HomeMy WebLinkAbout2005-01-18_COUNCIL PACKETAGENDA
EDINA HOUSING AND REDEVELOPMENT AUTHORITY
EDINA CITY COUNCIL
JANUARY 18, 2005
7:00 P.M.
ROLLCALL
ADOPTION OF CONSENT AGENDA Adoption of the Consent Agenda is made by the
Commissioners as to HRA items and by the Council Members as to Council items. All
agenda items marked with an asterisk ( *) in bold print are Consent Agenda items and are
considered routine and will be enacted by one motion. There will be no separate discussion
of such items unless a Commissioner, Council Member or citizen so requests it. In such cases
the item will be removed from the Consent Agenda and considered in its normal sequence on
the Agenda.
* I. APPROVAL OF MINUTES OF HRA - Regular Meeting of January 4, 2005 .
* II. CONFIRMATION OF PAYMENT OF CLAIMS - As per Pre -List dated January 2,
2005, TOTAL $195.00.
III. ADTOURNMENT
EDINA CITY. COUNCIL
RECOGNITION OF SGT. STEPHEN MARSTON - MOTHERS AGAINST DRUNK DRIVERS (MADD)
* I. APPROVAL OF MINUTES - Regular. Meeting of January 4, 2005
II. AWARD OF BID
* A. Police Department Vehicle Purchase - Twelve Vehicles - Three Vendors
* B. Fairway Mower - Braemar Golf Course
* C. Groundsmaster Rotary Mower - Braemar Golf Course
* D. 1/2 Ton Chevrolet Pick -up - Utilities
* E. ASV Track Loader - Utilities
* F. 22 Garbage Receptacles - 50th & France
III. REPORTS/ RECOMMENDATIONS
* A. Traffic Safety Staff Review of January 10, 2005
Agenda /Edina City Council
January 18, 2005
Page 2
B. Annual Appointment of Weed Inspector
C. Enforcement of Hennepin County Smoke Free Ordinance
D. Change Order - Pond Dredging/ Paving - Swimming Pool and Point of France
Ponds - Contract No. 03 -6 - Engineering
E. Resolution No. 2005 -07 - Hennepin County Electronic Proprietary Data Base
(EPDB) Conditional Use License Agreement
F. Set Hearing Date (2/15/05) Resolution No. 2005 -08 - Neighborhood Roadway
Improvement Projects: No. A -204, South Harriet Park Northwest; and No. BA-
326, Sunnyslope
G. Set 3/1/05 Hearing Date for Final Draft of City of Edina Transportation Policy
H. Reappointment to Boards, Committees and Commissions
I. Appointment of Mayor Pro Tern
J. Renaming of Centennial Lakes Park Amphitheatre
IV. FINANCE
A. CONFIRMATION OF PAYMENT OF CLAIMS As per Pre -List dated January 5,
2005, TOTAL $491,416.08; and January 12, 2005, TOTAL $659,925.66.
V. COMMUNICATIONS AND PETITIONS
VI. CONCERNS OF RESIDENTS
VII. INTERGOVERNMENTAL ACTIVITIES
VIII. SPECIAL CONCERNS OF MAYOR AND COUNCIL
IX. MANAGER'S MISCELLANEOUS ITEM
SCHEDULE OF UPCOMING MEETINGS
Thur
Jan 20
Reception - Mayor Maetzold & Member Kelly 5:00 P.M.
Sat
Jan 29
Work Session
8:00 A.M.
Tues
Feb 1
Regular Meeting
7:00 P.M.
Tues
Feb 15
Regular Meeting
7:00 P.M.
Mon
Feb 21
PRESIDENTS DAY HOLIDAY OBSERVED - City Hall Closed
Tues
Mar 1
Regular Meeting
7:00 P.M.
Tues
Mar 15
Regular Meeting
7:00 P.M.
Tues
Apr 5
Regular Meeting
7:00 P.M.
Mon
Apr 11
Board of Appeals & Equalization
5:00 P.M.
Thur
Apr 14
Volunteer Recognition Reception
5:00 P.M.
Tues
Apr 19
Regular Meeting
7:00 P.M.
BRAEMAR CLUBHOUSE
EDINA SENIOR CENTER
COUNCIL CHAMBERS
COUNCIL CHAMBERS
COUNCIL CHAMBERS
COUNCIL CHAMBERS
COUNCIL CHAMBERS
COUNCIL CHAMBERS
EDINBOROUGH PARK
COUNCIL CHAMBERS
NEIGHBORHOOD ROADWAY
RECONSTRUCTION PROGRAM
CITY COUNCIL WORKSHOP
JANUARY 18, 2005 - 5:30 PM
Neighborhood Road Construction
Issues:
Why reconstruct?
What do.we look at ....Options.
Who funds -the projects?
How is the project financed?
Policy issues.
- (l. /: /''- '•111(; `,.
City Council Workshop Jan 18, 2005
TYPICAL PAVEMENT PERFORMANCE CURVES
10 -
P a
E TYPICAL LIFE
R
F OF PAVENEM
O 6
R
M
A
N. a
C
E
2
o
10 20
SEAL -)OAT.
EVERY 10 to 12
,JPAVENEPIr RECLAIM NG
ORRECONSTRUCTION
30 Q 50
YEAR
OD 70
Why?
11
City Council Workshop Jan 18, 2005
Options
Staff analyzes the following:
• Road replacement
• Add Curb &Gutter if it doesn't exist
• Utility Improvements
• Street Lighting
• Sidewalks
• Potential burying of overhead util.
ME f 71
___r City Council Workshop Jan 18, 2005
el
r� �J��T1Jrr! 1��r1JT����� 1�l� ;
W.
Mud Lek,
..... h—d
. k'
IndianAead
N'. much%
LAk.
tk.
H—k•
Uk,
L
p
Y-1
[Ad.
41
1,
Ld.
Options. . N 0 0 N 0 N . Curb &Gutter
Benefits:
• More cost effective
• Reduces pavement failure
• Controls drainage
• Aids street cleaning and snow plowing
• Reduces fall and spring maintenance
• Basic Safety — protects streetscape items
City Council Workshop Jan 18, 2005
Options..........No project
If a project is delayed:
• Minimally maintain roadway
"Maintenance costss increase on. older roads"
• Pothole. patching,. skin patching
• Snowplowing
• 10+ year delay in reconstructing. roadway
(increasing costs)
F \i__° City Council Workshop Jan 18, 2005
Funding
❑ General Fund Street Maintenance
budget ($3,200,000) currently covers:
• Seal- coating
• Patching
• Snow Removal
Street Sweeping
City Council Workshop Jan 18, 2005
Fu nd i ng . 0. H istorical Assessment. History
LJ 100% Assessment
Ll Street Improvement Cost - varies on:
• Density of neighborhood
• Geometrics of roadway
• If curb &gutter exist or adding
Add curb and gutter:
Pavement only (reclaim):
$7,000 for 1/4 Acre lot
$15,000 for % Acre lot
$4,000 for '/4 Acre lot
: ll ~$10,000 for 1.5 Acre lot
City Council Workshop Jan 18, 2005
Funding....Historical. Assessment History
❑ Pay back - in full or 10 year
• Capitalized Interest - Current 6.5% (2
pts above bond rate)
Ll Utility costs. are borne by all. users
{1 +1
City Council Workshop Jan 18, 2005
Finance. Issues .....100% Assessment
❑ Proposed Street Improvement Program increases
annual activity from $500,000 /yr to $3,000,000 /yr.
❑ $500,000 was internally financed, but new
program necessitates funding with Improvement
Bonds.
❑ Bonds could be issued every two years, but
improvement must be authorized before bonds
can be issued.
❑ Want to time bonds around significant utility
improvements — economies of scale in bond
issues..
City Council Workshop Jan 18, 2005
Finance. lssues....Other Options
0 100% assessment in other communities has
encouraged appeals /lawsuits.
o Funding Options other than 1 assessment?
• Levy for % of Improvement /Assess Balance.
• Debt .levy may be necessary for balance if levy
limits imposed.
• Debt levy for 2005 program - need to determine
number of years to spread.
• Balance assessed still needs improvement bonds
• Other financing options..:.
• Future Option may be transportation utility.
a
k
�,ti ns City Council Workshop Jan 18, 2005
Finance Issues
❑ Transition Issues /Fairness- w /previous
assessment methods.
• General Fund Levy impacts businesses in
addition to residential areas.
• Debt Levy adds interest component which
increases cost over general fund levy.
City Council Workshop Jan 18, 2005
L
O pt��o n�s;Dffe�c�t�s o n Home,:.,)s
Total Budget $ 3,000,000
Current Tax Levy $ 18,380,000
Annual Tax Cost on
% City Coverage Dollars % Increase Residential Homestead
of Assessment Needed In Levy $300,000 $ 500,000 $ 1,000,000
20%
$
600,000
3.26%
$
23.49
$
39.15
$
88.09
30%
$
900,000
4.90%
$
35.25
$
58.75
$
132.19
40%
$
1,200,000
6.53%
$
47.01
$
78.35
$
176.29
50%
$
1,500,000
8.16%
$
58.77
$
97.95
$
220.39
60%
$
1,800,000
9.79%
$
70.53
$
117.55
$
264.49
70%
$
2,100,000
11.43%
$
82.29
1 $
137.15
$
308.59
o e
, City Council Workshop Jan 18, 2005
Funding ...What our neighbors do?
ado
a }1 k
City Council Workshop Jan 18, 2005
Mandate
Other
Street
Utility
City
Curb &
funding
Assessment
Assessment
Gutter
source
%
%
Minnetonka
Yes
Annual Tax
0
0
levy
Eden Prairie
Yes
Annual Tax
40 %
0
Le vy / SA
Bloomington
Yes
Bonds
25%
0
Richfield
Yes
Franchise Fees
Set cost
0
St. Louis Park
Yes
Franchise Fees
0
0
/ Utility Fees
Plymouth
Y
Yes
Annual Tax
30%
0 (30% for
Levy /Bonds
storm)
ado
a }1 k
City Council Workshop Jan 18, 2005
Policy Issues
❑ Should the City pick up a portion of the neighborhood
assessment? If so, what amount?
❑ What should the City contribution cover of the
improvements — curb & gutter, street reconstruction or
utility improvements?
• Should Council defer improvements based on
neighborhood opposition?
• Should Council mandate curb & gutter improvements?
❑ If implemented for 2005, how do you spread the burden
in future years? Note:Levy for 2006 will include % for
government operations, gymnasium and street
improvement levy
°, City Council Workshop Jan 18, 2005
MINUTES
OF THE
EDINA HOUSING AND REDEVELOPMENT AUTHORITY
HELD AT CITY HALL
JANUARY 4, 2005,
7:00 P.M.
ROLLCALL Answering rollcall were Commissioners Housh, Masica, Swenson and Chair
Hovland.
CONSENT AGENDA APPROVED Motion made by Commissioner Housh and seconded
by Commissioner Masica approving the Consent Agenda for the Edina Housing and
Redevelopment Authority as presented.
Rollcall:
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
*MINUTES OF THE REGULAR MEETING OF THE EDINA HOUSING AND
REDEVELOPMENT AUTHORITY FOR JANUARY 4, 2005, APPROVED Motion made
by Commissioner Housh and seconded by Commissioner Masica approving the Minutes of
the regular meeting of the Edina Housing and Redevelopment Authority for January 4,
2005.
Motion carried on rollcall vote — four ayes.
There being no further business on the Edina Housing and Redevelopment Authority Agenda,
Chair Hovland declared the meeting adjourned.
Executive Director
R55CKREG LOG20000
Check 0 Date Amount Vendor / Explanation PO 0
13943 1/13/2005 100049 EHLERS 6 ASSOCIATES INC
195.00 TIF SEMINAR 2005
195.00
195.00 Grand.Total
CITY OF EDINA
Council Check Register
111312005 . — 1/13/2005
Doc No Inv No Account No
104307 123004 9134.6103
Subledger Account Description
PROFESSIONAL SERVICES
Payment Instrument Totals
Check Total 195.00
Total Payments 195.00
1/12/2005 16:00:30
Page - . 1
Business Unit
GRANDVIEW TAX DISTRICT
R55CKSUM LOG20000
Company
09000 HRA FUND
We confirm to the best of our knowledge
and belief, that these claims
comply in all material respects
with the requirements of the City
of Edina purchasing licies and
procedures date
City hUnager
o e
COMMENDATION OF
SGT. STEPHEN MARSTON
BY
MADD (Mother's Against
Drunk Drivers)
F-1 No packet data
Oral presentation
F1 Information coming
MINUTES
OF THE REGULAR MEETING OF THE
EDINA CITY COUNCIL
HELD AT CITY HALL
JANUARY 4, 2005
7:00 P.M.
OATHS OF OFFICE ADMINISTERED Judge James Swenson administered the Oath of Office to
Ann Swenson, Council Member. Clerk Mangen administered the Oath of Office to James B. Hovland,
Mayor and Linda Masica, Council Member. Terms of office for the Mayor and Council Members will
be to January 1, 2009.
ROLLCALL Answering rollcall were Members Housh, Masica, Swenson and Mayor Hovland.
CONSENT AGENDA ITEMS APPROVED Motion made by Member Housh and seconded by
Member Masica approving the Council . Consent Agenda as presented with the exception of
Approval of Special Minutes of December 21, 2004.
Rollcall:
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
*MINUTES OF THE REGULAR MEETING OF DECEMBER 21, 2004, APPROVED Motion made
by Member Housh and seconded by Member Masica, approving the Minutes of the Regular
Meeting of the Edina City Council for December 21, 2004.
Motion carried on rollcall vote - five ayes.
MINUTES OF THE SPECIAL MEETING OF DECEMBER 21, 2004, APPROVED AS AMENDED
Mayor Hovland removed the Special Meeting Minutes of December 21, 2004, from the agenda for an
addition of language, "Conceal Carry Legislation', to the list of topics discussed.
Motion made by Mayor Hovland and seconded by Member Housh approving the Minutes of the
Special Meeting of December 21, 2004, as amended.
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
ORDINANCE NO. 2005-1 AN ORDINANCE ADDING NEW SUBSECTION 130.04 - FILLING OF
VACANCIES IN OFFICE APPROVED, WITH WAIVER OF SECOND READING Mayor Hovland
noted that two years remain on his term on the Council because of his election to Mayor. Manager
Hughes noted according to State Law, the Council must designate whether Council vacancies will be
filled by special election or by appointment. He asked Attorney Gilligan to draft an Ordinance
providing the method for filling this vacancy. He noted that at any time, the Ordinance could be
amended.
Member Masica asked: for history on the process and if a formal application had been developed. Mr.
Hughes replied that he had been through the appointment. process three times. He noted that in all
three cases the Councils decided to fill the vacancies by appointment as opposed to a special election.
Mr. Hughes recalled in two cases the applicants were questioned about their interest in seeking
election at the next general election. He said an application similar Boards' and Commissions'
application was used during the last two appointments.
Page 1
Minutes/Edina Ci!y Council /fanuary 4, 2005
Member Housh indicated that elections were expensive. He asked serious consideration be given to
appointing one of the candidates who were on the ballot in November.
Member Swenson concurred with the application process going forward.
Mayor Hovland asked for more information on the process and the timing. Mr. Hughes indicated the
information could be placed on the website and in the Sun - Current. He suggested that a ,deadline be
set of January 27th for receipt of applications.
Member Masica asked if there was a state statute regulating when a vacancy must be filled. Attorney
Gilligan said state statute does not specify a deadline but states appointments must be completed in a
reasonable time.
Member Housh said as the Council was seated at present, the appointment vote could be a deadlock.
Mr. Hughes noted that if a deadlock were to happen the Mayor would make the appointment.
Mayor Hovland asked if a screening process of the applicants could be established. Mr. Hughes
replied the Council could interview all applicants or a list of finalists. He noted a committee of the
Council. could be chosen to develop a list of finalists stating he believed all applicants were
interviewed during the last appointment process. ,
Member Housh suggested since the election was recent, seeking the interest of the candidates who
ran for election in filling the vacancy.
Member Masica said she felt the process should be open to everyone.
Member Swenson concurred with Member Masica that the process should be open to everyone.
Mayor Hovland indicated that flexibility at the front end of the process would be valuable.
Mr. Hughes said depending upon the number of applicants, the interview process could possibly be
completed and a decision made by the February 15, 2005, Council Meeting.
Member Masica made a motion adopting Ordinance No. 2005 -1, An Ordinance, Adding New
Subsection 130.04 - Filling Vacancies in Office.with waiver of second reading and directing staff to
prepare an application, to prepare a press release inviting applications to fill the vacancy and to
notify the candidates who ran for the Council in the November General Election. Member. Housh
seconded the motion.
Rollcall:
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
BID AWARDED FOR WELL #4 AND #16 - CONTRACT NO. 04-4PW REPAIR, IMPROVEMENT
NO. WM-447 AND 448 Mr. Hughes noted that the well repair for Well #4 and Well #16, Contract No.
04 -4PW, Improvement No. WM -447 and 448, was not on the consent agenda as the low bid was
approximately 10% over the Capital Improvement Plan allocated for the project. Staff would
recommend approval of the project.
Page 2
Minutes/Edina City Council/January 4, 2005
Member Swenson made a motion approving the award of bid for well repair on Well #4 and Well
#16, Contract No. 04 -4PW, Improvement No. WM-447 and 448, to recommended low bidder,
Municipal Builders, at $352,827.00.
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
*AWARD OF BID FOR 20 ELECTRIC GOLF CARS - BRAEMAR GOLF COURSE Motion made by
Member Housh and seconded by Member Masica approving the award of bid for twenty (20)
electric golf cars at Braemar Golf Course to recommended low bidder, Versatile Vehicles, Inc., at
$37,500.00.
Motion carried on rollcall vote - four ayes.
BOARD OF APPEALS AND EQUALIZATION DATE SET - APRIL 11, 2005 Mr. Hughes explained
a date must be set for the Board of Appeal and Equalization between April 1, 2005 and May 31, 2005.
He suggested April 11, 2005, be set for the meeting with the date of the continuation meeting April 25,
2005.
Mr. Hughes informed the Council that state law now requires the Council to have two hours of
training on the process of the Board of Appeals and Equalization. He indicated Assessor Wilson
would be the trainer and suggested setting a date in March for the training.
Member Masica made a motion setting April 11, 2005, as the Board of Appeal and Equalization at
5:00 P.M. in the Council Chambers. Member Housh seconded the motion.
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
*RESOLUTION NO. 2005-01, APPROVED - DESIGNATION OF OFFICIAL NEWSPAPER Motion
made by Member Housh and seconded by Member Masica approving the following resolution:
RESOLUTION NO. 2005-01
DESIGNATING
OFFICIAL NEWSPAPER
BE IT RESOLVED by the City Council of the City of Edina, Minnesota, that the Edina Sun - Current
be and is hereby designated as the Official Newspaper for the City of Edina for the year 2005.
Passed and adopted this 4th day of January 2005.
Motion carried on rollcall vote - four ayes.
*RESOLUTION NO. 2005 -02, APPROVED - SIGNATORY RESOLUTION Motion made by
Member Housh and seconded by Member Masica approving the following resolution:
RESOLUTION NO. 2005-02
SIGNATORY RESOLUTION
BE IT RESOLVED that persons holding office as Mayor, Manager and Treasurer of the City of
Edina, be, and they hereby are authorized to act for this municipality in the transaction of any
banking business with Bremer Bank, Crown Bank, Excel Bank, Fidelity Bank, Marshall & Ilsley
Bank (M & I), North American, TCF National Bank, U.S. Bank, Wells Fargo Bank, and Western
Bank, (hereinafter referred to as the "Bank ") from time to time and until written notice to any Bank
to the contrary, to sign checks against said accounts, which checks will be signed by the Mayor,
Manager and City Treasurer. Each Bank is hereby authorized and directed to honor and pay any
checks against such account if signed as above described, whether or not said check is payable to
the order of, or deposited to the credit of, any officer or officers of the City, including the signers
of the check.
Page 3
Minutes/Edina City Council/fanuary 4, 2005
ADOPTED this 4th day of January, 2005.
Motion carried on rollcall vote four ayes.
*RESOLUTION NO. 2005 -03, APPROVED - DESIGNATION OF DIRECTOR/ ALTERNATE
DIRECTOR OF SUBURBAN RATE AUTHORITY Motion made by Member Housh and seconded
by Member Masica approving the following resolution:
RESOLUTION NO. 2005-03
DESIGNATING DIRECTOR
AND ALTERNATE DIRECTOR TO
SUBURBAN RATE AUTHORITY
BE IT RESOLVED by the City Council of the City of Edina, Minnesota, as follows: John C.
Wallin is hereby designated to serve as a Director of the Suburban Rate Authority, and Margaret
(Peggy) Gibbs is hereby designated to serve as Alternate Director of the Suburban Rate Authority
for the year 2005 and until their successors are appointed.
Motion carried on rollcall vote - four ayes.
*RESOLUTION NO. 2005 -04, APPROVED - DESIGNATION OF DIRECTOR/ ALTERNATE
DIRECTOR OF LOGIS Motion made by Member Housh and seconded by Member Masica
approving the following resolution:
RESOLUTION NO. 2005-04
DESIGNATING DIRECTOR
AND ALTERNATE DIRECTOR
TO LOGIS
BE IT RESOLVED by the City Council of the City of Edina Minnesota, as follows: John C.
Wallin is hereby designated as a Director of LOGIS and Eric R. Anderson is hereby designated as
Alternate Director of LOGIS for the year 2005, and until their successors are appointed.
Motion carried on rollcall vote - four ayes.
*RESOLUTION NO. 2005-05, APPROVED - FACSIMILE SIGNATURES Motion made by Member
Housh and seconded by Member Masica approving the following resolution:
RESOLUTION NO. 2005-05
AUTHORIZING USE OF
FACSIMILE SIGNATURES BY PUBLIC OFFICIALS
RESOLVED that the use of facsimile signatures by the following named persons:
JAMES B. HOVLAND - Mayor
GORDON L. HUGHES - City Manager
JOHN WALLIN - Treasurer
on checks, drafts, warrants, warrant - checks, vouchers or other orders of public funds deposited in
Bremer Bank, Crown Bank, Excel Bank, Fidelity Bank, Marshall & Ilsley Bank, North American,
TCF National Bank, U.S. Bank, Wells. Fargo Bank and Western Bank, be and hereby are approved,
and that each of said persons may authorize said depository banks to honor any such instrument
bearing his facsimile signature in such form as he may designate and to charge the same to the
account in said depository bank upon which drawn as fully as though it bore his manually written
signature and that instruments so honored shall be wholly operative and binding in favor of said
depository bank although such facsimile signature shall have been affixed without his authority.
ADOPTED this 4th day of January, 2005.
Motion carried on rollcall vote - four ayes.
*RESOLUTION NO. 2005 -06, APPROVED DESIGNATING OFFICIAL DEPOSITORIES Motion
made by Member Housh and seconded by Member Masica approving the following resolution as
presented:
Page 4
Minutes/Edina City Council/lanuary 4, 2005
RESOLUTION NO. 2005-06
DESIGNATING DEPOSITORIES
BE IT RESOLVED that the Crown Bank, Excel Bank, Fidelity Bank, Bremer Bank, Marshall
& Ilsley (M & I), North American, TCF National Bank, U.S. Bank, Wells Fargo Bank and Western
Bank, are authorized to do banking business in Minnesota, be and are hereby designated as
Official Depositories for the Public Funds of the City of Edina, County of Hennepin, Minnesota,
until January 1, 2006.
ADOPTED this 4th day of January, 2005.
Motion carried on rollcall vote - four ayes.
VOLUNTEER RECOGNITION RECEPTION DATE SET - APRIL 14, 2005 Mr. Hughes requested
the Council choose a date of either April 14, 2005 or April 21, 2005, for the Volunteer Recognition
Reception..
Following a brief Council discussion, Member Swenson made a motion approving April 14, 2005, as.
the date for the Volunteer Recognition Reception. at Edinborough Park at 5:00 P.M. Member Housh
seconded the motion.
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
JOINT POWERS AGREEMENT AND FACILITY USE AGREEMENT WITH EDINA PUBLIC
SCHOOLS FOR GYMNASIUMS APPROVED Mr. Hughes indicated that City staff and School
District staff have prepared and agreed upon a Joint Powers Agreement and a Facility Use Agreement
with respect to the gymnasiums proposed to be constructed on the Edina Community Center campus.
He explained the agreements had been prepared and reviewed by the City Attorney, the Attorney for
the District, the City Council committee of Mayor Hovland and Member Housh. Mr. Hughes said that
following approval of the Agreements by the Council and the Board of Education, the City would
proceed to retain project architects and a construction manager who will then prepare schematic
plans for the improvements. He explained after plans were prepared, an application for a Conditional
Use Permit will be submitted and considered by the City's Planning Commission and the City
Council at a public hearing which could occur in approximately six weeks.
Mr. Hughes added the Joint Powers Agreement provided a mechanism for how the gymnasiums will
be constructed and the process that would be followed. A joint powers oversight committee will be
formed of two members from the City Council and two members from the Board of Education plus
staff persons.
Mr. Hughes explained the Facility Use Agreement dealt with how the facility would be scheduled
and how operating costs would be paid. He said the proposed Agreement mimicked the concept that
was in place during the referendum of 2001 was never implemented. Mr. Hughes said hours of use as
well as maintenance of the facility would be detailed in the Facility Use Agreement. He said the City
would have priority times for use and would pay the full cost for the operation of the facility noting
that user fees would be needed and earmarked to defray the operational costs borne by the City.
Member Housh expounded regarding the spirit of good feeling existing between the elected officials
from the City and the School District allowing the approval of an agreement serving all Edina's youth.
Member Masica inquired whether a negotiation clause needed to be included at the end of the 30 -year
ground lease; what responsibility the City would have if major maintenance of the facility became
necessary; and also questions Article 111 3.01 how the fee is determined for Kid's club participants and
Page 5
Minutes/Edina City Council/lanuary 4, 2005
priority users. Mr. Gilligan explained the ground lease was in place as a financing mechanism. Mr.
Hughes said maintenance costs incurred would be billed back to the City and noted that under
Article II, Section 2.02 of the Facilities Use Agreement states that the School District is responsible for,
"HVAC System, internal roadway systems, parking areas, etc." Mr. Hughes explained that regarding
Article 111 3.01 fee was an hourly rental charge. Mayor Hovland added that the City must approve any
maintenance over $5,000.
Member Masica made. a motion approving the Joint Powers Agreement and the Facility Use
Agreement with the Edina Public Schools. Member Swenson seconded the motion.
Ayes: Housh, Masica, Swenson, Hovland
Motion carried.
*CONFIRMATION OF CLAIMS PAID Member Housh made a motion and Member Masica
seconded the motion approving payment of the following claims as shown in detail on the Check
Register dated . December 22, 2004, and consisting of 30 pages: General Fund $278,695.16;
Communications Fund $3,439.61; Working Capital Fund $46,408.96; Construction Fund $98,684.91;
Art Center Fund $18,360.45; Golf Dome Fund $2,023.03; Aquatic Center Fund $61,679.02; Golf
Course Fund $7,450.74, Ice Arena Fund $4,420.73; Edinborough/Centennial Lakes Fund $11,537.73,
Liquor Fund $47,260.57; Utility Fund $450,735.67; Storm Sewer Fund $6,402.15; PSTF Fund
$3,045.64; TOTAL $1,040,144.37; and for approval of payment of claims dated December 29, 2004;
and consisting of 25 pages: General Fund $356,224.72; Communications. Fund $12,463.52, Working
Capital Fund $22,570.67; Art Center Fund $1,663.81; Golf Dome Fund $4,555.97; Aquatic Center
Fund $254.79; Golf Course Fund $6,504.43; Ice Arena Fund $9,572.29; Edinborough/Centennial
Lakes Fund $5,428.20; Liquor. Fund $262,311.92; Utility Fund $45,984.36; Storm Sewer Fund
$6,387.18, PSTF Agency Fund $259.85; TOTAL $734,181.71.
Motion carried on rollcall vote -four ayes.
CONCERN OF RESIDENT Robert Webb, 4516 Drexel Avenue, commented on the Vision 20/20 plan
saying the number one objective of the plan is to maintain strong residential neighborhoods. He said
the Council would have a big job to maintain the plan as written and satisfy both residents and
drivers cutting through neighborhoods.
There being no further business on the Council Agenda, Mayor Maetzold declared the 'meeting
adjourned at 8:15 P.M.
City Clerk .
Page 6
�R
o e t4
V ffi� �y
•r ,�q•
roJOBS
AGENDA ITEM: I I.A.
DATE: 1/13/05
REQUEST FOR PURCHASE
TO: MAYOR AND COUNCIL
FROM: CHIEF MICHAEL SIITARI
VIA: GORDON L. HUGHES, CITY MANAGER
SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000
ITEM DESCRIPTION: Seven (7) full -size police squad cars, Police Interceptor model,
Crown Victoria
COMPANY BID AMOUNT
1. Superior Ford 1. $146,272.00
2. 2.
3. 3.
4. 4.
RECOMMENDED BID: State of Minnesota Cooperative Purchasing Agreement
Contract No. 432130
GENERAL INFORMATION:
• Replacement vehicles per equipment schedule
• To be used as first -line patrol vehicles. for a minimum of three years
• Ford is the only manufacturer of full -size, rear -wheel drive squad cars at this time.
,vim POLICE
Signature Department
The co end id � (within .budget) El (not within budget) 5�2� CL e
Go on L. Hughes, qty Manager JAn Wallin, Finance Director
I
�91�1�rL, AGENDA ITEM: II.A.
O e DATE: 1/13/05
co
v � �O
REQUEST FOR PURCHASE
TO: MAYOR AND COUNCIL
FROM: CHIEF MICHAEL SIITARI
VIA: GORDON L. HUGHES, CITY MANAGER.
SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $159000
ITEM DESCRIPTION: One (1) 2005 Chevrolet Uplander Van
COMPANY BID AMOUNT
1: Thane Hawkins Poler Chevrolet 1. $17,547.03
2. 2.
3. 3.
4. 4.
RECOMMENDED BID: State of Minnesota Cooperative Purchasing Agreement
Contract No. 433406
GENERAL INFORMATION:
Replacement of one unmarked Investigation Squad per equipment replacement schedule. The
Van will provide better utility than a four -door sedan for surveillance operations.
POLICE
Signature U Department
The Re omm ,nded B' is (within budget) (not within budget)
no
God L. Hughes, i anager 'John Wallin, Finance Director
(A
O
AGENDA ITEM:
DATE:
II.A.
1/13/05
REQUEST FOR PURCHASE
TO: MAYOR AND COUNCIL
FROM: CHIEF MICHAEL SIITARI
VIA: GORDON L. HUGHES, CITY MANAGER
SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000
ITEM DESCRIPTION: Four (4) 2005 Chevrolet Impala unmarked police squad cars
COMPANY BID AMOUNT
1. Hinckley Chevrolet 1: $69,191.40
2. 2.
3. 3•
4. 4.
RECOMMENDED BID: State of Minnesota Cooperative Purchasing Agreement
Contract No. 429970
GENERAL INFORMATION:
Replacement of four (4) unmarked Investigative squads per equipment replacement
schedule.
• Retention schedule of seven years (minimum).
c POLICE
Signature Department
The Rec mm ded Bid ' (within budget) F1 (not within budget) _"_! . �
Gordon L. Hughes, qty anager John Wallin, Finance Director
k 91N�1fr�,�
o e
;J 4o
REQUEST FOR PURCHASE
TO: Mayor Hovland and Members of the City Council
FROM: John Keprios, Director of Parks and Recreation
VIA: Gordon Hughes, City Manager
SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000
DATE: January 18, 2005
AGENDA ITEM II. B.
ITEM DESCRIPTION: Fairway Mower — Braemar Golf Course
Compan y Amount of Quote or Bid
1. MTI Distributing 1. $26,789.01
2. (State Contract #432120) 2.
RECOMMENDED QUOTE OR BID:', Account #: 5400.1740
MTI Distributing $26,789.01 (includes sales tax)
GENERAL INFORMATION:
This is for purchase of a Toro Reelmaster 5200 -D with 8 -blade reels fairway mower. The mower
is used to maintain the 36 fairways and driving range at Braemar Golf Course. It is being
purchased under the Minnesota State Bid Contract #432120. This new 2005 Toro Reelmaster
5200 -D replaces a 1996 =Jacobson LF -128 fairway mower. The $26,789.01 bid under the State
Contract includes sales tax minus $2,500 for the trade -in for the 1996 Jacobson LF -128 mower.
The new Toro Reelmaster 5200 -D unit comes with a 2 -year parts and labor warranty. This
purchase is funded under the Maintenance Equipment Replacement budget within the Capital
Improvement Plan, which is budgeted for $125,000 in 2005.
LW4z
ol -
This Recommended bid is
within budget not within
Edina Park and Recreation
Department ,
Director
Hughesk�ity Manager
Reelmaster- 5000 Series
These 2 or 4 -wheel drive lightweight fairway mowers are light on their feet, but down to earth for a
superb quality of cut.
61
o e
�o
less FOR PURCHASE
TO:
FROM:
VIA:
SUBJECT:
DATE:
Mayor Hovland and Members of the City Council
John Keprios, Director of Parks and Recreation
Gordon Hughes, City Manager
REQUEST FOR PURCHASE IN EXCESS OF $15,000
January 18, 2005
AGENDA ITEM lI. C.
ITEM DESCRIPTION: Groundsmaster Rotary Mower — Braemar Golf Course
Compan y Amount of Quote or Bid
1. MTI Distributing 1.$25,153.17
2. (State Contract #432120) 2.
RECOMMENDED QUOTE OR BID: Account #: 5400.1740
MTI Distributing $25,153.17 (includes sales tax)
GENERAL INFORMATION:
This is for purchase of a 2005 Toro Groundsmaster 3500 -D rotary mower. The mower is used to
maintain the areas around the greens, sand traps, tees, and the fairway perimeter at Braemar Golf
Course. It is being purchased under the Minnesota State Bid Contract #432120. This new 2005
Toro Groundsmaster 3500 -D replaces a 1996 Jacobson model 1684 -D rotary mower. The
$25,153.17 bid under the State Contract includes sales tax minus $750 for the trade -in for the
1996 Jacobson rotary mower. The new Toro Groundsmaster 3500 -D' unit comes with a 2 -year
parts and labor warranty. This purchase is funded under the Maintenance Equipment
Replacement budget within the Capital Improvement Plan, which is budgeted for $125,000 in
2005.
LWRr'!
This Recommended bid is
within budget . not within
Edina Park and Recreation
Director
Gordon Hughey, (City Manager
Groundsmaster° 3500 -D
A breakthrough rotary mower that delivers a superior quality of cut for trimming golf courses
and striping sports fields.
TO: ` Mayor & City Council
REQUEST FOR PURCHASE
FROM: Wayne D. Houle, PE, Director of Public Works
VIA: Gordon Hughes, City Manager
SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15.000
DATE: January 18, 2005
ITEM DESCRIPTION: 1/2 Ton Pickup Truck
Company
1.Thane Hawkins Polar Chevrolet (State Contract No. 433478)
RECOMMENDED QUOTE OR BID:
Thane Hawkins Polar Chevrolet
Sales tax — payable when license plates are purchased
Total Cost of pickup
GENERAL INFORMATION:
AGENDA ITEM: II. D.
Amount of Quote or Bid
1. $14,427.58
$14,427.58
937.80
$15,365.38
This is a purchase of a new 1/2 Ton Chevrolet Pickup truck. This pickup will replace a 1996 DodgeY2
ton pickup - Unit 70.278, which will be sold at an auction this summer. The Capital Improvement Plan
budgeted $18,000 for this purchase. This purchase is through the State of Minnesota Purchasing
Program and is funded through the Utility Department Capital Improvement Plan.
Public Works — Utilities
Signature Department
The Recommended Bid is
within budget
not within budget J(MrYWaft. Finance Director
Hughes; C* Manager
gJadmin ... /corrpw utilities /rfp- trucks/rfp 011805 halfton pickup.doc
11
TO: Mayor & City Council
REQUEST FOR PURCHASE
FROM: Wayne D. Houle, PE, Director of Public Works
VIA: Gordon Hughes, City Manager
SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000
DATE: January 18, 2005 AGENDA ITEM: II. E.
ITEM DESCRIPTION: ASV Model RC -100 Track Loader
Company Amount of Quote or Bid
1. St Joseph Equipment (State Contract #432222) 1. $ 51,484.00
RECOMMENDED QUOTE OR BID:
St. Joseph Equipment, Inc. $ 51,484.00
GENERAL INFORMATION:
This purchase will replace the City's 1996 New Holland Model 885 Skid Steer Loader. The existing unit
will be sold at auction this summer with proceeds going back into this fund. The Capital Improvement
Plan budgeted $55,000 for this purchase. This purchase is through the State of Minnesota Purchasing
Program and is funded through the Utility Department Capital Improvement Plan.
FM'l I �pn —�at;u4r —e
The Recommended Bid is i
within budget
Public Works – Utilities
Department
not within budget J6hn)VValK Finance Director
WAIF
- '3
gladmin ... /corrpw utilities /rfp -heavy equip.../rfp 011805 ASV Track Loader.doc
.11
TO: Mayor & City Council
REQUEST FOR PURCHASE
FROM: Wayne Houle, Director of Public Works
VIA: Gordon Hughes, City Manager
SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000
DATE: January 18, 2005
AGENDA ITEM III. F.
ITEM DESCRIPTION: 22 — Garbage Receptacles — 50th & France
Company Amount of Quote or Bid
1. Earl F. Andersen 1. $16,068.72
2. Dumor Site Furnishings 2. $16,894.08
RECOMMENDED QUOTE OR BID:
Earl F. Andersen $ 16,068.72
GENERAL INFORMATION:
This is the purchase of 22 garbage receptacles to replace the existing garbage receptacles at 50`x' &
France. The existing receptacles are at the end of their useful life; replacement parts are no longer
available. The style of the new garbage receptacles have , been approved by the 50'x' and France
Business Association and will look similar to the metal garbage receptacle in front of City Hall. These
garbage receptacles will also be painted to match the existing streetscape furniture. This purchase will
be funded through the 50'' & France Business District and will be spread over the next two years on
their annual maintenance assessment.
i 4
The Recommended Bid is
within budget
not within b
G: /admin... /corrpw /rfp- misc/rfp 011805 501' & france garbage cans.doc
Hughes,
Public Works — 50th & France
Department
Director
f
REPORT /RECOMMENDATION
To: Mayor & City Council
From: Z Boyd Tate
Traffic Safety Coordinator
Date: January 18, 2005
Subject: Traffic Safety Staff Review for
January 10, 2005
Agenda Item #,
III. A.
Consent
Information Only
❑
Mgr. Recommends
❑ To HRA
® To Council
Action
® Motion
❑ Resolution
❑ Ordinance
❑
Discussion
Recommendation:
Review and approve Traffic Safety Staff Review of Monday, January 10, 2005.
Info /Background:
It is not anticipated that residents will be in attendance at the Council meeting regarding
any of the attached issues.
G:\ Infrastructure \Streets \traffic \Traffic Advisory Committee \Staff Review Summaries\05 TS AG & Min\rr 01- 10- 05.doc
TRAFFIC SAFETY STAFF REVIEW
Monday, January 10, 2005
The staff review of traffic safety matters occurred on January 10, 2005. Staff present
included the City Engineer, Traffic Engineer, Traffic Safety Coordinator and Traffic
Safety Sergeant.
From that review, the recommendations below are provided. On each of the items,
persons involved have been contacted and the staff recommendation has been
discussed with them. They have also been informed that if they disagree with the
recommendation or have additional facts to present, they can be included on the
January 18, 2005 Council Agenda.
SECTION A:
Requests that staff recommends approval of request:
None for the January 10, 2005 meeting.
SECTION B:
Requests that staff recommends denial of request:
1. Request to move the "No Parking" signs currently installed on the east side of
Moorland Avenue to the west side of the street.
The requestor is a resident on Moorland Avenue and has indicated that
parked vehicles in front of their home sometimes block and make it difficult to
access their driveway. There has been a lengthy residential construction
project across the street from the requestor. Construction crews park their
equipment and personal vehicles on the street in front of the requestor's
house.
Moorland Ave is approximately 23 -ft wide with curb and gutter and sidewalks
on both sides of the street. NO PARKING ANYTIME is currently posted and
restricted on the east side of Moorland Avenue. These signs have been in
place for over 25 years.
Although staff agrees that access may be difficult at times as indicated, this is
typical for parking in this area and is not an isolated case. There are similar
construction projects currently in progress in this area of the city, and it is
anticipated that this trend may continue for an uncertain amount of time. Staff
feels that this issue at this specific location may resolve itself when the
adjacent residential project is finished. Additionally, moving parking to the
Traffic Safety Staff Review Page 1 of 6
January 10, 2005
opposite side of the street as requested will only shift the issue and pass it on
to other residents.
City code restricts parking within five feet of a private driveway. Further
violations of blocking driveways will be forwarded directly to the Police
Department for proper enforcement.
Staff recommends denial of the request to move the NO PARKING ANTIME
signs to the west side of Moorland Avenue.
2. Request to install a mid -block pedestrian crosswalk on W. 44th Street at
Kojetin Park.
The requester is a resident in the area who is concerned with the safety of
pedestrians accessing the park.
Kojetin Park is located on W. 44th Street between Grimes Avenue and
Wooddale Avenue. Both adjacent intersections with W. 44th Street include
all -way STOP signs. The street is approximately 30 -ft wide with curb and
gutter on both sides of the street and sidewalk located on the north side only.
Sight lines along W. 44th Street adjacent to Kojetin Park are not restricted and
are adequate. W. 44th Street is classified as a collector street.
A traffic survey was performed on W. 44th Street east of Browndale Avenue in
May 2001 and indicated an average daily traffic volume of 4,128 vehicles per
day with an 851h- percentile speed of 33.4 mph.
In June 1997, a crosswalk at this same location was requested and was
denied by City Council on July 7, 1997: Conditions of the area since this time
have not changed to further warrant a crosswalk at this location.
Edina's crosswalk policy is based on standards and guidelines in accordance
with the Minnesota Manual on Uniform Traffic Control Devices. Warrants for
a crosswalk at this location are not met and the policy specifically indicates
pedestrian crosswalks shall only be placed at intersections (not mid - block).
It should also be noted that an alternate pedestrian route to Kojetin Park (in
lieu of crossing W. 44th Street mid - block) is to use the existing sidewalks and
controlled crossings along W. 44th Street, south along Grimes Avenue, and
west along W. 45th Street.
Additionally, it should be noted that this area of W. 44th Street is included in
the Capital Improvement Program for 2006 to be reconstructed. As
recommended with the 'previous crosswalk request from June 1997, staff
continues to recommend that residents petition the City for sidewalks to be
constructed on the south side of W. 44th Street in this area to be included as
part of this'upcoming project.
.J
Traffic Safety Staff Review Page 2 of 6
January 10, 2005
Staff recommends denial of the request to install a crosswalk on West 44th
Street at Koietin Park for lack of warrants.
3. Request to install a STOP sign on Valley View Road at Ashcroft Avenue for
eastbound traffic.
The requester is a resident on Valley View Road southeast of Ashcroft
Avenue. He is concerned with the volume and speeds of traffic and the
safety of pedestrians on Valley View Road. A recent accident where a
vehicle knocked down a sign in his front yard prompted this concern. The
requester feels a stop sign will greatly reduce speeds of vehicles in this area.
Valley View Road is classified as an "A" minor arterial. Existing stop signs
(two -way) are present on Ashcroft Avenue at the intersection with Valley View
Road. A traffic survey was performed in this area along Valley View Road in
May 2002. The Monday through Friday average daily traffic volume was
6,165 vehicles and the 85h-percentile speed was 35.8 mph.
Additional or all -way STOP signs are not warranted as requested and the
existing two -way STOP signs are located at the appropriate locations to
define drivers' right -of -way at this intersection.
Additionally, it should be noted that the requestor made the same request in
May 1999. Council denied the request on August 17, 1999.
The speed radar trailer has been scheduled for this area.
Staff recommends maintaining the existing STOP signs on Ashcroft Avenue
and denial of the request to install a STOP sign for eastbound traffic on Valley
View Road for lack of warrants.
4. Request to improve sight lines at the intersection of Valley View Road with
Dakota Trail.
The requestor is a resident on Dakota Trail and is concerned that a large
stand of trees limits the sight line for drivers entering Valley View Road from
Dakota Trail. The requestor is also concerned with the speed of traffic on
Valley View Road and the safety of pedestrians /bicyclists in the area. A
recent car - bicycle accident at this intersection prompted this concern.
Dakota Trail intersects Valley View Road at a skewed angle and forms a T-
intersection with Valley View Road. A curve in the road exists on Valley View
Road and a single STOP sign exists on Dakota Trail at this intersection.
Valley View road is classified as a collector street and Dakota Trail as a local
street.
Traffic Safety Staff Review Page 3 of 6
January 10, 2005
A traffic survey was performed on Valley View Road west of Gleason Road in
August 2001. The Monday through Friday average daily traffic volume was
2,568 vehicles and the 85th- percentile speed was 37.2 mph. It is anticipated
that, due to the curvature in the roadway of Valley View Road, the 85th -
percentile speed is slightly lower than 37.2 mph on Valley View Road at
Dakota Trail.
Sight lines for both the intersection and along Valley View Road in this area
are somewhat limited but are typical for this area and are adequate.
The speed radar trailer has been scheduled for this area.
Staff recommends that no action be taken to increase the sight lines in this
area. Staff also recommends that residents petition to construct sidewalks in
this area to increase the safety of pedestrians.
5. Request to install a NO LEFT TURN sign on W. 70th Street for westbound
traffic turning into the daycare center located west of Highway 100.
The requestor is a resident on Hibiscus Avenue and claims that cars making
left turns are backing up traffic on W. 70th Street. The requestor claims this
occurs throughout the day.
W. 70th Street is classified as a "B" minor arterial roadway .and is a divided,
four -lane roadway with a raised median. Left -turn lanes do not exist for traffic
turning into the daycare center.
A traffic survey was performed in August 2001 on W. 70th Street east of
Rabun Drive. The Monday through Friday average daily traffic volume was
21,356 vehicles. There have been four accidents in this location since 1998
with the most recent on December 9, 2003.
Staff recently monitored traffic in this area and concurs that left - turnin
vehicles waiting in the through lane for a gap in on- coming traffic on W. 70
Street contributes to congestion in the area and is not ideal; however, this
lane configuration is common throughout Edina as well as the metro area.
Restricting left -turns is not feasible due to a lack of alternatives for re- routing
traffic to access the day care center at this time.
Currently, this area on W. 70th Street is included in the Capital Improvement
Program for 2006 for access management improvements. As part of this
proposed improvement, staff will evaluate this area and potentially include
designated left -turn lanes (separate from the through lanes) for the day care
center.
denial of
Traffic Safety Staff Review Page 4 of 6
January 10, 2005
6. Request to implement measures to restrict through traffic on Brook Drive from
W. 69th Street to Tracy Avenue.
The requestor is a resident on Brook Drive between W. 69th Street and Tracy
Avenue and is concerned with the safety of the children who live on the block
due to the volume and speed of vehicles. The requestor indicated that there
are nine homes on Brook Drive with young children and indicated that the
street is a "speedway" for high school students before and after class
traveling between Antrim Road and Tracy Avenue.
Brook Drive is classified as a local roadway and is approximately 30 -ft wide.
McGuire Park is located directly adjacent to the roadway on this block. Brook
Drive exists with no sidewalks and no parking restrictions on either side of the
street. Two -way STOP signs exist on Brook Drive at Tracy Avenue.
A traffic survey has not been performed on this street. Although higher levels
of traffic may be experienced during times before and after school, Brook
Drive is a typical local street with similar traffic volumes and speeds that are
experienced throughout this neighborhood.
The police department indicated that they perform routine speed enforcement
in this area. The speed radar trailer has also been scheduled for this area.
Staff recommends denial of the request to implement measures to restrict
through traffic on Brook Drive.
7. Request to install a STOP sign on Hansen Road between W. 60th Street and
W. 62nd Steet.
The requestor is a resident on Birchcrest Drive and is concerned with
speeding vehicles and pedestrian safety on Hansen Road.
Hansen Road is classified as a local roadway. It is a two -way roadway and is
approximately 30 -ft wide. No sidewalks exist on either side of the street.
A traffic survey was performed in September 2003 on Hansen Road at W.
62 "d Street. The Monday through Friday average daily traffic volume was 773
vehicles and the 8e- percentile speed was 32.1 mph. There have been no
accidents reported at this location within the last 5 years.
Warrants for STOP signs at this location are not met.
The speed radar trailer has been scheduled for this area.
Staff recommends denial of the request to install STOP signs on Hansen
Road.
Traffic Safety Staff Review
January 10, 2005
Page 5 of 6
CA
SECTION C:
Requests that are deferred to a later date or referred to others:
None for the January 10, 2005 meeting.
Traffic Safety Staff Review Page 6 of 6
January 10, 2005
G
To:
From:
Date:
Subject:
City Council
Debra Mangen
City Clerk
January 18, 2005
0
Annual Appointment of
Weed Inspector,
n
REPORT /RECOMMENDATION
Agenda Item III.B.
Consent
Information Only ❑
Mgr. Recommends ❑ To HRA
® To Council
Action ® Motion
❑ Resolution
❑ Ordinance
❑ Discussion
Recommendation:
Appoint Vince Cockriel, Park Superintendent, as Assistant Weed Inspector for calendar year
2005.
Info /Background:
The duties of the Assistant Weed Inspector are to ,carry out the enforcement of the City of
Edina's Nuisance Ordinance regarding Section 1050 — Maintenance of Vegetation. Primarily,
the Assistant Weed Inspector identifies and eradicates noxious weeds as defined by the State .
Commission of Agriculture and mandated by Minnesota Statutes. The duties also include
identifying and cutting turf grasses and weeds throughout the City of Edina that exceed ten
inches in height that are subject to Edina Code Section `1050.05. Edina's Park Superintendent,
Vince Cockriel has successfully served as the Assistant Weed Inspector for the past several
years. °
,r
(A
O
��RPOPp'Ty-
1888
REPORURECOMMENDATION
To:
MAYOR AND COUNCIL
Agenda Item
III.C.
From:
GORDON L. HUGHES
Consent
❑
CITY MANAGER
Information Only
F-1
Date:
JANUARY 18, 2005
Mgr. Recommends
❑
To HRA
®
To Council
Subject:
ENFORCEMENT OF
®
Motion .
HENNEPIN COUNTY
❑
Resolution
SMOKE FREE ORDINANCE
❑
Ordinance
❑
Discussion
RECOMMENDATION:
Authorize City of Edina staff to enforce Hennepin County Ordinance No. 24.
INFORMATION/BACKGROUND:
In October 2004, Hennepin County adopted .Ordinance No. 24. This Ordinance prohibits
smoking in all licensed,food establishments and bars within Hennepin County. This Ordinance
goes into effect on March 31, 2005.
G
The City of Edina maintains a delegation agreement with the Minnesota Department of Health
with respect to the licensing and inspection of food establishments. In addition, City of Edina staff
enforces the provisions of the Minnesota Clean Indoor Air Act. According to the County
Ordinance, a City, which maintains such a delegation agreement with the State, may elect to
enforce the Hennepin County Ordinance or, enforce an ordinance that is at least as restrictive as
the County Ordinance. Alternatively, we may request that Hennepin County staff enforce the
County- Ordinance in the City's licensed food establishments and bars. In that City staff provides
inspection and enforcement services with respect to all food establishments in the City, we believe
that it would be appropriate for City staff to likewise enforce Hennepin County Ordinance No.
24. We do not believe that enforcement by City staff will provide an undue burden on Health
Department or Police Department personnel..
Hennepin
Hennepin County Human Services Department
Public Health Protection
Epidemiology and Environmental Health
1011 South First Street, Suite 215
Hopkins,MN 55343 -9413
December 20, 2004
City of Edina
Eric Anderson
Assistant City Manager
4801 West 50th Street
Edina, MN 55424
Dear Mr. Anderson:
Epidemiology: (952) 351 -5230
Environmental Health: (952) 351 -5200
FAX: (952) 351 -5222
www.hennepin.us
I am writing to request your assistance in coordinating the implementation of Hennepin County's
new Smoke -free Ordinance effective March 31, 2005, in all licensed food establishments and bars
within Hennepin County. I have enclosed a printed copy for your reference. This Ordinance is also
available on the Hennepin County website at http: //hennepin.us by clicking on "ordinances" in the
lower right -hand box titled "reference ". The Smoke -free Ordinance is number 24. If you wish to
obtain additional printed copies, please call (952) 351 -5200.
Because your city has a delegation agreement(s) with the Minnesota Department of Health and/or the
Minnesota Department of Agriculture to license food establishments, your staff currently enforce
both the state's Food Code (MN Rules, Chapter 4626) and the MN Clean Indoor Air Act (MN Rules,
Chapter 4620). Hennepin County Ordinance 24 is an extension of the MN Clean Indoor Air Act for
food establishments and Hennepin County enforcement activities will be conducted: 1) as part of a
routine inspection and 2) in response to a complaint.
In order to assure compliance of Ordinance #24 and respond to complaints and inquiries from
citizens, Hennepin County requests either:
A. A letter signed by either your city manager /administrator or mayor stating your city
intends to adopt an ordinance as strict as Hennepin County #24 by March 31, 2005, or
your staff will be enforcing Hennepin County Ordinance #24 in your city's licensed food
establishments; or
B. A copy of a signed resolution from your city council requesting Hennepin County staff to
enforce Hennepin County Ordinance #24 in your city's licensed food establishments.
Please send A. or B. above to my attention by January 28, 2005. If you have any questions about this
letter or Ordinance #24, please contact Lynn Moore directly at (952) 35.1 -5215.
Sincerely,
Susan Palchick, Ph.D., MPH
Hennepin County Public Health Protection
Manager - Epidemiology and Environmental Health
Cc: Elliot Marston
Enclosure: Hennepin County Ordinance #24
An Equal Opportunity Employer Recycled Paper
ORDINANCE NO. 24 .
SMOKE -FREE ORDINANCE
"The Hennepin County Board of Commissioners does ordain:"
SECTION 1: PURPOSE.
1.01 Purpose. This Ordinance is enacted to protect the health, safety, and
general welfare of the people of Hennepin County pursuant to powers
granted under Minnesota Statutes Chapters 145A and 375 and
subsequent recodifications and /or amendments, and other applicable
legislation, as may be adopted from time to time.
1.02 Objectives. The principal objectives of this Ordinance are:
A. To prevent secondhand smoke exposure and its adverse health effects
on patrons and employees of food establishments; and
B. To protect, in particular, the health of vulnerable populations including
children and those with chronic health conditions.
SECTION 2: GENERAL PROVISIONS.
2.01 Scope. This Ordinance shall be applicable to all food establishments.
2.02 Prohibitions.
A. Smoking is prohibited in the indoor areas of food establishments
unless otherwise excluded.
B. Nothing in this Ordinance shall prevent the proprietor or other person
in charge of any place including, without limitation, any residence,
motor vehicle or outdoor space, from prohibiting smoking in any such
place.
C. Nothing in this Ordinance shall prevent other local levels of
government within Hennepin County from adopting measures to
protect citizens from secondhand smoke.
D. This Ordinance is intended to complement the Minnesota Clean Indoor
Air Act, Minnesota Statutes, Sections 144.411 to 144.417, or other
applicable law, as amended from time to time. Nothing in this
Ordinance authorizes smoking in any location where smoking is
prohibited or restricted by other laws.
2.03 Exclusions. This Ordinance does not apply to:
A. Outdoor spaces of food establishments.
B. Locations where smoking is expressly authorized by state or federal
law, rule, or regulation.
C. The use of tobacco as part of a recognized religious ritual or
4 activity.
D. Guest rooms of a hotel or motel.
E. Food establishments located in a house of worship when the food
service is limited to preparation, service or consumption by the
members of the house of worship and not advertised to the public.
F. The exclusions contained in this section shall not apply to an
individual, organization or activity which is established or undertakers to
avoid compliance with this ordinance.
2.04 Jurisdiction. This Ordinance shall apply throughout all of Hennepin
County as follows:
A. A statutory or home rule charter city that maintains a delegation of
authority agreement with the Minnesota Department of Health and /or
the Minnesota Department of Agriculture to regulate food
establishments pursuant to Minnesota Statues 145A.07 and /or
28A.075 may either:
1. Elect to enforce this Ordinance or a local ordinance; or
2. Provide verification to Hennepin County of its intention to have the
Health Authority enforce this Ordinance by submitting a resolution
of the City Council or authorized City official to Hennepin County.
B. The Health Authority shall be responsible for enforcing this Ordinance
for areas within its delegation of authority agreement with the
Minnesota Department of Health and the Minnesota Department of
Agriculture to regulate food establishments pursuant to Minnesota
Statutes 145A.07 and 28A.075. The Health Authority shall also be
responsible for enforcing this Ordinance:
1. In food establishments in cities under the provisions in section 2.04,
subpart A., 2., of this Ordinance; and
2. In food establishments not delegated by the Minnesota Department
of Agriculture pursuant to Minnesota Statutes 28A.075 located
within cities maintaining a delegation of authority agreement with
the Minnesota Department of Health pursuant to Minnesota
Statutes 145A.07.
SECTION 3: DEFINITIONS.
3.01 Food establishment. "Food establishment" means those establishments
defined in Minnesota Rules 4626.0020, subpart 35, including an
establishment that has an on -sale non - intoxicating malt liquor license; an
on -sale intoxicating liquor license; an on -sale wine license and /or strong
beer liquor license issued by the State of Minnesota, the municipality
within which it is located, or Hennepin County.
3.02 Health Authority. "Health Authority" means the Hennepin County Human
Services Department and its designated employees, agents, or
contractors, as the Hennepin County Board may designate.
•,
3.03 Other person in charge. "Other person in charge" has the meaning
'specified in the Minnesota Clean Indoor Air Act Rules, Minnesota Rules,
part 4620.0100, subpart 10, as amended from time to time.
3.04 Proprietor. "Proprietor" has the meaning specified by the Minnesota
Clean Indoor Air Act Rules, Minnesota Rules, part 4620.0100, subpart 13,
as amended from time to time.
3.05 Smoking. "Smoking" means the inhaling, exhaling or combustion of any
cigar, cigarette, pipe, tobacco product, weed, plant or any other similar
article. "Smoking" includes possessing or carrying a lighted cigar,
cigarette, pipe or any other lighted smoking equipment.
SECTION 4: ADMINISTRATION. Except where otherwise specified, this
Ordinance is subject to all provisions of the Hennepin County Administrative
Ordinance, Ordinance. No. 1, as may be amended from time to time.
SECTION 5: RESPONSIBILITIES OF PROPRIETORS.
5.01 Proprietors or other person in charge shall:
A. Post "no smoking" signs that comply with the requirements for sign
placement and size of letters consistent with the Minnesota Clean
Indoor Air Act Rules, Minnesota Rules, part 4620.0500, as may be
amended from time to time; and
B. Ask any person who smokes in an area where smoking is prohibited to
refrain from smoking and, if the person does not refrain from smoking
after being asked to do so, ask the person to leave the food
establishment.
SECTION 6: ENFORCEMENT:
6.01 Inspections. Compliance with the requirements of this Ordinance will be
verified:
A. As part of a routine food establishment inspection conducted by the
Health Authority pursuant to Hennepin County Ordinance No. 3, Food
Protection Ordinance;
B. As part of routine food establishment inspection conducted by a
statutory or home rule charter city that maintains a delegation of
authority agreement with the Minnesota Department of Health and /or
the Minnesota Department of Agriculture to regulate food
establishments pursuant to Minnesota Statues 145A.07 and /or
28A.075; or
C. As part of a complaint investigation.
6.02 Access to premises and records. The proprietor or other person in
charge shall, upon the request of the Health Authority and after proper
identification, permit access to all parts of the establishment as often as
necessary, and at any reasonable time for the purpose of inspection and
shall exhibit and allow copying of any and all records necessary to
ascertain compliance with this Ordinance.
6.03 Interference with the Health Authority. No person shall in any way
interfere with or hinder the Health Authority in the performance of duties,
or refuse the Health Authority to make such inspections..
SECTION 7: PENALTY.
7.01 Misdemeanor. Any person who violates this Ordinance, or who permits a
violation to exist on the premises under his /her control, or fails to take
action to abate the existence of the violation(s) within a specified time
period, when ordered or notified to do so by the Health Authority, shall be
guilty of a misdemeanor, and upon conviction thereof shall be punished as
provided by law. Each day of violation constitutes a separate offense.
7.02 Adverse license action. Violation of any provision of this Ordinance by a
proprietor or other person in charge shall be adequate grounds for the
denial, refusal to renew, revocation or suspension of a license to operate a
food establishment as determined by the Health Authority.
7.03 Civil remedies. In the event of a violation or a threat of violation of this
Ordinance, the City Attorney or County Attorney may take appropriate
action to enforce this Ordinance, including application for injunctive relief,
action to compel performance, or other appropriate action in court, if
necessary, to prevent, restrain, correct, or abate such violations or
threatened violations. The City Attorney or County Attorney enforcing
provisions of this Ordinance may seek costs and dispersements, including
attorneys' fees.
7.04 Citations. Whenever the Health Authority discovers a violation of this
Ordinance, a citation may be issued to the person alleged to have
committed the violation. The citation shall be issued to the person
charged with the violation, or in case of a corporation or municipality, to
any officer or agent expressly or impliedly authorized to accept such
issuance.
SECTION 8: FEES. Fees for Health Authority complaint investigation,
verification, and enforcement of violations of this Ordinance in food
establishments shall be those established by resolution, as amended from time
to time, of the Hennepin County Board of Commissioners.
SECTION 9: SEPARABILITY. If any provision or application of this Ordinance is
held invalid, that invalidity shall not affect other provisions or applications of this
Ordinance.
SECTION 10: CAPTIONS. The captions printed in boldfaced type before
sections of this Ordinance are mere catch words to indicate the content of the
section.
SECTION 11: EFFECTIVE DATE. After passage by the Hennepin County Board
of Commissioners, this Ordinance shall take effect on March 31, 2005. .
Passed by the Board of County Commissioners of Hennepin County, Minnesota,
this clay of A00 y
County of Hennepin
State of Minnesota
By: Chair, Board 16f tounty Commissioners
Attest:
rk .- the County Board
I
REPORT /RECOMMENDATION
To:
Mayor & City Council
From:
Wayne D. Houle, PE�
City Engineer
Date:
January 18, 2005
Subject:
Change Order for
Valley View Road & West 66"
Street Pond Dredging
Improvements, Contract No.
03 -6 ENG
Recommendation:
Agenda Item #
Consent
Information Only
Mgr. Recommends
Action
III. D.
❑ToHRA
® To Council
® Motion
❑ Resolution
❑ Ordinance
❑ Discussion
Authorize Change Orders for change in soil conditions during pond dredging.
O
Info /Background:
Staff's original soil borings for dredging of the Swimming Pool pond did not indicate any
bituminous material within the pond bottom. During the dredging of the pond, the
contractor discovered bituminous material within the dredging material, therefore
creating a change condition where material would need to be trucked to a different.
location.
The proposed total change orders to date is $71,670.31; this increases the contract
amount more than ten percent, therefore requiring City Council to approve these
change orders. The other change orders were approved by the City Council on July 20,
2004 and included additional paving within Rosland Park. The total increase of this
change order is $30,668.00. The original contract amount for the project is
$329,960.00. The cost of this project is funded by storm water utility funds. Staff
recommends approving this change order.
GAContract Numbers\200=306 Valley View Pond DredgingWISOrr 0306 ENG CO 011805.doc
., - . 'J
REPORT /RECOMMENDATION
TO: Mayor & City Council Agenda Item # III. E.
From: Wayne Houle, PE G✓ Consent
City Engineer Information Only ❑
Date: January 18, 2005 Mgr. Recommends ❑ To HRA
M To Council
Subject: Hennepin County Action. ❑ Motion
Electronic Proprietary ® Resolution
Data Base (EPDB) Conditional
Use License Agreement � Ordinance
❑ Discussion
Recommendation:
Re- approve Hennepin County's Conditional Use License Agreement #A00279 for
electronic geographical digitized database. Authorize Manager to sign attached
Agreement.
Info /Background:
The Conditional Use License Agreement is the standard document Hennepin County
asks governmental entities to sign when the County provides the entity with an
electronic geographical digitized database (computerized mapping information) of the
City. The Agreement is to protect the County's proprietary interest and removes the
restriction on the City's use and /or distribution of hardcopies made from the County
data. This renewal is for the extension of the 2000 EPDB Conditional Use License
Agreement to December 31, 2005.
Gladmin... /CorrEng/HC EPDB Agree...... /RR -EPDB 2005.doc
Hennepin County Taxpayer Services Department
Survey Division, Suite A -703
Hennepin County Government Center
Minneapolis, Minnesota 55487 -0073
December 6, 2004
Wayne D. Houle
City of Edina
4801 West 50th Street
Edina, MN 55424 -1394
612- 348 -3131, Phone
www.co.hennepin.mn.us
Agreement # A00279
Hennepin County desires to extend the above referenced EPDB. Conditional Use License
Agreement through December 31, 2005. If you as a Government Unit, Consultant/Third
Party or Private Corporation, desire to extend the above- reference Agreement, the
following requirements must be satisfied as they pertain to your entity. Please return the
required information to Hennepin County, Attention: Robert Moulder (at the address
stated at the top of this page).
A.) GOVERNMENTAL UNIT MUST FURNISH TO THE COUNTY A COPY OF
THE ACTION OF USER'S GOVERNING BODY AUTHORIZING THIS
AGREEMENT EXTENSION. HOWEVER, IF AN OFFICIAL OF USER IS
AUTHORIZED BY STATUTE OR CHARTER TO APPROVE AN
AGREEMENT OF THIS NATURE THEN THIS ORIGINAL LETTER SIGNED
BY SUCH OFFICIAL AUTHORIZING THE EXTENSION MUST BE
RETURNED TO THE COUNTY. NOTE: SUCH OFFICIAL MUST ATTACH TO THIS
LETTER A COPY OF THEIR STATUTORY OR CHARTER AUTHORITY TO APPROVE THE
AGREEMENTS.
B.) CONSULTANT/THIRD PARTY MUST PROVIDE THE COUNTY A COPY
OF AFFIRMATION BY GOVERNMENTAL UNIT THAT YOU WILL
CONTINUE AS CONSULTANT AS STATED IN AGREEMENT NO.
THROUGH THE YEAR 2005. IN ADDITION,
CONSULTANT /THIRD PARTY MUST SIGN THE ATTACHED SIGNATURE
PAGE AND ACKOWLEDGEMENT AND RETURN ORIGINALS OF BOTH
TO THE COUNTY.
C.) PRIVATE CORPORATION MUST SIGN THE ATTACHED SIGNATURE
PAGE AND ACKNOWLEDGEMENT AND RETURN ORIGINALS OF BOTH
TO THE COUNTY.
An Equal Opportunity Employer
Recycled Paper
As authorized by the Agreement and noting the above requirements, which pertain to you specifically,
please indicate below your intention to extend or not to extend this agreement through the year 2005.
Please return the originals of this page and the acknowledgement page and a copy of affirmation as
ConsultantrMird Party, as required, to the attention of Robert Moulder at the address shown at the top of
page 1 as soon as possible.
Please check (X-) appropriate box.
It IS our intention to extend this agreement through the year 2005.
_ It is NOT our intention to extend this agreement through the year 2005.
We no longer require this information.
Signature: Date:
Authorized Signature
Title:
If you have any questions about this notice, please call Robert Moulder at 612- 348 -2618 for assistance.
Sincerely,
ator
. _
r�
o� a RESOLUTION NO. 2005-7
Cn
RESOLUTION AUTHORIZING EXECUTION AND City Of Edina
DELIVERY OF CONDITIONAL USE AGREEMENT WITH
HENNEPIN COUNTY
BE IT RESOLVED by the City Council of the City of Edina, Minnesota (the "City ") as
follows:
Section 1. Recitals. Hennepin County (the "County ") has developed an
Electronic Proprietary Data Base (EPDB) (the "Data Base "), which the City desires to
utilize. There has been prepared and presented to the City a Conditional Use License
Agreement (the "Agreement ") between the City and County, pursuant to which the
County grants the City a limited license to use the Data Base as provided in the
Agreement and the City agrees to pay a fee for the use of the Data Base.
Section 2. Approvals. The form of the Agreement is hereby approved, and the
City Manager is authorized to enter into the Agreement on behalf of the City in
substantially the form presented to the City with such changes or modifications thereto
as do not change the substance of the Agreement and are approved by the City
Manager, such approval to be conclusively presumed by the execution and delivery of
the Agreement by the City Manager.
Dated: January 4, 2005
Attest:
City Manager Mayor
STATE OF MINNESOTA )
COUNTY OF HENNEPIN )SS
CITY OF EDINA )
CERTIFICATE OF CITY CLERK
I, the undersigned duly appointed and acting City Clerk for the City of Edina do hereby
certify that the attached and foregoing Resolution was duly adopted by the Edina City
Council at its Regular Meeting of January 4, 2005, and as recorded in the Minutes of
said Regular Meeting.
WITNESS my hand and seal of said City this day of .20 .
City Clerk
City Hall 952- 927 -8861
4801 WEST 50TH STREET FAX 952 - 826 -0390
EDINA, MINNESOTA, 55424 -1394 WWW.cityofedina.com TTY 952 -826 -0379
REPORT /RECOMMENDATION
To: Mayor & City Council
From: Wayne D. Houle, PE
City Engineer
Date: January 18, 2005
Subject: Set Public Hearing Dates
for:
• South Harriet Park West
Roadway Improvement No.
A -204
• Sunnyslope Area Roadway
Improvement No. BA -326
Recommendation:
Agenda Item # III. F.
Consent ® ,.
Information Only ❑
Mgr. Recommends ❑ To MRA
® To Council
Action Motion
® Resolution
❑ Ordinance
„ ❑ Discussion
Approve resolution calling -for Public Hearings on February 15, 2005 for roadway
improvements to the following:
• South Harriet Park West Area (Improvement No. A -204) consisting of West 52nd
Street, West 53rd Street, Kellogg Avenue, Oaklawn Avenue and Brookview
Avenue bounded by Minnehaha Creek, Wooddale Avenue, West 52nd Street and
West 54th Street.
• Sunnyslope Area (Improvement No. BA -326) consisting of East & West
Sunnyslope Road, Woodhill Way, Ridge Place, Dale Drive and Hilltop Lane.
Info /Background:
City staff is requesting these street improvements based on the condition of the streets
and the necessary utility improvements required throughout the neighborhood. Staff
has reviewed these projects and has determined they are feasible. Feasibility studies
will be completed and submitted prior to the Public Hearing. Staff suggests scheduling
a Public Hearing on February 15, 2005.
GAlmprovements\A204 South Harriet Park West \Doc \LetterW204 RR—request for public hearing .doc
+-
o e o REPORT /RECOMMENDATION
H�v �y
To: Mayor & City Council
From: c Steven L. Lillehaug, PE, PTOE
Traffic Engineer
Date: January 18, 2005
Subject: Set Public Hearing date for the
FINAL DRAFT Transportation
Commission Policy
Recommendation:
Agenda Item # III.G.
Consent ❑
Information Only ❑
Mgr. Recommends ❑ To HRA
® To Council
Action ® Motion
❑ Resolution
❑ Ordinance
❑ Discussion
Set Public Hearing date for March 1, 2005 regarding the Final Draft of the City of Edina
Transportation Commission Policy as recommended by the Transportation Commission
on January 6, 2005..
Info /Background:
Over the past several months, the Transportation Commission has worked with City
staff in developing a Transportation Commission Policy to guide its members and
residents in the identification and evaluation of traffic and transportation issues in the
community. The policy is intended to encourage public input and decisions that will be
made on quantitative, qualitative and objective factors.
An Open House to solicit public comment on the October 2004 DRAFT Policy was held
on December 9, 2004. Commissioners reviewed and considered these comments as
well as approximately 170 written comments regarding the policy and other
transportation issues in Edina. Written comments are continuing to be received and will
be forwarded to the Council prior to the Public Hearing.
The attached FINAL DRAFT of the Transportation Commission Policy was
recommended by the Transportation Commission for Council consideration on January
6, 2005. The Commission's recommendation was based on a six (ayes) and one (nay)
vote.
G: \Infrastructure\ Streets\ traffic \Transportation Commission\Agendas \report- recommendations\rr to CC 1- 18- 05.doc
i
CITY OF EDINA
TRANSPORTATION COMMISSION POLICY
O��
H
I•
•
FINAL DRAFT - January 6, 2005
-Edina Transportation Commission recommended the FINAL
DRAFT on January 6, 2005 for City Council consideration.
-Edina City Council action taken on
CITY OF EDINA
TRANSPORTATION COMMISSION POLICY
FINAL DRAFT - January 6, 2005
Contributors:
Transportation Commission
Joni Kelly Bennett
Dean Dovolis
Warren Plante
Fred Richards (Chair)
Marie Thorpe
Les Wanninger
Jean White
Steven L. Lillehaug, P.E., Traffic Engineer /Assistant Engineer
Wayne D. Houle, P.E., Public Works Director /City Engineer
City of Edina Engineering
City of Edina Transportation Policy i FINAL DRAFT - January 6, 2005
TABLE OF CONTENTS
TitleSheet .......................................................................... ............................... i
Tableof Contents ............................................................... ............................... ii
I. INTRODUCTION
1
Background........................................................................ ............................... 1
Purpose.............................................................................. ............................... 1
Vision................................................................................. ............................... 1
II. POLICY FRAMEWORK
2
Introduction........................................................................ ............................... 2
City of Edina Transportation Commission Policy ............... ............................... 2
III. PLAN IMPLEMENTATION
7
Transportation Commission Policy Adoption ..................... ...............................
7
ActionPlan ......................................................................... ...............................
7
Sources of Funding ............................................................ ...............................
8
Plan Costs and Acceptance Requirements ........................ ...............................
8
IV. NEIGHBORHOOD TRAFFIC MANAGEMENT PLAN
9
Introduction........................................................................ ...............................
9
Process and Schedule ..................................................... ...............................
10
Criteria for Screening ....................................................... ...............................
14
Scoringfor Ranking .......................................................... ...............................
15
Removal of Traffic Calming Measures ............................. ...............................
16
Traffic Management Devices — City of Edina Approved Options ....................
17
Benefited Area (Assessed Area) ......................................... .............................18
APPENDICES
Appendix A — Definitions
Appendix B — Traffic Management Devices / Measures
Appendix C — Application Request for Neighborhood Traffic Management Plan
Appendix D — Acknowledgments and References
City of Edina Transportation Policy ii FINAL DRAFT - January 6, 2005
I. INTRODUCTION
BACKGROUND
Sustaining, improving and operating a sound street and transportation system are integral
parts of the long -term vision of the City. Congestion on the regional roadway system and
the failure of that system to accommodate the continued growth in traffic volumes has
created and exacerbated traffic volumes, speed and congestion on local streets. These
conditions adversely affect the quality of life of the City's residents and the activities of
the businesses located in the City.
The Edina City Council in December 2003 established the Transportation Commission to
address these issues and to work to improve the local transportation system, consistent
with the Comprehensive Plan and Vision 20/20.
PURPOSE
The Edina Transportation Commission (ETC) was established to advise the Council on
matters relating to the operation of the local street system with respect to traffic volumes,
congestion, and functional classification, but not maintenance activities, of the City; to
review and comment on plans to enhance mass transit opportunities in the City; to
evaluate methods for traffic calming and other speed and volume mitigation measures and
to recommend their implementation where appropriate; and to review the findings of the
Local Traffic Task Force (2002 -2003) and offer recommendations for implementation.
VISION
Edina will maintain a transportation system that will accommodate the efficient
movement of people and goods throughout the City while fostering safe and livable
neighborhoods and business areas connected by aesthetically beautiful, pedestrian and
bicycle friendly streets and pathways.
City of Edina Transportation Policy 1 FINAL DRAFT — January 6, 2005
II. POLICY FRAMEWORK
INTRODUCTION
The Edina Transportation Commission Policy was developed as a supplement to the City
of Edina Transportation Plan (March 1999). The purpose of this policy is to guide the
ETC in the identification and evaluation of traffic and transportation issues in the
community and the prioritization of projects and improvements to the transportation
system. The policy is created to encourage public input and decisions that will be made
on quantitative, qualitative and objective factors.
CITY OF EDINA TRANSPORTATION COMMISSION POLICY
The City of Edina Transportation Commission Policy implements the purposes and
objectives of the ETC as provided in Section 1225. of the City Code (Transportation
Commission). The Policy also incorporates the amended policies of the Transportation
Plan as follows:
Roadway Design
1. Design roadway facilities constructed in conjunction with new developments
according to the intended function.
2. Upgrade existing roadways when warranted by demonstrated volume, safety or
functional needs, taking into consideration environmental limitations.
3. Emphasize improvements to management, maintenance and utilization of the
existing street and highway system.
4. Design residential street systems to discourage through traffic and to be compatible
with other transportation modes including transit, bicycle and walking, including
traffic calming measures on local streets and, in some cases, collector streets.
5. Design collector and arterial roadway corridors to be compatible with other
transportation modes including transit, bicycle and pedestrian.
6. Use adequate transitions and buffers including but not limited to earth berms, walls,
landscaping and distance to mitigate the undesirable impact of high volume
roadways.
7. Promote use of sound mitigating features (noise walls) and aesthetic barriers along
residential development adjacent to high volume roadways, and, where economically
feasible, make property owners and land developers responsible for noise attenuation
at new developments near high volume roadways.
City of Edina Transportation Policy 2 FINAL DRAFT — January 6, 2005
8. Encourage beautification of local corridors, where appropriate, with amenities such
as boulevard trees, decorative street lighting, and monuments.
Roadway Function and Access
1. Review and update regional and local functional street classification and coordinate
with adjacent cities and Hennepin County. Establish subcategory classifications and
criteria for local streets if warranted. Revise local roadway classifications when
warranted.
2. Provide logical street networks to connect residential areas to the regional highway
system and local activity centers.
3. Adequately control access points to the regional roadway system (including minor
arterials) in terms of driveway openings and side street intersections.
4. Provide access to the local street system (including collector and local streets) in a
manner that balances the need to safely and efficiently operate the street system with
the need for access to land.
5. Encourage intra -area trips on minor arterials rather than the principal arterial system,
and promote serving regional trips on the metropolitan highway system.
6. Separate, to the extent possible, conflicting uses on the public street system in order
to minimize safety problems. Give special attention to pedestrian and bicycle routes.
7. Provide access to redeveloping sites using current functional classification and
standards rather than the existing access at the sites.
8. Annually review and monitor citywide traffic volumes, congestion, existing traffic
calming devices, accident history, vehicle violation history, speed limits and
enforcement.
9. Educate public on vehicle operations including public relations campaigns that focus
on individual responsibilities to each other rather than individual rights.
10. Review and recommend traffic calming policies and consider traffic calming
implementation where requested by residents.
11. Implement measures to reduce non - local, cut - through traffic in cooperation with
County and State efforts by developing a local traffic calming policy to mitigate the
effects of cut - through traffic. Identify the origin and destination of cut - through
traffic.
City of Edina Transportation Policy 3 FINAL DRAFT — January 6, 2005
12. When requested by the Planning Commission, review landuse that may impact traffic
implementations. Continue to monitor adjacent community redevelopment and
activity that impact the City of Edina.
Roadway Maintenance and Operation
1. Cooperate with other agencies having jurisdiction over streets and highways in Edina
to assure good roadway conditions and operating efficiency.
2. Continue the implementation of the I -494 frontage road system and Integrated
Corridor Traffic Management system through ongoing coordination with Mn/DOT,
Hennepin County, and the cities of Richfield and Bloomington.
3. Maintain roads by repairing weather - related and other damage.
4. Use economic and environmentally sound management techniques for snow and ice
removal.
5. Replace substandard bridges and bridges that present safety or traffic problems, and
include bicycle and pedestrian features.
Transit/TDM
1. Participate in the I -494 Commission to encourage all forms of travel demand
management in order to reduce vehicle miles of travel, reduce petroleum
consumption, and improve air quality.
2. Review all -major new developments in light of the potential for ridesharing including
bus accessibility, preferential parking for carpools /vanpools, and mixed -use
development.
3. Support HOV bypasses and other preferential treatments for transit and high
occupancy vehicles on streets and highways.
4. Include transit planning in the construction or upgrading of streets and highways.
5. Pursue development of a demonstration project to provide a circulator system within
the Greater Southdale Area.
6. Encourage the legislature to increase funding for efficient mass transit. Review and
recommend policies requiring a mass transit component with all types of
development.
City of Edina Transportation Policy 4 FINAL DRAFT — January 6, 2005
Parking
1. Review new developments for adequacy of parking based upon need, the potential for
joint use of parking facilities and opportunities to encourage ridesharing.
2. Continue to limit on- street parking in and near congested commercial areas.
3. Find location of an additional Park and Ride facility located in close proximity to
major mass transit routes.
4. Work with appropriate commissions such as Planning and Zoning to review City
Code, Section 850.08 Parking and Circulation to identify parking based upon needs.
5. Evaluate present parking facilities found in Edina. Where appropriate, amend Section
850 to give commuter parking some spaces in City-owned ramps.
Pedestrian /Bicycle
1. Provide accessibility to pedestrians and bicycles at major activity centers, including
necessary storage facilities (e.g. bicycle racks and bicycle lockers) near visible points
of entry, wide sidewalks where there is no boulevard or sidewalks with boulevards.
Appropriate signage should be present at these facilities.
2. Create pedestrian and bicycle interconnections among major generators, with
continuity across major roadways and other barriers. Include painted striping on
roadways and paths designated as bicycle riding areas.
3. Provide sidewalks and safe crossing in high pedestrian danger areas, including high -
traffic streets, commercial areas, park and school areas, areas with transit access, and
in high- density residential locations.
4. Provide adequate signage along all bike paths including areas of conflict with
pedestrians and automobile traffic.
5. Review and recommend construction of pedestrian and bike paths throughout Edina
cooperatively with the Three Rivers Park District and Hennepin County.
6. Promote safe walking, bicycling and driving. Promote vehicle driver respect for
bicycles and pedestrians along with bicyclists and pedestrian observance of signs and
designated paths.
City of Edina Transportation Policy 5 FINAL DRAFT — January 6, 2005
I ,
Goods Movement
1. Serve major truck users and intermodal facilities with good minor arterial access to
the metropolitan highway system.
Funding and Jurisdiction
1. Pursue and support regional or multi - community funding sources for improvements
that provide regional or multi - community benefit. Support public funding for transit.
2. Support research efforts into more efficient and cost - effective management,
- maintenance and replacement of street surfaces.
3. Support governmental jurisdiction over roadways that reflect the role of the roadway
in the overall transportation system.
4. Develop and support legislation permitting a transportation utility.
City of Edina Transportation Policy 6 FINAL DRAFT — January 6, 2005
III. PLAN IMPLEMENTATION
This section provides the steps necessary to implement the transportation policies and
discusses a general strategy for carrying out the policies.
TRANSPORTATION COMMISSION POLICY ADOPTION
By adopting the Transportation Commission Policy, the. City Council establishes the
guidelines by which decisions regarding transportation facilities are made in Edina. It
should be revised as necessary to respond to changing conditions and needs, both locally
and regionally.
The policy should be circulated widely so the residents and the business community are
aware of the opportunities and limitations that the policy provides, thus enabling all
interested parties to voice their concerns and issues with full knowledge.
ACTION PLAN
Short Term (Immediate):
• Review and approve Transportation Commission Policy:
o Review and identify problems and causes of Edina traffic issues
(determine what is fact versus perception).
o Review volume and speed criteria.
o Present Draft Policy to Council.
o Open public comment period.
o Recommend to Council for approval.
• Review Local Traffic Task Force Findings and Recommendations as it reflects the
adoptive policies and procedures. Rank the six identified traffic "issue areas" and
review and recommend action for them as Neighborhood Traffic Management
Projects to the City Council
• Review and approve a Neighborhood Traffic Management Plan (NTMP).
• Publicize transportation issues to be studied by ETC.
• Establish a means for public communication for transportation issues:
o City of Edina Website
o About Town
o Edina Community Channel 16
o Edina Sun Current Newspaper
o Local Schools
• Create a citizen's guide to transportation issues
City of Edina Transportation Policy 7 FINAL DRAFT — January 6, 2005
Long Term (Continually):
• Review and recommend Neighborhood Traffic Management Plans.
• Review and update local roadway functional classification.
• Hold yearly public open house for transportation issues.
• Review and update Transportation Commission Policy annually.
• Review and make recommendations for collector and arterial roadway planned
improvements.
SOURCES OF FUNDING
The following sources of funding are explained in more detail in the Transportation Plan.
Existing Sources of Revenue:
• Federal Surface Transportation Program Funds
• Congestion Management and Air Quality (CMAQ)
• State Aid
• Special Assessments
• Livable Communities Grants
• Ad Valorem Taxes
• Tax Increment Financing
Potential Sources of Revenue:
• Impact Fees
• Road Access Charge
• Transportation Utility
PLAN COSTS AND ACCEPTANCE REQUIREMENTS
Plan acceptance requirements include educating residents about the possibility that they
may be asked to fund the installation and. maintenance of NTMP Projects through
additional taxes and/or special assessments. A typical project includes all costs accrued
for the improvement including all costs to perform the preliminary studies and data
collection, temporary test installations, final studies, final design and actual construction
costs. All costs associated with a Neighborhood Traffic Management Plan study and
project will be assessed to the Benefited Area if Council approves the project for final
implementation.
City of Edina Transportation Policy 8 FINAL DRAFT — January 6, 2005
IV.NEIGHBORHOOD TRAFFIC MANAGEMENT PLAN
INTRODUCTION
Neighborhood Traffic Management Plans (NTMP) include local, collector and arterial
street studies and neighborhood area studies. These studies would be conducted by the
City Engineering Department.
The NTMP studies are intended to respond to speeding and excessive cut - through traffic
on streets in a residential neighborhood and on multiple streets in one or more
neighborhoods, yet are intended to be sensitive to areas where there may be a potential for
diversion of this traffic onto other streets and/or into other neighborhoods. These plans
are required to respond to traffic problems that are symptomatic of wider problems, such
as congestion or lack of capacity on the arterial system. Possible solutions may include
revisions to the local street to slow traffic or to completely or partially divert traffic off
the street. While solutions will be considered for collector and arterial streets, only a
limited number of management devices will be allowed due to State design standards and
funding requirements (see Appendix B).
NTMP studies are developed primarily through the City Engineering Department, with
the involvement of the Transportation Commission and other City departments. They are
scheduled based on available resources and given priority by factors that include, but are
not limited to, the following:
• Previous efforts, requests and studies in the area
• Intensity and extent of the problems
• Degree of conflict between traffic conditions and land uses
• Availability of data
• Regional improvement projects scheduled or planned
• Feasibility of solutions
City of Edina Transportation Policy 9 FINAL DRAFT — January 6, 2005
PROCESS AND SCHEDULE
This section details the process and schedule for Neighborhood Traffic Management
Plans (See Table 1).
Table 1. Neighborhood Traffic Management Plan Schedule
Step
Item
Period (Typical)
-
General Traffic Management Information Open House
Late September
Step 1
Neighborhood Traffic Management Applications Due
2nd Monday in
February
Step 2
Initial Screening, Scoring and Ranking of Applications
March/April/May
Before data collection
Step 3
• Petition -to -study prepared and circulated by City staff
May /June
• Presentation to ETC for recommendation and to
Council for approval to order plan development
Step 4
Plan Development
June
• Review and comment by Fire, Police, Public Works
and Engineering, Transit and School (transportation)
agencies
• Public Open House
• Survey -to -test circulated and evaluated by City staff
• Trial Project Plan prepared
Step 5a
Presentation to ETC for recommendation
June
Step 5b
• Council approval of trial projects
July
• Schedule temporary installations, removals and after
data collection (minimum period of 2 weeks after
installation
Step 5c
• Temporary installations
July /August
Step 6
• After data collection (trial projects)
September
• Review and comment by Fire, Police, Public Works,
Transit, and School (transportation) agencies
• Prepare evaluation summaries
Step 7a
Mail Surveys
October
Step 7b
• Summarize returned surveys
November
• Open House
Step 8a
Recommendations to ETC, Public comment
December
Step 8b
Recommendations to Council, Improvement Hearing,
January
Preliminary Assessment Hearing, Order Project
Step 9a
Survey and Design
February / March
Step 9b
Final approval of plans by Council, Set bid schedule
Aril
Step 9c
Letting, Assessment Hearing
May
Step 9d
Construction
June / July
step 10
After data collection
July August
.Step 11
Follow-up Evaluation
Within 3 to 5 yrs
City of Edina Transportation Policy 10 FINAL DRAFT — January 6, 2005
STEPS:
1. Study Request (Application)
Neighborhood Traffic Management Plan (NTMP) studies cari be requested by individual
citizens or by neighborhood organizations. Requests to consider a NTMP study must be
in writing and are due by 4:30 p.m. on the second Monday in February of each year. See
Appendix C for application request.
2. Preliminary Review and Priority Ranking
City staff gathers and reviews preliminary data about the traffic request including volume,
speed and accident information and applies the criteria for screening and ranking to
prioritize for trial and evaluation of a NTMP. The Engineering Department ranks the
studies based on score (methodology outlined under "Scoring for Ranking ") and
schedules order of trial studies for ETC review. The number of trial studies depends on
equipment and personnel availability. Some trial studies. may be deferred if not feasible
due to conflicting construction, development in the area, county or state restrictions or
other concerns.
Requests are also reviewed by the Engineering Department for other possible solutions. If
the preliminary review shows that an immediate hazard to the public exists, the City may
choose to address the problem separately from the NTMP.
Studies are ranked citywide, based on the point score from Step 2. The highest- ranking
study is undertaken first. The number of studies initiated each year depends on City
resources.
The City notifies all study requestors of the status of their request after Step 2. The City
also notifies the ETC of the status of all ranked studies and asks for comments.
Once in the process, a study is considered in the annual priority ranking step for up to 3
years. If, after 3 years, a study has not received a high enough priority to proceed, it is no
longer eligible for consideration. This time limitation ensures that the study request has
not become obsolete because of changing traffic conditions and/or new residents in the
area.
The study requestor is notified when the 3 -year limit expires. Then, a new request may be
made to re -enter the study in the program. Step 1 is then repeated to obtain current
information. -. -
3. Petition -to -Study
If a study is ranked high enough to proceed, a petition -to -study must be circulated within
a defined study area.
City of Edina Transportation Policy 11 FINAL DRAFT January 6, 2005
The Transportation Commission establishes the petition -to -study area (benefited area),
based on information obtained in the preliminary review. At a minimum, this area is
generally defined as those households and businesses fronting on the affected segments of
the study area (see Benefited Area — Assessed Area on page 18).
The purpose of the petition -to -study is to determine the level of agreement among the
benefited area's residents regarding the problem they want to address. The petition -to-
study only defines the issue and surveys the benefited area that will be assessed for all
costs of the improvement. It is . used only to determine if the residents within the
benefited area agree with the issue that has been requested to be addressed. City staff
prepares the petition, describing the problem and the procedures to be followed if a study
is undertaken. The City then circulates the petition. Each household is entitled to one
signature. Property owners not living in the study area are not included in the petition -to-
study process. To proceed, a minimum of 30% of all surveys must be returned with 65%
of those returned surveys indicating agreement with the identified issue.
The applications and petitions -to -study are presented to the ETC and the City Council.
The City Council must order the plan development for the study to move forward to step
4.
4. Plan Development
Based on direction from the Council, the NTMP study moves forward. The NTMP is
reviewed by the City's Fire, Police, Public Works and Engineering Departments, and by
transportation agencies including transit and schools.
The ETC then holds a public meeting for the neighborhood and general public to inform
residents of the proposed project, to describe the NTMP process, and to gather additional
information about the traffic problems and related neighborhood needs.
Plan development consists of the following steps:
• Assessment of problems and needs
• Identification of project goals and objectives
• Determination of the benefited area and impacted area
• Identification of evaluation criteria
• Establishment of threshold criteria (on project -by- project basis)
• Development of alternative plans /solutions
The first two steps are accomplished through public meetings, neighborhood association
meetings, and ETC meetings. Additionally, City staff prepares a survey -to -test describing
the proposed project and calling for a temporary test installation. Staff then circulates the
survey -to -test within the impacted area, which is defined by the Transportation
Commission.
City of Edina Transportation Policy 12 FINAL DRAFT — January 6, 2005
Each household and business is entitled to one survey. The survey is evaluated and City
staff members prepare a trial installation plan. The City proposes solutions based on the
citizen responses and sound engineering principles. Possible criteria, solutions and their
impacts are evaluated by the ETC, City staff and other affected agencies.
5. Test Installation
The NTUT is presented to the ETC and the City Council. If recommended by the ETC
and approved by Council, the test will be installed for between 3 and 12 months. If the
City Traffic Engineer finds that an unforeseen hazard is created by the test, the test
installation may be revised or removed.
6. Project Evaluation
Following the test period, the City evaluates how well the test has performed in terms of
the previously defined problems and objectives. The evaluation includes the subject street
and streets affected by the project, and is based on before - and -after speeds and volumes,
impacts on emergency vehicles or commercial uses, and other evaluation criteria
determined during step 4. If, in the evaluation, desired improvements in quality of life are
not met to the satisfaction of the ETC and City staff, the traffic plan may be modified and
additional testing conducted.
The final test results are reviewed with the ETC, area residents, and relevant City staff,
and the information is distributed during the survey stage.
The City will not forward a project to the next step if the test results show it may be
unsafe or it violates NTMP policy or other City policies or regulations.
7. Survey
To forward the project to the stage where permanent implementation is approved (step 8),
a survey from households, businesses and non - resident property owners within the
impacted area is obtained through a mail survey administered by the City. The ETC then
holds an open house for the neighborhood to update residents about the proposed project.
8. City Council Action
Based on the project evaluation and survey, City staff members prepare a feasibility
report and recommendations for the ETC and City Council. The report outlines the
process followed, includes the project findings, states the reasons for the
recommendations and includes a preliminary assessment roll. The feasibility report and
preliminary assessment roll will be presented for a recommendation by the ETC before
final action by the City Council. If the feasibility report and preliminary assessment roll
are adopted, the project is ordered.
City of Edina Transportation Policy 13 FINAL DRAFT — January 6, 2005
If the feasibility report and preliminary assessment roll are not adopted, the plans and
specifications will not be ordered and the project is terminated. The project is dropped
from the list and the neighborhood is not able to reapply for five years.
9. Design, Final Assessment Roll and Construction
Final design and construction are administered by the City and are generally completed
within 12 months after final action by the City Council. City staff prepares and
recommends the final assessment roll as required under authority granted by Minnesota
Statute Chapter 429
10. Monitoring
The City monitors constructed traffic management devices and gathers post data,
including volume, speed and,accident information.
11. Follow -up Evaluation
Within 3 to 5 years after construction of an NTMP project, the City conducts a follow -up
evaluation to determine if the project's goals and objectives continue to be met. This
evaluation may entail traffic studies of volumes, speeds and accidents, as well as public.
opinion surveys.
CRITERIA FOR SCREENING
Each NTMP study is initially reviewed and screened for general qualification for this
process. The following prescribes the general criteria used by staff to determine the
eligibility for a NTMP study:
1. Roadway Classifications
• Eligible: All Edina streets under the Public Works Department jurisdiction.
• Not Eligible: All roadways within Edina designated as County, State, or
Federal Highways.
2. Minimum Distance of the traffic calming device from the following (all must
apply for eligibility):
• Traffic Signals (except neckdowns) 300 ft.
• Stop Signs (except neckdowns) 300 ft.
• Other Traffic Calming Devices 300 ft.
• Driveway /Alleys 20 ft.
• Horizontal or Vertical Curves affecting sight lines 200 ft.
• Railroad Crossing 300 ft.
• Dead End 400 ft.
City of Edina Transportation Policy 14 FINAL DRAFT — January 6, 2005
3. Access:
• No dead -end created without adequate turn around on public roadway right -of-
way roadway.
4. Not - Critical Emergency Route:
• To be reviewed and approved by the City Fire Chief.
All four eligibility requirements must be met for scoring and consideration.
SCORING FOR RANKING
The following criteria defines the scoring for ranking that is used to prioritize a requested
NTMP study as described in Step 2 of the NTMP process:
1. Sidewalk adjacent to the benefited area (0 to100 points):
• None + 100
• All of 1 side + 50
• All of 2 sides + 0
2. Public school yard, play lot, playground development adjacent to benefited
area (0 to 200 points):
• None + 0
• All of 1 side + 100
• All of 2 sides + 200
3. Residential development adjacent to benefited area (0 to 100 points):
• None + 0
• All of 1 side + 50
• All of 2 sides + 100
4. Number of reported correctable crashes based on last 5 years of available .
data (0 to 200 points):
• 20 per crash; maximum of 200 points
5. Average residential density adjacent to benefited area (0 to 50 points):
• 50 points maximum
• (0 dwelling units per adjacent 100 lin. ft.= 0 points
• 5+ dwelling units per adjacent 1001in. ft.= 50 points)
City of Edina Transportation Policy 15 FINAL DRAFT — January 6, 2005
6. Average Daily Traffic Volumes - ADT (0 to 200 points):
• ADT divided by 10; maximum 200 points
• For intersection, street segments or multiple streets, use higher volume street
7. Percent over speed limit - ADT (0 to 200 points): ,
• Percent over speed limit times 2.5 (times 100); maximum 200 points (80%
over limit)
• For intersection, street segments or multiple streets, use street with higher
speeds
Scoring is based on the criteria pertaining'to the benefited area. Correctable crashes are
determined by the Engineering Department.
REMOVAL OF TRAFFIC CALMING MEASURES
The City of Edina's Traffic Calming Program is intended to avoid the costly installation
and later costly removal of traffic calming devices. On occasion, it may be determined to
be desirable to remove a traffic calming device.
If the removal is City initiated due to safety /crash issues, the removal will be at City
expense. If the removal is at the neighborhood's request, the removal will be charged to
the property owners (previously defined benefited area). The following procedure will be
used for neighborhood initiated removals:
1. Petition requesting removal is submitted to the City Traffic Engineer.
2. A survey, including estimated cost for removal and data collected previously on the
device, is mailed to each property owner in the benefited area.
3. Surveys are summarized 30 days after mailing. Staff makes recommendation to the
ETC.
4. ETC forwards a recommendation to Council. If the recommendation is for removal,
improvement and assessment hearings are scheduled for Council.
5. Final approval of plans by Council. Set bid schedule.
6. Letting, final assessment and construction.
7. New traffic calming devices will not be considered for five years in benefited area of
removed device.
City of Edina Transportation Policy 16 FINAL DRAFT — January 6, 2005
TRAFFIC MANAGEMENT DEVICES — CITY OF EDINA APPROVED OPTIONS
This sections lists traffic management devices and methods that are approved for use in
the City of Edina. Appendix B contains a detailed description and overview of each item.
Speed Reduction Traffic Calming Measures:
• Speed Hump
• Speed Table
• Raised Crosswalk
• Raised Intersection
• Textured Pavements
• Center Island Narrowings
• Gateway Treatments
• Neckdowns
• Choker
• Chicane
• Realigned Intersections
• Traffic Circle
• Roundabout
Volume Reduction Traffic Calming Measures:
• Diagonal Road Closure
• Partial Street Closure
• Cul -de -sac
• Median Barriers
• Forced Turn Islands
Education and Enforcement:
• Targeted Police Enforcement
• Radar Speed Display Units
• Neighborhood Traffic Safety Campaigns
Regulatory Measures:
• Stop Sign
• Turn Restrictions
• One Way Streets
• Traffic Signals ( "Rest on Red" and "Rest on Green ")
• Pavement Striping (Centerline, Edge and Transverse)
City of Edina Transportation Policy 17 FINAL DRAFT — January 6, 2005
BENEFITED AREA (ASSESSED AREA)
This section generally defines the benefited area of the traffic management devices, for
use in determining the assessment area. The following prescribes the typical benefited
areas, but may be adjusted by the ETC on a project by project basis.
Speed Hump, Speed Table, Raised Intersection, Raised Crosswalk, Textured
Pavement, Center Island Narrowings, Neckdowns, Gateway Treatments,
Choker, Chicane, Traffic Circle:
• Benefited area extends 300 feet from the device along the street affected by the
device, or to the nearest stop sign or traffic signal, whichever is less.
Diagonal Road Closure, Round -a -bout:
• Benefited area extends to the next intersection on each leg of the intersection.
Partial Street Closure, Realigned Intersection, Forced Turn Island, Median
Barrier:
• Benefited area extends to the next intersection on the leg of the intersection
partially closed, realigned or restricted.
Cul -De -Sac:
• Benefited area extends from the point of closure to the next intersection on the leg
that is closed.
City of Edina Transportation Policy 18 FINAL DRAFT - January 6, 2005
APPENDICES
APPENDIX A — DEFINITIONS
APPENDIX B — TRAFFIC MANAGEMENT DEVICES / MEASURES
APPENDIX C — APPLICATION REQUEST FOR NEIGHBORHOOD TRAFFIC MANAGEMENT
PLAN
APPENDIX D — ACKNOWLEDGMENTS AND REFERENCES
City of Edina Transportation Policy FINAL DRAFT — January 6, 2005
Definitions
Benefited. Area — The properties expected to receive the majority of the positive impacts
from the proposed traffic calming. (Assessed Area)
Center Island Narrowings — An island or barrier in the center of a street that serves to
segregate traffic. (Midblock medians, median slowpoints, median chokers, central
islands.)
Chicane — Mainline deviations to deter the path of travel so that the street is not a straight
line (by the installation of offset curb extensions). (Deviations, serpentines, reversing
curves, twists.)
Choker — Physical street narrowing to expand sidewalks and landscaped areas; possibly
adding medians, on street parking, etc. (Pinch points, lane narrowing, midblock
narrowings, midblock yield points, constrictions.)
Circulator Service — A means provided within a major activity center, (such as a
regional business concentration, a metro center or community) for movement from place
to place within the center; such a system may be entirely pedestrian or may use transit.
Collector Street — Roadways that are designated to "collect' traffic from neighborhood
streets and get that traffic to arterial streets. Collector streets are described in the City of
Edina Comprehensive Plan.
Corridor Studies — Typically, highway corridor studies focus on a segment of a
particular travel corridor or travel shed. Land use, access issues, capacity, level of
service, geometries and safety concerns are studied; alternatives analyzed; and
recommendations made. Corridor studies are usually prepared with the participation and
cooperation of the affected communities and governmental agencies. Recommendations
for improvements are often incorporated into the local comprehensive plans of the
participating cities and continue to be used by implementing agencies as improvements in
the corridor are made.
Cul- de-sac — Physical street closure resulting in a dead end (no outlet) constructed with a
circular turn- around area.
Cut- through Traffic — Traffic that intrudes into a residential subdivision to avoid
congestion or other problem from an arterial or other high level street.
Diagonal Road Closures — A barrier placed diagonally across a four- legged intersection,
interrupting traffic flow across the intersection. This type of barrier may be used to create
a maze -like effect in a neighborhood. (Diagonal diverter.)
City of Edina Transportation Policy A -1 FINAL DRAFT — January 6, 2005
Feasibility Report — A report analyzing the recommended type of construction, the
estimated construction cost, estimated engineering cost and the estimated assessment.
Forced Turn Islands — Small traffic islands installed at intersections to channel turning
movements. (Forced turn barriers, diverters.)
Functional, Classification (of Roadways) — In accordance with the City of Edina
Transportation Plan (March 1999), the City has adopted the Metropolitan Council's
functional classification system designation and guidelines for use in the City's'roadway
system. Functional classification involves determining what role each roadway should
perform and ensures that certain transportation and non - transportation factors are taken
into account in the planning and design of roadways. A complete description of the
functional classification system criteria is found in Appendix D of the Transportation
Plan (March 1999). The following criteria lists typical vehicle volumes carried on
roadways:
Principal Arterials: 15,000 to 200,000 vehicles per day
Minor Arterials: 5,000 to 30,000 vehicles per day
Collector Streets: 1,000 to 15,000 vehicles per day
Local Streets: Less than 1,000 vehicles per day
Gateway Treatment — Treatment to a street that includes a sign, banner, landscaping or
other structure that helps to communicate a sense of neighborhood identity.
Guide Signs — A sign that shows route designations, destinations, directions, distances,
services, points of interest, or other geographical, recreational, or cultural information.
Impacted Area - Area for a project that is defined as those residences along local
residential streets that are positively or negatively impacted by excessive through traffic
volumes and speeding, or that may be positively or negatively impacted by proposed
traffic calming. Inconvenience caused by limitation of access is not considered to be a
negative impact under this definition.
Infrastructure — Fixed facilities, such as roadways or railroad tracks; permanent
structures.
Level of Service (as related to highways) — The different operating conditions that
occur on a lane or roadway when accommodating various traffic volumes. It is a
qualitative measure of the effect of traffic flow factors, such as speed and travel time,
interruption, freedom to maneuver, driver comfort and convenience, and indirectly, safety
and operating costs. It is expressed as levels of service "A" through "F." Level "A" is a
condition of free traffic flow where there is little or no restriction in speed or
maneuverability caused by presence of other vehicles. Level "F" is forced -flow operation
at low speed with many stoppages, the highway acting as a storage area.
Local Street — A roadway that connects blocks within neighborhoods.
City of Edina Transportation Policy A -2 FINAL DRAFT — January 6, 2005
Local Traffic — Traffic that originates from or is destined to a location within a
neighborhood or area.
Major Street — The street normally carrying the higher volume of vehicular traffic (vs.
Minor Street).
Median Barriers — Raised island or barrier in the center of the street that serves to
segregate traffic.
Metropolitan Urban Service Area (MUSA) — The portion of the metropolitan area
identified in the Regional Blueprint where development and redevelopment is to occur
and in which urban facilities and services are to be provided. The purpose of the MUSA
is to define the areas within the Twin Cities Metropolitan Area that are eligible for "urban
services ", specifically sewers, municipal water systems and particular types of
transportation systems. This boundary line is defined and maintained by the Metropolitan
Council to assist in the orderly development of the metropolitan area. All of Edina is
within the MUSA area.
"A" Minor Arterials — Roadways within the metropolitan area that are more regionally
significant than others. These roadways are classified into the following groups:
a) Relievers — Minor arterials that provide direct relief for traffic on major
metropolitan highways. These roads include the closest routes parallel to the
principal arterials within the core, urban reserve and urban staging areas.
These roadways are proposed to accommodate medium - length trips (less than
eight miles) as well as to provide relief to congested principal arterials.
Improvements focus on providing additional capacity for through traffic.
b) Expanders — Routes that provide a way to make connections between
developing areas outside the interstate ring or beltway. These routes are
located circumferentially beyond the area reasonably served by the beltway.
These roadways are proposed to serve medium to long suburb -to- suburb trips.
Improvements focus on preserving or obtaining right -of -way.
c) Connectors — This subgroup of "A" minor arterials are those roads that would
provide good, safe connections among town centers in the urban reserve, urban
staging and rural areas within and near the seven counties. Improvements
focus on safety and load - carrying capacity.
d) Augmenters — The fourth group of "A" minor arterials are those roads that
augment principal arterials within the interstate ring or beltway. The principal
arterial network in this area is in place. However, the network of principal
arterials serving the area is not in all cases sufficient relative to the density of
development that the network serves. In these situations, these key minor
arterials serve many long -range trips. Improvements focus on providing
additional capacity for through traffic.
City of Edina Transportation Policy A -3 FINAL DRAFT — January 6, 2005
Minor Street — The street normally carrying the lower volume of vehicular traffic (vs.
Major Street).
Municipal State Aid (MSA) Route — A designated City roadway that receives state
funds as allocated from the State gas tax for maintenance and construction.
Approximately 20 percent of the City roadways are designated as MSA routes. State of
Minnesota rules and standards, in addition to local jurisdiction guidelines, apply to these
roadways.
Neckdowns — Physical curb reduction of road width at intersections. Similar to lane
narrowing but used at intersection(s). Widening of street corners at intersections to
discourage cut - through traffic, to improve pedestrian access and to help define
neighborhoods. (Nubs, bulb -outs, knuckles, intersection narrowings, corner bulges, safe
crosses.)
Neighborhood Traffic Management Plan (NTMP) — Formalized process where
residents, commissioners and City staff evaluate the various requirements, benefits and
tradeoffs of traffic calming projects within neighborhoods. The overall objectives for the
Neighborhood Traffic -Management Plan are to improve neighborhood livability by
mitigating the impact of vehicular traffic on residential neighborhoods; to promote safe
and pleasant conditions for motorists, bicyclists, pedestrians and residents on
neighborhood streets; to encourage citizen involvement and effort in neighborhood traffic
management activities; to make efficient use of City resources by prioritizing traffic
management requests; and to support the Comprehensive Plan policy that livability and
safety of established residential neighborhoods be protected in transportation operations.
Non -Local Traffic — Traffic that does not originate from or is not destined to a location
within a neighborhood or area.
Off -Peak Period — Time of day outside the peak period (see peak period).
Partial Street Closure — Physical blockage of one direction of traffic on a two -way
street. The open lane of traffic is signed "One, way", and traffic from the blocked lane is
not allowed to go around the barrier through the open lane. (Half closure.)
Peak Hour — The hour during the peak period when travel demand is highest. Typically,
peak hours are found to be from 7 to 8 a.m. and from 4:30 to 5:30 p.m.
Peak Period — Typically, the time between 6:30 and 9:00 a.m. and between 3:30 and 6
p.m. on a weekday, when traffic is usually heavy.
Person Trip— A one -way journey between two points by one person in a vehicle.
Photo -radar Speed Enforcement — An automated camera system used to enforce speed
limits. It includes the camera, an attached radar "gun" and a display that shows the speed
of each passing vehicle. When a speeding vehicle is detected, the photo radar system
City of Edina Transportation Policy A-4 FINAL DRAFT — January 6, 2005
takes a picture of the driver and the license plate. The registered owner of the vehicle then
receives a ticket in the mail. This enforcement method is not legal in Minnesota.
Photo -Red Light Enforcement — Implementation of a photo red light, an automated
camera and computer system can be mounted on a traffic signal pole at an intersection for
red light enforcement. Photo red light takes pictures of any vehicles that run a red light,
records the time elapsed since the light turned red and the vehicle entered the intersection,
and issues a ticket. The photo red light systems are typically installed at key intersections
that have a high number of accidents. This enforcement method is not legal in
Minnesota.
Platoon — A group of vehicles or pedestrians traveling together as a group, either
voluntarily or involuntarily because of traffic signal controls, geometrics, or other factors.
Principal Arterials — The high capacity highways that make up the metropolitan
highway system, including all interstate freeways.
Radar Speed Display Units — Driver feedback signs that use radar to provide motorists
with an instant message, displayed on a reader board, telling them how fast they are
driving.
Raised Crosswalk — A speed table designed as a pedestrian crossing, generally used at
mid -block locations. (Raised crossings, sidewalk extensions.)
Raised Intersection — A raised plateau where roads intersect. The plateau is generally 4"
above the surrounding street. (Raised junctions, intersection humps, plateaus.)
Realigned Intersections — Physical realignment of intersection typically used to promote
better through movements for a major roadway (vs. a minor roadway). (Modified
intersections.)
Regional Blueprint — The Metropolitan Council plan that sets a general direction for
future development patterns in the metropolitan area and establishes guidelines for
making decisions about major regional facilities that are needed to support the
commercial, industrial and residential development of the area. It establishes urban and
rural areas and certain development policies for different geographic policy areas.
Regulatory Signs — A sign that gives notice to road users of traffic laws or regulations.
Right -of -Way (Assignment) — The permitting of vehicles and/or pedestrians to proceed
in a lawful manner in preference to other vehicles or pedestrians by the display of sign or
signal indications.
Roadway striping — Highlighting various areas of the road to increase the driver's
awareness of certain conditions (e.g., edge of road striping to create a narrowing/slowing
effect while defining space for cyclists).
City of Edina Transportation Policy A -5 FINAL DRAFT — January 6, 2005
Roundabout — Raised circular areas (similar to medians) placed at intersections. Drivers
travel in a counterclockwise direction around the circle. Modern roundabouts are "yield
upon entry", meaning that cars in the circle have the right of way and cars entering the
circle must wait to do so until the path is clear. When a roundabout is placed in an
intersection, vehicles may not travel in a straight line. (Rotaries.)
Signal Preemption.— Usually referred to in this plan as a technology that triggers the
green go -ahead on meters or signal lights to allow emergency vehicles (and sometimes
transit vehicles) to move more quickly through signalized intersections.
Speed— Speed is defined based on the following classifications:
a) Advisory Speed — A recommended speed for all vehicles operating on a
section of highway -and based on the highway design, operating
characteristics, and conditions.
b) Design Speed — A selected speed used to determine the various geometric
design features of a roadway.
c) 85`h- Percentile Speed — The speed at or below which 85 percent of the
motorized vehicles travel.
d) Posted Speed — The speed limit determined by law and shown on Speed
Limit signs.
e) Statutory Speed A speed limit established by legislative action that
typically is applicable for highways with specified design, functional,
jurisdictional and/or location characteristic and is not necessarily shown
on Speed Limit signs.
Speed Hump —Wave- shaped paved humps in the street. The height of the speed hump
determines how fast it may be navigated without causing discomfort to the driver or
damage to the vehicle. Discomfort increases as speed over the hump increases. Typically
speed humps are placed in a series rather than singularly. (Road humps, undulations.) .
Speed Limit — The maximum (or minimum) speed applicable to a section of highway or
roadway as established by law.
Speed Table — Trapezoidal shaped speed humps in the street, similar to speed humps.
(Trapezoidal humps, speed platforms.)
Speed Zone — A section of highway with a speed limit that is established by law but
which may be different from a legislatively specified statutory speed limit.
Street Closure — Street closed to motor vehicles using planters, bollards, or barriers, etc.
City of Edina Transportation Policy A -6 FINAL DRAFT — January 6, 2005
Targeted Police Enforcement — Specific monitoring of speeding and other violations by
police due to observed, frequent law disobedience.
Textured Pavements — A change in pavement texture (e.g., asphalt road to brick
crossing) that helps to make drivers aware of a change in the driving environment.
Traffic Calming — A combination of mainly physical measures that reduce the negative
effects of motor vehicle use, alter driver behavior and improve conditions for non-
motorized street users. Traffic calming involves changes in street alignment, installation
of barriers, and other physical measures to reduce traffic speeds and cut - through volumes
in the interest of street safety, livability and other public purposes. Traffic calming
measures are intended to be self - enforcing. Traffic calming measures rely on the laws of
physics rather than human psychology to slow down traffic.
Traffic Circle — Circular, raised island placed within the middle of intersections,
requiring vehicles to divert around them, potentially forcing drivers to slow down as they
traverse around the circle. (Intersection islands, similar to roundabouts.)
Traffic Signal Control Systems — The degree of traffic management of an arterial is
grouped and defined as follows:
a) Fixed Time — The traffic signals on an arterial are controlled locally through a
time clock system. In general, the progression of a through band (the amount
of green time available along an arterial at a given speed) along the arterial in
the peak direction is determined by past experience and is not a function of
immediate traffic demand.
b) Semi - actuated — The traffic signals along the arterial are designed to
maximize the green time on the major route in the major direction. Timing and
through band are based upon historical records. Use of green time on the
minor leg dependent upon real -time demand and maximized based upon total
intersection delay.
c) Interconnection — A traffic signal system in which data collected at individual
signals is shared with a central processor or controller. Adjustments in traffic
signal control can be made based upon incoming data as opposed to historical
data.
d) Optimization — The process in which a traffic signal or system is modified to
maximize the amount of vehicles passing through the intersection for all
approaches or on the major road in the peak direction.
e) Real -time Adaptive Control — An advanced traffic control system that
incorporates current technologies in communications, data analysis, and traffic
monitoring to provide real -time traffic control of arterials, corridors or roadway
networks.
City of Edina Transportation Policy A -7 FINAL DRAFT — January 6, 2005
Transportation Comprehensive Plan — Assists the City in making correct
transportation- related decisions today by anticipating the character, magnitude and timing
of future transportation demand.
Transportation Demand Management (TDM) — Programs and methods to reduce
effective demand. In the broadest sense, any activity or facility that reduces vehicle trips
would fall within this classification. The highest. priority in the region is given to
reducing single - occupant vehicle trips in the peak :periods. Techniques that might be
utilized are carpooling, vanpooling, transit, alternative work hours, transportation
management organizations, and land development or ordinances that discourage vehicle
trips and encourage walk, bike, rideshare and transit trips.
Transportation Policy Plan - This document is one chapter of the Metropolitan
Development Guide, as provided for in Minnesota Stat. 473, Sections 145 and 146.
Section 145 states: "The Metropolitan Council shall prepare and adopt ... a comprehensive
development guide for the metropolitan area."
Vehicle Trip - A .one -way journey made by an auto, truck or bus to convey people or
goods.
Volume -to- capacity Ratio (v /c) The hourly number of vehicles expected to use a
roadway in the busiest hour, divided by the number of moving vehicles the roadway can
safely accommodate in an hour.
Warning Signs — A sign that gives notice to road users of a situation that might not be
readily apparent.
City of Edina Transportation Policy A -8 FINAL DRAFT — January 6, 2005
APPENDIX B - TRAFFIC MANAGEMENT DEVICES /MEASURES
City of Edina Transportation Policy FINAL DRAFT — January 6, 2005
TRAFFIC MANAGMENT DEVICES /MEASURES
(Not in priority order)
City of Edin :portation Policy r FINAL DRAFT - Jani 2005
TRAFFIC
PAGE
MANAGEMENT
SPEED
TRAFFIC
FUEL
AIR/NOISE
EMERGENCY
TEST VS.
NO.
DEVICE/MEASURE
REDUCTION
REDUCTION
CONSUMPTION
POLLUTION
COST
SERVICES
PERMANENT
OTHER
B-4
Speed Hump
Probable
Possible
Small Increase
Small Increase
Low
Possible
Test Installation
Not used on
Increased
Possible
Collector and
Response Time
Arterial Streets
B -5
Speed Table
Probable
Possible
Small Increase
Small Increase
Low
Possible
Test Installation
Not used on
Increased
Possible
Collector and
Response Time
Arterial Streets
B -6
Raised Crosswalk
Possible
Possible
Small Increase
Small Increase
Low
Possible
Test Installation
Not used on
Increased
Possible
Collector and
Response Time
Arterial Streets
B -7
Raised Intersection
Probable
Possible
Small Increase
Small Increase
Medium
Possible
Permanent
Possible Drainage
to High
Increased
Installation Only
Problem
Response Time
B -8
Textured Pavement
Possible
No Effect
No Change
Minimal Effect
Low to
Minimal Impact
Permanent
Increased
Medium
Installation Only
Maintenance
B -9
Center Island
Possible
Possible
No Effect
No Effect
Medium
Minimal Impact
Test Installation
Narrowings
Possible
B -10
Neckdowns
Possible
Possible
Small Increase
Small Increase
Medium
Minimal Impact
Test Installation
to High
Possible
B -11
Gateway Treatment
Possible
Possible
No Change
Small Decrease
Medium
Minimal Impact
Permanent
Increased
to High
Installation Only
Maintenance
B -12
Choker
Probable
Possible
Small Increase
Small Increase
Medium
Minimal Impact
Test Installation
Possible
B -13
Chicane
Probable
Possible
Slight Increase
Slight Increase
Medium
Minimal Impact
Test Installation
Not used on
to High
Possible
Collector and
Arterial Streets
B -14
Realigned Intersection
Varies
Varies
Small Decrease
Small Decrease
High
Varies
Permanent
Installation Only
City of Edin :portation Policy r FINAL DRAFT - Jani 2005
TRAFFIC MANAGMENT DEVICES /MEASURES
(Not in priority order)
City of EdinaTransportation Policy B -2 FINAL DRAFT - January 6, 2005
TRAFFIC
PAGE
MANAGEMENT
SPEED
TRAFFIC
FUEL
AIR/NOISE
EMERGENCY
TEST VS.
NO.
DEVICE/MEASURE
REDUCTION
REDUCTION
CONSUMPTION
POLLUTION
COST
SERVICES
PERMANENT
OTHER
B-15
Traffic Circle
Possible
Possible
Slight Increase
Small Increase
Medium
Possible
Test Installation
Not used on
Increased
Possible
Collector and
Response Time
Arterial Streets
B -16
Roundabout
Probable
Possible
No Effect
Slight Increase
Medium
Possible
Permanent
Increased
to High
Increased
Installation Only
Maintenance
Response Time
B -17
Diagonal Road
Probable
Probable
Small Increase
Small Increase
Low to
Varies
Test Installation
Not used on
Closures
Medium
Possible
Collector and
Arterial Streets
B -18
Partial Street Closure
Possible
Probable
Small Increase
Small Increase
Medium
Minimal Impact
Test Installation
Not used on
Possible
Collector and
Arterial Streets
B -19
Cul- de-sac
Probable
Yes
Small Increase
Small Increase
High
Possible
Test Installation
Not used on
Increased
Possible
Collector and
Response Time
Arterial Streets
B -20
Median Barriers
Small Possiblity
Possible
No Effect
No Effect
Varies
Possible
Test Installation
Increased
Possible
Response Time
B-21
Forced Turn Islands
Possible
Possible
Small Increase
Small Increase
Low to
Possible
Test Installation
Not used on
Medium
Increased
Possible
Collector and
Response Time
Arterial Streets
B -22
Targeted Police
Depends on
Possible
No Effect
No Effect
High
No Effect
Temporary
Enforcement
Amount
B -23
Radar Speed Units
Probable
No Effect
No Effect
No Effect
Low
No Effect
Temporary or
Permanent
B-24
Neighborhood Traffic
Possible
No Effect
No Effect
No Effect
Low
No Effect
Temporary or
Safety Campaigns
Permanent
B -25
Stop Sign
Varies (may
Varies
Small Increase
Small Increase
Low
Possible
Temporary or
increase)
Increased
Permanent
Response Time
City of EdinaTransportation Policy B -2 FINAL DRAFT - January 6, 2005
TRAFFIC MANAGMENT DEVICES /MEASURES
(Not in priority order)
City of Edir, sportation Policy F FINAL DRAFT - Jan, 1 2005
TRAFFIC
PAGE
MANAGEMENT
SPEED
TRAFFIC
FUEL
AIR/NOISE
EMERGENCY
TEST VS.
NO.
DEVICE/MEASURE
REDUCTION
REDUCTION
CONSUMPTION
POLLUTION
COST
SERVICES
PERMANENT
OTHER
B -26
Turn Restrictions
Varies
Yes
Small Increase
No Effect
Low
No Effect
Temporary or
Permanent
B -27
One -Way Streets
No
Possible
Small Decrease
Small Decrease
Low
Varies
Temporary or
Permanent
B -28
Traffic Signal
Possible
Varies
Varies
Varies
High
No Effect
Temporary or
( "Rest on Red" and
Permanent
"Rest on Green ")
B -29
Pavement Striping
Possible.
No Effect
No Effect
No Effect
Low
No Effect
Permanent
Installation Only
City of Edir, sportation Policy F FINAL DRAFT - Jan, 1 2005
Definition: Speed humps are wave - shaped paved humps in the street. The height of the speed hump determines how
fast it may be navigated without causing discomfort to the driver or damage to the vehicle. Discomfort increases as
speed over the hump increases. Typically speed humps are placed in a series rather than singularly. (Road humps,
undulations.)
Description:
• Rounded raised areas of pavement typically 12 to 14
feet in length.
• Often placed in a series (typically spaced 300 to 600
feet apart).
• Sometimes called road humps or undulations.
Applications:
• Residential, local streets.
• Not allowed on collector and arterial streets.
• Midblock placement, not at an intersection.
• Not on grades greater than 5 percent.
• Work well with neckdowns.
Design /Installation Issues:
• Typically 12 to 14 feet in length; other lengths (10,
22, and 30 feet).
• Speed hump shapes include parabolic, circular, and
sinusoidal.
• Hump heights range between 3 and 4 inches with
trend toward 3 - 3 %Z inches maximum.
• Difficult to construct precisely; may need to specify a
construction tolerance (e.g. t 1/8 inch) on height.
• Often have signage (advance warning sign before
first hump in series and warning sign or object
marker at hump).
• Typically have pavement markings (zigzag, shark's
tooth, chevron, zebra).
• Taper edge near curb to allow gap for drainage.
• Some have speed advisories.
• Bicyclists prefer that it not cover or cross a bike lane.
Evaluation Considerations
MEN
Advantages:
• Effective speed control /reduction at the
installation.
• May reduce traffic volumes.
• Does not impact parking.
• Works well with curb extensions.
Disadvantages:
• May increase noise (breaking and
acceleration).
• May impact drainage.
• Not appropriate for grades greater than 5
percent.
• May shift traffic to parallel streets.
• Tend to reduce air quality and increase
energy consumption.
• May increase speeds between humps.
• May cause bus passengers discomfort.
• Not appropriate on some horizontal /vertical
curves.
• Requires signage that may be considered
unsightly..
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
I Reduction
Consumption
Pollution
Services
Permanent
Probable
Possible
Small
Small
Low
Possible
Test
Not Used on
Increase
Increase
Increased
Installation
Collector and
Response Time
Possible
Arterial Streets
City of Edina Transportation Policy B4 FINAL DRAFT - January 6, 2005
Definition: Trapezoidal shaped speed humps in the street, similar to regular speed humps. (Trapezoidal humps,
speed
Description:
• Long raised speed humps with a flat section in the
middle and ramps on the ends; sometimes
constructed with brick or other textured materials on
the flat section.
Applications:
• Residential, local streets.
• Not allowed on collector and arterial streets.
• Typically long enough for the entire wheelbase of a
passenger car to rest on top.
• Midblock placement or at an intersection.
• Not on grades greater than 5 percent.
• Work well with neckdowns.
Design /Installation Issues:
• Typically 22 feet in the direction of travel with 6 foot
ramps on each end and a 10 foot flat section in the
middle; other lengths (32 and 48 feet).
• Most common height is between 3 and 4 inches (as
high as 6 inches).
• Ramps are typically 6 feet long (up to 10 feet long)
and are either parabolic or linear.
Evaluation Considerations
Mr.-
Advantages:
• Effective speed control /reduction at the
installation.
• Designed to be aesthetically pleasing.
• May reduce traffic volumes.
• Typically does not impact parking.
• Typically preferred by fire department over
speed hump.
Disadvantages:
• May increase noise (breaking and
acceleration).
• May impact drainage.
• Not appropriate for grades greater than 5
percent.
• May shift traffic to parallel streets.
• May increase speeds between tables.
• May cause bus passengers discomfort.
• Not appropriate on some curves.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Probable
Possible
Small
Small
Low
Possible
Test
Not Used on
Increase
Increase
Increased
Installation
Collector and
Response Time
Possible
Arterial Streets
City of Edina Transportation Policy B -5 FINAL DRAFT - January 6, 2005
Definition: A speed table designed as a pedestrian crossing, generally used at mid -block locations. (Raised crossings,
sidewalk extensions.)
Description:
• Speed Table with flat area to accommodate
pedestrian traffic.
Applications:
• Local streets.
• Not allowed on collector and arterial streets.
• Midblock placement or at an intersection.
• Not on grades greater than 5 percent.
• Works well in combination with curb extensions and
curb radius reductions.
Design /Installation Issues:
• Typically 22 feet in the direction of travel with 6 foot
ramps on each end and a 10 foot flat section in the
middle; other lengths (32 and 48 feet) reported in
U.S. practice.
• Most common height is between 3 and 4 inches (as
high as 6 inches).
• Ramps are typically 6 feet long (up to 10 feet long)
and are either parabolic or linear.
Evaluation Considerations
F-0, aII" - I mil N
ill► : i.=
Advantages:
• Effective speed control /reduction at the
installation.
• Effective pedestrian amenity.
• May be designed to be aesthetically
pleasing.
• May reduce traffic volumes.
• Increases pedestrian visibility and
likelihood that driver yields to pedestrian.
Disadvantages:
• May increase noise (breaking and
acceleration).
• May impact drainage.
• Not appropriate for grades greater than 5
percent.
• May shift traffic to parallel streets.
• May cause bus passengers discomfort.
• Not appropriate on some curves.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
Possible
Small
Small
Low
Possible
Permanent
Not Used on
Increase
Increase
Increased
Installation
Collector and
Response Time
Only
Arterial
Streets
City of Edina Transportation Policy B -6 FINAL DRAFT - January 6, 2005
Definition: A raised plateau where roads intersect. The plateau is generally 4 inches above the surrounding street.
(Raised junctions, intersection humps, plateaus.)
Description:
• Flat raised areas covering entire intersections, with
ramps on all approaches and often with brick or other
textured materials on the flat section and ramps.
Applications:
• Local streets.
• Allowed on collector and arterial streets at all -way
stop controlled intersection only.
• Works well with curb extensions and textured
crosswalks.
• Often part of an area wide traffic calming scheme
involving both intersecting streets.
Design /Installation Issues:
• Storm drainage modifications may be necessary.
• Typically rise to sidewalk level.
• May require bollards to define edge of roadway
• Installations typically have gentle 1:40 slopes on
ramps.
• Not typically used in densely developed urban areas
where loss of parking would be unacceptable.
Evaluation Considerations
Advantages:
• Reduction in through movement speeds at
intersection.
• No effect on access.
• Makes entire intersections more
pedestrian - friendly.
• Designed to be aesthetically pleasing.
Disadvantages:
• May slow emergency vehicles to
approximately 15 miles per hour.
• May impact drainage.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Probable
Possible
Small
Small
Medium to
Possible
Permanent
Possible
Increase
Increase
High
Increased
Installation
Drainage
Response Time
Only
Problem
City of Edina Transportation Policy B -7 FINAL DRAFT - January 6, 2005
Definition: A change in pavement texture (e.g., asphalt road to brick crossing) that helps to make drivers aware of a
change in the driving environment.
Description:
• An area within in the roadway set off from the typical
pavement (e.g. bituminous and concrete) by using
cobble stones, stamped concrete, etc.
Applications:
• Used as community enhancement and /or as a
gateway treatment.
• Works well with raised crosswalk and intersection
applications.
Design /Installation Issues:
• In some cases, not preferred by bicyclists due to
rough surface.
Evaluation Considerations
►Ally
Advantages:
• Designed to be aesthetically pleasing.
• May be used to define pedestrian crossing.
• May reduce speeds.
Disadvantages:
• Increased Maintenance.
• May increase noise.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
No Effect
No Change
Minimal
Low to
Minimal
Permanent
Effect
Medium
Impact
Installation
Only
City of Edina Transportation Policy B -8 FINAL DRAFT - January 6, 2005
Definition: An island or barrier in the center of a street that serves to segregate traffic. (Midblock medians, median
slowpoints, median chokers, central islands.)
Description:
• Raised islands located along the centerline of a
street that narrow the travel lanes at that location.
Applications:
• Are often nicely landscaped to provide visual amenity
and neighborhood identity.
• Can help pedestrianize streets by providing a mid-
point refuge for pedestrians crossings.
• Sometimes used on wide streets to narrow travel
lanes.
• Works well when combined with crosswalks.
Design /Installation Issues:
• Bicyclists prefer not to have the travel way narrowed
into path of motor vehicles.
• Islands need to be wide enough to allow signs to
mark them.
• Driving lanes in each direction should be 12 feet plus
gutter width.
• Driveways, alleys, and snowplow operations should
be considered.
• Should not be used where on- street parking needs
are extensive.
Evaluation Considerations
____j '%
f ILL
ti
r._...
IMU
Advantages:
• Reduces pedestrian crossing width.
• Provides a refuge for pedestrians and
cyclists.
• Provides barrier between lanes of traffic.
• May produce a limited reduction in vehicle
speeds.
• May visually enhance the street through
landscaping.
• May prevent passing of turning vehicles.
• Preferred by fire departmentlemergency
response agencies to most other traffic
calming measures. .
• May reduce traffic volumes.
• Self- enforcing.
Disadvantages:
• May reduce parking and driveway access.
• May reduce separation for bicycles and
pedestrians.
• May limit visibility of pedestrian crossings.
• May reduce driver sightlines if over -
landscaped.
• Increased maintenance.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
I Reduction
Consumption
Pollution
Services
Permanent
Possible
Possible
No Effect
No Effect
Medium
Minimal Impact
Test
Increased
Installation
Maintenance
Possible
City of Edina Transportation Policy B -9 FINAL DRAFT'- January 6, 2005
Definition: Physical curb reduction of road width at intersections. Similar to lane narrowing but used at intersection(s).
Widening of street corners at intersections to discourage cut - through traffic, to improve pedestrian access and to help
define neighborhoods. (Nubs, bulb -outs, knuckles, intersection narrowings, corner bulges, safe crosses.)
Description:
• Realignment of curb, reducing street width at
intersections.
Applications:
• Residential, local streets.
• Should not be used in locations where turn lanes or
through lanes would be lost.
• County typically does not allow neckdowns directly
adjacent to county roads.
• Can be used in multiple applications or on a single
segment of roadway.
Design /installation Issues:
• Must result in a minimum intersection opening and
radii to accommodate turning movements.
• Drainage issues may be significant.
• Vertical delineators or object markers are often used
to make visible to snowplow operators.
Evaluation Considerations
Advantages:
• May be aesthetically pleasing if
landscaped.
• Reduces pedestrian crossing distance.
• May reduce speeds and traffic volumes.
• Self- enforcing.
• May improve sight lines.
Disadvantages:
• Unfriendly to cyclists unless designed to
accommodate them.
• Landscaping may cause sight line
problems.
• Increased maintenance if landscaped.
• May impact drainage.
• May impact bicycle accommodations.
• May impact parking.
• May require signage that may be
considered unsightly.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
I Reduction
Consumption
Pollution
Services
Permanent
Possible
Possible
Small
Small
Medium to
Minimal Impact
Test
Increase
Increase
High
Installation
Possible
City of Edina Transportation Policy B -10 FINAL DRAFT - January 6, 2005
Definition: Treatment to a street that includes a sign, banner, landscaping or other structure that helps to communicate
a sense of neighborhood identity.
Description:
• Monument or landscaping used to denote an
entrance into a neighborhood.
Applications:
• Used at entrances to residential neighborhoods
typically adjacent to collector or arterial roadways.
Design /Installation Issues:
• Determination and agreement for responsibility of
maintenance.
• Drainage issues may be significant.
• Must maintain proper intersection sight lines.
Evaluation Considerations
! V
Advantages:
• Positive indication of a change in
environment from arterial /collector
roadways to residential street.
• May reduce entry speed.
• Helps give neighborhood a sense of
identity.
• Allows neighborhood creativity and
participation in design.
Disadvantages:
• Increased maintenance.
• Determination and agreement of
maintenance responsibility.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
Possible
No Change
Small
Medium to
Minimal Impact
Permanent
Increased
Decrease
High
Installation
Maintenance
Only
City of Edina Transportation Policy B -11 FINAL DRAFT - January 6, 2005
Definition: Physical street narrowing to expand sidewalks and landscaped areas; possibly adding medians, on street
parking, etc. (Pinch points, lane narrowing, midblock narrowings, midblock yield points, constrictions.)
Description:
• Curb extensions at midblock that narrow a street by
widening the boulevard or sidewalk area.
Applications:
• Works well with pedestrian crossings.
• Works well with speed humps, speed tables, raised
intersections, textured pavement, and raised median
islands.
• Some applications use an island, which allows
drainage and bicyclists to continue between the
choker and the original curb line.
Design /Installation Issues:
• Bicyclists prefer not to have the travelway narrowed
into the path of motor vehicles.
• Typically designed to narrow road to 22 feet for two -
way traffic with 1:10 tapers at the ends.
• Adequate drainage is a key consideration.
• Provides opportunity for landscaping.
• Vertical delineators, bollards or object markers are
often used to make visible to snowplow operators.
• Effective when used in a series.
• Avoid narrowings of two way traffic to single lanes.
• Avoid use in locations where at the crest of a hill and
on some curves.
• Parking must be restricted at the choker.
Evaluation Considerations
�w
4
Advantages:
• Reduces pedestrian crossing width and
increases visibility of pedestrian.
• May reduce speed and traffic volume
• Self- enforcing.
• Preferred by many fire department/
emergency response agencies to most
other traffic calming measures.
Disadvantages:
• May impact parking and driveway access.
• Unfriendly to bicyclists unless designed to
accommodate them.
• May impact drainage.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Probable
Possible
Small
Small
Medium
Minimal Impact
Test
May Impact
Increase
Increase
Installation
Drainage
Possible
City of Edina Transportation Policy B -12 FINAL DRAFT - January 6, 2005
Definition: Mainline deviations to deter the path of travel so that the street is not a straight line (by the installation of
offset curb extensions). (Deviations, serpentines, reversing curves, twists.)
Description:
• A series of narrowings or curb extensions that
alternate from one side of the street to the other
forming S- shaped curves.
Applications:
• Residential, local streets.
• Not allowed on collector and arterial streets.
• Appropriate for midblock locations only.
• Most effective with equivalent volumes on both
approaches.
• Typically, is a series of at least three curb extensions.
• Can use on- street parking to create chicane.
• Very effective method of changing the initial
impression of the street. If designed correctly,
drivers will not be able to see through. Appears as a
road closure yet allows through movement.
DesigniInstallation Issues:
• Unless well designed, chicanes may still permit
speeding by drivers cutting straight paths across the
center line.
• Recommend shifts in alignment of at least one lane
width, deflection angles of at least 45 degrees, and
center islands to prevent drivers from taking a
straight "racing line" through the feature.
Evaluation Considerations
r �
Advantages:
• Provides opportunity for landscaping.
• Pedestrians have reduced crossing
distance.
• Imposes minimal inconveniences to local
traffic.
• Accepted by public as speed control
device.
• May reduce speed and traffic volumes.
• Self- enforcing.
• Emergency response typically prefer two -
lane chicanes to speed humps.
Disadvantages:
• Can impact parking and driveway access.
• Street sweeping may need to be done
manually.
• May impact drainage.
• Typically, not appropriate for intersections.
• Not appropriate on some curves.
• May cause problems during winter.
• Increased maintenance.
• May create head -on conflicts on narrow
streets.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Probable
Possible
Slight
Slight
Medium to
Minimal
Test
Not Used on
Increase
Increase
High
Impact
Installation
Collector and
Possible
Arterial streets
City of Edina Transportation Policy B -13 FINAL DRAFT - January 6, 2005
Definition: Physical realignment of intersection typically used to promote better through movements for a major
roadway (vs. a minor roadway). (Modified intersections.)
Description:
• Revised street geometrics of an existing intersection
that typically improves and decreases the traffic
delay for the main through movement (vs. the less
important road).
Applications:
• Typically used to correct and provide a non -stop
condition for the legs of an existing intersection with
the larger traffic volume.
• Used to help define driver's right -of -way.
Design /Installation Issues:
• Drainage may be an issue.
• May require mitigation signage due to substandard
curvature of roadway.
Evaluation Considerations
Advantages:
• Provides a more fluent through movement
for the major roadway.
• Improves driver expectation by providing a
more typical intersection.
• May better define driver's right -of -way.
• May reduce traffic volume.
Disadvantages:
• May impact parking and driveway access.
• May impact drainage.
• May be perceived as an inconvenience by
some neighbors.
• May require additional right -of -way
acquisition.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Varies
Varies
Small
Small
High
Varies
Permanent
Decrease
Decrease
Installation
Only
City of Edina Transportation Policy B -14 FINAL DRAFT - January 6, 2005
Definition: Circular, raised island placed within the middle of intersections, requiring vehicles to divert around them,
potentially forcing drivers to slow down as they traverse around the circle. (Intersection islands, similar to roundabouts.)
Description:
• Raised islands, placed in intersections, around which
traffic circulates (this is not a roundabout).
• Motorists yield to motorists already in the intersection.
• Require drivers to slow to a speed that allows them to
comfortably maneuver around them.
Applications:
• Intersections of local streets.
• Not allowed on collector and arterial streets.
• One lane each direction entering intersection.
Design /Installation Issues:
• Typically circular in shape, though not always.
• Often controlled by YIELD signs on all approaches, but
many different signage approaches are used.
• Key design features are the offset distance (distance
between projection of street curb and center island),
lane width for circling the circle, the circle diameter,
height of mountable outer ring for large vehicles such
as school buses and trash trucks, and potential for
pedestrian path - vehicle path conflicts.
• Usually landscaped in center islands. Quality of
landscaping and its maintenance are key issues.
• Landscaping needs to be designed to allow adequate
sight distance.
• Not typically used at intersections with high volume of
large trucks and buses turning left.
Evaluation Considerations
s
Al.
MQ`
06
I
Advantages:
• No effect on access.
• May reduce speed and traffic volumes.
• Effective in reducing intersection collisions.
• Self- enforcing.
Disadvantages:
• Can result in bicycle /auto conflicts at
intersections because of narrowed travel
lane.
• May require parking restrictions at
intersection.
• Left turns may be confusing.
• Care must be taken to avoid routing
vehicles through unmarked crosswalks on
side - street approach.
• Increased maintenance.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
Possible
Slight
Small
Medium
Possible
Test
Not Used on
Increase
Increase
Increased
Installation
Collector and
Response Time
Possible
Arterial streets
City of Edina Transportation Policy B -15 FINAL DRAFT - January 6, 2005
Definition: Raised circular areas (similar to medians) placed at intersections. Drivers travel in a counterclockwise
direction around the circle. Modern roundabouts are "yield upon entry', meaning that cars in the circle have the right of
way and cars entering the circle must wait to do so until the path is clear. When a roundabout is placed in an
intersection, vehicles may not travel in a straight line. (Rotaries.)
Description:
• Circular intersections with specific design and traffic
control features including yield control of all entering
traffic, channelized approaches, and appropriate
geometric curvature to ensure travel speeds within
the roundabout are less than 30 mph.
Applications:
• Intersections of local, collector and arterial streets.
• Used to improve the operation of an intersection.
• Sometimes used as community enhancement as a
gateway treatment.
• Used in high crash areas where the crash type is
inclined to be corrected by the use of a roundabout.
Design /Installation Issues:
• Adequate speed reduction.
• Design vehicle consideration.
• Pedestrian crossings located at least one vehicle
length upstream from crossing and only across legs.
• Circulating vehicles have the right -of -way.
• All vehicles circulate in a counter - clockwise direction
and pass to the right of the central island.
• Incorporate splitter islands to separate traffic, to
deflect entering traffic, and to provide opportunity for
pedestrians to cross in two stages.
Evaluation Considerations
Circular Roadway
Splitter Island
Truck
Apron
One -way Fat
operation at 15-
20 mph 11 Yield
Entry
Advantages:
• Reduces speed at intersection approach
• Longer speed reduction influence zone.
• May reduce traffic volumes.
• Effective in reducing intersection collisions.
• Self- enforcing.
• Provides space for landscaping.
• Provides a good environment for bicycles.
• Provides equal access to intersections for
all drivers.
• Cheaper to maintain than a traffic signal.
Disadvantages:
• Requires a larger amount of right -of -way
than a typical intersection.
• May require additional lighting and signing.
• Initial safety issues as drivers adjust.
• Increased maintenance responsibilities.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Probable
Possible
No Effect
Slight
Medium to
Possible
Permanent
Increased
Increase
High
Increased
Installation
Maintenance
Response Time
Only
City of Edina Transportation Policy B -16 FINAL DRAFT - January 6, 2005
Definition: A barrier placed diagonally across a four - legged intersection, interrupting traffic flow across the intersection.
This type of barrier may be used to create a maze -like effect in a neighborhood. (Diagonal diverter.)
Description:
• Barriers placed diagonally across an intersection,
blocking the through movement.
Applications:
• Used only on local roadways.
• Not allowed on collector and arterial streets.
• Closures are typically applied only after other
measures have failed or have been determined to be
inappropriate.
• Often used in sets to make travel through
neighborhoods more circuitous - typically staggered
internally in a neighborhood, which leaves through
movement possible but less attractive than
alternative (external) routes.
• Closures have been used as a crime prevention tool.
Design /Installation Issues:
• Provisions are available to make diverters passable
for pedestrians and bicyclists.
• There may be legal issues associated with closing a
public street.
• Barriers may consist of landscaped islands, walls,
gates, side -by -side bollards, or any other obstruction
that leave an opening smaller than the width of a
passenger car.
• Diverter width and curvature is dependent upon the
intersection roadway widths.
Evaluation Considerations
L
0
Advantages:
• Typically reduces traffic volumes.
• Reduces speeds at the closure area.
• Bicycles /pedestrians may not be
restricted.
Disadvantages:
• May divert significant traffic volumes to
parallel local streets.
• No significant effect on vehicle speeds
beyond the closed block.
• Increased emergency response in most
cases.
• Interrupts street network connectivity.
• May impact drainage.
• May impact parking.
• Tends to increase travel distance.
• May increase maintenance.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Probable
Probable
Small
Small
Low to
Varies
Test
Not Used on
Increase
Increase
Medium
Installation
Collector and
Possible
Arterial streets
City of Edina Transportation Policy B -17 FINAL DRAFT - January 6, 2005
Definition: Physical blockage of one direction of traffic on a two -way street. The open lane of traffic is signed "One
way", and traffic from the blocked lane is not allowed to go around the barrier through the open lane. (Half closure.)
Description:
• Barriers that block travel in one direction for a short
distance on otherwise two -way streets (when two
half - closures are placed across from one another at
an intersection, the result is a semi - diverter).
Applications:
• Not allowed on collector and arterial streets.
• Closures are typically applied only after other
measures have failed or been determined to be
inappropriate.
• Often used in sets to make travel through
neighborhoods more circuitous - typically staggered
internally in a neighborhood, which leaves through
movement possible but less attractive than
alternative (external) routes.
• Closures have been used as a crime prevention tool.
• Intended to reduce the through traffic in one direction
without the negative access issues of one -way
streets.
Design /Installation Issues:
• Partial closure must extend to centerline of the
affected street.
• A minimum opening of 14 feet must be maintained.
• Provisions are available to make diverters passable
for pedestrians and bicyclists.
• Barriers may consist of landscaped islands.
Evaluation Considerations
rwo
Advantages:
• Typically reduces traffic volumes (mostly in
one direction and possibly in the other).
• Reduces speeds at the closure area.
• Allows two -way traffic in the remainder of
the street.
• Shorter pedestrian crossing distance.
Disadvantages:
• May divert significant traffic volumes to
parallel local streets.
• No significant effect on vehicle speeds
beyond the closed block.
• Interrupts street network connectivity.
• Enforcement issues (compliance may not
be 100 %)
• Increased maintenance if landscaped.
• Emergency vehicles may be minimally
affected (they have to drive around partial
closure with care).
• Reduces access to residents.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
Probable
Small
Small
Medium
Minimal
Test
Not Used on
Increase
Increase
Impact
Installation
Collector and
Possible
Arterial streets
City of Edina Transportation Policy B -18 FINAL DRAFT - January 6, 2005
Definition: Physical street closure resulting in a dead end (no outlet) constructed with a circular turn - around area.
Description:
• A street with no outlet that eliminates cut - through
traffic.
Applications:
• Used only on local streets.
• Not allowed on collector and arterial streets.
• Cannot be used on truck routes, bus routes, snow
emergency routes, through streets, or any other
major roadway.
Design /Installation Issues:
• Must be a minimum of 120 feet of right -of -way
(diameter) to accommodate the minimum turn - around
radius of 40 feet.
• Obtain approval of police, fire and emergency
medical services.
Evaluation Considerations
I
IVA
Advantages:
• Eliminates through traffic.
• Reduces speed of the remaining vehicles.
• Improves safety for all the street users.
• Pedestrian and bike access maintained.
Disadvantages:
• Reduces emergency vehicle access.
• Reduces access to properties for
residents.
• May be perceived as an inconvenience by
some neighbors and an unwarranted
restriction by the general public.
• May increase trip lengths.
• May increase volumes on other streets.
• May require additional right -of -way
acquisition.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
I Reduction
Consumption
Pollution
Services
Permanent
Probable
Yes
Small
Small
High
Possible
Test
Not Used on
Increase
Increase
Increased
Installation
Collector and
Response Time
Possible
Arterial
streets
City of Edina Transportation Policy B -19 FINAL DRAFT - January 6, 2005
Definition: Raised island or barrier in the center of the street that serves to segregate traffic.
Description:
• Raised islands in the centerline of a street that
continues through an intersection that blocks the left
turn movement from all intersection approaches and
the through movement at the cross street.
Applications:
• Median closures are typically applied only after other
measures have failed or been determined to be
inappropriate.
• Intended to reduce the through traffic in one direction
without the negative access issues of one -way
streets.
Design /Installation Issues:
• A minimum opening of 14 feet must be maintained.
• Provisions are available to make diverters passable
for pedestrians and bicyclists.
• Barriers may consist of landscaped islands.
Evaluation Considerations
L iL
A i
a
4•
• r
Advantages:
• Typically reduces traffic volumes (mostly in
one direction and possibly in the other).
• Reduces speeds at the median area.
• Allows two -way traffic in the remainder of
the street.
• .Shorter pedestrian crossing distance.
Disadvantages:
• May divert significant traffic volumes to
parallel local streets.
• No significant effect on vehicle speeds
beyond the closed block.
• Interrupts street network connectivity.
• Enforcement issues (compliance may not
be 100 %)
• Increased maintenance if landscaped.
• Emergency vehicles may be minimally
affected.
• Reduces access to residents.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Small
Possible
No Effect
No Effect
Varies
Possible
Test
Possibility
Increased
Installation
Response Time
Possible
City of Edina Transportation Policy B -20 FINAL DRAFT - January 6, 2005
Definition: Small traffic islands installed at intersections to channel turning movements. (Forced turn barriers,
diverters.)
Description:
• Raised island barriers placed at intersections,
typically blocking the through movement.
Applications:
• Used only on local roadways.
• Not allowed on collector and arterial streets.
• Physical barrier used to divert traffic to help prevent
the temptation of drivers from making an illegal
turning or through movement.
• Intended to reduce traffic volume or to prevent a
turning movement due to safety constraints.
• Used for access management.
Design /Installation Issues:
• Island width and curvature is dependent upon the
intersection roadway widths.
• Must design corner radii to accommodate vehicle
turning movements (e.g. Trucks and buses).
Evaluation Considerations
/
1
f-
14
Advantages:
• Typically reduces traffic volumes.
• May reduce speeds at island area.
Disadvantages:
• May divert significant traffic volumes to
parallel streets.
• Emergency vehicles may be minimally
affected (they have to drive around island
with care).
• May interrupt street network connectivity.
• May increase travel distance.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
Possible
Small
Small
Low to
Possible
Test
Not Used on
Increase
Increase
Medium
Increased
Installation
Collector and
Response Time
Possible
Arterial streets
City of Edina Transportation Policy B -21 FINAL DRAFT - January 6, 2005
Definition: Specific monitoring of speeding and other violations by police due to observed, frequent law disobedience.
Description:
• Use of local police to enforce traffic laws appropriate
to traffic problems identified in a neighborhood.
Applications:
• Should only be used when specific problems are
outlined or documented.
• Can be used in conjunction with speed wagon
applications.
Design /Installation Issues:
• No design needed in a physical sense.
• Due to staff time constraints, every effort should be
made to clearly identify the problem (e.g. speeding,
driving in the parking lane, running stop signs, etc.)
• The problem should be narrowed down to the
occurrence day, time, specific location, or vehicle
type.
• Follow -ups indicating the impact of enforcement are
needed to determine the effectiveness.
Evaluation Considerations
Advantages:
• Good temporary public relations tool.
• Serves to inform pu0blic that traffic law
violations are undesirable behavior for
which there are consequences.
• Easy to implement.
• Can result in area -wide positive impacts.
Disadvantages:
Effect is not permanent.
Enforcement is an expensive tool.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Depends
Possible
No Effect
No Effect
High
No Effect
Temporary
on
Amount
City of Edina Transportation Policy B -22 FINAL DRAFT - January 6, 2005
Definition: Driver feedback signs that use radar to provide motorists with an instant message, displayed on a reader
board, telling them how fast they are driving. (Permanent Radar Signs.)
Description:
• Tool to help raise driver awareness.
• Displays speeds of passing vehicles on a reader
board
• Used in areas with frequent speeding
• Stationary Radar Signs direct a motorist's attention to
the posted speed limit and displays the speed of the
driver's vehicle on a large message board.
• Purpose is to remind drivers that they are speeding
to help encourage compliance.
Applications:
• The Police Department may use it as a "speed
checkpoint" and have an officer present to issue
citations to violators.
• Portable Radar Sign on a dolly enables residents to
borrow and place on their street
• Stationary Radar Signs are used in locations that do
not qualify for other physical measures, such as
speed humps.
Design /Installation Issues:
• Needs power to function.
Stationary Radar Signs
Evaluation Considerations
Radar Dolly
Radar Speed Trailer
Advantages:
• Heightens driver awareness of the speed
limit and the speed they are traveling.
Disadvantages:
• May provide only short-term effectiveness.
• Vandalism may be an issue.
Speed
Traffic
I
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Probable
No Effect
No Effect
No Effect
Low
No Effect
Temporary or
Permanent
City of Edina Transportation Policy B -23 FINAL DRAFT - January 6, 2005
Definition: Educational campaign used to appeal for compliance with traffic laws.
Description:
• Neighborhood traffic safety campaigns that typically
consist of personalized letters or general flyers that
are distributed to all residents of a neighborhood that
cite statistics on speeding within the neighborhood
and appeal for compliance with traffic laws.
Applications:
• Used in local residential neighborhoods.
Design /Installation Issues:
• Target all residents of an entire neighborhood (not
certain individuals).
Evaluation Considerations
Neighborhood Traffic
Management
Area
Advantages:
• Low cost.
• May reduce speeds.
• Residents may feel better after the
experience despite lack of noticeable
results.
Disadvantages:
• Effects may be short term.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
No Effect
No Effect
No Effect
Low
No Effect
Temporary or
Permanent
City of Edina Transportation Policy B -24 FINAL DRAFT - January 6, 2005
Definition: A regulatory sign that gives notice to road users that traffic is required to stop. Used to assign right -of -way
at an intersection. Recommended for installation only when specific warrants are met in accordance with the Minnesota
Manual on Uniform Traffic Control Devices ( MMUTCD). Stop signs are generally not installed to divert traffic or reduce
speeding.
Description:
• An octagonal sign with a white legend and border on
red background used to require traffic to stop.
Applications:
• Used at an intersection of a less important road with
main road where application of the normal right -of-
way rule would not be expected to provide a
reasonably safe operation.
• Used at a street entering a through highway or street.
• Used at an unsignalized intersection in a signalized
area.
• Used when abnormal conditions exist such as very
high speeds, restricted view or crash records indicate
a need for stop control.
Design /Installation Issues:
• Stop signs should not be used for speed control.
• Stop signs should be installed in manner that
minimizes the numbers of vehicles having to stop.
• In most cases, the street carrying the lowest volume
should be stopped. A stop sign should not be
installed on the major street unless justified by a
traffic engineering study.
is
Evaluation Considerations
Advantages:
• Relatively inexpensive installation cost.
• Effectively defines driver's right -of -way.
• Reduces speed at the intersection.
Disadvantages:
• When not warranted and used improperly,
they typically cause negative traffic safety
impacts (non - compliance with the signs
and increased accidents).
• May result in increased mid -block
speeding.
• Full compliance with stop control is rare.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
I Reduction
Consumption
Pollution
Services
Permanent
Varies
Varies
Small
Small
Low
Possible
Temporary or
Must meet
(may
Increase
Increase
Increased
Permanent
MMUTCD
increase )
Response Time
warrants
City of Edina Transportation Policy B -25 FINAL DRAFT - January 6, 2005
Definition: The use of regulatory signs to restrict turning movements entirely or partially (e.g. restrictions for certain
time periods during peak traffic periods).
Description:
• Prohibition of turns typically regulated by signs
placed where they will most be easily seen by road
users who might be intending to turn.
Applications:
• Used to restrict right, left and U- turns at intersections
to work in conjunction with medians, signal systems,
etc.
• Used during certain time periods (peak traffic hours)
to. help maintain safety of certain driving situations.
Design /Installation Issues:
• Most effective when applied to peak traffic hours.
• Consideration should be given to install physical
barriers (active devices) to aid in the enforcement of
the regulatory sign (passive device).
Evaluation Considerations
Advantages:
• Low installation cost.
• May increase safety.
Disadvantages:
• High violation rates without constant
enforcement or physical barriers.
• May inconvenience residents.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Varies
Yes
Small
No Effect
Low
No Effect
Temporary or
Increase
Permanent
City of Edina Transportation Policy B -26 FINAL DRAFT - January 6, 2005
Definition: Streets that are designated for use by traffic in one direction only. Typically controlled by the use of "One-
Way' regulatory signs.
Description:
• One -way signs used to indicate streets upon which
vehicular traffic is allowed to travel in one direction
only.
Applications:
• Used to restrict through traffic in isolated applications
or in combinations that create maze -like routes
through a neighborhood.
• Used to increase street capacity and traffic flow.
Design /Installation Issues:
• Combine one -way streets in ways that force turns
every block or two to avoid speeding or cut - through
problems.
ONE WAY
Evaluation Considerations
Advantages:
• May increase roadway capacity.
• May reduce traffic volumes.
Disadvantages:
• May inconvenience residents.
• May increase speeds.
• Enforcement issues.
• May increase volumes on other streets.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
No
Possible
Small
Small
Low
Varies
Temporary or
Decrease
Decrease
Permanent
City of Edina Transportation Policy B -27 FINAL DRAFT - January 6, 2005
Definition: Semi - actuated traffic signals that are programmed to rest on green or red for the different legs of the
intersection. Typically, signals are dependent upon traffic demand and maximized based upon total intersection delay
with the rest on red given to the leg with the lower approach volume.
Description:
• "Rest on Red" is an application of a signal system
where all approaches to an intersection face red
lights. If advance loops detect an approaching
vehicle moving at or below the desired speed and no
other vehicle is being served at the cross street, the
signal turns green. If speeding is detected, the green
phase is not triggered until the vehicle comes to rest
at the stop line.
• `Rest on Green" is an application of a signal system
where approaches along a main street will have a
green light. If the traffic on the main street is moving
at or below the desired speed and no one is waiting
on the side street, the light will remain green on the
main street. The signal will switch to red if speeding
is detected.
Applications:
• An application of a signal system used to control
speed.
Design /Installation Issues:
• Should not be used on roadways with high levels of
traffic due to operational concerns.
• May be used at non -peak times at some
intersections.
Evaluation Considerations
Advantages:
• Punishes or rewards based on compliance
with speed limits.
• Somewhat self- enforcing.
Disadvantages:
• May affect intersection operation if used at
intersections with high levels of traffic.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
Reduction
Consumption
Pollution
Services
Permanent
Possible
Varies
Varies
Varies
High
No Effect
Temporary or
Other
Permanent
Agency
Approval
City of Edina Transportation Policy B -28 FINAL DRAFT - January 6, 2005
Definition: Paint or thermoplastic street markings commonly placed for delineation that provides guidance and
information to the road user.
Description:
• Centerline, edgeline and transverse markings on the
street used to provide guidance and information to
the driver.
Applications:
• Used to supplement other traffic control devices.
• Used to effectively convey regulations, guidance or
warning.
• Centerlines and edgeline use may have the effect of
visually narrowing the roadway.
• Used to create bicycle lanes.
• Patterns of transverse markings placed across travel
paths used to help slow traffic at intersections and at
horizontal curve locations.
Design /Installation Issues:
• The materials used for markings should provide the
specified color throughout their useful life.
• Consideration should be given to selecting materials
that will minimize tripping or loss of traction for
pedestrians and bicyclists.
Evaluation Considerations
Advantages:
• Provide important information while
allowing minimal diversion of driver
attention from the roadway.
• Perception of narrowing the roadway may
modestly reduce speeds.
Disadvantages:
• Visibility of markings can be limited by
snow, debris and water.
• Marking durability is limited.
Speed
Traffic
Fuel
Air /Noise
Cost
Emergency
Test vs.
Other
Reduction
I Reduction
Consumption
Pollution
Services
Permanent
Possible
No Effect
No Effect
No Effect
Low
No Effect
Permanent
Installation
Only
City of Edina Transportation Policy B -29 FINAL DRAFT - January 6, 2005
APPENDIX C - APPLICATION REQUEST FOR NEIGHBORHOOD
TRAFFIC MANAGEMENT PLAN
City of Edina Transportation Policy FINAL DRAFT — January 6, 2005
Neighborhood Traffic Management Plan Application Form
Contact Name:
Address:
' Day /Message Phone:
Today's Date:
'E -mail Address:
Please indicate traffic issues that concern residents in your
neighborhood:
❑ Speeding ❑ Traffic Volumes
❑ Pedestrian /Bicycle Safety ❑ Accidents
❑ Other:
CITY OF
EDINA
Engineering D!Rartment
4801 West 50 Street
Edina, Minnesota 55424 -1394
(952) 826 -0371
www.cityofedina.com
Suggested Traffic Calming Measures (See Appendix B of the Transportation Commission Policy, please
rank, No. 1 is most favored):
Proposed Location from: to'
(street name)
on
(street name)
(street name)
We, the undersigned, as residents, hereby request the evaluation of the traffic management device listed
above. We understand we may be assessed for the cost for the device.
Please list all addresses in the potentially benefited area. One signature per household or business.
Date Name lease print) Address Signature
Page of
Please return the completed application form to the Engineering Department at the address noted above.
1. The Minnesota Data Practices Act requires that we inform you of your rights about the private data we are requesting on this form. Under
the law, your telephone number is private data. This application when submitted will become public information. There is no consequence
for refusing to supply this information.
Edina NTMP Application Form- FINAL DRAFT - January 6, 2005
APPENDIX D - ACKNOWLEDGMENTS AND REFERENCES
City of Edina Transportation Policy FINAL DRAFT — January 6, 2005
Acknowledgments and References
Edina Transportation Commission:
Joni Kelly Bennett
Dean Dovolis
Warren Plante
Fred Richards (Chair)
Marie Thorpe
Les Wanninger
Jean White
Technical and Advisory:
City of Edina Engineering Department
City of Edina Public Works Department
City of Edina Planning Department
City of Edina Police Department
City of Edina Fire Department
City of Edina Local Traffic Task Force
Cities' Websites:
• City of Albuquerque Neighborhood Traffic Management Program
http: / /www.cabg.gLov /streets /policies.html
• City of Boulder Planning and Public Works
http: / /www3.ci.boulder.co.us /pwplan/
• City of Las Vegas Traffic Engineering Division
http: / /www.lasvegasnevada.goy/public works/
• City of Bellevue Transportation Department
http: / /www.ci.bellevue.wa.us /page.asp ?view =1056
• City of Bloomington Traffic Calming Policy and Procedure Manual
http:// www. ci. bloominidon .nm.us /cityhall/commiss /ttac /calmin calming htm
• City of Colorado Springs Traffic Engineering Management
htlp://www.gpringsgov.com/Page.go?NavlD=1397
• City of Austin Transportation Division ,
hLtp://www.ci.austin.tx.us/roadworks/default.htm
• City of Vancouver Engineering Services
http:// www .city.vancouver.bc.ca/engsvcs/
• City of Gresham's Neighborhood Traffic Control Program
htip: / /www.ite.org /traffic /documents /Gresham.pdf
• City of Portland Office of Transportation
hU: / /www. trans. ci. portland.or.us /Trafficcalming/how/how.htm
City of Edina Transportation Policy D -1 FINAL DRAFT — January 6, 2005
• City of Berkley Office of Transportation
http: / /www.ci.berkeley.ca.us /transportation/
• Seattle Department of Transportation
hlW: / /www.seattle. gov /tranWortation/ntppreports.htm
• City of Savage Traffic Safety Committee
http: / /www.ci.savage.mn.us /traffic safety.html
• City of Tempe Traffic Management Program
hLtp://www.tMe.gov/traffic/trafmgnt.htin
• City of Asheville Neighborhood Traffic Calming Policy
ht
1p: / /www.ci.asheville.nc.us /engineer /Trafficpolicy.pdf
• City of Honolulu Transportation Services
http:// www. co.honolulu.hi.us /dts /index.htm
• City of Rochester, New York Neighborhood Traffic Calming Programs
hgp: / /www.ci.rochester.ny.us /streetcalm/index.htm
Websites:
• Institute of Transportation Engineers (ITE) Traffic Calming
hM: / /www.ite.org/traffic /index.html
• US Department of Transportation Federal Highway Administration - Traffic Calming
bgp://www.fliwa.dot.gov/enviromnent/tcalm/
• www.TrafficCalming.org
bttp://www.trafficcahning.org/
• LessTraffic.com
http:// www. lesstrafl =ic.com/Programs /SR/SR.htm
• US Department of Transportation Federal Highway Administration - Roundabouts
hiLtp://www.tffirc.gov/safety/00068.pd
• Victoria Transportation Policy Institute
http: / /www.vtpi.org/tdm/
• Minnesota Safety Council — Crosswalk Safety
http:// www .mnsafelycouncil.orgZcrosswalk/
• Bucknell University — Traffic Calming Measures
http: / /www.students.bucknell.edu /prof ects /trafficcalming/Measures.html
• Minnesota Department of Transportation — Pedestrian Plan
http: / /www.dot.state.mn.us /modes /pedt)lan.html
• 3 E's of Traffic Calming
bZ://www.3etrafficcalming.com/
• US Department of Transportation Federal Highway Administration — Safety Research
http://www.tffirc.gov/safety /safety.htm
Publications and Manuals:
1) Ewing, Reid H. Traffic Calming State of the Practice. Washington, DC: Institute
of Transportation Engineers 1999.
2) City of Edina Transportation Plan. Edina, Minnesota, 1999.
City of Edina Transportation Policy D -2 FINAL DRAFT — January 6, 2005
3) City of Edina Local Traffic Task Force Findings and Recommendations. Edina,
Minnesota. 2003.
4) Collier County Neighborhood Traffic Management Program. Collier County,
Florida.
5) Reardon, Linda. Traffic Calming — Creatively Mitigating Traffic Speeds and
Volumes. CE News. November 2001.
6) Traffic Calming, City of Minneapolis Department of Public Works Transportation
Division. Minneapolis, Minnesota. 1997
7) Canadian Guide to Neighborhood Traffic Calming. Transportation Association
of Canada — Canadian Institute of Transportation Engineers. December 1998
8) Saffel, Amy J. Effective Traffic Calming Applications and Implementations.
Minnesota Local Road Research Board. St. Paul, Minnesota, October 1998
9) Monahan, Bill. Getting People to Police Themselves. APWA Reporter. July
2004
10) Transportation Policy Plan. Metropolitan Council, Twin Cities Metropolitan
Area, Minnesota. December 1996
City of Edina Transportation Policy D -3 FINAL DRAFT — January 6, 2005
To: Mayor & City Council
From: James B. Hovland
Mayor
Date: January 18, 2005
Subject: Re- appointments to Boards,
Commissions and
Committees,,
REPORT /RECOMMENDATION
Agenda Item Ill. H.
Consent ❑
Information Only ❑
Mgr. Recommends ❑ To HRA
® To Council
Action ® Motion
❑ Resolution
❑ Ordinance
❑ Discussion
Recommendation:
Endorse Mayor's recommendations for annual appointments and re- appointments as
presented.
Info /Background:
Letters were sent to members of all Edina's advisory boards, commissions and committees with
terms expiring February 1, 2005, inquiring whether or not they would accept reappointment to
their respective- boards. The overwhelming response of most members was to accept
reappointment.
I recommend reappointment of the following individuals:
Committee /Board /Commission
Member
Term X Date/
Art Center Board
Imogene Anderson
2/1/2008
Art Center Board
Delores Dege
2/1/2008
Art Center Board
Elizabeth Eisenbrey
2/1/2008
Art Center Board
Heather Randall King
2/1/2008
Community Health Committee
Idelle Longman
2/1/2008
Construction Board of Appeals
David Fisher
2/1/2008
Construction Board of Appeals
John D. Glover
2/1/2008
Heritage Preservation Board
Bob Kojetin
2/1/2007
Heritage Preservation Board
Marie Thorpe
2/1/2007
Human Relations Commission
Wayne Prochniak
2/1/2008
Park Board
Andrew Finsness
2/1/2008
Park Board
Linda Presthus
2/1/2008
Park Board
Karla Sitek
2/1/2008
Planning Commission
Stephen Brown
2/1/2008
Planning Commission
John Lonsbury
2/1/2008
Recycling & Solid Waste Commision
Kathryn Frey
2/1/2007
Committee /Board /Commission
Term X Date/
Member
Recycling & Solid Waste Commision
Inna Hays
2/1/2007
Zoning Board of Appeals
William Skallerud
2/1/2008
Zoning Board of Appeals
Edward Schwartzbauer
2/1/2008
Zoning Board of Appeals
Rose -Mary Utne
2/1/2008
East Edina`Housing Foundation
Tom Erickson
2/1/2008
East Edina Housing Foundation
William Greer
2/1/2008
I am reviewing applications for our vacant positions and will be prepared to recommend new
appointees to our Board, Commissions and Committees.at
the February 1,
2005 meeting.
a
a
4,.91A,
owe �
�l
IB98
•
REPORURECOMMENDATIOP
To:
EDINA CITY COUNCIL
Agenda Item
III.I.
From
JAMES B. HOVLAND
.Consent
❑
MAYOR
Information Only
❑
Date:
JANUARY 18, 2005
Mgr. Recommends
❑
To HRA
To Council_
Subject:
APPOINTMENT OF.
®
Motion
MAYOR PRO. TEM
❑
Resolution
❑
Ordinance
❑
Discussion
RECOMMENDATION:.
I recommend the appointment of Council Member Scot Housh as Mayor pro tem.
INFORMATION/BACKGROUND:
According to State Law, the Council is required to appoint a Mayor pro tem who
performs the duties of Mayor during the disability or absence of the Mayor from
the City, or if a vacancy in the office of mayor exists. I recommend that Council
Member Housh be appointed to this position.
1
w�1NAp
I \ V
1
oe
H
AGENDA ITEM: HI.J.
RENAMING OF
CENTENNIAL LAKES PARK
. AMPHITHEATRE
No packet data
❑ Oral presentation
Information coming
4
8,737.88
R55CKREG LOG20000
CITY OF EDINA
267834
116/2005
Council Cheek Register
1/6/2005 - 1/6/2005
Check 9 Date Amount
Vendor / Explanation
PO 9 Doe No Inv No Account No
Subledger Account Description
267833 11612006
100613 AAA
99.64
4,368.94
PLATES FOR 25.338
103675 123004 1553.6260
LICENSES & PERMITS
4,368.94
PLATES FOR 25.340
103675 123004 1553.6260
LICENSES & PERMITS
COST OF GOODS SOLD MIX
COST OF GOODS SOLD MIX
COST OF GOODS SOLD MIX
COST OF GOODS SOLD MIX
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
GENERAL SUPPLIES
CONTRACTED REPAIRS
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
REPAIRRARTS
MILEAGE OR ALLOWANCE
1/5/2005 14:52:11
Page - 1
Business Unit
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
VERNON SELLING
VERNON SELLING
YORK SELLING
50TH ST SELLING
PARKING RAMP
GENERAL (BILLING)
CENTRAL SERVICES GENERAL
GENERAL MAINTENANCE
COMMUNICATIONS
COMMUNICATIONS
EQUIPMENT OPERATION GEN
GOLF ADMINISTRATION
8,737.88
267834
116/2005
102971 ACE ICE COMPANY
48.12
103421
450449
5862.5515
99.64
103422
449730
5862.5515
99.08
103423
449728
5842.5515
37.40
103582
449727
5822.5515
284.24
267835
1/6/2005
100616 ACME WINDOW CLEANING INC
1,054.35
RAMP CLEANING
103490
054981
1375.6103
1,054.35
267836
1/6/2005
100616 ACTION MAILING SERVICES INC.
404.81
MAIL PROCESSING
103676
102001
5910.6103
404.81
267837
1/6/2006
102191 ADVANCED GRAPHIC SYSTEMS INC.
683.03
TONER
103644
INV00058256
1550.6406
683.03
267838
1/6/2005
116798 ALL -WOOD PRODUCTS
2,331.00
DISPOSAL OF LEAVES
103535
10687
1301.6180
2,331.00
267839
1/6/2006
103367 ALPHA VIDEO & AUDIO
400.00
CRESTRON PROGRAMMING
103381
SYSINVO3614
2210.6103
295.85
AN SERVICES
103645.
SYSINVO3616
2210.6103
695.85
267840
116/2006
100624 ALTERNATOR REBUILD CO.
126.74
ALTERNATOR
103491
36972
1553.6530
126.74
267841
1/6/2005
117481 AMLIE, TIM
55.13
MILEAGE REIMBURSEMENT
103646
122904
5410.6107
55.13
267042
1/6/2005
101874 ANCOM COMMUNICATIONS INC.
COST OF GOODS SOLD MIX
COST OF GOODS SOLD MIX
COST OF GOODS SOLD MIX
COST OF GOODS SOLD MIX
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
GENERAL SUPPLIES
CONTRACTED REPAIRS
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
REPAIRRARTS
MILEAGE OR ALLOWANCE
1/5/2005 14:52:11
Page - 1
Business Unit
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
VERNON SELLING
VERNON SELLING
YORK SELLING
50TH ST SELLING
PARKING RAMP
GENERAL (BILLING)
CENTRAL SERVICES GENERAL
GENERAL MAINTENANCE
COMMUNICATIONS
COMMUNICATIONS
EQUIPMENT OPERATION GEN
GOLF ADMINISTRATION
R55CKREG LOG20000 _ CITY OF EDINA
Council Check Register
1/6/2005 -1/6 /2005
Check 9 Date' Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description
179.45 PAGER BATTERIES 103492 39824 1470.6406 GENE_ RAL SUPPLIES
179.45
267843 1/6/2005 102382 ANDERSON, MOLLY
334.01 UNIFORM PURCHASE 103536 122804 1400.6203 UNIFORM ALLOWANCE
334.01
267844 11612005 101566 APPRAISAL INSTITUTE
440.00 2005 DUES 103762 010105
440.00
267845 11612006 101
1190.6105
977 ARCH WIRELESS
64.96 PAGER RENTAL 103493 N6339611L 1470.6151
5610.6105
1553.6530
1553.6530
1553.6530
1553.6180
5420.6188
1552.6530.
1/5/2005 14:52:11
Page - 2
Business Unit
FIRE DEPT. GENERAL
POLICE DEPT. GENERAL
DUES & SUBSCRIPTIONS ASSESSING
EQUIPMENT RENTAL FIRE DEPT. GENERAL
DUES & SUBSCRIPTIONS ED ADMINISTRATION
REPAIR PARTS
EQUIPMENT OPERATION GEN
64.96
EQUIPMENT OPERATION GEN
REPAIR PARTS
EQUIPMENT OPERATION GEN
267846
116 /2005
103220 ASCAP
268.00
2005 MUSIC LICENSE FEE
103763
122104
268.00
267847
116/2005
100634 ASPEN EQUIPMENT CO.
73.49
FLOW COVERS
103382
1019891
227.53
HEADLAMP KIT
103383
1020591
835.85
LIGHTS, RADIO
103384
1019461
350.00
SAFETY INSPECTION
103677
117813
1,486.87
267848
1/6/2006
100266 AT &T WIRELESS
23.01
103647
121704
23.01
267849
1/6 /2006
100642 BANNERS TOGO
95.85
SIGNS
103365
18849
95.85
267860
116 /2005
102449 BATTERY WHOLESALE INC.
394.67
BATTERIES
103537
22339
374.61
BATTERIES
103678
22528
769.28
267851
11612005
100646 BECKER ARENA PRODUCTS
312.05
BROOMBALL NETS
103679
48178
101.18-
RETURN
103680
48178CR
5610.6105
1553.6530
1553.6530
1553.6530
1553.6180
5420.6188
1552.6530.
1/5/2005 14:52:11
Page - 2
Business Unit
FIRE DEPT. GENERAL
POLICE DEPT. GENERAL
DUES & SUBSCRIPTIONS ASSESSING
EQUIPMENT RENTAL FIRE DEPT. GENERAL
DUES & SUBSCRIPTIONS ED ADMINISTRATION
REPAIR PARTS
EQUIPMENT OPERATION GEN
REPAIR PARTS
EQUIPMENT OPERATION GEN
REPAIR PARTS
EQUIPMENT OPERATION GEN
CONTRACTED REPAIRS
EQUIPMENT OPERATION GEN
TELEPHONE CLUB HOUSE
REPAIR PARTS CENT SVC PW BUILDING
1553.6530
REPAIR PARTS
1553.6530
REPAIR PARTS
4077.6406
GENERAL SUPPLIES
4077.6406
GENERAL SUPPLIES
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
EDINA ATHLETIC ASSOCIATION
EDINA ATHLETIC A` \TION
R55CKREG LOG20000 _ CITY OF EDINA 1/5/2005 14:52:11
Council Check Register Page - 3
1/6/2005 - 118/2005
Check 6 Date Amount Vendor / Explanation PO 6 Doc No Inv No Account No Subledger Account Description Business Unit
210.87
267862 116/2005
101366 BELLBOY CORPORATION
1,476.90
103424
31826500
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
105.00
103425
31815900
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
47.77
103426
39378900
5822.6406
GENERAL SUPPLIES
50TH ST SELLING
24.00
103427
39378800
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
75.48
103428
39384100
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
854.40
103429
31826300
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
15.48
103430
31757800
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
105.56
103431
39307700
5862.6406
GENERAL SUPPLIES
VERNON SELLING
23.00
103432
39384200
5862.6406
GENERAL SUPPLIES
VERNON SELLING
534.00
103433
31826200
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5.40
103434
39355400
5862.6406
GENERAL SUPPLIES
VERNON SELLING
325.36
103434
39355400
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
265.23
103583
39384000
5842.5515
COST.OF GOODS SOLD MIX
YORK SELLING
1,446.00
103584
31883900
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
149.30
103585
39409200
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
128.00
103586
31884000
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
37.95
103587
31884200
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
1,476.95
103717
31826000
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
7,095.78
267853 11612005
100648 BERTELSON OFFICE PRODUCTS
25.17
OFFICE SUPPLIES
103538
3528170
1400.6406
GENERAL SUPPLIES
POLICE DEPT. GENERAL
43.61
CUSTOM STAMP
103539
SA9595
1400.6406
GENERAL SUPPLIES
POLICE DEPT. GENERAL
41.95
OFFICE SUPPLIES
103540
3517130
1400.6406
GENERAL SUPPLIES
POLICE DEPT. GENERAL
43.61
CUSTOM STAMP
103541
SA9572
1400.6406
GENERAL SUPPLIES
POLICE DEPT. GENERAL
41.95-
RETURN
103542
CM3442180
5510.6513
OFFICE SUPPLIES
ARENA ADMINISTRATION
109.42
OFFICE SUPPLIES
103648
3533280
2210.6406
GENERAL SUPPLIES
COMMUNICATIONS
89.20-
CREDIT
103649
CM3510430
1550.6406
GENERAL SUPPLIES
CENTRAL SERVICES GENERAL
25.34
LABELS
103681
3530570
1552.6406
GENERAL SUPPLIES
CENT SVC PW BUILDING
157.95
267864 1/612006 100068 BFI
32,171.80 RECYCLING
32,171.80
267865 116/2006 101676 BIFFS INC
31.21 SANITATION
31.21
103543 7000078 - 041200 5952.6183
103650 WW243945 5422.6182
RECYCLING CHARGES
RUBBISH REMOVAL
RECYCLING
MAINT OF COURSE & GROUNDS
R55CKREG LOG20000
CITY OF EDINA
1/5/2005 14:52:11
Council Check Register
Page - 4
1/6/2005
— 1/6/2005
Check #
Date
Amount
Vendor! Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
11612005
100711 BLOOD, DAVID
-
100.00.
POLICE SERVICES
103374
. JAN 05
1419.6102
CONTRACTUAL SERVICES
RESERVE PROGRAM
100.00.
267867
11612006
100659 BOYER TRUCK PARTS
117.59
HOSE ASSEMBLY
103494
699349
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
1,675.14
BRAKES. ROTORS, SPRINGS
103495
699251
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
31.13
INDICATOR
103496
700942
1553.6530
REPAIR PARTS .
EQUIPMENT OPERATION GEN
25.11
BOLTS, SCREWS, GASKETS
103497
700014
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
1,298.81
BRAKES
103544
699261
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
3,147.78
267868
11612005
100664 BRAUN INTERTEC
110.00
WATER ANALYSIS
103682
4120306
5915.6103
PROFESSIONAL SERVICES
WATER TREATMENT
110.00
267869
11612005
103264 BRO -TEX INC.
213.00
RECYCLE SORBENTS
103386
305864
1280.6271
HAZ. WASTE DISPOSAL
SUPERVISION & OVER
213.00
267860
116/2006
100667 BROCK WHITE COMPANY
2,316.38
CRACK SEAL MATERIAL
103545
11303833 -00
1301.6519
ROAD OIL
GENERAL MAINTENANCE
2,316.38
267861
1/6/2006
100776 BUTLER, GEORGE
100.00
POLICE SERVICES
103372
JAN 05
1419.6102
CONTRACTUAL SERVICES
RESERVE PROGRAM
100.00
267862
116/2006
114676 CALIFORNIA CONTRACTORS SUPPLIE
322.20
POLICE LINE TAPE
103546
L90761
1400.6610
SAFETY EQUIPMENT
POLICE DEPT. GENERAL
322.20
267863
11612006
117394 CHAMBERLAIN, MARCY
64.00
SKATING CLASS REFUND
103651
122904
5511.6136
PROFESSIONAL SVC - OTHER
ARENA BLDG/GROUNDS
64.00
267864
1/612005
101395 COMMISSIONER OF TRANSPORTATION
521.68
LAB TEST
103683
PA000104651
01205.1705.30
CONTRACTOR PAYMENTS
WOODDALE - 56 TO W RECLAIM
521.68
267866
11612005
101323 CONNEY SAFETY PRODUCTS
148.10
GLOVES, TAPE
103387
02471873,
1301.6610
SAFETY EQUIPMENT
GENERAL MAINTEI
R55CKREG LOG20000
41.84
PERMIT REFUND
CITY OF EDINA
ED030690
1495.4110
HEATING & VENTING LICENSE
INSPECTIONS
Council Check Register
1/6/2005
- 1/6/2005
Check 9
Date
Amount
Vendor / E)lanation PO /
Doc No
Inv No
Account No
Subledger Account Description
283.43
ENVELOPES
28.48
GLOVES
103386
02472241
1301.6610
SAFETY EQUIPMENT
283.43
14.04
SAFETY GLASSES, GLOVES
103684
02476584
5913.6610
SAFETY EQUIPMENT
267870
1/6/2005
19.29
SAFETY GLASSES, GLOVES
103654
02476584
1646.6610
SAFETY EQUIPMENT
87.65
SAFETY GLASSES, GLOVES
103684
02476554
1552.6406
GENERAL SUPPLIES
EQUIPMENT REPLACEMENT
SENIOR CENTER FURNISHING
297.56
138.75
267866
11612006
104948 CONTINENTAL RESEARCH CORPORATI
116/2005
117106 CUT & FILL INC.
383.57
OJD
103389
215849 -CRC -1
1552.6530
REPAIR PARTS
FILL REMOVAL
103548
383.57
1301.6180
CONTRACTED REPAIRS
GENERAL MAINTENANCE
267867
1/612006
101832 CORNERHOUSE
267872
1/6/2006
3,710.90
FORENSIC INTERVIEW SERVICES
103764
2005
1400.6103
PROFESSIONAL SERVICES
3,710.90
WORKBOOKS
103549
MN -38284
1425.6406
GENERAL SUPPLIES
267868
1/612006
104708 CRONSTROMS HEATING & A/C
DARE ITEMS
103550
MN -38285
1425.6406
1/5/2005 14:52:11
Page - 5
Business Unit
GENERAL MAINTENANCE
DISTRIBUTION
BUILDING MAINTENANCE
CENT SVC PW BUILDING
CENT SVC PW BUILDING
POLICE DEPT. GENERAL
41.84
PERMIT REFUND
103652
ED030690
1495.4110
HEATING & VENTING LICENSE
INSPECTIONS
41.84
267869
1/612006
100700 CURTIS 1000
283.43
ENVELOPES
103547
65798801
1400.6575
PRINTING
POLICE DEPT. GENERAL
283.43
267870
1/6/2005
101961 CUSTOM REFRIGERATION INC
138.75
SERVICE CALL
103764
2511 -6965
47021.6710
EQUIPMENT REPLACEMENT
SENIOR CENTER FURNISHING
138.75
267871
116/2005
117106 CUT & FILL INC.
2,300.00
FILL REMOVAL
103548
L6633
1301.6180
CONTRACTED REPAIRS
GENERAL MAINTENANCE
2,300.00
267872
1/6/2006
111057 DA.R.E. AMERICA MERCHANDISE
108.00
WORKBOOKS
103549
MN -38284
1425.6406
GENERAL SUPPLIES
DARE
143.06
DARE ITEMS
103550
MN -38285
1425.6406
GENERAL SUPPLIES
DARE
251.06
287873
1/6/2006
102285 DAVANNIS
36.11
SGTS INTERVIEWS
103551.
152621-C
1400.6106
MEETING EXPENSE
POLICE DEPT. GENERAL
36.11
267874
11612006
102478 DAY DISTRIBUTING
20.00
103588
295234
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
3,081.90
103589
295233
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
R55CKREG LOG20000
Check p Date Amount Vendor / Explanation
0o nn
CITY OF EDINA 1/5/2005 14:52:11
Council Check Register Page - 6
1/612005 - 1/6/2005
PO 0 Doc No Inv No Account No Subledger Account Description Business Unit
103590 295236 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING
103591 295235 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING
267875
116/2005
COST OF GOODS SOLD BEER
100718 DELEGARD TOOL CO.
COST OF GOODS SOLD MIX
50TH ST SELLING
COST OF GOODS SOLD BEER
YORK SELLING
COST OF GOODS SOLD MIX
79.53
SOCKETS
103552
703088
1553.6556
36.01
FASTENER DRIVE
103553
702641
1553.6556
44.55
PLIERS, BLOWGUN
103554
702158
1301.6406
160.09
267876
11612006
100735 E-Z SHARP INC '
547.84
SHARPENER PARTS
103653
8917
5511.6406
547.84
267877
1/6/2006
100739 EAGLE WINE
1,443.26
103592
169606
5842.5513
. 1,255.43
103593
169601
5862.5513
3,675.30
103718
168604
5842.5513
6,373.99
267878
116/2006
100741 EAST SIDE BEVERAGE
6,895.75
103594,
324567
5862.5514
908.90
103595,
324564
5822.5514
10.70
103596
324565
5822.5515
7,742.60
103719
324589
5842.5514
30.00
103720
324588
5842.5515
15,587.95
267879
116/2006
103236 EDEN PRAIRIE COMMUNITY BAND
150.00
PERFORMANCE 1/9105
103766
121604
5610.6136
150.00
267880
11612005
100744 EDINA CHAMBER OF COMMERCE
80.00
LEGISLATIVE BRIEFING
103716
122704
1100.6106
80.00
267881
1/612005
105224 EDINA POLICE RESERVES
731.25
2003 & 2004 WINTER WADDLE
103555
122904
1428.6010
731.25
267882
11612005
104733 EMERGENCY MEDICAL PRODUCTS
INC
231.64
BATTERIES
103654
INV663124
400.6406
TOOLS EQUIPMENT OPERATION GEN
TOOLS EQUIPMENT OPERATION GEN
GENERAL SUPPLIES GENERAL MAINTENANCE
GENERAL SUPPLIES ARENA BLDG/GROUNDS
COST OF GOODS SOLD WINE YORK SELLING
COST OF GOODS SOLD WINE VERNON SELLING
COST OF GOODS SOLD WINE YORK SELLING
COST OF GOODS SOLD BEER
VERNON SELLING
COST OF GOODS SOLD BEER
50TH ST SELLING
COST OF GOODS SOLD MIX
50TH ST SELLING
COST OF GOODS SOLD BEER
YORK SELLING
COST OF GOODS SOLD MIX
YORK SELLING
PROFESSIONAL SVC - OTHER ED ADMINISTRATION
MEETING EXPENSE CITY COUNCIL
SALARIES REGULAR EMPLOYEES OFF DUTY EMPLOYMENT
GENERAL SUPPLIES POLICE DEPT. GENI
R55CKREG LOG20000
CITY OF EDINA 1/5/2005 14:52:11
Council Check Register Page - 7
1/6/2005 — 1/6/2005
Check 9 Date Amount Vendor / Explanation PO 9 Doc No Inv No Account No Subledger Account Description Business Unit
231.64 —
267883 1/6/2006 117483 ENGELE, LEE
100.00 PERFORMANCE 1111105 103765 121604 5610.6136 PROFESSIONAL SVC - OTHER ED ADMINISTRATION
WEB DEVELOPMENT COMMUNICATIONS
WEB DEVELOPMENT COMMUNICATIONS
CONTRACTED REPAIRS FIRE DEPT. GENERAL
FIRST AID SUPPLIES FIRE DEPT. GENERAL
PHOTOGRAPHIC SUPPLIES FIRE DEPT. GENERAL
SERVICES CUSTODIANS YORK OCCUPANCY
HEATING & VENTING LICENSE INSPECTIONS
HEATING & VENTING LICENSE INSPECTIONS
COST OF GOODS SOLD MIX VERNON SELLING
GENERAL SUPPLIES
GENERAL SUPPLIES
COLLECTION SYSTEMS
BUILDING MAINTENANCE
100.00
267884
11612005
105339 ENRGI
1,073.75
WEBSITE CONSULTING
103498
2255
2210.6124
552.50
WEBSITE CONSULTING
103685
2273
2210.6124
1,626.25
267885
11612005
103351 ESSIG'S TREE & LANDSCAPE INC.
2,333.00
LANDSCAPE REPAIRS
103686
158
1470.6180
2,333.00
267886
1/6/2006
100044 FAIRVIEW SOUTHDALE HOSPITAL
1,719.99
AMBULANCE SUPPLIES
103499
12/1004STMT
1470.6510
1,719.99
267887
11612005
100297 FAST FOTO & DIGITAL
44.79
PHOTO FINISHING
103500
T2- 196847
1470.6408
44.79
267888
1/6/2006
105420 FIKES SERVICES
34.08
AIR DEODORIZERS
103655
58040
5841.6162
34.08
267889
11612005
114661 FIRESIDE HEARTH & HOME
29.36
PERMIT REFUND
103656
ED029562
1495.4110
87.60
PERMIT REFUND
103657
ED030510
1495.4110
116.96
267690
1/612006
101603 FLAHERTY'S HAPPY TYME CO.
207.00
103435
18778
5862.5515
207.00
267891
1/612005
101512 FLEXIBLE PIPE TOOL COMPANY
88.29
GAS STRUT, CANOPY
103390
9178
5923.6408
88.29
267892
11612005
100759 FLOYD TOTAL SECURITY
9.59
KEYS
103658
735088
1646.6406
WEB DEVELOPMENT COMMUNICATIONS
WEB DEVELOPMENT COMMUNICATIONS
CONTRACTED REPAIRS FIRE DEPT. GENERAL
FIRST AID SUPPLIES FIRE DEPT. GENERAL
PHOTOGRAPHIC SUPPLIES FIRE DEPT. GENERAL
SERVICES CUSTODIANS YORK OCCUPANCY
HEATING & VENTING LICENSE INSPECTIONS
HEATING & VENTING LICENSE INSPECTIONS
COST OF GOODS SOLD MIX VERNON SELLING
GENERAL SUPPLIES
GENERAL SUPPLIES
COLLECTION SYSTEMS
BUILDING MAINTENANCE
R55CKREG LOG20000
CITY OF EDINA
1/5/2005 14:52:11
Council Check Register
Page - 8
1/6/2005
- 1/6/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
9.59
267893
1/612006
102727 FORCE AMERICA
538.19
AUGER, SENSOR, DRIVE
103687
01218418
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
538.19
267894
116/2006
117476 FOX VALLEY SYSTEMS INC.
169.76
TURF PAINT
103501
17GLZ
5210.6406
GENERAL SUPPLIES
GOLF DOME PROGRAM
169.76
267896
1/6/2006
102466 GALLS INC.
144.83
CAR OPENING KITS
103556
5745417300014
1400.6406
GENERAL SUPPLIES
POLICE DEPT. GENERAL
144.83
267896
11612006
103316 GOETSCH, SAM L.
420.00
INTERPRETER
103688
123004
4078.6103
PROFESSIONAL SERVICES
INCLUSION PROGRAM
420.00
267897
116/2005
114610 GOODHUE COUNTY
200.00
OUT OF COUNTY WARRANT
103557
122904
1000.2055
DUE TO OTHER GOVERNMENTS
GENERAL FUND BALANCE SHEET
200.00
267898
11612006
100781 GRAFIX SHOPPE
106.50
VEHICLE LETTERING
103391
38877
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
106.50
267899
11612006
101103 GRAINGER
118.70
PHOTOCONTROLS, PLIER
103392
498 - 591261 -9
5511.6406
GENERAL SUPPLIES
ARENA BLDG /GROUNDS
189.56
MARKING CHALK PAINT
103393
001 - 6252041
5913.6532
PAINT
DISTRIBUTION
78.05
MARKING CHALK PAINT
103394
495 - 669623 -3
5913.6532
PAINT
DISTRIBUTION
87.67
GREASE GUN, BATTERIES
103395
495 - 508824 -2
1553.6406
GENERAL SUPPLIES
EQUIPMENT OPERATION GEN
44.60
MARKING CHALK PAINT
103502
495.613117 -3
5913.6532.
PAINT
DISTRIBUTION
205.12
TV & VCR MOUNTS
103502
495-613117 -3
1552.6406
GENERAL SUPPLIES
CENT SVC PW BUILDING
457.16
MEGOHMMETER, BATTERIES
103503
495 - 854021 -5
5921.6406
GENERAL SUPPLIES
LIFT STATION MAINT
44.60
MARKING CHALK PAINT
103504
495-036452 -3
5913.6532
PAINT
DISTRIBUTION
44.60-
CREDIT
103505
495-022247 -3
5913.6532
PAINT
DISTRIBUTION
71.57
BALLASTS, LIGHTS
103659
495-022243 -2
5420.6406
GENERAL SUPPLIES
CLUB HOUSE
1,252.43
267900
11612006
102217 GRAPE BEGINNINGS INC
518.25
103436
69601
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
518.25
R55CKREG, LOG20000
- CITY OF EDINA
Council Check Register
1/8/2005 - 18/2005
Check 0 Date Amount Vendor / Explanation PO 0 Doc No Inv No Account No Subledger Account Description
267901 1/6/2005 101518 GRAUSAM, STEVE
63.09 CELL PHONE CHARGES 103660 122204 5841.6168 TELEPHONE
63.09
COST OF GOODS SOLD MIX
YORK SELLING
5842.5512
267902 116/2005
100783 GRAYBAR ELECTRIC CO. INC.
5842.5512
COST OF GOODS SOLD LIQUOR
1,193.65
LIGHTING
103558
905857445
1,193.65
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5862.5515
267903 11612006
100785 GREUPNER, JOE
5862.5512
COST OF GOODS SOLD LIQUOR
10,050.00
1ST OTR RETAINER
103767
122004
10,050.00
COST OF GOODS SOLD MIX
YORK SELLING
5842.5515
267906 1/6/2006
100782 GRIGGS COOPER & CO.
5842.5512
COST OF GOODS SOLD LIQUOR
319.27
5842.5515
103437
166968
14,688.37
COST OF GOODS SOLD LIQUOR
103438
166969
225.60
YORK SELLING
103439
166970
358.84
5842.5512
103440
168152
6,008.63
COST OF GOODS SOLD MIX
103441
166379
130.75
YORK SELLING
103442
168378
1.70
5862.5512
103443
159141
10.78-
COST OF GOODS SOLD LIQUOR
103444
655692
8.42-
VERNON SELLING
103445
655703
6.15-
5882.5512
103446
655681
6.06-
COST OF GOODS SOLD LIQUOR
103446
655681
54.90
YORK SELLING
103597
169609
378.69
103598
169610
121.70
103599
169611
.85
103600
168523
2.55
103601
168519
34.10
103602
169605
270.36
103603
169608
5,221.61
103603
169608
2,181.90
103604
169504
.85
103605
155300
432.54
103606
168163
4,866.20
103607
156077
116.10
103608
169505
391.70-
103609
655733
5.52-
103721
656419
75.55-
103722
656504
34,911.53
1/5/2005 14:52:11
Page - 9
Business Unit
YORK OCCUPANCY
1375.6530 REPAIR PARTS PARKING RAMP
5410.6132 PROFESSIONAL SVCS - GOLF GOLF ADMINISTRATION
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
5642.5515
COST OF GOODS SOLD MIX
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5662.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5682.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5882.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
R55CKREG LOG20000
CITY OF EDINA
1/5/2005 14:52:11
Council Check Register
Page - 10
1/6/2005
— 1/6/2005
Check #
Date
Amount
Vendor / E)lanation PO #
Doc No
Inv No
Account No .
Subledger Account Description
Business Unit
267906
1162006
100788 H&L MESABI
457.95
CUSTOM BOLTS
103506
64026
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
457.95
267907
1162006
102320 HAMCO DATA PRODUCTS
114.91
REGISTER PAPER
103396
239160
5822.6512
PAPER SUPPLIES
50TH ST SELLING
114.91
267908
1/62005
117479 HAPPE, SHANNON
61.00
SKATING CLASS REFUND
103661
122904
5511.6136
PROFESSIONAL SVC - OTHER
ARENA BLDG /GROUNDS
61.00
267909
1162006
100792 HARMON AUTOGLASS
336.81
PLEXIGLASS, POLISH
103559
1073002560
1553.6180
CONTRACTED REPAIRS
EQUIPMENT OPERATION GEN
336.81
267910
1162006
117477 HATLING, LLOYD
25.00
AMBULANCE OVERPAYMENT
103507
122804
1470.4329
AMBULANCE FEES
FIRE DEPT. GENERAL
25.00
267911
1162006
101209 HEIMARK FOODS
210.24
MEAT PATTIES
103508
018081
5421.5510
COST OF GOODS SOLD
GRILL
210.24
267912
1162005
117186 HELGREN, ADAM
75.00
CONFERENCE REGISTRATION
103662
122804
5610.6104
CONFERENCES 8 SCHOOLS
ED ADMINISTRATION
75.00
267913
1162006
100803 HENNEPIN COUNTY
100.00
NOTARY SIGNATURE
103768
122904
1190.6103
PROFESSIONAL SERVICES
ASSESSING
100.00
NOTARY SIGNATURE
103768
122904
1160.6103
PROFESSIONAL SERVICES
FINANCE
200.00
267914
1162006
106436 HENNEPIN COUNTY INFORMATION
1,676.02
RADIO LEASE
103509
24118009
1470.6151
EQUIPMENT RENTAL
FIRE DEPT. GENERAL
1,676.02
267916
1162005
100802 HENNEPIN COUNTY M_ EDICAL CENTER
114.19
AMBULANCE SUPPLIES
103510
13707
1470.6510
FIRST AID SUPPLIES
FIRE DEPT. GENERAL.
114.19
f,
R55CKREG LOG20000
CITY OF EDINA
Council Check Register
1/6/2005
— 1/6/2005
Check #
Date
Amount
Vendor / Explanation PO 0
Doc No
Inv No
Account No
Subledger Account Description
267916
1/6/2005
106288 HENNEPIN COUNTY RECORDER
100.00
NOTARY SIGNATURE
103769
122904
1120.6105
DUES & SUBSCRIPTIONS
100.00
NOTARY SIGNATURE
103769
122904
1120.6105
DUES & SUBSCRIPTIONS
200.00
267917
11612005
100801 HENNEPIN COUNTY TREASURER
2,307.46
NOV 2004
103663
000776
1195.6225
BOARD & ROOM PRISONER
2,307.46
267918
11612006
102460 HENNEPIN COUNTY TREASURER
3,081.80
TNT NOTICE FEE
103689
122904
1503.6915
SPECIAL ASSESSMENTS
3,081.80
267919
11612005
106371 HENNEPIN FACULTY ASSOCIATES
2,265.17
MEDICAL DIRECTOR SERVICES
103380
JAN 05
1470.6103
PROFESSIONAL SERVICES
2,265.17
267920
116/2006
101938 HOLDAHL INC.
707.68
COMPUTER LAMINATE
103511
694064
5430.6406
GENERAL SUPPLIES
707.68
267921
11612006
117485 HRIBAR, LUCILLE
12.00
PARKING PERMIT REFUND
103690
0107
4090.4751
PARKING PERMITS
12.00
267922
1/6/2005
101426 HUGHES, GORDON
244.88
MILEAGE REIMBURSEMENT
103715
010305
1120.6107
MILEAGE OR ALLOWANCE
244.88
267923
1/6/2005
100811 HYDRO METERING TECHNOLOGY
1/5/2005 14:52:11
Page - 11
Business Unit
ADMINISTRATION
ADMINISTRATION
LEGAL SERVICES
SPECIAL ASSESSMENTS
FIRE DEPT. GENERAL
RICHARDS GOLF COURSE
STREET REVOLVING
ADMINISTRATION
2,462.41 WATER METER 103691 0028574 -IN 5917.6530 REPAIR PARTS METER REPAIR
1,254.57- METER CREDIT 103692 0026352 -CM 5914.5516 COST OF GOODS SOLD METERS TANKS TOWERS & RESERVOIR
455.82- METER CREDIT 103693 0028409 -CM 5914.5516 COST OF GOODS SOLD METERS TANKS TOWERS & RESERVOIR
752.02
267924 11612006 102664 IKON OFFICE SOLUTIONS
240.39 COPIER MAINTENANCE 103694 23539556 1628.6103 PROFESSIONAL SERVICES SENIOR CITIZENS
240.39
267926 1/612006 104380 INGRAHAM & ASSOCIATES INC.
790.15 SUBDIVISION STUDY 103560 1372 1500.6103 PROFESSIONAL SERVICES CONTINGENCIES
790.15
R55CKREG LOG20000
Check # Date Amount Vendor/ Explanation
267926 1/6/2006 101183 INSPECTRON INC.
10,975.00 INSPECTION SERVICES
10,975.00
CITY OF EDINA
Council Check Register
1/6/2005 - 1/6/2005
PO # Doc No Inv No Account No
103397 121404 1495.6103
267927 11612006
101761 IVERSON, KATHRYN .
COST OF GOODS SOLD WINE
50TH ST SELLING
COST OF GOODS SOLD LIQUOR
232.11
CONSULTANT
103695
093004
4201.6406
1,666.66
CONSULTANT
103695
093004
5840.6103
1,666.66
CONSULTANT
103695
093004
5860.6103
1,666.68
CONSULTANT
103695
093004
5820.6103
230.29
CONSULTANT
103696
123104
4201.6406
1,666.66
CONSULTANT
103696
123104
5840.6103
1,666.66
CONSULTANT
103696
123104
5860.6103
1,666.68
CONSULTANT
103696
12310.4
5820.6103
10,462.40
267928 11612005
101400 JAMES, WILLIAM F
100.00
POLICE SERVICES
103378
JAN 05
1419.6102
100.00
267930 11612005
100835 JOHNSON BROTHERS LIQUOR CO.
592.90
103447
1831741
5822.5512
702.03
103448
1831742
5822.5512
192.16
103449
1831738
5822.5512
95.45
103450
1831743
5822.5515
1,341.49
103451
1631739
5622.5513
5,657.95
103452
1628423
5842.5512
1,453.50
103453
1827579
5842.5512
310.19
103454
1831753
5862.5512
419.80
103455
1632126
5862.5512
1,058.65
103456
1831156
5862.5512
3,562.13
103457
1631749
5842.5513
95.45
103458
1831751
5842.5515
251.70
103459
1631744
5842.5512
1.776.20
103460
1831740
5842.5512
684.87
103461
1831752
5842.5513
30.89
103462
1831746
5842.5515
13,613.35
103463
1831750
5842.5512
9,933.74
103464
1831747
5842.5512
265.09
103465
1832176
5842.5512
64.66-
103466
268586
5842.5512
3,907.86
103610
1831745
842.5513
Subledger Account Description
PROFESSIONAL SERVICES
GENERAL SUPPLIES
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
GENERAL SUPPLIES
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
CONTRACTUAL SERVICES
1/5/2005 14:52:11
Page - 12
Business Unit
INSPECTIONS
EDINA CHEMICAL AWARENESS
LIQUOR YORK GENERAL
VERNON LIQUOR GENERAL
50TH STREET GENERAL
EDINA CHEMICAL AWARENESS
LIQUOR YORK GENERAL
VERNON LIQUOR GENERAL
50TH STREET GENERAL
RESERVE PROGRAM
COST OF GOODS SOLD LIQUOR 50TH ST SELLING
COST OF GOODS SOLD LIQUOR 50TH ST SELLING
COST OF GOODS SOLD LIQUOR 50TH ST SELLING
COST.OF GOODS SOLD MIX
50TH ST SELLING
COST OF GOODS SOLD WINE
50TH ST SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD LIQUOR
VERNON SELLING
COST OF GOODS SOLD LIQUOR
VERNON SELLING
COST OF GOODS SOLD LIQUOR
VERNON SELLING
COST OF GOODS SOLD WINE
YORK SELLING
COST OF GOODS SOLD MIX
YORK SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD WINE
YORK SELLING
COST OF GOODS SOLD MIX
YORK SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD LIQUOR
YORK SELLING
COST OF GOODS SOLD WINE
YORK SELLING
R55CKREG LOG20000
CITY OF EDINA 1/5/2005 14:52:11
Council Check Register Page - 13
116/2005 - 116/2005
Check 9 Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subiedger Account Description
Business Unit
3,432.05
103611
1831746
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
16.00-
103612
269515
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
8.96-
103613
269512
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
6.20-
103614
269514
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
347.78-
103615
267950
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
21.33-
103616
269670
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
22.50-
103617
269669
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
79.57-
103723
269513
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
16.33-
103724
269668
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5.33-
103725
269667
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
16.58-
103726
269671
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
4.49-
103727
268868
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
13.78-
103728
268869
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
6.01-
103729
268867
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
10.67-
103730
268866
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
7.61-
103731
268865
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
128.90-
103732
268864
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
64.65-
103733
268863
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
48,726.10
267931 1/612005
101817 KLEINBERG, ERIC
180.70
UNIFORM PURCHASE
103561
122904
1400.6203
UNIFORM ALLOWANCE
POLICE DEPT. GENERAL
180.70
267932 1/6/2006
105887 KOESSLER, JOE
199.00
DEC FEE
103697
123104
1628.6103
PROFESSIONAL SERVICES
SENIOR CITIZENS
199.00
267933 1/612006
102474 KRULL, JULIE
82.08
UNIFORM PURCHASE
103664
123004
1400.6203
UNIFORM ALLOWANCE
POLICE DEPT. GENERAL
82.08
267934 1/612006
116776 KUSTOM KARRIERS
211.06
TOW BILL DWI
103562
122904
4601.6103
PROFESSIONAL SERVICES
POLICE FORFEITURE
211.06
267936 1/612005
101552 LEAGUE OF MINNESOTA CITIES
15.00
SAFETY #1 EVENT
103563
1- 000019261
1400.6104
CONFERENCES & SCHOOLS
POLICE DEPT. GENERAL
15.00
267936 116/2006
106301 LOFFLER COMPANIES INC.
56.00
COPIER USAGE
103564
103257
5910.6406
GENERAL SUPPLIES
GENERAL (BILLING)
R55CKREG LOG20000
CITY OF EDINA
1/5/2005 14:52:11
Council Check Register
Page - 14
1/6/2005
- 1/6/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
56.00
267937
11612005
100858 LOGIS
30.00
103565
24682
1554.6103
PROFESSIONAL SERVICES
CENT SERV GEN - MIS
930.00
103565
24682
2210.6160
DATA PROCESSING
COMMUNICATIONS
1,993.00
103565
24682
1495.6160
DATA PROCESSING
INSPECTIONS .
2,058.50
103565
24682
1120.6160
DATA PROCESSING
ADMINISTRATION.
2,347.00
103565
24682
1554.6160
DATA PROCESSING
CENT SERV GEN - MIS
2,985.00
103565
24682
5910.6160
DATA PROCESSING
GENERAL (BILLING)
4,673.00
103565
24682
1190.6160
DATA PROCESSING
ASSESSING
4,861.50
103565
24682
1160.6160
DATA PROCESSING
FINANCE
19,878.00
267938
11612006
112677 M. AMUNDSON LLP
1,030.18
103618
171688
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
1,030.18
267939
116/2006
100864 MAC QUEEN EQUIP INC.
271.46
ROLLER, KEY
103698
2050776
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
138.02
ICE CURB GUARD .
103699
2046416
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
409.48
267940
1/6/2006
100868 MARK VII SALES
3,516.85
103467
748986
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
42.40
103468
748987
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
1,438.25
103619
748588
5862.5514
COST OF GOODS SOLD BEER
VERNON SELLING
3,777.90
103620
748961
5862.5514
COST OF GOODS SOLD BEER
VERNON SELLING
93.25
103621
748962
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
3,585.14
103734
750703
5642.5514
COST OF GOODS SOLD BEER
YORK SELLING
12,453.79
267941
116/2006
101666 MARSHALL & SVAFT
774.95
COMMERCIAL ESTIMATOR 7
103770
5551111
1190.6105.
DUES & SUBSCRIPTIONS
ASSESSING
774.95
267.942
11612006
103944 MED.COMPASS
91.00
SCBA EXAM
103512
7600
1470.6175
PHYSICAL EXAMINATIONS
FIRE DEPT. GENERAL
91.00
267943
1/612005
100881 MERFELD, BURT
100.00
POLICE SERVICES
103373
JAN 05
1419.6102
CONTRACTUAL SERVICES
RESERVE PROGRAM
100.00
R55CKREG LOG20000
CITY OF EDINA
Council Check Register
1/6/2005 — 1/6/2005
Check # Date Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
267944 11612005
100882 MERITSUPPLY
267946
1/612005
115212 METROIMINNESOTA CHAPTER
111.24
WYPALL, AMMONIA
103398
656050
1325.6406
GENERAL SUPPLIES
255.49
TISSUE, CUPS, TOWELS
103566
65994
1552.6406
GENERAL SUPPLIES
366.73
120.00
287945 11612005
104967 METHODIST HOSPITAL
267947
1/6/2006
100410 METROCALL
2,744.00
STRESS TESTS
103567
122804STMT
1470.6175
PHYSICAL EXAMINATIONS
115/2005 14:52:11
Page - 15
Business Unit
STREET NAME SIGNS
CENT SVC PW BUILDING
FIRE DEPT. GENERAL
2,744.00
267946
1/612005
115212 METROIMINNESOTA CHAPTER
120.00
CHAPTER SERVICE FEE 103771
2005
1190.6105
DUES & SUBSCRIPTIONS
ASSESSING
120.00
267947
1/6/2006
100410 METROCALL
346.64
PAGER RENTALS 103568
01980167 -1
1400.6151
EQUIPMENT RENTAL
POLICE DEPT. GENERAL
346.64
267948
11612005
117484 METROPOLITAN RADIO BOARD
1,270.92
MOTOROLA SERVICE CONTRACT 103774
SERV0509
1400.6230
SERVICE CONTRACTS EQUIPMENT
POLICE DEPT. GENERAL
1,270.92
267949
11612005
100692 MIDWEST COCA -COLA EAGAN
439.10
103469
82533064
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
281.70
103735
81532166
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
720.80
267960
1/6/2005
100913 MINNEAPOLIS SUBURBAN SEWER & W
1,360.00
WATER MAIN REPAIR 103513
32611
5913.6160
CONTRACTED REPAIRS
DISTRIBUTION
1,360.00
267951
116/2005
102089 MINNESOTA COMMERCE DEPARTMENT
40.00
NOTARY RENEWAL 103777
122904
1120.6105
DUES & SUBSCRIPTIONS
ADMINISTRATION
40.00
NOTARY RENEWAL 103777
122904
1120.6105
DUES & SUBSCRIPTIONS
ADMINISTRATION
80.00
267952
1/6/2006
101912 MINNESOTA DEPARTMENT OF AGRICU
120.00
PESTICIDE LICENSE RENEWALS 103772
2005
1640.6260
LICENSES & PERMITS
PARK MAINTENANCE GENERAL
120.00
267963
11612005
101569 MINNESOTA STATE FIRE CHIEFS AS
270.00
2005 DUES 103775
2005
1470.6105
DUES & SUBSCRIPTIONS
FIRE DEPT. GENERAL
R55CKREG . LOG20000 _ CITY OF EDINA
Council Check Register
11612005 — 118/2005
Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description
270.00
267964 11612006 100908 MINNESOTA WANNER
59.02 ADAPTER, VALVE 103399 0062633 -IN 1553.6530 REPAIR PARTS
100.00
LICENSES & PERMITS
GENERAL SUPPLIES
1/5/2005 14:52:11
Page - 16
Business Unit
EQUIPMENT OPERATION GEN
PONDS & LAKES
FIRE DEPT. GENERAL
CONFERENCES & SCHOOLS PARK ADMIN. GENERAL
CONFERENCES & SCHOOLS TRAINING
DUES & SUBSCRIPTIONS PUBLIC HEALTH
COST OF GOODS SOLD WINE YORK SELLING
GENERAL SUPPLIES STREET NAME SIGNS
TELEPHONE FIRE DEPT. GENERAL
TELEPHONE POLICE DEPT. GENERAL
CONTRACTUAL SERVICES RESERVE PROGRAM
59.02
267965
11612006
102776 MN DNR WATERS
202.00
DNR PERMITS
103776
2005
5933.6260
202.00
267956
11612005
100169 MOOERS PRINTING INC.
724.20
WELCOME PACKET BROCHURES
103514
3827
1470.6406
724.20
267957
11612005
102776 MRPA
1,215.00
. MRPA CONFERENCE
103755
3586
1600.6104
1,215.00
267968
1/6/2005
101608 MSSA
35.00
MEMBERSHIP DUES
103773
2005
1281.6104
35.00
267969
116/2005
101472 NEHA
85.00
NEHA MEMBERSHIP
103515
S WILMOT
1490.6105
85.00
267960
11612006
100076 NEW FRANCE WINE CO.
591.00
103736
29204
5842.5513
591.00
267961
11612005
100922 NEWMAN TRAFFIC SIGNS
1,354.69
SIGNS
103400
11-0134341
1325.6406
1,354.69
267962
11612005
104672 NEXTEL COMMUNICATIONS
1,053.50
103516
757391129-025
1470.6188
521.25
103569
909583317 -037
1400.6188
1,574.75
267963
1/6/1006
100724 NISSEN, DICK
100.00
POLICE SERVICES
103377
JAN 05
1419.6102
100.00
LICENSES & PERMITS
GENERAL SUPPLIES
1/5/2005 14:52:11
Page - 16
Business Unit
EQUIPMENT OPERATION GEN
PONDS & LAKES
FIRE DEPT. GENERAL
CONFERENCES & SCHOOLS PARK ADMIN. GENERAL
CONFERENCES & SCHOOLS TRAINING
DUES & SUBSCRIPTIONS PUBLIC HEALTH
COST OF GOODS SOLD WINE YORK SELLING
GENERAL SUPPLIES STREET NAME SIGNS
TELEPHONE FIRE DEPT. GENERAL
TELEPHONE POLICE DEPT. GENERAL
CONTRACTUAL SERVICES RESERVE PROGRAM
R55CKREG LOG20000
103470 8056963 -IN 5822.5513 COST OF GOODS SOLD WINE
50TH ST SELLING
90.00-
_ CITY OF EDINA
50TH ST SELLING
504.00
103622 8057312 -IN 5862.5513 COST OF GOODS SOLD WINE
VERNON SELLING
755.00
Council Check Register
1/6/2005
- 1/6/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
267964
11612005
117102 NORTH AMERICAN SALT CO.
7,158.27
ROAD SALT
103401
1166223
1318.6525
SALT
8.14
FUEL SURCHARGE
103402
11170040
1318.6525
SALT
7,166.41
267965
1/612005
105205 NORTH CENTRAL EMS COOPERATIVE
75.00
MEMBERSHIP DUES
103778
2005
1470.6105
DUES & SUBSCRIPTIONS
75.00
267966
116/2005
102652 NORTHLAND CHEMICAL CORP.
64.41
DETERGENT
103403
86307
1552.6530
REPAIR PARTS
64.41
267967
1/612005
100930 NORTHWESTERN TIRE CO.
614.39
TIRES
103570
NW -93431
1553.6583
TIRES 8 TUBES
140.32
FLOOR DRY
103571
NW 93688
1553.6583
TIRES & TUBES
754.71
267968
116/2005
103678 OFFICE DEPOT
135.55
PRINTER
103665
268791060-001
5410.6406
GENERAL SUPPLIES
20.24
BATTERY, CABLE
103666
268973060-001
5410.6406
GENERAL SUPPLIES
155.79
267969
1/6/2005
100936 OLSEN COMPANIES
41.11
HANDLES
103700
316260
5913.6406
GENERAL SUPPLIES
41.11
267970
11612005
101484 OSWALD HOSE & ADAPTERS
677.34
RINK FLOODING HOSE
103667
103376
1648.6406
GENERAL SUPPLIES
677.34
267971
1/612006
103906 PARSONS
398.04
FFE -PHONE SYS
103517
72895
7400.1705
CONSTR. IN PROGRESS
398.04
267972
11612005
100347 PAUSTIS 3 SONS
1/5/2005 14:52:11
Page - 17
Business Unit
SNOW 8 ICE REMOVAL
SNOW & ICE REMOVAL
FIRE DEPT. GENERAL
CENT SVC PW BUILDING
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
GOLF ADMINISTRATION
GOLF ADMINISTRATION
DISTRIBUTION
SKATING RINK MAINTENANCE
PSTF BALANCE SHEET
341.00
103470 8056963 -IN 5822.5513 COST OF GOODS SOLD WINE
50TH ST SELLING
90.00-
103471 8056417 -CM 5822.5513 COST OF GOODS SOLD WINE
50TH ST SELLING
504.00
103622 8057312 -IN 5862.5513 COST OF GOODS SOLD WINE
VERNON SELLING
755.00
R55CKREG LOG20000
CITY OF EDINA
1/5/2005 14:52:11
Council Check Register
Page - 18
1/6/2005
- 1/6/2005
Check # Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
267973 11612006
100946 PEPSI -COLA COMPANY
134.80
103738
72467520
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
134.80
267974 11612006
100946 PERA
77,822.58
PPEND 12128/04
103581
122904
1000.2023
P.E.R.A. PAYABLE
GENERAL FUN_ D BALANCE SHEET
77,822.58
267975 1/6/2006
100743 PHILLIPS WINE & SPIRITS
497.70
103472
2149412
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
1,424.70
103473
2149413
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
399.60
103474
2146597
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
2,805.01
103475
2150169
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
67.90
103478
2149417
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
1,238.87
103477
2149415
5842.5512,
COST OF GOODS SOLD LIQUOR
YORK SELLING
5,113.58
103623
2149416
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
8,787.37
103624
2149418
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
6.68-
103625
3310858
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5.25-
103626
3310859
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
15.05-
103627
3310758
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
8.25-
103628
3310412
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
3,745.30
103739
2150343
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
1,939.20
103740
2150344
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
134.10-
103741
3310465
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
6.90-
103742
3310436
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
1.38-
103743
3310468
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
7.58-
103744
3310469
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
25,834.04
267976 116/2005
102166 PINNACLE DISTRIBUTING
225.50 103745- 49703 5842.5515
226.60
267977 11612005 100961 POSTMASTER
150.00 PRESORT PERMIT 9939 103668. 120204 1550.6235
150.00
267978 116/2005 100961 POSTMASTER
550.00 ABOUTBUSINESS POSTAGE 103779 2005 2210.6123
550.00
1.267979 11812005 101032 PRINT SHOP, THE
COST OF GOODS SOLD MIX YORK SELLING
POSTAGE
CENTRAL SERVICES GENERAL
MAGAZINEMEWSLETTER EXPENSE COMMUNICATIONS
R55CKREG LOG20000
CITY OF EDINA
1/512005 14:52:11
Council Check Register
Page - 19
1/6/2005
- 1/6/2005
Check 0 Date
Amount
Vendor / Explanation PO 0
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
862.43
NEWSLETTER
103701
21032
1628.6575
PRINTING
SENIOR CITIZENS
662.43
267980 11612005
100968 PRIOR VINE COMPANY
596.00
103629
169607
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
813.50
103746
169543
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
1,409.50
267981 1/6/2005
110484 QPR
2,658.57
COLD MIX BITUMINOUS
103702
42070
5913.6518
BLACKTOP
DISTRIBUTION
2,658.57
267983 1/6/2005
100971 QUALITYWINE
6.54-
103478
495811 -00
5860.5518
VENDOR DISCOUNTS
VERNON LIQUOR GENERAL
327.23
103478
495811 -00
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
9.80
103479
493598 -00
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
20.00-
103480
494164-00
5840.5518
VENDOR DISCOUNTS
LIQUOR YORK GENERAL
2,023.58
103480
494164-00
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
5.76-
103481
495612 -00
5840.5518
VENDOR DISCOUNTS
LIQUOR YORK GENERAL
287.80
103481
495612 -00
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
7.65-
103482
495812 -00
5840.5518
VENDOR DISCOUNTS
LIQUOR YORK GENERAL
382.60
103482
495812 -00
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
25.20-
103483
489544-00
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
38.47-
103484
490368 -00
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
16.97-
103630
497074 -00
5860.5518
VENDOR DISCOUNTS
VERNON LIQUOR GENERAL
856.23
103630
497074-00
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
28.26-
103631
496331 -00
5860.5518
VENDOR DISCOUNTS
VERNON LIQUOR GENERAL
2,852.84
103631
496331 -00
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
91.37-
103632
497073 -00
5840.5518
VENDOR DISCOUNTS .
LIQUOR YORK GENERAL
4,598.60
103632
497073-00
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
3.32-
103833
497330-00
5840.5518
VENDOR DISCOUNTS
LIQUOR YORK GENERAL
167.11
103633
497330-00
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
15.00-
103634
497262 -00
5840.5518
VENDOR DISCOUNTS.
LIQUOR YORK GENERAL
1,520.35
103634
497262 -00
5842.5513
COST OF GOODS SOLD WINE
-YORK SELLING
35.91-
103835
.497140-00
5840.5518
VENDOR DISCOUNTS
LIQUOR YORK GENERAL
3,625.34
103635
497140-00
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
295.85
103636
497141 -00
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
84.22-
103637
490369-00
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING -
4.33-
103747
497007 -00
5840.5518
VENDOR DISCOUNTS
LIQUOR YORK GENERAL
433.61
103747
497007 -00
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
23.16-
103748
493214-00
5842.6513
COST OF GOODS SOLD VINE
YORK SELLING
55.83-
103749
493904-00
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
R55CKREG LOG20000
316.78
_ CITY OF EDINA
267986
Council Check Register
104642 RCM SPECIALTIES INC.
1/6/2005 — 116/2005
Check # Date Amount
Vendor / Explanation
PO A Doc No
Inv No Account No .
Subledger Account Description
16,916.95
1,600.00
267984 11612006
101966 QWEST
267986
1/612005
111.45
101902 RINK SYSTEMS INC
103404
8166 -12104 1550.6188
TELEPHONE
65.10
952 927 -8861
103756
8861 -12/04 1550.6188
TELEPHONE
54.47
952 929-0297
103757
0297 -12/04 4090.6188.
TELEPHONE
85.76
952 929 -9549
103758
9549 -12/04 5841.6188
TELEPHONE
EQUIPMENT RENTAL
GENERAL SUPPLIES
CONTRACTED REPAIRS
SAND GRAVEL & ROCK
HAZ. WASTE DISPOSAL
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
PRINTING
1/5!2005 14:52:11
Page - 20
Business Unit
CENTRAL SERVICES GENERAL
CENTRAL SERVICES GENERAL
STREET REVOLVING
YORK OCCUPANCY
GENERAL MAINTENANCE
ARENA BLDG/GROUNDS
CENTENNIAL LAKES
DISTRIBUTION
SUPERVISION & OVERHEAD
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
INSPECTIONS
100.00 PERFORMANCE 1/13/05 103780 121604 5610.6136 PROFESSIONAL SVC - OTHER ED ADMINISTRATION
100.00
316.78
267986
11612005
104642 RCM SPECIALTIES INC.
1,600.00
PATCHER SERVICE
103518
2650
1301.8151
1,600.00
267986
1/612005
101902 RINK SYSTEMS INC
906.85
POLYCARBONATE
103405
811377
5511.6406
906.85
267987
116/2005
105324 RT ELECTRIC
2,194.00
REPLACE BALLASTS
103669
04-876
5630.6180
2,194.00
267988
116/2006
100987 SA-AG INC
140.06
SAND
103406
40934
5913.6517
140.06
267989
116/2006
100988 SAFETY KLEEN
105.44
CHANGE OUT PARTS WASHER
103407
MB01218058
1280.6271
105.44
267990
1/612006
101822 SAM'S CLUB DIRECT
90.00
MEMBERSHIP FEE _
103572
999999
1553.6103
100.00
ADMIN FEE
103573
CF0412
1553.6103
190.00
267991
11612005
104788 SANDY'S PROMOTIONAL STUFF
551.38
PROMO PENSIMARKERS
103408
SH4261
1495.6575
551.38
267992
1/612006
101662 SAWYER, CHERYL
EQUIPMENT RENTAL
GENERAL SUPPLIES
CONTRACTED REPAIRS
SAND GRAVEL & ROCK
HAZ. WASTE DISPOSAL
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
PRINTING
1/5!2005 14:52:11
Page - 20
Business Unit
CENTRAL SERVICES GENERAL
CENTRAL SERVICES GENERAL
STREET REVOLVING
YORK OCCUPANCY
GENERAL MAINTENANCE
ARENA BLDG/GROUNDS
CENTENNIAL LAKES
DISTRIBUTION
SUPERVISION & OVERHEAD
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
INSPECTIONS
100.00 PERFORMANCE 1/13/05 103780 121604 5610.6136 PROFESSIONAL SVC - OTHER ED ADMINISTRATION
100.00
R55CKREG LOG20000
2,271.50
_ CITY OF EDINA
1/612005
101383 SIITARI, MICHAEL
569.36
Council Check Register
569.36
267999
1/612006
1/6/2005 — 1/6/2005
101275 SJS CORP - CUSTOMIIPSC SUPPLY
Check 0
Date
Amount
Vendor / Explanation PO 0
Doc No
Inv No Account No
Subledger Account Description
267993
116/2005
1/6/2005
105128 SCHMIDT COMMUNICATIONS
101342 SOCCER EXPRESS
893.50
UNIFORM SHIRTS 103704 0278 1470.6558 DEPT UNIFORMS
204.21
2005 MEDIA DIRECTORY
103781
6433 2210.6406
GENERAL SUPPLIES
1/6/2006
204.21
267994
116/2005
117487 SEARCH SYSTEMS INC.
1,698.00
DELSAR SIMULATORS
103703
001361 1470.6579
TRAINING AIDS
1,698.00
267996
1/612005
100997 SESAC INC.
441.00
MUSIC FEES
103782
2303083 5610.6105
DUES & SUBSCRIPTIONS
148.50
MUSIC FEES
103763
2292709 5510.6105
DUES & SUBSCRIPTIONS
589.50
267996
1/612005
117474 SHERMAN, MELANIE
1/5/2005 14:52:11
Page- 21
Business Unit
COMMUNICATIONS
FIRE DEPT. GENERAL
ED ADMINISTRATION
ARENA ADMINISTRATION
20.00 PROGRAM REFUND 103409 122804 1600.4390.37 SCHOOL RELEASE FIELD TRIPS PARK ADMIN. GENERAL
20.00 PROGRAM REFUND 103410 12128 1600.4390.37 SCHOOL RELEASE FIELD TRIPS PARK ADMIN. GENERAL
40.00
267997 1/612005 111824 SIDEKICK
2,271.50 PLAN SCAN & INDEXING 103670 1678 1495.6136 PROFESSIONAL SVC - OTHER INSPECTIONS
POLICE DEPT. GENERAL
PATHS & HARD SURFACE
FIRE DEPT. GENERAL
2,594.55 103636 157984 5842.5514 COST OF GOODS SOLD BEER YORK SELLING
536.05 103639 157978 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING
25.05 103640 157977 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING
3,155.65
268002 11612006 108563 SOUTHTOWN PLUMBING INC.
17.60 PERMIT REFUND 103671 ED027765 1495.4110 HEATING & VENTING LICENSE INSPECTIONS
2,271.50
267998
1/612005
101383 SIITARI, MICHAEL
569.36
UNIFORM PURCHASE 103574 122904 1400.6203 UNIFORM ALLOWANCE
569.36
267999
1/612006
101275 SJS CORP - CUSTOMIIPSC SUPPLY
317.77
ICE MELT 103411 5249 1647.6406 GENERAL SUPPLIES
317.77
268000
1/6/2005
101342 SOCCER EXPRESS
893.50
UNIFORM SHIRTS 103704 0278 1470.6558 DEPT UNIFORMS
893.50
268001
1/6/2006
101002 SOUTHSIDE DISTRIBUTORS INC
POLICE DEPT. GENERAL
PATHS & HARD SURFACE
FIRE DEPT. GENERAL
2,594.55 103636 157984 5842.5514 COST OF GOODS SOLD BEER YORK SELLING
536.05 103639 157978 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING
25.05 103640 157977 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING
3,155.65
268002 11612006 108563 SOUTHTOWN PLUMBING INC.
17.60 PERMIT REFUND 103671 ED027765 1495.4110 HEATING & VENTING LICENSE INSPECTIONS
R55CKREG LOG20000
CITY OF EDINA
Council Check Register
1/6/2005
- 1/6/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No,
Subledger Account Description
17.60,
268003
116/2005
101017 SUBURBAN CHEVROLET
13.21
BEZEL
103519
370330CVW
1553.6530
REPAIR PARTS
13.21
268004
11612005
106874 SUBURBAN TIRE WHOLESALE INC.
1,102.23
TIRES
103575
10032116
1553.6583
TIRES 8 TUBES
1,102.23
268005
11612005
100900 SUN NEWSPAPERS
290.00
ADVERTISING
103672
745541
5822.6122
ADVERTISING OTHER
290.00
ADVERTISING
103672
745541
5842.6122
ADVERTISING OTHER
290.00
ADVERTISING
103672
745541
5862.6122
ADVERTISING OTHER
870.00
268006
11612006
110674 SUPERIOR WIRELESS COMMUNICATIO
46.91
PHONE CASE, SERVICE
103412
8149
5913.6406
GENERAL SUPPLIES.
13.25
PHONE CASE
103705
8263
5913.6406
GENERAL SUPPLIES
60.16
268007
11612005
1.00794 SWANSON, HAROLD
100.00
POLICE SERVICES
103376
JAN 05
1419.6102
CONTRACTUAL SERVICES
100.00
268008
1/6/2006
101027 TARGET
18.63
BATTERIES
103706
0928814
2210.6406
GENERAL SUPPLIES
18.63
268009
1/612006
101035 THORPE DISTRIBUTING COMPANY
1/5/2005 14:52:11
Page - 22
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
50TH ST SELLING
YORK SELLING
VERNON SELLING
DISTRIBUTION
DISTRIBUTION
RESERVE PROGRAM
COMMUNICATIONS
3,998.49 103841 358402 5862.5514 COST OF GOODS SOLD BEER VERNOH SELLING
53.80 103642 358403 5862.5515 COST OF GOODS SOLO MIX VERNON SELLING
4,052.29
268010 1/6/2006 117476 TIET7, LILA
25.00 AMBULANCE OVERPAYMENT 103520 122804 1470.4329 AMBULANCE FEES FIRE DEPT. GENERAL
25.00
268011 11612005 101474 TITLEIST
71.14 GOLF BALLS 103673 1785583 5440.5511 COST OF.GOODS - PRO SHOP PRO SHOP RETAIL SALES
71.14
R55CKREG LOG20000
1,200.00
CUSTODY FEE
_ CITY OF EDINA
2804050
5910.6103
PROFESSIONAL SERVICES
GENERAL (BILLING)
Council Check Register
1/6/2005
— 1/6/2005
Cheek 0
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
268012
11612005
103415
101038 TOLL GAS & WELDING SUPPLY
2210.6123
MAGAZINE/NEWSLETTER EXPENSE
COMMUNICATIONS
34.45-
144.08
WELDING GASES
103413
335004
1553.6406
GENERAL SUPPLIES
144.08
268013
1/612005
1/612006
101693 TOTAL REGISTER
101063 UNITED ELECTRIC COMPANY
309.17
REBUILT SCANNER & LABEL
103521
17712
5842.6406
GENERAL SUPPLIES
1646.6406
GENERAL SUPPLIES
309.17
1,757.25
LIGHT FIXTURES
103576
268014
116/2006
REPAIR PARTS
101047 TWIN CITY GARAGE DOOR CO
1,798.79
153.88
DOOR REPAIR
103414
228961
1553.6530
REPAIR PARTS
101065 UNIVERSITY.OF MINNESOTA
153.88
268015
11612005
103784
102255 TWIN CITY OXYGEN CO
1495.6104
CONFERENCES & SCHOOLS
INSPECTIONS
1,180.00
132.22
OXYGEN
103522
806089
1470.6510
FIRST AID SUPPLIES
268021
116/2006
83.39
OXYGEN
103707
806203
1470.6510
FIRST AID SUPPLIES
6.77
OXYGEN
103708
606216
1470.6510
FIRST AID SUPPLIES
32.26
OXYGEN
103709
806204
1470.6510
FIRST AID SUPPLIES
254.64
268016
1/6/2006
102160 TWIN CITY SEED CO.
433.46
SEED MIXTURE
103710
11511
1643.6547
SEED
433.46
268017
116/2005
103048 U.S. BANK
1/512005 14:52:11
Page- 23
Business Unit
EQUIPMENT OPERATION GEN
YORK SELLING
EQUIPMENT OPERATION GEN
FIRE DEPT. GENERAL
FIRE DEPT. GENERAL
FIRE DEPT. GENERAL
FIRE DEPT. GENERAL
GENERAL TURF CARE
1,200.00
CUSTODY FEE
103711
2804050
5910.6103
PROFESSIONAL SERVICES
GENERAL (BILLING)
1,200.00
268018
1/612006
102026 UNISOURCE
68.91
ABOUT TOWN PAPER
103415
59358083400
2210.6123
MAGAZINE/NEWSLETTER EXPENSE
COMMUNICATIONS
34.45-
CREDIT
103416
59358011001
2210.6123
MAGAZINE/NEWSLETTER EXPENSE
COMMUNICATIONS
34.46
268019
1/612006
101063 UNITED ELECTRIC COMPANY
41.64
LOCKS
103417
607918
1646.6406
GENERAL SUPPLIES
BUILDING MAINTENANCE
1,757.25
LIGHT FIXTURES
103576
607143
1648.6530
REPAIR PARTS
SKATING RINK MAINTENANCE
1,798.79
268020
1/612006
101065 UNIVERSITY.OF MINNESOTA
1,180.00
BLDG OFFICIAL INSTITUTE
103784
PO 4149
1495.6104
CONFERENCES & SCHOOLS
INSPECTIONS
1,180.00
268021
116/2006
114236 USA BLUE BOOK
R55CKREG LOG20000
CITY OF EDINA
1/5/2005 14:52:11
Council Check Register
Page - 24
1/612005
- 118/2005
Check #
Date
Amount
Vendor/ Explanation PO #
Doe No
Inv No
Account No.
Subledger Account Description
Business Unit
989.64
WATER LEVEL INDICATOR
103523
908131
5913.6406
GENERAL SUPPLIES
DISTRIBUTION
989.64
268022
116/2006
101068 VAN PAPER CO.
153.63
PLATES. UTENSILS
103418
561652
1552.6406
GENERAL SUPPLIES
CENT SVC PW BUILDING
650.98
BAGS
103524
561398
5842.6512
PAPER SUPPLIES
YORK SELLING
607.46
BAGS
103525
561399
5862.6512
PAPER SUPPLIES
VERNON SELLING
36.21
ROLL TOWELS
103526
561190
1470.6406
GENERAL SUPPLIES
FIRE DEPT. GENERAL
1,448.28
268023
11612006
102970 VERIZON WIRELESS
523.59
103577
3578477170
1400.6188
TELEPHONE
POLICE DEPT. GENERAL
523.59
268024
1/6/2005
101069 VOSS LIGHTING
26.20
CLIPS
103527
. 15001298 -00
5111.6406
GENERAL SUPPLIES
ART CENTER BLDG/MAINT
598.61
LIGHTING
103527
15001298-00
1628.6406
GENERAL SUPPLIES
SENIOR CITIZENS
187.61
LIGHTING
103578
15001298 -01
1628.6406
GENERAL SUPPLIES.
SENIOR CITIZENS
812.42
268026
1/6/2006
101743 WAGERS INC.
22.60
COPIER USAGE
103579
CNIN019901
1400.6230
SERVICE CONTRACTS EQUIPMENT
POLICE DEPT. GENERAL
22.60
268026
1/6/2006
101223 WALSER FORD
31.40
HINGE ASSEMBLY
103419
115782WFOW
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
143.95
FILTER KITS
103712
115799WFOW
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
89.06
TANK/INJECTOR ASSEMBLY
103713
115781WFOW
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
264.41
268027
1/6/2006
101080 - WALSH, WILLIAM
100.00
POLICE SERVICES
103375
JAN 05
1419.6102
CONTRACTUAL SERVICES
RESERVE PROGRAM
100.00
268028
1/6/2006
101944 WATERSTREET, JOAN M
308.97
UNIFORM PURCHASE
103580
122904
7400.6203
UNIFORM ALLOWANCE
POLICE DEPT. GENERAL
308.97
268029
1/612006
103266 WELSH COMPANIES LLC
593.65
JAN MAINTENANCE
103785
JAN05
5841.6103
PROFESSIONAL SERVICES
YORK OCCUPANCY
593.65
R55CKREG LOG20000
CITY OF EDINA
Council Check Register
1/6/2005 - 1/6/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
268030
1/612006
101077 WEST WELD SUPPLY CO.
97.45
WELDING SUPPLIES
103420
277102
1553.6580
WELDING SUPPLIES
216.20
CUT OFF WHEELS
103528
283598
1553.6530
REPAIR PARTS
313.65
268031
1/6/2006
101033 WINE COMPANY, THE
381.40
103485
106443-00
5822.5513
COST OF GOODS SOLD WINE
296.05
103643
106894-00
5862.5513
COST OF GOODS SOLD WINE
208.00
103750
106686-00
5842.5513
COST OF GOODS SOLD WINE
64.00
103751
106810-00
5842.5515
COST OF GOODS SOLD MIX
4,206.70
103751
106810.00
5842.5513
COST OF GOODS SOLD WINE
5,156.15
268032
1/612006
101312 WINE MERCHANTS
498.72
103486
113270
5822.5513
COST OF GOODS SOLD WINE
1,776.39
103487
113271
5842.5513
COST OF GOODS SOLD WINE
48.00-
103752
23009
5842.5513
COST OF GOODS SOLD VINE
2,227.11
268033
1/612006
117482 WINECONNECTINC.
1,185.00
WINE KIOSK
103786
27
5842.6406
GENERAL SUPPLIES
1,185.00
268034
1/612006
117486 WOODARD, DOROTHY
12.00
PARKING PERMIT REFUND
103714
0118
4090.4751
PARKING PERMITS
12.00
268036
1/612006
101086 WORLD CLASS WINES INC
329.00
103488
159252
5882.5513
COST OF GOODS SOLD WINE
325.00
103489
159264
5822.5513
COST OF GOODS SOLD WINE
529.00
103753
159376
5842.5513
COST OF GOODS SOLD WINE
1,183.00
268036
11612005
101087 WROBLESKI, HENRY
.100.00
POLICE SERVICES
103379
JAN 05
1419.6102
CONTRACTUAL SERVICES
100.00
268037
1/6/2006
101726 XCEL ENERGY
7.43
103529
1375390650356
1846.8185
LIGHT & POWER
26.65
103530
1263610010356
1330.6185
LIGHT & POWER
53.78
103531
2357377472355
1551.6185
LIGHT 8 POWER
52.76
103532
1671793348357
1460.6185
LIGHT & POWER
1/5/2005 14:52:11
Page - 25
Business Unit
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
50TH ST SELLING
VERNON SELLING
YORK SELLING
YORK SELLING
YORK SELLING
50TH ST SELLING
YORK SELLING
YORK SELLING
YORK SELLING
STREET REVOLVING
VERNON SELLING
50TH ST SELLING
YORK SELLING
RESERVE PROGRAM
BUILDING MAINTENANCE
TRAFFIC SIGNALS
CITY HALL GENERAL
CIVILIAN DEFENSE
R55CKREG LOG20000
- CITY OF EDINA
1/5/2005 14:52:11
Council Check Register
Page - 26
1/6/2005 — 1/6/2005
Check # Date Amount
Vendor / Explanation
PO # Doc No
Inv No Account No
Subledger
Amount Description.
Business Unit
11,197.30
103759
0748247681362 5913.6185
LIGHT & POWER
DISTRIBUTION
7,757.99
103760
1215173122363 5620.6185
LIGHT & POWER
EDINSOROUGH PARK
2,978.55
103761
1002656716363 5911.6185
LIGHT & POWER
PUMP & LIFT STATION OPER .
22,074.46
268038 1/6/2006
117480 YAGGIE, DOREEN
122.00
SKATING CLASS REFUND
103674
122904 5511.6136
PROFESSIONAL SVC - OTHER
ARENA BLDG/GROUNDS
122.00
491,416.08
Grand Total
Payment Instrument Totals
Check Total.
491,416.08
Total Payments
491,416.08
R55CKSUM LOG20000
Company
Amount
01000 GENERAL FUND
192,842,11
02200 COMMUNICATIONS FUND
4,168.82
04000 WORKING CAPITAL FUND
1,521.55
04800 CONSTRUCTION FUND
521.68
05100 ART CENTER FUND
26.20
05200 GOLF DOME FUND
169,76
05400 GOLF COURSE FUND
11,375.77
05500 ICE ARENA FUND
1,926.94
05600 EDINBOROUGH /CENT LAKES FUND
11,085.99
05800 LIQUOR FUND
209,200.50
05900 UTILITY FUND
25,804.92
05930 STORM SEWER FUND
202.00
05950 RECYCLING FUND
32,171.80
07400 PSTF AGENCY FUND
398.04
Report Totals 491,416.08
CITY OF EDINA 1/5/2005 15:00:09
Council Check Summary Pepe - 1
1/6/2005 - 102005
We confirm to the best of our knowledge
and belief, that these claims
comply in all material respects
with the requirements of the City
of, -Edina purchasing lic ies and
Procedures da /p �Q5'
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 1
1!7/2005
- 1113/2005
Check #
Date
Amount
Vendor/ Explanation PO #
Doe No
Inv No
Account No
Subledger Account Description
Business Unit
268040
1/13/2005
101833 A.T.O.M.
150.00
SWAT/HN TACTICAL LIAISON
103938
P. LARSEN
1400.6104
CONFERENCES & SCHOOLS
POLICE DEPT. GENERAL
150.00
SWAT /HN TACTICAL LIAISON
103939
S. KUYPER
1400.6104
CONFERENCES & SCHOOLS
POLICE DEPT. GENERAL
150.00
SWAT/HN TACTICAL LIAISON
103940
T. MCKENZIE
1400.6104
CONFERENCES & SCHOOLS
POLICE DEPT. GENERAL
75.00
LAW ENFORCEMENT TECHNIQUES
103941
D. WAGNER
1400.6104
CONFERENCES & SCHOOLS
POLICE DEPT. GENERAL
525.00
268041
111312006
116531 ABLE SPRINKLER & LANDSCAPE
LIG
68.64
SPRINKLER REPAIR
103846
7816
01202. 1705.31
MATERIALS/SUPPLIES
HALIFAX - GRIMES STREET RECON
251.55
SPRINKLER REPAIR
103847
8043
01202. 1705.31
MATERIALS/SUPPLIES
HALIFAX - GRIMES STREET RECON
320.19
268042
1/13/2006
102971 ACE ICE COMPANY
54.60
103980
449757
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
16.28
103981
449755
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
70.88
268043
1/13/2005
117668 AINSWORTH, MARY
523.66
AMBULANCE OVERPAYMENT
104201
010605
1470.4329
AMBULANCE FEES
FIRE DEPT. GENERAL
523.66
268044
111312006
105262 ALEX AIR APPARATUS INC.
743.04
COMPRESSOR MAINTENANCE
104202
7180
1470.6215
EQUIPMENT MAINTENANCE
FIRE DEPT. GENERAL
743.04
268046
111312005
114821 ALLEGIANCE TELECOM CO WORLDWID
532.69
PHONE/DATA
103921
13534384
7411.6188
TELEPHONE
PSTF OCCUPANCY
532.69
268046
1/1312005
102715 ALLEGRA PRINT & IMAGING
353.58
2005 BUDGET BOOKS
104289
54822
1550.6575
PRINTING
CENTRAL SERVICES GENERAL
364.76
2005 CIP BOOKS
104289
54822
4001.6575
PRINTING
WORK CAP REVENUES
718.34
268047
1/1312005
108617 AMERICAN SOLUTIONS FOR 13USINES
337.45
PATRON CARDS
103886
2192450
5410.6575
PRINTING
GOLF ADMINISTRATION
337.45
268048
1/1312006
101601 AMUNDSON, ERIK
624.90
UNIFORM EXPENSE
103933
010405
1400.6203
UNIFORM ALLOWANCE
POLICE DEPT. GENERAL
624.90
R55CKREG LOG20000
CITY OF EDINA
1/1212005 15:41:55
Council Check Register
Page - 2
1/7/2005
- 1/13/2005
Check #
Date
Amount
Vendor/ Explanation PO #
Doe No
Inv No
Account No
Subledger Account Description
Business Unit
268049
1/13/2006
104058 ANDERSON, RONALD
85.60
UNIFORM PURCHASE
104032
010505
1301.6201
LAUNDRY
GENERAL MAINTENANCE
85.60
268060
1/1312006
100595 ANOKA COUNTY SHERIFF'S OFFICE
666.00
OUT OF COUNTY WARRANT
103934
010505
1000.2055
DUE TO OTHER GOVERNMENTS
GENERAL FUND BALANCE SHEET
666.00
268061
111312006
104235 APPLIED MEDIA
100.00
PERFORMANCE 1/18/05
103935
010105
5610.6136
PROFESSIONAL SVC - OTHER
ED ADMINISTRATION
100.00
268052
111312005
102646 AQUA LOGIC INC.
134.08
DE, CAL HYPO
104033
26191
5620.6545
CHEMICALS
EDINBOROUGH PARK
74.32
CHLORINE, MAGIC LURE
104203
26148
5620.6545
CHEMICALS
EDINBOROUGH PARK
208.40
268053
1/13/2005
103680 ARAMARK REFRESHMENT SRVCS
67.95
COFFEE
103922
6013-440272
7411.6406
GENERAL SUPPLIES
PSTF OCCUPANCY
147.06
BEVERAGES
104204
6013 - 434522
1551.6406
GENERAL SUPPLIES
CITY HALL GENERAL
215.01
268064
111312005
101977 ARCH WIRELESS
10.96
PAGER
104290
O6096083A
1551.6406
GENERAL SUPPLIES
CITY HALL GENERAL
10.96
268065
1/13/2005
100634 ASPEN EQUIPMENT CO.
13.31
GREASE SEALS
104205
1027741
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
13.31
268056
1/1312006
102774 ASPEN WASTE SYSTEMS
101.35
WASTE/RECYCLING
103937
010305
7411.6182
RUBBISH REMOVAL
PSTF OCCUPANCY
101.35
268057
1113/2005
102928 ASSOC OF METROPOLITAN MUNICIPA
10,455.00
2005 DUES
103936
706
1120.6105
DUES & SUBSCRIPTIONS
ADMINISTRATION
10,455.00
i
268058
1H312005
100877 AUTO MACHINE AND SUPPLY CO.
a.
18.09
GEAR PULLER
104206
D -70212
5630.6406
GENERAL SUPPLIES
CENTENNIAL LAKES
18.09
ti
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 3
1/112005
- 1/13/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doe No
Inv No
Account No
Subledger Account Description
Business Unit
268069
111312006
106111 BATZLI, LAURIE
53.95
ART WORK SOLD AT EAC
104146
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
53.95
268060
1/1312006
103697 BECKER, MIKE
992.00
CLOTHING
103887
13144
5440.5511
COST OF GOODS - PRO SHOP
PRO SHOP RETAIL SALES
992.00
268061
1/13/2006
117379 BENIEK PROPERTY SERVICES INC.
900.00
SNOW REMOVAL
103923
8652
7411.6136
SNOW 8 LAWN CARE
PSTF OCCUPANCY
900.00
268062
1/1312006
100661 BENN, BRADLEY
590.20
ART WORK SOLD AT EAC
104145
010704
5101.4413
ART WORK SOLD
ART CENTER REVENUES
590.20
268063
111312006
116067 BENSON, RON PAUL
130.00
ART WORK SOLD AT EAC
104151
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
130.00
268064
111312005
100648 BERTELSON OFFICE PRODUCTS
112.88
PAPER, CALCULATOR
104207
3521900
5610.6406
GENERAL SUPPLIES
ED ADMINISTRATION
45.32
OFFICE SUPPLIES
104208
3540520
1552.6406
GENERAL SUPPLIES
CENT SVC PW BUILDING
158.20
268065
1/13/2006
103866 BLALOCK, KAREN
42.25
ART WORK SOLD AT EAC
104150
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
42.25
268066
111312005
115306 BLENKER, DEAN
53.97
UNIFORM PURCHASE
103942
010405
1301.6201
LAUNDRY
GENERAL MAINTENANCE
53.97
268067
111312005
102276 BLUHM, KIMBERLEE
156.84
ART WORK SOLD AT EAC
104149
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
156.84
268066
1/13/2006
100664 BRAUN INTERTEC
228.50
MATERIALS TESTING
103848
239294
01202. 1705.31
MATERIALS/SUPPLIES
HALIFAX - GRIMES STREET RECON
228.50
268069
1/1312005
103279 BRETSON, GREG
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 4
117/2005
- 1/13/2005
Check #
Date
Amount
Vendor/ Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
41.98
UNIFORM PURCHASE
103943
010305
1553.6201
LAUNDRY
EQUIPMENT OPERATION GEN
41.98
268070
111312006
101563 BRIGHT, CAROL
23.40
ART WORK SOLD AT EAC
104148
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
23.40
268071
1/13/2005
113680 BRONZE MEMORIAL CO.
76.81
PLAQUE
103944
516130
4704.6406
GENERAL SUPPLIES
PARK MEMORIALS
76.81
268072
111312006
103996 BRYAN, LINDA NELSON
99.45
ART WORK SOLD AT EAC
104147
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
99.45
268073
1/13/2005
103244 BURTIS, ROBERT
150.00
PERFORMANCE 1/20/05
103945
010105
5610.6136
PROFESSIONAL SVC - OTHER
ED ADMINISTRATION
150.00
268074
111312006
106316 CALTON, BOB
62.73
ART WORK SOLD AT EAC
104155
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
240.00
INSTRUCTOR AC
104156
123104
5110.6103
PROFESSIONAL SERVICES
ART CENTER ADMINISTRATION
302.73
268075
111312006
102046 CAMPE, HARRIET
150.65
ART WORK SOLD AT EAC
104154
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
150.65
268076
1/1312006
100681 CATCO
41.26
FITTINGS
104210
3 -84041
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
102.99
HOSE ENDS
104211
1 -17974
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
144.25
268077
1/1312005
100897 CENTERPOINT ENERGY MINNEGASCO
99.59
103924
010305
5821.6186
HEAT
50TH ST OCCUPANCY
142.73
103924
010305
5430.6186
HEAT
RICHARDS GOLF COURSE
146.91
103924
010305
5841.6186
HEAT
YORK OCCUPANCY
400.87
103924
010305
5861.6186
HEAT
VERNON OCCUPANCY
456.03
103924
010305
5422.6186
HEAT
MAINT OF COURSE & GROUNDS
458.14
103924
010305
1481.6186
HEAT
YORK FIRE STATION
1,248.77
103924
010305
5911.6186
HEAT
PUMP & LIFT STATION OPER
1,385.20
103924
010305
530.6186
HEAT
CENTENNIAL LAKES
R55CKREG LOG20000
Check # Date
Amount
Vendor / Explanation
1,497.54
Council Check Register
1,522.65
1!1/2005 -
- 1/13/2005
1,949.50
2,159.38
2,640.69
3,828.90
4,562.74
7,668.86
10,643.85
40,812.35
268078 111312005
116363 CHIPPEWA GRAPHICS INC.
459.44
ENVELOPES
1,536.95
VOLUNTEER BROCHURES
1,996.39
268079 1/1312005
102691 CHRISTOFFER, KELLI
124.69
SUPPLIES REIMBURSEMENT
124.89
268080 111312005
105693 CITYSPRINT
11.24
COURIER
12.12
COURIER
23.42
COURIER
46.78
268081 1113@006
100689 CLAREYS SAFETY EQUIP.
148.00
MIRROR BRACKETS
148.00
268082 1/13/2005
105316 CLARK, PENNY
422.50
ART WORK SOLD AT EAC
422.50
268083 1/13/2005
101227 COFFEE MILL INC.
280.00
BEVERAGES
290.00
BEVERAGES
570.00
268084 1/13/2005
101345 COLOURS
2,566.16
BROCHURE DESIGN
7,477.01
WINTER ABOUT TOWN DESIGN
PO # Doc No Inv No Account No Subledger Account Description
103924 010305 5111.6186 HEAT
103924 010305 5420.6186 HEAT
103924 010305 1470.6186 HEAT
103924 010305 1628.6186 HEAT
103924 010305 1552.6166 HEAT
103924 010305 5913.6186 HEAT
103924 010305 1646.6186 HEAT
103924 010305 5210.6186 HEAT
103924 010305 5511.6186 HEAT
103925 5977 1550.6406 GENERAL SUPPLIES
104212 5919 2210.6575 PRINTING
104213 010605 1629.6406 GENERAL SUPPLIES
1/12/2005 15:41:55
Page - 5
Business Unit
ART CENTER BLDG/MAINT
CLUB HOUSE
FIRE DEPT. GENERAL
SENIOR CITIZENS
CENT SVC PW BUILDING
DISTRIBUTION
BUILDING MAINTENANCE
GOLF DOME PROGRAM
ARENA BLDG/GROUNDS
CENTRAL SERVICES GENERAL
COMMUNICATIONS
ADAPTIVE RECREATION
104214 10860 -1916 1190.6103 PROFESSIONAL SERVICES ASSESSING
104214 10860 -1916 1554.6406 GENERAL SUPPLIES CENT SERV GEN - MIS
104214 10860- 1916 4400.6710 EQUIPMENT REPLACEMENT CITY HALLIPOLICE BUILDING
103888 43842 1553.6585 ACCESSORIES EQUIPMENT OPERATION GEN
104153 010705 5101.4413 ART WORK SOLD ART CENTER REVENUES
104291 736459 5630.5510 COST OF GOODS SOLD CENTENNIAL LAKES
104292 736464 5630.5510 COST OF GOODS SOLD CENTENNIAL LAKES
103849 9243 2210.6103 PROFESSIONAL SERVICES COMMUNICATIONS
103850 9223,1,2 2210.6123 MAGAZINEINEWWSLETTER EXPENSE COMMUNICATIONS
CITY OF E
EDINA
Council Check Register
1!1/2005 -
- 1/13/2005
103925 5977 1550.6406 GENERAL SUPPLIES
104212 5919 2210.6575 PRINTING
104213 010605 1629.6406 GENERAL SUPPLIES
1/12/2005 15:41:55
Page - 5
Business Unit
ART CENTER BLDG/MAINT
CLUB HOUSE
FIRE DEPT. GENERAL
SENIOR CITIZENS
CENT SVC PW BUILDING
DISTRIBUTION
BUILDING MAINTENANCE
GOLF DOME PROGRAM
ARENA BLDG/GROUNDS
CENTRAL SERVICES GENERAL
COMMUNICATIONS
ADAPTIVE RECREATION
104214 10860 -1916 1190.6103 PROFESSIONAL SERVICES ASSESSING
104214 10860 -1916 1554.6406 GENERAL SUPPLIES CENT SERV GEN - MIS
104214 10860- 1916 4400.6710 EQUIPMENT REPLACEMENT CITY HALLIPOLICE BUILDING
103888 43842 1553.6585 ACCESSORIES EQUIPMENT OPERATION GEN
104153 010705 5101.4413 ART WORK SOLD ART CENTER REVENUES
104291 736459 5630.5510 COST OF GOODS SOLD CENTENNIAL LAKES
104292 736464 5630.5510 COST OF GOODS SOLD CENTENNIAL LAKES
103849 9243 2210.6103 PROFESSIONAL SERVICES COMMUNICATIONS
103850 9223,1,2 2210.6123 MAGAZINEINEWWSLETTER EXPENSE COMMUNICATIONS
R55CKREG LOG20000 CITY OF EDINA
Council Check Register
1/7/2005 - 1/132005
Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description
862.00 NOMINATION CARDS 103926 9224 2210.6103 PROFESSIONAL SERVICES
ART WORK SOLD,
GENERALSUPPLIES
PROFESSIONAL SERVICES
ART WORK SOLD
ART WORK SOLD
1/12/2005 15:41:55
Page - 6
Business Unit .
COMMUNICATIONS
ART CENTER REVENUES
CENT SVC PW BUILDING
CITY HALL GENERAL
ART CENTER REVENUES
ART CENTER REVENUES
COST OF GOODS - PRO SHOP - PRO SHOP RETAIL SALES
REPAIR PARTS
REPAIR PARTS
REPAIR PARTS
COST OF GOODS SOLD WINE
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
DISTRIBUTION
DISTRIBUTION
FIRE DEPT. GENERAL
YORK SELLING
YORK SELLING
VERNON SELLING
50TH ST SELLING
VERNON SELLING
OFFICE SUPPLIES ED ADMINISTRATION
10,905.17
268085
11132006
105278 CONNORS, TIM
205.40
ART WORK SOLD AT EAC
104152
010705
5101.4413
205.40
268086
1/132005
100613 COVERALL OF THE TWIN CITIES IN
191.70
CARPET CLEANING
104209
92282
1552.6406
2,742.38
CUSTODIAL SERVICES
104293
0000092282
1551.6103
2,934.08
268087
11132005
103143 DAKOTA MAE DESIGNS
57.20
ART WORK SOLD AT EAC
104160
010705
5101.4413
57.20
268088
111312005
103176 DANICIC, JOHN
224.90
ART WORK SOLD AT EAC
104159
010705
5101.4413
224.90
268089
111312005
102121 DATREK PROFESSIONAL BAGS INC
411.60
MERCHANDISE
103889
818497
5440.5511
411.60
268090
11132006
100712 DAVIES WATER EQUIPMENT
3,792.85
HYDRANTS & PARTS
103927
3271814
5913.6530
3,801.69
HYDRANTS & PARTS
103928
3269161
5913.6530
216.20
DETECTOR CARTRIDGE
104215
3273255
1470.6530
7,810.74
268091
1/132006
102478 DAY DISTRIBUTING
556.00
103982
295566
5842.5513
1,531.31
103983
295994
5842.5514
680.47
103984
295992
5862.5514
300.60
103985
295993
5822.5514
103.75-
104216
295233CR
5862.5514
2,964.63
268092
1/132006
100713 DAY - TIMERS INC.
87.43
CALENDAR REFILLS
104217
53518232
5610.6513
87.43
ART WORK SOLD,
GENERALSUPPLIES
PROFESSIONAL SERVICES
ART WORK SOLD
ART WORK SOLD
1/12/2005 15:41:55
Page - 6
Business Unit .
COMMUNICATIONS
ART CENTER REVENUES
CENT SVC PW BUILDING
CITY HALL GENERAL
ART CENTER REVENUES
ART CENTER REVENUES
COST OF GOODS - PRO SHOP - PRO SHOP RETAIL SALES
REPAIR PARTS
REPAIR PARTS
REPAIR PARTS
COST OF GOODS SOLD WINE
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
DISTRIBUTION
DISTRIBUTION
FIRE DEPT. GENERAL
YORK SELLING
YORK SELLING
VERNON SELLING
50TH ST SELLING
VERNON SELLING
OFFICE SUPPLIES ED ADMINISTRATION
R55CKREG LOG20000
COST OF GOODS SOLD WINE
236.94
268100 1/13/2005 100739 EAGLE WINE
CITY OF EDINA
VERNON SELLING
325.98
268096
1/13/2006
641.59
116356 DIEKMAN, LARRY
Council Check Register
34.10
103987
173349
218.42
149.01
UNIFORM PURCHASE
1/7/2005 - 1/13/2005
010305
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No Account No
Subledger Account Description
268093
1/13/2005
1/1312006
114665 DEIRDRE & CO.
108648 DOAN, SIIRI
324651
1,471.70
104060
324642
33.80
ART WORK SOLD AT EAC
104158
010705 5101.4413
ART WORK SOLD
5101.4413
33.80
130.65
268094
111312006
1113/2005
100720 DENNYS 6TH AVE. BAKERY
100731 DPC INDUSTRIES
62.51
BAKERY
103946
181727 5421.5510
COST OF GOODS SOLD
5915.6586
62.51
1,596.79
268096
111312006
111312005
101675 DESHLER, BRANDON
102669 DPD
236.94
UNIFORM EXPENSE
103947
010505 1400.6203
UNIFORM ALLOWANCE
272.00
COST OF GOODS SOLD WINE
236.94
268100 1/13/2005 100739 EAGLE WINE
COST OF GOODS SOLD WINE
VERNON SELLING
325.98
268096
1/13/2006
641.59
116356 DIEKMAN, LARRY
172650
34.10
103987
173349
218.42
149.01
UNIFORM PURCHASE
103948
010305
4090.6201
7,250.26
COST OF GOODS SOLD BEER
149.01
268101 1/13/2005 100741 EAST SIDE BEVERAGE
1,499.20
268097
1/1312006
2,975.65
108648 DOAN, SIIRI
324651
1,471.70
104060
324642
5,946.75
130.65
ART WORK SOLD AT EAC
104157
010705
5101.4413
130.65
268098
1113/2005
100731 DPC INDUSTRIES
1,596.79
CHEMICALS
103890
82701960 -04
5915.6586
1,596.79
268099
111312005
102669 DPD
272.00
REGISTRATION FORMS
104034
0026617 -IN
5510.6513
272.00
COST OF GOODS SOLD WINE
50TH ST SELLING
268100 1/13/2005 100739 EAGLE WINE
COST OF GOODS SOLD WINE
VERNON SELLING
325.98
103801
169603
641.59
103986
172650
34.10
103987
173349
218.42
104057
172681
6,130.17
104058
172168
7,250.26
COST OF GOODS SOLD BEER
VERNON SELLING
268101 1/13/2005 100741 EAST SIDE BEVERAGE
1,499.20
103988
324641
2,975.65
104059
324651
1,471.70
104060
324642
5,946.75
LAUNDRY
ART WORK SOLD
1/1212005 15:41:55
Page- 7
Business Unit
ART CENTER REVENUES
GRILL
POLICE DEPT. GENERAL
STREET REVOLVING
ART CENTER REVENUES
WATER TREATMENT SUPPLIES WATER TREATMENT
OFFICE SUPPLIES ARENA ADMINISTRATION
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
5862.5514
COST OF GOODS SOLD BEER
VERNON SELLING
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 8
1/7/2005
— 1/13/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
268102
1/13/2005
100742 ECOLAB PEST ELIMINATION DMSI
117.15
PEST CONTROL
104218
4145938
5620.6230
SERVICE CONTRACTS EQUIPMENT
EDINBOROUGH PARK
117.15
268103
111312006
103236 EDEN PRAIRIE COMMUNITY BAND
100.00
PERFORMANCE 1/16/05
103950
010105
5610.6136
PROFESSIONAL SVC - OTHER
ED ADMINISTRATION
100.00
268104
111312005
101923 EDINA ATHLETIC BOOSTERS
250.00
PROGRAM AD
104035
004
1600.6103
PROFESSIONAL SERVICES.
PARK ADMIN. GENERAL
250.00
268105
111312005
103069 EDINA COMMUNITY FOUNDATION
500.00
TRANSFER DONATION
103851
123104
1500.6103
PROFESSIONAL SERVICES
CONTINGENCIES
500.00
268106
1/1312006
106467 EDINA CRIME PREVENTION FUND
125.00
MEMORIAL FUNDS
103949
BRAEMAR CG
5400.2072
MEN'S CLUB
GOLF BALANCE SHEET
125.00
268107
111312005
104331 EILERS, JOYCE
255.78
ART WORK SOLD AT EAC
104161
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
255.78
268108
111312005
101956 EMERGENCY APPARATUS MAINTENANC
312.99
E-81 REPAIRS
104219
20378
1470.6180
CONTRACTED REPAIRS
FIRE DEPT. GENERAL
1,213.97
E -81 REPAIRS
104220
20342
1470.6180
CONTRACTED REPAIRS
FIRE DEPT. GENERAL
1,526.96
268109
1/1312005
104733 EMERGENCY MEDICAL PRODUCTS INC
180.78
DEFIB PADS
103891
INV661962
1400.6610
SAFETY EQUIPMENT
POLICE DEPT. GENERAL
234.22
AMBULANCE SUPPLIES
104221
INV663477
1470.6510
FIRST AID SUPPLIES
FIRE DEPT. GENERAL
415.00
268110
111312006
105339 ENRGI
525.00
WEBSITE CONSULTING
103852
2280
2210.6124
WEB DEVELOPMENT
COMMUNICATIONS
525.00
268111
1/1312005
100018 EXPERT T BILLING
5,616.00
DEC TRANSPORTS
104222
010505
1470.6103
PROFESSIONAL SERVICES
FIRE DEPT. GENERAL
5,616.00
R55CKREG LOG20000
WINTER ICE FESTIVAL 103952 010305 5610.6136
PROFESSIONAL SVC - OTHER
CITY OF EDINA
675.00
268120 1/1312006
105317 GOODSPEED, ELNA
Council Check Register
43.23
ART WORK SOLD AT EAC 104167 010705 5101.4413
ART WORK SOLD
ART CENTER REVENUES
43.23
U712005
- 1/13/2005
Check #
Date
Amount
Vendor / E)Vanation PO #
Doe No
Inv No
Account No
Subledger Account Description
268112
1/1312005
100297 FAST FOTO & DIGITAL
15.59
PHOTO FINISHING
104223
T2- 197131
1470.6408
PHOTOGRAPHIC SUPPLIES
70.55
PHOTO FINISHING
104294
T2- 197271
1470.6408
PHOTOGRAPHIC SUPPLIES
86.14
268113
1/1312006
108664 FLANDERS, SUSAN
49.40
ART WORK SOLD AT EAC
104162
010705
5101.4413
ART WORK SOLD
49.40
268114
111312005
102745 FREUND, JEFF
207.75
MILEAGE REIMBURSEMENT
104224
010505
5610.6107
MILEAGE OR ALLOWANCE
207.75
268115
111312005
104071 FREUND, JEFF
10.00
PETTY CASH
104225
010505
5610.6105
DUES & SUBSCRIPTIONS
37.00
PETTY CASH
104225
010505
5610.6235
POSTAGE
195.20
PETTY CASH
104225
010505
5620.6406
GENERAL SUPPLIES
242.20
268116
1/1312006
105372 FRONT AVENUE POTTERY
92.30
ART WORK SOLD AT EAC
104183
010705
5101.4413
ART WORK SOLD
92.30
268117
1/13/2006
102456 GALLS INC.
33.50
TURTLENECKS
103951
5747453500010
1400.6203
UNIFORM ALLOWANCE
33.50
268118
1/13/2005
103185 GERTENS GREENHOUSE
9,993.16
LANDSCAPE TREES & SHRUBS
103929
069298
1644.6541
PLANTINGS & TREES
9,993.16
268119
111312005
100026 GOLDEN SHOE STABLES
1/1212005 15:41:55
Page- 9
Business Unit
FIRE DEPT. GENERAL
FIRE DEPT. GENERAL
ART CENTER REVENUES
ED ADMINISTRATION
ED ADMINISTRATION
ED ADMINISTRATION
EDINBOROUGH PARK
ART CENTER REVENUES
POLICE DEPT. GENERAL
TREES & MAINTENANCE
675.00
WINTER ICE FESTIVAL 103952 010305 5610.6136
PROFESSIONAL SVC - OTHER
ED ADMINISTRATION
675.00
268120 1/1312006
105317 GOODSPEED, ELNA
43.23
ART WORK SOLD AT EAC 104167 010705 5101.4413
ART WORK SOLD
ART CENTER REVENUES
43.23
268121 1/1312006
111092 GOTZSCHE, OTTO
102.70
ART WORK SOLD AT EAC 104168 010705 5101.4413
ART WORK SOLD
ART CENTER REVENUES
102.70
R55CKREG LOG20000
Check 8 Date Amount
Vendor / Explanation
268122 111312005
101103 GRAINGER
44.46
LAMPS, WRENCH
44.46
COST OF GOODS SOLD LIQUOR
268123 111312005
102670 GRAND PERE VANES INC
900 35
69758
CITY OF EDINA
Council Check Register
1/7/2005 - 1/13/2005
PO 8 Doc No Inv No Account No Subledger Account Description Business Unit
104226 498 - 386560 -3 5420.6406 GENERAL SUPPLIES CLUB HOUSE
1/1212005 15:41:55
Page - 10
103989 00014876 5822.5513 COST OF GOODS SOLD WINE .50TH ST SELLING
104061 00014899 5842.5513 COST OF GOODS SOLD VINE YORK SELLING
268124
111312005
ART CENTER REVENUES
102217 GRAPE BEGINNINGS INC
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
58415512
COST OF GOODS SOLD LIQUOR
135.25
5842.5512
103802
69758
5842.5512
COST OF GOODS SOLD LIQUOR
135.25
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
268125
111312005
YORK SELLING
101518 GRAUSAM, STEVE
COST OF GOODS SOLD MIX
YORK SELLING
5862.5515
COST OF GOODS SOLD MIX
212.98
OFFICE CHAIRS
104295
010704
5822.5515
COST OF GOODS SOLD MIX
212.98
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
268126
111312005
VERNON SELLING
100783 GRAY13AR ELECTRIC CO. INC.
COST OF GOODS SOLD MIX
VERNON SELLING
962.5513
COST OF GOODS SOLD VINE
1,610.28
LIGHTOLIERS
104227
906005193
161.58
VOLUME CONTROLS
104228
906033847
1,771.86
268127
111312005
101186 GREENWOOD, JULIE
78.00
ART WORK SOLD AT EAC
104166
010705
78.00
268128
111312006
100782 GRIGGS COOPER 8 CO.
416.69
103803
169483
1.70
103990
172775
6,739.15
103991
171580
5,707.91
103992
171247
1,133.80
103993
172066
3,612.05
103994
172850
188.23
103995
172849
34.10
103996
173348
5,014.45
104062
172279
26.05
104063
172847
707.57
104064
172848
1,577.57
104065
172846
30.45
104066
172845
59.08-
104067
656944
5862.5513 COST OF GOODS SOLD WINE VERNON SELLING
k
5840.6513 OFFICE SUPPLIES LIQUOR YORK GENERAL
1375.6530 REPAIR PARTS PARKING RAMP
1646.6530 REPAIR PARTS BUILDING MAINTENANCE
5101.4413
ART WORK SOLD
ART CENTER REVENUES
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
58415512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
962.5513
COST OF GOODS SOLD VINE
VERNON SELLING
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check
Register
Page - 11
1/712005
— 1/13/2005
Check 9
Date
Amount
Vendor / Explanation PO 9
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
152.50-
104068
656945
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
24,978.14
268129
111312005
100918 GRIMSBY, NANCY
214.50
ART WORK SOLD AT EAC
104165
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
214.50
268130
1/13/2005
100155 GRITTON, KAY
84.50
ART WORK SOLD AT EAC
104164
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
54.50
268131
1H3/2006
100786 GROTH MUSIC
65.00
SHEET MUSIC
103930
943694
5620.6406
GENERAL SUPPLIES
EDINBOROUGH PARK
65.00
268132
1/13/2005
100791 HALLMAN OIL COMPANY
2.474.85
BULKATF
103892
142148
1553.6584
LUBRICANTS
EQUIPMENT OPERATION GEN
444.00
BULK 5W30
103893
142147
1553.6584
LUBRICANTS
EQUIPMENT OPERATION GEN
2,918.85
268133
1H312005
116447 HANSEN THORP PELLINEN OLSON
IN
1,035.00
CONSTRUCTION ADMIN
103853
13471
05430.1705.21
CONSULTING INSPECTION
WATERMAIN EXT - OXFORD & 52ND
1,035.00
268134
111312005
101387 HAPPY FACES
200.00
WINTER ICE FESTIVAL
103953
010305
5610.6136
PROFESSIONAL SVC - OTHER
ED ADMINISTRATION
200.00
268135
U1312005
117652 HARROLD, ROGER
91.53
PROJECT SUPPLIES
103954
010505
5410.6513
OFFICE SUPPLIES
GOLF ADMINISTRATION
91.53
268136
1/13/2005
114666 HARTKE, BRENDA
71.50
ART WORK SOLD AT EAC
104170
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
71.50
268137
1/1312005
102301 HARTLAND FUEL PRODUCTS LLC
9,875.12
GAS
103894
634267
1553.6581
GASOLINE
EQUIPMENT OPERATION GEN
9,875.12
268138
U1312005
102190 HAYNES, PATRICIA
55.90
ART WORK SOLD AT EAC
104169
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
R55CKREG LOG20000 CITY OF EDINA
Council Check Register
1!7/2005 — 1/13/2005
Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit
55.90
268139 1/1312006 101676 HEGGIES PIZZA
241.00 PIZZA 104298 128410 5421.5510 COST OF GOODS SOLD GRILL
1/12/2005 15:41:55
Page - 12
DUES & SUBSCRIPTIONS ENGINEERING GENERAL
PROFESSIONAL SERVICES COMM DEV BLK GRANT
DUES & SUBSCRIPTIONS PLANNING
LAUNDRY DISTRIBUTION
COST OF GOODS SOLD BEER 50TH ST SELLING
PROFESSIONAL SERVICES ANIMAL CONTROL
EQUIPMENT REPLACEMENT MEDIA STUDIO
CLASS REGISTRATION ART CENTER REVENUES
DUES & SUBSCRIPTIONS POLICE DEPT. GENERAL
241.00
268140
111312006
117651 HENNEPIN COUNTY GIS USER GROUP
10.00
2005 DUES-R. FOSTER
103955
033143
1260.6105
10.00
268141
1/13/2005
106288 HENNEPIN COUNTY RECORDER
39.00
FILING FEES
103854
8477077 -78
2127.6103
39.00
268142
111312005
106288 HENNEPIN COUNTY RECORDER
100.00
NOTARY SIGNATURE
103956
010405
1140.6105
100.00
268143
1/13/2005
101281 HERSHEY, JERRY
170.98
UNIFORM PURCHASE
104036
010605
5913.6201
170.98
268144
. 1/13/2005
104375 HOHENSTEINS INC.
98.85
103997
348462
5822.5514
98.85
268145
111312005
101618 HOPKINS PET HOSPITAL
6,124.84
20041MPOUNDS
104229
0229311
1450.6103
6,124.84
268146
1113/2005
100842 HSBC
176.77
VIDEO TAPES, SOFTWARE
104230
12150400204339
5125.6710
176.77
268147
1/13/2005
117664 ILIFF, KAITLYN
40.00
CLASS REFUND
103895
112304
5101.4607
40.00
268148
1M3/2006
100644 INTL CONFERENCE OF POLICE CHAP
500.00
2005 DUES
103957
010105
1400.6105
500.00
1/12/2005 15:41:55
Page - 12
DUES & SUBSCRIPTIONS ENGINEERING GENERAL
PROFESSIONAL SERVICES COMM DEV BLK GRANT
DUES & SUBSCRIPTIONS PLANNING
LAUNDRY DISTRIBUTION
COST OF GOODS SOLD BEER 50TH ST SELLING
PROFESSIONAL SERVICES ANIMAL CONTROL
EQUIPMENT REPLACEMENT MEDIA STUDIO
CLASS REGISTRATION ART CENTER REVENUES
DUES & SUBSCRIPTIONS POLICE DEPT. GENERAL
R55CKREG LOG20000
Check #
Date
Amount
Vendor / Explanation
268149
1113/2005
1917
106630 ISD #271
GENERAL SUPPLIES
PLAYGROUND & THEATER
1,500.00
TPS GRANT TRANSFER
1552.6406
GENERAL SUPPLIES
1,500.00
103898
268160
111312005
GENERAL SUPPLIES
100823 J & F REDDY RENTS INC.
103898
1917
62.98
ROTO HAMMER RENTAL
DISTRIBUTION
103898
62.98
1628.6406
268161
111312006
103898
100828 JERRY'S FOODS
1622.6406
GENERAL SUPPLIES
76.19
103898
1917
5421.5510
1.29
GRILL
103931
123104
5.31
GENERAL SUPPLIES
DISTRIBUTION
103931
11.25
5620.6406
GENERAL SUPPLIES
EDINBOROUGH PARK
13.99
123104
5511.6406
GENERAL SUPPLIES
17.66
103931
123104
5422.6406
22.63
MAINT OF COURSE & GROUNDS
103931
123104
91.82
GENERAL SUPPLIES
STREET NAME SIGNS
103931
240.14
5420.6406
268162
1/13/2006
103931
100829 JERRY'S HARDWARE
1552.6406
GENERAL SUPPLIES
13.77
103931
123104
1553.6406
13.78
EQUIPMENT OPERATION GEN
103931
123104
14.07
GENERAL SUPPLIES
FIRE DEPT. GENERAL
103931
28.79
1301.6406
GENERAL SUPPLIES
GENERAL MAINTENANCE
33.82
123104
5630.6406
GENERAL SUPPLIES
39.36
103931
123104
1646.6406
49.21
BUILDING MAINTENANCE
50.79
76.74
81.32
108.42
116.59
169.21
200.81
211.31
225.26
269.23
285.66
309.02
379.20
2,676.36
CITY OF EDINA
Council Check Register
1/7/2005 - 1/13/2005
PO N Doe No Inv No Account No Subledger Account Description
104284 010605 1600.4390.15 GEN ADAPTIVE REC
103896 03- 250171 -02 1552.6530 REPAIR PARTS
1/12/2005 15:41:55
Page - 13
Business Unit
PARK ADMIN. GENERAL
CENT SVC PW BUILDING
103897
1902
5110.6564
CRAFT SUPPLIES
ART CENTER ADMINISTRATION
103898
1917
1624.6406
GENERAL SUPPLIES
PLAYGROUND & THEATER
103898
1917
1552.6406
GENERAL SUPPLIES
CENT SVC PW BUILDING
103898
1917
1400.6406
GENERAL SUPPLIES
POLICE DEPT. GENERAL
103898
1917
5913.6406
GENERAL SUPPLIES
DISTRIBUTION
103898
1917
1628.6406
GENERAL SUPPLIES
SENIOR CITIZENS
103898
1917
1622.6406
GENERAL SUPPLIES
SKATING & HOCKEY
103898
1917
5421.5510
COST OF GOODS SOLD
GRILL
103931
123104
5860.6406
GENERAL SUPPLIES
VERNON LIQUOR GENERAL
103931
123104
1551.6406
GENERAL SUPPLIES
CITY HALL GENERAL
103931
123104
5540.6406
GENERAL SUPPLIES
LIQUOR YORK GENERAL
103931
123104
7411.6406
GENERAL SUPPLIES
PSTF OCCUPANCY
103931
123104
5210.6406
GENERAL SUPPLIES
GOLF DOME PROGRAM
103931
123104
1322.6406
GENERAL SUPPLIES
STREET LIGHTING ORNAMENTAL
103931
123104
4090.6406
GENERAL SUPPLIES
STREET REVOLVING
103931
123104
1400.6406
GENERAL SUPPLIES
POLICE DEPT. GENERAL
103931
123104
5913.6406
GENERAL SUPPLIES
DISTRIBUTION
103931
123104
5620.6406
GENERAL SUPPLIES
EDINBOROUGH PARK
103931
123104
5511.6406
GENERAL SUPPLIES
ARENA BLDG /GROUNDS
103931
123104
5422.6406
GENERAL SUPPLIES
MAINT OF COURSE & GROUNDS
103931
123104
1325.6406
GENERAL SUPPLIES
STREET NAME SIGNS
103931
123104
5420.6406
GENERAL SUPPLIES
CLUB HOUSE
103931
123104
1552.6406
GENERAL SUPPLIES
CENT SVC PW BUILDING
103931
123104
1553.6406
GENERAL SUPPLIES
EQUIPMENT OPERATION GEN
103931
123104
1470.6406
GENERAL SUPPLIES
FIRE DEPT. GENERAL
103931
123104
1301.6406
GENERAL SUPPLIES
GENERAL MAINTENANCE
103931
123104
5630.6406
GENERAL SUPPLIES
CENTENNIAL LAKES
103931
123104
1646.6406
GENERAL SUPPLIES
BUILDING MAINTENANCE
R55CKREG LOG20000 CITY OF EDINA 1/12/2005 15:41:55
Council Check Register Page - 14
1/7/2005 - 1/13/2005
Check # Date Amount
Vendor / Explanation PO # Doc No
Inv No
Account No
Subledger Account Description
Business Unit
268166 111312005
100836 JOHNSON BROTHERS LIQUOR CO.
489.40
103804
1834921
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
145.05
103805
1834922
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
5,974.77
103806
1834924
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
2,771.39
103807
1834925
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
3,185.62
103808
1834927
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
907.06
103809
1834918
5822.5513
COST OF GOODS SOLD VINE
50TH ST SELLING
1,396.52
103810
1834928
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
88.60
103811
1834933
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
347.30
103812
1834932
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
47.90
103813
1834929
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
62.80
103814
1834930
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
93.15
103815
1834923
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
232.90
103816
1834940
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
5,611.67
103817
1834934
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
86.70-
103818
268388
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
1,338.83
103855
1834937
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
383.48
103856
1834938
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
419.80
103857
1834935
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
629.24
103998
1835440
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
261.98
103999
1835272
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
133.05
104000
1835439
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
261.98
104001
1835438
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
480.00
104002
1834421
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
767.38
104069
1838286
5822.5513
COST OF GOODS SOLD VINE
50TH ST SELLING
374.27
104070
1838287
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
229.42
104071
1838288
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
834.76
104072
1838298
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
1,722.96
104073
1838301
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
395.67
104074
1835276
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
580.60
104075
1834939
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
4,069.60
104076
1834936
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
28.97
104077
1838296
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
875.07
104078
1838293
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
199.15
104079
1838289
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
2,178.81
104080
1838291
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
90.45
104081
1838292
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
530.74
104082
1838290
5842.5513
COST OF GOODS SOLD WANE
YORK SELLING
147.60
104083
1838294
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
333.26
104084
1838295
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
1,678.95
104085
1834926
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
R55CKREG LOG20000
CITY OF EDINA 1/12/2005 15:41:55
Council Check Register Page - 15
1/7/2005 - 1/13/2005
Check #
Date
Amount
Vendor / Explanation
PO # Doc No
Inv No
Account No
Subledger Account Description
Business Unit
549.70
104086
1838297
5662.5513
COST OF GOODS SOLD VINE
VERNON SELLING
173.44
104087
1838299
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
190.85-
104088
259953
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
84.66-
104089
270087
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
39.50-
104090
269940
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
9.04-
104091
270122
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
22.50-
104092
270089
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
5.51-
104093
270088
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
28.92-
104094
270090
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
55.70-
104095
269941
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
136.65-
104096
269943
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
40,365.26
268166
111312005
100367 JOHNSON, DAN
244.90
UNIFORM PURCHASE
103958
010305
1646.6201
LAUNDRY
BUILDING MAINTENANCE
244.90
268167
111312005
103664 JOHNSON, DENISE
78.00
ART WORK SOLD AT EAC
104171
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
78.00
268168
1/13/2005
114668 JOHNSON, MARTI L,
24.70
ART WORK SOLD AT EAC
104172
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
24.70
268159
1/13/2005
100839 KAMAN INDUSTRIAL TECHNOLOGIES
505.05
BEARINGS
103858
J986469
5422.6530
REPAIR PARTS
MAINT OF COURSE & GROUNDS
505.05
268150
1/13/2006
117556 KARAS TECHNICAL
3,955.00
SENTINEL ALARM SYSTEM
103959
8955
1400.6710
EQUIPMENT REPLACEMENT
POLICE DEPT. GENERAL
3,955.00
268161
1/13/2005
116887 KC FINE ART LLC
34.91
ART WORK SOLD AT EAC
104174
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
34.91
288182
1/13/2005
105371 KLINE, GWEN
45.51
ART WORK SOLD AT EAC
104173
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
45.51
268163
1/1312005
114569 KOLODJI, JAN M
R55CKREG LOG20000 CITY OF EDINA
Council Check Register
1!7/2005 - 1/13/2005
Check 9 Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description
43.55 ART WORK SOLD AT EAC 104175 010705 5101.4413 ART WORK SOLD
1/12/2005 15:41:55
Page - 16
Business Unit
ART CENTER REVENUES
5101.4413 ART WORK SOLD ART CENTER REVENUES
5101.4413 ART WORK SOLD ART CENTER REVENUES
5842.5515
COST OF GOODS SOLD MIX
43.55
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
268164_
1/1312005
50TH ST SELLING
102526 KOVACH, ORLEAN
COST OF GOODS SOLD MIX
50TH ST SELLING
5822.5514
COST OF GOODS SOLD BEER
72.80
ART WORK SOLD AT EAC
104176
010705
72.80
268165
1/13/2006
114344 KRAEMER, KARIN
131.95
ART WORK SOLD AT EAC
104177
010705
131.95
268166
111312006
100846 KUETHER DISTRIBUTING CO
35.00
103819
422968
1,094.60
103820
422969
48.50
104003
423069
36.00
104004
423068
943.65
104005
423070
1,485.50
104097
423443
3,643.25
268167
1/1312006
100850 LAKELAND FLORIST
77.75
SPANISH MOSS
104037
554991
77.75
268168
1/13/2005
102111 LASER TECHNOLOGY INC.
143.78
SCOPE RECERTIFICATION
-103899
33336RI '
143.78
268169
111312005
103441 LAWRENCE, JEANNIE
42.25
ART WORK SOLD AT EAC
104178
010705
42.25
268170
1/13/2006
100853 LEEF SERVICES
65.81
SHOP TOWELS
103859
310384
65.81
268171
1/13/2005
100867 LITTLE FALLS MACHINE INC.
382.45
CLEVIS, NUTS, PINS
104231
00032944
1,312.21
BUFFER
104232
00032941
1,694.66
268172
1113120OF
101098 LUNDEEN, MARGA
1/12/2005 15:41:55
Page - 16
Business Unit
ART CENTER REVENUES
5101.4413 ART WORK SOLD ART CENTER REVENUES
5101.4413 ART WORK SOLD ART CENTER REVENUES
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
5620.6406 GENERAL SUPPLIES EDINBOROUGH PARK
1400.6215
5101.4413
5422.6201
1553.6585
1553.6585
EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL
ART WORK SOLD ART CENTER REVENUES
LAUNDRY MAINT OF COURSE & GROUNDS
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
ACCESSORIES
ACCESSORIES
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 17
1!1/2005
- 1/13/2005
Check 9
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
16.25
ART WORK SOLD AT EAC
104179
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
16.25
268173
1/13/2005
100865 M & S ROOFING
730.00
ROOF REPAIR
103900
6270
1552.6530
REPAIR PARTS
CENT SVC PW BUILDING
730.00
268174
111312006
112677 M. AMUNDSON LLP
646.14
103860
172179
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
832.36
104006
172342
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
591.77
104098
170732
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
2,070.27
268176
1/1112006
101741 M. SHANKEN COMMUNICATIONS INC.
30.00
WINE SPECTATOR
103861
414805
5820.6105
DUES & SUBSCRIPTIONS
50TH STREET GENERAL
30.00
268176
111312005
116292 MAC TOOLS
87.11
SOCKETS, TRAYS
104233
23724
1553.6556
TOOLS
EQUIPMENT OPERATION GEN
87.11
268177
1/13/2005
106336 MAGNUSON, SHARON
487.00
MEDIA INSTRUCTOR
104183
010705
5125.6103
PROFESSIONAL SERVICES
MEDIA STUDIO
487.00
268178
111312006
101451 MAKELA, BARB
69.68
ART WORK SOLD AT EAC
104180
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
69.68
268179
1/1312005
114699 MANAGED SERVICES INC.
420.68
JANITORIAL SERVICES
104038
606896
7411.6103
PROFESSIONAL SERVICES
PSTF OCCUPANCY
420.68
268180
1/13/2005
100868 MARK VII SALES
377.95
103862
750535
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
37.30
103863
750536
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
98.00
103864
750537
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
2,037.85
104007
750951
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
98.00
104008
750953
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
21.95
104009
750952
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
712.30
104010
750534
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
116.00
104011
750698
5862.5514
COST OF GOODS SOLD BEER
VERNON SELLING
R55CKREG LOG20000
Check #
Date
Amount
Vendor / Explanation
Council Check
2,793.40
Page - 18
942.70
- 1/13/2005
30.20
Inv No
Account No
Subledger Account Description
873.47
104012
750697
5862.5514
8,139.12
VERNON SELLING
268181
111312005
5862.5514
100869 MARTIN- MCALLISTER
VERNON SELLING
104100
1,050.00
PERSONNEL EVALUATIONS
COST OF GOODS SOLD BEER
50TH ST SELLING
1,050.00
752705
268182
1113/2006
50TH ST SELLING
101030 MATHISON CO.
4067
1550.6121
31.83
OIL FLAKE WHITE
103901
586862 -1
31.83
COST OF GOODS SOLD
268183
1/13/2006
010405
103287 MCPA
DUES & SUBSCRIPTIONS
POLICE DEPT. GENERAL
150.00
2005 DUES
1490.6105
DUES & SUBSCRIPTIONS
150.00
103865
268184
1/13/2005
REPAIR PARTS
103232 MEHA
103902
91481
30.00
MEMBERSHIP DUES
RICHARDS GOLF COURSE
104235
30.00
1552.6406
268185
1/13/2006
104039
101483 MENARDS
5620.6406
GENERAL SUPPLIES
44.27
OIL
46923
5630.6406
17.42
PAINT SUPPLIES
104237
46175
160.62
BITS, MEASURING TAPES
CENTENNIAL LAKES
104238
-222.31
5620.6530
268166
IM312005
104239
101987 MENARDS
1470.6557
FIREFIGHTING FOAM
85.96
HEATER, TOTES
256550
1470.6557
37.24
TIMERS, WIRE
79.69
BULBS, WREATHS
202.89
268187
1/13/2006
100882 MERIT SUPPLY
515.99
SCRUBBER PARTS
515.99
268188
1/13/2006
101390 MES INC.
487.00
FOAM
196.00
FOAM
683.00
CITY OF EDINA
1/12/2005 15:41:55
Council Check
Register
Page - 18
lf7/2005
- 1/13/2005
PO # Doc No
Inv No
Account No
Subledger Account Description
Business Unit
104012
750697
5862.5514
COST OF GOODS SOLD BEER
VERNON SELLING
104099
750942
5862.5514
COST OF GOODS SOLD BEER
VERNON SELLING
104100
752706
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
104101
752705
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
104234
4067
1550.6121
ADVERTISING PERSONNEL
CENTRAL SERVICES GENERAL
103901
586862 -1
5120.5510
COST OF GOODS SOLD
ART SUPPLY GIFT GALLERY SHOP
103960
010405
1400.6105
DUES & SUBSCRIPTIONS
POLICE DEPT. GENERAL
104296
010405
1490.6105
DUES & SUBSCRIPTIONS
PUBLIC HEALTH
103865
90150
5431.6530
REPAIR PARTS
RICHARDS GC MAINTENANCE
103902
91481
5430.6406
GENERAL SUPPLIES
RICHARDS GOLF COURSE
104235
92241
1552.6406
GENERAL SUPPLIES
CENT SVC PW BUILDING
104039
54706
5620.6406
GENERAL SUPPLIES
EDINBOROUGH PARK
104236
46923
5630.6406
GENERAL SUPPLIES
CENTENNIAL LAKES
104237
46175
5630.6406
GENERAL SUPPLIES
CENTENNIAL LAKES
104238
66009
5620.6530
REPAIR PARTS
EDINBOROUGH PARK
104239
257860
1470.6557
FIREFIGHTING FOAM
FIRE DEPT. GENERAL
104240
256550
1470.6557
FIREFIGHTING FOAM
FIRE DEPT. GENERAL
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 19
1/712005
— 1/13/2005
Check #
Date
Amount
Vendor/ Explanation PO #
Doe No
Inv No
Account No
Subledger Account Description
Business Unit
268189
1113/2006
102729 METROPOLITAN FORD OF EDEN PRAI
425.23
BEARING ASSEMBLY, SHAFT
104040
438045FOW
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
79.88-
CORE RETURN
104286
CM437257
1553.6530
REPAIR PARTS
EQUIPMENT OPERATION GEN
345.35
268190
111312005
102508 METZGER, MAURE ANN
127.40
ART WORK SOLD AT EAC
104181
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
127.40
268191
1/1312005
116753 MGS PROFESSIONAL BUILDING MAIN
2,075.00
WINDOW CLEANING
104241
17553
1550.6103
PROFESSIONAL SERVICES
CENTRAL SERVICES GENERAL
2,075.00
268192
111312005
100692 MIDWEST COCA -COLA EAGAN
93.50
103821
82533049
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
93.50
268193
111312006
101604 MIDWEST GANG INVESTIGATORS ASS
275.00
CONFERENCE FEE
103961
010305
1400.6104
CONFERENCES & SCHOOLS
POLICE DEPT. GENERAL
275.00
268194
1/1312005
101260 MIDWEST LIGHTING PRODUCTS
1,506.98
LIGHTING
104242
00040192
1322.6406
GENERAL SUPPLIES
STREET LIGHTING ORNAMENTAL
1,506.98
268195
111312005
102873 MILLER, SUSAN
1,108.43
TUITION, BOOK
104243
010605
1600.6104
CONFERENCES & SCHOOLS
PARK ADMIN. GENERAL
1,108.43
268196
1/13/2005
100522 MINNESOTA AIR INC.
160.90
GAS VALVE, LEAK DETECTOR
104244
2043622 -00
5860.6406
GENERAL SUPPLIES
VERNON LIQUOR GENERAL
160.90
268197
1/1312006
101912 MINNESOTA DEPARTMENT OF AGRICU
10.00
PESTICIDE LICENSE RENEWAL
103963
20053784
1640.6260
LICENSES & PERMITS
PARK MAINTENANCE GENERAL
10.00
268198
1/1312006
101689 MINNESOTA GFOA
40.00
JOHN WALLIN DUES
104041
010605
1160.6105
DUES & SUBSCRIPTIONS
FINANCE
40.00
PEGGY GIBBS DUES
104041
010605
1160.6105
DUES & SUBSCRIPTIONS
FINANCE
40.00
PAULA NELSON DUES
104041
010605
1160.6105
DUES & SUBSCRIPTIONS
FINANCE
R55CKREG LOG20000
CITY OF EDINA
1/1212005 15:41:55
Council Check Register
Page - 20
1!1/2005
— 1/132005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
120.00
268199
11132005
115975 MINNESOTA LEGAL REGISTER
75.00
2005 SUBSCRIPTION
103962
2535
1190.6105
DUES & SUBSCRIPTIONS
ASSESSING
. 75.00
268200
1/132005
101410 MINNESOTA STATE BOARD OF ELECT
80.00
LICENSE RENEWAL
103964
AM05997
1281.6104
CONFERENCES & SCHOOLS
TRAINING
80.00
268201
1/132005
101669 MINNESOTA STATE FIRE CHIEFS AS
35.00
2005 DUES - CHIEF
104297
010605
1470.6105
DUES & SUBSCRIPTIONS
FIRE DEPT. GENERAL
35.00
268202
1/132006
100899 MINNESOTA STATE TREASURER
4,890.54
DEC 2004
103866
123104
1495.4380
SURCHARGE
INSPECTIONS
4,890.54
268203
11132006
102775 MN DNR WATERS
19,869.75
PERMIT FEE
103965
010505
5915.6260
LICENSES & PERMITS
WATER TREATMENT
19,869.75
268204
11132006
106190 MOORE, MARY CARROLL
47.87
ART WORK SOLD AT EAC
104182
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
47.87
268206
1/132005
101796 MPCA
23.00
LICENSE RENEWAL
104043
010605
5919.6260
LICENSES & PERMITS
TRAINING
23.00
268206
11132005
101796 MPCA
1,840.00
SEMINAR REGISTRATION FEES
104042
010705
5919.6104
CONFERENCES & SCHOOLS
TRAINING
1,840.00
268207
1/132005
102776 MRPA
149.50
2005 MEMBERSHIP DUES
103966
010105
1640.8104
CONFERENCES & SCHOOLS
PARK MAINTENANCE GENERAL
149.50
2005 MEMBERSHIP DUES
103966
010105
5410.6105
DUES & SUBSCRIPTIONS
GOLF ADMINISTRATION
598.00
2005 MEMBERSHIP DUES
103966
010105
1600.6105
DUES & SUBSCRIPTIONS
PARK ADMIN. GENERAL
598.00
2005 MEMBERSHIP DUES
103966
010105
5610.6105
DUES & SUBSCRIPTIONS
ED ADMINISTRATION
1,495.00
268208
11132006
101608 MESA
R55CKREG LOG20000
CITY OF EDINA
Council Check Register
1/712005
— 1/1312005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
35.00
2005 MEMBERSHIP DUES
103967
R. GLANZER
5913.6105
DUES & SUBSCRIPTIONS
35.00
268209
111312006
102592 MUNICIPAL LEGISLATIVE COMMISSI
11,500.00
2005 DUES
104044
122104
1120.6105
DUES & SUBSCRIPTIONS
11,500.00
268210
111312006
106334 NELSON, PEGGY
1,317.00
MEDIA INSTRUCTOR
104185
010705
5125.6103
PROFESSIONAL SERVICES
1,317.00
268211
1/1312006
102260 NORMAN, MIKE
111.15
ART WORK SOLD AT EAC
104184
010705
5101.4413
ART WORK SOLD
111.15
268212
1/13/2005
117102 NORTH AMERICAN SALT CO.
1,683.54
ICE CONTROL SALT
104245
11176420
1318.6525
SALT
7,895.30
ICE CONTROL SALT
104246
11174531
1318.6525
SALT
3,405.07
ICE CONTROL SALT
104247
11174536
1318.6525
SALT
12,065.97
ICE CONTROL SALT
104248
11174538
1318.6525
SALT
25,049.88
268213
1/13/2005
100933 NORTHWEST GRAPHIC SUPPLY
106.11
ART SUPPLIES
103903
30863700
5120.5510
COST OF GOODS SOLD
18.30
CHARCOAL
103904
30735801
5120.5510
COST OF GOODS SOLD
54.90
CHARCOAL
103905
30838000
5120.5510
COST OF GOODS SOLD
179.31
268214
111312005
100052 NRPA
450.00
2005 MEMBERSHIP DUES
103968
010505
1600.6105
DUES & SUBSCRIPTIONS
450.00
268215
1/13/2006
103678 OFFICE DEPOT
30.30
BATTERIES
104288
265648335
5410.6513
OFFICE SUPPLIES
30.30
268216
1/1312005
101692 OFFICEMAX CREDIT PLAN
12.24
OFFICE SUPPLIES
104285
122304
2210.6406
GENERAL SUPPLIES
193.66
OFFICE SUPPLIES
104285
122304
5610.6513
OFFICE SUPPLIES
205.90
268217
1/13/2005
105738 ORIENTAL ART SUPPLY
1/12/2005 15:41:55
Page - 21
Business Unit
DISTRIBUTION
ADMINISTRATION
MEDIA STUDIO
ART CENTER REVENUES
SNOW & ICE REMOVAL
SNOW & ICE REMOVAL
SNOW & ICE REMOVAL
SNOW & ICE REMOVAL
ART SUPPLY GIFT GALLERY SHOP
ART SUPPLY GIFT GALLERY SHOP
ART SUPPLY GIFT GALLERY SHOP
PARK ADMIN. GENERAL
GOLF ADMINISTRATION
COMMUNICATIONS
ED ADMINISTRATION
R55CKREG LOG20000 CITY OF EDINA
Council Check Register
1!7/2005 - 1/13/2005
Cheek # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description
271.96 ART SUPPLIES 103906 8287 5120.5510 COST OF GOODS SOLD
GENERAL SUPPLIES
GENERAL SUPPLIES
CONTRACTED REPAIRS
REPAIR PARTS
ART WORK SOLD
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
COST OF GOODS SOLD WINE
COST OF GOODS SOLD BEER
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
1/12/2005 15:41:55
Page - 22
Business Unit
ART SUPPLY GIFT GALLERY SHOP
ART CENTER ADMINISTRATION
ART CENTER ADMINISTRATION
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
ART CENTER REVENUES
YORK SELLING
50TH ST SELLING
VERNON SELLING
YORK SELLING
50TH ST SELLING
50TH ST SELLING
VERNON SELLING
YORK SELLING
YORK SELLING
YORK SELLING
COST OF GOODS SOLD CENTENNIAL LAKES
COST OF GOODS SOLD CENTENNIAL LAKES
COST OF GOODS SOLD LIQUOR 50TH ST SELLING
COST OF GOODS SOLD VINE 50TH ST SELLING
COST OF GOODS SOLD WINE 50TH ST SELLING
271.96
268218
1/1312005
100247 ORLANDI STATUARY CO. INC.
68.28
SMILING VENUS, LARGE HAND
103907
02416023
5110.6406
133.73
FIST, EARS, MASK, LION
103908
02416040
5110.6406
-
202.01
268219
111312005
103624 P & L AUTOMOTIVE INC.
300.00
UNDERCOAT
104249
151412
1553.6180
300.00
268220
1113/2006_
101718 PARTS PLUS
2,579.04
PARTS
103887
122604
1553.6530
2,579.04
268221
111312005
102440 PASS, GRACE
119.60
ART WORK SOLD AT EAC
104186
010705
5101.4413
119.60
268222
111312005
100347 PAUSTIS & SONS
3,091.98
103822
8057315 -IN
5842.5513
1,420.47
103823
8057314 -IN
5822.5513
1,515.00
104013
8057912 -IN
5862.5513
96.00
104014
8057916 -IN
5842.5514
115.20
104102
8057914 -IN
5822.5514
431.80
104102
80579WIN
5822.5513
268.80
104103
8057913 -IN
5862.5514
1,621.40
104104
8057915 -IN
5842.5513
136.00-
104105
8057649 -CM
5842.5513
300.00
CREDIT TAKEN TWICE
104250
CM- 8055389
5842.5513
8,724.65
268223
111312005
100946 PEPSI -COLA COMPANY
288.20
104045
73439589
5630.5510
214.00
104251
67819753
5630.5510
502.20
268226
111312006
1
100743 PHILLIPS VANE & SPIRITS
69.85
103824
2151578
5822.5512
1,256.93
103825
2151580
5822.5513
252.30
103826
2151579
`22.5513
GENERAL SUPPLIES
GENERAL SUPPLIES
CONTRACTED REPAIRS
REPAIR PARTS
ART WORK SOLD
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD BEER
COST OF GOODS SOLD BEER
COST OF GOODS SOLD WINE
COST OF GOODS SOLD BEER
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
1/12/2005 15:41:55
Page - 22
Business Unit
ART SUPPLY GIFT GALLERY SHOP
ART CENTER ADMINISTRATION
ART CENTER ADMINISTRATION
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
ART CENTER REVENUES
YORK SELLING
50TH ST SELLING
VERNON SELLING
YORK SELLING
50TH ST SELLING
50TH ST SELLING
VERNON SELLING
YORK SELLING
YORK SELLING
YORK SELLING
COST OF GOODS SOLD CENTENNIAL LAKES
COST OF GOODS SOLD CENTENNIAL LAKES
COST OF GOODS SOLD LIQUOR 50TH ST SELLING
COST OF GOODS SOLD VINE 50TH ST SELLING
COST OF GOODS SOLD WINE 50TH ST SELLING
R55CKREG LOG20000 CITY OF EDINA 1/1212005 15:41:55
Council Check Register Page - 23
1!7/2005 - 1/132005
Check # Date
Amount
Vendor / Explana0on PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
46.90
103827
2151585
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
1,460.30
103828
2151584
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
676.30
103829
2151583
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
815.64
103830
2151582
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
1,368.10
103831
2151586
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
54.09-
103868
3310466
5822.6512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
79.40-
103869
3310467
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
1,390.40
104015
2151227
5542.5513
COST OF GOODS SOLD VINE
YORK SELLING
2,229.30
104016
2152132
5842.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
431.20
104106
2153854
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
651.40
104107
2153880
5542.5512
COST OF GOODS SOLD LIQUOR
YORK SELLING
2.817.50
104108
2153883
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
60.90
104109
2153882
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
3,862.80
104110
2153885
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
544.15
104111
2153886
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
183.30
104112
2153876
5822.5512
COST OF GOODS SOLD LIQUOR
50TH ST SELLING
2,091.75
104113
2153879
5822.5513
COST OF GOODS SOLD VINE
50TH ST SELLING
3,621.85
104114
2153878
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
2,832.00
104115
2151581
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
12.66-
104116
3311267
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
207.90-
104117
3311266
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
6.00-
104118
3311271
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
201.00-
104119
3311265
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
25.90-
104120
3311023
5822.5513
COST OF GOODS SOLD VINE
50TH ST SELLING
3.45-
104121
3311270
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
6.63-
104122
3311268
5862.5512
COST OF GOODS SOLD LIQUOR
VERNON SELLING
11.40-
104123
3311159
5862.6513
COST OF GOODS SOLD WINE
VERNON SELLING
16.00•
104124
3311269
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
104.35-
104125
3311024
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
25,954.09
268226 11132005
104717 PHILLIPS, RAY
50.92
UNIFORM PURCHASE
104046
010505
5913.6201
LAUNDRY
DISTRIBUTION
50.92
268227 1/132005
100968 PLUNKETT'S PEST CONTROL
728.46
PEST CONTROL CONTRACT
104047
512902
5511.6406
GENERAL SUPPLIES
ARENA BLDG /GROUNDS
728.46
268228 1/132005
103266 POKORNY COMPANY
159.75
SLOAN KITS
104252
20486
5420.6530
REPAIR PARTS
CLUB HOUSE
159.75
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 24
1172005
- 1/132005
Check # Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
268229 11132005
101110 POLLY NORMAN PHOTOGRAPHY
50.00
ABOUT TOWN PHOTOS
103969
010405
2210.6123
MAGAZINEMEWSLETTER EXPENSE
COMMUNICATIONS
50.00
268230 11132005
1
100819 POPP TELECOM
2,046.83
REPLACE PHONE SYS
103970
12065
5511.6180
CONTRACTED REPAIRS
ARENA BLDG /GROUNDS
2,046.83
268231 11132005
100961 POSTMASTER
300.00
NEWSLETTER POSTAGE
104048
010705
1628.6235
POSTAGE
SENIOR CITIZENS
300.00
268232 11132005
100968 PRIOR WINE COMPANY
120.60
103832
167466
5842.5515
COST OF GOODS SOLD MIX
YORK SELLING
2,337.24
103832
167466
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
1,612.00
103833
169602
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
58.75
103834
169604
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
258.10
104017
173350
5862.5515
COST OF GOODS SOLD MIX
VERNON SELLING
1,263.73
104017
173350
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
239.66
104018
171936
5862.5513
COST OF GOODS SOLD VINE
VERNON SELLING
61.10
104126
173351
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
256.77
104126
173351
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
1,062.43
104127
173352
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
678.71
104128
171935
5842.5513
COST OF GOODS SOLD VINE
YORK SELLING
289.90
104129
171746
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
8,239.01
268233 1/132005
100969 PROGRESSIVE CONSULTING ENGINEE
1,500.00
RECYCLE SYSTEM
103870
03034.15
05425.1705.20
CONSULTING DESIGN
PLANT #2 BACKWASH RECYCLE SYST
1,704.84
RECYCLE SYSTEM
103870
03034.15
05426.1705.20
CONSULTING DESIGN
PLANT #4 BACKWASH RECYCLE SYST
3,204.84
268234 11132006
106322 PROSOURCE SUPPLY
250.35
TISSUE, ROLL TOWEL
104049
3469
5620.6511
CLEANING SUPPLIES
EDINBOROUGH PARK
293.30
TISSUE, TOWELS, WYPALL
104253
3476
5630.6511
CLEANING SUPPLIES
CENTENNIAL LAKES
543.65
268236 1/132005
100971 QUALITY WINE
3.76-
103835
497315-00
5820.5518
VENDOR DISCOUNTS
50TH STREET GENERAL
379.68
103835
497315-00
5822.5513
COST OF GOODS SOLD VINE
50TH ST SELLING
7.31-
103836
497143-00
'20.5518
VENDOR DISCOUNTS
50TH STREET GENER
R55CKREG LOG20000
CITY OF EDINA
Council Check Register
1/712005 - 1/13/2005
Check # Date Amount Vendor / Explanation
PO # Doc No
Inv No
736.52
103836
497143-00
7.62-
103837
496910-00
385.10
103837
496910-00
15.15-
103838
496789-00
1,527.10
103838
496769-00
32.38-
103839
496174-00
16.54
104019
500296 -00
833.12
104019
500296-00
40.39-
104020
500295-00
2,038.82
104020
500295-00
71.15-
104021
499158-00
3,576.00
104021
499158-00
4.32-
104022
498725-00
434.91
104022
498725-00
3.72-
104023
500171 -00
376.60
104023
500171 -00
3.36-
104024
500212 -00
338.81
104024
500212 -00
8.68-
104025
500168-00
880.04
104025
500168-00
7.46-
104026
500213-00
753.82
104026
500213-00
15.36-
104027
499160-00
771.63
104027
499160-00
15.14
104130
500347 -00
767.81
104130
500347 -00
196.90
104131
500215-00
.69-
104132
500169-00
70.69
104132
500169-00
3.72-
104133
500214-00
375.24
104133
500214-00
11.10-
104134
499442 -00
1,124.55
104134
499442 -00
15,301.47
Account No
5822.5513
5820.5518
5822.5512
5860.5518
5862.5513
5862.5513
5820.5518
5822.5512
5640.5518
5842.5512
5840.5518
5842.5512
5840.5518
5842.5513
5840.5518
5842.5513
5840.5518
5842.5513
5860.5518
5862.5513
5860.5518
5862.5513
5820.5518
5822.5512
5860.5518
5862.5512
5822.5514
5820.5518
5822.5513
5820.5518
5822.5513
5820.5518
5822.5513
Subledger Account Description
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD LIQUOR
VENDOR DISCOUNTS
COST OF GOODS SOLD VINE
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD LIQUOR
VENDOR DISCOUNTS
COST OF GOODS SOLD LIQUOR
VENDOR DISCOUNTS
COST OF GOODS SOLD LIQUOR
VENDOR DISCOUNTS
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD LIQUOR
VENDOR DISCOUNTS
COST OF GOODS SOLD LIQUOR
COST OF GOODS SOLD BEER
VENDOR DISCOUNTS
COST OF GOODS SOLD WINE
VENDOR DISCOUNTS
COST OF GOODS SOLD VINE
VENDOR DISCOUNTS
COST OF GOODS SOLD WINE
1/12/2005 15:41:55
Page - 25
Business Unit
50TH ST SELLING
50TH STREET GENERAL
50TH ST SELLING
VERNON LIQUOR GENERAL
VERNON SELLING
VERNON SELLING
50TH STREET GENERAL
50TH ST SELLING
LIQUOR YORK GENERAL
YORK SELLING
LIQUOR YORK GENERAL
YORK SELLING
LIQUOR YORK GENERAL
YORK SELLING
LIQUOR YORK GENERAL
YORK SELLING
LIQUOR YORK GENERAL
YORK SELLING
VERNON LIQUOR GENERAL
VERNON SELLING
VERNON LIQUOR GENERAL
VERNON SELLING
50TH STREET GENERAL
50TH ST SELLING
VERNON LIQUOR GENERAL
VERNON SELLING
50TH ST SELLING
50TH STREET GENERAL
50TH ST SELLING
50TH STREET GENERAL
50TH ST SELLING
50TH STREET GENERAL
50TH ST SELLING
268237 1/13/2005 101965 QWEST
57.32
104264
122804
1628.6188
TELEPHONE
SENIOR CITIZENS
85.36
104264
122804
5861.6188
TELEPHONE
VERNON OCCUPANCY
94.48
104254
122804
5821.6188
TELEPHONE
50TH ST OCCUPANCY
97.60
104254
122804
6841.6188
TELEPHONE
YORK OCCUPANCY
165.79
104264
122804
5610.6188
TELEPHONE
ED ADMINISTRATION
R55CKREG LOG20000 CITY OF EDINA 1/12/2005 15:41:55
Council Check Register Page - 26
1!7/2005 - 1/1312005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
167.00
104254
122804
1622.6188
TELEPHONE
SKATING & HOCKEY
190.90
104254
122804
1470.6188
TELEPHONE
FIRE DEPT. GENERAL
217.79
104254
122804
1646.6188
TELEPHONE
BUILDING MAINTENANCE
237.00
104254
122804
5932.6188
TELEPHONE
GENERAL STORM SEWER
250.72
104254
122804
5511.6188
TELEPHONE
ARENA BLDG /GROUNDS
352.92
104254
122804
5911.6188
TELEPHONE
PUMP & LIFT STATION OPER
2,864.57
104264
122804
1550.6188
TELEPHONE
CENTRAL SERVICES GENERAL
51.15
952 926-0092
104299
010505-0092
5913.6188
TELEPHONE
DISTRIBUTION
91.38
952 926 -0419
104300
010105.0419
1646.6188
TELEPHONE
BUILDING MAINTENANCE
4,923.98
268238
111312005
100974 RAYMOND HAEG PLUMBING
1,280.00
NEW WATER HEATER
103871
122204
2127.6103
PROFESSIONAL SERVICES
COMM DEV BLK GRANT
1,280.00
268239
111312005
.102096 RICKERT, DAVID
76.05
ART WORK SOLD AT EAC
104187
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
76.05
268240
1/1312006
100980 ROBERT B. HILL CO.
85.60
SOFTENER SALT
104255
00157925
1551.6406
GENERAL SUPPLIES
CITY HALL GENERAL
85.60
268241
1/13/2005
106062 ROSEVILLE PLUMBING & HEATING 1
685.64
RPZ REPAIR
104256
29848
5620.6180
CONTRACTED REPAIRS
EDINBOROUGH PARK
685.64
268242
1/13/2005
106534 ROTARY CLUB OF EDINA/MORNINGSI
195.00
DUES -ERIC ANDERSON
104301
271
1120.6105
DUES & SUBSCRIPTIONS
ADMINISTRATION
195.00
268243
1/13/2005
106324 RT ELECTRIC
325.00
POND LIGHT REPAIR
104257
04- 877
5630.6180
CONTRACTED REPAIRS
CENTENNIAL LAKES
325.00
268244
111312005
102066 RUST, ROGER
235.00
WINTER ICE FESTIVAL
103971
010305
5610.6136
PROFESSIONAL SVC - OTHER
ED ADMINISTRATION
235.00
268245
111312006
100988 SAFETY KLEEN
122.06
CHANGE OUT PARTS WASHER
104258
0027936044
1280.6271
HAZ. WASTE DISPOSAL
SUPERVISION & OVERHEAD
122.06
R55CKREG LOG20000
375.00
CITY OF EDINA
268260 11132005
102949 SECURITAS SECURITY SYSTEMS USA
Council Check Register
265.85
SECURITY SYS REPAIR
104263
2056498 -IN
1!7/2005 — 1/13/2005
CONTRACTED REPAIRS
Check #
Data
Amount
Vendor / Explanation PO #
Doc No
Inv No Account No
Subledger Account Description
268246
11132005
100995 SEH
100305 SARA LEE COFFEE 3 TEA
8,000.00
459.81
COFFEE
104302
7585372 5421.5510
COST OF GOODS SOLD
8,000.00
459.81
103872
0123524
5915.6103
PROFESSIONAL SERVICES
268247
11132005
CITYWORKS SOFTWARE
100890 SCHARBER 3 SONS
0123524
5932.6103
PROFESSIONAL SERVICES
15,000.00
569.70
BRACKET, FRONT WGHT
104259
327924 1553.6530
REPAIR PARTS
15,000.00
79.34
ANTENNA
104260
327996 1553.6530
REPAIR PARTS
15,000.00
89.94
SUN VISOR
104261
328048 1553.6530
REPAIR PARTS
17,541.87
738.98
103873
0123892
03413.1705.20
CONSULTING DESIGN
268248
1/132006
WELL INSPECTION
105442 SCHERER BROS. LUMBER CO.
0124095
05429.1705.20
CONSULTING DESIGN
86,785.48
158.30
PLYWOOD
104262
40013667 1646.6577
LUMBER
268252 V132005
158.30
268249
11132006
ART WORK SOLD AT EAC
104161 SCHINDLER ELEVATOR CORP.
010705
5101.4413
ART WORK SOLD
1/1212005 15:41:55
Page - 27
Business Unit
GRILL
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
BUILDING MAINTENANCE
375.00 QUARTERLY CONTRACT 104050 8101201031 1550.6230 SERVICE CONTRACTS EQUIPMENT CENTRAL SERVICES GENERAL
EDINBOROUGH PARK
DISTRIBUTION
WATER TREATMENT
GENERAL STORM SEWER
M80 VALLEY LN & VIEW - 66TH ST
PHASE 1 ARDEN, BRUCE, CASCO WM
PHASE 1 ARDEN, BRUCE, CASCO ST
PHASE 1 ARDEN, BRUCE, CASCO SS
WELL 97 REHAB
ART CENTER REVENUES
26,250.00 OUTREACH SERVICES 2005 104051 010505 1504.6103 PROFESSIONAL SERVICES HUMAN RELATION COMMISSION
26,250.00
375.00
268260 11132005
102949 SECURITAS SECURITY SYSTEMS USA
265.85
SECURITY SYS REPAIR
104263
2056498 -IN
5620.6180
CONTRACTED REPAIRS
265.85
268251 11132005
100995 SEH
8,000.00
CITYWORKS SOFTWARE
103872
0123524
5913.6103
PROFESSIONAL SERVICES
8,000.00
CITYWORKS SOFTWARE
103872
0123524
5915.6103
PROFESSIONAL SERVICES
8,156.19
CITYWORKS SOFTWARE
103872
0123524
5932.6103
PROFESSIONAL SERVICES
15,000.00
TOPO SURVEYIFIELD DATA
103873
0123892
01212.1705.20
CONSULTING DESIGN
15,000.00
TOPO SURVEY/FIELD DATA
103873
0123892
05436.1705.20
CONSULTING DESIGN
15,000.00
TOPO SURVEY/FIELD DATA
103873
0123892
04297.1705.20
CONSULTING DESIGN
17,541.87
TOPO SURVEY/FIELD DATA
103873
0123892
03413.1705.20
CONSULTING DESIGN
87.42
WELL INSPECTION
103874
0124095
05429.1705.20
CONSULTING DESIGN
86,785.48
268252 V132005
102870 SEIFERT, ELIZABETH
255.45
ART WORK SOLD AT EAC
104191
010705
5101.4413
ART WORK SOLD
255.45
266263 1/132006
101587 SENIOR COMMUNITY SERVICES
EDINBOROUGH PARK
DISTRIBUTION
WATER TREATMENT
GENERAL STORM SEWER
M80 VALLEY LN & VIEW - 66TH ST
PHASE 1 ARDEN, BRUCE, CASCO WM
PHASE 1 ARDEN, BRUCE, CASCO ST
PHASE 1 ARDEN, BRUCE, CASCO SS
WELL 97 REHAB
ART CENTER REVENUES
26,250.00 OUTREACH SERVICES 2005 104051 010505 1504.6103 PROFESSIONAL SERVICES HUMAN RELATION COMMISSION
26,250.00
R55CKREG LOG20000
CITY OF EDINA
1/12/2005 15:41:55
Council Check Register
Page - 28
117/2005
— 1/13/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
268264
111312006
101380 SHAUGHNESY, SANDRA
228.80
ART WORK SOLD AT EAC
104190
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
228.80
268256
111312006
100999 SIGNAL SYSTEMS INC.
76.79
TIMECARDS
104052
30270
5620.6406
GENERAL SUPPLIES
EDINBOROUGH PARK
76.79
268256
1/13/2005
100301 SIMPLOT PARTNERS
511.26
WEED SPRAY
103875
433039SI
1643.6546
WEED SPRAY
GENERAL TURF CARE
511.20
268267
111312006
101275 SJS CORP - CUSTOMIPSC SUPPLY
264.00
ICE MELT
104053
5269
1647.6406
GENERAL SUPPLIES
PATHS & HARD SURFACE
254.00
268268
1/1312005
113859 SOUTHERN DATACOMM INC.
900.00
PROTOBASE EXPRESS SERVICE
104303
97651
5840.6160
DATA PROCESSING
LIQUOR YORK GENERAL
900.00
268269
1/1312005
101002 SOUTHSIDE DISTRIBUTORS INC
6,477.40
104028
158231
5842.5514
COST OF GOODS SOLD BEER
YORK SELLING
60.25
104029
158227
5822.5514
COST OF GOODS SOLD BEER
50TH ST SELLING
13.55
104030
158228
5822.5515
COST OF GOODS SOLD MIX
50TH ST SELLING
6,551.20
268260
111312005
101023 SOUTHWEST SUBURBAN CABLE COMMI
2,478.66
FIRST QUARTER
103972
200502
2210.6136
PROFESSIONAL SVC - OTHER
COMMUNICATIONS
2,478.66
268261
1113/2005
110977 SOW, ADAMA
488.80
ART WORK SOLD AT EAC
104188
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
488.80
268262
1/1312005
103411 SPORTSIGN
56.00
INTERPRETER
104264
05006
4078.6103
PROFESSIONAL SERVICES
INCLUSION PROGRAM
56.00
268263
111312005
101016 SRF CONSULTING GROUP INC
96.00
TRAFFIC STUDY
103876
5160 -3
01321.1705.20
CONSULTING DESIGN
BA-321 VALLEY VIEW - WOODDALE
1,609.28
CITY IMPROVEMENT PROJ S-091
103877
5211 -1
07091.1705.20
CONSULTING DESIGN
SIDEWALK INTERLACHENBLAKE
1,705.28
R55CKREG LOG20000
CARTS 103912
531190
5440.5511
CITY OF EDINA
PRO SHOP RETAIL SALES
243.91
Council Check Register
268271 1/1312006
100900 SUN NEWSPAPERS
1/7/2005
- 1/13/2005
746671
Check 0
Date
Amount
Vendor / Explanation PO 0
Doc No
Inv No
Account No
Subiedger Account Description
268264
111312006
ADVERTISING 104271
103277 ST. JOSEPH EQUIPMENT CO INC
5862.6122
ADVERTISING OTHER
VERNON SELLING
870.00
93.52
MIRROR, CLAMP, PLUG
103909
SI34597
1553.6530
REPAIR PARTS
1,147.01
BACKHOE BUCKET
103910
SM08564
5900.1735
AUTOMOBILES & TRUCKS
1,240.53
268265
111312006
100650 STANLEY SECURITY SOLUTIONS INC
29.02
KEYS
103878
MN- 357363
1646.6406
GENERAL SUPPLIES
204.38
KEYS
104265
MN- 356935
1646.8406
GENERAL SUPPLIES
20.16
KEYS
104266
MN- 357509
1646.6406
GENERAL SUPPLIES
78.65
KEYS
104267
CH- 357180
1646.6406
GENERAL SUPPLIES
332.19
268266
1/1312006
101007 STAR TRIBUNE
1,302.50
WANT AD
103911
123104
1650.6121
ADVERTISING PERSONNEL
1,302.50
268267
1/13/2006
106352 STEPHENSON, TED
90.00
MN GREEN EXPO
104064
010605
6610.6104
CONFERENCES & SCHOOLS
90.00
268268
1/13/2005
117657 STORE TO DOOR
2,660.00
2005 GRANT
104055
010505
1504.6103
PROFESSIONAL SERVICES
2,660.00
268269
1/1312006
101017 SUBURBAN CHEVROLET
543.00
REPAIRS
104268
CVCB474324
1553.6530
REPAIR PARTS
275.00
REPAIRS
104269
CVCB474152
1553.6530
REPAIR PARTS
49.23
HANDLE
104270
371617CVW
1553.6530
REPAIR PARTS
867.23
268270
111312006
102140 SUN MOUNTAIN SPORTS INC.
1/12/2005 15:41:55
Page - 29
Business Unit
EQUIPMENT OPERATION GEN
UTILITY BALANCE SHEET
BUILDING MAINTENANCE
BUILDING MAINTENANCE
BUILDING MAINTENANCE
BUILDING MAINTENANCE
CENTRAL SERVICES GENERAL
ED ADMINISTRATION
HUMAN RELATION COMMISSION
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
243.91
CARTS 103912
531190
5440.5511
COST OF GOODS - PRO SHOP
PRO SHOP RETAIL SALES
243.91
268271 1/1312006
100900 SUN NEWSPAPERS
290.00
ADVERTISING 104271
746671
5822.6122
ADVERTISING OTHER
50TH ST SELLING
290.00
ADVERTISING 104271
746671
5842.6122
ADVERTISING OTHER
YORKSELLING
290.00
ADVERTISING 104271
746671
5862.6122
ADVERTISING OTHER
VERNON SELLING
870.00
268272 1/132006
114800 SUPERIOR WILDLIFE MANAGEMENT 1
R55CKREG LOG20000
CITY OF EDINA
Council Check
Register
1/212005
— 1/13/2005
Check #
Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
3,200.00
DEER REMOVAL
104272
010305
1509.6103
PROFESSIONAL SERVICES
3,200.00
268273
111312005
110674 SUPERIOR WIRELESS COMMUNICATIO
30.93
CLIP CASE
104273
8323
1322.6406
GENERAL SUPPLIES
30.93
268274
1H312006
116868 SWENSON, SUSAN
249.80
ART WORK SOLD AT EAC
104189
010705
5101.4413
ART WORK SOLD
249.80
268276
111312006
108609 TAFFEE, MARY
89.05
ART WORK SOLD AT EAC
104194
010705
5101.4413
ART WORK SOLD
89.05
268276
1/13/2006
102299 TAPPER, ELIZABETH
87.75
ART WORK SOLD AT EAC
104193
010705
5101.4413
ART WORK SOLD
87.75
268277
1/13/2005
101326 TERMINAL SUPPLY CO
90.34
TORCHES
104274
93099-00
1553.6585.
ACCESSORIES
90.34
TORCHES
104275
9289400
1553.6585
ACCESSORIES
41.15-
CREDIT
104287
9997559
1553.6530
REPAIR PARTS
139.53
268278
1/13/2005
101526 THOMPSON, BETTY
36.08
ART WORK SOLD AT EAC
104195
010705
5101.4413
ART WORK SOLD
36.08
268279
1/13/2005
111339 THOMPSON, PHIL
80.60
ART WORK SOLD AT EAC
104192
010705
5101.4413
ART WORK SOLD
60.60
268280
111312005
101035 THORPE DISTRIBUTING COMPANY
Y
1/1212005 15:41:55
k
Page - 30
t
1
Business Unit
'DEER CONTROL
STREET LIGHTING ORNAMENTAL
FART CENTER REVENUES
:ART CENTER REVENUES
s
6
11
ii
BART CENTER REVENUES
r
'EQUIPMENT OPERATION GEN
"'EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
ART CENTER REVENUES
ART CENTER REVENUES
26.90 104135 359088 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING
4,768.80 104136 359087 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING
4,795.70
268281 1/1312005 101826 THYSSENKRUPP ELEVATOR CORP.
300.00 QUARTERLY MAINTENANCE 103973 83525 5511.6406 GENERAL SUPPLIES ARENA BLDG /GROUNDS
300.00
R55CKREG LOG20000
CITY OF EDINA
1/1212005 15:41:55
Council Check Register
Page - 31
117/2005
- 1/13/2005
Check # Date
Amount
Vendor / Explanation PO #
Doc No
Inv No
Account No
Subledger Account Description
Business Unit
268282 111312005
114701 TIME WARNER CABLE
50.62
JAN SERVICE
103974
122804
5511.6406
GENERAL SUPPLIES
ARENA BLDG/GROUNDS
50.62
268283 111312005
102742 TKDA ENGINEERS ARCHITECTS PLAN
796.87
CONSTRUCTION INSPECTION
103879
200400002391
10026.1705.21
CONSULTING INSPECTION
LS-26 LIFT STATION 14
796.87
CONSTRUCTION INSPECTION
103879
200400002391
10027.1705.21
CONSULTING INSPECTION
LS-27 LIFT STATION 15
796.87
CONSTRUCTION INSPECTION
103879
200400002391
10028.1705.21
CONSULTING INSPECTION
LIFT STATION #5
796.87
CONSTRUCTION INSPECTION
103879
200400002391
10029.1705.21
CONSULTING INSPECTION
LIFT STATION #13
796.87
CONSTRUCTION INSPECTION
103679
200400002391
10030.1705.21
CONSULTING INSPECTION
LIFT STATION HIGHLANDS LAKE
796.88
CONSTRUCTION INSPECTION
103879
200400002391
10031.1705.21
CONSULTING INSPECTION
LIFT STATION ARNESON ACRES
4,781.23
268284 1/13/2005
101693 TOTAL REGISTER
14.20
MONTHLY FTP FOLDER
104276
17741
5820.6160
DATA PROCESSING
50TH STREET GENERAL
14.20
MONTHLY FTP FOLDER
104276
17741
5840.6160
DATA PROCESSING
LIQUOR YORK GENERAL
14.20
MONTHLY FTP FOLDER
104276
17741
5860.6160
DATA PROCESSING
VERNON LIQUOR GENERAL
42.60
268285 1/13/2005
103163 TREUTING, KRISTEN
97.83
ART WORK SOLD AT EAC
104196
010705
5101.4413
ART WORK SOLD
ART CENTER REVENUES
97.83
268286 1/13/2005
103121 TURTLE BAY BUILDING SERVICE IN
985.13
JAN HOUSEKEEPING
104056
2971
5620.6511
CLEANING SUPPLIES
EDINBOROUGH PARK
985.13
268287 111312005
101360 TWIN CITY HARDWARE
2,445.00
BUILDING REPAIRS
103880
138319
1646.6180
CONTRACTED REPAIRS
BUILDING MAINTENANCE
520.00
REPAIR PARTS
103881
138828
1646.6530
REPAIR PARTS
BUILDING MAINTENANCE
2,965.00
268288 111312005
102266 TWIN CITY OXYGEN CO
120.50
OXYGEN
104277
806322
1470.6510
FIRST AID SUPPLIES
FIRE DEPT. GENERAL
120.50
268289 1/13/2006
100363 U.S. BANK
30.00
104278
010705
1470.6405
BOOKS 6 PAMPHLETS
FIRE DEPT. GENERAL
54.43
104278
010705
1470.6106
MEETING EXPENSE
FIRE DEPT. GENERAL
59.00
104278
010705
1470.6180
CONTRACTED REPAIRS
FIRE DEPT. GENERAL
86.95
104278
010705
1470.6558
DEPT UNIFORMS
FIRE DEPT. GENERAL
451.49
104278
010705
1470.6530
REPAIR PARTS
FIRE DEPT. GENERAL
R55CKREG LOG20000 CITY OF EDINA
Council Check Register
1/7/2005 — 1/13/2005
Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description
1.206.32 104278 010705 1470.6406 GENERAL SUPPLIES
268290
111312005
102513 U.S. FILTER CORPORATION
466.96
TANK FILTERS
103882
1365779
5511.6408
466.96
268291
111312005
101066 ,UNIVERSITY OF MINNESOTA
240.00
CEAM CONFERENCE
103975
010305
1240.6104
240.00
268292
111312006
102819 UNLIMITED SUPPLIES INC
431.86
ANCHORS, SCREW PINS
103913
04120711
1325.6531
431.86
268293
1/1312005
101908 US FOODSERVICE INC
356.35
FOOD
103976
33338277
5630.5510
356.35
268294
1/13/2005
100060 USPS
4,000.00
POSTAGE
104304
010705
1550.6235
1
4,000.00
268295
111312006
101058 VAN PAPER CO.
272.91
BAGS
103883
563301
5842.6512
156.87
DEICER, GLOVES
104279
562567
1551.6511
429.78
268296
1/13/2005
101060 VANTAGE ELECTRIC
524.00
LIGHT INSTALLATION
104280
18091
5620.6180
524.00
268297
1/13/2006
116104 VERDICON INC.
342.80
MAXI MELT
103914
5001903089.001
4090.6406
342.80
268298
1/1312006
101610 VERdON DIRECTORIES CORP.
90.75
DIRECTORY AD
103915
390009528758
5110.6122
90.75
268299
1113/2005
101063 VERSATILE VEHICLES INC.
414.68
RANGER CART PARTS
103916
17861
'422.6530
GENERAL SUPPLIES
CONFERENCES & SCHOOLS
SIGNS & POSTS
COST OF GOODS SOLD
POSTAGE
PAPER SUPPLIES
CLEANING SUPPLIES
CONTRACTED REPAIRS
GENERAL SUPPLIES
ADVERTISING OTHER
REPAIR PARTS
1/12/2005 15:41:55
Page- 32
` 'Business Unit
'FIRE DEPT. GENERAL
s
i
t
ARENA BLDG /GROUNDS
;PUBLIC WORKS ADMIN GENERAL
I
STREET NAME SIGNS
�CENTENNIALLAKES
`CENTRAL SERVICES GENERAL
yYORK SELLING
CITY HALL GENERAL
f;
P
�!EDINBOROUGH PARK
"STREET REVOLVING
:ART CENTER ADMINISTRATION
i
MAINT OF COURSE 8 ' INDS
R55CKREG LOG20000
Check # Date
Amount
Vendor / Explanation
103918
414.68
1553.6530
268300 111312005
CM11397WFOW
100023 VOGEL, ROBERT C.
104281
9,600.00
2005 CONSULTANT SERVICES
104305
9,600.00
1553.6530
268301 1/1312005
COST OF GOODS SOLD WINE
106320 WADE, SHELLEY
5842.5513
128.38
ART WORK SOLD AT EAC
5862.5513
128.38
VERNON SELLING
268302 1/13/2005
101223 WALSER FORD
258.97
WHEEL ASSSEMBLIES
211.44
SUSPENSION
407.79-
CREDIT
11.05
BUCKLE
36.23
BUCKLE ASSEMBLY
109.90
268303 1/1312005
115072 WELCH, HOLLY
125.90
ART WORK SOLD AT EAC
125.90
268304 1/1312006
103862 WERDIEN, COLLEEN
29.25
ART WORK SOLD AT EAC
29.25
268305 1/1312005
102100 WERRE, JIM
168.91
SHOE RETURN SHIPPING COST
168.91
268306 111312005
101033 WINE COMPANY, THE
1,160.55
104.00-
655.60
268307 111312005 101312 WINE MERCHANTS
265.66
1,135.08
1,319.85
CITY OF EDINA 1/1212005 15:41:55
Council Check Register Page - 33
117/2005 - 1/13/2005
PO # Doc No Inv No Account No Subledger Account Description Business Unit
103977 24015 1140.6103 PROFESSIONAL SERVICES PLANNING
104197 010705 5101.4413
103917
115940WFOW
1553.6530
103918
115080WFOW
1553.6530
103919
CM11397WFOW
1553.6530
104281
115882WFOW
1553.6530
104305
116003WFOW
1553.6530
104198 010705
104199 010705
104306 010605
103840 106892 -00
103841 106702 -00
104137 107365-00
104138 107363-00
104139 107362 -00
103842 113768
103843 113769
103844 113770
5101.4413
5101.4413
5440.6122
ART WORK SOLD
REPAIR PARTS
REPAIR PARTS
REPAIR PARTS
REPAIR PARTS
REPAIR PARTS
ART WORK SOLD
ART WORK SOLD
ADVERTISING OTHER
ART CENTER REVENUES
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
EQUIPMENT OPERATION GEN
ART CENTER REVENUES
ART CENTER REVENUES
PRO SHOP RETAIL SALES
5622.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
5822.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
5842.5513
COST OF GOODS SOLD WINE
YORK SELLING
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
R55CKREG LOG20000
Check 8 Date
Amount Vendor / Explanation
184.65-
1,164.45
6,978.00
455.18
CITY OF EDINA
Council Check Register
1!7/2005 - 1/13/2005
PO O Doc No Inv No Account No
103884 23033 5822.5513
104140 114207 5842.5513
104141 114206 5842.5513
104142 114208 5862.5513
104143 114205 5822.5513
Subledger Account Description
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
COST OF GOODS SOLD WINE
1/12/2005 15:41:55
Page - 34
Business Unit
50TH ST SELLING
YORK SELLING
YORK SELLING
VERNON SELLING
50TH ST SELLING
11,375.30
268308 1H3/2005 100591 WITTSTRUCK, MARTHA
94.90 ART WORK SOLD AT EAC 104200 010705 5101.4413 ART WORK SOLD ART CENTER REVENUES
94.90
268309 111312006
101086 WORLD CLASS WINES INC
1,138.25
103845
159447
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
645.00
104031
159713
5862.5513
COST OF GOODS SOLD WINE
VERNON SELLING
269.00
104144
159740
5622.5513
COST OF GOODS SOLD WINE
50TH ST SELLING
2,052.25
268310 1/1312006
100932 XCEL ENERGY
4,850.00
POWER/HOOKUP FEE
103978
4079 W 51 ST
10084.1705.31
MATERIALS /SUPPLIES
W 51ST & HALIFAX PED SIDEWALK
4,850.00
268311 111312006
101726 XCEL ENERGY
382.62
103787
1746737629357
5913.6185
LIGHT & POWER
DISTRIBUTION
5,005.27
103788
0322363655363
1551.6185
LIGHT & POWER
CITY HALL GENERAL
756.44
103789
0746597713364
5821.6185
LIGHT & POWER
50TH ST OCCUPANCY
1,084.41
103789
0746597713364,
5861.6185
LIGHT & POWER
VERNON OCCUPANCY
1,372.77
103789
0746597713364
5841.6185
LIGHT & POWER
YORK OCCUPANCY
1,524.24
103790
2163178392364
1628.6185
LIGHT & POWER
SENIOR CITIZENS
1,485.28
103791
2175962411363
5210.6185
LIGHT & POWER
GOLF DOME PROGRAM
71.89
103792
0113885804363
1322.6185
LIGHT & POWER
STREET LIGHTING ORNAMENTAL
141.82
103793
1281698281363
4086.6185
LIGHT & POWER
AQUATIC WEEDS
264.77
103794
0920152567363
1481.6185
LIGHT & POWER
YORK FIRE STATION
838.36
103794
0920152567363
1470.6165
LIGHT & POWER
FIRE DEPT. GENERAL
129.52
103795
0841469985363
5932.6185
LIGHT & POWER
GENERAL STORM SEWER
338.46
103796.
1159385995363
5422.6185
LIGHT & POWER
MAINT OF COURSE & GROUNDS
264.53
103797
1554936687363
6430.6185
LIGHT & POWER
RICHARDS GOLF COURSE
448.62
103798
2170773325363
5311.6185
LIGHT & POWER
POOL OPERATION
27,828.70
103799
1190923893363
1321.6185
LIGHT & POWER
STREET LIGHTING REGULAR
4,688.98
103800
1860198788363
1330.6185
LIGHT & POWER
TRAFFIC SIGNALS
15,798.47
103920
2212719485365
5511.6185
LIGHT & POWER
ARENA BLDG /GROUNDS
113.74
104282
0042688577363
5933.6185
LIGHT & POWER
PONDS & LAKES
3,206.02
104283
1124423268005
120.6185
LIGHT & POWER
CLUB HOUSE
R65CKREG LOG20000
Check r1 Date Amount
Vendor / Explarkatlon
85.746.91
286312 111312005
103684 XPEDX
1.190.40
LETTERHEAD PAPER
1.190.40
288313 1M312005
101091 ZIEGLER INC
345.00
JAN CONTRACT FEE
345.00
659.925.66
Grand Total
CITY OF EDINA
Council Check Register
117/2005 — 1113/2005
Pox Doc No Inv No Account No SuMedger Account Description
103885 N340841111 1550.6408
103979 E3809710
1551.6180
Payment Instrument Totals
Cheek Total 659.925.66
Total Payments 659.925.68
GENERAL SUPPLIES
CONTRACTED REPAIRS
1/1212005 15:41:55
Page - .35
Business Unit
CENTRAL SERVICES GENERAL
CITY HALL GENERAL
R55CKSUM LOG20000 CITY OF EDINA 1/1212005 15:49:13
Count Check Summary Page - 1
1172005 - 1113/2005
Company
Amount
01000 GENERAL FUND
235,885.06
02100 CDBG FUND
1,319.00
02200 COMMUNICATIONS FUND
15,508.02
04000 WORKING CAPITAL FUND
7,399.40
04800 CONSTRUCTION FUND
16,705.28
05100 ART CENTER FUND
11,076.35
05200 GOLF DOME FUND
9,187.96
05300 AQUATIC CENTER FUND
448.62
05400 GOLF COURSE FUND
10,904.60
05500 ICE ARENA FUND
30,666.33
05600 EDINBOROUGH/CENT LAKES FUND
10,973.13
05800 LIQUOR FUND
189,02*,44
05900 UTILITY FUND
95,136,56
05930 STORM SEWER FUND
23,636.45
07400 PSTF AGENCY FUND
2,051.46
Report Totals 659,925.66
We confirm to the hest of Our knowledge
and belief, that these claims
comply in all matmial respects
With the requirements of the City
of Edina purchasin8 'ides and
Procedures da 1 13
.sue
city
tip
To the Edina City Council
January 11 '`, 2005
Dear Members of the Council,
Having run for City Council this past year, I have watched the developments of the selection
process for Mayor Hovland's former seat with an obvious piqued. interest. Thus it was with a
sense of disappointment that I observed on the January 4h council meeting the Council did
not decide to move for, or vigorously discuss, a special election to fill the now empty council
seat.
I know that the task before you is difficult and that there. are few solutions a solid consensus
of Edina residents could agree upon. But an "either or" choice of appointing the third -place
finisher or an individual from among resumes submitted to City Hall are processes that,
however well - intentioned; will far more likely foster an atmosphere of distrust between the
Council and citizens. A special election, regardless of the outcome, is a fair. and decisive way
to circumvent such potential problems. A fifth council member decided by election is far
preferable than attempting to interpret the will of the voters by appointment.
We live in lean times and so I clearly understand the magnitude of what I suggest. Elections,
at any time, are not free and they are not cheap. For those of you who know me or heard
some of the messages of my campaign, you know that I do not take the spending of taxpayer
dollars lightly, but I can think of few better uses for our budget than to guarantee a City
Council of five elected representatives. While I appreciate the city sending me an application
for the council appointment, as well to as my fellow former council candidates, I feel I must
return mine with this letter of explanation. That is how strongly I feel that the.process chosen
is not the best for Edina.
I would highly urge you to reconsider your position on the selection process. A special
election is no small feat but neither should we shrink from its challenge due to concerns of
cost and time, weighty though they may be. You have the talents among you and your great
staff at City Hall to make such an even_ t happen. Please make the effort to do so; Edina
would be grateful and thankful for it.
Sincerely,
John S
4808 Hibiscus Ave
Edina, MN 55435
612- 799 -0742
Darlene Wallin
From: Jennifer Bennerotte
Sent: Tuesday, January 11, 200510:32 AM
To: Darlene Wallin
Subject: FW: City Council Elections
- - - -- Original Message---- -
From: crobb@mmn.rr.com [mailto:crobb@mn.rr.com]
Sent: Tuesday, January 11, 2005 10:24 AM
To: Jennifer Bennerotte
Subject: City Council Elections
Please send to City Mayor and all City Council Members:
It is my understanding that there is now a vacancy on the City Council. The position
should, of course, be filled by the person on the ballot.that received the most votes.
I understand that Ms. Alice Hulbert was the candidate who received the third most votes
and should therefore be placed in this position. The voters voted for her because of the
diversity she would bring to the council and because of her position on relavent issues.
As a voter who voted for her, I would expect that she would be named as an elected member
of the City Council automatically due to the election results. Ms. Hulbert should begain
holding office as soon as possible.
Thank you for taking action on this matter as soon as possible.
Cynthia L Robb
5337 Oaklawn Avenue
Edina, MN 55424
1
Darlene Wallin
From:
Jennifer Bennerotte
Sent:
Thursday, January 06, 2005 8:06 AM
To:
Darlene Wallin
Cc:
Gordon Hughes
Subject:
FW: Alice Hulbert
Importance: High
- - -- Original Message---- -
From: Nancy Kays [mailto:nkays@mn.rr.com]
Sent: Wednesday, January 05, 2005 10:01 PM
To: Jennifer Bennerotte
Subject: Alice Hulbert
Importance: High
Please distribute to all members of the Edina City Council:
Dear Mayor Hovland and City Council Members:
As a long -time resident of Edina, I am concerned that, so soon after the
November election, that some members of your council would debate or
question naming Alice Hulbert to fill Mayor Hovland's council seat. In
particular, have the two most recently elected members of your council
chosen to ignore the "voice of the people ?" With the third largest number
of votes, Alice Hulbert is the obvious candidate for this position,
according to Edina voters. Why, then, is there debate, when the same
residents who confirmed their support of Council members Masica and Swenson
at the polls also selected Alice Hulbert above all other candidates?
Clearly, there are far greater issues in Edina to resolve than Alice
Hulbert's qualifications, experience and deep dedication to serving Edina as
a member of the City Council. She has worked tirelessly on behalf of a
number of community efforts, and she will be a great asset to your .
organization. Isn't it time to put personal agendas aside and affirm the
vote of the people? Any other action would surely make a mockery of the
election process in Edina.
I urge your immediate consideration and action in this matter.
Sincerely,
Nancy E. Kays
1
Darlene Wallin
'rom: Jennifer Bennerotte
Sent: Monday, January 10, 2005 8:26 AM
To: Darlene Wallin
Subject: FW: appointment of Alice Hulbert
- - - -- Original Message---- -
From: jeromefmillerjr [mailto:jmiller2 @mn.rr.com]
Sent: Sunday, January, 09, 2005 7:18 PM
To: Jennifer Bennerotte
Subject: appointment of Alice Hulbert
Dear Mayor Jim Hovland and City Council Members,
I would like to see Alice Hulbert appointed to the City Council. Over 3000
voters in the recent election chose her. What she stands for is well known
in the community. To choose someone the voters have not had an opportunity
to hear and vote for would be undemocratic. I know Alice and am sure she
will work hard for our community.
Sincerely,
Jerry and Carol Miller
5808 Mait Lane
Edina 55436
1
;g
v
1 77777 �tt
`i���v
3
Z50 X
fit.
t
41 j
t q Y-t
,it-
asF
•.v.:
Yj•�
t
Page 1 of 2
Darlene Wallin
From: Jennifer Bennerotte
Sent: Friday, January 14, 2005 8:00 AM
To: Darlene Wallin
Subject: FW:
- - - -- Original Message---- -
From: Jim Gaasedelen [mailto:jim @usjet.net]
Sent: Wednesday, January 12, 2005 9:51 PM
To: jzwilling@mnsun.com
Cc: Jennifer Bennerotte
Subject:
To the editor:
According to a new ordinance just adopted by the city council, the Edina city council seat vacated by our new
mayor is to be filled by appointment. Despite a recent election, this seat is now open to anyone. To his credit,
Councilman Scott Housh, seems to be the only council member who cares about the will of the people. He
recommended to the council that the seat be given to the next highest vote getter from the election. All the other
members want to be able to appoint the newest member.
These are the questions that need to be answered by any city council candidate who did not run for this position
in our recent city election:
Where were you in September 2004 when you needed to sign up to run for the city council race?
Where were your yard signs and campaign buttons?
Where was you campaign literature that explained your positions on issues?
Where were your during the two debates that the League of Women Voters and the Morningside community held
in October for the purpose of allowing citizens to scrutinize all the candidates?
Why didn't you come forwarded to let the Sun Current editors interview you about your positions on key issues
and consider you for endorsement?
How many of your friends and supporters gave their time, efforts and money to keep your campaign running?
How.much time did you take away form your job and family in order to campaign?
How much shoe leather did you burn up walking the streets of Edina meeting and talking with voters?
How many doorbells did you ring in an attempt to get to know the citizens and garner their support?
If you didn't bother to come to the voters' front doors during the election, why would you expect now to be
appointed through the back door?
How many citizens voted for you? Did you get any write -in votes?
How much commitment have you shown to the voters?
Do you in fact believe that the citizens of Edina can be trusted to. vote for their elected officials?
Do you believe in the democratic process?
No excuses -where were you?
In a democracy the time to select the slate of candidates is before the election. If citizens are not happy with the
slate then they should encourage others to run. The outcome of the election is final. In a democracy our votes
count. To ignore the will and the wishes of the electorate belittles democracy itself. Shame on you, Edina City
Council! This is Chicago machine politics. I thought we lived in a nicer place than that.
(Signed)
James Gaasedelen
1/14/2005
MINUTES OF THE
%w,� Regular Meeting of the
p e t� Edina Transportation Commission
n o Thursday, November 18, 2004
Edina City Hall
4801 West 50th Street
Community Room
MEMBERS PRESENT:
Marie Thorpe, Jean White, Warren Plante, Joni Kelly Bennett, Les Wanninger
MEMBERS ABSENT:
Dean Dovolis, Fred Richards
STAFF PRESENT:
Wayne Houle, Steve Lillehaug, Sharon Allison
I. Call to Order
Acting Chair Wanninger called the meeting to order.
II. New Business
Bennett inquired about building renovations at 50th & France Avenue in the southwest
corner. Houle said the Planning Dept. has not received plans for this area. Discussion
ensued about how to fix the traffic problems in that area. Some ideas were to use the
�- building renovation as an opportunity, though this is not the normal course of action to
fix traffic issues; develop a partnership with the city of Minneapolis (there was a
partnership some years ago that did not pan out); calibrate semaphores (three
government agencies are responsible for semaphores); remove some parking spaces to
create left turn lanes (parking is limited on the Minneapolis side, while Edina has
parking ramp). The difference in adjacent land use to the Minneapolis side was noted,
with one side being residential while the other is commercial. The consensus is that
they need to find alternatives or solutions to the traffic problems that plague 50th &
France. Working with the Southwest Neighborhood Association was suggested.
Bennett said a resident has expressed frustrations with the project at Wooddale and
Valley View Road because of the potential closure of the intersections of Oaklawn Ave.,
W. 62nd St. and Brookview Ave. and not being notified. Houle said the intersections are
unsafe primarily for pedestrians and the city has not yet reached a decision about how
best to rectify the situation. Consultants are still gathering information for a
recommendation to the Council in December or January. Adjacent residents were
notified and surveyed about the potential changes based on those most likely to be
affected. Bennett also inquired about plans for redevelopment at the corner of
Wooddale and Valley View. Houle said there are no definite plans that he's aware of,
but the Planning Dept. would know more.
III. Old Business
<- a. Traffic Control Device Policies and Procedures
Lillehaug discussed the traffic safety issues that staff receives complaints about on a
daily basis from residents. The issues surround regulatory signing, warning signs,
guide signs, pedestrian crosswalks, pedestrian /bicyclist, and traffic speed and volume.
A part-time staff receives complaints, analyzes the situation and makes
recommendation to the complainant. Boyd Tate was recently hired to fill this position.
The Traffic Safety Advisory Board, made up of city staff (Engineering, Police, Planning
and Public Works) reviews staff recommendations and in -turn makes recommendations
to the Council on course of action. Lillehaug said some issues are deferred to the
Police or Engineering Dept and some will now be deferred to the ETC. Some issues
that the ETC can anticipate handling is finding traffic calming alternatives in lieu of
requested stop signs that are not warranted, etc.
Lillehaug reviewed stop sign policy, which includes the purpose of stop signs (all traffic
policies are listed on the web). The policy was developed using the Minnesota Manual
on Uniform Traffic Control Devices (MMUTDC), which was developed from national
guidelines and in authority with Minnesota statutes. Lillehaug said the purpose of stop
signs is to assign right of way at intersection, not to slow traffic speed like most people
believe. Bennett asked about the basket weave method. Lillehaug said if laid out
properly it could be effective. He also reviewed the myths of stop signs.
b. Sidewalk and Funding Policy and Master Plan
Lillehaug reviewed the current Capital Improvement funds available compared to what
is needed to fill in the missing segments of State Aid sidewalks. State Aid segments
completed this summer are Wooddale Ave., and W. 51St & Halifax Ave.; W. 70 St. is
scheduled for completion in 2005; W. 58th St. between Concord Ave. and Wooddale
Ave., Blake Rd. from Parkwood Rd. to Interlachen Blvd., and Valley View Rd. from
McCauley Tr. to Braemar Blvd are scheduled for 2005 -06. Lillehaug said for safety
reasons, boulevard style sidewalks are preferred over the curb style sidewalks because
there is space between the street and the sidewalk.
Wanninger stated that the school district is transporting students who live within the
walking distance because there are no sidewalks so this may be a good time to revisit
with them about installing sidewalks. Bennett said there are several issues to consider:
the district is operating at a deficit, start times are staggered so students will leave and
return home in the dark and crosswalks would be needed.
A copy of Lillehaug's presentations is available upon request.
c. Systematic Development of Informed Consent (Management Training)
Houle gave an overview of the basic principles of a management training seminar he
and Lillehaug attended regarding building informed consent. The seminar, titled Citizen
Participation: Building a Systematic Development of Informed Consent (SDIC), was
developed and presented by the Institute for Participatory Management and Planning
(IPMP). The emphasis is on getting project approval by building informed consent
amongst stakeholders. A copy of Houle's handout is available upon request.
d. Edina Traffic Task Force Report
Staff reviewed the six problem areas identified by the Edina Traffic Task Force in its
1999 report to the Council and the issues surrounding each area. The areas are as
follow:
2
• e Northeast: W. 50th St. & France Ave., north to the city limits and France Ave. over to
TH 100;
e Northwest: Parkwood Knolls Area; Artic Way/Tamarac Ave Area; and
Lincoln/Vernon Dr Area;
e Edina High School & Valley View Middle School Area;
e Community Center Area: Southview Ln and Concord Ave;
e W. 70th Street: from TH 100 to France Ave. and the residential neighborhoods south
of 70th St.;
e France Avenue: the area between Crosstown and TH 494 bounded by France Ave.
and York Ave.;
Staff was directed to develop a plan using the draft policy to rectify the issues identified
by the Task Force. Wanninger said this a test to see if the draft policy, as is, can
address any of the issues. A copy of the presentation is available upon request.
e. Legislative Policies, January 2005 Draft
Handout (copy available upon request).
Schedule of Upcoming Meetings
December 7n, 5:30 -7:00 p.m.: Joint Council /ETC in the Community Room
December 9th, 6:00 -8:00 p.m.: Open House in the Council Chambers
January 6th, 6:00 -8:00 p.m.: ETC consideration of public comments
Lillehaug said the press release announcing the comment period did not appear in the
Edina Sun as scheduled. Bennett said she is dismayed that the information has not
been made available to the public already.
IV. Approval of Minutes from October 28th
Correction on page 2: last paragraph, delete repeated paragraph, sentence beginning
with "Thorpe said..." and ending with "She said neighborhood versus..."
Correction on page 4: 4t" paragraph, delete `Bennett concerned..." and insert 'Bennett
is concerned that the method of publicity would not reach all residents."
Correction on page 5: delete 1St paragraph (repeated from page 4); 7th paragraph,
delete "...instead of assessing property owners. ".
A motion was made by Plante to approve the minutes with the corrections as stated
above. Seconded by Thorpe.
Meeting adjourned at 8:20 p.m.
3
CORRECTED MINUTES
A, MINUTES OF THE
Ow e �t4 Open -House Meeting
(Public Comment) of the
�y Edina Transportation Commission
Thursday, December 9, 2004
less Edina City Hall
4801 West 50th Street
Council Chambers
MEMBERS PRESENT:
Fred Richards, Marie Thorpe, Jean White, Warren Plante, Joni Kelly Bennett, Les
Wanninger, Dean Dovolis
MEMBERS ABSENT:
STAFF PRESENT:
Wayne Houle, Steve Lillehaug, Sharon Allison
Chair Richards called the meeting to order and thanked the residents for attending.
Commissioners and staff were introduced.
Chair Richards explained that the Transportation Commissioners were appointed by the
Council to address six issue areas and they developed a draft policy as a framework for
dealing with the issue areas and other such areas in Edina. He said the Commission is
advisory in nature and the Council will make all final decisions.
Chair Richards explained that the purpose of tonight's meeting is for the residents to voice
their concerns as they relate to traffic /transportation issues and the draft policy. Chair
Richards said the Commission will meet again on January 6th to finalize the draft policy for
Council's approval. Residents can continue to give feedback in writing until December 30tH
Lillehaug gave an overview of the draft policy, including the background, purpose, vision;
action plans: short and long term; sources of funding; process and schedule; criteria for
screening, etc. Lillehaug said approximately 70 emails and other correspondences have been
received to date.
Public Comments
Jennifer Bunkers, 4209 Scott Terrace
• Plan Development — be inclusive as possible; disenfranchisement based on one block
radius; burden shifting from one to another;
• Speed at which plan is being pushed through; terms such as impacted area not defined;
consistency of definition needed.
CORRECTED MINUTES
Mary Porter, 5120 Halifax Avenue
• Too much traffic; cut thru traffic is necessary to get from point A to point B;
• 50th & France at Halifax — intersection is blocked though posted signs state not to block
intersection; can only turn left onto France — why? Change timing of semaphores to
prevent backups;
• Applauded Commission for taking on the task.
Ken Bolinger, 3924 12th Ave. So, Minneapolis
• Travels through Edina for work; if Crosstown becomes a toll road he would use Edina's
local streets;
• Discrimination because he contributes to gas tax funds;
• Violations are due to lack of police presence; sees police presence in Edina.
J. C. Beckstrand, 4386 Wooddale Avenue, St. Louis Park
• Policy would limit voices of people;
• Neighborhood by neighborhood decision - making tears apart fabric of community;
• Sidewalks at Country Club side of 44th & Wooddale installed only after his daughter was
hit;
• Crosswalk requested but was not approved.
Julia Beckstrand, 4386 Wooddale Avenue, St. Louis Park
• Work together to make streets safe.
Laurine Ford, 3936 W. 44th Street
• Good vision statement, with the exception of closing streets with one block notification
area, arbitrary decision - making;
• Has learned to live with busyness of her street;
• Enforce the laws instead of closing streets.
• Major arteries need work.
Mary Rogers, 4215 W. 42 "d Street
• Has learned to live with her busy, cut - through street; no sidewalks;
• Use policy to unite the community, including Minneapolis and St. Louis Park;
• Do not pit neighborhoods against each other; consider' regional significance of
decisions.
Wendy Simpson, 4229 W. 44th Street
• A policy that.excludes residents' opinions will be detrimental;
• St. Louis Park's residents are her neighbors and she will speak on their behalf;
• Crosswalks are needed;
• Do not divert traffic; opposes street closings.
Molly Kapsner, 4221 Country Club Road
• Spent one year on Country Club Traffic Committee, looked at what would happen if
certain streets were cut off; should have looked at the region instead of neighborhood;
• Concerned with the 300 ft. minimum distance; inform area within surrounding arteries;
Jonathan Gross, 4208 Grimes Avenue
• Concerned about the negative definition of cut thru traffic;
2
CORRECTED MINUTES
• Did illustration of how he's impacted by cut thru traffic but this is necessary being a city
dweller; also used map to show all the areas where traffic cannot currently travel thru
due to various reasons (ponds, lakes, highways, etc.);
• Concerned about limited definition of study area;
• Methods listed for traffic calming actually restructure the roads;
• Volume control.
Tim Rudnicki, 4224 Lynn Avenue
• Commended Commissioners for work done, but more is needed;
• Does not harmonize existing city codes, land use, air quality, etc.
• Referring to "the properties" instead of to people reflects a disconnect;
• Shifting traffic creates burden for one and ease for others;
• Use police to reduce speeding;
• Process has been a failure because not publicized properly.
Brian Fogelberg, 4632 Bruce Avenue
• Good framework; good first step;
• Remediation /changes is included in policy;
• Neighborhoods north and south of 44th is for or against the plan;
• Draft policy creates an excellent forum;
• Impacted area should be looked at since many people are speaking about it.
Dolores Dege, 4012 Kipling Avenue
• Objects to limited area for impacted study;
• Objects to 'anyone requesting a study'; how many studies will be done;
• Reduce traffic at 50th & France by opening Bridge Avenue
• More education, polite drivers and enforcements;
• Lack of notice of public comment.
Mary Carte, 4208 Branson Street
• Policy has put into writing what is general practice already;
• Look at other areas in the city; do not allow a neighborhood to hijack the process.
Diana Cooper, 4005 Natchez Avenue
• Greatest concern is 50th & Wooddale: not safe for children biking, drivers goes through
the red and Xellow light every day even with police in the area;
• 42 "d and 44 are very busy and should be looked at closely;
• Lives on a high traffic street, many school buses;
• Concerned that driving her children to activities or school is seen as cut thru traffic;
• Country Club is getting surveyed while Morningside is not.
Hosmer Brown, 7104 West Shore Drive
• Do not stop the residents from commenting because they may have some good ideas;
• Need to move people quickly and safely "traffic calming may not be the issue ", look at
other options such as mass transit;
• Some areas already intense with traffic so try to limit land use that would exacerbate the
problem such as building high rises.
• Appreciate what the Commission is doing.
3
CORRECTED MINUTES
Brady Halverson, 4211 W. 44th Street
• Good start;
• Traffic volume vs. velocity; calming is needed; strike argument against volume and
residents will buy -in;
• People are always going to cut thru; Country Club area is appealing because there are
several ways to get thru.
• Moving volume from one neighborhood to the next is the major issue;
• More streets closed, worse congestion on arterials.
Penelope, 5000 Summit Avenue
• Keep in mind Interlachen and 50th; a left turn signal onto eastbound 50th would be
helpful;
• Cut thru traffic increasing on Interlachen as drivers tries to avoid Hwy. 100 when going
to Hopkins.
Allen Beers, 6045 Wooddale Avenue
• Traffic getting worse and worse;
• Lots of speeding and police is never around;
• Drivers failing to stop at stop sign at Wooddale and Valley View;
• New sidewalk made a difference, but still speeding.
Robb Webb, 4516 Drexel Avenue
• Likes that the policy puts neighborhoods as focus;
• Everyone wants to give input but traffic is mathematical; requires a traffic engineer to
figure out how to get traffic back on the arterials;
• Create threshold that defines a problem objectively. What is an appropriate amount of
volume? Need to collect and analyze data to state objectively that there is a problem;
need to determine an appropriate amount.of volume on street;
• Concept of living in the city near other cities so must deal with traffic;
• Concerned about voting instead of analyzing traffic data;
Bright Dornblaser, 4630 Drexel Avenue
• Very clear and necessary for Edina to work on this issue;
• Put emphasis on collectors streets first instead of neighborhoods streets;
• Emphasis on calming devices vs. volume; would be less concerned about volume if not
for speed;
• Supports what has been done thus far.
Art Heim, Highland Neighborhood
• Moving traffic on 50 going ng east is a big concern, maybe no left turn at Halifax;
• Minneapolis uses directional arrows to discourage turning on certain streets;
• Roundabouts are accident prone;
• Traffic problems are not going away, getting worse;
• Traffic not worse in Country Club than in other neighborhoods;
• Favors speed bumps.
David Farmer, 4612 Casco Avenue
• Created a toolbox to solve traffic issues — good first step;
• Quantifiable traffic numbers identifies problems such as speeding;
• Lacking in the definition of impacted area;
4
CORRECTED MINUTES
• Inconvenienced —try to quantify what this will mean;
• Great framework overall;
• Significant diversion not defined.
Mark Johnson, 5007 Arden Avenue
• Disappointed because he found out about meeting on the local news;
• Continue to hold forums, but not in the media.
Roberta Castellano, 4854 France Avenue
• France Avenue is a bottleneck at certain times of the days;
• Drivers use alternative routes because of bottleneck;
• Problem will continue as population increases;
• All drivers here tonight; we are someone else's perceived nuisance;
• All seems to tolerate amount of traffic but speeding seems to be an issue;
• Impacted area — be more inclusive.
Lee Marks, 4602 Arden Avenue
• Streets were designed 100 years ago and are no longer adequate;
• Changes will not happen overnight;
• Disappointed in residents' behavior in meetings such as Morningside and Country Club
pitting against each other; references made to process being a failure, us vs. them, an
eye for an eye attitude;
• Policy takes the emotion out of the process; it is fact based; includes all the options;
working within confines of available tools;
• Appears to be objective, takes out subjectivity.
Tom Steel, 5057 Ewing. Minneapolis
• Not understanding or ignoring traffic signs is a law enforcement issue; increasing fines
will get their attention;
• People living closest to impacted area should have more say than someone living say a
mile away;
• Language of property vs. people: the changes stays with the property long after the
people are gone;
• Notification of meeting: medium used seems to be quite effective based on attendance
tonight.
Chris O'Brien. 4627 Drexel Avenue
• Have friends in many areas that are having problems;
• Freeways are getting worse; 2 lane highways causes people to cut thru local streets to
avoid congestion;
• Speed /volume are both problems, not separate.
Helen Burke, 4246 Grimes Avenue
• Read letter on behalf of her daughter, Julia Silvis
• Definition of cut thru traffic is too flimsy and subjective; improve efficiency of legitimate
traffic;
• Include as many opportunities for public disclosure and debate;
• Serve the needs of the entire city rather than those of one (vocal) neighborhood.
5
CORRECTED MINUTES
Chair Richards thanked the residents for participating., and told them that their comments will
be taken into consideration. He assured them that citizens' input is very important, however,
this does not mean that their input will always be adhered to. He said it is obvious they need
to revisit the definition of impacted area and he emphasized that the Commission is not
proposing street closures — this is listed as one of the options available.
Residents were reminded to continue to submit written comments until December 30th. The
next Transportation Commission meeting is scheduled for January 6th. Regular meetings are
held the 4th Thursday of each month, 6:00 -8:00 p.m. in the Community Room and are open to
the public.
Meeting adjourned.
Rep. Ron Erhardt's
2005Session Questionnaire
Many issues will be debated during the upcoming session and your thoughts are important
to me. Please complete this questionnaire and add any comments you might have on these
or other issues. When you're finished, fold the questionnaire so that.my address shows, staple
or tape it closed, affix a stamp and put it in the mail. Thank you for your feedback and the privilege
of representing you in the Minnesota House of Representatives.
1. Once again, the,State of Minnesota will be facing a budget shortfall - approximately $1.7 billion. To
make up the deficit, should lawmakers:
A. Cut state spending A
B. Raise taxes B
C. Utilize a combination of spending cuts and tax increases C
D. Other (specify) D
2. If you support raising taxes to balance the budget, which tax would you prefer be raised:
A.
Property taxes
B.
Income taxes
C.
Sales tax
D.
Other (specify)
3. Over the next 22 years, the Minnesota Department of Transportation estimates it will require $21
billion in new money for construction needs in the metro area alone. To provide this money, should
the Legislature:
A. Raise the gas tax
B. increase license tab fees
C. Other (specify)
4. Under current law, the State of Minnesota will spend over $12 billion - nearly 40% of the state's
total budget - on K -12 education in 2006 -2007. Do you think that the state is:
A. Not spending enough on K -12 education
B. Spending too much on K -12 education
C. Spending about the right amount on K =12 education
5. What do you believe is the best solution to traffic congestion in the southwest metro area?
A. More highway capacity
B. More transit options
C. Both more highway capacity and more transit options
D. Other (specify)
6. Considering the following issues, which should be a top priority at the Capitol this session?
A. Increasing K -12 education funding
B. Increasing funding for transportation
C. Cutting taxes
D. Eliminating the state's budget deficit
E. Other (specify)
Questions, Comments or Suggestions
If you would like a copy of the survey results, please provide your name and address below.
Name Phone
Address —
A
B
C
D
A
B
C
D
A
B
C
D
A A
B B
C C
A A
B B
C C
A
B
C
D
A
B
C
D
E
A
B'
C
D
A
B
C
D
E
USPS will
not deliver
without I st
Class Stamp
Rep. Ron Erhardt
591 State Office Building
100 Rev. Dr. MLK, Jr. Blvd.
St. Paul, MN 55155 -1298
Contact Rep. Ron Erhardt
With your questions, comments and suggestions
At the Capitol:
591 State Office Building
100 Rev. Dr. MLK, Jr. Blvd.
St. Paul, MN 55155 -1298
(651) 296 -4363
At Home:
4214 Sunnyside Road
Edina, MN 55424
(952) 927 -9437
E -mail:
rep. ron. erhardt @hous e. mn
9£b99 AJW 'UUipg '3312=1 XgSIa}I OZ£S "Sealy, `�ooW fined `aauiuiwoD iaalunIOA T 1419 041 Aq lo3 pied pue paiedwj
3SN3dX3 .LAIMNMA00 IV ad. N111d .LORI
OEEI. -7Z7S5 NW VNIQ3
1S HiOS M 1087
juaptsa8 - ua.ljn3 jo
1NNIS38
E10
IIIIIIIIIIIIIIIIIIIIIIII ,IIIIIIII V III V III IIII IIIIIIIIII III
)1IQ Io;ideo
QIVJ
ORMSod'S'fl
GIs IldslId
86ZI-99199 1\ W `invd 'IS
'PAig Uf `` rI R 'IQ 'AaZt 001
Suipling 33330 ajujS 169
jp.ivq.i:j uo-d •dall
Y
January 10. 2005
Dear Mroule�
Our den wo�Ake to thank you f or taking the time to teach 'us
about Civil Engineering Vr%:really enjoyed -the tour at Ci "y Hall.
Some of the highlights�ifor us were learning more about. the
Robot Surve tr�e.wh*ch tQ ht us more about wha# a;;
Y> ,
Civil Engineer actually doffs, and-the opportunity fora few of us
to get to see an aerial shot of our homes on the computer. We
also want to thank t6-6th er man who helped you with the tour.
We apologize that we have forgotten his:name. One of the goals
in Scouting is to make this world a bettP ' place'- we appreciate
your. work in helping us strive for that goah�
Sincerely,
� del" M �✓2�, �lZ��c U�
Two &SOSOtIls '-:� C-K.
INDEPENDENT SCHOOL DISTRICT 273
Regular Meeting, January 10, 2005
Room 349, Edina Community Center
AGENDA
Determination of Quorum and Call to Order
Approval of Minutes of Meeting of December 7, 2004
Approval of Minutes of Special Meeting of December 8, 2004
Approval of Minutes of Special Meeting of December 17, 2004
HEARINGS OF INDIVIDUALS, DELEGATIONS, AND PRESENTATION OF PETITIONS
FROM THE PUBLIC REGARDING ITEMS BEFORE THE BOARD FOR ACTION OR ON
ANY OTHER ISSUE ( *SEE ATTACHED DETAIL)
PRESENTATION
➢ National Urban Alliance (NUA) Learning Strategies — Valley View Middle School
REPORTS
➢ Sabbatical Leaves — Kit Olson, Social Studies Teacher, Valley View Middle School;
Nancy Roberts, Speech Clinician, Cornelia Elementary School; and Dr. Kay Wagner,
Art Teacher, - Cornelia and Countryside Elementary Schools
➢ BRRRG Committee — Brian Hedberg, Board of Education; and Dr. Kenneth Dragseth,
Superintendent
➢ Legislative Initiatives — Dr. Dragseth and Laura Tueting Nelson, Director of
Communications & Public Affairs
ACTION
268 Annual Election of Chairperson of the Board of Education
269 Annual Election of Officers
270 Reaffirmation of Policies
271 Designation of the Official Newspaper
272 Designation of Depositories
273 Signatories on General and Building Bonds 2005 Accounts
274 Delegation of Authority to Make Electronic Funds Transfers January
2005 through December 2005 1
275 Designation of Responsible Authority and Designation of Data
Practices Compliance Officials
276 Personnel Recommendations
277 Expenditures Payable on January 10, 2005, appended
278 Structural Balance
279 Master Agreement — Independent School District 273 and the Edina
Administrative Council 2005 -06, appended
280 Salary and Benefit Recommendations for Controller for 2005 -06
EM
487 -489
490
491 -495
496
M.
281 Gymnasium Agreements with City of Edina, appended
CONSENT
498
282
Community Education Services Personnel Recommendations,
499
283
Lease Amendment to Lease Agreement with The Works
500
284
Commendation of National Board Certified Edina Teachers
501
285
Commendation of Jeff Krause and Kristy Lehman
502
286
Commendation of Edina High School 2004 -2005 Girls' Tennis Team
503
287
Commendation of South Suburban 2004 -2005 Adapted Soccer Team
504
— The PI Flyers
288
Commendation of Edina High School 2004 -2005 Girls' Cross Country
505
Individual,
289
Commendation of Edina High School 2004 -2005 Boys' Cross Country
506
Individuals
290
Commendation of Edina High School 2004 -2005 Girls' Swimming and
507
Diving Team
291
Gift from Karen Heine
508
292
Gift from Dr. Charles and Mrs. Bert Ledder
509
293
Gift from Amon and Rebecca Johnson
510
294
Gift from Edina Education Fund
511
295
Gift from Edina Football Association
512
296
Gift from Edina High School Varsity Cheerleading Team
513
297
Gifts to Early.Childhood Special Education
514
INFORMATION
298 Expenditures Payable on December 20, 2004, appended 515
299 Bond Fund Expenditures Payable on December 22, 2004 516 -517
300 Bond Fund Expenditures Payable on January 6, 2005 518 -519
301 Electronic Fund Transfers for the Period Ending December 31, 2004 520 -522
302 Enrollment as of December 17, 2004 523
303 Recognition of Staff 524
Adjournment
*Persons who wish to address the Board are requested to complete and submit an appropriate form to the Board
Secretary prior to the designated hearing time. When recognized, each individual shall identify himself /herself
and the group represented, if any. He /She shall then state the reason for addressing the Board and shall be
limited in time at the discretion of the Board Chair. Individual employees of the School District or representatives
of employee organizations shall have utilized administrative procedures before making a request to address the
Board.
d .
Metropolitan Council
Building communities that work
Environmental Services
January 2005
By the year 2030, our region is expected to grow by nearly 1 million people.
The Metropolitan Council has prepared a draft Water Resources Management Policy
Plan that lays out when and how regional sewer service will provide. to the planning
areas identified in the 2030 Regional Development Framework. In addition, the new
policy plan contains policies and implementation strategies pertinent to water supply,
surface water management, and other wastewater issues.
A brochure summarizing the Water Resources Management Policy is enclosed. A copy
of the complete plan may be obtained online at www.metrocouncii.org or by calling the
Council's Data Center at 651 -602 -1140.
We would very much like your feedback on our plan. To comment on it, you may do any
of the following:
•. Testify at our public hearing at 2 p.m. Tuesday, February 8, in the Council Chambers.
You may register to speak by calling the Data Center at the number listed above.
Submit written comments by mail, e-mail at data .center(a),metc.state.mn.us., or fax to 651-
602 -1464.
• Call our Public Comment Line at 651- 602 -1500. .
The public record will remain open until 5 p.m. February 18, 2005.
Sincerely,
William Moore
General Manager, Environmental Services Division
WM:js
Enclosure
www.metrocouncd.org
Metro info Line 602 -1888
230 East Fifth Street - St. Paul, Minnesota 55101 -1626 - (651) 602 -1005 - Fax 602 -1138 - TIY 229 -3760
An Fqual Opportunity Employer
economic vitality
Water and the region's
economic vitality
Three majestic rivers. Nine - hundred and fifty
lakes. Extensive wetlands. A 1,000- foot -deep
aquifer system. The Twin Cities metropolitan
area is blessed with abundant water
resources. Water is fundamental to the
region's economic competitiveness. The
abundant water resources here are critical to
commerce and industry, create a quality of
life that attracts highly skilled workers, and
support a thriving tourism industry. When
many places around the U.S. and the world
are facing actual and potential water
shortages, this region offers its residents a
reliable supply of high quality water from
within its seven -county border.
Nonetheless, the region cannot afford to be
complacent or careless about its water
resources. The Metropolitan Council projects
that the region will grow by 471,000
households, nearly one million people and
563,000 jobs between 2000 and 2030. Wise
stewardship of our resources is required.
The Council's commitment to environmental
stewardship is translated into the policies and
implementation strategies contained in its
updated Water Resources Management
Policy Plan (Water Plan). The Council will
continue to provide high quality, affordable
wastewater collection and treatment services
while guiding growth in a manner that
protects water resources. The Council will
also identify water supply and water quality
challenges, and address them by working
with all interested partners.
One of the Council's primary strengths is its
regional perspective, which takes into
account the interrelationships of land use,
growth patterns, transportation and other
regional services, and water resources use and
protection. This integrated perspective is the
foundation of the Council's 2030 Regional
Development Framework, from which the
new Policy Plan evolved.
Ensuring a plentiful water supply
Regional water demand in 2004 totaled more than 1.3 billion gallons per day.
That will only grow along with the region's economy and population. In addition,
increased development creates more impervious surface (e.g., pavement and
rooftops), decreasing the opportunity for groundwater recharge during rainfall
and snowmelt. Water supply may also be threatened by competing demand
between groundwater withdrawal and surface water protection; drought; and
aquifer contamination.
The Council proposes, working with its regional partners, to develop a comprehen-
sive water supply planning framework to evaluate water resources and plan for their
efficient use. Currently most supplies are developed without an assessment of the
potential impact on other users or natural resources. Furthermore, water supply
capital investments are typically based on local interests without looking at regional
interests. No funding mechanisms exist to support water supply research and
planning projects that meet local needs while also providing regional benefits. A
planning framework is needed, and the Council will take an active role in
developing it. The Council will also continue to review local water supply plans,
facilitate inter - community task forces, promote conservation, and investigate
reusing wastewater effluent.
preserving
Preserving wastewater capacity for
regional growth
The metropolitan wastewater collection and treatment system is critical to the region's
future development. To keep costs within reason, metropolitan service is focused on the
urbanized area of the region. In order to accommodate its projected population growth,
the region in the next 25 years will need to invest $3.7 billion to maintain, replace and
expand its wastewater treatments facilities, including interceptors and treatment plants.
A. major threat to the efficient use of existing and planned wastewater infrastructure is
infiltration and inflow (I /I) of clear water into wastewater conveyance pipes, especially
during major rainfall events. The updated Water Plan details how the Council will
work closely with communities to reduce I/I to reasonable amounts so that the system
continues to have adequate capacity to serve future growth. The Council will:
• Establish I/I goals for all communities discharging wastewater into the
metropolitan disposal system.
• Require communities served by the metropolitan disposal system to include an
I/I reduction program in their comprehensive plan.
• Potentially limit increases in service to communities with ongoing excessive I /I.
• Starting in 2007, institute a surcharge program to provide funding for I/I
reduction efforts.
Starting in 2013, institute a demand charge for communities that do not meet
their I/I goals.
Another policy change is that the Council will consider acquiring and operating local
wastewater treatment plants in rural growth centers where the community requests it
and enough growth is projected to make Council involvement economically feasible.
The plan establishes criteria whereby the Council can evaluate such requests, and also
outlines circumstances where the Council might share the costs with local communities
of system improvements.
Protecting the quality
Of water
The updated Water Plan puts an
increased emphasis on control of
nonpoint source pollution — urban and
agricultural runoff. The U.S.
Environmental Protection Agency
estimates that more than 90 percent of
the pollution of the nation's waterways
is from nonpoint sources. Point source
controls alone cannot adequately begin
to address the pollution attributed to
nonpoint sources.
The Water Plan proposes that if the
surface water management section of a
community's local comprehensive plan
lacks a strong emphasis on managing
nonpoint source pollution, the Council
could find the local plan to be inconsis-
tent with regional policies. Such a
finding, called a "system impact," would
require modification of the local plan.
The Council will continue to work in
partnership with local governments,
watershed organizations, and other
public and private entities on a variety of
efforts to reduce nonpoint source
pollution, including:
Ongoing monitoring of water
quality in the region's lakes, rivers
and streams.
• Technical assistance to help the
Council's partners institute best
.management practices that reduce
stormwater runoff, prevent erosion
and flooding, and maintain or
improve water quality.
• Review of local comprehensive
plans, watershed management
plans, local surface water manage-
ment plans, environmental permits
and other documents to ensure that
communities are fulfilling their
nonpoint source pollution reduc-
tion requirements and therefore
reducing the impacts on the
region's wastewater system.
JIM SPARROW
5301 Oaklawn Ave. — Edina, MN 55424
(952) 925 -4736 —jamesspaffow@aol.com
Dear Edina City Council Member:
The purpose of this letter is to make you aware of my position on the proposed curb /gutter street "improvements" for my
neighborhood.
I am against this idea for the following reasons:
Financial/Economic - There are literally hundreds of better ways I can think of to spend $10,000 of my money. College
savings for my three children would be high on the list. While my lot may be classified as a "problem area" for water runoff,
after a rain I get debris on the edge of my yard on 53rd street, this requires about 10 minutes of maintenance time to rake and
bag. While I consider this a nuisance, if the alternative is to shell out $10,000, I'm happy to put up with it.
Aesthetics - In my view, curbs would detract from the charm of the neighborhood rather than enhance it. Of the items under
consideration, I find more tasteful lighting to be the least objectionable.
Democratic — I don't believe it is what the majority of affected neighborhood homeowners want. Whether the compiled
surveys you receive will reflect this I don't know. I do think however, that if you are going to compel homeowners to pay
$10,000 for a project, you should be certain it is something the majority of them desire after full disclosure of the total costs
involved. I would prefer a referendum that could be voted upon by affected residents, but I presume this would be too costly
for the city to administer.
Thank you for your consideration. I hope you will act rationally and vote down this proposal since is not in my best
interests, nor in the best interests of the majority of my neighbors.
Sincerely,
/m Sparrow
A digest of actions taken by the Metropolitan Council, Metropolitan Airports Commission, Metropolitan Parks & Open Space
Commission and Metropolitan Sports Facilities Commission.
Minutes of all Council and Commission meetings are filed with
the Legislative Reference Library, 645 State Office Building,
6th Floor, in St. Paul for a period of up to two years and can be
viewed by the public. Call the appropriate commission or operations area for meeting information and/or specific questions.
Metropolitan Council
ne Metropolitan Council is located at Mears Park Centre, 230 E. Fifth St., St. Paul, MN, 55 10 1. For further information
regarding the contents of this publication, contact Pat Curtiss
at (651) 602 -1390. The Council's general number is (651) 602 -
1000, TDD: (651) 291 -0904. Recent Council publications can be found at major public libraries in the Metro Area.
Publications can be ordered by e-mail. The address is: data.center@metc.state.mmus Comments can be made to that address as
well. as (651) 602 -1500, the �Netro Council Public Comment Line. Check the internet web site at'kUp.11www.me1rocounciLorg.
The Council... -
• approved the cooperative agreement
between Hennepin County and Three Rivers
Community Development
Park District (Suburban Hennepin Regional
I'ark) and released applicable restrictive
• authoriied the Regional Administrator to
covenants on park land subject to approval
execute the 2(104 -2008 Regional Parccl Data
of un agreement by I Icnnepin County, Thrcc
Sharing Agreement and accompanying
ltivers Park District, and the cities of
license with each of, the r+cvcn Mctro Arcn
Dayton and Champlin
countics crlabling 111C Council to uNC the
• upprovcd the use of earned administrative
data.
fcc reserves from the Section 8 Program to
• ticsignntcd the (:11S.Munagcr as the
provide $40,000 grant funding to support
"Authorized Representative- liar the
the work of the llousingLink, an affordable
Council.
housing information and referral service.
• designated the GIS Manager to execute the
license to distribute the data to other
Environment
organizations.
• approved the land exchange to convert no
• approved the Comprehensive Sewer Plans
more than 38.5 acres of Cottage Grove
(Tier In for the Cities of Edina, Falcon
Ravine Regional Park for joint Cottage
Heights, Farmington and South St. Paul.
Grove/Washington County public service
• authorized the Regional Administrator to
..
center in exchange for an equal amount of
execute an extension to the license
land northeast of the existing park.
agreement to utilize MCES property near
boundary, and release the restrictive :
the Seneca Plant, between Tree Trust and
covenant on those acres removed from
the Metropolitan Council through December
Cottage Grove Ravine Regional Park
31, 2009.
subject to approval of the Attachment 4
• authorized the Regional Administrator to
agreement by Washington County and the
issue purchase orders to Nalco Company to
City of Cottage Grove
provide CE45115 Polymer to the Blue Lake
• authorized a grant of $150,000 to the
Plant at a unit price of $0.888 per pound,
Minneapolis Park and Recreation Board for
and. to Polydyne Incorporated, to provide
the,49th Avenue-trail development project
Clarifloc CE -600 Polymer to the Seneca
in North Mississippi River Regional Park.
Plant at a unit price of $0.82 per pound.
ME, TR�O DIGEST'
• authorized its the Regional Administrator to
negotiate and execute a Professional
Services Contract for Design and
Construction Phase Engineering Services
with Howard R. Green Company for design
and construction services for Rosemount
Interceptor Pumping Stations
• adopted the draft Water Resources
Management Policy Plan for public hearing
purposes.
• authorized its Regional Administrator to
negotiate and execute an engineering
services contract with lioncstroo, Rosenc,
Anderlik and Associates for the Facility
Planning for Victoria Area Interceptor
Improvements
• authorized its Regional Administrator to
negotiate and execute an engineering
services contract for facility planning,
design, and construction support services for
the Chaska L71 Lift Station Replacement
project with Bonestroo Rosene Anderlik &
Associates for $834,707.
Management
• approved Resolution 2004 -55 adopting the
Metropolitan Council's 2004 Tax Levy for
General Purposes
• approved Resolution 2004 -56 adopting a
2004 Tax Levy for the Livable Communities
Demonstration Account in the Metropolitan
Livable Communities Fund
• approved Resolution 2004 -57 adopting a
2004 Tax Levy for the Tax Base
Revitalization Account in the Metropolitan
Livable Communities Fund
• approved Resolution 2004 -58 certifying
2004 Tax Levies for Debt Service on Future
Transit and Park Bonds
• approved Resolution 2004 -59 adopting the
Metropolitan Council's 2005 Unified
Operating Budget
• approved Resolution No. 2004 -60 adopting
a 2004 property tax levy, payable 2005, of $
2,803,379 for the purposes of the
Metropolitan Right -of -Way Acquisition .
Loan Fund
• approve Resolution 2004 -61 adopting the
2005 -2010 Capital Improvement Program
and 2005 Capital Program and Budget
• finds it is necessary for the Management
Committee to meet with its attorneys in
confidential settings to preserve the
attorney - client privilege; and for the specific
reasons stated, finds it is in the public .
interest to discuss in closed meetings
pending and imminent litigation anti
iietllement ignuetl rented to Iminunal injury,
workers' compensation, cmploymcnt and
other types ol'claims asscrtcd against the
Council
• . approved holding, at the dates, times and
places indicated on the Meeting Schedule,
Litigation Review Special Committee
meetings that will be closed to the public to
discuss attorney - client privileged matters
related to pending and imminent litigation
and settlement issues.
• approved the Minnesota State Auditor's
Management and Compliance Report for the
Metropolitan Council for the year ended
December 31, 2003 which was presented to
the Audit Committee on September 9, 2004.
• finds it in the public interest to discuss labor
negotiation issues in closed meetings of its
Management Committee and (2) approved
holding, at the times and places indicated on
the meeting schedule, Management
Committee meetings that will be closed to
the public pursuant to the Minnesota Open
Meeting Law
• approved a revision to the Council's
Investment Policy (3-4 -4) changing the
composition of the Investment Review
Committee
• adopted schedules for its regular 2005
Council and Committee of the Whole
meetings,-subject to cancellation or
adjustment of time and place as determined
by the Chair and specified in the notice for
each meeting..
• authorize the Regional Administrator to
execute a contract with En Pointe
Technologies to provide maintenance and
other related services for Council -owned
desktop computer equipment and printers
for a period of three years
• authorized renewal of the Property
Insurance with our current carrier, FM
Global, effective 1/1/05 - 12/31/05.
Transportation
• concurred with the Transportation Advisory
Board's action to amend the 2004 -2006 TIP
by adding SP# TRF 7209 -04, Twin Cities
Linnea Homes and SP# TRF 0659 -04 East
Side Neighborhood Services Bus Purchase.
• authorized the Regional Administrator to
negotiate and execute a contract amendment
with URS Corporation (the Hiawatha
Project Management Consultant), to adjust
the contract duration from December 31,
2004 to June 30, 2005
• authorized the Regional Administrator to
execute a Supplemental Agreement to the
Design/Build contract between Minnesota
Department of Transportation (MnDOT)
and Minnesota Transit Constructors
(MnTC), for the release of the balance of
the Shared -Risk contingency fund.
• , authorized the Regional Administrator to
execute a contract amendment with
Northeast Suburban Transit (a Minnesota
joint powers commission) to provide
regular route transit services in the
Maplewood, White Bear, Mahtomedi,
Oakdale and Landfall areas from January 1
to December 31, 2005, in an amount not to
exceed $358,643.00. for the term
• authorized the Regional Administrator to
negotiate the potential purchase of the
Ragstock property at 830 North Seventh
Street for property to construct another
garage facility near the existing Heywood
Garage.
DIGEST
• authorized the Regional Administrator to:
1) execute a renewal of a four -year U Pass
Agreement with the University of
Minnesota for student participants and,
2) execute a renewal of a four -year
Metropass Agreement with the
University of Minnesota for staff and
faculty participants.
• accepted the report on the Public Hearing
held September 27; 20Q4 on the Draft
Transportation Policy Plan
• adopedt Resolution No. 2004 =54 authorizing
the Adoption of the 2030 Transportation
Policy Plan as amended.
• approved the reallocation of up to $120,000
from the authorized Van Pool Employer
Contribution Match Program to the VanGo!
regional van pool program, covering a
period from December 1, 2004, to
December 31; 2005.
• authorized the Regional Administrator to
enter into an interagency cooperative
agreement with the Northstar Corridor
Development Authority to enable Metro
Council to provide certain staff resources
and to be reimbursed for same in support of
the Northstar Commuter Rail Project in
2005.
The Council Also:
• presented a Regional Leadership Award to
Representative Ron Abrams
• approved Resolution 2004 -63 recognizing
the contributions of Council Member Tom
Egan
New Publications
Council publications are available from the
Council's Regional Data Center. For a free
and complete list of publications, write the
Metropolitan Council Data Center, 230 E. Fifth
St., St. Paul, MN 55101, or call (651) 602 -1140.
E -mail address is: data. center@metc.state.mn.us
There is a charge for some publications.
TR�O
.ME DICiEST
The bimonthly Council Directions newsletter Council Directions at no charge, call Dawn
provides information on regional issues and Hoffner at (651) 602 -1447.
Council Programs. If you wish to subscribe to
Metropolitan Commission Activities
Metropolitan Airports Commission
Metropolitan Airports Commission offices are located at
6040 28th Av. S., Minneapolis, MN 55450. For more
information, call Lynn Sorensen at (612) 726 - 8186.'
The Commission
There. is no report this month; activities will be
included in the next Digest
Metropolitan Parks & Open Space
Commission (MP &OSC)
Metropolitan Parks & Open Space Commission offices are
located at Mears Park Centre, 230 E. Fifth St., St. Paul,
55101. For more information, call Sandi Dingle at (651)
602 -1312.
The Commission:
• recommend that the Metropolitan Council
approve.the expansion of the boundary of Spring
Lake Regional Park Reserve to include
approximately 50 additional acres of Mississippi
River island property
• recommended that the Metropolitan Council
consider reimbursing the City of St. Paul up to
$989,000 for three regional park capital
improvement in'a future regional parks capital
improvement program
•
Metropolitan Sports Facilities Commission
(MSFQ
Metropolitan Sports Facilities Commission offices are
located at 900 South 5th St., Minneapolis, MN 55415. For
more information, call Nancy Matowitz at (612) 335 -3310.
There is no report this month; activities will be
included in the next Metro Digest
®s 5kv-c t
14(614U(cHTED /STR /KECC0- foP%
04SED oaJ •7:C. REcoM•N E,0 M71*V.S
�RO�I 11 �loS 46'ET1Af
H j A) (o APE v U 1 14RC
I(NcL"Ueo A5 N o ff N
°T
wig> Mirot.
CITY OF EDINA
TRANSPORTATION COMMISSION POLICY
•
•
•
FINAL DRAFT - January 6, 2005
-Edina Transportation Commission recommended the FINAL
DRAFT on January 6, 2005 for City Council consideration.
-Edina City Council action taken on
CITY OF EDINA
TRANSPORTATION COMMISSION POLICY
FINAL DRAFT - January 6, 2005
Contributors:
Transportation Commission
Joni Kelly Bennett
Dean Dovolis
Warren Plante
Fred Richards (Chair)
Marie Thorpe
Les Wanninger
Jean White
Steven L. Lillehaug, P.E., Traffic Engineer /Assistant Engineer
Wayne D. Houle, P.E., Public Works Director /City Engineer
City of Edina Engineering
City of Edina Transportation Policy i FINAL DRAFT - January 6, 2005
TABLE OF CONTENTS
TitleSheet .......................................................................... ............................... i
Tableof Contents ............................................................... ............................... ii
I. INTRODUCTION
1
Background........................................................................ ............................... 1
Purpose.............................................................................. ............................... 1
Vision................................................................................. ............................... 1
II. POLICY FRAMEWORK
2
Introduction........................................................................ ............................... 2
City of Edina Transportation Commission Policy ............... ............................... 2
III. PLAN IMPLEMENTATION
7
Transportation Commission Policy Adoption ..................... ...............................
7
ActionPlan ......................................................................... ...............................
7
Sourcesof Funding ............................................................ ...............................
8
Plan CostsanO Acceptance Requirements ........................ ...............................
8
IV. NEIGHBORHOOD TRAFFIC MANAGEMENT PLAN
9
Introduction........................................................................ ...............................
9
Process and Schedule ..................................................... ...............................
10
Criteria for Screening ....................................................... ...............................
14
Scoringfor Ranking .......................................................... ...............................
15
Removal of Traffic Calming Measures ............................. ...............................
16
Traffic Management Devices — City of Edina Approved Options ....................
17
Benefited Area (Assessed Area) ......................................... .............................18
APPENDICES
Appendix A — Definitions
Appendix B — Traffic Management Devices / Measures
Appendix C — Application Request for Neighborhood Traffic Management Plan
Appendix D — Acknowledgments and References
City of Edina Transportation Policy ii FINAL DRAFT - January 6, 2005
I. INTRODUCTION
BACKGROUND
Sustaining, improving and operating a sound street and transportation system are integral
parts of the long -term vision of the City. Congestion on the regional roadway system and
the failure of that system to accommodate the continued growth in traffic volumes has
created and exacerbated traffic volumes, speed and congestion on local streets. These
conditions adversely affect the quality of life of the City's residents and the activities of
the businesses located in the City.
The Edina City Council in December 2003 established the Transportation Commission to
address these issues and to work to improve the local transportation system, consistent
with the Comprehensive Plan and Vision 20/20.
PURPOSE
The Edina Transportation Commission (ETC) was established to advise the Council on
matters relating to the operation of the local street system with respect to traffic volumes,
congestion, and functional classification, but not maintenance activities, of the City; to
review and comment on plans to enhance mass transit opportunities in the City; to
evaluate methods for traffic calming and other speed and volume mitigation measures and
to recommend their implementation where appropriate; and to review the findings of the
Local Traffic Task Force (2002 -2003) and offer recommendations for implementation.
VISION
Edina will maintain a transportation system that will accommodate the efficient
movement of people and goods throughout the City while fostering safe and livable
neighborhoods and business areas connected by aesthetically beautiful, pedestrian and
bicycle friendly streets and pathways.
City of Edina Transportation Policy 1 FINAL DRAFT — January 6, 2005
INTRODUCTION
The Edina Transportation Commission Policy was developed as a supplement to the City
of Edina Transportation Plan (March 1999). The purpose of this policy is to guide the
ETC in the identification and evaluation of traffic and transportation issues in the
community and the prioritization of projects and improvements to the transportation
system. The policy is created to encourage public input and decisions that will be made
on quantitative, qualitative and objective factors.
CITY OF EDINA TRANSPORTATION COMMISSION POLICY
The City of Edina Transportation Commission Policy implements the purposes and
objectives of the ETC as provided in Section 1225 of the City Code (Transportation
Commission). The Policy also incorporates the amended policies of the Transportation
Plan as follows:
Roadway Design,
1. Design roadway facilities constructed in conjunction with new developments
according to the intended function.
2. Upgrade existing roadways when warranted by demonstrated volume, safety or
functional needs, taking into consideration environmental limitations.,
3. Emphasize improvements to management, maintenance and utilization of the
existing street and highway system.
4. Design residential street systems to discourage through traffic and to be compatible
with other transportation modes including transit, bicycle and walking, including
traffic calming measures on local streets and, in some cases, collector streets.
5. Design collector and arterial roadway corridors to be compatible with other
transportation modes including transit, bicycle and pedestrian.
6. Use adequate transitions and buffers including but not limited to earth berms, walls,
landscaping and distance to mitigate the undesirable impact of high volume
roadways.
7. Promote use of sound mitigating features (noise walls) and aesthetic barriers along
residential development adjacent to high volume roadways, and, where economically
feasible, make property owners and land developers responsible for noise attenuation
at new developments near high volume roadways. .
City of Edina Transportation Policy 2 FINAL DRAFT — January 6, 2005
8. Encourage beautification of local corridors, where appropriate, with amenities such
as boulevard trees, decorative street lighting, and monuments.
Roadway Function and Access
1. Review and update regional and local functional street classification and coordinate
with adjacent cities and Hennepin County. Establish subcategory classifications and
criteria for local streets if warranted. Revise local roadway classifications when
warranted.
2. Provide logical street networks to connect residential areas to the regional highway
system and local activity centers.
3. Adequately control access points to the regional roadway system (including minor
arterials) in terms of driveway openings and side street intersections.
4. Provide access to the local street system (including collector and local streets) in a
manner that balances the need to safely and efficiently operate the street system with
the need for access to land.
5. Encourage intra -area trips on minor arterials rather than the principal arterial system,
and promote serving regional trips on the metropolitan highway system.
6. Separate, to the extent possible, conflicting uses on the public street system in order
to minimize safety problems. Give special attention to pedestrian and bicycle routes.
7. Provide access to redeveloping sites using current functional classification and
standards rather than the existing access at the sites.
8. Annually review and monitor citywide traffic volumes, congestion, existing traffic
calming devices, accident history, vehicle violation history, speed limits and
enforcement.
9. Educate public on vehicle operations including public relations campaigns that focus
on individual responsibilities to each other rather than individual rights.
10. Review and recommend traffic calming policies and consider traffic calming
implementation where requested by residents.
11. Implement measures to reduce non -local, cut - through traffic in cooperation with
County and State efforts by developing a local traffic calming policy to mitigate the
effects of cut - through traffic. Identify the origin and destination of cut - through
traffic.
City of Edina Transportation Policy 3 FINAL DRAFT — January 6, 2005
12. When requested by the Planning Commission, review landuse that may impact traffic
implementations. Continue to monitor adjacent community redevelopment and
activity that impact the City of Edina.
Roadway Maintenance and Operation
1. Cooperate with other agencies having jurisdiction over streets and highways in Edina
to assure good roadway conditions and operating efficiency.
2. Continue the implementation of the I -494 frontage road system and Integrated
Corridor Traffic Management system through ongoing coordination with Mn/DOT,
Hennepin County, and the cities of Richfield and Bloomington.
3. Maintain roads by repairing weather - related and other damage.
4. Use economic and environmentally sound management techniques for snow and ice
removal.
5. Replace substandard bridges and bridges that present safety or traffic problems, and
include bicycle and pedestrian features.
Transit/TDM
1. Participate in the I -494 Commission to encourage all forms of travel. demand
management in order to, reduce vehicle miles of travel, reduce petroleum
consumption, and improve air quality.
2. Review all major new developments in light of the potential for ridesharing including
bus accessibility, preferential parking for carpools /vanpools, and mixed -use
development.
3. Support HOV bypasses and other preferential treatments for transit and high
occupancy vehicles on streets and highways.
4. Include transit planning in the construction or upgrading of streets and highways.
5. Pursue development of a demonstration project to provide a circulator system within
the Greater Southdale Area.
6. Encourage the legislature to increase funding for efficient mass transit. Review and
recommend policies requiring � a mass transit component with all types of
development.
City of Edina Transportation Policy 4 FINAL DRAFT — January 6, 2005
Parking
1. Review new developments for adequacy of parking based upon need, the potential for
joint use of parking facilities and opportunities to encourage ridesharing.
2. Continue to limit on- street parking in and near congested commercial areas.
3. Find location of an additional Park and Ride facility located in close proximity to
major mass transit routes.
4. Work with appropriate commissions such as Planning and Zoning to review City
Code, Section 850.08 Parking and Circulation to identify parking based upon needs.
5. Evaluate present parking facilities found in Edina. Where appropriate, amend Section
850 to give commuter parking some spaces in City-owned ramps.
Pedestrian /Bicycle
1. Provide accessibility to pedestrians and bicycles at major activity centers, including
necessary storage facilities (e.g. bicycle racks and bicycle lockers) near visible points
of entry, wide sidewalks where there is no boulevard or sidewalks with boulevards.
Appropriate signage should be present at these facilities.
2. Create pedestrian and bicycle interconnections among major generators, with
continuity across major roadways and other barriers. Include painted striping on
roadways and paths designated as bicycle riding areas.
3. Provide sidewalks and safe crossing in high pedestrian danger areas, including high -
traffic streets, commercial areas, park and school areas, areas with transit access, and
in high- density residential locations.
4. Provide adequate signage along all bike paths including areas of conflict with
pedestrians and automobile traffic.
5. Review and recommend construction of pedestrian and bike paths throughout Edina
cooperatively with the Three Rivers Park District and Hennepin County.
6. Promote safe walking, bicycling and driving. Promote vehicle driver respect for
bicycles and pedestrians along with bicyclists and pedestrian observance of signs and
designated paths.
City of Edina Transportation Policy 5 FINAL DRAFT — January 6, 2005
Goods Movement
1. Serve major truck users and intermodal facilities with good minor arterial access to
the metropolitan highway system.
Funding and. Jurisdiction
1. Pursue and support regional or multi - community funding sources for improvements
that provide regional or multi - community benefit. Support public funding for transit.
2. Support research efforts into more efficient and cost - effective management,
maintenance and replacement of street surfaces.
3. Support governmental jurisdiction over roadways that reflect the role of the roadway
in the overall transportation system.
4. Develop and support legislation permitting a transportation utility.
City of Edina Transportation Policy 6 FINAL DRAFT — January 6, 2005
III. PLAN IMPLEMENTATION
This section provides the steps necessary to implement the transportation policies and
discusses a general strategy for carrying out the policies.
TRANSPORTATION COMMISSION POLICY ADOPTION
By adopting the Transportation Commission Policy, the City Council establishes the
guidelines by which decisions regarding transportation facilities are made in Edina. It
should be revised as necessary to respond to changing conditions and needs, both locally
and regionally.
The policy should be circulated widely so the residents and the business community are
aware of the opportunities and limitations that the policy provides, thus enabling all
interested parties to voice their concerns and issues with full knowledge.
ACTION PLAN
Short Term (Immediate):
• Review and approve Transportation Commission Policy:
o Review and identify problems" and causes of Edina traffic issues
(determine what is fact versus perception).
o Review volume and speed criteria.
o Present Draft Policy to Council.
o Open public comment period.
o Recommend to Council for approval.
• Review Local Traffic Task Force Findings and Recommendations as it reflects the
adoptive policies and procedures. Rank the six identified traffic "issue areas" and
review and recommend action for them as Neighborhood Traffic Management
Projects to the City Council.
• Review and approve a Neighborhood Traffic Management Plan (NTMP).
• Publicize transportation issues to be studied by ETC.
• Establish a means for public communication for transportation issues:
o City of Edina Website
o About Town
o Edina Community Channel 16 Pubi '
o Edina Sun Purr_ enj Newspaper
o Local Schools
• Create a citizen's guide to transportation issues
City of Edina Transportation Policy 7 FINAL DRAFT — January 6, 2005
Long Term (Continually):
• Review and recommend Neighborhood Traffic Management Plans.
• Review and update local roadway functional classification.
• Hold yearly public open house for transportation issues.
• Review and update Transportation Commission Policy yeardY annually;.
• Review and make recommendations for collector and arterial roadway planned
improvements.
SOURCES OF FUNDING
The following sources of funding are explained in more detail in the Transportation Plan.
Existing Sources of Revenue:
• Federal Surface Transportation Program Funds
• Congestion Management and Air Quality (CMAQ)
• State Aid
• Special Assessments
• Livable Communities Grants
• Ad Valorem Taxes
• Tax Increment Financing
Potential Sources of Revenue:
Impact Fees
Road Access Charge
Transportation Utility
PLAN COSTS AN0 ACCEPTANCE REQUIREMENTS
Plan _acceptance requirements include educating beats residents about the possibility
that they may be asked to fund the installation and maintenance of NTMP Projects
through additional taxes and/or special assessments. A typical project includes all costs
accrued for the improvement including all costs to perform the preliminary studies anj
data collection, temporary test installations, final studies, final design and actual
construction costs. All costs associated with a Neighborhood Traffic Management Play}
study and project will be assessed to the Benefited Area if- Council approves the project
for final implementation;
City of Edina Transportation Policy 8 FINAL DRAFT — January 6, 2005
IV.NEIGHBORHOOD TRAFFIC MANAGEMENT PLAN
INTRODUCTION
Neighborhood Traffic Management Plans (NTMP) include local, collector and arterial
street studies and neighborhood area studies. These studies would be conducted by the
City Engineering Department.
The NTMP studies are intended to respond to speeding and excessive cut - through traffic
on streets in a residential neighborhood and on multiple streets in one or more
neighborhoods, yet are intended to be sensitive to areas where there may be a potential for
diversion of this traffic onto other streets and/or into other neighborhoods. These plans
are required to respond to traffic problems that are symptomatic of wider problems, such
as congestion or lack of capacity on the arterial system. Possible solutions may include
revisions to the local street to slow traffic or to completely or partially divert traffic off
the street. While solutions will be considered for collector and arterial streets, only a
limited number of management devices will be allowed due to State design standards and
funding requirements (see Appendix B).
NTMP studies are developed primarily through the City Engineering Department, with
the involvement of the Transportation Commission and other City departments. They are
scheduled based on available resources and given priority by factors that include, but are
not limited to, the following:
• Previous efforts, requests and studies in the area
• Intensity and extent of the problems
• Degree of conflict between traffic conditions and land uses
• Availability of data
• Regional improvement projects scheduled or planned
• Feasibility of solutions
c:lty of Edina Transportation Policy 9 FINAL DRAFT — January 6, 2005
PROCESS AND SCHEDULE
This section details the process and schedule for Neighborhood Traffic Management
Plans (See Table 1).
Table 1_ Neinhbnrhnnd Traffir_ Mnnnnomont Plan c..hdhAmmle
Step
Item
Period (Typical)
-
General Traffic Management Information Open House
Late September
Step 1
Neighborhood Traffic Management Applications Due
2nd Monday in
February
Step 2
Initial Screening, Scoring and Ranking of Applications
March/April/May
Before data collection
Step 3
• Petition -to -study prepared and circulated by City staff
May /June
• Presentation to ETC for recommendation and to
Council for appr6vil.46 order plan development
Step 4
Plan Development :
June
• Review, and comment by Fire, Police, Public Works
and Engineering, Transit and School (transportation)
agencies
- Public Open House
• Survey -to -test circulated and evaluated by City staff
• Trial Project Plan prepared
St 5a
Presentation to ETC for recommendation
June
Step 5b
• Council approval of trial projects
July
• Schedule temporary installations, removals and after .
data collection (minimum period of 2 weeks after
installation
Step 5c
• Temporary installations
July /August
Step 6
- After data collection (trial projects)
September
• Review and comment by Fire, Police, Public Works,
Transit, and School (transportation) agencies
• Pr are evaluation summaries
Step 7a
Mail Surveys
October
Step 7b
• Summarize returned surveys
November
• Open House
Step 8a
Recommendations to ETC, Public comment
December
Step 8b
Recommendations to Council, Improvement Hearing,
January
Preliminary Assessment Hearing, Order Project
Step 9a
Survey and Design
February / March
Step 9b
Final approval of plans by Council, Set bid schedule
Aril
Step 9c
Letting, Assessment Hearing
May
Step 9d
Construction
June / Jul
Step 10
After data collection
July August
StT 11
Follow -up Evaluation
Within 3 to 5 yrs
City of Edina Transportation Policy 10 FINAL DRAFT — January 6, 2005
STEPS:
1. Study Request (Application)
Neighborhood Traffic Management Plan (NTMP) studies can be requested by individual
citizens or by neighborhood organizations. Requests to consider a NTMP study must be
in writing and are due by 4:30 p.m. on the second Monday in February of each year. See
Appendix C for application request.
2. Preliminary Review and Priority Ranking
City staff gathers and reviews preliminary data about the traffic request including volume,
speed and accident information and applies the criteria for screening and ranking to
prioritize for trial and evaluation of a NTMP. The Engineering Department ranks the
studies based on score (methodology outlined under "Scoring for Ranking ") and
schedules order of trial studies for ETC review. The number of trial studies depends on
equipment and personnel availability. Some trial studies may be deferred if not feasible
due to conflicting construction, development in the area, county or state restrictions or
other concerns.
Requests are also reviewed by the Engineering Department for other possible solutions. If
the preliminary review shows that an immediate hazard to the public exists, the City may
choose to address the problem separately from the NTMP.
Studies are ranked citywide, based on the point score from Step 2. The highest- ranking
study is undertaken first. The number of studies initiated each year depends on City
resources.
The City notifies all study requestors of the status of their request after Step 2. The City
also notifies the ETC of the status of all ranked studies and asks for comments.
Once in the process, a study is considered in the annual priority ranking step for up to 3
years. If, after 3 years, a study has not received a high enough priority to proceed, it is no
longer eligible for consideration. This time limitation ensures that the study request has
not become obsolete because of changing traffic conditions and/or new residents in the
area.
The study requestor is notified when the 3 -year limit expires. Then, a new request may be
made to re -enter the study in the program. Step 1 is then repeated to obtain current
information.
3. Petition -to -Study
If a study is ranked high enough to proceed, a petition -to -study must be circulated within
a defined study area.
City of Edina Transportation Policy 11 FINAL DRAFT — January 6, 2005
The Transportation Commission f establishes the petition -to -study area
�.
(benefited area), based on information obtained in the preliminary review. At a minimum,
this area is generally defined as those households and businesses fronting on the affected
segments Of the study area (see Benefited Area — Assessed Area on page 18).
y aft*
The_ purpose of the petition -to -study is to determine the level of agreement among the
benefit area's rest •— --
s�� e� _ _ _ _ ___ 'dents regarding the want to address. The hon
- y -- - -- - - -- peh
to -study only defines the issue and surveys the benefited area that will be assessed for
costs of the improvement. It is used only to determine if the residents within thq
benefited area agree with the issue that has been requested to be addressed City staff
- -
prepares the petition, describing the problem and the procedures to be followed if a study
is undertaken. The City then circulates the petition. Each household is entitled to one
signature. Property owners not living in the study area are not included in the petition -to-
study process. To proceed, a minimum of 30% of all surveys must be returned with 65 °/a
of those returned surveys-indicating agreement with the identified issue
The applications and petitions -to -study are presented to the ETC and the City Council.
The City Council must order the plan development for the study to move forward to step
4.
4. Plan Development
Based on direction from the Council, the NTMP study moves forward. The NTMP is
reviewed by the City's Fire, Police, Public Works and Engineering Departments, and by
transportation agencies including transit and schools.
The ETC then holds a public meeting for the neighborhood and general public to inform
residents of the proposed project, to describe the NTMP process, and to gather additional
information about the traffic problems and related neighborhood needs.
Plan development consists of the following steps:
• Assessment of problems and needs
• Identification of project goals and objectives
• Determination of the benefited area and impacted area
• Identification of evaluation criteria
• Establishment of threshold criteria (on project -by- project basis)
• Development of alternative plans /solutions
The first two steps are accomplished through public meetings, neighborhood association
meetings, and ETC meetings. Additionally, City staff prepares a survey -to -test describing
the proposed project and calling for a temporary test installation. Staff then circulates the
City of Edina Transportation Policy 12 FINAL DRAFT — January 6, 2005
survey -to -test within the defined afee-E� impacted area, 3 which is defined by th�
survey-to-test - -
Transport4t ion Commission
Each household and business is entitled to one survey. The
survey is evaluated and City staff members prepare a trial installation plan. The City
proposes solutions based on the citizen responses and sound engineering principles.
Possible criteria, solutions and their impacts are evaluated by the ETC, City staff and
other affected agencies.
5. Test Installation
The NTMP is presented to the ETC and the City Council. If recommended by the ETC
and approved by Council, the test will be installed for between 3 and 12 months. If the
City Traffic Engineer finds that an unforeseen hazard is created by the test, the test
installation may be revised or removed.
6. Project Evaluation
Following the test period, the City evaluates how well the test has performed in terms of
the previously defined problems and objectives. The evaluation includes the subject street
and streets affected by the project, and is based on before - and -after speeds and volumes,
impacts on emergency vehicles or commercial uses, and other evaluation criteria
determined during step 4. If, in the evaluation, desired improvements in quality of life are
not met to the satisfaction of the ETC and City staff, the traffic plan may be modified and
additional testing conducted.
The final test results are reviewed with the ETC, area residents, and relevant City staff,
and the information is distributed during the survey stage.
The City will not forward a project to the next step if the test results show it may be
unsafe or it violates NTMP policy or other City policies or regulations.
7. Survey
To forward the project to the stage where permanent implementation is approved (step 8),
a survey from households, businesses and non - resident property owners within a-defiae4
sp e�aFea E the.impacted area ) is obtained through a mail survey administered by the
City. The ETC then holds an open house for the neighborhood to update residents about
the proposed project.
City of Edina Transportation Policy 13 FINAL DRAFT - January 6, 2005
8. City Council Action
Based on the project evaluation and survey, City staff members prepare a feasibility
report and recommendations for the ETC and City Council. The report outlines the
process followed, includes the project findings, states the reasons for the
recommendations and includes a preliminary assessment roll. The feasibility report and
preliminary assessment roll will be presented for a recommendation by the ETC before
final action by the City Council. If the feasibility report and preliminary assessment roll
are adopted, the project is ordered.
If the feasibility report and preliminary assessment roll are not adopted, the plans and
specifications will not be ordered and the project is terminated. The project is dropped
from the list and the neighborhood is not able to reapply for five years.
9. Design, Final Assessment Roll and Construction
Final design and construction are administered by the City and are generally completed
within 12 months after final action by the City Council. City staff prepares and
recommends the final assessment roll as required under authority granted by Minnesota
Statute Chapter 429
10. Monitoring
The City monitors constructed traffic management devices and gathers post data,
including volume, speed and accident information.
11. Follow -up Evaluation
Within 3 to 5 years after construction of an NTMP project, the City conducts a follow -up
evaluation to determine if the project's goals and objectives continue to be met. This
evaluation may entail traffic studies of volumes, speeds and accidents, as well as public
opinion surveys.
CRITERIA FOR SCREENING
Each NTMP study is initially reviewed and screened for general qualification for this
process. The following prescribes the general criteria used by staff to determine the
eligibility for a NTMP study;
1. Roadway Classifications
• Eligible: All Edina streets under the Public Works Department jurisdiction.
• Not Eligible: All roadways within Edina designated as County, State, or
Federal Highways.
City of Edina Transportation Policy 14 FINAL DRAFT — January 6, 2005
2. Minimum Distance of the traffic calming device from the following (all must
apply for eligibility):
• Traffic Signals (except neckdowns) 300 ft.
• Stop Signs (except neckdowns) 300 ft.
• Other Traffic Calming Devices 300 ft.
• Driveway /Alleys 20 ft.
• Horizontal or Vertical Curves affecting sight lines 200 ft.
• Railroad Crossing 300 ft.
• Dead End 400 ft.
3. Access:
• No dead -end created without adequate turn around on public roadway right -of-
way roadway.
4. Not - Critical Emergency Route:
• To be reviewed and approved by the City Fire Chief.
All four eligibility requirements must be met for scoring and consideration.
SCORING FOR RANKING
The following criteria defines the scoring for ranking that is used to prioritize a requested
NTMP study as described in Step 2 of the NTMP process
1. Sidewalk adjacent to the benefited area (0 to100 points):
• None + 100
• All of 1 side + 50
• All of 2 sides + 0
2. Public school yard, play lot, playground development adjacent to benefited
area (0 to 200 points):
• None + 0
• All of 1 side + 100
• All of 2 sides + 200
3. Residential development adjacent to benefited area (0 to 100 points):
• None + 0
• All of 1 side + 50
• All of 2 sides + 100
City of Edina Transportation Policy 15 FINAL DRAFT — January 6, 2005
4. Number of reported correctable crashes based on last 5 years of available
data (0 to 200 points):
• 20 per crash; maximum of 200 points
5. Average residential density adjacent to benefited area (0 to 50 points):
• 50 points maximum
• (0 dwelling units per adjacent 100 lin. ft. = 0 points
• 5+ dwelling units per adjacent 100 lin. ft.= 50 points)
6. Average Daily Traffic Volumes - ADT (0 to 200 points):
• ADT divided by 10; maximum 200 points
• For intersection, street segments or multiple streets, use higher volume street
7. Percent over speed limit - ADT (0 to 200 points):
• Percent over speed limit times 2.5 (times. 100); maximum 200 points (80%
over limit)
• For intersection, street segments or multiple streets, use street with higher
speeds
Scoring is based on the cntena'perlatung to; the benefited area. Correctable crashes are
determined by the Engineering Department.
REMOVAL OF TRAFFIC CALMING MEASURES
The City of Edina's Traffic Calming Program is intended to avoid the costly installation
and later costly removal of traffic calming devices. On occasion, it may be determined to
be desirable to remove a traffic calming device.
If the removal is City initiated due to safety/crash issues, the removal will be at City
expense. If the removal is at the neighborhood's request, the removal will be charged to
the property owners (previously defined benefited area). The following procedure will be
used for neighborhood initiated removals:
1. Petition requesting removal is submitted to the City Traffic Engineer.
2. A survey, including estimated cost for removal and data collected previously on the
device, is mailed to each property owner in the benefited area.
3. Surveys are summarized 30 days after mailing. Staff makes recommendation to the
ETC.
City of Edina Transportation Policy 16 FINAL DRAFT — January 6, 2005
4. ETC forwards a recommendation to Council. If the recommendation is for removal,
improvement and assessment hearings are scheduled for Council.
5. Final approval of plans by Council. Set bid schedule.
6. Letting, final assessment and construction.
7. New traffic calming devices will not be considered for five years in benefited area of
removed device.
TRAFFIC MANAGEMENT DEVICES — CITY OF EDINA APPROVED OPTIONS
This sections lists traffic management devices and methods that are approved for use in
the City of Edina. Appendix B contains a detailed description and overview of each item.
Speed Reduction Traffic Calming Measures:
•
Speed Hump
•
Speed Table
•
Raised Crosswalk
•
Raised Intersection
•
Textured Pavements
•
Center Island Narrowings
•
Gateway Treatments
•
Neckdowns
•
Choker
•
Chicane
•
Realigned Intersections
•
Traffic Circle
' •
Roundabout
Volume Reduction Traffic Calming Measures:
• Diagonal Road Closure
• Partial Street Closure
• Cul -de -sac
• Median Barriers
• Forced Turn Islands
Education and Enforcement:
• Targeted Police Enforcement
• Radar Speed Display Units
• Neighborhood Traffic Safety Campaigns
City of Edina Transportation Policy 17 FINAL DRAFT — January 6, 2005
• Stop Sign
• Turn Restrictions
• One Way Streets
• Traffic Signals ( "Rest on Red" and "Rest on Green ")
• Pavement Striping (Centerline, Edge and Transverse)
BENEFITED AREA (ASSESSED AREA)
This section generally defines the benefited area of the traffic management devices for
use in determining the assessment area. The following prescribes the typical benefited
areas, but may be adjusted by the ETC on a project by project basis.
Speed Hump, Speed Table, Raised Intersection, Raised Crosswalk, Textured
Pavement, Center Island Narrowings, Neckdowns, Gateway Treatments,
Choker,' Chicane, Traffic Circle:
• Benefited area extends 300 feet from the device along the street affected by the
device, or to the nearest stop sign or traffic signal, whichever is less.
Diagonal Road Closure, Round -a -bout:
• Benefited area extends to the next intersection on each leg of the intersection.
Partial Street Closure, Realigned Intersection, Forced Turn Island, Median
Barrier:
• Benefited area extends to the next intersection on the leg of the intersection
partially closed, realigned or restricted.
Cul -De -Sac:
• Benefited area extends from the point of closure to the next intersection on the leg
that is closed.
City of Edina Transportation Policy 18 FINAL DRAFT — January 6, 2005
APPENDICES
APPENDIX A — DEFINITIONS
APPENDIX B — TRAFFIC MANAGEMENT DEVICES / MEASURES
APPENDIX C — APPLICATION REQUEST FOR NEIGHBORHOOD TRAFFIC MANAGEMENT
PLAN
APPENDIX D — ACKNOWLEDGMENTS AND REFERENCES
City of Edina Transportation Policy FINAL DRAFT — January 6, 2005
APPENDIX A - DEFINITIONS
City of Edina Transportation Policy FINAL DRAFT — January 6, 2005
Definitions
Benefited Area — The properties expected to receive the majority of the positive impacts
from the proposed traffic calming. (Assessed Area)
Center Island Narrowings — An island or barrier in the center of a street that serves to
segregate traffic. (Midblock medians, median slowpoints, median chokers, central
islands.)
Chicane — Mainline deviations to deter the path of travel so that the street is not a straight
line (by the installation of offset curb extensions). (Deviations, serpentines, reversing
curves, twists.)
Choker — Physical street narrowing to expand sidewalks and landscaped areas; possibly
adding medians, on street parking, etc. (Pinch points, lane narrowing, midblock
narrowings, midblock yield points, constrictions.)
Circulator Service — A means provided within a major activity center, (such as a
regional business concentration, a metro center or community) for movement from place
to place within the center; such a system may be entirely pedestrian or may use transit.
Collector Street — Roadways that are designated to "collect" traffic from neighborhood
streets and get that traffic to arterial streets. Collector streets are described in the City of
Edina Comprehensive Plan.
Corridor Studies — Typically, highway corridor studies focus on a segment of a
particular travel corridor or travel shed. Land use, access issues, capacity, level of
service, geometries and safety concerns are studied; alternatives analyzed; and
recommendations made. Corridor studies are usually prepared with the participation and
cooperation of the affected communities and governmental agencies. Recommendations
for improvements are often incorporated into the local comprehensive plans of the
participating cities and continue to be used by implementing agencies as improvements in
the corridor are made.
Cul- de-sac — Physical street closure resulting in a dead end (no outlet) constructed with a
circular turn - around area.
Cut - through Traffic — Traffic that intrudes into a residential subdivision to avoid
congestion or other problem from an arterial or other high level street.
Diagonal Road Closures — A barrier placed diagonally across a four - legged intersection,
interrupting traffic flow across the intersection. This type of barrier may be used to create
a maze -like effect in a neighborhood. (Diagonal diverter.)
City of Edina Transportation Policy A -1 FINAL DRAFT — January 6, 2005
Feasibility Report — A report analyzing the recommended type of construction, the
estimated construction cost, estimated engineering cost and the estimated assessment.
Forced Turn Islands — Small traffic islands installed at intersections to channel turning
movements. (Forced turn barriers, diverters.)
Functional Classification (of Roadways) — In accordance with the City of Edin
Transportation Plan (March 1999), the City has adopted the Metropolitan Council'
functional classification system designation and guidelines for use in the City's roadwa;
system. Functional classification involves determining what role each roadway shout
perform and ensures that certain transportation and non - transportation factors are take
into account in the planning and design of roadways. A complete description of th
functional classification system criteria is found in Appendix D of the Transportatioi
Plan (March 19991_ The following criteria lists typical vehicle volumes carried of
roadways -
Principal Arterials: 15,000 to 200,000 vehicles per days
Minor Arterials: 5,000 to 30,000 vehicles per daX
Collector Streets: 1,000 to 15,000 vehicles per day,
Local Streets. :. Less than 1,000 vehicles per day
Gateway Treatment — Treatment to a street that includes a sign, banner, landscaping or
other structure that helps to communicate a sense of neighborhood identity.
Guide Signs — A sign that shows route designations, destinations, directions, distances,
services, points of interest, or other geographical, recreational, or cultural information.
Impacted Area - Area for a project that is defined as those residences along local
residential streets that are positively or negatively impacted by excessive through traffic
volumes and speeding, or that may be positively or negatively impacted by proposed
traffic calming. Inconvenience caused by limitation of access is not considered to be a
negative impact under this definition.
Infrastructure — Fixed facilities, such as roadways or railroad tracks; permanent
structures.
Level of Service (as related to highways) — The different operating conditions that
occur on a lane or roadway when accommodating various traffic volumes. It is a
qualitative measure of the effect of traffic flow factors, such as speed and travel time,
interruption, freedom to maneuver, driver comfort and convenience, and indirectly, safety
and operating costs. It is expressed as levels of service "A" through "F." Level "A" is a
condition of free traffic flow where there is little or no restriction in speed or
maneuverability caused by presence of other vehicles. Level "F" is forced -flow operation
at low speed with many stoppages, the highway acting as a storage area.
Local Street — A roadway that connects blocks within neighborhoods.
City of Edina Transportation Policy A -2 FINAL DRAFT — January 6, 2005
Local Traffic — Traffic that originates from or is destined to a location within- a
neighborhood or area.
Major Street — The street normally carrying the higher volume of vehicular traffic (vs.
Minor Street).
Median Barriers — Raised island or barrier in the center of the street that serves to
segregate traffic.
Metropolitan Urban Service Area (MUSA) — The portion of the metropolitan area
identified in the Regional Blueprint where development and redevelopment is to occur
and in which urban facilities and services are to be provided. The purpose of the MUSA
is to define the areas within the Twin Cities Metropolitan Area that are eligible for "urban
services ", specifically sewers, municipal water systems and particular types of
transportation systems. This boundary line is defined and maintained by the Metropolitan
Council to assist in the orderly development of the metropolitan area. All of Edina is
within the MUSA area.
"A" Minor Arterials — Roadways within the metropolitan area that are more regionally
significant than others. These roadways are classified into the following groups:
a) Relievers — Minor arterials that provide direct relief for traffic on major,
metropolitan highways. These roads include the closest routes parallel to the
principal arterials within the core, urban reserve and urban staging areas.
These roadways are proposed to accommodate medium - length trips (less than
eight miles) as well as to provide relief to congested principal arterials.
Improvements focus on providing additional capacity for through traffic.
b) Expanders — Routes that provide a way to make connections between
developing areas outside the interstate ring or beltway. These routes are
located circumferentially beyond the area reasonably served by the beltway.
These roadways are proposed to serve medium to long suburb -to- suburb trips.
Improvements focus on preserving or obtaining right -of -way.
c) Connectors — This subgroup of "A" minor arterials are those roads that would
provide good, safe connections among town centers in the urban reserve, urban
staging and rural areas within and near the seven counties. Improvements
focus on safety and load - carrying capacity.
d) Augmenters — The fourth group of "A" minor arterials are those roads that
augment principal arterials within the interstate ring or beltway. The principal
arterial network in this area is in place. However, the network of principal
arterials serving the area is not in all cases sufficient relative to the density of
development that the network serves. In these situations, these key minor
City of Edina Transportation Policy A -3 FINAL DRAFT — January 6, 2005
arterials serve many long -range trips. Improvements focus on providing
additional capacity for through traffic.
Minor Street — The street normally carrying the lower volume of vehicular traffic (vs.
Major Street).
Municipal State Aid (MSA) Route — A designated City roadway that receives state
funds as allocated from the State gas tax for maintenance and construction.
Approximately 20 percent of the City roadways are designated as MSA routes. State of
Minnesota rules and standards, in addition to local jurisdiction guidelines, apply to these
roadways.
City of Edina Transportation Policy A -4 FINAL DRAFT — January 6, 2005
Neckdowns — Physical curb reduction of road width at intersections. Similar to lane
narrowing but used at intersection(s). Widening of street comers at intersections to
discourage cut - through traffic, to improve pedestrian access and to help define
neighborhoods. (Nubs, bulb -outs, knuckles, intersection narrowings, comer bulges, safe
crosses.)
Neighborhood Traffic Management Plan (NTMP) — Formalized process where
residents, commissioners and City staff evaluate the various requirements, benefits and
tradeoffs of traffic calming projects within neighborhoods. The overall objectives for the
Neighborhood Traffic Management Plan are to improve neighborhood livability by
mitigating the impact of vehicular traffic on residential neighborhoods; to promote safe
and pleasant conditions for motorists, bicyclists, pedestrians and residents on
neighborhood streets; to encourage citizen involvement and effort in neighborhood traffic
management activities; to make efficient use of City resources by prioritizing traffic
management requests; and to support the Comprehensive Plan policy that livability and
safety of established residential neighborhoods be protected in transportation operations.
Non -Local Traffic — Traffic that does not originate from or is not destined to a location
within a neighborhood or area.
Off -Peak Period — Time of day outside the peak period (see peak period)
Partial Street Closure — Physical blockage of one direction of traffic on a two -way
street. The open lane of traffic is signed "One way", and traffic from the blocked lane is
not allowed to go around the barrier through the open lane. (Half closure.)
Peak Hour — The hour during the peak period when travel demand is highest. Typically,
peak hours are found to be from 7 to 8 a.m. and from 4:30 to 5:30 p.m.
Peak Period — Typically, the time between 6:30 and 9:00 a.m. and between 3:30 and 6
p.m. on a weekday, when traffic is usually heavy.
Person Trip — A one -way journey between two points by one person in a vehicle.
Photo-radar Speed Enforcement — An automated camera system used to enforce speed
limits. It includes the camera, an attached radar "gun" and a display that shows the speed
of each passing vehicle. When a speeding vehicle is detected, the photo radar system
takes a picture of the driver and the license plate. The registered owner of the vehicle then
receives a ticket in the mail. This enforcement method is not legal in Minnesota.
Photo-Red Light Enforcement — Implementation of a photo red light, an automated
camera and computer system can be mounted on a traffic signal pole at an intersection for
red light enforcement. Photo red light takes pictures of any vehicles that run a red light,
records the time elapsed since the light turned red and the vehicle entered the intersection,
and issues a ticket. The photo red light systems are typically installed at key intersections
City of Edina Transportation Policy A -5 FINAL DRAFT — January 6, 2005
that have a high number of accidents. This enforcement method is not legal in
Minnesota.
Platoon — A group of vehicles or pedestrians traveling together as a group, either
voluntarily or involuntarily because of traffic signal controls, geometrics, or other factors.
Principal Arterials — The high capacity highways that make up the metropolitan
highway system, including all interstate freeways.
Radar Speed Display Units — Driver feedback signs that use radar to provide motorists
with an instant message, displayed on a reader board, telling them how fast they are
driving.
Raised Crosswalk — A speed table designed as a pedestrian crossing, generally used at
mid -block locations. (Raised crossings, sidewalk extensions.)
Raised Intersection — A raised plateau where roads intersect. The plateau is generally 4"
above the surrounding street. (Raised junctions, intersection humps, plateaus.)
Realigned Intersections — Physical realignment of intersection typically used to promote
better through movements for a major roadway (vs. a minor roadway). (Modified
intersections.)
Regional Blueprint — The Metropolitan Council plan that sets a general direction for
future development patterns in the metropolitan area and establishes guidelines for
making decisions about major regional facilities that are needed to support the
commercial, industrial and residential development of the area. It establishes urban and
rural areas and certain development policies for different geographic policy areas.
Regulatory Signs — A sign that gives notice to road users of traffic laws or regulations.
Right -of -Way (Assignment) — The permitting of vehicles and/or pedestrians to proceed
in a lawful manner in preference to other vehicles or pedestrians by the display of sign or
signal indications.
Roadway striping — Highlighting various areas of the road to increase the driver's
awareness of certain conditions (e.g., edge of road striping to create a narrowing/slowing
effect while defining space for cyclists).
Roundabout — Raised circular areas (similar to medians) placed at intersections. Drivers
travel in a counterclockwise direction around the circle. Modern roundabouts are "yield
upon entry", meaning that cars in the circle have the right of way and cars entering the
circle must wait to do so until the path is clear. When a roundabout is placed in an
intersection, vehicles may not travel in a straight line. (Rotaries.)
City of Edina Transportation Policy A -6 FINAL DRAFT — January 6, 2005
1
Signal Preemption Usually referred to in this plan as a technology that triggers the
j green go -ahead on meters or signal lights to allow emergency vehicles (and sometimes
transit vehicles) to move more quickly through signalized intersections.
Speed- Speed is defined based on the following classifications:
a) Advisory Speed — A recommended speed for all vehicles operating on a
section of highway and based on the highway design, operating
characteristics, and conditions.
b) Design Speed — A selected speed used to determine the various geometric
design features of a roadway.
c) 85th- Percentile Speed — The speed at or below which 85 percent of the
motorized vehicles travel.
i
d) Posted Speed - The speed limit determined by law and shown on Speed
Limit signs.
e) Statutory Speed — A speed limit established by legislative action that
typically is applicable for highways with specified design; functional,
jurisdictional and/or location characteristic_ and is not necessarily shown:
on Speed Limit. signs.
Speed Hump — Wave - shaped paved humps in the street. The height of the speed hump
determines how fast it may be navigated without causing discomfort to the driver or j
damage to the vehicle. Discomfort increases as-'speed over the hump increases. Typically
speed humps are placed in a series rather than singularly. (Road humps, undulations.)
Speed Limit — The maximum (or minimum) speed applicable to a section of highway or
roadway as established by law.
Speed Table — Trapezoidal shaped speed, humps in the street, similar to speed humps.
(Trapezoidal humps, speed platforms.)
Speed Zone — A section of highway with a speed limit that is established by law but
which may be different from a legislatively specified statutory speed limit.
Street Closure — Street closed to motor vehicles using planters, bollards, or barriers, etc.
Targeted Police Enforcement — Specific. monitoring of speeding and other violations by
police due to observed, frequent law disobedience.
Textured Pavements — A change in pavement texture (e.g., asphalt road to brick
crossing) that helps to make drivers aware of a change in the driving environment.
City of Edina Transportation Policy A -7 FINAL DRAFT — January 6, 2005
Traffic Calming — A combination of mainly physical measures that reduce the negative
effects of motor_ vehicle use, alter driver, behavior and improve conditions for non-
motorized street users. Traffic calming involves changes in street alignment, installation
of barriers, and other physical measures to reduce traffic speeds and cut - through volumes
in the interest of street safety, livability and other public purposes. Traffic calming
measures are intended to be self- enforcing. Traffic calming measures rely on the laws of
physics rather than human psychology to slow down traffic.
Traffic Circle — Circular, raised island placed within the middle of intersections,
requiring vehicles to divert around them, potentially forcing drivers to slow down as they
traverse around the circle. (Intersection islands, similar to roundabouts.)
Traffic Signal Control Systems — The degree of traffic management of an arterial is
grouped and defined as follows:
a) Fixed Time — The traffic signals on an arterial are controlled locally through a
time clock system. In .general, the progression of a through band (the amount
of green time available .along an arterial at a given speed) along the arterial in
the peak direction is determined by past experience and is not a function of
immediate traffic demand.
b) Semi- actuated — The traffic signals along the arterial are designed to
maximize the green time on the major route in the major direction. Timing and
through band are based upon historical records. Use of green time on the
minor leg dependent upon real -time demand and maximized based upon total
intersection delay.
c) Interconnection — A traffic signal system in which data collected at individual
signals is shared with a central processor or controller. Adjustments in traffic
signal control can be made based upon incoming data as opposed to historical
data.
d) Optimization — The process in which a traffic signal or system is modified to
maximize the amount of vehicles passing through the intersection for all
approaches or on the major road in the peak direction.
e) Real -time Adaptive Control — An advanced traffic control system that
incorporates current technologies in communications, data analysis, and traffic
monitoring to provide real -time traffic control of arterials, corridors or roadway
networks.
Transportation Comprehensive Plan — Assists the City in making correct
transportation- related decisions today by anticipating the character, magnitude and timing
of future transportation demand.
City of Edina Transportation Policy A -8 FINAL DRAFT — January 6, 2005
Transportation Demand Management (TDM) — Programs and methods to reduce
effective demand. In the broadest sense, any activity or facility that reduces vehicle trips
would fall within this classification. The highest priority in the region is given to
reducing single- occupant vehicle trips in the peak periods. Techniques that might be
utilized are carpooling, vanpooling, transit, alternative work hours, transportation
management organizations, and land development or ordinances that discourage vehicle
trips and encourage walk, bike, rideshare and transit trips.
Transportation Policy Plan - This document is one chapter of the Metropolitan
Development Guide, as provided for in Minnesota Stat. 473, Sections 145 and 146.
Section 145 states: "The Metropolitan Council shall prepare and adopt ... a comprehensive
development guide for the metropolitan area."
Vehicle Trip — A one -way journey made by an auto, truck or bus to convey people or
goods.
Volume -to- capacity Ratio (v /c) — The hourly number of vehicles expected to use a
roadway in the busiest hour, divided by the number of moving vehicles the roadway can
safely accommodate in an hour.
Warning Signs — A sign that gives notice to road users of a situation that might not be
readily apparent.
City of Edina Transportation Policy A -9 FINAL DRAFT — January 6, 2005
44 all
Moro
A 'Now"
IL
rim
J1
J
CITY OF EDINA
V
N
aP
2005 -2009 Capital Improvement Program
TABLE OF CONTENTS
CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS: DESCRIPTION
PAGE
POLICY 2
FINANCING 3
FINANCIAL TABLES
• Summary of Revolving Fund Balance 6
• Projects Financed Through Enterprise Funds 7
• Capital Improvement Program
• Projects by Department - 9
• Projects by Funding Source 14
CIP PROJECT DESCRIPTIONS
• Year 1 -2005 1-65
• Year 2 - 2006 1-50
• Year 3 — 2007 1-34
• Year 4 - 2008 1-32
• Year 5 — 2009 1-33
go
NCIL
D� 0 Co s
FR AMBER
C
City of Edina Page 1
CAPITAL IMPROVEMENT PROGRAM
FISCAL POLICY
GOAL: The goal of the City of Edina's Capital Improvement
Program is to develop a comprehensive capital
improvement program for use by decision makers to guide
capital investments based on an assessment of the
Community's needs taking into account the best use of
limited resources while providing efficient and effective
municipal services.
PROCESS: The Capital Improvement Program process includes analyzing
projects contributing to the public health and welfare; projects
helping to maintain and improve the efficiency of the existing
systems; and projects that define a future need within the
community. All capital improvements will be consistent with this
program, and will be coordinated through a multi -year plan in
conjunction with the City budgeting process.
City of Edina - CIP Page 2
FINANCING
CAPITAL IMPROVEMENT PROGRAM
INTRODUCTION: Implementing - capital improvements - requires- sound and
economical financing. The City of Edina is able to utilize
several financing mechanisms ranging from cash reserves
to special - purpose funds as well as borrowing through
bond sales. The exact financing method for each
improvement. is based on the general policies, jurisdictions
and.:legal requirements. The final selection and scheduling
of proposed capital improvements is then based on the
ability of the City to draw upon various funds.
The total cost for each project includes construction costs,
administration costs and interest.
In analyzing the financial viability of the capital
improvements in the 2005 -2009 program, the following
methods of financing were examined:
INTERNAL METHODS: Special Assessments - Special assessments are based
on the concept that when land is benefited from a particular
improvement, all or part of the costs of the finance such
improvements. Special assessment bonds are retired
through special assessment collections but may be backed
by the full faith and credit of the City.
Enterprise Fund - Capital Improvements and equipment
purchased in the Enterprise funds are financed through
enterprise fund revenues derived from user charges for the
respective services. Enterprise funds are designed for
self- sustaining operations.
Utility Funds - Capital improvements to the water and
sewer utilities are financed through utility fund revenues
derived from user charges for the respective services.
Revenue bonds are used to finance large projects.
Tax Increment Funds - These funds are derived from tax
increment districts include 50th and France, Southeast
Edina, Grandview, and 70th Street and Cahill Road. In tax
increment districts, property owners pay ad valorem taxes
at the full rate levied by the units of local government within
City of Edina - CIP Page 3
sp
FINANCING
CAPITAL IMPROVEMENT PROGRAM
the taxing jurisdiction. At the time the tax increment district
is created, property values are "frozen ". The units of local
government receive taxes based on the frozen property
values. Any additional taxes paid by property owners
based on the increase in property values since the district
was created is known as the "increment ". The increment
revenue is then used to finance physical improvements
within the district. These improvements can be financed
on a cash: basis after sufficient increment revenues have
been collected, or through a bond issuance with increment
tax revenues dedicated to retire the bonds.
Lease /Revenue Bonds - These bonds are backed by the
full faith and credit of the City and supported through an ad
valorem special levy by an annual appropriation. The debt
would be issued through the Housing and Redevelopment
Authority, to procure capital equipment or facilities
supported with a lease purchase relationship agreement
With the City.
Eauiament ,Certificates — These certificates are capital
notes subject to the: city debt 1imit. They can be used to
purchase public safety equipment, ambulance and other
medica[ 1 :equipment, road construction and maintenance
equipment; - and other capital equipment having an
expected useful life at least as long as the term of the
notes. The notes shall be payable in not more than five
years. A tax ]evy shall be made for the payment of the
principal -and interest on the notes.
Revolving Fund - This fund is designed to provide
financing for capital improvements. Revenues for this fund
may be derived from such sources as investment income,
rental income and operating transfers from other funds.
Other - Other funding options available are excess levy on
property taxes, interest income on City investments, and
transfer from reserves.
City of Edina Page 4
FINANCING
CAPITAL IMPROVEMENT PROGRAM
EXTERNAL METHODS: Municipal State Aid - The Minnesota Department of
Transportation provides funding assistance for
improvements to those municipal streets which are
designated as part -of- -its Municipal - State Aid- (MSA)
system. Money for this fund is supplied with a dedicated
portion of revenues collected from road use and gasoline
taxes. Funds are released for improvements on those
streets on the system whose design and construction meet
MSA standards. Funds may be expended for any street on
the MSA system at any time, and MSA funds may be
accumulated over several years.
Minnesota Department of Transportation - The
Minnesota Department of Transportation provides
financing assistance for maintenance and improvements
on those highways included in the Mn /DOT trunk highway
system and federal interstate system. These
improvements could include intersecting local or county
streets. In the City of Edina, these highways are Nos. 62,
100, 169 and 494. Improvements on these highways must
meet State trunk highway standards before Mn /DOT
releases funds.
Other - Other sources of financing come from bonds,
which are backed by the full faith and credit of the City,
grants, donations, and other municipalities who share
boundaries: --
City of Edina Page 5
Financial Tables
2005 - 2009 Summary of Revolving Fund Balance
Expenditures
2005
2006
2007
2008
2009
Total
MSA
1,611,000
1,348,000
1,934,000
1,073,000
930,000
6,896,000
Bridge
0
250,000
0
0
0
250,000
Municipal Buildings
5,035,000
8,635,000
35,000
35,000
35,000
13,775,000
Bond Issuance Costs
50,000
125,000
50,000
0
50,000
2759000
Arena
25,000
25,000
0
25,000
1,090,000
1,165,000
Art Center
20,000
65,000
0
10,000
0
95,000
City-Wide
205,000
75,000
75,000
75,000
75,000
505,000
Parks
609,500
970,000
450,000
499,000
355,000
2,883,500
Public Safety
55,000
.70,000
50,000
0
40,000
215,000
Public Works
95;000
130,000
50,000
50,000
50,000
375,000
Street Reconstruction
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Assessments
1,480,600
360,000
56,000
310,000
120,000
2,326,600
utility
12,186,100
15,053,000
5,700,000
5,077,000
5,745,000
43,761,100
Revenues
2005
2006
2007
2008
2009
Total
MSA
1,530,450
1,361,150
1,904,700
1,116,050
937,150
6,849,500
Bridge
0
0
250,000
0
0
250,000
G0.'Impr6vement Bonds
3,500,000
3,000,000
3,000,000
3,000,060
3,000,000
15,500,000
GO Public Imp Bonds
0
8,600,000
0
0
0
8,600,000
Arena Revenue Bonds
0
0
0
0
1,000,000
1,000,000
Lease Revenue Bonds
5,000,0100
0
0
0
0
5,000,000
Assessments
956,959
871,749
1,043,279
1,021,666
862,442
4,756,095
General Fund
50,000
50,000
75,000
100,000
125,000
400,000
Liquor
100,000
100,000
100;000
100,000
100,000
500,000
utility
100,000
100,000
100,000
100,000
100,000
500,000
Current Due From:
MSA
855,000
0
0
0
0
855,000
utility
92,000
0
0
0
0
92,000
Developer
-0
0
14,000
0
0
14,000
Hennepin County
586,300
0
0
0
0
586,300
Interest - 2, 3, 4%
110,122
186,025
216,670
256,816
281,517
1,051,150
12.880.831
14.268.924
6.703.649
5.694.532
6.406.109
45 9..9d 045
Balance Revolving Fund
Beginning 5,506,095 6,200,826 5,416,750 6,420,399 7,037,931
Ending 6,200,826 5,416,750 6,420,399 7,037,931 7,699,040
City of Edina Page 6
Projects Financed through Enterprise Funds
Aquatic Center 2005 2006 2007 2008 2009 Total
Begin Cash Balance
281,470
389,221
80,409
266,717
449,735
1,712,353
Revenue
740,200
777,210
816,071
856,874
899,718
4,090,073
Expense
(412,618)
(429,562)
(447,224)
(465,635)
(484,829)
(2,239,868)
Other Rev /(Exp)
(149,831)
(156,460)
(162,539)
(158,221)
(158,648)
(785,699)
Operating Cash
177,751
191,188
206,308
233,018
256,241
808,265
CIP
(70,000)
(500,000)
(20,000)
(50,000)
(50,000)
(690,000)
End Cash Balance
389,221
80,409
266,717
449,735
655,976
Golf Course 2005 2006 2007 2008 2009 Total
Begin Cash Balance
Revenue
Expense
Other Rev /(Exp)
Revenue Bonds
Operating Cash
Op Transfer
CIP
End Cash Balance
785 941 1,562 774 1,071
3,108,400 3,253,033 3,404,574 3,563,360 3,729,741 17,059,108
(2,435,109) (2,525,411) (2,619,093) (2,716,282) (2,817,111) (13,113,006)
(439,135) (586,001) (627,269) (707,781) (822,053) (3,182,239)
0 0 0 0 2,200,000 2,200,000
234,156 141,621 158,212 139,297 2,290,577 2,963,863
21,000 25,000 13,000 39,000 14,000 98,000
(255,000) (166,000) (172,000) (178,000) (2,269,000) (3,040,000)
941 1,562 774 1,071 36,648
Golf Dome
2005
2006
2007
2008
2009 Total
1,712,353
Expense
(224,730)
(233,277)
(242,152)
Begin Cash Balance
30,942
30,993
30,426
30,969
30,294
Revenue
310,500
325,715
341,681
358,437
376,020
1,712,353
Expense
(224,730)
(233,277)
(242,152)
(251,368)
(260,938)
(1,212,465)
Other Rev /(Exp)
(64,719)
(68,005)
(70,986)
(08,744)
(71,295)
(343,749)
Operating Cash
21,051
24,433
28,543
38,325
43,787
112,352
Op Transfer
(21,000)
(25,000)
(13,000)
(39,000)
(14,000)
(112,000)
CIP
0
0
(15,000)
0
(30,000)
(45,000)
End Cash Balance
30,993
30,426
30969
30,294
30,081
City.of Edina Page 7
Projects Financed through Enterprise Funds
Edinborough /Cen Lk 2005 2006 2007 2008 2009 Total
Begin Cash Balance 4,573,985 4,459,314 4,247,757 3,970,158 3,789,997
Revenue
1,398,325
1,445,632
1,494,768
1,545,813
1,598,847
7,483,385
Expense
(1,607,996)
(1,662,548)
(1,718,981)
(1,777,363)
(1,837,760)
(8,604,648)
Other Rev /(Exp)
200,000
178,359
19,114
186,389
178,289
762,151
Operating Cash
(9,671)
(38,557)
(205,099)
(45,161)
(60,624)
(298,488)
CIP
(105,000)
(173,000)
(72,500)
(135,000)
(70,000)
(555,500)
End Cash Balance
4,459,314
4,247;757
3,970,158
3,789,997
3,659,373
4,071;753
Liquor Operations
2005
2006
2007
2008
2009
Total
Begin Cash Balance
390,248
89,933
72,622
113,704
484,941
Revenue
2,584,365
2,713,583
2,849,262
2,991,726
3,141,312
14,280,248
Expense
(1,655,640)
(1,718,119)
(1,782,992)
(1,850,352)
(1,920,296)
(8,927,399)
Other Rev /(Exp)
(202;540)
(46,680)
4,120
185,020
289,000
228,920
Operating Cash
726;185
948,784
1,070,390
1,326,394
1,510,016
4,071;753
Op Tran /Rent
(936,500)
(940,095)
(937,308)
(955,157)
(954,662)
(3,769,060).
CIP
(90,000)
(26,000)
(92,000)
0
0
(208,000)
End Cash Balance
891-933
72,622
113,704
484,941
1,040,295
Utilities
2065
2006
2007
2008
2009
Total
Begin Cash Balance
4,230,160
5,369,870
3,893,267
3,677,711
4,781,603
Revenue
10,091,500
10,679,572
11,302,675
11,962,904
12,662,479
56,699,130
Expense
(7,171,263)
(7,454,942)
(7,749,911)
(8,056,622)
(8,375,546)
(38,808,284)
Other Rev /(Exp)
(1,113,527)
(1,153,233)
(1,167,320)
(1,172,390)
(694,862)
(5,301,332).
Revenue Bonds
3,600,000
0
1 0
0
0
3,600,000
Operating Cash
5,406,710
2,071,397
2,385,444
2,733,892
3,592,071
12,597,443
Rent
(100,000)
(100,000)
(100,000)
(100,000)
(100,000)
(500,000)
CIP
(4,167,000)
(3,448,000)
(2,501,000)
(1,530,000)
(780,000)
(12,426,000)
End Cash Balance
5,369,870
3,893,267
3,677,711
4,781,603
7,493,674
City of Edina Page 8
Capital Improvement Program
City of Edina, MN
PROJECTS BY DEPARTMENT
2005 thru 2009
Department Project Priority 2005 2006 2007 2008 2009 Total
Aquatic Center
Upgrades and Replacements
AOC-00-007
0
50,000
50,000
100,000
Flowrider
AQC-03-001
0
500,000
500,000
Expand Deck & Fence Line
AQC-04-001
0
35,000
35,000
Theme wall addition
AQC -04 -002
0
35,000
35,000
Replace Light Poles
AQC- 04-003
0
20,000
20,000
Aquatic Center Total
70,000
500,000
20,000
50,000
50,000
690,000
Arena
Bathroom Remodel (Arena)
A -00-001
0
25,000
25,000
Truck With Snow Plow
A -00-002
0
25,000
25,000
Replace Zamboni
A -00-006
0
90,000
90,000
Building Maintenance
A -00-008
0
25,000
25,000
Refurbish West Arena
A-W01
0
1,000,000
1,000,000
Arena Total
25,000
25,000
25,000
1,090,000
1,165,000
Art Center
Roof Repair: Art Center
ART -00-002
0
20,000
20,000
Main Office Remodel Art Center
ART -00-005
0
10,000
10,000
Parking Lot Expansion
ART -01 -001
0
65,000
65,000
Art Center Total
20,000
65,000
10,000
95,000
Citywide
Citywide Fiber Optic Cabling
CW -02 -001
0
185,000
75,000
75,000
75,000
75,000
485,000
_._. Data Card System
CW -04 -001
0
20,000
20,000
Citywide Total
205,000
75,000
75,000
75,000
75,000
505,000
Edinborough Pk/Centennial Lks
Paver Replaanent (Edin)
ECL -00-004
0
14,000
14,000
Skate Sharpener
ECL -00-008
0
8,000
8,000
Greensmowers (Centen)
ECL -00-013
0
10,000
10,000
Replaster Pool EP
ECL -00-017
0
30,000
30,000
Centennial Lakes Park Speakers
ECL -00-018
0
7,000
7,000
Remodel Locker Rooms - Edinborough Park
ECL -00-026
0
15,000
15,000
Pool Fitter Room Exhaust
ECL -00-028
0
9,000
9,000
Page 9
Department Project Priority 2005 2006 2007 2008 2009 Total
Replace Telephone System
ECL -00-032
0
10,000
130,000
135,000
140,000 145,000
10,000
Replace Skate Tile - Centennial Lakes
ECL -00-033
0
7,000
36,000
37,000
38,000 39,000
7,000
Reshingle Centrum Building
ECL -02 -002
0
60,000
475,000
60,000
Cushman Vehicle
ECL -02 -004
0
10,000
850,000
10,000
Remodel Tot Lot Area
ECL -02 -005
0
50,000
18,000
18,000
New filter system for Edinborough Pool
ECL -03-003
0
60,000
500,000
60,000
Case Loader
ECL -03-004
0
50,000
20,000
20,000
Great Hall Doors
ECL -03-005
0
10,000
260,000
10,000
Pass ID System
ECL -03-006
0
255,000
8,000
172,000
178,000 2,269,000
8,000
Adventure Peak Remodel Improvement
ECL -03-007
0
25,000
.50,000
75,000
Centennial Lakes Park Storage Building
ECL -03-008
0
15,000
30,000
15,000
Paint Centennial Lakes Park Fixtures
ECL -03-009
0
25,000
25,000
Renovate artificial ponds at Centennial Lakes Park
ECL -03-010
0
15,000
30,000
15,000
Replace Great Hall Floor
ECL -03-011
0
45,000
45,000
EP Remove Planter Bed
ECL - 04-001
0
8,000
7,000
8,000
EP Replace Genie Lift
ECL - 04-002
0
6,500
6,500
EP Weight Equipment
ECL- 04-003
0
16,000
10,000
10,000
CL Replace Utility Vehicle
ECL-04-004
0
25,000
12,000
12,000
CL Bridge to Clubhouse
ECL- 04-005
0
10,000
40,000
40,000
Centennial Lakes Fountain
ECL4M06
0
65,000
8,000
8,000
Edinborough Pk/Centennial Lks
105,000
173,000
72,500 135,000
70,000
555,500
Golf Course
Maintenance Equipment: Braemar
GC-00-002
0
125,000
130,000
135,000
140,000 145,000
675,000
Miscellaneous Equipment: Braemar
GC -00 -007
0
30,000
36,000
37,000
38,000 39,000
180,000
Clubhouse Expansion - East Side: Braemar
GC-00-008
0
475,000
475,000
Redesign Holes 19-27: Braemar
GC-00-010
0
850,000
850,000
Braemar Range Automation
GC -00 -012
0
50,000
50,000
Driving Range Renovation
GC-02 -001
0
500,000
500,000
12th Tee Renovation
GC -03-001
0
50,000
50,000
Cart Path Renovation
GC-03 -002.
0
260,000
260,000
Golf Course Total
255,000
166,000
172,000
178,000 2,269,000
3,040,000
Golf Dome
Upgrade Electrical Service & Lighting
GD40-001
0
30,000
30,000
Propane Back -up Inflation System
GD -04 -001
0
15,000
15,000
Golf Dome Total
15,000
30,000
45,000
Liquor Stores
50th: Tile In Front of Beer Cooler
LIQ-00-015
0
7,000
7,000
50th: Replace carpet
LIQ -01 -001
0
10,000
10,000
50th: Replace 2 Compressors
LIQ -01 -002
0
16,000
16,000
York: Office Addition
LIQ-01 -004
0
25,000
25,000
York: Replace Counter Tops
LIQ-01 -006
0
10,000
10,000
York - Enclose Loading Dock
LIO -02 -002
0
65,000
65,000
Page 10
Department Project Priority 2005 2006 2007 2008 2009 Total
50th - Store Remodel LIQ -02 -005 . 0 75,000 75,000
Liquor Stores Total
90,000 26,000 92,000 208,000
Municipal Buildings
68,000 -
68,000
609,500 970,000 450,000 499,000 355,000
2,883,500
300,000
Public Works Building
MB- 04-001
0
8,000,000
450,000
Gymnasiums
MB 404-002
0
5,000,000
PS -01 -003
150,000
City Hall/Public Works Building
MB -04-003
0
35,000
35,000
35,000
Addition/Renovation Fire Station #1
MB -04 -004
0
0
600,000
60,500
Municipal Buildings Total
PS-03-001
92,000
5,035,000
8,635,000
35,000
Park & Recreation
110,000
215,000
120,000
120,000
Pathway Repairs /Additions: Amason Acres
PK -00-028
0
30,000
Playground: Alden Park
PK -00-031
0
110,000
90,000
-- - Parking Lot: Amason Park- - - -- - -
PK -00-032
--0--
-
-
- -
Renovate senior athletic field: Pamela Park
PK -00-033
0
300,000
Parking Lot: Weber Park
PK -00-035
0
Replace/Upgrade Concessions Bldg: Courtney
PK -00-036
0
450,000
Playground: McGuire Park
PK -00-037
0
120,000
Playground: Pamela Park
PK -00-039
0
Renovate softball field: Todd Park
PK -01 -001
0
Renovate athletic field: Braemar Park
PK -01 -003
0
312,000
Renovate west baseball field: Countryside Park
PK -01 04
0
Cahill School 8 Grange Building repairs
PK -02 -002
0
60,500
New Maintenance Garage: Courtney Fields
PK -02 -008
0
92,000
Renovate field #4: Courtney Ball Fields
PK -02 -010
0
360,000
Playground: Kojetin Park
PK -02-040
0
110,000
Playground: Chowen Park
PK -02-041
0
Playground: York Park
PK -02.042
0
New Entrance: Amason Acres Park
PK -02 -EXT
0
35,000
Batting /Pitching Cages - Pamela Park
PK -04 -001
0
50,000
Hockey Rink Relocation - Walnut Ridge Park
PK-04 -003
0
8,000,000
5,000,000
35,000 35,000 175,000
600,000
35,000 35,000 13,775,000
30,000
110,000
Park & Recreation Total
68,000 -
68,000
609,500 970,000 450,000 499,000 355,000
2,883,500
300,000
77,000
77,000
Training CV Bumer Unit
450,000
3
40,000
120,000
150,000
PS -01 -003
150,000
91,000
50,000
91,000
PS -02 -001
2
312,000
138,000
Outdoor Warning System
138,000
0
40,000
60,500
Fire Station Vehicle Exhaust Removal Systems
PS-03-001
92,000
55,000
55,000
360,000
110,000
215,000
120,000
120,000
120,000
120,000
35,000
50,000
90,000
90,000
Park & Recreation Total
609,500 970,000 450,000 499,000 355,000
2,883,500
Public Safety
Training CV Bumer Unit
PS -01 -001
3
40,000
40,000
In -Squad Video System
PS -01 -003
0
50,000
50,000
Computerized Emergency Medical Dispatch
PS -02 -001
2
30,000
30,000
Outdoor Warning System
PS -02 -004
0
40,000
40,000
Fire Station Vehicle Exhaust Removal Systems
PS-03-001
2
55,000
55,000
Public Safety Total
55,000 70,000 50,000 40,000
215,000
Page 11
Department Project Priority 2005 2006 2007 2008 :2009 Total
Public Works
Mill & Overlay: Benton Ave. (Hansen - Hwy 100)
PW -00-004
0
100,000
100,000
Mill & Overlay: Dewey Hill Road (Gleason - Cahill)
PW -00 -005
0
167,000
167,000
Reconstruct: Valley View Rd (Wooddale - 64th ST)
PW -00-008
0
500,000
0
500,000 » -
Mill & Overlay: Vernon (Lincoln/London - Gleason)
PW -00-010
0
224,000
UT -00-023
224,000
Reconstruct: 44th Ave. (TH 100 - France)
PW -00-012
0
100,000
400,000
400,000
Mill & Overlay: Brookside (Interlachen - RR)
PW-00 -013
0
130,000
2,000,000
130,000
Concrete Rehab: Tracy Ave. (Vernon - TH62)
PW -00-015
0
200,000
300,000
300,000
Concrete Rehab: W. 70th St. (TH100 - France)
PW -00-017
0
120,000
283,000
283,000
Neighborhood Street Recon. Program
PW -00-026
0
3,000,000
3,000,000 3,000,000 3,000,000 3,000,000
15,000,000
Street Lighting Highlands Area
PW -00-027
0
50,000
50,000
Browndale Bridge
PW -00-028
0
140,000
140,000
56th Street Bridge
PW -00.029
0
250,000
250,000
Sidewalks/Pathways (MSA)
PW -00-030
0
120,000
60,000 50,000 50,000 50,000
330,000
SidewalkslPathways: City Costs
PW -00-031
0
50,000
50,000 50,000 50,000 50,000
250,000
Concrete Rehab: Park lawn Ave. (France to W 77)
PW -00-074
0
300,000
300,000
Reconstruct: W 70th St. & Metro Blvd.
PW -01 -010
0
400,000
400,000
Reconstruct: W 62nd St. (Oaklawn - France)
PW -01 -011
0
320,000
320,000
Reconstruct: W 54th St. (Wooddale to France)
PW -01 -012
0
300,000
300,000
Milt Overlay: Eden Ave. (Vernon to Arcadia)
PW -01.013
0
48,000
48,000
Reconstruct: W. 58th St. (Concord to Wooddale)
PW -02 -001
0
400,000
400,000
Reconstruct: Concord Ave (VVRD to Southview Ln)
PW -02 -002
0
500,000
500,000
Mill &` Oveday :Southview.Ln,(TH100toConcord)
PW -02 -003
0
120,000
120,000
Landscaping: W 54th St at Minnehaha Creek
PW -02 -005
0
65,000
65,000
Public Works: Braemar Cold Storage: Concrete Floor
PW -02 -006
0
80,000
80,000
Signals: W 50th St & Dale Ave
PW -03-002
0
180,000
180,000
Mill & Overlay: Blake Rd (Vernon to Intedachen)
PW -03-003
0
120,000
120,000
Reconstruct: W 58th St (France to Xerxes)
PW -03-005
0
300,000
300,000
Mill & Overlay: W 50th St (Wooddale to France)
PW -03-007
0
155,000
155,000
Aesthetic Barriers: Various Locations
PW -03-008
0
1,205,600
1,205,600
Reconstruct: W 58th St (Wooddale to France)
PW -04 -001
0
750,000
750,000
Sidewalk I Pathway: Interiachen Boulevard
PW -04 -002
0
1,500,000
1,500,000
Public Works Total 1 6,206,600 5,088,000 5,040,000 4,433,000 4,100,000 24,867,600
Utility Department
Van Valkenburg Water Tower (paint)
UT -00-008
0
600,000
600,000
WatermainlSanitary: Country Club Area
UT -00-020
0
1,236,000
1,236,000
2,472,000
WatermainlSanihary: Nine Mile Village
UT -00-021
0
300,000
300,000
Utility Data Collection System (Water)
UT -00-023
0
100,000
100,000
Water Main Improvements
UT -00-025
0
400,000
400,000
400,000 400,000 400,000
2,000,000
Sanitary Sewer Improvements
UT- 00-026
0
200,000
200,000
200,000 200,000 200,000
1,000,000
Storm Sewer: W. 59th Street & Ashcroft Ave.
UT- 00-028
0
120,000
120,000
Pond & Lake Dredging
UT -00-030
0
60,000
60,000
60,000 60,000 60,000
300,000
Page 12
Department
Project
Priority
2005
2006
2007 2008
2009 Total
Storm Sewer Pipe & Grading Improvements
UT-00 -034
0
120,000
120,000
120,000 120,000
120,000 600,000
Portable Generator: 300 KW Wtr Trtmt Pnt No 1
UT -01 -008
0
90,000
90,000
Stone water Lift Station (Highlands Lake)
UT -02 -003
0
75,000
75,000
Annual Vehicle Replacements
UT -02 -004
0
70,000
55,000
55,000
180,000
Well #7 (5241 Eden Circle)
UT -02 -005
0
100,000
100,000
Well #3 (5233 Halifax Avenue)
UT -02 -008
0
160,000
160,000
Well #16 (6301 Gleason Road)
UT -02 -011
1
160,000
160,000
Well #17 (5900 Park Place)
UT -02 -012
0
160,000
160,000
Portable Generator Replacement: 25OKW
UT -02 -013
0
90,000
90,000
Well #10 (4500 West 76th Street)
UT -02 -014
0
65,000
65,000
Well #11 (4500 West 76th Street)
UT -02 -015
0
65,000
65,000
Well #17 Piping to Filter Plant #2
UT -02 -016
0
300,000
300,000
Lift Station #22 (7701 France Avenue)
UT -02 -017
0
100,000
100,000
Lift Station #21 (5970 Walnut Drive)
UT -02 -018
0
100,000
100,000
Storm Sewer. Schaeffer Road
UT -02 -025
0
160,000
160,000
New 6 inch Trash Pump
UT -03-003
0
30,000
30,000
Lift Station # 6 (4400 West 72nd Street)
UT -03-004
.0
150,000
150,000
Lift Station #3 (5707 Warden Ave)
UT -03-005
0
75,000
75,000
Backwash Recycling Tank: Treatment Plant No. 2
UT -03-006
0
320,000
320,000
Backwash Recycling Tank: Treatment Plant No. 3
UT -03-007
0
320,000
320,000
Backwash Recycling Tank: Treatment Plant No. 4
UT -03-008
0
320,000
320,000
Lift Station #1 (4041 Sunnyside Road)
UT -03-010
0
50,000
50,000
Lift Station #21 (5970 Walnut Drive)
UT -03-011
0
50,000
50,000
1998 Cat Backhoe Replacement
UT -03-012
0
140,000
140,000
Pickup truck Replacements
UT -03-013
0
60,000
60,000
Water Main Replacement Program
. UT- 03-014.
0
_ ......
300,000
300,000
Well #2 (4521 West 50th Street)
UT -03-015
0
50,000
50,000
GPS System
UT -03-016
0
50,000
50,000
Well No. 7 Treatment
UT- 03-017
0
500,000
500,000
Replace Sanitary Sewer Main on Shannon Drive
UT -04-001
2
80,000
80,000
Water Treatment Plant #1 Roof Replacement
UT -04-002
2
30,000
30,000
Expand the Pond at 42nd Street and France Ave.
UT -04003
2
100,000
100,000
Well #4 (4701 Southview Lane)
UT -04-004
1
100,000
100,000
Public Works: Braemar Work Site - Lead Removal
UT -04005
0
200,000
200,000
Utility Billing Software
UT -04006
1
92,000
92,000
184,000
Utility Department Total 4,147,000 3,448,000 2,501,000 1,530,000 780,000 12,406,000
GRAND 16,823,100 19,241,000 8,522,500 6,970,000 8,894,000 60,450,600
Page 13
Capital Improvement Program
City of Edina, MN
PROJECTS BY FUNDING SOURCE
2005 thm 2009
Source Project Priority 2005 2006 2007 2008 2009 Total
Enterprise Funds
Upgrades and Replacements
AOC-00-007
0
50,000
50,000
100,000
Flowrider
AOC-03-001
0
500,000
500,000
Expand Deck & Fence Line
AQC-04 -001
0
35,000
35,000
Theme wall addition
AQC- 04-002
0
35,000
35,000
Replace Light Poles
AQC- 04-003
0
20,000
20,000
Paver Replaanent (Edin)
ECL -00-004
0
14,000
14,000
Skate Sharpener
ECL -00-008
0
8,000
8,000
Greensmowers (Centen)
ECL -00-013
0
10,000
10,000
Replaster Pool EP
ECL -00-017
0
30,000
30,000
Centennial Lakes Park Speakers
ECL -00-018
0
7,000
7,000
Remodel Locker Rooms - Edinborough Park
ECL -00-026
0
15,000
15,000
Pool Filter Room Exhaust
ECL -00-028
0
9,000
9,000
Replace Telephone System
ECL -00-032
0
10,000
10,000
Replace Skate Tile - Centennial Lakes
ECL -00-033
0
7,000
7,000
Reshingle Centrum Building
ECL -02 -002
0
60,000
60,000
Cushman Vehicle,
ECL -02 -004
0
10,000
10,000
Remodel Tot Lot Area
ECL -02 -005
0
18,000
18,000
New filter system for Edinborough Pool
ECL -03-003
0
60,000
60,000
Case Loader
ECL -03-004
0
20,000
20,000
Great Hall Doors
ECL -03-005
0
10,000
10,000
Pass ID System
ECL -03-006
0
8,000
8,000
Adventure Peak Remodel Improvement
ECL -03-007
0
25,000
50,000
75,000
Centennial Lakes Park Storage Building
ECL -03-008
0
15,000
15,000
Paint Centennial Lakes Park Fixtures
ECL -03-009
0
25,000
25,000
Renovate artificial ponds at Centennial Lakes Park
ECL -03-010
0
15,000
15,000
Replace Great Hall Floor
ECL -03-011
0
45,000
45,000
EP Remove Planter Bed
ECL - 04,001
0
8,000
8,000
EP Replace Genie Lift
ECL - 04002
0
6,500
6,500
EP Weight Equipment
ECL -04-003
0
10,000
10,000
CL Replace Utility Vehicle
ECL-04-004
0
12,000
12,000
CL Bridge to Clubhouse
ECL4"05
0
40,000
40,000
Centennial Lakes Fountain
ECL4"06
0
8,000
8,000
Maintenance Equipment: Braemar
GC-00-002
0
125,000
130,000
135,000
140,000
145,000
675,000
Miscellaneous Equipment: Braemar
GC-00-007
0
30,000
36,000
37,000
38,000
39,000
180,000
Clubhouse Expansion - East Side: Braemar
GC-00-008
0
475,000
475,000
Redesign Holes 19-27: Braemar
GC-00-010
0
850,000
850,000
Page 14
Source Project
Priority
2005
2006
2007 2008 2009
Total
Braemar Range Automation
GC -00-012
0
50,000
50,000
Driving Range Renovation
GC-02 -001
0
500,000
500,000
12th Tee Renovation
GC-03-001
0
50,000
50,000
Cart Path Renovation
GC-03-002
0
260,000
260,000
Upgrade Electrical Service & Lighting
GD -00-001
0
30,000
30,000
Propane Back -up Inflation System
GD -04 -001
0
15,000
15,000
50th: Tile In Front of Beer Cooler
LIQ-00 -015
0
7,000
7,000
50th: Replace carpet
LIQ -01 -001
0
10,000
10,000
50th: Replace 2 Compressors
LIQ -01 -002
0
16,000
16,000
York: Office Addition
LIQ -01 -004
0
25,000
25,000
York: Replace Counter Tops
LIQ -01 -006
0
10,000
10,000
York - Enclose Loading Dock
LIQ -02 -002
0
65,000
65,000
50th - Store Remodel
LIQ -02 -005
0
75,000
75,000
Enterprise Funds Total
520,000
865,000
371,500 363,000 2,419,000
4,538,500
General Obligation Improvement
Neighborhood Street Recwn. Program
PW -00 -026
0
3,000,000
3,000,000
3,000,000 3,000,000 3,000,000
15,000,000
General Obligation
3,000,000
3,000,000
3,000,000 3,000,000 3,000,000
15,000,000
Improvement Bonds Total
GO Public Improvement Bonds
Public Works Building Improvements
MB -04 -001
0
8,000,000
8,000,000
Addition/Renovation Fire Station #1
MB -04 -004
0
600,000
600,000
GO Public Improvement Bonds
8,600,000
8,600,000
Lease Revenue Bonds
Gymnasiums
MB -04 -002
0
5,000,000
5,000,000
Lease Revenue Bonds Total
5,000,000
5,000,000
Municipal State Aid
Mill & Overlay: Benton Ave. (Hansen - Hwy 100)
PW -00 -004
0
100,000
100,000
Mill & Overlay: Dewey Hill Road (Gleason - Cahill)
PW -00 -005
0
167,000
167,000
Reconstruct: Valley View Rd ( Wooddale - 64th ST)
PW -00-008
0
500,000
500,000
Mill & Overlay: Vernon (Lincoln/London - Gleason)
PW -00-010
0
224,000
224,000
Reconstruct: 44th Ave. (TH 100 - France)
PW -00 -012
0
320,000
320,000
-" Mill & Overlay: Brookside (Interlachen - RR)
PW -00 -013
0
130,000
130,000
Concrete Rehab: Tracy Ave. (Vernon - TH62)
PW -00 -015
0
220,000
220,000
Concrete Rehab: W. 70th St. (TH100 - France)
PW -00 -017
0
203,000
203,000
Sidewalks/Pathways (MSA)
PW -00-030
0
120,000
60,000
50,000 50,000 50,000
330,000
Concrete Rehab: Parklawn Ave. (France to W 77)
PW -00 -074
0
200,000
200,000
Reconstruct: W 70th St. & Metro Blvd.
PW -01 -010
0
320,000
320,000
Reconstruct: W 62nd St. (Oaklawn - France)
PW -01 -011
0
264,000
264,000
Reconstruct: W 54th St. ( Wooddale to France)
PW -01 -012
0
240,000
240,000
Mill & Overlay: Eden Ave. (Vernon to Arcadia)
PW -01 -013
0
48,000
48,000
Reconstruct: W. 58th St. (Concord to Wooddale)
PW -02 -001
0
315,000
315,000
Reconstruct: Concord Ave (VVRD to Southview Ln)
PW -02 -002
0
400,000
400,000
Page 15
Source Project
Priority
2005 2006 2007
2008 2009
Total
Mill & Overlay: Southview Ln (TH100 to Concord)
PW -02 -003
0
120,000
Truck With Snow Plow
120,000
Signals: W 50th St & Dale Ave
PW -03 -002
0
180,000
180,000
Mill & Overlay: Blake Rd (Vernon to Interlachen)
PW -03-003
0
0
120,000
120,000
Reconstruct: W 58th St (France to Xerxes)
PW -03-005
0
90,000
240,000
240,000
Mill & Overlay: W 50th St (Wooddale to France)
PW -03-007
0
155,000
25,000
155,000
Reconstruct: W 58th St (Wooddale to France)
PW4"01
0
0
600,000
600,000
Sidewalk / Pathway: Intedachen Boulevard
PW- 04-002
0
1,500,000
Main Office Remodel Art Center
1,500,000
Municipal State Aid Total
1,611,000 1,348,000 1,934,000
1,073,000 930,000
6,896,000
Revenue Bonds
Parking Lot Expansion
ART -01 -001
0
65,000
Refurbish West Arena
A- 04-001
0
65,000
1,000,000
1,000,000
Revenue Bonds Total
185,000
75,000
75,000
1,000,000
1,000,000
Revolving Fund
Bathroom Remodel (Arena)
A -00-001
0
25,000
25,000
Truck With Snow Plow
A -00-002
0
25,000
25,000
Replace Zamboni
A -00-006
0
90,000
90,000
Building Maintenance
A -OM08
0
25,000
25,000
Roof. Repair: Art Center
ART -00-002
0
20,000
20,000
Main Office Remodel Art Center
ART -00-005
0
10,000
10,000
Parking Lot Expansion
ART -01 -001
0
65,000
65,000
Citywide. Fiber Optic Cabling
CW -02 -001
0
185,000
75,000
75,000
75,000
_75,000
485,000
Data Card System
CW -04-001
0
20,000
20,000
City Hall/Public Works Building
MB- 04-003 "
0
35,000
35,000
35,000
35,000
35,000
175,000
Pathway Repairs /Additions: Amason Acres
PK -00 -028
0
30,000
30,000
Playground: Alden Park
PK -00-031
0
110,000
110,000
Parking Lot: Amason Park
PK -00-032
0
68,000
68,000
Renovate senior athletic field: Pamela Park
PK 40-033
0
300,000
300,000
Parking Lot: Weber Park
PK -00-035
0
77,000
77,000
Replace/Upgrade Concessions Bldg: Courtney
PK -00 -036
0
450,000
450,000
Playground: McGuire Park
PK -00-037
0
120,000
120,000
Playground: Pamela Park
PK -00-039
0
150,000
150,000
Renovate softball field: Todd Park
PK -01 -001
0
91,000
91,000
Renovate athletic field: Braemar Park
PK -01 -003
0
312,000
312,000
Renovate west baseball field: Countryside Park
PK -01 -004
0
138,000
138,000
Cahill School & Grange building repairs
PK -02 -002
0
60,500
60,500
New Maintenance Garage: Courtney Fields
PK -02 -008
0
92,000
92,000
Renovate field 94: Courtney Ball Fields
PK -02 -010
0
360,000
360,000
Playground: Kojetin Park
PK- 02-040
0
110,000
110,000
Playground: Chowen Park
PK- 02-041
0
120,000
120,000
Playground: York Park
PK- 02-042
0
120,000
120,000
New Entrance: Amason Acres Park
PK- 02 -EXT
0
35,000
35,000
Batting /Pitching Cages - Pamela Park
PK -04 -001
0
50,000
50,000
Hockey Rink Relocation - Walnut Ridge Park
PK -04 -003
0
90,000
90,000
Training Ctr Burner Unit
PS-01 -001
3
40,000
40,000
In -Squad Video System
PS-01 -003
0
50,000
50,000
Page 16
Source Project
Priority
2005
2006
2007 2008 2009
Total
Computerized Emergency Medical Dispatch
PS -02 -001
2
30,000
30,000
Outdoor Warning System
PS -02 -004
0
40,000
40,000
Fire Station Vehicle Exhaust Removal Systems
PS -03-001
2
55,000
55,000
Fire Station #1 Fitness Room Addition
PS -04 -001
3
90,000
90,000
Sidewalks/Pathways: City Costs
PW -00-031
0
50,000
50,000
50,000 50,000 50,000
250,000
Landscaping: W 54th St at Minnehaha Creek
PW -02 -005
0
45,000
45,000
Public Works: Braemar Cold Storage: Concrete Floor
PW -02 -006
0
80,000
80,000
Revolving Fund Total
1,044,500
1,370,000
660,000 694,000 645,000
4,413,500
Special Assessments
Reconstruct: 44th Ave. (TH 100 - France)
PW -00-012
0
80,000
80,000
Concrete Rehab: Tracy Ave. (Vernon - TH62)
PW -00-015
0
80,000
80,000
Concrete Rehab: W. 70th St. (TH100 - France)
PW -00-017
0
80,000
80,000
Street Lighting Highlands Area
PW -00-027
0
50,000
50,000
Browndale Bridge
PW -00-028
0
140,000
140,000
Concrete Rehab: Parklawn Ave. (France to W 77)
PW -00-074
0
100,000
100,000
Reconstruct: W 70th St. & Metro Bbd.
PW -01 -010
0
80,000
80,000
Reconstruct: W 62nd St. (Oaklawn - France)
PW -01 -011
0
56,000
56,000
Reconstruct: W 54th St. ( Wooddale to France)
PW -01-012
.. 0
60,000
60,000
Reconstruct: W. 58th St. (Concord to Wooddale)
PW -02-001
0
85,000
85,000
Reconstruct: Concord Ave (VVRD to Southview Ln)
PW -02 -002
0
100,000
100,000
Reconstruct: W 58th St (France to Xerxes)
PW -03-005
0
60,000
60,000
Aesthetic Barriers: Various Locations
PW -03-008
0
1,205,600
1,205,600
Reconstruct: W 58th St ( Wooddale to France)
PW- 04-001
0
150,000
150,000
Special Assessments Total
1,480,600
360,000
56,000 310,000 120,000
2,326,600
State Bridge Bond
56th Street Bridge
PW -00-029
0
250,000
250,000
State Bridge Bond Total
250,000
250,000
Utility Funds
Landscaping: W 54th St at Minnehaha Creek
PW -02 -005
0
20,000
20,000
Van Valkenburg Water Tower (paint)
UT -00-008
0
600,000
600,000
Watermain/Sanitary: Country Club Area
UT -00-020
0
1,236,000
1,236,000
2,472,000
Watermain/Sanitary: Nine Mile Village
UT -00.021
0
300,000
300,000
Utility Data Collection System (Water)
UT- 00-023
0
100,000
100,000
Water Main Improvements
UT -00-025
0
400,000
400,000
400,000 400,000 400,000
2,000,000
Sanitary Sewer Improvements
UT- 00-026
0
200,000
200,000
200,000 200,000 200,000
1,000,000
Storm Sewer: W. 59th Street & Ashcroft Ave.
UT -00-028
0
120,000
120,000
• - Pond & Lake Dredging
UT- 00-030
0
60,000
60,000
60,000 60,000 60,000
300,000
. Storm Sewer Pipe & Grading Improvements
UT- 00-034
0
120,000
120,000
120,000 120,000 120,000
600,000
Portable Generator: 300 KW Wtr Trtmt Pnt No 1
UT -01 -008
0
90,000
90,000
Storm water Lift Station (Highlands Lake)
UT -02 -003
0
75,000
75,000
Annual Vehicle Replacements
UT -02 -004
0
70,000
55,000
55,000
180,000
Well #7 (5241 Eden Circle)
UT -02 -005
0
100,000
100,000
Well #3 (5233 Halifax Avenue)
UT -02 -008
0
160,000
160,000
Well #16 (6301 Gleason Road)
UT -02 -011
1
160,000
160,000
Page 17
Source
Project
Priority
2005
2006 2007 2008
2009 Total
Well #17 (5900 Park Place)
UT -02 -012
0
160,000
160,000
Portable Generator Replacement: 250KW
UT -02 -013
0
90,000
90,000
Well #10 (4500 West 76th Street)
UT -02 -014
0
65,000
65,000
Well #11 (4500 West 76th Street)
UT -02 -015
0
65,000
65,000
Well #17 Piping to Filter Plant #2
UT -02 -016
0
300,000
300,000
Lift Station #22 (7701 France Avenue)
UT -02 -017
0
100,000
100,000
t.ift Station #21 (5970 Walnut Drive)
UT -02 -018
0
100,000
100,000
Storrs Sewer: Schaeffer Road
UT -02 -025
0
160,000
160,000
New 6 inch Trash Pump
UT -03-003
0
30,000
30,000
Lift Station # 6 (4400 West 72nd Street)
UT -03-004
0
150,000
150,000
Lift Station #3 (5707 Warden Ave)
UT -03-005
0
75,000
75,000
Backwash Recycling Tank: Treatment Plant No. 2
UT -03-006
0
320,000
320,000
Backwash Recycling Tank: Treatment Plant No. 3
UT -03-007
0
320,000
320,000
Backwash Recycling Tank: Treatment Plant No. 4
UT -03-008
0
320,000
320,000
Lift Station #1(4041 Sunnyside Road)
UT -03-010
0
50,000
50,000
Lift Station #21(5970 Walnut Drive)
UT -03-011
0
50,000
50,000
1998 Cat Bacldroe Replacement
UT -03 -012
0
140,000
140,000
Pickup truck Replacements
UT -03-013
0
60,000
60,000
Water Main Replacement Program
UT -03-014
0
300,000
300,000
Well #2 (4521 West 50th Street)
UT -03-015
0
50,000
50,000
GPS System
UT -03-016
0
50,000
50,000
Well No. 7 Treatment
UT -03.017
0
500,000
500,000
Replace Sanitary Sewer Main on Shannon Drive
UT- 04-001
2
80,000
80,000
Water Treatment Plant #1 Roof Replacement
UT -O"02 ,
2
30,000
.30,000
Expand the Pond at 42nd Street and France Ave.
UT- 04-003
2
100,000
100,000
Well #4 (4701 Southview Lane)
UT- 04-004
1
100,000
100,000
Public Works: Braemar Work Site - Lead Removal
UT- 04-005
0
200,000
200,000
Utility Billing Software
UT4A -006
1
92,000
92,000
184,000
Utility Funds Total 4,167,000 3,448,000 2,501,000 1,530,000 780,000 12,426,000
GRAND 16,823,100 19,241,000 8,522,500 6,970,000 8,894,000 60,450,600
Page 18
CIP PROJECT
DESCRIPTIONS
200-5
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # AQC -04001
Project Name Expand Deck & Fence Line
Type Improvement
Useful Life
Category Unassigned
category names
Priority n/a
Contact
Department Aquatic Center
ription
project will move the south fence line at the Edina Aquatic Center a few feet further to the south and yet maintain a
grade. The added deck space will be concrete to match existing deck.
Justification
Through our experience, we have learned that our customers at the Edina Aquatic Center need more deck space on
many days during the most;favorable weathered"swimming days.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 35,000 35,000
Total 35,000 35,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 35,000 35,000
Total 35,000 35,000
Page 1 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Iroject # AQC -04-002
'roject Name Theme wall addition
Type Unassigned Priority n/a
- Useful Life — — — - Contact - -Park &Recreation
Category Building Improvements Department Aquatic Center
category names
Description
The plan is to continue the theming aesthetics under the existing ship used as a platform for the cable ride. This
expanded theming will make the existing filter room look like a large rock wall under the ship.
Justification
Che theming of the filter room exterior will provide an added visual attraction to the Edina Aquatic Center that will be
;asily visible from the high volume traffic Crosstown Highway 62. The theming is intended to be an attractive
tdvertising piece to draw customers to the facility.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 35,000 35,000
Total 35,000 35,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 35,000 35,000
Total 35,000 35,000
Page 2 of 65
Capital Improvement Program Data in Year Zoos
City of Edina, MN
Project # A -00 -002
Project Name Truck With Snow Plow
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Arena
Description
For purchase of a 1 ton pickup truck with a snow plow attachment.
Justification
We need to be self - sufficient with plowing snow around the facility before the Street Department is able to plow the
irea. This will similar to the current Braemar Golf Course self-sufficient snow removal operations.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 25,000 25,000
Total 25,000 25,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 25,000 25,000
Total 25,000 25,000
Page 3 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # . ART -00 -002
Project Name Roof Repair: Art Center
Type Improvement Priority n/a
Useful Life - Contact Park &- Recreation --
Category Building Improvements Department Art Center
category names
F Spec, professional roofing inspector, has determined that the Art Center needs approximately $20,000 in roof
it in 2005.
Justification
the roof on the old section of the Art Center is over 20 years old and in need of repair
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 20,000 20,000
Total 20,000 20,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 20,000 20,000
Total 20,000 20,000`
Page 4 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # CW-02 -001
Project Name Citywide Fiber Optic Cabling
Type Improvement
Useful Life
Category Computer Network
category names
Priority n/a
Contact Asst City Manager
Department Citywide
This represents the cost of running fiber optic cabling to a number of our offsite facilities. Currently, we connect to
many of our facilities through the use of T1 phone lines which cost us around_$3,000 per T1 line. Some of our facilities
have multiple T1 lines to accommodate both voice and data transmissions. By running fiber optic cabling to these
facilites, the City could remove the operating expense of the T lines from the offsite budgets. There would be a small
offset of annual costs associated with service contracts on the equipment needed at each end of the cabling. It would
also allow us to look at Voice over IP for our telecommunications in the long run. Most of the larger facilities (Fire and
Public Works ) have a 3 -4 year payback 'of the 60 61 costs inopeiating cost reductions.
Justification
Expenditures '200.5
2006
2007
2008
2009
Total
EquipNehicles /Furnishings 185,000
75,000
75,000.
75,000
75,000
485,000
Total 185,000
75,000
75,000
75,000
75,000
485,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 185,000 75,000 75,000 75,000 75,000 485,000
Total 185,000 75,000 75,000 75,000 75,000 485;000
Page 5 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # CW- 04-001
Project Name Data Card System
Type Equipment
Useful Life
Category Computer Software
category names
Description
Priority n/a
Contact IT Manager
Department Citywide
,tly our Aquatic Center and Edinborough Park are using stand -alone Phot ID systems to create ID badges.
;ly, the Golf Course expressed an interest in using this type of technology to produce their annual 2500+ patron
This eliminates their manual method of producing patron cards, allowing them to generate phot ID patron cards,
would make it easier for golf course staff to validate patrons and eliminate patron fraud.
e could provide a citywide, threeworkstations, solution that could provide the core set of tolls for creating cards and
port designs, creating production forms, entering and retrieving data, capturing images and sending jobs to one central
int location.
Justification
ing in this technology citywide gives us a more complete identification card solution. Besides placing a
,tation at our Braemar Golf Course, two additional workstations could be placed at city hall to create employee,
;tion and public safety identification badges, eliminating the need for cutting, pasting and laminating. One dual
printer would be installed at city hall to produce all card types.
workstation could also be added at city hall to produce seasonal pool passes, as an alternative site. This would be an
ded convenience for our residents, and reduce congestion at the beginning of the season.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Furnishings 20,000 20,000
Total 20,000 20,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 20,000 20,000
Total 20,000 20,000
Page 6 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # . ECL-00 -032
Project Name Replace Telephone System
Type Improvement
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial I.ks
the existing telephone system at Edinborough Park and Centennial Lakes Park.
Justification
The existing telephone system was installed in 1991. The
becoming increasingly more difficult to find.
i
frequently breaks down and replacement parts are
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 10,000 10,000
Total 10,000 10,000
Page 7 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # ECL-00 -033
Project Name Replace Skate Tile - Centennial Lakes
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
Description
[ieplace the skate tile flooring for the Centrum Building at Centennial Lakes Park.
Justification
The skate file flooring for the Centrum Building at Centennial Lakes Park was purchased and installed in 1990 and
seeds to be replaced in 2005.
-Expenditures
EquipNehicles /Fumishings
2005 2006
7,000
2007 2008 2009 Total
7,000
Total
7,000
7,000
Funding Sources
2005 2006
2007 2008 2009 Total
Enterprise Funds
7,000
7,000
Total
7,000
7,000
Page 8 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # ECL -02 -004
Project Name Cushman Vehicle
Type Equipment
Useful Life
Category Equipment Replacement
category names
Cushman utility vehicle.
Priority n/a
Contact Park & Recreation
Department Edinborougb Pk/Centennial Lks
Justification
This is a•routine equipment replacement; purchase, in this. case a 1985 Cushman utility vehicle. This maintenance
vehicle is used to haul grass clippings, leaves and plant materials out of the park.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 10,000 10,000
Total 10,000 10,000
Page 9 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # ECL -03 -003
Project Name New filter system for Edinborough Pool
Type Improvement
Useful Life
Category
category names
Description
Add a new pool filtration system.
Priority n/a
Contact
Department Edinborough Pk/Centennial Lks
Justification
The current pool filtration system does meet code and requires major retrofit.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 60,000 60,000
Total 60,000 60,000
Funding Sources 2005 2006 2007 2008 2009 Total
- Enterprise Funds 60,000 60,000
Total 60,000 60,000
Page 10 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # ECL-03 -005
Project Name Great Hall Doors
Type Improvement
Useful Life
Category
category names
glass doors to Great Hall.
Priority n/a
Contact
Department Edinborough Pk/Centennial Lks
Justification
To provide for better security during set -ups and take - downs for rentals and special events.
Expenditures 2005 2006 2007 2008 2009 Total
Construcbon/Maintenance 10,000 10,000
Total 10,000 10,000
Funding Sources
Enterprise Funds
2005 2006 2007 2008 2009 Total
10,000 10,000
Total 10,000 10,000
Page 11 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # ECL -04 -001
Project Name EP Remove Planter Bed
Type Improvement
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
Description
Kemove the planter bed wall by Adventure Peak.
Justification
Che removal of a portion of planter bed outside of Adventure Peak is needed to allow for stroller parking and coat rack
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 8,000 8,000
Total 8,000 8,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 8,000 8,000
Total 8,000 8,000
Page 12 of 65
Capital Improvement Program Data in Year 2005
City of Edina, NW
Project # GC -00 -002
Project Name Maintenance Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
Routine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment.
Justification
These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that
are on a 10 -15 year replacement schedule.
Page 13 of 65
Expenditures
2005
2006
2007
2008
2009
Total
EquipNehicles /Fumishings
125,000
130,000
135,000
140,000
145,000
675,000
Total
125,000
130,000
135,000
140,000
145,000
675,000
Funding Sources
2005
2006
2007
2008
2009
Total
Enterprise Funds
125,000
130,000
135,000
140,000
145,000
675,000
Total
125,000
130,000
135,000
140,000
145,000
675,000
Page 13 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # GC -00 -007
Project Name Miscellaneous Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
Routine equipment replacement purchases for driving range equipment and small utility vehicles.
Justification
These are routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that
ire on a 10 year replacement schedule.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Furnishings 30,000 36,000 37,000 38,000 39,000 180,000
Total 30,000 36,000 37,000 38,000 39,000 180,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 30,000. 36,000 37,000 38,000 39,000 180,000
Total 30,000 36,000 37,000 38,000 39,000 180,000
Page 14 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # GC-00 -012
Project Name Braemar Range Automation
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
the plan is to add a small building with automated ball dispenser machines.
Justification
fling an automated ball dispenser machine reduces labor costs, increases cash control, and better serves our driving
tinge customers.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 50,000 50,000
Total 50,000 50,000
Page 15 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # GC -03 -001
Project Name 12th Tee Renovation
Type Improvement Priority n/a
Useful Life Contact
Category Department Golf Course
category names
Description
Expand the 12th tee to create more green space for tee area, primarily the middle tee box.
Justification
The 12th tee, our signature hole, has always had problem with adequate turf. The teeing ground on par three holes
always seem to lack enough turf to support the amount of play that golf shots require from these areas. With over 200
shots every day, there soon is no turf left. Laying sod does not work. Increasing turf area is the only solution. This
picturesque tee setting needs to be enlarged. The present plan and expenditure will more than double tee size. The
middle tee is the primary expansion which will mean considerable keystone construction.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 50,000 50,000
Total 50,000 50,000
Page 16 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # LIQ -01-004
Project Name York: Office Addition
Type Improvement Priority n/a
Useful Life Contact Liquor Stores
Category Building Improvements Department Liquor Stores
category names
Description
Add office space above beer cooler for Liquor Director.
Justification
Veed office space for Liquor Director to conduct business without sharing space with 3 other employees.
Expenditures
Construction/Maintenance
2005 2006
25,000
2007 2008 2009 Total
25,000
Total
25,000
25,000
Funding Sources
2005 2006
2007 2008 2009 Total
Enterprise Funds
25,000
25,000
Total
25,000
25,000
Page 17 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # LIQ- 02-002
Project Name York - Enclose Loading Dock
Type Improvement Priority n/a
Useful Life Contact Liquor Stores
Category Building Improvements Department Liquor Stores
category names
Description
Take existing loading dock and enclose it by adding walls and roof. Will also install mechanical leveling gate.
Justification
need bigger opening and area for checking in merchadise. Wastes energy by always having door open for deliveries.
Expenditures 2005 2006 2007 2008 2009 Total
Construclion/Maintenance 65,000 65,000
Total 65,000 65,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 65,000 65,000
Total 65,000 65,000
Page 18 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project a . M B- 04-002
Project Name Gymnasiums
Type Improvement Priority n/a
Useful Life Contact City Manager
Category Building Improvements Department Municipal Buildings
category names
Description
Build two new gymnasiums on school property.
Justification
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 5,000,000 5,000,000
Total 5,000,000 5,000,000
Funding Sources 2005 . 2006 2007 2008 2009 Total
Lease /Revenue Bonds 5,000,000 5,000,000
Total 5,000,000 5,000,000
Page 19 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
J'rgject # MB -04 -003
'roject Name City Hall/Public Works Building
Type Unassigned
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Asst City Manager
Department Municipal Buildings
Description
These funds will cover any changes /additions to file areas, workstations and record storage.
Justification
Expenditures 2005
2006
2007
2008
2009
Total
EquipNehicles /Fumishings 35,000
35,000
35,000
35,000
35,000
175,000
Total 35,000
35,000
35,000
35,000
35,000
175,000
Funding Sources 2005
Revolving Fund 35,000
2006
35,000
2007
35,000,
2008
35,000
2009
35,000
Total
175,000
Total 35,000
35,000
35,000
35,000
35,000
175,000
Page 20 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PK-01 -003
Project Name Renovate athletic field: Braemar Park
Type Improvement
Useful Life
Category Ballfield Improvements
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
Description
Regrade the soccer field turf and provide new sand and peat mixture sub -soils and re- install the underground irrigation
system.
Justification
This soccer field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The
irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow
for reduced use of herbicides.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 312,000 312,000
Total 312,000 312,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 312,000 312,000
Total 312,000 312,000
Page 21 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PK-02 -002
Project Name Cahill School & Grange building repairs
Type Improvement
Useful Life
'Category Building Improvements
category, names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
Description
[be historic Cahill School and Grange buildings need roof replacement, custom wood window replacement, exterior
Nall painting that includes some wood siding replacement, and drain tile work on both buildings.
Justification
3oth roofs are in need of replacement, there is water constantly seeping into the basements of both buildings, the
windows are falling out of the rotted wood panes, and the exterior walls need painting while some exterior boards need
o be replaced.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 60,500 60,500
Total 60,500 60,500
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 60,500 60,500
Tom 60,500 60,500
Page 22 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project# PK-02 -008
Project Name New Maintenance Garage: Courtney Fields
Type Improvement
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
plan is to tear down the existing garage and replace it with a new and larger garage that will support the
itenance needs of four heavily- scheduled baseball fields at the Courtney Complex.
ect Propose: Staff
stification
isting garage is at the point where the roof needs replacement and, from an operations standpoint, the garage needs
argement.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 92,000 92,000
Total 92,000 92,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 92,000 92,000
Total 92,000 92,000
Page 23 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PK -02 -040
Project Name Playground: Kojetin Park
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Park Development Department Park & Recreation
category names
Description
Meet with neighborhood group, gather thoughts and ideas, contract landscape, architect, bid project, accept desired bid.
Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
border and adding new playground equipment with accessible path to transfer stations.
Justification I
Che current playground equipment was installed in 1991. Playground equipment is currently on a 15 year replacement
schedule. If replaced in the year 2006, the equipment will have been 16 years old. In some cases, even if equipment
tppears to be structurally sound after 15 years, the equipment will likely no longer conform to current safety standards
Ind will need a new look.
Expenditures 2005 2006 2007 2008 2009 Total.
Construction/Maintenance 110,000 110,000
Total 110,000 110,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 110,000 110,000
Total 110,000 110,000
Page 24 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN .
Project # . PK- 02 -EXT
Project Name New Entrance: Arneson Acres Park
Type Improvement
Useful Llfe
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
mption
�n public entrance /exit, install island for incoming and outgoing traffic, remove berm along 70th Street, and install
park identification sign.
Justification I
This park improvement is needed to improve the safety and visibility for those wishing to use Arneson Acres'Park,
provide recognition for the Edina Historical Society and Edina Garden Council, and will make the entrance area easier
to maintain.
Expenditures
2005 2006
2007 2008 2009 Total
Construction/Maintenance
35,000
35,000
Total
35,000
35,000
Funding Sources
2005 2006
2007 2008 2009 Total
Revolving Fund
35,000
35,000
Total
35,000
35,000
Page 25 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PS -03 -001
Project Name Fire Station Vehicle Exhaust Removal Systems
Type Equipment
Useful Life 50 years
Category Fire
category names
Priority 2 Very Important
Contact Fire Department
Department Public Safety
Description
this project would be the installation of vehicle exhaust systems in the two fire stations. The system would remove the
✓ehicle exhaust from the fire station until the vehicle is outside of the fire station.
Justification
the exhaust from the fire vehicles currently enters the living quarters of the fire stations. The system would prevent
;xhaust from entering the living quarters of the fire stations, therefore improving the indoor air quality.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Furnishings 55,000 55,000
Total 55,000 55,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 55,000 55,000
Total 55,000 55,000
Page 26 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PS -04 -002
Project Name Fiber Optic Connecting Fire Stations and SMPSTF
Type Equipment
Useful Life 50 years
Category Fire
category names
Priority 2 Very Important
Contact Fire Department
Department Public Safety
his project would be the installation a fiber optic connection between Fire Stations #1 & #2 and either a fiber optic or
T -1 line to the South Metro Public Safety Training. Facility ( SMPSTF).
The fiber optic connection is needed to connect the video conferencing equipment ($115,000 federal grant) which
would allow training to occur at all three sites and crews would be available to respond to emergency calls from the
proper locations. Eventually we would intend to connect to the LOGIS system and to Fairview Southdale Hospital
which we would then be able to train with many fire departments and the hospital staff and physicians.
Page 27 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -00 -001
Project Name Reconstruct: W 77th Street ( Parklawn - Hwy 100)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
This project provides for the reconstruction of West 77th Street from the entrance to Pentagon Office Park Complex to
approximately Parklawn Ave. It includes the addition of a continuous center turn lane and a sidewalk along the south
boulevard area. A concrete sidewalk extending to France Ave. is also included.
Justification
['his segment of W. 77th St. is currently under capacity for existing conditions.
Page 28 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW- 00-005
Project Name Mill & Overlay: Dewey Hill Road (Gleason - Cahill)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
- scription
.is project involves the milling of distressed surface and the repaving of a new surface on Dewey Hill Road from
eason Road to Cahill Road.
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 167,000 167,000
Total 167,000 167,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 167,000 167,000
Total 167,000 167,000
Page 29 of 65
Capital Improvement Program
City of Edina, MN
Data in Year 2005
Project # . PW -00 -008
Project Name Reconstruct: Valley View Rd ( Wooddale - 64th ST)
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names
S project provides for the reconstruction of Valley View Road from Wooddale Avenue to West 64th Street. This
ject will provide new concrete curb & gutters, pavement and sidewalks along both sides of Valley View Road.
Justification
Chis project was initiated by the Pavement Management Systam due to the roadway paement reaching a point of
.ailure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 500,000 500,000
Total 500,000 500,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 500,000 500,000
Total 500,000 500,000
Page 30 of 65
Capital Improvement Program Data in Year 2005
City of Edina, NW
Project # PW -00 -010
Project Name Mill & Overlay: Vernon (Lincoln/London - Gleason)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public works
category names MSA
Description
Phis project involves the milling. of distressed surface and the repaving of a new surface on Vernon Avenue from
Londonderry Road to Gleason Road.
Justification
The need to rehabilitate this segment of roadway was determined'by the Pavement Management System.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 224 ,000 224,000
Total 224,000 224,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 224,000 224,000
Total 224,000 224,000
Page 31 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # Pw -00 -013
Project Name Mill & Overlay: Brookside (Interlachen - RR)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
Description
This project involves the milling of distressed surface and the repaving of a new surface on Brookside Avenue from
Interlachen Boulevard to SOO Line Railroad tracks.
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures
2005 2006
2007 2008 2009 Total
Construction/Maintenance
130,000
130,000
Total
130,000
130,000
Funding Sources
2005 2006
2007 2008 2009 Total
Municipal State Aid
130,000
130,000
Total
130,000
130,000
Page 32 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -00 -026
Project Name Neighborhood Street Recon. Program
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Local Streets Department Public Works
category names
Description
This project . will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost
,ffective manner.
Justification
The need to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based
on condition and age of pavement, and also ratings compared with other local neighborhoods.
potential future roadway reconstruction projects are:
!005: Sunnyslope Neighborhood, Harriet Park West, Harriet Park East, Rolling Green Neighborhood, Ridge Road and
ichaefer Road.
!006: Lake Cornelia South Neighborhood, Hollywood / Todd Park Neighborhood, West Pamela Park Neighborhood.
'007: Harvey Lake Neighborhood, Lake Cornelia East Neighborhood, West Shore Drive and West 70th Street
Mirror Lakes Drive South Neighborhood, East Highland Park Neighborhood, Harvey Lake East Neighborhood,
Cornelia West Neighborhood, Northeast Arden Park Neighborhood.
East Concord Neighborhood, South Concord Neighborhood, West 54th Street / Beard Ave. Neighborhood.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
Total 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
General Obligation Improveme 3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Total 3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Page 33 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -00 -027
Project Name Street Lighting Highlands Area
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Local Streets Department Public Works
category. names
projects will provide for the reinstallation and installation of local street lighting projects.
Justification
These projects are initiated by the recommendations of Staff.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Special Assessments 50,000 50,000
Total 50,000 50,000
Page 34 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW- 00-028
Project Name Browndale Bridge
Type Improvement
Useful Life
Category Local Streets
category names
Priority
n/a
Contact
Public Works
Department
Public Works
;ription
project provides for reconstructing this bridge and possible abutments.
Justification
Tfie need to rehabilitate this bridge was determined by the annual bridge certification program.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 140,000 140,000
Total 140,000 140,000
Funding Sources 2005 2006 2007 2008 2009 Total
Special Assessments 140,000 140,000
Total 140,000 140,000
Page 35 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -00 -030
Project Name Sidewalks/Pathways (MSA)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
Description
- onstruct sidewalks along MSAS designated streets as petitioned from residents.
Justification
These projects will provide separation of pedestrians and vehicles along the designated routes.
Expenditures
2005
2006
2007
2008
2009
Total
Constructlon/Maintenance
120,000
60,000
50,000
50,000
50,000
330,000
Total
Funding Sources
120,000
2005
60,000
2006
50,000
2007
50,000
2008
50,000
2009
330,000
Total
Municipal State Aid
120,000
60,000
50,000
50,000
50,000
330,000
Total
120,000
60,000
50,000
50,000
50,000
330,000
Page 36 of 65
"Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # Pw -00 -031
Project Name Sidewalks/Pathways: City Costs
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Sidewalk - Pathways Department Public Works
category names
Description
These projects will provide separation of pedestrians and vehicles along the designated routes.
Justification
These projects are initiated by petitions from residents only.
Expenditures 2005
2006
2007 ,
2008
2009
Total
Construction/Maintenance 50,000
50,000
50,000
50,000
50,000
250,000
Total 50,000
50,000
50,000
50,000
50,000
250,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 50,000 50,000 50,000 50,000 50,000 250,000
Total 50,000 50,000 50,000 50,000 50,000 250,000
Page 37 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -02 -001
Project Name Reconstruct: W. 58th St. (Concord to Wooddale)
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names
This project provides for the reconstruction of West 58th Street from Concord Avenue to Wooddale Avenue. This
project will provide a new roadway section and will bring this road into compliance with State -Aid Standards.
Sidewalks will also be analyzed with this reconstruction.
Justification
this project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
Failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also
;onsidered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 400,000 400,000
Total 400,000 400,000
Funding Sources 2005 2006 2007 2008 2009 Total
,Municipal State Aid 315,000 315,000
Special Assessments 85,000 85,000
Total 400,000 400,000
Page 38 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -02 -005
Project Name Landscaping: W 54th St at Minnehaha Creek
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Street New Construction Department Public Works
category names
Description
Landscape boulevard area, improve roadway and storm sewer system at West 54th Street and Minneahaha Creek.
Justification
This is a local resident petitioned project. This area is currently utilized by Edina Public Works at a temporary street
sweeping deposit area. The area is adjacent to the Minnehaha Creek making this a very environmentaly sensitive area.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 65,000 65,000
Total 65,000 65,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 45,000 45,000
Utility Funds 20,000 20,000
Total 65,000 65,000
Page 39 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -03 -007
Project Name Mill & Overlay: W 50th St (Wooddale to France)
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names
Description
this project involves the milling of distressed surface and the repaving of a new surface on West 50th Street. from
Wooddale to France Avenue.
Justification
Che need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 155,000 155,000
Total 155,000 155,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 155,000 155,000
Total 155,000 155,000
Page 40 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # PW -03 -008
Project Name Aesthetic Barriers: Various Locations
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Aesthetic Barriers Department Public Works
category names
Description
Aesthetic Barriers / Sound Mitigation Measures for 2005 include TH100 from Vernon Avenue to West 44th Street.
Justification
Chese projects are resident petitioned or council initiated projects.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,205,600 1,205,600
Total 1,205,600 1,205,600
Funding Sources 2005 2006 2007 2008 2009 Total
Special Assessments 1,205,600 1,205,600
Total 1,205,600 1,205,600
Page 41 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # . UT -00 -021
Project Name Watermain/Sanitary: Nine Mile Village
Type Improvement
Useful Life
Category Water Main
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Zeplace water mains, services and sanitary sewers.
Justification
Sanitary sewer and water mains are deteriorating due to age. This is a high maintenance area of the City utility system.
Sanitary sewer pipes should be upgraded.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 300,000 300,000
Total 300,000 300,000
Page 42 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-00 -023
Project Name Utility Data Collection System (Water)
Type Improvement
Useful Life
Category Water Main
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Install data collection system on all wells, pumps and filters.
Justification
Provides for an efficient operation and control of water system. Will provide security of system and failure alarms. Will
also provide operational and performance data.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 100,000 100,000
Total 100,000 100,000
Page 43 of 65
Capital Improvement Program
City of Edina, MN
Project # UT-00 -025
Project Name Water Main Improvements
Type Improvement
Useful Life
Category water Main
category names
Data in Year 2005
Priority n/a
Contact Engineering
Department Utility Department
a
Description
Update water system when reconstructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification
[be majority of the existing system consists of unlined cast iron pipes. These pipes are more susceptible to failure than
t lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide better water
luality and water pressure.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 400,000 400,000 400,000 400,000 400,000 2,000,000
Total 400, 000 400,000 400,000 400,000 400,000 2,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 400,000
400,000
400,000
400,000
400,000
2,000,000
Total 400, 000
400,000
400,000
400,000
400,000
2,000,000
Page 44 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT -00 -026
Project Name Sanitary Sewer Improvements
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Sanitary Sewer Improvements Department Utility Department
category names
is
z:
�µ
Description
Jpdate sanitary sewer system when constructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification I
Most of the sanitary sewer system consists of clay pipe that was installed upto.the 1970's. This type of pipe is more
prone to failure than the current poly - vinyl- chloride and concrete pipes. The clay pipe is typically more suceptable to
root intrusion, which decreases the capacity of a pipe.
rhe. upgrade to the system will help reduce inflow and infiltration into sanitary sewer system due to deteriorating
sanitary manholes, leaking joints in`pipes, and leaking covers.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000 200,000 200,000 200,000 200,000 1,000,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000 200,000 200,000 200,000 200,000 1,000,000
Page 45 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT -00 -028
Project Name Storm Sewer: W. 59th Street & Ashcroft Ave.
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Storm Sewer Improvements Department Utility Department
category names
Description
Provide a pump outlet for this low area.
Justification
this was a result of residential flooding due to a no- outlet low area along the rear property lines.
Expenditures
2005 2006
2007 2008 2009 Total
Construction/Maintenance
120,000
120,000
Total
120,000
120,000
Funding Sources
2005 2006
2007 2008 2009 Total
Utility Funds
120,000
120,000
Total
120,000
120,000
Page 46 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-00 -030
Project Name Pond & Lake Dredging
Type Improvement Priority n/a
Useful Life Contact Utility Supt -
Category Storm Sewer Improvements Department Utility Department
category names
Description
Dredge ponds as necessary.
Justification
These projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling m
from sediment inot the systme and natural life of organic material.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 60,000
60,000
60,000
60,000
60,000
300,000
Total 60,000
60,000
60,000
60,000
60,000
300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 60,000 60,000 60,000 60,000 60,000 300,000
Total 60,000 60,000 60,000 60,000 60,000 300,000
Page 47 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-01 -003
Project Name Storm Sewer- Pipe and Grading Improvements
Type Improvement
Useful Life
Category Storm Sewer Improvements
category names
Description
Priority n/a
Contact Engineering
Department Utility Department
Provide replacement storm sewer for aging system. This also includes new drain tiles for roof drains and sump pump
discharges.
Justification
roadways are reconstructed within the City storm sewers will require updating. See Project No. PW -00 -026 for
ential neighborhoods. Drainage swales also need to be regraded. Drain tiles where needed should also be included
h these projects.
1998 the City undertook a sump pump inspection program that included inspections of all properties in the City to
minate any clear water connections into the City's sanitary sewer system. The program identified all homes in the
.y that have sump pumps and other asement water problems. These new storm sewer improvements will provide a
.ce for clear water discharges especially during the winter months.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 120,000
120,000
120,000
120,000
120,000
600,000
Total 120,000
120,000
120,000
120,000
120,000
600,000
Funding Sources 2005 .2006 2007 2008 2009 Total
Utility Funds 120,000 120,000 120,000 120,000 120,000 . 600,000
Total 120,000 120,000 120,000 120,000 120,000 600,000
Page 48 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-01 -008
Project Name Portable Generator: 300 KW Wtr Trtmt Pnt No 1
Type Improvement Priority n/a
Useful Life 20 years Contact Utility Supt
Category Utility Equipment Replacement Department Utility Department
category names
00 KW Portable Generator to operate Water Treatment Plant No. 1.
Justification
During power outages this generator would operate Water Treatment Plant No. 1 to help provide the City with its
minimal water requirements.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 90,000 90,000
Total 90,000 90,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 90,000 90,000
Total 90,000 90,000
Page 49 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT -02 -004
Project Name Annual Vehicle Replacements
Type Equipment Priority n/a
Useful Life 10 years Contact Utility Supt
Category Utility Equipment Replacement Department Utility Department
category names
Description
Replacement` of small vehicles and equipment that are 10 years old or 100,000 miles. In 2005 we have a pickup and a
skidsteer replacement.
Justification
Vehicles have reached their life expectancy.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 70,000 55,000 55,000 180,000
Total 70,000 55,000 55,000 180,000
Funding Sources 2005
2006
2007 2008
2009 Total
Utility Funds 70,000
55,000
55,000
180,000
Total 70,000
55,000
55,000
180,000
Page 50. of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-02 -011
Project Name Well #16 (6301 Gleason Road)
Type Improvement
Useful Life 15 years
Category wells
category names
Priority 1 Urgent
Contact Utility Supt
Department Utility Department
Description
tedevelop well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical
:quipment.
Justification
This rehab has a 15year life on the pump and 30 plus years on the other equipment and well hole. Operating costs will
be lower and water production will be higher.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 160,000 160,000
Tom 160,000 160,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 160,000 1 160,000
Total 160,000 160,000
Page 51 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-02 -016
Project Name well #17 Piping to Filter Plant #2
Type Improvement
Useful Life 100 years
Category Water Main
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Sipe well directly to filter plant #2 so that the radium levels can be reduced to meet the new federal standards effective
A08. This includes street restoration and engineering costs.
Justification
Water quality standards will not be met starting in 2008 (testing as of 2007). By filtering the water radium will be
-educed and the standards will be met.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009. Total
Utility Funds 300,000 300,000
Total 300,000 300,000
Page 52 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT -02 -025
Project Name Storm Sewer: Schaeffer Road
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Storm Sewer Improvements Department Utility Department
category names
Description
Provide storm sewer or drain file along Schaeffer Road from Westwood Court to Haroldswood Lane.
Justification
_urrently the properties along this roadway are pumping both their sump pumps and pumps from their ponds onto the
.-oadway, thus creating a hazard along the roadway. This project will allow the homeowners to connect to an
mderground storm sewer pipe.
Expenditures
2005 2006 2007
2008 2009 Total
Construction/Maintenance
160,000
160,000
Total
Funding Sources
160,000
2005 2006 2007
160,000
2008 2009 Total
Utility Funds
160,000
160,000
Total
160,000
160,000
Page 53 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT -03 -003
Project Name New 6 inch Trash Pump
Type Equipment Priority n/a
Useful Life 20 years Contact Utility Supt.
Category Utility Equipment Replacement Department Utility Department
category names
purchase of an new 6" Trash Pump.
Justification
This pump will be used for pumping ponds and lakes that are flooded as a result of major storms.
Expenditures
2005 2006
2007 2008 2009 Total
EquipNehicles /Fumishings
30,000
30,000
Total
Funding Sources
30,000
2005 2006
30,000
2007 2008 2009 Total
Utility Funds
30,000
30,000
Total
30,000
30,000
Page 54 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
'roject # UT-03 -004
'roject Name Lift Station # 6 (4400 West 72nd Street)
Type Improvement
Useful Life 30 years ,
Category Lift Stations
category names
Priority n/a
Contact Utility Supt.
Department Utility Department
Description
tehab lift station by replacing failing ventilation system, replace 75 horse power pump, install existing VFD, add
venerator receptacles on the outside of the building, and improve the safety features of the wet well side of the station.
Justification
Chis is a major lift station, and some of the systems are showing signs of failure. We are currently having problems
with the 75 hp pump and ventilation system. Other safety features are need to bring this facility up to current standards.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 150;000 150,000
Total 150,000 150,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 150,000 150,000
Total 150,000 150,000
Page 55 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT -03 -005
Project Name Lift Station #3 (5707 Warden Ave)
Type Improvement Priority n/a
Useful Life 30 years Contact Utility Supt.
Category Lift Stations Department Utility Department
category names
Description
Update ventilation and heating systems and make building improvements
Justification
Maintenance on the building and mechanical equipment to maintain future operations.
::=`:_
1
li
H
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 75,000 75,000
Total 75,000 75,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 75,000 75,000
Total 75,000 75,000
Page 56 of 65
Capital Improvement Program Data in Year 2005
City. of Edina, MN
Project # UT -03 -006
Project Name Backwash Recycling Tank: Treatment Plant No. 2
Type Improvement
Useful Life
Category Filter Plants
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
?rovide underground storage tank for recycling water from water treatment back wash procedure.
aa�.auvu �
ently the backwash water from this treatment plant is discharged into the storm sewer system: The iron within this
large exceeds MPCA standards. The backwash water can either be discharged into the sanitary sewer or recycled
a backwash recycling tank. The extra sanitary sewer charges exceeds the cost to construct and operate a backwash
;line tank.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 320,000 320,000
Total 320,000 320,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 320,000 320,000
Total 320,000
Page 57 of 65
320,000
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-03 -007
Project Name Backwash Recycling Tank: Treatment Plant No. 3
Type Improvement
Useful Life
Category Filter Plants
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Provide underground storage tank for recycling water from water treatment back wash procedure.
Justification I
Currently the backwash water from this treatment plant is discharged into the storm sewer system. The iron within this
discharge exceeds MPCA standards. The backwash water can either be discharged into the sanitary sewer or recycled
with a backwash recycling tank. The extra sanitary sewer charges exceeds the cost to construct and operate a backwash
recycline tank.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 320,000 320,000
Total 320,000 320,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 320,000 320,000
Total 320,000 320,000
Page 58 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-03 -008
Project Name Backwash Recycling Tank: Treatment Plant No. 4
Type Improvement
Useful Life
Category Filter Plants
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
'rovide underground storage tank for recycling water from water treatment back wash procedure.
Justification I
Currently the backwash water from this treatment plant is discharged into the storm sewer system and sanitary sewer
system. The iron within this discharge exceeds MPCA standards. The backwash water can either be discharged into
the sanitary sewer or recycled with a backwash recycling tank. The extra sanitary sewer charges exceeds the cost to
construct and operate a backwash recycling tank.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Wintenance 320,000 320,000
Total 320,000 320,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 320,000 320,000
Total 320,000 320,000
Page 59 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # . UT -03 -016
Project Name GPS System
Type Improvement
Useful Life
Category Water Main
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
31obal Posistioning System to locate utility distribution and collection system.
Justification I
this Global Positioning System combined with the Robotic Total Station in Engineering will provide an efficient means
o locate the utility infrastructure system; ie: water, storm and sanitary sewers. Many times important gate valves and
Apes cannot be found during emergencies. This will provide another tool to find these items when they are either
.overed with snow or vegitation.
Expenditures
2005 2006 2007
2008 2009 Total
Equip/Vehicles /Fumishings
50,000
50,000
Total
Funding Sources
50,000
2005 2006 2007
50,000
2008 2009 Total
Utility Funds
50,000
50,000
Total
50,000
50,000
Page 60 of 65
Capital Improvement Program Data in Year 2005
City of Edina, NM
Project # UT -03 -017
Project Name well No. 7 Treatment
Type Improvement
Useful Life
Category Wells
category names
at Well No. 7
Priority n/a
Contact Utility Supt
Department Utility Department
Fell No. 7 has preliminarily tested positive for vinyl chlorides. Well No. 7 is a seasonal well and will not be used until
solution is in place. Staff is currently exploring different solutions for this well.
Page 61 of 65
Expenditures
2005 2006 2007 2008
2009 Total
Construction/Maintenance
500,000
500,000
Total
500,000
500,000
Funding Sources
2005 2006 2007 2008
2009 Total
Utility Funds
500,000
500,000
Total
500,000
500,000
Page 61 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT -04 -001
Project Name Replace Sanitary Sewer Main on Shannon Drive
Type Improvement Priority 2 Very Important
Useful Life 100 years Contact Utility Supt.
Category Sanitary Sewer Improvements Department Utility Department
category names
Replace one section of sanitary sewer main on Shannon Dr. at Dewey Hill Rd. Television reports shows that this line
has vertical misalignments throughout this section of pipe. Over the years there has been several sewer blockages in
this line which backed up into a home on Kemrich Drive.
Justification
Improve sewer flows and eliminate sewer back ups.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 80,000 80,000
Total 80,000 80,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 80,000 80,000
Total 80,000 80,000
Page 62 of 65
Capital Improvement Program
City of Edina, MN
Data in Year 2005
Project # . UT-04 -002
Project Name water Treatment Plant #1 Roof Replacement
Type Improvement
Useful Life 20 years
Category Wells
category names
Priority 2 Very Important
Contact Utility Supt.
Department Utility Department
the roof on WTP #1 with one that fits in better with the park or neighborhood.
Justification
fhe roof is leaking and needs replacement to prevent further damage to the building.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 30,000 30,000
Total 30,000 30,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 30,000 30,000
Total 30,000 30,000
Page 63 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-04 -004
Project Name Well #4 (4701 Southview Lane)
Type Improvement
Useful I-ite 30 years
Category Wells
category names
Priority 1 Urgent
Contact Utility Supt.
Department Utility Department
iption
i Well #4 with new electrical, michanical, and Well Pump equipment.
Justification
This is one of the City's major wells thej operating equipment is old and in poor condition. The well hole has not been
looked at in over seven years and has a reduced capacity. This rehab has a 7 year life on the pump and 30 plus years on
:he other equipment and well hole. Operating costs will be lower and water production will be higher.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 100,000 100,000
Total 100,000 100,000
Page 64 of 65
Capital Improvement Program Data in Year 2005
City of Edina, MN
Project # UT-04 -006
Project Name Utility Billing Software
Type Equipment
Useful Life 10 years
Category Computer Software
category names
Priority 1 Urgent
Contact Finance Director
Department Utility Department
Description
The Logis consortium has selected Advanced Utitliy Systems to provide utility billing software for 18 of its member
- ities. The payments will be made over 2 years.
Justification
Fhe current UB software package runs on an HP 3000 line of servers. HP plans to discontinue support of these servers.
Therefore, Logis has been searching for a new UB software package for the past 2 years and recenetly selected
Advanced Utility Systems. Implementation will begin in 2005 for 3 Logis cities, with a new group of cities starting
-very 6. months.
Expenditures
2005
2006 2007
2008 2009 Total
' EquipNehicles /Fumishings
92,000
92,000
184,000
Total
92,000
92,000
184,000
Funding Sources
2005
2006 2007
2008 2009 Total
Utility Funds
92,000
92,000
184,000
Total
92,000
92,000
184,000
Page 65 of 65
. . ........... ....
2006
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # AQC-03 -001
Project Name Flowrider
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact
Department Aquatic Center
Description
Purchase and installation of a flowrider on the south side of the Aquatic Center.
Justification
To continue to diversify the Edina Aquatic Center's offerings, a flowrider aquatic amenity would be a unique water
feature to add,to that diversity. This constant downhill flow of water would provide a surfing sensation that is not
available in the midwest. This compact water feature would complete the Aquatic Center master plan.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 500,000 500,000
Total 500,000 500,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 500,000 500,000
Total
500,000
Page 1 of 50
500,000
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # A -00 -001
Project Name Bathroom Remodel (Arena)
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Arena
Arena lower lobby bathrooms need new fixtures from the 1984 remodeling project. Needs new fixtures and ceiling
Justification
the bathrooms have not been updated for 20 years.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 25,000 25,000
Total 25,000 25,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 25,000 25,000
Total 25,000 25,000
Page 2 of 50
Capital Improvement Program Data in Year 2006
tdent base has grown to the point where on occasion they must park as far away as the tennis courts at night. Curbs at
Ty. are worn away and our current on -site parking stall count is significantly short of the need.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 65,000 65,000
Total 65,000 65,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 65,000 65,000
Total 65,000 65,000
Page 3 of 50
Capital Improvement Program
City of Edina, MN
Project # CW -02 -001
Project Name Citywide Fiber Optic Cabling
Type Improvement
Useful Life
Category Computer Network
category names
Data in Year 2006
Priority n/a
Contact Asst City Manager
Department Citywide
Description
This represents the cost of running fiber optic cabling to a number of our offsite facilities. Currently, we connect to
many of our facilities. through the use of T1 phone lines which cost us around $3,000 per T1 line. Some of our facilities
have multiple T1 lines to accommodate both voice and data transmissions. By running fiber optic cabling to these
facilites, the City could remove the operating expense of the T1 lines from the offsite budgets. There would be a small
offset of annual costs associated with service contracts on the equipment needed at each end of the cabling. It would
also allow us to look at Voice over IP for our telecommunications in the long run. Most of the larger facilities (Fire and
Public Works ) have a 3 -4 year payback of the capital costs inoperating cost reductions.
Justification
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 185,000 75,000 75,000 75,000 75,000 485,000
Total 185,000 75,000 75,000 75,000 75,000 485,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 185,000 75,000 75,000 75,000 75,000 485,000
Total 185,000 7000 75,000 75,000 75,000 485,000
Page 4 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECL-00 -004
Project Name Paver Replacment (Edin)
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Department Edinborough Pk/Centennial Lks
category names
Description
?inish replacing the ouside walkway pavers at Edinborough park.
'Justification
Sidewalk pavers on the outside pathways aIre`heaving and in need of repair. Several, tripping incidents have occurred in
the past few years. Replacement of the worst pavers started in 2001 and will be finished in 2003.
In 2006, the main entrance pavers will be 20, ears old and in need of replacement. They are cracked and uneven.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehides /Fumishings 14,000 14,000
Total 14,000 14,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 14,000 14,000
Total 14,000 14,000
Page 5 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECL-00 -018
Project Name Centennial Lakes Park Speakers
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact
Department Edinborough Pk/Centennial Lks
in ground speakers at Centennial Lakes Park.
Justification
Outdoor speakers tend to have a life expectancy of 5 -8 years and then need replacement. The outdoor speakers at
Centennial Lakes Park will be in need of replacement in the year 2006.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 7,000 7,000
Total 7,000 7,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 7,000 7,000
Total 7,000 7,000
Page 6 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECL-00 -026
Project Name Remodel Locker Rooms - Edinborough Park
Type Improvement
Useful Life
Category Ballfield Improvements
category names
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
Description
Replace and repair floor tile and wall tile, and replace the countertops and fixtures in the mens and womens locker
Justification
The floors, walls, countertops and fixtures will be 20 years old and in need of replacement.
Expenditures -2005
Construction/Maintenance
2006 2007
15,000
2008 2009 Total
15,000
Total
15,000
15,000
Funding Sources 2005
2006 2007
2008 2009 Total
Enterprise Funds
15,000
15,000
Total
15,000
15,000
Page 7 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECIr00 -028
Project Name Pool Filter Room Exhaust
Type Improvement
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
Description
Install a new exhaust system in the pool filter /mechanical room.
Justification
The Edina Fire Marshall has long recommended that an exhaust system be installed in the pool filter room to allow
vapors from the chemicals to be drawn outside, rather than into the park.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Furnishings 9,000 9,000
Total 9,000 9,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 9,000 9,000
Total 9,000 9,000
Page 8 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # . ECL-02 -002
Project Name Reshingle Centrum Building
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Building Improvements Department Edinborough Pk/Centennial Us
category names
Description
teplace the roofing material on the Centrum Building. The cedar shakes will be replaced with architectural asphalt
Fustification
'he Centrum Building at Centennial Lakes Park has several -leaks in its roof The roof slope is such that it does not
rain well enough to support cedar shakes. Asphalt shakes should correct the problem.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 60,000 60,000
Total 60,000 60,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 60,000 60,000
'total 60,000 60,000
Page 9. of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECL-03 -004
Project Name Case Loader
Type Improvement
Useful Life
Category
category names
existing 1992 Case Loader.
Priority n/a
Contact
Department Edinborough Pk/Centennial Lks
Justification
Che 1992 Case Loader will need to be replaced.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 20,000 20,000
Total 20,000 20,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 20,000 20,000
Total 20,000 20,000
Page 10 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECL, -03 -006
Project Name Pass ID System
Type Improvement Priority n/a
Useful Life Contact
Category Department Edinborough Pk/Centennial Lks
category names
Description
Replace current Edinborough Park season pass system with new photo ID system.
Justification
The current season pass photo ID system is old and out of date and needs to be replaced with a more user friendly and
.-eliable system.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 8,000 8,000
Total 8,000 8,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 8,000 8,000
Total 8,000 8,000
Page 11 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECL-03 -007
Project Nsme Adventure Peak Remodel Improvement
Type Improvement Priority n/a
Useful Life Contact
Category Department Edmborough Pk/Centenmal Lks
category names
Description
Jpdate current Adventure Peak playground structure with new components.
Justification
Every two to three years, Adventure Peak playground structure should be enhanced with a new play feature to keep user
nterest high.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 25,000 50,000 75,000
Total 25,000 50,000 75,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 25,000 50,000 75,000
Total
25,000
Page 12 of 50
50,000
75,000
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # ECL -03 -008
Project Name Centennial Lakes Park Storage Building
Type Improvement Priority n/a
Useful Life Contact
Category Department Edinborough Pk/Centennial Lks
category names
Description
kdd a storage building for the putting course and lawn games area at Centennial Lakes Park.
Justification
Centennial Lakes Park needs a storage facility to provide secure storage for putting course and lawn games area
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 15,000 15,000
Total 15,000 15,000
Page 13.of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # GC -00 -002
Project Name Maintenance Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
Zoutine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment.
Justification
These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that
ire on a 10 -15 year replacement schedule.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 125,000 130,000 135,000 140,000 145,000 675,000
Total 125,000 130,000 135,000 140,000 145,000 675,000
Funding Sources 2005
2006
2007
2008
2009
Total
Enterprise Funds 125,000
130,000
135,000
140,000
145,000
675,000
Total 125,000
130,000
135,000
140,000
145,000
675,000
Page 14 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project# . GC-00 -007
Project Name Miscellaneous Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
equipment replacement purchases for driving range equipment and small utility vehicles.
Justification
These,are;routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that
are on a 10 year replacement schedule.
Expenditures
2005
2006
2007
2008
2009
Total
EquipNehicieslFumishings
30,000
36,000
37,000
38,000
39,000
180,000
Total
30,000
36,000
.37,000
38,000
39,000
180,000
Funding Sources
2005
2006
2007
2008
2009
Total
Enterprise Funds
30,000
36,000
37,000
38,000
39,000
180,000
Total
30,000
36,000
37,000
38,000
39,000
180,000
Page_ 15_ of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # LIQ- 01-002
Project Name 50th: Replace 2 Compressors
Type Improvement Priority n/a
Useful Life Contact
Category Department Liquor Stores
category names
Description
Zeplace both cooler compressors in basment.
Justification
need to replace due to age. Replace before they break down.
Expenditures 2005 2006 2007 2008 2009 Total
Equip/Vehicles /Fumishings 16,000 16,000
Total 16,000 16,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 16,000 16,000
Total 16,000 16,000
Page 16 of 50
Capital Improvement Program
City of Edina, MN
Project # LIQ- 01-006
Project Name York: Replace Counter Tops
Data in Year 2006
Type Improvement Priority n/a
Useful Life Contact
Category Department Liquor Stores
category names
Description
[temove existing counter tops and replace with a longer lasting surface.
Justification
- ounter tops are close to 10 years old and are starting to wear through.
Expenditures 2005
2006 2007
2008 2009 Total
EquipNehicles /Fumishings
10,000
10,000
Total
10,000
10,000
Funding Sources 2005
2006 2007
2008 2009 Total
Enterprise Funds
10,000
10,000
Total
10,000
10,000
Page 17 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Iroject # MB-04 -001
'roject Name Public Works Building
Type Improvement
Useful Life
Category Building Improvements
category names
Description
telocate the Public Works building.
Justification
Priority n/a
Contact Public Works
Department Municipal Buildings
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 8,000,000 8,000,000
Total 8,000,000 8,000,000
Funding Sources 2005 2006 2007 2008 2009 Total
GO Public Improvement Bonds .8,000,000 8,000,000
Total 8,000,000 8,000,000
Page 18 of 50
Capital Improvement Program Data Mn Year 2006
City of Edina, MN
Project # MB-04 -003
Project Name City Hall/Public Works Building
Type Unassigned
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Asst City Manager
Department Municipal Buildings
Description
These funds will cover any changes /additions to file areas, workstations and record storage.
Justification
Expenditures 2005
200.6.
2007
2008
2009
Total
EquiplVehicles /Furnishings 35,000
35,000
35,000
35,000
35,000
175,000
Total 35,000
35,000
35,000
35,000
35,000
175,000
Funding Sources 2005
2006
2007
2008
2009
Total
Revolving Fund 35,000
35,000
35,000
35,000
35,000
175,000
Total 35,000
35,000
35,000
35,000
35,000
175,000
Page 19 - of. 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # . M13-04 -004
Project Name Addition/Renovation Fire Station #1
Type Improvement Priority 2 Very Important
Useful Life Contact Fire Department
Category Building Improvements Department Municipal Buildings
category names
Description
This project would require the hiring of an architect to design an addition that would consist of a Women's locker
_ room/shower room and restroom and a fitness area to house exercise equipment that has been purchased through a
wellness grant. The project would also include replacing the roof and carpeting and the installation of an automatic
commercial fire sprinkler system.
Justification
Fire Station #1 was designed and constructed for the exclusive use of male firefighters. There is one small (4X6)
women's public restroom and no shower facility for women to use. The showers are located in the men's restroom along
with the men's locker room. We would like to accommodate our future women firefighters /paramedics by preparing a
facility for their needs. An addition is also needed for a fitness area. The Fire Department received a Wellness Grant in
2002 and purchased over $30,000 in exercise equipment. The equipment is now in the apparatus area where vehicles
are parked. This does not work well for several reasons, diesel exhaust fumes, non - climate controlled, water overspray
and the need for additional parking for five department vehicles. Fire Code requires a sprinkler system to be installed
when building an addition. Replacing the entire roof at this time is needed as the current roof is 30 years old and
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 600,000 600,000
Total 600,000 600,000
Funding Sources 2005 2006 2007 2008 2009 Total
GO Public Improvement Bonds 600,000 600,000
Total 600,000 600,000
Page 20 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PK -00 -031
Project Name Playground: Alden Park
Type Improvement
Useful Life
Category Park Development
category names
Priority
n/a
Contact
Park & Recreation
Department
Park & Recreation
ription
with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid.
Jes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
�r and adding new playground equipment with accessible path to transfer stations.
Justification
rhe e-current playground equipment was installed in 1987 and is becoming worn from age and use. Playground
;quipment is currently on a 15 year replacement schedule. In 2003, Alden Park's equipment will be 16 years old.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 110,000 110,000
Total 110,000 110,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 110,000 110,000
Total 110,000 110,000
Page 21 of 50
Capital Improvement Program Data in Year 2006
ri4cs ^PUav�n 1kAXT
Justification
The existing concessions building does not meet ADA specifications for restrooms; the stairway leading to the scoring
booth on the second level is too steep and dangerous; the concessions area is too small for the volume of customers, and
a new building will help resolve the dangerous errant baseballs (mostly foul balls) issue.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 450,000 450,000
Total 450,000 450,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 450,000 450,000
Total 450,000 450,000
Page 22 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PK-02 -010
Project Name Renovate field #4: Courtney Ball Fields
Type Improvement
Useful Life
Category Ballfield Improvements
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
grade the baseball field, re- install existing irrigation system, replace outfield fencing including backstop, and replace
Justification
The ball field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The irrigation
system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced
use of herbicides. This field should be renovated at the same time that the concessions building is replaced.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 360,000 360,000
Total
360,000
360,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 360,000 360,000
Total 360,000 360,000
Page 23 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PK-04 -001
Project Name Batting/Pitching Cages - Pamela Park
Type Improvement
Useful Life
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
is for construction of two additional chain link fence cages for fast -pitch softball batting and pitching practice at
;la Park.
Justification
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 50,000 50,000
Total 50,000 50,000
Page 24 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project# PS -01 -001
Project Name Training Ctr Burner Unit
Type Equipment
Useful Life 30 years
Category Building Improvements
category names
Priority 3Important
Contact Fire Department
Department Public Safety
Description
This project would install an additional burner unit into the proposed Public Safety Training Center. The burner unit
would be installed in the Fire Tower.
Justification
The Fire Training Center only has two burner units to simulate fires. A third burner unit is required in the fire tower
portion of the facility to simulate high -rise structure fires. The Training Ctr is designed for additional burner units, due
to funding shortages, some burner units will not be installed in the initial construction of the project.
Expenditures 2005 2.006 2007 2008 2009 Total
EquipNehicles /Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 40,000 40,000
Total 40,000 40,000
Page 25 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PS-02 -001
Project Name Computerized Emergency Medical Dispatch
Type Equipment
Useful Life
Category Police
category names
Priority
2 Very Important
Contact
Police Department
Department
Public Safety
Description
- omputerized Emergency Medical Dispatch (EMD) System - a computer server, software and CAD interface would be
purchased to replace the manual flip card system presently used by the 9 -1 -1 dispatchers.
Justification I
Edina's 9 -1 -1 dispatchers provide emergency medical instructions to callers on all medical emergencies. In 2001, the
iispatchers provided 2,389 callers EMD using the flip card system. A computerized EMD system interfaced with our
- omputer Aided Dispatch software would enable dispatchers to process EMD calls faster and more accurately. Timely
iiagnoses and instruction are critical factors when the call is a true life or death situation.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 30,000 30,000
Total 30,000 30,000
Page 26 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # . PW -00 -012
Project Name Reconstruct: 44th Ave. (TH 100 -France)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public. Works
category names MSA
.ription
project provides for the reconstruction of W. 44th Street from Hwy 100 to France Avenue. This project will
ide new concrete curb and gutters, pavement, and sidewalks along the northerly side.
Justification
Ns project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
'ailure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 400,000 400,000
Total 400,000 400,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 320,000 320,000
Special Assessments 80,000 80,000
Total 400,000 400,000
Page 27 of 50
1
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW -00 -026
Project Name Neighborhood Street Recon. Program
Type Improvement Priority n/a
Useful Life Contact Public works
Category Local Streets Department Public works
category names
Description
This project will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost
effective manner.
Justification
the need to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based
)n condition and age of pavement, and also ratings compared with other local neighborhoods.
potential future roadway reconstruction projects are:
2005: Sunnyslope Neighborhood, Harriet Park West, Harriet Park East, Rolling Green Neighborhood, Ridge Road and
Schaefer Road.
2006: Lake Cornelia South Neighborhood, Hollywood / Todd Park Neighborhood, West Pamela Park Neighborhood.
2007: Harvey Lake Neighborhood, Lake Cornelia East Neighborhood, West Shore Drive and West 70th Street
Mirror Lakes Drive South Neighborhood, East Highland Park Neighborhood, Harvey Lake East Neighborhood,
Cornelia West Neighborhood, Northeast Arden Park Neighborhood.
East Concord Neighborhood, South Concord Neighborhood, West 54th Street / Beard Ave. Neighborhood.
Expenditures
2005
2006
2007
2008
2009
Total
Construction/Maintenance
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Total
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000.
15,000,000
Funding Sources
2005
2006
2007
2008
2009
Total
General Obligation Improveme
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Total
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Page 28 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW -00 -029
Project Name 56th Street Bridge
Type Improvement Priority n/a.
Useful Life Contact Public Works
Category Local Streets Department Public Works
category names
Description
This project provides for reconstructing this bridge and possible abutments.
07
s�
need to rehabilitate this bridge was determined'by the annual bridge certification program.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 250,000 250,000
Total 250,000 250,000
Funding Sources 2005 2006 2007 2008 2009 Total
State Bridge Bond 250,000 250,000
Total 250,000 250,000
Page 29 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW- 00-030
Project Name Sidewalks/Pathways (MSA)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
Description
Construct sidewalks along MSAS designated streets as petitioned from residents.
Justification
these projects will provide separation of pedestrians and vehicles along the designated routes.
Expenditures
2005
2006
2007
2008
2009
Total
Construction/Maintenance
120,000
60,000
50,000
50,000
50,000
330,000
Total
Funding Sources
120,000
2005
60,000
2006
50,000
2007
50,000
2008
50,000
2009
330,000
Total
Municipal State Aid
120,000
60,000
50,000
50,000
50,000
330,000
Total
120,000
60,000
50,000
50,000
50,000
330,000
Page 30 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW_00 -031
Project Name Sidewalks/Pathways: City Costs
These projects will provide separation of pedestrians and vehicles along the designated routes.
Justification
These projects are initiated by petitions from residents only.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 50,000
50,000
50,000
50,000
50,000
250,000
Total 50,000
50,000
50,000
50,000
50,000
250,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 50,000 50,000 50,000 50,000 50,000 250,000
Total 50,000 50,000 50,000 50,000 50,000 250,000
Page 31 of 50
l
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # . PW -00 -074
Project Name Concrete Rehab: Parklawn Ave. (France to W 77)
Type Improvement
Useful Life
Category Municipal State Aid
category names MSA
Description
rehab existing concrete roadway.
Priority
n/a
Contact
Public Works
Department
Public Works
Justification
This roadway is over 30 years old and is in need of concrete repair.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 200,000 200,000
Special Assessments 100,000 100,000
Total 300,000 300,000
Page 32 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW -01 -010
Project Name Reconstruct: W 70th St. & Metro Blvd.
Type Improvement
Useful Life
Category Municipal State Aid
category names MSA
Description
Priority n/a
Contact Engineering
Department Public Works
/ Rehabiliate the roadway and signals at West 70th St. from THIN to Metro Boulevard.
Justification
Chis project will provide additional capicity to both intersections; Metro Blvd and Rabun Drive, Currently vehicles
tccessing West 70th St. from Rabun Drive have difficulty entering and exiting due to the peak hour traffic.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 400,000 400,000
Total 400,000 400,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 320,000 320,000
Special Assessments 80,000 80,000
Total 400,000 400,000
Page 33 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW -01 -013
Project Name Mill & Overlay: Eden Ave. (Vernon to Arcadia)
Type Improvement
Useful Life
- Category Municipal State Aid
category names MSA
Priority n/a
Contact Engineering
Department Public works
Description
this project involves the milling of distressed surface and the repaving of a new surface on Eden Avenue from Vernon
kvenue to Arcadia Avenue. This project will also include milling and overlaying Sherwood Road from Sherwood Park
;o Eden Avenue.
Justification
[be need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 48,000 48,000
Total 48,000 48,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 48,000 48,000
Total 48,000 48,000
Page 34 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW- 02-002
Project Name Reconstruct: Concord Ave (VVRD to Southview Ln)
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names
This project provides for the reconstruction of Concord Avenue from West 58th Street to Valley View Road. This
project will provide a new roadway section and will bring this road into compliance with State -Aid Standards.
Sidewalks will also be analyzed with this reconstruction.
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 500,000 500,000
Total 500,000 500,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 400,000 400,000
Special Assessments 100,000 100,000
Total 500,000 500,000
Page 35 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # PW_02 -006
Project Name Public Works: Braemar Cold Storage: Concrete Floor
- omplete construction of concrete floor at Braemar Public Works Cold Storage Building.
Justification
Che Braemar Public Works Cold Storage Building was constructed in 1998 -99 to store off -season equipment for both
3ublic Works and Park Maintenance. Public Works staff has placed concrete on the center drive isle to reduce dust
hrough the buildig. The remaining storage areas are also in need of a hard surface floor.
Expenditures 2005
2006 2007
2008 2009 Total
Construction/Maintenance
80,000
80,000
Total
Funding Sources 2005
80,000
2006 2007
80,000
2008 2009 Total
Revolving Fund
80,000
80,000
Total
80,000
80,000
Page 36 of 50
Capital Improvement Program
City of Edina, MN
Project # UT -00 -008
Project Name Van Valkenburg Water Tower (paint)
Type Improvement
Useful Life
Category Water Towers
category names
Description
Refinish pressure tank and structure.
Data in Year 2006
Priority n/a
Contact Utility Supt
Department Utility Department
Justification
Coating is nearly 20 years old and has deteriorated sugnificantly.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 600,000 600,000
Total 600,000 600,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 600,000 600,000
Total 600,000 600,000
Page 37 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # . UT -00 -020
Project Name Watermain/Sanitary: Country Club Area
Type Improvement
Useful Life
Category Water Main
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Replace water mains, services and sanitary sewers.
Justification
Sanitary sewer and water mains are deteriorating due to age. This is a high maintenance area of the City utility system.
Sanitary sewer pipes should be upgraded.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,236,000 1,236,000 2,472,000
Total 1,236,000 1,236,000 2,472,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 1,236,000 1,236,000 2,472,000
Total 1,236,000 1,236,000 2,472,000
Page 38 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT-00 -025
Project Name Water Main Improvements
Type Improvement
Useful Life
Category Water Main
category names
Priority n/a
Contact Engineering
Department Utility Department
Description
Jpdate water system when reconstructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification
The,majority of the existing system consists of unlined cast iron pipes. These pipes are more susceptible to failure than
a lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide better water
quality and water pressure.
i
2005. 2006 2007 2008 2009 Total
B 400,000 400,000 400,000 400,000 400,000 2,000,000
Total 400,000 400,000 400,000 400,000 400,000 2,000,000
Funding Sources 2005 2006 2007 2008
Utility Funds 400,000 400,000 400,000 400,000
2009 Total
400,000 2,000,000
Total 400, 000 400,000 400,000 400,000 400,000 2,000,000
Page 39 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT -00 -026
Project Name Sanitary Sewer Improvements
Type Improvement Priority n/a
Usef it Life Contact Utility Supt
Category Sanitary Sewer Improvements Department Utility Department
category names
NY:ST ».
Description
Update sanitary sewer system when constructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification
Most of the sanitary sewer system consists of clay pipe that was installed upto the 1970's. This type of pipe is more
prone to failure than the current poly - vinyl - chloride and concrete pipes. The clay pipe is typically more suceptable to
root intrusion, which decreases the capacity of a pipe.
The. upgrade to the system will help reduce inflow and infiltration into sanitary sewer system due to deteriorating
sanitary manholes, leaking joints in pipes, and leaking covers.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000 200,000 200,000 200,000 200,000 1,000,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000 200,000 200,000 200,000 200,000 1,000,000
Page 40 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project# UT-00 -030
Project Name pond & Lake Dredging
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Storm Sewer Improvements Department Utility Department
category names
Description
Dredge ponds as necessary.
Justification
These projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling in
from sediment inot the systme and natural life of organic material.
Expenditures 2005
2006
2007
2008
2009
Total
Construction /Maintenance 60,000
60,000
60,000
60,000
60,000
300,000
Total 60,000
60;000
60,000
60,000
60,000
300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 60,000 60,000 60,000 60,000 60,000 300,000
Total 60,000 60,000 60,000 60,000 60,000 300,000
Page 41 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT -01 -003
Project Name Storm Sewer -Pipe and Grading Improvements
Type Improvement
Useful Life
Category Storm Sewer Improvements
category names
Priority n/a
Contact Engineering
Department Utility Department
replacement storm sewer for aging system. This also includes new drain tiles for roof drains and sump pump
Justification
ks roadways are reconstructed within the City storm sewers will require updating. See Project No. PW -00 -026 for
.3otential neighborhoods. Drainage swales also need to be regraded. Drain tiles where needed should also be included
Kith these projects.
In 1998 the City undertook a sump pump inspection program that included inspections of all properties in the City to
eleminate any clear water connections into the City's sanitary sewer system. The program identified all homes in the
City that have sump pumps and other asement water problems. These new storm sewer improvements will provide a
place for clear water discharges especially during the winter months.
Expenditures
2005
2006
2007
2008
2009
Total
Construction/Maintenance
120,000
120,000
120,000
120,000
120,000
600,000
Total
120,000
120,000
120,000
120,000
120,000
600,000
Funding Sources
2005
2606
2007
2008
2009
Total
Utility Funds
120,000
120,000
120,000
120,000
120,000
600,000
Total
120,000
120,000
120,000
120,000
120,000
600,000
Page 42 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT-02 -003
Project Name Storm water Lift Station (Highlands Lake)
Type Improvement Priority n/a
Useful Life 20 years Contact Utility Supt
Category Storm Sewer Improvements Department Utility Department
category names
lift station with one that has two larger pumps and automatic controls.
..........si rt
r;l
Existing station collects dirt and debris which affects its operation. Larger pumping capabilities are needed to prevent
flooding of public and private property.
Expenditures .2005 2006. 2007 2008 2009 Total
Construction/Maintenance 75,000 75,000
Total 75,000 75,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 75,000 75,000
Total 75,000 75,000
Page 43 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT- 02_004
Project Name Annual Vehicle Replacements
Type Equipment Priority n/a
Useful Life 10 years Contact Utility Supt
Category Utility Equipment Replacement Department Utility Department
category names
Description
Replacement of small vehicles and equipment that are 10 years old or 100,000 miles. In 2005 we have a pickup and a
skidsteer replacement.
Justification
Vehicles have reached their life expectancy.
Expenditures
EquipNehicles /Furnishings
2005
70,000
2006
55,000
2007 2008
55,000
2009 Total
180,000
Total
70,000
55,000
55,000
180,000
Funding Sources
2005
2006
2007 2008
2009 Total
Utility Funds
70,000
55,000
55,000
180,000
Total
70,000
55,000
55,000
180,000
Page 44 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT-02 -008
Project Name Well #3 (5233 Halifax Avenue)
Type Improvement Priority n/a
Useful Life 15 years Contact Utility Supt
Category Wells Department Utility Department
category names
Description
tedevelop well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical
Justification
Phis rehab has a 15 year,life on the pump and 30 plus years on the other equipment and well hole. Operating costs will
)e lower and water will be higher.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 160,000 160,000
Total 160,000 160,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 160,000 160,000
Total 160,000 160,000
Page 45 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT-02 -012
Project Name Well #17 (5900 Park Place)
Type Improvement
Useful Life 15 years
Category Wells
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Redevelop well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical
Justification
This rehab has a 15 year life on the pump and 30 plus years on the other equipment and well hole. Operating costs will
be lower and water production will be higher.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 160,000 160,000
Total 160,000 160,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 160,000 160,000
Total 160,000 160,000
Page 46 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT42 -013
Project Name Portable Generator Replacement: 250KW
Type Equipment Priority n/a
Useful Life 20 years Contact Utility Supt
Category Utility Equipment Replacement Department Utility Department
category names
existing 250KW generator is a 1985 unit and is used to operate wells during power outages.
Justification
This generator will be 21 years old was purchased used and has high maintenance cost.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 90,000 90,000
Total 90,000 90,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 90,000 90,000
Total 90,000 90,000
Page 47 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT-02 -017
Project Name Lift Station #22 (7701 France Avenue)
Type Improvement
Useful Life 20 years
Category Lift Stations
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Replace lift station and add more storage capacity.
t,.
t;
Justification
Ibis station uses old and obsolete parts as well as has a short down time because of lack of storage capacity.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources -2005 2006 2007 2008 2009 Total
Utility Funds 100,000 100,000
Total 100,000 100,000
Page 48 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # UT -04 -003
Project Name Expand the Pond at 42nd Street and France Ave.
Type Improvement Priority 2 Very Important
Useful Life 50 years Contact Utility Supt.
Category Storm Sewer Improvements Department Utility Department
category names
the pond to handle 100 year rain storms.
Justification
This pond was only designed to handle 50 year rain events. Property along France Ave who's backyards are on this
pond get flooded during heavy rain falls one house had several inches of water in their basement from the heavy rains in
July of 2003.
Expenditures 2005
2006 2007
2008 2009 Total
Construction/Maintenance
100,000
100,000
Total
Funding Sources 2005
100,000
2006 2007
100,000
2008 2009 Total
Utility Funds
100,000
100,000
Total
100,000
100,000
Page 49 of 50
Capital Improvement Program Data in Year 2006
City of Edina, MN
Project # . UT-04 -006
Project Name Utility Billing Software
Type Equipment
Useful Life 10 years
Category Computer Software
category names
Priority 1 Urgent
Contact Finance Director
Department Utility Department
Logis consortium has selected Advanced Utitliy Systems to provide utility billing software for 18 of its member
s. The payments will be made over 2 years.
Justification
The current UB software package runs on an HP 3000 line of servers. HP plans to discontinue support of these servers.
Therefore, Logis has been searching for a new UB software package for the past 2 years and recenetly selected
kdvanced Utility Systems. Implementation will begin in 2005 for 3 Logis cities, with a new group of cities starting
;very 6 months.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 92,000 92,000 184,000
Total 92,000 92,000 184,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 92,000 92,000 184,000
Total 92,000 92,000 184,000
Page 50 of 50
I
SI
2007
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # . AQC -04003
Project Name Replace Light Poles
Type Equipment Priority n/a
Useful Life Contact Park & Recreation
Category Equipment Replacement Department Aquatic Center
category names
Description
[,eplace five original light poles and fixtures.
Justification
The original light poles were installed in 1958 and are
currently forty-six years old. The facility hag also been
modified a number of times over the years and the current
light poles and fixtures no longer illuminate the entire pool
area. It is also my understanding that there are much more
energy efficient lights today.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 20,000 20,000
Total 20,000 20,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 20,000 20,000
Total
Page 1 of 34
20,000
20,000
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # CW -02 -001
Project Name Citywide Fiber Optic Cabling
Type Improvement Priority n/a
Useful Life Contact Asst City Manager
Category Computer Network Department Citywide
category names
Description
This represents the cost of running fiber optic cabling to a number of our offsite facilities. Currently, we connect to
many of our facilities through the use of T1 phone lines which cost us around $3,000 per T1 line. Some of our facilities
have multiple T1 lines to accommodate both voice and data transmissions. By running fiber optic cabling to these
facilites, the City could remove the operating expense of the T1 lines from the offsite budgets. There would be a small
offset of annual costs associated with service contracts on the equipment needed at each end of the cabling. It would
also allow us to look at Voice over IP for our telecommunications in the long run. Most of the larger facilities (Fire and
Public Works) have a 3 -4 vear navback of the capital costs inoneratine cost reductions.
Justification
Expenditures
2005
2006
2007
2008
2009
Total
EquipNehicles /Fumishings
Total
185,000
185,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
485,000
485,000
Funding Sources 2005
2006
2007
2008
2009
Total
Revolving Fund 185,000
Total 185,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
485,000
485,000
Page 2 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # EC1-00 -008
Project Name Skate Sharpener
Type Improvement Priority n/a
Useful Life Contact
Category Department Edinborough Pk/Centennial Lks
category names
iption
ce existing skate sharpener at Centennial Lakes Park.
Justification
The current skate sharpener will have reached its life expectancy by 2007 and will need to be replaced.
Expenditures 2005
2006 2007 2008
2009 Total
EquipNehicles /Fumishings
8,000
8,000
Total
8,000
8,000
Funding Sources 2005
2006 2007 2008
2009 Total
Enterprise Funds
8,000
8,000
Total
8,000
8,000
Page 3 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # ECL-00 -013
Project Name Greensmowers (Centen)
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Department Edmborough Pk/Centenmal Lks
category names
Description
Replace the greensmower at Centennial Lakes Park.
Justification
These are routine replacement or maintenance items that need to be done that are not part of the Operating Budget.
This piece of equipment is needed to mow the greens at Centennial Lakes Park.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 10,000 10,060
Total 10,000 10,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 10,000 10,000
Total 10,000 10,000
Page 4 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # ECL -00 -017
Project Name Replaster Pool EP
Type Improvement
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
and restore pool shell at Edinborough Park.
Justification
The pool shell at Edinborough Park has deteriorated over the past 18 years and needs 'a new surface coat of gunite.
Expenditures 2005
2006 2007 2008
2009 Total
Equip/Vehicles /Fumishings
30,000
30,000
Total
30,000
30,000
Funding Sources 2005
2006 2007 2008
2009 Total
Enterprise Funds
30,000
30,000
Total
30,000
30,000
Page 5 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # ECL -02 -005
Project Name Remodel Tot Lot Area
Type Improvement
Useful Life
Category
category names
iption
del and expand tot lot floor area.
Priority n/a
Contact
Department Edinborougb Pk/Centennial Lks
Justification
the tot lot area playground equipment no longer meets safety standards for fall zone requirements and therefore unable
o get replacement parts. The plan is to remove all remaining tot lot playground equipment, expand the floor space by
aking out one planter, and increase the floor space to be used for a picnic area for birthday parties and social gatherings.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 18,000 18,000
Total 18,000 18,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 18,000 18,000
Total 18,000 18,000
Page 6 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # ECL -04 -002
Project Name EP Replace Genie Lift
Type Equipment
Useful Life
Category Equipment Replacement
category names
Edinborough Park Genie Lift.
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
Justification
[teplacement of the electric Genie lift is needed because the equipment has reached its life expectancy.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 6,500 6,500
Total 6,500 6,500
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 6,500 6,500
Total 6,500 6,500
Page 7 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # GC-00 -002
Project Name Maintenance Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
Routine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment.
Justification
These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that
ire on a 10 -15 year replacement schedule.
Expenditures 2005
2006
2007
2008
2009
Total
EquipNehicles /Furnishings 125,000
130,000
135,000
140,000
145,000
675,000
Total 125,000
130,000
135,000
140,000
145,000
675,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 125,000 130,000 135,000 140,000 145,000 675,000
Total 125,000 130,000 135,000 140,000 145,000 675,000
Page 8 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # GC -00 -007
Project Name Miscellaneous Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
toutine equipment replacement purchases for driving range equipment and small utility vehicles.
Justification
These are routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that
are on a 10 year replacement schedule.
Expenditures
2005
2006
2007
2008
2009
Total`
EquipNehicles /Fumishings
30,000
36,000
37,000
38,000
39,000
180,000
Total
30,000
36,000
37,000
38,000
39,000
180,000
Funding Sources
2005
2006
2007
2008
2009
Total
Enterprise Funds
30,000
36,000
37,000
38,000
39,000
180,000
Total
30,000
36,000
37,000
38,000
39,000
180,000
Page 9 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # GD -04 -001
Project Name Propane Back -up Inflation System
Useful Life
Category Unassigned
category names
Priority n/a
Contact
Department Golf Dome
Description
Replace 20 year old inflation/heating system at the Golf Dome.
Justification
the inflation system is at the end of its useful life. The Dome can be damaged
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources .2005 2006 2007 2008 2009 Total
Enterprise Funds 15,000 15,000
Total 15,000 15,000
Page 10 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # LIQ- 00-015
Project Name 50th: Tile In Front of Beer Cooler
Type Improvement Priority n/a
Useful Life Contact Liquor Stores
Category Department Liquor Stores
category names
Description
[Ieplace carpet in front of beer cooler with Quany tile to match existing entrance tile
Justification
Carpet is being damaged when product breaks near beer cooler. It is easier to clean up tile vs. carept.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 7,000 7,000
Total 7,000 7,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 7,000 7,000
Total 7,000 7,000
Page 11 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # LIQ- 01-001
Project Name 50th: Replace carpet
Type Improvement
Useful Life
Category
category names
Description
Replace carpet on sales floor.
7.w
Priority n/a
Contact
Department Liquor Stores
Justification
teplace due to useful life of carpet. Seams and fraying have started to occur.
Expenditures 2005
2006 2007 2008
2009 Total
Construction/Maintenance
10,000
10,000
Total
Funding Sources 2005
10,000
2006 2007 2008
10,000
2009 Total
Enterprise Funds
10,000
10,000
Total
10,000
10,000
Page 12 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # . LIQ- 02-005
Project Name 50th - Store Remodel
Type Improvement Priority n/a
Useful Life Contact Liquor Stores
Category Building Improvements Department Liquor Stores
category names
re current lighting with brighter and more efficient lighting. Replace all wood shelving on liquor wall with Lozier
shelving. Replace wood interior with lighter material.
istification
ore was last remodeled in 1
nrently laid out.
We need to brighten up the interior and get better lighting for how the store is
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 75,000 75,000
Total 75,000 75,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 75,000 75,000
Total 75,000 75,000
Page 13 of 34
Capital Improvement Program
City of Edina, MN
Project # MB- 04_003
Project Name City Halt/Public Works Building
Type Unassigned
Useful Life
Category Building Improvements
category names
Data in Year 2007
Priority n/a
Contact Asst City Manager
Department Municipal Buildings
Description
These funds will cover any changes /additions to file areas, workstations and record storage.
Justification
Expenditures
EquipNehicles/Fumishings
2005
35,000
2006
35,000
2007
35,000
2008
35,000
2009
35,000
Total
175,000
Total
35,000
35,000
35,000
35,000
35,000
175,000
Funding Sources
2005
2006
2007
2008
2009
Total
Revolving Fund
35,000
35,000
35,000
35,000
35,000
175,000
Total
35,000
35,000
35,000
35,000
35,000
175,000
Page 14
of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PK-00 -028
Project Name Pathway Repairs /Additions: Arneson Acres
Type Improvement
Useful Life
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
in and level class five rock, pave and pack asphalt pathway.
Justification
- tirrently we have a gravel pathway that goes from the Arneson Acres Terrace Room down to the gazebo and formal
;ardens area of the park. For ease of walking and long term maintenance we need to pave the pathway.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 30,000 30,000
Total 30,000 30,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 30,000 30,000
Total 30,000 30,000
Page 15 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PK -00 -033
Project Name Renovate senior athletic field: Pamela Park
Useful Life
Category Ballfield Improvements
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
iption
de the soccer field turf and provide new sand and peat mixture sub -soils and re- install the underground irrigation
Justification
Chis soccer field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The
rrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow
.or reduced use of herbicides.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 300,000 300,000
Total 300,000 300,000
Page 16 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PK -00 -037
Project Name Playground: McGuire Park
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Park Development Department Park & Recreation
category names
Description
Meet with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid.
Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
border and adding new playground equipment with accessible path to transfer stations.
Justification
The current playground equipment was installed in 1989 and is becoming worn from age and use. Playground
equipment is currently on a 15 year replacement schedule. In 2005, McGuire Park's equipment will be 16 years old.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 120,000 120,000
Total 120,000 120,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 120,000 120,000
Total 120,000 120,000
Page 17 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PS-01 -003
Project Name In -Squad Video System
Type Improvement
Useful Life
Category Police
category names
Priority n/a
Contact Police Department
Department Public Safety
ruggedized video system, consisting of a camera, microphones, and recorder would be purchased for each of our
,elve patrol squads. Station equipment would include a supply of tapes, storage space and a player that can view, copy
d print images.
Justification
Video recording systems in squad cars provide audio and visual documentation of events for evidentiary purposes in
;riminal and civil cases. The video provides an impartial record of disputed events.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 50,000 50,000
Total 50,000 50,000
Page 18 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # . PW -00 -026
Project Name Neighborhood Street Recon. Program
Type Improvement
Useful Life
Category Local Streets
category names
Description
Priority n/a
Contact Public Works
Department Public Works
project will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost
tive manner.
Justification
e need to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based
condition and age of pavement, and also ratings compared with other local neighborhoods.
potential future roadway reconstruction projects are:
: Sunnyslope Neighborhood, Harriet Park West, Harriet Park East, Rolling Green Neighborhood, Ridge Road and
-fer Road.
Lake Cornelia South Neighborhood, Hollywood / Todd Park Neighborhood, West Pamela Park Neighborhood.
Harvey Lake Neighborhood, Lake Cornelia East Neighborhood, West Shore Drive and West 70th Street
Mirror Lakes Drive South Neighborhood, East Highland Park Neighborhood, Harvey Lake East Neighborhood,
Cornelia West Neighborhood, Northeast Arden Park Neighborhood. '
East Concord Neighborhood, South Concord Neighborhood, West 54th Street / Beard Ave. Neighborhood.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
Total 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Obligation Improveme 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
Total 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
Page 19 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PW_00 -030
Project Name Sidewalks/Pathways (MSA)
Type Improvement Priority n/a
Useful Life Contact Public works
Category Municipal State Aid Department Public works
category names MSA
Description
�onstruct sidewalks along MSAS designated streets as petitioned from residents.
Justification
Chese projects will provide separation of pedestrians and vehicles along the designated routes.
Expenditures
2005
2006
2007
2008
2009
Total
Construction /Maintenance
120,000
60,000
50,000
50,000
50,000
330,000
Total
Funding Sources
120,000
2005
60,000
2006
50,000
2007
50,000
2008
50,000
2009
330,000
Total
Municipal State Aid
120,000
60,000
50,000
50,000
50,000
330,000
Total
120,000
60,000
50,000
50,000
50,000
330,000
Page 20 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PW -00 -031
Project Name Sidewalks/Pathways: City Costs
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Sidewalk,- Pathways Department Public Works
category names
Description
These projects will provide separation of pedestrians and vehicles along the designated routes.
Justification
These projects are initiated by petitions from residents only.
Expenditures 2005
2006
2007
2008
2009
Total
Construction /Maintenance 50,000
50,000
50,000
50,000
50,000
250,000
Total 50,000
50,000
50,000
50,000
50,000
250,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 50,000 50,000 50,000 50,000 50,000 250,000
Total 50,000 50,000 50,000 50,000 50,000 250,000
Page 21 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PW -01 -011
Project Name Reconstruct: W 62nd St. ( Oaklawn -France)
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names MSA
Description
This project provides for the reconstruction of West 62nd Street from Oaklawn Avenue to France Avenue. This project
will provide a new roadway section and will bring this road into compliance with State -Aid Standards. Sidewalks will
also be proposed with this reconstruction.
Justification
this project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
Failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also
.onsidered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 320,000 320,000
Total 320,000 320,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 264,000 264,000
Special Assessments 56,000 56,000
Total 320,000 320;000
Page 22 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # PW- 02-003
Project Name Mill & Overlay: Southview Ln (TH100 to Concord)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names
Description
This project involves the milling of distressed surface and the repaving of a new surface on
Southview Lane from TH 100 to Concord Avenue.
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures 2005
2006 2007 2008
2009 Total
Construcbon/Maintenance
120,000
120,000
Total
Funding Sources 2005
120,000
2006 2007 2008
120,000
2009 Total
Municipal State Aid
120,000
120,000
Total
120,000
120,000
Page 23 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # . PW_04 -002
Project Name Sidewalk / Pathway: Interlachen Boulevard
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names
Description
The City acquired a $1,000,000 Federal Grant to construct a pathway along Interlachen Boulevard / Blake Road from
Vernon Avenue to the Southwest LRT line just north of Excelsior Boulevard.
Justification
Expenditures 2005
2006 2007 2008
2009 Total
Construction/Maintenance
1,500,000
1,500,000
Total
Funding Sources 2005
1,500,000
2006 2007 2008
1,500,000
2009 Total
Municipal State Aid
1,500,000
1,500,000
Total
1,500,000
1,500,000
Page 24 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # UT -00 -020
Project Name Watermain/Sanitary: Country Club Area
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category water Main Department Utility Department
category names
Description
teplace water mains, services and sanitary sewers.
Justification
Sanitary sewer and water mains are deteriorating due to age. This is a high maintenance area of the City utility system.
Sanitary sewer pipes should be upgraded.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,236,000 1,236,000 2,472,000
Total 1,236,000 1,236,000 2,472,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 1,236,000 1,236,000 2,472,000
Total 1,236,000 1,236,000 2,472,000
Page 25 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # UT-00_025
Project Name water Main Improvements
Type Improvement
Useful Life
Category Water Main
category names
Priority n/a
Contact Engineering
Department Utility Department
Description
Jpdate water system when reconstructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification
[be majority of the existing system consists of unlined cast iron pipes. These pipes are more susceptible to failure than
t lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide better water
luality and water pressure.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 400,000 400,000 400,000 400,000 400,000 2,000,000
Total 400,000 400,000 400,000 400,000 400,000 2,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 400,000
400,000
400,000
400,000
400,000
2,000,000
Total 400,000
400,000
400,000
400,000
400,000
2,000,000
Page 26 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # UT-00 -026
Project Name Sanitary Sewer Improvements
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Sanitary Sewer Improvements Department Utility Department
category names
a.... .............. u
fi
Description
Jpdate sanitary sewer system when constructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification
Most of the sanitary sewer system consists of clay pipe that was installed upto the 1970's. This type of pipe is more
prone to failure than the current poly - vinyl- chloride and concrete pipes. The clay pipe is typically more suceptable to
root intrusion, which decreases the capacity of a pipe.
The upgrade to the system will help reduce inflow and infiltration into sanitary sewer system due to deteriorating
sanitary manholes, leaking joints in pipes, and leaking covers.
Expenditures 2005.
2006.
2007
2008
2009
Total
Construction /Maintenance 200,000
200,000
200,000
200,000
200,000
1,000,000
Total 200,000
200,000
200,000
200,000
200,000
1,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 200,000
200,000
200,000
200,000
200,000
1,000,000
Total 200,000
200,000
200,000
200,000
200,000
1,000,000
Page 27 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # UT -00 -030
Project Name Pond &. Lake Dredging
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Storm Sewer Improvements Department Utility Department
category names
Description
Dredge ponds as necessary.
Justification
These projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling in
From sediment inot the systme and natural life of organic material.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 60,000 60,000 60,000 60,000 60,000 300,000
Total 60,000 60,000 60,000 60,000 60,000 300,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 60,000
60,000
60,000
60,000
60,000
300,000
Total 60,000
60,000
60,000
60,000
60,000
300,000
Page 28 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # UT-01 -003
Project Name Storm Sewer - Pipe and Grading Improvements
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Storm Sewer Improvements Department Utility Department
category names
replacement storm sewer for aging system. This also includes new drain tiles for roof drains and sump pump
As. roadways are reconstructed within the City storm sewers will require updating. See Project No. PW -00 -026 for
potential neighborhoods. Drainage swales also need to be regraded. Drain tiles where needed should also be included
with these projects.
In 1998 the City undertook a sump, pump inspection program that included inspections of all properties in the City to
eleminate any clear water connections into the City's.sanitary sewer system. The program identified all homes in the
City that have sump pumps and other asement water problems. These new storm sewer improvements will provide a
lace for clear water discharges especially during the winter months.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 120,000
120,000
120,000
120,000
120,000
600,000
Total 120,000
120,000
120,000
120,000
120,000
600,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 120,000 120,000 120,000 120,000 120,000 600,000
Total 120,000 120,000 120,000 120,000 120,000 600,000
Page 29 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project# UT -02 -004
Project Name Annual Vehicle Replacements
Type Equipment Priority n/a
Useful Life 10 years Contact Utility Supt
Category Utility Equipment Replacement Department Utility Department
category names
lent of small vehicles and equipment that are 10 years old or 100,000 miles. In 2005 we have a pickup and a
replacement.
Justification
Vehicles have reached their life expectancy.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 70,000 55,000 55,000 180,000
Total 70,000 55,000 55,000 180,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 70,000 55,000 55,000 180,000
Total 70,000 55,000 55,000 180,000
Page 30 of 34
Capital Improvement Program
City of Edina, MN
Project # . UT-02 -014
Project Name Well #10 (4500 West 76th Street)
Data in Year 2007
Type Improvement Priority, n/a
Useful Life 10 years Contact Utility Supt
Category Wells Department Utility Department
category names
Description
[Zedevelop well hole, create a cavity on the bottom, and rebuild 'pump.
Justification
Chis well is a year around well and has a 7 year life expectancy. The last time this well was rehabbed was 1999.
Expenditures 2005
2006 2007 2008
2009 Total
Construction /Maintenance
65,000
65,000
Total
Funding Sources 2005
65,000
2006 2007 2008
65,000
2009 Total
Utility Funds
65,000
65,000
Total
65,000
65,000
Page 31 of 34
Capital Improvement Program
City of Edina, MN
Project # UT -02 -015
Project Name Well #11 (4500 West 76th Street)
Data in Year 2007
Type Improvement Priority n/a
Useful Life 10 years Contact Utility Supt
._. Category Wells Department Utility Department
category names
Description
Redevelop well hole, create a cavity on the bottom, and rebuild the pump.
Justification
Chis well is operated year around and has a 7 year life expectancy. The last time this well was rehabbed was 1998.
Expenditures 2005
2006 2007 2008
2009 Total
Construction/Maintenance
65,000
65,000
Total
65,000
65,000
Funding Sources 2005
2006 2007 2008
2009 Total
Utility Funds
65,000
65,000
Total
65,000
65,000
Page 32 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # UT -02 -018
Project Name Lift Station #21 (5970 Walnut Drive)
Type Improvement
Useful Life 20 years
Category Lift Stations
category names
Description
teplace Lift Station.
Priority n/a
Contact Utility Supt
Department Utility Department
Justification
Lift Station is using old and obsolete parts.
}
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 100,000 100,000
Total 100,000 100,000
Page 33 of 34
Capital Improvement Program Data in Year 2007
City of Edina, MN
Project # UT-04 -005
Project Name Public Works: Braemar Work Site - Lead Removal
Type Improvement
Useful Life
Category Water Main
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
kemove existing stabilized lead contaminated soil located at Braemar Public Works Site.
Justification
The lead abatement project for the Brian Wipperman Gun Range left approximately 2000 cubic yards of stabilized lead
soil at this location. The construction of the Braemar Public Safety Training Facility has drastically redued the amoun
of space neeeded for the Public Works and Parks maintenance operation. This soil removal will free -up approximately
15,000 squqre feet of working area. This area is used for sorting soils and debris from watermain breaks, construction
projects, leaf storage, etc.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 200,000 200,000
Total 200,000 200,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 200,000 200,000
Total 200,000 200,000
Page 34 of 34
iii;
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # AQC-00 -007
Project Name Upgrades and Replacements
Type Improvement
Useful Life
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Aquatic Center
These are upgrades and replacements of mechanical and small capital items that unexpectedly fail or become worn or
damaged and in need of replacement, repair, or upgrade. Equipment could include bath house water heaters, pumps,
lifeguard chairs, funbrellas, chaise lounges, etc.
Justification
Mechanical and small capital items can unexpectedly fail or wear out before their scheduled time for replacement. This
replacement budget will help serve as a rainy day fund for those unexpected failures or losses.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 50,000 50,000 100,000
Total 50,000 50,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 50,000 50,000 100,000
Total 50,000 50,000 100,000
Page 1 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # A -00 -008
Project Name Building Maintenance
Type Improvement Priority n/a
Useful Life Contact
Category Department Arena
category names
Description
West Arena board kick plate replacement - $8,000.
,obby handicap door opener - $7,000.
Bast Arena rink lights - $10,000.
Justification I
8" kick plate is worn out from using the power edging machine.
Handicap door needed to serve our special population (those with disabilities). This is not required by ADA (currently
in compliance), however, we have received requests.
East Arena rink lights are old and less energy efficient.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 25,000 25,000
Total 25,000 25,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 25,000 25,000
Total 25,000 25,000
Page 2 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # ART -00 -005
Project Name Main Office Remodel Art Center
Type Improvement Priority n/a
Useful Life Contact
Category Department Art Center
category names
Description
Remodel the front main office /retail store area.
Justification
The current main office /retail store area at the Edina Art Center needs to be renovated to make operations more efficient
end create a more aesthetically pleasing office /store area. Old file cabinets and desk areas need to be upgraded. Some
Files can be moved to another location in the Art Center to make more room for customers and staff.
Expenditures 2005 2006 2007
2008 2009
Total
Construction/Maintenance
10,000
10,000
Total
Funding Sources 2005 2006 2007
10,000
2008 2009
10,000
Total
Revolving Fund
10,000
10,000
Total
10,000
10,000
Page 3 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # CW- 02-001
Project Name Citywide Fiber Optic Cabling
Type Improvement Priority n/a
Useful Life Contact Asst City Manager
Category Computer Network Department Citywide
category names
Description
This represents the cost of running fiber optic cabling to a number of our offsite facilities. Currently, we connect to
many of our facilities through the use of T1 phone lines which cost us around $3,000 per T1 line. Some of our facilities
have multiple T1 lines to accommodate both voice and data transmissions. By running fiber optic cabling to these
facilites, the City could remove the operating expense of the T 1 lines from the offsite budgets. There would be a small
offset of annual costs associated with service contracts on the equipment needed at each end of the cabling. It would
also allow us to look at Voice over IP for our telecommunications in the long run. Most of the larger facilities (Fire and
Public Works ) have a 3 -4 year payback of the capital costs inoperating cost reductions.
Justification
Expenditures
2005
2006
2007
2008
2009
Total
EquipNehicles /Fumishings
185,000
75,000
75,000
75,000
75,000
485,000
Total
185,000
75,000
75,000
75,000
75,000
485,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 185,000 75,000 75,000 75,000 75,000 485,000
Total 185,000 75,000 75,000 75,000 75,000 485,000
Page 4 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # ECL -03 -007
Project Name Adventure Peak Remodel Improvement
Type Improvement Priority n/a
Useful Life Contact
Category Department Edinborough Pk/Centennial Lks
category names
iption
e current Adventure Peak playground structure with new components.
Justification
Every two to three years, Adventure Peak playground structure should be enhanced with a new play feature to keep user
interest high.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 25,000 50,000 75,000
Total 25,000 50,000 75,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 25,000 50,000 75,000
Total 25,000 50,000 75,000
Page 5 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # . ECL-03 -009
Project dame Paint Centennial Lakes Park Fixtures
Type Improvement
Useful Life
Category
category names
Description
Strip and paint light
Priority n/a
Contact
Department Edinborough Pk/Centennial Lks
bridges and railings at Centennial Lakes Park.
Justification
the light fixtures, bridges, and railings at Centennial Lakes Park will need to be stripped and painted in the year 2008.
Expenditures 2005 2006 2007
2008 2009
Total
Construction/Maintenance
25,000
25,000
Total
Funding Sources 2005 2006 2007
25,000
2008 2009
25,000
Total
Enterprise Funds
25,000
25,000
Total
25,000
25,000
Page 6 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project 0 ECL -03 -010
Project Name Renovate artificial ponds at Centennial Lakes Park
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact ,
Department Edinborough Pk/Centennial Lks
iption
ld the water features at the Centennial Lakes putting course.
Justification
The artificial ponds and water features at Centennial Lakes Park putting course have been experiencing break downs,
leaks and water clarity issues. The entire artificial pond system will be in need of major renovation to correct the
ongoing problems by the year 2008:
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 15,000 15,000
Total 15,000 15,000
Page 7 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # ECL-03 -011
Project Name Replace Great Hall Floor
Type Improvement Priority n/a
Useful Life Contact
Category Department Edinborougb Pk/Centennial Lks
category names
Description
Replace the floor in the Great Hall in Edinborough Park.
Justification
Me original multi- purpose floor will be in need of replacement by the year 2008.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 45,000 45,000
Total 45,000 45,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 45,000 45,000
Total 45,000 45,000
Page 8 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # GC-00 -002
Project Name Maintenance Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
toutine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment.
Justification
These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that
Ire on a 10 -15 year replacement schedule.
Expenditures 2005
2006
2007
2008
2009
Total
EquipNehicles /Fumishings 125,000
130,000
135,000
140,000
145,000
675,000
Total 125,000
130,000
135,000
140,000
145,000
675,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 125,000 130,000 135,000 140,000 145,000 675,000
Total 125,000 130,000 135,000 140,000 145,000 675,000
Page 9 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
project # GC -00 -007
'roject Name Miscellaneous Equipment: Braemar
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Department Golf Course
category names
Description
Routine equipment replacement purchases for driving range equipment and small utility vehicles.
Justification
These are routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that
are on a 10 year replacement schedule.
Expenditures 2005
2006
2007
2008
2009
Total
EquipNehicies/Fumishings 30,000
36,000
37,000
38,000
39,000
180,000
Total 30,000
36,Q00
37,000
38,000
39,000
180,000
Funding Sources 2005
2006
2007
2008
2009
Total
Enterprise Funds 30,000
36,000
37,000
38,000
39,000
180,000
Total 30,000
36,000
37,000
38,000
39,000
180,000
Page 10 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # MB-04 -003
Project Name City Ha MO& Works Building
Type Unassigned
Useful Life
Category Building Improvements
category names
Priority n/a
Contact Asst City Manager
Department Municipal Buildings
Description
these funds will cover any changes /additions to file areas, workstations and record storage.
Justification
Expenditures 2005
2006
2007
2008
2009
Total
EquipNehicles /Furnishings 35,000
35,000
35,000
35,000
35,000
175,000
Total 35,000
35,000
35,000
35,000
35,000
175,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 35,000 35,000 35,000 35,000 35,000 175,000
Total 35,000 35,000 35,000 35,000 35,000 175,000
Page 11 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
P"ject # PK-00 -039
Project Name Playground: Pamela Park
Type Improvement
Useful Life
Category Park Development
category names
Priority
n/a
Contact
Park & Recreation
Department
Park & Recreation
Description
Meet with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid.
Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
border and adding new playground equipment with accessible path to transfer stations.
Justification
The current playground equipment was installed in 1990 and is becoming worn from age and use. Playground
.-quipment is currently on a 15 year replacement schedule. In 2006, Pamela Park's equipment will be 17 years old. The
- urrent equipment does not meet current ADA standards.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 150,000 150,000
Total 150,000 150,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 150,000 150,000
Total 150,000 150,000
Page 12 of 32
Capital Improvement. Program Data in Year 2008
City of Edina, MN
Project # PK -01 -001
Project Name Renovate softball field: Todd Park
Type Improvement
Useful Life
Category Ballfield Improvements
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
Description
renovate adult softball field with existing soils and install underground irrigation system.
Justification
This adult softball ball field is in.need of re- grading for proper drainage purposes and to correct uneven turf conditions.
The irrigation system is in keeping -with the Turf Management Plan which relies on proper irrigation and drainage to
allow for reduced use of herbicides.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 91,000 91,000
Total 91,000 91,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 91,000 91,000
Total 91,000 91,000
Page 13 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # PK -01 -004
Project Name Renovate west baseball field: Countryside Park
Type Improvement
Useful Life
Category Balifield Improvements
category names
Priority
n/a
Contact
Park & Recreation
Department
Park & Recreation
Description
Regrade the ball field, provide underground irrigation and replace backstop fencing.
Justification
The ball field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The irrigation
system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced
use of herbicides. The backstop is worn and in need of replacement.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 138,000 138,000
Total 138,000 138,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 138,000 138,000
Total 138,000 138,000
Page 14 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # PK -02 -042
Project Name Playground: York Park
Type Improvement
Useful Life
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid.
ies removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
T and adding new playground equipment with accessible path to transfer stations.
Justification I
Fhe current playground equipment was installed in 1990. Playground equipment is currently on a 15 year replacement
schedule. If replaced in the year 2006, the equipment will,have been. 17 years old. In some cases, even if equipment
ippears to be structurally sound after 15 years, the equipment will likely no longer conform to current safety standards
ind will need a new look.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 120,000 120,000
Total 120,000 120,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 120,000 120,000
Total 120,000 120,000
Page 15 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # PW -00 -015
Project Name Concrete Rehab: Tracy Ave. (Vernon - TH62)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
•� - -�•: . r `, 4un�11- 11111 ?�_ -. 1 5 � "_
' - • -___
Description
This project provides for the rehabilitation of concrete pavement along Tracy Avenue from Vernon Avenue to TH 62.
The existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of the
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 220,000 220,000
Special Assessments 80,000 80,000
Total 300,000 300,000
Page 16 of 32
Capital Improvement Program
City of Edina, MN
Data in Year 2008
RON
Type Improvement Priority n/a M.N.
Useful Life Contact Public Works
Category Municipal State Aid Department ,
category names MSA
■ _ :_ II:
Description
This project provides for the rehabilitation of concrete pavement along W. 70th Street from Hwy 100 to France
Avenue. The existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of
he roadway.
Justification
The need to rehabilitate this segment of roadwaywas determined by the Pavement Management System.
Expenditures 2005 .2006 2007 2008 2009 Total
Construction/Maintenance 283,000 283,000
Total 283,000 283,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 203,000 203,000
Special Assessments 80,000 80,000
Total 283,000 283,000
Page 17 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # . PW-00 -026
Project Name Neighborhood Street Recon. Program
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Local Streets Department Public Works
category names
This project will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost
effective manner.
Justification
need to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based
condition and age of pavement, and also ratings compared with other local neighborhoods.
potential future roadway reconstruction projects are:
2005: Sunnyslope Neighborhood, Harriet Park West, Harriet Park East, Rolling Green Neighborhood, Ridge Road and
Schaefer Road.
2006: Lake Cornelia South Neighborhood, Hollywood / Todd Park Neighborhood, West Pamela Park Neighborhood.
2007: Harvey Lake Neighborhood, Lake Cornelia East Neighborhood, West Shore Drive and West 70th Street
Neighborhood.
2008: Mirror Lakes Drive South Neighborhood, East Highland Park Neighborhood, Harvey Lake East Neighborhood,
Lake Cornelia West Neighborhood, Northeast Arden Park Neighborhood.
2009: East Concord Neighborhood, South Concord Neighborhood, West 54th Street / Beard Ave. Neighborhood.
Expenditures 2005
Construction/Maintenance 3,000,000
2006
3,000,000
2007
3,000,000
2008
3,000,000
2009
3,000,000
Total
15,000,000
Total' 3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Obligation Improveme 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
'total 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 15,000,000
Page, 18 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # PW -00 -030
Project Name Sidewalks/Pathways (MSA)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
Description
�onstruct sidewalks along WAS designated streets as petitioned from residents.
Justification
These projects will provide separation of pedestrians and vehicles along the designated routes.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 120,000
60,000
50,000
50,000
50,000
330,000
Total 120,000
60,000
50,000
50,000
50,000
330,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 120,000 60,000 50,000 50,000 50,000 330,000
Total 120,000 60,000 50,000 50,000 50,000 330,000
Page 19 of 32
i
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # PW -00 -031
Project Name Sidewalks/Pathways: City Costs
Type Improvement
Useful Life
Category Sidewalk - Pathways
category names
Priority
n/a
Contact
Public Works
Department
Public Works
Description
These projects will provide separation of pedestrians and vehicles along the designated routes.
i
Justification
These projects are initiated by petitions from residents only.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000 50,000 50,000 50,000 250,000
Total 50,000 50,000 50,000 50,000 50,000 250,000
Funding Sources 2005
2006
2007
2008
2009
Total
Revolving Fund 50,000
50,000
50,000
50,000
50,000
250,000
Total 50,000
50,000
50,600
50,000
50,000
250,060
Page 20 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # PW_04 -001
Project Name Reconstruct: W 58th St ( Wooddale to France)
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names
Description
This project provides for the reconstruction of West 58th Street from Wooddale Avenue to France Avenue. This
) roject will provide a new roadway section and will bring this road into compliance with State -Aid Standards.
Sidewalks will also be analyzed with this reconstruction.
Justification
Ibis project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
'ailure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also
;onsidered inadequate per the Municipal, State -Aid Standards as set by the Minnesota Department of Transportation.
Expenditures 2005 2006 2007
2008 2009
Total
Construction/Maintenance
750,000
750,000
Total
750,000
750,000
Funding Sources 2005 2006 2007
2008 2009
Total
Municipal State Aid
600,000
600,000
Special Assessments
150,000
150,000
Total
750,000
750,000
Page 21 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # UT -00 -025
Project Name water Main Improvements
Useful Life
Category Water Main
category names
Priority n/a
Contact Engineering
Department Utility Department
Description
Update water system when reconstructing neighborhood streets. See Project No. PW -00 -026 for potential
neighborhoods.
Justification
The majority of the existing system consists of unlined cast iron pipes. These pipes are more susceptible to failure than
i lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide better water
Iuality and water pressure.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 400,000 400,000 400,000 400,000 400,000 2,000,000
Total 400, 000 400,000 400,000 400,000 400,000 2,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 400,000
400,000
400,000
400,000
400,000
2,000,000
Total 400,000
400,000
400,000
400,000
400,000
2,000,000
Page 22 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # UJT-00 -026
Project Name Sanitary Sewer Improvements
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Sanitary Sewer improvements Department Utitity Department
category names
H,
,i';`:
Description
Jpdate sanitary sewer system when constructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification
Most of the sanitary sewer system consists of clay pipe that was installed upto the 1970's. This type of pipe is more
prone to failure than the current poly - vinyl- chloride and concrete pipes. The clay pipe is typically more suceptable to
root intrusion, which decreases the capacity of a pipe.
The upgrade to the system will help reduce inflow and infiltration into sanitary sewer system due to deteriorating
sanitary manholes, leaking joints in pipes, and leaking covers.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 200,000
200,000.
200,000
200,000
200,000
1,000,000
Total 200,000
200,000
200,000
200,000
200,000
1,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 200,000
200,000
200,000
200,000
200,000
11000,000
Total 200,000
200,000
200,000
200,000
200,000
1,000,000
Page 23 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # UT -00 -030
Project Name Pond & Lake Dredging
Type Improvement
Useful Life
Category Storm Sewer Improvements
category names
ponds as necessary.
Priority n/a
Contact Utility Supt
Department Utility Department
projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling in
sediment inot the systme and natural life of organic material.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 60,000 60,000 60,000 60,000 60,000 300,000
Total 60,000 60,000 60,000 60,000 60,000 300,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 60,000
60,000
60,000
60,000
60,000
300,000
Total 60,000
60,000
60,000
60,000
60,000
300,000
Page 24 of 32
Capital Improvement Program Data in Year 2008
City of Edina, NW
Project # UT -01 -003
Project Name Storm Sewer - Pipe and Grading Improvements
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Storm Sewer Improvements Department Utility Department
category names
Description
?rovide replacement storm sewer for aging system. This also includes new drain tiles for roof drains and sump pump
Justification
As roadways are reconstructed within the City storm sewers will require updating. See Project No. PW -00 -026 for
potential neighborhoods. Drainage swales also need to be regraded. Drain tiles where needed should also be included
with these projects.
In 1998 the City undertook.a sump pump inspection program that included inspections of all properties in the City to
eleminate any clear water connections into the City's sanitary sewer system. The program identified all homes in the
City that have sump pumps and other asement water problems. These new storm sewer improvements will provide a
place for clear water discharges especially during the winter months.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 120,000
120,000
120,000
120,000
120,000
600,000
Total 120,000
120,000
120,000
120,000
120,000
600,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 120,000
120,000
120,000
120,000
120,000
600,000
Total 120,000
120,000
120,000
120,000
120,000
600,000
Page 25 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # UT-02 -005
Project Name well #7 (5241 Eden Circle)
Type Improvement
Useful Life 15 years
Category wells
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Redevelop well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical
equipment.
Justification I
Chis rehab has a 15 year life on the pump and 30 plus years on the other equipment and well hole. Operating cost will
)e lower and water production will be higher. This well will be delayed because of the contamination problem.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 100,000 100,000
Total 100,000 100,000
Page 26 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # UT-03 -010
Project Name Lift Station #1 (4041 Sunnyside Road)
Type Improvement
Useful Life 20 years
Category Lift Stations
category names
Description
Pump, Motor, and Wet Well Rehab.
Priority n/a
Contact Utility Supt.
Department Utility Department
lion
worn-out pumps and rehab concrete wet well.
f�
1?
Expenditures 2005
2006 2007 2008 2009
Total
Construction/Maintenance
50,000
50,000
Total
Funding Sources. 2005
50,000
2006 2007 2008 2009
50,000
Total
Utility Funds
50,000
50,000
Total
50,000
50,000
Page 27 of 32
Capital Improvement Program
City of Edina, MN
Project a UT-03 -011
Project Name Lift Station #21 (5970 Walnut Drive)
Type Improvement
Useful Life 20 years
Category Lift Stations
category names
Data in Year 2008
Priority n/a
Contact Utility Supt.
Department Utility Department
Description
tehab pumps, wet well, and force main.
Justification
'revent failures and leaks.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 50,000 50,000
Total 50,000 50,000
Page 28 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # UT-03 -012
Project Name 1998 Cat Backhoe Replacement
Type Equipment
Useful Life 10 years
Category Utility Equipment Replacement
category names
Description
replacement
Priority n/a
Contact Utility Supt.
Department Utility Department
Justification
This backhoe will be 10 years old and at the end of its life expectancy
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 140,000 140,000
Total 140,000 140,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 140,000 140,000
Total 140,000 140,000
Page 29 of 32
Capital Improvement Program Data in Year 2008
City of Edina, MN
Project # UT-03 -013
Project Name Pickup truck Replacements
Type Equipment
Useful Life 10 years
Category Utility Equipment Replacement
category names
two 10 year old pickup trucks.
Priority n/a
Contact Utility Supt
Department Utility Department
Justification
These trucks are at the end of their service life.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 60,000 60,000
Total 60,000 60,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 60,000 60,000
Total 60,000 60,000
Page 30 of 32
Capital Improvement Program Data in Year 2008
Citv of Edina, MN
Project # UT-03 -014
Project Name water Main Replacement Program
Type Improvement
Useful Life 50 years
Category Water.Main
category names
Priority n/a
Contact Utility Supt
Department Utility Department
Description
Replace old failed water main in areas where the streets will be reconstructed.
Justification
Water main failures are
the water system.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
J Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 300,000 300,000
Total 300,000 300,000
Page 31 of 32
Capital Improvement Program
City of Edina, MN
Project #' UT -03 -015
Project Name Well #2 (4521 West 50th Street)
Type Improvement
Useful Life 6 years
Category wells
category names
Description
Well rehab
Data in Year 2008
Priority n/a
Contact Utility Supt
Department Utility Department
Justification
- ontinue to produce required water supply.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Utility Funds 50,000 50,000
Total 50,000 50,000
Page 32 of 32
2009
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project#
AQC- 00-007
Project Name
Upgrades and Replacements
Type
Improvement Priority n/a
Useful Life
Contact Park & Recreation
Category
Park Development Department Aquatic Center
category names
These are upgrades and replacements of mechanical and small capital items that unexpectedly fail or become wom or
damaged and in need of replacement, repair, or upgrade. Equipment could include bath house water heaters; pumps,
lifeguard chairs, f inbrellas, chaise lounges, etc.
ianical and small capital items can unexpectedly fail or wear out before their scheduled time for replacement. This
;ement budget will help serve as a rainy day fund for those'unexpected failures or losses.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 50,000 50,000 100,000
Total 50,000 50,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 50,000. 50,000 100,000
Total 50,000 50,000 100,000
Page 1 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project# A -00 -006
Project Name Replace Zamboni
Type Improvement
Useful Life
Category Building Improvements
category names
Priority
n/a
Contact
Park & Recreation
Department
Arena
iption
,e the 1997 ice resurfacing machine.
Justification
Chis is a routine equipment replacement purchase. The 1997 Zamboni will be 10 years old in 2006.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 90,000 90,000
Total 90,000 90,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 90,000 .90,000
Total 90,000 90,000
Page 2 of 33
Capital Improvement Program Data in Year 2009
City of Edina, NW
Project # A -04 -001
Project Name Refurbish West Arena
Type Improvement
Useful Life 15 years
Category Building Improvements
category names
Priority n/a
Contact Park & Recreation
Department Arena
Description
teplace all existing refrigeration piping from arena to mechanical room.
Justification
Che current piping was installed in 1964 and will reach the end of it's useful life. The new technology is better
nsulated and therefore, more efficient to operate.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,000,000 1,000,000
Total 1,000,000 1,000,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revenue Bonds 1,000,000 1,000,000
Total 1,000,000 1,000,000
Page 3 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project# CW- 02-001
Project Name Citywide Fiber Optic Cabling
Type Improvement Priority n/a
Useful Life Contact Asst City Manager
Category Computer Network Department Citywide
category names
Description
This represents the cost of running fiber optic cabling to a number of our offsite facilities. Currently, we connect to
many of our facilities through the use of T1 phone lines which cost us around $3,000 per T1 line. Some of our facilities
have multiple T1 lines to accommodate both voice and data transmissions. By running fiber optic cabling to these
facilites, the City could remove the operating expense of the T1 lines from the offsite budgets. There would be a small
offset of annual costs associated with service contracts on the equipment needed at each end of the cabling. It would
also allow us to look at Voice over IP for our telecommunications in the long run. Most of the larger facilities (Fire and
Public Works ) have a 3 -4 year payback of the capital costs inoperating cost reductions.
Justification -
Expenditures 2005
2006
2007
2008
2009
Total
EquipNehicles/Fumishings 185,000
75,000
75,000
75,000
75,000
485,000
Total 185,000
75,000
75,000
75,000
75,000
485,000
Funding Sources 2005
2006
2007
2008
2009
Total
Revolving Fund 185,000
75,000
75,000
75,000
75,000
485,000
Total 185,000
75,000
75,000
75,000
75,000
485,000
Page 4 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # - ECL-04 -003
Project Name EP Weight Equipment
Type Equipment
Useful Life
Category Equipment Replacement
category names
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
iption
-e existing weight equipment at the Edinborough Park fitness area.
Justification
['he old weight exercise equipment needs. to be replaced to allow for newer and more user friendly and more versatile
weight exercise equipment as requested by our customers.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 10,000 10,000
Total 10,000 10,000
Page 5 of 33
Capital Improvement Program
City of Edina, MN
Project # ECL -04 -004
Project Name CL Replace Utility Vehicle
Type Equipment
Useful Life
Category Equipment Replacement
category names
Data in Year 2009
Priority n/a
Contact Park & Recreation
Department Edinborough Pk/Centennial Lks
Description
teplace a 1992 Cushman utility vehicle at Centennial Lakes.
Justification
fhe 1992 utility Cushman vehicle has reached its life expectancy and is need of replacement.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 12,000 12,000
Total 12,000 12,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 12,000 12,000
Total 12,000 12,000
Page 6 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # ECL-04 -005
Project Name CL Bridge to Clubhouse
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Park Development Department Edinborough Pk/Centennial Lks
category names
iption
ce the steep pedestrian bridge at the Clubhouse with a ramped, accessible bridge.
Justification
The bridge next to the clubhouse should be replaced with a more accessible bridge that would be a welcomed
mprovement for our customers, many whom are senior citizen age and for those who have mobility issues.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 40,000 .40,600
Total 40,000 40,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 40,000 40,000
Total 40,000 40,000
Page 7 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # ECL-04 -006
Project Name Centennial Lakes Fountain
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Unassigned Department Edinborough Pk/Centennial Lks
category names
Description
[replace one of the fountains in the Centennial Lakes pond.
Justification
Dne of the fountains on Centennial Lake needs to be replaced with a more energy efficient and more reliable fountain,
which will save money in the long run and provide more reliable service.
Expenditures 2005 2006 2007 2008
2009
Total
EquipNehicles/Fumishings
8,000
8,000
Total
Funding Sources 2005 2006 2007 2008
8,000
2009
8,000
Total
Enterprise Funds .
8,000
8,000
Total
8,000
8,000.
Page 8 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # GC-00 -002
Project Name Maintenance Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
Routine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment.
Justification
These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that
ire on a 10 -15 year replacement schedule.
Expenditures
2005
2006
2007
2008
2009
Total
EquipNehicles/Fumishings
125,000
130,000
135,000
140,000
145,000
675,000
Total
125,000
130,000
135,000
140,000
145,000
675,000
Funding Sources
2005
2006
2007
2008
2009
Total
Enterprise Funds
125,000
130,000
135,000
140,000
145,000
675,000
Total
125,000
130,000
135,000
140,000
145,000
675,000
Page 9 of 33
Capital Improvement Program
City of Edina, NW
Project # . GC -00 -007
Project Name Miscellaneous Equipment: Braemar
Type Improvement
Useful Life
Category
category names
Data in Year 2009
Priority n/a
Contact Park & Recreation
Department Golf Course
iption
ie equipment replacement purchases for driving range equipment and small utility vehicles.
Justification
These are routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that
ire on a 10 year replacement schedule.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 30,000 36,000 37,000 38,000 39,000 180,000
Total 30,000 36,000 37,000 38,000 39,000 180,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 30,000 36,000 37,000 38,000 39,000 180,000
Total 30,000 36,000 37,000 38,000 39,000 180,000
Page 10 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # GC-00 -008
Project Name Clubhouse Expansion -East Side: Braemar
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Building Improvements Department Golf Course
category names _
Description
To include increase in the indoor capacity of the Braemar. Room by 100 people, bringing the total capacity to
approximately 250. The exterior deck would be expanded to the south side of the building, allowing for larger groups
to be outside during favorable weather. The expanded deck would overlook the 8th and 19th tees and the 7th green.
Justification
This expansion will generate more rentals and thus more revenue. It will make the Braemar Room more marketable for
large rentals (e.g., wedding receptions, business meetings, parties, etc.).
Expenditures 2005 2006
2007 2008 2009 Total
Construction/Maintenance 475,000 475,000
Total 475,000 475,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 475,000 475,000
Total 475,000 475,000
Page I 1 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # GC -00 -010
Project Name Redesign Holes 19 -27: Braemar
Type improvement
Useful Life
Category
category names
Priority n/a
Contact Park & Recreation
Department Golf Course
Description
The renovation of several holes on the new nine would include widening of some fairways and possibly shortening
some holes. The actual configuration would be determined by an architect and the ability to work around existing
wetlands. The total cost of $800,000 is just an estimate that could be slightly more or less than the actual amount.
Justification I
the plan is to redesign several fairways on the new nine (holes 19 -27) to make the course more forgiving and enjoyable
.'or the average golfer. There are several holes on the new nine that experience has taught us are simply too challenging
ind unforgiving for the average player. Unlike holes 1 -18, an errant shot on several new nine holes result in a lost ball
and a penalty stroke. The fairways are too narrow and the hazards are too severe.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 850,000 850,000
Total 850,000 850,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 850,000 850,000
Total 850,000 850,000
r
Page 12 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # GC -02 -001
Project Name Driving Range Renovation
Type Improvement Priority n/a
Useful Life Contact Park & Recreation
Category Golf Course Redevelopment Department Golf Course
category names
Description
Phis plan calls for the expansion and renovation of the existing driving range.
Justification
hiving range is 35 years old and often times cannot safely keep up with the demand. The current configuration
)resents a safety issue that needs to be corrected. An expanded driving range will allow us to better serve the growing
iemand for outdoor grass surface driving range golf.
Expenditures 2005 2006 2007
2008 2009
Total
Construction/Maintenance
500,000
500,000
Total
500,000
500,000
Funding Sources 2005 2006 2007
2008 2009
Total
Enterprise Funds
500,000
500,000
Total
500,000
500,000
Page 13 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # GC -03 -002
Project Name Cart Path Renovation
Type Improvement Priority n/a
Useful Life Contact
Category Department Golf Course
category names
Description
Add cart paths throughout the entire golf course tee to green.
Justification
3raemar is quite often closed to golf car use during rainfall of more than 3/4 inches. When this happens, many older
;lientele chose not to play. Many events could go on if we could require players to "stay on the cart paths ". Some holes
ire more subject to flooding than others. When we lose golf car revenue we quite often lose green fees also. Newer
;ourses now plan cart paths tee to green.
Management agrees that with new additional cart paths we will be able to stay open more during rain events and
vill soon recover the investment of cart paths. The additional benefit will be less turf damage when we are open under
hese conditions. A bad weather summer could see revenues covering these costs in one season.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 260,000 260,000
Total 260,000 260,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 260,000 260,000
Total 260,000 260,000
Page 14 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # GD -00 -001
Project Name Upgrade Electrical Service & Lighting
Type Improvement Priority n/a
Useful Life Contact
Category Department Golf Dome
category names
Scription
grade the interior lighting in Dome. This would require additional wiring in the Dome and (12) 1,000 watt fixtures.
Justification
the lighting at the Dome has bee:
since it was built.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2005 2006 2007 2008 2009 Total
Enterprise Funds 30,000 30,000
Total
Page 15 of 33
30,000 30,000
r.
Capital Improvement Program
City of Edina, MN
Project # MB -04 -003
Project Name City Ha"ublic Works Building
Type Unassigned
Useful Life
Category Building Improvements
category names
Data in Year 2009
Priority n/a
Contact Asst City Manager
Department Municipal Buildings
iption
funds will cover any changes /additions to file areas, workstations and record storage.
Justification
Expenditures 2005
EquipNehicles /Fumishings 35,000
2006
35,000
2007
35,000
2008
35,000
2009
35,000
Total
175,000
Total 35,000
35,000
35,000
35,000
35,000
175,000
Funding Sources 2005
2006
2007
2008
2009
Total
Revolving Fund 35,000
35,000
35,000
35,000
35,000
175,000
Total 35,000
35,000
35,000
35,000
35,000
175,000
Page 16 of 33
Capital Improvement Program
City of Edina, MN
Project # . PK-00 -032
Project Name Parking Lot: Arneson Park
Type Improvement
Useful Life
Category Park Development
category names
Data in Year 2009
Priority n/a
Contact Park & Recreation
Department Park & Recreation
Description
- ontract (or do internally) a complete overlay of the Arneson Acres lower parking lot and entryway.
Justification
krneson Park has 2 parking lots (upper and lower). The lower lot is in need of re- paving and re- lining. For safety
)urposes, the park entrance should be widened to allow for easier and safer entrance into the park.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 68,000 68,000
Total 68,000 68,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 68,000 68,000
Total 68,000 68,000
Page 17 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # PK-00 -035
Project Name Parking Lot: Weber Park
Type Improvement
Useful Life
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
Description
Contract (or do internally) a complete overlay of the Weber Park parking lot and entryway.
Justification
- urrently, the parking lot entrance and parking lot are in need of a complete overlay. The Calvin Christian. School may
tssist in some of the maintenance expense due to the new joint use agreement.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 71,000 77,000
Total 77,000 77,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 71,000 77,000
Total
Page 18 of 33
77,000 77,000
Capital Improvement Program Data in Year 2009
City of Edina, MN
'roject # PK -02 -041
'roject Name Playground: Chowen Park
Type Improvement
Useful Life
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
Description
Meet with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid.
Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
)order and adding new playground equipment with accessible path to transfer stations.
Justification I
fhe current playground equipment Was installed in 1991. Playground equipment is currently on a 15 year replacement
Ichedule. If replaced in the year 2006, the equipment will have been 16 years -old. In some cases, even if equipment
ippears to be structurally sound after 15 years, the equipment will likely no longer conform to current safety standards
Ind will need a new look.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 120,000 120,000
Total 120,000 120,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 120,000 120,000
Total 120,000 120,000
Page 19 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # PK -04 -003
Project Name Hockey Rink Relocation - Walnut Ridge Park
Type Improvement
Useful Life
Category Park Development
category names
Priority n/a
Contact Park & Recreation
Department Park & Recreation
is for relocating the hockey rink and lights at Walnut Ridge Park.
Justification
fhe existing hockey rink at Walnut Ridge Park is currently in close proximity to resident homes, which becomes a
pound nuisance during early morning maintenance hours. Residents have requested relocating the rink for several
(ears. The hockey rink lights and hockey rink boards are in need of replacement.
Expenditures 2005 2006 2007 2008 2009 Total
Construclion/Maintenance 90,000 90,000
Total 90,000 90,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 90,000 90,000
Total 90,000 90,000
Page 20 of 33
Capital Improvement Program Data in Year 2009
City of Edina, NW
Project # PS-02 -004
Project Name Outdoor Warning System
Type Equipment Priority n/a
Useful Life Contact Police Department
Category warning System Department Public Safety
category names
network of ten sirens and radio controlled decoders are used to alert the public of impending or an existing
mergency such as severe weather, floods or national attack. The sirens are activated from the Hennepin County
heriffs Radio Center in Golden Valley via the radio controller. The sirens have an expected life span of 25 years and
re on a staggered replacement schedule. The oldest siren is 23 years old. The current replacement cost per siren is
15,000.
The radio control units were purchased in 1986. The manufacturer is not in the siren control business any more and
replacement parts are nonexistent for both the. sending and receiving units. The control system will be replaced on a
countywide basis in the next 2 -5 years. There have been no cost estimates yet for the replacement system. The
replacement cost for the current units was $3,875.
Justification
The outdoor warning system is an integral part of the City's emergency response plan. The ability to warn the public of
impending disaster allows people to take immediate action to reduce their risk of harm. The primary use of the warning
system has been for severe weather emergencies, such as tornado warnings, in which prompt warning can mean the
difference between life and death.
Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles /Fumishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2005 2006 2007 2008 2009 Total
Revolving Fund 40,000 40,000
Total 40,000 40,000
Page 21 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # . Pw -00 -004
Project Name jyll]l & Overlay: Benton Ave. (Hansen - Hwy 100)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
t
e
'fl
w
ascription
is project involves the milling of distressed surface and the repaving of a new surface on Benton Ave. from Hansen
. to Hwy 100.
Justification
rbe need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures 2005 2006 2007 2008 2009 Total
Construcbon/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 100,000 100,000
Total 100,000 100,000
' h
Page 22 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project# PW_00 -026
Project Name Neighborhood Street Recon. Program
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Local Streets Department Public Works
category names
Description
This project will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost
.ffective manner.
Justification
The need 'to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based
on condition and age of pavement, and also ratings compared with other local neighborhoods.
potential future roadway reconstruction projects are:
2005: Sunnyslope Neighborhood, Harriet Park West, Harriet Park East, Rolling Green Neighborhood, Ridge Road and
Schaefer Road.
2006: Lake Cornelia South Neighborhood, Hollywood / Todd Park Neighborhood, West Pamela Park Neighborhood.
2007: Harvey Lake Neighborhood, Lake Comelia East Neighborhood, West Shore Drive and West 70th Street
Neighborhood.
2008: Mirror Lakes Drive South Neighborhood, East Highland Park Neighborhood, Harvey Lake East Neighborhood,
Lake Cornelia West Neighborhood, Northeast Arden Park Neighborhood.
2009: East Concord Neighborhood, South Concord Neighborhood, West 54th Street / Beard Ave. Neighborhood.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Total 3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
General Obligation Improveme 3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Total 3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Page 23 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # PW_00 -030
Project Name Sidewalks/Pathways (MSA)
Type Improvement Priority n/a
Useful Life Contact Public Works
Category Municipal State Aid Department Public Works
category names MSA
Description
- onstruct sidewalks along MSAS designated streets as petitioned from residents.
Justification
rbese projects will provide separation of pedestrians and vehicles along the designated routes.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 120,000
60,000
50,000
50,000
50,000
330,000
Total 120,000
60,000
50,000
50,000
50,000
330,000
Funding Sources 2005
2006
2007
2008
2009
Total
Municipal State Aid 120,000
60,000
50,000
50,000
50,000
330,000
Total 120,000
60,000
50,000
50,000
50,000
330,000
Page 24 of 33
Capital Improvement Program Data in Year 2009
City of Edina, NM
Project # PW_00 -031
Project Name Sidewalks/Pathways: City Costs
These projects Will provide separation of pedestrians and vehicles along the designated routes.
Justification
These projects are initiated by petitions from residents only.
Expenditures
Construction /Maintenance
2005
50,000
2006
50,000
2007
50,000
2008
50,000
2009
50,000
Total
250,000
Total
50,000
50,000
50,000
50,000
50,000
250,000
Funding Sources
2005
2006
2007
2008
2009
Total
Revolving Fund
50,000
50,000
50,000
50,000
50,000
250,000
Total
50,000
50,000
50,000
50,000
50,000
250,000
Page 25 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # PW- 01-012
Project Name Reconstruct: W 54th St. ( Wooddale to France)
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names MSA
Description
This project provides for the reconstruction of West 54th Street from Wooddale Avenue to France Avenue. This
project will provide a new roadway section and will bring this road into compliance with State -Aid Standards.
Sidewalks will also be analyzed with this reconstruction.
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
Failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also
- onsidered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 240,000 240,000
Special Assessments 60,000 60,000
Total 300,000 300,000
Page 26 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # PW_03 -002
Project Name Signals: W 50th St & Dale Ave
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Municipal State Aid Department Public Works
category names
Description
Provide traffic signal at Dale Avenue and West 50th Street.
Justification
Elie access to the Sunnyslope'neighborhood is deteriorating. This will provide .a secure access to this neighborhood
ilong with ingress and egress to the, new City Hall. Warrants for this traffic signal will most likely not be met until this
ime.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 180,000 180,000
Total 180,000 180,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 180,000 180,000
Total 180,000 180,000
Page 27 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project# . PW- 03-003
Project Name Mill & Overlay: Blake Rd (Vernon to Interlachen)
Type Improvement
Useful Life
Category Municipal State Aid
category names
Priority n/a
Contact Engineering
Department Public works
Description
This project involves the milling of distressed surface and the repaving of a new surface on Blake Road from Vernon
Avenue to Interlachen Boulevard.
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Expenditures 2005 2006
2007 2008 2009
Total
Construction/Maintenance
120,000
120,000
Total
120,000
120,000
Funding Sources 2005 2006
2007 2008 2009
Total
Municipal State Aid
120,000
120,000
Total
120,000
120,000
Page 28 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
'roject # PW -03 -005
'roject Name Reconstruct: W 58th St (France to Xerxes)
Type Improvement
Useful Life
Category Municipal State Aid
category names
Priority n/a
Contact Engineering
Department Public works
project provides for the reconstruction of West 58th Street from France Avenue to Xerxes Avenue. This project
provide a new roadway section and will bring this road into compliance with State -Aid Standards. Sidewalks will
be analyzed with this reconstruction.
Justification �.
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 240,000 240,000
Special Assessments 60,000 60,000
Total 300,000 300,000
Page 29 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # UT-00 -025
Project Name water Main Improvements
Type Improvement Priority n/a
Useful Life Contact Engineering
Category water Main Department Utility Department
category names
Description
Update water system when reconstructing neighborhood streets. See Project No. PW -00 -026 for potential
neighborhoods.
Justification
The majority of the existing system consists of unlined cast iron pipes. These pipes are more susceptible to failure �an i lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide better wat
Iuality and water pressure.
Expenditures 2005 2006 2007 2008 2009 Total
Construction /Maintenance 400,000 400,000 400,000 400,000 400,000 2,000,000
Total 400,000 400,000 400,000 400,000 400,000 2,000,000
Funding Sources 2005 2006 2007 2008 2009. Total
Utility Funds 400,000 400,000 400,000 400,000 400,000 2,000,000
Total 400,000 400,000 400,000 400,000 400,000 2,000,000
Page 30 of 33
Capital Improvement Program Data in Year 2009
City of Edina., MN
Project # UT-00 -026
Project Name Sanitary Sewer Improvements
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Sanitary Sewer Improvements Department Utility Department
category names
Description
Update sanitary sewer system when constructing neighborhood streets. See Project No. PW -00 -026 for potential
Justification 7 1
Most of the sanitary sewer'system consists of clay pipe that was installed upto the 1970's. This type of pipe is more
prone to failure than the current poly- vinyl - chloride and concrete pipes. The clay pipe is typically more suceptable to
root intrusion, which decreases the capacity of a pipe.
The upgrade to the system will help reduce inflow and infiltration into sanitary sewer system due to deteriorating
sanitary manholes, leaking joints in pipes, and leaking covers.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 200,000
200,000
200,000
200,000
200,000
1,000,000
Total 200,000
200,000
200,000
200,000
200,000
1,000,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 200,000
200,000
200,000
200,000
200,000
1,000,000
'total 200,000
200,000
200,000
200,000
200,000
1,000,000
Page 31 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # UT-00 -030
Project Name Pond & Lake Dredging
Type Improvement Priority n/a
Useful Life Contact Utility Supt
Category Storm Sewer Improvements Department Utility Department
category names
Description
Dredge ponds as necessary.
Justification
These projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling in
from sediment inot the systme and natural life of organic material.
Expenditures
2005
2006
2007
2008
2009
Total
Construction /Maintenance
60,000
60,000
60,000
60,000
60,000
300,000
Total
Funding Sources
60,000
2005
60,900
2006
60,000
2007
60,000
2008
60,000
2009
300,000
Total
Utility Funds
60,000
60,000
60,000
60,000
60,000
300,000
Total
60,000
60,000
60,000
60,000
60,000
300,000
Page 32 of 33
Capital Improvement Program Data in Year 2009
City of Edina, MN
Project # UT -01 -003
Project Name Storm Sewer - Pipe and Grading Improvements
Type Improvement Priority n/a
Useful Life Contact Engineering
Category Storm Sewer Improvements Department Utility Department
category names
Description
'rovide replacement storm sewer for aging system. This also includes new drain tiles for roof drains and sump pump
Justification
As roadways are reconstructed within the City storm sewers will require updating. See Project No. PW -00 -026 for
potential neighborhoods. Drainage swales also need to-be regraded. Drain tiles where needed should also be included
with these projects.
In 1998 the City undertook a sump pump inspection program that included inspections of all.properties in the City to
eleminate any clear water connections into the City's sanitary sewer system. The program identified all homes in the
City that have sump pumps and`other asement water problems. These new storm sewer improvements will provide a
place for clear water discharges'especially during the winter months.
Expenditures 2005
2006
2007
2008
2009
Total
Construction/Maintenance 120,000
120,000
120,000
120,000
120,000
600,000
Total 120,000
120,000
120,000
120,000
120,000
600,000
Funding Sources 2005
2006
2007
2008
2009
Total
Utility Funds 120,000
120,000
120,000
120,000
120,000
600,000
Total 120,000
120,000
120,000
120,000
120,000
600,000
Page 33 of 33
I V
o�
- � -i %
jo
CITY OF EDINA
2005 Budget
DO NOT REMOVE
, i FROM COUNCIL
e CHAMBERS
�� r )0 2005 ANNUAL BUDGET
J -?
TABLE OF CONTENTS PAGE
I. SUMMARY OF REVENUES & EXPENDITURES
Overview
Revenue by Fund & Source 1 - 2
Expenditures by Fund & Source 3 - 4
Property Tax Levy
II. GENERAL GOVERNMENT
Overview
Mayor & Council
5 --6
Administration
7- 8
Planning
9-10
Finance
11-12
Election
13-14
Assessing
15-16
Legal & Court Services
17-18
III. PUBLIC WORKS
Overview
Administration
19-20
Engineering
21-22
Supervision
23-24
Payroll Distribution
25-26
Street Maintenance
27-30
Street Lighting
31-32
Traffic & Street Name Signs
33-34
Traffic Control
35-36
Bridges /Guard Rails
37-38
Retaining Wall Maintenance
39-40
Sidewalks /Ramps /Parking Lots
41-44
2005ANNUAL BUDGET
rail
TABLE OF CONTENTS PAGE
IV. PUBLIC SAFETY
Overview
Overview
Police Protection
45-
48
Civilian Defense
49-
50
Animal Control
51-
52
Fire Protection
53-
56
Public Health
57-
58
Inspections
59-
60
V. PARK & RECREATION
Overview
Overview
Administration
61-
62
Recreation
63-
68
Payroll Distribution
69-
70
Maintenance
71-
80
VI. NON- DEPARTMENTAL
Overview
Contingencies 1 81- 82
Capital Plan Appropriation 83- 84
Special Assessments on City Property 85- 86
Fire Station Debt Service 87- 88
Employee Programs 89- 90
Commission & Special Projects 91- 94
VII. Appendix
Central Services
Overview
General
95- 96
City Hall
97- 98
Public Works Building
99-100
Equipment Operation
100-102
Summary
Of
Revenues &
Expenditures
MISC. Rev��
4.7%
Court Fines
3.7%
Fees & Charges
8.6%
Licenses & Permits
8.4%
Revenue Overview
Total Revenues
Distribution by Type
Intgov't Aid
3.5%
Taxes
71.5%
Eqt
Commodi
4.5%
Contractual
Services
13.1%
Expenditure Overview
Total Expenditures
Distribution by Type
Central
Services
10.2%
Total Expenditures
Distribution by Area
Public Works
21.8%
General
Government
13.6%
3ries
5%
° blic Safety
49.1%
Park & Rec.
Non- 13.2%
Departmental
2.3%
CITY OF EDINA ANNUAL BUDGET PAGE - 1
FUND:
GENERAL
REVENUE SUMMARY
REVENUES SUMMARY
2002
2003
2004
2005
DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
PROPOSED
GENERAL FUND:
TAXES:
PROPERTY TAXES
$15,305,796
$15,607,503
$16,489,129
$16,489,129
$17,772,350
PENALTIES AND INTEREST
13,934
22,504
15,000
15,000
15,000
MARKET VALUE CREDIT
623,980.
0
(528,756)
(528,756)
(528,756)
LOSS DUE TO ABATEMENTS
0.
0
100,000
100,000
100,000
TOTAL TAXES
15,943,710:
15,630,007
15,875,373
15,875,373
17,158,594
LICENSE AND PERMITS:
HEATNENT LICENSE
28,105
43,332
22,200
22,200
23,000
BUILDING PERMITS
1,218,055
1,399,037
1,298,300
1,298,300
1,300,000
PLUMBING PERMITS
146,209
152,563
124,200
124,200
110,690
MECHANICAL PERMITS
233,090
241,901
237,400
237,400
250,910
WATER CONNECTION
0
8,000
0
0
0
DOG LICENSES
10,984
13,903.
12,100
12,100
12,500
BEER LICENSE
9,844
10,859
13,355
13,355
10,000
WINE LICENSE
22,000'
25,167
20,400,
20,400
25,000
LIQUOR LICENSE
94,963
95,803
88,390
88,390,
96;000
PARKING RAMP
1,800
2,350
3,300
3,300
3,300
OTHER PERMITS & LICENSES
2,175
5,553
1,600
11600
2,000
SPRINKLER PERMITS
20,371
25,867
28,000
28,000
28,500
ALARM PERMITS
8,373
8,995
9,000
9,000
9,270
TOBACCO LICENSE
8,400
9,395
8,500
8,500
8,925
FOOD ESTABLISHMENT LICENSE
79,931
82,122
84,000
84,000
88,200
FOOD VENDING LICENSE
3,105
3,345
2,800
2,800
2,940
POOL.LICENSE
19,965
21,205
21,000
21,000
22,050
AMUSEMENT DEVICE LICENSE
1,545
1,440
1,500
1,500
1,575
LODGING LICENSE
141
141
150
150
158
GARBAGE COLLECTORS LICENSE
10,935
13,610
11,000
11,000
11,550
PARKING GARAGE LICENSE
2,400
2,800
2,500
2,500
2,625
SIGN PERMIT
12,405
10,095
9,100
9,100
11,000
ROAD RESTRICTION PERMITS
4,410
4,780
5,900
5,900
5,000
TOTAL LICENSES AND PERMITS
1,939,206
2,182,263
2,004,695
2,004,695
2,025,193
FEES AND CHARGES:
BLDG CODE COMPLIANCE
1,383
188
2,700
2,700
300
OTHER BUILDING FEES
2,722
1,268
0
0
1,500
LIQUOR PENALTIES
4,500
2,000
0
0
0
OTHER CITY CLERK FEES
10,110
9,163
0
0
0
VENTILATION SYSTEM
13,990
14,400
14,500
14,500
15,000
SPECIAL HAZARD PERMITS
2,900
2,525
3,300
3,300
3,400
FALSE ALARMS FIRE
2,800
4,100
25,000
25,000
13,000
OTHER FIRE FEES
2,955
5,046
4,000
4,000
4,200
AMBULANCE
1,269,045
1,065,177
1,050,000
1,050,000
1,081,500
RE
CITY OF EDINA ANNUAL BUDGET PAGE - 2
FUND:
-T
GENERAL
REVENUE SUMMARY
REVENUES SUMMARY
2002
2003
2004
2005
DESCRIPTION
ACTUAL
ACTUAL
PROPOSED
ESTIMATED
BUDGETED
FEES AND CHARGES:
DOG IMPOUNDING FEES
7,902
1,861
2,800
2,800
3,700
FALSE ALARMS POLICE
41,025
36,250
90,000
90,000
65,000
SAFETY /SECURITY CONTRIBUTION
145,818;
100,300
157,000
157,000
151,600
OTHER POLICE FEES
5,321
7,503
4,000
4,000
4,000
RIGHT OF WAY FEE
29,800
11,059
5,300
5,300
10,000
ENGINEERING & CLERICAL
26,906
105,885
78,800
78,800
90,0.00
STREET'OPENING FEES
0
0
11,800
11,800
, 0
CURB CUT FEE
2,703
3,180
3,400
3,400
3,800
ENGINEERING FEES
7,810
6,970
12,200
12,200
18,000
UNDERGROUND PARK INSPECTION
2,035
3,175
3,000
3,000
3,150
LAB FEES
65
0
0
0
0
FOOD PLAN REVIEW FEE
2,125
2,150
3,000
3,000
3,150
PLANNING FEES
22,385
29,235
25,500
25,500
27,000
OTHER FEES
8,307
7,327
6,500
6,500
6,500
HOUSING FOUNDATION CONTRACT
24,565
24,988
29,300
29,300
31,100
SERVICES HRA
67,412
22,196
20,000
20,000
20,000
ASSESSING SEARCHES
710
557
500
500
0
REGISTRATION FEES
65,616
81,777
75,000
75,000
77,250
PARK BACKGROUND CHECKS
0
0
6,945
6,945
0
SENIOR CENTER FEES
94,517
102,149
65,000
65,000
103,169
50TH & FRANCE ASSESSMENT
16,620
17,124
37,300
37,300
68,000
CHARGES TO OTHER FUNDS
167,424
172,320
247,728
247,728
263,616
TOTAL FEES AND CHARGES
2,049,471
1,839,873
1,984,573
1,984,573
2,067,935
FINES AND FORFEITURES:
MUNICIPAL COURT FINES
910,407
785,227
900,000
900,000
900,000
OTHER REVENUES:
INCOME ON INVESTMENTS
$88,037
$68,344
$100,000
$100,000
$110,000
SALE OF PROPERTY
151,533
86,044
40,400
40,400
45,000
RENTAL OF PROPERTY
232,451
267,254
246,000
246,000
280,000
DONATIONS
17,507
5,026
0
0
0
MISCELLANEOUS REVENUE
12,887
5,021
5,000
5,000
5,000
CONTRIBUTION FROM LIQUOR
0
0
666,500
666,500
686,500
TOTAL OTHER REVENUES
502,415
431,689
1,057,900
1,057,900
1,126,500
INTERGOVERNMENTAL AID:
FEDERAL AID
21,052
315,517
113,800
113,800
51,400
STATE AID MAINTENANCE
195,000
195,000
195,000
195,000
195,000
OTHER STATE AID
104,807
214,765
177,814
177,814
176,634
POLICE AID
306,732
320,482
300,000
300,000
310,000
COUNTY HEALTH AID
161,184
36,222
0
0
0
TOTAL INTERGOVERNMENT AID
788,775
1,081,986
786,614
786,614
733,034
TOTAL OPERATING REVENUE
$22,133,984
$21,951,045
$22,609,155
$22,609,155
$24,011,256
CITY OF EDINA ANNUAL BUDGET
PAGE - 3
FUND:
T
GENERAL
EXPENDITURE SUMMARY
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
PROPOSED
GENERAL FUND:
GENERAL GOVERNMENT:
MAYOR & COUNCIL
$70,870
$77,017
$78,259
$78,259
$73,981
ADMINISTRATION
853,677
888,419
935,140
935,140
959,173,;
PLANNING
320,375
337,665
376,349
376,349
368,571:
FINANCE
544,959
538,631
566,910
566,910
585,110
ELECTIONS
189,956
31,746
122,585
122,685
117,467-
ASSESSING
599,880
562,864
709,538
709,538
740,153
LEGAL & COURT SERVICES
436,707
305,215
408,000
408,000
410,000_
TOTAL GENERAL GOVERNMENT
$3,016,424
$2,741,557
$3,196,781
$3,196,781
$3,254;455
PUBLIC WORKS:
ADMINISTRATION
$144,309
$156,396
$172,458
. $172,458
$177,433
ENGINEERING
593,600
608,867
705,145
705,145
755,259
SUPERVISION
754,219
. 414,442
388;830
388,830
382,344
STREET MAINTENANCE
2,351,754
2,518,956
2,399,521
2,399,521
3,21.6;494
STREET LIGHTING
352,786
357,157
447,438
447,438
411,320
STREET NAME SIGNS
93,899
103,910
103,459
103,459
49,900
TRAFFIC CONTROL
144,942
116,295
182,103
182,103
129,100
BRIDGES /GUARD RAILS
19,056
26,238
29,863
29,863
9,500
RETAINING WALL MAINTENANCE
12,028
12,974
26,954
26,954
20,090
SIDEWALKS, RAMPS & PARKING LOTS
87,027
122,344
172,534
172,534
90,185
TOTAL PUBLIC WORKS
$4,553,620
$4,437,579
$4,628,305
$4,628,305
$5,241,625
PUBLIC SAFETY:
POLICE PROTECTION
$5,693,517
$5,749,647
$6,384,666
$6,384,666
$6,593,341
CIVILIAN DEFENSE
33,832
32,085
45,109
45,109
43,320
ANIMAL CONTROL
78,488
40,583
71,603
71,603
74,982
FIRE PROTECTION
3,339,349
3,751,107
3,674,611
3,674,611
3,932,476
PUBLIC HEALTH
473,632
422,201
420,052
420,052
443,641
INSPECTIONS
588,062
660,016
666,845
666,845
692,305
TOTAL PUBLIC SAFETY
$10,206,880
$10,655,639
$11,262,886
$11,262,886
$11,780,065
PARK & RECREATION:
ADMINISTRATION
$595,852
$621,199
$633,439
$633,439
$648,724
RECREATION
258,949
309,707
340,328
340,328
351,814
MAINTENANCE
1,804,253
1,820,249
2,027,108
2,027,108
2,177,191
TOTAL PARK DEPARTMENT
$2,659,054
$2,751,155
$3,000,875
$3,000,875
$3,177,729
CITY OF EDINA ANNUAL BUDGET PAGE - 4
FUND:
GENERAL
EXPENDITURE SUMMARY
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
PROPOSED
NON - DEPARTMENTAL EXPENSES:
CONTINGENCIES
$22,102
$244,707
$119,431
$119,431
$123,014
SPECIAL ASSESSMENTS
40,380
28,188
27,000
27,000
28,000
CAPITAL PLAN APPROPRIATION
50,000
50,000
50,000
50,000
50,000
FIRE DEPT. DEBT SERVICE
83,761
83,761
0
0
0
EMPLOYEE PROGRAMS
69,173
132,308
126,724
126,724
130,000
COMMISSIONS 8 SPEC. PROJECTS
180,513
189,323
197,153
197,153
226,368
TOTAL NON - DEPARTMENTAL
$445,929
$728,287
$520,308
$520,308
$557,382
TOTAL OPERATING
EXPENDITURES
$20,881,907
$21,314,217
$22,609,155
$22,609,155
$24,011,256
General Fund Levy
City Hall Debt Service
Equipment Certificates
Total Property Tax Levy
Total Property Tax Levy Increase
Park Bond Market Value Levy
City of Edina
Property Tax Levies
2002 2003 2004 2005
$15,990,256
$16,171,875
$16,489,129
$17,772,350
1,000,000
1,026,437
1,028,837
1,058,840
0
586,163
604,275
162,200
$16,990,256
$17,784,475
$18,122,241
$18,993,390
17.67% 4.67% 1.90% 4.81%
$738,347 $721,967 $686,662 $674,162
Park Bond Market Value Increase /(decrease) 1.60% -2.22% -4.89% - 1.825/.
General Government
General Government Overview
General Government
Distribution by Area
Legal &Court Services Mayor & Council 2 3%
12.6%
Assessing
22.7%
Ele
3
Commodities
0.5%
Contractual Services
24.1%
Finance
18.0%
Jministration
29.5%
ing
General Government
Distribution by Expenditure
Central Services Equipment
7.5% 0.8%
laries
'.2%
CITY OF EDINA ANNUAL BUDGET PAGE-5
FUND: FUNCTION: AREA: PROGRAM:
GENERAL GENERAL GOVERNMENT MAYOR & COUNCIL 1100
SUMMARY OF PERFORMANCE MEASURES
Mayor & Council -1100:
The City Council constitutes the policy- making division of Edina City Government. The
Council is composed of the Mayor and 4 Council members, all elected at large for overlapping
terms of four years. The Mayor,is the official head of City Government and is the presiding
officer at the Council meetings. The Council meets on the first and third Tuesdays of each
month at City Hall. The City Council also serves as the commissioners of the Housing
Redevelopment Authority.
2004 2005
Total Mayor & Council Budget $78,259 $73,981 -5.47%
CITY OF EDINA ANNUAL BUDGET PAGE _ R
FUND:
FUNCTION:
I AREA:
PROGRAM:
GENERAL
GENERAL GOVERNMENT
MAYOR & COUNCIL
1100
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$28,507
$27,556
$27,450
$27,450
$27,450
6030 PENSIONS
34
904
1,518
1,518
1,518
6034 SOCIAL SECURITY
81
2,108
2,100
2,100
2,100
6045 WORKERS COMPENSATION
3
86
91.
91
69
28,625
30,654
31,159
31,159
31,137
CONTRACTUAL SERVICES:
6104 CONTINUING EDUCATION
1,372
1,025
400
400
900
6106 MEETING EXPENSE
2,517
6,066
3,700
3,700
3,800
3,889
7,091
4,100
4,100
4,700
COMMODITIES:
6406 GENERAL SUPPLIES
388
189
1,000
1,000
1,100
CENTRAL SERVICES:
6803 GENERAL
25,344
24,695
22,476
22,476
22,152
6804 CITY HALL
12,624
14,388
19,524
19,524
14,892
37,968
39,083
42,000
42,000
37,044
TOTAL MAYOR & COUNCIL
$70,870
$77,017.
$78,259
$78,259
$73,981
Ul I Y Ur LUINA ANNUAL BUDGET PAGE - 7
FUND: FUNCTION: AREA: PROGRAM:
GENERAL GENERAL GOVERNMENT ADMINISTRATION 1120
SUMMARY OF PERFORMANCE MEASURES
Administration -1120:
Personal services consists of 8 full time employees in this area.
The office of the City Manager is responsible for executing the policies adopted by the City
Council. Specifically, the City Manager's office provides for the general management of the
City and is responsible for the following:
• Personnel compensation and benefits administration for approximately 900 full time and
part time employees
• Labor relations with four organized bargaining units
• Risk management
• Long range planning
• Maintenance of official records and minutes
• Publication of ordinances and legal notices
• Licensing
• Policy research and implementation
• Management of selected central services
• Human relations
• Staff service to the HRA -
• Employee training and career development
• Facility management of City Hall
2004 2005 %
Total Administration Budget $935,140 $959,173 2.57%
CITY OF EDINA ANNUAL BUDGET PAGE - 8
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
GENERAL GOVERNMENT
I ADMINISTRATION
1120
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$553,823
$561,434
$584,367
$584,367
$603,653
6011 OVERTIME
4,175
4,568
5,508
5,508
6,180
6030 PENSIONS
1,171
31,071
32,620
32,620
33,724
6034 SOCIAL SECURITY
1,633
41,042
42,067
42,067
42,926
6040 FLEX PLAN
2,301
55,901
56,430
56,430
58,410
6045 WORKERS COMPENSATION
125
3,406
3,735
3,735.
3,179
563,228
697,422
724,727
724,727
748,072
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
3,429
12,791
13,000
13,000
13,000
6104 CONTINUING EDUCATION
3,417
2,958
4,000
4,000
5,000
6105 DUES & SUBSCRIPTIONS
50,553
49,588
54,000
54,000
55,000
6106 MEETING EXPENSE
1,894
2,496
3,000
3,000
3,000
6107 MILEAGE
17,560
16,345
17,500
17,500
18,000
6120 LEGAL ADVERTISEMENTS
13,848
16,093
16,000
16,000
16,000
6160 DATA PROCESSING HR
14,042
26,205
29,000
29,000
31,000
6188 TELEPHONE
1,117
1,144
1,300
1,300
1,300
105,860
127,620
137,800
137,800
142,300
COMMODITIES:
6405 BOOKS AND PAMPHLETS
162
45
300
300
300
6406 GENERAL SUPPLIES
2,565
1,088
1,800
1,800
1,900
6575 PRINTING
434
34
300
300
300
3,161
1,167
2,400
2,400
2,500
CENTRAL SERVICES:
6803 GENERAL
159,396
36,974
39,804
39,804
41,292
6804 CITY HALL
20,328
23,172
22,788
22,788
17,376
6808 EQUIPMENT OPERATION
1,704
2,064
1,800
1,800
1,812
181,428
62,210
64,392
64,392
60,480
EQUIPMENT:
6710 REPLACEMENT
0
0
5,821
5,821
5,821
TOTAL ADMINISTRATION
$853,677
$888,419
$935,140
$935,140
$959,173
CITY OF EDINA ANNUAL BUDGET PAGE - E
FUND: FUNCTION: AREA: PROGRAM:
GENERAL GENERAL GOVERNMENT PLANNING 1140
SUMMARY OF PERFORMANCE MEASURES
Planning -1140:
Personal services consist of 3 & % full time employees in this area.
The Planning Department provides staff service to the City Council, the Planning
Commission, the Board of Appeals and Adjustments, the Heritage Preservation Board, the
Housing and Redevelopment Authority (HRA) and the East Edina Housing Foundation. The
department also handles the administration of the City's sign ordinance, the zoning ordinance,
the subdivision ordinance, the Metro Rental Assistance Program, and the Federal Community
Development Block Grant program, and East Edina Housing Foundation programs.
Explanation of Change:
Professional Services has been reduced by $10,000.
Total Planning Budget
2004
$376,349
2005 . %
$368,571 -2.07%
CITY OF EDINA ANNUAL BUDGET PAGE - 10
FUND:
FUNCTION:
AREA:
I
PROGRAM:
GENERAL
GENERAL GOVERNMENT
PLANNING
1140
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$227,123
$234,691
$239,808
$239,808
$247,225
6011 OVERTIME
1,515
1,085
2,958
2,958
3,090
6030 PENSIONS
501
13,414
13,425
13,425
13,842
6034 SOCIAL SECURITY
705
19,499
18,572
18,572
19,042
6040 FLEX PLAN
1,008
21,498
25,035
25,035
25,935
6045 WORKERS COMPENSATION
64
1,851
1,981
1,981
1,557
230,916
292,038
301,779
301,779
310,691
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
4,035
9,600
20,000
20,000
10,000
6104 CONTINUING EDUCATION
55
199
1,300
1,300
1,300
6105 DUES & SUBSCRIPTIONS
115
115
500
500
500
6106 MEETING EXPENSE
8
0
100
100
100
6107 MILEAGE
3,515
3,387
3,520
3,520
3,600
7,728
13,301
25,420
25,420
15,500
COMMODITIES:
6405 BOOKS AND PAMPHLETS
0
0
100
100
100
6406 GENERAL SUPPLIES
72
420
500
500
500
6408 PHOTOGRAPHIC SUPPLIES
0
0
100
100
100
6575 PRINTING
695
456
515
515
700
767
876
1,215
1,215
1,400
CENTRAL SERVICES:
6803 GENERAL
75,180
24,850
25,248
25,248
25,716
6804 CITY HALL
5,784
6,600
17,652
17,652
13,464
80,964
31,450
42,900
42,900
39,180
EQUIPMENT:
6710 REPLACEMENT
0
0
5,035
5,035
1,800
TOTAL PLANNING
$320,375
$337,665
$376,349
$376,349
$368,571
CITY OF EDINA ANNUAL BUDGET PAGE-11
FUND: FUNCTION: AREA: PROGRAM:
GENERAL GENERAL GOVERNMENT FINANCE 1160
SUMMARY OF PERFORMANCE MEASURES
Finance -1160:
Personal services consist of 5 &' /z full time employees in this area.
The Finance Department provides accounting and control services for all financial activities of
the City. Major functions.include:
• During 2003, the Finance Department issued 13,000 payroll checks on a payroll of over
$18,000,000 for over 800 full time and part time employees
• Preparation of the annual budget, comprehensive financial report, enterprise profit and loss
statements, bond statements, and other financial reports
• Issuance of 13,000 accounts payable checks on expenditures of over $72,000,000 for
general operating, debt service, capital projects, enterprise activities and other City
functions during 2003
• Performing financial analysis on investments and various proposals
Total Finance Budget
2004 2005 %
$566,910 $585,110 3.21%
-F
INE
CITY OF EDINA ANNUAL BUDGET PAGE - 12
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
GENERAL GOVERNMENT
FINANCE
1160
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$305,566
$327,388
$333,995
$333,995
$348,735
6011 OVERTIME
1,141
1,579
1,836
1,836
1,891
6030 PENSIONS
673
18,192
18,571
18,571
19,390
6034 SOCIAL SECURITY
935
24,725
24,763
24,763
25,709
6040 FLEX PLAN
1,481
35,715
37,620
37,620
38,940
6045 WORKERS COMPENSATION
67
1,956
2,125
2,125
1,825
309,863
409,555
418,910
418,910
436,490
CONTRACTUAL SERVICES:
6104 CONTINUING EDUCATION
21-872
1,698
2,500
2,500
2,600
6105 DUES & SUBSCRIPTIONS
735
745
800
800
800
6107 MILEAGE
6,644
3,241
6,800
6,800
3,600
6130 ANNUAL AUDIT
5,000
7,000
8,000
8,000
10,000
6160 DATA PROCESSING -LOGIS
90,690
79,480
75,000
75,000
79,000
105,941
92,164
93,100
93,100
96,000
COMMODITIES:
6405 BOOKS AND PAMPHLETS
78
84
100
100
100
6406 GENERAL SUPPLIES
1,333
504
2,000
2,000
2,000
1,411
588
2,100
2,100
2,100
CENTRAL SERVICES:
6803 GENERAL
94,512
24,744
29,316
29,316
31,224
6804 CITY HALL
10,152
11,580
17,664
17,664
13,476
104,664
36,324
46,980
46,980
44,700
EQUIPMENT:
6710 REPLACEMENT
23,080
0
5,820
5,820
5,820
TOTAL FINANCE
$544,959
$538,631
$566,910
$566,910
$585,110
CITY OF EDINA ANNUAL BUDGET PAGE - 13
FUND: FUNCTION: AREA: PROGRAM:
GENERAL GENERAL GOVERNMENT ELECTIONS 1180
SUMMARY OF PERFORMANCE MEASURES
Elections -1180:
Personal services consist of 1 full time person of which '/2 the salary is billed to the school
district in school district election years as election costs. Personal services also includes the
election judge payrolls for primary and general elections and payroll for additional hours of
regular staff persons.
The City Clerk is responsible for conducting all national, state, county, and City elections held
in the City of Edina in even numbered years. In addition, the City Clerk conducts all Edina
School District 273 elections in odd numbered years. Costs for conducting school elections
are billed to the school district.
The City is divided into 20 voting precincts which must be equipped for conducting each
election. The Clerk` must recruit and train approximately 300 election judges in each election
year. Approximately 4,000 absentee ballot applications are processed.
The Clerk is also responsible for maintaining. the permanent voter registration system in the
City amounting to almost 35,000 registrations. In a 12 month ;period about 6,500 registration
changes are processed. Following the primary and general elections an additional 5,000 adds
and deletes are processed.
Explanation of Change:
• Equipment replacement has been eliminated as we will not purchase new election equipment
unless there is federal funding.
2004 2005 %
Total Elections Budget $122,585 $117,467 -4.18%
CITY OF EDINA ANNUAL BUDGET PAGE - 14
FUND: -
FUNCTION:
AREA:
PROGRAM:
GENERAL
GENERAL GOVERNMENT
ELECTIONS
1180
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$151,068
$20,551
$71,021
$71,021
$73,507
6030 PENSIONS
89
689
3,927
3,927
4,065
6034 SOCIAL SECURITY
123
1,016
5,433
5,433
5,623
6040 FLEX PLAN
271
1,762
6,840
6,840
7,080
6045 WORKERS COMPENSATION
6
64
251
251
272
151,557
24,082
87,472
87,472
90,547
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
5,071
0
3,331
3,331
3,431
6104 CONTINUING EDUCATION
0
0
0
0
2,100
6106 MEETING'EXPENSE
142
0
0
0
0
6107 MILEAGE
50
0
241
241
248
6120 LEGAL ADVERTISEMENT
490
0
205
205
211
6151 EQUIPMENT RENTAL
455
0
525
525
541
6235 POSTAGE
129
0
8,168
8,168
8,413
6,337
0
12,470
12,470
14,944
COMMODITIES:
6406 GENERAL SUPPLIES
3,276
0
2,563
2,563
2,640
6575 PRINTING
3,146
0
2,563
2,563
2,640
6,422
0
5,126
5,126
5,280
CENTRAL SERVICES:
6803 GENERAL
16,308
7,664
6,324
6,324
6,696
EQUIPMENT:
6710 REPLACEMENT
9,332
0
11,193
11,193
0
TOTAL ELECTIONS
$189,956
$31,746
$122,585
$122,585
$117,467
CITY OF ED.INA
ANNUAL BUDGET
FUND: FUNCTION: AREA: PROGRAM:
GENERAL GENERAL GOVERNMENT ASSESSING 1190
SUMMARY OF PERFORMANCE MEASURES
Assessing - 1190:
Personal services consist of 7 full time employees.
PAGE - 15
The Assessing Department conducts quintile field inspections (Minnesota Statute 273.08) and
performs annual classification and valuation of Edina's 20,701 real estate parcels. In addition,
once every six years the department must appraise all exempt properties. All factors which
may affect value are considered and then accepted approaches (cost, market and income
approach) to value a property are considered in the appraisal process. Each year all tangible
changes to property that may affect value are physically inspected using building permits .as
an informational source. Statistical analysis is performed on over 700 residential sales and
existing assessor's market values each year, forming a basis for annual adjustments to value.
Sales -and the analysis of available income and expense data help determine adjustments to
commercial industrial and apartment values. All of the departments work culminates each
year with the Board. of Review. Thousands of inquiries and reviews are handled each year
prior to that meeting: Because of the subjective nature of valuing real estate and determining
classifications, dozens of tax court petitions and scores of `abatements and . individual
appeals /reviews are processed annually. In addition, dissemination of general and specific
information, homesteads, explanation of processes and procedures, trial preparation and
negotiations with taxpayers or their legal representatives are on- going. functions. See 2004
Assessment calendar for further detail.
Throughout the year, ratios of assessor's values to sale prices are compared, coordinated and
discussed between municipalities within Hennepin County to assure an acceptable level of
assessment and equity between jurisdictions. These ratios indicate the quality of our
assessment and are monitored and corrected (if necessary) by the Department of Revenue.
Please refer to .the 2004 Board of Review book for a more detailed explanation of,Assessment
Performance Measures.
In addition to the above mentioned services, the Assessing Department is also responsible for
computing, notifying, spreading, and collection of special assessments.
Explanation of Change:
Telephone — wireless airtime of $2,900 was added for new PDS system. Postage is included
in LOGIS budget.
Total Assessing Budget
2004 2005 %
$709,538 $740,153 4.31%
CITY OF EDINA ANNUAL BUDGET
PAGF - 1R
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
GENERAL GOVERNMENT
ASSESSING
1190
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$398,018
$340,181
$428,445
$428,445
$456,603
6030 PENSIONS
867
18,495
23,693
23,693
25,250
6034 SOCIAL SECURITY
1,197
26,605
32,776
32,776
34,692
6040 FLEX PLAN
1,838
34,073
47,880
47,880
49,560
6045 WORKERS COMPENSATION
107
2,486
3,327
. 3,327
2,726
402,027
421,840
536,121
536,121
568,831
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
0
8,697
13,296
13,296
14,000
6104 CONTINUING EDUCATION
2,808
3,975
5,500
5,500
6,000
6105 DUES & SUBSCRIPTIONS
4,653
4,384
5,000
5,000
6,500
6106 MEETING EXPENSE
179
71
1,000
1,000
1,100
6107 MILEAGE
3,665
2,778
4,000
4,000
4,800
6160 DATA PROCESS ING-LOGIS
44,973
63,085
61,230
61,230
65,340
6188 TELEPHONE
0
0
0
0
2,900
6235 POSTAGE
6,123
4
7,020
7,020
0
62,401
82,994
97,046
97,046
100,640
COMMODITIES:
6406 GENERAL SUPPLIES
656
5,183
1,333
1,333
1,800
6575 PRINTING
0
265
585
585
600
656
5,448
1,918
1,918
2,400
CENTRAL SERVICES:
6803 GENERAL
119,520
35,470
33,816
33,816
35,820
6804 CITY HALL
10,152
11,580
20,160.
20,160
15,372
6808 EQUIPMENT OPERATION
5,124
5,532
5,172
5,172
5,136
134,796
52,582
59,148
59,148
56,328
EQUIPMENT:
6710 REPLACEMENT
0
0
15,305
15,305
11,954
TOTAL ASSESSING
$599,880
$562,864
$709,538
$709,538
$740,153
CITY OF EDINA
ANNUAL BUDGET
FUND: FUNCTION: AREA: PROGRAM:
GENERAL GENERAL GOVERNMENT LEGAL & COURT 1195
SERVICES
SUMMARY OF PERFORMANCE MEASURES
PAGE - 17
Legal and Court Services - 1195:
The City requires the professional services of attorneys who are contracted for on an annual
basis. They provide legal counsel and prepare the necessary ordinances and resolutions
required to implement the wishes of the City Council. The Prosecuting Attorney defends the
City in claims and suits and prosecutes all cases arising out of violation of City ordinances.
The following list summarizes the cases prosecuted in 2003:
Arraignments 5,518
Pre -trials 689
Court Trials 186
Jury Trials 111
Total 6,504
2004
Total Legal & Court Services Budget $408,000
2005 %
$410,000 0.49%
CITY OF EDINA ANNUAL BUDGET PAGE - 18
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
GENERAL GOVERNMENT
LEGAL & COURT SERVICES
1195
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
CONTRACTUAL SERVICES:
6103 PROSECUTING
$230,966
$211,493
$248,000
$248,000
$255,000
6131 CIVIL
160,816
56,776
92,000
92,000
95,000
6170 HENNEPIN COUNTY
BOOKING CHARGE
9,774
10,745
18,000
18,000
15,000
6225 ROOM & BOARD
PRISONERS
35,151
26,201
50,000
50,000
45,000
TOTAL LEGAL &
COURT SERVICES
$436,707
$ 305,215
$408,000
$408,000
$410,000
\ \ \� \..�»_�y���\
Public Works
Contractual
Services
14.1%
CITY OF EDINA ANNUAL BUDGET PAGE - 19
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS ADMINISTRATION 1240
SUMMARY OF PERFORMANCE MEASURES
Public Works Administration -1240:
Personal services consist of 1 & % employees in this area.
This department provides supervision and policy guidance over various Public Works
departments. These departments are Engineering, Streets, Utilities, and Equipment Operation.
The total permanent employment in the Public Works area is 60. The function of the City
Engineer is also provided under Public Works Administration.
Additionally, operating City liaison to other agencies such as MNDOT, Metro Council, Hennepin
County, PCA, Minnesota Board of Health, Corps of Engineers, Department of Natural
Resources, Nine Mile Creek and Minnehaha Creek Watershed Districts and other Cities is
provided for through this account.
2004 2005 %
Total Public Works Budget $4,628,305 $5,241,625 13.25%
Explanation of Change:
$22,000 was added to the Engineering department to fund the traffic safety
position and summer part time help.
• $344,000 was added to equipment replacement.
CITY OF EDINA ANNUAL BUDGET PAGE - 20
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC WORKS
ADMINISTRATION
1240
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$102,213
$113,920
$121,941
$121,941
$127,694
6030 PENSIONS
94
6,250
6,743
6,743
7,061
6034 SOCIAL SECURITY
127
8,343
8,400
8,400
8,319
6040 FLEX PLAN
205
6,505
10,260
10,260
10,620
6045 WORKERS COMPENSATION
3
847
962
962
787
102,642
135,865
148,306
148,306
154,481
CONTRACTUAL SERVICES:
6104 CONTINUING EDUCATION
928
556
900
900
1,000
6105 DUES & SUBSCRIPTIONS
585
320
600
600
500
6107 MILEAGE
388
3,376
3,500
3,500
3,500
6188 CELL PHONE
0
0
.300
300
300
1,901
4,252
5,300
5,300
5,300
COMMODITIES:
6406 GENERAL SUPPLIES
226
2
0
0
0
CENTRAL SERVICES:
6803 GENERAL
36,624
12,953
10,908
10,908
11,592
6804 CITY HALL
2,916
3,324
7,944
7,944
6,060
39,540
16,277
18,852
18,852
17,652
TOTAL ADMINISTRATION
$144,309
$156,396
$172,458
$172,458
$177,433
U i Y Ur tuiNA ANNUAL BUDGET PAGE - 21
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS ENGINEERING 1260
SUMMARY OF PERFORMANCE MEASURES
Engineering -1260:
Personal services consist of 7 & 1/2 employees in this area.
The Engineering Department prepares. plans, specifications and estimates for public
construction projects. This includes street grading and surfacing, sanitary sewers, storm
sewers, watermains and other structures and improvements. It supervises the construction of
these projects and provides the necessary inspection to insure materials and workmanship are
in accordance with project specifications. The department maintains records and files on all of
the above mentioned activities and operates and maintains plan reproduction equipment.
CITY OF EDINA ANNUAL BUDGET PAGE - 22
FUND:
FUNCTION:
AREA:
I
PROGRAM:
GENERAL
PUBLIC WORKS
ENGINEERING
1260
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$346,444
$ 324,144
$419,682
$419,682
$463,777
6011 OVERTIME
23,641
15,258
2,652
2,652
2,781
6030 PENSIONS
562
17,941
23,355
23,355
25,801
6034 SOCIAL SECURITY
791
26,378
32,309
32,309
35,692
6040 FLEX PLAN
1,3$7
34,599
51,300
51,300
53,100
6045 WORKERS COMPENSATION
31
.2,020
3,085
3,085
2,876
372,806
420,340
532,383
532,383
584,027
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
23,293
48,302
30,600
30,600
32,000
6104 CONTINUING EDUCATION
3,513
3,367
3,500
3,500
3,600
6105 DUES & SUBSCRIPTIONS
610
940
1,000
1,000
1,000
6106 MEETING EXPENSE
501
1,650
500
500
550
6107 MILEAGE
3,399
297
2,700
2,700
3,300
6188 CELL PHONE
2,665
2,573
3,100
3,100
2,600
33,981
57,129
41,400
41,400
43,050
COMMODITIES:
6406 GENERAL SUPPLIES
4,692
6,181
8,800
8,800
9,500
6548 BLUEPRINTING /CAD
1,288
466
2,400
2,400
2,000
6577 LUMBER & TOOLS
3,146
2,006
2,000
2,000
2,000
9,126
8,653
13,200
13,200
13,500
CENTRAL SERVICES:
6803 GENERAL
132,600
28,976
29,556
29,556
31,704
6804 CITY HALL
10,152
11,580
23,808
23,808
18,156
6808 EQUIPMENT OPERATION
14,592
16,584
18,048
18,048
18,072
157,344
57,140
71,412
71,412
67,932
EQUIPMENT:
6710 REPLACEMENT
20,343
65,605
46,750
46,750
46,750
TOTAL ENGINEERING
$593,600
$608,867
$705,145
$705,145
$755,259,
CITY OF EDINA ANNUAL BUDGET PAGE-23
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS SUPERVISION 1280 -1281
SUMMARY OF PERFORMANCE MEASURES
Supervision -1280:
Personal services consist of 2 % time employees.
The operations of the Public Works department are overseen by the Public Works Coordinator.
Some of the activities include:
1. Maintaining a computerized vehicle management system to determine the expense of
vehicle maintenance
2. the purchasing and billing of equipment and supplies; and
3. maintaining an up to date inventory of the commodities used to service the City.
Additionally, the Coordinator, through this account, plans and coordinates Public Works
activities, maintains cost and work records and provides the training and instruction necessary
to insure the workers do-their jobs most efficiently and effectively.
Overhead - the major portion of this :budget is the general benefits for the street department
allocated from the Central Services General (1550) budget.
Training -1281:
This program provides for the personal services time and aids required to provide the necessary
training.
CITY OF EDINA ANNUAL BUDGET PAC.F - 9d
FUND:
FUNCTION: 7AREA:
PROGRAM:
GENERAL
PUBLIC WORKS
SUPERVISION
1280-1281
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
SUPERVISION -1280
PERSONAL SERVICES:
6010 PAYROLL
$126,115
$118,486
$135,100
$135,100
$140,265
6011 OVERTIME
1,659
1,474
3,825
3,825
4,017
6030 PENSIONS
513
6,632
7,682
7,682
7,979
6034 SOCIAL SECURITY
712
9,134
10,628
10,628
11,038
6040 FLEX PLAN
899
13,714
17,100
17,100
17,700
6045 WORKERS COMPENSATION
73
751
867
867
745
129,971
150,191
175,202
175,202
181,744
CONTRACTUAL SERVICES:
6104 CONTINUING EDUCATION
1,169
1,779
2,500
2,500
2,600
6105 DUES & SUBSCRIPTIONS
130
49
500
500
300
6188 CELL PHONE
4,171
366
3,000
3,000
3,100
6270 GOPHER ONE STATE
3,911
5,560
3,100
3,100
3,200
6271 HAZ. WASTE DISPOSAL
5,941
5,397
8,000
8,000
8,000
15,322
13,151
17,100
17,100
17,200
CENTRAL SERVICES:
6803 GENERAL
505,020
120,774
81,360
81,360
84,084
6806 PUBLIC WORKS BUILDING
34,800
35,664
37,176
37,176
38,340
6808 EQUIPMENT OPERATION
2,628
17,268
17,352
17,352
17,376
542,448
173,706
135,888
135,888
139,800
TOTAL SUPERVISION
$687,741
$337,048
$328,190
$328,190
$338,744
TRAINING -1281
PERSONAL SERVICES:
6010 PAYROLL
$46,259
$47,087
$30,616
$30,616
$25,000
BENEFITS
0
13,400
9,224
9,224
0
46,259
60,487
39,840
39,840
25,000
CONTRACTUAL SERVICES:
6104 CONTINUING EDUCATION
20,219
16,312
20,000
20,000
18,000
COMMODITIES:
6579 TRAINING AIDS
0
595
800
800
600
TOTAL TRAINING
$66,478
$77,394
$60,640
$60,640
$43,600
TOTAL SUPERVISION & TRAINING
$754,219
$414,442
$388,830
$388,830
$382,344
CITY of EDINA ANNUAL BUDGET PAGE - 25
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS STREET DEPARTMENT
SUMMARY OF PERFORMANCE MEASURES
Street Department
Payroll Summary - Distribution
The Street Department consists of 28 personnel which include the following positions:
2 Team Leaders
1 Master Electrician
25 * Heavy Equipment Operators, Equipment Operators, and Specialists
Additionally, 8 summer employees are hired to assist in various projects.
* New program has the individuals placed in Step Program based on skill level.
Street Maintenance
$1,270,606
Charged to Other Funds:
Central Services:
City Hall
15,578
Public Works Building
34;686
Park "Buildings
20,000
Enterprise Funds
105,000
Total Street Payroll
$1,445,870
Explanation of Change:
The Street Maintenance department has shifted budgeting salary by activity to budgeting at a higher
level. Actual activities worked on will still be recorded.
CITY OF EDINA ANNUAL BUDGET PAGE - 26
FUND: FUNCTION: AREA: PROGRAM:
GENERAL I PUBLIC WORKS I STREET DEPARTMENT
I SUMMARY OF PERFORMANCE MEASURES I
This page is intentionally left blank.
CITY OF EDINA
ANNUAL BUDGET
PAGE - 27
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS STREET MAINTENANCE 1301 -1310
SUMMARY OF PERFORMANCE MEASURES
General Maintenance -1301:
These funds are allocated for the general repairs made to the street; ex: rubberized crack
sealing, asphalt patching, minor seal coating, and miscellaneous repairs.
Crews totaling approximately five "people years" work on general maintenance of City streets
year round, weather permitting.
Equipment -1305:
This program provides funding for the replacement of existing equipment and the purchase of
capital upgrades for all Public Works programs.
Street Sweeping -1310:
These funds are allocated for cleaning the 200 miles (800 lane miles) of City streets and 45
parking lots. Sweeping usually begins in early March, attempting to rid the streets and lots of
winter sand to prevent being washed into storm sewers.
Six people are involved in the sweeping effort from early spring into summer and begins again
in the fall when leaves are swept up to prevent the clogging of catch basins.
CITY OF EDINA ANNUAL BUDGET PAGE - 28
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC WORKS
STREET MAINTENANCE
1301 -1310
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
GENERAL MAINTENANCE -1301
PERSONAL SERVICES:
6010 PAYROLL
$364,433
$417,859
$369,688
$369,688
$1,185,866
6011 OVERTIME
7,070
9,422
14,000
14,000
59,740
6030 PENSIONS
1,267
23,486
21,218
21,218
70,265
6034 SOCIAL SECURITY
1,756
33,543
29,352
29,352
97,201
6040 FLEX PLAN
2,968
51,371
51,368
51,368
170,980
6045 WORKERS COMPENSATION
718
14,001
13,655
13,655
50,820
378,212
549,682
499,281
499,281
1,634,872
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SVCS
758
5,311
900
900
930
6151 EQUIP RENTAUCRUSHING
1,049
27,961
25,000
25,000
30,000
6180 CONTRACTED REPAIR
17,967
8,684
21,000
21,000
15,000
6182 RUBBISH HAULING
4,992
4,641
4,500
4,500
5,000
6188 CELL PHONE
0
0
0
0
1,500
6201 LAUNDRY
15,326
14,190
14,500
14,500
14,800
40,092
60,787
65,900
65,900
67,230
COMMODITIES:
6406 GENERAL SUPPLIES
17,975
20,808
16,000
16,000
19,000
6517 SELECT MATERIALS
1,464
266
1,800
1,800
1,300
6518 ASPHALT MIX
12,252
10,883
15,000
15,000
14,000
6519 MC 1 OIL/RUB CRACK FILL
10,038
1,503
8,500
8,500
8,500
6520 CONCRETE
(512)
146
1,000
1,000
1,030
6556 TOOLS
14,105
14,734
14,400
14,400
15,000
6610 SAFETY EQUIPMENT
14,784
12,687
14,000
14,000
14,000
70,106
61,027
70,700
70,700
72,830
CENTRAL SERVICES:
6808 EQUIPMENT OPERATION
580,692
511,392
512,544
512,544
512,988
TOTAL GENERAL MAINTENANCE
$1,069,102
$1,182,888
$1,148,425
$1,148,425
$2,287,920
EQUIPMENT -1305
EQUIPMENT:
-
6710 REPLACEMENT
$371,901
$368,216
$131,416
$131,416
$475,374
TOTAL REPLACEMENT
$371,901 -
$368,216
$131,416
$131,416
$475,374
STREET SWEEPING -1310
PERSONAL SERVICES
6010 PAYROLL
$97,842
$84,355
$94,102
$94,102
$0
6011 OVERTIME
1,321
3,869
1,400
1,400
0
6030 PENSIONS
181
4,879
5,281
5,281
0
6034 SOCIAL SECURITY
246
6,786
7,306
7,306
0
6040 FLEX PLAN
485
12,192
12,786
12,786
0
6045 WORKERS COMPENSATION
103
2,964
3,399
3,399
0
100,178
115,045
124,274
124,274
0
COMMODITIES:
6523 BROOMS
12,657
17,618
14,500
14,500
15,000
6524 WEARING SHOES
347
1,090
100
100
500
13,004
18,708
14,600
14,600
15,500
TOTAL STREET SWEEPING
$113,182
$133,753
$138,874
$138,874
$15,500
CITY OF EDINA
D: FUNCTION:
ANNUAL BUDGET PAGE -29
GENERAL I PUBLIC WORKS I STREET MAINTENANCE I 1314-1318
SUMMARY OF PERFORMANCE MEASURES
Street Renovation -1314:
This program incorporates approximately fifteen to twenty miles of street renovation yearly.
This work would include surface leveling prior to seal coating, and seal coating asphalt streets.
Also, this would include some milling of asphalt streets, overlaying with a new lift of asphalt, and
recycling street in place with an asphalt overlay.
As to concrete streets, this account would fund concrete repairs that are not a result of
watermain and utility repairs. The concrete repair would be concrete surface repairs, curb and
gutter adjustments, and concrete panel replacement.
This work area involves approximately twenty persons (full and part time) from May (when road
restrictions are lifted) to late September.
Snow and Ice Removal -1318:
Snow and ice removal in Edina constitutes a majority of the- Steet`Department's work during the
winter months. The City, which consists of 200 miles of street, 47 miles of sidewalk, 5 miles of
alley, 273 cul -de -sacs, 45 parking lots,; and 3 parking ramps is divided in 26 snow plow routes.
The equipment involved in plowing includes 23 trucks with;,piows, 1 graders, 5 loaders, and 3
sidewalk plows. Twenty -three units are equipped with wings for more efficient plowing and
some are equipped with pre- wetting equipment.
CITY OF EDINA ANNUAL BUDGET PAGE - 30
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC WORKS
STREET MAINTENANCE
1314 -1318
SUMMARY OF EXPENDITURES
2002
2003
2003
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
RENOVATION -1314
PERSONAL SERVICES:
6010 PAYROLL
$257,440
$195,691
$210,633
$210,633
$0
6011 OVERTIME
6,810,
8,279
2,000
2,000
0
6030 PENSIONS
36
10,998
11,759
11,759
0
6034 SOCIAL SECURITY
44
15,907
16,266
16,266
0
6040 FLEX PLAN
74
22,701
28,467
28,467
0
6045 WORKERS COMPENSATION
20
7,043
7,567
7,567
0
264,424
260,619
276,692
276,692
0
CONTRACTUAL SERVICES:
6180 CONTRACTED REPAIR
14,378
7,833
22,000
22,000
22,900
COMMODITIES:
6406 GENERAL SUPPLIES
3,418
6,830
7,000
7,000
7,000
6517 GRANULAR MATERIALS
42,481
32,408
43,000
43,000
44,300
6518 ASPHALT MIX
104,581
154,476
153,600
153,600
158,000
6519 EMUL. ASPHALT
39,872
31,291
46,000
46,000
42,000
6520 CONCRETE
46,220
45,842
40,000
40,000
46,000
236,572
270,847
289,600
289,600
297,300
TOTAL RENOVATION
$515,374
$539,299
$588,292
$588,292
$320,200
SNOW & ICE REMOVAL -1318
PERSONAL SERVICES:
6010 PAYROLL
$129,085
$135,889
$181,917
$181,917
$0
6011 OVERTIME
25,110
26,113
32,000
32,000
0
6030 PENSIONS
401
8,959
11,830
11,830
0
6034 SOCIAL SECURITY
548
12,521
16,365
16,365
0
6040 FLEX PLAN
953
19,306
28,639
28,639
0
6045 WORKERS COMPENSATION
225
4,933
7,613
7,613
0
156,322
207,721
278,364
278,364
0.
COMMODITIES:
6406 GENERAL SUPPLIES
6,504
3,855
8,100
8100
8,300
6516 CALCIUM CHLOR. /DEICER
0
0
50
50
300
6517 SAND
12,000
12,423
31,000
31,000
31,900
6525 SALT
107,369
70,801,
75,000
75,000
77,000
125;873
87,079
114,150
114,150
117,500
TOTAL SNOW & ICE REMOVAL
$282,195
$294,800
$392,514
$392,514
$117,500
TOTAL STREET MAINTENANCE
$2,351,754
$2,518,956
$2,399,521
$2,399,521
$3,216,494
CITY OF EDINA ANNUAL BUDGET PAGE-31
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS STREET LIGHTING 1321-1322
SUMMARY OF PERFORMANCE MEASURES
Regular Street Lighting -1321:
In the City, there are 1,908 NSP owned street lights; for the most part, `over the roadway" lights
are attached to existing NSP service poles. The funds in this program are used for rental fees,
power and replacement of existing systems.
Ornamental Street Lighting -1322:
The City owns 498, ornamental street lights. Ornamental lights include decorative or
architectural lighting that has a unique design head and pole, or in some cases, antique lighting.
The City is responsible for all parts and maintenance of the lights including: underground wiring
and painting of the poles. The funds in this program are expended on power parts, replacement
fixtures, poles and lamps.
CITY OF EDINA ANNUAL BUDGET PAGE - 32
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC WORKS
STREET LIGHTING
1321-1322
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
REGULAR -1321
PERSONAL SERVICES:
6010 PAYROLL
$1,297
$179
$3,259
$3,259
$0
BENEFITS
0
44
982
982
0
1,297
223
4,241
4,241
0
CONTRACTUAL SERVICES:
6180 CONTRACTED REPAIRS
0
0
1,200
1,200
1,200
6185 LIGHT & POWER
279,286
277,048
300,000
300,000
299,000
279,286
277,048
301,200
301,200
300,200
COMMODITIES:
6530 REPAIR PARTS
0
286
600
600
620
TOTAL STREET LIGHTING
REGULAR
$280,583
$277,557
$306,041
$306,041
$300,820
ORNAMENTAL -1322
PERSONAL SERVICES:
6010 PAYROLL
$29,375
$25,819
$33,580
$33,580
$0
6030 PENSIONS
44
1,428
1,857
1,857
0
6034 SOCIAL SECURITY
62
2,016
2,569
2,569
0
6040 FLEX PLAN
74
2,354
4,496
4,496
0
6045 WORKERS COMPENSATION
22
766
1,195
1,195
0
29,577
32,383
43,697
43,697
0
CONTRACTUAL SERVICES:
6180 CONTRACTED REPAIRS
180
0
1,200
1,200
12,000
6185 LIGHT & POWER
26,423
21,904
70,500
70,500
73,000
6188 CELL PHONE
0
0
0
0
1,000
26,603
21,904
71,700
71,700
86,000
COMMODITIES:
6406 GENERAL SUPPLIES
5,456
4,257
10,000
10,000
6,500
6530 REPAIR PARTS
10,567
21,056
16,000
16,000
18,000
16,023
25,313
26,000
26,000
24,500
TOTAL STREET LIGHTING
ORNAMENTAL
$72,203
$79,600
$141,397
$141,397
$110,500
TOTAL STREET LIGHTING
$352,786
$357,157
$447,438
$447,438
$411,320
GITY OF EDINA ANNUAL BUDGET PAUL -33
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS TRAFFIC & STREET SIGNS 1325
SUMMARY OF PERFORMANCE MEASURES
Street Name Signs/Traffic Signs -1325:
The funds for this program are used for the maintenance and replacement of the City's 2,200
street name signs. These signs usually last 6 to 7 years, however, most are replaced _earlier
due to damages or vandalism at a rate of roughly 10% per year.
The traffic sign account covers the maintenance and replacement of approximately 2,500 traffic
signs.
CITY OF EDINA ANNUAL BUDGET PAGE - 34
FUND:
FUNCTION:
AREA: TRAFFIC
PROGRAM:
GENERAL
PUBLIC WORKS
� STREET NAME SIGNS
1325
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$61,042
$57,690
$46,615
$46,615
$0
6030 PENSIONS
78
2,941
2,578
2,578
0
6034 SOCIAL SECURITY
100
4,249
3,566
3,566
0
6040 FLEX PLAN
215
7,825
6,241
6,241
0
6045 WORKERS COMPENSATION
45
1,843
1,659
1,659
0
61,480
74,548
60,659
60,659
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
0
0
6,500
6,500
10,000
6188 CELL PHONE
0
0
0
0
400
0
0
6,500
6,500
10,400
COMMODITIES:
6406 GENERAL SUPPLIES
13,648
10,138
13,500
13,500
12,000
6531 SIGNS & POSTS
16,571
19,224
22,000
22,000
26,700
6532 PAINT
2,200
0
800
800
800
32,419
29,362
36,300
36,300
39,500
TOTAL STREET NAME SIGNS
$93,899
$103,910
$103,459
$103,459
- $49,900
CITY OF EDINA
ANNUAL BUDGET
FUNCTION: AREA:
GENERAL PUBLIC WORKS TRAFFIC CONTROL
SUMMARY OF PERFORMANCE MEASURES
Traffic Signal Maintenance -1330:
PAGE - 35
LAM:
1330 -1335
The City owns and maintains eleven traffic signal systems, and in conjunction with the State,
assists with maintenance of an additional nine signal systems. Electronic maintenance is
performed down to a component level on all printed circuit boards. Ninety percent of the funds
from this account are applied toward light and power with the remaining 10% directed towards
parts, back -up equipment and test equipment.
Pavement Marking -1335:
The City: sign shop, which is responsible for pavement marking, consists of 2 people, 1 truck, 2
stripers, and 1 trailer. The bulk of the funds for this account are directed towards the following
projects:
Projects Material Used
- Center line striping of State Aid streets 450 gallons paint
- Lane striping 250 gallons paint
- Painting legends & arrows on
pavement and parking lots; and 70
school crossings 100 gallons paint
Additionally, the sign shop is responsible for striping the City's 45 parking lots and painting the
center line and messages on Cornelia and Bredeson Park walking paths.
Also, the 6532 line item now includes permanent pavement marking materials. We have found
that some high traffic areas and concrete streets do not hold paint very well. We have changed
to different materials which last longer.
CITY OF EDINA ANNUAL BUDGET PAGE - 36
FUND:
FUNCTION:
AREA:
I 7
PROGRAM:
GENERAL
PUBLIC WORKS
TRAFFIC CONTROL
1330-1335
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
TRAFFIC SIGNAL MAINTENANCE
1330
PERSONAL SERVICES:
6010 PAYROLL
$14,267
$9,995
$20,147
$20,147
$0
6030 PENSIONS
23
555
1,114
1,114
0
6034 SOCIAL SECURITY
33
809
1,541
1,541
0
6040 FLEX PLAN
35
750
2,697
2,697
0
6045 WORKERS COMPENSATION
12
300
717
717
0
14,370
12,409
26,216
26,216
0
CONTRACTUAL SERVICES:
6180 CONTRACTED REPAIRS
6,076
(1,479)
8,000
8,000
8,200
6185 LIGHT & POWER
49,237
53,083
60,000
60,000
55,000
6215 EQUIPMENT MAINT.
32,746
7,222
28,000
28,000
35,500
88,059
58,826
96,000
96,000
98,700
COMMODITIES:
6406 GENERAL SUPPLIES
1,403
569
1,900
1,900
800
6530 REPAIR PARTS
2,882
3,808
6,000
6,000
7,300
4,285
4,377
7,900
7,900
8,100
TOTAL TRAFFIC SIGNAL
MAINTENANCE
$106,714
$75,612
$130,116
$130,116
$106,800
PAVEMENT MARKING -1335
PERSONAL SERVICES:
6010 PAYROLL
$10,971
$13,499
$24,889
$24,889
$0
BENEFITS
0
3,848
7,498
7,498
0
10,971
17,347
32,387
32,387
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
1,249
598
1,400
1,400
600
COMMODITIES:
6406 GENERAL SUPPLIES
5,517
4,756
3,200
3,200
3,300
6532 PAINT & PAVE MARKING
20,491
17,982
15,000
15,000
18,400
26,008
22,738
18,200
18,200
21,700
TOTAL PAVEMENT MARKING
$38,228
$40,683
$51,987
$51,987
$22,300
TOTAL TRAFFIC CONTROL
$144,942
$116,295
$182,103
$182,103
$129,100
CITY OF EDINA ANNUAL BUDGET PAGE - 37
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS BRIDGES /GUARD RAILS 1343
SUMMARY OF PERFORMANCE MEASURES
Bridges /Guard Rails -1343:
The sign shop is responsible for the sanding, priming, and painting of bridge rails and guide
posts. There are 25 bridges and culverts in the City which require annual inspection and
certification to the state as to their condition. Major deck repairs are taken care of by outside,'
contractors.
Additionally, there are numerous guard rail locations throughout the City requiring periodic
maintenance.
CITY OF EDINA ANNUAL BUDGET PAGE - 38
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC WORKS
I BRIDGES /GUARD RAILS
1343
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$11,972
$15,033
$15,802
$15,802
$0
6030 PENSIONS
23
831
874
874
0
6034 SOCIAL SECURITY
29
1,128
1,209
1,209
0
6040 FLEX PLAN
61
2,001
2,116
2,116
0
6045 WORKERS COMPENSATION
13
504
562
562
0
12,098
19,497
20,563
20,563
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
120
1,800
1,500
1,500
1,600
6151 EQUIPMENT RENTAL
0
0
800
800
700
120
1,800
2,300
2,300
2,300
COMMODITIES:
6406 GENERAL SUPPLIES
1,783
2,111
3,000
3,000
3,000
6533 GUARD RAIL MATERIAL
5,055
2,830
4,000
4,000
4,200
6,838
4,941
7,000
7,000
7,200
TOTAL BRIDGES /GUARD RAILS
$19,056
$26,238
$29,863
$29,863
$9,500
CITY OF EDINA
ANNUAL BUDGET
PAGE - 39
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC WORKS RETAINING WALL MAINT. 1344
SUMMARY OF PERFORMANCE MEASURES
Retaining Wall Maintenance —1344:
There are approximately 50 retaining walls in the City. They are beginning to show age for
various reasons and are in need of repair. They are constructed of timber, lannon stone and
other landscaping materials. This program would provide for materials, some contracted
repairs, and labor distributed from the general street maintenance program.
CITY OF EDINA ANNUAL BUDGET PA(.F _ An
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC WORKS
RETAINING WALLS
13"
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$84
$961
$5,728
$5,728
$0
BENEFITS
0,
302
1,726
1,726
0
84
1,263
7,454
7,454
0
CONTRACTUAL SERVICES:
6180 CONTRACTED REPAIRS
11,206
11,130
13,000
13,000
13,390
COMMODITIES:
6406 GENERAL SUPPLIES
342
581
1,200
1,200
1,200
6577 LUMBER/STONE
396
0
5,300,
5,300
5,500
738
581
6,500
6,500
6,700
TOTAL RETAINING WALLS
$12,028
$12,974
$26,954
$26,954
$20,090
"1.;
CITY OF EDINA ANNUAL.BUDOET PAGE - 41
FUND: FUNCTION: AREA: SIDEWALKS PROGRAM:
GENERAL PUBLIC WORKS RAMPS, PARKING LOTS 1365-1370
SUMMARY OF PERFORMANCE MEASURES
Sidewalks - Maintenance & Repair -1365:
Maintenance and repairs for the City's 47 miles of sidewalk begin in the early spring with the
sweeping of winter .sand and, proceed through the summer and fall with maintenance on an as
needed basis by the City street crews.
Sidewalks -'Snow & Ice Removal -1370:
Removal 'of snow from the City's 47 .miles of sidewalk is another responsibility of the Street
department. Three snow plow /blowers are used to accomplish this task. Under normal
conditions; it takes 2 to 4 days to clear walks.
CITY OF EDINA ANNUAL BUDGET PAGE - 42
FUND:
FUNCTION:
AREA: SIDEWALKS
I
PROGRAM:
GENERAL
PUBLIC WORKS
RAMPS, PARKING LOTS
1365 -1370
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
SIDEWALKS - MAINTENANCE
& REPAIR -1365
PERSONAL SERVICES:
6010 PAYROLL
$6,400
$2,082
$19,752
$19,752
$0
BENEFITS
0
589
5,951
5,951
0
6,400
2,671
25,703
25,703.
0
COMMODITIES:
6406 GENERAL SUPPLIES
425
0
1,200
1,200
1,240
6518 BLACKTOP
0
0
200
200
210
6520 CONCRETE
2,277
1,632
2,500
2,500
2,570
2,702
1,632
3,900
3,900
4,020
TOTAL SIDEWALK -
MAINTENANCE & REPAIR
$9,102
$4,303
29,603
29,603
4,020
SIDEWALKS - SNOW & ICE
REMOVAL -1370
PERSONAL SERVICES:
6010 PAYROLL
$10,108
$13,118
$18,400
$18,400
$0
6011 OVERTIME
1,193
682
858
858
0
6030 PENSIONS
19
763
1,065
1,065
0
6034 SOCIAL SECURITY
24
1,040
1,473
1,473
0
6040 FLEX PLAN
48
1,867
2,578
2,578
0
6045 WORKERS COMPENSATION
11
432
685
685
0
11,403
17,902
25,059
25,059
0
COMMODITIES:
6406 GENERAL SUPPLIES
0
0
500
500
515
TOTAL SIDEWALK - SNOW
& ICE REMOVAL
$11,403
$17,902
$25,559
$25,559
$515
CITY OF EDINA ANNUAL BUDGET PAGE - 43
FUND: FUNCTION: AREA: SIDEWALKS PROGRAM:
GENERAL PUBLIC WORKS RAMPS PARKING LOTS 1375-1380
SUMMARY OF PERFROMANCE MEASURES
Parking Ramp Maintenance -1375:
The City owns 3 parking ramps in downtown Edina. Each ramp consists of three levels, with
302 spaces in the south ramp, 274 spaces in the center ramp and 269 in the north ramp. The
funds from this account are allocated towards plowing, sweeping, lighting, cleaning supplies,
and contractual services. $37,300 is received in revenue from the 50th and France Business
Association to pay for their portion of ramp maintenance.
Parking Lot Maintenance -1380:
Funds for this program are directed toward maintaining the City's parking lots. The parking lots
covered in this account includes parking lots located at the following locations: Public Works,
City Hall, 50th & France Middle Surface lot, easterly row of the Lund's surface lot,. at 50th &
France, the entrance lot of the Jerry's Parking Ramp at Grandview. Maintenance includes
sweeping, plowing and striping of the lots and is accomplished by the street department.
CITY OF EDINA ANNUAL BUDGET PAGE - 44
FUND:
FUNCTION:
AREA: SIDEWALKS
PROGRAM:
GENERAL
PUBLIC WORKS
I RAMPS, PARKING LOTS
I 1375-1380
SUMMARY OF EXPENDITURES
2002
2003
2003
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PARKING RAMP MAINT. - 1375
PERSONAL SERVICES:
6010 PAYROLL
$6,039
$10,008
$10,237
$10,237
$0
6011 OVERTIME
2,682
3,649
2,800
2,800
0
BENEFITS
0
3,821
3,928
3,928
0
8,721
17,478
16,965
16,965
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
2,784
18,767
10,000'
10,000
10,000
6185 LIGHT$ POWER
38,185
40,567
43,000
43,000
44,000
6189 SEWER & WATER
259
220
200
200
250
41,228
59,554,
53,200
53,200
54,250
COMMODITIES:
6406 GENERAL SUPPLIES
1,480
1,947
1,200
1,200
2,200
6511 CLEANING SUPPLIES
0
0
600
600
300
6530 REPAIR PARTS
8,062
1,603
10,200
10,200
8,000
9,542
3,550
12,000
12,000
10,500
TOTAL PARKING
RAMP MAINTENANCE
$59,491
$80,582
$82,165
$82,165
$64,750
PARKING LOT
MAINTENANCE -1380
PERSONAL SERVICES:
6010 PAYROLL
$2,410
$217
$11,456
$11,456
$0
BENEFITS
0
67
3,451
3,451
0
2,410
284
14,907
14,907
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
0
15,263
600
600
600
COMMODITIES:
6406 GENERAL SUPPLIES
0
0
1,200
1,200
1,200
6518 BLACKTOP
4,621
1,560
14,000
14,000
14,000
6519 ROAD OIUSEALING
0
2,450
4,500
4,500
5,100
4,621
4,010
19,700
19,700
20,300
TOTAL PARKING LOTS
$7,031
$19,557
$35,207
$35,207
$20,900
TOTAL SIDEWALKS - RAMPS
& PARKING LOTS
$87,027
$122,344
$172,534
$172,534
$90,185
I
~ : \
� w .
/� ±� .
t��\
L :
<�
Public Safety
» 7
Public Safety Overview
Public Safety
Distribution by Area
Health
Inspections 5.9%
1) Doi
Fire
33.4%
Animal
0.6%
EquipmP ^+
4%
Civil Defense
0.4%
Public Safety
Distribution by Expenditure
Central Services
10%
Commodities
2%
Contractual
Services
7%
Police
56.0%
CITY OF EDINA ANNUAL BUDGET PAGE-45
FUND: FUNCTION: AREA: PROGRAM:
GENERAL I PUBLIC SAFETY I POLICE PROTECTION 1 1400-1419
SUMMARY OF PERFORMANCE MEASURES
Police —1400
Personal services consist of 66 full time employees, part-time help, and community service
officers
The City of Edina Police Department is called upon to perform many emergency and public
service tasks throughout the year. In 2003, the department responded to over 26,000 calls for
service which involved medicals, fires, emergencies, accidents, thefts, damage to property,
suspicious persons and vehicles, alarm responses as well as public service and educational
activities. Approximately 30% of these calls require multiple officer responses, which equals
over 30,000 officer responses.
The City reports approximately 1,047 major Part I crimes such as burglary, robbery, assault, and
theft, with an additional 976 Part II or lessor crimes also reported.
Police respond to emergency calls within 5 minutes and to non - emergency calls within 10
minutes under normal conditions.
The Police Department is also responsible for educating the public in crime prevention
techniques, investigation of all felony crimes against persons and, where warranted, other
crimes as well.
Over 80% of the Police budget is directly or indirectly spent on labor.
The Police Department operates 1,095 shifts, 7 days a week, 24 hours per day and maintains
an average patrol strength of 5.2 officers at any given time.
Explanation of Change:
$28,000 added to Service Contracts for the maintenance agreement for 800 MHz radio system
infrastructure, i.e. dispatch center, microwave link and repeater sites.
$14,000 reduction in Range Rental due to higher revenues than expected.
CITY OF EDINA ANNUAL BUDGET PAGE - 46
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC SAFETY
POLICE PROTECTION
1400-1419
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
POLICE SERVICES -1400
PERSONAL SERVICES:
6010 PAYROLL
$3,529,509
$3,553,505
$3,893,402
$3,893,402
$4,045,785
6011 OVERTIME
209,703
200,841
158,751
- 158,751
142,958
6030 PENSIONS
12,700
329,735
350,335
350,335
361,633
6034 SOCIAL SECURITY
3,740
92,302
86,986
86,986
99,401
6040 FLEX PLAN
14,618
369,252
449,730
449,730
474,360
6045 WORKERS COMPENSATION
2,625
74;617
110,000
110,000
86,350
3,772,895
4,620,252
5,049,204
5,049,204
5,210,487
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
16,013
17,978
10,318
10,318
14,237
6104 CONTINUING EDUCATION
31,256
29,048
30,263
30,263
31,171
6105 DUES & SUBSCRIPTIONS
2,251
2,530
2,445
2,445
2,445
6106 MEETING EXPENSE
705
402
1,055
1,055
1,000
6107 MILEAGE
7,360
2,431
1,100
1,100
1,100
6151 EQUIPMENT RENTAL
16,269
15,263
15,375
15,375
19,532
6160 DATA PROCESSING
25,028
37,049
63,345
63,345
63,345
6175 PHYSICAL EXAMINATIONS
0
1,766
1,300
1,300
1,300
6188 TELEPHONE
14,413
11,723
12,169
12,169
12,534
6201 LAUNDRY
634
531
538
538
538
6203 UNIFORM ALLOWANCE
47,643
41,509
41,067
41,067
42,299
6204 TELETYPE SERVICE
3,010
3,121
6,420
6,420
4,000
6215 EQUIPMENT MAINT.
6,315
16,419
11,178
11,178
11,513
6221 RANGE RENTAL
0
0
30,250
30,250
16,250
6230 SERVICE CONTR. - EQUIP.
68,006
59,573
54,546
54,546
82,546
238,903
239,343
281,369
281,369
303,810
COMMODITIES:
6405 BOOKS AND PAMPHLETS
2,024
70
2,460
2,460
2,400
6406 GENERAL SUPPLIES
37,878
26,648
32,147
32,147
34,147
6408 PHOTOGRAPHIC SUPPLIES
926
1,535
2,045
2,045
2,045
6510 FIRST AID. SUPPLIES
1,363
2,206
848
848
1,848
6513 OFFICE SUPPLIES
6,259
3,502
2,612
2,612
3,637
6514 INSPECTION EXPENSES
0:
0
1,056
1,056
1,098.
6551 AMMUNITION
9,833
9,645
9,557
9,557
9,844
6575 PRINTING
9,912
7,547
12,400
12,400
10,000
6610 SAFETY EQUIPMENT
227
7,934
3,137
3,137
3,231
6630 GRANT EXPENDITURES
1,038
0
0
0
0
69,460
59,087
66,262
66,262
68,250
CITY OF EDINA ANNUAL BUDGET PAGE-47
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC SAFETY POLICE PROTECTION 1400-1419
SUMMARY OF PERFORMANCE MEASURES
2004 2005 %
Total Police Budget $6,384,666 $6,593,341 3.27 %
Reserve Program -1419:
The reserve program is comprised of -the Senior Police Reserve (8 members), Explorer ,Post
925 (20 members), and the Edina Police- Reserve (15 members).
Explorer Post 925 contributes approximately 700 hours of public services to various community
events and programs. This is a result of career orientation and training provided by the Police
Department.
The Edina Police Reserve serves the community in excess of 1,400 hours annually. They
perform work during special events and provide non - emergency service work and patrol.
CITY OF EDINA ANNUAL BUDGET PAGE - 48
FUND:
FUNCTION:
AREA:
OGRAM:
GENERAL
PUBLIC SAFETY
POLICE PROTECTION ]E11400
-1419
SUMMARY OF EXPENDITURES
2002;
2003
2003
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
CENTRAL SERVICES:
6803 GENERAL
$1,006,200
$161,067
$181,788
$181,788
$249,984
6804 CITY HALL
82,536
94,104
195,372
195,372
148,860
6808 EQUIPMENT OPERATION
273, 732
346,404
348,816
348,816
349,128
1,362,468
601,575
725,976
725,976
747,972
EQUIPMENT:
6710 REPLACEMENT
223,090
210,507
242,018
242,018
243,000
223,090:
210,507
242,018
242,018
243;000
TOTAL POLICE SERVICES
$5,666,816
$5,730,764
$6,364,829
$6,364,829
$6,573,519
RESERVE PROGRAM -1419
CONTRACTUAL SERVICES:
6102 CONTRACTUAL SERVICES
$12,000
$11,300
9,600
9,600
8,400
6104 CONTINUING EDUCATION
7,021
1,700
3,485
3,485
4,145
6106 MEETING EXPENSE
100
0
1,266
1,266
1,000
6203 UNIFORM ALLOWANCE
7,314
5,834
5,126
5,126
5,280
26,435
18,834
19,477
19,477
18,825
COMMODITIES:
6406 GENERAL SUPPLIES
266
49
360
360
997
TOTAL RESERVE PROGRAM
$26,701
$18,883
$19,837
$19,837
$19,822
TOTAL POLICE PROTECTION
$5,693,517
$5,749,647
$6,384,666
$6,384,666
$6,593,341.
CITY OF EDINA
ANNUAL BUDGET
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC SAFETY CIVILIAN DEFENSE 1460
SUMMARY OF PERFORMANCE MEASURES
Civilian Defense -1460:
PAGE - 49
Personal services consist of '/ the time of the police chief. This is a cumulative estimate of
Police department time of the Director, Coordinator, and administrative specialists.
The objective of the Civilian Defense program is to prepare the community for disasters or
emergencies - natural or man -made. This is accomplished by compliance with Federal, State
and County guidelines for emergency preparedness planning.
Action, plans are developed and practiced at the City level. This activity, coupled with 10
outdoor warning sirens, ensures the operation of government and maintenance of emergency
services during disasters.
2004 2005 %
Total Civilian, Defense Budget $45,109 $43,320 -3.97%
CITY OF EDINA ANNUAL BUDGET PAGE - 50
FUND:
-F-PUBLIC
FUNCTION:
AREA:
PROGRAM:
GENERAL
SAFETY
CIVILIAN DEFENSE
1460
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$25,939
$26,700
$26,922
$26,922
$27,733
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
1,000
0
1,625
1,625
1,625
6104 CONTINUING EDUCATION
1,135
826
1,159
1,159
1,159
6105 DUES & SUBSCRIPTIONS
160
60
130:
130
218
6185 LIGHT AND POWER
633
633
741
741
763
6230 SERVICE CONTRACTS
3,060
3,840
5,121
5,121
5,274
5,988.
5,359
8,776
8,776
9,039
COMMODITIES:
6406 GENERAL SUPPLIES
41
26
1,309
1,309
1,348
EQUIPMENT:
6710 REPLACEMENT
1,864
0
8,102
8,102
5,200
TOTAL CIVILIAN DEFENSE
$33,832
$32,085
$45,109
$45,109
$43,320
CITY OF EDINA ANNUAL BUDGET PAUL - bl
FUND: FUNCTION: AREA:. PROGRAM:
GENERAL PUBLIC SAFETY ANIMAL CONTROL 1450
SUMMARY OF PERFORMANCE MEASURES
Animal Control -1450:
Personal services consist of 1 full time person.
Animal control is provided 12 hours per day by augmenting one Animal Control Officer with
CSOs responding to calls for service.
Animal control is a function of the Police Department. The Animal Control Officer is responsible
for the enforcement of the City's animal - related ordinances and also assists City residents with
animal control problems, both wild and domestic. Approximately. 3,000 calls for service are
responded to annually.
Priorities for animal control are the safety and protection of persons, the well -being of the City's
animal population, and the protection of property.
2004 2005 %
Total Animal Control Budget $71,603 $74,982 4.72%
ANNUAL BUDGET
PAGE - 52
FUND:
FUNCTION:
AREA:
-T
PROGRAM:
GENERAL
PUBLIC SAFETY
ANIMAL CONTROL
1450
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$42,513
$20,014
$34,957
$34,957
$38,461
6011 OVERTIME
869
558
540
540
540
6030 PENSIONS
89
931
3,319
3,319
2,157
6034 SOCIAL SECURITY
152
1,620
515
515
566
6040 FLEX PLAN
142
2,328
6,840
6,840
7,080
6045 WORKERS COMPENSATION
24
321
610
610
741
43,789
25,772
46,781
46,781
49,545
CONTRACTUAL SERVICES:
6104 CONTINUING EDUCATION
30
536
785
785
785
6217 KENNEL SERVICES
14,810
6,309
6,913
6,913
7,144
14,840
6,845
7,698
7,698
7,929
COMMODITIES:
6406 GENERAL SUPPLIES
515
175
3,745
3,745
3,857
CENTRAL SERVICES:
6803 GENERAL
15,792
4,059
2,940
2,940
3,000
6808 EQUIPMENT OPERATION
3,552
3,732
3,744
3,744
3,756
19,344
7,791
6,684
6,684
6,756
EQUIPMENT:
6710 REPLACEMENT
0
0
6,695
6,695
6,895
TOTAL ANIMAL CONTROL
$78,488
$40,583
$71,603
$71,603
$74,982
CITY OF EDINA ANNUAL BUDGET PAGE-53
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC SAFETY FIRE PROTECTION 1470
SUMMARY OF PERFORMANCE MEASURES
Fire Protection -1470:
Personal services consist of 31 full time personnel, 1 part time position and 10 - 15 volunteer
firefighters.
Services are provided in 5 primary areas; fire suppression, special operations, emergency
medical services, fire prevention, and public information.
The primary purpose of fire suppression and special operations is to provide an immediate
response to protect lives, property and the environment from exposure to natural, industrial and
environmental hazards. Response should place a fire or emergency unit on the scene within 8
minutes at least 90% of the time. Typical actions are search, rescue, and removal of persons in
immediate danger, interior fire attack to stop the fire development, exterior fire streams to
prevent fire extension, fire extinguishment and control. Also necessary actions and measures to
minimize property damage by smoke, water, weather and release of hazardous or toxic
materials. Equipment consists of 3. pumpers, 1 aerial tower and various support vehicles. In
2003, 1,062 (a decrease of 4.140/o .from M02)--fire responses included fires, hazardous
conditions, and .public service emer9ency calls. In 2004, we will begin using the Metro 800 MHz
radio system.
The purpose of Emergency Medical Services (EMS) is to provide immediate and advanced life
support actions to meet- -the community's emergency medical needs. Response should place an
ambulance on the scene within 6 minutes at least 90% of the time. Equipment consists of 3
Advanced Life Support: '(ALS) paramedic ambulances and one ALS pumper. Services provide
both immediate emergency care and. transportation to metro -area hospitals. Paramedics are
cross - trained as firefighters, and all firefighters are cross - trained to emergency medical
technician level. Emergency medical services also include public information activities to
prevent and best prepare citizens for emergency medical situations. In 2003, medical calls
totaled 3,030 (a 4.01 % decrease from 2002). The long -term trend in medical emergency calls is
upward.
The goal of fire prevention activities is three -fold: first, to prevent fire ignition whenever possible,
second, when fires do occur, to minimize fire impact on lives and property, and finally
information management to allow us to forecast needs in the areas of built fire protection
systems, operational support and program development. Strategies for action include fire
detection, automatic suppression, structural compartmentalization, building access and site
controls. Prevention information emphasizes citizen survival by teaching proven fire safety
techniques. All Fire Department personnel are involved in public information programs, smoke
detector installation and building inspection activities. Fire inspectors typically make the
specialized permit and approval inspections. A new pre -fire planning system was developed in
2003 and will be expanded upon. In 2005, the Edina Fire Department will become a State of
MN sponsored Structural Collapse /Search Rescue Team.
CITY OF EDINA ANNUAL BUDGET PAGE - 54
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC SAFETY
FIRE PROTECTION
1470
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$2,046,518
$2,063,319
$2,083,711
$2,083,711
$2,149,079
6011 OVERTIME
239,375
219,969
334,223
334,223
344,250
6030 PENSIONS
7,708
204,096
223,588
223,588
229,051
6034 SOCIAL SECURITY
1,232
33,534
33,504
33,504
36;938
6040 FLEX PLAN
7,194
182,375
218,880
218,880
219,480
6045 WORKERS COMPENSATION
2,435
65,686
85,060
85,060
89,244
2,304,462
2,768,979
2,978,966
2,978,966
3,068,042
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
74,719
97,526
87,400
87,400
90,000
6104 CONTINUING EDUCATION
20,289
28,122
21,500
21,500
24,000
6105 DUES & SUBSCRIPTIONS
3,839
1,242
2,000
2,000
2,000
6106 MEETING EXPENSE
1,038
797
800
800
825
6107 MILEAGE
81
129
250
250
150
6151 EQUIPMENT RENTAL
7,505
13,571
30,070
30,070
26,000
6160 DATA PROCESSING
6,099
9,975
7,500
7,500
7,500
6175 PHYSICAL EXAMINATION
4,887
4,553
4,000
4,000
8,000
6180 CONTRACTED REPAIRS
31,291
46,840
36,500
36,500
37,000
6182 RUBBISH REMOVAL
2,218
1,735
2,000
2,000
2,000
6185 LIGHT AND POWER
9,200
9,695
9,000
9,000
10,000
6186 HEAT
12,060
16,148
19,000
19,000
19,000
6188 PAGERS /CELL PHONE
7,719
12,039
5,800
5,800
7,000
6189 SEWER AND WATER
1,283
1,534
1,500
1,500
1,600
6201 LAUNDRY
4,629
4,539
4,400
4,400
4,600
6215 PREVENTATIVE MAINT.
16,907
17,155
14,000
14,000
15,000
6221 TOWER RENTAL
0
0
30,000
30,000
16,000
6260 LICENSES AND PERMITS
10
449
500
500
500
203,774
266,049
276,220
276,220
271,175
COMMODITIES:
6405 BOOKS AND PAMPHLETS
782
922
1,500
1,500
1,500
6406 GENERAL SUPPLIES
63,503
76,026
47,000
47,000
52,000
6408 PHOTOGRAPHIC SUPPL.
1,293
405
600
600
600
6510 FIRST AID SUPPLIES
37,932
33,457
45,006
45,000
41,000
6511 CLEANING SUPPLIES
3,894
2,080
1,500
1,500,
2,00.0
6513 OFFICE SUPPLIES
1,580-
2,154
1,600
1,600
2,000
6530 REPAIR PARTS
1,895
9,486
8,000
8,000
9,000
6550 HAZARDOUS MATERIALS
239
213
800
800
700
6552 PROTECTIVE CLOTHING
11,024
7,602
5,500
5,500
6,000
6556 TOOLS
3,389.
1,555
1,500
1,500
1,500
6557 FIREFIGHTING FOAM
1,598
1,080
850
850
1,000
6558 FIRE UNIFORMS
16,842
15,239.
12,500
12,500
13,000
6579 TRAINING AIDS
2,025
2,525
2,000
2,000
2,000
6614 FIRE PREVENTION
1,476
3,403
1,700
1,700
2,000
147,472
156,147
130,050
130,050
134,300
CITY OF EDINA
ANNUAL BUDGET
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC SAFETY FIRE PROTECTION 1470
SUMMARY OF PERFORMANCE MEASURES
PAGE - 55
Explanation of Change:
$14,000 has been deducted from last year's $30,000 Tower Rental of the new Public Safety
Training facility. This is due to decreased operating costs.
$160,000 was added to equipment replacement to replace the deductions from the previous two
years budgets.
Total Fire Budget
2004 2005 %
$3,674,611 $3,932,476 7.02%
CITY OF EDINA ANNUAL BUDGET PAGE - 56
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC SAFETY
FIRE PROTECTION
1470
SUMMARY OF EXPENDITURES
2002
2003
2003
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
CENTRAL SERVICES:
6803 GENERAL
$515,820
$71,914
$121,716
$121,716
$130,944
6808 EQUIPMENT OPERATION
97,884
139,560
143,724
143,724
143,844
$613,704
$211,474
265,440'
265,440
274,788
EQUIPMENT:
6710 REPLACEMENT
69,937
348,458
23,935
23,935
184,171
69,937
348,458
23,935
23,935
184,171:
TOTAL FIRE PROTECTION
$3,339,349
$3,751,107
$3,674,611
$3,674,611
$3,932,476
CITY OF EDINA
D: .
GENERAL
Public Health - 1490:
ANNUAL BUDGET
CTION: AREA:
PUBLIC SAFETY I PUBLIC HEALTH
SUMMARY OF PERFORMANCE MEASURES
PAGE - 57
PROGRAM:
1490
Personal services consist of 2.75 full time employees and part time help in this area.
The health department inspects food establishments, investigates foodbome illness reports,
inspects public swimming pools, investigates nuisance complaints, investigates housing
complaints, and responds to concerns about the Minnesota Clean Indoor Air Act. The
department contracts for personal public health nursing services such as home health care,
family health, health promotion, and .disease prevention and control. The proposed contract for
these services for 2005 is $160,865.
The Health Department provides staff support for the Edina Community Health Committee and
the Recycling and Solid Waste Comm. ission. The Department administers the City properties'
refuse collection contract and serves as a resource for the City employees' occupational health
and safety.
In 2003, the Department performed 280 food establishment inspections, 380 swimming pool
inspections, over 80 nuisance investigations, 2 Minnesota Clean Indoor Act complaint
investigations, and 6 housing complaint investigations.
2004 2005
Total Public Health Budget $420,052 $443,641
b.bzU /o
CITY OF EDINA ANNUAL BUDGET PAr.F _ RR
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC SAFETY
PUBLIC HEALTH
1490
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$182,139
$181,305
$168,818
$168,818
$191,000
6030 PENSIONS
375
9,840
9,336
9,336
10,562
6034 SOCIAL SECURITY
544
14,548
12,915
12,915
14,611
6040 FLEX PLAN
649
15,422
16,530
16,530
19;470
6045 WORKERS COMPENSATION
45
1,400
1,438
1,438
1,229:
183,752
222,515
209,037
209.037
236,872
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
197,712
165,141
158,180
158,180
162,865
6104 CONTINUING EDUCATION
2,975
1,156
2,000
2,000
2,060
6105 DUES & SUBSCRIPTIONS
530
590
1,000
1,000.
1,000
6107 MILEAGE
7,121
6,788`
8,160'
8,160
8,160
208,338
173,675
169,340
169,340
174,085
COMMODITIES:
6406 GENERAL SUPPLIES
919
673
2,050
2,050
800
6408 PHOTOGRAPHIC SUPPLIES
0
0
300
300
200
6575 PRINTING
119
134
300
300
300
1,038
807
2,650
2,650
1,300
CENTRAL SERVICES:
6803 GENERAL
59,328
17,896
14,268
14,268
15,708
6804 CITY HALL
4,344
4,956
11,184
11,184
8,532
6808 EQUIPMENT OPERATION
2,628
2,352
1,944
1,944
1,944
66,300
25,204
27,396
27,396
26,184
EQUIPMENT:
6710 REPLACEMENT
14,204
0
11,629
11,629
5,200
TOTAL PUBLIC HEALTH
$473,632
$422,201
$420,052
$420,052
$443,641
CITY OF EDINA ANNUAL BUDGET PAGE - 59
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PUBLIC SAFETY INSPECTIONS 1495
SUMMARY OF PERFORMANCE MEASURES
Inspections - 1495:
Personal services consist of the building official, 33/ full time inspectors and 1% full time support
staff.
The Inspections Department reviewed, issued and performed inspections for 5,714 building,
plumbing and heating permits in 2003. Staff enforce the State Building Code, which includes
the International Building Code and the International Residential Code. Over 11,600
inspections were performed in 2003.
2003 revenue for the various permits issued was as follows:
Building Permits $ 1,3791036
Plumbing Permits 139,537
HVAC Permits 240;832
The Building Department also receives.16 to 7 complaint calls per week from residents which are
investigated promptly. The department is also responsible for the review, permitting and
inspection rnon- public grading /fill /excavation projects.
Explanation of Change:
$5,500 has been added to the data processing budget for increases in permit software costs.
$1,680 has been added to the professional services budget to fund the maintenance contract
for the OCE printer.
$2,394 has been added to the equipment replacement budget to fund the Inspections
Department portion of the replacement costs for the fax machine, copier and OCE printer.
Total Inspections Budget
2004 2005
$666,845 $692,305
of
J.VL /O
CITY OF EDINA ANNUAL BUDGET PAGE - 60
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PUBLIC SAFETY
I INSPECTIONS
1495
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$367,275
$388,885
$398,546
$398,546
$410,920
6011 OVERTIME
4,460
20,490
3,407
3,407
3,509
6030 PENSIONS
812
21,677
22,228
22,228
22,918
6034 SOCIAL SECURITY
1,058
28,799
30,749
30,749
31,704
6040 FLEX PLAN
1,648
39,604
46,170
46,170
46,020
6045 WORKERS COMPENSATION
101
2,905
3,168
3,168
2,515
375,354
502,360
504,268
504,268
517,586
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
22,684
49,850
32,415
32,415
40,000
6104 CONTINUING EDUCATION
3,127
640
1,500
1,500
1,545
6105 DUES & SUBSCRIPTIONS
233
420
300
300
425
6107 MILEAGE
3,549
3,415
3,426
3,426
3,529
6136 PLAN MANAGEMENT
7,767
5,750
5,750
5,750
5,923
6160 DATA PROCESSING
23,207
27,876
26,000
26,000
31,500
6188 TELEPHONE
2,009
2,088
1,888
1,888
1,945
62,576
90,039
71,279
71,279
84,867
COMMODITIES:
6405 BOOKS AND PAMPHLETS
647
537
400
400
1,012
6406 GENERAL SUPPLIES
1,780
1,389
1,900
1,900
1,957
6558 UNIFORMS
599
746
900
900
927
6575 PRINTING
886
1,198
1,000
1,000
400
3,912
3,870
4,200
4,200
4,296
CENTRAL SERVICES:
6803 GENERAL
125,016
36,839
31,488
31,488
33,552
6804 CITY HALL
8,700
9,924
25,332
25,332
19,320
6808 EQUIPMENT OPERATION
8,148
15,888
15,276
15,276
15,288
141,864
62,651
72,096
72,096
68,160
EQUIPMENT:
6710 REPLACEMENT
4,356
1,096
15,002
15,002
17,396
TOTAL INSPECTIONS
$588,062
$660,016
$666,845
$666,845
$692,305
E «
��\
Al
r�
Park & Recreation
Park Recreation Overview
Maintenan
68.5%
Park & Recreation
Distribution by Area
Administration
.4%
Park & Recreation
Distribution by Expenditure
Equipment
3'°'
Commodities;
6.9%
Contractual
Services
15.1%
Central Services
9.8%
Recreation
11.1%
alaries
34.4%
CITY OF EDINA ANNUAL BUDGET PAGE - 61
FUND: FUNCTION: AREA: PROGRAM:
GENERAL I PARK & RECREATION I ADMINISTRATION 1 1600
SUMMARY OF PERFORMANCE MEASURES
Park Administration -1600:
Personal services consist of 7 full time employees and occasional seasonal part time help in this
area. The seven full time positions include:
I. Director
2. Assistant Director
3. Recreation Supervisor
4. Recreation Supervisor (Adaptive Recreation)
5. Senior.Citizen Director
6. Office Coordinator
7. Secretary
Responsibility is to administer and maintain the entire Park and Recreation Department
including: 40 parks totaling 1,553 acres of park property, revenue facilities (Golf Courses, 3
indoor ice rinks at Braemar Arena, Aquatic Center, Art Center, Edinborough Park, and
Centennial Lakes Park), administering and programming .,a Senior Citizen's .Center, adaptive
recreation program, administering and scheduling -adult and youth recreational programs and
fourteen athletic associations and working closely with and in support of the Edina Garden
Council, the Edina Historical Society and the Edina Museum.
2004 2005 %
Total Park & Recreation Budget $39000,875 $3,177,729 5.89%
CITY OF EDINA ANNUAL BUDGET PAGE - 62
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PARK & RECREATION
ADMINISTRATION
1600
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$415,605
$ 422,130
$428,299
$428,299
$441,193
6011 OVERTIME
620
0
0
0
0
6030 PENSIONS
878
22,902
23,685
23,685
24,398
6034 SOCIAL SECURITY
1,248
31,658
31,837
31,837
32,637
6040 FLEX PLAN
1,724
43,965
46,512
46,512
48,144
6045 WORKERS COMPENSATION
109
3,040
3,287
3,287
2,629
420,184
523,695
533,620
533,620
549,001
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
6,384
5,861
6,168
6,168
6,353
6104 CONTINUING EDUCATION
3,013
1,946
4,196
4,196
3,928
6105 DUES & SUBSCRIPTIONS
680
2,420
1,884
1,884
2,560
6106 MEETING EXPENSES
155
320
523
523
439
6107 MILEAGE
14,606
14,008
15,233
15,233
15,690
6188 TELEPHONE
1,228
807
1,478
1,478
1,522
26,066
25,362
29,482
29,482
30,492
COMMODITIES:
6405 BOOKS & PAMPHLETS
31
39
105
105
100
6406 GENERAL SUPPLIES
929
1,407
1,591
1,591
1,639
6513 OFFICE SUPPLIES
133
266
567
567
467
6575 PRINTING
13,365
11,746
1,000
1,000
1,030
14,458
13,458
3,263
3,263
3,236
CENTRAL SERVICES:
6803 GENERAL
125,004
46,012
41,796
41,796
43,752
6804 CITY HALL
10,140
11,556
20,664
20,664
15,756
135,144
57,568
62,460
62,460
59,508
EQUIPMENT:
6710 REPLACEMENT
0
1,116
4,614
4,614
6,487
TOTAL ADMINISTRATION
$595,852
$621,199
$633,439
$633,439
$648,724
CITY OF EDINA ANNUAL BUDGET PAGE-63
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION RECREATION 1621-1623
SUMMARY OF PERFORMANCE MEASURES
Athletic Activities -1621:
These funds are used to assist fourteen athletic associations and all adult athletic programs in
common equipment needs. The 14 youth athletic associations are: Edina Baseball Association,
Edina Basketball Association, Edina LaCrosse Association, Edina Girls' Athletic Association,
Edina Girls' Traveling Basketball, Edina Youth Softball Association,, Edina Swim Club, Edina
Fast :Pitch Softball Association, Braemar City of Lakes Figure Skating Club, Edina Football
Association, Jr. Olympic Volleyball Association, Edina Soccer Traveling Club and the Edina
Soccer Association.
Outdoor Ice Rinks -1622:
These funds are used for all supervision, phone service, general supplies, and, equipment for 12
warming_ houses, 11 `.hockey rinks, and 12 general skating areas. This consists of an 8 -week
season; 7 days a week from approximately December 15 to February 15 and can stay open
longer.- weather permitting.
Tennis Program -1623:
These funds are used for supervision, coaching, USTA memberships, instruction and supplies
for approximately 500 tennis program registrants. The Tennis Program includes lessons for
students ages 5 -adult taught by USTA trained tennis instructors, a six week Team Tennis
League, which competes against tennis teams from surrounding communities and a Summer
Classic Tennis Tournaments (adult and youth) in early August.
CITY OF EDINA ANNUAL BUDGET PAGE - 64
FUND:
FUNCTION:
AREA:
I
PROGRAM:
GENERAL
PARK & RECREATION
RECREATION
1621-1623
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
ATHLETIC ACTIVITIES -1621
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
322
0
0
0
0
322
0
0
0.
0
COMMODITIES:
6406 GENERAL SUPPLIES
3,214
9,409
8,000
8,000
8,240
TOTAL ATHLETIC ACTIVITIES
$3,536
$9,409
$8,000'
$8,000
$8,240
SKATING & HOCKEY -1622
PERSONAL SERVICES:
6013 PAYROLL .
$25,467
$45,342
$44,000
$44,000
$45,320
6034 SOCIAL SECURITY
87
3,469
3,366
3,366
3,467
6045 WORKERS COMPENSATION
7
253
389
389
299
25,561
49,064
47,755
47,755
49,086
CONTRACTUAL SERVICES:
6107 MILEAGE
80
119
209
209
215
6188 TELEPHONE
3,901
4,010
6,691
6,691
" 5,600
3,981
4,129
6,900
6,900
5,815
COMMODITIES:
6406 GENERAL SUPPLIES
266
132
1,568
1,568
1,000
TOTAL SKATING & HOCKEY
$29,808
$53,325
$56,223
$56,223
$55,901
TENNIS PROGRAM -1623
PERSONAL SERVICES:
6013 PAYROLL
$14,795
$17,977
$18,574
$18,574
$20,721
CONTRACTURAL SERVICES:
6105 DUES & SUBSCRIPTIONS
0
95
77
77
100
6107 MILEAGE
329
380
410
410
425
329
475
487
487
525
COMMODITIES:
6406 GENERAL SUPPLIES
3,015
3,472
4,266
4,266
4,393
TOTAL TENNIS PROGRAM
$18,139
$21,924
$23,327
$23,327
$25,639
CITY OF EDINA ANNUAL BUDGET PAGE -65
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION RECREATION 1624-1627
SUMMARY OF PERFORMANCE MEASURES
Youth Summer Recreation Programs (Playground Program, Family Jamboree Special
Event, FAB 4 and 5, Nature Camp, Firearms Safety Class and Fishing Clinic) —1624:
These funds are used for the implementation of the summer Playground Program, which is a
six -week program offered at 13 different parks open to children ages 6 to 10. These funds are
also used for the annual Family Jamboree Special Event, which is an evening of family
entertainment at Rosland Park, featuring games, entertainment, refreshments and family fun.
This also funds the FAB 4 and 5 Program, which is a summer recreation program for 4 and 5
year -olds that offers weekly themes designed to foster a child's creativity, imagination and
curiosity. Each week offers a new adventure filled with crafts, stories, songs and other age -
appropriate creative activities. It also funds a Nature Camp Program, which is a four -day
(daytime only) nature camp at Rolland Park where 6 -10 year old day - campers discover the
world of nature. They can learn about insects, look for bird nests, go fishing, search for pet
rocks, participate in a nature scavenger hunt and swim at the Aquatic Center on the fourth day.
The Firearms Safety Training classes are sponsored by the Minnesota Department of Natural
Resources. Classes are taught by certified trained instructors at the Arneson Acres Park
Terrace Room. New recreation programs, all of which are financially self-sufficient, include
Super 6 47's, You're Not. Too Old for This, Pre -Teen Party, and Creepers, Critters & Crawlers.
These programs meet needs that are not offered in the traditional playground programs.
Recreation Participant Programs:
Revenues and expenses for all youth summer recreation programs increase or decrease
depending on the number of participants in each program:
Program 2001 2002 2003 2004
Tennis Instruction 590 605 524 440
Playground 649 676 535 589
Miscellaneous and Special Activities —1627
These funds are used for miscellaneous special projects and equipment such as the 4th of July
Parade, sound system for July 4th concert in the park, special events, dedications and grand
openings.
CITY OF EDINA ANNUAL BUDGET PAGE - 66
FUND:
FUNCTION:
AREA:
-T
PROGRAM:
GENERAL
PARK & RECREATION
RECREATION
1624-1627
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
YOUTH SUMMER RECREATION
PROGRAMS -1624
PERSONAL SERVICES:
6013 PAYROLL
$26,681
$30,032
$31,706
$31,706
$35,371
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
3,610
4,867
600
600
618
6107 MILEAGE
447
345
615
615
633
4,057
5,212
1,215
1,215
1,251
COMMODITIES:
6406 GENERAL SUPPLIES
5,743
7,080
8,000
8,000
8,240
TOTAL YOUTH SUMMER
RECREATION PROGRAMS
$36, 481
$42,324
$40,921
$40,921
$44,862
MISCELLANEOUS & SPECIAL
ACTIVITIES -1627
PERSONAL SERVICES:
6013 PAYROLL
$6,807
$4,234
$4,500
$4,500
$4,630
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
3,976
2,466
4,000
4,000
4,120
COMMODITIES:
6406 GENERAL SUPPLIES
3,836
3,838
4,100
4,100
4,223
6408 PHOTOGRAPHIC SUPPLIES
17
0
100
100
103
3,853
3,838
4,200
4,200
4,326
TOTAL MISCELLANEOUS &
SPECIAL ACTIVITIES
$14,636
$10,538
$12,700
$12,700
$13,076
CITY OF EDINA ANNUAL BUDGET PAGE - 67
FUND: r UNCTION: AREA:
PRO
GENERAL PARK & RECREATION RECREATION GRAM:
1628 - 1629
SUMMARY OF PERFORMANCE MEASURES
Senior Citizens -1628:
These funds now reflect expenses for all senior citizen programs, classes, trips and mailings,
plus, all expenses related to operating the new Edina Senior Citizen Center at Grandview
Square.
Adaptive Recreation -1629:
The adaptive recreation budget provides part-time seasonal staff for adaptive programs and
inclusion services for children with disabilities in Edina pcograms'who need a 1:1 staff person. It
also includes professional services, which pay for sign language interpreters, contracted
adaptive staff, and other miscellaneous staff expenses. General supplies cover all adaptive
equipment and supplies for the variety of inclusion and adaptive recreation programs held year
round for youth and adults with disabilities.
CITY OF EDINA ANNUAL BUDGET PAGE - 68
FUND:
FUNCTION:
AREA:
-T
PROGRAM:
GENERAL
PARK & RECREATION
RECREATION
1628 -1629
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
SENIOR CITIZENS -1628
PERSONAL SERVICES:
6010 PAYROLL
$22,212
$26,259
$25,500
$25,500
$26,265
6011 OVERTIME
33
211
0
0
0
6030 PENSIONS
36
1,460
1,410
1,410
1,452
6034 SOCIAL SECURITY
49
2,043
1,951
1,951
2,009
6045 WORKERS COMPENSATION
2
553
90
90
97
$22,332
$30,526
$28,951
$28,951
$29,823
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
47,599
48,956
62,356
62,356
64,227
6182 RUBBISH REMOVAL
1,037
781
1,200
1,200
1,236
6185 LIGHT AND POWER
19,126
20,334
30,000
30,000
30,900
6186 HEAT
6,174
5,974
19,560
19,560
20,147
6188 TELEPHONE
3,627
4,001
3,960
3,960
4,079
6189 SEWER & WATER
1,173
1,282
1,000
1,000
1,030
6235 POSTAGE
4,260
4,432
3,690
3,690
3,801
82,996
85,760
121,766
121,766
125,420
COMMODITIES:
6406 GENERAL SUPPLIES
7,009
7,898
2,617
2,617
2,696
6513 OFFICE SUPPLIES
686
1,015
1,333
1,333
1,373
6575 PRINTING
7,747
8,412
7,278
7,278
7,496
15,442
17,325
11,228
11,228
11,565
TOTAL SENIOR CITIZENS
$120,770
$133,611
$161,945
$161,945
$166,808
ADAPTIVE RECREATION -1629
PERSONAL SERVICES:
6010 PAYROLL
$14,299
$20,097
$17,545
$17,545
$18,071
6030 PENSIONS
24
870
970
970
0
6034 SOCIAL SECURITY
44
2,163
1,342
1,342
1,382
6045 WORKERS COMPENSATION
4
223
155
155
119
$14,371:
$23,353
$20,012
$20,012
$19,572.
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
12,110
9,760
12,000
12,000
12,360
COMMODITIES:
6405 BOOKS & PAMPHLETS
0
0
100
100
103
6406 GENERAL SUPPLIES
6,870
3,474
3,000
3,000
3,090
6575 PRINTING
2,228
1,989
2,100
2,100
2,163
9,098
5,463
5,200
5,200
5,356
TOTAL ADAPTIVE RECREATION
$35,579
$38,576
$37,212
$37,212
$37,288
TOTAL RECREATION
$258,949
$309,707
$340,328
$340,328
$351,814
CITY OF EDINA ANNUAL BUDGET PAGE - 69
FUND: FUNCTION: AREA: PROGRAM:
GENERAL I PARK & RECREATION PARK MAINTENANCE
SUMMARY OF PERFORMANCE MEASURES
Park Maintenance
Payroll Distribution
Park maintenance consists of 17 personnel which include the following positions:
1 Superintendent
1 Foreman
13.6 Park Maintenance Staff
1 Janitor
1 Contract Forester (part-time year round)
1 Contract Weed Inspector (part-time seasonal)
Park Maintenance
Public Works
Charged to Other Funds:
Enterprise funds
Total Park Maint. Payroll
$1,050,997
20,000
10,000
$1,060,997
CITY OF EDINA ANNUAL BUDGET PAGE - 70
FUND: FUNCTION: AREA: PROGRAM:
GENERAL I PARK & RECREATION I PARK MAINTENANCE
I SUMMARY OF PERFORMANCE MEASURES I
This page is intentionally left blank.
CITY OF EDINA
ANNUAL BUDGET
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION MAINTENANCE 1640-1641
SUMMARY OF PERFORMANCE MEASURES
PAGE - 71
General Maintenance - 1640:
This account handles the paid leave, training and equipment maintenance for the park
maintenance programs. Paid. leave includes sick, vacation, and holiday pay.
Mowing -1641:
Funds from this account are used for maintenance of all manicured grass areas consisting of
422 different areas all mowed and maintained with a minimum of 10 days between cuttings. All
scheduled athletic fields are maintained every 5 working days and several weekends throughout
the season.
CITY OF EDINA . ANNUAL BUDGET PAM: _ 79
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PARK & RECREATION
MAINTENANCE
1640 -1641
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
GENERAL MAINTENANCE -1640
PERSONAL SERVICES:
6010 PAYROLL
$103,925
$111,578
$796,126
$796,126
$830,586
6011 OVERTIME
0
16
28,955
28,955
29,870
6020 PART TIME
0
7,298
193,894.
193,894
200,541
6030 PENSIONS
446
6,347
56,349
56,349
58,673
6034 SOCIAL SECURITY
632
9,563
77,962
77,952
81,166
6040 FLEX PLAN
851
13,271
109,916
109,916
117,846
6045 WORKERS COMPENSATION
152
2,369
21,939
21,939
20,939
106,006
150,442
1,285,131
1,285,131 -
1,339,621
CONTRACTUAL SERVICES:
6104 CONTINUING EDUCATION
7,303
7,517
6,663
6,663
8,000
6188 TELEPHONE
1,255
1,697
3,639
3,639
2,400
8,558
9,214
10,302
10,302
10,400
COMMODITIES:
6406 GENERAL SUPPLIES
370
208
1,200
1,200
1,236
CENTRAL SERVICES:
6803 GENERAL
248,556
32,460
28,044
28,044
29,196
6806 PUBLIC WORKS BUILDING
26,016
26,676
27,804
27,804
28,680
6808 EQUIPMENT OPERATION
189,012
196,212
192,876
192,876
193,044
463,584
255,348
248,724
248,724
250,920
TOTAL GENERAL MAINTENANCE
$578,518
$415,212
$1,545,357
$1,545,357
$1,602,177
MOWING -1641
PERSONAL SERVICES:
6010 PAYROLL
$98,648
$74,775
$0
$0
$0
BENEFITS
0
16,696
98;648:
91,471
0
,- 0
0
COMMODITIES:
6406 GENERAL SUPPLIES
1,741
616
1,591
1,591
1,639
TOTAL MOWING
$100,389
$92,087
$1,591
$1,591
$1,639
CITY OF EDINA ANNUAL BUDGET PAGE - 73
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION MAINTENANCE 1642-1643
SUMMARY OF PERFORMANCE MEASURES
Field Maintenance -1642:
All sports fields are specially prepared for scheduled games. These fields are dragged and field
lined with a chalk material. A special mixture (agricultural lime) is used each spring for filling
holes and regrading is done as needed during the playing season. All of the field areas are
fertilized each year and the grass is treated with herbicides. The grassy playing surfaces in all
of these parks are aerated, seeded and /or sodded when necessary to maintain safe ground
cover.
This account is supplemented by a $8 field use fee from participants. In 2002, $59,890 was
contributed from the activities listed below. $72,013 was collected in 2003.
Activity
2002
2003
Adult Soccer
$1,077
$1,915
Adult Baseball
1,595
76
Adult Softball
7,000
7,150
Edina Baseball Association
7,994
7,535,
EGAA Flag ?Foot ball -
1,484
2;457
Edina Youth Softball Association
2,456
2,792
Edina Girls Fast Pitch Softball
434
616
Edina Soccer Assoc. & Soccer Club
19,523
29;856
Edina Football Association
5,796
5,912
Edina Lacrosse. Association
490
2,416
Miscellaneous Field Rentals
12,041
11.,288
Total
$59,890
$72,013
General Turf Care -1643:
The funds in this program provide for all city properties and general park maintenance. This
includes the contracted spraying of weeds (dandelions) twice a year in areas that are in keeping
with Edina's Turf Management Plan.
CITY OF EDINA ANNUAL BUDGET PAGE - 74
FUND:
FUNCTION:
AREA:
71642-1643
PROGRAM:
GENERAL
PARK & RECREATION
MAINTENANCE
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
FIELD MAINTENANCE -1642
PERSONAL SERVICES:
6010 PAYROLL
$153,309.
$154,216
$0
$0
$0
6011 OVERTIME
4,662
5,071,
0
0
0
BENEFITS
0
29,856
0
0
0.
157,971
189,143
0
0
0,
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
4,561
3,646
624
624
5,643
6180 CONTRACTED REPAIRS
387
1,920
624
624
1;643
4,948
5,566
1,248
1,248
7,286
COMMODITIES:
6406 GENERAL SUPPLIES
12,770
4,609
5,687
5,687
5,858
6540 FERTILIZER
1,432
3,422
1,933
1,933
4,991
6542 INFIELD MIXTURE
4,321
3,292
3,752
3,752
3,865
6544 LINE MARKING POWDER
6,840
7,468
5,600
5,600
5,768
6546 WEED SPRAY
0
0
568
568
585
6547 SEED
224
575
1,500
1,500
1,545
25,587
19,366
19,040
19,040
22,612
TOTAL FIELD MAINTENANCE
$188,506
$214,075
$20,288
$20,288
$29,898
GENERAL TURF CARE -1643
PERSONAL SERVICES:
6010 PAYROLL
$89,056
$72,688
$0
$0
$0
6011 OVERTIME
1,308
1,839
0
0
0
BENEFITS
47
15,788
0
0
0
90,411
90,315
0
0
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
4,954
5,935
11,599
11,599
7,947
6180 CONTRACTED REPAIRS
0
4,892
5,913
5,913
6,090
6260 LICENSES AND PERMITS
20
30
226
226
233
4,974
10,857
17,738
17,738
14,270
COMMODITIES:
6406 GENERAL SUPPLIES
1,915
6,951
3,524
3,524
5,630
6517 SAND, GRAVEL, & ROCK
308
0
1,250
1,250
1,288
6540 FERTILIZER
3,914
6,078
4,775
4,775
11,918
6543 SOD & BLACK DIRT
4,886
3,757
2,387,
2,387
2,459
6546 WEED SPRAY
4,000
1,033
6,560
6,560
6,757
6547 SEED
4,161
1,753
6,822
6,822
6,000
19,184
19,572
25,318
25,318
34,052
TOTAL GENERAL TURF CARE
$114,569
$120,744
$43,056
$43,056
$48,322
CITY OF EDINA ANNUAL BUDGET PAGE - 75
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION MAINTENANCE 1644-1645
SUMMARY OF PERFORMANCE MEASURES
Forestry -1644:
These funds are used to administer a comprehensive park and boulevard forestry program plus
removal of diseased trees on private properties. This account includes contracted tree removal
and stump removal of all trees that are diseased (diseased trees on private properties are
contracted for removal only when necessary). This account provides for maintenance of tree
trimming on boulevard and park trees as well as contractual oak wilt disease identification,
control and prevention program. All boulevard tree trimming and removal is assessed to the
property owner.
Litter Removal -1645:
These funds are used for maintenance and removal of all trash from 40 park areas on a daily
basis ,in season or a weekly basis throughout the year. This also includes the purchase of trash
containers.
CITY OF EDINA ANNUAL BUDGET PAGE - 76
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PARK & RECREATION
MAINTENANCE
1644 -1645
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
FORESTRY -1644
PERSONAL SERVICES:
6010 PAYROLL
$124,960
$120,375
$0
$0
$0
6011 OVERTIME
788
1,029
0
0
0
6030 PENSIONS
68
6,368
0
0
0
6034 SOCIAL SECURITY
95
9,693
0
0
0
6040 FLEX PLAN
29
9,127
0
0
0
6045 WORKERS COMPENSATION
12
2,044
0
0
0
125,952
148,636
0
0
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
15,073
7,697
15,353
15,353
15,814
6107 MILEAGE OR ALLOWANCE
2,282
2,458
2,064
2,064
2,126
6180 CONTRACTED REPAIRS
1,259
3,074
12,623
12,623
13,002
6182 TREE WASTE DISPOSAL
13,865
1,820
14,000
14,000
14,420
32,479
15,049
44,040
44,040
45,362
COMMODITIES:
6406 GENERAL SUPPLIES
435
841
2,000
2,000
2,060
6541 PLANTING & TREES
6,820
7,745
9,000
9,000
9,270
6543 SOD & BLACK DIRT
0
0
6,000
6,000
6,180
6556 TOOLS
2,237
2,983
2,274
2,274
2,342
9,492
11,569
19,274
19,274
19,852
TOTAL FORESTRY
$167,923
$175,254
$63,314
$63,314
$65,214
LITTER REMOVAL -1645
PERSONAL SERVICES:
6010 PAYROLL
$17,167
$18,910
$0
$0
$0
6011 OVERTIME
58
58
BENEFITS
0
3,608
0
0
0
17,225
22,576
0
0
0
CONTRACTUAL SERVICES:
6182 RUBBISH REMOVAL
3,869
2,845
7,163
7,163
7,378
COMMODITIES:
6406 GENERAL SUPPLIES
3,227
10,979
8,187
8,187
8,433
TOTAL LITTER REMOVAL
$24,321
$36,400
$15,350
$15,350
$15,811
CITY OF EDINA ANNUAL BUDGET PAGE - 77
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION MAINTENANCE 1646
SUMMARY OF PERFORMANCE MEASURES
Building Maintenance -1646:
These funds are used for the maintenance, repair, and cleaning of 27 buildings in the park
system. These funds are also used for the upkeep and new construction of 11 hockey rinks in
the park system.
Buildings Maintained:
1. Arden Park Shelter
2. Arneson Gazebo
3. Arneson Greenhouse
4. Arneson Historical House
5. Braemar Complex
6. Bredesen Comfort Station
7. Cahill School Building
8. Chowen Picnic' Shelter
9. Cornelia School_ Park Shelter
10. Countryside Park Shelter
11. Creek Valley Park Shelter
12. Edina Senior Center
13. Garden Comfort Station
14. Grange Hall
15. Highlands Park Shelter
16. Lewis Park Shelter
17. Normandale Park Shelter
18. Pamela Park Shelter
19. Rosland Park Picnic Shelter
20. Rosland Park Comfort Station
21. Strachauer Park Shelter
22. Todd Park Shelter
23. Wooddale Picnic Shelter
24. Utley Park Restrooms
25. Van Valkenburg Complex
26. Walnut Ridge Park Shelter
27. Weber Park Shelter
CITY OF EDINA ANNUAL BUDGET PAGE - 78
FUND:
FUNCTION:
AREA
PROGRAM:
GENERAL
PARK & RECREATION
MAINTENANCE
1646
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
BUILDING MAINTENANCE -1646
PERSONAL SERVICES:
6010 PAYROLL
$159,522
$174,851
$0
$0
$0
6011 OVERTIME
1,583
4,266
0
0
0
6030. PENSIONS
242
9,639
0
0
0
6034 SOCIAL SECURITY
334
14,001
0
0
0
6040 FLEX PLAN
453
19,500
0
0
0
6045 WORKERS COMPENSATION
89
3,733
0
0
0
162,223
225,990
0
0
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
10,673
16,726
4,393
4,393
14,000
6180 CONTRACTED REPAIRS
8,558
13,662
6,128
6,128
6,312
6185 LIGHT & POWER
66,874
64,294
90,038
90,038
71,013
6186 HEAT
25,126
33,478
39,220
39,220
40,397
6188 TELEPHONE
5,575
6,600
10,984
10,984
8,900
6189 SEWER & WATER
2,950
584
500
500
1,500
6201 LAUNDRY
12,249
11,358
12,263
12,263
12,631
132,005
146,702
163,526
163,526
154,753
COMMODITIES:
6406 GENERAL SUPPLIES
33,218
32,568
26,642
26,642
32,000
6530 REPAIR PARTS
7,721
8,470
12,570
12,570
11,000
6556 TOOLS
7,498
7,686
6,150
6,150
7,800
6577 LUMBER
2,325
3,042
10,145
10,145
10,449
6578 LAMPS & FIXTURES
1,131
980
6,482
6,482
3,500
6610 SAFETY EQUIPMENT
5,307
4,683
5,127
5,127
5,281
57,200
57,429
67,116
67,116
70,030
TOTAL BUILDING MAINTENANCE
$351,428
$430,121
$230,642
$230,642
$224,783
CITY OF EDINA
ANNUAL BUDGET
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION MAINTENANCE 1647-1648
SUMMARY OF PERFORMANCE MEASURES
Paths, Hard Surfaces, Hockey Rinks, & Park Amenities Maintenance -1647:
PAGE - 79
These funds are used for the maintenance of all hard surface areas within the park system.
This includes the resurfacing of 26 tennis courts, resurfacing and maintaining 8 hard surface
basketball courts, and maintenance and surfacing of 10 miles of walking and bicycling paths
within the park system.
These funds are also used for the maintenance and replacement of 23 playground equipment
sites, plus park lighting, picnic tables, bleachers, tables, chairs, park benches, signs and
drinking fountains throughout Edina's 40 parks. .
Skating Rink Maintenance' -1648:
These funds are used for flooding and maintaining an operation of 11 hockey rinks and 12
general skating areas. This account is supplemented by an $8 per participant user fee.
CITY OF EDINA ANNUAL BUDGET PAGE - 80
FUND:
FUNCTION:
AREA:
-T
PROGRAM:
GENERAL
PARK & RECREATION
MAINTENANCE
1647-1650
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PATHS & HARD SURFACES -1647
PERSONAL SERVICES:
6010 PAYROLL
$19,463
$33,412
$0
$0
$0
6011 OVERTIME
1,059
716
0
0
0
6030 PENSIONS
25
1,875
0
0
0
6034 SOCIAL SECURITY
36
2,773
0
0
0
6040 FLEX PLAN
48
3,794
0
0
0
6045 WORKERS COMPENSATION
8
745
0-
0
0
20,639
43,315
0
0
0
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
49,078
76,509
60,000
60,000
61,800
COMMODITIES:
6406 GENERAL SUPPLIES
13,105
7,300
4,208
4,208
4,334
6518 BLACKTOP
3,461
0
3,411
3,411
3,513
6519 ROAD OIL
0
0
2,615
2,615
2,693
16,566
7,300
10,234
10,234
10,540
TOTAL PATHS & HARD
SURFACE MAINTENANCE
$86,283
$127,124
$70,234
$70,234
$72,340
SKATING RINK MAINT. -1648
PERSONAL SERVICES:
6010 PAYROLL
$111,931
$113,635
$0
$0
$0
6011 OVERTIME
9,362
14,506
0
0
0
6030 PENSIONS
1,008
7,086
0
0
0
6034 SOCIAL SECURITY
1,451
10,229
0
0
0
6040 FLEX PLAN
1,872
13,096
0
0
0
6045 WORKERS COMPENSATION
326
2,445
0
0
0
125,950
160,997
0
0
0
CONTRACTURAL SERVICES:
- 6103 - PROFESSIONAL SERVICES-
- - 4,285
0
_
0
355
0
COMMODITIES:
6406 GENERAL SUPPLIES
3,816
1,164
3,700
3,700
3,811
6530 REPAIR PARTS
1,480
26
1,932
1,932
1,990
5,296
1,190
5,632
5,632
5,801
TOTAL SKATING RINK MAINT.
$135,531
$162,542
$5,632
$5,632
$5,801
CITY OF EDINA ANNUAL BUDGET PAGE - 81
FUND: FUNCTION: AREA: PROGRAM:
GENERAL PARK & RECREATION MAINTENANCE 1650— 1652
SUMMARY OF PERFORMANCE MEASURES
Equipment -1650:
This account provides funding for the replacement of existing Park Maintenance equipment and
for the purchase of any new additional equipment needed for maintenance of all parks.
Explanation of Change:
Equipment Replacement was increased by $79,000 for equipment that was previously purchased
by equipment certificates.
Weed Mowing -1652;
These funds are used for the control.and removal of noxious weeds located on park property as
well as other city properties. It is also used to handle all city properties, public and private, that
are not in compliance with our clear view and weed and noxious growth ordinances. The
private properties are later:assessed for reimbursement.
CITY OF EDINA ANNUAL BUDGET PAGE - 82
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
PARK & RECREATION
I MAINTENANCE 7
1650 -1652
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
EQUIPMENT -1650
EQUIPMENT:
6710 REPLACEMENT
$56,785
$26,906
$31,644
$31,644
$111,206
TOTAL EQUIPMENT
$56,785
$26,906
$31,644
$31,644
$111,206
WEED MOWING -1652
PERSONAL SERVICES:
6010 PAYROLL
$0
$13,735
$0
$0
$0
6011 OVERTIME
0
589
0
0
0
6030 PENSIONS
0
106
0
0
0
6034 SOCIAL SECURITY
0
1,179
0
0
0
6040 FLEX PLAN
0
184
0
0
0
6045 WORKERS COMPENSATION
0
198
0
0
0
0
15,991
0
0
0
CONTRACTURAL SERVICES:
6103 PROFESSIONAL SERVICES
0
3,793
0
0
0
TOTAL WEED MOWING
$0
$19,784
$0
$0
$0
TOTAL PARK-MAINTENANCE
$1;804,253
$1,820,249
$2,027,108
$2,027,108
$2,177,191
M
Non Departmental
Non - Departmental Overview
Commissions &
Special Projects
40.6%
Non - Departmental
Distribution by Area
^--' --encies
I%
Employee
Program
23.3%
Non - Departmental
Distribution by Expenditure
Equipment
14.0%
Personal
Services
Contractual
Services
64.6%
Capital Plan
9.0%
Special
sessments
5.0%
CITY OF EDINA ANNUAL BUDGET PAGE - 83
FUND: FUNCTION: AREA: PROGRAM:
GENERAL NON - DEPARTMENTAL CONTINGENCIES 1500
SUMMARY OF PERFORMANCE MEASURES
Contingencies -1500:
The contingencies budget provides for unbudgeted and unforeseen expenditures which may be
authorized during the year. It also reduces the impact of unforeseen losses of revenue which
may occur.
Total Contingencies Budget
2004
$119,431
2005 %
$123,014 3.00%
CITY OF EDINA ANNUAL BUDGET PAGE - 84
FUND:
GENERAL
FUNCTION:
NON - DEPARTMENTAL
AREA:
CONTINGENCIES
PROGRAM:
1500
SUMMARY OF EXPENDITURES
ACCT. DESCRIPTION
2002
ACTUAL
2003
ACTUAL
2004
2005
ADOPTED
ESTIMATED
BUDGETED
CONTRACTUAL SERVICES:
6103
TOTAL CONTINGENCIES
$22,102
$22,102
$244,707
$244,707
$119,431
$119,431
$119,431
$119,431
$123,014
$123,014
CITY OF EDINA ANNUAL BUDGET PAGE - 85
FUND: FUNCTION: AREA: PROGRAM:
GENERAL NON - DEPARTMENTAL CAPITAL PLAN 1502
APPROPRIATION
SUMMARY OF PERFORMANCE MEASURES
Capital Plan Appropriation -1502:
This appropriation reflects the amount the operating budget contributes to the capital plan.
Total Capital Plan Budget
2004. 2005
$50,000 $50,000
CITY OF EDINA ANNUAL BUDGET PAGE - 86
FUND:
FUNCTION:
AREA: CAPITAL
PROGRAM:
GENERAL
NON - DEPARTMENTAL
PLAN APPROPRIATION
1502
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
EQUIPMENT:
6711
$50,000
$50,000
$50,000
$50,000
$50,000
TOTAL CAPITAL PLAN
APPROPRIATION
$50,000
$50,000
$50,000
$50,000
$50,000
CITY OF EDINA ANNUAL BUDGET PAGE - 87
FUND: FUNCTION: AREA: PROGRAM:
GENERAL NON- DEPARTMENTAL SPECIAL ASSESSMENTS 1503
ON CITY PROPERTY
SUMMARY OF PERFORMANCE MEASURES
Special Assessments on City Property -1503:
City owned properties are subject to special assessments for various improvement projects.
This program provides funds to pay for these assessments. The budget also reflects the costs
necessary to pay Hennepin County for mandated truth in taxation mailing.
2004 2005
Total Special Assessments Budget $27,000 $28,000
- V /V
CITY OF EDINA ANNUAL BUDGET PAGE - RR
FUND:
FUNCTION:
AREA: SPECIAL
PROGRAM:
GENERAL
NON - DEPARTMENTAL
ASSESSMENTS ON CITY PROP.
1503
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
SPECIAL ASSESSMENTS:
6915
$40,380
$28,188
$27,000
$27,000
$28,000
TOTAL SPECIAL
ASSESSMENTS
$40,380
$28,188
$27,000;
$27,000
$28,000
CITY OF EDINA ANNUAL BUDGET PAGE - 8S
FUND: FUNCTION: AREA: PROGRAM:
GENERAL NON - DEPARTMENTAL FIRE STATION DEBT 1510
SERVICE
SUMMARY OF PERFORMANCE MEASURES
Fire Station Debt Service -1510:
This budget was used to pay the debt service the York Avenue fire station.
Explanation of Change:
The remaining debt will be prepaid from the Capital Improvement Program. The debt was
scheduled to end in 2006, however,'by prepaying in 2004, the City will save approximately $15,
in interest payments.
2004 2005 %
Total =Fire Station Debt Service $0 $0 0
CITY OF EDINA ANNUAL BUDGET PAGE - 90
FUND:
FUNCTION:
I AREA:
PROGRAM:
GENERAL
NON - DEPARTMENTAL
FIRE STATION DEBT SERVICE
1510
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
CONTRACTUAL SERVICES:
8220 DEBT SERVICE PAYMENTS
$83,761
$83,761
$0
$0
$0
TOTAL FIRE DEBT SERVICE
$83,761
$83,761
$0
$0
$0
CITY OF EDINA ANNUAL BUDGET PAGE - 9'
FUND: FUNCTION: AREA: OGRAM:
r
GENERAL NON- DEPARTMENTAL EMPLOYEE PROGRAMS 1513
SUMMARY OF PERFORMANCE MEASURES
Employee Programs -1513:
Employee Programs is made up of three expense items; Separation Benefits, which covers
vacation and sick leave payouts for employees leaving the City, Employee Recognition, which
covers various programs to honor dedicated employees, and Clothing Allowance, an allotment
given to City Hall employees to purchase clothing with the City logo.
Total Employee Programs
2004 2005 %
$126,724 $130,000 2.58%
CITY OF EDINA ANNUAL BUDGET PAGE - 92
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
NON- DEPARTMENTAL
EMPLOYEE PROGRAMS
1513
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6035 SEPARATION BENEFITS
$59,529
$123,400
$115,720
$115,720
$119,200
CONTRACTUAL SERVICES:
6103 EMPLOYEE RECOGNITION
7,428
7,263
6,000
6,000
7,500
6203 CLOTHING ALLOWANCE
2,216
1,645
5,004
5,004
3,300
9,644
8,908
11,004
11,004
10,800..
TOTAL EMPLOYEE PROGRAMS
$69,173
$132,308
$126,724
$126,724
$130,000
CITY OF EDINA ANNUAL BUDGET PAGE - 93
FUND: FUNCTION: AREA: PROGRAM:
GENERAL NON - DEPARTMENTAL COMMISSIONS & SPECIAL 1504 —1507
PROJECTS
SUMMARY OF PERFORMANCE MEASURES
Human Relations Commission -1504:
The Human Relations Commission has 12 members and is an advisory body to the City Council
in the areas of human rights, human needs and human relationships. The Commission meets
monthly and submits to the City Council an annual proposed human services budget.
Fireworks -1505:
Fireworks display to be presented after the band concert on the fourth of July.
Explanation of Change:
The City will now solicit a sponsor to cover the cost of the Fireworks display.
Suburban Rate Authority -1506:
The Suburban Rate Authority is a joint powers organization that actively intervenes in matters
affecting gas, electric, and telephone rates. The Suburban Rate. Authority has also been active
in matters concerning uniform gas and electric franchises, gas, electric and telephone rate
regulation, right -of -way issues, and in legislation concerning the Public Utilities Commission.
Edina Resource Center -1507:
In 2002, the City elected to withdraw from the Hennepin South Services Collaborative (HSSC)
and establish a freestanding family services resource center. This resource center, named
Edina Resource Center, is operated as part of the family services collaborative administered by
the Edina Public Schools. This budget item constitutes the City's contribution to the operation of
the Edina Resource Center
CITY OF EDINA ANNUAL BUDGET PAGE - 94
FUND:
FUNCTION:
AREA: COMMISSIONS
PROGRAM:
GENERAL
NON - DEPARTMENTAL
I & SPECIAL PROJECTS
1504 -1507
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
HUMAN RELATIONS
COMMISSION -1504
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
$94,323
$79,938
$78,329
$78,329
$82,240
6104 CONTINUING EDUCATION
50
0
250
250
250
6105 DUES & SUBSCRIPTIONS
247
247.
200
200
200
6136 CHEMICAL HEALTH
0
0
500
500
500
6218 EDUCATION PROGRAM
289
414
800
800
800
TOTAL HUMAN RELATION
COMMISSION
$94,909
$80,599
$80,079
$80,079
$83,990
FIREWORKS -1505
COMMODITIES:
6406 GENERAL SUPPLIES
$12,200
$12,400
$0
$0
$0
TOTAL FIREWORKS
$12,200
$12,400
$0
$0
$0
SUBURBAN RATE
AUTHORITY -1506
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
$4,000
$3,000
$3,000
$3,000
$3,000
TOTAL SUBURBAN
RATE AUTHORITY
$4,000
$3,000
$3,000
$3,000
$3,000
EDINA RESOURCE CENTER -1507
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
$31,610
$32,400
$32,400
$32,400
$33,372
TOTAL EDINA RESOURCE
CENTER
$31,610
$32,400
$32,400
$32,400
$33,372
CITY OF EDINA
ND:
ANNUAL BUDGET
FUNCTION: AREA:
GENERAL NON - DEPARTMENTAL COMMISSIONS & S
PROJECTS
SUMMARY OF PERFORMANCE MEASURES
Human Services Planning and Coordination -1508:
PAGE - 95
PROGRAM:
1508-1515
With the withdrawal from HSSC, the City's contribution to the research, planning and
coordination (RPC) function of HSSC has been eliminated. This budget item will be used by the
City to undertake human service planning and coordination activities on an as- needed basis.
Deer Control Program —1509:
This program was authorized by the Council to reduce the City's deer population.
Records Management Program —1511:
This would include doing an inventory and setting up a database in order to meet state data
practice laws.
Dial -a -Ride Program —1514:
The Edina Dial -a -Ride program provides a low cost transit alternative to Edina residents,
principally senior citizens, who require transportation to the Senior Center, medical
appointments, shopping and so forth. The program began in February 2001 and provides
approximately 4,200 passenger rides annually. Continued Metropolitan Council funding plus fare
box revenues will fund about 50 percent of the program. The proposed budgeted amount
constitutes the "local share" to continue the program.
Public Artscape —1515:
Funding for the Public Arts Program will be used by the Edina Public Art Committee to provide
opportunities for local artists to exhibit their work; encourage participation in and appreciation of
the arts by City residents; serve in an advisory capacity to the City in arts - related policies, gifts,
or loans of artwork; and work with the City and the Edina Community Foundation to secure
funding for projects. The committee will present any major decisions or policy recommendations
in writing to the City Manager and /or the City Council for approval.
Total 2004 2005 %
Commissions $ Spec. Proj. $197,153 $226,368 14.82%
CITY OF EDINA ANNUAL BUDGET PAGE - 96
FUND:
FUNCTION:
AREA: COMMISSIONS
PROGRAM:
GENERAL
NON - DEPARTMENTAL
& SPECIAL PROJECTS
1508-1515
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
HUMAN SERVICES PLANNING &
COORDINATION -1508
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
$21,536
$0
$22,074
$22,074
$22,736
TOTAL HUMAN SERVICES
PLANNING & COORDINATION
$21,536
$0
$22,074
$22,074
$22,736
DEER CONTROL PROGRAM -1509
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
7,840
4,634
9,000
9,000
9,270
TOTAL DEER CONTROL
$7,840
$4,634
$9,000'
$9,000
$9,270
RECORDS MANAGEMENT -1511
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
$8,418
$36,022
$26,600
$26,600
$27,000
DIAL A RIDE -1514
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
$0
$20,268
$24,000
$24,000
$22,000
PUBLIC ARTSCAPE -1515
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
$0
$0
$0
$0
$25,000
TOTAL PUBLIC ARTS PROGRAM
$0
$0
$0
$0
$25,000
TOTAL COMMISSIONS &
SPECIAL PROJECTS
$180,513
$189,323
$197,153
$197,153
$226,368
'
Appendix
Central Services
Central Services Overview
Equipment
Operation
42.8%
Central Services
Distribution by Area
3eneral
38.7%
City Hall
Pub. Works Bldg. 9.2%
9.3%
Central Services
Distribution by Expenditure
Central Services
Equipment 7.4%
1), Ao1
Commodities
22.7%
Contractual
Services
42.9%
;s
0
CITY OF EDINA ANNUAL BUDGET PAGE - 97
FUND:
GENERAL
FUNCTION:
CENTRAL SERVICES
AREA:
GENERAL
PROGRAM:
1550
SUMMARY OF PERFORMANCE MEASURES
General -1550:
Personal services consist of 2 full time employees.
Central Services General is made up of worker's compensation
and liability
insurance,
upgrade and maintenance to the City's wide area network and shared
costs, such as postage,
bank charges and personnel advertising. These costs are allocated
based on departmental
usage or number of employees in 'each department. One third of this
budget is allocated to
our enterprise funds and is not tax supported.
Explanation of Change:
• Insurance increased $69,000 to reflect increased cost in liability and benefits
insurance.
• Increased unemployment compensation by $20,000 to reflect actual
expenses.
Distribution
Allocated to General Fund: Allocated to other Funds:
Annual Monthly
Annual
Monthly
Mayor & Council 22,152 1,846 City Hall
6,156
513
Administration 41,292 3,441 Public Works Building
4,272
356
Planning 25,716 2,143 Equipment Operation
17,136
1,428
Finance 31,224 2,602 Art Center
18,012
11501
Elections 6,696 558 Pool
13,620
1,135
Assessing 35,820 2,985 Golf Course
82,704
6,892
Public Works: Arena
17,448
1,454
Administration 11,592 966 Edin /Cent
41,124
3,427
Engineering 31,704 29642 Utilities
113,256
9,438
Maintenance 84,084 7,007 50th Assessment Dist.
1,956
163
Police 249;984 20,832 50th Street - Liquor
26,712
2,226
Animal Control 3,000 250 York - Liquor
48,900
4,075
Fire 130,944 10,912 Vernon - Liquor
44,388
3,699
Health 15,708 1,309 Recycling
4,224
352
Inspections 33,552 2,796 Communications
18,372
1,531
Parks:
Administration 43,752 3,646
Maintenance 29,196 .2,433
458,280
38,190
$796,416 $66,368 Total
$1,254,696
$104,558
2004
2005
%
Total Central Services General $1,113,048
$1,254,696
12.73%
CITY OF EDINA ANNUAL BUDGET PAGE - 98
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
CENTRAL SERVICES
I GENERAL
1550
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$94,477
$101,137
$107,643
$107,643
$114,137
6030 PENSIONS
1,933,334
6,807
5,953
5,953
6,312
6034 SOCIAL SECURITY
303
8,255
8,235
8,235
8,731
6040 FLEX PLAN
1,536,992
26,544
13,680
13,680
19,656
6045 WORKERS COMPENSATION
38
596
953
953
753
6046 UNEMPLOYMENT COMP.
10,248
20,291
3,000
3,000
25,000
3,575,392
163,630
139,464
139,464
174,589
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
23,499
30,716
29,000
29,000
31,000
6104 COMPUTER TRAINING
2,680
2,930
12,000
12,000
12,000
6121 PERSONNEL
21,900
34,298
40,000
40,000
40,000
6151 EQUIPMENT RENTAL
10,774
11,219
20,000
20,000
18,000
6155 BANK SERVICE CHARGES
43,078
42,826
30,000
30,000
33,853
6160 COMPUTER SOFTWARE
50,022
50,422
58,000
58,000
90,000
6188 TELEPHONE
79,006
82,943
87,000
87,000
85,000
6200 INSURANCE
971,768
583,001
530,489
530,489
602,980
6230 SERVICE CONTR. - EQUIP.
11,507
11,717
13,500
13,500
22,100
6235 POSTAGE
42,353
36,262
50,000
50,000
45,000
1,256,587
886,334
869,989
869,989
979,933
COMMODITIES:
6406 GENERAL SUPPLIES
39,287
36,315
49,200
49,200
47,000
EQUIPMENT:
6710 REPLACEMENT
28,690
2,471
54,395
54,395
53,174
6711 NEW
0
0
0
0
0
28,690
2,471
54,395
54,395
53,174
TOTAL GENERAL
$4,899,956
$1,088,750
$1,113,048
$1,113,048
$1,254,696
CITY OF EDINA ANNUAL BUDGET PAGE - 99
FUND: FUNCTION: AREA: PROGRAM:
GENERAL CENTRAL SERVICES CITY HALL 1 1551
SUMMARY OF PERFORMANCE MEASURES
City Hall - 1551:
Personal services consist of 1 full time employee, public works help, park maintenance help,
and part time help.
This program provides for the operation and maintenance of the City Hall. Operating costs
are allocated to departments on the basis of space occupied.
Explanation of Change:
• This budget has been decreased to reflect the costs of the new City Hall and Police
Department. A full time custodian was budgeted in 2004 and will not be hired, a
cleaning service will be used. In 2004, social security was overstated by $90,000.
Distribution
Allocation to Operating Departments
Annual
Monthly
Mayor & Council
$14,892
$1,241
Administration
17,376
1,448
Planning
13,464
1,122
Finance
13,476
1,123
Assessing
15,372
1,281
Public Works:
Administration
6,060
505
Engineering
18,156
1,513
Police
148,860
12,405
Health
8,532
711
Inspections
19,320
1,610
Parks
15,756
1,313
Utilities
4,476
373
Communications
2,124
177
Total
$297,864 $24,822
2004 2005 %
Total City Hall Budget $390,756 $297,864 -23.77%
CITY OF EDINA ANNUAL BUDGET PAGE - 100
FUND:
FUNCTION:
AREA:
I
PROGRAM:
GENERAL
CENTRAL SERVICES
CITY HALL
1551
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ADOPTED
ESTIMATED
BUDGETED
PERSONAL SERVICES:
6010 PAYROLL
$59,931
$58,396
$100,255
$100,255
$59,620
6011 OVERTIME
2,644
1,275
5,000
5,000
5,000
6030 PENSIONS
184
3,296
5,588
5,588
3,571
6034 SOCIAL SECURITY
237
4,243
97,733
97,733
4,944
6040 FLEX PLAN
491
7,878
17,442
17,442
10,196
6045 WORKERS COMPENSATION
46
1,698
3,054
3,054
2,077
63,533
76,786
229,072
229,072
85,408;
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
0
0
0
0
40,300
6180 CONTRACTED REPAIR
3,588
3,285
16,100
16,100
13,000
6182 RUBBISH SERVICE
2,024
2,552
3000
3,000
3,000
6185 LIGHT & POWER
30,821
35,055
56,000
56,000
68,000
6186 HEAT
7,100
15,343
25,000
25,000
35,000
6189 SEWER & WATER
2,073
773
4,500
4,500
3,000
6201 LAUNDRY
3,279
3,308
4,700
4,700
6,000
48,885
60,316
109,300
109,300
168,300
COMMODITIES:
6406 GENERAL SUPPLIES
5,229
6,142
22,000
22,000
18,000
6511 CLEANING SUPPLIES
944
962
2,600
2,600
4,000
6512 PAPER SUPPLIES
11,971
6,528
15,000
15,000
9,000
6530 REPAIR PARTS
2,518
591
7,000
7,000
7,000
20,662
14,223
46,600
46,600
38,000
CENTRAL SERVICES:
6803 GENERAL
20,424
5,286
5,784
5,784
6,156
TOTAL CITY HALL
$153,504
$156,611
$390,756
$390,756
$297,864
CITY OF EDINA
ANNUAL BUDGET
PAGE - 101
FUND: FUNCTION: AREA: PROGRAM:
GENERAL CENTRAL SERVICES PUBLIC WORKS BUILDING 1552
SUMMARY OF PERFORMANCE MEASURES
Public Works Building -1552:
Personal services consist of 1 full time employee, and Public Works help.
The function of the public works building is to provide a shelter for equipment maintenance
operations and provide stockroom and office facilities for public works personnel. A large part of
this account is directed towards rubbish .hauling, light and power, heat and fuel oil, and repair
parts for the building.
Allocation to Operating Departments
Public Works
Parks
Equipment Operation
Utilities
Total
Distribution
Annual
$38,340
28,680
211,500
22,680
$301,200
Monthly
$3,195
2,390
17,625
1,890
$25,100
2004 2005
Total Public Works Building Budget $292,032 $301,200
3.14%
CITY OF EDINA ANNUAL BUDGET PAGE - 102
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
CENTRAL SERVICES
I PUBLIC WORKS BUILDING
1552
SUMMARY OF EXPENDITURES
_ 2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$68,722
$90,289
$71,981
$71,981
$70,718
6011 OVERTIME
383
800
2,550
2,550
2,627
6030 PENSIONS
172
5,079
4,125
4,125
4,056
6034 SOCIAL SECURITY
235
7,197
5,702
5,702
5,615
6040 FLEX PLAN
481
12,210
11,286
11,286
13,452
6045 WORKERS: COMPENSATION
97
2,669
2,483
2,483
2,588
70,090
118,244
98,127
98,127
99,056.
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
4,496
5,143
1,100
1,100
1,133
6182 RUBBISH SERVICE
5,291
5,206
4,200
4,200
4,300
6185 LIGHT & POWER
38,540
38,624
42,000
42,000
43,260
6186 HEAT & FUEL OIL
47,254
70,762
65,100
65,100
67,000
6189 SEWER & WATER
3,993
3,667
3,900
3,900
4,096
99,574
123,402
116,300
116,300
119,789
COMMODITIES:
6406 GENERAL SUPPLIES
15,227
19,115
14,000
14,000
14,400
6511 CLEANING SUPPLIES
11,981
14,517
12,000
12,000
12,400
6530 REPAIR PARTS
40,245
33,906
40,100
40,100
41,283
67,453
67,538
66,100
66,100
68,083
CENTRAL SERVICES:
6803 GENERAL
15,960
3,103
3,816
3,816
4,272
EQUIPMENT:
6710 REPLACEMENT
8,080
13,058
7,689
7,689
10,000
TOTAL PUBLIC WORKS
BUILDING
$261,157
$325,345
$292,032
$292,032
$301,200
CITY OF EDINA ANNUAL BUDGET PAGE - 103
FUND: FUNCTION: AREA: PROGRAM:
GENERAL CENTRAL SERVICES EQUIPMENT OPERATION 1553
SUMMARY OF PERFORMANCE MEASURES
Equipment Operation -1553:
This account provides for the operation and maintenance of all City vehicles. A large part of the
operation costs are attributed to the purchase of fuel for City equipment. The shop supervisor
and five mechanics plus a '/s position assigned to inventory control are the personnel
responsible for the City's 46 cars, 102 trucks, plow trucks, pickups and vans, 140 off -road
vehicles, 6 trailers, and miscellaneous equipment. One -half position is assigned to inventory
control. Additionally, the public works shop is responsible for all maintenance of equipment and
power tools. Costs of equipment operation are charged to operating departments and other
funds on the basis of use.
Explanation of Change:
• Labor from Street Maintenance workers was previously budgeted here for time spent
maintaining street vehicles. This time will now be budgeted in. the Street Maintenance
department.
Distribution
Allocated to General Fund: Allocated to other Funds:
Annual Monthly Annual Monthly
Administration $1,812 $151 Pool $2,784 $232
Assessing 5,136 428 Golf Course 696 58
Public Works: Edin /Cent. Lake 9,456 788
Engineering 18,072 1,506 Utilities 114,240 9,520
Supervision 17,376 1,448 York— Liquor 276 23
Maintenance 512,988 42,749 $127,452 $10,621
Police 349,128 29,094
Animal Control 3,756 313
Fire 143,844 11,987
Health 1,944 162
Inspections 15,288 1,274
Park Maintenance 193,044 16,087
$1,262,388 $105,199 Total $1,389,840 $115,820
2004 2005 %
Total Equipment Operation Budget $1,388,628 $1,389,840 0.09%
CITY OF EDINA ANNUAL BUDGET PAGE - 104
FUND:
FUNCTION:
AREA:
PROGRAM:
GENERAL
CENTRAL SERVICES
EQUIPMENT OPERATION
1553
SUMMARY OF EXPENDITURES
2002
2003
2004
2005
ACCT. DESCRIPTION
ACTUAL
ACTUAL
ESTIMATED
BUDGETED
ADOPTED
PERSONAL SERVICES:
6010 PAYROLL
$338,184
$333,476
$350,291
$350,291
$327,381
6011 OVERTIME
6,022
4,189
3,162
3,162
3,193
6030 PENSIONS.
633
18,532
19,544
19,544
18,286
6034 SOCIAL SECURITY
888
26,152
27,039
27,039
25,293
6040 FLEX PLAN
1,394
38,598
48,495
48,495
46,020
6045 WORKERS COMPENSATION
273
8,338
9,338
9,338
9,864
347,394
429,285
457,869
457,869
430,037
CONTRACTUAL SERVICES:
6103 PROFESSIONAL SERVICES
38.
0
1,500
1,500
1,500
6160 DATA PROCESSING
5,431
2,827
3,100
3,100
3,200
6180 CONTRACTED REPAIRS
46,483
75,150
76,000
76,000
78,300
6201 LAUNDRY
5,213
6,660
6,600
6,600
6,800
6237 RADIO SERVICE
6,119
2,755
7,500
7,500
7,700
6238 CAR WASHES
7,058
7,389
5,000
5,000
5,200
6260 LICENSE FEES & PERMITS
29,448
41,189
20,600
20,600
21,205
99,790
135,970
120,300
120,300
123,905
COMMODITIES:
6406 GENERAL SUPPLIES
17,110
21,910
23,000
23,000
23,700
6530 REPAIR PARTS
169,733
202,833
195,000
195,000
200,900
6556 REPLACEMENT OF TOOLS
7,836
8,366
9,000
9,000
9,200
6580 WELDING SUPPLIES
5,629
7,813
7,300
7,300
7,500
6581 GAS & FUEL OIL
188,875
211,480
218,000
218,000
224,500
6583 TIRES & TUBES
33,290
40,847
42,000
42,000
43,300
6584 LUBRICANTS
12,025
13,521
14,000
14,000
14,400
6585 ACCESSORIES
45,013
33,731
55,000
55,000
56,700
6610 SAFETY EQUIPMENT
1,827
3,117
4,500
4,500
4,634
481,338
543,618
567,800
567,800
584,834
CENTRAL SERVICES:
6803 GENERAL
113,256
26,282
15,816
15,816
17,136
6806 PUBLIC WORKS BUILDING
191,916
196,740
205,068
205,068
211,500.
305,172
223,022
220,884
220,884
228,636'
EQUIPMENT:
6710 REPLACEMENT
24,379
84,700
21,775
21,775
22,428
TOTAL EQUIPMENT OPERATION
$1,258,073
$1,416,595
$1,388,628
$1,388,628
$1,389,840