFT Page 106 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ART -11 -005
Project Name HVAC
2013 thru 2017
Type Replace or repair Department Parks - Art Center
Useful Life 20 years Contact
Category Buildings Priority 3 Significant
Status Active
Description
The Edina Art Center HVAC system is comprised of one boiler, 5 roof top units and one furnace. The boiler on the lower level is 14 years old,
was installed in 1998 and has a life expectancy of 25 -30 years. The average life of the roof top heating/cooling units is 15 years. Two units are
made by York; one installed in 2001 and one in 2002 and are I l and 10 years old respectively. The remaining three units, two roof top units
and one furnace, were made by Carrier and installed in 1998 with the recent addition of the Media Studios. These three units are 14 years old
with an average life of 15 years. The ductless split which serves the upper level, or Loft, of the Art Center was installed in 2011 and is less
than one year old. Price of the roof top units needing to be replaced in the next year or more is estimated to be between $7,000 - $8,000 per
unit, but can go as high as $10,000 per unit with the variance in price due to the cost of metal at time of purchase.
Justification
2013 would be the scheduled replacement of roof top HVAC Carrier systems over the Media Studios at the end of the 15 year life expectancy.
The replacement of the HVAC units, upgrade of the ventilation and exhaust systems would be in line with the Comprehensive Plan as a
necessity for heating and cooling of the building and comfort of the patrons. In addition, appropriate management of health and safety issues
and hazardous material management for participants and visitors is a top priority for a high quality center. Vision 20/20 speaks to the quality of
services and duality of life the city arovides to its residents.
Expenditures
Prior 2013 2014
2015 2016 2017 Future Total
Construction/Maintenance
22,800
22,800
Total
Funding Sources
22,800
Prior 2013 2014
22,800
2015 2016 2017 Future Total
Construction Fund
22,800
22,800
Total
22,800
22,800
DRAFT Page 107 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # ART -13 -001
Project Name MaxSolutions Enterprise Acquisition
2013 thru 2017
Type New Department Parks -Art Center
Useful Life 11 -20 years Contact
Category Equipment Priority 2
Status Active
Description
Acquisition of MaxSolutions Enterprise software, terminal and training for Art Center staff. Technology update for Art Center for
memberships, point of sale, registration, and reporting.
Justification
Alignment with Art Center Consultant study and Art Center work plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 15,000 15,000
Total 15,000 15,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 15,000 15,000
Total
15,000
15,000
DRAFT Page 108 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # CL -06 -005
Project Name Replace HVAC Units
Type Replace or repair
Useful Life 20 years
Category Buildings
2013 thru 2017
Department Parks - Centennial Lakes Park
Contact Park & Recreation
Priority 2
Status Active
Description
Replace 2 of the 4 HVAC units for the Centennial Lakes Pavillion.
The current heating and air conditioning units were installed in 1990 and are reaching the end of their life expectancy. Newer units will also
be more energy efficient than our current models, allowing us to save on energy costs.
Justification
New HVAC units will help maintain the interior building at comfortable temperatures for special event clients and other park users. A Sound
Public Infrastructure is listed as part of the City Vision Statement; replacement of these HVAC units will align with this goal.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These nroiects reourpose aline infrastructure and allow us to Drovide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 25,000 25,000
Total
25,000
25,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 25,000 25,000
Total 25,000 25,000
DRAFT Page 109 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # CL-09 -008
Project Name Replace Park Sound System
Type Replace or repair
Useful Life l0 years
Category Equipment
Description
2013 thru 2017
Department Parks - Centennial Lakes Park
Contact Park & Recreation
Priority 7 Desirable
Status Active
The sound system for the Centennial Lakes pathways currently consist of over 160 in- ground speakers, eight pole- mounted speakers, and 10
amplifiers, all connected by several miles of low voltage wire. The majority of this system was installed in 1999 with an anticipated useful life
of 8 -10 years. The system allows us to play music throughout the park for the enjoyment of park patrons as well as make announcements as
needed.
We propose to replace all necessary components of the system with new components.
Justification
The park music system is a unique amenity that is important in establishing Centennial Lakes as a premier public facility, which aligns with
the Vision 20/20 mission statement.
Walking trails were identified as extremely important to Edina residents in the 2006 Community Attitudes and Interest survey. A properly
functioning sound system will enhance the park walkways for walkers and runners alike.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 32,000 32,000
Total
32,000
32,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 32,000 32,000
Total 32,000 32,000
DRAFT Page 110 Tuesdgy -, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # CL -12 -001
Project Name Replace HVAC Units
2013 thru 2017
Type Replace or repair Department Parks - Centennial Lakes Park
Useful Life 20 years Contact Park & Recreation
Category Buildings Priority 5Important
Status Active
Description
Replace 2 of the four HVAC units for the Centennial Lakes Pavilion. (The other two units are scheduled for replacement in 2014.)
The current heating and air conditioning units were installed in 1990 and are nearing the end of their life expectancy. Newer units will be
more energy efficient than our current models, allowing us to save on energy costs as well as reduce maintenance expense.
Justification
New HVAC units will help maintain the building interior at comfortable temperatures for special event clients and other park users. A Sound
Public Infrastructure is listed as part of the City Vision Statement; replacement of these HVAC units will align with this goal.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 25,000 25,000
Total
Funding Sources
25,000
25,000
Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 25,000 25,000
Total 25,000 25,000
DRAFT Page 111 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # CL-13 -001
Project Name One -Ton Truck
2013 thru 2017
Type Replace or repair Department Parks - Centennial Lakes Park
Useful Life 11 -20 years Contact Park & Recreation
Category Vehicles Priority 5Important
Status Active
Description
Our current one -ton truck will be 20 years old in 2017 and in need of replacement.
The one -ton truck, which has beefed up suspension and a heavy duty steel dump box, is used to haul out all of the organic material and debris
from the care and maintenance of the plants, trees and grass areas at Centennial Lakes Park. Since we have no dumping area for these types of
items at Centennial Lakes, all of this material is trucked over to the main City dump site at Braemar. In addition, it is used to haul mulch, soil
and landscape materials back into the nark.
Justification
A reliable vehicle will help in our efforts to provide a premier public facility as desired by the Vision 20/20 mission statement.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 28,000 28,000
Total 28,000 28,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 28,000 28,000
Total 28,000 28,000
DRAFT Page 112 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -00 -017
Project Name Replaster Pool
Type Replace or repair
Useful Life Unassigned
Category Buildings
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 3 Significant
Status Active
Description
Re- plaster and restore pool shell at Edinborough Park. The pool shell is the original constructed in 1987.
Justification
Edina parks and facilities are the essential components of the foundation of our city. The pool needs an update to be considered a premier
Edina facility. The original pool shell at Edinborough Park is cracked and badly discolored. Pieces of plaster are coming off of the shell. The
pool shell needs a new surface coat of gunite, sprayed applied concrete. Our goal at Edinborough Park is to increase usage of the pool. It is
essential to have a comparable pool with other providers in the area. Failure to make this repair will cause cracking or heaving of the pool
shell which could compromise the structural integrity.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 71,800 71,800
Total 71,800 71,800
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 71,800 71,800
Total 71,800 71,800
DRAFT Page 113 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina. MN
Project # EP -08 -007
Project Name Security Camera System
Type Replace or repair
Useful Life 10 years
Category Buildings
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 5Important
Status Active
Install a new web based security camera system with the ability for video surveillance. Included in the system are cameras, DVR and
monitors. The useful life is anticipated to be 10 years.
Justification
Vision 20/20 Objective 7 states to evaluate and efficiently employ technological advancements to provide City services. The current system
was installed in 2006 and has many limitations. A more efficient system would allow us remote access to view the park, maintain a safe
environment for the public, and view clear images of the facility. This system is being used effectively at the Aquatic Center and Public
Works buildings.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Equip/Vehicles /Furnishings 43,100 43,100
Total 43,100 43,100
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 43,100 43,100
Total
43,100
43,100
DRAFT Page 114 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -08 -02.1
Project Name pool and Wall Tile
2013 rhru 2017
Type Replace or repair Department Parks - Edinborough Park
Useful Life Contact Park & Recreation
Category Buildings Priority 3 Significant
Status Active
Description
`Replace the tile on the walls of the pool along with the deck tile. The tile is original to.the park and was installed in 1987.
Jdstification
Edina parks and facilities are the essential components of the foundation of our city. The pool needs an update to be'considered a premier
Edina facility. The deck and wall tile is original to the park over 26 years old. There are several.cracked and damaged pieces along the east
Wall, and buckled tile along the north wall. We have replaced several larger areas of deck tile that are discolored. The wall tile is fractured
in several areas and could potentially become a safety issue. Our goal is to increase usage of the facility with a strong focus on the pool.
Vision. 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 189,500 189,500
Total 189,500 189,500
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Edinborough Fund 189,500 189,500
Total 189,500 189,500
DRAFT Page 115 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -09 -014
Project Name Lift to Birthday Party Area
2013 thru 2017
Type New Department Parks - Edinborough Park
Useful Life Contact Park & Recreation
Category Buildings Priority 3 Significant
Status Active
Description
Lift from the great hall floor to the Birthday Party Plateau - the old tot lot area.
Justification
this area was not designed to be handicapped accessible. We are currently providing two other birthday party sites in different locations with
iccessibility. We are receiving an increased number of requests for handicapped accessible areas in the park.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 42,000 42,000
Total 42,000 - 42,000
Funding Sources Prior 2013 2014 2015 2016 2017 "Future Total
Construction Fund 42,000 42,000
Total 42,000 42,000
DRAFT Page 116 Tuesday, September 25, 2012
Capital Improvement -Plan
City of Edina, MN
Project # EP -09 -015
Project Name Track Floor
2013 thru 2017
Type Replace or repair Department Parks - Edinborough Park
Useful Life 20 years Contact Park & Recreation
Category Buildings Priority 7 Desirable
,
Status Active
Description
Replace the track floor with a similar rubber, surface. The useful •life is anticipated to be 20 years. .
Justification
Edina parks and facilities are the ,essential components of the foundation of our city., Parks and Recreation Facilities and Services Needs
AssessmentSurvey confirmed that having indoor exercise facilities and an indoor running/walking track is important to the residents of Edina.
The`track surface was originally installed in 1987. The track has experienced significant wear over the years. Portions of the track surface.
are wearing thin causing,potential tripping hazards. The current surface is a deterrent to many people. Improving the surface of the track will
help us achieve our goal of increasing usage of the facility.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures
Prior 2013 2014 2015 2016.
2017 Future Total
Construction/Maintenance
65,000
65,000
Total
65,000
65,000 .
Funding Sources
Prior 2013 2014 2015„ 2016
2017 Future Total
i
Construction Fund
65,000
65,000
Total
65,000
65,000
DRAFT Page 117 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -09 -016
Project Name Concrete repairs
Type Replace or repair
Useful Life
Category Infrastructure
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 4
Status Active
Description
[tepair deteriorated concrete on west sidewalk as well as concrete and drain tile near the parking ramp entrance.
Justification I
✓ision 20/20 Objective 1 states the City maintain strong residential neighborhoods. Maintaining and improving the condition of our
ieighborhood street and sidewalks is essential. Concrete on the west sidewalk is deteriorating and may become a tripping hazard. This
;idewalk is used by many residents accessing the park and other businesses located in the Corporate Center.
✓ision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
Fhese projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Currently, in the parking ramp entrance we have water seeping into the entryway, loading dock entrance, and hallway underneath. Concrete
repairs would prevent further deterioration and damage.
Expenditures
Prior 2013 2014
2015 2016 2017 Future Total
Construction/Maintenance
153,800
153,800
Total
Funding Sources
153,800
Prior 2013 2014
153,800
2015 2016 2017 Future Total
Construction Fund
153,800
153,800
Total
153,800
153,800
DRAFT Page 118 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a EP -09 -021
Project Name Adventure Peak Remodel
Type Replace or repair
Useful Life l0 years
Category Equipment
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 3 Significant
Status Active
Description
Replace worn events on Adventure Peak. The useful life on most of the events varies depending on use and materials, but most events last
less than 10 years. Adventure Peak opened in 2004.
Justification
Adventure Peak brings in approximately $600,000 a year in revenue for Edinborough Park. We have one of the largest and most used play
structures in the country. Replacing the worn events is critical for maintaining the safety of the play structure. Replacing the events will also
refresh the look of the structure and keep it fun and exciting for the enjoyment of our customers. New play structures are opening all over the
Twin Cities and it's critical that we continue to renew and modify the play structure to maintain interest and customer base.
IVision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: I
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 26,000 26,000
Total 26,000 26,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 26,000 26,000
Total 26,000 26,000
DRAFT Page 119 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a EP -10 -011
Project Name North Sidewalk
2013 thru 2017
Type Replace or repair Department Parks - Edinborough Park
Useful Life 20 years Contact Park & Recreation
Category Infrastructure Priority 5Important
Status Active
Description
Replace the deteriorating concrete on the sidewalks on the North side of the facility. The concrete is original to the park and was poured in
1987. The useful life on concrete is approximately 20 years but varies depending on use, weight and weather.
Justification
Vision 20/20 Objective 1 states the City maintain strong residential neighborhoods. Maintaining and improving the condition of our
neighborhood street and sidewalks is essential. The concrete on the North sidewalk is deteriorating and may become a tripping hazard. This
sidewalk is used by many residents living in the condos to access the park and businesses in the Corporate Center. Over the years, we have
patched several sections and even those sections are starting to crumble. Replacing the concrete would decrease the tripping hazard.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 32,300 32,300
Total 32,300 32,300
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 32,300 32,300
Total
32,300
32,300
DRAFT Page 120 Tuesday, Seplember 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -11 -005
Project Name Track Air Conditioning
Type New
Useful Life 10 years
Category Buildings
2013 thru 2017
Department Parks - Edinborough Park
Contact Park &.Recreation
Priority 7 Desirable
Status Active
Description
add air conditioning to the track and exercise area. The useful life is anticipated to be 10 years.
Justification
Currently, there is no air conditioning in the track area. The track is surrounded by windows that cannot be opened. During the summer
months temperatures can exceed 90 degrees. Exercising at these temperatures can become a safety and health issue for anyone, especially
seniors. The addition of air conditioning to the track will make the facility a more appealing alternative for the community to enjoy year round.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 66,600 66,600
Total 66,600 66,600
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 66,600 66,600
Total 66,600 66,600
DR,4FT Page 121 Tuesdm, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -11 -006
Project Name Adventure Peak Wave Slide
Type Replace or repair
Useful Life 11- 20years
Category Equipment
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 3 Significant
Status Active
Description
teplace the triple wave slide on Adventure Peak. The useful life is anticipated to be 10 -12 years.
Justification
Vision 20/20 Objective 2 states the City provides services that sets Edina apart from other communities. Adventure Peak brings in
approximately $600,000 a year in revenue for Edinborough Park. We have one of the largest and most used play structures in the area.
Each year thousands of children play in Adventure Peak. Adventure Peak attracts people to Edina from all over the Twin Cities metro. The
slide is an original play feature and is wearing out. The coating on the slide is wearing thin from heavy use. There is color deterioration and
the surface is increasingly difficult to maintain. In order to continue to attract large numbers of users, it is important to continually renew and
update the play structure. Our guests notice and appreciate the investment.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 26,300 26,300
Total
26,300
26,300
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 26,300 26,300
Total 26,300 26,300
DRAFT Page 122 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -11 -007
Project Name Exterior Entryway Doors
Type Replace or repair
Useful Life
Category Buildings
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 5Important
Status Active
Description
The exterior doors are the original doors installed when the park first opened in 1987. They are over 25 years old and have become difficult to
lock. The interior components of the doors are also deteriorating and have become expensive to repair. New doors would also be much more
enerev efficient.
Justification
Edina parks and public buildings are the essential components of the foundation of our city. The exterior doors are the first thing people see
,vhen they enter Edinborough Park. The doors are original to the park and have corroded components. The doors do not lock well which could
•esult in safety issues inside the park. The doors are difficult to open which is a challenge for kids and older adults. The doors are discolored
and look poorly to the public using the park. One of our goals is to increase usage of the facility. We are updating the look of the facility by
•emoving overgrown trees and filling in the Grotto. Replacing the doors will create a positive first impression of the facility.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 90,500 90,500
Total
90,500
90,500
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 90,500 90,500
Total 90,500 90,500
DRAFT Page 123 Tuesday, Sepiemher 25, 2012
Capital Improvement Plan
City of Edina, MN
Project 4 EP -11 -008
Project Name Interior Entryway Doors
2013 thru 2017
Type Replace or repair Department Parks - Edinborough Park
Useful Life Contact Park & Recreation
Category Buildings Priority 5Important
Status Active
Description
The interior doors are the original doors installed when the park first opened in 1987. It is my recommendation to replace the interior lockable
doors on all four entrances to the park.
Justification
Edina parks and public buildings are the essential components of the foundation of our city. The interior doors are the first thing people see
when they enter Edinborough Park. The doors are original to the park and have corroded components causing instability. New doors would be
much more energy efficient. The doors are faded and do not represent the image that we want to portray to our guests. In 2017, Edinborough
Park will be 30 years old. Our goal is to update the look of the facility and replacing the interior doors will help us achieve that goal.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 67,900 67,900
Total 67,900 67,900
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 67,900 67,900
Total
67,900
67,900
DRAFT Page 124 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -11 -009
Project Name Upstairs Restroom Remodel
2013 thru 2017
Type Replace or repair Department Parks - Edinborough Park
Useful Life 11 -20 years Contact Park & Recreation
Category Buildings Priority 6
Status Active
Description
tenovate and remodel the upstairs restrooms at Edinborough Park. The useful life is anticipated to be 15 -18 years.
Justification
Edina parks and facilities are the essential components of the foundation of our city. I recommend replacing the tile, countertops, lighting
fixtures, and toilet partitions. These are heavily used restrooms and are showing their age. The tile is chipping in certain areas and could be a
safety concern. The restroom facilities look very outdated and do not represent the quality that is expected from an Edina facility.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 30,800 30,800
Total
30,800
30,800
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 30,800 30,800
Total 30,800 30,800
DRAFT Page 125 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -11 -010
Project Name Adventure Peak Renovation
Type Replace or repair
Useful Life 11 -20 years
Category Equipment
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 5Important
Status Active
Description
teplacement of deck pads and thick foam pipe covering throughout Adventure Peak. Adventure Peak was built in 2003 and the foam pipe
:overing is original and is starting to wear out and tear due to heavy use.
Justification
Each year. thousands of children play in Adventure Peak. Adventure Peak attracts people to Edina from all over the Twin Cities metro area.
Exterior foam and soft deck pads wear out with use. The thick foam padding covers all of the structural piping throughout Adventure Peak.
Kids hang on and bump into the pads. Replacing deck pads and foam pipe covering is essential to maintaining safety standards on the Peak.
Edinborough Park has a reputation in the community to be a safe facility for families to enjoy.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 33,100 33,100
Total
33,100
33,100
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 33,100 33,100
Total 33,100 33,100
DRAFT Page 126 Tuesday September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -12 -003
Project Name Park Boiler
Type Replace or repair
Useful Life 10 years
Category Buildings
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 5Important
Status Active
Description
Replace the main park boiler at Edinborough Park. The boiler provides heat to most of the park including the entryways, locker rooms, pool
and track. The useful life on a boiler is approximately 10 years.
Justification
The main park boiler was installed in 2004. The boiler provides heat to most of the areas in the park. By 2015, we will have surpassed the
useful life of an average boiler. Providing heat in the facility would be necessary for us to operate during the months we experience colder
weather.
Vision 20/20, Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses
maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart
from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 26,900 26,900
Total 26,900 26,900
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 26,900 26,900
Total
26,900
26,900
DRAFT Page 127 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -13 -001
Project Name POS System
Type Replace or repair
Useful Life 10 years
Category Equipment
2013 lhru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 5Important
Status Active
Description I
Implement a new Point of Sale system with the ability to manage aspects of daily operations in the park. The current Point of Sale system was
installed in 2006. The useful life is anticipated to be 10 years.
Justification
Vision 20/20 Objective 7 states the City evaluates and efficiently employ technological advancements to provide City services. Implementing
a new Point of Sale system will bring more efficiency to accessing information to improve daily operations. The benefits include:
- Improved customer tracking
- Billing and receivables
- Facility scheduling
- Marketine tools. renortine. etc
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 28,300 28,300
Total 28,300 28,300
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 28,300 28,300
Total 28,300 28,300
DRAFT Page 128 Tuesday, Seplember 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -13 -002
Project Name Ramp to Track
2013 thru -2017
Type New Department Parks - Edinborough Park
Useful Life Contact Park & Recreation
Category Buildings Priority 5Important
Status Active
Add a ramp, to access the track and exercise area. Currently, an individual who wants to use the track must go up a minimum of four stairs,
limiting access for individuals using a walker, wheelchair, or have other physical limitations.
y
Justification
Currently, the track is not handicapped accessible. The ramp is needed to make the track and exercise area handicapped accessible to allow
more people to utilize the track and exercise area. For Edinborough Park to increase the cost recovery percentage to 90 -100% we will need to
make updates to the facility ,to accommodate all user groups. Many people utilizing the track are individuals living in the Condos and in Park
Plaza both with aging. residents. By adding the ramp to access the track, we will provide an inclusive opportunity for all residents to utilize.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These moiects reouroose aeins infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 41,000 41,000
Total 41,000 41,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 41,000 41,000
Total 41,000. 41,000
DRAFT, Page 129 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -13 -003
Project Name Provide Larger Locker Rooms
Type Expansion
Useful Life
Category Buildings
Description
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 1 Critical
Status Active
Renovate and expand both the men's and women's locker rooms. The locker rooms are original to the park and have always been significantly
undersized for the needs of our customers. We would convert a storage area to create a new locker room. The result would be doubling the
size of both locker rooms.
Justification
The lockers rooms are original to the park. We continually receive feedback that the locker rooms are too small to accommodate our
customers. The locker rooms can comfortably accommodate 8 -10 people, with the dressing areas only able to accommodate 4 or 5. We have
water exercise classes with over 18 participants. The Edina Swim Club has over twenty kids in some levels that will need the locker rooms.
We have entered into an agreement with the Edina Swim Club to be the home of their club, hosting approximately 4 hours of practice time
daily, a minimum of five days/week.
Our goal is to increase the cost recovery percentage for Edinborough Park to 90 -100 %. To accomplish this goal it's essential we increase
usage of the facility thus requiring adequate facilities to accommodate our customers. Expanding the locker rooms would enable us to
accomplish the following, resulting in increased revenue:
Update the look of the locker room facilities to appeal to the public
Improve the comfort of the locker rooms by improving air quality and water drainage
Accommodate larger groups - rentals, group reservations and/or birthday parties
Offer additional programming opportunities - water zumba, zumba, yoga, etc.
Sion 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
rovide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
ese Droiects reDumose aeine infrastructure and allow us to Drovide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 582,000 582,000
Total
582,000
582,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Edinborough Fund 582,000 582,000
Total 582,000 582,000
DRAFT Page 130 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # EP -13 -004
Project Name Window Washing
Type Replace or repair
Useful Life 20 years
Category Buildings
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 3 Significant
Status Active
Description
Wash the interior and exterior windows in the park. There are several areas in the facility that we do not have access to with our current
equipment. Several of the windows in the park have never been washed due to access issues.
Justification
Edina parks and facilities are the essential components of the foundation of our city. The windows in certain areas have not been cleaned in
twenty five years. There are several interior windows that we cannot reach with current equipment. This project would require special
equipment and personnel which explains the high cost. In order to keep the aesthetic appeal of the facility it is recommended that the windows
be cleaned.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These nroiects reuurroose aeine infrastructure and allow us to arovide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 26,300 26,300
Total
26,300
26,300
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 26,300 26,300
Total
26,300
26,300
DRAFT Page 131 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a EP -13 -005
Project Name Roof Repairs
Type Replace or repair
Useful Life
Category Buildings
2013 thru 2017
Department Parks - Edinborough Park
Contact Park & Recreation
Priority 5Important
Status Active
Description
Make all necessary repairs to eliminate water leaks in the Park. This includes roof repairs and also window glazing replacement. The
Nindows and glazing are original to the park.
Justification
Edinborough Park is twenty six years old. It is recommended to make the necessary improvements to the roof. With steady rain we have
several areas throughout the park where water is leaking into the facility from the windows and/or roof. Over the years, we have seen an
increase in the number of leaks causing more damage to the facility. The location of some of the leaks presents safety concerns for possible
slipping when the public is in the park.
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These nroiects reouroose aeine infrastructure and allow us to Drovide a level of service that sets Edina anart from other communities.
Expenditures
Prior 2013 2014 2015 2016 2017 Future
Total
Construction /Maintenance
110,400
110,400
Total
Funding Sources
110,400
Prior 2013 2014 2015 2016 2017 Future
110,400
Total
Construction Fund
110,400
110,400
Total
110,400
110,400
DRAFT Page 132 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina,' NW
Project # GC -12 -005
ProjechName Driving Range Expansion
2013 rhru 2017
Type Expansion Department_ ,Parks - Golf Course
Useful Life Contact Park & Recreation
,Category Parks Priority 7 Desirable
Status Active
Description
Expansion of Driving Range increasing depth and width. The benefits of expansion are increased capacity,for peak time s;; improved turf .
quality, and eliminating safety concerns of customers being hit by golf.lialls while on the Executive Course and "teaching. tee ". The expansion
would include talking the current second and third holes of the Executive Course as part the Driving Range. The two current Par 4's would
turn into fourPar 3's making the Executive Course'(now Par 29 into a Par a Course (Par 27).
Justification
This was the top priority,for CIP improvements by the National Golf Foundation consultant report. The National Golf Foundation (NGF)
report also-, confirms justification: "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are
','living and breathing" assets that will deteriorate over time,-and significant reductions in capital expenditures eventually will catch up to the
system ".
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These proiects repurpose a1;ing infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior
2013 2014 2015 2016
2017 Future Total
Planning /Design,
Construction/Maintenance
75,000
925,000
75,000
925,000
Total
Funding Sources Prior
1,000,000
2013 2014 2015 2016 .
1,000,000"
2017 Future Total,.
Construction fund
Grants & Donations — Braemar
650,000
350,000
650,000
350,000
Total
1,000,000
1,000,000 .
DRAFT Page 133 Tuesday, .September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # GC -12 -006
Project Name Braemar: Carpeting
Type Replace or repair
Useful Life 10 years
Category Buildings
2013 thru 2017
Department Parks -Golf Course
Contact Park & Recreation
Priority 7 Desirable
Status Active
Description
teplace carpeting in Pro Shop and lower level. Useful life 10 years.
Justification
Replacement needed to keep facility up to acceptable standards for a premier facility. In strategic alignment with Edina's mission statement to
"offer premier public facilities" and Edina's Vision 20/20 Section 2.2 Vision and Goals of A Sound Public Infrastructure "Edina streets,
utilities, parks, and public buildings are the essential components of the foundation of our city". The National Golf Foundation (NGF) report
also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and
breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch uD to the system ".
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 25,000 25,000
Total 25,000 25,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 25,000 25,000
Total
25,000
25,000
DRAFT Page 134 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # GC -12 -007
Project Name Braemar: Slit Drainage 3 Fairways
2013 thru 2017
Type Expansion Department Parks - Golf Course
Useful Life 11 -20 years Contact Park & Recreation
Category Parks Priority 7 Desirable
Status Active
Description
Slit drainage for fairways will create better surface drainage effectively eliminating the need for cart paths in high traffic areas. This will also
improve turf quality playability. The process creates small trenches that are filled with sand to improve drainage with minimal disruption.
The effective life 10 -15 years.
Justification
The National Golf Foundation's consultant report recommended to improve the cart path system while improving turf quality/playability.
The National Golf Foundation (NGF) report also confirms justification: "NGF has observed declining investment in in the golf courses as
revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital
expenditures eventually will catch up to the system ".
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 50,000 50,000
Total
50,000
50,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 50,000 50,000
Total 50,000 50,000
DRAFT Page 135 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # GC -12 -008
Project Name Braemar: Clubhouse Roof Replacement
Type Replace or repair
Useful Life 20 years
Category Buildings
2013 thru 2017
Department Parks - Golf Course
Contact Park & Recreation
Priority 5Important
Status Active
Description
Replacement of Clubhouse and Pro Shop roof consisting of flat roof and cedar shake areas. The useful life is 20+ years. A number of repairs
have been performed over the years, with areas of the roof still leaking. Areas of the roof are over 25 years old. This project would:
-Avoid additional ongoing repair costs
- Reduce exposure of potential water damage to building, equipment, and merchandise
Justification
Necessary to keep building up to acceptable standards.
Expenditures
Prior 2013 2014
2015 2016
2017 Future Total
Construction/Maintenance
80,000
80,000
160,000
Total
80,000
80,000
160,000
Funding Sources
Prior 2013 2014
2015 2016
2017 Future Total
Construction Fund 80,000 80,000 160,000
Total 80,000 80,000 160,000
DRAFT Page 136 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # GC -12 -009
Project Name Cart Path Repair/Expansion
Type Expansion
Useful Life
Category Parks
Description
2013 thru 2017
Department Parks -Golf Course
Contact Park & Recreation
Priority 3 Significant
Status Active
Repair /replace existing asphalt and gravel/class 5 cart paths. Expand some asphalt cart paths in addition to gravel /class 5 paths which when
combined with improved drainage in some fairway areas would effectively create a "wall to wall" cart path system which would allow cart
usage after heavy rains without the ongoing repair /replacement costs of "wall to wall" asphalt paths.
Justification
.is was the second highest ranked CIP recommendation for Braemar Golf Courses by the National Golf Foundation's consultant report. In
ategic alignment with Edina's mission statement to "offer premier public facilities" and Edina's Vision 20/20 Section 2.2 Vision and Goals
a sound public infrastructure "Edina streets, utilities, parks, and public buildings are the essential components of the foundation of our
y ". The National Golf Foundation (NGF) report also confirms justification:
"NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will
deteriorate over time. and sienificant reductions in capital expenditures eventuallv will catch up to the system".
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 25,000 25,000 75,000 75,000 200,000
Total
25,000 25,000 75,000 75,000
200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 25,000 25,000 75,000 75,000 200,000
Total 25,000 25,000 75,000 75,000
200,000
DRAFT Page 137 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # GC -13 -001
Project Name Maintenance Equipment Replacement
Type Replace or repair
Useful Life 11 -20 years
Category Equipment
2013 thru 2017
Department Parks -Golf Course
Contact Park & Recreation
Priority 5Important
Status Active
Description
Replacement of maintenance equipment such as mowers, utility vehicles, and sand pros on an as- needed basis. The equipment has a useful
life 10 -15 years. Replacement of equipment as needed will increase help improve course conditions, reduce labor and repair costs, in addition
to maintaining good trade -in values of used equipment.
Justification
Replacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf
Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf
courses are "living and breathing' assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch
up to the system ".
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 145,000 155,000 155,000 160,000 615,000
Total 145,000 155,000 155,000 160,000
615,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 145,000 155,000 155,000 160,000 615,000
Total 145,000 155,000 155,000 160,000 615,000
DRAFT Page 138 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # GC -13 -003
Project Name Tee Renovation
Type Expansion
Useful Life 20 years
Category Parks
2013 thru 2017
Department Parks - Golf Course
Contact Park & Recreation
Priority 4
Status Active
Description I
Renovating existing tee areas including improving soil quality, leveling, and utilizing heartier newer strains of turf. Some new tees areas will
also be as needed. Many of the existing tees have become uneven and the soils have compacted over time. The effective life is 20 years.
Justification
The National Golf Foundation (NGF) report also confirms justification: "NGF has observed declining investment in in the golf courses as
revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital
expenditures eventually will catch up to the system ".
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These proiects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 50,000 70,000 100,000 220,000
TOW
50,000 70,000 100,000
220,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 50,000 70,000 100,000 220,000
Total 50,000 70,000 100,000 220,000
DRAFT Page 139 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a GC -13 -004
Project Name Irrigation System Replacement Phase 1
Type Replace or repair
Useful Life 30 years
Category Parks
2013 thru 2017
Department Parks - Golf Course
Contact Park & Recreation
Priority 5Important
Status Active
Description
teplacement of Irrigation system (installed in 1980). This is the first of three planned phases. The useful life is 30+ years. A new system
vill reduce ongoing repair and labor costs, improve course conditions, and be more efficient and environmentally friendly.
Justification
This was a recommendation for Braemar Golf Courses by the National Golf Foundation's consultant report. The National Golf Foundation
(NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are
"living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the
Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states:
"Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure.
These oroiects reDuroose aeine infrastructure and allow us to Drovide a level of service that sets Edina apart from other communities.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 1,500,000 1,500,000
Total
1,500,000
1,500,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund
Total
1,500,000
1,500,000
1,500,000
1,500,000
DRAFT Page 140 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PS -11 -005'
Project Name Police to Community Software
2013 thru 2017
Type New Department Public Safety Functions
Useful Life Contact Police Department
Category Equipment Priority 3 Significant
Status Active
Description
This enhancement to our software suite mill enable our agency to utilize the.internet to host a portal for citizens to retrieve, enter and print
reports. This „browser -based solution provides a convenient means for citizens 6 perform, simple searches, download reports and complete
applications online - Citizens can search accident reports, view the daily bulletin, view missing persons, view the agency's event calendar,
agency announcements and enter basic, non- emergency incident reports.
Jus if cation
P2C (Police To Citizen) enhances accessibility, engages citizens with.the agency and provides citizens with convenient access to public
information. Additionally,, this module will simplify operations, increase efficiency and reduce workload. In 2011, officers spent 708 hours
responding to and taking theft reports alone. The entry of even half of those reports by citizens using P2C will increase the time officers are on
the street and available for higher priority events. Other reports suitable for P2C include abandoned vehicles, lost property, property damage
and traffic complaints.
Providing citizens with the means to search and print copies of reports will free records technicians for more critical and beneficial tasks.
The acquisition of the P2C module alisns with Obiective #7 of Edina Vision 20/20 and is also cart of the Police Department's Work Plan.
Expenditures
Prior 2013 2014 2015
2016 2017 Future Total
EquipNehicles /Furnishings
25,000
25,000
Total
Funding Sources
25,000
Prior 2013 2014 2015
25,000
2016 2017 Future Total
Construction Fund
25,000
25,000
Total
25,000
25,000.
DRAFT Page 141 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PS -12 -007
Project Name PD Alarm Billing Software
2013 thru 2017
Type New Department Public Safety Functions
Useful Life Contact Police Department
Category Equipment Priority 3 Significant
Status Active
Description
The CryWolf software and interface automates the documentation, processing and billing of alarm calls. The two -way interface exports false
alarm call information and billing data from our Computer Aided Dispatch system (CAD) when alarm calls are generated and dispatched.
Additionally, the program builds and imports accurate and detailed premise information into CAD, enhancing officer and citizen safety.
We currently use an outdated data -entry program (Access) requiring redundant documentation of alarm calls. With an average of over 2400
alarm calls annually, the CryWolf software interface will reduce the amount of time spent by officers, dispatchers and support staff on alarm
tracking and billing. Additionally, this interface will imarove billine accuracv, enabline us to maximize revenue in this area.
Justification
This program would eliminate redundant datarentry for billing purposes. Integrated reports allow for easy tracking of outstanding invoices,
repeat offenders and locations with multiple alarms on the same date. Additionally the program maps alarm patterns to determine problem
areas. In the event the City adopts an alarm registration/permit program, CryWolf automatically tracks registered and unregistered locations,
potentially saving hundreds of clerical hours.
Using current technology to increase efficiency and maximize revenue is aligned with Objective #7 of Edina Vision 20/20.
In addition, the acquisition of this interface is hart of the Police Department Work Plan.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicies /Furnishings 50,000 50,000
Total
50,000
50,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 50,000 50,000
Total
50,000
50,000
DRAFT Page 142 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
F roject # PS -12 -008
Project Name PD License Plate Reader
Type New
Useful Life
Category Equipment
Description
2013 thru 2017
Department Public Safety Functions
Contact Police Department
Priority 5Important
Status Active
License Plate Recognition (LPR) is an image - processing technology used to identify vehicles by their license plates. This technology is used in
various security and traffic applications. It is available to "add on" to our current "in -car" video system. The camera finds and initiates license
date checks without the officer taking their eyes of the road and hands off the steering wheel.
the LPR's significant advantage is that the system can keep an image record of the vehicle which is useful in order to fight crime and fraud.
This is innovative technology that would assist the police department in locating stolen vehicles; vehicles wanted in other crimes; persons with
warrants; and non -valid drivers. It is like having a second officer in the car to complete the computer work needed to "run" license plates in
:he computer.
My recommendation is we purchase two mobile units. The averase life exnectancv of a LPR is five years.
Justification
The reason why the police department would like to purchase several LPR units is because it follows Edina's 20/20 Vision plan. The 20/20
Vision plan talks about innovation and providing technological resources that improve the quality of life for the residences. LPR will provide
innovative technology to reduce crime and apprehend violators.
Objective #2 in the 20/20 Vision states, "Provide a level of City services that sets Edina apart from other communities." Currently very few of
our surrounding cities have implemented LPR technology. With integrating LPR technology into Edina's patrol fleet, it will set us apart as a
premiere police oreanization.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 40,000 40,000
Total 40,000 40,000
DRAFT Page 143 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina., MN
Project # PS -13 -001
Project Name Fire Department Equipment Replacement
2013 thru 2017
Type Replace or repair Department Public Safety Functions
Useful Life Contact Fire Department
Category Equipment Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Fire department's equipment list includes passenger vehicles, fire
trucks, ambulances and rescue equipment, among other items. We estimate the useful life of this equipment to be around 6 years for an
ambulance up to about 20 years for a fire truck.
The Fire department also maintains a network of warning sirens located around the city.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 475,000 154,000 273,000 165,000 95,000 1,162,000
Total 475,000 154,000 273,000 165,000 95,000
1,162,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Equipment Replacement Progra 475,000 154,000 273,000 260,000 1,162,000
Total 475,000 154,000 273,000 260,000 1,162,000
DRAFT Page 144 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PS -13 -002
Project Name Police Department Equipment Replacement
2013 thru 2017
Type Replace or repair Department Public Safety Functions
Useful Life Contact Police Department
Category Equipment Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Police department has squad cars, dispatch and communications
equipment, and software included on their equipment replacement list. The useful lives of these items ranges from 3 years for a squad car up
to 10 or even 15 years for some of the dispatch and communications equipment.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future, Total
EquipNehicles /Furnishings 251,916
923,345
448,925
24,760
10,000
1,658,946
Total 251,916
923,345
448,925
24,760
10,000
1,658,946
Funding Sources Prior 2013
2014
2015
2016
2017 Future
Total
Equipment Replacement Progra 251,916 923,345 448,925 24,760 10,000 1,658,946
Total 251,916 923,345 448,925 24,760 10,000 1,658,946
DRAFT Page 145 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PS -13 -003
Project Name Inspections Division Equipment Replacement
2013 thru 2017
Type Replace or repair Department Public Safety Functions
Useful Life Contact Fire Department
Category Equipment Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Inspections division has several passenger vehicles used to get
Inspectors to various work sites around the City. These vehicles have an estimated useful life of 10 years.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 15,000 18,000 60,000 93,000
Total 15,000
18,000
60,000
93,000
Funding Sources Prior 2013
2014 2015 2016
2017 Future
Total
Equipment Replacement Progra 15,000 18,000 60,000 93,000
TOW 15,000 18,000 60,000 93,000
DRAFT Page 146 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project 4 PS -13 -004
Project Name Health Division Equipment Replacement
Type Replace or repair
Useful Life
Category Equipment
2013 thru 2017
Department Public Safety Functions
Contact Police Department
Priority n/a
Status Active
Description
Replace equipment according to the equipment replacement schedule. The Health division has one passenger vehicle with a useful life of
about 10 years.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 16,500 16,500
Total 16,500 16,500
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Equipment Replacement Progra 16,500 16,500
Total
16,500
16,500
DRAFT Page 147 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PS -13 -005
Project Name FD Plan Review Software
Type New
Useful Life
Category Equipment
Description
2013 thru 2017
Department Public Safety Functions
Contact Fire Department
Priority 3 Significant
Status Active
This request is for Plan Review software for the Building Inspections division. The software is requested by our customers and would improve
communications with the customer and reduce the time to approve designs and architectural plans. Currently all plan review is done with very
large paper plans. The proposed software would allow for immediate transmissions of questions and results with the customer. The building
and fire department personnel that need to work on approving the plans would be notified automatically with the process. Applicants are
notified when re- submission is required and the process repeats itself until final approval. Inspectors can also access projects and drawings
from any location to make notes for updates to approved plans. Upon completion, plans can be archived electronically. The cost is an
estimate.
Justification
The purpose of the proposed software is to meet the demands of the customer, improve our plan review accuracy, reduce the length of delay in
plan review, and improve approval of changes that occur during the building process. The software would improve the efficiency and reduce
the cost of the staff in the building inspections and fire inspections division, which will save taxpayers time and money, dramatically reduce
naner consumption. and provide a more transparent and efficient nermittina nrocess.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 250,000 250,000
Total 250,000 250,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 250,000 250,000
Total
250,000
250,000
DRAFT Page 148 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a PS -13 -006
Project Name CityWorks Code Enforcement Software
Type New
Useful Life
Category Equipment
2013 thru 2017
Department Public Safety Functions
Contact Police Department
Priority 3 Significant
Status Active
Description
�ityworks is a data management software program which empowers GIS to manage both physical infrastructure and land- focused asset
management. Cityworks is currently utilized by Engineering and Public Works to manage physical infrastructure assets in Edina.
d focused management will be used by other city departments providing services in conjunction with properties and businesses regarding
ining/maintenance /enforcement responsibilities. These responsibilities may include permits, licenses, planning activities and code
ircement cases. The software management system provides a central location for these activities, requests and functions to help city
irtrnents coordinate by property address. Service requests, work orders, inspections and projects are used to track citizen concerns and all
;s of work activities with their associated costs. Combining land- focused asset management with infrastructure asset management enables
organization to complete our asset management system. Building, Health and Planning will be key system users with Fire, Assessing,
;nsing, Finance and Administration being secondary.
addition to the
Justification
ation cost, an annual user's fee is required and is estimated to be $11
(Expanding our Cityworks Software Program to incorporate the Code Enforcement component provides a comprehensive software management I
system for our organization by adding land- focused asset management to existing infrastructure asset management. The software system will
address needs of various departments to coordinate information tracking and quality customer service response.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Planning /Design 50,000 50,000
Total 50,000 50,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 50,000 50,000
Total 50,000 50,000
DRAFT Page 149 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
2013 thru 2017
Project # PW_02_006
Project Name Public Works: Braemar Cold Storage: Improvements
Type New
Useful Life Unassigned
Category Buildings
Department Public Works
Contact Public Works Coordinator
Priority 7 Desirable
Status Active
Description I
Complete construction of concrete floor at Braemar Public Works Cold Storage Building. This improvement has a 50 year life and will
eliminate the need to continuously wash equipment that gets dusty from the dirt floor that exists in this facility.
Justification
The Braemar Public Works Cold Storage Building was constructed in 1998 -99 to store off season equipment for both Public Works and Park
Maintenance. Public Works Staff has placed concrete on the center drive aisle to reduce dust throughout the building. The remaining storage
areas are in need of a hard surface floor. This is a project that was projected to be completed in 2012 but was delayed due to the discussion
about the possibility of Sports Dome being located on this site.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 40,000 50,000 90,000
Total 40,000
50,000
90,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 40,000 50,000 90,000
Total 40,000 50,000 90,000
DRAFT Page 150 Tuesday, September 25, 2012
Capital Improvement Plan 2013 thru 2017
r'i4cr of P.4;ina MM
Justification
The Braemar Public Works Cold Storage Building was constructed in 1998 -99 to store off season equipment for both Public Works and Park
Maintenance. The building is 17,000 SF and is not fire protected. This project would provide fire suppression to the existing building.
This is a project that was projected to be completed in 2012 but was delayed due to the discussion about the possibility of Sports Dome being
located on this site.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction /Maintenance 70,000 70,000
Total 70,000 70,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 70,000 70,000
Total 70,000 70,000
DRAFT Page 151 Tuesday, September 25, ?017
Capital Improvement Plan
City of Edina, MN
Project # Pw -11 -006
Project Name GPS Electrical System
Type New
Useful Life
Category Equipment
Department Public Works
Contact Public Works
Priority 7 Desirable
Status Active
2013 thru 2017
Description
the intent of this project is to provide electrical locations for all of the electrical services for over 63 municipal facilities and City owned
Facilities.
Justification
As a developed community, the city's infrastructure generally including roads, utilities, and public buildings and electrical equipment is aging
and is in need of ongoing maintenance and replacement. Maintaining and replacing infrastructure represents a formidable challenge in the
years ahead because of the potential magnitude and cost of probable improvements. Knowing an exact location of these facilities will increase
the efficiency of the Public Works Department and will increase the protection of the life safety and welfare of the general public by allowing
us to locate these services more accurately.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 30,000 30,000
Total 30,000 30,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 30,000 30,000
Total 30,000 30,000
DRAFT Page 152 Tuesday, September 25, 2012
Capital Improvement Plan 2013 rhru 2017
City of Edina., MN.
Project Of PW_13 -001
Project Name Industrial Park Lighting
Type Replace or repair Department Public Works
Useful Life Contact Public Works
Category Infrastructure Priority 3 Significant
Status Active
Description
The intent of this project is to provide a change out of lighting in the industrial park near the Public Works facility..These poles,have
deteriorated at rapid pace and need to be replaced. Normal lighting changes,canbe accomplished during a reconstruction project and normally
are assessed back ,to the adjacent: property owners. Due to the irregularity of lot sizes, it is the intent of this project to.changout the lighting
f ix onsiand pol of
es'h new; poles and change the terms of the Contract with Excel to install meters and reduce lighting costs and increase
ine renairs'for this area. There are 64 lights and this simply cannot be performed under the current budget.
Justification
As a devel`oped,,community, the city's infrastructure generally including roads, utilities, and public buildings and electrical equipment is aging
and is in need of ongoing maintenance and replacement. Maintaining and replacing infrastructure represents a formidable challenge in the
years ahead because`of the potential magnitude and cost of probable improvements. This system is over 30 years old and there isn't a road
reconstruction project in this area for years to come. The pole bases are rusted and badly in need of replacement. The total cost of these
improvements is estimated at $416,000 including pole replacement, underground wire replacement, and potentially adding LED light fixtures.
We determined that it was most fiscally responsible to complete this project over a four 4 year period.
IAs part of Edina's Vision 20/20, one of the goals is to maintain a sound public infrastructure because it encourages the development of la I
stable private infrastructure, leadine to an enhancement of the sense of quality that Edina has and will enioy. This proiect meets that goal.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 104,000 104,000 104,000 104,000 416,000
Total 104,000 104,000 104,000 104,000 416,000
Funding Sources Prior 2013.
2014
2015
2016 2017 Future
Total
Construction Fund 104,000
104,000
104,000
104,000
416,000
Total 104,000
104,000
104,000
104,000
416,000
DRAFT Page 153 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # Pw -13 -002
Project Name Bridge Repairs
Type Replace or repair
Useful Life
Category Infrastructure
Department Public Works
Contact Public Works
Priority 1 Critical
2013 thru 2017
Status Active
Description
The intent of this funding is to provide additional revenue for bridge rehab and repairs other then the funds currently available in the general
Fund under bridge repairs (program 1343) There is $10,800 in the budget for 2013.
Justification
The city receives an annual bridge report from our certified consultant on 26 bridges in town.This report indicates the need for a more
aggressive preventative maintenance program to extend the useful life of these structures. Although most of these bridges are on State Aid
Routes. State aid funding is generally used for total reconstruction. This funding also replaces a past project to paint the Centennnial Lake
bridge railings that was estimated at $70,000 in 2015. Due to lack of this painting, these railings now need replacement as they are badly
rusted and in need of repair. Maintaining a sound infrastructure is a stated goal of Vision 20/20 and a sound bridge infrastructure is critical to
the safetv and duality of life of its residents.
Expenditures Prior 2013
2014
2015
2016
2017 Future
Total
Construction/Maintenance 100,000
170,000
100,000
100,000
100,000
570,000
Total 100,000
170,000
100,000
100,000
100,000
570,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund
Total
100,000 170,000
100,000 170,000
100,000 100,000
100,000 100,000
100,000
100,000
570,000
570,000
DRAFT Page 154 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # Pw -13 -003
Project Name Parking Ramp Repairs
Type Replace or repair Department Public Works
Useful Life Contact Public Works
Category Infrastructure Priority 3 Significant
Status Active
Description
2013 thru 2017
The intent of these funds is to extend the life of three city owned parking ramps by leveraging private investment and providing a City funding
source to jumpstart each of the ramp retrofits. These funds will be used for larger rehab and maintenance projects. ie: major joint repair, deck
coating, stairwell repairs or replacement, door replacement, camera system etc. and capitalize on the major reconditioning and/or expansion of
these facilities in the upcoming years. The cost of these repairs may be billed back to the 50th & France Association if it is the City Council
desire but is designed to leverage ttrivate investment for larger renovations.
Justification
As part of the 50th & France Business Area there are three parking ramps located in the downtown area. Maintaining sound public
infrastructure is essential to offering premium public facilities. It is highly recommended by our consultants to set up a regular scheduled
maintenance program. This program will address the ongoing Deterioration and extend the life of these structures.
One of the first accomplishments that is mentioned in the original Vision 20/20 is establishing and upgrading the 50th and France commercial
neighborhood starting in the 1930s. It also mentions that a sound public infrastructure encourages the development of a stable private
infrastructure, leading to an enhancement of the sense of quality that Edina has and will enjoy.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 30,000 30,000 30,000 30,000 120,000
TOta1 30,000 30,000 30,000 30,000 120,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Construction Fund 30,000 30,000 30,000 30,000 120,000
Total 30,000 30,000 30,000 30,000
120,000
DRAFT Page 155 Tuesdcrv, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # PW -13 -004
Project Name Public Works Equipment Replacement
Type Replace or repair
Useful Life
Category Equipment
Description
Department Public Works
Contact Public Works
Priority n/a
Status Active
2013 thru 2017
Replace equipment according to the equipment replacement schedule. The Public Works department has over $6 million of equipment covered
under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an
estimated useful life of between 10 -20 years.
Justification
Regular updates to equipment helps to keep maintenance costs low.
Expenditures Prior 2013
2014
2015
2016
2017 Future
Total
EquipNehicles /Furnishings 390,254
511,395
314,842
664,420
563,415
2,444,326
Total 390,254
511,395
314,842
664,420
563,415
2,444,326
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Equipment Replacement Progra 390,254 511,395 314,842 664,420 563,415 2,444,326
Total
390,254 511,395 314,842 664,420 563,415
2,444,326
DRAFT Page 156 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # Pw -13 -005
Project Name Utilities Equipment Replacement
Type Replace or repair
Useful Life
Category Equipment
Department Public Works
Contact Public Works
Priority 3 Significant
2013 thru 2017
Status Active
Description
This project includes normal replacement of vehicles that are part of the utilities division fleet.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. We cannot perform the
functions of a Public Works Department without a reliable fleet. Vehicles are replaced on a minimum of a 10 year schedule and vehicles have
reached their life expectancy. This includes a fleet vehicles, (trucks), tandem in 2013, a street sweeper in 2014, replacement jetter truck in
2015 and backhoe replacement in 2016.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 260,000 237,000 465,000 270,000 80,000 1,312,000
Total 260,000
237,000
465,000
270,000
80,000
1,312,000
Funding Sources Prior 2013
2014
2015
2016
2017 Future
Total
Utility Fund - Sewer 133,000 440,000 104,000 40,000 717,000
Utility Fund - Storm 63,000 197,000 63,000 323,000
Utility Fund - Water 64,000 40,000 25,000 103,000 40,000 272,000
Total 260,000 237,000 465,000 270,000 80,000 1,312,000
DRAFT Page 157 Tuesday, September 15, 2012
Capital Improvement Plan
City of Edina, MN
Project # Pw -13 -006
Project Name well #13 Rehab Project
2013 thru 2017
Type Replace or repair Department Public Works
Useful Life 6 years Contact Public Works Coordinator
Category Infrastructure Priority 5Important
Status Active
Description
this project would include the rehabilitation of Well # 13 by repairing or replacing the well pump, motor, and other worn equipment.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its
municipal water wells. This fits into that work plan as it was last rehabilitated in 2009. This is a well that runs year round.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 120,000 120,000
Total 120,000 120,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 120,000 120,000
Total 120,000 120,000
DRAFT Page 158 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # Pw -13 -007
Project Name well #17 Rehab Project
Type Replace or repair
Useful Life 6 years
Category Infrastructure
2013 thru 2017
Department Public Works
Contact Public Works Coordinator
Priority 5Important
Status Active
Description
This project would include the rehabilitation of Well # 17 by repairing or replacing the well pump, motor, and other wom equipment.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its
municipal water wells. This fits into that work plan as it was last rehabilitated in 2007. This is a well that runs year round and is past due for
rehabilitation.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 120,000 120,000
Total
120,000
120,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 120,000 120,000
Total 120,000 120,000
DRAFT Page 159 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # Pw -13 -008
Project Name well #6 Rehab Project
Type Replace or repair
Useful Life 6 years
Category Infrastructure
2013 thru 2017
Department Public Works
Contact Public Works Coordinator
Priority 5Important
Status Active
Description
Phis project would include the rehabilitation of Well # 6 by repairing or replacing the well pump, motor, and other worn equipment.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services.,Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its
municiaal water wells. This fits into that work plan as it was last rehabilitated in 2007. This is a well that runs vear round.
Expenditures
Prior 2013 2014 2015 2016 2017 Future
Total
EquipNehicles /Furnishings
120,000
120,000
Total
Funding Sources
120,000
Prior 2013 2014 2015 2016 2017 Future
120,000
Total
Utility Fund - Water
120,000
120,000
Total
120,000
120,000
DRAFT Page 160 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -08 -009
Project Name well #5 (West 69th Street)
2013 thru 2017
Type Replace or repair Department Public Works
Useful Life 15 years Contact Public Works Coordinator
Category Infrastructure Priority 4
Status Active
Description
This project would include the rehabilitation of Well # 5 by repairing or replacing the well pump, motor, and other worn equipment. It also
includes converting the existing well pump to a submersible pump and removal of the building that is in the median of West 69th Street after
it is hooked up to the new water treatment facility. The timing of this work has been pushed back so that it coincides with new water
treatment facilitv in the Southdale area.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its
seasonal municipal water wells. This fits into that work plan as it was last rehabilitated in 2002.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 120,000 120,000
Total
120,000
120,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 120,000 120,000
Total 120,000 120,000
DRAFT Page 161 Tuesday, Sep[ember 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -09 -010
Project name Well # 2 Rehab Project
Type Replace or repair
Useful Life 6 years
Category Infrastructure
2013 thru 2017
Department Public Works
Contact Public Works Coordinator
Priority 1 Critical
Status Active
Description
This project would include the rehabilitation of Well # 2 by repairing or replacing the well pump, motor, and other worn equipment. It also
includes removal of sand from the well hole as this is a well that now pumps into the new water treatment facility.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its
municipal water wells. This fits into that work plan as it was last rehabilitated in 2006. This is a well that runs year round.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 120,000 120,000
Total 120,000 120,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 120,000 120,000
Total 120,000 120,000
DRAFT Page 162 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -10 -006
Project Name water Meter Replacement Project
2013 thru 2017
Type Replace or repair Department Public Works
Useful Life 20 years Contact Public Works Coordinator
Category Infrastructure Priority 1 Critical
Status Active
Description
This project is a continuation of the project that was initiated in 2012 and under contract with Ferguson Water Works. It includes replacing all
of our existing water meters with new radio read meters.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. As
mentioned above, this is a project that is currently under Contract.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 1,600,000 2,100,000 3,700,000
Total 1,600,000 2,100,000
3,700,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 1,600,000 2,100,000 3,700,000
Total 1,600,000 2,100,000
3,700,000
DRAFT Page 163 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -10 -008
Project Name well #9 Rehab Project
Type Replace or repair
Useful Life 15 years
Category Infrastructure
2013 thru 2017
Department Public Works
Contact Public Works Coordinator
Priority 1 Critical
Status Active
Description
This project would include the rehabilitation of Well # 9 by repairing or replacing the well pump, motor, and other worn equipment. It also
includes building modifications as this is a well that now pumps into the new water treatment facility.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its
municipal water wells. This fits into that work plan as it was last rehabilitated in 2006. This is a well that runs year round.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 200,000 200,000
Total 200,000 200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 200,000 200,000
Total 200,000 200,000
DRAFT Page 164 Tuesday, September 25, 2012
Capital Improvement'Plan 2013 thru 2017
City of Edina., MN
Project # UT -10 -009
Project Name Well # 11 Rehab Project
-)Type Replace or repair Department Public Works
Useful Life 6 years Contact Public Works Coordinator
Category. Infrastructure Priority 3 Significant
Status Active
Description
This project would include the rehabilitation'of Well # 11 by repairing themell pump, motor, and other worn equipment.
Justification
M outlined in Vision 20/20, it is the mi §sion'of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to,Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure; the Public Works Department has implemented a 7 year rehabilitation schedule for each of its
municipal water wells. This fits into that work plan as it was last rehabilitated in 2007.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 120,000 120,000
Total 120,000 120,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund -'Water 120,000 120;000
Total 120,000 120,000
DRAFT Page 165 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -11 -006
Project Name well #10 Rehab Project
2013 thru 2017
Type Replace or repair Department Public Works
Useful Life 6 years Contact Public Works Coordinator
Category Infrastructure Priority 4
Status Active
Description
Fhis project would include the rehabilitation of Well # 10 by repairing the well pump, motor, and other worn equipment.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the
Comprehensive Plan identifies a goal to Provide the City's water customers with safe, reliable, high quality potable water supply. In order to
provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its
municipal water wells. This fits into that work plan as it was last rehabilitated in 2008.
Expenditures Prior 2013 2014 2015 2016 2017 Future
Total
Construction/Maintenance 120,000
120,000
Total 120,000
120,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future
Total
Utility Fund - Water 120,000 120,000
Total
120,000
120,000
DRAFT Page 166 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project is UT -11 -007
Project Name Storm Water Lift Station #3 Rehab
Type Replace or repair
Useful Life 30 years
Category Infrastructure
2013 thru 2017
Department Public Works
Contact Public Works Coordinator
Priority 1 Critical
Status Active
Description
Phis project would include the upgrade of the Melody Lake Lift Station by providing new electrical equipment, new pumps, etc.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. This lift station is located in the
Southeast Minnehaha Creek drainage area as referenced in the Comprehensive Water Resources Management Plan. It regulates the elevation
of the water level and provides flood protection in Melody Lake and has become unreliable due to its age and condition. It simply needs to be
replaced.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 200,000 200,000
Total 200,000 200,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Storm 200,000 200,000
Total
200,000
200,000
DRAFT Page 167 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project a UT -11 -008
Project Name Sewer Camera and Cable Reel
Type New
Useful Life 15 years
Category Equipment
2013 thru 2017
Department Public Works
Contact Public Works Coordinator
Priority 3 Significant
Status Active
Description
Phis project would include the purchase of a sewer camera to mount directly on the sewer jetter truck to give the Utility employees the ability
:o televise the larger sewer mains and storm sewers within the City of Edina.
Justification
As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services and maintain a sound public
infrastructure. With our current equipment, it is nearly impossible to televise our larger sewer mains and storm sewer system. Televising our
system provides an important mechanism to proactively diagnose and correct deficiencies in our infrastructure.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Sewer 20,000 20,000
Utility Fund - Storm 20,000 20,000
Total 40,000 40,000
DRAFT Page 168 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project 4 UT -12 -006
Project Name well No. 8
2013 thru 2017
Type Replace or repair Department Public Works
Useful Life Contact Public Works Coordinator
Category Infrastructure Priority 4
Status Active
Description
This project would include the replacement of the siding, roof, soffits and fascia on the entire building. This wellhouse is located within a
residential district and needs maintenance to blend into the adjacent land use.
Justification
As outlined in Vision 20/20, it is the goal of the City Council to provide balance of land uses. In order to be a model of urban development, it
is the intent of this project to blend into the surrounding land use and provide a more manicured look to this important piece of infrastructure.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
Construction/Maintenance 35,000 35,000
Total 35,000 35,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Water 35,000 35,000
Total
35,000
35,000
DRAFT Page 169 Tuesday, September 25, 2012
Capital Improvement Plan
City of Edina, MN
Project # UT -12 -007
Project Name SCADA Radio System Upgrade
2013 thru 2017
Type Replace or repair Department Public Works
Useful Life 30 years Contact Public Works Coordinator
Category Equipment Priority 4
Status Active
Description
Replace all radios on the Gleason Water Tower leg of the SCADA system.
Justification
The Supervisory Control And Data Acquisition is the communication system for our water and sewer systems. It allows the system to alert our
employees when there is a problem and creates the backbone of a sound public infrastructure. The SCADA system allows Public Works Staff
to provide effective and valued public service to our residents as outlined in the City of Edina's mission statement. These older radios are
outdated, nor repairable and highly unreliable and need to be replaced.
Expenditures Prior 2013 2014 2015 2016 2017 Future Total
EquipNehicles /Furnishings 60,000 60,000
Total 60,000 60,000
Funding Sources Prior 2013 2014 2015 2016 2017 Future Total
Utility Fund - Sewer 20,000 20,000
Utility Fund - Storm 20,000 20,000
Utility Fund - Water 20,000 20,000
Total 60,000 60,000
DRAFT Page 170 Tuesday, September 25, 2012