Loading...
HomeMy WebLinkAbout2005-04-19_COUNCIL PACKETAGENDA EDINA HOUSING AND REDEVELOPMENT AUTHORITY EDINA CITY COUNCIL APRIL 19, 2005 7:00 P.M. ROLLCALL ADOPTION OF CONSENT AGENDA Adoption of the Consent Agenda is made by the Commissioners as to HRA items and by the Council Members. as to Council items. All agenda items marked with an asterisk ( *) in bold print are Consent Agenda items and are considered routine and will'be enacted by one motion. There will be no separate discussion of such items unless a Commissioner, Council Member or citizen so requests it. In such cases the item will be removed from the Consent Agenda and considered in its normal sequence on the Agenda. I. APPROVAL OF MINUTES OF HRA - Regular Meeting of April 5, 2005 II. CONFIRMATION OF PAYMENT OF CLAIMS - As per Pre -List dated April 6, 2005, TOTAL $1,332.18. III. ADJOURNMENT EDINA CITY COUNCIL RESOLUTION OF COMMENDATION - EDINA HIGH SCHOOL ALPINE SKI TEAM I. APPROVAL OF MINUTES - Regular Meeting of April 5, 2005 and Board of Review of April 11, 2005 II. PUBLIC HEARING ON PROPOSED IMPROVEMENTS - Affidavits of Notice by Clerk. Presentation by Engineer. Public comment heard: Motion to close hearing. If Council wishes to proceed, action by 1 resolution. 3/5 favorable rollcall vote of all members of the Council required to pass if improvement is petitioned for; 4/5 favorable rollcall if no petitions. Rollcall. A. PUBLIC HEARING ROADWAY. RECONSTRUCTION - Schaefer Road - Improvement No. A -216 Rollcall B. PUBLIC HEARING ROADWAY RECONSTRUCTION - Schaefer Circle - Improvement No: A -217 RolicaIl C. PUBLIC HEARING ROADWAY RECONSTRUCTION - West 58th Street Improvement No. BA- 328 Ill. PUBLIC HEARINGS ON VACATIONS OF STREET OR UTILITY AND DRAINAGE EASEMENTS Affidavits of Notice by Clerk. Presentation by Engineer. Public comment heard. Motion to close hearing. If Council wishes to proceed, action by Resolution 3/5 favorable rollcall of Council Members required to pass. A. PUBLIC HEARING - VACATION OF PUBLIC STREET - Pukwana Lane - Continue to 5/3/05 IV. PUBLIC HEARINGS AND. REPORTS ON PLANNING MATTERS - Zoning Ordinances: First Reading requires affirmative rollcall votes of three Council members except that a rezoning from residential to non - residential requires four affirmative votes. Second Reading requires affirmative rollcall votes of three of Council to pass except rezoning from residential to non - residential requires four affirmative votes. Waiver of Second Reading: Affirmative rollcall votes of four members of Council to pass. Final Development Plan Approval of Property Zoned Planned District: Affirmative rollcall vote of three Council members required passing. Conditional Use Permit: Affirmative rollcall vote of three Council members required to pass. Variance Appeal: Favorable rollcall of Council Members present to uphold or deny appeal Rollcall A. PUBLIC HEARING - AMENDMENT TO THE ZONING ORDINANCE AND CONDITIONAL USE PERMIT FINAL APPROVAL - Haugland Companies. 3901 -3907 West 50th Street and 5000- 5020 France Avenue South. Retail and Residential Redevelopment. Agenda /Edina City Council April 19, 2005 Page 2 ' B. PUBLIC HEARING - FINAL REZONING AND FINAL PLAT APPROVAL - Mark Jones/Pukwana Townhomes LLC. 5125 49th Street West. Townhouse Development - Continue to 5/3/05 Rollcall C. PUBLIC HEARING - CONDITIONAL USE PERMIT - City of Edina and Independent School District 273. Edina Community Center and Southview Campus. Generally located east of Hwy 100, west of Concord Avenue and south of Southview Lane. Construction of Gyms. Rollcall D. PUBLIC HEARING - CONDITIONAL USE PERMIT - Good Samaritan Church. 5730 Grove Street. Church Expansion ' E. PUBLIC HEARING - PRELIMINARY PLAT APPROVAL - The Blake School and City of Hopkins. West of Blake Road/North of Belmore Lane - Continued to 5/3/05 V. AWARD OF BID * A. Robotic Total Station Unit (Engineering) * B. Deck Replacement and Expansion - Edina Aquatic Center * C. Theme Wall Addition - Edina Aquatic Center VI. REPORTS/ RECOMMENDATIONS A. PUBLIC HEARING - Temporary On -Sale Liquor License 501h & France Business Association Edina Art Fair * B. Vernon Avenue Watermain Agreement with St. Louis Park C. Park Board Appointment VII. FINANCE * A. CONFIRMATION OF PAYMENT OF CLAIMS As per Pre -List dated April 6, 2005, TOTAL $444,568.06; and April 13, 2005, TOTAL $631,236.46. VIII. COMMUNICATIONS AND PETITIONS * A. RECEIVE PETITION - Requesting Street Lighting at 5900 Vernon Avenue IX. CONCERNS OF RESIDENTS X. INTERGOVERNMENTAL ACTIVITIES XI. SPECIAL CONCERNS OF MAYOR AND COUNCIL XII. MANAGER'S MISCELLANEOUS ITEM SCHEDULE OF UPCOMING MEETINGS Mon Apr 25 Continuation Date Board of Appeals 5:00 P.M. Tues May 3 Regular Meeting 7:00 P.M. Tues May 10 Joint Meeting Council /Plan Comm /Trans Comm 5:00 -8:00 P.M. Tues May 17 PUBLIC WORKS OPEN HOUSE 3:00 -7:30 P.M. Tues May 17 Regular Meeting 7:00 P.M. Mon May 30 MEMORIAL DAY OBSERVED - City Hall Offices Closed Tues Jun 7 Regular Meeting 7:00 P.M. Tues June 21 Regular Meeting 7:00 P.M. Mon July 4 INDEPENDENCE DAY HOLIDAY OBSERVED - City Hall Offices Closed Tues July 5 Regular Meeting 7:00 P.M. Tues July 19 Regular Meeting 7:00 P.M. COUNCIL CHAMBERS COUNCIL CHAMBERS CENTENNIAL LAKE CENTRUD PUBLIC WORKS BUILDINI COUNCIL CHAMBERS COUNCIL CHAMBERS COUNCIL CHAMBERS COUNCIL CHAMBERS COUNCIL CHAMBERS MINUTES OF THE EDINA HOUSING AND REDEVELOPMENT AUTHORITY HELD AT CITY HALL APRIL 5, 2005 7:00 P.M. ROLLCALL Answering rollcall were Commissioners Housh, Masica, Swenson and Mayor Hovland. CONSENT AGENDA APPROVED Motion made by Commissioner Housh and seconded by Commissioner Swenson approving the Consent Agenda for the Edina Housing and Redevelopment Authority as presented. Rollcall: Ayes: Housh, Masica, Swenson, Hovland Motion carried. *MINUTES OF THE REGULAR MEETING OF THE EDINA HOUSING AND REDEVELOPMENT AUTHORITY FOR MARCH 15, 2005, APPROVED Motion made by Commissioner Housh and seconded by Commissioner Swenson approving the Minutes of the regular meeting of the Edina Housing and Redevelopment Authority for March 15, 2005. Motion carried on rollcall vote — four ayes. There being no further business on the Edina Housing and Redevelopment Authority Agenda, Chair Hovland declared the meeting adjourned. Executive Director R55CKREG LOG20000 Check # Date Amount Vendor / Explanation PO # 13946 41712005 100643 BARR ENGINEERING CO. 1,332.18 CONSULTING FEES 1,332.18 CITY OF EDINA Council Check Register 4/7/2005 —417/2005 Doc No Inv No Account No 109127 2327C11Y04 -1 9137.1719 Subledger Account Description PROF FEES ARCH AND ENG 1,332.18 Grand Total Payment Instrument Totals Check Total 1,332.18 Total Payments 1,332.18 41612005 8:33:28 Page - 1 Business Unit HAZARDOUS SUBSTANCE SUBDISTRIC R55CKSUM LOG20000 CITY OF EDINA 4/6/2005 8:33:37 Council Check Summary Page - 1 4/7/2005 417/2006 Company Amount 09000 HRA FUND 1.332.18 Report Totals 1.332.18 We confirm to the best of Our knowledge and belief, that these claims comply in all material respects with the requirements of the City of Edina purchasing E licies and procedures d Finance D or City Manager O e veon 1888 RESOLUTION OF COMMENDATION EDINA HIGH SCHOOL 2005 GIRLS' ALPINE SKI TEAM WHEREAS, the members of the Edina High School 2005 Girls' Alpine Ski Team were Champions of the Classic Lake Conference, Section 6AA Champions and State Champions; and WHEREAS, success has come to the members of the Team because of their extraordinary ability, hours of practice and the leadership of their coaches; and WHEREAS, as representatives of the City of Edina, the members of the Team exemplified the highest standards of athletic proficiency and good sportsmanship; and WHEREAS, this is Edina's 119th State Championship. NOW, THEREFORE, BE IT RESOLVED by the Edina City Council that congratulations be extended to the members of the Team: Mallory Baker Leslie Fox Dave Nelson, Coach Jaci Daudt Patricia Lindholm Sue Nelson, Coach Perrie Finsand Ellie White Sarah Nelson, JV Coach BE IT FURTHER RESOLVED that this resolution be recorded in the Minutes of the Edina City Council and that copies be given to members of the Team. ADOPTED this 19th day of April, 2005. James B. Hovland, Mayor MINUTES OF THE REGULAR MEETING OF THE EDINA CITY COUNCIL HELD AT CITY HALL APRIL 5, 2005 7:00 P.M. ROLLCALL Answering rollcall were Members Housh, Masica, Swenson and Mayor Hovland. CONSENT AGENDA ITEMS APPROVED Motion made by Member Housh and seconded by Member Swenson approving the Council Consent Agenda as presented with the exception of Agenda Item III. D., P90 Carbines, Ammunition and Accessories, Agenda Item E. Commodities Purchase, Sand, Rock, Bituminous Materials, Concrete & Engine Oil, and Water Treatment Chemicals, and Agenda Item F. Valley View Road Lighting - Contract 05 -1, Improvement No. L42. Rollcall: Ayes: Housh, Masica, Swenson, Hovland Motion carried. RECOGNITION OF TDM EFFORTS BY UNITED PROPERTIES AT CENTENNIAL LAKES OFFICE PARK NOTED Melissa Madison, of 494 Commuter Services thanked the City for the great partnership in promoting alternatives to the drive alone commute as well as membership in the 494 Corridor Commission. Mayor Hovland presented an award to United Properties at Centennial Lakes Office Park for its exceptional commitment to reducing traffic congestion by promoting commuting alternatives. In 2004 they won the prestigious "Commuter Choice Award" from the Metropolitan Council for outstanding promotion of reducing drive alone commutes. Dave VanHattam, of 494 Commuter Services, explained the Earth Day, April 22, Commuter Challenge Roundtable which will be held from 7:45 - 9:30 A.M. at the Best Buy Corporate Campus, 7601 Penn Avenue in Richfield. He presented a video suggesting Travel Demand Management via "Van Go ". *MINUTES OF THE REGULAR MEETING OF MARCH 1, 2005, AND MARCH 15, 2005, AND SPECIAL MEETINGS OF MARCH 8, MARCH 14, AND MARCH 15, 2005, APPROVED Motion made by Member Housh and seconded by Member Swenson, approving the Minutes of the Regular Meeting of the Edina City Council for March 1, 2005, and March 15, 2005, and Special Meetings of March 8, March 14, and March 15, 2005. Motion carried on rollcall vote - four ayes. *HEARING DATE OF APRIL 19, 2005, FOR PLANNING MATTERS Motion made by Member Housh and seconded by Member Swenson setting April 18, 2005, for hearing date for planning matters as follows: 1. Amendment to the Zoning Ordinance and Conditional Use Permit Final Approval. Haugland Companies. 3901- 3907 West 50th Street and 5000 - 5020 France Avenue South - Retail and Residential Redevelopment. 2. Preliminary Plat Approval. The Blake School and City of Hopkins. West of Blake Road/North of Belmore Lane. Page 1 Minutes/Edina City. Council/Apri15, 2005 3. Final Rezoning and Final Plat Approval. Mark Jones/Pukwana Townhomes LLC - 5125 49th Street West -. Townhouse Development. 4. Conditional Use Permit - City of Edina and Independent School District 283. Edina Community Center and Southview Campus. Generally located east of Highway 100, west of Concord Avenue and south of Southview Lane Construction of Gyms.. 5. Conditional Use Permit - Good Samaritan Church - 5730 Grove Street - Church Expansion. Motion carried on rollcall vote - four ayes. *RESOLUTION NO. 2005 -27 LOT DIVISION FOR PARTY WALL AT 6016 - 6020 BERNE CIRCLE APPROVED Member Housh introduced the following resolution, seconded by Member Swenson and moved its adoption: RESOLUTION NO. 2005-27 APPROVING A LOT DIVISION FOR 6016 - 6020 BERNE CIRCLE WHEREAS, the following described properties are at present one tract of land: Lot 3, Block 1, DECKAS ADDITION, Hennepin County, Minnesota. WHEREAS, the owner has requested the subdivision of said tract into separate parcels (herein called "parcels "), described as follows: PARCEL 1: Lot 3, Block 1, Hennepin County, Minnesota, lying northerly of the following described line• Commencing at that part of Lot 3 lying Southwesterly of a line described as running from a point in the West line of said Lot'3 distant 107.0 feet North of the Southwest corner thereof, to a point in the Southeasterly line 31.5 feet Northeasterly from the most Southeasterly corner of said Lot 3, as measured along said Southeasterly line all in Block 1, DECKAS ADDITION. PARCEL 2: Lot 3, Block 1, Hennepin County, Minnesota, lying southerly of the following described line: Commencing at that part of Lot 3 lying Southwesterly of a line described as running from a point in the West line of said Lot 3 distant 107.0 feet North of the Southwest corner thereof, to a point in the Southeasterly line 31.5 feet Northeasterly from the most southeasterly corner of said Lot 3 as measured along said Southeasterly line all in Block 1, DECKAS ADDITION. WHEREAS, the requested subdivision is authorized under Code Section 810 and it has been determined that compliance with the Subdivision and Zoning Regulations of the City of Edina will create an unnecessary hardship and said newly created Parcels as separate tracts of land do not interfere with the Subdivision and Zoning Regulations as contained in the Edina City Code Sections 810 and 850; NOW, THEREFORE, it is hereby resolved by the City Council of the City of Edina that the conveyance and ownership of the above described, tracts of land (PARCEL 1 and PARCEL 2) as separate tracts of land are hereby approved and the requirements and provisions of Code Sections 850 and 810 are hereby waived to allow said division and conveyance thereof as Page 2 Minutes/Edina City. Council/April 5, 2005. separate tracts of land but only to the extent permitted under Code Sections 810 and,' 850 subject to the limitations set out in Code Section 850 and said Ordinances are now waived for any other purpose or as to any other provisions thereof, and further'subject, however, to the provision that no further subdivision be made of said Parcels unless made in compliance with the pertinent Ordinances of the City of Edina. Adopted this 5th day of April, 2005. Motion carried on rollcall vote - four ayes. UPDATE GIVEN ON WALLINGFORD PROPERTIES Planner Larsen reminded the Council that a rezoning of the Wallingford Properties at 5101 West 70th Street had been approved on July 20, 2004. This would have allowed development of the site with a 106 -unit development. The plans approved illustrated a 74 -unit rental building and a 32 -unit condominium building. There were two owners of the property Tony and Vasco Bernardi. Mr. Larsen said that Tony planned to build the condos while Vasco's plan was to build the 74 -unit apartment side of the project. Since approval was granted Tony Bernardi has sold his portion of the property and Vasco has, based upon a market study decided that his 74 -unit luxury apartments would not be feasible. Mr. Larsen introduced Vasco Bernardi to make his request of the Council in person. Vasco Bernardi, owner of 5105 West 70th Street requested the Council allow him to redesign the interior of his portion of the building making each unit smaller and increasing the number of units to 84 with at least 20 percent of the units becoming affordable housing. In order to accomplish this Mr. Bernardi explained he would need the City of Edina to assist him with Tax Increment Financing. Mr. Bernardi introduced Wally Johnson of Stonebridge Companies in Apple Valley and Todd Young of KKE Architects who reviewed in detail for the Council the proposal Mr. Bernardi was making. In addition, Dennis Nichols, the purchaser of Tony Bernardi's property, explained his intention for his portion of the property. After discussing with the proponent's alternative proposal the Council declined to take any further action on this property. *BID AWARDED FOR KOTETIN PARK PLAYGROUND EQUIPMENT Motion made by Member Housh and seconded by Member Swenson for award of bid for Playground Equipment for Kojetin Park to recommended low bidder, Koolmo Construction, Inc., at $107,815.00. Motion carried on rollcall vote - four ayes. *BID AWARDED FOR TACOBSEN HR -9016 ROTARY MOWER FOR PARK MAINTENANCE DEPARTMENT Motion made by Member Housh and seconded by Member Swenson for award of bid for a Jacobsen HR -9016 Rotary Mower for the Park Maintenance Department to recommended bidder, Carlson Tractor Company under State Contract #434108 at $52,609.00. Motion carried on rollcall vote - four ayes. *BID AWARDED FOR 3/4 TON PICK -UP TRUCK - FOR PARK MAINTENANCE DEPARTMENT Motion made by Member Housh and seconded by Member Swenson for award of bid for one 3/4 ton pick -up truck for the Park Maintenance Department to recommended_ bidder, Thane Hawkins Polar Chevrolet under State Bid Contract #433478, at $18,404.90. Motion carried on rollcall vote - four ayes. Page 3 E Minutes/Edina City Council/April 5, 2005 AWARD OF BID FOR ELEVEN P -90 CARBINES, AMMUNITION AND ACCESSORIES FOR POLICE DEPARTMENT Member Masica asked that the award of bid for eleven P -90 Carbines, Ammunition and Accessories be removed from the Consent Agenda for further information. She questioned whether the purchase price of the Carbines was covered totally by the private donor. Chief Siitari said yes. Motion made by Member Masica and seconded by Member Swenson for award of bid for eleven P -90 Carbines, Accessories and Ammunition to recommended sole bidder, Streichers Police Equipment at $42,550.00. Ayes: Housh, Masica, Swenson, Hovland Motion carried. BID AWARDED FOR COMMODITIES . - SAND, ROCK, BITUMINOUS MATERIALS, CONCRETE AND ENGINE OIL, AND WATER TREATMENT CHEMICALS Member Masica. asked that the bid award for commodities for sand, rock, bituminous materials, concrete and engine oil and water treatment chemicals be removed from the consent agenda for further information. She questioned why there was an alternate award of bid for asphalt for 2005. Mr. Houle explained asphalt was a hot mix and if the designated bidder was not available when the mix was needed, the alternate bidder was called upon to supply the hot mix asphalt. Member Masica made a motion approving the award of bid for sand, rock, bituminous materials, concrete, engine oil and water treatment chemicals for period April 1, 2005 to March 31, 2006, to recommended bidders as follows: Coarse Sand (delivered) to SA -AG at $6.45 per ton, CL2.Limestone (delivered) to Midwest Asphalt (recycled material) at $10.50 per ton; CL2.Limestone (delivered) (alternate bid) to Bryan Rock (new material) at $11.60 per ton; FA -2 Seal Coat Chips (delivered) to Dresser Trap Rock at $28.80 per ton; *Asphalt 2331 Base Type 31 or 32 (delivered) to Midwest Asphalt at $32.60 per ton or (picked up at plant) to Midwest Asphalt at $27.60 per ton; *Asphalt 2331 Base Type 31 or 32 (alternate bid) to Bituminous Roadways (delivered) at $35.00 per ton or to Bituminous Roadways (picked .up at plant) at $27.50 per ton; *Asphalt 2331 Base Type 41 or 42 (delivered) to Midwest Asphalt at $33.75 per ton or to Midwest Asphalt (picked up at plant) at $28.75 per ton; *Asphalt 2331 Base Type 41 or 42 (alternate bid) to Bituminous Roadways (delivered) at $37.00 per ton or Bituminous Roadways (picked up at plant) at $29.50 per ton; *Asphalt 2331 Wear Type 41 or 42 to Midwest Asphalt (delivered) at $32.75 per ton or Midwest Asphalt (picked up at plant) at $27.75 per ton; *Asphalt 2331 Wear type 41 or 42 (delivered) to Bituminous Roadways at $35.50; *Asphalt 2331 Wear Type 41 or 42 (picked up at plant) to Bituminous Roadways at $28.00, *Asphalt 2331 Wear Type 31 or 32 (delivered) to Midwest Asphalt at $33.50 per ton or to Midwest Asphalt (picked up at Plant) $28.50 per ton; *Asphalt 2331 Wear Type 31 or 32 (alternate bid) to Bituminous Roadways (delivered) at $37.00 per ton and to Bituminous Roadways (picked up at plant) at $29.50 per ton; Asphalt 2360 to Midwest Asphalt (delivered) at $33.75 per ton or to Midwest Asphalt (picked up at plant) at $28.75 per ton; Asphalt 2360 (alternate bid) to Commercial Asphalt (picked up at plant) at $33.40 per ton; Concrete 3+ yards (delivered) to Agg. IndAagan at $80.65 CY, Emulsified Asphalt CRS2 to Marathon Ashland at 0.7390 per gallon; Emulsified Tack Oil to Bituminous Roadways at $26.00 per gallon; Crack Joint Sealer to Bargen at $0.332 per pound; Hydrofluosilicic Acid to DPC Industries at $9.03 per 55 gallon drum, Hydrofluosilicic Acid to DPC Industries at $9.03 per 140 gallon drum, Liquid Chlorine to DPC Industries at $36.20 CWT; Water Treatment Chemical (Poly) to DPC Industries at $4.35 per gallon; Caustic Soda to DPC Industries at $28.06 per CWT; Manhole Covers (complete casting) to Ess Brothers & Sons, Inc. at $764.00 each; Red Ball Aggregate to Bryan Rock at $15.72 per ton; Lannon Stone Wall Repair to Bjork Stone at $16.25 per SF. Page 4 Minutes/Edina Ci!y Council/April 5, 2005. ( *These items are awarded on basis of total cost per ton including trucking and labor, and past year's performance.) Member Housh seconded the motion Ayes: Housh, Masica, Swenson, Hovland Motion carried. AWARD OF BID FOR VALLEY VIEW ROAD LIGHTING - CONTRACT 05 -1, IMPROVEMENT NO. L-42 Member Masica asked that the award of bid for Valley View Road Lighting be removed from the Consent Agenda for further information. She asked about the funding of the Valley View. Road lighting Contract 05 -01 (Improvement No. L042). Mr. Houle responded that funding was between Municipal Sate Aid System funds and special assessments. Member Masica made a motion approving the award of bid for the Valley View Road Lighting, Contract 05 -1, Improvement No. L-42 to recommended low bidder LPD Electric, Inc., at $97,160.00. Ayes: Housh, Masica, Swenson, Hovland Motion carried. TRANSPORTATION COMMISSION TRAFFIC POLICY ADOPTED Assistant City Engineer Lillehaug reminded the Council that a public hearing was held on March 1, 2005, to take public comment on the final draft of the Transportation Commission Policy. Following the public hearing two work sessions were held with the City Council and the Transportation Commission and a revised version of the final draft has been completed. Council Comments: Member Masica asked for clarification of the role of the Traffic Safety Committee as opposed to the Transportation Commission within the process. She further inquired if residents can still make requests through the Traffic Safety Committee. Traffic Engineer Lillehaug said two processes exist; 1) Traffic Safety honors requests for signs, etc. and of which staff follows strict guideline warrant analysis, and 2) Traffic calming requests would be considered by the Transportation Commission. Residents should be made aware that to avoid any confusion, requests should begin with staff or the engineering department. Member Masica questioned whether 'parking' and 'pedestrian/ bicycle' policies now located in two sections could be integrated. Mr. Hughes responded that the guidance from the workshop was the Transportation plan quoted verbatim. Member Housh pointed out the statement (page 4), 'In addition to the policies contained in the Transportation Plan, the Edina Transportation Commission has adopted the following policies:' He added that the Comprehensive Plan was being maintained with the additional comments augmenting the plan. Member Swenson said in order. to keep the plans separate, the Council made the decision to do it in this manner. Mayor Hovland said a method of integration to simplify the ability to use the policy should be sought. Council consensus was to Bold the introductory statement of the policy section. Ms. Masica questioned whether #6 on page 3 (Providing access .......... rather than the existing access at the sites) meant to change classifications to suit re- development. Mr. Lillehaug said it addresses safety issues with access to a site which follows MnDOT "s guidelines regarding access control. Ms. Masica questioned #8 on Page 5 and asked if a strategy had been developed for structuring. Mr. Lillehaug responded presently the Planning Commission reviews any land use changes and it has not been decided how to include the Transportation Commission in initiating the review process for land use changes. Mayor Hovland suggested a change on page 5 #8 to Page 5. Minutes/Edina City Council/April 5, 2005. read, "When requested by the Planning Commission, review land use that 'nay impact traffic implementations. Continue to monitor adjacent community redevelopment and other activity that potentially impacts the City of Edina ". Member Masica questioned why the Action Plan on page #6 was still in the document. Mr. Lillehaug said it was important for the Action Plan to remain in the document presently. Member Masica made a correction in paragraph 6, that should read, "Steps (c) through (e) ". Mayor Hovland noted typographical errors in the document that required changes. Joni Kelly - Bennett, voiced concern and noted a clarification on page A -2, adding in the Impacted Area portion, the words ......... and businesses" along local, etc. Member Housh complimented the finished produce and said the long, arduous process has produced a viable, working document. Member Masica said the policy was a good, solid starting point. She thanked the Commission for their tireless effort Mayor Hovland said he believes a collective effort brings forth a better product.and he voiced his ,pleasure with the product. Member Housh made a motion adopting the City of Edina Transportation Commission Policy dated April 2005, as amended. Member Masica seconded the motion. Ayes: Housh, Masica, Swenson, Hovland Motion carried. *RESOLUTION NO. 2005 -23 ADOPTED APPOINTING CHERYL L. ENGELMAN AND GORDON HUGHES AS AGENTS OF THE COMMUNITY HEALTH BOARD Member Housh introduced the following resolution seconded by Member Swenson and moved its adoption: RESOLUTION NO. 2005-23 APPROVING APPOINTMENT OF CHERYL L. ENGELMAN AND GORDON HUGHES AS AGENTS OF THE COMMUNITY HEALTH BOARD BE IT RESOLVED by the City Council (Community Health Board) of the City of Edina, Minnesota, pursuant to its authority under Minnesota Statutes, Chapter 145A, that it hereby appoints and authorizes the following persons to act on the Boards behalf and bind the Board for the following purposes: To serve as the Board's agent in communicating with the Commissioner of Health between Board meetings, including receiving 'information from the Commissioner and disseminating that information to the Board, as well as providing information to the Commissioner on the Board's behalf (Minn. Stat.145A.04, Subd. 2). NAME: Cheryl L. Engelman ADDRESS: 4801 West 50th Street Edina, MN 55424 -1394 PHONE: 952- 826 -0464 FAX: 952 - 826 -0390 Page 6 Minutes/Edina City. Council/April 5, 2005 To sign and submit, to the Commissioner the prepared Community Health Plan and revisions to the plan, and activity reports submitted according to Minn. Stat.145A -10, Subd'. 5, 6, and 8: NAME: Cheryl L. Engelman To sign and submit to the Commissioner the Board's annual budget, revisions to the budget and expenditure reports submitted according to Minn. Stat 145..A.10, Subd. 6 and 8. NAME: Cheryl L. Engelman To sign and submit on behalf of the Board, delegation agreements with the Commissioner of Health according to Minn. Stat.145A.07, Subd.1. NAME: Gordon L. Hughes ADDRESS: 4801 West 50th Street Edina, MN 55424 -1394 PHONE: 952 - 826 -0401 FAX: 952- 826 -0390 Adopted this 5th day of April 2005. Motion carried on rollcall vote - four ayes. BOARDS /COMMISSIONS /COMMITTEES TERM LIMITS ADOPTED Manager Hughes indicated that a report on the appointment dates for existing members of the City's Boards, Commissions and Committees as requested by the Council had been provided in the packet. Member Swenson said she computed the average term limits for each Board, Commission and Committee with a resulting average of 9.3 years of service. She inquired about the lengthy terms for members of the Construction Board of Appeals. Mr. Hughes responded that they meet very, infrequently and members have a background in the construction. trades. Member Swenson noted that terms on the Park Board were questioned but the computed average was at 4.0 years of service. She suggested if Boards have a turnover of members the Chair of the Board should also be changed. Member Masica made suggestions as follows: 1. Term limits set for six years with a one year. moratorium before having the ability to re- apply; 2. Members limited to one board /commission /committee membership; 3. Term limits may be extended if no qualified applicant applies; 4. Terms must be staggered; and 5. Term for Chair set at one term or three years. Member Masica suggested if it was a requirement of a board that a member of another board serve on the board, that term limit would not be taken into consideration. Member Housh suggested that term limits be set for nine years rather than six, allowing more of a chance to serve as Chair after learning about the board /commission /committee. Member Swenson concurred with term limits being set at nine years. She added that rules should not be changed for individual members. Member Housh said in order to implement the policy, members who have served nine years could be asked to not seek re- appointment or the process could be started now. Page 7 L Minutes/Edina City Council/April 5, 2005. Member Swenson suggested the Chair of a respective board /commission /committee be appointed for one term. Mr. Hughes noted that currently members are serving staggered terms. If a member's term were at nine years or over they would serve until the end of their current term. Mary Jo Strom, 4520 Andover Road, suggested that the terms be limited to six years with the expectation that they would be up to speed on the board /commission /committee within six months. Member Housh noted personally that he, while serving on the Park Board and currently on the Council, has found that six months was not adequate to "get up to speed ". He added that serving a full calendar year was what was most beneficial with a learning curve. Former Mayor Van Valkenburg indicated that acquiring replacements on the Art Center . Board was not simple. He suggested examining the function of the boards/ commissions/ committees and considers the advice of 'seasoned' members over the newly appointed ones. Mr. Van Valkenburg said he does not favor term limits. . Chris Rofidal, 5037 West 56th Street, said he would support term limits of either six or nine years. He stated he has applied to serve on a board /commission /committee and believes new members keep up the viability of the boards. Martha Rice, 4501 Lakeview ' Drive, said that experience was valued but new vitality was extremely important on the boards. Following a Council discussion, Member Masica made a motion approving term limits on City Boards /Commissions/Committees as follows; 1. Term limits would be nine years with one intervening year before a person was eligible for reappointment; 2. An individual who now exceeds the term limit may finish their current term but are not eligible for reappointment; 3. One membership per person except for mandated cross representation; 4. Council may waive the term if no new qualified individual has applied; and 5. Recommendation to each Board/Commission/Committee that no one individual serve more than three consecutive years as chair. Member Housh seconded the motion. Ayes: Housh, Masica, Swenson, Hovland Motion carried. GUIDELINES FOR PUBLIC HEARINGS ADOPTED Mr. Hughes reminded the Council that he had been directed to prepare background information about establishing more formal procedures for public hearings. A thorough review of this topic was recently undertaken by the City of Eden Prairie. Minnesota cities as well as jurisdictions outside of the state were included in the survey. Although the Edina City Council has not adopted formal written policies concerning hearings, informal guidelines are included in the Welcome to a Meeting of the Edina City Council" brochure, which was provided to meeting attendees. The brochure includes the following guidelines: Page 8 Minutes/Edina City Council/April 5, 2005 • You may speak at hearings provided your comments are relevant to the discussion. • When addressing the Council, stand at the podium and begin your presentation by stating your name and address. • Present petitions, letters or printed material to the . Clerk prior to beginning your presentation. • Please refrain from applause or other unnecessary disturbances. • After all have spoken, the Council will close the hearing. Three things that were commonly used by other jurisdictions include: 1. A time limit for speakers, which may be extended if an individual was speaking on behalf of a group whose individual members will not be testifying 2. No individual. may speak a second time until everyone has had an opportunity to speak for the first time, and 3. "Encouragement" that individuals refrain from, unduly repeating previous testimony by. others, Based on Eden Prairie's research, the most common rule imposed by other jurisdictions was a time limit for speakers. Some jurisdictions, such as the Edina Public Schools, ask that individuals sign up in .advance if they wish to address the Council or Board. Mr. Hughes said it would be appropriate for the Council to discuss protocols with respect to the "Concerns of Residents" portion of the agenda. Some individuals have used this portion of the agenda to conduct a de facto public hearing on a particular issue. Some cities have successfully adopted a more -informal approach to receiving resident concerns. Under such a system, "Concerns of Residents' would be removed from the agenda and would be considered by the Council prior to the start of the regular, televised meeting, maybe at 6:30 P.M. Residents wishing to bring a concern to the Council would sign up in advance if possible. Residents would be given a limited period of time to present their issue. "Concerns of Residents" would end promptly at 7:00 P.M. with. the start of the regular Council meeting. Mayor Hovland suggested "Guidelines" for participation in public hearings as follows: • It was suggested a speaker should limit their presentation to five (5) minutes or less; and • It was suggested a speaker on behalf of a group should limit their presentation to ten (10) minutes or less. The Mayor or presiding officer may have the discretion to modify presentation times. if a resident wishes to speak they should: • Present petitions, letters or printed material to the Clerk prior to the beginning of their presentation; • Stand at the podium and being the presentation stating their name/ address; • Direct presentation to whole Council; • Try not to repeat remarks or points of view made by prior speakers; • Limit comments to the topic under consideration; and • Allow all speakers a chance to be heard before speaking a second time. Residents in the audience at a public hearing should: • Avoid signs, clapping, cheering, booing or any other form of verbal or non - verbal communication are not allowed in order to maintain a comfortable environment; and • Avoid comment during Council or Board deliberations unless requested by the Mayor or presiding officer asking for more information. Page 9 Minutes/Edina City. Council/April 5, 2005 Following a Council discussion, Member Housh made a motion approving the Public Hearing Guidelines as presented and modified. Member Masica seconded the motion. Ayes: Housh, Masica, Swenson, Hovland Motion carried. CONCERNS OF RESIDENTS Mayor Hovland inquired whether the Council would consider an one /half hour session at 6:30 PM prior to the regularly scheduled Council meetings for residents to voice concerns. Following a brief discussion, Council consensus was to maintain the meeting agenda as usual with "Concerns of Residents" in its designated location and allowing residents a televised forum before the Council. No formal Council action was taken. *DATE SET OF TULY 12, 2005, FOR 40TH ANNUAL BRAEMAR INSPECTION TOUR Motion made by Member Housh and seconded. by Member Swenson approving July 12, 2005, as the date for the 401i Annual Braemar Inspection Tour. . Motion carried on rollcall vote - four ayes. IKASU SUSHI BAR AND LOUNGE - ON SALE AND SUNDAY SALE INTOXICATING LIQUOR LICENSES APPROVED. Mr. Hughes explained. Yang Companies LLC, 'dba /Ekasu Sushi Bar and Lounge applied for their liquor license on March 25, 2005. All necessary applications were filed and applicable fees paid. Staff and Chief Siitari have completed their review. Staff notified the management that their license expired on March 31, and currently they are not serving liquor until the Council approves their renewal application. Staff recommends approval of the licenses and will submit necessary documentation. to the State on behalf of Ikasu. Member Masica asked for background on the February 2005 incident where underage consumption was noted. Mr. Siitari indicated a walk -thru was done by the Police Department with the discovery of three underage drinkers. They .were charged, as well as the owner who attempted to obstruct the legal process. He noted that one - incident does not indicate non - renewal of the license. Mr. Yang, co -owner of Ikasu, elaborated that his brother thought the walk -thru by the Police was more extensive than he believed necessary and therefore he became involved. Member Swenson made a motion approving the On -Sale Intoxicating and Sunday Sale Liquor License renewals for Ikasu Sushi Bar and Lounge. Member Housh seconded the motion. Ayes: Housh, Masica, Swenson, Hovland Motion carried. IKASU SUSHI BAR AND LOUNGE - DANCE PERMIT APPROVED Chief Siitari indicated that Ikasu Sushi Bar and Lounge has held a dance permit since September 2003. They have applied for a renewal of the permit. The City has received no problems related to the dance. The application requests a permit for Monday through Sunday, 9:00 PM to 1:00 AM that was different from their original request of 10:00 PM to 1:00 AM. Ikasu has held only a few dances within the last year. Mr. Siitari recommended approval of the permit conditioned upon security personnel, approved by the Chief of Police, must be on duty when Ikasu operates as a dance club. This condition was authorized by City Code Section 200.06, Police Protection. Page 10 Minutes/Edina City. Council/April 5, 2005 Member Housh made a motion to renew the Ikasu Sushi Bar and Lounge Public Dance Permit for one year conditioned upon security personnel approved by the Chief of Police, being on duty when Ikasu operates a dance club. Member Swenson seconded the motion. Ayes: Housh, Masica, Swenson, Hovland Motion carried. *REPLACEMENT WETLANDS DECLARATION APPROVED FOR BRAEMAR GOLF COURSE 17TH TEE Motion made by Member Housh and seconded by Member Swenson approving the Replacement Wetlands Declaration Agreement, Consent to Replacement Wetland, and Affidavit of Landowner as required by the Minnesota Wetland Conservation Act of 1991 and directed by the Nine Mile Creek Watershed District, % Barr Engineering Company. Motion carried on rollcall vote - four ayes. *RESOLUTION NO. 2005 -25 - RECEIVING FEASIBILITY REPORTS: ROADWAY IMPROVEMENT PROJECTS: NO. A -216 - SCHAEFER ROAD; NO.A -217 - SCHAEFER CIRCLE; NO. BA -328 - WEST 58TH STREET APPROVED Member Housh introduced the following resolution, seconded by Member Swenson and moved approval: RESOLUTION NO. 2005-25 ACCEPTING FEASIBILITY REPORTS FOR SCHAEFER ROAD IMPROVEMENT NO. A -216, SCHAEFER CIRCLE IMPROVEMENT NO. A -217 AND WEST 58TH STREET IMPROVEMENT NO. BA -328 WHEREAS, it is proposed to improve the .Schaefer Road, Schaefer Circle, West 58th Street neighborhood streets and to assess the benefited properties for all or a portion of the cost of said Improvements No. A -216, A -217, and BA -328 pursuant to Minnesota Statute's, Chapter 429; and WHEREAS, the Edina City Engineer has prepared a feasibility report for Schaefer Road - A- 216, Schaefer Circle - A -217, and West 58s' Street - BA -328; WHEREAS, the reports provide information regarding whether proposed projects are cost effective and feasible. NOW, THEREFORE, BE IT RESOLVED that the Edina City Council hereby receives the feasibility reports for Improvements No. A -216, A -217, and BA -328. Passed and adopted this 5th day of April 2005. Motion carried on rollcall vote - four ayes. *RESOLUTION NO 2005 -26 - SETTING HEARING DATE OF MAY 3,_2005, FOR ROADWAY IMPROVEMENT PROTECTS: NO BA -312 - BRIDGE LANE AND TOWNES ROAD; AND NO. BA -329 - SHANNON DRIVE Motion made by Member Housh and seconded by Member Swenson introducing Resolution No. 2005 -26 and moving its approval: RESOLUTION NO. 2005-26 SET PUBLIC HEARING DATE OF MAY 3, 2005, FOR ROADWAY IMPROVEMENT NO. BA -312 BRIDGE LANE AND TOWNES ROAD AND ROADWAY IMPROVEMENT NO. BA -329 SHANNON DRIVE NOW, THEREFORE, BE IT RESOLVED BY THE- CITY COUNCIL OF EDINA, MINNESOTA, that a public hearing shall be held on the 3rd day of May, 2005, in the Council Chambers at City Hall at 7:00 P.M. to consider Improvement No. BA -312 for roadway Page 11 Minutes/Edina City Council/April 5, 2005 improvements consisting of Bridge Lane west of Townes Road and Townes Road between West 481h Street and Bridge Lane and Improvement No. BA -329 consisting of Shannon Drive between Dewey Hill Road and Kemrich Drive. BE IT FURTHER RESOLVED that the City Clerk shall give mailed and published notice of such hearing and improvements as required by law. Adopted this 5th day of April 2005. Motion carried on rollcall vote - four ayes. *CONFIRMATION OF CLAIMS PAID Member Housh made a motion and Member Swenson seconded the motion approving payment of the following claims as shown in detail on the Check Register dated March 16, 2005, and consisting of 25 pages: General Fund $210,150.93; Communications Fund $6,394.75; Working Capital. Fund $15,324.39, Construction Fund $23,102.23, Art Center Fund $29.95; Golf Dome Fund $2,596.20, Aquatic Center Fund $199.41; Golf Course Fund $15,843.22, Ice Arena Fund $3,945.51; Edinborough/Centennial Lakes Fund $7,158.85; Liquor Fund $152,158.18; Utility Fund $100,474.38; Storm Sewer Fund $8,280.68; Recycling Fund $405.00; PSTF Fund $31,566.10; TOTAL $577,629.78; and for approval of payment of claims dated March 23; 2005, and consisting of 33 pages: General Fund $1,025,049.07; Communications Fund $7,404.54; Working Capital Fund $121,936.95; Art Center Fund $24,916.74; Golf Dome Fund $1,193.52; Aquatic Center Fund $199.41; Golf Course Fund $31,424.25; Ice Arena Fund $361.89; Edinborough/Centennial Lakes Fund $8,599.29, Liquor Fund $114,796.71; Utility Fund $316,966.84; PSTF Agency Fund $93.04; TOTAL $1,652,942.25 and for approval of payment of claims dated March 30, 2005, and consisting of 27 pages: General Fund $525,649.19; Communications Fund $12,538.98; Working Capital Fund $3,842.56; Art Center Fund $5,973.47; Golf Dome Fund $10,227.79; Aquatic Center Fund $223.77; Golf Course Fund $24,093.23; Ice Arena Fund $3,660.04; Edinborough/Centennial Lakes Fund $14,731.22; Liquor Fund $128,062.03; Utility Fund $22,164.42; Storm Sewer Fund $1,978.17; Recycling Fund $20.23, PSTF Agency Fund $4,196.68; TOTAL $757,361.78. Motion carried on rollcall vote - four ayes. RESOLUTION NO. 2005 -24 APPROVING ISSUANCE OF REVENUE BONDS BY CITY OF MINNEAPOLIS ON BEHALF OF FAIRVIEW HEALTH SERVICES Attorney Gilligan indicated a proposal from Fairview Health Services ("Fairview") has been received requesting the City to consent to the issuance by the City of Minneapolis of tax- exempt revenue-bonds under Minnesota Statutes, Section 469.152 to 469.165 to finance a remodeling project at Fairview Southdale Hospital and to refund bonds previously issued by the Minnesota Agricultural and Economic Development Board in 1997 and 2000, a portion of proceeds of which financed improvements at Fairview Southdale. Following a public hearing, he recommended the council approve the issuance of the bonds by the City of Minneapolis and issue a resolution approving the issuance of the bonds by the City of Minneapolis. Member Housh inquired whether he should recuse himself from the discussion and final motion because he serves as a volunteer on the Board of Directors of Fairview Southdale. Attorney Gilligan advised Mr. Housh he had no conflict and could fully participate in the discussion and voting. Member Masica asked what was the total dollar amount of the bond issue. Mr. Gilligan responded it was approximately $490 million of all the Fairview bonds from Minneapolis. The Edina portion for remodeling would be approximately $35 million with the refunding portion at Page 12 Minutes/Edina City Council/April 5, 2005. approximately $20. or $25 million. Proposed projects are for Fairview Hospitals in Red Wing, Hibbing, Princeton and Wyoming and Minneapolis. Brent William, Vice President of Finance for Fairview Southdale Hospital, said the main use of the funding for Fairview Southdale would be to update /upgrade peri- operative services as well as to acquire 32 additional beds. No changes will be apparent on the building exterior. Member Swenson made a motion closing the public hearing, seconded by Member Masica. Rollcall: Ayes: Housh, Masica, Swenson, Hovland Motion carried. Member Masica introduced the following resolution and moved its approval: RESOLUTON NO. 2005-24 APPROVING THE ISSUANCE OF BONDS BY THE CITY OF MINNEAPOLIS ON BEHALF OF FAIRVIEW HEALTH SERVICES UNDER THE MINNESOTA STATUTES,. SECTIONS 469.152 TO 469.165 BE IT RESOLVED by the City Council of the City of Edina, Minnesota (the "City of Edina "), as follows: SECTION 1 Recitals and Findings 1.1. This Council has received a proposal from. Fairview Health Services, a Minnesota nonprofit corporation ( "Fairview "), that the City of Edina authorize the City of Minneapolis, Minnesota (the "City of Minneapolis ") to issue bonds under Minnesota Statutes, Sections 469.152 through 469.165 (the "Act ") to finance the remodeling of portions of Fairview Southdale Hospital in the City, and the acquisition and installation of. items of equipment therein (the "Project "), and to refund the Health Care System Revenue Bonds, Series 1997 (Fairview Hospital and Healthcare Services) and the Health Care System Revenue Bonds, Series 2000A (Fairview Health Services) of the Minnesota Agricultural and Economic Development Board (the "Refunding "), a portion of the proceeds of which were used finance improvements to Fairview Southdale Hospital and the acquisition and installation of items of equipment therein. 1.2. At a public hearing held on April 5, 2005, all parties who appeared at the hearing were given an opportunity to express their views with respect to the proposal to finance the Project and provide for the Refunding through the issuance of revenue bonds under the Act by the City of Minneapolis and interested persons were given the opportunity to submit written comments to the City Clerk before the time of the hearing. SECTION 2 Approvals 2.1. The issuance of bonds by the City of Minneapolis, pursuant to the Act to finance the Project and provide fro the Refunding, is hereby consented to and approved. The terms of the bonds shall be as are approved by the Minneapolis City Council. 2.2. The Mayor and City Manager and other officers of the City of Edina are authorized and directed to furnish to Fairview, the City of Minneapolis and the attorneys rendering an opinion on the issuance of the bonds, certified copies of all proceedings and records of the City of Edina relating to the bonds and such other affidavits and certificates as may be required to show the facts relating to the legality and marketability of the bonds as such facts appear from the books and records in the officer's custody and control or as otherwise known to them; and all such certified copies, certificates and affidavits, including Page 13 Minutes/Edina Cam. Council/April 5, 2005. any heretofore furnished, shall constitute representations of the City of Edina as to the truth of all statements contained therein. Adopted this 5th day of April, 2005. Member Swenson seconded the motion. Rollcall: Ayes: Housh, Masica, Swenson, Hovland Motion carried. There being no further business on the Council Agenda, Mayor Hovland declared the meeting adjourned at 10:55 P.M. City Clerk Page 14 )r MINUTES OF THE MEETING OF THE EDINA BOARD OF REVIEW HELD AT CITY HALL APRIL 11, 2005, AT 5:00 P.M. ROLLCALL Answering rollcall were Members Housh, Hulbert, Masica, Swenson, and Mayor Hovland. The meeting was convened pursuant to published Notice of Board of Review in the Edina Sun - Current and notice posted on City bulletin boards for the purpose of hearing those persons who considered themselves aggrieved by their property valuation for assessment purposes, or who were requesting homestead classification. Mayor Hovland stated no decision would be made at this meeting, but would take place at the continuation meeting of the Board on April 25, 2005. He added that property owners would be notified of the Board's decision within twenty days. Further appeal may be made to the Hennepin 'County Board of Equalization beginning June 13, 2005. The following property owners appeared personally or were represented before the Board to object to the Assessor's estimated market value as of January 2, 2005: Name Address PID Number 2005 Original Est. Owners' Requested Value Market Value Mark & Usha Abramovitz 6804 Brook Drive 05- 116 -21-44 - 0041 $452,800 $415,470 Richard N & Laura B Kuyath 6103 Jeffrey Lane 32- 117- 21 -23- 003 $473,500 $400,000 The Council heard the owners present their reasons for requesting reductions and in some cases, asked questions clarifying issues. The owners of the following properties submitted applications or letters objecting to their market value and requested the Board's review, however, the owners did not appear personally: Name Address PID Number 2005 Original Est, Owners' Requested Value Market Value Marie M Anderegg 5848 Creek Valley Road 05- 116- 21 -24- 0004 $406,800 $365,000 Joan McMillan 7601 Edinborough Way # 6105 32- 028 -24-34 -0706 $178,000 $100,000 Cheryl & Christopher Pedrohe 6307 Colonial Court 05- 116 -21 -11 -0100 $397,800 Not specified Richard & Kathy Elkin 421 Tyler Ave 30- 117 -21 -12 -0079 $286,400 $250,000 - $265,000 Bruce D & Susan Lee McCarthy 6708 Point Drive 30- 028 -24-42 -0024 $807,800 $742,000 Bradley Bakke Apartment Prop 5400 West 77th St 08- 116 -21 -11 -0018 $1,835,500 Not specified Bradley Bakke Apartment Prop 4301 Valley View Road 30- 028 -24 -12 -0063 $557,800 Not specified Minutes/Edina Board of Review /April 11, 2005 Bradley Bakke Apartment Prop 5330 France Ave S 18- 028 -24 -44 -0113 $959,300 Not specified Jim Maciej Industrial Prop ain Street Partners, LLP 444 West 76th St 31- 028 -24-41 -0008 $1,689,000 $1,225,000 Ray & Patricia DeMont 7400 Edinborough Way #5308 32- 028 -24 -32 -0474 $313,400 $293,600 Cathy McKay 5615 Schaefer Road 31- 117 -21 -14 -0037 $1,010,800 Not specified Virginia S Thomas 6228 Parkwood Road 31- 117 -21 -11 -0001 $698,500 Not specified Mayor Hovland made a motion closing the public hearing for the 2003 Edina Board of Review and recessing the Board of Review until April 25, 2005 at 5:00 p.m. in the Edina City Council Chambers. Member Housh seconded the motion. Ayes: Housh, Hulbert, Masica, Swenson, Hovland Motion carried. City Clerk REPORT /RECOMMENDATION TO: Mayor & City Council Agenda Item # II. A. From: Wayne D. Houle, PE - Consent ❑. City Engineer Information Only ❑ Date: April 19, 2005 Mgr. Recommends ❑ To HRA ® To Council Subject: Public Hearing for Schaefer Action ® Motion Road— Roadway ® Resolution improvement No. A -216 ❑ Ordinance 1-1 Discussion Recommendation: If the Council determines the project to be warranted and necessary, Council shall adopt a resolution approving Schaefer Road Roadway Improvements, City Improvement No. A -216, authorize plans and specifications to be completed and bids taken. This project will require a 4/5 favorable vote from the Council to move the project forward. Info /Background: This project was initiated by staff from a resident request to address ongoing drainage problems along the roadway. Staff expanded the project to include reconstructing the roadway after reviewing the pavement condition. The existing storm sewer at Harold Woods Lane will be extended to the south .to accommodate the many sump pumps that are currently draining along this roadway. No concrete curb and gutter is proposed along this roadway. The estimated roadway construction cost is $188,000. This cost does not include costs for the storm sewer or other City utility repairs; staff is analyzing these repairs and will include them with final plans; funding for these repairs will be funded through the respective utility funds. Funding for the roadway will be from a special assessment of approximately $9,400 per residential equivalent unit (REU). The Feasibility Study is included with this report, along with all correspondence received to date. Staff analyzed the project and feels that the project is feasible from an engineering standpoint. GAEngineering \Improvements\A216 Schaefer Road \CORRESPONDENCE \Misc \RRpublic hearing - A216.doc 4291N�,1 o� e FEASIBILITY STUDY — A216 J .ay ENGINEERING DEPARTMENT • "UnUa �• CITY OF EDINA STREET AND UTILITY IMPROVEMENTS SCHAEFER ROAD MARCH 31, 2005 LOCATION: The Schaefer Road project extends from Interlachen Boulevard to Westwood Court (see Figure 1). 35 4900 4901 4920 .21 4904 6516 4905 4924 25 6408 6400 6520 4928 :41729 6424 4.909 IN TERLACNEN 13j -Yg__ 6308 6304 8300 cy, 6228 !�- 8224 6328 8212 6320 5004 6201 6321 5011 5017 5012 - . .u.. Project 5021 Boundary 5r.o „09 5021 5025 5101 5025 5020 6519 6501 6401 5224 6413 8409 6405 3 3009 5117 5116 5125 5004 5012 � .5013 5201 6220 6212 6208 5016 5021 5008 5020 6200 6404 5216 0025 5012 5100 WO 5321 5311 6501HAROLD 6313 16 6405 5106 5016 109 5112 5116 5117 5120 5125 5152 5200 5201 5204 5200 5200 5204 5210 5205 _ 5212 5209 5211 15 5216 5215 ,224 11 5215 5220 5219 P 23 5219 5224 _ 5223 6227 5231 5228 5304 5305 6404 6400 5227 5308 5309 5234 5238 5301 6401 6605 6416 6412 X5 00 6424 6420 6308 6304 8300 cy, 6228 !�- 8224 6328 8212 6320 5004 6201 6321 5011 5017 5012 - . .u.. Project 5021 Boundary 5r.o „09 5021 5025 5101 5025 5020 5225 5224 5It3 5100 5224 5017 5020 5111v 5024 511 1 _ 5117 5116 5125 5124 • 5200 j 5201 6220 6212 6208 5204 ESTW000 C T i 6204 5209 6231 6200 5217 6229 6225 6221 6217 6215 6209 5216 5220 5225 5224 5221 5224 5228 5225 6300 6304 6308 • 5300 5304 ESTW000 C T 5301 5308 6312 6301 5304 5331 5321 5311 5316 6313 16 5 &109 5312 53 —..._ �. 6320 5320 5324 Figure 1. Protect Area Map Feasibility Study Schaefer Road Imp. No. A -216 March 31, 2005 INITIATION & ISSUES: The Schaefer Road project was initiated partially by a resident request to address drainage problems along the roadway. The Engineering Department expanded this area and included the neighborhood as outlined in Figure 1 as part of the City's planning process to update the infrastructure within this neighborhood. The following are existing features that present issues in determining the feasibility of the project and are addressed in this report: • Surface rainwater drainage issues • Poor condition of existing pavement • Existing landscaping, retaining walls, driveways, etc. • Existing mature trees EXISTING CONDITIONS: The roadway in this neighborhood was previously re- constructed in the early 1970's and the utilities (sanitary sewer, storm sewer and watermain) were installed ranging from 1965 to 1993. The roadway width along Schaefer Road varies from 27 -ft to 30 -ft with no curb and gutter and no sidewalks. The pavement on Schaefer Road is in generally poor condition with very poor conditions experienced along the edge of the roadways in many locations (see Photo 1). The pavement throughout this neighborhood appears to be approaching the end of its useful life while the costs to maintain and repair the roadways are steadily increasing. Photo 1. Existing Pavement Condition & Drainage Issues Page 2 of 6 Feasibility Study Schaefer Road Imp. No. A -216 March 31, 2005 Schaefer Road generally consists of rolling terrain varying from 0.5% to 5.3% slopes. There is some existing storm sewer in the area, but overall the surface drainage is relatively poor with erosion problems along the edge of the roadway in certain areas. The roadway remains in a wet condition most of the summer due to the amount of sump pump discharge onto the roadway. Watermain /water service breaks and sanitary sewer blockage occurrences have been reported as minimal in this area. The private utilities in this neighborhood are located both overhead and underground. Street lighting consists of standard "cobra head" lights mounted on wood poles that are located intermittently along Schaefer Road. PROPOSED IMPROVEMENTS: This project involves reconstructing the existing bituminous pavement and base, replacing fire hydrants, and extending the storm sewer to accommodate new sump pump drain tile where needed to allow the property owners to connect their sump pump discharges directly into the storm sewer system. This will eliminate the adjacent sump pump discharge directly onto the roadway. A neighborhood informational meeting was held on November 15, 200 4 gather data and answe r project. Approximately Schaefer Road. questions the homeowners had relating to four residents attended this meeting residing to the on A neighborhood survey was sent to learn the favorability of installing decorative streetlights with this project and the favorability of installing traffic calming measures in response to comments received at the information meeting. Input from the survey and comments received throughout the planning of this project have been included in this report as an attachment. The results of the survey are shown in Table 1. *Note: Based on a 1 to 3 ranking system. Traditional was most favored with the lowest average ranking of 1.5. Only two returned surveys indicated rankings for lighting. Table 1. Survey Results The following is a summary regarding the survey results including staff's recommendations: • The majority of residents do not prefer installing decorative street lighting — Staff does not recommend including decorative street lighting with this project since the improvement is overwhelmingly not supported by the property owners and a direct benefit to each property for this improvement is difficult to substantiate. Page 3 of 6 Returned Prefer Decorative Street Lights Prefer Traffic Calming Measures Total Surveys Surveys Yes No I Style* Yes No Sent Colonial Acorn Traditional 22 1 11 1 10 1 2.5 2 1.5 6 4 of Returned Surveys 1 50% 9% 91% 55% 36% *Note: Based on a 1 to 3 ranking system. Traditional was most favored with the lowest average ranking of 1.5. Only two returned surveys indicated rankings for lighting. Table 1. Survey Results The following is a summary regarding the survey results including staff's recommendations: • The majority of residents do not prefer installing decorative street lighting — Staff does not recommend including decorative street lighting with this project since the improvement is overwhelmingly not supported by the property owners and a direct benefit to each property for this improvement is difficult to substantiate. Page 3 of 6 Feasibility Study Schaefer Road Imp. No. A -216 March 31, 2005 • The majority of residents prefer implementing traffic calming measures in this neighborhood — A traffic survey was performed on Schaefer Road in July 1999. The Monday through Friday average daily traffic volume was 1,049 vehicles per day and the 85`h- percentile speed was 34.5 mph. The vehicle volume is relatively high for a local road with speeds exceeding 30 mph; however, these volumes and speeds are very typical throughout Edina neighborhoods on local roadways. Staff recommends the residents file an application for traffic calming in accordance with the Transportation Commission Policy and the Neighborhood Traffic Management Plan. It is not anticipated that traffic calming measures would be included with this construction project due to the procedure and schedule as outlined in the Policy. The proposed roadway width is 28 -ft, which closely matches the existing width and helps minimize impacts to the surrounding topography and landscaping features (see Figure 2). Trees will be protected and impacts to the trees will be minimized. Figure 2. Proposed Project Layout Staff is continuing to analyze the utility repairs /replacements and will include the needed improvements with the final plans. Other utility activities may include replacement of gas mains within the neighborhood, which is determined and coordinated by the local gas utility company. Page 4 of 6 1. Feasibility Study Schaefer Road Imp. No. A -216 March 31, 2005 RIGHT -OF -WAY & EASEMENTS The right -of -way along Schaefer Road is typically 60 feet wide. All proposed improvements stay within this right -of -way and no additional easement requirements are anticipated. FEASIBILITY: This project is feasible from an engineering and City standpoint. PROJECT COSTS: The total estimated project cost is $188,000. The total cost includes indirect costs of 15% for engineering and clerical costs and 7.5% for first year finance costs. The estimated construction cost does not include storm sewer or other utility improvements. Final utility improvements will be determined during the final design and will be funded through the respective utility fund. Funding for the entire project will be from a combination of special assessment and utility funds. ASSESSMENTS: A special assessment of approximately $9,400 per residential equivalent unit or assessable lot will be levied against residents adjacent to the neighborhood's roadways. The justification for assessments is attributed to properties receiving benefit of the new pavement. The assessable lot is based on a detached single family home. Properties that abut the project and have access with their side or rear yards will be assessed 1/3 of the assessable unit cost (see Figure 3). PROJECT SCHEDULE: The following schedule is feasible from an Engineering standpoint: ATTACHMENTS: Council Orders Public Hearing .......... ..........................March 15, 2005 Receive Feasibility Report .................... ..........................April 5, 2005 Public Hearing ........................... ...... .......................... April 19, 2005 Bid Opening ........ ............................... ............................May 2005 Award Contract ..... ............................... ...........................June 2005 Begin Construction .......................... ............................... June 2005 Complete Construction ......................... ........................October 2005 • Information Meeting Attendance List and Comments • Survey Results and Comments • Preliminary Assessment Roll Page 5 of 6 Feasibility Study Schaefer Road Imp. No. A -216 March 31, 2005 6535 4900 4901 - 4920 L4251 6300 4904 6228 329 6516 4905 6408 6400 4924 6224 28 6212 131 6520 6424 4909 ' 6320 8228 - --- - - - - - INTERLACHEN ■ e201 29 654 6519 6501 6401 = 5004 6321 3 5001 6413 6409 6405 • 5009 t 5004 5012 5013 5011 ■ 501 5016 W21 5008 5017 5020 Project BOZO 6404 5021 = Boundary 5025 5012 i 5f n o009 5100 6501 HAROLD WO N = 5020 5021 5025 5101 5025 5101 �� • 5108 6405 i■ ■ ■■ ■ ■ ■ ■ ■y Sim 0 5016 5113 3 5108 5109 � = 5111 5112 _ j 5017 5020 5024 5112 � ■ ■ ■. ■ ■. ■ ■ ■ ■ ■ ■N� 5117 5116 5117 5117 � = 5116 5120 9 5125 5152 W 5125 5124 Nuu ■ ■y uLLj i 5200 17201 5204 = 52 5210 5200 : 5200 5201 6220 6212 6208 5204 5205 Y ■ ■. ■ ■ ■■� - - �. ■..N. ■N ■ ■■ 6204 6200 5212 5209 6231 � iii 5209 52110 V622 IS 5216 5217 6225 6221 6217 6215 6209 5216 11 5215 5215 i 5224 5220 5220 = 5225 5224 5221 5224 5219= 1224 + ■.■N ■ ■■N ■. ■■ ■■ ■■. '23 5219 5224 • ■ 5228 5225 5300 5223 = ` 6300 : 6304 6308 5227 5231 �~�■■■■■■ ■�■■��■4a�■■��■ Lasno■■■i 5300 5304 5228 5304 5305 6404 6400 WESTWOOD CT 5301 5308 5227 12 6301 6 6304 5308 5309 5234 5238 5301 Assessments 8401 6416 6412 6405 6313 6 -16 5331 $3,150.00 SF 7504 8500 8424 6420 6409 5312 $9,400.00 53 n53 Figure 3. Preliminary Assessment Map Page 6 of 6 SIGN IN SHEET - IN &MATION MEETING W.� and Ridge Rd. November 15, 2004 (Please print legibly - Thank you!) .. N' � L, r`/ / .l. •_ .� • • . � '.'IAu'1A.1: : /V:i 1}I%3.bli ji'p�1�_' rail, mill' �W Ara W. Me MR % Ph e4 '�+zW L QUESTION / COMMENT CARD uld + er imhblevn av\,a efoS(on ALL,%' lb MawaU 6Y\ Name T)i Q nt Address PLEASE PRINT PLEASE PRINT ca QUESTION / COMMENT CARD Name Ma the S�� K Address 5 0 I aer RJ PLEASE PRINT PLEASE PRINT 9y5 - 93-7c) Phone Conversation on November 17, 2004 Steve L. Ed Glickman 952- 935 -0625 5217 Schaefer Rd. • DRAIN TILE /STORM SEWER WILL BE INSTALLED WITH RDWY PROJECT TO ACCOMMODATE HIS BACKYARD POND PUMPING ONTO THE STREET. • WOULD LIKE US TO TAKE A LOOK AT PONDING THAT OCCURS IN HIS FRONT YARD. CURRENTLY AN INFILTRATION TYPE SYSTEM. HE MAY POSSIBLY PUT IN A SUMP PUMP. • DISCUSSED A HUGE 200 YR OLD COTTON WOOD TREE. • HIS NEIGHBOR (HARRY) HAS A HUGE OAK. ROOTS GROWING INTO STREET. SUGGESTED PUTTING A FLAG ON THE TREE SO WE KNOW NOT TO IMPACT IT. • WOULD LIKE HIS NEIGHBOR (5209 SCHAEFER RD) TO DIRECT HIS WATER TO THE STORM SEWER SYSTEM IN THE STREET (NEW STORM SEWER) AND NOT TO HIS PROPERTY. Schaefer Road Improvements Improvement No. A -216 SURVEY RESULTS. NO STREET Returned Decorative Street Lights TRAFFIC CALMING COMMENTS Survey Yes I No Style Yes No Colonial Acorn Traditional 5004 SCHAEFER RD 5008 SCHAEFER RD X X* X** *Don't want, but if to be, the one that gives the best light; * *Speed bump between 5004 and 5008 Schaefer Rd. The knoll makes these five driveways somewhat blind and the traffic is sometimes fast. There have been some very dose calls. 5011 SCHAEFER RD X X X We need some sort of traffic calming on Schaefer Rd, please consider implementing. 5012 SCHAEFER RD 5016 SCHAEFER RD 5017 SCHAEFER RD X X X Schaefer is a racetrack! 5021 SCHAEFER RD X X 2 3 1 X Speeders going 40-50 mph going down the hill between 5021 and 15217 Schaefer Rd. This happens fre uentl 1 5025 SCHAEFER RD 5113 SCHAEFER RD 5117 SCHAEFER RD X X Cars do frequently exceed speed limit on this street - often by as much as 20 mph, but I don't know how best to slow vehicles down. 5125 SCHAEFER RD X X X 5152 SCHAEFER RD 5200 SCHAEFER RD 5201 SCHAEFER RD X X X* *That was done years ago on the comer of Knoll Dr and Schaefer. I was a disaster and quickly removed by a good sense council I believe. 5209 SCHAEFER RD X X X 5217 SCHAEFER RD X X X 5224 SCHAEFER RD 5224 SCHAEFER RD 5225 SCHAEFER RD X X X Oppose entire project, see letter. 6300 WESTWOOD CT X X 3 1 2 X RE: Rainwater drainage: It is my- opinion that in the past a resident(s) has taken advantage of the city to drain water from a pond because of overflowing due to rain. It was dearly not an instance of the water causing damage to the home. It is not our obligation to pay for a problem caused by a personal choice in landscaping and a desire for improved aesthetics. This is more aggravating knowing that this resident also runs water into the pond 24 hours a day when the water level is too low. 6321 INTERLACHEN BLVD 6401 INTERLACHEN BLVD Returned Prefer Decorative Street Lights Prefer Traffic Calming Measures Total Surveys Surveys Yes No e* Yes I No Sent Colonial Acorn ITraciftnall 22 1 Ti- 1 1 10 2.5 2 1.5 6 4 % of Returned Surveys 50% 9% 191% 55% 36% Note: *Avora a Rankin from 1 to 3 - Only 2 retumed surveys included rankings Z).o-c P7, z.o o 4 cjo S .ew ems. a s S e. s s #un is q w e. O�rn,' tea. E�7. ', �_ Yiz&4 v ajf is `nor t. o- h-?.es n 2 t e. S S-J^q ®ppose � - �1�[��. ��oJe-ct. d� SaaS Sc:4ae PRELIMINARY ASSESSMENT ROLL SCHAEFER ROAD IMPROVEMENT A -216 CITY OF EDINA STREET PID # LEGAL STREET NO. OWNER ASSESSABLE LOTS LOT BLOCK TOTAL LOTS ASSESSMENT COST A Interlachen Blvd 30- 117 -2141 -0026 1 1 6321 Boehland, Thomas & Kim 0.333333 $ 3,133.33 30- 117 -21 -42-0018 4 11 6401 Aanenson, Vernon 0.333333 $ 3,133.33 Schaefer Rd 30- 117 -21.41 -0027 2 1 5011 Schultz, Scott & Martha 1 $ 9,400.00 30- 117 -21-41 -0028 3 1 5017 Macneil Patricia 1 $ 9,400.00 30- 117 -21 -41 -0004 pt 27 5021 Me r Franz 1 $ 9,400.00 30- 117 -21 -41 -0030 26 5025 Drobn , Jeffrey 1 $ 9,400.00 30- 117 -21 -41 -0029 25 5113 Schulze. Richard 1 $ 9,400.00 30- 117 -21 -41 -0002 24 5117 ISanderson, Paul & Janet 1 $ 9,400.00 30 -117 -21-41 -0001 23 5125 Smith Kevin & Pamela 1 9,400.00 30- 117 -21- 44-0004 22 5201 Kyllo, John & Carole 1 $ 9,400.00 30- 117 -21-44 -0065 1 1 5209 Emerson Thomas & Zoneida 1 $ 9,400.00 30- 117 -21 -44 -0059 5 1 5217 Glickman Edward 1 $ 9,400.00 30- 117 -21-44 -0001 19 5225 Dinwlddie, Harry & Barbara 1 $ 9,400.00 30- 117 -21-43 -0004 14 5224 Weiner, Howard 1 9400.00 30- 117 -21 -43-0003 13 5224 Weiner, Howard 1 $ 9,400.00 30- 117 -21 -43-0063 2 1 5200 Thomas, James & Dianne 1 $ 9,400.00 30- 117 -21 -42 -0036 1 1 5152 Schall, David & Patricia 1 $ 9,400.00 30- 117 -21 -42-0022 1 1 5016 Young, Evelyn 1 $ 9,400.00 30- 117 -21 -42 -0021 2 1 5012 Rich Jeffrey & Amy 1 $ 9,400.00 30- 117 -21 -42 -0020 1 1 5008 Nelson Jr Bernard & Joan 1 $ 9,400.00 30- 117 -21 -42 -0019 1 5 1 5004 Johnson, Roger 1$ 9.400.001 Westwood Ct 30- 117 -21-44 -0024 1 11 1 6300 1 Larson, Cliffeord & Lucy 1 0.333333 $ 3,1 20 $ 188,c TOTAL PROJECT COST $ 188,000.00 AVERAGE COST PER LOT $ 9,400.00 A-219 AssessmeMa_ Feasift Page 1 1.45 PM3f31R005 REPORT /RECOMMENDATION To: Mayor & City Council From: Wayne D. Houle, PE City Engineer Date: April 19, 2005 Subject: Public Hearing for Schaefer Circle — Roadway Improvement No. A -217 Recommendation: Agenda Item # II. B. 0 Consent El Information Only ❑ Mgr. Recommends ❑ To HRA ® To Council Action ® Motion ® Resolution Ordinance„ Discussion If the Council determines the project to be warranted and necessary, Council shall adopt a resolution approving Schaefer Circle Roadway Improvements, City Improvement No. A -217, authorize plans and specifications to be completed and bids taken. This project will require a 4/5 favorable vote from the Council to move the project forward. Info /Background: This project was initiated by staff from a resident request to address drainage problems at the east end of the cul -de -sac along with concerns on the pavement condition of the roadway. After review of the current water system, staff expanded the project to include adding a watermain to this project. This project does not include the addition of concrete curb and gutter. The estimated roadway construction cost is $68,000. This cost does not include costs for the watermain or other City utility repairs; staff is analyzing these repairs and will include them with final plans; funding for these repairs will be funded through the respective utility funds. The costs of the roadway remain the same if the watermain is or is not installed. Funding for the roadway will be from a special assessment of approximately $8,500, per residential equivalent unit (REU). The Feasibility Study is included with this report, along with all correspondence received to date. Staff analyzed the project and feels that the project is feasible from an engineering standpoint. G: \Engineering \lmprovements\A217 Schaefer Circle \CORRESPONDENCE \Misc \RRpublic hearing - A217.doc w9jA,l o� e X.vi FEASIBILITY STUDY — A217 �o ENGINEERING DEPARTMENT CITY OF EDINA STREET AND UTILITY IMPROVEMENTS SCHAEFER CIRCLE MARCH 31, 2005 LOCATION: The Schaefer Circle project includes the neighborhood east of Schaefer Road (see Figure 1). 05 5704 5709 5706 5708 5708 5713 Project 5710 u 5712 Bondary 5714 5712 5717 """ 5716 6204 6208 5718 5716 6216 6212 : 6201 gGNAE Ea Ok 800 6209 6217 6213 9 5804 �O� P z b J 5810 809- 11 Figure 1. Project Area Map Feasibility Study Schaefer Circle Imp. No. A -217 March 31, 2005 INITIATION & ISSUES: The Schaefer Circle project was initiated partially by a resident request to address drainage problems at the east end of the cul -de -sac. The Engineering Department expanded this area and included the neighborhood as outlined in Figure 1 as part of the City's planning process to update the infrastructure within this neighborhood. The following are existing features that present issues in determining the feasibility of the project and are addressed in this report: • Surface rainwater drainage issues • No existing watermain in Schaefer Circle • Residents experience "brown water" problems • Poor condition of existing pavement • Existing landscaping, mailboxes, driveways, etc. EXISTING CONDITIONS: The roadway in this neighborhood was originally constructed in the early 1960's, the sanitary sewer was installed in 1959 and the water services were installed in 1969 and 1977. The roadway width varies ranging from 26 -ft to 29 -ft with no curb and gutter and no sidewalks. The pavement condition varies but is in very poor condition overall (see Photo 1). Photo 1. Existing Pavement Condition Street grades within the neighborhood are relatively flat in the cul -de -sac with a steeper sloping roadway on the west end. Typical features exist adjacent to the roadway such as retaining walls, concrete driveways, landscaping, shrubs, trees and mailboxes. There is some existing storm sewer in the area with isolated surface drainage problems. Currently, no watermain exists in Schaefer Circle. Multiple residents are served from single water service lines and /or from the water main located in Page 2 of 6 Feasibility Study Schaefer Circle Imp. No. A -217 March 31, 2005 Vernon Avenue. Due to multiple residents using a single service that is not looped, some residents experience "brown water' conditions. No sanitary sewer blockages have been reported. Most of the private utilities in this neighborhood are overhead and serve the residents from the back of the properties with the exception of the gas lines, which are buried in the roadway. PROPOSED IMPROVEMENTS: This project involves reconstructing the existing bituminous pavement, installing new watermain, repairing sanitary sewer as needed, and replacing the water services from the new watermain to the curb boxes (valves located at the property lines). A neighborhood informational meeting was held on November 15, 2005 to gather data and answer questions the homeowners had relating to the project. Approximately six residents attended this meeting. A neighborhood survey was sent to learn the favorability of constructing concrete curb and gutters and installing decorative street lights with this project. Input from the survey and comments received throughout the planning of this project have been included in this report as an attachment. The results of the survey are shown in Table 1. Note: ' 3 surveys responded and ranked Traditional No. 1 - no others were ranked Table 1. Survey Results The following is a summary regarding the survey results including staff's recommendations: The majority of residents do not prefer new concrete curb and gutter — Reasons to construct concrete curb and gutter in this neighborhood include: concrete curb and gutter tends to be more cost effective over the life of the street, reduces pavement failure, provides safety, controls drainage, provides driveway and traffic control, prevents roadway edge rutting, prevents boulevard damage, and aids cleaning and snow plowing. Although staff recommends constructing concrete curb and gutter in this neighborhood, it is feasible to partially improve the roadway without including concrete curb and gutter with this project. (The cost estimate and assessment amount included in the report do not include curb and gutter costs.) Page 3 of 6 Returned Prefer Curb & Gutter Prefer Decorative Street Lights Total Surveys Surveys Yes No B -HEAD S -MOUNT Yes No Style Sent Colonial Acorn Traditional 8 8 1 7 1 1 2 6 of Returned Surveys 100% 12% 88% 25% 75% Note: ' 3 surveys responded and ranked Traditional No. 1 - no others were ranked Table 1. Survey Results The following is a summary regarding the survey results including staff's recommendations: The majority of residents do not prefer new concrete curb and gutter — Reasons to construct concrete curb and gutter in this neighborhood include: concrete curb and gutter tends to be more cost effective over the life of the street, reduces pavement failure, provides safety, controls drainage, provides driveway and traffic control, prevents roadway edge rutting, prevents boulevard damage, and aids cleaning and snow plowing. Although staff recommends constructing concrete curb and gutter in this neighborhood, it is feasible to partially improve the roadway without including concrete curb and gutter with this project. (The cost estimate and assessment amount included in the report do not include curb and gutter costs.) Page 3 of 6 Feasibility Study Schaefer Circle Imp. No. A -217 March 31, 2005 • The majority of residents do not prefer installing decorative street lighting — Staff does not recommend including decorative street lighting with this project since lighting is not supported by the property owners and a direct benefit to each property for this improvement is difficult to substantiate. The pavement throughout this neighborhood appears to be at the end of its useful life while the costs to maintain and repair the roadways are steadily increasing. Overlaying or seal coating the pavement in this neighborhood is not feasible. The proposed roadway width is 27 -ft, which closely matches the existing width and helps minimize impacts to the surrounding topography and landscaping features (see Figure 2). Trees will be protected and impacts to the trees will be minimized. - I + ' M RIGHT -OF -WAY & EASEMENTS f� u P Figure 2. Proposed Project Layout .i - �f! Staff is continuing to analyze the utility repairs /replacements and will include the needed improvements with the final plans. Other utility activities may include replacement of gas mains within the neighborhood, which is determined and coordinated by the local gas utility company. The right -of -way along Schaefer Road is 60 -ft wide (60 -ft radius in the cul -de- sac). All proposed roadway improvements stay within this right -of -way. However, existing City utilities located in Schaefer Circle connect across the properties in the southeast corner of the cul -de -sac to utilities located in Vernon Avenue. No record of an existing easement for these utilities has Page 4 of 6 Feasibility Study Schaefer Circle Imp. No. A -217 March 31, 2005 been discovered to date. It is anticipated that a permanent drainage and utility easement will be required from the adjacent property owners to install the new watermain in Schaefer Circle and loop it between the existing watermain located in Schaefer Road and Vernon Avenue. The necessary easements will be obtained as required. FEASIBILITY: This project is feasible from an engineering and City standpoint. PROJECT COSTS: The total estimated project cost is $68,000. The total cost includes indirect costs of 15% for engineering and clerical costs and 7.5% for first year finance costs. The estimated construction cost does not include storm sewer, watermain or utility improvements. New watermain is anticipated to be installed in this neighborhood; however, the final utility improvements will be determined during the final design and will be funded through the respective utility fund. Funding for the entire project will be from a combination of special assessment and utility funds. ASSESSMENTS: A special assessment of approximately $8,500 per residential equivalent unit or assessable lot will be levied against residents adjacent to the neighborhood's roadways (see Figure 3). The justification for assessments is attributed to properties, receiving benefit of the new pavement. The assessable lot is based on a detached single family home. A 10 -year payback period for these special assessments is proposed for this project. PROJECT SCHEDULE: The following schedule is feasible from an Engineering standpoint: ATTACHMENTS: Council Orders Public Hearing .......... ..........................March 15, 2005 Receive Feasibility Report ............... ............................... April 5, 2005 Public Hearing ... ........................:...... .........................April 19, 2005 BidOpening .................................... ............................... May 2005 Award .Contract .......................... ............................... Summer 2005 Begin Construction ..................... ............................... Summer 2005 Complete Construction ... ............................... Fall 2005 /Summer 2006 Note: The schedule is dependent on obtaining an easement for the watermain. • Information Meeting Attendance List and Comments • Survey Results and Comments • Preliminary Assessment Roll Page 5 of 6 Feasibility Study Schaefer Circle Imp. No. A -217 March 31, 2005 .d i v-r 705 5704 5709 5706 9 5708 5708 5713 5710 Project 5712 Boundary 5714 5712 �a 5717,,•.....6865 ................... ,,5716 �� 6208 6204 °••,�5,�� 5718 5716 6216 6212 ,••.� s 6201 ••.••�' SCNA�F�It C1R •••••• 1800 6209 .• 6217 ••' 6213 .�• °'• 5804 �,�� `'�►•• °••• 5810 809- Figure 3. Preliminary Assessment Map Page 6 of 6 SIGN IN SHEET - IN &MATION MEETING Schaefer Circle November 15, 2004 (Please print legibly - Thank you!) Name(s) Address 3. 4. Z 1 7 6v 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Phi Caft ► (It glo QUESTION / COMMENT CARD gtNe L . Also ,�.est�v� ecQ AD- {�� ,�� sf��l, �� necv Name as kq Address �OZy� �c �ae'K( Crc Ie- PLEASE PRfNT PLEASE PRINT QUESTION / COMMENT CARD r Nam r Address l D `! 5 h -a ege r Lt r' PLEASE PRINf PLEASE PRINT SCHAEFEr% %;IRCLE IMPROVEMENT NO. A -217 SURVEY RESULTS NO STREET Returned Preferred Curb & Gutter Decorative Street Lights COMMENTS Survey Yes No B -HEAD S -MOUNT Yes No Style Colonial Acorn Traditional 6201 SCHAEFER CIR X X X 6204 SCHAEFER CIR X X X 6208 SCHAEFER CIR X X X X 1 We are very interested in burying the power lines. 6209 SCHAEFER CIR X X X X 1 We are in favor of a new street - perhaps C &G, but not upgrade every one elses waterline. We would not benefit from it. We hooked up to city water directly from Vernon and no one on our street helped pay for it. 6212 SCHAEFER CIR X X X I would prefer that this project not take place at all. Resurfacing the road would be fine, but I am totally against the water and utility improvement part of the project. 6213 SCHAEFER CIR X X X Letter attached. 6216 SCHAEFER CIR X X X 1 1 I am on a comer lot and would probably have to pay once for Schaefer Cir and then again for Schaefer Rd construction. The darkness is most upsetting. It is dangerous and a security risk. Thank you. 6217 SCHAEFER CIR X X X Total Surveys Returned Prefer Curb & Gutter Prefer Decorative Street Lights Survey Yes No B -HEAD S-MOUNT Yes No Style• Sent Colonial Acom Traditional 8 8 1 7 1 1 2 6 0 0 1 % of Returned Surveys 100% 12.50% 87.50% 25% 75% Note:' 3 surveys responded and ranked Traditional No. 1 - no others were ranked M . - Z" - Hasbargen 6213 Schaefer circle Edina, MN 55436 952 - 932 -0877 Mr. Steven L. Lillehaug Edina Traffic Engineer /Assistant Engineer City Hall 4801 west 5011' Street Edina, MN 55424 rte: Improvement No. A -217 Schaefer Circle Dear Mr. Lillehaug: This is in reference to the above mentioned road improvement on Schaefer Circle. For the record, we are against the improvements mentioned in your letter, dated December 9, 2004. For a road, which has limited traffic, the amount mentioned for this project seems outlandish. we are also hard pressed to understand why resurfacing the road is not covered by our taxes. we are also not in favor of the curb and gutter improvement and the streetlight. it seems to us, these two improvements are out of character with the surrounding neighborhood. we have no rainwater drainage issues. Further, we are unaware of any thing that has changed drainage in the neighborhood. if the issue of drainage is arising because there are issues with those who live at the end of the cul- de -sac, these issues do not impact the rest of the circle and should be addressed as so. The geography of our neighborhood hasn't changed at all: This is not an issue. Thank you for taking the appreciate keeping.us up wait to hear from you in time to read our to date on these the near future. very truly yours, comments. we issues and will Donald and Terese Hasbargen PRELIMINARY ASSESSMENT ROLL SCHAEFER CIRCLE IMPROVEMENT S -217 CITY OF EDINA STREET PID # LEGAL STREET NO. OWNER LOT BLOCK TOTAL LOTS ASSESSMENT COST A Schaefer Cir 31- 117 -21- 14-0020 6 1 6216 Walsh, James, Helen, & Mary 1 $ 8,500.00 31- 117 -21 -14 -0070 7 & pt8 1 6212 Gaarder, Timothy 1 $ 8,500.00 31- 117 -21- 14-0023 pte 1 6208 Gaasedelen, James & Claudia 1 $ 8,500.00 31- 117 -21- 14-0024 9 1 6204 Hartig, Paul & Man 1 $ 8,500.00 31- 117 - 2131-0023 13 1 6201 Las Michael 1 $ 8500.00 31- 117 - 2131-0024 14 1 6209 Totall, Gary & Helen 1 $ 8,500.00 31 -117- 2131.0025 15 1 6213 Hasba en, Donald & Teresa 1 $ 8,500.00 31- 117 - 2131-0026 18 1 6217 !Jung us & Jody 1 $ 8,5w00 e $ 68,000.00 TOTAL PROJECT COST $ 68,000.00 AVERAGE COST PER LOT $ 8,500.00 A217 AssesenemaFewbity Page 1 1:47 PM31312005 REPORT /RECOMMENDATION To: Mayor & City Council Agenda Item # II. C. From: Wayne D. Houle,, PE Consent El City Engineer-- Information Only ❑ Date: April 19, 2005 Mgr. Recommends ❑ To HRA ® To Council Subject: Public Hearing °for West 58th Action ® Motion Street — Roadway ® Resolution Improvement No. BA -328 ❑ Ordinance ❑ Discussion Recommendation: If the Council determines the project to be warranted and necessary, Council shall adopt a resolution approving West 58th Street Roadway Improvements, City Improvement No. BA-'328, authorize, plans and specifications to be completed and bids taken. This project will require a 4/5 favorable vote from the Council to move the project forward. Info /Background: Staff initiated this project. The proposed project will include reconstructing the roadway addin� concrete curb and gutter, decorative street lighting, and a sidewalk on the northerly side of West 58 Street from Concord Avenue to Wooddale Avenue. The estimated roadway construction cost is $357,000. This cost does not include costs for the City utility repairs; staff is analyzing these repairs and will include them with final plans; funding for these repairs will be funded through the respective utility funds. Funding for this project will be from a special assessment of approximately 20% of the roadway cost, the remaining portion will be from moneys received from the State Gas Tax as appropriated through the Municipal State Aid System. The Feasibility Study is included with this report, along with all correspondence received to date. Staff analyzed the project and feels that the project is feasible from an engineering standpoint. G: \Engineering \Improvements \BA328 - West 58th St\CORRESPONDENCE\Misc\RRpublic hearing - BA328.doc 495/A \lam o� e tr� FEASIBILITY STUDY — BA328 N� o ENGINEERING DEPARTMENT �• Y��ti� a CITY OF EDINA STREET AND UTILITY IMPROVEMENTS WEST 58TH STREET APRIL 1, 2005 LOCATION: The West 58th Street project extends from Concord Avenue to Wooddale Avenue (see Figure 1). Dbll .16 N N n O O O O N N °7 °7 iD ':' 4601 a a LO v 5615 5700 '18 v � IT 5633 5619 5700 4620 4616 4608 4604 4600 5705 5623 cO `� 0 u7 c-7 L(i LO In U ) v It IT v 5640 4516 4512 5656 4524 dt 5901 5900 5901 5900 5901 5900 5901 5900 5905 5904 5905 5904 5905 5904 5905 5904 Figure 1. Protect Area Map 4629 7 ^ °7 °7 iD ':' 4601 5701 4505 5700 v � IT It 'r v 5700 5705 cO `� 0 5704 5705 5704 4630 N N v v t v 0 v v 4600 5708 5709 5712 5708 CONCORDTER 5713 571c 5713 5712 00 5713 c� ^ o 0 4601 Project v 5717 5'. Boundary 1717 5716 5717 Movi WERE 5721 5724 5721 5720 O O N a0 C' CS O ap N 5721 a v a � a v 5725 5728 5725 5754 = W 58TH ST 9 a 5801 5800 mom!-5801-1- 5800 ■w 5801 5800 ■w 5801 5800 W 5 05 580-4—' a 5805 5804 a 5805 5804 a 5805 5804 c' 5 c 5808 0 5809 5808 j = 5809 5808 'LL 5809 5808 'J 5 z 809 5812 0 13 5812 ° 5813 5812 ''< ' 5813 -, °c 5 817 5816 < 17 5816 cc 5817 5816 5817 5812 f 5 821 5820 821 5820 5821 5820 5821 5820 5 825 5824 5824 5825 5824 5825 5 29 5828 5825 5828 5829 5828 5829 5828 5 833 5832 5833 5832 5833 5832 ! 5833 5832 5 837 5836 5837 5836 5837 5836 5837 5836 5 5840 5841 5840 5841 5840 5841 5840 5 841 5844 5845 5844 5845 5844 5845 5844 5 5901 5900 5901 5900 5901 5900 5901 5900 5905 5904 5905 5904 5905 5904 5905 5904 Figure 1. Protect Area Map Feasibility Study West 581h Street Imp. No. A -204 April 1, 2005 INITIATION & ISSUES: The West 58th Street project was initiated by the Engineering Department as part of the Five -Year Capital Improvements Program, which is part of the City's planning process to update the critical infrastructure within this neighborhood as outlined in Figure 1. The following are existing features that present issues in determining the feasibility of the project and are addressed in this report: • Surface rainwater drainage and storm sewer issues • Sump pump discharging directly onto street • Sanitary sewer and watermain deficiencies • Poor condition of existing pavement • Existing landscaping, driveways, etc. • Existing overhead utility lines and poles • Existing mature trees • Existing lighting EXISTING CONDITIONS: West 58th Street is part of the City's designated Municipal State Aid Roadway System (MSA). The street and utilities in this neighborhood were originally constructed in the 1950's with a storm sewer improvement in 1979. The roadway width in this neighborhood is approximately 30 -ft with intermittent curb and gutter and no sidewalks. The pavement condition varies throughout the neighborhood but is in very poor condition overall (see Photo 1). Photo 1. Existing Pavement Condition Page 2 of 7 Feasibility Study West 581h Street Imp. No. A -204 April 1, 2005 The speed limit on this roadway is 30 mph and currently no parking restrictions are posted along West 58th Street. Street grades within the neighborhood vary slightly but are relatively flat and level. There is some existing storm sewer in the area, but overall the surface drainage is very poor. Other typical items exist adjacent to the roadway such as concrete driveways, landscaping, shrubs, trees and fences. Most of the private utilities in this neighborhood are overhead (with the exception of the gas lines). Street lighting consists of standard "cobra head" lights mounted on wood poles that are typically located at the intersections. PROPOSED IMPROVEMENTS: This West 58th Street project involves the following improvements: • Reconstructing the existing bituminous pavement. • Constructing new concrete curb and gutter, driveway aprons, and sidewalk. • Retaining walls (lannon stone) • Installing new decorative street lighting. • Repairing /replacing the watermain where needed. • Replacing fire hydrants. • Repairing the sanitary sewer where needed. • Updating and extending the storm sewer to accommodate the new concrete curb and gutter. • Installing drain the where needed to allow the property owners to connect their sump pump discharges directly into the storm sewer system. A neighborhood informational meeting was held on November 22, 2005 to gather data and answer questions the homeowners had relating to the project. Over 14 residents attended this meeting. Additionally, a neighborhood survey was sent to learn the favorability of widening the street to obtain the necessary roadway width (to allow on- street parking versus restricting parking) and installing decorative street lights with this project. Input from the survey and comments received throughout the planning of this project have been included in this report as an attachment. The results of the survey are shown in Table 1. Total Surveys Surveys Prefers Decorative Street Lighting Prefers Street Widening (Parking Allowed Sent Returned Yes No Style Yes No Colonial Acorn Traditional 19 12 7 • 4 2.00 1.57 1.50 1 10 of Returned Surveys 63% 58% 33% 8% 83% Table 1. Survey Results Page 3 of 7 Feasibility Study West 58`h Street Imp. No. A -204 April 1, 2005 The following is a summary regarding the survey results including staff's recommendations: The majority of residents prefer installing decorative street lighting — Staff recommends including decorative street lighting with this project (see Figure 2). Figure 2. Decorative Liqhtinq — Traditional (latern) Style The majority of residents do not prefer widening the street by 2 -ft to accommodate on- street parking — Staff recommends constructing the street to a 32 -ft width between Concord Avenue and St. Johns Avenue to meet MSA standards, which accommodates one lane of parking. This will allow on- street parking for those residents that directly front West 58 "' Street. The roadway will be constructed to MSA standards. The proposed roadway widths range from 28 -ft with no parking and 32 -ft with parking allowed on one side of the street (see Figure 4). Parking is proposed to be allowed only on the north side of West 58th Street between Concord Avenue and St. Johns Avenue. This area consists of the properties that front directly on West 58th Street — All other properties front on the side streets where on- street parking is available. Parking is proposed to be restricted in all other locations along West 58th Street in the project area. The varying roadway widths accommodate the neighborhood by minimizing impacts to the surrounding topography. Trees will be protected and impacts to the trees will be minimized. Staff recommends installing a barrier style curb and gutter as it will work well with the existing topography within this neighborhood (see Figure 3). A barrier style curb provides the best control of water runoff and better defines the roadway while providing protection to the sod and pavement edge from snowplow damage in the winter months. BG18 CUNC CURB & GUTTER 6' R1 /2' R 3' AT 3/8' R 3' 6' SLOPE .3/4 PER Ft. • , . 7' I BASE 7 112' 18' 8' Figure 3. Typical Barrier /Bulkhead Curb and Gutter Page 4 of 7 Feasibility Study West 58`h Street Imp. No. A -204 April 1, 2005 5721 ,zU 4b]6 460& 460, 4600,_ r W 58TH ST O Ul 'x O 7!7��,- r F- r .. U U) Q # 5808 :TWT •tea_. _ �. Ou 7`4 51 ?5 % ! t� Z � LLI ATANNONOW W W 58TH ST Q o O r •r � RIGHT -OF -WAY i 370 4. C) RIGHT -OF -WAY Fiaure 4. Proposed Proiect Lavout The pavement throughout this neighborhood appears to be at the end of its useful life while the costs to maintain and repair the roadways are steadily increasing. Overlaying or seal coating the pavement in this neighborhood is not feasible. Staff is continuing to analyze the utility repairs /replacements and will include the needed improvements with the final plans. Other utility activities usually include replacement of gas mains within the neighborhood, which is determined and coordinated by the local gas utility company. & EASEMENTS The right -of -way along West 58`h Street is typically 60 feet wide. All proposed improvements stay within this right -of -way and no additional easement requirements are anticipated. Page 5 of 7 C) Fiaure 4. Proposed Proiect Lavout The pavement throughout this neighborhood appears to be at the end of its useful life while the costs to maintain and repair the roadways are steadily increasing. Overlaying or seal coating the pavement in this neighborhood is not feasible. Staff is continuing to analyze the utility repairs /replacements and will include the needed improvements with the final plans. Other utility activities usually include replacement of gas mains within the neighborhood, which is determined and coordinated by the local gas utility company. & EASEMENTS The right -of -way along West 58`h Street is typically 60 feet wide. All proposed improvements stay within this right -of -way and no additional easement requirements are anticipated. Page 5 of 7 Feasibility Study West 58th Street Imp. No. A -204 April 1, 2005 FEASIBILITY: This project is feasible from an engineering and City standpoint. PROJECT COSTS: The total estimated project cost is $357,000 (this amount includes $40,000 for decorative lighting). The total cost includes indirect costs of 15% for engineering and clerical costs and 7.5% for first year finance costs. The estimated construction cost does not include utility improvements. Sanitary sewer, storm sewer and watermain work is anticipated in this neighborhood; however, the final utility improvements will be determined during the final design and will be funded through the respective utility fund. Funding for the entire project will be from a combination of special assessment and utility funds. ASSESSMENTS: , A special assessment of approximately $68 per assessable front foot is proposed for this project and will be levied against the residents adjacent to West 58th Street. This assessment will cover 20% of the roadway reconstruction costs. The funding the City receives through the State Gas Tax for maintenance and construction of roadways will fund the remaining portion of this cost. The justification for assessments is attributed to properties receiving benefit of the new pavement, concrete curb and gutter, and the addition of decorative street lighting. The assessable front foot is based on Hennepin County 1/8 Section maps and includes property that abuts the West 58th Street right -of -way. Properties that abut this right -of -way with their backyard or sideyard will be assessed at 1/3 of the assessable front footage rate. A 10 -year payback period for these special assessments is proposed for this project. A tabulated preliminary assessment roll is attached to this study and a summary of this assessment roll is shown in Figure 5. PROJECT SCHEDULE: The following schedule is feasible from an Engineering standpoint: ATTACHMENTS: Council Orders Public Hearing .......... ..........................March 15, 2005 Receive Feasibility Report ............... ............................... April 5, 2005 Public Hearing .. ............................... ..........................April 19, 2005 Bid Opening .................................... ............................... May 2005 Award Contract ..... ............................... ...........................June 2005 Begin Construction ............................... ...........................June 2005 Complete Construction ....................... .........................Summer 2006 • Information Meeting Attendance List and Comments • Survey Results and Comments • Preliminary Assessment Roll Page 6 of 7 Feasibility Study West 58th Street Imp. No. A -204 April 1, 2005 5611 rn �~ (CO) 0 o N N N '� `' 4501 316 N v v v 5615 v v v LO 56 518 5640 5633 5619 4620 4616 4608 4604 4600 ,Nn 4516 4512 5656 05623 4524 629 Cn r� " Cc:)) v d v v v 46015700 5701 4505 5700 705 v 0 0 N CC) 5704 5705 5704 cv N .- 0 0 5708 630 v v v 4600 5712 5709 5708 CONCORDTER 713 N a 0 4601 5713 5716 5713 5712 °N V v v (0 v v 5717 5720 5717 5716 IT 717 N cD N v Q 5721 5724 5721 5720 00 5721 5721 v v v O O 25 5728 5725 5754 W 58TH ST w 5801 5800 W 5801 5800 w 5801 5800 w 5801 5800 W 580 a 5805 5804 < "5805 5804 'a 5805 5804 'a 5805 5804 a 580 ° 5808 5809 5808 z 5809 5808 a 5809 5808 a 580 O x LL 5809 5812 v 5813 5812 ° 5813 5812 a 5813 $ 581 5817 5818 s 5817 5816 N 5817 5816 5817 5812 3 581 5821 582 5821 5820 5821 5820 5821 5820 582 25 582 5825 5824 5825 5824 5825 582 829 582 5828 5829 5828 5829 5828 582 833 5832 5833 5832 5833 5832 5833 5832 583 5837 5836 5837 5836 5837 5836 5837 5836 583 5841 5840 5841 5840 5841 5840 5841 5840 584 5844 5845 5844 5845 5844 5845 5844 584 5901 5900 5901 5900 5901 5900 5901 5900 590 5905 5904 5905 5904 5905 5904 590 ^ =H••m• ^v 590 5909 5908 5909 5908 5908 590 590 r 5913 5912 5913 5913 5912 591 UU 14 591 Figure 5. Preliminary Assessment Map Page 7 of 7 ToCM� i o✓� ge2�-✓ly C�f�c►��ance) $ s+ Ct rvr►ti Cw► CorcJ io In 1crt� d d at (� �et m e Acld re s 5 _�42p F. -.W ,(,(. �.aw►t. 5-�ag r-aI le, FAY fx-i c-, s� r 1/ ir oira. .�o5h O&m f _. _IOC 6 �G�-- �.l-�. S?as�rRk,.�e Ave 5801 AshcroC+ Ave. q (, o o s-Y q&a4 w s�' Q TION / COMMENT CARD GCS L req, Name 6co PLEASE PRrNT Address G' 7zS hv PLEASE PRINT QUESTION / COMMENT CARD 1h e &, 1 k *to krona *WL W 1 Ix an rte, MCA C,m^(ex(\eA alokAk, 5P4110 of iycLt c Name d Address 51 15 Fo-1 u� PLEASE PRI r PLEASE PRINT � ON qaa - iota Steve Lillehaug From: Wayne Houle Sent: Monday, November 29, 2004 4:21 PM To: Steve Lillehaug Subject: FW: 58th Street Improvement Project fyi - - - -- Original Message---- - From: Moira [ mailto :morninglory08ll29 @excite.comI Sent: Monday, November 29, 2004 4:10 PM To: Wayne Houle Cc: joshua .olson@provationmedical.com Subject: 58th Street Improvement Project Hi Wayne, Josh & I wish to express our desire NOT to have a "parking bay" located directly across the street from our 5801 Ashcroft Ave. home. We feel that this will invite non - neighbors to park across from us, and thus affect our sense of security. We will be more than happy to try to assist our neighbors in sharing our driveway if they ask us for help at special events, etc., when they may have driveway overflow. We also feel that a parking bay would look extremely odd ... as few, if any, surrounding streets have such a feature. We do not wish our home's curbside appeal to be negatively impacted. Please add this concern to your list of comments on this project. Thank you. Moira & Josh Olson Join Excite! - http: / /www.excite.com 1 'Steve Lillehaug From: Wayne Houle Sent: Wednesday, November 24, 2004 8:31 AM To: emominglory08l l29@excite.com' Cc: Steve Lillehaug Subject: RE: 58th Street Improvement Project Josh & Moira: Thank you for your comments. Your comments and issues will be addressed and included in the referenced project's feasibility study and presented to the Council for consideration. Thanks Wayne Houle, PE Director of Public Works / City Engineer City of Edina 4801 West 50th Street Edina, MN 55424 -1394 whoule @ci.edina.mn.us 952 -826 -0443 direct 952 - 826 -0390 fax - - - -- Original Message---- - From: Moira [ mailto :morninglory08ll29 @excite.com] Sent: Tuesday, November 23, 2004 3:27 PM To: Wayne Houle Cc: joshua .olson@provationmedical.com Subject: 58th Street Improvement Project Hello Wayne, Thanks again for the informative meeting last evening. Josh & I own 5801 Ashcroft.Ave., and we wanted to point out a serious concern to us, as sidewalk feasability /location is one of the improvements on the table. We have a one -car cement driveway. Last month, we had an asphalt pull -out spot added alongside the east side of the driveway, bumping our total available parking spaces to 3 outside the garage. We spent $1000 in order to make this improvement from 2 to 3 spaces. If a sidewalk is added, we'll be back down to 2 spaces (unless we change our cars to Geo Metros) and won't have a long enough available space to add more. It would look ridiculous to add another spot alongside the 2 existing spaces. As we have 1 14 -year old and a preteen in the family, parking for us will really be at a premium soon. We very much will appreciate you taking our situation into consideration as various sidewalk pros and cons are discussed. Please feel free to contact Moira at 952- 285 -2969 (home) or 952 - 992 -5341 (work) to discuss the matter further. Sincerely, 1 r Moira and Joshua Olson Join Excitet - http: / /www.excite.com The most personalized portal on the Web! Page 1 of 1 Steve Lillehaug From: Bob.Stoltz [Bob.Stoltz@target.com] - Sent: Tuesday, November 23, 2004 2:17 PM To: Steve Lillehaug Cc: bobnewkirk@mn.rr.com Subject: Comments for 58th St. Improvements Hi Steve - Thank you for the thorough presentation of the proposed road improvements for 58th St. - it was very informative in helping us understand the scope and possible options to consider. I live at 4608 58th St. (one of the "blue" houses) - My comments somewhat reflect the fact that I am one of seven houses that have addresses on 58th Street. My comments /concerns are: • Maintain the mature trees on the north side of 58th (between Concord and St. Johns - I don't recall mature trees on the north side between St. Johns and Wooddale). • Maintain "residential" feel of street - Ideally, reduce the width of the new road relative to the existing road. I would not want the street to resemble Wooddale in terms of width. Wide feels like fast. • Add a sidewalk with a minimal boulevard - The idea being to have "green" between the road and sidewalk so that the sidewalk does not feel like an extension of the road. • No parking on either side of the road. I don't mean to represent my neighbors on this issue, but very seldom does anyone park on the road currently. I think this was reflected in some of the comments last night. My preference is to not make it more inviting to park along 58th (which is what I believe parking "bays" would do). I've attached a sketch that reflects the concerns mentioned above - If the road was reduced to 28 feet in width (from it's current 30 feet) and by shifting the the south edge of the road 2 feet to the south, it would allow the north side to have a boulevard, sidewalk and 3' of existing "green" to the base of the existing trees. An option to consider - The section of road from St. Johns to Wooddale could have a wider boulevard w /trees since there are not existing mature trees on the north side (nor do the houses "front" 58th Street). The road would align the full length, but the sidewalk would "shift" at St. Johns. Not sure if that's allowable or not. Thanks again for your time - let me know if you have any questions or comments! Bob (and Vivian) Stoltz 4608 58th Street West (952) 929 - 3613 11/23/2004 ®, -s S _ m.♦ G�� J �p a. s 0 � m ��itiTin(� RDan xi ti �Pro v � 0 T Ff Vi �NO ftgK►n& ,1 ,fit' COW) 4or man �K1✓J) � / V ✓ �s, , r 6\11 6-r a AL40 1 $6ovHR1D C 6 N Steve Lillehaug From: Steve Lillehaug Sent: Tuesday, November 23, 2004 11:07 AM To: 'Ryan Langsev'; Wayne Houle Cc: Steve Lillehaug Subject: RE: 58th Street West street project Thank you for your comments. Your comments and issues will be addressed and included in the referenced project's feasibility study and presented to the Council for consideration. Thank you. Steven L. Lillehaug, P.E., P.T.O.E. Edina Traffic Engineer /Assistant Engineer Engineering Department 952 - 826 -0445 slillehaug ®ci.edina.mn.us City of Edina 4801 West 50th Street Edina, MN 55424 -1394 www.cityofedina.com (fax) 952- 826 -0389 - - - -- Original Message---- - From: Ryan Langsev [ mailto :rlangsev @mulliganbjornnes.com) Sent: Tuesday, November 23, 2004 10:56 AM To: Wayne Houle Cc: Steve Lillehaug Subject: 58th Street West street project Mr. Houle: Thank you for the informational meeting last evening. I and my family reside at 5801 Concord Avenue. Although we have many concerns regarding the street project as a homeowner, none is more greater than whether the project will address a huge and vexing problem that continues to concern property owners in the western part of this project: stormwater runoff. Current stormwater pipes / utilities in this area do NOT properly handle this significant water concern. Every time the City receives a one -half inch or more of rainfall in a 24 hour period, ponding occurs in the area adjacent to and along Concord Avenue and south of South View middle school where the new high school baseball field is being built. Ponding occurs every time. I am not aware of what steps were taken to address this concern in the recent construction on the south side of the southeast parking lot for the middle school campus. Nonetheless, I do not see how the problem was resolved; if anything, it appears the addition of two more drain outlets to this spot has significantly compounded this problem. Ponding becomes a temporary "lake" for a period of time corresponding to the amount of rainfall: for one -half inch, about one day; greater than one -half to an inch, one day of water, and another day when the field is too soaked for human access; more than one inch, days of standing water, followed by a day or two when the field cannot handle human traffic. It will be interesting to watch how the Edina High School baseball team attempts to maintain its schedule and host games on 1 this field during a wet spring. As a parent, I would be concerned whether my child is put in jeopardy playing on a soggy field in an attempt to get all the games played due to postponement from rain. The Edina high school baseball team may begin playing its games and practices on a field which has a reputation in the Twin Cities western suburbs as being a mud field. During the major storm of June 2003 when our area lost power for over three days, the water runoff from the storm went over the sidewalk from the school campus into Concord Avenue and over the eastside gutters onto our property and other properties along the east side of Concord Avenue. Clearly, the stormwater drains do NOT properly handle significant water amounts or prevent such water from causing major structural damage to many houses in the Concord Avenue / 58th Street West area. If this street project is to address all issues for a fifty year period, it MUST fully provide significant storm drainage capacity much greater than its current ability to accomodate water runoff. Water runoff appears to be increasing in volume to the area based upon past history, recent construction, and reporting that our general weather patterns are becoming warmer with more severe weather systems (i.e. greater number of tornados and other systems characterized by torrential rains). I understand the area water problem may be compounded fundamentally by being located at the end of the water drain system whereby its immediate runoff is partly back -up from and /or a result of all immediate eastern properties runoff which must drain away before the water in this area can finally drain away. It is for these reasons and others that I was puzzled how the City determined it could place its preminent baseball field in this location. My concerns are not meant to address the incredible water problems caused by the 1987 storm. You are well aware as to how high the water levels reached in our area. Nonetheless, I submit that the City will exercise poor business judgment and implement bad decisions of its discretionary capacity in its governmental role if it does not properly address the water runoff in this area in implementation of this street project. The City is certainly on notice that water runoff in this area is a significant problem. The City Council certainly should not only be fully advised of this problem, but also advised that the project WILL address the issue, and demonstrate to the Council the project's ability to properly correct the significant problem and accommodate the water runoff. I trust you, Steven L. Lillehaug, and your department will address this significant problem in the context of the proposed 58th Street project. Ryan E. Langev 5801 Concord Avenue Edina, MN 55424 (952) 925 -9141 Ryan E. Langsev Mulligan & Bjornnes PLLP 401 Groveland Avenue Minneapolis, MN 55403 (612) 879 -1819 2 Steve Lillehaug From: Gary Williams [gary@SayltsSold.com] Sent: Tuesday, November 23, 2004 9:39 AM To: Steve Lillehaug Subject: FW: November 22, Informational Meeting Edina City Hall - - - -- Original Message---- - From: Gary Williams (mailto:gary ®SayItsSold.com] Sent: Monday, November 22, 2004 10:26 PM To: 'slillehaug@edina.mn.us' Subject: November 22, Informational Meeting Edina City Hall Hi Steve Thank you first of all for the very informative meeting tonight. My name is Gerard E. Williams, and I live at 5728 Fairfax Ave. So Edina. I would very much like you to accept my vote to do the reconstruction of 58th street. I would like to see the road decreased to 28 feet wide. I am not in favor of having parking spaces adjacent to my home, as it would not give me much side yard. I would like to see it adjacent to the homes further west as you have it planned, I think it would not only look good but also slow down the speed. I would vote for side walks , even though I believe they would be on my side of the street. Unlike some of the other's I would like to see the extra monies spent to add the nice street lighting, as I think it would add value to the neighborhood. If you have any further comments needed from me I would be happy to share them. I make my living selling Real Estate, and I do know what will help increase the value of homes. If my home faced 58th like the one's west of me I would not hesitate to have parking in front of my home, as it will help future sales value for resale. I would be glad to speak to that fact if you need it. Thank You Gerard E. Williams WEST 58TH ST I IMPROVEMENT IMPROVEM NO. BA-328 SURVEY RESULTS Returned Decorative Street Lights Widening Street Survey Yes No Style Yes No NO STREET COMMENTS Colonial Acorn Traditional Please se my email of 12/17 for additional comments; if decorative street lights are installed, I think lightpoles should be black, not green. 4600158TH ST W X X 2 3 1 X Thanks. Leave street as is. Add "no parking" signs on one side. Do not destroy 8 blvd treets on no.side. No sidewalk - widen street 2 ft. - parking one 4604 58TH ST W X 1 X side. No to parking. Must retain mature trees. Please go forward with proposed 28 ft. road. 32 ft. section gives impression that road is wider (ala Wooddale) - narrow road with no parking should be only 4608158TH ST W X X 2 1 3 X consideration. Thank you. 4612 58TH ST W 4616 58TH ST W 4620 58TH ST W Such proposed parking is not seen anywhere else in Edina. Its presence would only serve to cheapen the value of our n'hood and promote strangers to park their vehicles on our street. It also eats into the yards and driveways of residents. Having a sidewalk, especially a buffered one is damaging enough as it is. Why is that not a question on the survey? IYs known issue (you mention it yourself in this mailing) The choise of whether or not to have a buffer has already been taken out of our hands. I don't appreciate the felling that the entire issue of a sidewalk has been as well. It seems as though you might be more concerned with the city than the citizens, on that issue. I look forward to 5801 JASHCROFT AVE X X 1 X hearing more about the status of a sidewalk. 5800 ASHCROFT AVE I am not in favor of a new sidewalk on the northside of the street. My 5721 CONCORD AVE X X 1 X concern is the trees that could be endangered with a sidewalk. Parking along 58th st. has always been a problem involving traffic flow issues, especially during high volume use activities such as football games. However, I recognize that great deference should be afforded the homeowners on the no.side of 58th between Concord and St. 5801 CONCORD AVE X X 1 X johns. Aves. I would like to see the road from Wooddale to St. Johns reduced by 2' to then be 28' wide. You can then widen from St. Johns to concord to allow for parking. I just don't want from Wooddale to St. Johns 5728 FAIRFAX AVE X X 2 3 1 X widened. 5800 FAIRFAX AVE WEST 58TH STREET IMPROVEMENT IMPROVEMENT NO. BA-328 SURVEY RESULTS NO STREET Returned Survey Decorative Street Li hts Widening Street COMMENTS Yes No Style Yes No I Colonial jAcorn Colonial Traditional I Traditional 5725 FAIRFAX AVE X X 7 1 2.00 2 1.50 X 10 58011 FAIRFAX AVE X 33% X 1 1 8% 83% X No sidewalks. 5725 5801 ST JOHNS AVE ST JOHNS AVE X X 3 1 2 *Abstain - I am not impacted by the decsion directly. I am for whatever has the least impact to existing trees considering also the proposed sidewalk. 5800 ST JOHNS AVE X X 1 X Want narrow street. 5754 WOODDALE AVE 5800 WOODDALE AVE X X 1 X I am a senior citizen and wonder why or if widening the street is for parking for the new gyms and not residents. I have never noticed the street lights north of 50th on Wooddale, but now that I have, they are dim and look dirty. Totals 19 12 7 4 10 "1 12 1 10 2.001 1.57 1.501 1 Total Surveys Surveys Decorative Street Lighting Preference Street Widening Preference (Parkinj Allowed Sent Returned Yes No Style Yes No Colonial Acorn I Traditional 19 12 7 4 2.00 1.571 1.50 1 1 10 of Returned Surveys 1 63% 58% 33% 1 1 8% 83% Page I of 2 Steve Lillehaug From: Bob Newkirk [bobnewkirk@mn.rr.com] Sent: Saturday, December 18, 2004 1:16 AM To: Steve Lillehaug Cc: Bob.Stoltz Subject: More Comments for 58th St. Improvements Steve, Just wanted to let you know that Kristine and I (at 4600 W. 58th St.) support the views outlined in Bob Stoltz's note below, as well as the specific plan he attached. I think the major concerns of the residents are: Keep Speeds Down. In this case, that means a narrower road. Parking availability doesn't slow traffic down, because so little parking takes place on this road. Maintain Aesthetics. This means keeping the mature trees, and adding a "boulevard" sidewalk, i.e., one that isn't flush up against the street. I would also observe that there is a power line that crosses the street between just west of Woodale that could be buried. Improve Drainage. This all takes place underground, I assume, but the area in general gets a lot of runoff during storms and this issue must be kept front of mind. I do think a sidewalk is in order for the children in the area. We would also be open to nicer street lamps, pending the additional assessment analysis. With respect to parking, I would note that this would only appear to be a practical issue for the residents that have driveways on 58th street. The number of nearby side streets and the double -width driveways on this street mitigate the relatively minor need for parking. I also don't see how there is room to save the mature trees, have a boulevard sidewalk and have parking. One of the three has to go. It's easy for me to say, as our driveway opens on St. John's, but I would choose to eliminate the parking. Thanks again for a good presentation last month. I'm sure the ultimate end product will turn out well. Bob Newkirk 4600 W. 58th St. 952.924.6023 -- Original Message - -- From: Bob.Stoltz To: slillehaugaci.edina.mn.us Cc: bobnewkirk(a)mn.rr.com Sent: Tuesday, November 23, 2004 12:16 PM Subject: Comments for 58th St. Improvements Hi Steve - Thank you for the thorough presentation of the proposed road improvements for 58th St. - it was very informative in helping us understand the scope and possible options to consider. I live at 4608 58th St. (one of the "blue" houses) - My comments somewhat reflect the fact that I am one of seven houses that have addresses on 58th Street. My comments /concerns are: 12/22/2004 Page 2 of 2 • Maintain the mature trees on the north side of 58th (between Concord and St. Johns - I don't recall mature trees on the north side between St. Johns and Wooddale). • Maintain "residential" feel of street - Ideally, reduce the width of the new road relative to the existing road. I would not want the street to resemble Wooddale in terms of width. Wide feels like fast. • Add a sidewalk with a minimal boulevard - The idea being to have "green" between the road and sidewalk so that the sidewalk does not feel like an extension of the road. • No parking on either side of the road. I don't mean to represent my neighbors on this issue, but very seldom does anyone park on the road currently. I think this was reflected in some of the comments last night. My preference is to not make it more inviting to park along 58th (which is what I believe parking "bays" would do). I've attached a sketch that reflects the concerns mentioned above - If the road was reduced to 28 feet in width (from it's current 30 feet) and by shifting the the south edge of the road 2 feet to the south, it would allow the north side to have a boulevard, sidewalk and 3' of existing "green" to the base of the existing trees. An option to consider - The section of road from St. Johns to Wooddale could have a wider boulevard w /trees since there are not existing mature trees on the north side (nor do the houses "front" 58th Street). The road would align the full length, but the sidewalk would "shift" at St. Johns. Not sure if that's allowable or not. Thanks again for your time - let me know if you have any questions or comments! Bob (and Vivian) Stoltz 4608 58th Street West (952) 929 - 3613 12/22/2004 PRELIMINARY ASSESSMENT ROLL W 58th St IMPROVEMENT BA-328 CITY OF EDINA STREET FIG LEGAL STREET NO. OWNER Frontage LOT BLOCK Front Fmtg Slde Fmtg Back Frntg Total Assessable Frontage ASSESSMENT COST A Ashcroft Ave 19ffi 6-2631 -0068 24 7 6601 8660fe, 16148 1366200 46.2067 S 3,089.04 19-02&24-31 -0089 1 6 6600 Soot. Dorothy 136.6200 46.2067 S 3,069.94 Concord Ave 18-028-24.24 422 13 1 6721 Band. Jaoqudim 1167100 38.6700 s 2,619.25 1992 8-2431 -0090 248 pt23 6 6601 Ungm, Rym A Ladle 1361200 46.2697 S 3,089.94 Fairfax Ave mma -24-24 40028 4 2 5728 Williams, Dowd 1312700 43.7567 S 2.971.47 1942&2424 -0037 6 3 5725 Ford Gerald 8 Addants, Cwyn 129.6000 43.2000 2.W3.67 19928-24,31 -0021 24 5 6801 Trwntl Josnh 134.1200 44.7087 303699 1902 &24 - 31-0022 1 8 Saw Werxn Stepharft 1366200 462067 S 3089.94 Saint Johns Ave 10-02 &24.24 -0029 6 21 5725 HaiM Gregory 8 Molina 1312700 431667 S 2,971.47 19-02 &24.31 -0046 0 0 61101 Wilson Kristopher 8 M Amanda 136,6260 462087 $ 3, 069.95 11IO2 &24,31 -0048 1 7 6600 Bar Alan A Mkhd. 1361200 46,2697 S 3.059.94 W 58th St 10-02 8-26 24-0021 12 1 4620 Herd 60.6000 60.6000 s 5.432.72 19-02 8-24-24 -0020 11 1 4816 E aPetdGa 110.0000 60.0000 6432.72 19.02 8-2624-0019 10 1 4812 Cholor, Jmvwv a Ompotang, Yeah 60.0000 8D ww I k432.72 %o2 &2624-0016 9 1 4808 Stoltz, Robert a Wan 60.0000 60.0000 $ 6.432.72 1992 8-24-24 -0017 S 1 4804 E RkJtad a Jeamlre 60.0000 00.0000 432.72 IGMS -24. 24-0016 7 1 4600 Robert a 101allm 76.2700 762700 6316.24 Wooddale Ave 19-02 &2624-0079 4 3 6764 Wind. Je ome 128.6000 43.2000 S 2,933.67 1992 &2631 -0001 1 I Robert a Ell7aberh 134.1200 44.7057 S 3,035.09 1,051.4087 S 71,400.00 to" mad -y PROJECT COST S 317,000.00 demratNS lighting coal S 40.000.00 total roedwvy4lpMinpmal S 357,000.00 Total Aee09aeble Coat (20% mseaaed / 80% SA) S 71,400.00 TOTAL ASSESSABLE FTG: 1,061.407 ASSESSABLE COST PER FOOT: s 87.91 wmst�j-biup Papal 2:as PMY31r2M Agenda Item # II.C. TO: Engineering Department FROM: Residents of 58th Street DATE: April 19, 2005 RE: Resident Petition Proposed Roadway Improvement No. BA -328 West 58"' Street Improvements Attached is a copy of a petition that will be 9resented to the Edina City Council at tonight's meeting. West 58 Street residents within the proposed improvement zone are unanimously oovoosed to on- street parking but supgort preservation of the mature trees along the roadway. If you have any questions, please contact Bob or Kristine Newkirk at 952.924.6023. Thank you. TO: Edina City Council DATE: April 19, 2005 RE: Neighborhood roadway Improvements - Proposed Improvement No. BA-328 West 5e Street Improvements We, the undersigned residents of 58th Street, have two primary goals in mind for the proposed roadway improvements on West 58th Street. 1. Maintain a safe thoroughfare for local residents and children walking to and from area schools 2. Preserve property values In order to meet these goals, we respectfully support the following road improvements: • No on- street parking. Cars move faster on wider streets. The City's goal for the area should be to calm traffic flow, which can be accomplished with a 28 foot wide thoroughfare. • Preserve mature trees along 58"' Street. Thank you for the opportunity to participate in this hearing. Name Address ii s !� / / . W, ..W R i' fir 1 � � C �/ s n .S7Z J- �-�/� 5 %1' ! o D,'•u f-t� �s mac.., -7-57t • f n IA ki ( t , 4<v6'j Au 56 y 4� l6 .2,0 r,- 5 k�, � -a- Page 2 -7-P- j `. A VAV MI 3"10( fr. _' /i-1- Aowe �� �s�2, co ' y .f v- 1888 AGENDA NO. III.A. PUBLIC HEARING - VACATION OF PUBLIC STREET PUKWANA LANE CONTINUED TO MAY 39 2005 No packet data 1-1 Oral presentation Information coming w` ° e o REPORT/RECOMMENDATION To: Mayor & City Council From: Craig Larsen Date: April 19, 2005 Subject: Zoning Ordinance Amendment and Conditional Use Permit — Southwest Quadrant of 50th and France — Haugland Companies Agenda Item # IV. A. Consent ❑ . Information Only ❑ Mgr. Recommends ❑ To HRA ❑To Council Action ® Motion ❑Resolution ®'Ordinance ❑ Discussion Recommendation: Grant Second Reading to Ordinance Amendment allowing residential dwelling units as a Conditional use in the PCD -1, 2 and 3 districts, and approve Conditional Use Permit subject to: a 1. Platting the property to incorporate all easement vacations and dedications. 2. Developer's Agreement covering utility work and restoration of streets and walks.. Info /Background: See attached' Planning Commission minutes, staff report, plans and correspondence. 0 I r' •r. �I 'h' aJ �. Utu iom o3mu7 mum mtraat wam 1.5020 Franca Avenue Se IV DRAFT MINUTES PC MEETING MARCH 30, 2005 C-05 -1 Conditional Use Permit Haugland Companies Southwest quadrant of France Avenue and 50th St. W. Mr. Larsen told the Commission on March 15, 2005, the City Council approved and granted first reading of,a Zoning Ordinance amendment allowing residential use in the Planned Commercial. District subject to a Conditional Use Permit. The proponents have now filed plans in support of their request for a Conditional Use Permit pursuant to the amended Ordinance. Mr. Larsen concluded staff recommends approval of the Conditional Use Permit conditioned on: 1. Final adoption of ordinance amendment 2. Watershed District Permits . 3. Developer's Agreement covering utility easements and vacations as required; air and subterranean rights easements; and temporary construction easements. 4. Landscaping bond covering replacement of plant materials and restoration of public walks, drives and fixtures. The proponent, Mr. Gene Haugland was present to respond to questions. Mr. Haugland addressed the Commission and with graphics pointed out the changes that occurred since the Commission last heard this issue with regard to the fagade of the proposed redevelopment. Mr. Haugland said exterior materials and the building elevation has been refined and this change in elevation allows owners to take advantage of the views. Mr. Haugland noted fine - tuning still needs to be accomplished with regard to utilities. Commissioner Brown stated if he remembers correctly from our previous meeting that sidewalks will be widened. Mr. Haugland responded that is correct. He said the sidewalk along France Avenue will be widened by 3 feet with the sidewalk along West 50th remaining the same. He noted the sidewalk between the Arbys site and Ampersand building will also be widened. Commissioner Losnbury asked Mr. Haugland if there will be a visitor entrance at the rear.. Mr. Haugland responded our initial thought is to have visitor ,t access only off France Avenue. Mr. Haugland acknowledged it may be possible that in the future the condo association may desire a rear visitor entrance but at this time the building will be designed without that. The entrance and exit for visitors will be from France Avenue. Commissioner Lonsbury asked Mr. Haugland if the issues with Mr. Curtin have been resolved. Mr. Haugland responded he believes they have been resolved. He added discussions are continuing with regard to erecting a canopy over the adjoining walkway. Chair Workinger asked Mr. Haugland if any changes were made with regard to guest parking. Mr. Haugland responded the parking element remains the same with no guest parking in the below grade garage. Only residents of the building will park their vehicles in that area. Guest parking would be accommodated in the public ramps or on the public street. Chair Workinger stated he was unable to attend the last Commission meeting when this issue was heard and noted there was some discussion regarding air /subterranean rights and questioned if they have been addressed. Mr. Haugland responded utilities etc. will be addressed in the Developer's Agreement and at that time finalized. Chair Workinger questioned if the trash enclosure would remain in the same location. Mr. Haugland said the trash enclosure area will remain in the same location, as it exists today. He explained the majority of the retail tenants use this trash area. He added he believes Lunds has its own trash enclosure area, and also due to utility placement the conclusion was to retain the trash area, as it presently exists. Chair Workinger asked if the trash area is secured. Mr. Haugland said presently the trash area is secured with a code pad for access. Mr. Hosmar Brown, property owner in the area, told the Commission he still has difficulty with this proposal. He said he agrees with much of what he sees, but questioned if this is the right location for a development of this size. He added his concern is with traffic and traffic congestion. He stated he believes traffic in the area will only increase in the future and this will contribute to that increase. Mr. Brown told the Commission that presently merchants in the area already complain that their clients have a hard time finding adequate parking. Concluding, Mr. Brown said he hopes this proposal doesn't end up creating a canyon feel to that comer. Mr. Grabiel moved to recommend Conditional Use Permit approval subject to staff conditions. Commissioner Fischer seconded the motion. All voted aye; motion carried. INN Sri I -Y L!I'. •y i 1 � � nnuslana %oompi 101 -3907 50th Stnw 00020 Franca Avenues Sep ,y IL REGULAR MEETING OF THE EDINA PLANNING COMMISISON WEDNESDAY, MARCH 30,2005,7:00 PM EDINA CITY HALL COUNCIL CHAMBERS 4801 WEST 50TH STREET Case Number: C -05 -1 Location: Southwest quadrant of France Avenue and 50th Street Applicant: Haugland Companies Request: Conditional Use Permit to allow residential dwelling units above retail in the PCD -2 zoning district. Request: The City Council, on March 15, 2005, granted first reading of a Zoning Ordinance amendment allowing residential use in Planned Commercial Districts subject to a Conditional Use Permit. (Ordinance is attached). The proponents have now filed plans in support of their request for a Conditional Use Permit pursuant to the amended Ordinance. Plans submitted include site plan, utility plan, floor plans, landscaping plan, and building elevations. The plans submitted satisfy Ordinance requirements. Zoning Compliance: The plans presented comply with the requirements of the PCD -2 district, and the residential plans comply with Conditional Use requirements. The plans are essentially the same as those reviewed by the Commission in February. Since that time the developer has continued to work on utilities and to refinements of the exterior of the building. The plans suggest using varying brick colors with copper and pre - finished metal accents. The developer will have a color rendering at the Commission meeting. "f 1 Recommendation: Staff recommends approval of the Conditional Use Permit conditioned on: 1. Final adoption of ordinance amendment 2. Watershed District permits. 3. Developer's Agreement covering utility easements and vacations, as required; air and subterranean rights easements; and temporary construction easements. 4. Landscaping bond covering replacement of plant materials and restoration of public walks, drives and fixtures. M REGULAR MEETING OF THE EDINA PLANNING COMMISISON WEDNESDAY, MARCH 30,2005,7:00 PM EDINA CITY HALL COUNCIL CHAMBERS 4801 WEST 50TH STREET Case Number: C -05 -1 Location: Southwest quadrant of France Avenue and 50th Street Applicant: Haugland Companies Request: Conditional Use Permit to allow residential dwelling units above retail in the PCD -2 zoning district. Request: The City Council, on March 15, 2005, granted first reading of a Zoning Ordinance amendment allowing residential use in Planned Commercial Districts subject to a Conditional Use Permit. (Ordinance is attached). The proponents have now filed plans in support of their request for a Conditional Use Permit pursuant to the amended Ordinance. Plans submitted include site plan, utility plan, floor plans, landscaping plan, and building elevations. The plans submitted satisfy Ordinance requirements. Zoning Compliance: The plans presented comply with the requirements of the PCD -2 district, and the residential plans comply with Conditional Use requirements. The plans are essentially the same as those reviewed by the Commission in February. Since that time the developer has continued to work on utilities and to refinements of the exterior of the building. The plans suggest using varying brick colors with copper and pre - finished metal accents. The developer will have a color rendering at the Commission meeting. Recommendation: Staff recommends approval of the Conditional Use Permit conditioned on: 1. Final adoption of ordinance amendment 2. Watershed District permits. 3. Developer's Agreement covering utility easements and vacations, as required; air and subterranean rights easements; and temporary construction easements. 4. Landscaping bond covering replacement of plant materials and restoration of public walks, drives and fixtures. ORDINANCE NO. 2005 -3 AN ORDINANCE ADDING RESIDENTIAL DWELLING UNITS AS A CONDITIONAL USE IN THE PCD -1,2 AND 3 ZONING DISTRICTS THE CITY COUNCIL OF THE CITY OF EDINA, MINNESOTA, ORDAINS: Section 1. Subsection 850.16 of Section 850 of the Edina City Code is amended by adding the following thereto: "Conditional Uses in PCD -1,2 and 3." Residential dwelling units above principal uses. Section 2. Subd. 11, of Subsection 850.16 is further amended by adding thereto: O. Standards for residential dwelling units. 1. No part of any dwelling unit shall be located at street grade. 2. The floor area of the building used for residential purposes shall be exempt from the Floor Area requirements of the underlying district. 3. Dwelling units with a floor area of 1,500 square feet or less shall provide a minimum of 1.25 fully enclosed parking spaces per unit. Dwelling units exceeding 1,500 square feet shall provide a minimum of 1.5 fully enclosed spaces per unit. Section 3. Effective Date. This ordinance shall be in full force and effect after its adoption and publication according to the law. April 11, 2005 City Council City of Edina 4801 West 50`x' St. Edina, MN 55424 RICHARD T. CURTIN 6310 MCINTYRE POINTE EDINA. MN 55439 952- 828 -0900 Re: Proposed Haugland development April 19, 2005, public hearing Dear Members of the City Council: I am the owner of the Ampersand Building, 5074 France Avenue South, located immediately south of the Haugland Development. I am generally excited about and supportive of the development as presented, but I have some specific concerns about how this project will affect use of the Ampersand Building. Mixing residential and commercial uses works only if all parties know what to expect. am hopeful that each prospective buyer of a condominium will be informed about our plans for the Ampersand Building before they make their purchase and I want to make sure we do not miss any opportunities to minimize the potential conflict between competing uses. The Ampersand Building is going to undergo a substantial renovation and to do so it necessary to understand how the Haugland project affects us. It would be helpful if we could see an elevation from the south, a drawing that shows the height of the Haugland development along our joint property line. We would also like to see an overhead, showing how close to our sidewalk the Haugland development comes. This information has not been previously available, but it vital to understanding what is proposed. At the last public hearing, I expressed some concern about how the development would affect the use of the roof — I was then thinking about roof top dining. An issue I did not bring up is the problems of venting the cooking smells from a restaurant. We would like to see an elevation from the south, looking north, that shows which windows and balconies may face our property. We would also like to see an overhead so we can see how close the balconies and windows come to our property line. That would help us understand the impact of noise and cooking smells. This information has not been previously available, but it is vital to understanding what is being proposed Page 1 of 2 We have not heard any details about a proposed canopy. We are generally supportive of a canopy over the sidewalk, but we have no way to determine how such a canopy might be constructed. Another concern is how the proposal will affect the use of the Ampersand Building's sidewalk. I am in discussions with a prospective tenant who proposes an upscale restaurant, for the Ampersand Building. They would access the restaurant from France Avenue and they would also access from the existing sidewalk, along the north side of the Ampersand Building. In addition to the new tenant, there is an existing business, Oliver & Taylor, which uses this sidewalk as their only access. We understand that many details remain to be resolved. However, this is the last public hearing, the last time we can have public assurances and a public explanation as to what is proposed. Very truly yours, RICHARD T. CURTIN Page 2 of 2 March 31, 2005 Re: 501h & France Redevelopment and Proposed Transportation Policy Edina City Council, The purpose of this correspondence is to commend the Council with respect to its March 15 decision to approve the proposed redevelopment of the SW quadrant of 501h & France by Haugland Companies. I genuinely believe the proposed redevelopment will complement existing buildings /architecture and will continue to position the "iconic" 50`h & France as one of the preeminent business districts within the greater Twin Cities. I appreciated the opportunity'to attend the March 15 Public Hearing with presentations by the developer, architect, and engineer; as well as to hear comments from fellow residents. Unlike the redevelopment of the "NE quadrant" of 50`h & France several years ago; greater attention to detail with respect to project scale, "step back" symmetry, mixed facade composites, and preservation of sufficient sidewalk are all characteristics which will create a truly residential/pedestrian friendly asset for our community. These attributes should also contribute to the economic vitality and success of the commercial tenants. I was also truly amazed by the, speed and efficiency in which this proposal was reviewed and approved by the various City officials including City staff, Planning Commission, Transportation Commission, City Council and City residents via the Public Hearing. The entire process amounted to a matter of weeks. Problem - solving and decision - making are competencies evident in our City's government when we are truly committed to the task at hand. While I am supportive of the redevelopment, I remain somewhat concerned with respect to traffic related implications for NE Edina, particularly during the construction phase which will span nearly two years. As well documented, NE Edina has significant traffic issues which have largely not been addressed due to the absence of a policy from which to wide the problem - solving and decision - making phases. In 1999, traffic- calming to 50` & France diverted traffic into contiguous neighborhoods. Three years ago, traffic issues in NE Edina were exacerbated due to construction/repairs to Hwy 100, which reduced the number of traffic lanes. The proposed redevelopment has the potential to have the same effect, again particularly during the construction phase. In accordance with the definition in the proposed Transportation Policy, portions of NE Edina could be classified as an "Impacted Area" (with respect to the redevelopment project). While I certainly am not suggesting that I should have a right to impede the 501n & France redevelopment, I do believe that I should have the opportunity to work with fellow residents and city staff to address existing traffic problems and proactively protect our neighborhood from the intrusion of additional non - residential traffic which may result from the redevelopment project. The proposed Transportation Policy provides this opportunity. The practice of initiating traffic- calming measures throughout residential neighborhoods situated adjacent to commercial districts is very common. Several nearby examples include the cities of Minneapolis and St. Louis Park: . • SW Minneapolis (throughout the Southwest High School neighborhood, NE of 501h & France) initiated actions many years ago and just replaced many of these measures in November 2004 to safeguard the neighborhood and minimize non- residential traffic. • Minnekanda Vista (SLP) neighborhood has been "calmed" to minimize any intrusion from the recent Excelsior and Grand redevelopment. The traffic - calming in this neighborhood is so subtle, that it is hardly noticeable yet effective. These actions simply allow the coexistence of residential and commercial businesses, and have not resulted in any adverse impact to traffic flow. I certainly recognize and appreciate that the City has worked very diligently for over a year to formulate a transportation policy. The process has been publicly transparent from Day 1, allowing community input throughout the development stages. The draft policy, passed by the Edina Transportation Commission by a 6 to 1 vote, has been readily available to the public for five months during which time a public open house and a public hearing were conducted by the City. This process can also be described as democratic. The proposed policy is well thought -out and representative of existing policies across the country. They have withstood the test of time. Therefore, I encourage your support and passage of the proposed Transportation Policy. Respectfully submitted, Keith Wolf 4600 Wooddale Avenue cc Fred Richards, ETC Chairman Steve Lillehaug, City of Edina r I I I I I I I I f I f I I I I I I I I I I i I I I I I f I I I I I I f I f I I I I I I I I I N I i 20 scxF II 10 o zo 40 �r li! Ill I Il I11 IIl III Il I! 1jl 1jl Il !jl jl Ilj 1�1 1� 0\ OPUS. aws w� t ate.. iaao a.e bw rm Ifmdoita &on* 5w tjt a ►. W-s"n ear wAkft co Sam WW =me w iwsn wR 14 mos ieo..m e wsMi A. Slm* i �e LL U M(tlE • u.e � r e..w. • rarZ.i.4. a.pr w r n7.nlr r rata �.� . Tire..u...../..r.. • D�a�.r u... r ae� rra �o.e►��s..rw r a. err •.ap.�rirr +rr � .rir�. �i e � ps sr ISO q rI� tlV. but IW enr� 1\ M. JIm Ate SMff.Sff. E CONDrnom 7 C1.1 J -1 Q� t L FRANCE AVENUE SOUTH PROUECT WORMATION SITE AREA 11,277 SF SOUTH PARCEL 16.371 SF NORTH PARCEL TOTAL SITE AREA 30,648 SF RETAIL AREA 22403 4V RESIDENTIAL AIWA 3 FLOORS % 24-M5 SF./FLOOR - 73AM S.F. (24 UNITS TOTAL) PARKING SPACES-. µ SPACES SHMN IN GARAGE. 2 SPACES AT GRADE PLOT DATE March 16. 2005 - 327p1n OPUS. Opus; AIL'dwb 8 or�rr rr � Aosw. M� r AMY m[® 2/9/05 MY MWTIIAL (ZOMNC) 3/16/05 CITY STI9RTAL (SITE PLAN APPROVAL) m ra Y31_5790 ■em sa 03/16/CS C. LARMN - m� S JOHNSON amo. R A9fSM 1111 Id 11 • 0.a m r r r..rl- � �.reZ r 4. m•r w r �Ati•�w aw aO-� O • A/b ..w OPUS. 50TH AND FRANCE DEVELOPMENT EDINA, WL �mg ARCHITECTURAL SITE PLAN/ LEVEL ONE PLAN 17Al-.l1l OPUS. Opus Amhbets B Enghms, ws 7rrr war r. murw eet® r amm I I I w10. I alo. I I law. coop r.al ww i Slam i I I 7,pYIQ. T A- s ,T7 - T .mom, -:naw.T ---- - - - - -- -- - -- -- -- -- -- -- -- i i smpwa a smwa q r<oraa I r -s• r-r 77 1 77 74 y I I I m I A m y a :, a® I I I i /1� 0711' S18 (ZQmIC) I —_— —_— —_— _ —_— W —_— opwoo i r -r r -r i r-r r-s• i I I I I I i i I I I I I = 1 7 I i Y7/ }790 I I I I 0• ■ S imlam I I I I I in 17 I is n m I R X oHm I I I I I I � • euw r o. e.�.wr. r rw,wiwro,. ww`�v I I � I I I i I 7bwib rarrr�hr I I I I �••�' •�—a ••� smwc= s siom a smaa =� sloop m smaa n aawas ie I o=v. mr. I --- — — -- — -- — -- ---- -- — -- - -- -- -- — ,amr sow smswx a smwr� q s'aowx 14 smmia is I •wore�aen m b. wi -- -- -- --- — — — - - -- -- -- ergs. ,,•.w,. i i i i i OPUS. iL ooR PLAN - LOYVEIt Levy I/F. I.3 ED- 1 a PLOT DATE March 16, 2005 — 3:28pm 50TH AND FRANCE DEVELOPMENT m L»�7l 1aL .m M FLOOR PLAN LOWER LEVEL FLOOR PLAN -LEVEL Two 00 opus. Ow9 A 8 .bm mt..ry wr�r �e orww s�-ws r m 2/9/05 CITY W arK (Zmm) 7/15/05 CRY MOMAL (50E RAN APPRWO ® m Y71 }Z90 wam wm .w G IA160N m•. & A NSM IL JOHOW • 0.w r .. rr.w. r rr�ri sweri`r r dKm* •wr dP"NW :alit~. W.% •das w.y h.+r %\ OPUS. ..e 50TH AND FRANCE DEVELOPMENT wow E69Y1 WL —m FLOOR PLAN LEVEL TWO P PLOT DATE Ucrch 16, 2005 - 3:28pm I A2.211 L T FLOOR PLAN- LEVELTHJM ®~ ., L PLOT DATE Morch 16. 2005 - 3:28pm OPUS. s r r r mare r fID.O 1/9/65 CITY S Sam (Zmmo 3/16/05 WY VAUUAL (S11E PLAN APPRM) MU-5790 ,m oa s 3/16 1m ifs G WISm s0 S JOHNSON X JOH SM r.wr<i. � 4.• aysr •w r f r Y.f•rd �r \ ra.H: r. • a .•�/ tlii a✓t1r1 i Y w• iw6� r r v 1e �N• r • OY Ams� q �r r Iwa f Pr O • . jY �r OPUS. 50TH AND FRANCE DEVELOPMENT 1® Fond H L t ff FLOOR PLAN LEVEL THREE " A2.3 0 FLOOR P LAN - LEVE FOUR 1 - 1 z� ROT DATE March 16, 2005 - 3:29pm L OPUS. OpO6 kditCb e E.InL m r r r a.rr• r.rt.. �►e r mo m 2/8/06 CITY SIAIO K (ZONC6) 3/16/06 COY 9U98RAL (SITE PUN APPBO/K) m, v TW�6790 wm mw s lam mal t IAF= sa S JOHNSM mr■ R JOHNSON r�i.srir s 4�• e � w...+i wort r ar ara r•. . r- Psi � .r a w'7•T•i •Ir d-4 r.r 14 rwWw ark/ w rnw 0.8 Mk ww.w rlr r 0 OPUS. SOTH AND FRANCE DEVELOPMENT UNk ml. .vw FLOOR PLAN LEVEL FOUR •, I\ \I PLOT DATE larch 16, 2005 - 7:JOpm ,wd 1 OPUS. om kcmw s a s r r r w� ewe were r aeo m. e® 3/16/05 c" SLwn& IW}79D s 7 /16/05 � ®gym C W601 v e A A1660N ams• R JON" e� ==12" d eta �a w..r. m.warv�r .�rsre gqs bi.� oe m°��,rra �.0w ar W~ w.r r OPUS. ever 50TH AND FRANCE DEVELOPMENT mw WL DID vu ROOF PLAN A2.5 ---------------------- ------------------ -E 41 P; w T VE w PiI_ - Sit i, �, 10 1 MIRWIZI HE, 0 H . ... .... I. T -7. --Mom OWN 111 171,11 mologivioses= 111111101 =1111agessiol�= Mom 11211111� logo 11=- ■fssom- z- 111voill =1111:: WO ■ as -a—If an I M I I f S MIMAME �MEW- _11M 1010� 1. Mizi I.i MEN RA ri. OP M 0 one—man, —imisision,= Neill ffilin no—sonE IIIJII noomomnmns 1115V —mm, MINN— 0 1lWIl!lF1lW No of 2. No ­....' H.E. ROOM I NINE IN=— Ell =11P.1211mi OR MUM W I 1A ■ LN rll'�"Idi id IMP 111131iii111id! Ill ill 1;1:11!! Illllll :lild11',11lflill.11llllll IL— MINI Elm I I IMM, u ME An HUM111 I — - -------------- MEESE== V an E lu r Ill Igloo: AN a _41 N Ird Ird A'd 1 1 I 1 1 1 I 1 .01/ amm . am. Ird .rmo� I Coom W.M 1 1 1 1 I I I I aa,da .ml rd rd • l!1 1 i -11 u�- . 17'i 1 rd . a 4RC ID 1 I I 1 � SECTION AT EPI7ItY TO PAW071G GARAGE -- 1 wo.a.n IA. lord oll.s ow Yd 7r--r m' -r W-W 2r-r 1 1 I 1 1 I 1 I I I s 16.1 r =wm U."r - Wv OF RII. I I I I � I�TYP�'JILNORTH- SOUrH5ECT10N L u - u Y I b 1 1 L b_ 1 I I 1 L A OLIIOOtA 4�1.. 1 1 I � 1 I -ro. ar 1 IYfd wla4 >g ]rd I r I I I iii AI a I § 1 1 s 1 T aaa� I � I L I I I 1 PLOT DATE March 16. 2005 - 3:31pa, OPUS. Opus AThbeb 8 Enomm tm wsrrr mso r 2/9/05 CITY SAWAL (ZOWJG) 3/18/05 CITY SLOM AL (SITE RAM APPROPAL) ®ro IWa790 3/18/05 Iem w C IARM IJOHNSON R JoHNm •Gil.. r r ..�.ra r Ti.r.rd mr+r r rwrl rb th. nrs.r.b r Ir r r ..e r rwh ��rs r rti .rr mPkd W w . r Iyb ...r Ir OPUS. 50TH AND FRANCE DEVELOPMENT r® a Nk WL .m .IG BUILDING SECTIONS lmv� A4.1 r 20 10 0 20 40 l3G1LE FAT J �� OPUS. ,,. 1080 &0 Hoed wad IOeodwli% Mhou a 59a ,SZ-6Si -440 Fm 952 -W-45n i r rlas 4r.�s. s0 wqm CPI OB.4 ews�9 m ea Mt 14. 2009 �o C. LARSal .w SIEMHOFF e w IL IEOM ..1.. rrwwr.r O• wwi•Z A1. w7•iY w w wplr� 111 r N melt r fth" • erlr isnrw4.r mry bpd �s.r.. r rr�7irr d h. • I 0°~r•rra.e � • r y w..l 10001 optis. OM ee® eeanamL ut M A.:0w err.• t 10m MM AND FRAWM DE•LOPMOI ess 0006 wL 0l � R I' DM D A i ���� ••,,•,, UrLffY rte' em oe• C1.2 J Is Lv �� FRANCE AVENUE SOUTH 2DeaL roTm - LAMOOCAM COMINACTOR SMALL ~ SM PFIOR TO PIeMr,.e E10 To wre Cr 6R M o CladrILY FA11A I SM 40140TTIOR! - ALL 1001160 AN FINIM ORADM TO S DOW P 0001? - NO PLARTM PILL m /OTALLM VKM ALL SIMMONS, IMO C 007PMTM 11116 Ssl Op PlZrW N MmIATE AIPA, - R S M RYC10ON." e M Orem a rgRPAd=M TO 00001 'L IPOebRCrPO CAG m Ommm FIRM ETG- am M - IF VIOLA! S A MG.IWAN•Y PITYIM T1! MME OF PLAIIIII S OMIN OM THIS RAN AW M IaMSR OF FLAMP! SOMI N M Fl..AW LNR. M MPeDa Or FLAMM am" am M RAN FILL TAIO r1KOBlfd - ALL C WAPM IIA}WAL TO S OROPM N 94WAOOTR A P004 M OF O MOKIIIL - ALL IWISINAL SMALL 42MMY PTITM M TW �� poll mAt=W Sf0 JAIOD AOIIOCIATION OF MlVBtfmm -1l/He ALL OANAOE TO PPAPeOY FROM FLAMM OPMATIpS AT NO COOT To M Crum - OLNRI1NAa TOI RAMP IM7OOAL T1sLOIlOM pe GA 4W C.AY!M FOR OGoITO W. V TO sYJ• GAL P 6NS "A MI To W M. 6AItl^ S> ®131 S! FROM TIME waa TPO rNDOAR TIMLO 1'I10r1 lOe a rROMB0IAL AGCD'rAliE. - ALL PNpbOW PLAIIIO SMALLS LOCATW rllmaLLY As SIaM ON M RANG AV SMALL m APPROVm or LAIOOCAP! AlICMIICT 680M T116r AIm OWALLED - LArOYIlE CONTRACTM SMALL DSMe TINT Im "Sms mvw aKIO M all APe 010 room aMLAM allm FIM SMLAR SOLD To M SOY OF TMs PRO"? OEAvr TO M:AVr, LOW TO LWR. WEAVY TO LOMr - LANDW -Am CCNIRAOTOR 16 Ima0m TO PImVa Orem RIM MNMTOIM1rd NNSONTON OLFIMP OOMIAIRR rvTlo2 RDl.TOO 70INTOOIIL i�p16. PFIPOO, M" NS rIN L MO RDATm allm TMs CP S Fl�AMm Ala aDJVp1ID lO aMa AFlea PROV0ICrNL Vr L^N 10K A/ 091MC Mb ®1 MVDI m Lw1aYM ARpPIC11 - FII/MPOO MAT00AL SMALL S COmM^vm TRS PROTCTIon PPM M 013 OF TLQ r VIA. OSL) LA FAW THAN M CAL7131 am" SS or TMQ TO S PROTIOTm. PNM ALL TIC DOCST INCI®ONY TIM S ALL S rROTMT W rM= TO OA APO TUNS RDIOb® or Nl. SwL• POLY e7e4D11PLem slClleO arIWPY ! A1CK vNrt CDODI eTTOa =-W=%= CK nPPIR DME srna m�Pea - ROCK M" S S cow IV irr PIA, MMJm R11001 POCK PPM P09 &W CLOIN - SIIC LANDBCAM FA IPLTQ PLAT) To MA ff A C 0 MM DOOM► OF 4A-03 m FM SY. FAISM SIOLD Te uV. arABLInP AIV MAyE A Fly! TEAM MOMM PlATHM AM" PACTOR M PULL SML/2Kr. PAONr To S rM LLlD Cum R OR BaWALDIT SAWLE IObPRm FOR APPROVAL - ALL FLAMM fMLL 10MVE PeRma R AO POLLd6 W"St AND PALL rLAKrM - 015PCrQ FO M rRI!<gV APPLY 0-20-32 ORANILAR N bYCOe AI OM PLMIr AT M RATE OP F0 m cAm Pea 2-9` ri1L TM= t M m CM FULL Pel Swan POAAM lI FIM M DMe APIMW Q 10-10-40 M MOLLQOtl &w4N& - WD SNLL S MINLMO SOD. 9T t 100' TO W LAO AMALLIL TO CAT7�p ILMn 1Nv! SrA07e® XMIS, all Sore 0T�0a TMW 0.1 pL ORASNOE SNLM M 703 SMALL m 5r=NIO M ORa/0. scARrr MP M fO IXs10 ORAOS PsM rpO CIL CA10 TO T MIL AND Or M dMAD IS M SM Q lOrsO< AND A To ORAOOO PM OOD. P *MIATRY rRL I TO PLACW eOD. cGNrR/1GTlR syaL APPLY 10• n Pa Peeruama wr M RATE or pas Pea Inca m R • aALWM OF ALL TRS TOW" W To Alp WAIOMO Y SMALL S reAOINS Y D2 AVE OPOPO LEVEL. AIO S PROVE OROMa LN6 r10R LARODI Nm - ommu 10 SRm SMALL INK M KN Or FIVE B CANS AT sPeaP W MDO Tr MLM OTIDVfyS MMW N FLAW LOT. - IF M CONTRACTOR r015.0 AM BOWL MAIL EM MAm RmMmPIS SPACNO OR MYIOOIIIIIS or A SY,Qs OF RANT MATESAL 81016A720 ON M PLAN. IOMrr M L.AIPOCAM ANDOWT PAM TO M INSTALLATION OF PLANT KODUAL ALL 10LY INSTALLED FLAIR rNTeNAL 'JLALA m FLAMTO N TQL-0RAPm wRw 6ONIRACTOR SNIL AVOO ft"I. AKr FLAW IYLTOIIAL N ORAMAOE OMALe1 OR FIT P PCOMY ORMNm AREAS Al sti W17Y 5 lifir Page 1 of 1 AGENDA ITEM: IV.A. Darlene Wallin From: Jennifer Bennerotte Sent: Wednesday, March 16, 2005 8:44 AM To: Darlene Wallin Subject: FW: 50th & France Importance: High - - - -- Original Message---- - From: Kitty ODea [mailto:kittyodea @mn.rr.com] Sent: Wednesday, March 16, 2005 12:58 AM To: Jennifer Bennerotte Subject: 50th & France importance: High To City Council - As I said at the meeting, I do think the mixed -use development is an exciting concept at 50th & France, but I am really disappointed that there isn't more serious consideration about the residual traffic problems 50th & France generates. Reality is that the Haugland traffic study was insufficient and we will potentially see an increase of several hundred cars per day. Given the already congested situation, those cars will end up in the adjacent neighborhoods. The situation will only become more critical as the east side of 50th is developed. I am fine with development, but not if it is at the expense of the surrounding neighborhoods. That's a win -lose situation. This could be a win -win situation. St. Louis Park went to extraordinary means to protect nearby neighborhoods from any negative impact from Excelsior and Grand. A comprehensive traffic study was done, the medians were changed, turn signal timing was changed, entrances to neighborhoods were controlled and there are stop signs on every corner. They saw the opportunity to improve the entire area, not just the commercial development. I don't see the same approach being taken by Edina. You can't look at 50th & France in a vacuume. You have a fiduciary responsibility to all the citizens of Edina, not just the developers /commercial districts. At a minimum the Council should commit to a comprehensive traffic plan to address the issues in the area. This is bigger than the NTMP. The City needs to get ahead of the problem. What will it take to get this done? Sincerely, Kitty O'Dea 3/16/2005 AGENDA ITEM: IV.A. From: Jesenia Morales (mailto:Jesenia.Morales @chrobinson.com] Sent: Monday, April 04, 2005 4:53 PM To: dapeterson @startribune.com Subject: Your story about 50th & France Importance: High Good afternoon Mr. Peterson, I hope this finds you well. I just read your story online regarding the 50th & France remodel. Seems they're trying to go for the Excelsior Grand look with condo's and a Mojito restaurant at the corner. How absolutely revolting. I moved from NYC 2 years ago and I have a friend with an office on 50th & France (Peter Hill Design). He also (with his partner Kim formerly of Belle Epoque) opened up Alfred's on 44th & France with the same upscale spirits associated with the current 50th /France. Coming from NYC and having experienced the shopping feel of 5th Ave, SOHO and the upper west side, I instantly fell in love with the 50th & France area. It was not clich6. It was not chain store galore. It gave a feeling of uniqueness, and was purposefully special for those that chose to shop there. And now... ...Now it will be pathetically homogenous to the rest of the shopping districts. What's next ... a Macy's? Or better yet, Kohl's. The feel of the area was never meant to be voluntarily disclosed and invited to all, but rather discovered by those that sought to find it. Now it will just be ... ordinary. Oh what an incredibly boring and sad prospect. Please, if you can, forward this to whomever is responsible for killing the beauty of unique exclusivity. You'll probably find them at the comer Starbucks ... as unique as a bodega on a NYC street. Regards, Jesenia Morales "bet it right the first time - that's the main thing. 6et it right the next time.. that's not the same thing.. " CM - Finance /Foodservice C.H. Robinson 8967 Columbine Road, Suite 900 Eden Prairie, MN 55347 Phone: 952.946.4921 Fax: 952.937.7703 jesenia.morales@chrobinson.com A, Z�- o Le vv �NBB . AGENDA NO. IV.B. PUBLIC HEARING - FINAL REZONING & FINAL PLAT APPROVAL MARK JONES/PUKWANA TOWNHOMES 512549TH STREET WEST TOWNHOUSE DEVELOPMENT CONTINUED TO 5/3/05 Z No packet data F-] Oral presentation Information coming rr, '� ° e o REPORT /RECOMMENDATION To: Mayor & City Council Agenda Item # IV. C. From: Craig ,Larsen 0 Consent ❑ Information Only ❑ Date: April, 19, 2005 Mgr. Recommends ❑ To HRA ❑To Council Subject: Conditional Use Permit for Action ® Motion Two New Gymnasiums — ❑ResOlutlon Edina Community Center El ordinance Campus ❑ Discussion Recommendation: The Planning Commission recommends approval of the Conditional Use Permit to add one gym to the Community Center and one to South View Middle School. Info /Background: See attached Planning Commission minutes, staff report, traffic study and plans. L; G u REPORT /RECOMMENDATION To: Mayor & City Council Agenda Item # IV. C. From: Craig Larsen Consent ❑ Information Only ❑ Date: April 19, 2005 Mgr. Recommends ❑ To HRA Subject: Conditional Use Permit for ❑To Council Action ®Motion Two New Gymnasiums — ❑Resolution Edina Community Center Campus ❑ Ordinance ❑ Discussion Recommendation: The Planning Commission recommends approval of the Conditional Use Permit to add one gym to the Community Center and one to South View Middle School. Info /Background: See attached Planning Commission minutes, staff report, traffic study and plans. LOCATION MAP Edina Overview C -05 -2 Conditional: Use Permit City of`Edina /School District N , DRAFT MINUTES PC Meeting March 30, 2005 C -05 -2 City of Edina /ISD # 273 Edina Community Center and Southview Campus Proposal to construct two (2) gyms Mr. Larsen informed the Commission the City is requesting a Conditional Use Permit to allow for the construction of two new gymnasiums on the campus. One gym is attached to the Community Center, and the other added to Southview Middle School. Mr. Larsen explained the City Council and Edina School Board held a joint public hearing on November 26, 2004. Following that hearing each body voted to proceed and enter into a joint use agreement with the new facilities paid for by the City. Mr. Larsen concluded staff recommends approval of the requested Conditional Use Permit subject to watershed district permits. Mr. Rozeboom, project architect was present to respond to questions. Mr. John Keprios was present representing the City of Edina. Mr. Rozeboom addressed the Commission and with the aide of graphics pointed out to the Commission the locations of the proposed gyms, greenspace and traffic circulation patterns of the proposal. Mr. Rozeboom pointed out one aspect of the project is that school district users can move between the community Center /middle School and the new gyms internally. This flow makes the "joint use" component of the project work well. Mr. Keprios explained the need for additional gyms resulted from the growth and desire of the City's recreational user groups for more gym space. Continuing, Mr. Keprios told the Commission over the past decade the City along with the user groups has had an ongoing discussion on how to provide additional gym space to meet the demands of our growing leagues. Mr. Keprios said different sites were looked at to achieve more gym space, one being the Northwest Racquet site, which did not work out. Concluding Mr. Keprios noted traffic congestion will be eased when events are not scheduled simultaneously, and the school district and user groups are mindful of this. Commissioner Brown asked Mr. Keprios whom the user groups schedule their activities with. Mr. Keprios responded user groups would continue to schedule activities through City offices. Commissioner Brown asked if user fees would be increased as a result of construction of the new gyms. Mr. Keprios responded user fees would be increased with hourly fees set by the district and a one -time yearly fee set by the City. Ms. Friedman, 6612 Sally Lane, addressed the Commission and informed them the EGAA is very happy with the proposed new gyms. She explained house league sports continue to grow and any traffic generated is usually not that intense. She pointed out most user groups car -pool, which reduces the number of vehicles coming and going. She added house league activities usually do not meet on weekends except during championship games, which occur a couple times a year. Concluding, Ms. Friedman said she believes the addition of two new gyms is a wonderful asset for Edina's youth and the entire community. Commissioner Brown moved to recommend Conditional Use Permit Approval. Commissioner Grabiel seconded the motion. All voted aye; motion carried. Commissioner Fischer told the Commission he believes the re- design of the campus along with the placement of the two new gyms will actually improve the existing situation, and reduce impact to the neighborhood. Regular Meeting of the Edina Planning Commission Wednesday, March 30, 2005, 7:00 PM Edina City Hall Council Chambers Staff Report Case Number: C -05 -2 Location: Edina Community Center and Southview campus Applicant: City of Edina Property owner: Edina Schools, ISD # 273 Request: Conditional Use Permit to allow the construction of two, new gymnasiums on the campus. One attached to the Community Center, and one added to Southview Middle School. Background: The City Council and Edina School Board held a joint public hearing to get input on the proposed gyms on November 16, 2004. Following that hearing each body voted to proceed and enter into a joint use agreement (agreement attached). The new facilities would be built and paid for by the City. Project Description: The attached schematic design report, prepared by the project architect, contains a detailed description of the proposed gyms. Each addition contains approximately 10,000 square feet of total floor area. The addition to the Community Center requires the removal of the non - conforming buildings on the south end of the Center. Parking on the campus would remain as approved earlier for the bond referendum project. Parking and Traffic: The City engaged a traffic consultant to analyze the impact of the gyms on parking and traffic in the neighborhood. The consultant's report is attached. Recommendation: Staff recommends approval of the requested Conditional Use Permit. Refer to: City Council minutes from November 16, and December 7, 2004. Memo from John Keprios, report by Rozeboom Miller Architects, and traffic study by Howard R. Green Co. Nov. 16, 2004 Edina City Council Special Meeting Minutes Page 1 of 4 MINUTES OF THE SPECIAL JOINT MEETING OF THE EDINA CITY COUNCIL AND EDINA SCHOOL BOARD HELD AT CITY HALL NOVEMBER 16, 2004 6:30 P.M. ROLLCALL Answering rollcall were Members Housh, Hovland, Masica and Mayor Maetzold. Member Kelly was absent. Mayor Maetzold stated the purpose of the Joint Meeting was to gather information and hear public testimony regarding the possibility of building two gymnasiums on the Edina Community Center Campus as part of the renovations currently underway. Park Director Presentation Park Director Keprios informed the Council and School Board that 211 notices had been mailed November 3, 2004, to property owners within 500 feet of the Edina Community Center east campus informing residents of the Joint Public Hearing. He explained that the proposal before the Council /Board would construct two new gymnasiums on the Edina Community Center east campus. He outlined the proposal as follows: PROPOSAL IN CONCEPT • Need for additional gymnasiums for community use (youth athletic associations). • One additional gymnasium to South View Middle School. • One additional gymnasium to Edina Community Center. • City of Edina will pay for all construction costs and architect/ engineering fees. • City of Edina will assume responsibility for 100% of all operating expenses. CONSTRUCTION FINANCING • Project costs approximately $4.12 million. • City of Edina (HRA /City Council) would sell lease revenue bonds to finance construction. • 20 -year bonds = $370,000 debt expense per year. • Equates to approximately 2.5% increase in City tax levy. COST PER HOME OPERATIONAL COSTS • Expenses $40,000 per year ($20,000 per gym). • Gymnasium rental fees (1,356 hours Q $6 per hour) $ 8,136 • Participant user fees ($8 per participant per season) $16,288 • Donations ($5,000 per year for 10 years) $ 5,000 • City costs (other revenues/ donations) $10,576 • TOTAL $40,000 PROCESS • Public Hearing; November 16, 2004. • School District and City will develop a Facility Use Agreement. • City -based programs will have priority access evenings and weekends. • Gym user fees will be similar for all gyms. http:// www. ci .edina.mn.us/Pages /CityCouncil MeetingMinutes /20041116Spec.htm 3/24/2005 Nov. 16, 2004 Edina City Council Special Meeting Minutes Page 2 of 4 • Construction Agreement between City and School District. • Lease Agreement (School District owns property). • Formal action by Board of Education and City Council December 7, 2004. • Program/ schematic design 60 -days (user group input). • Conditional Use Permit following schematic design. • Council calls for sale of bonds February. • Construction begins in 2005. Council and Board members asked questions regarding the proposed gymnasium additions including: • Definition of priority user groups - During City use time - City Youth Athletic groups; School time - Kids Club • Parking impact estimate - Preliminary discussions suggest that School District would control use of facilities and if they deem inadequate parking for event, they may deny • Amount of bleacher seating - Anticipated three risers on one side of each gym • Fees derivation - School District will set hourly use fee • Fund raising for operating dollars - $10,000 /year for five years pledged with belief more is forthcoming • Mark Ruff, Ehlers Associates briefly reviewed bond process. Mr. Ruff stated the sale would be a fairly simple sale: City Attorney will write technical documents while the facility use agreements between City and School District were negotiated; bonds would be rated with a sale called in February for late February or early March; City to receive proceeds from sale in March. Public Comment Dick Ward, 6809 Galway Drive, representing Edina Basketball Association, stated the Association served 1,000 Edina children, and gave the Associations overwhelming support of the proposal. He stated they had over 300 signatures on a petition to present to the City Council and School Board. Mr. Ward said they had been waiting a long time while the demand has continued to grow. He noted no new gyms have been built since the Edina High School was built. Mr. Ward urged the Council/ Board to move forward stating it was the right time and the right place for the gyms. Marcia Friedman, 6613 Sally Lane, President of Edina Girls Athletic Association, stated they have over 1,000 girls involved in basketball and volleyball. Ms. Friedman said her association was totally in support of the m proposal. She explained that they currently have limited accessibility to gyms and with enrollment substantially increasing over the last five years this has been a concern. Ms. Friedman also presented a petition in support of the gym proposal. Jack Field, 5418 Creek View Lane, President of the Edina Girls Traveling Basketball Association stated he had the suppor -of 128 families. He noted that they have 5t' graders scheduled at 8:00 �m. b g` �9 ders }o a or ten 'cl ck. Field added that his ou ets izmpe� ie le igh Scl o� needs me gyms ffairpy o�ten. He said this was a growu�pr�g�am and the competition for gym space is difficult. Mr. Field stated his belief that Edina must keep up with surrounding communities to stay competitive. He urged the Council /Board to approve the proposals adding his hope that the gyms would be full size basketball courts. Jane Tierney, Edina Kids Club, Edina Community Education, stated they serve 500 kids before and after school. She said the Hut is not ideal, but currently the only area they have and urged that the gyms be available for use by Kids Club. She presented a petition with over 800 signatures. Frank Bennett, 4704 White Oaks Road, said that ten years ago he promised to help work for additional gyms. He stated he believed this was a wonderful opportunity for the community. Mr. Bennett urged the Council/ Board to move forward positively. httn-// www. ci .edina.mn.us/Pages /CitvCouncil MeetineMinutes /20041116Snec.htm 3/24/2005 Nov. 16, 2004 Edina City Council Special Meeting Minutes Page 3 of 4 Mike Breitenbecher, 5532 Concord Avenue, stated he supported the proposal, adding he and his family enjoy being able to walk over to use the Community Center facilities. He said he thought the gyms will add value to his neighborhood and that would outweigh any traffic issues. Kathleen Lennen, 4507 Moorland Avenue, stated she was the parent of students involved in basketball. She asked that the new gyms be not used only for "elite" but for all students. Ms. Lennen urged that the Council / Board keep more kids playing. Tony Tsakakis, 661-2 Paiute Pass, said he had two girls in basketball. Mr. Tsakakis stated he supported buildin Bthe gyms. He added other communities have the facilities they need and T urged the Council to move ahead and make the commitment. Elaine Carlson, 5821 Eastview Lane, asked if available parking had been factored into the proposed gyms. She expressed concern about both traffic and parking on -site. Doug John, 5119 Valley View, Director of Community Education Services, explained that with the renovation of the Edina Community Center Campus, approximately 60 -70 parking spaces would be added. He added that the new gyms would primarily be used in the evenings for practice when there typically is not a huge demand on parking. He said that the District would factor in all uses before deciding whether to schedule a particular event. Mr. Johnson said they did not anticipate very much would be scheduled in the gyms during the school day. He added that the parking at South View Middle School would remain the same. Charlie Gits, 5311 Evanswood Lane, stated he was a parent and former president of the Soccer Association. He noted that the two new soccer fields developed by the City have totally re- energized soccer. New gyms will have the same effect on both volleyball and basketball. Mr. Gits urged moving forward with the gyms. Jeff Krause, Head Volleyball Coach, Edina High School, stated he believed these facilities would go a long way to help develop a girls volleyball association. Two gyms will be an excellent start. Jody Kozlak, 4632 Browndale Avenue, informed the Council /Board that last evening her 12 year old arrived home at 10:30 p.m. and had to be at school at 7:30 a.m. the next morning. Ms. Kozlak said that year after year more and more kids would be affected in this negative way if more gyms cannot be built. She stated this appeared to be an opportunity to develop multiuse facilities and urged the Council /Board to move forward on the proposal. Mary Franze, 5717 Chowen Avenue, stated some concerns from the Normandale Elementary School Site Council. Mr. Frame said they had concern regarding: safety, reducing available walking space, increased stress on their facility, connecting another public venue, and logistics of the 3:00 dismissal time. Ms. Frame asked that other spaces be evaluated before committing to this proposal. Member Masica made a motion, seconded by Member Housh to close the public hearing at 7.29 p.m. for in person testimony, however, the record will remain open for the next two weeks for written submissions. Ayes: Housh, Hovland, Masica, Maetzold Motion carried. Member Hovland made a motion to continue consideration of the gymnasiums proposals until the December 7, 2004, Regular Council Meeting. Member Housh seconded the motion. Ayes: Housh, Hovland, Masica, Maetzold Motion carried. There being no further business on the Council Agenda, Mayor Maetzold declared the meeting adjourned at 7:29 P.M. httv:// www. ci .edina.mn.us/Pages /CitvCouncil MeetingMinutes /20041116Svec.htm 3/24/2005 L MINUTES Page 4 of 18 - 3390 54 <h on made by Member Masica and seconded b oush for award of bid for two -. replacement vehicles for the Ass epartment to recommended sole bidder Elk River Ford at $23,894.00, unde innesota Contract #433399. x -five a es. i i, ' l GYMNASIUM PROPOSAL PRESENTATION Mayor Maetzold indicated at the November 16, t:. A, 2004, Council and Board of Education public hearing, the gymnasium proposal, in concept, 1V included: • One additional gymnasium to South View Middle School • One additional gymnasium to Edina Community Center r . City of Edina will pay for all construction costs and architect/ engineering fees • City of Edina will assume responsibility for 100% of all operating expenses Total project costs were estimated at $4.12 million. The City of Edina would sell lease revenue q bonds to finance construction. The 20 -year bonds would cost roughly $370,000 per year, which equates to a 2.5% increase in the City tax levy. t Mayor Maetzold inquired if the Council approved the gymnasium proposal, what subsequent 4 steps would be taken. Mr. Hughes said the steps would be, 1) a facility use agreement, 2) a joint powers agreement, 3) formal approval from the Board of Education, 4) programming and schematic design from the Board's project architect, 5) the Board would apply to the City for a Conditional Use Permit with the Planning Commission, 6) following the Planning Commission's approval, the issue would be before the Council, 7) the Council's approval of the Conditional Use Permit for the project, 8) the Board's architect would proceed to prepare detailed drawings, 9) the Council would need to approve drawings and preliminary cost estimates of the project, 10) bids would be sought, considered by the Board, and, 11) the City would conduct a bond sale. Member Masica asked if the construction manager and architect have to go out for bid again. Mr. Hughes said they were engaged by the School District for their ongoing projects pursuant to the referendum, and their services would be maintained. Following approval of the design, public bids would be sought on the construction contracts. Member Maetzold asked if the HRA as well as the Council should execute the facility use agreement and the joint powers agreement. Attorney Gilligan said the bonds were issued by the BRA and proceeds made available to the City to construct the facility with a lease between the BRA and the City. The City would appoint the school district as its agent to construct the facility. It was not necessary to have the HRA as a party to these agreements but there will be agreements between the HRA and City connected with the bond sale. Mr. Hughes noted the Board of Commissioners of the HRA was the City Council. Mayor Maetzold inquired of the Council whether the public hearing should be re- opened. Member Masica made a motion to re -open the public hearing on the gymnasium proposal. Member Kelly seconded the motion. Ayes: Housh, Hovland, Kelly, Masica, Maetzold Motion carried. Mayor Maetzold called for comments in opposition to the gymnasium proposal. httn:// www. ci .edina.mn.us/Pages /CityCouncil MeetingMinutes /20041207Reg.htm 3/25/2005 MINUTES Page 5 of 18 Public Comment Maria Fesenmaier, 5713 Concord Avenue, representing the Edina Community Center Neighborhood Association, stated the Association was vehemently opposed to additional gyms if nothing was done to correct traffic safety, student and resident safety, and parking. Ms. Fesenmaier stated the Association represented 567 homes and she added she was disappointed in the notice of the original public hearing. Ms. Fesenmaier said the Association felt a mistrust of the process being followed relative to the proposed gymnasiums. Trish Kolkman, 5612 St. Andrews Avenue, read a statement from resident Dan Rectenwald who could not be present stating his opposition. Ms. Kolkman also spoke about her own opposition to the proposal because of traffic and safety concerns. Wayne Kewitsch, 5615 Dalrymple Road, stated he had been a resident since 1969. Mr. Kewitsch said he was not opposed to the gymnasiums, but that the increased traffic must be studied and measures put into place to mitigate the negative impact on the surrounding neighborhood from all the proposed improvements taking place on the ECC campus, not just the two additional gyms. He stated he was very disappointed that the Council was moving forward on the gyms when there was going to be an additional load on the neighborhood because of the addition to the auditorium and the renovated swimming pool. Susan Covnick, 47,15 Golf . Terrace, explained the Edina Community Center Neighborhood Association included homes between Wooddale Avenue to Highway 100 east to west and Edina Country Club to Valley View Road north to south. Ms. Covnick asked the Council to guarantee that any future development would be limited as part of their motion relative to the gymnasiums. Kelsey Smith, 4801 West 44t` Street, stated he attended the meeting for a different reason, but after listening to the neighbors speak, urged the Council to find a different space for the proposed gymnasiums. He suggested that Fred Richards Golf Course was a potential location. Marcia Friedman, 6613 Sally Lane, assured the audience members that there would only be one boy's and one girl's tournament annually. She stated that in her opinion, traffic and parking would improve when the projects at the Edina Community Center Campus were completed. Council Discussion /Action Member Kelly stated the Council has heard from everyone and know there existed an acute need for additional gym space in Edina. He said in his opinion adding the two proposed gyms to the Edina Community "Center Campus was the appropriate location for the gyms. Member Kelly pointed out building the gyms as proposed would: 1) allow for efficiency of operation, 2) allow the City to take advantage of the construction already planned and, 3) would also benefit Community Education. He suggested moving forward to the next step. Member Housh agreed with Member Kelly. He added he appreciated the neighborhood comments. Member Housh noted he had been a Council member for four years and the need for additional gyms has been well established. He stated he felt the Edina Community Center was appropriate because it also was a community- gathering place. Member Housh said the Council must look at the needs of the entire community and balance those needs with fiscal responsibility, httv:// www. ci .edina.mn.us/Pages /CityCouncil MeetingMinutes /20041207Reg.htm 3/25/2005 MINUTES Page 6 of 18 adding he intended to support the proposed gyms. Member Masica acknowledged the neighbor's comments, but pointed out there has been a demonstrated need for additional gyms for many years. She added that she believed if the facility were as well designed as she believed it will be, there may be a lessening of the impact on the neighborhood because traffic and parking will be directed to the opposite side of the campus. Finally, Member Masica stated she could live with the traffic generated if it were in her neighborhood. She pointed out that she had not supported the installation of a bubble over, Kuhlman, but she really felt the ECC Campus would be able to support the proposed gyms. Member Hovland pointed out the City had sent out over two hundred notices on the third of November for the November 16, 2004, hearing. He added the neighbors were present at the November 16, 2004, hearing and chose not to speak. Member Hovland stated that he and Member Kelly have been working on locating additional gymnasiums since 1998. He said during the February 15, 2001, Blue Ribbon Hearing when four basketball courts were proposed for the Edina Community Center Campus, no neighbors spoke against them. Member Hovland acknowledged the difficulty of the neighborhood's location in proximity to the schools. However, he said he has carefully studied the issue and will be making a careful decision in favor of the proposed gyms. Mayor Maetzold agreed with Member Hovland regarding the notices of the meeting. He added that during his tenure on the City Council, the Council has conducted the public's business in public, openly and honestly. Mayor Maetzold stated that he and his fellow Council Members do not have "side" meetings and if more than three members were together they post the "meeting." He pointed out that since moving to the new city hall, meetings were televised so citizens have more accessibility to meetings than ever. Mayor Maetzold said that in 1990 the Edina School District had 5,500 students while today there were approximately 7,500 school age children. In addition, girl's athletics has had a large impact on facilities use. This need was only going to grow as more youngsters participate in activities. He stated that in his opinion locating the gyms at school sites made sense for many reasons including: 1) efficiency of operation, 2) mutual benefits to Community Education, and, 3) the expense of operating a stand alone facility. Mayor Maetzold indicated his support for the proposed gyms. Member Kelly made a motion approving the gymnasium proposal subject to the Facility Use Agreement and joint Powers Agreement as well as subject to the issuance of a Conditional Use Permit. Member Housh seconded the motion. Ayes: Housh, Hovland, Kelly, Masica, Maetzold Motion carried. VV11Vir, t1v4w Vnrux Ll%_EngzC7 — t1LrI%ELJ a7 V rGlll 1VliL",ftaalry RETAIL INC. D LFRED'S CAFE - 4388 f`i "AVE E SOUTH Manager Hughes noted that an application recei�r^ed•Yrom the owner of Alfred's Grand Petit Magasin Retail, Inc., dba /Alfred's Cafe at- 38 ce Avenue South, The site was formerly occupied by may, Durr, Ltd. The necessarv,.d� ments for liquo ' nses and all applicable fees have been paid. The Planning, He�a3f &`Pi olice Departments have com d their investigations with no negative findin aff recommends approving the On -Sale Wine an er licenses for Alfred's Grand Petit agasin Retail, Inc., dba /Alfred's Cafe for the period begituiin ecember 7, 2004 and ending March 31, 2005. httn:// www. ci .edina.mn.us/Pages/CityCouncil MeetingMinutes /20041207Reg.htm 3/25/2005 ''r r� INTEROFFICE MEMORANDUM TO: CRAIG LARS FROM: JOHN KEPRI S SUBJECT: JPOC, & PROG M DESIGN COMMITTEE. DATE: MARCH 22, 2005 JPOC In follow up to our conversation earlier today, in accordance with the Joint Powers Agreement between the City of Edina and Independent School District No 273, we have formed a Joint Powers Oversight Committee (JPOC). The members of JPOC are: Jim Hovland, Mayor of Edina Scot Housh, Council Member Ed MacHolda, Assistant Director John Keprios, Director Peyton Robb, Board of Education Member Jeff Johnson, Board of Education Member Doug Johnson, Director of Community Services Jay Willemssen, Business Director The main function of this eight- person committee is to advise the City of design, contracts, payments of bills, and other construction issues that may arise. The architect under contract with the City of Edina to design these two gymnasiums is Rozeboom/Miller Architects, which is the same architect firm hired by the School District to design their new referendum approved projects at the Edina Community Center Campus. The construction manager for the gymnasiums is Kraus Anderson, which is also the same construction management firm contracted with the school district. JPOC has already met four times to review design drawings and plans. The initial estimates were around $4.12 million for both gyms, including soft costs. After the Program Design Committee's input, the design of the facilities changed in a manner that added approximately 1,000 square feet. The estimated cost now is $5.22 million, which JPOC is recommending can be reduced somewhat with value engineering. The elevator added significant cost to the project, plus unexpected significant soil corrections at the South View gym site, plus additional lobby & vestibule space, expanded floor space for bleacher area, concessions area, translucent glass, and entrance modifications also 41 , contributed to the higher estimates. JPOC is currently recommending that the architect identify value - engineering options that will bring total project costs to under $5 million. The next JPOC meeting is scheduled for Tuesday, March 29, 2005, at 7:30 a.m. to take action on the new schematic drawings and value engineering options. JPOC's recommendations will be made prior to the Planning Commission meeting scheduled for Wednesday, March 30th. PROGRAM DESIGN COMMITTEE As part of the program design process, I invited gymnasium facility user groups and a representative from the Edina Community Center Campus Neighborhood Committee, Dan Rechtenwald, and school district staff, and Ed MacHolda to serve as the Ad -Hoc Program Design Committee. Representatives from the Edina Basketball Association, Edina Girls Traveling Basketball Association, and Edina Girls Athletic Association attended a handful of program design input meetings and provided valuable input into the design of these two gymnasium buildings. Their input included a strong desire for: • Wood floors in both gyms. • An elevator in the South View gym. • No air conditioning in either gym. • Ceiling height minimums for volleyball. • Six retractable basketball backboards in each gym. • Bleacher seating for less than 100. • Regulation volleyball standards & nets. • Access to other gyms within the building without having to go outside. • No need for concessions stand. • Desire to play soccer, baseball, lacrosse and football in both gyms. • Retractable batting cage for one gym. • Make entrance more visible by extending Plaza. • Create better drop - off/pickup by sliding the ADA parking to the south and pulling the curb slightly away from the building. • Create better viewing of parking pickup and stadium by reversing the restrooms /concessions with the lobby. • Add exterior lighting. • Add signage. As you can see, the Ad -Hoc Program Committee provided valuable input into the design of both gyms. Please let me know if you need any further information. Many thanks. 2 4 Howard R. Green Company MEMO To: Craig Larsen; Wayne Houle, PE; Steve Lillehaug, PE City of Edina, MN From: Steve Manhart, PE, PTOE�` Subject: Community Center and South View Gymnasium Traffic Study Date: March 16, 2005 Introduction The City of Edina and Edina Public Schools have undertaken a project to expand the Edina Community Center and South View Middle School on the Community Center campus located south of Southview Lane between Concord Avenue and Normandale Road. These expansions include building additions coupled with a parking lot expansion and reconfiguration. Of particular interest to the City and the School District is the addition of two new gymnasiums — one adjacent to the Edina Community Center and one at South View Middle School. Per City request, Howard R. Green Company (HRG) has been authorized to conduct a review of the internal and off -site traffic and parking impacts associated with the construction of these two new gymnasiums. Specifically, the goal of this study is to determine whether the proposed gymnasiums will adversely impact the traffic and parking in the area. This analysis shows that traffic and parking demand increases with the construction of the new gymnasiums. Nevertheless, the study shows that the increased traffic will not adversely impact the capacity of the roadways in the study area. Furthermore, upon completion of the proposed parking lot modifications, the on -street and off - street parking supply will adequately serve the daytime, evening and weekend tournament demands. Study Area This study is focused on an area north of 60'" Street W., east of TH 100, south of Lakeview Drive, and west of Wooddale Avenue. Figure 1 shows the study area and highlights the location of the Edina Community Center campus. The existing Community Center building once served as the location of Edina East High School. After the closing of Edina East High School in 1981 -82, the existing building was converted into the Edina Community Center. Currently the Community Center shares its space with Normandale Elementary French Immersion School. The Community Center houses a variety of daytime and evening activities and events, both during the week and on weekends. Approximately 600 students are enrolled at Normandale Elementary School, which is considered an alternate education program school serving grades K through 5. South View Middle School has existed in its present location for several decades. Currently, it serves 1100 students in grades 6 through 9. Building expansions are underway for Normandale Elementary French Immersion School, the Community Center and South View Middle School. The locations of the building additions and the two additional gymnasiums are highlighted. The parking lots are being expanded and reconfigured near these buildings. Currently the Community Center houses two gyms — one large and one small. South View Middle School also houses two gyms. Two new gymnasiums are being constructed as part of this campus development project. A new City gymnasium will be constructed on the southeast corner of the Edina Community Center building. Another new City gymnasium will be constructed on the south side of the existing South View Middle School just to the northwest of the South View parking lot. The existing gyms will remain in use, even after the construction of the new gyms is completed. It is important to note that these new gymnasiums will be in addition to the existing gymnasium space located in the Community Center and South View Middle School. Each gym will be approximately 65' by 120' and will not house formal bleachers. It is intended that these gyms be "multi - purpose ", and thus are able to accommodate a variety of uses. Existing Land Use According to the City's Land Use Plan (from March 1999), the study area is "quasi - public" surrounded by single - family residential zoning. The City's "quasi- public" zoning refers to multiple uses such as schools, community centers, golf courses, etc. In this study area, the quasi - public uses include the Community Center, South View Middle School, Normandale Elementary French Immersion'School, Concord Elementary School, and the associated parking lots, and athletic fields. This land use also incorporates Kuhlman Field, which serves outdoor sports activities such as football, soccer and track & field athletics. The bleachers at Kuhlman Field seat up to 8,000 people. The single - family residential uses in this study area generally refer to single - family homes with driveways and garages. Historic and Existing Traffic Demand Traffic in the study area is split between the trips generated by the residential uses and the trips generated by the quasi - public uses. Figures 2A through 2D illustrate traffic volumes recorded historically by the City of Edina within the study area between 1975 and 2004. Figures 2A through 2C show weekday 24 -hour traffic volumes, while Figure 21) shows weekend 24 -hour traffic volumes recorded by the City. These historic traffic counts show variations in traffic volumes over the decades. In general over the last thirty years, the trend has been upward. For instance, in 1975 the daily traffic volume on Southview Lane was 1703 vehicles per day, while in 2001 the daily traffic volume was 3675 vehicles per day. Reasons for this historical increase may be based on the changing land uses in Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ1824960J\Rpt#1- Rev1sed 031605 -Final Draft.doc 03i16W Page 2 the area (high school to community center), changes in demographics, and /or increases in number of vehicles per household. Also the historical trend has been that the weekday 24 -hour traffic volume is characteristically greater than the Saturday or Sunday 24 -hour traffic volumes. This is because more work - related traffic is generated during the week than during weekends. Figure 3 illustrates the relationship between average daily traffic volumes and levels of service based on types of roadway. Level of Service (LOS) is a letter designation that describes a range of operating conditions on a particular type of roadway facility, with LOS -A referring to free -flow conditions and LOS -F describing system breakdown. The vast majority of roadways in the study area are two -lane undivided roadways without turn lanes. According to the daily traffic volumes recorded throughout the last three decades, most study area roadways operate at LOS -A or LOS - B. (NOTE: Roadway operations in the Twin Cities area are generally considered acceptable when operating at LOS-13 or better.) Although not field verified by traffic counts, it is assumed that the traffic patterns of the single - family residential uses corresponds to traditional directional peak hours outbound from the study area in the period between 6:00 and 8:00 am, and inbound in the period between 4:00 and 6:00 pm. There are distinctive periods of daily activity at the schools and the Community Center within the study area. During the school year, South View Middle School hours are from 7:45 am to 2:40 pm, and both Normandale Elementary School and Concord School hours are from 8:35 am to 3:05 pm. School related traffic generally approaches the schools between 7:00 and 9:00 am, and departs the site between 2:30 and 4:00 pm. The Community Center provides a variety of programs and activities throughout the day and evening. As a result, the peak inbound and outbound traffic periods are less definitive than the residential and school traffic in the area. In the evenings, traffic patterns in the study area vary widely, based on the programs, activities and events scheduled at each facility. According to the Edina School District and the City of Edina's Park and Recreation Office, the existing gymnasiums are scheduled for practices on Mondays, Tuesdays, Thursdays and Fridays between October and April by youth basketball and volleyball leagues. Ninety- minute practices are scheduled in shifts between 6:00 and 9:30 pm. On Wednesdays, adult basketball is scheduled between 6:00 and 10:00 pm. Also, there is demand from out -of- season youth sports leagues (i.e., traveling baseball, traveling soccer, etc.) for indoor practice and conditioning when facilities are available. Evening events and special programs may draw a variety of traffic to the schools or the Community Center. The youth sports activities tend to draw drop -off and pick -up traffic before and after the scheduled practices, as well as traffic from coaches or others. On selected weekends between October and April, there are tournaments that draw teams, coaches and parents from surrounding communities for games. Leagues that host tournaments include the Edina Basketball Association and Edina Girls Traveling Basketball Association. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:TR0J1624960Mpt#1- Revised 031605 -Final Draft.doc 03/16W Page 3 In general, these evening and weekend programs and activities do not adversely impact traffic volumes on the roadways to degrade the levels of service below a LOS -B. In most cases, the existing levels of service on these roadways stay at LOS -A (i.e., fewer than 3000 vehicles per day.) Existing and Proposed Parking Supply On- Street Parking Figure 4 shows the existing on- street parking regulations within the study area. On- street parking is allowed along the south side of Southview Lane, but not along the north side of the street. There is room for approximately 33 vehicles to park along the south side of Southview between Normandale Road and Concord Avenue. Normandale Road, west of Normandale School is signed for bus parking only Monday through Friday from 8:00 am to 6:00 pm. Many streets north of the Community Center and South View Middle School have parking prohibitions, especially during school hours. St. Andrews Avenue, Dalrymple Avenue and Sherwood Avenue restrict parking on the east side of the streets at all times, but allow parking on the west side of the streets at times other than 8:00 am to 6:00 pm Mondays through Fridays. Under peak parking conditions, these streets would each serve 20 to 25 vehicles parked on- street. Concord Avenue and streets to the east have no .posted parking prohibitions. There are some parking prohibitions by Concord Elementary, but those are isolated. Off - Street Parking The Community Center building and South View Middle School are currently undergoing renovation. In addition, three parking lots are also being reconstructed and expanded. Table 1 shows the existing and proposed parking supply for each of the off - street parking lots within the northern half of the study area. Specifically, the parking supply for each lot is as follows: TABLE 1 PARKING INFORMATION Parking Lot Existina # of Stalls Proposed # of Stalls North Lot 88 88 South Lot 181 210 (completed) East Lot 174 (117 during const.) 218 South View Lot 148 155 Front Lot 10 10 TOTAL 601 (544 during const.) 681 22 drop-off spaces Source: Rozeboom Miller Architects, Inc., and Oslund and Associates, February 25, 2005 Community Center and South View Gymnasium Traffic Study City of Edina, MN 0APR0J\824960J\Rpt#1- Revised 031805 -Final Draft.doc 03/18/05 Page 4 The drop -off spaces shown in Table 1 are in addition to the designated parking stalls. The 22 proposed drop-off spaces are located in the looped driveway south of the Edina Community Center and along the south and east curb lines of the East Lot between the Community Center and South View Middle School. In addition, Concord School on the southern half of the study area has two parking lots. The east lot is combined with the student drop -off and pick up area, and is marked with 38 stalls, but may hold more if the drop -off -space is counted. The west lot at Concord holds 90 vehicles. Therefore, the entire study area currently has off- street parking capacity for 729 vehicles. Upon construction of the proposed parking, the study area will have total off - street parking capacity of 809 vehicles, plus 22 drop -off spaces, as shown in Figure 5. Parking Demand Daytime Demand During the school year, daytime traffic patterns around the schools are well established. Parents are instructed each school year where to pick -up and drop -off students. Buses are relegated to specific areas of parking lots and streets. School staff members are instructed where they are allowed to park. Except for bad weather days, this pattern would seem not to change much during the school year. Similarly, the daytime parking demand for the Community Center is fairly constant. Customers tend to park in the lots to the east and south of the Community Center. Current parking is constrained on the east side of the Community Center because of construction. Parking is adequate on the south side. Field reviews of the study area in January and February were conducted to get a "snapshot" of the average parking usage in the lots. While day - today events and activities may change, the snapshot inventory of the parking lots was taken to get a feel for the "average" parking demand within a typical weekday mid - moming. The findings show that most of the lots are nearing capacity. Table 2 shows the inventory and related percentage to capacity for each lot inventoried. When the expansion and reconfiguration of the parking lots are complete, the total number of stalls available in the north project area will be 686 stalls — an increase of 85 stalls. Assuming the existing demand would remain constant, the parking lot usage would drop to 65.3% during daytime hours in the school year. It is important to note that during this field review, of the 33 stalls available for on -street parking along Southview Lane, only 17 vehicles (or 51.5 %) were in use. In addition there was one vehicle each parked on Woodland Road and on Concord Terrace east of Concord Avenue, where on- street parking is unrestricted. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:1PROJ\824960J1Rpt#1- Revised 031805 -Final Draft.doc 03116105 Page 5 TABLE 2 DAYTIME PARKING USAGE Parking Lot # Stalls Used # Stalls Available % Used North Lot 72 88 81.8% South Lot 138 210 65.7% East Lot * 121 ** 117 (will be 218) 103.4% * South View Lot 109 148 (will be 155) 73.6% * Front Lot 8 10 80.0% Total North Project Area 448 573 (will be 681) 78.2% Concord E Lot 8 38 21.1% Concord W Lot 87 90 96 7% Total South Project Area 95 128 74.2% * Denotes use of existing parking lot, not proposed ** Denotes usage over capacity due to drivers parked in non - designated locations because of construction Source: Howard R. Green Company, January 31 and February 7, 2005 Evening Demand According to officials with the Edina School District and City of Edina Parks & Recreation Department, there are several activities that are scheduled in these buildings in the evenings. Many of these activities are listed in the "Historic and Existing Traffic Demand" section of this memorandum. The evening parking patterns are far less predictable than the daytime parking patterns for these buildings. Nevertheless, another field review was taken of the site to assess the parking demand. This field review occurred mid -week after 7:00 p.m. in February. Table 3 shows the results of the evening survey. The survey also noted whether vehicles were parked on street in the neighborhood north of the Community Center and South View Middle School. There were 13 vehicles parked along Southview Lane. There were no vehicles parked along the west side of St. Andrews Road, Dalrymple Road, or Sherwood Avenue. Also, no vehicles were parked on the streets east of Concord Avenue. Community Center and South View Gymnasium Traft Study City of Edina, MN 0APROJ1824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16/05 Page 6 TABLE 3 EVENING PARKING USAGE Parking Lot # Stalls Used # Stalls Available % Used North Lot 39 88 44.3% South Lot 33 210 15.7% East Lot * 50 117 (will be 218) 42.7% * South View Lot 5 148 (will be 155) 3.4% * Front Lot 7 10 70.0% Total North Project Area 134 573 (will be 681) 23.4% Concord E Lot 2 38 5.3% Concord W Lot 0 90 0.0% Total South Project Area 2 129 1.6% * Denotes use of existing parking lot, not proposed Source: Howard R. Green Company, February 9, 2005 Weekend Tournament Demand As with the evening activities, the Edina School District and City of Edina Parks & Recreation Department have stated that there are several activities that are scheduled in these buildings on the weekends. Many of these activities are listed in the "Historic and Existing Traffic Demand" section of this memorandum. Aside from the programs and activities scheduled for the Edina Community Center, there are occasional athletic tournaments scheduled for the gymnasiums. For example, on the weekend of February 4 through 6, as many as 124 teams from 28 communities participated in the Edina Classic at these gyms and hosted by Edina Girls Traveling Basketball Association. As a result, participants, coaches and parents came and went throughout the days and evenings. To assess weekend demand, parking usage was surveyed on the weekend of February 4 through 6. Table 4 shows the results of the evening survey. The survey also noted vehicles parked on street in the neighborhood north of the Community Center and South View Middle School. There were 23 vehicles parked along the south side of Southview Lane. There were 16 vehicles parked along the west side of St. Andrews, no vehicles parked along the west side of Dalrymple, and one vehicle parked along the west side of Sherwood Avenue. In comparison, no vehicles were parked on the streets east of Concord Avenue. Community Center and South View Gymnasium Traft Study City of Edina, MN 0:1PROJ1824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16105 Page 7 TABLE 4 WEEKEND PARKING USAGE Parking Lot # Stalls Used # Stalls Available % Used North Lot 5 88 5.7 % South Lot 14 210 6.7% East Lot * 98 117 (will be 218) 83.8% * South View Lot 58 148 (will be 155) 39.2% * Front Lot 0 10 0.0% Total North Project Area 175 573 (will be 681) 30.5% Concord E Lot 1 38 2.6% Concord W Lot 3 90 3.3% Total South Project Area 4 128 3.1% * Denotes use of existing parking lot, not proposed Source: Howard R. Green Company, February 4 -6, 2005 (This analysis does not include the impacts of parking and traffic generated by athletic activities at Kuhlman Field. It is assumed that those football games and other activities, because of their nature, create overflow conditions for traffic and parking throughout all streets and parking lots in the study area. It is also assumed that the City and School District have formulated special traffic control scenarios to cope with these events and activities, which is outside the scope of this analysis.) Parking Analysis Review of these "snapshots" of parking usage shows that parking demand is most critical during weekdays while school is in session, and while daytime activities are occurring at the Community Center. Given the current configuration of the parking lots, the north half of the study area used nearly 80% of the existing parking capacity during weekdays while school is in session. Upon the completion of the parking expansions and reconfigurations, the current demand would drop to 65% of proposed capacity. Similarly, the evening and weekend demands for the north half of the study area was approximately 23% and 30 %, respectively of the existing parking capacity. Upon completion of the parking expansions and reconfigurations, the current evening and weekend parking lot demand would drop to approximately 20% and 26 %, respectively. On street parking was most critical during the weekend review period, where vehicles were parked along Southview Lane and along some of the streets north of South View Middle School. At no time during this review, however, were parked vehicles recorded over the capacity of the available on -street parking. St. Andrews Avenue recorded this highest incidence of on- street parking, with 64% of the available on- street parking used. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0APR0J\824960J\Rpt#1- Rev1sed 031605 -Final Draft.doc 0306/05 Page 8 During this analysis, parking demand for the southern part of the study area was most critical during weekdays. The West Concord Lot was nearing capacity at 97% occupied. The East Concord Lot, however, had available space for student pick -up and drop -off. Traffic and Parking Demand from Additional Gymnasiums It has been proposed to add two additional gymnasiums to the current campus renovation that is underway (see Figure 1). These two gymnasiums will add recreation opportunities to each site. In addition, these will add traffic to the adjacent street system, and will also add parking and pick- up /drop -off demand to the area. According to Ed MacHolda, Edina's Assistant Parks and Recreation Director, these gymnasiums are to be considered "multi- purpose ". When completed, each gym will house athletic and general activities. Neither gym will have "traditional" bleachers for spectators, but will have a viewing capacity of approximately 75 to 100 people. Therefore, each gym will be used primarily for participant -only activities (such as youth or adult basketball and volleyball) or Community Center programs or activities. To account for future traffic and parking demand created by these gyms, typical traffic scenarios must be developed. Daytime Scenario Assumptions :• South View Middle School uses new gym for school activities. Therefore, no additional traffic or parking demand projected during school hours. ❖ Community Center uses new gym for multi - purpose activities. Therefore, assume four ninety- minute sessions during the day. Assume 40 people per session = 4 x 40 =160 people throughout day; therefore assume 160 inbound trips and 160 outbound trips = 320 total additional trips. Up to 40 additional parking stalls required per session. Evening Scenario Assumptions ❖ Two simultaneous practices /games per gym = 40 participants, 4 coaches, 8 spectators (many sharing trips) = 30 inbound trips and 30 outbound trips per gym = 60 total additional trips; ❖ Two sessions per evening (6:30 to 9:30 p.m.)= 120 additional trips per evening ❖ Up to 30 additional parking stalls per gym required, but assume twice that many. (Up to 60 spaces needed to accommodate change over between sessions, as participants from early shift leave and participants of later shift arrive. In reality, pick -up /drop -off areas may accommodate some of these participants, but not assumed in this worst -case scenario.) Community Center and South View Gymnasium Traffic Study City of Edina, MN 0APROJ1824960JU2pt#1- Rev1sed 031805 -Final Dmft.doc 03/l/05 Page 9 Weekend Toumament Scenario Assumvtions ❖ Between four and ten seventy- minute sessions during the day. Assume 25 people per session (some travel together) = 20 trips inbound and 20 trips outbound = 40 trips per session. ❖ Four sessions on Friday night for each new gym = 4 x 40 trips x 2 gyms = 320 additional trips. ❖ Eight sessions on Saturday for each gym = 8 x 40 trips x 2 gyms = 640 additional trips. ❖ Six sessions on Sunday for each gym = 6 x 40 trips x 2 gyms = 480 additional trips. ❖ Twenty additional parking stalls required per session. Also, assume that there is turnover in the parking (i.e., all vehicles are not present throughout the day, but will arrive just before and will leave just after each session). The traffic volumes shown on Figures 2C reflect the most current weekday traffic volumes recorded by the City throughout the study area. The new gyms may add up to 440 vehicles per day (320 daytime and 120 evening trips) into the weekday traffic volumes. This traffic will be dispersed along the streets in the north half of the study area, especially along the neighborhood collectors of Southview Lane, Concord Avenue, Normandale Road, and West 5e Street. Figure 6A shows the estimated distribution of the additional weekday trips on the street network. Tournament weekend traffic would also impact the existing weekend traffic volumes in the study area. Figure 2D shows the historical and most current weekend traffic volumes recorded by the City. Typically weekend traffic in residential areas is less than weekday traffic volumes. Figure 6B illustrates the estimated distribution of the additional tournament weekend trips on the street network. There was no historical weekend traffic count data along Southview Lane in this area. However, an average of other weekend volumes versus weekday volumes for streets in the area yields the following ratios — Saturday traffic averages 61.7% of weekday traffic, and Sunday traffic averages 54.6% of weekday traffic. Therefore, Southview Lane traffic can be assumed from these ratios to be 2,267 vehicles per Saturday, and 2,007 per Sunday. (Note: No traffic counts were recorded along Normandale Road between the MN 100 on -ramp and Southview Lane.) Table 5 illustrates the effect of the traffic added to the system by the gymnasiums. The trips distributed throughout the system in Figures 6A and 6B have been added to the most current daily traffic volumes. As a result, levels of service are calculated for these ADTs by using Figure 3. Overall, tournament Fridays will experience the highest traffic volumes of any time period. Not only will those days experience the weekday traffic use to and from the gyms, but they will also experience the evening tournament use, which draws more traffic than the typical evening uses. Nevertheless, the level of service on Tournament Fridays will remain at LOS -B or better on these facilities. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:1PROJ\824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16105 page 10 TABLE 5 ESTIMATED TRAFFIC AND LEVEL OF SERVICE COMPARISON Location Weekday (including Tournament Friday Tournament Tournament Evening) Evening* Saturday- Sunda Concord Ave. south 1,303/1,333 1,333/1,361 804/860 711/753 of58h St. W. A/A A/A A/A A/A 58 St. W east of 1,392 /1,530 1,530/ 1,632 859/1,063 760/913 Concord Ave. A/A A/A A/A A/A Concord Ave. south 2,639/ 2,787 2,787 / 2,877 1,628 /1,808 1,441 /1,576 of Woodland Rd. A/A A/A A/A A/A Southview Lane 3,675 / 3,823 3,823/ 3,913 2,267 / 2,447 2,007 / 2,142 west of concord Ave B/ B B/ B A/A A/A Southview Lane east 3,675/ 3,825 3,825/ 3,955 2,267 / 2,527 2,007 / 2,202 of Normandale Rd. B/ B B/ B A/A A/A Note: Blue Numbers denote most current average daily traffic (ADT) volume Red Numbers indicate ADTs plus new gymnasium traffic. 'denotes Friday tournament traffic added to weekday traffic WITH the new gymnasiums operational *denotes estimated Saturday traffic using ratio "'denotes estimated Sunday traffic using ratio Source: Howard R. Green Company, 2005 Traffic will also increase on Normandale Road, as seen in figures 6A and 6B. Unfortunately, the lack of traffic counts along that facility has precluded the ability to assess levels of service during the weekday and tournament weekend periods. However, an estimate of level of service based on engineering judgment for the weekday and tournament weekend periods would place the facility at LOS -B or better. Regarding parking demand, the proposed parking supply will be adequate to serve the additional demand generated by the new gyms. Users of the new Community Center gym will use the South Lot more frequently, where there is available capacity. The East Lot is being expanded, thus benefiting users of both the Community Center and South View Middle School. The South View Lot is being reconfigured, and will provide additional stalls. The most critical time period for the parking supply will be during the overlap of people arriving and departing between sessions. At these times, the parking supply will (at worst case) need to be twice the anticipated number of vehicles. In reality, pick -up /drop -off areas may accommodate many of these trips. Furthermore, on tournament weekends, participants will be scheduled for games at various times throughout the weekend, so not all participants will need to be at the gyms at once. Safety During this analysis, the morning school arrival period at South View Middle School was monitored. Traffic volumes along Southview Lane began building after 7:15 a.m. and continued until the start of classes at 7:45 a.m. Traffic was a mix of parents dropping kids off at the school and those drivers heading to work. Those parents dropping kids off at school would approach the western driveway at South View and turn into the drop off area where a patrol guard motioned the Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:1PR0J\824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/166 Page 11 vehicles forward. There was storage for approximately twelve vehicles in the drop off area. The parents would drop off their kids, and then exit back onto Southview Lane at the east driveway. As the time approached 7:30 a.m., traffic peaked and it became more challenging for parents to find adequate gaps in the traffic stream. At times, some vehicles turned onto side streets to drop off students, thus creating a safety issue with these students crossing Southview between the vehicles that were queued to use the drop off area in front of school. Meanwhile, some westbound drivers not in queue for the school drop -off were seen passing on the right in order to get to Normandale Road. These drivers created a de facto through lane along the curb in order to get past the school related traffic. It appears that many of these safety issues have been addressed within the expansion and reconfiguration of South View Middle School. The official drop off area will be relocated to the west side of the new addition. This will allow significantly more traffic to use the east and south curb lines of the parking lot between the school and the Community Center. As a result, drop off traffic will be pulled off of Southview Lane during school arrival times, thus providing a much safer condition along the street. In addition, through traffic will be less likely to pass long queues on the right to get to Normandale Road. In all, a safer condition will result. Summary Analysis of the traffic and parking patterns of the Edina Community Center and South View Middle School study area have yielded the following findings: ❖ The traffic volumes in the study area have fluctuated through the years, but are generally trending upward. ❖ The existing levels of service on the street system in the study area are generally at LOS-13 or better. School days and tournament Fridays yield peak traffic volume and parking usage periods. ❖ An equitable balance of on- street parking regulations has evolved in the neighborhood in the.north half of the study area. Compliance appears to be high. Parking regulations are not posted, nor do they appear to be needed, in the neighborhood to the east of Concord Avenue. ❖ The Community Center and South View Middle School parking lots are currently at an 78% usage rate during the school day; 23% during the evenings and 31% on toumament weekends. Expansion and reconfiguration of the parking lots will increase parking capacity at the site, and may result in some shifting of parking preference by users. On- street parking is common along the south side of Southview Lane during daytime, evening and, tournament weekend periods. In evenings and on weekends, on- street parking becomes common along the west side of St. Andrews Avenue, but at no point in the review did on- street parking demand meet or exceed capacity. No other street Community Center and South View Gymnasium Traffic Study City of Edina, MN 0APR0J\824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/1&05 Page 12 in the neighborhood experiences the same level of on- street parking frequency, as does St. Andrews. Levels of service on the streets in the study area will not degrade appreciably as a result of the addition of the two new gymnasiums. The distribution of the added trips indicates that the roadways in the study area will remain at the same levels of service as before the completion of the new gyms. This was true for weekday and tournament weekend scenarios. Conclusion The goal of this study has been to determine whether the proposed gymnasiums will adversely impact the traffic and parking in the area. The levels of service on the streets within the study area will not degrade appreciably as a result of the addition of the two new gymnasiums. Upon completion of the proposed parking lot changes, the on- street and off - street parking supply will adequately serve the daytime, evening and tournament weekend demands. Community Center and South View Gymnasium Traffic Study City of Edina, MN OAPROJ1824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/1&05 Page 13 References: 1. Land Use Plan Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 2. Existing Traffic Volumes Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 3. Forecast 2020 Daily Traffic Volumes Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 4. Functional Classification Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 5. Pedestrian /Bicycle Facilities Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 6. Traffic Analysis Zones Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 7. Parking Restrictions Map, data accumulated by City of Edina, MN, February 2005. 8. Historical Traffic Volumes, 1975 -2004, data accumulated by City of Edina, MN, February 2005. 9. ECC /Normandale Elementary School Gym Addition Floor Plan, Rozeboom - Miller Architects, February 2005. 10. South View Middle School Gymnasium Addition Floor Plan, Rozeboom - Miller Architects, February 2005. 11. Edina Community Center /South View Middle School Site Plan, Rozeboom - Miller Architects, February 2005. 12. Phone conversations with Doug Johnson, Edina School District, 01/31/05 and 02/02/05. 13. Phone conversation with Ed MacHolda, Edina Assistant Parks & Recreation Director, 02/01/05. 14. City of Edina Local Traffic Task Force Findings and Recommendations, May 6, 2003 15. 2005 Edina Park & Recreation Insider, City of Edina, 2005. 16. Edina Basketball Association website, www.edinabasketball.com 17. Edina Girls Athletic Association website, www.egaa.org 18. Girls Traveling Basketball website, www.edinaciidsbasketball.org 19. Edina School District website, www.edina.kl2.mn.us 20. City of Edina website, www.ci.edina.mn.us 21. "Campus Traffic and Parking" HRG Memo to Jay Willemssen, Edina Public Schools, from Howard Preston, PE, and Chris Albrecht, July 31, 2000. 22. 2003 Official City Map of City of Edina 23. Field checks of study area, Howard R. Green Company, 01/31/05; 02/05/05; 02/06/05; 02/09/05; 03/03/05. Community Center and South View Gymnasium Traffic Study City of Edina, MN O:XPROJ\824980J\Rpt#1- Revised 031805 -Final Draft.doc 03/16/05 Page 14 Figures 1. Study Area 2A. Weekday 24 -Hour Traffic Volumes (1975 -1984) 2B. Weekday 24 -Hour Traffic Volumes (1985 -1994) 2C. Weekday 24 -Hour Traffic Volumes (1955 -2004) 2D. Weekend 24 -Hour Traffic Volumes 3. General Roadway Levels of Service 4. Parking Restrictions 5. Proposed Parking Lot Availability 6A. Estimated Additional Weekday Traffic 6B. Estimated Additional Traffic on Tournament Weekends Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/1 &05 Page 15 A IV • , r .- xJke •� —} > 4 . 7 1 6 te..• -�,' .'.. M� �„d6 y �:.� ^%t A r., 4r1 low. •b - 'h'�. °yam ^F°� y a L U t .� �• SSii �' s� +ey y7 I� > .._1 ` P _ ` li �{ S • .ice"' 7� %'4 ^ .•� t'�.1 ,,;,y ` �� ; - i• ITt A. t ice°' 'fit 00` 4�a,� f +.•' is.. � �"�'.� ) A - •a•. a' 1. � i'° �� `. �a4 a': ' y % . 1 �P r 1► - - — ' � 1. 4V � .•.� - 'rte: ", - ` PIN , 1985- 1361 t Pik 1987- 1971 • 1989- 1979 1991 - 2378 1 1• . _ p a; . s s ;'` .il�_ '►:r �L�`n , � � • -.;alb �� 3��. '� a � t 1 � , _ i F '"+yr f 1985 - 1150 S 1987 - 520 a is - 1987 - 5468 ,yam •� ■. -733 y �1991 Legend Cirr 1984-1234 Year -ADT Volume Number •-r Source: of I Minnesota . x WEEKDAY 24 -HOUR TRAFFIC VOLUMES (1985 -1994) FIGURE P F- ard R. Green Company TRAFFIC STUDY CITY OF EDINA, MINNESOTA 2B 45,000 acity Assumptions: �'� Los fThrough Only Lane 800 vph Note: This figure contains 40,000 TH Lane 600 vph RT Lane 700 vph approximate values. The values are highly dependant LOSE TH/RT /LT Lanes 600 vph on the assumptions used. It Turn Lanes 350 vph should not be used for operational analyses or final \\ \\\\\\\\\ 35,000 Peak Hour Percentages i2i design. Arterial Roadway 10% \\\\\\\\\\\ Directional Orientation 60/40 Los F LOS D. 30,000 (1) Assumes 1/4 mile signal spacing. For :' :' . • :' less than 1/4 mile signal spacing, roadway LOSE' ' becomes too volatile to determine LOS by \\\\\\..... GADT. Q � % 25,000 20,000 For greater than 1/4 mile signal spacing, the capacity for a through lane can be increased by approximately 50-100 vplph.. (2) Based on data provided in the Mn/DOT 1998 Automatic Traffic Recorder (ATR) LOS F .•LOSE ... LOS •' LOS \\. .\ \\\ :°. S .\ �' Los c '(d ® W LOS Los , >, LOS . \\ a'. Los ,'. /, /• /• / /, /• d tai LOS F LOSE \\\\\\\\\\\ w...... \\\ , >,•,•,•�', ,iiiniiiii LOS B Qi ' 15,000 .: \\\\\\\\\\\ • ,,a • > <s ,a,a,•,,,>, I //III // //, LOS - .\...... \\ \\\ Los ., \, \..,,. \,\ ..,.,,, \,.\ .. > > > > .... a •, >, >,•, >,> . , • > • .. a . . . ,.,.,.,.,., ,,, LOS B •/ ,,,,,,,,,,, LOS F \\\\\\\\\\\ • > . . . 10,000 >,', >, > < >< LOSE a Los C :'< ,. ....... a ,,s >,> LOS �> >�sa•�> <>a I.../i„/ /i LOS ...... ,fd BI // - 5,000 `e LOS C a ` ,�. LOS B ,i ......... /. 'a a a > >< ,i. LOS B LOS A:::: :} LOS A: ell. Los B ............ ' ./ - - - :: p : LOS A.':' :• }: LOS A � � . � • }:� LOS A :; ........... ............ ........... ........... LAS A 0 2 -Lane Undivided w/o 2 -Lane Undivided with R 3 -Lane Undivided with L 3 -Lane Undivided with R 4 -Lane Undivided w/o 4 -Lane Undivided with R 4 -Lane Divided with R & Turn Lanes or L Turn Lanes Turn Lane & L Turn Lanes Turn Lanes or L Turn Lanes L Turn Lanes Type of Roadway. GENERAL ROADWAY.LEVELS OF SERVICE FIGURE P� R, Green Company RAFFIC STUDY 3 y CITY OF EDINA, MINNESOTA Howard R. Green CorrPany MEMO To: Craig Larsen; Wayne Houle, PE; Steve Lillehaug, PE, PTOE From: Steve Manhart, PE, PTOE Subject: ADDENDUM #1 — Community Center and South View Gymnasium Traffic Study Date: March 29, 2005 On Wednesday, March 24, 2005, 1 presented the findings of this traffic study to the Edina Transportation Commission. This traffic study focused on the traffic impacts associated with activities and events at the two new gymnasiums proposed in the Community Center and South View Middle School campus. Following my presentation, the Commission raised several questions regarding the impacts of the overall redevelopment of the campus on the traffic conditions in the surrounding area. Based on these questions, additional information has been gathered regarding the overall redevelopment for the site, and the resultant impacts this development will have on traffic. Mr. Ted Rozeboom of Rozeboom - Miller Architects, Inc., project architect for the campus redevelopment, has provided information regarding elements of the project expansion: Community Center and Normandale School Expansion: • A total of 1,800 square feet are being added to the building. • The lobby for Normandale School is being expanded on the south end of the building. • No classrooms are being added, and the school's capacity will not be increased. • A reduction and reconfiguration in seating is proposed in the Art and Music Room from 900 fixed seats to 500 fixed seats. South View Middle School Expansion: • The expansion is not adding capacity to the school, but is modifying the spaces in the school. (The number of classrooms and student population are not anticipated to change significantly in the future.) • There is an increase in seating capacity in the theater from 400 to 600. • The existing lower gymnasium is being modified. The existing bleachers (seating capacity 900) are being removed, as are the temporary seating areas (seating capacity 250). The lower gym will remain an auxiliary gym with no seating. • The existing upper gym is being converted to a music rehearsal suite, which better accommodates the existing programs and uses for this space. • A new gymnasium planned for the field house expansion will seat 1,036, which is less than the seating lost from the existing lower gym (900 bleacher seats + 250 temporary seats =1,150 seats). • The existing pool has no fixed seating, but does have temporary seating in place for swim meets. This pool area is being transformed into additional music rehearsal area. • A new pool and diving well is being added to the field house area. There will be new seating for 365. ADDENDUM #1 03/29/05 Community Center and South View Gymnasium Traffic Study page 2 The modifications proposed for the Community Center and South View campus area are not the result of increases in numbers of students — the enrollments at South View and Normandale schools are expected to remain steady. These modifications represent a general reorganization of existing uses and overall increases in space, not seating capacity, for various activities. In fact, a review of the combined seating capacities in the Community Center and South View campus before and after the redevelopment shows a slight overall decline in seating capacity for the uses listed above. The existing seating capacity for these combined uses has been 2,560 seats (including temporary seats). The projected seating of these combined uses after redevelopment is 2,501 seats. Therefore, these aforementioned uses will present a minimal change in traffic impacts to the Community Center and South View Middle School campus area. The same numbers of students will be using the increased spaces. The changes in the Community Center and Normandale School do not produce or attract additional trips. As a result, the two new gymnasiums discussed in the original report become the more decisive trip generators for the study area. It will be the activities scheduled for these two new gyms that will create increased traffic to and from the campus, not the elements of the redevelopment listed above. Therefore, the investigation and findings presented in the original report reflect the more critical impacts to traffic to streets in the study area. It may be argued that the campus redevelopment listed above will intensify the traffic if events and activities in the theater or pool areas are scheduled simultaneously with activities in the new gyms. In an earlier conversation with Doug Johnson of the Edina School District, it was acknowledged that the scheduling of simultaneous events would put pressure on parking in the area. Mr. Johnson stated that the school district will be mindful of previously scheduled events in the gymnasiums, and would avoid scheduling simultaneous events in the theater or pool areas. In summary, the critical traffic generators for the site will be the two new gymnasiums and not the redevelopment of the other areas in the campus. The Community Center and Normandale School expansion will not increase the number of classrooms, nor will it increase activity areas. The South View Middle School expansion will redistribute activity space within the school, but will not reflect increases in numbers of students. The overlap of events will generally not occur as indicated by the school district. Therefore, the analysis and findings of the original report present the most critical impacts to the surrounding street system. G:XEngineering% Infrastructure\Streets%Trafflc\STUDIES\School Studies\2005 Southview Community Ctr Gym Traffic Analysis\3 -29- 05—Addendum—Traffic Study.doc 1' 11 `,91A , MINUTES OF THE Edina Transportation Commission ow e co Thursday, March 24, 2005 �J �y Edina City Hall 4801 West 50th Street � 8Sao Community Room MEMBERS PRESENT: Fred Richards, Marie Thorpe, Jean White, Warren Plante, Joni Kelly Bennett, Dean Dovolis MEMBERS ABSENT: Les Wanninger STAFF PRESENT: Steve Lillehaug, Sharon Allison b. Community Center & South View Gvmnasium Traffic Study — Howard R. Green Company Steve Manhart with Howard R. Green Company said they were commissioned to conduct a traffic study to identify internal and off -site traffic and parking impacts and to determine whether the proposed gymnasiums will adversely impact traffic and parking in the area of the Community Center and South View Middle School. The study area is bounded by W. 60th St. to the north, Lakeview Drive to the south, TH 100 to the east and Wooddale Avenue to the west. In addition to the gymnasiums, there will be building expansion on South View Middle School and the Edina Community Center, as well as the east and west parking lot and reconfiguration of South View's parking lot. Manhart said they used historical traffic count data dating back to 1975 as well as more current counts (1995- 2004), provided to them by the Engineering Department. Through data analysis and observation of the area, the study identified the following: • Local streets have high access but low mobility; principal arterials have low access but high mobility; • Traffic on roadways free flows at Level of Service (LOS) A (LOS -D or better is generally acceptable in the Twin Cities); • Relocation of South View's students drop -off location will pull more vehicles off Southview Lane; Projected Traffic and Parkinq Demand • Daytime Scenario: No additional trip generation /parking for school's gym; 320 additional trips and 40 parking stalls required for the Community Center's gym (assuming 4 ninety - minute sessions and 40 people per session daily for multi - purpose activities); Evening Scenario: 120 trips created by two simultaneous practices /games per gym (assuming 40 participants, 4 coaches and 8 spectators); 30 additional parking stalls per gym, but up to 60 spaces to accommodate change over between sessions; • Tournament Weekend Scenario: Four sessions on Friday night per gym ( =4x40 trips x 2 gyms) equals 320 additional trips; eight sessions on Saturday per gym ( =8x40 trips x 2 gyms) equals 640 additional trips; six sessions on Sunday per gym ( =6x40 trips x 2 gyms) equals 480 additional trips. • On- street parking restrictions seem to be in compliance; most parking are on Southview Lane and side streets during weekend tournaments, especially St. Andrews; • Weekend tournament traffic travels primarily along collector streets ( Southview Lane, Concord Ave. and Normandale Rd.); In conclusion, the study found that "Levels of Service will not degrade appreciably as a result of the construction of the new gymnasiums and upon completion of the proposed parking lot changes, on- street and off - street parking supply will adequately serve weekday, evening and tournament weekend demands." Richards indicated that the school should provide adequate off - street parking since they are continuing to intensify usage of the area. Plante concurred and stated that the traffic issue should have been addressed ahead of time and not after - the -fact. Dovolis said usage of the area would intensify even more when new programs are added and even if they were to provide adequate off- street parking, the number of trips generated will be an issue. Bennett said the number of vehicles is unacceptable for a residential area and there has been a lack of communication with the residents. White suggested creating an alternative transportation system to reduce the number of trips. Thorpe asked what could they do at this point considering that everything appears to be in place and construction has already begun. Lillehaug said funding for the gyms is yet to be approved. Residents in attendance commented as follow: Julie Risser, 6112 Ashcroft Ave. Risser stated that Valley View Rd should have been included in the study because it is used heavily when events are over and while the. study addressed traffic on Normandale Rd, it did not address the excess traffic that Valley View Rd will carry. She said Valley View Rd is a 1.1 miles speedway road with one only one place for drivers to stop between Normandale Rd and Hwy 62. She said the only designated crosswalk for students at Concord and Valley View Rd is dangerous because the flasher is on constantly and is therefore ignored by drivers. She said there is also a 'dip' in the road just before the crosswalk that makes it difficult for drivers to see an adult crossing, let alone children. She said the sidewalk does not go all the way through and students must be bused 2.5 blocks from Concord Elementary because Valley View Rd is too dangerous to cross. She is also not happy with the increased traffic in the area. Ron Wenaas, 5617 Sherwood Ave. Wenaas stated that he is disappointed that the traffic study only considered the impact of two gyms and not all four that are planned. He said the operating hours used in the study is not correct, it should be from 4 -10:30 p.m. which then doubles the traffic study's assumptions. He said the numbers used to determine trip generations are low and needs to be reconsidered. He stated that the traffic study should have been done based on what the project is going to do to the entire community, not just the effects of two gyms. He said the Edina Community Neighborhood Association implores the ETC to not recommend that they go forward with the gyms. Ralph Overholt, 6321 Rolf Ave. Overholt asked how has the Level of Service changed specifically and are there areas that are more affected than others? He said based on the cost per parking stall, the School Board should get students to bike or use other alternatives. Bennett stated that the Commission does not have an accurate picture of the impact on the community considering that all four gyms were not included in the traffic study. Dovolis concurred, stating that the study does not address all the uses, capacities, functions and future uses. Bennett said the study should not advance until all this information is known. Plante said Valley View Rd should be included in the future study. Dovolis made a motion encouraging a new traff community, including future potential of sites and the community is known. Seconded by Plante. Ayes: 6 Nayes: 0 Motion carried. study that will look at the impact on the entire withhold approval of gyms until the full impact on wpm 1 ���pp�p1 3 i V WLN- vA r e v. r � 1 � i t Proposed Gym Site .k 3-, a �y tie�e'` �r j00 ,� C 2�� - o Darlene Wallin Jennifer Bennerotte -rom: Wednesday, April 13, 200511:59 AM Sent: Darlene Hughes; John Keprios Center and Southview To: Gordon Hug Cc: FW : Gymnasiums for Community Subject: -__- original Message'- rlang Langs sev�mulliganb]ornnes.com] ev [mai13, 2005 11:58 AM From Ryan April 13, sent: Bennerotte nit Center and Southview To: Jennifer Subject: Fwd: Gymnasiums for COMM Commu Would you Councilmember Scot Houscdon't have Jennifer: between myself and Councilmembers (I It would be communication rios and ou Gordon Hughes. is an email this communication to the other Below as to forward to Mr. John Kep be so kind as well as their email addresses) much appreciated. Ryan E• Langsev 5801 Concord Avenue Edina, MN 55424 E. Langsev PLLP Ryan Bornnes Mulligan & '� Avenue 401 Groveland 55403 Minneapolis, MV 879 -1819 05 lo:40AM »> (612) com> 04/13/ at the community <scot•houstu�willir the gymnasiums at the Roush regarding were misleading make >>> Scot H for your comments. if my comments and Maria to Ryan - Thanks with Dan center and southvie9 and I have communicated council meeting comments were based. last sure they know on what my issue and wish I could be ateat a s about this I will be in Philadelphia I appreciate your feeling unfortunately, Tuesday evening- ed. These conflicts occur can not be Chang time to time. meeting on which do happen from business meeting a but tl�Y with infrequently for m of the community infrequ which we we try to balance the needs make decisions at council a tryborhoods. We need In our role today and for the future. the needs of individual a:f Edina We take feel best serve issue, please knouttistvalued and not see eye '" eye on every Your inP we may to us very seriously* final decision is While You send before a the communication been a� will be considered 9. your comments My number reached. be of further assisheccouncil have please feel free to call if I can ers of I will cake sure the other memb is 763 - 302 -7174• well. your communication as Thanks, Scot 1 "Ryan Langsev ". <rlangsev@mulliganbj ornnes.com> 04/13/2005 10:19 AM Community Center Neighborhood. CDT Councilmember. Housch: To: Scot Housh /Min /US /WCGUWCG CC:. . bcc: Subject: Sports Complex Plan for Edina It is difficult to fully express in this email my disappointment with the Edina City Council in its proposed plans to build the City -and School District sponsored gymnasiums ( "Sports Complex ") on the Edina Community Center campus in our neighborhood. The Sports. Complex plans has the obvious problems with putting too much into one location in a'single family residential neighborhood. But it was tentatively approved on December 7,. 2004 without a traffic study in this time when traffic is arguably the primary concern of city voters.. The study produced is.fatally flawed with many significant problems including, but not limited to: incorrect useage assumptions, applies street degradation standards to our neighborhood quality of life standards, and is blatantly. bias (acknowledges. your. previous vote, among other reasons) to such a high degree in which it has no objectivity from which to use in basing a decision. Moreover, the Council's actions suggest an insensitivity to the ECC neighborhood. The Council appears interested with.traffic problems voiced by the residents of the Country Club and Morningside neighborhoods regarding increased temporaryy cut - through traffic due to the delay in widening Hwy 100 between 36th and 394,. or the potential for greater traffic in a commercial area in the 44th Street and France Avenue area. Yet, you intentionally direct on a permanent ongoing basis a high - volume of traffic into our single family residential neighborhood without a traffic study. into an area that has no isolated ingress and egress.point during the times when we have a temporary reprieve from our high volume of. vehicle traffic. This plan is nearly unconscionable. To make matters worse,. your. closing comments.during the April 5, 2005 council meeting that the neighborhood supports the Sports Complex plans only highlights your.lack of constituency work and appreciation of the sentiments of the residents in the ECC neighborhood. In addition,. your specific references to Dan Rectenwald (who has always strongly opposed the Sports Complex plans at ECC) implicitly as a supporter of the plans was clearly misleading, if not a misrepresentation on the record to the Council body. One thing you can be sure of:. residents will voice their disapproval of the Sports.Complex plans, whether you attend the April 19, 2005 hearing or not. I hope you change your plans and attend. I have much more to say than is contained in this email. I don't consider it being "unEdinan" if I object to plans that greatly diminish the quality of life for my family. Ryan Langsev 5801 Concord Avenue 0 Edina, MN 55424 Ryan E. Langsev Mulligan & Bjornnes PLLP 401 Groveland Avenue .nnea olis, MN 55403 � lZ� -71 Z t DF �v e L D No� g �N� 4B Eg &A �Z A° �f cn 1 0 w, '5 EDINA COMMUNITY CENTER SOUTH VIEW MIDDLE SCHOOL Gymnasium Additions Edina, Minnesota SCHEMATIC DESIGN REPORT 16 March 2005 ROZEBOOM MILLER ARCHITECTS Minneapolis, Minnesota TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY 2 DESIGN PROCESS /ACKNOWLEDGMENTS 3 SCHEMATIC DESIGN NARRATIVE SITE DESIGN 4 BUILDING DESIGN g BUILDING PROGRAM 7 BUILDING SYSTEMS EXTERIOR CONSTRUCTION 8 INTERIOR CONSTRUCTION g STRUCTURAL SYSTEMS 10 SVMS GYM STRUCTURAL 11 ECC GYM STRUCTURAL 12 MECHANICAL SYSTEMS 15 SVMS GYM MECHANICAL 15 ECC GYM MECHANICAL 20 ELECTRICAL SYSTEMS 24 SVMS GYM ELECTRICAL 24 ECC GYM ELECTRICAL 28 STATEMENT OF PROBABLE COST 31 SCHEMATIC DESIGN DRAWINGS 43 Rozeboom Miller Architects, Inc. Page 1 EXECUTIVE SUMMARY Overview The City of Edina Gymnasium project includes both the Edina Community Center (ECC) and South View Middle School (SVMS) Gymnasium additions. The building design is the result of creating clear identities at two different scales —that of the campus scale and the scale of the individual buildings themselves. From a campus -wide perspective, the design of both additions incorporates similar elements and strategies for organization, thus tying the two together: Distinct entries with similar landscape treatments, public plazas, and their pedestrian connections serve to create a campus feel to tie the site together. The hardscape plazas with standalone gateway canopies mark the entries of each addition; similar landscape and building materials are used, as are the fixtures demarcating pedestrian paths and lighting the plazas. The buildings relate to the existing buildings as well as the greater campus context through use of materials, and clearly demarcate entries to the new venues through strategic use of glazing and building form. Addition and Renovation Work The ECC Gym Addition will be located on the south side of the ECC building, tying in to the existing first floor. The SVMS Gym Addition will be constructed along the south side of the existing middle school, between the new locker room addition and existing media center, tying in to the existing first floor. Construction will begin in the summer of 2005, and will be completed in the summer of 2006. Rozeboom Miller Architects, Inc. Page 2 DESIGN PROCESS /ACKNOWLEDGMENTS The goal has been to make the process of designing the project as open and inclusive as possible. Through many hours of meetings and discussions, staff members, administrators and community members have worked with the architectural and construction management teams to achieve a consensus on the design. The schematic design presented in this report has been reviewed and endorsed by the Joint Powers Oversight Committee. Many of the committee members volunteered their time and should be recognized for their generosity and commitment: Joint Powers Oversight Committee: Jim Hovland Scot Housh John Keprios Ed MacHolda Peyton Robb Jeff Johnson Jay Willemssen Doug Johnson Architectural /Engineering Team Ted Rozeboom, Greg Shuster, Doug Bergert, Glenn Waguespack, Rozeboom Miller Architects Robert Kurtz, Meyer, Borgman, and Johnson Tom Lind, Bob Tschida, Dunham Associates Tom Oslund, Tadd Kreun, oslund and associates Roy Anderson, Jared Lee, Anderson - Johnson Associates Construction Manager John Huenink, Kraus Anderson Midwestern Division Rozeboom Miller Architects, Inc. Page 3 SCHEMATIC DESIGN NARRATIVE Site Design The site plan for the ECC -SVMS Campus was conceived by the simple move of creating a green space or commons to link all of the various uses of this site with a long sinuous pedestrian spine. The green space created becomes the heart of the campus and a pedestrian connection between all of the facilities and parking lots. Pedestrian Spine: The pedestrian spine connects both the lower lot at SVMS and the south lot at the ECC allowing pedestrians to circulate to the center of the campus where all of the entries to the facilities are located. The spine was designed with the vision that is much like a river that flows through the campus. As the river flows through the site, seat walls located at the plazas serve as wing dams to slow the flow of people and pull them off of the spine into the gathering spaces created for events. The pedestrian spine is lighted. Plazas: The plazas at the new additions serve as gateways at either end of the pedestrian spine; each has a canopy marking the entry to the site. The new plazas become gathering spaces for events associated with the gyms, and the ECC plaza becomes a viewing platform overlooking the stadium. This site vernacular is seen at the Edina High School Gymnasium plaza, Tennis Court plaza, SVMS addition entries, and locker room entry off of the SVMS aquatics center. These spaces all are of a similar family of materials of exposed aggregate and colored concrete, and stacked stone planter walls. Parking /Circulation: Visitor parking will occur at the lots adjacent to each gym addition. Landscape Plantings: The plantings for the campus serve to reinforce the design intent, creating a campus feel and relating the plazas to one another. The pedestrian spine which connects the new gym plaza at the ECC with the new gym plaza at South View, is planted with clump form Amur Maples which will provide a stunning red fall color and as these trees mature the walk will begin to feel enclosed with the arching branches of the trees over the walkway. The gym plazas are planted with a hedge of Barberry with each entry having a different variety of Barberry to create interest and variety at each entry while continuing to have some consistency in plant species. Additionally, there will be perennial plantings for seasonal interest and color. The new gym plazas at each end of the pedestrian spine will become focal points for the campus as prominent locations for drop -off and pick up on a daily basis as well as for stadium events. Rozeboom Miller Architects, Inc. Page 4 Building Design The new building additions will create easily identifiable entries to the new venues. The building design is based on: • programmatic considerations, both for daily use and for after hours use • tying into and expanding upon the existing palette of materials • attention to natural light • attention to the building image in non - daylight hours Building Concepts Exterior Materials: The palette of materials for both additions will complement the existing campus palette (brick, metal, glass and stone), and include brick to complement the existing building, as well as metal wall panels and glazing to include both a clear glazing (storefront or curtain wall type) system and translucent glazing system where obscured view or diffuse light is required. The largest masses of the building (the "big boxes ") are clad in mostly brick, and the adjacent lobby spaces are articulated with metal wall panels and glazing. Architectural precast panels similar to the existing stone of the ECC and SUMS buildings protect the base of glazed areas of the building, as well as cladding the toilet room masses adjacent to the lobby at the ECC addition. Attention to Natural Light and Building Image After Hours: Daylighting in buildings is a vital component to the well being and productivity of their inhabitants. Clear glass storefront and curtain wall systems are used where views in and out of the building are important and some sunlight is desirable. Translucent glazing is used where glare could be a problem for athletics and daylight must be diffused. In addition to daylighting issues, the light emitted during predawn and nighttime hours is an important design consideration. In northern latitudes, where short winter days are the norm, a building that appears open and lit is a welcome beacon in dark conditions. Natural light and light emitted from the building at night will welcome people to the facility. Both transparency and translucency will fulfill these objectives. Addition Gymnasium: The new gymnasium will contain fixed bleacher seating (seating 70 @ ECC, 85 @ South View), as well as 6 basketball goals and striping for 1 competition basketball court and1 volleyball court. Storage areas are directly accessible from the gymnasium space. The ECC gym will house baseball practice equipment, including an existing practice mound and existing ceiling mounted retractable batting cage. Lobby /Support Spaces: The new lobby spaces are the public face of the new addition, and provide gathering space during events, as well as a securable connection to the existing buildings. Built in benches provide seating. The ECC addition lobby includes a new vestibule, concession stand, and public toilets. It connects the new gymnasium to the existing gymnasium lobby. Curtain wall glazing opens up views overlooking Kuhlman field. The SVMS addition lobby includes a vestibule serving both the new gym and existing middle school. A stair and elevator at the double height lobby provides a secured connection for use Rozeboom Miller Architects, Inc. Page 5 by South View students, as well as connection to the existing lower gym and new addition gym spaces for tournament or school -wide events. A window and skylight allow natural light into the once - exterior existing science classroom windows. Two toilet rooms and a janitor closet accessible off the lobby serve the new addition. Rozeboom Miller Architects, Inc. Page 6 Building Program ECC / NORMANDALE GYM ADDITION Lobby 1720 Vestibule 122 Janitor 45 Roof Access 56 Toilet Rooms (2) 546 Concessions 200 Gymnasium (70 fixed seats) 6255 Storage 332 Existing office remodeled into corridor 438 Existing gym stairs remodeled into exits 100 Subtotal 538 9276 SOUTH VIEW GYM ADDITION Lobby 1074 Vestibule 423 Janitor 54 Toilet Rooms (2) 625 Gymnasium (85 fixed seats) 6291 Storage 223 Elevator Mechanical 178 Subtotal 0 8868 Rozeboom Miller Architects, Inc. Page 7 BUILDING SYSTEMS Exterior Construction Brick Veneer Walls: masonry cavity walls with precast structural backup; brick will have special patterns or blends as budget allows. Metal Panel Walls: standing seam galvalume panels with precast or CMU backup; perforated metal wall panels at ECC Architectural Precast Concrete: integrally colored & acid etched panels to match existing stone veneer with CMU backup at ECC. Sheet metal flashing and trim: prefinished sheet metal, metallic kynar finish @ brick veneer wall; galvalume sheet metal @ metal panel walls. Windows: anodized aluminum, thermally broken, fixed windows with 1" low -E clear glass. Translucent wall panel glazing system: Double walled polycarbonate with anodized aluminum frame, thermally broken. Skylight System (South View): Double walled polycarbonate with anodized aluminum frame Storefront/Curtain Wall /Entrance: thermally- broken, clear anodized aluminum, 1" low -E clear glass. ECC gym windows have polycarbonate panels attached to the interior of the storefront frame where indicated on the elevations. General Roofing System: Ballasted EPDM membrane roofing system, polyiso rigid insulation. Gateway Canopies: Painted tube steel framing with perforated metal panels attached to a secondary tube steel frame. Rozeboom Miller Architects, Inc. Page 8 Interior Construction Partitions: CMU partitions, full height to underside of structure, at new areas. Burnished CMU at walls exposed to view. Existing Wall Surfaces: Existing exterior walls on the interior ofAhe_ ECC addition lobby will be patched and cleaned where exposed. Existing exterior walls on the interior of the SVMS addition lobby will be cleaned and painted to match new walls.. Sunshades.will be removed from existing classroom windows looking into the new lobby space. Interior Windows & Doors: hollow metal frames; aluminum storefront system @ new lobby vestibules. Stairs: New stair atthe SVMS lobby will be painted steel stairs w/ integrally colored concrete treads, Railings: Painted tube steel railing with painted perforated sheet metal guardrails & painted steel handrails. Athletic Equipment: Wall pads, basketball backstops, volleyball inserts. Provisions for suspending existing baseball batting cage from the ECC gym roof structure. Rozeboom Miller Architects, Inca Page 9 STRUCTURAL SYSTEMS Design Loads (Minnesota State Building Code) Roof: 35 psf + required increase for drifted snow load and mech. equip. Stairs and Corridors: 100 psf Bleachers: 100 psf Lobbies: 100 psf Ceiling and Mechanical: 10 psf, typical Wind: 90 mph, Exposure B Seismic: No Seismic Design Required Materials Cast -in -Place Concrete: 4000 psi at 28 days: Footings 4000 psi at 28 days: All other concrete, U.N.O. 3000 psi at 28 days: Masonry corefill All concrete exposed to weather or deicing salts shall be air entrained at the rate of 6% plus or minus 1 % at the point of placement and have a maximum water /cement ratio of 0.40. Precast Concrete: 5000 psi minimum at 28 days: All precast components. Masonry: fm = 2000psi for all concrete masonry units (cmu) See architect for brick specifications (non- bearing) Reinforcing Steel: ASTM A615, Grade 60 ASTM A775, Grade 60 Epoxy Coated Reinforcing Steel at all exterior slabs and stoop slabs that are exposed to deicing salts Structural Steel: Wide flange shapes: ASTM A992 or A572, Grade 50 unless noted otherwise Tube sections: ASTM A500, Grade B Pipe sections: ASTM A53, Grade B Channels, Angles, Plates, Anchor bolts: ASTM A36 Connection Bolts: ASTM A325, Type N (Bearing bolts) Cold Formed Metal Framing: 6" or 8" deep, 16 gage C- shaped metal studs with minimum 1 5/8" flange and minimum Y2" return flanges, spaced at 16" o.c All light gage metal shall be galvanized to G60 specifications. Typical Roof Deck: 1 -1/2" deep, 20 -gage wide rib steel deck. Roof Deck at Gym: 1 -1/2" deep, 20 -gage wide rib acoustical steel deck Live Load Deflection Criteria Floor and Roof Framing: U360 typical, 3/8" max. at structures above curtain walls Exterior Studs and Brick Support: U600 Rozeboom Miller Architects, Inc. Page 10 • Lateral Drift of Building: Height/500 (for entire building and each floor to floor) Description of Structural Systems I. South View Middle School Gym General Description Typical Roof Framing Gym Roof.- Acoustical steel roof deck over 48 inch deep long span steel joists spaced at 5'- 0° o.c. spanning approximately 60 feet (66 foot span over bleachers). Joists will be bottom chord bearing on the east end at the translucent wall panel system. Joist panel points are to align. High Lobby and Steel roof deck over structural steel wide flange beams Vestibules. Storage Room 8 inch precast concrete plank and Toilets. Canopy. Steel roof deck supported by a HSS structural steel beam and column welded frame. General Areas • General Foundation Requirements: Footing sizes will be determined based on an allowable bearing capacity of 3000 psf per the soils report prepared by Braun Intertec Corporation dated 19 January, 2004. A qualified geotechnical engineer shall confirm this value in the field. All unsuitable fill materials shall be removed from the project area as indicated in the geotechnical report. Perimeter building footings in heated areas should be placed at least 3'- 6° below the lowest adjacent exterior grade to provide frost protection. Foundation elements in unheated areas should be placed at least 5 feet below exterior grade for frost protection. Interior footings may be placed directly beneath the slab -on- grade. All footing elevations will also be governed by underground utility locations. The elevator pit will be constructed of 12- inch thick reinforced cast in place concrete. Footings: Due to the elevation difference between the exterior grade and the gymnasium floor (roughly 15'), the west wall and portions of the north and south walls of the gymnasium will require a cantilevered concrete retaining wall (minimum thickness of 18 inches) to resist the lateral earth pressure. The exterior of the retaining wall should be protected with a complete membrane water proofing system that includes drainage panels and a continuous drain tile system. The retaining wall extends around the north and south walls of the gym as required by the exterior grade and changes to a conventional spread footing at frost depth. Note that temporary shoring of existing foundations will likely be required prior to excavation for the new retaining wall. The exterior precast wall panels (see below) will bear on the concrete retaining wall, concrete foundation walls where required or directly on concrete footings. • A new concrete foundation is required to support the existing ACC mechanical unit to be relocated on the west side of the new gym. Rozeboom Miller Architects, Inc. Page 11 Exterior Walls: The gym enclosure consists of 10" thick x 10' -0" wide precast load bearing wall panels. Precast beams and columns shall support the wall panels and brick above the window openings in the southwest corner of the gym. The completed precast system must be capable of resisting the vertical loads, in -plane lateral loads and out of plane lateral loads. Dovetail slot anchors are required in the panels where exterior brick veneer is located. 8" cmu walls with brick veneer can be used at the toilet rooms. A portion of the entry vestibule walls will be glass curtain wall with a structural steel frame that provides both lateral support for the curtain wall and gravity load support for the roof structure. • Interior Walls: Typical interior walls will be 8" cmu bearing on a continuous concrete footing. The elevator shaft walls shall be 8" reinforced cmu. Non -load bearing partition walls less than 15' -0" tall will be 8" cmu supported by a thickened slab -on- grade. Provide vertical slip connection to structure at the top of the partition walls. Slab -on- Grade: Typical slab on grade will be 4" thick and reinforced with fibermesh at the rate of 1.5 pounds per cubic yard. Slabs with exposed concrete finishes will be reinforced with #4 bars at 24" on center in lieu of fibermesh. All slabs on grade shall have control joints sawn immediately after placement using the "soft -cut" procedure and spaced at a maximum of 15 feet apart in each direction. See the architectural drawings for vapor barrier recommendations below the slab on grade. • Retractable Bleachers: Slab on grade requirements for support of the retractable bleachers shall be verified with the manufacturer. • Lobby and Entry Areas: Structural steel framing as required for support of curtain wall and linear glass elements. • Expansion Joint: An expansion joint will be placed between the new and existing structures. Design of appropriate flashing and expansion joint details will be required. Primary Lateral Load Resisting System • Lateral loads will be transferred from the roof deck diaphragm system to the perimeter precast wall panels and cmu walls. Interior Work • A new steel stair and second floor steel framed platform will connect the main floor of the lobby to the new elevator and existing second floor hall. II. Edina Community Center Gym General Description Typical Roof Framing Gym Root Acoustical steel roof deck over 48" deep long span steel joists spaced at 5' -0" o.c. spanning approximately 60 feet. Joist panel points are to align. Rozeboom Miller Architects, Inc.- Page 12 Toilets, Concessions, Storage: 8" precast concrete plank spanning 15' -0" maximum Lobby. Steel roof deck over structural steel wide flange beams Canopy. Steel roof deck supported by a HSS structural steel beam and column welded frame General Areas • General Foundation Requirements: Footing sizes will be determined based on an allowable bearing capacity of 3000 psf per the soils report prepared by Braun Intertec Corporation dated 19 January, 2004. A qualified geotechnical engineer shall confirm this value in the field. All unsuitable fill materials shall be removed from the project area as indicated in the geotechnical report. Perimeter building footings in heated areas should be placed at least 3'- 6" below the lowest adjacent exterior grade to provide frost protection. Foundation elements in unheated areas should be placed at least 5 feet below exterior grade for frost protection. Interior footings may be placed directly beneath the slab -on- grade. All footing elevations will also be governed by underground utility locations. • Footings: Precast concrete wall panels shall bear on concrete foundation walls where required or directly on continuous concrete footings. Other walls will be supported by conventional spread footings. Exterior Walls: The gym enclosure consists of 10" thick x 10' -0" wide precast load bearing wall panels. Precast columns and beams shall support the wall panels and brick above the storefront glazing systems at the southeast and northwest corners of the gymnasium. The completed precast system must be capable of resisting the vertical loads, in -plane lateral loads and out of plane lateral loads. Dovetail slot anchors are required in the panels where exterior brick veneer is located. 8" cmu walls with brick veneer can be used at the toilet rooms, concession area and storage room. • Interior Walls: Typical interior walls will be 8" cmu bearing on a continuous concrete footing. Non -load bearing partition walls less than 15' -0" tall will be 8" cmu supported by a thickened slab -on- grade. Provide vertical slip connection to structure at the top of the partition walls. • Slab -on- Grade: Typical slab on grade will be 4" thick and reinforced with fibermesh at the rate of 1.5 pounds per cubic yard. Slabs with exposed concrete finishes will be reinforced with #4 bars at 24" on center in lieu of fibermesh. All slabs on grade shall have control joints sawn immediately after placement using the "soft -cut" procedure and spaced at a maximum of 15 feet apart in each direction. See the architectural drawings for vapor barrier recommendations below the slab on grade. • Retractable Bleachers: Slab on grade requirements for support of the retractable bleachers shall be verified with the manufacturer • Expansion Joint: An expansion joint will be placed between the new and existing structures. Design of appropriate flashing and expansion joint details will be required Rozeboom Miller Architects, Inc. Page 13 Primary Lateral Load Resisting System • Lateral loads will be transferred from the roof deck diaphragm system to the perimeter precast wall panels and cmu walls. Provisions for Future Expansion None. Rozeboom Miller Architects, Inc. Page 14 MECHANICAL SYSTEMS SOUTH VIEW GYM MECHANICAL GENERAL 1. The work described in this document will include all materials, labor, equipment and services to construct and install a complete operating mechanical system for the Edina City Gymnasium Addition at South View Middle School. The design of the mechanical systems is based upon this narrative. DESIGN CONDITIONS 1. Outdoor: a. Winter = -16 °F DB 2. Indoor: a. Winter = 72 °F 3. °U" Values (new construction a. Walls = To be determined (TBD). b. Roof = TBD. c. Windows = TBD. 4. Occuaancv Levels for load and ventilation rate calculations: a. Designed to meet ASHRAE design conditions unless noted as follows: 1) Gymnasium = Seating area + 30. 2) Lobby = 50% of Gymnasium. 5. Ventilation Air Quantities: a. Designed to meet ASHRAE design outdoor air as designated per space usage. b. Designed to meet ASHRAE multiple space requirements as applicable. c. Designed to provide make -up air as required to meet exhaust demand. SITE UTILITIES 1. Domestic Water Service: The existing School water service will provide the domestic water needs of the addition. 2. Fire Protection Water Service: The existing School fire service will serve the needs of the additions. 3. Sanitary Sewer: No new site connections to Sanitary Sewer are foreseen for this project. 4. Storm Sewer: Existing catch basin CB 8 (BP -2, sheet C2.10) will require relocation. Interior storm drains will be rerouted to the new location of CB 8. Gymnasium addition roof drainage will connect to the new location of CB 8. 5. Natural Gas: No new site connections to natural gas are foreseen for this project. PLUMBING SYSTEMS Rozeboom Miller Architects, Inc. Page 15 Domestic Water: The existing domestic water systems will be extended to the Gymnasium addition areas to serve toilet rooms. These include hot water, recirculated hot water and cold -water piping. Sanitary Waste and Vent System: Sanitary waste and vent piping will be provided to each plumbing fixture. Sanitary waste piping will route through the tunnel and connect to a main sewer line in the boiler room. Roof Drainage System: Roof drains (cast iron body with aluminum dome) and piping will be installed. Overflow drainage will be accomplished using scuppers in the roof parapet. Overflow roof drains will be added to isolated roofs where required. The overflow roof drain system will "daylight" through a wall mounted discharge nozzle. Plumbing Fixtures: Water closets: Wall hung, flush valve, 1.6 gallons per flush. Urinals: Wall hung, flush valve, 1.0 gallons per flush. Lavatories: Vitreous china, wall hung or counter mounted with mixing faucet. Electric Water Coolers: Wall hung accessible. Service Sinks: Floor- mounted 24 "x 24" receptors in custodial closets and wall mounted sinks in Mechanical Rooms with mixing faucets. Plumbing Materials: a. Domestic water piping: Type L copper with 95/5 soldered joints. b. Sanitary waste and vent: Service weight cast iron with no -hub couplings above grade and hub - and - spigot joints below grade. c. Rain water piping: Service weight cast iron with no -hub couplings above grade and hub - and - spigot joints below grade. Bid option for schedule 40 PVC with solvent joints below grade. Plumbing Insulation: Type: Rigid preformed fiberglass type with vapor proof all service jacket. Application: Domestic cold, hot, and recirculated hot water piping, horizontal rainwater leaders. FIRE PROTECTION SYSTEM Fire Protection System: The school's wet -pipe sprinkler system will be extended to protect the Gymnasium Addition. HEATING SYSTEM 1. Steam Systems: The school's existing low- pressure steam boilers will provide heating for the Gymnasium addition. Steam piping will be extended to the new air handler heating coil. 2. Condensate Return System: Condensate will be returned to the existing boiler feed system using the new condensate receiver CRA (CRA may need to be increased in size). 3. Hydronic Systems: Building- heating water for the Gymnasium addition will be produced in the new steam -to -water U -tube heat exchangers. The pumping system will not need to be increased to accommodate the additional heating requirements. 4. Terminal Units: a. Duct mounted heating coils for zone temperature control, 1 or 2 rows as required. b. Cabinet Unit Heaters in vestibules and exit stairwells. Rozeboom Miller Architects, Inc. Page 16 c. Vertical or Horizontal unit heaters in mechanical equipment and storage rooms. d. Finned tube radiation at exterior walls. 5. Piping Materials: a. Low Pressure Steam: Schedule 40 seamless steel pipe with flanged, or welded fittings for pipe sizes 2 -1/2" and larger. Schedule 40 seamless steel pipe with screwed or butt- welded fittings for pipe sizes 2" and below. b. Condensate: Schedule 80 seamless steel with flanged, or welded fittings for pipe sizes 2 -1/2" and larger. Schedule 80 black steel with socket welded fittings for pipe sizes 2" and below. c. Hydronic Heating Water: Schedule 40 black steel with flanged, welded, or cut grooved mechanical couplings for pipe sizes 2 -1/2" and larger. Schedule 40 black steel with screwed fittings or Type `L' copper with soldered fittings for pipe sizes 2" and below. 6. Piping Installation: Pump piping connections will be made with flexible connectors. 7. Piping Insulation: a. Type: Rigid preformed fiberglass type with vapor proof all service jacket. b. Application: All steam, condensate and hydronic water piping. Rozeboom Miller Architects, Inc. Page 17 AIR HANDLING SYSTEMS General: Unit will be factory- fabricated modular OUTDOOR unit by Trane, McQuay, or York. Sizes are preliminary estimates based on occupancy, and square footage. a. Cabinet construction will be 2" thick insulated double wall with solid internal liner unless noted as perforated liner. City of Edina Gymnasium (AHU -9): This unit will be a Constant Volume, zone heating air handling unit, 14,000 CFM capacity, with the following sectional components: Roof mounted relief hoods with automatic control dampers. Inlet Section with outside air damper, and return air damper with economizer controls. Minimum outside air quantity will be set during balancing. Filter section with 30% efficient pre - filters and 65% efficient 4" deep cartridge final filters. Access /Inspection Section for access to cartridge filters. Steam heating coil (face- and - bypass damper) section with discharge air temperature controls. Access /Inspection Section for control sensor installation. Chilled water - cooling and dehumidification coils with drain pans and discharge control (Section Only). Access /Inspection Section for control sensor installation. Centrifugal supply fan with low discharge sound characteristics, and mounted on spring vibration isolators. Cabinet liner shall be perforated. Air Handler Locations: AHU -9 will be located on the roof of the Gymnasium. Distribution Systems: Ductwork Systems (All): Low - pressure ductwork systems shall be G90 galvanized steel, rectangular or round. Exposed ductwork shall have a mill phosphatized finish to accept field painting. All constant volume supply, all retum/relief, and general exhaust will be constructed to SMACNA 2" pressure class with seal class W. Duct Insulation: Two -inch thick rigid fiberglass with foil face in mechanical equipment rooms for supply, return, relief, and outside air ductwork. One -inch thick flexible fiberglass with foil face for supply and return air in unconditioned spaces (i.e. shafts and above ceilings). External ductwork will be insulated with 2" thick fiberglass covered with a field applied aluminum jacket, or factory fabricated double wall ductwork. Internal liner will be installed only in locations where it can be inspected and cleaned and where required for sound attenuation. Liner will be mat -faced 3 -pcf fiberglass. Air Inlets and Outlets: Supply air will be distributed using wall registers with double deflection adjustable vanes, round ceiling diffusers in areas with exposed ductwork, and square louvered -face ceiling diffusers in rooms with ceilings. Return and exhaust air inlets will be wall registers and grilles with fixed 450 degree vanes or grates with 1" cube openings, and ceiling egg crate registers and grilles. Sound Control: Specified sound criteria will be as follows: RC -40N (Lobby, Gymnasium). Noise generated at the air handling units will be attenuated using a combination of acoustical sound plenum enclosures, sound traps, ductwork fittings, and manufactured duct mounted sound attenuators with perforated internal liners covering faced fiberglass insulation. Noise generated by air movement in ductwork will be controlled through established design criteria, including low air velocity, and radius elbows. Square elbows with Rozeboom Miller Architects, Inc. Page 18 turning vanes, flow splitters, terminal duct mounted attenuators, and other terminal duct accessories will not be used. Spring vibration isolators will be used on fans, pump isolation bases, ductwork, and piping located in the Mechanical Equipment Rooms. Exhaust Ventilation: General: Roof mounted centrifugal fans will provide the exhaust needs as identified below. All fans will be equipped with motorized isolation dampers in the ductwork near the roof penetration. PRV -16: Exhausts the Edina Gymnasium Toilet rooms (1,500 CFM), and will be scheduled to operate with AHU -9 in the occupied mode. PRV -17: Exhausts the Elevator equipment room (600 CFM), and will be scheduled to operate with AHU -9 in the occupied mode. BUILDING AUTOMATION SYSTEM (BAS): The building automation system will include automatic controls for monitoring and control of building temperature, humidity, and pressure. System components will include microprocessor based stand -alone field panels, electronic sensors, electric operators, wiring. A personnel computer workstation will be provided within the building. Testing, Adjusting, and Balancing Provide testing of the following systems: Air and water balancing of revised systems. Commissioning of all new and revised mechanical systems described herein. South View Middle School Modifications Reguired (BP #10 Proposal Request): The following work in the Middle School is required due to the Gymnasium Addition Relocation of Chiller CH -1 and relocation of chilled water piping. Deletion of outside air louver and extension of outside air duct to new roof mounted intake hood. Increase CRA capacity to include AHU -9 heating coil. ESL Room 225: The ESL classroom will be provided with new ventilation, and air conditioning from a new unit ventilator (Airedale type.) Science Room 125: The Science classroom will be provided with new ventilation, and air conditioning from a new unit ventilator (Airedale type.) Rooms 127 and 227: These classrooms will require modifications to their existing unit ventilator outside /condenser air inlets /outlets. Rozeboom Miller Architects, Inc. - Page 19 EDINA COMMUNITY CENTER GYM MECHANICAL GENERAL 1. The work described in this document will include all materials, labor, equipment and services to construct and install a complete operating mechanical system for the Edina City Gymnasium Addition at the Edina Community Center. The design of the mechanical systems is based upon this narrative. DESIGN CONDITIONS Outdoor: Winter = -16 °F DB Indoor: Winter = 72 °F "U" Values (new construction): Walls = To be determined (TBD). Roof = TBD. Windows = TBD. Occupancy Levels for load and ventilation rate calculations: Designed to meet ASHRAE design conditions unless noted as follows: Gymnasium = Seating area + 30. Lobby = 60% of Gymnasium. Ventilation Air Quantities: Designed to meet ASHRAE design outdoor air as designated per space usage. Designed to meet ASHRAE multiple space requirements as applicable. Designed to provide make -up air as required meeting exhaust demand. SITE UTILITIES Domestic Water Service: The existing School water service will provide the domestic water needs of the addition. Fire Protection Water Service: The existing School fire service will serve the needs of the additions. Sanitary Sewer: No new site connections to Sanitary Sewer are foreseen for this project. Storm Sewer: Existing catch basin CB 19 (BP -2, sheet C2.10) may require relocation. Storm drains from the new Normandale Elementary School Addition will require rerouting to an additional catch basin, or a relocated CB 19. Gymnasium addition roof drainage will connect to the new location of CB 19 and /or MH 110. Natural Gas: No new site connections to natural gas are foreseen for this project. PLUMBING SYSTEMS Rozeboom Miller Architects, Inc. Page 20 Domestic Water: The existing domestic water systems will be extended to the Gymnasium addition areas to serve toilet rooms. These include hot water, recirculated hot water and cold -water piping. Sanitary Waste and Vent System: Sanitary waste and vent piping will be provided to each plumbing fixture. Sanitary waste piping will route below the existing, Locker Room floor and connect to -existing sanitary drain lines. _Roof Drainage System. Roof drains. (cast iron body with aluminum dome) and piping will be installed: Overflow drainage will be accomplished -using scuppers in the roof parapet. Overflow roof drains will be.added to isolated roofs where required. The overflow roof drain system will "daylight" through a wallmounted discharge nozzle. Plumbing Fixtures Water, closets: Wall hung, flush valve, 1.6 gallons. per flush. Urinals: Wall hung, flush valve; 1.0 gallons per flush. Lavatories:_ Vitreous china,' wall hung or counter mounted with mixing faucet. Electric Water Coolers: Wall hung accessible. Sinks: Stainless steel of sizes, required. Service Sinks: Floor- mounted 24 °x 24" receptors in custodial closets and wall mounted sinks in Mechanical Rooms with mixing faucets. Plumbing Materials: d. Domestic water piping: Type L copper with 95/5 soldered joints. e. Sanitary waste and vent: Service weight cast iron with no -hub couplings above grade and hub - and - spigot joints below grade. f. Rain water piping: Service weight cast iron with no -hub couplings above grade.and hub - and - spigot joints below grade. Bid option for schedule 40 PVC with solvent joints below grade. Plumbing Insulation: Type: Rigid preformed fiberglass type with vapor proof all service jacket. Application:, Domestic cold, hot, and recirculated hot water piping, horizontal rainwater leaders. FIRE PROTECTION SYSTEM Fire Protection System: The school's new wet -pipe sprinkler system will be extended to protect the Gymnasium Addition. HEATING: SYSTEM Steam Systems: The school's existing low- pressure steam boilers will provide`heating for the. Gymnasium addition. Steam piping will be extended to the new air handler- heating coil. Condensate Return System: Condensate will be returned by gravity.to the boiler room. Hydronic Systems: Building- heating water for the Gymnasium addition will be produced in a new steam -to -water U -tube heat exchanger. Inline pumps will circulate heating water to the terminal units. Terminal Units: a. Duct mounted heating coils for zone temperature control, 1 or 2 rows as required. b. Cabinet Unit_ Heaters in vestibules and exit stairwells. C. Vertical or Horizontal unit heaters in mechanical equipment and storage rooms. Rozeboom Miller Architects, Inc. Page 21 d. Finned tube radiation at exterior walls. AIR HANDLING SYSTEMS General: Units will be factory- fabricated modular units by Trane, McQuay, or York. Sizes are preliminary estimates based on occupancy, and square footage. a. Cabinet construction will be 2" thick insulated double wall with solid internal liner unless noted as perforated liner. City of Edina Gymnasium (AHU -8): This unit will Constant Volume, zone heating air handling unit, 14,000 CFM capacity, with the following sectional components: Roof mounted relief hoods with automatic control dampers. Inlet Section with outside air damper, and return air damper with economizer controls. Minimum outside air quantity will be set during balancing. Filter section with 30% efficient pre - filters and 65% efficient 4" deep cartridge final filters. Access /Inspection Section for access to cartridge filters. Steam heating coil (face- and - bypass damper) section with discharge air temperature controls. Access /Inspection Section for control sensor installation. Chilled water - cooling and dehumidification coils with drain pans and discharge control (Section Only). Access /Inspection Section for control sensor installation. Centrifugal supply fan with low discharge sound characteristics, and mounted on spring vibration isolators. Cabinet liner shall be perforated. Air Handler Locations: AHU -8 will be located on the Lobby roof. Distribution Systems: Ductwork Systems (All): Low - pressure ductwork systems shall be G90 galvanized steel, rectangular or round. Exposed ductwork shall have a mill phosphatized finish to accept field painting. All constant volume supply, all return/relief, and general exhaust will be constructed to SMACNA 2" pressure class with seal class W. Duct Insulation: Two -inch thick rigid fiberglass with foil face in mechanical equipment rooms for supply, return, relief, and outside air ductwork. One -inch thick flexible fiberglass with foil face for supply and return air in unconditioned spaces (i.e. shafts and above ceilings). External ductwork will be insulated with 2" thick fiberglass covered with a field applied aluminum jacket, or factory fabricated double wall ductwork. Internal liner will be installed only in locations where it can be inspected and cleaned and where required for sound attenuation. Liner will be mat -faced 3 -pcf fiberglass. Air Inlets and Outlets: Supply air will be distributed using wall registers with double deflection adjustable vanes, round ceiling diffusers in areas with exposed ductwork, and square louvered -face ceiling diffusers in rooms with ceilings. Return and exhaust air inlets will be wall registers and grilles with fixed 45° degree vanes or grates with 1" cube openings, and ceiling egg crate registers and grilles. Sound Control: Specified sound criteria will be as follows: RC-40N (Lobby, Gymnasium). Noise generated at the air handling units will be attenuated using a combination of acoustical sound plenum enclosures, sound traps, ductwork fittings, and manufactured duct mounted sound attenuators with perforated internal liners covering faced fiberglass insulation. Rozeboom Miller Architects, Inca Page 22 Noise generated by air movement in ductwork will be controlled through established design criteria, including low air velocity, and radius elbows. Square elbows with turning vanes, flow splitters, terminal duct mounted attenuators, and other terminal duct accessories will not be used. Spring vibration isolators will be used on fans, pump isolation bases, ductwork, and piping located in the Mechanical Equipment Rooms.. Exhaust Ventilation: General: Roof mounted centrifugal fans will provide the exhaust needs as identified below. All fans .will. be equipped with motorized, isolation dampers 'in the ductwork near the roof penetration. PRV -X :..Exhausts the Edina Gymnasium Toilet..rooms (1;,300 CFM), and will be scheduled;to.operate with AHU -8 in the occupied mode. PRV -XX: Exhausts the' Concession Room (400 CFM), and will be controlled by a switch with = pilot 1ight. BUILDING AUTOMATION SYSTEM (BAS): The building automation system will include automatic controls for monitoring and control of building temperature, humidity, and pressure. System components will include microprocessor based stand -alone field panels, electronic sensors, electric operators, and wiring. Rozeboom Miller Architects, Inc. Page 23 ELECTRICAL SYSTEMS SOUTH VIEW GYM ELECTRICAL I. GENERAL 1. The work described in this document will include all materials, labor, equipment and services to construct and install a complete operating electrical system for the Edina City Gymnasium Addition to South View Middle School. The design of the electrical systems is based upon this narrative. II. APPLICABLE CODES All electrical systems for this facility will be designed in accordance with the Minnesota Building Codes as well as. other industry recognized codes and standards. The applicable codes and standards include, but are not limited to, the following: a. International Building Code (IBC). b. National Electrical Code — 2002 edition. C. Illuminating Engineering Society of North America Handbook, 9t' Ed. d. NFPA —1997 e. Minnesota Energy Code, Chapter 7676, 1999 111. BASIC ELECTRICAL MATERIALS AND METHODS Emphasis in equipment and systems selection will be placed on manufacturers readily available to and serviceable from the local metropolitan area. Equipment used will be manufacturer's standard where possible. Manufacturers currently used in the District will be considered to aid in minimizing stocking of multiple equipment types. IV. POWER DISTRIBUTION AND WIRING 1. Main Service: a. Extend a 600 amp - 277/480 volt feeder from the 3000 amp main switchboard — MSB -1 located in the in the electrical vault adjacent to the existing boiler room. Provide new 600 amp -3 phase fused switch in MSB -1. b. Install new 600 amp, 277/480 volt, 3- phase, 4 -wire distribution switchboard in the new Gym storage room. C. Install a new 112.5 KVA transformer in the gym storage room to feed a new 400 amp, 120/208 volt 3- phase, 4 wire switchboard located in the gym storage room. Transformer to be fed from the new 600 amp 480 volt distribution switchboard. 2. Distribution Panels: a. A 600 amp, 277/480 volt, 3- phase, 4 wire volt distribution panel will be added in the gymnasium storage room. 3. Panelboards: a. A 400 amp, 3 phase, 120/208 volt panelboard shall be added to gym storage room. b. Panelboards shall be circuit breaker type. Rozeboom Miller Architects, Inc. Page 24 4. 480V 3 phase circuits will be used for large motors, pumps, plumbing, HVAC, etc. 5. Emergency Power: a. Extend 3- 20 amp circuits from existing "Emergency " lighting panel to service the "Life Safety" circuits in the new addition and remodeled areas. IV. INTERIOR LIGHTING AND CONTROL New lighting will consist of T -8 fluorescent lamps and electronic ballasts, along with daylight harvesting and occupancy controls as recommended by the Minnesota State Energy code and other energy conservation organizations. a. Typical lighting shall be T -8 — 32 -watt fluorescent lamps with solid -state electronic 277V (120 volt) ballasts. Typical 3 lamp fixture schemes shall utilize "Master - Slave" ballast configuration. b. Corridor 1) Typical Corridor lighting shall consist of 2'x 4'2 lamp fluorescent fixtures with prismatic lenses spaced approximately 10' on center. 2) Selected fixtures, approximately 30' on center, shall be connected to the "emergency" power source for egress lighting. 3) Selected fixtures, typically near building entrances, shall be on 24 hours a day for security lighting. 4) Exit lights shall have brushed aluminum faces with red letters, LED type per energy code guidelines. Exit lights shall be connected to the emergency generator. 5) Manual "keyed" switches shall control corridor lighting. 6) Corridor lighting shall be designed to achieve an average of 25 FC. C. Storage / Mechanical Rooms: 1) Storage and Mechanical Areas shall 4' industrial fluorescent, 2 lamp fixtures; chain hung or surface mounted directly to structure, provided with wire guards. If a suspended ceiling is provided, recessed 1' x 4' fluorescent fixtures with prismatic lenses will be used. d. Gym: 1) New gym lighting shall have 400 watt pulse start "High Bay" HID fixtures. 2) New gym fixtures shall be equipped with Multi -tap ballasts for "multi - Level" lighting. 3) New gym shall be designed to achieve 65 fc. e. Lobby: 1) Lobby lighting shall utilize twin 57 watt PLT -10" down lights. Light levels in Lobby area shall be designed to achieve a light level of 35 FC. f. Restrooms: 1) Restroom lighting shall utilize a combination of cove lights and down lights. Light levels in restrooms shall be designed to achieve a light level of 30 FC. V. EXTERIOR LIGHTING 1. Building Perimeter a. Building Perimeter shall be lit with a combination of building mounted lights and area walkway pole mounted lights. Walkway shall be metal halide, typically Rozeboom Miller Architects, Inc. Page 25 100 watt luminaries mounted 12' above grade, located as required to achieve an average of 1 fc along walkways. Light fixtures shall match the new fixtures installed during the "Site Development " portion of the Edina School projects. b. Metal halide downlights in canopies. C. Significant architectural features may be highlighted with floodlights, or wall mounted fixtures. d. Perimeter lighting shall be controlled with a photocell and time clock. Entrance fixtures shall remain on all night or as dictated by time clock (District decision). VII. DATA SYSTEM 1. Data infrastructure upgrades shall be implemented as part of a separate District wide "Bid Package ". 2. Data related installations which shall be part of this project shall be as follows: a. Installation of a minimum of 5 data openings in gym. b. Installation of a minimum of 35 data openings in Lobby area. c. Data opening rough -ins shall consist of a 2 -gang steel junction box with a single gang extension ring. A minimum of a 1" conduit routed from the junction box and stubbed into an open ceiling area. The conduit stub shall be complete with a bushed fitting at the conduit end terminating in the ceiling space. d. 2" conduit stubs shall be installed through fire rated partitions for protection of data cabling. These conduits shall be provided with a `Mire stopping" material upon completion of data cabling installation. e. Camera (Security) opening rough -ins shall consist of a 2-gang steel junction box with a single gang extension ring. A minimum of a 1" conduit routed from the junction box and stubbed into an open ceiling area. The conduit stub shall be complete with a bushed fitting at the conduit end terminating in the ceiling space. f. Provide data connections to scoreboard. VIII PAGING SYSTEM 1. Paging system shall consist of an extension of the existing "Dukane" paging system presently located in the South View office area. 2. Paging speakers shall be added to the gym, lobby and restroom areas. IX CLOCK SYSTEM New "Atomic" clocks will be installed in all new Public spaces and gym. The existing clock system will not be extended to the new and renovated areas. XII MECHANICAL SYSTEMS 1. Provide electrical power connections to new mechanical Air Handling and cooling systems. a. Air Handling Units. b. Roof Mounted Exhaust Fans. C. Cabinet Unit Hebters. d. Heating Water Pumps. Rozeboom Miller Architects, Inc. Page 26 X111 FIRE ALARM SYSTEM 1. Fire alarm upgrades to the existing system shall be implemented as part of a separate District wide "Bid Package". 2. Fire Alarm related installations which shall be part of this project will be to provide a conduit infra - structure to accommodate the future district wide fire alarm upgrade as follows: a. Manual pull stations shall be located at all the building engineer's office, boiler room and main administrative offices. b. Smoke detectors shall be located as follows: 1) Corridors: Maximum 30 feet on center, maximum 15 feet from corridor ends. 2) Storage rooms. 3) Maintenance and mechanical equipment rooms. 4) Top of stairs /mezzanines. c. Heat Detectors shall be located as follows: 1) Kitchen. 2) Boiler room. d. Duct Detectors shall be located as follows: 1) Per NFPA guidelines, typically in supply and return ductwork for air handling units over 2,000 CFM. e. Horn/Strobes shall be located as follows: 1) Position DA 75 candela horn/strobe combination units in corridors, spaced approximately 50' on center. 2) Large assembly rooms: gymnasium, media center, etc., not to exceed 100 feet on center. 3) Areas with high ambient noise levels: machine rooms, wood /metal cutting areas, music. 4) Exterior of building: locate in areas of outdoor assembly; weatherproof. 5) Mini -hom strobes (30 candela) in classrooms. 6) Mini-horn strobes (30 candela) in Music practice rooms. f. Strobes, due to ADA requirements, strobe units are required in the following areas: 1) Public toilets. 2) Each classroom. 3) Public accessible conference rooms. g. Interface fire alarm control panel's alarm output with the Building Management System and an auto dialer to notify responsible party(s). h. Monitor Fire protection system tamper and flow switches. i. Interface Fire alarm system with Air Handling equipment to accomplish unit shut down upon activation of fire alarm system per NFPA. j. Connection of the Fire Protection system tamper/flow switches to the existing fire alarm system. Rozeboom Miller Architects, Inc. Page 27 EDINA COMMUNITY CENTER GYM ELECTRICAL I. GENERAL The work described in this document will include all materials, labor, equipment and services to construct and install a complete operating electrical system for the Edina City Gymnasium Addition to the Edina Community Center. The design of the electrical systems is based upon this narrative. II. APPLICABLE CODES 1. All electrical systems for this facility will be designed in accordance with the Minnesota Building Codes as well as other industry recognized codes and standards. The applicable codes and standards include, but are not limited to, the following: a. International Building Code (IBC). b. National Electrical Code — 2002 edition. C. Illuminating Engineering Society of North America Handbook, 91' Ed. d. NFPA —1997 e. Minnesota Energy Code, Chapter 7676, 1999 III. BASIC ELECTRICAL MATERIALS AND METHODS Emphasis in equipment and systems selection will be placed on manufacturers readily available to and serviceable from the local metropolitan area. Equipment used will be manufacturer's standard where possible. Manufacturers currently used in the District will be considered to aid in minimizing stocking of multiple equipment types. IV. POWER DISTRIBUTION AND WIRING 1. Main Service: a. Extend a 400 amp- 277/480 volt feeder from the 2000 amp main switchboard — MSB -1 located in the in the electrical vault adjacent to the existing boiler room. Provide new 400 amp -3 phase fused switch in MSB -1. b. Install new 400 amp, 277/480 volt, 3- phase, 4 -wire distribution switchboard in the new Gym storage room. c. Install anew 112.5 KVA transformer in the gym storage room to feed anew 400 amp, 120/208 volt 3- phase, 4 wire panelboard located in the gym storage room. Transformer to be fed from the new 400 amp 480 volt distribution switchboard. 2. Distribution Panels: a. A 400 amp, 277/480 volt, 3- phase, 4 wire volt distribution panel will be added in the gymnasium storage room. 3. Panelboards: a. A 400 amp, 3 phase, 120/208 volt panelboard shall be installed in gym storage room. b. Panelboards shall be circuit breaker type. Rozeboom Miller Architects, Inc. Page 28 4. 480V 3 phase circuits will be used for large motors, pumps, plumbing, HVAC, etc. 5. Extend 5 -20 amp -120 volt circuits and 1 -30 amp- 208 volt circuit to concessions stand. 6. Extend 3 -20 amp circuits from existing "Emergency" lighting panel to service the "Life Safety" circuits in the new addition and remodeled areas. IV INTERIOR LIGHTING AND CONTROL 1. New lighting will consist of T -8 fluorescent lamps and electronic ballasts, along with daylight harvesting and occupancy controls as recommended by the Minnesota State Energy code and other energy conservation organizations. a. Typical lighting shall be T -8 — 32 -watt fluorescent lamps with solid -state electronic 277V (120 volt) ballasts. Typical 3 lamp fixture schemes shall utilize "Master - Slave" ballast configuration. b. Corridor 1) Typical Corridor lighting shall consist of 2' x 4' 2 lamp fluorescent fixtures with prismatic lenses spaced approximately 10' on center. 2) Selected fixtures, approximately 30' on center, shall be connected to the "emergency" power source for egress lighting. 3) Selected fixtures, typically near building entrances, shall be on 24 hours a day for security lighting. 4) Exit lights shall have brushed aluminum faces with red letters, LED type per energy code guidelines. Exit lights shall be connected to the emergency generator. 5) Manual "keyed" switches shall control corridor lighting. 6) Corridor lighting shall be designed to achieve an average of 25 FC. C. Storage / Mechanical Rooms: 1) Storage and Mechanical Areas shall 4' industrial fluorescent, 2 lamp fixtures; chain hung or surface mounted directly to structure, provided with wire guards. If a suspended ceiling is provided, recessed V x 4' fluorescent fixtures with prismatic lenses will be used. d. Gym: 1) New gym lighting shall have 400 watt pulse start "High Bay' HID fixtures. 2) New gym fixtures shall be equipped with Multi -tap ballasts for "multi - Level" lighting. 3) New gym shall be designed to achieve 65 FC. e. Lobby 1) Lobby lighting shall utilize twin 57 watt PLT -10" down lights. Light levels in Lobby area shall be designed to achieve a light level of 35 FC. f. Restrooms 1) Restroom lighting shall utilize a combination of fluorescent cove lights and down lights. Light levels in restrooms shall be designed to achieve a light level of 30 FC. Rozeboom Miller Architects, Inc. - Page 29 V. EXTERIOR LIGHTING Building Perimeter a. Building Perimeter shall be illuminated with a combination of building mounted lights and area walkway pole mounted lights. Walkway shall be metal halide, typically 100 watt luminaries mounted 12' above grade, located as required to achieve an average of 1 FC along walkways. Light fixtures shall match the new fixtures installed during the "Site Development " portion of the Edina School projects. b. Metal halide down lights in canopies. C. Significant architectural features may be highlighted with floodlights, or wall mounted fixtures. d. Perimeter lighting shall be controlled with a photo -cell and time clock. Entrance fixtures shall remain on all night or as dictated by time clock (District decision). Vll DATA SYSTEM 1. Data infrastructure upgrades shall be implemented as part of a separate District wide "Bid Package ". 2. Data related installations which shall be part of this project shall be as follows: a. Installation of a minimum of 5 data openings in gym. b. Installation of a minimum of 35 data openings in Lobby area. c. Data opening rough -ins shall consist of a 2-gang steel junction box with a single gang extension ring. A minimum of a 1" conduit routed from the junction box and stubbed into an open ceiling area. The conduit stub shall be complete with a bushed fitting at the conduit end terminating in the ceiling space. d. 2" conduit stubs shall be installed through fire rated partitions for protection of data cabling. These conduits shall be provided with a "fire stopping" material upon completion of data cabling installation. e. Camera (Security) opening rough -ins shall consist of a 2 -gang steel junction box with a single gang extension ring. A minimum of a 1" conduit routed from the junction box and stubbed into an open ceiling area. The conduit stub shall be complete with a bushed fitting at the conduit end terminating in the ceiling space. f. Provide data connections to scoreboard. VIII PAGING SYSTEM 1. Paging system shall consist of an extension of the existing "Dukane" paging system presently located in the South View office area. 2. Paging speakers shall be added to the gym, lobby and restroom areas. IX CLOCK SYSTEM 1. New "Atomic" clocks will be installed in all new Public spaces and gym. The existing clock system will not be extended to the new and renovated areas. Rozeboom Miller Architects, Inc. Page 30 STATEMENT OF PROBABLE COST — ECC /NORMANDALE GYM ADDITION PROJ: ECC / Normandale Gym Addition LOC.: Edina, MN C.M.: KAMW ARCH: RMA DATE: 3/18/2005 Schematic Design Estimate BUILDING f : S.F.= .1 Foundations andLower'Slab at Boiler Rm Excavation - Perimeter Wall Foundations 10,180 sf 3.00 30,540 -Soil `Corrections at Footings 10,180 sf 1.00 10,180 -Step Footings & Misc. 1 Is 15,000.00 151000 7 n = Intenor 1NalI Footings 220 LF 6.00 1,320 Col4 n4Pads - Fxterior 10 EA 350.00 3,500 Column Pads - Interiors 8 EA 250.00 2,000 Misc. Foundation,Excavation. 1 Is 25,000.00 25,000 Footings ' Exterior Wall 360 If 30.00 10,800 " 7, nterior'Footingi' 220 If 20.00 4,400 Misc.1Unyderpinning, 1 Is 20,000.00 20,000 }.�Column`Pads- Interior 3x3: — EA 1,100.00 0 Pads - 8x8 10 EA 1,700.00 17,000 Column Pad s - andSteps 1 allw 15,000.00 15,000 n °, g Foundation Wails 800 SF 18.00 14,400 _ _ Rigid, Insulation @ Perimeter:, 2,100 SF 2.00 4,200 _ V1/aterproofing 2,100 SF 2.00 4,200 mm mm Foundation Drainage 1 Is 5,000.00 5,000 Subtotal'Foundations 182,540 , 17 93 _... 2 X Substructure V Slab on Grade; 10,000 SF 4.00 40,000 Plaza's 6,000 SF 5.00 30,000 Sand:Cushon (compactionne'grading) 10,000 SF 1.00 10,000 Misc Infll, sf 10.00 0 s Meth Equip Pad 11 Is 1 5,000.00 5,000 = Rozeboom Miller Architects, Inc. Page 31 Rozeboom Miller Architects, Inc.- Page 32 Risers, @Stairs 135 L 25.00 3,375; Ramp @ Subtotal Substructure 66perstructure SF 6.00 0 . 883758 68 3 -Roof Framing kik /Deck r Roof Framing Long $panw% acoustical' 2,900 SF 7.00 20,300 7,280 SF 9.50 69,160 =rv' deck Misc. Structural Framing 1 LS 10,000.00 10,000 A a k S te el` Erection, 10,180 sf 4.00 40,720 ank 8'` sf 10.00 0 ri Plank'12 "' sf 14.00 0 Canopy /Overhang Framing 1 Is 10,000.00 10,000" 4 f r_ 777 x 1 allw 5,000.00 5,000 . Lintels „ Lz d t3 Stairs'; 0 LS 8,000.00 0 s - Fire proofing 1 Is 0.00 0 ..F Misc Metal Fabncaboris 1 Is 5,000.00 5,000 160;180. w 1 3 Subtotal Superstructure __ Extenor;Closu °re " 4, Bnck /Insulation 8,200 sf 18.00 147,600 Masonry /insulation 2,100 sf 16.00 33,600 Precast back up 13,000 sf 15.00 195,000 7,326 sf 3.00 21,978 upgrade ..for sandblast Vintenor "sorry #rim /Blending w 1 allw 10,000.00 10,000 £ ,Ma r Perforated Metal Panel' 1,100 sf 30.00 33,000 Galvalume includes 1;725 sf 26.00 44,850F� , . Framing�for areas 1,725 12.00 20,700 galvalume K = Exterior all" sf >' 1 allw 25,000.00 25,000 f: , 7 -. ry td its/Overhanas (metal panels) Storefront with Doors, Storefront /Windows` 1 allw 5,000.00 5,000 250 2,100 sf sf. 70.00 55.00 17,500 115,500 } _ Curtain Wal! g sf 40.00 0 Gaulkirig°and Sealants 1 Is 5,000.00 5,000 ---JExitsi Single, OverheadDaors r Louvers 1 ea 1,500.00 1,500 ^ ' ea 3,500.00 00 Is 5,000.00 0 Rozeboom Miller Architects, Inc.- Page 32 5 ubtotal .; Exterior Closure _ Roofing Membrane Roof Misc Tie-in 676,228 f, 66.43 10,180 sf 4.80 48,864 1 allw 10,000.00 10,000 �Flashin S� � � g/ S heet Metal r.0 Roof Access, _ Reof Blod ing/curbs - Su6totali- Roofing Interior Construction rn CMU Partitions . � Brick, Gypsum Walls Misd 'n an Patch /.minor Renovation Doors- Single Doors Double Acoustical Doors Coiling., Doors Allum intenor:Vesti./ nter Storefront Polycarbonate bnerinsrdegym storefront' Floors -VCT - Floors- Terrazzo Floors- Ceramic Tile 450 If 20.00 9,000 1 alw 5,000.00 5,000 M 450 If 25.00 11,250: 84,114 8.26 3 6 2,812 sf 12.00 33,744 W 1,736 sf sf 17.00 8.00 29,512 0" 1 2 allw ea 35,000.00 1,000.00 35,000 2,000 v ; 1 pr ea 2,250.00 4,100.00 2,250 0 _ 1 250 365 ea sf sf 2,000.00 55.00 48.00 2,000 13,750 17,520,17 sf 2.00 0 , sf 12.00 0 - - 752 sf 9.00 6,768 = Floors Wood 6,393 sf 10.00 63,930' . Floors- Caret 420 sf sf 3.00 1.00 0 420 Floors- Sealed Concrete ,. Floors- Colorbd 1,882 sf 6.00 11,292 WaIIs- Ceramic,Tile v Sand Blast Precast Paint - Walls Paint -Doors Paint Columns -� Clean old Brick, ;Ceilings Acoustical (Tectum: <V- Line "Panel} Ceilings - Plaster 1,185 sf 9.00 10,665 - above 4,676 sf 1.00 4,676' ea 150.00 0 1 Is 1,000.00 1,000 1,329 sf 1.00 1,329 1,360 sf 3.00 4,080 547 sf 12.00 6,564 Ceilings Gyp Bd�Pamted. 579 sf 10.00 51790 ry Rozeboom Miller Architects, Inc. Page 33 C em- a' edPaint6d 99s7, -PP§ ' Soffits Mlsb.zBloc I' h9vC rlie6ii j -bau I -'-'Ik hg,(Int4 "La 6tali b1h over gym, storefrbnts '"e I s'Laddef 6,3931 sf 2.00 1 Is 15,000.00 1 alw 15,000.00 1 777 alw sf 3,000.00 28.00 I Is 8,000.00 55,000.00 3.00 5.00 8.00 2.75 1.00 12.00 2.00 2.80 0.55 0.30 0.20 4.00 0.00 0.70 0.10 0.00 1.00 1.00 LLdumpster, else, despeirhits,hba,: 71 mo 1 20,000.00 Rozeboom Miller Architects, Inc. Al -f I,- 'Y I 30,540 50,900 81,440 27,995 10,180 7- 122,160 323,2151 31.75 20,360 28,504 5,599 -T -5-,054 7-77 A- 2,036 40,720 0 7,126 1,018 0 10,180 10,180 128,777 140,66-0 Page 34 Subtotal rlor,Cohitru,01140 L L L � Systems 777 .Conveying ryElevatioc Subto tal, EldvabDft, 0 ea- Meiclianical .8, F ire. P rotedtion Plumbing 10,180 sf 10,180 sf Piping, 10,180 sf 6. g, Controls 1 0,180 sf est/13616nde 10,180 sf Wntilatidh 10,180 sf Iiiiii-if-- -Mo6iiin-464 !9 ' '010drical ''-Servic6A.Digtrib6bbn', 10,180 sf 10,180 sf PowerNVinng/Devicev Equip -onh 6/M& 10,180 sf 777�777 mergency:Power 10,180 sf 77 EEmergencyI Lighting g , 10,180 sf Lighting 1gr ng 10,180 sf Lighting 10,180 sf 7r0, 10,180 sf Clock ........ .. t lj' $,ys, ern 10,180 sf Tdii&6WF%in61PA- Site - Lighting Computer, Data 7= 10,180 10,180 sf sf 10,180 sf 71, 55,000.00 3.00 5.00 8.00 2.75 1.00 12.00 2.00 2.80 0.55 0.30 0.20 4.00 0.00 0.70 0.10 0.00 1.00 1.00 LLdumpster, else, despeirhits,hba,: 71 mo 1 20,000.00 Rozeboom Miller Architects, Inc. Al -f I,- 'Y I 30,540 50,900 81,440 27,995 10,180 7- 122,160 323,2151 31.75 20,360 28,504 5,599 -T -5-,054 7-77 A- 2,036 40,720 0 7,126 1,018 0 10,180 10,180 128,777 140,66-0 Page 34 Rozeboom Miller Architects, Inc. Page 35 ECC /South View rr r' Middle School Gymnasium Additions • Sc iematic Design I rr r' 700 sf 55 38500; , A, 350 sf 250 87,500 1 Is 20,000 20,000 0 0 �u 0 .0 , 0 0 7... �: 2458 705 - ., 1. Rozeboom Miller Architects, Inc. Page 36 STATEMENT OF PROBABLE COST — SOUTH VIEW GYM ADDITION PROJ: South View Gym Addition LOC.: Edina, MN C.M.: KAMW ARCH: RMA DATE: 3/16/2005 Schematic Design Estimate BUILDING S.F.= 1 Foundations; and Lower$labtat Boiler R_m _ Excavation = Perimeter Wall Foundations 9,800 sf 4.00 39,200 Soil Corrections at Footings — - - Step Footings Misc Interior Wall Footings` " - Column Pads:- Exterior " Column Pads Interior Foundation Excavation Foo ings - Exterior Wall Infer16FFootings Underpinnng Column Pads- Interior 3x3 Pads 8x8 - Column Pads-Exterior and Steps ;. Foundation, Walls Rigid'l 6sulation @ Perimeter Waterproofing _ - - Foundation Drainage °bt&i('- Foundations, �� — Substructure Slab o mGrade Plazas Sand Cushion (compactionne grading) _ - -- Miisc Infill Mech Pad 9,800 allw 9.60 94,080 1 Is 15,000.00 15,000 _ - 160 LF 6.00 960 10 EA 350.00 3,500 _ �W 1 EA Is 250.00 15,000.00 0 15,000 390 If 30.00 11,700 160 If 20.00 3,200 W _ 1 Is 20,000.00 20,000 EA 1,100.00 0 10 1 EA allw 1,700.00 15,000.00 17,000 15,000 600 SF 18.00 10,800 2,000 SF 2.00 4,000 2,000 SF 2.00 4,000 1 Is 5,000.00 5,000 258,440 27.49; _ :- 9,600 SF 4.00 38,400 3,500 SF 5.00 17,500 9,000 SF 1.00 9,000 1 sf Is 10.00 5,000.001 0 5,000 Rozeboom Miller Architects, Inc. Page 37 .......... Risers @ Stairs 135 LF 25.00 3,375 . .............. _ Ramp @ SF 6.00 0 Subtotal - Substructure 73,275 7.80 7 Superstructure Roof Framing - Joists /Deck @ CR's 2,600 SF 7.00 18,200 Roof Framing -Long Span w/ acoustical 7,200 SF 9.50 68,400 deck Misc. Structural Framing 1 LS 10,000.00 10,000 Steel Erection 9,800 sf 4.00 39,200 Plank 8" sf 10.00 0 Plank 12" sf 14.00 0 Canopy /Overhang Framing 1 Is 10,000.00 10,000 = - ...... _... W� .. _ Lintels 1 allw 5,000.00 5,000 - = _._ .._W ..._ Stairs 300 sf 85.00 25,500 Fire proofing- 1 Is 0.00 0 _ Mist. Metal Fabrications 1 Is 5,000.00 5,000 Subtotal Su perstructure 181,300 19...29 Exterior Closure ! 4 __ .... _ . _ _ .:. Brick /Insulation 12,675 sf 17.00 215,475 _ Precast back -up 13,650 sf 15.00 204,750 upgrade for sandblast interior 6,600 sf 3.00 19,800 Architectural Precast / Face stone 1 allw 0.00 0 Masonry trim / Blending 1 allw 10,000.00 10,000 Galvalume 650 sf 28.00 18,200 y Framing for galvalume areas 650 sf 12.00 7,800 Exterior Wall Demo 1 allw 25,000.00 25,000 Exterior Gate (Meth equip. yard) 224 sf 35.00 7,840 Soffits/Overhangs (metal panels) 1 allw 10,000.00 10,000 Storefront with Doors 250 sf 70.00 17,500 Storefront / Windows 160 sf 55.00 8,800 Curtain Wall sf 40.00 0 Caulking and Sealants 1 Is 5,000.00 5,000 Exits . ._ ., Double 1 ea 2,500.00 2,500 Overhead Doors ea 3,500.00 0 Louvers Is 5,000.00 0 Rozeboom Miller Architects, Inc. Page 38 Rozeboom Miller Architects, Inc. Page 39 <'Subtotal -- Exteroor Closure Roofing 552;665 r 58.79 - - 5 M Membrane Roof Misc Tie -in 9,400 sf 4.80 45,120 1 allw 5,000.00 5,000 Flasfiing/Sheet MetaC Roof Access Skylight Roof 6166 king/curts Subtotal Roofing Interior::Constructio CMU Partitions Interior Cast in Place wall 450 If 20.00 9,000 <. 1 alw 5,000.00 5,000 140 sf 115.00 16,100 450 If 25.00 11,250 . 91,470 9.73 r 6.. 2,986 sf 13.00 38,818 1,400 sf 19.00 26,600 Bnck rt 1,082 sf 18.00 19,476 Precasf Benches Gypsum Walls Misc Tie-in and Patch _ _ x r s =5mgle Doors- Double Acoustical Doors k = >� 90 1 If sf allw 15,000.00 8.00 20,000.00 15,000 0 20,000 2 ea 1,000.00 2,000 3 pr 2,250.00 6,750 ea 4,100.00 0 Coiling Doors x ea 2,000.00 0 um interior Vestr.. Floors- Ceramic Tile 4 Floors Colored 285 sf 45.00 12,825 655 sf 9.00 5,895 1,825 sf 6.00 10,950 Floors- Porcelain Tile! sf 8.00 0 :Floors -Wooii Floors- Seated'Concrete h r, °Walls Ceramic Tite 6,290 sf 10.00 62,900 11 7 453 sf 0.50 227 950 sf 10.00 9,500 - s 'Paint - Walls' Paint �- Doors 5,380 sf 2.00 10,760 ea 150.00 0 _. Sand Blast Precast Ceilings Acoustical Ceilings Gyp Bd Painted Ceilings - Plaster; Ceilings Exposed Painted :'Painted Gyp above 1,815 sf sf 1.60 8.00 0 14,520 655 6,290 sf sf 12.00 2.50 7,860x 15,725 {" :. 1,850 sf 3.00 59550 Rozeboom Miller Architects, Inc. Page 39 Rozeboom Miller Architects, Inc. Page 40 Rozeboom Miller Architects, Inc. Page 41 ECC /South View Middle School Gymnasium Additions. Schematic Design Ro ebo m Mme Architects, |n . Page 42 wr 777 Me ..z« ma e . /k bh. 1 Is /\ 16,000- «\ :16000 ^ «2« «��:� s oo a k. 450 sf 250 . 112,500 Cao�\ §1 I 2;00 ^;20402 � � � � , .. .. . . °. - « «2 . \ . \.� 0 0 0^ O O . :: ... . .. ..... .., .«? kn §p& \\ \ / \ 48,500-:,-; y>.. .. 24713 ƒ \, Ro ebo m Mme Architects, |n . Page 42 0 I I SYNTHETIC TURF ENTRY I I IN go mu EAST LOT] n I ENT — tol ldl W F d 11111111 0 COMMUNITY c �M CENTER lot - A. �. l._.' GYM —: t ADDITION d ® iI ENTRY ryq i n DR OP �YNa• ADDITION S� PLAZA 1 I 0' , 1 ' 17 • it • PARKING INFORMATION: PARKING LOT EXIST!NG # OF STALLS JI r NORTH LOT 88 STALLS r •t r � i ' •` O* r / s ' SOUTHVIEW LOT 148 STALLS s • r � • .s• - 1 I 0' , 1 ' 17 • it • �u ❑� • r I 00 � I I I - I SOUTH VIEW O' I MIDDLE ° SCHOOL � 0. Q •' F I I SOUTHVIEW LOT I 0' I I •o I xv I Uh I••+ am .d I �tl���Its1III��M \O I \ I LLJ I t I � _E01 z L�J I I I Q I I I \ I I BAS \ I I / ' I � I I U I U I I I I I I I 1 PARKING INFORMATION: PARKING LOT EXIST!NG # OF STALLS NORTH LOT 88 STALLS KEY SOUTH LOT 181 STALLS EXISTING BUILDING EAST LOT 174 STALLS SOUTHVIEW LOT 148 STALLS PROPOSED BUILDING FRONT LOT 10 STALLS TOTALS 601STALLS • • • FIE D o • s e • • �u ❑� • r I 00 � I I I - I SOUTH VIEW O' I MIDDLE ° SCHOOL � 0. Q •' F I I SOUTHVIEW LOT I 0' I I •o I xv I Uh I••+ am .d I �tl���Its1III��M \O I \ I LLJ I t I � _E01 z L�J I I I Q I I I \ I I BAS \ I I / ' I � I I U I U I I I I I I I 1 PROPOSED # OF STALLS 88 STALLS 204 STALLS 218 STALLS 155 STALLS 10 STALLS 675 STALLS 22 DROP OFF SPACES PARKING INFORMATION: PARKING LOT EXIST!NG # OF STALLS NORTH LOT 88 STALLS KEY SOUTH LOT 181 STALLS EXISTING BUILDING EAST LOT 174 STALLS SOUTHVIEW LOT 148 STALLS PROPOSED BUILDING FRONT LOT 10 STALLS TOTALS 601STALLS PROPOSED # OF STALLS 88 STALLS 204 STALLS 218 STALLS 155 STALLS 10 STALLS 675 STALLS 22 DROP OFF SPACES MEN= I r STORAGE 332 SF ga a LINE OF ROOFTOP MECHANICAL UNIT �s d; + T ENCLOSURE ABOVE RN E $ 906 �4 I LT �— T125= JAN. CONCESSIONS '200 SF � I - - - - - -- I I I 1 I 1 LOBBY _ 1720 SF I I I TLT V S . F� — 122 SF e i i i I I I � e LINE OF CANOPY ABOVE - 0 �v� EC10 WORKS X s' i WAITING/LOBBY o w7' i 13u F i Y El 1183 SF SF T2 SF VESTIBUL r' wM` o SOCIAL C WNF. § PRINCIPALS PSYCH EECHi' F +�� ` op 000 0 Y LINE OG OPV - -- -- -- -- -- --------- - - - - -- T _ I I OBBY 720 SF e I I I ' I � I /0 I I I � I �I - - - - - -- -- -- --- - - - - -- -- — —J I GYMNASIUM / p/ I 6255 SF I ffi �\ ON �i --ry � �- . P' p€; � .- _ % ::.� v�� � � Y . _.., _ � .. -_� .�,�. - •r. ,... . ,�_.,,� ..5 �... .,... ,,.__,.. �� �;�.�;. - �i.n�c,`.' � PERFORATED METAL CANOPY ROOF TOP MECHANICAL UNIT 0 s' 1 o 20' 40' WEST ELEVATION 119' . l'-0 EAST ELEVATION Iftr . I U 7 -., �A lam' ma - i M. A1' ?�p• w9� 14 A.. f� ■ 4 ® v ,�,N• Rozeboom Miller Architects. Inc. ILM (e ti ..`'d ..ui` � / !f•'J Ywt^ +!M[+ ` +1 'IC' ^YTib3zP r.. 111 Ij EDINA COMMUNITY CENTER GYM ADDITION f: f" ELEVATIONS �OQ w9� 14 A.. f� r 4 ® v ,�,N• 7, Y .... n _ ., . ,. ,.. Q TA you qq ,.. :, , ,:. .. r.... v, U f, L .1941. .i "ir- i .S- f u K h 4 < h h F s f f: p ✓:.. ,:_:... ., 5. < :.; e.. ,. .,..... .,.._... ,...:. �.. .n .;,:r..i, t.. ... :vx .Y,.. S,.... .. 2. ., .:,,:.' >%-S. >i` i ;t Exv. 4 as 2 x 1 3 S ,.: ,_ _. . ' rte. 2 MOM NOW-, R � r s, >.w TWA s,. ..... x won _S . t' s > F k k } t ^t 7 t ,,� Y5' ti �tzsra •L, d y -.:. ,y.2 .xR'+'.'...- :- .'., '1� _•.. ,1'.0 -i. r -at d w� k �6 Y ,., _ ._ .r,- , {.... -2 , xw. , <, . c , _za; .. , >. • >s rtrn •+z S ±X Y •u".< rY K s <r 7 s MW s� �8 S L. M0, x> S.s v -..v. , .. , . ,..✓tip. , ..:. w. .✓ ,..« ., Q-.: ..: ... , . ...: .. ,�# .,# J , . . I rp ,. ,._ ... ✓ r: ,_.,., i., .:,. , � .- .,_. , rry , �. .. ..., ., .�Q. .. - .mac..;., , }�x,.a .. - . _ .,, -„ -.. k ro . R.. P. t 4,, - �LJ aR .. .. c,�,a 1r;4. ..k<--," Y 5 } `ms`s a 2 6 . n, �z O: Y a t z» a : ➢ ,., M .. .v . .. .. . , „,..a,. .. ate, 4-1— . ..•v., ....... ... NAM ANN ymy_g wvg $3 tax s ,^ r F r� 1 yA "MEMO"'”" MO Wong . d x a O.D. O.D. -m—Quo Yom, e* }j I, fs 'f a"� y � rr. �oA I j 9 4�:• I � ;a '"� s. z sic mmj�& Ply gr r „ 4 Z VC ,. kO " E I O �; I ,; , �� o o + OD. V-n TO CIO s3q a 3 7 + Y,n too Pin q 5 ;i Q O.D. F T 4 3 ]] Yqc v v? �t E Y 4 _. Aa I, w �tf r� c ?i n r . z .�a � s : . rn`._ tt i n r� y ?ry . t a f_Y wM , A. �, rr h_v Y 3t{^ Y �r v4 c< SY 5 rd {{ a ,as _ h x' f r d S- v" i fi. J,E z + Q r » F7 +a ; x 1 r ",-3- E c p 0 s is zm as CROSS SECTION THRU GYMNASIUM va . ,+o STANDING SEAM GALVALUME PANEL LONG SECTION THRU GYMNASIUM Iff -,a T.O PARAPET EL 1354' B.G. STRUCTURE - EL. 130'4r WINDOW HEAD EL 107'-4° FIRST FL OO' R EL 100'-0 T.O PARAPET - -- EL 1354' B.G. STRUCTURE EL. 130'-0' T.O. PARAPET - - EL 120'-0' _ T.O. CANOPY EL 112'4' FIRST FLOOR - - - EL. 100'-0' I n� Rozeboom Miller Architects, Inc. I�II�II��I�II�II�L�I I��Ih . Si _IUTH VIEW MIDDLE SCH01 _IL GYMNASIUM ADDITI1 JN BUILDING SECTIONS 3132" = V -0" OO� �o�. o @ ' �a i' MARCH 16, 2005 � __, !1 EAST ELEVATION � WEST ELEVATION APR.19'2005 12:58 952 941 5492 SECURITY DEVELOPMENT #0290 P.002/002 Dewey Johnson 4504 Lakeview Dr Edina, MN 55424 April 18, 2005 RE: NEW GYMPS Dear Mayor Hovland, Council Members, and Edina Planning Dept.: 1 have lived in the community center neighborhood for 26 years, and 1 am in favor of additional mss. Edina needs these facilities! The pnmary concern of the City of Edina should be to provide a positive environment for encouraging recreational participation, especially for our children. The traffic concerns of the .neighborhood association are highly exaggerated. The new gyms will greatly enhance the community and provide long overdue new facilities. Please vote in favor of the new gymnasiums. Thank you. Very Truly Yours, Dewey Jo on AGENDA ITEM: IV.C. Darlene Wallin From:. Jennifer Bennerotte Sent: Tuesday, April 19, 2005 12:13 PM To: Darlene Wallin Subject: FW: Gymnasium additions - - - -- Original Message---- - From: Amy Henriksen [ mailto :ahenriksen @novationap.com] Sent: Tuesday, April 19, 2005 11:34 AM To: Jennifer Bennerotte Cc: mtfesenmaier @eschelon.com Subject: Gymnasium additions We are unable to be present for tonite's meeting however, we feel very strongly that more time be taken to assess the risks and impact on our neighborhoods. We have 2 small children, and our street is not safe for them to ride their bike and tricycle, there is already too much traffic on our street. The cars already go too fast, and there is no parking on either side of the street during the day. If we wanted to live by a commercial sports facility, we would live by the Dome /Target center. We feverently oppose this plan. Jason and Amy Henriksen Amy Henriksen NOVATION ARCHITECTURAL PRODUCTS, INC. 313 West 48th Street Minneapolis, MN 55409 -2417 Phone: (612) 827 -8282 Fax: (612) 827 -5378 Email: ahenriksen @novationap.com Website: www.novationap.com C. 1 L:, Page 1 of 1 AGENDA ITEM: I IV.C. Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 12:58 PM To: Darlene Wallin Cc: Steve Lillehaug Subject: FW: Transportation Commission - - - -- Original Message---- - From: Dan Rectenwald [mailto:DRectenwald @hga.com] Sent: Tuesday, April 19, 2005 12:32 PM To: Jennifer Bennerotte Subject: Transportation Commission Your summary of the Traffic and Parking study for the new gyms intimates that through the use of on- street parking, the need will be met. Is is a goal and /or principle of the site and city council to meet the parking demands of the area within the parking lots? Daniel J. Rectenwald, AIA, ACHA Principal Hammel, Green & Abrahamson, Inc. 701 Washington Avenue North Minneapolis, Minnesota 55401 Direct: 612/758 -4564 Fax: 612/758 -9564 Cell: 612/867 -2377 4/19/2005 -VV Jackie Hoogenakker From: Amy Henriksen [ahenriksen @novationap.com] Sent: Tuesday, April 19, 2005 11:35 AM To: Jackie Hoogenakker Subject: FW: Gymnasium additions Amy Henriksen NOVATION ARCHITECTURAL PRODUCTS, INC. 313 West 48th Street Minneapolis, MN 55409 -2417 Phone: (612) 827 -8282 Fax: (612) 827 -5378 Email: ahenriksenOnovationap.com Website: www.novationap.com - - - -- Original Message---- - From: Amy Henriksen ( mailto :ahenriksen@novationap.com] Sent: Tuesday, April 19, 2005 11:34 AM To: edinamail@ci.edina.mn.us Cc: mtfesenmaier @eschelon.com Subject: Gymnasium additions We are unable to be present for tonite's meeting however, we feel very strongly that more time be taken to assess the risks and impact on our neighborhoods. We have 2 small children, and our street is not safe for them to ride their bike and tricycle, there is already too much traffic on our street. The cars already go too fast, and there is no parking on either side of the street during the day. If we wanted to live by a commercial sports facility, we would live by the Dome /Target center. We feverently oppose this plan. Jason and Amy Henriksen Amy Henriksen NOVATION ARCHITECTURAL PRODUCTS, INC. 313 West 48th Street Minneapolis, MN 55409 -2417 Phone: (612) 827 -8282 Fax: (612) 827 -5378 Email: ahenriksen @novationap.com Website: www.novationap.com 1 Pagel of 2 AGENDA ITEM: IV.C. Darlene Wallin. From: Jennifer Bennerotte Sent: Monday, April 18, 2005 8:22 AM To: Darlene Wallin Subject: FW: Additional Gym Construction at South View Middle School C -0502 - - - -- Original Message---- - From: chris wichman [mailto:chris wich @yahoo.mm] Sent: Sunday, April 17, 2005 12:37 PM To: Jennifer Bennerotte Cc: mtfesenmaier @eschelon.com Subject: Re: Additional Gym Construction at South View Middle School C -0502 Re: Additional Gym Construction at South View Middle School C -0502 My wife and I both live across the street from South View. Middle School, right across the street at 5617 St. Andrews Avenue. We both are very disappointed, close to infuriated about the consideration of additional construction of more gyms at the school. We. both went through this once before 3. years ago and are greatly annoyed that this is being done again. What is more upsetting is the fact that this was defeated once before and the money expenditure has not been voted upon by the public. It is even going to cost 1 million dollars more. There is a traffic and parking. problem here at the middle school and we as residents take. the brunt of the problem. Every Saturday and Sunday and in the weekday evenings, my street is stuffed with SUV's and people cruising around looking for a place to park so they can do the gym or activity at the school. Every football game, it is worse. And to add to, the problem, . when there is a football game, both sides of the streets are chock full of cars making it very hard to get down the street. If you consider adding a multilevel car park, you may solve your parking problem, but I doubt if it is cost effective and you still have to deal with the traffic on residential streets. Now you still have to get all those cars and people in and out of they area, and we. come to safety. The roads are not designed for the traffic flow. Construction of the gyms will bring in . more traffic and keep it there longer crowding the area neighborhood. I do not include. the addtional traffic issue caused by the recent renovation of the swimming pool and auditorium in the community center. This is residential and I really resent the fact that you are turning into more of a Lifetime. Fitness Center without a parking lot. Do a traffic study for all the hours concerned (a proper one, not an experts guess and include the recent improvements to the school that will bring more people in II). And don't be so hypocritical about this, since the city is considering traffic calming and redirection for other parts of town, why shift it over here. These gyms belong in the Braemar area and not here. Get it through your heads that this neighborhood does not want the gyms, the traffic and the parking problems here. I note the proponents do not live here and will drive here to use it. I don't see them leaving the cars behind and walking. Do not build these gyms. Get public referendum approval and if you must have them, move 4/18/2005 Page 2 of 2 them to Braemar.. What part of NO do you not understand.. Chris and Teri Wichman 5617 St.. Andrews. Avenue. Edina, MN 952- 927 -8224. Do you Yahoo!? Plan great trips with Yahoo! Travel: Now over 17,000 guides! 4/18/2005 AGENDA ITEM: IV.C. Darlene Wallin From: Jennifer Bennerotte Sent: Monday, April 18, 2005 8:26 AM To: Darlene Wallin Subject: FW: Community Center Complex proposal input Page 1 of 2 - - - -- Original Message---- - From: morninglory081129 @comcast. net (mailto :morninglory08ll29 @comcast.net) Sent:. Monday, April 18, 2005 8:25 AM To: Jennifer Bennerotte Cc: mtfesenmaier @eschelon.com Subject: Community Center Complex proposal input Hello, We've lived at the intersection of 58th Street and Ashcroft Avenue for 2 years. We bought into this neighborhood because we have 2 children, and it seemed to have the ideal sense of tranquility, security, community, and convenience that we sought. Now these reasons appear to be strongly threatened by the Community Center Complex proposal that is under consideration. We've been concerned for some time about the proposed widening of our street from the current 28 feet to 32 feet, against the wishes of us or any of our neighbors. We, nor our neighbors, have any desire for a parking bay to be located directly across the street of our home. We've felt for some time that this will only serve to invite non - neighbors to park near our home, threatening our security. Now we've learned why the city wants to add more parking to our neighborhood: because of the Commercial Sports Facility proposal. We feel that we're being steamrolled into something that we don't want to live with, and don't want to pay for. We are very concerned about this threat to our neighborhood. Our road widening problem is a strictly a means to increase the number of parking for non - neighbors, and we are to pay for it. It appears that the city still plans to widen our street, against the surveyed desires of all of our neighbors. The proposal, apparently in advanced stages, to build a Commercial Sports Facility at the school complex at the end of our street involves the construction of 5 indoor sports facilities which will be hosting practices, games, and tournaments up to 7 nights per week and up to 10:30 PM nightly, with hundreds of additional car driving thru our neighborhood daily. Traffic impact studies rejected our neighborhood as suitable for even 2 additional gyms, but the City Planning Commission is moving forward with the plan regardless of this rejection. Our property value, our neighborhood's safety and security, and our overall quality of life are all most certainly on the line. Every reason we bought into this neighborhood is threatened, despite the fact that we've put significant time, effort, and expense into remodeling our house into the place that we planned to call home for years. We ask the City Council to please reject the proposal to add any additional gym space to the project already committed to. A more suitable location or split locations can certainly be found. Please consider how you would feel if this was your quality of life at stake. We also ask the the City Council NOT approve the plan to widen 58th Street to 32 feet. We wish the street width to remain at the current 28 feet, to maintain slower driving speeds and to discourage on- street parking of non - neighbors. The speed issue speaks for itself, and non - neighbor parking will compromise our security. Our yards are also at risk. Our front yard, facing 58th Street, is quite narrow 4/18/2005 Page 2 of 2 enough, as anyone driving by can observe. We do not wish vehicles to be driving any closer to our home than they already are, as it we hear each and every vehicle that speeds by as it is with the current street width. Our neighbors across the street do not want to lose their beautiful mature trees, which provide us all with pleasant shade in the summertime. Please consider our quality of life in making your decision. We will be in attendance at the April 19 City Council meeting, and reaffirm our wishes at that time. PLEASE consider our concerns as if they were your own. Sincerely, Moira and Joshua Olson 5801 Ashcroft Avenue 4/18/2005 Page 1 of 1 AGENDA ITEM: IV.C. Darlene Wallin From: Jennifer Bennerotte Sent: Monday, April 18, 2005 8:24 AM To: Darlene Wallin Subject: FW: Gymnasiums in South View and Community Center - - - -- Original Message---- - From: Sessy02 @aol.com [mailto:Sessy02 @aol.coml Sent: Sunday, April 17, 2005 9:40 PM To: Jennifer Bennerotte Subject: Gymnasiums in South View and Community Center I would like to have my name added to the list of neighbors that are not in support of the additional gymnasiums. I feel that the City Council has been trying to jeopardize this neighborhood and continues to not look at all of the issues. They are not listening to the transportation committee and are taking short cuts in this area. Let's start working for the entire city and not continue to ruin the neighborhood by the schools. There is too much traffic for all of the students in this current area. We are already going to add much to the traffic in our neighborhood just by the additional space given to all of the schools in this area. Concord added space last year and now we are adding much more space to the middle school and community/french immersion school. I AM NOT IN SUPPORT OF THE DECISION TO ADD AN ADDITIONAL GYMS AND WOULD LIKE REVIEW OF THE DECISION MAKING PROCESS BY OUR CITY COUNCIL AND MAYOR. Sandy Essendrup 4717 School Road Edina, MN 55424 4/18/2005 AGENDA ITEM: IV.C. April 17, 2005 Edina City Council: Mayor, Jim Hovland Council Member Scot Housh Council Member Alice Hulbert Council Member Linda Masica Council Member Ann Swenson Please take into consideration the neighborhood that you continue to cause great strain on the traffic. I ask you to consider the information below and take another look into the transportation issues at hand. We do not want to build a problem that can not be reversed. Safety in Edina should be our number one consideration. Why the Edina Community Center Neighborhood Association opposes this plan: • The ECC neighborhood was identified as a significant traffic problem area in 1999 ...nothing has changed since then, except the addition of more traffic! • The two additional gyms were added to construction plans after last year's referendum was passed ... with a no vote by area Edina residents. • The city commissioned a traffic study, but the Edina Transportation Commission (ETC) unanimously rejected the study as flawed. Yet, the City Planning Commission and City Council are going ahead, ignoring the Transportation Commission's rejection. • The flawed study looked at the effect of the two new gyms only ... not the impact of what would become 5 indoor sport areas that could host as many as 7 concurrent school or city- sponsored practices, games, or tournaments drawing even more traffic through one concentrated area ... our neighborhood. • In the study, only 2 practices or games per gym, per night, were assumed. The original rental plan presented to Council, projected 6 practices or games in one gym, 4 in the other, each night! Again, this will add significantly more traffic than the study projects. • Original plans did not include weekend tournaments ... that's changed, along with a concession stand in the revised plan. Events will start as early as 4pm and end as late as 10:30 pm, 7 days a week. • For weekend tournaments, the study's projections are considerably lower than they should be ... again, because it considers only the 2 additional gyms. • The study ignored the impact of other activities on traffic flow that will increase with the renovations at Southview and the Community Center (theatre, music, other rec programs) that will of course grow as time goes on. • The study considered the effect of traffic on a very limited area. Increased traffic on Valley View Rd. was not even considered relevant. Please make your decision based on the traffic and not on personal desires. Tha�k AEssen ou LL el San y ru p 4717 School Road Edina, WIN 55424 AGENDA ITEM: IV.C. April 17, 2005 Edina City Council: Mayor, Jim Hovland Council Member Scot Housh Council Member Alice Hulbert Council Member Linda Masica Council Member Ann Swenson Again you continue to target the same small area of Edina for public use. We have lived in this neighborhood for over 20 years and feel that we and most other neighbors have been excellent hosts for many sports and school events year after year. Now with the addition of new facilitates to the Community Center and South View we will deal with more. When it was just Edina student and parents we were willing to continue to be good neighbors. However, the "game" has now changes with the city wanting to add facilities that will be open for general use. Please seriously consideration that you continue to cause great strain on the traffic and general congestion in this neighborhood. We have been pushed as far as we can and are now ready to "fight back ". I am asking you to do your job and consider the information below and take another look into the issues at hand. We do not want to build a problem that can not be reversed. Neighborhood safety in Edina should be your number one consideration not finding ways to make room for commercial sports facilities next to our schools and homes. We feel strongly enough about this to personally "beat the pavement" before the next elections if it appears we have elected officials who are not interested in our families and neighborhoods welfare. Why the Edina Community Center Neighborhood Association opposes this plan: • The ECC neighborhood was identified as a significant traffic problem area in 1999 ...nothing has changed since then, except the addition of more traffic! • The two additional gyms were added to construction plans after last year's referendum was passed ... with a no vote by area Edina residents. • The city commissioned a traffic study, but the Edina Transportation Commission (ETC) unanimously rejected the study as flawed. Yet, the City Planning Commission and City Council are going ahead, ignoring the Transportation Commission's rejection. • The flawed study looked at the effect of the two new gyms only ... not the impact of what would become 5 indoor sport areas that could host as many as 7 concurrent school or city- sponsored practices, games, or tournaments drawing even more traffic through one concentrated area ... our neighborhood. • In the study, only 2 practices or games per gym, per night, were assumed. The original rental plan presented to Council, projected 6 practices or games in one gym, 4 in the other, each night! Again, this will add significantly more traffic than the study projects. • Original plans did not include weekend tournaments ... that's changed, along with a concession stand in the revised plan. Events will start as early as 4pm and end as late as 10:30 pm, 7 days a week. • For weekend tournaments, the study's projections are considerably lower than they should be ... again, because it considers only the 2 additional gyms. • The study ignored the impact of other activities on traffic flow that will increase with the renovations at Southview and the Community Center (theatre, music, other rec programs) that will of course grow as time goes on. • The study considered the effect of traffic on a very limited area. Increased traffic on Valley View Rd. was not even considered relevant. Please seriously consider these facts, do appropriate studies and consider the children who go to school and families who live in this neighborhood. Given the limited road space and options available once a decision has been made to add these facilities it will be very difficult to "fix" after the fact. Thank You or your onsideratiou, Bill Essen rup 4717 Sehool Road Edina, MN 55424 Proposed new gyms Page 1. of 1 Darlene Wallin From: Jennifer Bennerotte Sent: Monday, April 18, 2005 12:51 PM To: Darlene Wallin Subject: FW: Proposed new gyms - - - -- Original Message---- - From: DAVID KRASNO /5236 [mailto:davidkr @omnicell.com] Sent: Monday, April 18, 2005 11:47 AM To: Jackie Hoogenakker; Jennifer Bennerotte Cc: mtfesenmaier @eschelon.com Subject: Proposed new gyms I do not know what makes me more upset about the proposed plan to add 2 more gyms to the Community Center complex... the fact that it is even being considered at the expense of the safety of our children living near the project or the fact the Council has tried to use Stealth tactics to get it through. If more gyms are truly needed, build them at Braemar where they have space and where the add'I traffic will not affect a neighborhood like ours. We are about to get enough additional traffic with the completion of the school addition. Because of few stop signs, curry streets and no sidewalks, this is a tricky enough neighborhood to navigate for ourselves and would be worse for people from other areas. went along with the school addition but will no longer vote for members who push for this ill fated project. Sincerely, David Krasno 5607 Dalrymple Rd. 4/18/2005 rare 1 VI 1 Jackie Hoogenakker From: Jensens gensens @tcinternet.net] Sent: Sunday, April 17, 2005 1:56 AM To: Jackie Hoogenakker Subject: Proposed New Gymnasiums - Count 4 against Hello there, We are property owners near the Edina Community Center & Southview Middle School Campus. We received the Notice of Public Hearing for Tuesday, April 19, 2005 to discuss proposed two new proposed gymnasiums to the campus. We are unable to attend that hearing, so in lieu thereof, we offer the following comments: My wife and I and our two college -age adult children are very much against the building of the new gyms at Southview and the Community Center. Ther is already too much activity and traffic on our street and in our formerly quiet neighborhood. We can't help but feel that there must be a better place to add gym space (if it were truly necessary), and that this proposal was ramrodded through without much thought to the people who live in the area. Sincerely - the Jensens at 5705 Concord Ave. PS - my wife adds - after months of being awakened by heavy trucks and construction noise, enough already(!) 4/18/2005 Case File C -05 -2: Gyms at ECC and South View Jackie Hoogenakker From: Mike Klein [fhe_Klein_Family @att.net] Sent: Sunday, April 10, 2005 10:02 PM To: Jackie Hoogenakker Subject: Case File C -05 -2: Gyms at ECC and South View Page 1 of 1 As property owners living within 500 feet of the two proposed gyms, we want to express our deep concerns with the project. We've lived at our present address since 1990. The existing use overtaxes the available parking at the ECC and at South View Middle School. The recent expansion of South View appears to have provided some additional parking, but this only takes the situation from extremely severe, back to perhaps just severe. It does not provide truly adequate parking for the current use, and any expansion would further aggravate the situation. A comprehensive traffic report that takes into account all of the facilities on the site, and their overlapping uses, would certainly bear out this point. While there may be a need to provide additional gyms in the city, and while the Community Center may be a convenient location for such facilities, the plain fact is that the site cannot support additional parking or additional traffic. Anyone living in our neighborhood for even a brief time discovers this undeniable fact very quickly. Anyone using the ECC facilities on a busy night, knows what it's like. The parking issue is merely a major inconvenience, when compared to the greater issue of life safety. Even without the addition of two new gyms, there are major traffic hazards which exist primarily along South View Lane. Cars parked along the south side of the street during South View Middle School or ECC events make it extremely difficult for those driving along South View Lane to see pedestrians who try to cross the street. Adults and children emerge from between parked cars (and yes, acknowledged that they are jaywalking) and risk being run over. In addition, the parked cars also block the vision of drivers emerging from the parking lots onto South View Lane, resulting in frequent near - collisions with oncoming traffic. I have no information on the number of actual accidents that occur, but I would be interested to hear these statistics from the police department. The additional traffic from two proposed gyms poses a significantly increased risk to public safety, and we urge the Planning Department and the City Council to reject this project in its current location. Perhaps a better location could be found where the traffic could be better tolerated, and the ingress /egress traffic layouts could be better designed to minimize the safety risks. Respectfully submitted, Mike Klein and Sue Klein 5901 Ashcroft Avenue Edina, MN 55424 Mike's Cell: (952) 270 -9469 Home: (952) 927 -5900 Email: The Klein Family@att.net 4/18/2005 ragC 1 oI 1 Jackie Hoogenakker 1 v, G From: Michele Vig [michelevig @yahoo.com] Sent: Monday, April 11, 2005 8:17 PM To: Jackie Hoogenakker Subject: Edina Community Center Gyms (Case File C -05 -2) City Council Members, We are writing to express concern about the two gyms currently being built at the Community Center and Southview Middle School (Case File C- 05 -2). Our main concern with the new gyms is whether the city has adddressed parking in the design plans of the new gyms. There are already many nights and weekends where the residential streets near the school and community center are filled with vehicles. Where will the users of the two new gyms park? Was parking considered in the design of these gyms? We understand the need for additional recreational facilities for the city and the school district and even support using tax payer dollars to pay for them. However, as Edina taxpayers, we do not feel residential streets should be the designated parking spots for the users of the two new gymnasiums. We appreciate you taking the time to read about our concerns as we are not able to attend the public hearing on Tuesday, 'April 19. We would, however, like our comments added to the record. Thank you. Regards, Dan Mueller & Michele Vig 5614 Sherwood Avenue Edina, MN 55424 Do you Yahoo!? Yahoo! Small Business -.Try our new resources site! 4/18/2005 rage i oz i Jackie Hoogenakker I From: DCorbett @birchlabs.com Sent: Monday, April 18, 2005 10:09 AM To: Jackie Hoogenakker Cc: mtfesenmaier @eschelon.com; rwenaas @usfamily.net Subject: Proposal for additional gymnasiums Dear Sirs, We are home owners at 5616 Dalrymple Road, corner house across the street from the new addition to the school that I stare at in amazement every day. I still cannot believe that was O.K.'d considering the traffic we have put up with the last soon to be twenty years. At present our house is for Sale. Our house was priced for "Quick Sale" and we were looking forward to downsizing this year. It took only the initial run thru for the realtors to point out the existing traffic and "eyesore" across the street meant even lower pricing if we expect to sell. I cannot tell you how many comments we have had saying "love the house and yard but way to much traffic for comfort." This attitude is hard to combat when people are pulling into our driveway to turn around like we are part of the school property as people are looking at the house. We have actually seen: times we could not pull into our own driveway during football season. What can we expect now? I cannot stress my amazement that the City of Edina would take a residential area already overburdened with traffic from two schools and a community center and intentionally add to the confusion with the plans in progress at present. Does the city have our support? Absolutely notl Sincerely, James & Donna Corbett 5616 Dalrymple Rd. Edina, MN 55424 cdc227 @aol.com The information contained in this e-mail message may be privileged, confidential, and protected from disclosure. If you are not the intended recipient, any further disclosure or use, dissemination, distribution or copying of this message or any attachment is strictly prohibited. If you think that you have received this e-mail message in error, please e-mail the sender at the above address, and delete the e-mail. Thank you much. 4/18/2005 Page 1 of 1 Jackie Hoogenakker 1 V From: Joanredhed @aol.com Sent: Monday, April 18, 2005 11:21 AM To: Jackie Hoogenakker Cc: mtfesenmaier @eschelon.com Subject: Gymnasium hearing To Whom It May Concern, I am writing to express my views on the addition of two more gymnasiums in my neighborhood. I am very much against adding more traffic and more parking issues to a neighborhood already dealing with a more than fair share. We've known for years that traffic was a frustrating issue along our street, and that was confirmed when our neighborhood was identified as having a significant traffic problem in 1999. Nothing has been done to ease the problem in 6 years. also understand that there's a belief that we need two more gyms, but I also hear that school population is declining. Ask yourself what we always ask ourselves as homeowners with budgets. Is this a need or a want, and what is the priority it is setting? Sports are important, but we keep sending the message that sports are more important than almost anything else in this community. How does the importance of sports compare with neighborhood safety, or the sense of quiet community we hope to keep, or keeping taxes down? Again, as someone who grew up without a lot of money, I also think it's important to separate want from need. There are some things in this life that it's okay to get along without ... and to work around. This might be one of them. Or maybe there's a another neighborhood that would like to share some of their green space or quiet streets with the rest of the city. While we're grateful for easy access to the schools and community center, and we knew it was there when we moved in, we are now taking on more traffic from new construction already going on, and the exponential growth that would come with constant and concurrent games and practices at two new gymnasiums is an undue burden. My husband and I are in the process of deciding whether to make significant improvements to our home, but now feel a need to reconsider. Why would we want a front porch to sit and look at increased traffic and parked cars on our street, when the reason we wanted it was for an increased sense of connection to our neighborhood? As for the study that was commissioned, I think it's your obligation to us as the people who put faith in you, to use integrous information when putting a study together. After many years in news, I know that any study can support just about anything by adding or deleting information. You can play that game and win, but at what cost? Certainly, reputation and integrity are at stake if you knowingly make an easy decision supported by flawed information. Edina has a wonderful reputation, and I would certainly expect more from you as its representatives. Please use all the pertinent information when doing your study and then consider it all when making your decision. Thank you for your attention, Joan Steffend Brandmeier 5605 Dalrymple Road Edina, MN 55424 4/18/2005 rage i of 1 Jackie Hoogenakker To: JRA4721 @ aol.com Subject: RE: Gymnasiums, Case File: C -05 -2 - - - -- Original Message---- - From: IRA4721 @aol.com [mailto:JRA4721 @ aol.com] Sent: Wednesday, April 13, 2005 7:38 PM To: Jackie Hoogenakker Subject: Gymnasiums, Case File: C -05 -2 To: The City Council We are very concerned over the proposal to build two additional gymnasiums on the Edina Community Center site. With three schools, four gymnasiums, athletic field, Community Ed classes, Early Childhood Program and administration offices already in place, it is not an appropriate location for the addition of two quasi - public athletic gymnasiums. On any day or evening, without the current construction hazards, there is considerable traffic congestion. Parking and access are not adequate to accommodate additional traffic without sacrificing safety for children and pedestrians. We strongly urge further study, with consideration to another location, preferably Braemar where: (1) Acess could be reached from many directions. (2) Parking would be plentiful with ample room for buses to maneuver in and out. (3) Where children and pedestrian's safety would not be jeopardized. (4) Residences would not be imposed upon for street parking. Please take time to visualize the impact of traffic on a long term basis as it continues to increase ane the athletic programs also grow. Mr. and Mrs. James R. Anderson 4721 School Rd Edina, MN 952 - 926 -9580 4/18/2005 rage i of i Jackie Hoogenakker I V. C From: Dan Rectenwald [DRectenwald @hga.com] Sent: Monday, April 18, 2005 7:09 AM To: Jackie Hoogenakker Cc: Fesenmaier, Maria T. Subject: Additional Gym Proposal (Case C -05 -2) I would like to give testimony at the city council meeting on April 19, 2005. I am opposed to the current gymnasium addition proposal and would like to offer testimony directed towards why I feel a Braemer Park option would work, over viewing: a) Programs Needs b) Planning Options c) Impact on Parking d) Impact on Traffic e) Impact on Cost f) Comments from the EHA h) Why this option is safer and offers long term flexibility I will have some 11x17 diagrams to share. Daniel J. Rectenwald, AIA, ACHA Principal Hammel, Green & Abrahamson, Inc. 701 Washington Avenue North Minneapolis, Minnesota 55401 Direct: 612/758 -4564 Fax: 612/758 -9564 Cell: 612/867 -2377 4/18/2005 Darlene Wallin -rom: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:30 AM To: Darlene Wallin Subject: FW: Safer Alternatives - - - -- Original Message---- - From: Richard .L.Heinrich @HealthPartners.Com (mailto: Richard .L.Heinrich @HealthPartners.Com] Sent: Tuesday, April 19, 2005 7:31 AM To: Jennifer Bennerotte Subject: Safer Alternatives The current proposal to expand to 6 gyms to the Community Center Complex should be voted down. Further study, alternative placements, and a better traffic plan needs to be considered. We did not vote on expanding the gyms in the initial referendum and bonding bill. Anna and Richard Heinrich This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are not the intended recipient or the individual .-esponsible for delivering the e-mail to the intended recipient, please be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited. If you have received this e-mail in error, please immediately notify the HealthPartners Support Center by telephone at (952) 967 -6600. You will be reimbursed for reasonable costs incurred in notifying us. Darlene Wallin 'rom: Jennifer Bennerotte Sent: Monday, April 18, 2005 4:44 PM To: Darlene Wallin Subject: FW: Safety in my neighborhood - - - -- Original Message---- - From: Lisa Moeller ( mailto :lisamoeller @olgschool.net] Sent: Monday, April 18, 2005 9:40 AM To: Jennifer Bennerotte Cc: mtfesenmaier @eschelon.com Subject: Safety in my neighborhood Dear Mr. Hovland and Council Members, I am extremely concerned about the safety of my neighborhood. We moved to the ECC (not country club) neighborhood 10 years ago when our first baby was 11 months old. We loved being within WALKING distance of EFCE, the Library and Church. We have learned to enjoy football season by first walking our babies up to the game to peek in the fence and now I accompany my 9 and it year olds inside to watch the games. It is noisy, but fun. We have learned to adapt to football season and understood football season before we bought our house. We are not prepared to live in the noise, unsafe situations that football season brings on a year round basis. After Football games, we have collected alcohol bottles and cans from our yard and he frontage road. I have had my front step (door bell included) urinated on by partying teenage boys .... try explaining that disgusting situation to you children. We have also witnessed a pedestrain flying through the air after being hit by a driver during football season. We do not need any more traffic in our neighborhood, our streets are small and you are risking the lives of the many small children on our block who like to bike, scooter, explore and walk their dogs. Currently, people drive very FAST down our street speeding to pick up their precious children, with little regard for our precious children. There is so much traffic in the morning, that I can't even let our 11 year old daughter walk across Southview Lane to Southview School. I simply cannot believe the unsafe traffic conditions that are being proposed for our neighborhood. If there are more gyms, the community center / Southview will turn into a sports complex crammed /rammed into a neighborhood with small, narrow residential streets, no main, large roads and inadequate parking. With hundreds of people traveling into our small neighborhood from surrounding cities and suburbs our streets and neighborhood will be.put at risk for accidents, extreme traffic and crowding and exposing our children needlessly to danger. Really are sports and gyms the most important priority in our community for- our - children,. What happened- to-safety, peace and the ability to be a pedestrian? Use your brains, there must be a safer option for the addition of Sports Space. How about the Braemar area? I can travel by car to Braemar without even going through a residential neighborhood. Sports Centers in other communities are not crammed into existing small neighborhoods. ks a mother and a teacher, I am concerned about the safety of all children verywhere. I beg you to reconsider the site and really reevaluate the situation. If you have children, please consider my children and the children of the Community Center neighborhood. I would do the same for any of you. Do the right thing. Sincerely, Lisa Moeller 0 Howard R, Green Company MEMO To: Craig Larsen; Wayne Houle, PE; Steve Lillehaug, PE, PTOE From: Steve Manhart, PE, PTOE Subject: ADDENDUM #1 — Community Center and South View Gymnasium Traffic Study Date: March 29, 2005 On Wednesday, March 24, 2005, 1 presented the findings of this traffic study to the Edina Transportation Commission. This traffic study focused on the traffic impacts associated with activities and events at the two new gymnasiums proposed in the Community Center and South View Middle School campus. Following my presentation, the Commission raised several questions regarding the impacts of the overall redevelopment of the campus on the traffic conditions in the surrounding area. Based on these questions, additional information has been gathered regarding the overall redevelopment for the site, and the resultant impacts this development will have on traffic. Mr. Ted Rozeboom of Rozeboom - Miller Architects, Inc., project architect for the campus redevelopment, has provided information regarding elements of the project expansion: Community Center and Normandale School Expansion: • A total of 1,800 square feet are being added to the building. • The lobby for Normandale School is being expanded on the south end of the building. • No classrooms are being added, and the school's capacity will not be increased. • A reduction and reconfiguration in seating is proposed in the Art and Music Room from 900 fixed seats to 500 fixed seats. South View Middle School Expansion: • The expansion is not adding capacity to the school, but is modifying the spaces in the school. (The number of classrooms and student population are not anticipated to change significantly in the future.) • There is an increase in seating capacity in the theater from 400 to 600. • The existing lower gymnasium is being modified. The existing bleachers (seating capacity 900) are being removed, as are the temporary seating areas (seating capacity 250). The lower gym will remain an auxiliary gym with no seating. • The existing upper gym is being converted to a music rehearsal suite, which better accommodates the existing programs and uses for this space. • A new gymnasium planned for the field house expansion will seat 1,036, which is less than the seating lost from the existing lower gym (900 bleacher seats + 250 temporary seats = 1,150 seats). • The existing pool has no fixed seating, but does have temporary seating in place for swim meets. This pool area is being transformed into additional music rehearsal area. • A new pool and diving well is being added to the field house area. There will be new seating for 365. ADDENDUM #1 03/29/05 Community Center and South View Gymnasium Traffic Study Page 2 The modifications proposed for the Community Center and South View campus area are not the result of increases in numbers of students — the enrollments at South View and Normandale schools are expected to remain steady. These modifications represent a general reorganization of existing uses and overall increases in space, not seating capacity, for various activities. In fact, a review of the combined seating capacities in the Community Center and South View campus before and after the redevelopment shows a slight overall decline in seating capacity for the uses listed above. The existing seating capacity for these combined uses has been 2,560 seats (including temporary seats). The projected seating of these combined uses after redevelopment is 2,501 seats. Therefore, these aforementioned uses will present a minimal change in traffic impacts to the Community Center and South View Middle School campus area. The same numbers of students will be using the increased spaces. The changes in the Community Center and Normandale School do not produce or attract additional trips. As a result, the two new gymnasiums discussed in the original report become the more decisive trip generators for the study area. It will be the activities scheduled for these two new gyms that will create increased traffic to and from the campus, not the elements of the redevelopment listed above. Therefore, the investigation and findings presented in the original report reflect the more critical impacts to traffic to streets in the study area. It may be argued that the campus redevelopment listed above will intensify the traffic if events and activities in the theater or pool areas are scheduled simultaneously with activities in the new gyms. In an earlier conversation with Doug Johnson of the Edina School District, it was acknowledged that the scheduling of simultaneous events would put pressure on parking in the area. Mr. Johnson stated that the school district will be mindful of previously scheduled events in the gymnasiums, and would avoid scheduling simultaneous events in the theater or pool areas. In summary, the critical traffic generators for the site will be. the two new gymnasiums and not the redevelopment of the other areas in the campus. The Community Center and Normandale School expansion will not increase the number of classrooms, nor will it increase activity areas. The South View Middle School expansion will redistribute activity space within the school, but will not reflect increases in numbers of students. The overlap of events will generally not occur as indicated by the school district. Therefore, the analysis and findings of the original report present the most critical impacts to the surrounding street system. CADocuments and Settings \dwallin \Desktop\3 -29-05 Addendum Traffic Study.doc 0 Howard R. Green Company MEMO To: Craig Larsen; Wayne Houle, PE; Steve Lillehaug, PE City of Edina, MN From: Steve Manhart, PE, PTOE Subject: Community Center and South View Gymnasium Traffic Study Date: March 16, 2005 Introduction The City of Edina and Edina Public Schools have undertaken a project to expand the Edina Community Center and South View Middle School on the Community Center campus located south of Southview Lane between Concord Avenue and Normandale Road. These expansions include building additions coupled with a parking lot expansion and reconfiguration. Of particular interest to the City and the School District is the addition of two new gymnasiums — one adjacent to the Edina Community Center and one at South View Middle School. Per City request, Howard R. Green Company (HRG) has been authorized to conduct a review of the internal and off -site traffic and parking impacts associated with the construction of these two new gymnasiums. Specifically, the goal of this study is to determine whether the proposed gymnasiums will adversely impact the traffic and parking in the area. This analysis shows that traffic and parking demand increases with the construction of the new gymnasiums. Nevertheless, the study shows that the increased traffic will not adversely impact the capacity of the roadways in the study area. Furthermore, upon completion of the proposed parking lot modifications, the on- street and off - street parking supply will adequately serve the daytime, evening and weekend tournament demands. Study Area This study is focused on an area north of 601h Street W., east of TH 100, south of Lakeview Drive, and west of Wooddale Avenue. Figure 1 shows the study area and highlights the location of the Edina Community Center campus. The existing Community Center building once served as the location of Edina East High School. After the closing of Edina East High School in 1981 -82, the existing building was converted into the Edina Community Center. Currently the Community Center shares its space with Normandale Elementary French Immersion School. The Community Center houses a variety of daytime and evening activities and events, both during the week and on weekends. Approximately 600 students are enrolled at Normandale Elementary School, which is considered an alternate education program school serving grades K through 5. South View Middle School has existed in its present location for several decades. Currently, it serves 1100 students in grades 6 through 9. Building expansions are underway for Normandale Elementary French Immersion School, the Community Center and South View Middle School. The locations of the building additions and the two additional gymnasiums are highlighted. The parking lots are being expanded and reconfigured near these buildings. Currently the Community Center houses two gyms — one large and one small. South View Middle School also houses two gyms. Two new gymnasiums are being constructed as part of this campus development project. A new City gymnasium will be constructed on the southeast corner of the Edina Community Center building. Another new City gymnasium will be constructed on the south side of the existing South View Middle School just to the northwest of the South View parking lot. The existing gyms will remain in use, even after the construction of the new gyms is completed. It is important to note that these new gymnasiums will be in addition to the existing gymnasium space located in the Community Center and South View Middle School. Each gym will be approximately 65' by 120' and will not house formal bleachers. It is intended that these gyms be "multi- purpose ", and thus are able to accommodate a variety of uses. Existing Land Use According to the City's Land Use Plan (from March 1999), the study area is "quasi - public" surrounded by single - family residential zoning. The City's "quasi- public" zoning refers to multiple uses such as schools, community centers, golf courses, etc. In this study area, the quasi - public uses include the Community Center, South View Middle School, Normandale Elementary French Immersion School, Concord Elementary School, and the associated parking lots, and athletic fields. This land use also incorporates Kuhlman Field, which serves outdoor sports activities such as football, soccer and track & field athletics. The bleachers at Kuhlman Field seat up to 8,000 people. The single - family residential uses in this study area generally refer to single - family homes with driveways and garages. Historic and Existing Traffic Demand Traffic in the study area is split between the trips generated by the residential uses and the trips generated by the quasi - public uses. Figures 2A through 2D illustrate traffic volumes recorded historically by the City of Edina within the study area between 1975 and 2004. Figures 2A through 2C show weekday 24 -hour traffic volumes, while Figure 2D shows weekend 24-hour_ traffic volumes recorded by the City. These historic traffic counts show variations in traffic volumes over the decades. In general over the last thirty years, the trend has been upward. For instance, in 1975 the daily traffic volume on Southview Lane was 1703 vehicles per day, while in 2001 the daily traffic volume was 3675 vehicles per day. Reasons for this historical increase may be based on the changing land uses in Community Center and South View Gymnasium Traffic Study City of Edina, MN 0: \PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16/05 Page 2 the area (high school to community center), changes in demographics, and /or increases in number of vehicles per household. Also the historical trend has been that the weekday 24 -hour traffic volume is characteristically greater than the Saturday or Sunday 24 -hour traffic volumes. This is because more work - related traffic is generated during the week than during weekends. Figure 3 illustrates the relationship between average daily traffic volumes and levels of service based on types of roadway. Level of Service (LOS) is a letter designation that describes a range of operating conditions on a particular type of roadway facility, with LOS -A referring to free -flow conditions and LOS -F describing system breakdown. The vast majority of roadways in the study area are two -lane undivided roadways without turn lanes. According to the daily traffic volumes recorded throughout the last three decades, most study area roadways operate at LOS -A or LOS - B. (NOTE: Roadway operations in the Twin Cities area are generally considered acceptable when operating at LOS -D or better.) Although not field verified by traffic counts, it is assumed that the traffic patterns of the single - family residential uses corresponds to traditional directional peak hours outbound from the study. area in the period between 6:00 and 8:00 am, and inbound in the period between 4:00 and 6:00 pm. There are distinctive periods of daily activity at the schools and the Community Center within the study area. During the school year, South View Middle School hours are from 7:45 am toy 2:40 pm, and both Normandale Elementary School and Concord School hours are from 8:35 am to 3:05 pm. School related traffic generally approaches the schools between 7:00 and 9:00 am, and departs the site between 2:30 and 4:00 pm. The Community Center provides a variety of programs and activities throughout the day and evening. As a result, the peak inbound and outbound traffic periods are less definitive than the residential and school traffic in the area. In the evenings, traffic patterns in the study area vary widely, based on the programs, activities and events scheduled at each facility. According to the Edina School District and the City of Edina's Park and Recreation Office, the existing gymnasiums are scheduled for practices on Mondays, Tuesdays, Thursdays and Fridays between October and April by youth basketball and volleyball leagues. Ninety- minute practices are scheduled in shifts between 6:00 and 9:30 pm. On Wednesdays, adult basketball is scheduled between 6:00 and 10:00 pm. Also, there is demand from out -of- season youth sports leagues (i.e., traveling baseball, traveling soccer, etc.) for indoor practice and conditioning when facilities are available. Evening events and special programs may draw a variety of traffic to the schools or the Community Center. The youth sports activities tend to draw drop -off and pick -up traffic before and after the scheduled practices, as well as traffic from coaches or others. On selected weekends between October and April, there are tournaments that draw teams, coaches and parents from surrounding communities for games. Leagues that host tournaments include the Edina Basketball Association and Edina Girls Traveling Basketball Association. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0: \PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03116105 Page 3 In general, these evening and weekend programs and activities do not adversely impact traffic volumes on the roadways to degrade the levels of service below a LOS -B. In most cases, the existing levels of service on these roadways stay at LOS -A (i.e., fewer than 3000 vehicles per day.) Existing and Proposed Parking Supply On- Street Parkin Figure 4 shows the existing on- street parking regulations within the study area. On- street parking is allowed along the south side of Southview Lane, but not along the north side of the street. There is room for approximately 33 vehicles to park along the south side of Southview between Normandale Road and Concord Avenue. Normandale Road, west of Normandale School is signed for bus parking only Monday through Friday from 8:00 am to 6:00 pm. Many streets north of the Community Center and South View Middle School have parking prohibitions, especially during school hours. St. Andrews Avenue, Dalrymple Avenue and Sherwood Avenue restrict parking on the east side of the streets at all times, but allow parking on the west side of the streets at times other than 8:00 am to 6:00 pm Mondays through Fridays. Under peak parking conditions, these streets would each serve 20 to 25 vehicles parked on- street. Concord Avenue and streets to the east have no posted parking prohibitions. There are some parking prohibitions by Concord Elementary, but those are isolated. Off- Street Parking The Community Center building and South View Middle School are currently undergoing renovation. In addition, three parking lots are also being reconstructed and expanded. Table 1 shows the existing and proposed parking supply for each of the off - street parking lots within the northern half of the study area. Specifically, the parking supply for each lot is as follows: TABLE 1 PARKING INFORMATION Parking Lot Existing # of Stalls Proposed # of Stalls North Lot 88 88 South Lot 181 210 (completed) East Lot 174 (117 during const.) 218 South View Lot 148 155 Front Lot 10 10 681 TOTAL 601 (544 during const.) 22 drop -off spaces Source: Rozeboom Miller Architects, Inc., and Oslund and Associates, February 25, 2005 Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16105 Page 4 The drop -off spaces shown in Table 1 are in addition to the designated parking stalls. The 22 proposed drop -off spaces are located in the looped driveway south of the Edina Community Center and along the south and east curb lines of the East Lot between the Community Center and South View Middle School. In addition, Concord School on the southern half of the study area has two parking lots. The east lot is combined with the student drop -off and pick up area, and is marked with 38 stalls, but may hold more if the drop- off -space is counted. The west lot at Concord holds 90 vehicles. Therefore, the entire study area currently has off - street parking capacity for 729 vehicles. Upon construction of the proposed parking, the study area will have total off - street parking capacity of 809 vehicles, plus 22 drop -off spaces, as shown in Figure 5. Parking Demand Daytime Demand During the school year, daytime traffic patterns around the schools are well established. Parents are instructed each school year where to pick -up and drop -off students. Buses are relegated to specific areas of parking lots and streets. School staff members are instructed where they are allowed to park. Except for bad weather days, this pattern would seem not to change much during the school year. Similarly, the daytime parking demand for the Community Center is fairly constant. Customers tend to park in the lots to the east and south of the Community Center. Current parking is constrained on the east side of the Community Center because of construction. Parking is adequate on the south side. Field reviews of the study area in January and February were conducted to get a "snapshot" of the average parking usage in the lots. While day -to -day events and activities may change, the snapshot inventory of the parking lots was taken to get a feel for the "average" parking demand within a typical weekday mid - moming. The findings show that most of the lots are nearing capacity. Table 2 shows the inventory and related percentage to capacity for each lot inventoried. When the expansion and reconfiguration of the parking lots are complete, the total number of stalls available in the north project area will be 686 stalls — an increase of 85 stalls. Assuming the existing demand would remain constant, the parking lot usage would drop to 65.3% during daytime hours in the school year. It is important to note that during this field review, of the 33 stalls available for on- street parking along Southview Lane, only 17 vehicles (or 51.5 %) were in use. In addition there was one vehicle each parked on Woodland Road and on Concord Terrace east of Concord Avenue, where on- street parking is unrestricted. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16105 Page 5 TABLE 2 DAYTIME PARKING USAGE Parking Lot # Stalls Used # Stalls Available % Used North Lot 72 88 81.8% South Lot 138 210 65.7% East Lot * 121 ** 117 (will be 218) 103.4% * South View Lot 109 148 (will be 155) 73.6% * Front Lot 8 10 80.0% Total North Project Area 448 573 (will be 681) 78.2% Concord E Lot 8 38 21.1% Concord W Lot 87 90 96.7% Total South Project Area 95 128 74.2% * Denotes use of existing parking lot, not proposed ** Denotes usage over capacity due to drivers parked in non - designated locations because of construction Source: Howard R. Green Company, January 31 and February 7, 2005 Evening Demand According to officials with the Edina School District and City of Edina Parks & Recreation Department, there are several activities that are scheduled in these buildings in the evenings. Many of these activities are listed in the "Historic and Existing Traffic Demand" section of this memorandum. The evening parking patterns are far less predictable than the daytime parking patterns for these buildings. Nevertheless, another field review was taken of the site to assess the parking demand. This field review occurred mid -week after 7:00 p.m. in February. Table 3 shows the results of the evening survey. The survey also noted whether vehicles were parked on street in the neighborhood north of the Community Center and South View Middle School. There were 13 vehicles parked along Southview Lane. There were no vehicles parked along the west side of St. Andrews Road, Dalrymple Road, or Sherwood Avenue. Also, no vehicles were parked on the streets east of Concord Avenue. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \624960J \Rpt#1- Revised 031605 -Final Draft.doc 03/16105 Page 6 TABLE 3 EVENING PARKING USAGE Parkinci Lot # Stalls Used # Stalls Available % Used North Lot 39 88 44.3% South Lot 33 210 15.7% East Lot' 50 117 (will be 218) 42.7% * South View Lot 5 148 (will be 155) 3.4% " Front Lot 7 10 70.0% Total North Project Area 134 573 (will be 681) 23.4% Concord E Lot 2 38 5.3% Concord W Lot 0 90 0.0% Total South Project Area 2 129 1.6% Denotes use of existing parking lot, not proposed Source: Howard R. Green Company, February 9, 2005 Weekend Toumament Demand As with the evening activities, the Edina School District and City of Edina Parks & Recreation Department have stated that there are several activities that are scheduled in these buildings on the weekends. Many of these activities are listed in the "Historic and Existing Traffic Demand" section of this memorandum. Aside from the programs and activities scheduled for the Edina Community Center, there are occasional athletic tournaments scheduled for the gymnasiums. For example, on the weekend of February 4 through 6, as many as 124 teams from 28 communities participated in the Edina Classic at these gyms and hosted by Edina Girls Traveling Basketball Association. As a result, participants, coaches and parents came and went throughout the days and evenings. To assess weekend demand, parking usage was surveyed on the weekend of February 4 through 6. Table 4 shows the results of the evening survey. The survey also noted vehicles parked on street in the neighborhood north of the Community Center and South View Middle School. There were 23 vehicles parked along the south side of Southview Lane. There were 16 vehicles parked along the west side of St. Andrews, no vehicles parked along the west side of Dalrymple, and one vehicle parked along the west side of Sherwood Avenue. In comparison, no vehicles were parked on the streets east of Concord Avenue. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16105 Page 7 TABLE 4 WEEKEND PARKING USAGE Parkinq Lot # Stalls Used # Stalls Available % Used North Lot 5 88 5.7% South Lot 14 210 6.7% East Lot * 98 117 (will be 218) 83.8% * South View Lot 58 148 (will be 155) 39.2% * Front Lot 0 10 0.0% Total North Project Area 175 573 (will be 681) 30.5% Concord E Lot 1 38 2.6% Concord W Lot 3 90 3.3% Total South Project Area 4 128 3.1% * Denotes use of existing parking lot, not proposed Source: Howard R. Green Company, February 4 -6, 2005 (This analysis does not include the impacts of parking and traffic generated by athletic activities at Kuhlman Field. It is assumed that those football games and other activities, because of their nature, create overflow conditions for traffic and parking throughout all streets and parking lots in the study area. It is also assumed that the City and School District have formulated special traffic control scenarios to cope with these events and activities, which is outside the scope of this analysis.) Parking Analysis Review of these "snapshots" of parking usage shows that parking demand is most critical during weekdays while school is in session, and while daytime activities are occurring at the Community Center. Given the current configuration of the parking lots, the north half of the study area used nearly 80% of the existing parking capacity during weekdays while school is in session. Upon the completion of the parking expansions and reconfigurations, the current demand would drop to 65% of proposed capacity. Similarly, the evening and weekend demands for the north half of the study area was approximately 23% and 30 %, respectively of the existing parking capacity. Upon completion of the parking expansions and reconfigurations, the current evening and weekend parking lot demand would drop to approximately 20% and 26 %, respectively. On street parking was most critical during the weekend review period, where vehicles were parked along Southview Lane and along some of the streets north of South View Middle School. At no time during this review, however, were parked vehicles recorded over the capacity of the available on- street parking. St. Andrews Avenue recorded this highest incidence of on- street parking, with 64% of the available on- street parking used. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PR0J \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03(16/05 Page 8 During this analysis, parking demand for the southern part of the study area was most critical during weekdays. The West Concord Lot was nearing capacity at 97% occupied. The East Concord Lot, however, had available space for student pick -up and drop -off. Traffic and Parking Demand from Additional Gymnasiums It has been proposed to add two additional gymnasiums to the current campus renovation that is underway (see Figure 1). These two gymnasiums will add recreation opportunities to each site. In addition, these will add traffic to the adjacent street system, and will also add parking and pick- up /drop -off demand to the area. According to Ed MacHolda, Edina's Assistant Parks and Recreation Director, these gymnasiums are to be considered "multi - purpose ". When completed, each gym will house athletic and general activities. Neither gym will have "traditional" bleachers for spectators, but will have a viewing capacity of approximately 75 to 100 people. Therefore, each gym will be used primarily for participant -only activities (such as youth or adult basketball and volleyball) or Community Center programs or activities. To account for future traffic and parking demand created by these gyms, typical traffic scenarios must be developed. Daytime Scenario Assumptions ❖ South View Middle School uses new gym for school activities. Therefore, no additional traffic or parking demand projected during school hours. ❖ Community Center uses new gym for multi - purpose activities. Therefore, assume four ninety- minute sessions during the day. Assume 40 people per session = 4 x 40 = 160 people throughout day; therefore assume 160 inbound trips and 160 outbound trips = 320 total additional trips. ❖ Up to 40 additional parking stalls required per session. Evening Scenario Assumptions ❖ Two simultaneous practices /games per gym = 40 participants, 4 coaches, 8 spectators (many sharing trips) = 30 inbound trips and 30 outbound trips per gym = 60 total additional trips; ❖ Two sessions per evening (6:30 to 9:30 p.m.)= 120 additional trips per evening ❖ Up to 30 additional parking stalls per gym required, but assume twice that many. (Up to 60 spaces needed to accommodate change over between sessions, as participants from early shift leave and participants of later shift arrive. In reality, pick -up /drop -off areas may accommodate some of these participants, but not assumed in this worst -case scenario.) Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16/05 Page 9 Weekend Toumament Scenario Assumptions ❖ Between four and ten seventy- minute sessions during the day. Assume 25 people per session (some travel together) = 20 trips inbound and 20 trips outbound = 40 trips per session. ❖ Four sessions on Friday night for each new gym = 4 x 40 trips x 2 gyms = 320 additional trips. ❖ Eight sessions on Saturday for each gym = 8 x 40 trips x 2 gyms = 640 additional trips. ❖ Six sessions on Sunday for each gym = 6 x 40 trips x 2 gyms = 480 additional trips. ❖ Twenty additional parking stalls required per session. Also, assume that there is turnover in the parking (i.e., all vehicles are not present throughout the day, but will arrive just before and will leave just after each session). The traffic volumes shown on Figures 2C reflect the most current weekday traffic volumes recorded by the City throughout the study area. The new gyms may add up to 440 vehicles per day (320 daytime and 120 evening trips) into the weekday traffic volumes. This traffic will be dispersed along the streets in the north half of the study area, especially along the neighborhood collectors of Southview Lane, Concord Avenue, Normandale Road, and West 58th Street. Figure 6A shows the estimated distribution of the additional weekday trips on the street network. Tournament weekend traffic would also impact the existing weekend traffic volumes in the study area. Figure 2D shows the historical and most current weekend traffic volumes recorded by the City. Typically weekend traffic in residential areas is less than weekday traffic volumes. Figure 6B illustrates the estimated distribution of the additional tournament weekend trips on the street network. There was no historical weekend traffic count data along Southview Lane in this area. However, an average of other weekend volumes versus weekday volumes for streets in the area yields the following ratios — Saturday traffic averages 61.7% of weekday traffic, and Sunday traffic averages 54.6% of weekday traffic. Therefore, Southview Lane traffic can be assumed from these ratios to be 2,267 vehicles per Saturday, and 2,007 per Sunday. (Note: No traffic counts were recorded along Normandale Road between the MN 100 on -ramp and Southview Lane.) Table 5 illustrates the effect of the traffic added to the system by the gymnasiums. The trips distributed throughout the system in Figures 6A and 6B have been added to the most current daily traffic volumes. As a result, levels of service are calculated for these ADTs by using Figure 3. Overall, tournament Fridays will experience the highest traffic volumes of any time period. Not only will those days experience the weekday traffic use to and from the gyms, but they will also experience the evening tournament use, which draws more traffic than the typical evening uses. Nevertheless, the level of service on Tournament Fridays will remain at LOS -B or better on these facilities. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16/05 Page 10 TABLE 5 ESTIMATED TRAFFIC AND LEVEL OF SERVICE COMPARISON Location Weekday (including Tournament Friday Tournament Tournament Evening) Evening* Saturday" Sunday*** Concord Ave. south 1,303 / 1,333 1,333 / 11361 804/860 711/753 of58'"St. W. A/A A/A A/A A/A 58 St. W east of 1,392 / 1,530 1,530 / 1,632 859/1,063 760/913 Concord Ave. A/A A/A A/A A/A Concord Ave. south 2,639 / 2,787 2,787 / 2,877 1,628 / 1,808 1,441 /1,576 of Woodland Rd. A/A A/A A/A A/A Southview Lane 3,675 / 3.823 3,823 / 3,913 2,267 / 2,447 2,007 / 2,142 west of Concord Ave B/ B B/ B A/A A/A Southview Lane east 3,675 / 3,825 3,825 / 3,955 2,267 / 2,527 2,007 / 2,202 of Normandale Rd. B/ B B/ B A/A A/A Note: Blue Numbers denote most current average daily traffic (ADT) volume Red Numbers indicate ADTs plus new gymnasium traffic. *denotes Friday tournament traffic added to weekday traffic WITH the new gymnasiums operational *denotes estimated Saturday traffic using ratio ** *denotes estimated Sunday traffic using ratio Source: Howard R. Green Company, 2005 Traffic will also increase on Normandale Road, as seen in figures 6A and 613. Unfortunately, the lack of traffic counts along that facility has precluded the ability.to assess levels of service during the weekday and tournament weekend periods. However, an estimate of level of service based on engineering judgment for the weekday and tournament weekend periods would place the facility at LOS-131 or better. Regarding parking demand, the proposed parking supply will be adequate to serve the additional demand generated by the new gyms. Users of the new Community Center gym will use the South Lot more frequently, where there is available capacity. The East Lot is being expanded, thus benefiting users of both the Community Center and South View Middle School. The South View Lot is being reconfigured, and will provide additional stalls. The most critical time period for the parking supply will be during the overlap of people arriving and departing between sessions. At these times, the parking supply will (at worst case) need to be twice the anticipated number of vehicles. In reality, pick -up /drop -off areas may accommodate many of these trips. Furthermore, on tournament weekends, participants will be scheduled for games at various times throughout the weekend, so not all participants will need to be at the gyms at once. Safety During this analysis, the morning school arrival period at South View Middle School was monitored. Traffic volumes along Southview Lane began building after 7:15 a.m. and continued until the start of classes at 7:45 a.m. ' Traffic was a mix of parents dropping kids off at the school and those drivers heading to work. Those parents dropping kids off at school would approach the western driveway at South View and turn into the drop off area where a patrol guard motioned.the Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PR0J \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16/05 Page 11 vehicles forward. There was storage for approximately twelve vehicles in the drop off area. The parents would drop off their kids, and then exit back onto Southview Lane at the east driveway. As the time approached 7:30 a.m., traffic peaked and it became more challenging for parents to find adequate gaps in the traffic stream. At times, some vehicles turned onto side streets to drop off students, thus creating a safety issue with these students crossing Southview between the vehicles that were queued to use the drop off area in front of school. Meanwhile, some westbound drivers not in queue for the school drop -off were seen passing on the right in order to get to Normandale Road. These drivers created a de facto through lane along the curb in order to get past the school related traffic. It appears that many of these safety issues have been addressed within the expansion and reconfiguration of South View Middle School. The official drop off area will be relocated to the west side of the new addition. This will allow significantly more traffic to use the east and south curb lines of the parking lot between the school and the Community Center. As a result, drop off traffic will be pulled off of Southview Lane during school arrival times, thus providing a much safer condition along the street. In addition, through traffic will be less likely to pass long queues on the right to get to Normandale Road. In all, a safer condition will result. Summary Analysis of the traffic and parking pattems of the Edina Community Center and South View Middle School study area have yielded the following findings: ❖ The traffic volumes in the study area have fluctuated through the years, but are generally trending upward. ❖ The existing levels of service on the street system in the study area are generally at LOS-13 or better. School days and tournament Fridays yield peak traffic volume and parking usage periods. ❖ An equitable balance of on- street parking regulations has evolved in the neighborhood in the north half of the study area. Compliance appears to be high. Parking regulations are not posted, nor do they appear to be needed, in the neighborhood to the east of Concord Avenue. ❖ The Community Center and South View Middle School parking lots are currently at an 78% usage rate during the school day; 23% during the evenings and 31% on tournament weekends. Expansion and reconfiguration of the parking lots will increase parking capacity at the site, and may result in some shifting of parking preference by users. ❖ On- street parking is common along the south side of Southview Lane during daytime, evening and tournament weekend periods. In evenings and on weekends, on- street parking becomes common along the west side of St. Andrews Avenue, but at no point in the review did on- street parking demand meet or exceed capacity. No other street Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PR0J \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16/05 Page 12 in the neighborhood experiences the same level of on- street parking frequency, as does St. Andrews. ❖ Levels of service on the streets in the study area will not degrade appreciably as a result of the addition of the two new gymnasiums. The distribution of the added trips indicates that the roadways in the study area will remain at the same levels of service as before the completion of the new gyms. This was true for weekday and tournament weekend scenarios. Conclusion The goal of this study has been to determine whether the proposed gymnasiums will adversely impact the traffic and parking in the area. The levels of service on the streets within the study area will not degrade appreciably as a result of the addition of the two new gymnasiums. Upon completion of the proposed parking lot changes, the on- street and off - street parking supply will adequately serve the daytime, evening and tournament weekend demands. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ \824960J\Rpt#1- Revised 031605 -Final Draft.doc 03116(05 Page 13 References: 1. Land Use Plan Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 2. Existing Traffic Volumes Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 3. Forecast 2020 Daily Traffic Volumes Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 4. Functional Classification Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 5. Pedestrian /Bicycle Facilities Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 6. Traffic Analysis Zones Map, City of Edina Transportation Plan, City of Edina, MN, March 1999. 7. Parking Restrictions Map, data accumulated by City of Edina, MN, February 2005. 8. Historical Traffic Volumes, 1975 -2004, data accumulated by City of Edina, MN, February 2005. 9. ECC /Normandale Elementary School Gym Addition Floor Plan, Rozeboom - Miller Architects, February 2005. 10. South View Middle School Gymnasium Addition Floor Plan, Rozeboom - Miller Architects, February 2005. 11. Edina Community Center /South View Middle School Site Plan, Rozeboom - Miller Architects, February 2005. 12. Phone conversations with Doug Johnson, Edina School District, 01/31/05 and 02/02/05. 13. Phone conversation with Ed MacHolda, Edina Assistant Parks & Recreation Director, 02/01/05. 14. City of Edina Local Traffic Task Force Findings and Recommendations, May 6, 2003 15. 2005 Edina Park & Recreation Insider, City of Edina, 2005. 16. Edina Basketball Association website, www.edinabasketball.com 17. Edina Girls Athletic Association website, www.egaa.org 18. Girls Traveling Basketball website, www.edinagirlsbasketball.org 19. Edina School District website, www.edina.k12.mn.us 20. City of Edina website, www.ci.edina.mn.us 21. "Campus Traffic and Parking" HRG Memo to Jay Willemssen, Edina Public Schools, from Howard Preston, PE, and Chris Albrecht, July 31, 2000. 22. 2003 Official City Map of City of Edina 23. Field checks of study area, Howard R. Green Company, 01/31/05; 02/05/05; 02/06/05; 02/09/05; 03/03/05. Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:%PR0J1824960JXRpt#1- Revised 031605 -Final Draft.doc 03116105 Page 14 Figures 1. Study Area 2A. Weekday 24 -Hour Traffic Volumes (1975 -1984) 2B. Weekday 24 -Hour Traffic Volumes (1985 -1994) 2C. Weekday 24 -Hour Traffic Volumes (1955 -2004) 2D. Weekend 24 -Hour Traffic Volumes 3. General Roadway Levels of Service 4. Parking Restrictions 5. Proposed Parking Lot Availability 6A. Estimated Additional Weekday Traffic 6B. Estimated Additional Traffic on Tournament Weekends Community Center and South View Gymnasium Traffic Study City of Edina, MN 0:\PROJ\824960J\Rpt#1- Revised 031605 -Final Draft.doc 03/16(05 Page 15 4� y' N r T r M 4 ' 6 � � � ,�' } 1 j_ �a t���Yi! . � *a.r r`` `l.. y tiKA ••k- �,,• • '� �{ t1 x �� � + � i.-sy f r `.� '; ,pe 4 '� 'tea z ,�y .. ►v � '�� �,.: _ y's- a�� k 'V � '"4;,I q f� � i , YI �.�'F� 3f � ,uy�•'�; {.�� *c.ii~ • i • - f Middle 4 T - • • # r Jt- "i t 1S yy t •r+' �, r jya� 6 *j} • 1 School Elementary I School Edina if ♦ ♦♦ r r Y, i f j } Community Center Z; 4 � j;`� �, ,� ' _ ��s —u�r ��� t �►_y +�u�`� ire:: �� � "� `� rte, Gil. <,... 4 _: • � .,ss Y. "i. :: � b. ��" '�� _ -._� _.��'� � �� !,� `r� J i w _ _ - ., � a� d1 � r y � "r ' .�1.1. -•'yam . re..: l 1'�!, ��t;•i... a � , _ ,. "4 = %'� y' i Concord ' a + Elementary Vfa Y , 5 . , . �4,.�r. j �! Ra A�b. , {,jrR•_{ ,ice #�l ,f ."M..- air � y {� �%� T'+ - '�?��`. � , Legend Building Addition Proposed Gymnasiums i ID Parking Lot Source: City of Edina, Minnesota a 4 / q� Y }, e'' • Lo •'a�i!'��� ii �c 6 aE� . _ � ..s�.�_i..�l.�:a�r. "_.:. -. - �L���r.. f� {'+.:��. - ,- y RI f � • � L k �. .-'_ _ - ,� s {�''� � �< .. ►�_i�,�t��1'. ,�'� � to ��— J 100 lei �j, '_' +.�. � � � —' a�•� i ^ eA � J.q AF _i t�r+n L - b� - ; r.. � � J-. � � .. Q • Q � } t � - L �� .fir• ' f4y� kq� !'"Sc' �f ..,� j - r s y • 1. _` y. ; F "' ° .1� ,� .+: Jr` ` ail ti' Y'`•7�` 4 i .%i�' - a .' rdd`� � r ' 1 ±'L * Ea > a : , c,�� 4' 4 .F. TAN s#r�� ~`-3'i -,r -� _trM' '...•••^^^... 1975 1900 1979 - 2773 yes T 7 77- 1981 - 1833 yt - , 1983 - 1759 s ( <z� — ' > 4�' ■i -7 lwv 1975 - 157 n , tu`S ti 'l a�n3 �i9J� 7 1979 - 1339 ' •4 t+ '_f r icy^ �..�r— 'ix, 1981 - 1377 It 1 E r 1 1 r i q 4 , 40 1983 - 1415 IL k :-WA ELLS ~ y, � ! �+�, T � ` +�-• , . :� w a � r..•Q�. - i s f0, ,� .� 3 1 1 79- 1096 1975 - 6290 1977 - 5630 1981 - 1771 • F _. 1981 - 6300 1983 - 4771 _A e' Legend r _ 5r Volume +a7 d 'z is *sue �' n Source* A- N �_r ,41, MITI, tit -A Y '1 -W 1985 - 420' 1987-403 1989-454, 1991 -429. L_ A 1993 - Al Ai .44 oil, ;r 4 t ­4 A Ir L jm L 1985-1220 f. 1987-1339 1989-1578 Fj 1 991 -1580 1993-1664 ter: ' ' ��` � 4�1. ° � . ,1 � tit 7� A J JAMM Jp Ito 1985 - 1150 7, 1987 - 520 1989 - 913— 1991 - 733 OL - Al_,lil RK y N 1 n , t 1 1 r — o <� h Y r r. -V'LI �G w .. 1 " 201 30 - n � AFT +k will Ilk wl 2004 387 - i Y_ y A + r .i. ' • q 1995 1814 r- �z y r: xi 2001 j P AVA IA -V jot 1998- 1900 a i Ir J1 . _ t � y [+ T i4 IL Year - ADT Volume Number Wy of Edina, Minnesota ���Y �lp:i�rri .:L �� ��r'�'i.... itl::.L`.� ,c i'.`i!1'a i:+, L..�• ... .`. �._ _ �3. 'i� �+.,:'s��_.. - —�: 2000 -53 IN i! 1 1 1 a � p �'i ��-� '- w '� _, 'jM�r + � :y: cc..;i r' �! Y �i'� I � v # il ��Y•.t:r� �, �•�o `• � � Ilk Ak 740 � ! s� e�'� � `� "4k, � � !�'. fir.• f" ` +i �,�.•y1� j�! .,Idw1�; �� �p., < � ( �1. + d t F. log- 2000 ref �°*►.� / 1 J. i X. _� _ • ter. o i�� I 1 1 `fir � f �" � •1} \`P � Y �t-:.y • ^�`� 111 �fld y� _ '— { # 1 1 �� `� �,.a � (� --•� *:E'er' �A�'' ��•- � 1 • y. .y ej ILI I p ti - ~ - 3-D Y j -- *a r$e• -S3n I� i '4J Re— T Awi _ �6 .- k ` _Lai- �� - �`..a. � FFF � i _' � . • A Legend AIR 1994 .1234 Year - ADT Volume Number, Ur Saturday Count 1994 - 1234 Year - ADT Volume Number, Sunday Count 1'-;! Source: City of Edina, Minnesota 2002 -4050 �- r3 s e Y ' I.i.•i- x'7"7_ W _��Y s + :<_4t�._r „'.ri 45,000 acity Assumptions: �'� Los fThrough Only Lane 800 vph Note: This figure contains 40,000 H Lane 600 vph RT Lane 700 vph RT /LT Lanes 600 vph approximate values. The values are highly dependant on the assumptions used. It ..L..E. . Turn Lanes 350 vph should not be used for operational analyses or final 35,000 Peak Hour Percentages cs> design. Arterial Roadway 10% Directional Orientation 60/40 LOS F Los D. 30,000 (1) Assumes 1/4 mile signal spacing. For less than 1/4 mile signal spacing, roadway • • • • • • • • • .: Lose •. „ \. \ \,,,,, becomes too volatile to determine LOS b For greater than 1/4 mile signal GADT. Q ... 25.000 spacing, the capacity for a through lane can be increased by approximately 50 -100 vplph. ' 2 Based on data provided in the Mn /DOT 1998 Automatic Traffic Recorder (ATR) LOS :LOSE ' LOS LOS \ \ \ \ \ \, \ \ \\ . \\ \\\ Los . \\ \ \ \ \ \ \ \ \ \ \\ •`• ;< dos c,. • • <,�> 20.000 Report. \ \, \, \ \ \ \ \\ '� D 4% C: ci 15,000 LOS F ,,,\,,,\,,, LOS • . LOSE • • \V.......,, \,• LOS • \\ ..... �\ < < < ' >' >' >'• \ \ \ \ \ \, \ \ \ \ \\\\\,\\\\, ,,,,,\,,,\\ '•� LOS X. ` >�•� >�•,•, > <• <• < > <'.> LOS ��•�•�•�•i•� > > • > /i/uuuii i LOS B \\\ LOS „ ,,,\\\\\\\\ �•�•� >� >�> � >� >� >�•�.� LOS B ,/ /iiiiiiiiii 10,000 LOS F ' < >,',•,•,•, ..... LOSE •' '< Los ��< .:-.LOS <> > < > < > <> > > • //. // // LOS .., // /� o'// LOS B \ LOS D •.\\ /iiiiiiiiii /iiiiiiiiii LOS B ii ' > /v, LOS 8 // /iiiiiiiiii `> LOS C >' :;;•LOS A:: 5,000 `• > > ' LOS / ./. :;:; LOS A ::y ;:} LOS A :; ; { {:LOS A :: {:: LOS A.< � LOS A :::$ 0 2 -Lane Undivided w/o 2 -Lane Undivided with R 3 -Lane Undivided with L 3 -Lane Undivided with R 4 -Lane Undivided w/o 4 -Lane Undivided with R 4 -Lane Divided with R & Turn Lanes or L Turn Lanes Turn Lane & L Turn Lanes Turn Lanes or L Turn Lanes L Turn Lanes Type of Roadway Howard R. Green Company GENERAL ROADWAY LEVELS OF SERVICE TRAFFIC STUDY CITY OF EDINA, MINNESOTA FIGURE 3 IN s. Lot WL4, Will Z If Aye N —.k -- — -- *t . 4. '17 J4 7V it f L welt- va j -- ^ww _w- L AD 4� 40 - x' - X41 7. v 401 'W Legend F41- L7 'e r No Parking Anytime ;,Owl No Parking, M-F 8 - 6 wj No Parking School Days L 1; Bus Parking Only M-F 8 - 4:30 A 15 Min Parking M-F 7 - 6 4ji jv fill No Parking or Stopping v INT MV No Parking School Days 7 - 9 AM Nothing Posted J, Wf I iyo inneso a Source. C't f Edina, M' t 20 so TUI_7w 1 ^ r r 1 y North • �' # .. � � � rE y�'• pye r t ".1. '� � T 88 stalls As _ 7 le. ': `.r IT, , r b J.- T QC;- Arlo S•+ I v g r •�� t Ilk- Lit P _ '�► , e, r t i 1 drop-off V, spaces 4� �T k_ s . 16�' Concord East Lot-� - 38 stalls it Ir Concord West Lot 90 stalls Legend z lair -• - Lam. ti'.. - r s ; °L --•+ + {.4 t '� �1 �` _,yg_ (1�•i1F.: .'.� _ :'"�.i k _ 100 .{ Ly - 4Z 'M __ j• it a: - �i ply -��..� a. .... Drop-off S.. - ! y, Howard R. Green Company a s � Y¢. '.•a,,, � �.e � ¢,1 � - • sa �Y �4 ��, t ..F �p,r� yy ¢ ,x k a A M." P � Sff I i i;,, A y .i I'M i LLJ , �� ` l•� ry . per, .P ��! - ; 1.. ' f x 1 ,� t .. �I , f�� � � _� � �� �� ► Jai` 4 4 1 tea. j.-, . IL R s f „ M j ! gawk - -- "1 '-may. • � E` � -�. �a -+� k . ! p: a :7 e, rt �`• ;:'�, • it *" 5 1... Sir !�� --•'ti J , ., Legend Weekday trips added to system _,6, +XX Day V� ��.c t' � a t • w -rte , � P + _ trips • • ' Evening trips added �, +XX Total weekday trips aed .._ Source: - e� -4_ .P E MINUTES. OF. THE Edina Transportation. Commission Thursday, March 24, 2005 Edina City Hall. 4801 West 50th Street Community Room MEMBERS PRESENT: Fred Richards, Marie Thorpe, Jean White, Warren Plante, Joni Kelly Bennett, Dean Dovolis. MEMBERS. ABSENT: Les Wanninger STAFF PRESENT:. Steve. Lillehaug, Sharon Allison b. Community Center & South View. Gvmnasium Traffic Study - Howard R. Green Company Steve Manhart with Howard R. Green Company said they were commissioned to conduct. a traffic study to identify internal and off -site traffic and parking impacts and to determine whether the proposed gymnasiums will adversely impact traffic and parking in the area of the Community Center and South View Middle School. The study area is bounded by W. 60th St. to the north, Lakeview Drive to the south, TH 100 to the east and Wooddale Avenue to the west. In addition to the gymnasiums, there will be building expansion on South View Middle School and the Edina Community Center, as well as the east and west parking lot and reconfiguration of South View's parking lot. Manhart said they used historical traffic count data dating back to 1975 as well as more current counts (1995- 2004), provided to them by the Engineering Department. Through data analysis and observation of the area, the study identified the following: • Local streets have high access but low mobility; principal arterials have low access but high mobility; • Traffic on roadways free flows at Level of Service (LOS) A (LOS -D or better is generally acceptable in the Twin Cities); • Relocation of South View's students drop -off location will pull more vehicles off Southview Lane; Projected Traffic and Parking Demand • Daytime Scenario: No additional trip generation /parking for school's gym; 320 additional trips and 40 parking stalls required for the Community Center's gym (assuming 4 ninety - minute sessions and 40 people per session daily for multi - purpose activities); • Evening Scenario: 120 trips created by two simultaneous practices /games per gym (assuming 40 participants, 4 coaches and 8 spectators); 30 additional parking stalls per gym, but up to 60 spaces to accommodate change over between sessions; • Tournament Weekend Scenario: Four sessions on Friday night per gym ( =4x40 trips x 2 gyms) equals 320 additional trips; eight sessions on Saturday per gym ( =8x40 trips x 2 gyms) equals 640 additional trips; six sessions on Sunday per gym ( =6x40 trips x 2 gyms) equals 480 additional trips. • On- street parking restrictions seem to be in compliance; most parking are on Southview Lane and side streets during weekend tournaments, especially St. Andrews; • Weekend tournament traffic travels primarily along collector streets ( Southview Lane, Concord Ave. and Normandale Rd.); In conclusion, the study found that "Levels of Service will not degrade appreciably as a result of the construction of the new gymnasiums and upon completion of the proposed parking lot changes, on- street and off - street parking supply will adequately serve weekday, evening and tournament weekend demands." Richards indicated that the school should, provide adequate off - street parking since they are continuing to intensify usage of the area. Plante concurred and stated that the traffic issue should have been addressed ahead of time and not after - the -fact. Dovolis said usage of the area would intensify even more when new programs are added and even if they were to provide adequate off- street parking, the number of trips generated will be an issue. Bennett said the number of vehicles is unacceptable for a residential area and there has been a lack of communication with the residents. White suggested creating an alternative transportation system to reduce the number of trips. Thorpe asked what could they do at this point considering that everything appears to be in place and construction has already begun. Lillehaug said funding for the gyms is yet to be approved. Residents in attendance commented as follow: Julie Risser, 6112 Ashcroft Ave. Risser stated that Valley View Rd should have been included in the study because it is used heavily when events are over and while the study addressed traffic on Normandale Rd, it did not address the excess traffic that Valley View Rd will carry. She said Valley View Rd is a 1.1 miles speedway road with one only one place for drivers to stop between Normandale Rd and Hwy 62. She said the only designated crosswalk for students at Concord and Valley View Rd is dangerous because the flasher is on constantly and is therefore ignored by drivers. She said there is also a 'dip' in the road just before the crosswalk that makes it difficult for drivers to see an adult crossing, let alone children. She said the sidewalk does not go all the way through and students must be bused 2.5 blocks from Concord Elementary because Valley View Rd is too dangerous to cross. She is also not happy with the increased traffic in the area. Ron Wenaas, 5617 Sherwood Ave. Wenaas stated that he is disappointed that the traffic study only considered the impact of two gyms and not all four that are planned. He said the operating hours used in the study is not correct, it should be from 4 -10:30 p.m. which then doubles the traffic study's assumptions. He said the numbers used to determine trip generations are low and needs to be reconsidered. He stated that the traffic study should have been done based on what the project is going to do to the entire community, not just the effects of two gyms. He said the Edina Community Neighborhood Association implores the ETC to not recommend that they go forward with the gyms. talph Overholt, 6321 Rolf Ave. Overholt asked how has the Level of Service changed specifically and are there areas that are more affected than others? He said based on the cost per parking stall, the School Board should get students to bike or use other alternatives. ` 13ennett stated that the Commission does not have an accurate picture of the impact on the community considering that all four gyms were not included in the traffic study. Dovolis concurred, stating that the study does not address all the uses, capacities, functions and future uses. Bennett said the study should not advance until all this information is known. Plante said Valley View Rd should be included in the future study. Dovolis made a motion encouraging a new traffic study that will look at the impact on the entire community, including future potential of sites and withhold approval of gyms until the full impact on the community is known. Seconded by Plante. Ayes: 6 Nayes: 0 Motion carried. Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:35 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug Subject: FW: Gymnasium hearing - - - -- Original Message---- - From: Fesenmaier, Maria T. [ mailto :mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 5:09 PM To: Jennifer Bennerotte Subject: FW: Gymnasium hearing Page 1 of 2 Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: loanredhed @aol.com [mailto:Joanredhed @aol.com] Sent: Monday, April 18, 2005 11:21 AM To: jhoogenakker @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com Subject: Gymnasium hearing To Whom It May Concern, I am writing to express my views on the addition of two more gymnasiums in my neighborhood. I am very much against adding more traffic and more parking issues to a neighborhood already dealing with a more than fair share. We've known for years that traffic was a frustrating issue along our street, and that was confirmed when our neighborhood was identified as having a significant traffic problem in 1999. Nothing has been done to ease the problem in 6 years. I also understand that there's a belief that we need two more gyms, but I also hear that school population is declining. Ask yourself what we always ask ourselves as homeowners with budgets. Is this a need or a want, and what is the priority it is setting? Sports are important, but we keep sending the message that sports are more important than almost anything else in this community. How does the importance of sports compare with neighborhood safety, or the sense of quiet community we hope to keep, or keeping taxes down? Again, as someone who grew up without a lot of money, I also think it's important to separate want from need. There are some things in this life that it's okay to get along without ... and to work around. This might be one of them. Or maybe there's a another neighborhood that would like to share some of their green space or quiet streets with the rest of the city. While we're grateful for easy access to the schools and community center, and we knew it was there when we moved in, we are now taking on more traffic from new construction already going on, and the exponential growth that would come with constant and concurrent games and practices at two new gymnasiums is an undue burden. My husband and I are in the process of deciding whether to make significant improvements to our home, but now feel a need to reconsider. Why would we want a front porch to sit and look at increased traffic and parked cars on our street, when the reason we wanted it was for an increased sense of connection to our neighborhood? As for the study that was commissioned, I think it's your obligation to us as the people who put faith in you, to use integrous information when putting a study together. After many years in news, I know that any study can support just about anything by adding or deleting information. You can play that game and win, but at what cost? 4/19/2005 s 4 Page 2 of 2 Certainly, reputation and integrity are at stake if you knowingly make an easy decision supported by flawed information. Edina has a wonderful reputation, and I would certainly expect more from you as its representatives. Please use all the pertinent information when doing your study and then consider it all when making your decision. Thank you for your attention, Joan Steffend Brandmeier 5605 Dalrymple Road Edina, MN 55424 4/19/2005 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:36 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug Subject: FW: Proposal for additional gymnasiums - - - -- Original Message---- - From: Fesenmaier, Maria T. [ mailto :mtfesenmaier@eschelon.com] Sent: Monday, April 18, 2005 5:25 PM To: Jennifer Bennerotte Subject: FW: Proposal for additional gymnasiums Page 1 of 2 Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! Message---- - From: DCorbett@birchlabs.com [mailto:DCorbett@ birchlabs.com] Sent: Monday, April 18, 2005 10:09 AM To: jhoogenakker @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com; rwenaas @usfamily.net Subject: Proposal for additional gymnasiums Dear Sirs, We are home owners at 5616 Dalrymple Road, corner house across the street from the new addition to the school that I stare at in amazement every day. I still cannot believe that was O.K.'d considering the traffic we have put up with the last soon to be twenty years. At present our house is for Sale. Our house was priced for "Quick Sale" and we were looking forward to downsizing this year. It took only the initial run thru for the realtors to point out the existing traffic and "eyesore" across the street meant even lower pricing if we expect to sell. I cannot tell you how many comments we have had saying "love the house and yard but way to much traffic for comfort." This attitude is hard to combat when people are pulling into our driveway to turn around like we are part of the school property as people are looking at the house. We have actually seen times we could not pull into our own driveway during football season. What can we expect now? I cannot stress my amazement that the City of Edina would take a residential area already overburdened with traffic from two schools and a community center and intentionally add to the confusion with the plans in progress at present. Does the city have our support? Absolutely not! Sincerely, 4/19/2005 Page 2 of 2 James & Donna Corbett 5616 Dalrymple Rd. Edina, MN 55424 cdc227 @aol.com The information contained in this e-mail message may be privileged, confidential, and protected from disclosure. If you are not the intended recipient, any further disclosure or use, dissemination, distribution or copying of this message or any attachment is strictly prohibited. If you think that you have received this e-mail message in error, please e-mail the sender at the above address, and delete the e-mail. Thank you much. 4/19/2005 - -- USFamily.Net - $8.25/mo! -- Hi seed - $19.99/mo! - -- Page 1 of 1 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:36 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug; John Keprios Subject: FW: ECCNA Member - Important Message - - - -- Original Message---- - From: Fesenmaier, Maria T. [ mailto :mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 5:27 PM To: Jennifer Bennerotte Subject: FW: ECCNA Member - Important Message Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: BLIacono @aol.com [mailto:BLIacono @ aol.com] Sent: Sunday, April 17, 2005 11:00 PM To: mtfesenmaier @eschelon.com Subject: Re: ECCNA Member - Important Message Hi Maria, Thank you for sending out this e-mail. I have been increasingly concerned about the fiasco that is happening at City Hall with regard to the gyms: Back in November, my husband and I sent an e-mail to John Keprios, expressing our opposition to the proposed additional gyms. The only apparent result was an accounting in the Edina Sun indicating there was little or no opposition, and a move forward by the City Council with the plan. I will send you a separate e-mail; I would really appreciate it if you could get it to the appropriate people ( Keprios, city council members, or whomever). I will definitely be at City Hall on Tuesday. Thanks again for all your efforts on our neighborhood's behalf. Beth Iacono 4813 W. 59th Street 929 -4487 4/19/2005 . Page 1 of 2 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:37 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug; John Keprios Subject: FW: Community Center Complex proposal input - - - -- Original Message---- - From: Fesenmaier, Maria T. [mailto:mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 5:28 PM To: Jennifer Bennerotte Subject: FW: Community Center Complex proposal input Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: morninglory081129 @comcast. net [ mailto : morning lory08ll29 @comcast.net] Sent: Monday, April 18, 2005 8:25 AM To: edinamail @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com Subject: Community Center Complex proposal input Hello, We've lived at the intersection of 58th Street and Ashcroft Avenue for 2 years. We bought into this neighborhood because we have 2 children, and it seemed to have the ideal sense of tranquility, security, community, and convenience that we sought. Now these reasons appear to be strongly threatened by the Community Center Complex proposal that is under consideration. We've been concerned for some time about the proposed widening of our street from the current 28 feet to 32 feet, against the wishes of us or any of our neighbors. We, nor our neighbors, have any desire for a parking bay to be located directly across the street of our home. We've felt for some time that this will only serve to invite non - neighbors to park near our home, threatening our security. Now we've learned why the city wants to add more parking to our neighborhood: because of the Commercial Sports Facility proposal. We feel that we're being steamrolled into something that we don't want to live with, and don't want to pay for. We are very concerned about this threat to our neighborhood. Our road widening problem is a strictly a means to increase the number of parking for non - neighbors, and we are to pay for it. It appears that the city still plans to widen our street, against the surveyed desires of all of our neighbors. The proposal, apparently in advanced stages, to build a Commercial Sports Facility at the school complex at the end of our street involves the construction of 5 indoor sports facilities which will be hosting practices, games, and tournaments up to 7 nights per week and up to 10:30 PM nightly, with hundreds of additional car driving thru our neighborhood daily. Traffic impact studies rejected our neighborhood as suitable for even 2 additional gyms, but the City Planning Commission is moving forward with the plan regardless of this rejection. Our property value, our neighborhood's safety and security, and our overall quality of lif a are all most certainly on the line. Every reason we bought into this neighborhood is threatened, 4/19/2005 Page 2 of 2 despite the fact that we've put significant time, effort, and expense into remodeling our house into the place that we planned to call home for years. We ask the City Council to please reject the proposal to add any additional gym space to the project already committed to. A more suitable location or split locations can certainly be found. Please consider how you would feel if this was your quality of life at stake. We also ask the the City Council NOT approve the plan to widen 58th Street to 32 feet. We wish the street width to remain at the current 28 feet, to maintain slower driving speeds and to discourage on- street parking of non - neighbors. The speed issue speaks for itself, and non - neighbor parking will compromise our security. Our yards are also at risk. Our front yard, facing 58th Street, is quite narrow enough, as anyone driving by can observe. We do not wish vehicles to be driving any closer to our home than they already are, as it we hear each and every vehicle that speeds by as it is with the current street width. Our neighbors across the street do not want to lose their beautiful mature trees, which provide us all with pleasant shade in the summertime. Please consider our quality of life in making your decision. We will be in attendance at the April 19 City Council meeting, and reaffirm our wishes at that time. PLEASE consider our concerns as if they were your own. Sincerely, Moira and Joshua Olson 5801 Ashcroft Avenue 4/19/2005 Page 1 of 1 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:39 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug; John Keprios Subject: FW: Gymnasium Proposal - - - -- Original Message---- - From: Fesenmaier, Maria T. [mailto:mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 5:30 PM To: Jennifer Bennerotte Subject: FW: Gymnasium Proposal Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: BLIacono @aol.com [mailto:BLIacono @aol.com] Sent: Sunday, April 17, 2005 11:13 PM To: mtfesenmaier @eschelon.com Subject: Gymnasium Proposal (Maria, would you please forward this message to appropriate persons at Edina City Hall? Thank you.) We are homeowners within 500 feet of the Edina Community Center Campus, and we are writing to express our concerns about the proposal to add two additional gymnasiums at the Community Center Campus. As parents of two middle school boys who have always been very active Edina youth athletics, we fully support providing all necessary athletic fields and facilities, as long as the safety and well -being of our neighborhoods are not put at risk in the process. Our main concerns are traffic safety and parking availability for users of the additional gyms (as well as the numerous other gyms and theaters on the campus). This past summer's traffic and parking fiasco (concentrated on the 4800 block of W. 59th Street and the streets leading to it) due to the re- location of youth soccer to McCarthy Field is something that should not be repeated on a regular basis. To this day, I am thankful (and somewhat amazed) that there was not a serious injury or death due to the excessive speeds, the driving and parking on the wrong side of the street, the children darting out from between parked cars, the hurried parents turning around in private driveways where neighborhood children were playing, etc., etc. And to think of this happening during winter months when our already narrow streets are even narrower because of snow drifts is unimaginable! We urge you to consider other options and locations that would not put the safety and well -being of our residential neighborhoods at risk. Thank you. Beth and David Iacono 4813 W. 59th Street Edina 4/19/2005 Page 1 of 1 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:39 AM To: Darlene Wallin Cc: . Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug; John Keprios Subject: FW: ECCNA Member - Important Message - - - -- Original Message---- - From: Fesenmaier, Maria T. [ mai lto:mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 5:31 PM To: Jennifer Bennerotte Subject: FW: ECCNA Member - Important Message ibennerotte(a)-ci.edina.mn.us Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: Sessy02 @aol.com [mailto:Sessy02 @aol.com] Sent: Sunday, April 17, 2005 9:37 PM To: mtfesenmaier @eschelon.com Subject: Re: ECCNA Member - Important Message Maria, Please forward to appropriate council. Thank you for the update on the Gymnasiums in our neighborhood. I would like to have my name added to the list of neighbors that are not in support of the additional gymnasiums. I feel that the City Council has been trying to jeopardize this neighborhood and continues to not look at all of the issues. They are not listening to the transportation committee and are taking short cuts in this area. Let's start working for the entire city and not continue to ruin the neighborhood by the schools. There is too much traffic for all of the students in this current area. We are already going to add much to the traffic in our neighborhood just by the additional space given to all of the schools in this area. Concord added space last year and now we are adding much more space to the middle school and community/french immersion school. I AM NOT IN SUPPORT OF THE DECISION TO ADD AN ADDITIONAL GYM AND WOULD LIKE REVIEW OF THE DECISION MAKING PROCESS BY OUR CITY COUNCIL AND MAYOR. Sandy Essendrup 4717 School Road Edina, MN 55424 What else can be done to be heard by our Council and Mayor ? ? ? ?? 4/19/2005 Page 1 of 2 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:40 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug; John Keprios Subject: FW: ECCNA Member - Important Message - - - -- Original Message---- - From: Fesenmaier, Maria T. [mailto:mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 5:39 PM To: Jennifer Bennerotte Subject: RE: ECCNA Member - Important Message Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: Wessy0l @aol.com [mailto:Wessy0l @aol.com] Sent: Monday, April 18, 2005 5:27 PM To: mtfesenmaier @eschelon.com Subject: Re: ECCNA Member - Important Message April 17, 2005 Edina City Council: Mayor, Jim Hovland Council Member Scot Housh Council Member Alice Hulbert Council Member Linda Masica Council Member Ann Swenson Again you continue to target the same small area of Edina for public use. We have lived in this neighborhood for over 20 years and feel that we and most other neighbors have been excellent hosts for many sports and school events year after year. Now with the addition of new facilitates to the Community Center and South View we will deal with more. When it was just Edina student and parents we were willing to continue to be good neighbors. However, the "game" has now changes with the city wanting to add facilities that will be open for general use. Please seriously consideration that you continue to cause great strain on the traffic and general congestion in this neighborhood. We have been pushed as far as we can and are now ready to "fight back ". I am asking you to do your job and consider the information below and take another look into the issues at hand. We do not want to build a problem that can not be reversed. Neighborhood safety in Edina should be your number one consideration not finding ways to make room for commercial sports facilities next to our schools and homes. We feel strongly enough about this to personally "beat the pavement" before the next elections 4/19/2005 Page 2 of 2 if it appears we have elected officials who are not interested in our families and neighborhoods welfare. Why the Edina Community Center Neighborhood Association opposes this plan: • The ECC neighborhood was identified as a significant traffic problem area in 1999 ...nothing has changed since then, except the addition of more traffic! • The two additional gyms were added to construction plans after last year's referendum was passed with a no vote by area Edina residents. • The city commissioned a traffic study, but the Edina Transportation Commission (ETC) unanimously rejected the study as flawed. Yet, the City Planning Commission and City Council are going ahead, ignoring the Transportation Commission's rejection. • The flawed study looked at the effect of the two new gyms only ... not the impact of what would become 5 indoor sport areas that could host as many as 7 concurrent school or city- sponsored practices, games, or tournaments drawing even more traffic through one concentrated area ... our neighborhood. . In the study, only 2 practices or games per gym, per night, were assumed. The original rental plan presented to Council, projected 6 practices or games in one gym, 4 in the other, each night! Again, this will add significantly more traffic than the study projects. • Original plans did not include weekend tournaments ... that's changed, along with a concession stand in the revised plan. Events will start as early as 4pm and end as late as 10:30 pm, 7 days a week. • For weekend tournaments, the study's projections are considerably lower than they should be... again, because it considers only the 2 additional gyms. • The study ignored the impact of other activities on traffic flow that will increase with the renovations at Southview and the Community Center (theatre, music, other rec programs) that will of course grow as time goes on. • The study considered the effect of traffic on a very limited area. Increased traffic on Valley View Rd. was not even considered relevant. Please seriously consider these facts, do appropriate studies and consider the children who go to school and families who live in this neighborhood. Given the limited road space and options available once a decision has been made to add these facilities it will be very difficult to "fix" after the fact. Thank You for your consideration, Bill Essendrup 4717 School Road Edina, MN 55424 4/19/2005 Pagel of 2 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:41 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug; John Keprios Subject: FW: ECCNA Member - Important Message - - - -- Original Message---- - From: Fesenmaier, Maria T. [ mailto :mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 5:40 PM To: Jennifer Bennerotte Subject: RE: ECCNA Member - Important Message Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: Wessy0l @aol.com [mailto:Wessy0l @aol.com] Sent: Monday, April 18, 2005 5:27 PM To: mtfesenmaier @eschelon.com Subject: Re: ECCNA Member - Important Message April 17, 2005 Edina City Council: Mayor, Jim Hovland Council Member Scot Housh Council Member Alice Hulbert Council Member Linda Masica Council Member Ann Swenson Please take into consideration the neighborhood that you continue to cause great strain on the traffic. I ask you to consider the information below and take another look into the transportation issues at hand. We do not want to build a problem that can not be reversed. Safety in Edina should be our number one consideration. 4/19/2005 Page 2 of 2 Why the Edina Community Center Neighborhood Association opposes this plan: • The ECC neighborhood was identified as a significant traffic problem area in 1999 ...nothing has changed since then, except the addition of more traffic! • The two additional gyms were added to construction plans after last year's referendum was passed ... with a no vote by area Edina residents. • The city commissioned a traffic study, but the Edina Transportation Commission (ETC) unanimously rejected the study as flawed. Yet, the City Planning Commission and City Council are going ahead, ignoring the Transportation Commission's rejection. • The flawed study looked at the effect of the two new gyms only ... not the impact of what would become 5 indoor sport areas that could host as many as 7 concurrent school or city- sponsored practices, games, or tournaments drawing even more traffic through one concentrated area ... our neighborhood. • In the study, only 2 practices or games per gym, per night, were assumed. The original rental plan presented to Council, projected 6 practices or games in one gym, 4 in the other, each night! Again, this will add significantly more traffic than the study projects. • Original plans did not include weekend tournaments ... that's changed, along with a concession stand in the revised plan. Events will start as early as 4pm and end as late as 10:30 pm, 7 days a week. • For weekend tournaments, the study's projections are considerably lower than they should be ... again, because it considers only the 2 additional gyms. • The study ignored the impact of other activities on traffic flow that will increase with the renovations at Southview and the Community Center (theatre, music, other rec programs) that will of course grow as time goes on. • The study considered the effect of traffic on a very limited area. Increased traffic on Valley View Rd. was not even considered relevant. Please make your decision based on the traffic and not on personal desires. Thank you, Sandy Essendrup 4717 School Road Edina, MN 55424 4/19/2005 Page 1 of 2 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:41 AM To: Darlene Wallin Cc: Gordon Hughes; Craig Larsen; Wayne Houle; Steve Lillehaug; John Keprios Subject: FW: letter to editor - - - -- Original Message---- - From: Fesenmaier, Maria T. [ mailto :mtfesenmaier @eschelon.com] Sent: Monday, April 18, 2005 6:08 PM To: Jennifer Bennerotte Subject: RE: letter to editor Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: Dan Rectenwald [mailto:DRectenwald @hga.com] Sent: Tuesday, April 12, 2005 8:38 AM To: Fesenmaier, Maria T. Subject: RE: letter to editor see the attached. share as you like. April 11, 2005 As the ECCNA representative that has participated in reviewing the current proposals for the Post - Referendum Gymnasium Additions, I would like to offer opinion the status of the proposals (the article in last week's Sun noted I was "unavailable for comment "). In my opinion, the Gymnasiums would better serve the community at a different site. A superior alternative would be a site with better access, ample parking, maximized traffic safety with no threat to residential neighborhoods. The Normandale and South-view sites possess none of these attributes. As a member of the Edina Community Center Neighborhood Association, I have represented the same opinion to the Post - Referendum Gymnasium Additions planning group. Safety has always been the #1 priority of the ECCNA, and the current proposal compromises such. That being said, I have still participated in the planning in a positive manner, supporting functional, flexible and cost effective design. The requests of the ECCNA have not added costs to the project (probably the contrary). Although I personally do not condone the Gymnasium Additions at the Normandale and Southview School locations, I have been trying, as an Architect, to make them "good" projects (making lemonade with these lemons). This should not be confused with my personal, or the ECCNA's, endorsement. It is not; there are still serious concerns. The Post - Referendum Gymnasium Additions user group did not discuss parking demand /location, traffic or safety. Per last week's Sun article, Council member Housh has already acknowledged that traffic in the area is a problem and the gyms will only compromise the are further. Granted, the gym additions did try to 4/19/2005 Page 2 of 2 allow for access from more than one parking lot, but this will have little to no impact on the traffic in the area. Bottom line, the Southview /ECC area has been identified by the City of Edina Transportation Commission as one of the city's safety "trouble zones." The referendum expansions and additional gymnasiums compound the situation (tee do zvantpeople to utilitie these new additions don't eve ?), and the Gym Additions exacerbate the issue further. Traffic and safety are real issues. The published ETC meeting minutes of 3/24/05 note the latest traffic study as timid and limited in scope, commenting that the impact on the area feeder streets would be imperceptible. The city commissioners noted that the study had its "flaws," lacked a critical analysis of the situation, and requested "a new traffic study that will take a look at the on the entire community" (oddly, the Planning Commission "rubber stamped" the project anyway). The process for the Post - Referendum Gymnasium Additions has been moving fast, going public right after the elections and seeking City Council approval at the holiday season, all in the name of "economies of scale" and cost savings. Reports indicate that the projects are presently 25% over budget. The gyms are freestanding entities, away from any Referendum project work. In my opinion there is little to no savings from moving so fast. In conclusion, the ECCNA appreciates having the opportunity to be involved. We have contributed in a positive manner. However, I and the ECCNA still feel that the additions threaten the safety of our neighborhoods and do not support the gymnasium additions at this location. Dan Rectenwald 5611 Sherwood Ave Edina, MN 55424 C 612/867 -2377 4/19/2005 Page 1 of 1 Darlene Wallin From: Jennifer Bennerotte Sent: Tuesday, April 19, 2005 8:45 AM To: Darlene Wallin Subject: FW: Proposal to Add Additional Gyms - - - -- Original Message---- - From: Roebuck, Lisa [mailto:URoebuck @CBBURNET.COM] Sent: Monday, April 18, 2005 9:40 PM To: Jennifer Bennerotte Cc: mtfesenmaier @eschelon.com Subject: Proposal to Add Additional Gyms Dear Mayor Hovland and Council Members, Allow me to tell you what bothers me about this proposal. This neighborhood told you, several years ago, in no uncertain terms, that it DID NOT WANT a dome over its football field or a mega - structure of gyms to rent out to the community. You heard us, the plans were scrapped, and more recently we agreed with the need for certain changes to our schools and community center. Now I find out that what,you couldn't bring in the front door, you're trying to sneak in the back. I do not want these extra gyms shoved down my throat. They don't belong here. They belong at Braemar, where there is space to put them and little risk to the surrounding residents. Don't assume that I reject this proposal because my children aren't athletes. My daughter was a captain of the tennis team and won two state championships. My son was a varsity tennis player and his team won state twice. My youngest daughter plays lacrosse and tennis. We know the importance of athletic involvement better than anybody, but these gyms will not improve our children's lives. On the contrary, you will turn this neighborhood into a three -ring circus and I truly believe this is a recipe for disaster. This neighborhood, with its curvy streets, limited stop signs and lack of sidewalks, is tricky even for its own residents. As each of my children has learned to drive, I have felt the need to stress, over and over, the danger of driving carelessly in this neighborhood, where children on bikes and people with dogs circle Lake Harvey, in the street, even in the dark. You bring in a large number of outsiders who don't know the neighborhood, the streets, the patterns of its residents, at a time when a sporting event has ended, it's dark out, people are tired, annoyed, happy, celebrating, whatever.... it's a crisis waiting to happen. Am I speaking from experience? I was hit broadside at an unmarked intersection in this neighborhood six years ago by a young man. He was on his cell phone calling for directions because he was lost, he approached the intersection and saw me but, as he told the policeman, he assumed I had a stop sign because he didn't, so he plowed into me. 1 spent months in physical therapy. A child on a bicycle will not be so lucky. Please- consider what the residents of this neighborhood are saying to you. We are not whiners. We love our homes, our town, our schools. We have always stepped up when you asked us to help support a change for the better. Please, do the right thing. These additional gyms are too much for this area. Sincerely, Lisa Roebuck - Krasno 5607 Dalrymple Road 952 - 922 -9164 4/19/2005 Presentation Outline 1. Process participation 2. Traffic Management 3. A "passive" alternative 4. Conclusion April 19, 2005 Edina Community Center Neighborhood Association Process Participation 1. Representation at the User Group meetings • Functional needs • Design response review 2. ECCNA's priority: Traffic and Safety • Recognized by Design Team as an issue with this site • Traffic Study was not done with Planning Studies April 19, 2005 Edina Community Center Neighborhood Association Traffic Study Findings 1. Referendum work • higher utilization of facilities are anticipated, but site will manage to net gain of "0." 2. Gym Additions-. 60 parking spaces per gym (includes cross over. time) -added (as in EXTRA) vehicle every 5-8 seconds (during 15-20 minute cross over time") April 19, 2005 Edina Community Center Neighborhood Association Management of E 1. Planning / Scheduling Principle: ALL PARKING PROVIDED ON SITE 2. The ECC SITE needs to do a better job PROACTIVELY managing the demand on the site • More proactive management of traffic /parking in neighborhood — Establish a review process — Monthly / quarterly meetings with ECCNA or others — Take it seriously 3. The ECCNA beseeches the Council to explore better "passive" options for Gym Additions • Fewer safety concerns • Potential for appropriate parking supply and locations • Potential for greater utilization April 19, 2005 Edina Community Center Neighborhood Association Other-Locations to, Consider 1. Braemer Park 2. Creekside Elementary School 3. Lewis Park 4. Others.... • Goal- Make SAFETY a priority; (less, traffic /neighborhood conflict) April 19, 2005 Edina Community Center Neighborhood Association 11-VI-1 "I c I I I e. 17 i 1) 0 F 897.6 X97.? Ll in 20 --, ". d rim .9 r Bet-) j, (on"c' Wc A 'I Y l 'it � !3t" I I., _-4ll23.3 I! IN .�, '" ';� �I,111;ii 1L� ,gyp of I 87 x v U x 891.4 7N x 885 7N P.- `4 c I I I e. 17 i 1) 0 F 897.6 X97.? Ll in 20 --, ". d rim .9 r Bet-) j, (on"c' Wc A 'I Y l 'it � !3t" I I., _-4ll23.3 I! IN .�, '" ';� �I,111;ii 1L� ,gyp of I 87 x T �i � I� �I i loo, .3 ,i Aral: \ x 864,9 1 . /, 891.4 PAPI 10 G, 890----.-!— H I. 'It N. d V l, 3:1 o '01 4 pI .1 P-i ... .... 1W 897.6 7.1 tt �� �, 87 1371' x 9.l . 5.31 WEW- woo GYMs. a Ity.. x 091.4 Z — 741 a Ity.. x 091.4 F. I '% I . It- 997.6 \ \ \\ x e64.9 i J I / . . ...... --7:�77 . . ........ ....... v 11 al Z — 4 'Oy ov V4 r f9 0 DF: "41 x. 'j V jJ cl, . x � i /! F. I '% I . It- 997.6 \ \ \\ x e64.9 i J I / . . ...... --7:�77 . . ........ ....... v 11 al 4 V4 t4 6- "41 'j V jJ 7PO YP 9. 87 x 876. "AF4 9 V4 t4 6- 7PO 9. 87 x 876. Braemer Park: Program Overview Space Comparison ECC Proposal SV Proposal Total Proposed At Braemer Proposed At Braemer gsimsJ 3 ms Gyms 61310 6,290 12,600 129600 18,900 Lobbies 1,855 21000 39855 25000 29500, Storage 230 225 455 230 400 j Toilets 600 625 19225 600 900 Concessions 210 0 210 0 0 Housekeeping 40 55 95 40 40 Lockers 0 0 0 21000 29000 Mechanical 0 0 0 500 500 Site Work 0 0 0 0 0 Sub Totals (SF) %245 91195 189440 179970 259240 Current Budget PR ( OJECT cost) $4,8009 000 $496779657 $693109000 $195109000 "Project" Cost per SF 1 $260 $260 II $250 April 19, 2005 Edina Community 9 Center Nei hborhood Association Braemer Park: Cost Implications "Project" Cost Increases Cost Increases per year (over 20 years) Cost per Citizen/year Cost per Citizen /month April 19, 2005 Ed 111 Low $11500,000 $75,000.00 $1.56 H�ic' h $1, 650, 000 i $ $1.72 12 $0.13 $0.14 Edina Community Center Neighborhood Association Conclusion 0 t. More program on the ECC site creates more traffic and SAFTEY CONCERNS 2. There are better options (ie: Braemer Park) that -will not cost more -will have improved safety -will have no residential traffic and parking conflicts April 19, 2005 Edina Community Center Neighborhood Association Item #1 Presentation Overview Maria Fesenmaier I Edina Community Center Neighborhood Association Overview Our presentation has 5 components: 1.) Present an overview of the ECCNA, and the Associations views on the overall gym proposal. Maria Fesenmaier 2.) Present corrected /additional factual data pertaining to the ETC traffic study, and its addendum. Ron Wenaas 3.) Present Existing Hazardous Safety Condition Example Area Resident Example 4.) Present alternative suggestions for locations. Dan Rectenwald 5.) And finally, to ask that Council reject the proposal for the two proposed gyms at the ECC campus. We ask the Council vote NO tonight to the proposed Facility Use Agreement until further extensive traffic /safety tests can -be completed (that incorporate the two gyms and the current construction), and that extensive tests be completed to evaluate alternate site l- Ocations for the two remaining gyms. We request that safety and quality of life, continue to remain_ everyones main focus, rather than speed of construction and convenience of location. Ryan Langsev �I. ........... Lill rr Con 0! o 'IQ 7- cp -zl 1-, d Item #2 Traffic Study Ron Wenaas Traffic Stud y One Thing Is Correct • � 1975 to 2001 —1703 to 3675 Per Day — 215% Increase and Growin 9��'� Traffic Is Up Safety is Down Traffic S Bad Design Wrong Assumptions Weak Conclusions Lack of Credibility Number of Courts Study's Assumptions 2 Disputed Courts Only Reality Should Have Been Based on 3 New Courts Hours of Operation Study's Assumption 6:30 -9:30 PM 90 Minute Sessions Reality Southview ECC 4 -10 PM 6 -10 PM One Hour Sessions Traffic Flow Study's Assumptions 30 Cars Per Session (40 participants per event = 30 cars ?) Added Traffic to SouthView Hours of Operation 4:00 — 10:00 PM = 6'Events 2 New Courts x 6 Events /Court x 30 Cars Each Event 360 Added Cars /Evening Added Traffic at CC Hours of Operation 6:00 — 10:00 PM = 4 Events 1 New Court x 4 Events x 30 Cars Each Event 120 Added Cars /Evening Traffic Increase Southview ECC 360 added - 6 hrs 120 added - 4 hrs Total 480 Each Evening 400% More Than the Study Projected Likely Case* Total Courts Hourly Events Cars Per Event S ECC 4 3 6 4 30 30 720 + 360 1080 Cars in 6 Hours * Not including other events or likely-growth Level of Service • Traffic levels from "A" to "F" Traffic over 24 hour period • Southview Lane = "B" 3800 cars per day is Our conclusion = 1080 /Evening Traffic Is U P Safety is Down Safet y 1st 9 Item #3 Existing Hazardous Safety Condition Example Lisa Roebuck - Krasno . Dear Mayor Hovland and Council Members, I am reading this statement for Lisa Roebuck - Krasno. She and her family reside at 5607 Dalrymple Road. Please allow me to tell you what concerns me about this proposal. This neighborhood told you, several years ago, in no uncertain terms, that it DID NOT WANT a dome over its football field or a mega- structure of gyms to rent out. You heard us, the plans were scrapped, and more recently we agreed with the need for certain changes to our schools and community center, via a referendum that was passed. Now I find out that what you couldn't bring in the front door with this referendum, you're trying to sneak in the back door. I do not want these extra gyms shoved down my throat. They don't belong here. They belong at an alternative site such as Braemar, where there is space to put them with little traffic safety risk to the surrounding residents. Please do not assume that I reject this proposal because my children aren't athletes. My daughter was a captain of the tennis team and won two state championships. My son was a varsity tennis player and his team won state twice. My youngest daughter plays lacrosse and tennis. We know the importance of athletic involvement better than anybody, but these gyms will not improve our children's lives. On the contrary, you will turn this neighborhood into a three -ring circus and I truly believe this is a recipe for disaster. This neighborhood, with its curvy streets, limited stop signs and lack of sidewalks, is tricky even for its own residents. As each of my children has learned to drive, I have felt the need to stress, over and over, the danger of driving carelessly in this neighborhood, where children on bikes and people with dogs circle Lake Harvey, in the street, even in the dark. You bring in a large number of outsiders who don't know the neighborhood, the streets, the patterns of its residents, at a time when a sporting event has ended, it's dark out, people are tired, annoyed, happy, celebrating, whatever ........... it is a crisis waiting to happen! Am I speaking from experience? Yes, six years ago, I was hit broadside by a young man at an unmarked intersection in this neighborhood. He was on his cell phone calling for directions because he was lost. He approached the intersection and saw me but, as he told the policeman, he assumed I had a stop sign because he didn't have one. He plowed into me. I spent months in physical therapy. A child on a bicycle will not be so lucky. Can you afford to make this decision? I say no. The area residents have been asking for these safety issues to be addressed for years now, at the same time plans were in the works for new gym space. Why is gym space at the ECC Campus more important than safety? Please consider what the residents of this neighborhood are saying to you. We are not whiners. We love our homes, our town, our schools. We have always stepped up when you asked us to help support a change for the better. Please, do the right thing. These additional gyms are too much for this area. Sincerely, Lisa Roebuck - Krasno 5607 Dalrymple Road Item #5 Quality of Life Ryan Langsev SAFE NEIGHBORHOODS, NOT SPORTS COMPLEX 1. PLAN CONTRARY TO THE RECENT INTENT OF THE MAJORITY OF CITY VOTERS. The Sports Complex Plan fails to recognize residents Citywide voted overwhelmingly against the $44 million referendum supported by City AND School District for park improvements. 2. PLAN HEAVILY BURDENS MINORITY TO THE BENEFIT OF THE PERCEIVED MAJORITY. Much of the Edina Community Center Neighborhood is without sidewalks, curb and gutter requiring immediate assessments to accommodated the Sports Complex Plan. 3. PLAN NOT SENSITIVE TO THE QUALITY OF LIFE IN EDINA COMM. CTR. NEIGHBORHOOD. The Sports Complex plan lacks sensitivity to the Quality of Life for the ECC Neighborhood while traffic concerns are addressed in Country Club and Morningside neighborhoods by (a) compromising the SAFETY of our neighborhood children and residents, and (b) circumventing previous long -term Urban planning Designs meant to keep significant vehicular traffic from entering the neighborhood and turns the area into a traffic destination. 4. PLAN FAILS TO JUSTIFY THE RATIONALE FOR ITS TENTATIVE APPROVAL. Much of the reasons for conditional approval of the Sports Complex Plan no longer justify its ongoing existence. Ifyou can not attend, please either email or call Maria Fesenmaier, or Ron Wenaas. Sign the petition and they will bring it to the meeting. Your Vote can make the differencel If you can, write a note or letter, email it to them and they will have it delivered to City Council and City Staff. Please attend the Public Hearing, your attendance will make the difference! Maria Fesenmaier ECCNA President 5713 Concord Ave. 952.239.8830 (cell) 952.922.6734 (home) mtfesenmaierna,eschelon.com Ron Wenaas ECCNA Steering Committee 5617 Sherwood Ave. 6IZ41& 7077 (cell) 952.929.0019 (home) rwenaas(a,usfamily.net NOTICE OF PUBLIC HEARING (case file #C -05 -2) Resident Petition: I, the undersigned, do state that I am a resident of the City Of Edina, and I DO NOT SUPPORT the two proposed gyms to be constructed at the Edina Community Center Facility. I urge Council to reject the permit application. 114" s, 4 9. "r If you can not attend, please either email or call Maria Fesenmaier, or Ron Wenaas. Sign the petition and they will bring it to the meeting. Your Vote can make the difference) If you can, write a note or letter, email it to them and they will have it delivered to City Council and City Staff. Please attend the Public Hearing, your attendance will make the difference! Maria Fesenmaier ECCNA President 5713 Concord Ave. 952.239.8830 (cell) 952.922.6734 (home) mtfesenmaier(aaeschelon.com Ron Wenaas ECCNA Steering Committee 5617 Sherwood Ave. 612.418 7077 (cell) 952.929.0019 (home) rwenaasna,usfamily.net NOTICE OF PUBLIC HEARING (case file #C -05 -2) Resident Petition: I, the undersigned, do state that I am a resident of the City Of Edina, and I DO NOT SUPPORT the two proposed gyms to be constructed at the Edina Community Center Facility. I urge Council to reject the permit application. ADDRESS: If you can not attend, please either email or call Maria Fesenmaier, or Ron Wenaas. Sign the petition and they will bring it to the meeting. Your Vote can make the difference! If you can, write a note or letter, email it to them and they will have it delivered to City Council and City Staff. Please attend the Public Hearing, your attendance will make the difference! Maria Fesenmaier ECCNA President 5713 Concord Ave. 952.239.8830 (cell) 952.922.6734 (home) mtfesenmaier(i ,eschelon.com Ron Wenaas ECCNA Steering Committee 5617 Sherwood Ave. 6IZ41& 7077 (cell) 952.929.0019 (home) rwenaasna,usfamily.net NOTICE OF PUBLIC HEARING (case file #C -05 -2) Resident Petition: I, the undersigned, do state that I am a resident of the City Of Edina, and I DO NOT SUPPORT the two proposed gyms to be constructed at the Edina Community Center Facility. I urge Council to reject the permit application. NAME. ADDRESS: SIG TUBE: ip Feyenotqw, 5-713 a e c v 07 ►awl / n v of ►� r� ''T e.►t `1�3i,r�..�..,.,. S L t � S �C. A�d..rs, s °�.rw u9�.�..«, ..: .,1A 24 IM � fi r? % 04. If you can not attend, please either email or call Maria Fesenmaier, or Ron Wenaas. Sign the petition and they will bring it to the meeting. Your Vote can make the difference! If you can, write a note or letter, email it to them and they will have it delivered to City Council and City Staff. Please attend the Public Hearing, your attendance will make the difference! Maria Fesenmaier Ron Wenaas ECCNA President ECCNA Steering Committee 5713 Concord Ave. 5617 Sherwood Avg 952.239.8830 (cell) 612.418.7077 (cell) 952.,922:6734 (home) 952.929.0019 (home) mtfesenmaier(a,eschelon.com rwenaasausfamily.net NOTICE OF PUBLIC HEARING (case file #C -05 -2) Resident Petition: I, the undersigned, do state that I am a resident of the City Of Edina, and I DO NOT SUPPORT the two proposed gyms to be constructed at the Edina Community Center Facility. I urge Council to reject the permit application. NAME. ADDRESS. SIGNATURE. �. J) W1 , LvcdC S92 CPW-CORD ,9yE. 6Dlr✓A MA2 R. S r- z c Council Member / Council Member Council Member Council Member Scot Housh Alice Hulbert Linda Masica Ann Swenson 763 - 302 -7174 952- 942 -5615 952- 942 -6770 952- 927 -7524 If you can not attend, please either email or call Maria Fesenmaier, or Ron Wenaas. Sign the petition and they will bring it to the meeting. Your Vote can make the d fferencel Ifyou can, write a note or letter, email it to them and they will have it delivered to City Council and City Staff. Please attend the Public Hearing, your attendance will make the difference! Maria Fesenmaier Ron Wenaas ECCNA President JECCNA Steering Committee 5713 Concord Avg 5617 Sherwood Avg 952.239.8830 (cell) 612.418: 7077 (cell) " 952.922.6734 (home) 952.929.0019 (home) mtfesenmaier(7 schelon.eom rwenaas(a,usfamily.net NOTICE OF PUBLIC HEARING (case file #C -05 -2) Resident Petition: I, the undersigned, do state that I am a resident of the City Of Edina, and I DO NOT SUPPORT the two proposed gyms to be constructed at the Edina Community Center Facility. I urge Council to reject the permit application. NAME: ADDRESS. • GNATURE: w r� If you can not attend, please either email or call Maria Fesenmaier, or Ron Wenaas Sign the petition and they will bring it to the meeting. Your Vote can make the difference! If you can, write a note or letter, email it to them and they will have it delivered to City Council and City Staff. Please attend the Public Hearing, your attendance will make the difference! Maria Fesenmaier Ron Wenaas. ECCNA President ECCNA'Steering Committee 5713 Concord Ave. 5617 Sherwood Ave 952.239.8830 (cell) 612.418.7077-(ceU), 952.922.6734 (home) 952.929 0019 (home) mtfe §enmaier(a,eschelon.c6in rwenaa�sfamily.net NOTICE OF PUBLIC HEARING (case file #C 05 -2) Resident Petition: I, the undersigned, do state that I am a resident of the City Of Edina, and I DO NOT SUPPORT the two proposed gyms to. be constructed at the Edina Community Center Facility. I urge Council to reject the permit application. 1 IM 11& /,Z- �LL -'A. 1AWAA /;„ If you can not attend, please either email or call Maria Fesenmaier, or Ron Wenaas. Sign the petition and they will bring it to the meeting. Your Vote can make the differencel If you can, write a note or letter, email it to them and they will have it delivered to City Council and City Staff. Please attend the Public Hearing, your attendance will make the difference! . Maria Fesenmaier ECCNA President 5713 Concord Ave. 952.239.8830 (cell) 952.922.6734 (home) mffesewmaier a,ewhelon.com Ron Wenaas ECCNA Steering Committee 5617 Sherwood Av& 612.41& 7077 (cell) 952.929.0019 (home) rwenaas(a,usfamily.net NOTICE OF PUBLIC HEARING (case file #C -05 -2) Resident Petition: I, the undersigned, do state that I am a resident of the City Of Edina, and I DO NOT SUPPORT the two proposed gyms to be constructed at the Edina Community Center Facility. I urge Council to reject the permit application. ---- -Original Message---- - From: chris wichman [mailtwchris wich @yahoo.com] Sent: Sunday, April 17, 2005 12:37 PM To: edinamail @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com Subject: Re: Additional Gym Construction at South View Middle School C -0502 Re: Additional Gym Construction at South View Middle School C -0502 My wife and I both live across the street from South View Middle School, right across the street at 5617 St. Andrews Avenue. We both are very disappointed, close to infuriated about the consideration of additional construction of more gyms at the school. We both went through this once before 3 years ago and are greatly annoyed that this is being done again. What is more upsetting is the fact that this was defeated once before and the money expenditure has not been voted upon by the public. It is even going to cost 1 million dollars more. There is a traffic and parking problem here at the middle school and we as residents take the brunt of the problem. Every Saturday and Sunday and in the weekday evenings, my street is stuffed with SUV's and people cruising around looking for a place to park so they can do the gym or activity at the school. Every football game, it is worse. And to add to the problem, when there is a football game, both sides of the streets are chockfull of cars making it very hard to get down the street. If you consider adding a multilevel car park, you may solve your parking problem, but I doubt if it is cost effective and you still have to deal with the traffic on residential streets. Now you still have to get all those cars and people in and out of they area, and we come to safety. The roads are not designed for the traffic flow. Construction of the gyms will bring in more traffic and keep it there longer crowding the area neighborhood. I do not include the addtional traffic issue caused by the recent renovation of the swimming pool and auditorium in the community center. This is residential and I really resent the fact that you are turning into more of a Lifetime Fitness Center without a parking lot. Do a traffic study for all the hours concerned (a proper one, not an experts guess and include the recent improvements to the school that will bring more people in ll). And don't be so hypocritical about this, since the city is considering traffic calming and redirection for other parts of town, why shift it over here. These gyms belong in the Braemar area and not here. Get it through your heads that this neighborhood does not want the gyms, the,traffic and the parking problems here. I note the proponents do not live here and will drive here to use it. I don't see them leaving the cars behind and walking. Do not build these gyms. Get public referendum approval and if you must have them, move them to Braemar. What part of NO do you not understand. Chris and Teri Wichman 5617 St. Andrews Avenue Edina, MN 952 - 927 -8224 Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! ­-Original Message-- - From: Dan Rectenwald [mailto:DRectenwald @hga.com] Sent: Tuesday, April 12, 2005 8:38 AM To: Fesenma!er, Maria T. Subject: RE: letter to editor see the attached. share as you like. April 11, 2005 As the ECCNA representative that has participated in reviewing the current proposals for the Post - Referendum Gymnasium Additions, I would like to offer opinion the status of the proposals (the article in last week's Sun noted I was "unavailable for comment "). In my opinion, the Gymnasiums would better serve the community at a different site. A superior alternative would be a site with better access, ample parking, maximized traffic safety with no threat to residential neighborhoods. The Normandale and Southview sites possess none of these attributes. As a member of the Edina Community Center Neighborhood Association, I have represented the same opinion to the Post - Referendum Gymnasium Additions planning group. Safety has always been the # 1 priority of the ECCNA, and the current proposal compromises such. That being said, I have still participated in the planning in a positive manner, supporting functional, flexible and cost effective design. The requests of the ECCNA have not added costs to the project (probably the contrar)). Although I personally do not condone the Gymnasium Additions at the Normandale and Southview School locations, I have been trying, as an Architect, to make them "good" projects (making lemonade with these lemons). This should not be confused with my personal, or the ECC NA's, endorsement. It is not; there are still serious concerns. The Post - Referendum Gymnasium Additions user group did not discuss parking demand/location, traffic or safety. Per last week's Sun article; Council member Housh has already acknowledged that traffic in the area is a problem and the gyms will only compromise the are further. Granted, the gym additions did try to allow for access from more than one parking lot, but this will have little to no impact on the traffic in the area. Bottom line, the Southview /ECC area has been identified by the City of Edina Transportation Commission as one of the city's safety "trouble zones." The referendum expansions and additional gymnasiums compound the situation (ue ab uum people to t6hze due wwaddiaw don't ve?), and the Gym Additions exacerbate ,.,the issue further. Traffic and safety are real issues. The published ETC meeting minutes of 3/24/05 note the latest traffic study as timid and limited in scope, commenting that the impact on the area feeder streets would be imperceptible. The city commissioners noted that the study had its "flaws," lacked a critical analysis of the situation, and requested "a new traffic study that will take a look at the on the entire community" (oddly, the Planning Commission "rubber stamped" the project anywa)). The process for the Post - Referendum Gymnasium Additions has been moving fast, going public right after the elections and seeking City Council approval at the holiday season, all in the name of "economies of scale" and cost savings. Reports indicate that the projects are presently 25% over budget. The gyms are freestanding entities, away from any Referendum project work In my opinion there is little to no savings from moving so fast. In conclusion, the ECCNA appreciates having the opportunity to be involved. We have contributed in a positive manner. However, I and the ECCNA still feel that the additions threaten the safety of our neighborhoods and do not support the gymnasium additions at this location. Dan Rectenwald 5611 Sherwood Ave Edina, MN 55424 pent: Monday, April 18, 2005 5:31 PM To: 'jbennerotte @ci.edina.mn.us' Subject: FW: ECCNA Member - Important Message ibennerotteCcilci.edina.mn.us Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: Sessy02 @aol.com [maiito:Sessy02 @aol.com] Sent: Sunday, April 17, 2005 9:37 PM To: mtfesenmaler @eschelon.com Subject: Re: ECCNA Member - Important Message Maria, Please forward to appropriate council. Thank you for the update on the Gymnasiums in our neighborhood. I would like to have my name added to the list of neighbors that are not in support of the additional gymnasiums. I feel that the City Council has been trying to jeopardize this neighborhood and continues to not look at all of the issues. They are not listening to the transportation committee and are taking short cuts in this area. Let's start working for the entire city and not continue to ruin the neighborhood by the schools. There is too much traffic for all of the students in this current area. We are already going to add much to the traffic in our neighborhood just by the additional space given to all of the schools in this area. Concord added space last year and now we are adding much more space to the middle school and community/french immersion school. I AM NOT IN SUPPORT OF THE DECISION TO ADD AN ADDITIONAL GYM AND WOULD LIKE REVIEW OF THE DECISION MAKING PROCESS BY OUR CITY COUNCIL AND MAYOR. Sandy Essendrup 4717 School Road Edina, MN 55424 What else can be done to be heard by our Council and Mayor ? ? ? ?? 4/18/2005 Sent: Monday, April 18, 2005 5:25 PM To: 'jbennerotte @ci.edina.mn.us' Subject: FW: Proposal for additional gymnasiums Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! Message - - - -- ' From: DCorbett @birchlabs.com [mailto:DCorbett @birchlabs.com] Sent: Monday, April 18, 2005 10:09 AM To: jhoogenakker @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com; rwenaas @usfamily.net Subject: Proposal for additional gymnasiums Dear Sirs, We are home owners at 5616 Dalrymple Road, corner house across the street from the new addition to the school that I stare at in amazement every day. I still cannot believe that was O.K.'d considering the traffic we have put up with the last soon to be twenty years. At present our house is for Sale. Our house was priced for "Quick Sale" and we were looking forward to downsizing this year. It took only the initial run thru for the realtors to point out the existing traffic and "eyesore" across the street meant even lower pricing if we expect to sell. I cannot tell you how many comments we have had saying "love the house and yard but way to much traffic for comfort." This attitude is hard to combat when people are pulling into our driveway to turn around like we are part of the school property as people are looking at the house. We have actually seen times we could not pull into our own driveway during football season. What can we expect now? I cannot stress my amazement that the City of Edina would take a residential area already overburdened with traffic from two schools and a community center and intentionally add to the confusion with the plans in progress at present. Does the city have our support? Absolutely not! Sincerely, James & Donna Corbett 5616 Dalrymple Rd. Edina, MN 55424 cdc227 @aol.com 4/18/2005 Sent: Monday, April 18, 2005 5:27 PM To: 'jbennerotte @ci.edina.mn.us' Subject: FW: ECCNA Member - Important Message Jennifer, .. Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - Original Message--- - From:: BLIacono@aol.com [mailto:BLIacono @aol.com] Sent: Sunday, April 17, 2005 11:00 PM To: mtfesenmaier @eschelon.com Subject Re,.ECCNA Member - Important Message Hi Maria, Thank you for sending out this e-mail. I have been increasingly concerned about the fiasco that is happening at City Hall with regard to the gyms. Back in November, my husband and I sent an e-mail to John Keprios, expressing our opposition to the proposed additional gyms. The only apparent result was an accounting in the Edina Sun indicating there was little or no opposition, and a move forward by the City Council with the plan. will send you a separate e-mail; I would really appreciate it if you could get it to the appropriate people ( Keprios, city council members, or whomever). I will definitely be at City Hall on Tuesday. Thanks again for all your efforts on our neighborhood's behalf. Beth Iacono.. ,.. 4813 W. 59th Street 929 -4487 4/18/2005 Sent: Monday, April 18, 2005 5:29 PM To: 'jbennerotte @ci.edina.mn.us' Subject: FW: Additional Gym Proposal (Case C -05 -2) Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council. meeting. Thanks! - - - -= Original Message -.. From: Dan Rectenwald [mailto:DRectenwald @hga.com] Sent: Monday, April A, 2005 7:09 AM To: jhoogenakker @ci.edina.mn.us Cc; Fesenmaier, Maria T. Subject: Addibonal'Gym Proposal (Case C -05 -2) would like-to give testimony at the city council meeting on April 19, 2005. 1 am.opposed to the current gymnasium addition proposal and would like to offer testimony directed towards why I feel a Braemer Park option would work, over viewing: a) Programs Needs b) Planning Options c) Impact on Parking d) Impact on Traffic e) Impact on Cost f) Comments from the EHA h) Why this option is safer and offers long term flexibility will have some 11x17 diagrams to share. Daniel J. Rectenwald, AIA, ACHA Principal Hammel, Green & Abrahamson, Inc. 701 Washington Avenue North Minneapolis, Minnesota 55401 Direct: 612/75&4564 Fax: 612/758 -9564 Cell: 612/867 -2377 4/18/2005 Sent: Monday, April 18, 2005 5:30 PM To: 'jbennerotte @ci.edina.mn.us' Subject: FW: Gymnasium Proposal Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - -- Original Message-=-- - From: BUacono@aol.com [mailto:BUacono @aol.com] Sent: Sunday, April '17, 2005 11:13 PM To: mtfe r@e senmaieschelon.com Subject: Gymnasium Proposal (Maria, would you please forward this message to appropriate persons at Edina.City Hall? Thank you.) We are homeowners within 5.00 feet of the Edina Community Center Campus, and we are writing to express our concerns about the proposal to add two additional gymnasiums at the Community Center Campus. As parents of two.middle school boys who have always been very active Edina youth athletics, we fully support providing all necessary athletic fields and facilities, as long as the safety and well -being of our neighborhoods are not out at risk in the process. Our main concerns are traffic safety and parking availability for users of the additional gyms (as well as the numerous other gyms and theaters on the campus). This past summer's traffic and parking fiasco (concentrated on the 4800 block of W. 59th Street and the streets leading to' it) due to the re- location of youth soccer to McCarthy Field is something that should not be repeated on a regular basis.. 'To this day, Lam thankful (and somewhat amazed) that there was not a serious injury or death due to the excessive speeds, the driving and parking on the wrong side of the street, the children darting out from between parked cars, the hurried parents turning around in private driveways where neighborhood children were playing, etc., etc. And to think of this happening during winter months when our already narrow streets -are even narrower because of snow drifts is unimaginable! We urge you to consider other options and locations that would not put the safety and.well -being of our residential neighborhoods at risk. Thank you. Beth and David Iacono 4813 W. 59th Street Edina' 4/18/2005 jenniter, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanksl ---- -Original Message— From: mominglory081129 @comcast. net [ mailto :mominglory081129 @comcast.net] Sent: Monday, April 18, 2005 8:25 AM To: edinamail @ci.edina.mmus Cc: mtfesenmaler @eschelon.com Subject: Community Center Complex proposal input Hello, We've lived at the intersection of 58th Street and Ashcroft Avenue for 2 years. We bought into this neighborhood because we have 2 children, and it seemed to have the ideal sense of tranquility, security, community, and convenience that we sought. Now these reasons appear to be strongly threatened by the Community Center Complex proposal that is under consideration. We've been concerned for some time about the proposed widening of our street from the current 28 feet to 32 feet, against the wishes of us or any of our neighbors. We, nor our neighbors, have any desire for a parking bay to be located directly across the street of our home. We've felt for some time that this will only serve to invite non - neighbors to park near our home, threatening our security. Now we've learned why the city wants to add more parking to our neighborhood: because of the Commercial Sports Facility proposal. We feel that were being steamrolled into something that we don't want to live with, and don't want to pay for. We are very concerned about this threat to our neighborhood. Our road widening problem is a strictly a means to increase the number of parking for non- neighbors, and we are to pay for it. It appears that the city still plans to widen our street, against the surveyed desires of all of our neighbors. The proposal, apparently in advanced stages, to build a Commercial Sports Facility at the school complex at the end of our street involves the construction of 5 indoor sports facilities which will be hosting practices, games, and tournaments up to 7 nights per week and up to 10:30 PM nightly, with hundreds of additional car driving thru our neighborhood daily. Traffic impact studies rejected our neighborhood as suitable for even 2 additional gyms, but the City Planning Commission is moving forward with the plan regardless of this rejection. Our property value, our neighborhood's safety and security, and our overall quality of lif a are all most certainly on the line. Every reason we bought into this neighborhood is threatened, despite the fact that we've put significant time, effort, and expense into remodeling our house into the place that we planned to call home for years. We ask the City Council to please reject the proposal to add any additional gym space to the project already committed to. A more suitable location or split locations can certainly be found. Please consider how you would feel if this was your quality of life at stake. We also ask the the City Council NOT approve the plan to widen 58th Street to 32 feet. We wish the street width to remain at the current 28 feet, to maintain slower driving speeds and to discourage on street parking of non - neighbors. The speed issue speaks for itself, and non - neighbor parking will compromise our security. Our yards are also at risk. Our front yard, facing 58th Street, is quite narrow enough, as anyone driving by can observe. We do not wish vehicles to be driving any closer to our home than they already are, as it we hear each and every vehicle that speeds by as it is with the current street width. Our neighbors across the street do not want to lose their beautiful mature trees, which provide us all with pleasant shade in the summertime. Please consider our quality of life in making your decision. We will be in attendance at the April 19 City Council meeting, and reaffirm our wishes at that time. PLEASE consider our concerns as if they were your own. Sincerely, Moira and Joshua Olson 5801 Ashcroft Avenue Sent: Monday, April 18, 2005 5:39 PM To: 'jbennerotte @ci.edina.mn.us' Subject: RE: ECCNA Member - Important Message Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! ---- -Original Message---- - From: Wessy0l @aol.com [mailto:Wessy0l @ aol.com] Sent: Monday, April 18, 2005 5:27 PM To: mtfesenmaler @eschelon.com Subject: Re: ECCNA Member - Important Message April 17, 2005 Edina City Council: Mayor, Jim Hovland Council Member Scot Housh Council Member Alice Hulbert Council Member Linda Masica Council Member Ann Swenson Again you continue to target the same small area of Edina for public use. We have lived in this neighborhood for over 20 years and feel that we and most other neighbors have been excellent hosts for many sports and school events year after year. Now with the addition of new facilitates to the Community Center and South View we will deal with more. When it was just Edina student and parents we were willing to continue to be good neighbors. However, the "game" has now changes with the city wanting to add facilities that will be open for general use. Please seriously consideration that you continue to cause great strain on the traffic and general congestion In this neighborhood. We have been pushed as far as we can and are now ready to "fight back ". I am asking you to do your job and consider the information below and take another look Into the issues at hand. We do not want to build a problem that can not be reversed. Neighborhood safety In Edina should be your number one consideration not finding ways to make room for commercial sports facilities next to our schools and homes. We feel strongly enough about this to personally "beat the pavement" before the next elections If it appears we have elected officials who are not Interested in our families and neighborhoods welfare. Please seriously consider these facts, do appropriate studies and consider the children who go to school and families who live in this neighborhood. Given the limited road space and options available once a decision has been made to add these facilities it will be very difficult to "fix" after the fact. Thank You for your consideration, Bill Essendrup 4717 School Road r_I!_ - ■ ■•I I.I. IA• Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanksl — Original Message---- - From: Joanredhed @aol.com [mailto:Joanredhed @aol.com] Sent: Monday, April 18, 2005 11:21 AM To: jhoogenakker @ci.edina.mn.us Cc: mtfesenmaler @eschelon.com Subject: Gymnasium hearing To Whom It May Concern, I am writing to express my views on the addition of two more gymnasiums in my neighborhood. I am very much against adding more traffic and more parking issues to a neighborhood already dealing with a more than fair share. We've known for years that traffic was a frustrating issue along our street, and that was confirmed when our neighborhood was identified as having a significant traffic problem in 1999. Nothing has been done to ease the problem in 6 years. I also understand that there's a belief that we need two more gyms, but I also hear that school population is declining. Ask yourself what we always ask ourselves as homeowners with budgets. Is this a need or a want, and what is the priority it is setting? Sports are important, but we keep sending the message that sports are more important than almost anything else in this community. How does the importance of sports compare with neighborhood safety, or the sense of quiet community we hope to keep, or keeping taxes down? Again, as someone who grew up without a lot of money, I also think it's important to separate want from need. There are some things in this life that it's okay to get along without ... and to work around. This might be one of them. Or maybe there's a another neighborhood that would like to share some of their green space or quiet streets with the rest of the city. While we're grateful for easy access to the schools and community center, and we knew it was there when we moved in, we are now taking on more traffic from new construction already going on, and the exponential growth that would come with constant and concurrent games and practices at two new gymnasiums is an undue burden. My husband and I are in the process of deciding whether to make significant improvements to our home, but now feel a need to reconsider. Why would we want a front porch to sit and look at increased traffic and parked cars on our street, when the reason we wanted it was for an increased sense of connection to our neighborhood? As for the study that was commissioned, I think it's your obligation to us as the people who put faith in you, to use integrous information when putting a study together. After many years in news, I know that any study can support just about anything by adding or deleting information. You can play that game and win, but at what cost? Certainly, reputation and integrity are at stake if you knowingly make an easy decision supported by flawed information. Edina has a wonderful reputation, and I would certainly expect more from you as its representatives. Please use all the pertinent information when doing your study and then consider it all when making your decision. Thank yogi for your attention, Joan Steffend Brandmeier 5605 Dalrymple Road Edina, MN 55424 Sent: Monday, April 18, 2005 5:28 PM To: 'jbennerotte @ci.edina.mmus' Subject: FW: Safety in my neighborhood Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - -_ -- Original Message--- - From: Lisa Moeller ( mailto :lisamoeller @olgschool.net] Sent: Monday, April 18, 2005 9:40 AM To: edinamail @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com Subject:'Safety in my neighborhood Dear.Mr. Hovland and Council Members, I am extremely concerned about the .safety of my neighborhood. We moved to the ECC (not-country club) neighborhood 10 years ago when our first baby was 11 months old. We loved being within WALKING distance of EFCE, the Library and Church We have learned to enjoy football season by first walking our babies up to the game to peek in the fence and now I accompany my 9 and 11 year olds inside to watch the games. It is noisy, but fun. We have learned to adapt to football season and understood football season before we bought our house. We are not prepared to live in the noise, unsafe situations that football season brings on a year round basis. After Football games, we have collected alcohol bottles and cans from our yard and the frontage road. I have had my front step (door bell included) urinated on by partying teenage boys .... try explaining that disgusting situation to you children. We have also witnessed a pedestrain flying through the air after being hit by a driver during football season. We do not need any more traffic in our neighborhood, our streets are small and you are risking the lives of the many small children on our block who like to bike, scooter, explore and walk their dogs. Currently, people drive very FAST down our street speeding to pick up their precious children, with little regard for our precious children. There is so much traffic in the morning, that I can't even let our 11 year old daughter walk across Southview Lane to Southview School. I simply cannot believe the unsafe traffic conditions that are being proposed for our neighborhood. If there are more gyms, the community center / Southview will turn into a sports complex crammed /rammed into a neighborhood with small, narrow residential streets, no main, large roads and inadequate parking. With hundreds of people traveling into our small neighborhood from surrounding cities and suburbs our streets and neighborhood will be put at risk .for, accidents, extreme traffic and crowding and: exposing our children needlessly to danger. Really are sports and gyms the most important and they i.ability to be a pedestrian? U happened to safety, peace priority in. our community fo. our chil dren. What Use your brains, there must be a safer option for the addition of Sports Space..How about the Braemar area? I can travel by car to Braemar without even going through a residential neighborhood. Sports Centers in other communities are not crammed into existing small neighborhoods. As a mother and a teacher, I am concerned about the safety of all children everywhere. I beg you to reconsider the site and really reevaluate the situation. If you have children, please consider my children and the children of the Community Center neighborhood. of you. Do the right thing. Sincerely, Lisa Moeller I would do the same for any Jennifer, Please forward this to Council, Mr. Keprios, Mr.' Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - -- Original Message---- - From: Wessy0l @aol.com [mailto:Wessy0l @aol.com] Sent: Monday, April 18, 2005 5:27 PM To: mtfesenmaier @eschelon.com Subject: Re: ECCNA Member - Important Message Edina City Council: Mayor, Jim Hovland Council Member Scot Housh Council Member Alice Hulbert Council Member Linda Masica Council. Member Ann Swenson Please take Into consideration the neighborhood that you continue to cause great strain on the traffic. ask you to consider the Information below and take another look Into the transportation Issues at hand. We do not want to,. build a problem that can not be reversed. Safety in Edina should be our number one consideration. Why the Edina Community Center Neighborhood Association opposes this plan: • The ECC neighborhood was identified as a significant traffic problem area in 1999 ...nothing has changed since then, except the addition of more traffic! • The two additional gyms were added to construction plans after last year's referendum was passed with a no vote by area Edina residents. • The city commissioned a traffic study, but the Edina Transportation Commission (ETC) unanimously rejected the study as flawed. Yet, the City Planning Commission and City Council are going ahead, ignoring the Transportation Commission's rejection. • The flawed study looked at the effect of the two new gyms only ... not the impact of what would become 5 indoor sport areas that could host as many as 7 concurrent school or city- sponsored practices, games, or tournaments drawing even more traffic through one concentrated area ... our neighborhood. • In the study, only 2 practices or games per gym, per night, were assumed. The original rental plan presented to Council, projected 6 practices or games in one gym, 4 in the other, each nightl Again, this Will add significantly more traffic than the study projects. • Original plans did not include weekend tournaments ... that's changed, along with a concession stand in the revised plan. Events will start as early as 4pm and end as late as 10:30 pm, 7 days a week. • For weekend tournaments, the study's projections are considerably lower than they should be ... again, because it'considers only the 2 additional gyms. • The study ignored the impact of other activities on traffic flow that will increase with the renovations at Southview and the Community Center (theatre, music, other rec programs) that will of course grow as time goes on. • The study considered the effect of traffic on a very limited area. Increased traffic on Valley View Rd. was not even considered relevant. Please make your decision based on the traffic and not on personal desires. Thank you, Sandy Essendrup 4717 School Road Edina, MN 55424 . y, Jennifer, Please forward this to Council, Mr. Keprios, Mr. Hughes, Mr. Larson, Mr. Houle and Mr. Lillehaug, for the 4/19/2005 council meeting. Thanks! - - - -- Original Message---- - From: chris wichman [mailto:chris wich @yahoo.com] Sent: Sunday, April 17, 2005 12:37 PM To: edinamail @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com Subject: Re: Additional Gym Construction at South View Middle School C-0502 Re: Additional Gym Construction at South View Middle School C -0502 My wife and I both live across the street from South View Middle School, right across the street at 5617 St. Andrews Avenue. We both are very disappointed, close to infuriated about the consideration of additional construction of more gyms at the school. We both went through this once before 3 years ago and are greatly annoyed that this is being done again. What is more upsetting is the fact that this was defeated once before and the money expenditure has not been voted upon by the public. It is even going to cost 1 million dollars more. There is a traffic and parking problem here at the middle school and we as residents take the brunt of the problem. Every Saturday and Sunday and in the weekday evenings, my street is stuffed with SUV's and people cruising around looking for a place to park so they can do the gym or activity at the school. Every football game, it is worse. And to add to the problem, when there is a football game, both sides of the streets are chock full of cars making it very hard to get down the street. If you consider adding a multilevel car park, you may solve your parking problem, but I doubt if it is cost effective and you still have to deal with the traffic on residential streets. Now you still have to get all those cars and people in and out of they area, and we come to safety. The roads are not designed for the traffic flow. Construction of the gyms will bring in more traffic and keep it there longer crowding the area neighborhood. I do not include the addtional traffic issue caused by the recent renovation of the swimming pool and auditorium in the community center. This is residential and I really resent the fact that you are turning into more of a Lifetime Fitness Center without a parking lot. Do a traffic study for all the hours concerned (a proper one, not an experts guess and include the recent improvements to the school that will bring more people in ll). And don't be so hypocritical about this, since the city is considering traffic calming and redirection for other parts of town, why shift it over here. These gyms belong in the Braemar area and not here. Get it through your heads that this neighborhood does not want the gyms, the traffic and the parking problems here. I note the proponents do not live here and will drive here to use it. I don't see them leaving the cars behind and walking. Do not build these gyms. Get public referendum approval and if you must have them, move them to Braemar. What part of NO do you not understand. Chris and Teri Wichman 5617 St. Andrews Avenue Edina, MN 952 - 927 -8224 Page 1 of 1 From: Roebuck, Lisa [WRoebuck @CBBURNET.COM] Sent: Monday, April 18, 2005 9:40 PM To: edinamail @ci.edina.mn.us Cc: mtfesenmaier @eschelon.com Subject: Proposal to Add Additional Gyms Dear Mayor Hovland and Council Members, Allow me to tell you what bothers me about this proposal. This neighborhood told you, several years ago, in no uncertain terms, that it DID NOT WANT a dome over its football field or a mega - structure of gyms to rent out to the community. You heard us, the plans were scrapped, and more recently we agreed with the need for certain changes to our schools and community center. Now I find out that what you couldn't bring in the front door, you're trying to sneak in the back. I do not want these extra gyms shoved down my throat. They don't belong here. They belong at Braemar, where there is space to put them and little risk to the surrounding residents. Don't assume that I reject this proposal because my children aren't athletes. My daughter was a captain of the tennis team and won two state championships. My son was a varsity tennis player and his team won state twice. My youngest daughter plays lacrosse and tennis. We know the importance of athletic involvement better than anybody, but these gyms will not improve our children's lives. On the contrary, you will turn this neighborhood into a three -ring circus and I truly believe this is a recipe for disaster. This neighborhood, with its curvy streets, limited stop signs and lack of sidewalks, is tricky even for its own residents. As each of my children has learned to drive, I have felt the need to stress, over and over, the danger of driving carelessly in this neighborhood, where children on bikes and people with dogs circle Lake Harvey, in the street, even in the dark. You bring in a large number of outsiders who don't know the neighborhood, the streets, the patterns of its residents, at a time when a sporting event has ended, it's dark out, people are tired, annoyed, happy, celebrating, whatever.... it's a crisis waiting to happen. Am I speaking from experience? I was hit broadside at an unmarked intersection in this neighborhood six years ago by a young man. He was on his cell phone calling for directions because he was lost, he approached the intersection and saw me but, as he told the policeman, he assumed I had a stop sign because he didn't, so he plowed into me. I spent months in physical therapy. A child on a bicycle will not be so lucky. Please consider what the residents of this neighborhood are saying to you. We are not whiners. We love our homes, our town, our schools. We have always stepped up when you asked us to help support a change for the better. Please, do the right thing. These additional gyms are too much for this area. Sincerely, Lisa Roebuck - Krasno 5607 Dalrymple Road 952 - 922 -9164 MJ 4 0 REPORT /RECOMMENDATION To: Mayor & City Council Agenda Item # IV. A From: Craig Larsen Consent ❑ Information Only ❑ Date: April 19, 2005 Mgr. Recommends F-1 To HRA ❑To Council Subject: Conditional Use Permit for Action o ®Motion Good Samaritan Church, [:]Resolution Grove Street ❑ Ordinance ❑ Discussion Recommendation: The Planning Commission recommends approval of the Conditional Use Permit. Info /Background: See attached Planning Commission minutes, staff report, plans and correspondence. At the direction of the Planning Commission, staff and representatives of the church visited the site to determine if additional landscaping could reasonably be added to the site. The results are summarized in the attached memo from Jan Anderson, landscape architect for the church project. O LOCATION MAP DUNDEE RD 0 N W Y 3 r HAWKES TER O O� OHO WAD Subject Site 0 W U. E ST U 0 z O co z x O > LYLE CIR > a O H ca ca co ¢ BENTON AVE Edina Overview C -05-3 Conditional Use Permit Good Samaritan UMC 5730 Grove Street DRAFT MINUTES PC MEETING MARCH 30, 2005 C-05 -3 Conditional Use Permit Good Samaritan Church 5730 Grove Street Church building expansion Mr. Larsen informed the Commission the applicant is proposing a new addition extending north from the westerly end of the existing church building and a new entry, lobby area adjacent to the east parking lot. No changes to existing parking areas are proposed. Mr. Larsen concluded staff recommends approval of the Conditional Use Permit subject to watershed district permits. Mr. David Knutson, Mr. Hamilton and Mr. Timmer were present representing the church. Commissioner Schroeder noted it appears on the landscaping plan that a significant number of large oak trees will be removed with minimal replacement. Mr. Knutson addressed the Commission and explained a letter was mailed to neighbors surrounding the church site inviting them to attend a meeting on November 30, 2004 to view and discuss the proposal. Continuing, Mr. Knutson acknowledged that unfortunately a large number of trees will be removed as a result of expansion, but pointed out the site is large with many trees that will not be disturbed as a result of this proposal. A discussion ensued with Commissioners in agreement the proposed additions to the church are tastefully, but voiced concern with regard to landscaping Commissioner Schroeder moved to recommend Conditional Use Permit Approval subject to the building plans presented, subject to watershed district permits and subject to replacement of 26 large oak trees with 26 additional trees. Commissioner Lonsbury seconded the motion and requested that approval also be conditioned on matching exterior materials. Commissioner Schroeder said that was his intent and agreed exterior materials should match. Commissioner Brown added he agrees with Commissioner Schroeder's suggestion of requiring additional landscaping. Commissioner Grabiel stated he is hesitant to support the motion as presented. He asked church representatives if they believe there is enough room on site to support the planting of 26 additional trees. Mr. Hamilton responded a landscaping plan was submitted with the intent of adding additional plantings but not to the extent as suggested by Commissioner Schroeder. Continuing, Mr. Hamilton said with regard to exterior building materials that they would match the existing church buildings. Commissioner Grabiel said he agrees with Commissioner Schroeder with regard to tree replacement but is uncomfortable with the recommendation of replacing tree for tree, especially since the church has met landscaping code requirements. Commissioner Schroeder stated he understands Commissioner Grabiel's comments adding he does not know the correct number of trees that should be replanted but the Commission should note Edina is an older community with aging trees and vegetation and when we can the Commission should try to maintain our urban forest. Commissioner Grabiel responded he doesn't disagree with that comment. Chair Workinger asked Mr. Grabiel what approach would make the most sense to him. Commissioner Grabiel suggested that the Commission direct staff to review the existing vegetation keeping in mind what will be removed. He added this subject (landscaping) may need more visibility but having this discussion now may not be fair to this applicant especially in light of their compliance with code. Mr. Steve Timmer, church member addressed the Commission and explained to them the building task force agonized over tree removal but nothing could be done about it because of the proposed placement of the new addition. He stated at this time it would be a hardship for the church to replace tree for tree and asked the Commission to not request tree /tree replacement as a condition of approval. Commissioner Lonsbury stated as he views this the Commission can either act on the motion on the table, deny the request or table this issue until an additional landscaping plan is presented. Mr. Hamilton asked the Commission to note the church has met all requirements set forth by City Code. Commissioner Losnbury stated he agrees but in his opinion the landscaping plan is not adequate. Commissioner Schroeder explained his intent with his motion was to ensure that additional landscaping is added above what was depicted on the landscaping plan. He added he does not want to tell the church how to achieve this recommendation and suggested that a possibility in adding more landscaping would be as a youth group activity that would plant seedlings. He stated he would love to see the large trees replaced with other large trees acknowledging that is probably not a possibility. Mr. Larsen interjected adding he believes an option worth considering is to have planning staff walk the site with the City forester and church officials identifying the trees that will be lost as a result of this proposal and requesting if warranted that the church revise their landscaping plan to add additional plantings of undertimed size. Commissioner Schroeder withdrew his previous motion and moved to recommend Conditional Use Permit approval subject to staff conditions, subject to matching exterior building materials and subject to planning staff, the city forester and church officials walking the church site to determine what trees will be removed and agreeing on the amount of replacements trees and vegetation. Commissioner Lonsbury seconded the motion. All voted aye; motion carried. Commissioner Grabiel questioned being new to the Commission Watershed approval. Mr. Larsen responded watershed approval is triggered by the amount of grading and disruption that will occur on a site as a result of development or redevelopment. The watershed district reviews plans to ensure that water quality standards are met and to measure the rate of water run -off. Regular Meeting of the Edina Planning Commission Wednesday, March 30, 2005, 7:00 PM Edina City Hall Council Chambers 4801 West 50th Street Number: C -05 -3 Location: North of Grove Street and east of Wycliffe Road Applicant: Good Samaritan Church 5730 Grove Street Request: Conditional Use Permit to allow addition to existing church building. Proposed Addition: The application illustrates a new addition extending north from the westerly end of the existing building. The single story addition would house a multi - purpose room, changing rooms and two resource rooms. The plans also show a new entry, lobby area adjacent to the east parking lot. No changes to existing parking areas are proposed. Zoning Compliance: Both additions comply with the required 50 -foot setback. Proposed exterior materials comply with ordinance standards. Parking: The base parking demand is determined by the sanctuary that will not be changed. The activities planned for the addition would not coincide with Sunday services. Attached is a schedule of activities provided by the church. It includes planned activities for the addition called the family life center. Recommendation: Staff recommends approval of the Conditional Use Permit subject to: e Watershed District permits Page 1 of 2 Craig Larsen From: Jan Anderson [JAnderson @htpo.com] Sent: Thursday, April 07, 2005 5:30 PM To: Craig Larsen Subject: Memo - Meeting 4- 7- 05.doc MEMORANDUM To: Craig Larsen From: Jan Anderson Re: Good Samaritan Church - Edina Summary of Meeting Date: April 7, 2005 at 10:00 am In Attendance: City of Edina Forester Tom Hormath City of Edina Planning Dept. Craig Larsen Good Samaritan Roger Acton HTPO Inc. Jan Anderson • Twenty -four trees are being removed for the new addition and the Planning Commission would like to see some additional trees planted on the site. The Commission suggested that young small trees be planted. Since the site is wooded, space for new trees is limited, and it was agreed that the church would plant around twenty or so young trees (any size) in the existing wooded area. • The forester provided a list of shade tolerant trees: American Linden, Hackberry, Ironwood, Kentucky Coffeetree, Sugar Maple, River Birch, Serviceberry, Pin Cherry, Chokecherry, and Pagoda Dogwood. Roger informed us that the church is currently taking action to remove buckthorn from the wooded areas. • In addition to the young trees, it was decided to plant 2 larger (2.5" B &B) Swamp White Oak trees on each side of the walkway to the new church addition off Wycliffe Road. Trees are to be planted on church property and not in the street right -of -way. There are 2 existing Russian Olives and 1 stump along Wycliffe Road that will need to be removed. The Russian Olives are being removed because they are at the end of their lifespan, and removing them will give the new trees more space to grow. Removal of stumps, repairing of the ground, and reseeding where disturbed, will be done. • Craig Larsen also confirmed that church landscape plans can be used with HTPO's 4/8/2005 plans as long as the foundation plantings are installed around the new addition. 4/8/2005 Page 2 of 2 Page 1 of 1 Roger Acton From: 'Roger Acton" <lewisandlee @hotmail.com> To: <clarsen @ci.edina.mn.us> Sent: Thursday, April 14, 2005 2:54 PM Subject: Good Samaritan UMC Building Project Dear Mr. Larsen, You have requested an outline of the steps taken by the Church to notify our neighbors of our plans to expand our facilities @ 5730 Grove St, Edina. I offer the following: Early in the process we determined that keeping our neighbors informed was very important to our cause. We then obtained from the city a mailing list of all addresses within 500ft of the Church in preparation for future contacts. On Jan. 14,2004 we sent the attached letter to all those on the mailing list to alert them to our intentions. Upon completion of the detailed design in the fall of 2004 we once again wrote to all of those on our mailing list inviting them to an openhouse at the Church to view our plans, a model of the project & a power point presentation explaining the details. Refreshments were served. A copy of our invitation letter is attached. No attendance record was kept at the open house, however we believe that 10 to 12 households accepted our invitation. Building Committee members gave each attendee individual attention, explaining the project & answering questions. There were no negative comments from any of our guests. I believe this covers the activities we discussed. If you have questions or wish additional information please call me at 952/ 831 -7878. ger L. Acton, Chair Building Committee Good Samaritan UMC PS I will deliver copies of the 2 attachments to your office Friday morning, 4/15/05. 4/14/2005 January 14, 2004 Dear Friends and Neighbors, Early in 2003 the Long Range Planning Committee of Good Samaritan United Methodist Church determined that the church's facilities are in need of repair and updating. Handicap accessibility, rehabilitation and updating are the major areas of concern. A Building Committee was formed in April 2003 and an architect was consulted to determine if and how the building could be updated to meet today's codes. After much discussion the building committee determined that the West and East entrances required small additions to make the church more accessible to people with disabilities. The east entrance addition will also permit us to have a nursery near the Sanctuary. Also there will be roof repairs, electrical and plumbing updates, kitchen relocation and additions. A family life center will be added on the north side of the existing structure. On January 13d' our congregation authorized us to proceed with a detailed design, secure construction bids and conduct a fund raising drive. Upon completion of these steps we will present our recommendations to the congregation for a final vote authorizing'us to proceed. No actual construction will begin prior to this final authorization. While the day the first shovel of dirt is taken is a long way off we want you to know what we are thinking and planning. Our relationship with you is very important to us. If you have any concerns or questions, please contact us through the church office. We will continue tokeep you informed as we make progress on our revitalization projop(. Building Committee Good Samaritan United Methodist Church November 16, 2004 Dear Neighbors of Good Samaritan UMC, Some months ago we sent you a letter informing you of our church's plan to upgrade and expand our church . After devising tentative plans and a successful monetary campaign, the congregation voted to move forward with the project. Currently final plans are being drawn and financing is being secured. The final congregational vote of approval will occur in the Spring of 2005. With final approval, construction would begin in May, 2005. As promised we want to keep you informed of our plans. Therefore, on November 300' at 7:00 PM you are invited to preview our improvement plans. There will an open house style viewing of plans and members of our Building Committee to answer you questions. Come for as long as you want, see a paper version of our plans and have your questions answered. There will be FREE child care from 7:00 to 8:00 PM If you have questions please call Ben at 952- 929 -0049. Sincerely, Good Samaritan UMC Building Committee M1 5621 Wycliffe Road Edina, MN 55436 April 11, 2005 Mr. James Hovland, Mayor 4801 West 50th Street Edina, MN 55424 Dear Mr. Hovland: I am writing with regard to the proposed addition to Good Samaritan Church. I am writing with three main concerns and related requests. First, from my perspective, communication about the proposal has been confusing and information difficult to obtain on a project that appears to be moving at high speed. We live five houses down from the church and on the same side of the street. When the signs were posted, we asked neighbors we saw in the neighborhood what they knew of the project. No one seemed to know. We asked two neighbors that we knew attended the church and they were sketchy about the details and unsure of what to say. Within approximately a week my wife called the city planning office to learn more. She received unclear and minimizing information about the project. She was eventually told that the project was 50' by 80', would run along the backside of the building and that the playground area wouldn't be impacted. She was told that the church had the proposed plans posted in their lobby for viewing. She was not told about an impending planning commission meeting for further information or any process for public discussion. On Sunday, April 3`d I walked into the church to locate the plans and after 15 minutes of searching in earnest found none. I visited the city planning office on Friday, April 8. I persisted in obtaining a copy of the plan. When I asked whether there was an opportunity for public discussion, the answer was not clear but it became apparent that things were moving quickly. Trying to understand the process took effort. I learned the church had held a "courtesy" neighborhood meeting on Dec. 2, 2004, although we weren't invited and I'm not clear who was. I learned that there was a planning commission meeting held recently although I'm not sure when. I know it occurred somewhere over the busy Easter /Spring break period for many people and for us also a funeral. However, I was clearly told that it occurred after the minimum 10 -day waiting period from the date the signs were said to have been posted. It seemed that any discussion period, if there was one, had for all practical purposes closed since the planning commission meeting had occurred and the forester had even walked the property. I was told that the only event left to participate in was the city council meeting and that this was really to make a final decision. The suggestion was that the decision was likely a foregone conclusion since there were no variances required by the proposal. While we have subsequently received notice of the city council meeting, this now makes me wonder why we didn't receive notice of the planning commission meeting. Obviously, I am concerned about the process of disseminating facts and information to an interested public. If there is a process requiring public input, and it seems that the spirit of the legal process provides for this, I'd like to request more time for that to occur because I have concerns and questions about the impact to our neighborhood. I'd also like to suggest that improvements be made on the process of informing the public when building proposals such as this are made. The process appears to require the permit applicant to put up signs notifying the public. I'd like to request that these signs identify that it's a conditional use building permit and that they provide information about the public review process steps and time periods so that the public knows how and how quickly they need to get involved. Second, I am concerned about the impact the proposed addition will have on the traffic and parking in the neighborhood. We have four small children. We routinely walk around the neighborhood as a family with our strollers and dog, our kids walk to and from school events and often are riding bikes and playing in the streets and yards of Wycliffe Road. We are not alone in this. It is a common practice for the many families, especially those with small children. The addition of a gymnasium (and possible future additions) is only undertaken to increase usage of the church and of course would be a means to attempt to grow attendance at the church. The church may also attempt to use the proposed addition to as an extra source of income (or funding) from non - church groups such as boy scout troops or sports organizations etc. seeking practice or playing venue, again increasing usage of the church. Parking at the church on Sundays and other events is already an issue. Adequate parking space is not available and the on- street parking and traffic already create hazards. Increased attendance and usage of the church would create additional on- street parking, traffic and hazards and on potentially more days of the week. Given the design of the proposed addition, the natural place for users of the gym to attempt to park is along Wycliffe, even if not allowed. Finally, it's not at all unlikely that there will be nights when both the church and Countryside School have events, creating even more parking issues and hazardous traffic. Third, the proposed design not only protrudes perpendicular to the existing building, but it expands toward the street an additional 36 feet. It will also be higher than the existing facade facing Wycliffe. The aesthetic impact will be dramatic. There will be an imposing 30+ foot tall brick wall, 36 feet closer to Wycliffe and running 140 feet nearly parallel to it and protruding into a beautiful forested area. The footprint expansion from the current building is an expansion in every dimension -- seemingly one of the most impactful proposals possible. I am concerned about the sprawl of this proposal on the neighborhood and of the possibility of future sprawl along Hawkes Lake. I request that other less impactful designs be considered which can also be rationalized with the parking situation. I would like to invite you to walk the grounds and road as I have and imagine the impact to the neighborhood of the current proposal. I believe you will reach the conclusion as I have that there must be a better alternative to consider 'to meet church needs while minimizing the impact to the neighborhood. In summary, I request further time to study alternatives that would minimize the impact to the neighborhood and understand whether the intended uses are consistent with the neighborhood. I request moving any addition away from Wycliffe and also not protruding into the wooded area. I request that parking and traffic solutions be required as well as recognition that this is a school zone and that this compounds the traffic and parking issues. I request that for any trees removed replacement plantings of large size be used to enhance aesthetics. Finally, I request modifications to the process of notifying an interested public in situations such as this. I look forward to your assistance and leadership in this matter. Thanks for your attention. Yo 'Y' X4 ary .Lee Copy: I Hoogenakker, City of Edina Planning Dept. caM , C . L.,, vs,,, To: Craig Larson, City of Edina From: Good Samaritan UMC Re: Building proposal Good Samaritan fed Methodist Church 5730 Grove Street Edina, Minnesota 55436 Good Samaritan United Methodist Church is hoping to undertake the construction of our building project over the next two years. Starting two years ago with our long range planning committee we started to see a need for an expanded building. When we combined that with the need for updating some of our facilities and catching up on our deferred maintenance we decided on forming a building committee. Over the last 2 years we have researched what we would like, what we can afford, and what is the best compromise. The goals of the building program are to create a new kitchen, nursery, and family life center, and improve our offices, restrooms, narthex, and large meeting spaces. We feel that the current design will allow us to do all those things as well as upgrade our mechanical systems and stay within our budget. The new family life center will allow us to expand our youth programs to include sports and large gatherings. We also hope that the community would use the space for basketball /volleyball leagues. We have already had some interest in using the family life center for practicing golf during the winter. Attached is a calendar for what we see as uses for the new family life center. Along with these uses we expect to see expanded use of our large gathering space in our current building with the new kitchen. This kitchen will allow a caterer to come in and prepare everything on site for up to 300 people. We have also had a caterer that is interested in renting our kitchen to prepare meals that would then be taken off site. Our large and small group spaces are used by outside groups as meeting space about 10 -15 hours a week; we expect that with our new space that wuuid more then double. We iook forward to being abie to offer this space to our community for its use. The Edina Family Center has been leasing classroom and nursery space for the past few years from the church. The expanded building would allow them or a similar group more space, access to a large muscle area, an expanded nursery toddler area, and improved restrooms. We do not have an agreement with the Family Center due to their funding and our construction schedule but we expect that within a year of finishing construction we would have a group in the new building. We all believe that Good Samaritan is a special place, filled with God's sustaining love that supports us and permits us — impels us — to look outside our walls and love our neighbors as ourselves, and minister to them like our namesake, the Good Samaritan. If you have any questions please feel free to contact us at 952- 929 -0049. 952.929.0049 www.good.org 1. WORSHIP (1 Hour) SUNDAY SERVICES GOOD SAMARITAN UNITED METHODIST CHURCH CURRENT (2004) SPACE USAGE Avg. High Room I Space Attend. Attend SPECIAUSEASONAL SERVICES Ash Wednesday 9:00 am Sanctu@a 225 379 Sept to June 10:30 am Sanctuary 224 410 Easter Morning 5:30 DM Fellowship Rm 15 37 10:00 am Sanctuary 340 378 11:00 am Sanctuary 350 405 Thanks ivin Eve 9:30 am Sanctuary 222 280 June to Sept 5:30 pm I Fellowship Rm 14 27 SPECIAUSEASONAL SERVICES Ash Wednesday 7:00 pm Sanctuary 130 144 Maundy Thursday 7:00 pm Sanctuary 125 168 Easter Morning 9:00 am Sanctuary 365 396 10:00 am Sanctuary 340 378 11:00 am Sanctuary 350 405 Thanks ivin Eve 7:00 pm Sanctuary 100 125 Hanging of the Greens (15t Sunday in Advent ) 5:00 pm Sanctuary, Fellowship Room & narthexes 180 250 Christmas Eve (Family Services) 4:00 pm Sanctuary 275 332 5:00 pm Sanctuary 165 212 June to Sept Christmas Eve (Candlelight Services) 9:00 m Sanctua 339 375 11:00 pm Sanctuary 230 283 11. SUNDAY CHRISTIAN EDUCATION (1 Hour) Adult Class — weekly 7:45 am Conference Rm 10 16 Adult Class — week 10:30 am Fellowship Rm 20 32 Adult Class — month) 9:00 am Fellowship Rm 60 125 Children & Youth (2yrs old thru 8th grade) 9:00 am Classrooms through- out lower level 45 66 Sept to June Children & Youth same age range) 10 :30 am (same space as above) 30 45 Infant S toddler nursery 9:00 am 2 nursery rooms in lower level 7 12 Infant & toddler nurse 10:30 am same space as above 6 1 12 June to Sept Children (3 yrs. old thru 3'" grade) 9:30 am Room 103 (classroom beneath sanctuary) 22 37 Infant & toddler nursery 9:30 am 2 nursery rooms in lower level 7 12 191. WEEKLY CHURCH ACTIVITIES Mondays 9:30 -11:30 am Adult Class Fellowship Rm 11 12 Tuesda 9:30 -11:30 am Bible Study Fellowship Rm 18 35 Wednesdays 5:15 -7:00 pm Meal Kitchen/old narthex / Samaritan Hall 45 70 6:00 -7:30 pm Bell Choir 230 10 15 6:00 -6:45 pm Alleluia Choir 103 20 25 Choristers Choir 105 12 15 Youth Choir 101 15 20 6:00 -7:00 pm Adult Class 131 18 30 7:00 -8:00 pm Confirmation Fellowship Rm 15 24 BUZZ Jr. Hi. Youth Rm 18 25 7:30 -9:00 pm Adult Choir 101 .40 70 6:00 -9:15 pm Child care 129 8 15 Thursda 5:45 -7:00 pm Adult Class Fellowship Rm 29 35 Fridays 8:45 -11:30 am Women's Choir Samaritan Hall 25 -30 40 IV. MONTHLY CHURCH ACTIVITIES & MEETINGS A. Church Council meets once a month (2nd Tuesday, Sept. thru June) in the Fellowship Room, 7 -9 pm. Avg. Attend. —12 High. Attend - 25 B. Several groups & committees meet on a monthly basis. These meetings generally begin at 7 pm and last 2 hours, on average. At most, 3 of these meetings might fall on the same night. Spaces reserved for these individual committees are Fellowship Room, Conference Room, 131, 105 and Youth Room. For the groups listed below, average attendance would be 8, with a. high attendance of 15. Staff / Parish Relations Committee Trustees Long Range Planning Membership Reconciling. Comm ittee Finance / Stewardship Worship Missions Youth Council Children's Council Capital Campaign Committee (meets bi- weekly) Building Committee (meets twice a month) C. Fellowship groups that meet on a monthly basis at church generally begin at 7 pm and last for 2 -3 hours. These groups would meet in the Fellowship Room, Samaritan Hall or Youth Room. Friday Night at the Movies (12 / 20) 4d' Tuesday Readers (10/15) Adult Bridge Group (16 / 24) (F or Sat night / not the same week as Friday Night at the Movies) V. OUTSIDE GROUPS In addition to the groups in the following table, Good Samaritan leases space to the Edina Family Center from September thru May for their Early Childhood program. Their programs run Monday thru Friday, 9:30 am — 3:00 pm (a morning session and an afternoon session) and follow the Edina school calendar. Total enrollment for their program is 67 children, age 2 -5. The program also includes a parent education class and nursery care. The average occupancy of this building by the.EFC is 27 persons; the highest occupancy would be 45 persons. The following space is included in their lease: Rooms 103, 114, 116, 127, 128, and 131. Scouts Boy Scouts Cub Scouts Pack 68 mtg. ° leaders ° Den 3 Pack 168 mtg. " leaders ° Den 1 Girl Scout Leaders Monday (weekly) 7:00 -9:00 pm Scout Room 20 35 3 Tuesday 7:00 -8:00 prn Samaritan Hall 45 65 1 Tuesda 7:00 -8:00 pm Scout Room 6 12 r Tuesday 7:00 -8:00 pm Scout Room 7 10 3 Thursday 7:00 -8:00 pm Samaritan Hall 40 65 -2m Thursday 7:00 -8:00 pm Scout Room 6 10 1 Thursda 7:00 -8:00 pm Scout Room 6 10 C Monday 6:30 -9:30 pm Fellowship Room 35 50 SAMSNet Wednesday wkly) 1:15 -3:00 pm Fellowship Room 22 40 Golden K Tuesday (wkly) 8:30 -10:30 am Samaritan Hall 60 1 90 AA Men Wednesday (wkly) 8:00 -9:30 pm Scout Room 2 20 VI. OCCASIONAL & INTERMITTENT EVENTS U.M.W. (United Methodist Women) Dinner & Program Once a year / Saturday night Samaritan Hall Avg. Attendance —150 Highest Attendance — 224 U.M.W. Luncheons 3 times a year / Thursdays or Saturdays Fellowship Room or Samaritan Room Avg. Attendance — 45 Highest Attendance —115 Grandparent/Grandchild Late Night Once a year (Jan. or Feb.) / Friday evening, 6:00 -9:00 pm Samaritan Hall, Fellowship Room, narthexes & kitchen Avg. Attendance — 95 Highest Attendance -130 Funerals Monday — Saturday Sanctuary — Service Fellowship Room, Samaritan Hall, narthexes & kitchen — reception time Avg. Attendance —150 Highest Attendance — 650 Weddings & rehearsals Rehearsals — generally Friday evening Sanctuary Avg. Attendance —15 Highest Attendance — 45 Wedding ceremonies — generally Saturday afternoon & evening Sanctuary Avg. Attendance — 225 Highest Attendance — 400 Sample Weekly Calander for Family Life Center These would be programs that we would hope to have in place in the first year of operation. Times and days may vary depending on each program. Items in italics would be open to the public. Time Sun Mon Tue Wed Thu Fri , Sat Early Bird Early Bird Early Bind Early Bind Early Bird 7AM -8AM Walkers Walkers Walkers Walkers Walkers 8AM -9AM Aerobics Aerobics Aerobics Aerobics Aerobics 9AM -10AM PreSch000l PreSch000l PreSch000l PreSch000l PreSch000l 10AM -11 AM Gym Gym Gym Gym Gym 11 AM -NOON NOON -1 PM Open Gym O n G m 1 PM -2PM Open Gym O n Gym 2PM -3PM Open Gym Open Gym After School Alter School After School After School After School 3PM -4PM Program Program Program Program Program Open Gym After School After School After School After School After School 4PM -5PM Program Program Program Program Program Open Gym After School After School After School After School After School 5PM -6PM Program Program Program Program Program Wed. Night Middle 6PM -7PM Program School night Wed. Night Middle 7PM -8PM Open Gym O n Gym Program Open G m School night Edina Basketball Wed. Night Middle 8PM -9PM Assocation Open q" Program Open Gym School night Edina Basketball Middle 9PM -10PM Assocation Open Gym Open Gym School night 10PM -11 PM --------- -77 v V 1 IN Vt, 230.10(MEA5 -(D HAWKE5 o LAKE -' 10 \0 E"\ Xr,�INGIIAI - -- --- :2 AREA 0101ED 30' ROADWAY EA5EKIENT PER DOC. NO.3264580 C, C) w LLI ILL ILL FTJ N EW 5UILPlNU' XBTiNG M I APAGE FUTURE--- PATIO 10 \ EX15TV-6 � 5DEWALK 6 "l- 1 i NEW 51OEWALK 0 I 113 Em-wM--1 1EX-15TIN05TEr5 EXISTING SIDEWALK ❑ Lj Ij 1 55 TOTAL EXISTING STALLS SITE PLAN G R O V E STREET NEW CONG STAIRS AND IPTALR LING5 o NEW1301- N� EXISTING 5VEWALK lo 496.69 (MEA5) EX15TNO TlZA5H AREA NEW SIDEWALK CONC CURB HDCP X15TINGNTUNII f'ARKINr,LQT ONCRE;E WALK F()cp HDcp 24121 104 TOT - 5TALLS AL EXISTING 25 0= 0 5'10'15' 30' cfl II I W* 9 PRELIMINARY NOT FOR CON5TRUCT ]ON STATION NINETEEN Archftects • Irteorporated 2001 UNIVERSITY AVENUE SOUTHEAST SUITE 100 MINNEAPOLIS, MINNESOTA 55414 P= ('6�1)2.)813 Ir I h. �cwft Not Mh p1m, sp AeAbef 3/16MG 'b' MD8 JH. RB 0-6, a. w ROWShm- 4271 were ro.ns. GOOD SAMARITAN umc EDINA MINNESOTA CONDITIONAL USE 9 PERMIT SUBMITTAL 9 SITE PLAN s 1 3 EX15TING151TUMINOU5 PARKING LOT 14 14 1 55 TOTAL EXISTING STALLS SITE PLAN G R O V E STREET NEW CONG STAIRS AND IPTALR LING5 o NEW1301- N� EXISTING 5VEWALK lo 496.69 (MEA5) EX15TNO TlZA5H AREA NEW SIDEWALK CONC CURB HDCP X15TINGNTUNII f'ARKINr,LQT ONCRE;E WALK F()cp HDcp 24121 104 TOT - 5TALLS AL EXISTING 25 0= 0 5'10'15' 30' cfl II I W* 9 PRELIMINARY NOT FOR CON5TRUCT ]ON STATION NINETEEN Archftects • Irteorporated 2001 UNIVERSITY AVENUE SOUTHEAST SUITE 100 MINNEAPOLIS, MINNESOTA 55414 P= ('6�1)2.)813 Ir I h. �cwft Not Mh p1m, sp AeAbef 3/16MG 'b' MD8 JH. RB 0-6, a. w ROWShm- 4271 were ro.ns. GOOD SAMARITAN umc EDINA MINNESOTA CONDITIONAL USE 9 PERMIT SUBMITTAL 9 SITE PLAN s 1 3 N u a W KII N d n G ■ J U 0 i a i N u L a C i 4 PP' Ylnl • .rF 'Pik. 65 ...e z PROPOSED BUILDING s M=910.55 01 v A THEE LEGEND (5) 6 .. I 10 Bi '. ".'.7 5 T PR. V • _ •.PF_7. 01 1. Q I V IRRIG TION S' ,. �. FR 8.4 `.. •_.. 3 BJ'•. O . �5� �;:. - — 1)AF T 5 G &\ ry CN: 3b WALL MOUNTED LIGHT N1O^at eN1AA dPGVt- NIL rrGUnola M I-L 1 PC 5 GS < 1` - ' '' ' $'• • -,0 32 038 0`24' CN 30 \ �.•• 8 BJ ® _._.........,,. j 3 ROCK`�AIN CE `;STRIP DECIDUOUS TREE -- . - '" 0'• 24 .,l • ' 0 .26 \ ` , / _ .. �1` - - N DO Dnot- Cottooeeod PO Ia. EVERGREEN TREE 0 1$ i PO 12 _ H Duet- Gln�e H D-It- XedcpWry _,. —._.- HC Drat- Xeres Ch -roue ��— PROPOSED CONTOUR HI Gnat- XlrAry Al D-et. Aipw CN FINISHED POOR ELEVATION KC Orbt- KWWCMy Cohn u Dwbt- U. LO Orbt- Leant 8 0 1 , 0 q 16 0 24 `30 PROPOSED STORM SETTER - 0 18 PO l0 0 26� CN 48 \ :0 18 _.._...: - • PO 0 46 ` 12 •M 1 2 C� 28 `, \ , • 0)24 • ', :...., 18`',` Wa Drbtn WeNUI M N Irwin WWOW • 0 60.; CN 48 - Y 1 19 K MAINTENANCE STRIP ` BE 12 0. 28 T2 N u a W KII N d n G ■ J U 0 i a i N u L a C i 4 PP' Ylnl • .rF 'Pik. 65 ...e z PROPOSED BUILDING s M=910.55 01 v A THEE LEGEND (5) 6 .. I 10 Bi '. ".'.7 5 T PR. V • _ •.PF_7. 01 1. Q I V IRRIG TION S' ,. �. FR 8.4 `.. •_.. 3 BJ'•. O . �5� �;:. - — 1)AF T 5 G &\ ry a A'.TIE. r _... WALL MOUNTED LIGHT N1O^at eN1AA dPGVt- NIL rrGUnola M I-L 1 PC 5 GS N u a W KII N d n G ■ J U 0 i a i N u L a C i 4 PP' Ylnl • .rF 'Pik. 65 ...e z PROPOSED BUILDING s M=910.55 01 v A -: AHED _ - mACS w +nom+Mr 0 20 w 60 ..: ( .. tw F RELIMINARY — NOT OR CONSTRUCTION REPLACE ~ STEM AS U 1 COAL NOTES BEFORE DIGGING CALL OWNER ONE CALL (631) 45•_0007_ ALL WORK SHALL BE IN ACCORDANCE WITH THE CITY OF MINA AND MNDOT STANDARD SPECIFICATIONS RESTORE ALL DISTURBED AREAS TO EXISTING CONOITON OR BETTER SHOULD LANDSCAPE A PLANT BE UNAVAILABLE .THE TIME OF NSTALLATION, ALL SUBSTITUTIONS ARE Y:IB.ECT m THE APPROVAL OF THE LANDSCAPE ARCHITECT AND THEE A My EXISTING VEGETATION m BE REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A MANNER THAT IS APPLICABLE WITH LOCAL CITY AND STATE REQUIREMENTS. SEE EHONEERS GRACING AND UTILITY PLANS FOR EXACT LOCATIONS OF BERMS FENCE. RETAINING WALLS. AND PPE LOCATIONS ALL TREES SHALL RECEEVE MULCH SAUCERS AND SXREDOED HARDWOOD MLLOI INDIVIDUALLY AS PER PLANTING DETAIL. ALL SNUB tl+OLlPS SHALL BEGONE A COITINUOLR BEDLRE A Mw. CIF 21• FROM THE ROOTBALL t!i THE PROPOSED PODNETER PLANTS Ii THEAT rFOwIHa FINAL SHAPE 6 THE eEDLI/E5 ARE m BE FIELD APRROYED BT THE LANDSCAPE ARCHITECT. PANTS SIIALL BE LARCH® AS A CONTImOUS MASS ALL PAXTNNG BEDS AD RtXlf YIWTDIAIICE BEDS SHALL BE EDGED WITH A IEAVr OLltt BLAFR QAMOm [DGIHG Qi APPROVER EQUAL ROCIK OVER 1A105CAPE IABRIC 511ALL BE APPLIED m ALL "TING BEDS AREAS m A 3• DEPTH. 3• SHIEODED HARDWOOD MIRCIM 9G1LL BE APPLEp m ANNUAL AND FEREODAL BEDS EDGE NTX BLACK DIAMOND ELOPING OR APPROVED EQUAL BETWEEN Roo AHD WOOD HuLat ROCK SHALL MATCH EXISTING ROOK MULCH, PROMDE OWNER NTH ROCK SAMPLES FOR THEIR APPROVAL PRIOR TO CONSTRUCTION. SPRING EXCAVATION AND PANTING PREFERRED, STATION ALL AREAS NTXIN THZ PRKPEITY THAT ARE NOT SHIOIB BEDS OR HARD SURFACED E %CEPT AS NOTED S NALL BE SEEDED ALL AREAS QITSDE ,HIE PROPEITY LINES DIMMED BY GRADING OR UTILITY INSTALLATI ON SHALL BE RETURNED m EXISTING. NINE TE E N tDIETID„ OR BETTER OR A5 NOTED. Architects Incorporated 2001 UNIVERSITY AVENUE SOUTHEAST SUITE 100 MINNEAPOLIS, MINNESOTA 55414 PHONE (612) 623.1800 FAX (612) 623.0012 LEGE THEE LEGEND ED a .. I 10 Bi '. ".'.7 TELEPHONE BOX PR. V ' S AW A 1 _ rHEDGE,. O FFE =90593 I V IRRIG TION S' ,. �. FR 8.4 `.. •_.. 3 BJ'•. !:DGEfl�.HEDGE b Nm /-1 above voWw I.L.I. CIO tbcwq �;:. - — 7 AW _ __ a A'.TIE. r _... WALL MOUNTED LIGHT N1O^at eN1AA dPGVt- NIL rrGUnola M I-L 1 PC FR 12'.3.., _ I FIR 10 pR 10 FR 10. - -FR 10" - < / - ' '' ' $'• • .. A D-eln Ach E.Wnq� — — — w.. _ �.•• 8 BJ ® _._.........,,. j 3 ROCK`�AIN CE `;STRIP DECIDUOUS TREE BU 0—t- 8'.h OR D—t. CN DWbt- cch. DO Dnot- Cottooeeod EVERGREEN TREE OG 0a Oe9■oed FR Dabt- FXN i scals fm _ H Duet- Gln�e H D-It- XedcpWry _,. —._.- -: AHED _ - mACS w +nom+Mr 0 20 w 60 ..: ( .. tw F RELIMINARY — NOT OR CONSTRUCTION REPLACE ~ STEM AS U 1 COAL NOTES BEFORE DIGGING CALL OWNER ONE CALL (631) 45•_0007_ ALL WORK SHALL BE IN ACCORDANCE WITH THE CITY OF MINA AND MNDOT STANDARD SPECIFICATIONS RESTORE ALL DISTURBED AREAS TO EXISTING CONOITON OR BETTER SHOULD LANDSCAPE A PLANT BE UNAVAILABLE .THE TIME OF NSTALLATION, ALL SUBSTITUTIONS ARE Y:IB.ECT m THE APPROVAL OF THE LANDSCAPE ARCHITECT AND THEE A My EXISTING VEGETATION m BE REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A MANNER THAT IS APPLICABLE WITH LOCAL CITY AND STATE REQUIREMENTS. SEE EHONEERS GRACING AND UTILITY PLANS FOR EXACT LOCATIONS OF BERMS FENCE. RETAINING WALLS. AND PPE LOCATIONS ALL TREES SHALL RECEEVE MULCH SAUCERS AND SXREDOED HARDWOOD MLLOI INDIVIDUALLY AS PER PLANTING DETAIL. ALL SNUB tl+OLlPS SHALL BEGONE A COITINUOLR BEDLRE A Mw. CIF 21• FROM THE ROOTBALL t!i THE PROPOSED PODNETER PLANTS Ii THEAT rFOwIHa FINAL SHAPE 6 THE eEDLI/E5 ARE m BE FIELD APRROYED BT THE LANDSCAPE ARCHITECT. PANTS SIIALL BE LARCH® AS A CONTImOUS MASS ALL PAXTNNG BEDS AD RtXlf YIWTDIAIICE BEDS SHALL BE EDGED WITH A IEAVr OLltt BLAFR QAMOm [DGIHG Qi APPROVER EQUAL ROCIK OVER 1A105CAPE IABRIC 511ALL BE APPLIED m ALL "TING BEDS AREAS m A 3• DEPTH. 3• SHIEODED HARDWOOD MIRCIM 9G1LL BE APPLEp m ANNUAL AND FEREODAL BEDS EDGE NTX BLACK DIAMOND ELOPING OR APPROVED EQUAL BETWEEN Roo AHD WOOD HuLat ROCK SHALL MATCH EXISTING ROOK MULCH, PROMDE OWNER NTH ROCK SAMPLES FOR THEIR APPROVAL PRIOR TO CONSTRUCTION. SPRING EXCAVATION AND PANTING PREFERRED, STATION ALL AREAS NTXIN THZ PRKPEITY THAT ARE NOT SHIOIB BEDS OR HARD SURFACED E %CEPT AS NOTED S NALL BE SEEDED ALL AREAS QITSDE ,HIE PROPEITY LINES DIMMED BY GRADING OR UTILITY INSTALLATI ON SHALL BE RETURNED m EXISTING. NINE TE E N tDIETID„ OR BETTER OR A5 NOTED. Architects Incorporated 2001 UNIVERSITY AVENUE SOUTHEAST SUITE 100 MINNEAPOLIS, MINNESOTA 55414 PHONE (612) 623.1800 FAX (612) 623.0012 LEGE THEE LEGEND ED a AR CONDITI ONING LOOT EXISTING CODITIONS SURVEY AI/D TREE IDENTIFICATION '. ".'.7 TELEPHONE BOX PERFORMED tTY SCHUM Alm MADSON, INC. DATED 12- 10-04. V HYDRANT O MANHOLE N-b- I0a-Ir10 cbbl•Vi Um d-It- ari t d ®m1•ts PoIMEt ROLE b Nm /-1 above voWw I.L.I. CIO tbcwq o IP nMIWw a any) dWbt- th■ rAmlea a vwu al Thal IOCOU.. 1 dwlota P d•ad v «). a WALL MOUNTED LIGHT N1O^at eN1AA dPGVt- NIL rrGUnola M I-L V LICIT POLE — iO PIP( — U101NOM UNERFRWNp UTWr TELEPHONE yT . [D Dbs- chlb. (I n. PROPERTY TINE A D-eln Ach E.Wnq� — — — - EASEMENT LIE AV Dabtn Abm V t- BF DWbtn Bet•Wn Fb 0ILE. &2 ® RETAINING WALL RI Oabt- 81rM — - SHOW LINE BE D•notn B- OdW BN Dtebt- ButtW DECIDUOUS TREE BU 0—t- 8'.h OR D—t. CN DWbt- cch. DO Dnot- Cottooeeod EVERGREEN TREE OG 0a Oe9■oed FR Dabt- FXN FR D—l" frVll r1'WYW TIME l0@ H Duet- Gln�e H D-It- XedcpWry - EXISTING COI70UR HC Drat- Xeres Ch -roue ��— PROPOSED CONTOUR HI Gnat- XlrAry Al D-et. Aipw FFE FINISHED POOR ELEVATION KC Orbt- KWWCMy Cohn u Dwbt- U. LO Orbt- Leant �» PROPOSED STORM SETTER M Drbt■• MepH, MP DWMtn Nor Phw PROPOSED RIPRAP P D-0- Pr. PO Orbt- Papb RO Drbt- RV-i•n ' PROPOSED CONCRETE WALKWAYS pw SP DFrot- YPaH e m Drbl- Tree D■Nduaus TE Denotn EVryssl PROPOSED BUtlOO1G EXPANSION Wa Drbtn WeNUI M N Irwin WWOW /V� X �F�L PROPOSED TREE REMOVAL DOSED TREE PROTECTION PENCE PROPOSED EROSION CONTROL BLANKET NTH SEED '. ".'.7 PROPOSED SODDED AREAS LANDSCAPE REO1111::11 111179 SITE BOUNDARY - 2883 LF. 2.885 / w . 72 TREES REOUOED FOR 97E ADOTIDNAL. 30 TREES FIELD L0017ED ARNAAm BW.OING ANp FARKOm LOT. ADOITIOlALLT THE SITE CONTAINS DENSE WOODED AREAS ON THE EAST Alm NORTH SIDES OF THE SITE TOTAL E)"TINO TREES COUNTED - 121+ TREES EXISTING TREES TO BE REMOVED FOR IMPROVEMENTS - 26 TREES TOTAL 95* REMAI24 TREES EXCEEDING THE CITY'S REOLOREMEN75 SHP-US INSTALLAMON oA r Z=l PPn■N. TRt31 INSTALL.Arat > c�tHy tMl N 00Gm,. cpa'Ilk I be or G.Dd1 w b> .n• ea a,y M�d�Lbn■■d pGePOhslv,d ln/lnar � bw el N4 YtetA I ,n Wapv Andasyl 20893 3 -18-05 MBE ,TWA 04 -117 HTPO GOOD SAMARITAN UMC 5730 GROVE ST. EDINA. MINNESOTA LOTS 10 and 11, WARDEN ACRES 1117 Engineers • Surveyors Landscape Architects Ibex Thwp Perm OF be 1Fr.e- t+e aK. LANDSCAPE PLAN L1 I' ,I _ :I I J I I I STATION NINETEEN Arch tecti • Irworporoted 2001 UNIVERSITY . I AVENUE SOUTH EAST SURE too MINNEAPOUS, MINNESOTA SU14 UNEXC.'.Y.hIED PHONE 1812 823.1800 FAX Ie121 .0012 Ih "a ff em On phq apse em, a rwal rra prqurea M ms a W s mr a:al ayr NAEfw Ivnaa /y ibemrea ArelliYCl urbaY IN kra d u. sar oc _ MINNESOTA sl I 9pwr• PIGIMD 91WA6FE EXSr, UIall rLmo I AdOYM ro.w. NEXC': /'.IED MDB JH. 110 harly Obel+u4 \ I ro•ufM{{� b \ \ I 0 � � ^�okwn cup � '.❑ 1 I I I \ J E %5 r. UIILIIi IMNEI. I � UNEXCP:J ?.rED 42%1 UNEXC!.V: JED \\ GOOD SAMARITAN �\ UMC EDNA MINNESOTA UNEXC.A- IED CONDITIONAL USE �! PERMIT SUBMITTAL BASEMENT LEVEL FLOOR PLAN o21 12 PRELIMINARY LOWER LEVEL FLOOR PLAN 3/32 ° =ro' � � � NOT FOR COI5TRUCTION a b (DO I I L_ � I I i I I I I STATION NINETEEN y Arddtects • kKaporaLed 2001 UNIVERSITY 6 i AVENSOUTHEAST SUITE 100 -- -- MINNEAPOLIS, MINNESOTA 55414 I PHONE(612 627.1800 623.0012 A6eeFAAX�y cc(a61Nd2yy) I�G•dlvtlm. ��� I I °4011 uid Gw I m • dk ReI�Od adim ones ms Iev d to mrd I I O 1 (D I MINNESOTA I RCXIIim B10YIXlFE O �ou � I �° Y1B05 oa MDS J , I [- 4271 o lill Jill GOOD ' SAMARITAN UMC y O EDINA -- MINNESOTA O i i GENERAL LONE S��TCLEAR LL5ARE SHOWNSq.ID. NEK'Wr1LL5ARE CONDITIONAL USE PERMIT SUBMITTAL LOWER LEVEL FLOOR PLAN LOWER LEVEL FLOOR PLAN -L7 • . . 0 4' 6. 12 " PRELIMINARY A2 a A2 3/32 =r-01 NOT FOR CON65TRUCTION 11 i UPPER LEVEL FLOOR PLAN 7LJ7 W 3/32" = 0 4' 6' 12' NORTH A3 1'-O" l STATION NINETEEN Ard*wb • IRcoryoraW 2001 UNIVERSITY AVENUE SOUTHEAST SURE 100 MINNEAPOLIS, MINNESOTA 55414 PHONE (612 1621.1600 nn�eFAXy (612) .0012 eps4ra:r OW p . q».1 m n.wet W ne a „da. mr e.m Ile�e�uvm eb Ovt 1 am . eay pubiee Maebct urds m. ux a odro ■.r. MINNESOTA sps�u. A� 1iiONMFE laymen. xiae� Lt6N5 an Mob JH, RS -AV ReNy" 4271 GOOD SAMARITAN UMC EDINA MINNESOTA I EX15TINGWAL CONDITIONAL USE 1. ENN CLGK'ALLS PRE SHOV.N SCUD. NEV11.'.\LLS ARE sHa.MCLEPR PERMIT SUBMITTAL UPPER LEVEL FLOOR PLAN PRELIMINARY e NOT FOR CONSTRUCTION I pt E r A) -T, WEST ELEVATION .VI&06 m. IH DS Rewoo,m.. *F'11,-71 T ELEVATION 7..I-7 - o 2- .' (2 )NORTH ELEVATION L4 ) V8" f-a FRELIMINAKYJ NOT FOR CONSTRUCTION CONDITIONAL USE PERMIT SUBMISSIOP WILDING ELEVATIONS CI A4 STATION N I N E T E E N �zl a a o Ardiftects; Incorporated 2001 UNIVERSITY AVENUE SOUTHEAST SUITE 100 MINNEAPOLIS. MNNESOTA 55414 PHONE FAX (4621)20 DO 001182 I h..ft..Ulv Mal ft. Ph.. pd ;r . — = �2 SOUTH ELEVATION V.W . M da., R=.=-i-A.EW But W, � I — . th d* � , 1 d 0 1 4 .VI&06 m. IH DS Rewoo,m.. *F'11,-71 T ELEVATION 7..I-7 - o 2- .' (2 )NORTH ELEVATION L4 ) V8" f-a FRELIMINAKYJ NOT FOR CONSTRUCTION CONDITIONAL USE PERMIT SUBMISSIOP WILDING ELEVATIONS CI A4 Jackie Hoogenakker Oo From: Lawless, Kevin J [kevin.lawless @xcelenergy.com] Sent: Tuesday, April 19, 2005 3:27 PM To: Jackie Hoogenakker Cc: April Egan (E -mail) Subject: Good Samaritan Church Expansion My family and I live across the street from Good Samaritan Church. My wife and I have resided at 5809 Grove St. for 21 years. We have two children walk to Countryside school in 1st and 3rd grade. We have watched the church grow over the years. In general, Good Samaritan Church has been a good neighbor over the years. We and some of our neighbors have some concerns about this particular project though, especially its likely impact on the traffic and aesthetics of our relatively quiet neighborhood. In a broader context, this is a neighborhood that has dealt with a number of traffic issues over the years that have resulted in: * The rejection of making Wycliffe Road into a through street to Vernon Ave. * The addition of some sidewalks to Countryside School. * The addition of stop signs at the Grove St. and Stuart Av. intersection directly in front of the church. * Rerouting of bus traffic to Countryside School and improvements to'the pick -up and drop -off zones by the school. Now, this proposal takes the neighborhood in a different direction that will increase traffic on many more days and evenings, largely for non- church purposes. We are against expansion at Good Samaritan for non - church purposes. We request that it be placed in the historical context of the neighborhood, and how as a neighborhood we have worked to minimize the impacts of the increased traffic due to changes in the way we live in this metropolitan area. -I would like to emphasize that this is a residential neighborhood that co- exists with a school and a church in close proximity. * This project is an expansion of the church to support a range of activities that are church - related and commercial activities. When we reviewed the proposed uses for this expansion, most of the activities seem to be related to commercial renting of the facilities for basketball leagues, day -care, and banquets for up to 300 people. Many of these activities are scheduled simultaneously with the periods of time that children are traveling to school. Given that the church is very close to Countryside school (about 5 houses away), this has the potential to significantly increase traffic during school hours and when the neighborhood's children are walking to /from school. This will present an increased safety hazard for our children. * Aesthetically, the expansion of the church will create a large campus like structure within our neighborhood. Numerous large trees currently grow in the planned footprint of the expansion. Aesthetically this will change the neighborhood, with potentially changes in housing values. * Finally, the planned activities for this expansion are largely, commercial like activities. Banquets, basketball leagues, community events, etc can all be supported by existing commercial, city, and existing school facilities. This seems like a project looking for customers, not parishioners. The area is not zoned commercial and I assume the church is not a property -tax paying facility. We can also assume that due to the nature of the expanded traffic and safety issues that the neighbors will eventually be hit with expanded property taxes to support a tax -free, commercial -like facility. We recognize that the church has a need to find alternated purposes for its facilities when they aren't being used by the church, but this expansion seems to overly focus on these alternate purposes. In the end, we believe that this project will result in more traffic, additional expansions of traffic control measures, and investments in sidewalks. We request that this facility either not be approved at tonight's or that the question be tabled, until a traffic study be completed and shared with the neighborhood. In addition, the church may want to consider a smaller expansion. Sincerely, 1 Kevin J. Lawless and April H. Egan 5809 Grove Street Kevin J. Lawless Executive Sponsor, CRS Program Xcel Energy 414 Nicollet Mall (RS6) Minneapolis, MN 55401 phone: 612 - 330 -7936 e -mail: kevin.lawless @xcelenergy.com 5621 Wycliffe Road Edina, MN 55436 April 16, 2005 Mr. James Hovland, Mayor 4801 West 50th Street Edina, MN 55424 Dear Mr. Hovland: I've already sent a letter regarding the Good Samaritan building proposal and I maintain the requests I made from that letter, but I have since learned more about the proposed uses for the addition that have confirmed my fears about the impacts the project could have on our neighborhood and this leads me to be strongly opposed to the undertaking as envisioned. Churches serve a valuable role in the community. Growth is an outcome of a church that meets the needs of its members and creates enthusiasm for its programs. When growth does occur, the church as a neighbor should consider the impacts to the neighborhood and exert real effort to minimize them. When building is involved, the city assists in examining impacts to the neighborhood and helping to keep the impacts to a minimum including property values, aesthetics, safety, traffic, parking and the environment. I remain concerned about the process to balance this proposal regarding Good Samaritan with the input of the neighborhood. I understand that this meeting is an attempt to do just that, but what I'm concerned about is the process of creating understanding in the neighborhood so we can be prepared for this meeting. The truth is, in talking to people in the neighborhood nearly everyone I've talked to have had no understanding of what is going on. With this as the case, something seems to have gone amiss. When you recognize that this is a school zone, with kids coming and going to and from school at all times of day from all areas of this neighborhood, I also don't understand why a wider area of people weren't included in the notification. The notice appeared to include only those within 500 feet of the property. I believe the whole area is impacted if the proposal is about increased usage during all times of the day, all days of the week through the school year. I want to keep the impacts to the neighborhood to a minimum and as I've now had a chance to look at city residential R1 code, it appears that the spirit of the law provides for this. Subdivision 4.D.2 says "No conditional permit shall be issued unless the council finds that the operation will be complementary to other uses ... and will not adversely impact the neighborhood." Regarding whether the uses are complementary to those of a church, when I read the letter from the church to Craig Larson of the planning department about their intended uses, my concerns about the project heightened dramatically. In describing the intended uses for the new additions, the great majority of listed of user groups appear to be non- church related. The letter goes on to the point that I begin to wonder whether this could be from a commercial real estate developer outlining prospective tenants for a community center rather than a letter from a church. Non - church groups or programs listed include: Early bird walkers, aerobics, pre - school and ECFE, Edina Basketball association, volleyball leagues, golf practice. Then, with the kitchen, possible banquets for non- church groups, and further, a caterer interested in taking meals off campus presumably for profit. Growing churches should be an outcome of the church meeting the spiritual and social needs of its members with church programs. In this case, it appears that the church may be attempting to grow through the addition of a building and funding it by leasing to civic or other organizations. Regarding adverse impacts, all of my concerns about the impact to the neighborhood stated in my prior letter have been confirmed. I'm concerned about the impacts of increased usage that goes from 7:00 am to 10:00 pm at night, Monday through Friday, and Saturday and Sunday afternoons. Would this increase traffic hazards for kids going to and from school? Or would a church banquet for 275 people on Wednesday night have an impact on the many young families walking the neighborhood after dinner on a spring evening? Bear in mind a banquet with 275 attendees rivals the size of a Sunday service in peak season and would result in the same traffic and parking congestion as a Sunday morning. Could a men's basketball game between St. Louis Park and Edina on a Friday night when a school dance is going on make people in the neighborhood think differently about.how to care for their kids that evening? Some of the uses such as open gym on a Saturday afternoon may be. considered outreach, but I can't help but be concerned about bringing into the neighborhood people not really part of the church and not part of the neighborhood when my kids are riding their bikes in the street or to the school park to play. I- have four young daughters and in today's society I need to be concerned about such things. I would understand better if we were discussing the church having an in -house basketball league for its members. I also remain concerned about the impact of the design itself aesthetically and on property values especially with increased activity in the neighborhood. Also, if the church is successful in attracting new members, I'm concerned about the possible future sprawl and the impact to the wildlife environment around Hawkes lake: Where will additional parking go? I request that the council deny the current proposal and ask the church to consider an alternative plan and design. I request that the process slow down to take adequate neighborhood input and assessment of impacts. I request the recognition that this is a school zone. I request that the city require the intended uses to be church funded programs and the intended users to be church members. I request that any plan address impacts to aesthetics, parking, traffic, safety, and the environment now and in the future such as those I have described in this and my prior letter. Thank -you for your consideration. Yo tru , Gary A Lee ' '`'� rage i of i Jackie Hoogenakker W. 0' From: Tom Shaughnessy [thaughnessy @metronet.lib.mn.us] Sent: Tuesday, April 12, 2005 8:18 AM To: Jackie Hoogenakker Subject: Good Samaritan Church expansion Dear Mr Hoogenakker: We own the property immediately adjacent to Good Samaritan Church, 5705 Wycliffe Rd. We have reviewed the plans for the expansion of the church with some concern. But please note that we are not completely opposed to the church's plans but only ask that they consider some of our issues. First, we propose that the wing closest to Wycliffe be repositioned so as to be parallel to the existing building rather than being perpendicular to it. If this is not feasible, we ask that the new wing be set back farther from Wycliffe, with the west wall of the new wing made flush with the existing west entrance. However our most preferred solution is to place the new wing on the east side of the building. We prefer this approach because it will have less impact on Wycliffe (and our property). We worry that users of the new wing (which we understand will house a basketball court) will be inclined to park on Wycliffe because of its proximity to the facility's entrance. Both parking lots are at some distance from the new wing. And there are so many children who play in the street... ride bikes, skate board, etc that cars parked along Wycliffe will create a hazard. Finally we believe that the high roof line of the new wing will also detract from the very residential nature of our street, particularly if the new wing is not moved to the east and made flush with the existing west entrance to the church. We appreciate your consideration of these concerns. Sincerely, Tom and Marlene Shaughnessy 5705 Wycliffe Rd Edina MN 55436 952 922 -5381 Tom Shaughnessy Executive Director Metronet 1619 Dayton Ave. St. Paul, MN 55104 651.646 -0475 Fax 651.649 -3169 4/18/2005 Jackie Hoogenakker From: kenneth.frank @usbank.com Sent: Wednesday, April 13, 2005 8:29 AM To: Jackie Hoogenakker Subject: Good Sam Expansion Hello, We live on Grove Street about two houses away from Good Samaritan Church. The Church has been a good neighbor, however, we object to the proposed expansion. This addition to the church will allow the church to have more activities (other than actual church services). For us, this will mean INCREASED traffic on Grove Street at more hours of the day on more days of the week. This increased traffic will be harmful to safe access to our driveway and will increase the density of traffic on Grove Street. Both of these things will affect the safety of driving and walking on our street and will increase noise levels. Please do not allow,this expansion to be approved. Thank you. Kenneth Frank and Linda Klaver _ 5701 Grove Street West, Edina 55436 Riverbank location - Gold Area Phone 651 205 -1357 Electronic Privacy Notice. This e-mail, and any attachments, contains information that is, or may be, covered by electronic communications privacy laws, and is also confidential and proprietary in nature. If you are not the intended recipient, please be advised that you are legally prohibited from retaining, using, copying, distributing, or otherwise disclosing this information in any manner. Instead, please reply to the sender that you have received this communication in error, and then immediately delete it. Thank you in advance for your cooperation. I ` Y 1 oe 1v e8 R AGENDA NO. IV.E. PUBLIC HEARING - PRELIMINARY PLAT APPROVAL THE BLAKE SCHOOL AND CITY OF HOPKINS WEST OF BLAKE ROAD/ NORTH OF BELMO LANE CONTINUED TO 5/ OS No packet data � F-] Oral presentation F� Information coming REQUEST FOR PURCHASE TO: Mayor & City Council FROM: Wayne D. Houle, PE, City Engineer VIA: Gordon Hughes, City Manager SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000 DATE: April 19, 2005 AGENDA ITEM V.A. ITEM DESCRIPTION: Robotic Total Station Unit for Surveying Purposes Company Amount of Quote or Bid 1. Leica Geosystems 1. $ 32,256.44 2. GeoShack 2. $ 34,315.37 3. Kara Company 3. $ 35,089.87 RECOMMENDED QUOTE OR BID: Leica Geosystems $ 32,256.44 GENERAL INFORMATION: This purchase is for a Robotic Total Station Unit to replace an existing Total- Station Unit that is used within the Engineering Department for field surveys, staking construction projects, and maintaining data on our infrastructure. The Robotic Total Station Unit only requires one person to operate compared to two people for the existing unit. This unit can also be combined with a Global Positioning System (GPS) in the future that will further the efficiency of the survey requirements. This purchase.is funded through the Engineering equipment replacement budget. Staff recommends awarding this purchase to Leica Geosytems. Public Works - Engineering Signature Department The Recommended Bid is ,. within budget not within budget JohK allin Finance Director Gordon Hughes, ty anager i o e Ham`' 0 REQUEST FOR PURCHASE ess TO: Mayor Hovland and Members of the City Council FROM: John Keprios, Director of Parks and Recreation VIA: Gordon Hughes, City Manager SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000 DATE: April 19, 2005 AGENDA ITEM: V.B. ITEM DESCRIPTION: Deck Replacement and Expansion — Edina Aquatic.Center Company Amount of Quote or Bid 1. RJ Marco 1. $34,950.00 2. Lattemer Enterprises, Inc. 2. $35,750.00 RECOMMENDED QUOTE OR BID: RJ Marco $34,950.00 (includes sales tax) Account #: 5300.1715 GENERAL INFORMATION: This is for purchase and installation of 2,220 square feet (980 s.f. of replacement and 1,240 s.f. or expansion) of concrete decking for the Edina Aquatic Center. Specifications call for replacement of approximately 980 square feet of worn 5" concrete deck area where the old concessions stand was previously located. The 980 square feet of old and worn deck area is over 46 years old and needs replacement and has become a safety issue. Specifications also call for expansion of the existing deck in accordance with the master plan, which is approximately 1,240 additional square feet of 5" concrete deck area. As shown on the attached site plan, the expansion is located on the southwest side of the Aquatic Center, which is currently a grass area. No trees or shrubs are affected by this expansion. With the new step -in entry addition on the northeast end of the main pool, there is a loss of 900 square feet of concrete deck area. The existing fencing and gate will be reinstalled in the new expanded area and will require some new additional fencing. This project is budgeted at $35,000.00 and funded by the Enterprise Funds under the Capital Improvement Plan. Edina Park and Recreation John Kods, Director Department This Recommended bid is within budget not within budget ohA W Fin e Director Hughes,' E)WANSION JOINT. -� (EJ) TYPKN_ SEE DETAIL 12. NEW CONCRETE DECK (SHADED AREA) CONNECT DECK J DRAINSTO EXISTING LINE EXISTING FENCE TO REMAIN - DO NOT DISTURB. = (D O O O O \ pppV10� �'TL- R1�1c'TYc � PRIC�'Ta (tE�c� AEe� R�MIOVrc rcX16TlN6 � XT' OUD cowcei5c04g o t- �t7rN'D U6C.1C ea6E AF OtGK- f W To 14( O Lou+TtE: rN FIELD 4zE.laCS'f� 6 welop t'Ro{� -C� NEW Fi=NCE lot�►ToN O C♦�t. . ggyCIN6 uwopo— Fooloc.#,) FOOL OECR. CONCRETE WrM TW6X4W7AXTWAWWF. LIGHT BRDOM FWK NONSJP. TOOLED JOINTS. CONTROL DRANW EXISTING BATH HOUSE t;gty- Fwmo-pl o wo 11 • 1 • 04 e .CONTROL Jowl. (cn TOOL FoMDECIC CONCRETE CTM WO B X GINIA x WIANWF. t6 BROOM FM=t MOMSJP. TOOL JOR ' m § GRANULAR ORAWAOECOU 10 FELT Bao BREAI OR (SEESPOR r 0 e .�O ••tiro,„• REQUEST FOR PURCHASE laos TO: Mayor Hovland and Members of the City Council FROM: John Keprios, Director of Parks and Recreation VIA: Gordon Hughes, City Manager SUBJECT: REQUEST FOR PURCHASE IN EXCESS OF $15,000 DATE: April 19, 2005 AGENDA ITEM: V.C. ITEM DESCRIPTION: Theme Wall Addition - Edina Aquatic Center Compan y Amount of Quote or Bid 1. Themescapes, Inc. 1. $31,600.00 2. Rock & Waterscape Systems, Inc. 2. $98,750.00 RECOMMENDED QUOTE OR BID: Account #: 5300.1720 Themescapes, Inc. $31,600.00 (includes sales tax) GENERAL INFORMATION: This is for purchase and installation of custom theme rock formations in front of the pump house, mechanical, filtration rooms for the Edina Aquatic Center. This is the highly visible and currently unsightly area on the northwest side of the Edina Aquatic Center directly under the themed ship that is the platform for the cable ride attraction. This additional theme rock addition purpose is to serve as both a marketing attraction that is highly visible from the Crosstown Highway 62, as well as create a more aesthetically pleasing appearance under the themed ship. This theme rock addition is part of the master plan for the Edina Aquatic Center. Themescapes Incorporated is the local Minnesota company that previously installed the themed ship and dry playground area at the Edina Aquatic Center. There are few theme creation companies in the nation. Rock & Waterscape Systems Incorporated are located in California, which is probably the main reason for their extremely high quote. Themescapes Incorporated also provided all the theme amenities in Camp Snoopy at Mall of America, as well as, all of the Rainforest Cafe restaurants across the country. This project is budgeted at $35,000.00 and funded by the Enterprise Funds under the Capital John Kei6dos, Director This Recommended bid is within budget Edina Park and Recreation Department not within budget, _1 n_, Mriance Director Hugheg, City Manager G I Ow Le A� o �aee REPORURECOMMENDATION To: Mayor & City Council Agenda Item VI.A. From: Mike Siitari, Police Chief Consent ❑ ❑ Information Only ❑ Date: April 14, 2005 Mgr. Recommends To HRA ❑ To Council ® Subject: 501h & France Liquor License & Motion Permit to Use City Property El Resolution ° ❑ Ordinance ❑ Discussion RECOMMENDATION: Approve the 50`h & France Business Association's applications for a Temporary On -Sale Intoxicating Liquor License and a Special Permit for Use of City Property in Conjunction with a Temporary Liquor License. . INFO /BACKGROUND: The 50`h & France Business Association has applied for a Temporary On -Sale Intoxicating Liquor License to sell beer and wine at the 50`h & France Art Fair on June 3 -5, 2005. The Association has also applied for a Special Permit to use the Edina 5 -0 Municipal Parking Lot as the location for the licensed premises. A copy of the signage plan and parking lot set -up is attached. 11 1 Background checks on the Business Association show they are eligible for the liquor license. The plan submitted for the parking lot is similar to last year's plan but the size of the fenced area has been reduced. Private security will control access to the beer garden and two uniformed Edina Police Officers will patrol the parking lot and.fenced area on foot. The event was well run last year with no problems related to the Liquor License.or the use ofthe municipal parking lot. 0 49 1/2 Street \ �, 2005 Edina Art Fair Edina 5 -0 Parking Lot . Sound] rBq �'entid Stage trailer Qf,�Q WO Emergency Exit O' Wide) I Re co" eessioos - - Van �j ® ® ® WI Shooster's Griu Refridge. Info Tent ® ® ® a Truck Jerry's Truck Mario'5 Lemonade j Key Westrum's „ „ j.Ilpe No A! oho/ Beyond this Point (ono enter site side Y opposite ®Tables/ChairsI Restrooms 50th Street Gate Entrance w /Security officer 1D0 FEET checking I.D. 0 Roaming EPD Banner on Tent . Barricade C 10'x20' tent Approx. 4'x3' Wine Name and Logo Approx. 4'x3' Beer Name and Logo Pricing/ Pricing/ Product Product Sign Sign 22" x 28" ® 12211 x 28" Must be 21 + to purchase, I please have ID ready Art Fair Beer Garden Signage Plan REPORURECOMMENDATION TO: Mayor & City Council From: Wayne Houle, PE City Engineer Date: April 19, 2005 Subject: Authorize agreement for Vernon Avenue Watermain Relocation with City of St. Louis Park. Recommendation: Agenda Item # Consent Information Only Mgr. Recommends Action y VI. B. ❑ To H RA ® To Council ❑ Motion ® Resolution ❑ Ordinance ❑ Discussion Adopt resolution 2005 -28, authorizing the Mayor and City Manager to sign attached Letter of Agreement. Info /Background: The Minnesota Department' of Transportation is scheduled to construct sound walls along both sides of TH100 from Minnehaha Creek to West 44th Street on the east side and to the north City limits on the west side. The current watermain along Vernon Avenue will be required to be relocated as part of the sound wall project from West 44th Street to the north City limits. Additional watermain to the north along Vernon Avenue is also required to be relocated. The City of St. Louis Park has agreed to reconstruct the portion of watermain in Edina as part of their watermain relocation project. Estimated cost to the City of Edina is $37,600. Council approved the sound wall project north of West 44th Street on September 2, 2003, through the MNDOT Municipal Consent process. Staff and legal council has reviewed the agreement and recommends approval of this agreement. RESOLUTION NO. 2005-28 A RESOLUTION AUTHORIZING City of Edina EXECUTION OF AGREEMENT WITH THE CITY OF ST. LOUIS PARK FOR VERNON AVENUE WATERMAIN RELOCATION WHEREAS, the City of St. Louis Park has submitted an Agreement to the City of Edina requesting execution by the Mayor and City Manager allowing the Cities to jointly undertake the relocation of the watermain on Vernon Avenue; and WHEREAS, this agreement shall expire upon full payment by the City of Edina for all work constructed. NOW THEREFORE, Be It Resolved, that the City Council of the City of Edina has authorized the Mayor and City Manager to sign the agreement and return a copy to the City of St. Louis Park. Attest ADOPTED: the 19th day of April, 2005. City Manager Mayor STATE OF MINNESOTA ) COUNTY OF HENNEPIN ) SS CITY OF EDINA ) CERTIFICATE OF CITY CLERK I, the undersigned duly appointed and acting City Clerk for the City of Edina do hereby certify that the attached and foregoing Resolution is a true and correct copy of the Resolution duly adopted by the Edina City Council at its regular meeting of April 19, 2005, and as recorded in the Minutes of said regular meeting. WITNESS, my hand and seal of said City this day of .2005. City Clerk City Hall 952 - 927 -8861 4801 WEST 50TH STREET FAX 952 - 826 -0390 EDINA, MINNESOTA, 55424 -1394 www.cityofedina.com TTY 952 - 826 -0379 April 11, 2005 Mr. Wayne Houle, P.E. Director of Public Works /City Engineer City of Edina 4801 W. 50t}' Street Edina, MN 55435 RE: Letter of Agreement for Vernon Avenue Water main Relocation City Project No. 2005 -0100 Dear Wayne: This letter serves as an agreement between the cities of Edina and St. Louis Park related to the relocation of a water main on Vernon Avenue. The water main is located in and, serves property owners, in both cities. Due to the installation of a noise wall by the Minnesota Department of Transportation (Mn/DOT), it is necessary that the cities relocate the subject water main. Plans for this work, prepared by the City of St. Louis Park, have previously been submitted to your office for review and approval. In accordance with those plans, this letter attempts to lay out the roles and responsibilities of each agency in the undertaking of this project. Therefore, it is mutually agreed that: • it is necessary to relocate the water main to a location clear of the future noise wall • the City of St. Louis Park has prepared plans for this work which have been reviewed and approved by the City of Edina • the City of St. Louis Park will be responsible for procuring a contractor to execute this work in accordance with the Public Bidding Statutes and will provide the necessary construction observation and management of the project in accordance with approved plans and specifications • the City of Edina will be responsible for communicating with City of Edina residents regarding the project • the City of St. Louis Park will be responsible for communicating with City of St. Louis Park residents regarding the project • the City of St. Louis Park will be responsible for all payments to the contractor • the City of Edina will reimburse the City of St. Louis Park for that portion of the improvements located within the City of Edina based upon final quantities and costs upon completion of the project and receipt of an invoice from the City of St. Louis Park. • Restoration of the curb & gutter, driveway aprons, boulevards, etc. will be performed as a part of the Mn/DOT Noise Wall project • Maintenance of the roadway and water main will continue as currently performed by the cities • This letter of agreement shall expire upon full payment by the City of Edina for all work constructed Please review this letter to see if it meets your needs. If you are in agreement with the contents of this letter, please have the necessary signatures affixed and return both copies to my attention. The City of St. Louis Park will then sign the document and send you an original copy for your records. CITY OF ST. LOUIS PARK By: Jeffrey W. Jacobs, Mayor By: Thomas K. Harmening, City Manager Date: CITY OF EDINA By: James Hovland, Mayor By: Gordon Hughes, City Manager Date: Sincerely, �PEX M ' a A. Hagen, City Engineer c: Mike Rardin, Director of Public Works O:Tubwks\Const 2005\2005 -0100 - TH 100 WM RelocationTdina Agrmt Letter.DOC 11 a Info/Background: We have a vacancy on the Park Board and Bill Crawford has just resigned from the Heritage Preservation Board effective June 2005. On Tuesday evening I will make recommendations for these vacancies. M REPOKI/KLCUMMCN VA 11U1V To: City Council Agenda Item VI. C. From: James B. Hovland Consent Mayor Information Only Date: April 19, 2005 Mgr. Recommends F To HRA ® To Council ' Subject: Appointments to Park Board and Heritage Preservation Action VN Motion ° Board Resolution F1Ordinance Discussion Info/Background: We have a vacancy on the Park Board and Bill Crawford has just resigned from the Heritage Preservation Board effective June 2005. On Tuesday evening I will make recommendations for these vacancies. M COST OF GOODS SOLD MIX GENERAL SUPPLIES PROFESSIONAL SERVICES 4/6/2005 8:40:40 Page - 1 Business Unit BRIDGES GUARD RAILS EQUIPMENT OPERATION GEN GENERAL TURF CARE YORK SELLING CENTRAL SERVICES GENERAL ENGINEERING GENERAL SERVICE CONTRACTS EQUIPMENT RICHARDS GOLF COURSE TELEPHONE PSTF OCCUPANCY PRINTING COMMUNICATIONS GENERAL SUPPLIES GENERAL MAINTENANCE GENERAL SUPPLIES GRILL 63.24 108790 451768 5842.5515 R55CKREG LOG20000 63.24 CITY OF EDINA 270717 417/2005 102191 ADVANCED GRAPHIC SYSTEMS INC. Council Check Register 1,013.13 TONER CARTRIDGES 4!7/2005 — 417/2005 INV00060326 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 270713 417/2005 41712005 108757 3D SPECIALTIES 116355 ALIGNEX INC. 1,398.21 PANELS, FITTINGS 108934 418334 1343.6406 GENERAL SUPPLIES 1260.6103 1,398.21 202.35 270714 417/2005 4/7/2005 100613 AAA 100575 ALL SAFE FIRE & SECURITY 4,611.44 LICENSES 108724 032805 1553.6260 LICENSES & PERMITS 5430.6230 4,611.44 58.33 270715 4/7/2005 4/7/2005 101971 ABLE HOSE & RUBBER INC. 114821 ALLEGIANCE TELECOM CO WORLDWID 39.42 SCREW, BALL BEARING, HANDLE 108725 05 -02100 1643.6530 REPAIR PARTS 39.42 270716 417/2005 102971 ACE ICE COMPANY COST OF GOODS SOLD MIX GENERAL SUPPLIES PROFESSIONAL SERVICES 4/6/2005 8:40:40 Page - 1 Business Unit BRIDGES GUARD RAILS EQUIPMENT OPERATION GEN GENERAL TURF CARE YORK SELLING CENTRAL SERVICES GENERAL ENGINEERING GENERAL SERVICE CONTRACTS EQUIPMENT RICHARDS GOLF COURSE TELEPHONE PSTF OCCUPANCY PRINTING COMMUNICATIONS GENERAL SUPPLIES GENERAL MAINTENANCE GENERAL SUPPLIES GRILL 63.24 108790 451768 5842.5515 63.24 270717 417/2005 102191 ADVANCED GRAPHIC SYSTEMS INC. 1,013.13 TONER CARTRIDGES 108870 INV00060326 1550.6406 1,013.13 270718 41712005 116355 ALIGNEX INC. 202.35 SOFTWARE INSTALLATION 108871 2262 1260.6103 202.35 270719 4/7/2005 100575 ALL SAFE FIRE & SECURITY 58.33 EXTINGUISHER CERTIFICATION 108726 64985 5430.6230 58.33 270720 4/7/2005 114821 ALLEGIANCE TELECOM CO WORLDWID 544.24 PHONE /DATA 108935 15012358 7411.6188 544.24 270721 4/7/2005 102116 ANCHOR PRINTING CO. 783.28 CITY COUNCIL BROCHURES 108727 13882 2210.6575 783.28 270722 41712005 101874 ANCOM COMMUNICATIONS INC. 134.19 RADIO ACCESSORIES 108936 40544 1301.6406 134.19 270723 41712005 102172 APPERrS FOODSERVICE 107.03 108728 359492 5421.6406 COST OF GOODS SOLD MIX GENERAL SUPPLIES PROFESSIONAL SERVICES 4/6/2005 8:40:40 Page - 1 Business Unit BRIDGES GUARD RAILS EQUIPMENT OPERATION GEN GENERAL TURF CARE YORK SELLING CENTRAL SERVICES GENERAL ENGINEERING GENERAL SERVICE CONTRACTS EQUIPMENT RICHARDS GOLF COURSE TELEPHONE PSTF OCCUPANCY PRINTING COMMUNICATIONS GENERAL SUPPLIES GENERAL MAINTENANCE GENERAL SUPPLIES GRILL R55CKREG LOG20000 Check # Dale Amount Vendor / Explanation P O REPAIR PARTS 603.98 Council Check Register . COST OF GOODS SOLD MIX 711.01 4/7/2005 270724 41712005 118061 ARAMARK UNIFORM Inv No 37.98 UNIFORM PURCHASE 108728 . 27.19 UNIFORM PURCHASE COST OF GOODS SOLD 23.99 UNIFORM PURCHASE 1646.6201 63.92 UNIFORM PURCHASE 56657524 -1 121.88 UNIFORM PURCHASE 108874 25.98 .UNIFORM PURCHASE LAUNDRY 12.99 .UNIFORM PURCHASE 5422.6201 14.99 UNIFORM PURCHASE 56224868P0001 328.92 LAUNDRY 270725 4/7/2005 56631203 -1 100634 ASPEN EQUIPMENT CO. LAUNDRY 85.46 PRESSURE SWITCH, RELAY 1301.6201 380.21 BACKRACKS 56681623 -1 465.67 LAUNDRY 270726 41712005 103708 AUTOMATIC SYSTEMS CO. 301.50 SERVICE CALL 301.50 270727 41712005 112862 AXELSON, MARY 98.80 ART WORK SOLD AT EAC 98.80 270728 417/2005 103241 BALDINGER, WENDY 125.00 PERFORMANCE 4/14/05 125.00 - 270729 417/2005 102449 BATTERY WHOLESALE INC. 506.95 BATTERIES 47.09 BATTERY 554.04 270730 4/7/2005 101355 BELLBOY CORPORATION 500.00 325.00 107.30 20.13 499.50 108939 1061231 109045 1062261 108878 166665 109017 033005 109046 040105 108729 23069 108940 23399 108791 32786600 108792 32793700 108793 32793800 108794 39748000 108795 32786700 1553.6530 CITY OF EDINA REPAIR PARTS 5913.6180 Council Check Register . COST OF GOODS SOLD MIX 50TH ST SELLING 4/7/2005 - 4(712005 # Doc No Inv No Account No Subledger Account Description - 108728 . 359492 5421.5510 COST OF GOODS SOLD 108872 56641603 -1 1646.6201 LAUNDRY 108873 56657524 -1 1646.6201 LAUNDRY 108874 56641610 -1 1646.6201 LAUNDRY 108875 56631206 -1 5422.6201 LAUNDRY 108876 56224868P0001 1301.6201 LAUNDRY 108877 56631203 -1 5913.6201 LAUNDRY 108937 56626476 -1 1301.6201 LAUNDRY 108938 56681623 -1 1301.6201 LAUNDRY 108939 1061231 109045 1062261 108878 166665 109017 033005 109046 040105 108729 23069 108940 23399 108791 32786600 108792 32793700 108793 32793800 108794 39748000 108795 32786700 1553.6530 REPAIR PARTS 1553.6530 REPAIR PARTS 5913.6180 CONTRACTED REPAIRS 5101.4413 5610.6136 1553.6530 1553.6530 5842.5512 5822.5513 5822.5512 5822.5515 5862.5512 ART WORK SOLD 4/6/2005 8:40:40 Page - 2 Business Unit GRILL BUILDING MAINTENANCE BUILDING MAINTENANCE BUILDING MAINTENANCE MAINT OF COURSE & GROUNDS GENERAL MAINTENANCE DISTRIBUTION GENERAL MAINTENANCE GENERAL MAINTENANCE EQUIPMENT OPERATION GEN EQUIPMENT OPERATION GEN DISTRIBUTION ART CENTER REVENUES PROFESSIONAL SVC - OTHER ED ADMINISTRATION REPAIR PARTS REPAIR PARTS EQUIPMENT OPERATION GEN EQUIPMENT OPERATION GEN COST OF GOODS SOLD LIQUOR YORK SELLING COST OF GOODS SOLD WINE 50TH ST SELLING COST OF GOODS SOLD LIQUOR 50TH ST SELLING COST OF GOODS SOLD MIX 50TH ST SELLING COST OF GOODS SOLD LIQUOR VERNON SELLING y CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 3 417/2005 - 4!7/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 259.45 108796 32794100 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,711.38 270731 417/2005 117379 BENIEK PROPERTY SERVICES INC. 844.30 SNOW /LAWN CARE 109047 9123 7411.6136 SNOW & LAWN CARE PSTF OCCUPANCY 844.30 270732 417/2005 100661 BENN, BRADLEY 169.87 ART WORK SOLD AT EAC 109018 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 169.87 270733 4/7/2005 117697 BENSON, NANCY 35.75 ART WORK SOLD AT EAC 109019 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 35.75 270734 41712005 115067 BENSON, RON PAUL 52.00 ART WORK SOLD AT EAC 109020 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 52.00 270735 4/712005 100648 BERTELSON OFFICE PRODUCTS 11.69 OFFICE SUPPLIES 108730 3768400 1260.6406 GENERAL SUPPLIES ENGINEERING GENERAL 31.69 OFFICE SUPPLIES 108730 3768400 1495.6406 GENERAL SUPPLIES INSPECTIONS 93.67 PRINTER CARTRIDGES 108879 3787210 1120.6406 GENERAL SUPPLIES ADMINISTRATION 1.52 OFFICE SUPPLIES 108880 3785080 1260.6406 GENERAL SUPPLIES ENGINEERING GENERAL 8.73 OFFICE SUPPLIES 108880 3785080 1160.6406 GENERAL SUPPLIES FINANCE 46.60 OFFICE SUPPLIES 108880 3785080 1120.6406 GENERAL SUPPLIES ADMINISTRATION 62.33 OFFICE SUPPLIES 108880 3785080 1550.6406 GENERAL SUPPLIES CENTRAL SERVICES GENERAL 345.32 OFFICE SUPPLIES 108881 3767090 5862.6406 GENERAL SUPPLIES VERNON SELLING 50.45 LASER NAME BADGES 108941 3787960 1551.6406 GENERAL SUPPLIES CITY HALL GENERAL 187.17 OFFICE SUPPLIES 108995 3772530 1400.6513 OFFICE SUPPLIES POLICE DEPT. GENERAL 18.75 OFFICE SUPPLIES 109048 3783530 1552.6406 GENERAL SUPPLIES CENT SVC PW BUILDING 857.92 270736 417/2005 108515 BLAUER, LEIGH 35.75 ART WORK SOLD AT EAC 109021 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 35.75 270737 4/7/2005 100711 BLOOD, DAVID 100.00 POLICE SERVICE 108863 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 270738 4/7/2005 101010 BORDER STATES ELECTRIC SUPPLY i CITY OF EDINA 416/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 4. 4/7/2005 - 4/7/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Descriptlon Business Unit 172.80 DIMMER 108942 94299630' 1551.6530 REPAIR PARTS CITY HALL GENERAL 172.80 270739 41712005 100659 BOYER TRUCK PARTS 210.49 ANTI -LOCK 108943 731904 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 197.09 WINDSHIELD 108944 - 730065 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 407.58 270740 417/2005 100667 BROCK WHITE COMPANY 2,500.35 SEALER 109049 11322396 -00 1301.6519 ROAD OIL GENERAL MAINTENANCE 2,316.38- CREDIT 109120 11303835 -00 1301.6519 ROAD OIL GENERAL MAINTENANCE 183.97 270741 41712005 100776 BUTLER, GEORGE 100.00 POLICE SERVICE 108861 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 270742 417/2005 105315 CALTON, BOB 26.00 ART WORK SOLD AT EAC 109022 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 26.00 270743 41712005 102046 CAMPE, HARRIET 72.15 ART WORK SOLD AT EAC 109023 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 72.15 270744 41712005 100681 CATCO 273.07 HOSE, FITTINGS 108945 3 -71636 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 29.86 HOSE, CONNECTOR 108946 3 -71225 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 266.25 TIE RODS 108947 3 -71487 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 45.90 FITTINGS 108948 3 -71459 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 13.42 GLADHANDS 108949 3 -71122 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 52.82- CREDIT 108950 3 -70948 1553:6530 REPAIR PARTS EQUIPMENT OPERATION GEN 575.68 270745 4/7/2005 102372 COW GOVERNMENT INC. 342.92 TONER CARTRIDGE 108882 RL17247 1260.6548 BLUE PRINTING ENGINEERING GENERAL 250.27 DATA TRAVELERS 108996 RL35875 1400.6406 GENERAL SUPPLIES POLICE DEPT. GENERAL 593.19 270746 4/7/2005 105038 CENTRAL MN TREE SERVICE LLC 585.75 ASSESSMENT REMOVAL 108731 PO 5485 4088.6103 PROFESSIONAL SERVICES TREE REMOVAL 2,130.00 ASSESSMENT REMOVAL 108732 PO 5849 4088.6103 PROFESSIONAL SERVICES TREE REMOVAL i CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 5 417/2005 -417/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 2,715.75 270747 417/2005 100683 CHEMSEARCH 713.07 RUST REMOVER GEL 108951 106179 1553.6406 GENERAL SUPPLIES EQUIPMENT OPERATION GEN 140.30 LUBRICANTS 108952 106180 1553.6406 GENERAL SUPPLIES EQUIPMENT OPERATION GEN 853.37 270748 41712005 100256 CINGULAR WIRELESS 23.07 108883 031705 5420.6188 TELEPHONE CLUB HOUSE 23.07 270749 41712005 102123 CIT GROUP /COMMERCIAL SERVICES, 29.98 MERCHANDISE 108884 305506 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 29.98 270750 417/2005 101223 CITIES FORD 29.29 VALVE ASSEMBLY 108953 116705WFOW 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 40.85 SWITCH 108954 116703WFOW 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 8.34 RELAY 108955 117003WFOW 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 32.42 HANDLE ASSEMBLY - 108956 117000WFOW 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 79.88- CREDIT 108957 CM116467WFOW 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 31.02 270751 41712005 118064 CITY OF BROOKLYN PARK 220.00 TRAINING REGISTRATION 108997 033105 1400.6104 CONFERENCES 8 SCHOOLS POLICE DEPT. GENERAL 220.00 270752 4/712005 101345 COLOURS 9,295.59 ABOUT TOWN DESIGN 109121 9284 -1,2 2210.6123 MAGAZINE/NEWSLETTER EXPENSE COMMUNICATIONS 9,295.59 270753 41712005 101323 CONNEY SAFETY PRODUCTS 10.92 DUCT TAPE 108733 02534479 1301.6406 GENERAL SUPPLIES GENERAL MAINTENANCE 10.92 270754 41712005 104386 COTSWOLD INC. 240.34 MERCHANDISE 108734 7016 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 240.34 270755 41712005 116755 CSI ERGONOMICS 1,018.62 CHAIRS 108998 INV015371 1400.6406 GENERAL SUPPLIES POLICE DEPT. GENERAL 1,018.62 CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 6 4/7/2005 - 417/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270756 41712005 100701 CUSHMAN MOTOR CO. 934.53 CUSHMAN HAULSTER REPAIRS 108885 130220 5630.6180 CONTRACTED REPAIRS CENTENNIAL LAKES 136.88 STARTERS 109050 130239 5431.6530 REPAIR PARTS RICHARDS GC MAINTENANCE 1,071.41 270757 4!712005 104638 D. BRIAN'S DELI & CATERING 111.06 INTERVIEW MEALS 109051 13680 1400.6106 MEETING EXPENSE POLICE DEPT. GENERAL 111.06 270758 4/7/2005 103143 DAKOTA MAE DESIGNS 53.95 ART WORK SOLD AT EAC 109024 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 53.95 270759 417/2005 103176 DANICIC, JOHN 35.75 ART WORK SOLD AT EAC 109025 033005 5101.4413 ARTWORK SOLD ART CENTER REVENUES 35.75 270760 4/712005 102121 DATREK PROFESSIONAL BAGS INC 3,033.66 MERCHANDISE 108886 830231 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 3,033.66 270761 417/2. 005 116927 DAVIS SUN TURF 178.29 MOWER REPAIR PARTS 108958 T100135 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 155.64 SPINDLE, BLADE, SPRING 108959 T100135A 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN -333.93 270762 417/2005 102478 DAY DISTRIBUTING 2,546.25 108797 306794 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 19.80 108798 306793 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING 463.95 108799 306792 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 97.80 108800 305989 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 2,569.82 108801 305988 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 38.00 108802 306795 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 5,735.62 270763 41712005 118063, DC MANAGEMENT & ENVIRONMENTAL 11,649.00 LEAD REMOVAL 108960 05 -02 -01 7412.6103 PROFESSIONAL SERVICES PSTF RANGE 11,649.00 270764 417/2005 100720 DENNYS 5TH AVE. BAKERY 16.88 BAKERY 109052 186961 5421.5510 COST OF GOODS SOLD GRILL CITY OF EDINA 416/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 7 417/2005 — 41712005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 16.66 BAKERY 109053 186962 5421.5510 COST OF GOODS SOLD GRILL 33.54 270765 417/2005 108648 DOAN, SIIRI 110.50 ART WORK SOLD AT EAC 109026 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 110.50 270766 41712005 101691 DON BETZEN GOLF SUPPLY CO. 408.60 MERCHANDISE 108735 18903 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 408.60 270767 417/2005 117435 DUNCAN, PATRICIA 175.00 INSTRUCTOR AC 109043 031705 5110.6103 PROFESSIONAL SERVICES ART CENTER ADMINISTRATION 175.00 270768 417/2005 100739 EAGLE WINE 889.69 108803 211148 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 2,023.82 108804 211145 5662.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,640.29 109084 213181 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 1,122.52 109085 211149 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 5,676.32 270769 417/2005 100741 EAST SIDE BEVERAGE 2,706.10 108805 325451 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 2,706.10 270770 4/712005 100742 ECOLAB PEST ELIMINATION DIVISI 117.15 PEST CONTROL 109054 4432749 5620.6230 SERVICE CONTRACTS EQUIPMENT EDINBOROUGH PARK 117.15 270771 4!712005 104331 EILERS, JOYCE 95.88 ART WORK SOLD AT EAC 109027 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 95.88 270772 41712005 105339 ENRGI 1,520.00 WEBSITE CONSULTING 108736 2525 2210.6124 WEB DEVELOPMENT COMMUNICATIONS 2,188.75 WEBSITE CONSULTING 108737 2596 2210.6124 WEB DEVELOPMENT COMMUNICATIONS 3,708.75 270773 4/7/2005 100018 EXPERT T BILLING 5,448.00 FEB TRANSPORTS 109123 030205 1470.6103 PROFESSIONAL SERVICES FIRE DEPT. GENERAL 5,448.00 CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 8 4/7/2005 - 4/7/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270774 4/7/2005 100216 FARMER BROTHERS COFFEE 47.20 COFFEE 108887 7841882 5430.5510 COST OF GOODS SOLD RICHARDS GOLF COURSE 47.20 270775 4/712005 100297 FAST FOTO & DIGITAL 25.56 PHOTO PROCESSING 108738 T2- 200692 2210.6408 PHOTOGRAPHIC SUPPLIES COMMUNICATIONS 30.89 PHOTO PROCESSING 108888 T2- 201567 2210.6408 PHOTOGRAPHIC SUPPLIES COMMUNICATIONS 56.45 270776 4/7/2005 105824 FLYING CLOUD ANIMAL HOSPITAL 400.64 K9 HEALTH CHECK 108999 275709 1438.6103 PROFESSIONAL SERVICES K -9 UNIT 80.09 K9 HEALTH CHECK 109000 275736 1438.6103 PROFESSIONAL SERVICES K -9 UNIT 480.73 270777 4/7/2005 105599 FORTIS BENEFITS INSURANCE CO. 4,298.42 DENTAL PREMIUMS 108739 032205 1550.6040 HOSPITALIZATION CENTRAL SERVICES GENERAL 4,298.42 270778 4/7/2005 100775 GENERAL SPORTS CORPORATION 123.50 VOLLEYBALL T- SHIRTS 108961 69647 4077.6406 GENERAL SUPPLIES EDINA ATHLETIC ASSOCIATION 123.50 270779 41712005 117811 GOLDBERG, CAROLYN 60.45 ART WORK SOLD AT EAC 109028 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 60.45 270780 4/712005 100779 GOPHER CASH REGISTER 21.30 REGISTER REPAIR 108744 18954 5410.6230 SERVICE CONTRACTS EQUIPMENT GOLF ADMINISTRATION 21.30 270781 417/2005 101103 GRAINGER 39.97 MARKING WAND 108740 495- 376085 -9 5913.6406 GENERAL SUPPLIES DISTRIBUTION 174.59 PUMP KIT 108741 498- 202697 -5 1470.6530 REPAIR PARTS FIRE DEPT. GENERAL 117.06 SHELVING 108889 970- 974561 -7 5422.6406 GENERAL SUPPLIES MAINT OF COURSE & GROUNDS 273.90 CABINET 108890 495- 945575 -1 5422.6406 GENERAL SUPPLIES MAINT OF COURSE & GROUNDS 296.84 CABINET, LAMPS 108891 495- 184316 -0 5421.6406 GENERAL SUPPLIES GRILL 40.70 SOLDER 108962 495- 334009-0 1322.6406 GENERAL SUPPLIES STREET LIGHTING ORNAMENTAL 244.86 BINS 109055 498 -038211 -5 5422.6406 GENERAL SUPPLIES MAINT OF COURSE & GROUNDS 87.74 WRENCHES, HEX KEY SET 109056 498 - 983607 -9 5620.6556 TOOLS EDINBOROUGH PARK 1,275.66 R55CKREG LOG20000 CITY OF EDINA W01cvU0 0.YU.1. Council Check Register Page - 9 4/7/2005 - 417/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270782 417/2005 102217 GRAPE BEGINNINGS INC 242.50 108806 71671 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 242.50 270783 4/712005 100783 GRAYBAR ELECTRIC CO. INC. 88.35 CIRCUIT BREAKERS, RAY -O -VAC 108742 907826757 1322.6406 GENERAL SUPPLIES STREET LIGHTING ORNAMENTAL 88.35 270784 417/2005 100785 GREUPNER, JOE 10,050.00 2ND QTR RETAINER 108743 032805 5410.6132 PROFESSIONAL SVCS - GOLF GOLF ADMINISTRATION 3,521.10 GOLF LESSONS 109057 033105 5201.4543 GOLF DOME RECEIPTS GOLF DOME REVENUES 13,571.10 270785 41712005 100782 GRIGGS COOPER & CO. 170.79 108807 208484 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 990.64 108808 211547 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 52.35 108809 211146 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 3,156.65 108810 211147 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 67.25- 108811 660965 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 5,563.90 109086 211549 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 60.40 109087 211548 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 9,927.48 270786 4/712005 100155 GRI7TON, KAY 33.80 ART WORK SOLD AT EAC 109029 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 33.80 270787 41712005 100787 GRUBER'S POWER EQUIPMENT 28.07 WHEELS 108963 18689 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 28.07 270788 417/2005 100791 HALLMAN OIL COMPANY 402.41 OIL 108745 148232 1553.6584 LUBRICANTS EQUIPMENT OPERATION GEN 417.18 HYDRAULIC OIL 108746 148234 1553.6584 LUBRICANTS EQUIPMENT OPERATION GEN 504.95 5W30 OIL 108747 148233 1553.6584 LUBRICANTS EQUIPMENT OPERATION GEN 1,324.54 270789 41712005 105504 HAMILTON, WAYNE 100.00 PERFORMANCE 4/12105 109058 040105 5610.6136 PROFESSIONAL SVC - OTHER ED ADMINISTRATION 100.00 270790 41712005 102711 HARRIS BILLINGS COMPANY CITY OF EDINA 41612005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 10 4f7/2005 -- 4/7/2005 Check # Date Amount Vendor/ Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 745.50 PLASTIC PANELS, URINALS 108892 1012759 1646.6530 REPAIR PARTS BUILDING MAINTENANCE 745.50 270791 4/712005 102778 HARRIS COMPANIES 470.80 HUMIDITY SENSOR 108748 .014677 _ 1551.6530 REPAIR PARTS CITY HALL GENERAL 470.80 270792 41712005 100797 HAWKINS WATER TREATMENT 814.76 CHEMICALS 108893 695539 5915.6586 WATER TREATMENT SUPPLIES WATER TREATMENT 814.76 270793 41712005 102190 HAYNES, PATRICIA 34.78 ART WORK SOLD AT EAC 109030 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 34.78 270794 4/7/2005 103585 HENNEPIN COUNTY HOUSING DEPART - 31,943.65 REHAB LOAN PAYBACKS (2) 108894 R- 02- 3,R -96 -6 2101.4205 FEDERAL AID CDBG REVENUES .31,943.65 270795 41712005 100801 HENNEPIN COUNTY TREASURER 570.50 FEB 2005 109001 000890 1195.6225 BOARD & ROOM PRISONER LEGAL SERVICES 570.50 270796 4!7/2005 106371 HENNEPIN FACULTY ASSOCIATES 2,265.17 MEDICAL DIRECTOR SERVICES 108869 040705 1470.6103 PROFESSIONAL SERVICES FIRE DEPT. GENERAL 2,265.17 270797 41712005 102483 HILTI INC. 254.28 DRILL BITS, MORTAR 108895 1600532756 5913.6406 GENERAL SUPPLIES DISTRIBUTION 254.28 270798 4/7/2005 105785 HINCKLEY CHEVROLET 17,297.85 2005 CHEVROLET IMPALA 109002 M5097 1400.6710 EQUIPMENT REPLACEMENT POLICE DEPT. GENERAL 17,297.85 2005 CHEVROLET IMPALA 109003 M5095 1400.6710 EQUIPMENT REPLACEMENT POLICE DEPT. GENERAL 17,297.85 2005 CHEVROLET IMPALA 109004 M5096 1400.6710 EQUIPMENT REPLACEMENT POLICE DEPT. GENERAL 17,297.85 2005 CHEVROLET IMPALA 109005 M5094 1400.6710 EQUIPMENT REPLACEMENT POLICE DEPT. GENERAL 69,191.40 270799 4f7/2005 104375 HOHENSTEINS INC. 376.45 108812 354585 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 376.45 4/6/2005 8:40:40 Page - 11 Business Unit EQUIPMENT OPERATION GEN GENERAL FUND BALANCE SHEET 377 06 MILEAGE REIMBURSEMENT 109006 040105 1120.6107 MILEAGE OR ALLOWANCE ADMINISTRATION 377.06 CITY OF EDINA R55CKREG LOG20000 270803 41712005 112050 IMAGE TREND INC. Council Check Register 1,625.00 EMS DATA SUPPORT 108749 4/7/2005 - 417/2005 1470.6160 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 270800 41712005 101040 HOPKINS TOWN & COUNTRY DODGE 41712005 100814 INDELCO PLASTICS CORP. 296.18 KNUCKLE 108964 114868 1553.6530 REPAIR PARTS 16.67 296.18 108750 382440 1646.6530 270801 417/2005 100810 HRAICITY OF EDINA 1,500.00 TO FUND HRA 109059 040405 1000.1303 DUE FROM HRA 105694 INFRATECH 1,500.00 270802 41712005 SEALFOAM 101426 HUGHES, GORDON 0501379 5923.6406 4/6/2005 8:40:40 Page - 11 Business Unit EQUIPMENT OPERATION GEN GENERAL FUND BALANCE SHEET 377 06 MILEAGE REIMBURSEMENT 109006 040105 1120.6107 MILEAGE OR ALLOWANCE ADMINISTRATION FIRE DEPT. GENERAL BUILDING MAINTENANCE COLLECTION SYSTEMS COMMUNICATIONS EQUIPMENT OPERATION GEN FIRE DEPT. GENERAL CENT SVC PW BUILDING FIRE DEPT. GENERAL FIRE DEPT. GENERAL 100.00 POLICE SERVICE 108867 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 377.06 270803 41712005 112050 IMAGE TREND INC. 1,625.00 EMS DATA SUPPORT 108749 004100 1470.6160 DATA PROCESSING 1,625.00 270804 41712005 100814 INDELCO PLASTICS CORP. 16.67 PVC ELBOWS, TEES, CROSSES 108750 382440 1646.6530 REPAIR PARTS 16.67 270805 4/712005 105694 INFRATECH 191.70 SEALFOAM 108896 0501379 5923.6406 GENERAL SUPPLIES 191.70 270806 4/712005 116191 INSTY- PRINTS 384.97 UTILITY BILL STUFFERS 109122 69265 2210.6575 PRINTING 384.97 270807 41712005 101403 J -CRAFT 99.55 SOLENOID VALVE 108965 36523 1553.6180 CONTRACTED REPAIRS 99.55 270808 417/2005 101861 J.H. LARSON COMPANY 1.04 CORD 108897 4468622 -01 1470.6406 GENERAL SUPPLIES 77.72 CONDUIT, BODY, COVER 108897 4468622 -01 1552.6406 GENERAL SUPPLIES 67.83 CORD 108966 4468671 -01 1470.6406 GENERAL SUPPLIES 135.67 POWER CORD 109060 4464631 -03 1470.6406 GENERAL SUPPLIES 282.26 270809 41712005 101400 JAMES, WILLIAM F FIRE DEPT. GENERAL BUILDING MAINTENANCE COLLECTION SYSTEMS COMMUNICATIONS EQUIPMENT OPERATION GEN FIRE DEPT. GENERAL CENT SVC PW BUILDING FIRE DEPT. GENERAL FIRE DEPT. GENERAL 100.00 POLICE SERVICE 108867 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 R55CKREG LOG20000 CITY OF EDINA 4/6/2005 8:40:40 Council Check Register Page -. 12 417/2005 -417/2065 Check # Date Amount Vendor/ Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270811 41712005 100835 JOHNSON BROTHERS LIQUOR CO. 3,125.71 108813 1874171 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 432.55 108814 1874169 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 2,542.90 108815 1874166 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 188.65 108816 1874172 5862.5512' COST OF GOODS SOLD LIQUOR VERNON SELLING 35.20 108817 1874176 5862.5515 COST OF GOODS'SOLD MIX VERNON SELLING 3,228.82 108818 1874175 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 237.40 108819 1874312 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 1,378.97 108820 1874173 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,608.00- 108821 277170 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 379.80- 108822 - 277288 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 56.95- 108823 274016 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 253.05 109088 1876592 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 304.20 109089 1876593 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 383.20 109090 1876596 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 742.60 109091 1876598 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 2.85 109092 1876605 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 1,107.65 109093 1876599 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 1,858.14 109094 1876601 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 5,030.13 109095 1876603 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 1,268.49 109096 . 1876608 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 32.20 109097 1876604 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 3,232.92 109098 1876600 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 6,108.80 109099 1876606 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 29,449.68 . 270812 417/2005 100919 JOHNSON, NAOMI 7.80 PETTY CASH 109061 031905 5101.4413 ART WORK SOLD ART CENTER REVENUES 15.96 PETTY CASH 109061 031905 5125.6564 CRAFT SUPPLIES MEDIA STUDIO 41.32 PETTY CASH 109061 031905 5110.6564 CRAFT SUPPLIES ART CENTER ADMINISTRATION 46.61 PETTY CASH 109061 031905 5111.5510 COST OF GOODS SOLD ART CENTER BLDG /MAINT 75.55 PETTY CASH 109061 031905 5120.6406 GENERAL SUPPLIES ART SUPPLY GIFT GALLERY SHOP 114.95 PETTY CASH 109061 031905 5111.6406 GENERAL SUPPLIES ART CENTER BLDG /MAINT 118.26 PETTY CASH 109061 031905 5110.6122 ADVERTISING OTHER ART CENTER ADMINISTRATION 420.45 270813 4/7/2005 118069 JOYCE, CYNTHIA 133.90 ART WORK SOLD AT EAC 109031 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 133.90 270814 4/7/2005 100846 KUETHER DISTRIBUTING CO CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 13 417/2005 — 4/7/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 859.00 108824 431004 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 859.00 270815 41712005 117222 LAKES LANDSCAPE SERVICES 159.75 SPRINKLER REPAIR 108898 4063 01205.1705.30 CONTRACTOR PAYMENTS WOODDALE - 56 TO W RECLAIM 159.75 270816 4 /7/2005 100852 LAWSON PRODUCTS INC. 361.99 LOCK NUTS, WASHERS 108967 3037209 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 361.99 270617 4 /712005 100853 LEEF SERVICES 31.42 SHOP TOWELS 108899 359332 5422.6201 LAUNDRY MAINT OF COURSE & GROUNDS 31.42 270818 417/2005 118060 LINRUD, PEGGY 127.61 INVISIBLE FENCE REPAIR 108900 033005 01202.1705.30 CONTRACTOR PAYMENTS HALIFAX - GRIMES STREET RECON 127.61 270819 417/2005 116882 LIPPERT, BARBARA 52.00 ART WORK SOLD AT EAC 109032 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 52.00 270820 41712005 106301 LOFFLER COMPANIES INC. 56.00 COPIER USAGE 108751 110962 1552.6406 GENERAL SUPPLIES CENT SVC PW BUILDING 56.00 270821 4/7/2005 117023 LOUDER, MICHAEL 108.00 MODEL 109044 031705 5110.6103 PROFESSIONAL SERVICES ART CENTER ADMINISTRATION 108.00 270822 41712005 118059 LOW AND INSIDE LLC 2,650.00 OPEN HOUSE DESIGN 108901 L -5193 2210.6103 PROFESSIONAL SERVICES COMMUNICATIONS 2,650.00 270823 417/2005 100864 MAC QUEEN EQUIP INC. 150.00 SWEEPER CLINIC 108968 3/17 1281.6104 CONFERENCES & SCHOOLS TRAINING 150.00 270824 41712005 100868 MARK VII SALES 2,606.43 108825 778689 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 21.95 108826 778690 5842.5515 COST OF GOODS SOLD MIX YORK SELLING CITY OF EDINA 4/6/2005 8:40:40 R55CKREG L0620000 Council Check Register Page - 14 4f7/2005 - 417/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 2,628.38 270825 4(712005 102600 MATRIX COMMUNICATIONS INC 62.50 TELEPHONE SERVICE 108969 23704 1550.6188 TELEPHONE CENTRAL SERVICES GENERAL 62.50 270826 417/2005 100870 MATRX 105.60 AMBULANCE SUPPLIES 108752 885953 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 300.74 AMBULANCE SUPPLIES 108753 885915 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 406.34 270827 4/7/2005 118067 MCCALL, H. 59.71 OVERPAYMENT_ REFUND 109062 040105 5900.1211.1 ACCTS RECEIVABLE MANUAL UTILITY BALANCE SHEET 59.71 270828 4f7/2005 100875 MCCAREN DESIGNS INC. 750.83 PLANTS 109063 30528 5620.6620 TREES, FLOWERS, SHRUBS EDINBOROUGH PARK 750.83 270829 4(712005 111825 MCGUIRE MECHANICAL SERVICES IN 566.57 TOILET REPAIR 108754 .2486 1551.6180 CONTRACTED REPAIRS CITY HALL GENERAL 566.57 270830 417/2005 101483 MENARDS 35.61 VARNISH 108756 10175 1301.6406 GENERAL SUPPLIES GENERAL MAINTENANCE 35.61 270831 417/2005 102281 MENARDS 79.23 MAILBOXES 108970 63108 1318.6406 GENERAL SUPPLIES SNOW & ICE REMOVAL 79.23 270832 4(7/2005 100681 MERFELD, BURT 100.00 POLICE SERVICE 108862 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 270833 417/2005 100882 MERIT SUPPLY 477.65 TAR/ASPHALT CLEANER 108971 66577 1314.6406 GENERAL SUPPLIES STREET RENOVATION 477.65 270834 4/7/2005 102508 METZGER, MAURE ANN 27.30 ART WORK SOLD AT EAC 109033 033005 '5101.4413 ART WORK SOLD ART CENTER REVENUES 27.30 CITY OF EDINA 4/612005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 15 4f7/2005 — 4f7/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270835 417/2005 100889 MGA 85.00 RULES SEMINAR 108755 032805 5410.6104 CONFERENCES & SCHOOLS GOLF ADMINISTRATION 85.00 270836 4/712005 103186 MIDWEST FUELS 554.31 FUEL 108902 25427 5422.6581 GASOLINE MAINT OF COURSE & GROUNDS 554.31 270837 4/712005 108693 MIKULICH, KIM 130.00 ART WORK SOLD AT EAC 108903 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 130.00 270838 4/712005 100913 MINNEAPOLIS SUBURBAN SEWER &W 1,360.00 WATER SERVICE REPAIR 108757 32641 5913.6180 CONTRACTED REPAIRS DISTRIBUTION 680.00 WATER SERVICE REPAIR 108972 32644 5913.6180 CONTRACTED REPAIRS DISTRIBUTION 1,360.00 WATER SERVICE REPAIR 108973 32646 5913.6180 CONTRACTED REPAIRS DISTRIBUTION 3,400.00 270839 4/712005 101878 MINNESOTA REAL ESTATE JOURNAL 85.00 SUBSCRIPTION RENEWAL 108904 020521 -2005 1190.6105 DUES & SUBSCRIPTIONS ASSESSING 85.00 270840 41712005 118066 MINNESOTA REVENUE 1,230.00 WO ANNUAL PERMIT FEE 109064 4400034491 5915.6260 LICENSES & PERMITS WATER TREATMENT 1,230.00 270841 41712005 101996 MINNESOTA TROPHIES & GIFTS 58.79 PLAQUE 109007 103863 1400.6406 GENERAL SUPPLIES POLICE DEPT. GENERAL 58.79 270842 4/7/2005 100908 MINNESOTA WANNER 1,396.65 ALUMINUM & FABRICATION 108758 0063283 -IN 4400.6710 EQUIPMENT REPLACEMENT CITY HALLIPOLICE BUILDING 21.30 ANGLE IRON 108974 0063315 -IN 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 1,417.95 270843 41712005 102577 MISTER CAR WASH 818.99 CAR WASHES 109008 032205SM01 1553.6238 CAR WASH EQUIPMENT OPERATION GEN 818.99 270844 41712005 114343 MULLEN, JANET 28.28 ART WORK SOLD AT EAC 109034 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page- 16 4/712005 - 4!7/2005 Check # Date Amount Vendor I Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 28.28 270845 417/2005 100922 NEWMAN TRAFFIC SIGNS 1,724.51 SIGNS 109065 TI -0138512 1325:6531 SIGNS & POSTS . STREET NAME SIGNS 1.724.51 270846 41712005 104672 NEXTEL COMMUNICATIONS 366.63 109009 909583317040 1400.6188 TELEPHONE POLICE DEPT. GENERAL 113.48 109124" 737969523010 1495.6188 TELEPHONE INSPECTIONS 480.11 270847 4/712005 100724 NISSEN, DICK 100.00 POLICE SERVICE 108866 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 270848 4/7/2005 100930 NORTHWESTERN TIRE CO. 436.93 RECAPS, DISPOSAL FEE 108975 NW- 94964' 1553.6583 TIRES & TUBES EQUIPMENT OPERATION GEN 305.81 TIRES, DISPOSAL FEE 108976 NW -94865 1553.6583 TIRES 8 TUBES EQUIPMENT OPERATION GEN 742.74 270849 41712005 116480 NSITE MYSTERY SHOPPING 165.00 MYSTERY SHOPPING 108905 1132 5820.6103 PROFESSIONAL SERVICES 50TH STREET GENERAL 165.00 MYSTERY SHOPPING 108905 1132 5840.6103 PROFESSIONAL SERVICES LIQUOR YORK GENERAL 165.00 MYSTERY SHOPPING 108905 1132 5860.6103 PROFESSIONAL SERVICES VERNON LIQUOR GENERAL 495.00 270850 417/2005 101592 OFFICEMAX CREDIT PLAN 20.43 109066 032405 1504.6218 EDUCATION PROGRAMS HUMAN RELATION COMMISSION 34.69 109066 032405 2210.6406 GENERAL SUPPLIES COMMUNICATIONS 75.04 109066 032405 1643.6406 GENERAL SUPPLIES GENERAL TURF CARE 130.16 270851 417/2005 100936 OLSEN COMPANIES 36.93 CHAIN SAW PARTS 108906 328667 5422.6530 REPAIR PARTS MAINT OF COURSE 8 GROUNDS 36.93 270852 41712005 115669 ON CALL SERVICES 490.00 ACCESS PANEL INSTALLATION 109067 1132 5620.6180 CONTRACTED REPAIRS EDINBOROUGH PARK 490.00 270853 4/7/2005 101718 PARTS PLUS 2,036.27 PARTS 108977 032605 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN R55CKREG LOG20000 Check # Date Amount Vendor / Explanation 2,036.27 270854 4/7/2005 100347 PAUSTIS & SONS 720.00 270855 CITY OF EDINA VERNON SELLING 4/612005 8:40:40 PEPSI -COLA COMPANY Council Check Register 5862.5513 Page - 17 VERNON SELLING 4/7/2005 - 4!7/2005 COST OF GOODS SOLD WINE YORK SELLING PO # Doc No Inv No Account No Subledger Account Description Business Unit 109100 8065194 -IN 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 109101 8065193 -IN 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 109102 8065195 -IN 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 270855 417/2005 VERNON SELLING 100945 PEPSI -COLA COMPANY VERNON SELLING 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 345.20 COST OF GOODS SOLD WINE YORK SELLING 108759 76554848 50TH ST SELLING 5822.5513 172.90 50TH ST SELLING 5822.5515 108827 79754504 5822.5513 COST OF GOODS SOLD WINE 743.85 5842.5512 COST OF GOODS SOLD LIQUOR 108907 74263877 COST OF GOODS SOLD WINE YORK SELLING 1,261.95 COST OF GOODS SOLD WINE YORK SELLING 5842.5513 COST OF GOODS SOLD WINE 270856 4/7/2005 102406 PETSMART #458 76.01 K9 SUPPLIES 109010 T-0845 76.01 270857 41712005 100743 PHILLIPS WINE & SPIRITS 1,209.65 108828 2179515 94.40 108829 2179516 918.65 108830 2179514 1,576.40 108831 2179510 5.50- 108832 3315717 395.40 109103 2181311 47.20 109104 2181312 319.50 109105 2181313 398.79 109106 2181315 1,759.00 109107 2181310 825.00 109108 2180995 1,817.60 109109 2181316 9,356.09 270858 4/7/2005 100119 PING 188.82 GOLF BAGS 108908 7261390 188.82 270859 417/2005 101110 POLLY NORMAN PHOTOGRAPHY 350.00 ABOUT BUSINESS PHOTOS 108760 032405 350.00 270860 417/2005 116396 PRAXAIR DISTRIBUTION INC 5421.5510 5842.5515 5430.5510 1438.6406 COST OF GOODS SOLD GRILL COST OF GOODS SOLD MIX YORK SELLING COST OF GOODS SOLD RICHARDS GOLF COURSE GENERAL SUPPLIES K -9 UNIT 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 2210.6123 MAGAZINE/NEWSLETTER EXPENSE COMMUNICATIONS CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 18 417/2005 -417/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 1,400.88 CO2 8 METHANE 108978. 160724 7413.6406 GENERAL SUPPLIES PSTF FIRE TOWER 1,400.88 270861 417/2005 102728 PRECISION LANDSCAPE AND TREE C 1,224.75 ASSESSMENT TREE REMOVAL 108909 PO 5237 4088.6103 PROFESSIONAL SERVICES TREE REMOVAL 1,224.75 270862 417/2005 118062 PRETTY CASES INC. 125.00 MERCHANDISE 108910 6695 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 125.00 . 270863 41712005 100968 PRIOR WINE COMPANY 215.89 108833 211535 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 822.20 108834 201731 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 2,275.45 108835 211533 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 755.60 109110 211537 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 171.14 109111 211828 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 5,171.25 109112 211536 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 9,411.53 270864 41712005 103094 PROTECTION ONE 124.61 ALARM SERVICE 108911 031305 5511.6250 ALARM SERVICE ARENA BLDG /GROUNDS 124.61 270865 417/2005 101877 PRUDENTIAL INSURANCE COMPANY , 5.22 COBRA 109011 033105 1550.6040 HOSPITALIZATION CENTRAL SERVICES GENERAL 5.22 270867 4/7/2005 100971 QUALITY WINE 8.44- 108836 532503 -00 5860.5518 VENDOR DISCOUNTS VERNON LIQUOR GENERAL 857.18 108836 532503 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING .35- 108837 532473 -00 5860.5518 VENDOR DISCOUNTS VERNON LIQUOR GENERAL 36.82 108837 532473 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 8.35- 108838 532617 -00 5820.5518 VENDOR DISCOUNTS 50TH STREET GENERAL 421.24 108838 532617 -00 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 7.96- 108839 532562 -00 5820.5518 VENDOR DISCOUNTS 50TH STREET GENERAL 800.62 108839 532562 -00 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 6.77- 108840 531999 -00 5820.5518 VENDOR DISCOUNTS 50TH STREET GENERAL 685.35 108840 531999 -00 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 18.32- 108841 532467 -00 5860.5518 VENDOR DISCOUNTS _ VERNON LIQUOR GENERAL 1,852.48 108841 532467 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 17.60- 108842 532708 -00 5860.5518 VENDOR DISCOUNTS VERNON LIQUOR GENERAL CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 19 417/2005 -41712005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 887,81 108842 532708 -00 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 47.45- 109113 532714 -00 5840.5518 VENDOR DISCOUNTS LIQUOR YORK GENERAL 2,391.48 109113 532714 -00 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 12.83- 109114 532499 -00 5840.5518 VENDOR DISCOUNTS LIQUOR YORK GENERAL 1,300.56 109114 532499 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 19.02- 109115 532477 -00 5840.5518 VENDOR DISCOUNTS LIQUOR YORK GENERAL 1,934.82 109115 532477 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING .93- 109116 533483 -00 5840.5518 VENDOR DISCOUNTS LIQUOR YORK GENERAL 93.07 109116 533483 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 11,113.41 270868 4/7/2005 101965 QWEST 86.40 952 929 -9549 108979 9549 -3/05 5841.6188 TELEPHONE YORK OCCUPANCY 54.58 952 929 -0297 108980 0297 -3/05 4090.6188 TELEPHONE STREET REVOLVING 96.15 952 927 -8861 108981 8861 -3105 1550.6188 TELEPHONE CENTRAL SERVICES GENERAL 237.13 270869 4/712005 118052 REAL PRODUCTIONS 576.70 STATE OF THE CITY FILMING 108761 00012172 2210.6103 PROFESSIONAL SERVICES COMMUNICATIONS 576.70 270870 4!712005 102857 RECREATION SPORTS & PLAY 740.18 BLEACHERS FOR WEBER PK 108762 NB -0315A 1647.6406 GENERAL SUPPLIES PATHS & HARD SURFACE 740.18 270871 41712005 118068 REICHGELD, ROBERT 100.00 CLOTHING ALLOWANCE 109068 040105 5620.6201 LAUNDRY EDINBOROUGH PARK 100.00 270872 417/2005 100980 ROBERT B. HILL CO. 17.57 SOFTENER SALT 108763 00161073 1470.6406 GENERAL SUPPLIES FIRE DEPT. GENERAL 17.57 270873 417/2005 100981 ROCHESTER MIDLAND 125.00 SANITATIONIDEODORIZER 109069 260727 5430.6511 CLEANING SUPPLIES RICHARDS GOLF COURSE 125.00 SANITATION /DEODORIZER 109069 260727 5424.6406 GENERAL SUPPLIES RANGE 125.00 SANITATION /DEODORIZER 109069 260727 5210.6511 CLEANING SUPPLIES GOLF DOME PROGRAM 125.00 SANITATION /DEODORIZER 109069 260727 5422.6230 SERVICE CONTRACTS EQUIPMENT MAINT OF COURSE & GROUNDS 630.50 SANITATION/DEODORIZER 109069 260727 5421.6511 CLEANING SUPPLIES GRILL 1,130.50 270874 4/7/2005 100987 SA -AG INC R55CKREG LOG20000 CITY OF EDINA Council Check Register 417/2005 -417/2005 Check # Date Amount Vendor / Explanation PO # Doc No' Inv No Account No Subledger Account Description 575.79 ICE CONTROL SAND 109070 41884 1318.6517 SAND GRAVEL &ROCK GENERAL SUPPLIES COST OF GOODS SOLD 4/6/2005 8:40:40 Page - 20 Business Unit SNOW & ICE REMOVAL MAINT OF COURSE & GROUNDS GRILL SERVICE CONTRACTS EQUIPMENT CENTRAL SERVICES GENERAL TOOLS DISTRIBUTION ART WORK SOLD ART WORK SOLD PROFESSIONAL SERVICES ART WORK SOLD GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES. GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES ART CENTER REVENUES ART CENTER REVENUES DIAL -A -RIDE PROGRAM ART CENTER REVENUES STREET REVOLVING STREET REVOLVING STREET REVOLVING STREET REVOLVING . RICHARDS GC MAINTENANCE RICHARDS GC MAINTENANCE 575.79 270875 417/2005 111605 SABERTOOTH GOLF 809.13 RAKES 108912 4328 5422.6406 809.13 270876 4/712005 100305 SARA LEE COFFEE & TEA 509.34 COFFEE 109071 8321217 5421.5510 509.34 270877 4/712005 104151 SCHINDLER ELEVATOR CORP. 375.00 QUARTERLY MAINTENANCE 108913 8101260408 1550.6230 375.00 270878 4/7/2005 100992 SEARS COMMERCIAL ONE ACCOUNT 124.10 LASER MTS, WRENCH 108764 T756069 5913.6556 124.10 270879 4/7/2005 112875 SECOND FOUNDATION SCHOOL 100.75 ART WORK SOLD AT EAC 109035 033005 5101.4413 100.75 270880 4/7/2005 102870 SEIFERT, ELIZABETH 29.25 ART WORK SOLD AT EAC 109036 033005 5101.4413 29.25 270881 4/7/2005 101587 SENIOR COMMUNITY SERVICES 656.00 DIAL -A -RIDE JAN 2005 108765 032405 1514.6103 656.00 270882 4/7/2005 101380 SHAUGHNESY, SANDRA 53.95 ART WORK SOLD AT EAC 109037 033005 5101.4413 53.95 270883 417/2005 100998 SHERWIN WILLIAMS CO. 305.17 PAINT 108766 7492 -5 4090.6406 33.84 PAINT 108767 7610 -2 -4090.6406 33.84 PAINT 108768 7718 -3 4090.6406 27.20- CREDIT 108769 7602 -9 4090.6406 43.45 PAINT 109072 5038 -4 5431.6406 43.45 PAINT 109073 5036 -8 _ 5431.6406 GENERAL SUPPLIES COST OF GOODS SOLD 4/6/2005 8:40:40 Page - 20 Business Unit SNOW & ICE REMOVAL MAINT OF COURSE & GROUNDS GRILL SERVICE CONTRACTS EQUIPMENT CENTRAL SERVICES GENERAL TOOLS DISTRIBUTION ART WORK SOLD ART WORK SOLD PROFESSIONAL SERVICES ART WORK SOLD GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES. GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES ART CENTER REVENUES ART CENTER REVENUES DIAL -A -RIDE PROGRAM ART CENTER REVENUES STREET REVOLVING STREET REVOLVING STREET REVOLVING STREET REVOLVING . RICHARDS GC MAINTENANCE RICHARDS GC MAINTENANCE CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 21 47/2005 - 4!7/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 43.45- CREDIT 109074 5037 -6 5431.6406 GENERAL SUPPLIES RICHARDS GC MAINTENANCE 389.10 270884 4/712005 100301 SIMPLOT PARTNERS 1,846.71 FUNGICIDE 108914 430937SI 5422.6545 CHEMICALS MAINT OF COURSE & GROUNDS 1,354.68 FUNGICIDE 109075 431072SI 5422.6545 CHEMICALS MAINT OF COURSE & GROUNDS 3,201.39 270885 4/7/2005 101000 SIR SPEEDY 259.64 BUSINESS CARDS 108915 46800 1550.6406 GENERAL SUPPLIES CENTRAL SERVICES GENERAL 259.64 270886 417/2005 101002 SOUTHSIDE DISTRIBUTORS INC 6,217.55 108843 162668 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 49.90 108844 162667 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 13.85 108845 162663 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING 257.75 108846 162662 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 926.25 108847 162664 5622.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 7,465.30 270887 41712005 110977 SOW, ADAMA 345.80 ART WORK SOLD AT EAC 109038 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 345.80 270888 4/7/2005 101021 SPEEDWAY SUPERAMERICA LLC 116.49 FUEL, PROPANE 108982 032305 1314.6406 GENERAL SUPPLIES STREET RENOVATION 116.49 270889 41712005 116856 SPRINT 1,003.73 CDMA SERVICE 109012 031805 1400.6160 DATA PROCESSING POLICE DEPT. GENERAL 1,003.73 270890 41712005 101004 SPS COMPANIES 124.36 ANODE RODS 108770 S1188074.001 1646.6530 REPAIR PARTS BUILDING MAINTENANCE 239.31 WATER HEATER 108771 S1205055.001 1646.6530 REPAIR PARTS BUILDING MAINTENANCE 363.67 270891 41712005 103277 ST. JOSEPH EQUIPMENT CO INC 40.79 FILTERS 108983 S136529 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 30.01 HOSE 108984 S136533 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 70.80 CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 22 417/2005 - 41712005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270892 417/2005 101009 STATE TREASURER 35.00 SEMINAR 5/25105 108985 SPRING 1495.6104 CONFERENCES & SCHOOLS INSPECTIONS 35.00 270893 417/2005 101014 STREFF ADVERTISING INC 273.45 ANNUAL MEETING 108916 148073 1100.6106 MEETING EXPENSE CITY COUNCIL 273.45 270894 417/2005 101015 STREICHERS 621.00 LEATHERMAN FUSE 109013 1245655 1400.6406 GENERAL SUPPLIES POLICE DEPT. GENERAL 298.09 SQUAD SPOTLIGHT 109014 1255832 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL 298.09- SPOTLIGHTS 109076 CM203924 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL 621.00 270895 4/7/2005 101017 SUBURBAN CHEVROLET. 82.14 CYLINDERS, KEY 108986 384598CVW 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 82.14 270896 4/7/2005 105874 SUBURBAN TIRE WHOLESALE INC. 73.61 TIRE 108987 10034978 1553.6583 TIRES & TUBES EQUIPMENT OPERATION GEN 73.61 270897 417/2005 102140 SUN MOUNTAIN SPORTS INC. 1,194.50 MERCHANDISE 108917 548127 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 1,194.50 270898 417/2005 100900 SUN NEWSPAPERS 608.00 WANT AD 108772 763913 1550.6121 ADVERTISING PERSONNEL CENTRAL SERVICES GENERAL 608.00 270899 4/7/2005 110674 SUPERIOR WIRELESS COMMUNICATIO 15.00 REPLACE PARTS 109015 9375 1400.6188 TELEPHONE POLICE DEPT. GENERAL 15.00 270900 41712005 100794 SWANSON, HAROLD 100.00 POLICE SERVICE 108865 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 270901 4!7/2005 116868 SWENSON, SUSAN . 61.10 ART WORK SOLD AT EAC 109039 033005 5101.4413 ARTWORK SOLD ART CENTER REVENUES 61.10 CITY OF EDINA 4/6/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 23 4/7/2005 - 417/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270902 4/712005 116837 SWILER, KIM 31.20 ART WORK SOLD AT EAC 109040 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 31.20 270903 417/2005 102300 TCALMC 55.00 LMC TRAINING 109077 #3 1281.6104 CONFERENCES & SCHOOLS TRAINING 55.00 270904 41712005 101526 THOMPSON, BETTY 48.75 ART WORK SOLD AT EAC 109041 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 48.75 270905 4/712005 118072 THOMPSON, PAUL 28.50 WARMINGHOUSE HRS REFUND 109125 040405 1600.4722.08 SHELTER BUILDING RENT PARK ADMIN. GENERAL 28.50 270906 417/2005 101034 THOMSEN & NYBECK 45.50 PROSECUTING - YEAZIZW 109078 9441 1195.6103 PROFESSIONAL SERVICES LEGAL SERVICES 1,875.20 PROSECUTING - PROTESTOR 109079 9443 1195.6103 PROFESSIONAL SERVICES LEGAL SERVICES 13,231.80 PROSECUTING 109080 9568 1195.6103 PROFESSIONAL SERVICES LEGAL SERVICES 15,152.50 270907 41712005 101035 THORPE DISTRIBUTING COMPANY 3,172.45 108848 366833 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 71.50 108849 366834 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 2,770.00 108850 366963 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 71.70 108851 366835 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 492.00 109081 16954 5421.5514 COST OF GOODS SOLD BEER GRILL 6,577.65 270908 41712005 103366 TIME WARNER CABLE 587.76 CABLE TV ADVERTISING 108919 159134 5822.6122 ADVERTISING OTHER 50TH ST SELLING 587.76 CABLE TV ADVERTISING 108919 159134 5842.6122 ADVERTISING OTHER YORK SELLING 587.78 CABLE TV ADVERTISING 108919 159134 5862.6122 ADVERTISING OTHER VERNON SELLING 1,763.30 270909 41712005 114701 TIME WARNER CABLE 50.62 CABLE TV 108918 032405 5511.6406 GENERAL SUPPLIES ARENA BLDG /GROUNDS 50.62 270910 4/712005 101474 TITLEIST 447.68 MERCHANDISE 108774 1960654 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES CITY OF EDINA 416/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 24 4/712005 -- 417/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 370.40 GLOVES 108920 1962779 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 654.71 CAPS, VISORS 108921 1968248 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 1,228.61 GOLF BAGS 108922 1977412 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 229.44 CAPS 108923 1977903 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 39.78 GOLF BALLS 108924 1974733 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 2,970.62 270911 41712005 102742 TKDA ENGINEERS ARCHITECTS PLAN 702.65 WATER LEAK LOCATING 108773 000200501155 5913.6103 PROFESSIONAL SERVICES DISTRIBUTION 702.65 270912 41712005 118003 TOMMY BAHAMA 255.91 MERCHANDISE 108775 8200158 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 255.91 270913 4/7/2005 112965 TOP FLITE GOLF CO., THE 431.55 GOLF BALLS 108776 54406754 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 71.40 GOLF BALLS 108925 54483404 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 94.20 GOLF BALLS 108926 54484826 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 597.15 270914 41712005 101693 TOTAL REGISTER 32.50 GIFT CARDS 108777 18125 5822.6406 GENERAL SUPPLIES 50TH ST SELLING 97.50 GIFT CARDS 108777 18125 5862.6406 GENERAL SUPPLIES . VERNON SELLING 131.99 GIFT CARDS 108777 18125 5842.6406 GENERAL SUPPLIES YORK SELLING 14.20 MONTHLY FTP FOLDER 108927 18129 5820.6160 DATA PROCESSING 50TH STREET GENERAL 14.20 MONTHLY FTP FOLDER 108927 18129 5840.6160 DATA PROCESSING LIQUOR YORK GENERAL 14.20 MONTHLY FTP FOLDER 108927 18129 5860.6160 DATA PROCESSING VERNON LIQUOR GENERAL 3.88 CREDIT CARD CLEANER 108928 18134 5822.6406 GENERAL SUPPLIES 50TH ST SELLING 3.88 CREDIT CARD CLEANER 108928 18134 5842.6406 GENERAL SUPPLIES YORK SELLING 3.89 CREDIT CARD CLEANER 108928 18134 5862.6406 GENERAL SUPPLIES VERNON SELLING 316.24 270915 41712005 118053 TOXALERT INTERNATIONAL INC. 250.00 CO2 SENSOR 108778 11239 1551.6530 REPAIR PARTS CITY HALL GENERAL 250.00 270916 417/2005 103153 TREUTING, KRISTEN 28.60 ART WORK SOLD AT EAC 109042 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 28.60 270917 41712005 101053 UNITED ELECTRIC COMPANY CITY OF EDINA 416/2005 8:40:40 R55CKREG LOG20000 Council Check Register Page - 25 417/2005 -417 /2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 860.86 ELECTRIC PLUG 108779 937227 5913.6406 GENERAL SUPPLIES DISTRIBUTION 860.86 270918 417/2005 101226 UPS STORE #2965, THE 10.43 SHIPPING CHARGES 108929 POS3248 2210.6235 POSTAGE COMMUNICATIONS 12.82 SHIPPING CHARGES 108930 POS3249 2210.6235 POSTAGE COMMUNICATIONS 23.25 270919 417/2005 103590 VALLEY -RICH CO. INC. 3,508.70 WATER MAIN REPAIR 109082 9289 5913.6180 CONTRACTED REPAIRS DISTRIBUTION 3,508.70 270920 417/2005 101058 VAN PAPER CO. 427.33 BAGS 108931 575066 5842.6512 PAPER SUPPLIES YORK SELLING 427.33 270921 41712005 101063 VERSATILE VEHICLES INC. 37,500.00 GOLF CARS 108780 32205001 5423.6710 EQUIPMENT REPLACEMENT GOLF CARS 37,500.00 270922 417/2005 101080 WALSH, WILLIAM 100.00 POLICE SERVICE 108864 040705 1419.6102 CONTRACTUAL SERVICES RESERVE PROGRAM 100.00 270923 417/2005 103266 WELSH COMPANIES LLC 593.65 APRIL MAINTENANCE 108932 033105 5841.6103 PROFESSIONAL SERVICES YORK OCCUPANCY 593.65 270924 417/2005 101033 WINE COMPANY, THE 2,012.80 108852 112474 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 374.40 108853 112476 -00 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 33.35- 108854 111421 -00 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 33.35- 108855 111425 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 2,320.50 270925 4/712005 101312 WINE MERCHANTS 2,000.20 108856 120389 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 2,984.41 108857 120390 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 56.45- 108858 23985 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 902.25 109117 120815 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 83.78 109118 120813 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 2,203.60 109119 120814 5842.5513 COST OF GOODS SOLD WINE YORK SELLING R55CKREG LOG20000 CITY OF EDINA 4/6/2005 8:40:40 Council Check Register Page - 26 4/7/2005 - 4/7/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 8,117.79 101087 WROBLESKI, HENRY 100.00 POLICE SERVICE 270926 417/2005 102492 WIRTGEN AMERICA 270930 41712005 101726 XCEL ENERGY 3,014.19 COVER PANEL, BLADES 108781 144496 53.88 SCREWS, PLATE 108988 144996 3,068.07 SENIOR CITIZENS 1,319.47 CIVILIAN DEFENSE 270927 4/712005 118065 WOODBURY POLICE ASSOCIATION 4,438.28 BUILDING MAINTENANCE 100.00 CERTIFICATION 109016 033105 100.00 STREET LIGHTING REGULAR LIGHT & POWER PUMP & LIFT STATION OPER 270928 4/7/2005 101086 WORLD_ CLASS WINES INC SAFETY EQUIPMENT ARENA ADMINISTRATION 337.00 ED ADMINISTRATION 108859 162783 449.00 108860 162866 270929 417/2005 101087 WROBLESKI, HENRY 100.00 POLICE SERVICE 100.00 RESERVE PROGRAM 270930 41712005 101726 XCEL ENERGY 53.08 DISTRIBUTION 401.95 STREET LIGHTING ORNAMENTAL 72.26 ART CENTER BLDG /MAINT 63.20 GOLF DOME PROGRAM 1,354.23 SENIOR CITIZENS 1,319.47 CIVILIAN DEFENSE 52.23 CITY HALL GENERAL 4,438.28 BUILDING MAINTENANCE 7.43 RICHARDS GOLF COURSE 160.38 TRAFFIC SIGNALS 24.65 STREET LIGHTING REGULAR 108868 040705 108782 21201262 108783 21378191 108784 21357177 108785 21381276 108786 21415135 108787 21548931 108788 21578621 108989 21855615 108990 21718132 108991 21835651 108992 21728152 108993 21794467 109126 22248973 1553.6530 1553.6530 1438.6104 5842.5513 5862.5513 1419.6102 1321.6185 5913.6185 1322.6185 5111.6185 5210.6185 1628.6185 1460.6185 1551.6185 1646.6185 5430.6185 1330.6185 1321.6185 5911.6185 270931 417/2005 101089 ZEE MEDICAL SERVICE 64.94 FIRST AID SUPPLIES 108789 54064316 5210.6610 166.56 FIRST AID SUPPLIES 108933 54064317 5510.6610 575.60 FIRST AID SUPPLIES 109083 54160628 5610.6610 807.10 REPAIR PARTS EQUIPMENT OPERATION GEN REPAIR PARTS EQUIPMENT OPERATION GEN CONFERENCES & SCHOOLS K -9 UNIT COST OF GOODS SOLD WINE YORK SELLING COST OF GOODS SOLD WINE VERNON SELLING CONTRACTUAL SERVICES RESERVE PROGRAM LIGHT & POWER STREET LIGHTING REGULAR LIGHT & POWER DISTRIBUTION LIGHT & POWER STREET LIGHTING ORNAMENTAL LIGHT & POWER ART CENTER BLDG /MAINT LIGHT& POWER GOLF DOME PROGRAM LIGHT & POWER SENIOR CITIZENS LIGHT & POWER CIVILIAN DEFENSE LIGHT & POWER CITY HALL GENERAL LIGHT & POWER BUILDING MAINTENANCE LIGHT & POWER RICHARDS GOLF COURSE LIGHT & POWER TRAFFIC SIGNALS LIGHT & POWER STREET LIGHTING REGULAR LIGHT & POWER PUMP & LIFT STATION OPER SAFETY EQUIPMENT GOLF DOME PROGRAM SAFETY EQUIPMENT ARENA ADMINISTRATION SAFETY EQUIPMENT ED ADMINISTRATION R55CKREG LOG20000 Check # Date Amount Vendor / Explanation 270932 41712005 101091 ZIEGLER INC 39.62 FILTERS 39.62 444,568.06 Grand Total Lim CITY OF EDINA Council Check Register 417/2005 4172005 PO # Doc No Inv No Account No Subiedger Account Description 108994 PC000782602 1553.6530 REPAIR PARTS Payment Instrument Totals Check Total 444,568.06 Total Payments 444,568.06 41612005 8:40:40 Page - 27 Business Unit EQUIPMENT OPERATION GEN R55CKSUM LOG20000 CITY OF EDINA Council Check Summary . 417/2005 4/7/2005 Company Amount 01000 GENERAL FUND 160,941.61 02100 CDBG FUND 31,943.65 02200 COMMUNICATIONS FUND 17,863.68 04000 WORKING CAPITAL FUND 5,988.49 04800 CONSTRUCTION FUND 159.75 05100 ART CENTER FUND 2,752.96 05200 GOLF DOME FUND 5,065.27 05400 GOLF COURSE FUND 66,640.39 05500 ICE ARENA FUND 341.79 05600 EDINBOROUGH /CENT LAKES FUND 3,280.85 05800 LIQUOR FUND 122,020.56 05900 UTILITY FUND 13,130.64 07400 PSTF AGENCY FUND 14,438.42 Report Totals 444,568.06 4/612005 8:45:56 Page - 1 1 We confirm to the best of our knowledge and belief, that these claims comply in all material respects with the requirements of the City of Edina purchasing po icies and procedures � J Finance City Manager CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 1 4/8/2005 -41`14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 270933 4/8/2005 102202 GRAND VIEW LODGE 235.00 S. ENGELMAN 109406 040805 1490.6104 CONFERENCES & SCHOOLS PUBLIC HEALTH 345.00 S. WILMOT 109407 418 1490.6104 CONFERENCES & SCHOOLS PUBLIC HEALTH 580.00 270934 4/812005 103232 MEHA 50.00 S. WILMOT 109408 040805 1490.6104 CONFERENCES & SCHOOLS PUBLIC HEALTH 50.00 S. ENGELMAN 109409 0408 1490.6104 CONFERENCES & SCHOOLS PUBLIC HEALTH 50.00 E. MARSTON 109410 APR 8 1490.6104 CONFERENCES & SCHOOLS PUBLIC HEALTH 150.00 270935 4/1412005 100608 3M CO HGF0878 127.59 SCOTCHCAL NUMBERS 109249 SS41635 1325.6531 SIGNS & POSTS STREET NAME SIGNS 486.95 LETTERS & NUMBERS 109250 SS41637 1325.6531 SIGNS & POSTS STREET NAME SIGNS 614.54 270936 4/14/2005 100613 AAA 13.50 VEHICLE TITLE 109411 040705 1553.6260 LICENSES & PERMITS EQUIPMENT OPERATION GEN 13.50 270937 411412005 102971 ACE ICE COMPANY 89.08 109185 451767 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 51.40 109321 451810 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING 22,12 109322 451736 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 162.60 270938 4114/2005 101077 AIRTEC INC. 128.84 ELECTRODES, DRILL BITS 109128 299199 1553.6580 WELDING SUPPLIES EQUIPMENT OPERATION GEN 128.84 270939 4/14/2005 100575 ALL SAFE FIRE & SECURITY 137.15 EXTINGUISHER CERTIFICATION 109129 65105 1470.6215 EQUIPMENT MAINTENANCE FIRE DEPT. GENERAL 137.15 270940 4/14/2005 117824 ANDREW CORPORATION 11,068.00 MIKOM INSTALLATION SERVICES 109412 7458697 44003.6710 EQUIPMENT REPLACEMENT 800 MHZ RADIO 11,068.00 270941 4114/2005 102566 APPLIED CONCEPTS INC 95.65 STALKER LIDAR REPAIR 109251 110667 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL 95.65 R55CKREG LOG20000 CITY OF EDINA Council Check Register 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 270942 4/14/2005 102646 AQUA LOGIC INC. 69.23 POOL HEATER REPAIR 109130 26540 5620.6180 CONTRACTED REPAIRS 69.23 270943 4/14/2005 COST OF GOODS SOLD MIX 102774 ASPEN WASTE SYSTEMS COST OF GOODS SOLD WINE YORK SELLING COST OF GOODS SOLD MIX YORK SELLING 102.92 WASTE DISPOSAL 109252 040105 COST OF GOODS SOLD MIX 50TH ST SELLING 102.92 50TH ST SELLING GENERAL SUPPLIES 50TH ST OCCUPANCY 270944 4/14/2005 COST OF GOODS SOLD WINE 100636 ASTLEFORD EQUIPMENT CO. INC. COST OF GOODS SOLD MIX VERNON SELLING 11.48 FUEL FILTER 109413 T199700 11.48 270945 4/14/2005 101954 AUGIE'S INC. 47.22. FOOD 109414 17621 47.22 270946 4/1412005 101355 BELLBOY CORPORATION 143.43 109186 39774700 145.92 109187 39748100 1,276.33 109188 32855500 80.90 109189 39775000 197.96 109190 39748200 107.30 109191 32866400 48.75 109192 32866500 328.00 109193 32866300 3,79 109194 39774800 500.00 109323 32866800 65.95 109324 32866700 82.92 109325 39775100 2,981.25 270947 4/14/2005 117379 BENIEK PROPERTY SERVICES INC. 469.22 SPRING CLEAN UP 109253 9075 469.22 270948 4/14/2005 100648 BERTELSON OFFICE PRODUCTS 35.09 CUSTOM STAMP 109254 SA1514 38.17 OFFICE SUPPLIES 109255 3786440 195.94 OFFICE SUPPLIES 109415 3800870 269.20 270949 4/1412005 103239 BRIN NORTHWESTERN GLASS CO. 7411.6182 1553.6530 5430.5510 5822.5515 5842.5515 5842.5513 5842.5515 5862.5515 5822.5512 5822.5515 5822.5513 5821.6406 5862.5512 5862.5513 5862.5515 7411.6136 1400.6513 1400.6513 1120.6406 RUBBISH REMOVAL REPAIR PARTS COST OF GOODS SOLD 4/13/2005 12:43:35 Page - 2 Business Unit EDINBOROUGH PARK PSTF OCCUPANCY EQUIPMENT OPERATION GEN RICHARDS GOLF COURSE COST OF GOODS SOLD MIX 50TH ST SELLING COST OF GOODS SOLD MIX YORK SELLING COST OF GOODS SOLD WINE YORK SELLING COST OF GOODS SOLD MIX YORK SELLING COST OF GOODS SOLD MIX VERNON SELLING COST OF GOODS SOLD LIQUOR 50TH ST SELLING COST OF GOODS SOLD MIX 50TH ST SELLING COST OF GOODS SOLD WINE 50TH ST SELLING GENERAL SUPPLIES 50TH ST OCCUPANCY COST OF GOODS SOLD LIQUOR VERNON SELLING COST OF GOODS SOLD WINE VERNON SELLING COST OF GOODS SOLD MIX VERNON SELLING SNOW & LAWN CARE OFFICE SUPPLIES OFFICE SUPPLIES GENERAL SUPPLIES PSTF OCCUPANCY POLICE DEPT. GENERAL POLICE DEPT. GENERAL ADMINISTRATION R55CKREG LOG20000 CITY OF EDINA Council Check Register 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No 135.00 DOOR REPAIR 109131 643903 5821.6180 1314.6406 1650.6710 5610.6136 Subledger Account Description CONTRACTED REPAIRS GENERAL SUPPLIES 4/1312005 12:43:35 Page - 3 Business Unit 50TH ST OCCUPANCY STREET RENOVATION EQUIPMENT REPLACEMENT EQUIPMENT REPLACEMENT PROFESSIONAL SVC - OTHER ED ADMINISTRATION 5410.6513 135.00 GOLF ADMINISTRATION 1554.6406 GENERAL SUPPLIES 270950 4/14/2005 1260.6710 100669 BRYAN ROCK PRODUCTS INC. ENGINEERING GENERAL 1495.6710 EQUIPMENT REPLACEMENT 404.09 ROCK 109416 033105 7400.1705 404.09 PSTF BALANCE SHEET 5913.6406 GENERAL SUPPLIES 270951 4/14/2005 5430.6186 100679 CARLSON TRACTOR & EQUIPMENT RICHARDS GOLF COURSE 5821.6186 HEAT 3,816.96 FLAIL MOWER 109417 E00805 5861.6186 3,816.96 VERNON OCCUPANCY 5422.6186 HEAT 270952 4/14/2005 1481.6186 101377 CARLSON, CRAIG YORK FIRE STATION 5911.6186 HEAT 150.00 PERFORMANCE 4/21/05 109502 040105 5420.6186 150.00 CLUB HOUSE 5630.6186 HEAT 270953 4/14/2005 1470.6186 102372 CDW GOVERNMENT INC. FIRE DEPT. GENERAL 1552.6186 HEAT 277.56 FUSER KIT 109418 OX26787 5913.6186 277.57 FUSER KIT 109418 OX26787 BUILDING MAINTENANCE 487.78 MONITOR 109419 RK25408 616.00 MONITOR 109419 RK25408 34.66 CORDLESS MOUSE 109424 RH95859 40.07 CD -RW DRIVE 109424 RH95859 656.30 MONITORS 109424 RH95859 2,389.94 270954 4/14/2005 100897 CENTERPOINT ENERGY MINNEGASCO 115.64 109256 033105 185.70 109256 033105 261,72 109256 033105 379.83 109256 033105 491.01 109256 033105 527.53 109256 033105 1,030.05 109256 033105 1,279.36 109256 033105 1,564.90 109256 033105 1,573.11 109256 033105 2,062.39 109256 033105 2,118.59 109256 033105 2,231.87 109256 033105 3,931.64 109256 033105 4,833.69 109256 033105 9,853.99 109256 033105 1314.6406 1650.6710 5610.6136 Subledger Account Description CONTRACTED REPAIRS GENERAL SUPPLIES 4/1312005 12:43:35 Page - 3 Business Unit 50TH ST OCCUPANCY STREET RENOVATION EQUIPMENT REPLACEMENT EQUIPMENT REPLACEMENT PROFESSIONAL SVC - OTHER ED ADMINISTRATION 5410.6513 OFFICE SUPPLIES GOLF ADMINISTRATION 1554.6406 GENERAL SUPPLIES CENT SERV GEN - MIS 1260.6710 EQUIPMENT REPLACEMENT ENGINEERING GENERAL 1495.6710 EQUIPMENT REPLACEMENT INSPECTIONS 5913.6406 GENERAL SUPPLIES DISTRIBUTION 7400.1705 CONSTR. IN PROGRESS PSTF BALANCE SHEET 5913.6406 GENERAL SUPPLIES DISTRIBUTION 5430.6186 HEAT RICHARDS GOLF COURSE 5821.6186 HEAT 50TH ST OCCUPANCY 5841.6186 HEAT YORK OCCUPANCY 5861.6186 HEAT VERNON OCCUPANCY 5422.6186 HEAT MAINT OF COURSE & GROUNDS 1481.6186 HEAT YORK FIRE STATION 5911.6186 HEAT PUMP & LIFT STATION OPER 5111.6186 HEAT ART CENTER BLDG / MAINT 5420.6186 HEAT CLUB HOUSE 5630.6186 HEAT CENTENNIAL LAKES 1470.6186 HEAT FIRE DEPT. GENERAL 1552.6186 HEAT CENT SVC PW BUILDING 1628.6186 HEAT SENIOR CITIZENS 5913.6186 HEAT DISTRIBUTION 1646.6186 HEAT BUILDING MAINTENANCE 5511.6186 HEAT ARENA BLDG /GROUNDS R55CKREG LOG20000 CITY OF EDINA Council Check Register 270956 4/1412005 4/8/2005 - 411412005 100689 CLAREYS SAFETY EQUIP. Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 11,465.84 109256 033105. 5210.6186 HEAT 43, 906.86 44764 1470.6406 270955 4/1412005 105851 CHANHASSEN DINNER THEATRES 540.46 100.00 TRIP DEPOSIT -ORDER 49609 109420 49609 1628.6103.07 TRIPS PROF SERVICES GENERAL SUPPLIES DUES & SUBSCRIPTIONS GENERAL SUPPLIES SAFETY EQUIPMENT CRAFT SUPPLIES COST OF GOODS SOLD COST OF GOODS SOLD GENERAL SUPPLIES COST OF GOODS SOLD PROFESSIONAL SERVICES GENERAL SUPPLIES REPAIR PARTS 4113/2005 12:43:35 Page - 4 Business Unit GOLF DOME PROGRAM SENIOR CITIZENS FIRE DEPT. GENERAL ASSESSING FIRE DEPT. GENERAL GENERAL MAINTENANCE ART CENTER ADMINISTRATION ART SUPPLY GIFT GALLERY SHOP ART SUPPLY GIFT GALLERY SHOP ART CENTER BLDG /MAINT ART SUPPLY GIFT GALLERY SHOP ADAPTIVE RECREATION PSTF OCCUPANCY DISTRIBUTION 100.00 270956 4/1412005 100689 CLAREYS SAFETY EQUIP. 540.46 AXES, IRON SLINGS 109132 44764 1470.6406 540.46 270957 4/14/2005 103258 COLLIERS TURLEY MARTIN TUCKER 49.00 MARKET REPORT 109421 04052005 -4801 1190.6105 49.00 270958 4114/2005 100693 COMMERCIAL FURNITURE 798.75 CHAIRS 109133 00094259 1470.6406 798.75 270959 4/14/2005 101323 CONNEY SAFETY PRODUCTS 92.54 GLOVES 109422 02542045 1301.6610 92.54 270960 4114/2005 100695 CONTINENTAL CLAY CO. 46.61 CLAY 109257 INV000011864 5110.6564 737.25 CLAY 109257 INV000011864 5120.5510 58.36 KEMPER TOOLS 109258 INV000011865 5120.5510 90.25 CLAY 109501 INV000011198 5111.6406 418.56 CLAY 109501 INV000011198 5120.5510 1,351.03 270961 4/14/2005 101704 COOK, BARBARA 297.19 PROGRAM STAFF 109552 5 -1169 1629.6103 297.19 270962 4/14/2005 100699 CULLIGAN BOTTLED WATER 34.34 WATER 109423 033105 7411.6406 34.34 270963 4114/2005 100712 DAVIES WATER EQUIPMENT 23.43 LOCATER CABLE 109425 3279504 5913.6530 23.43 GENERAL SUPPLIES DUES & SUBSCRIPTIONS GENERAL SUPPLIES SAFETY EQUIPMENT CRAFT SUPPLIES COST OF GOODS SOLD COST OF GOODS SOLD GENERAL SUPPLIES COST OF GOODS SOLD PROFESSIONAL SERVICES GENERAL SUPPLIES REPAIR PARTS 4113/2005 12:43:35 Page - 4 Business Unit GOLF DOME PROGRAM SENIOR CITIZENS FIRE DEPT. GENERAL ASSESSING FIRE DEPT. GENERAL GENERAL MAINTENANCE ART CENTER ADMINISTRATION ART SUPPLY GIFT GALLERY SHOP ART SUPPLY GIFT GALLERY SHOP ART CENTER BLDG /MAINT ART SUPPLY GIFT GALLERY SHOP ADAPTIVE RECREATION PSTF OCCUPANCY DISTRIBUTION R55CKREG LOG20000 Check # Date Amount Vendor / Explanation 270964 4114/2005 116927 DAVIS SUN TURF 129.71 MOWER CHUTE ASSEMBLY 99.62 PUSHARM ASSEMBLY 229.33 109259 T100135B 1553.6530 270965 4/1412005 102478 DAY DISTRIBUTING 2,604.20 306790 78.60 5421.5510 400.00 307902 2,633.19 1,587.40 307477 141 nn CITY OF EDINA 307433 Council Check Register 100720 4/8/2005 - 4/14/2005 306791 PO # Doc No Inv No Account No Subledger Account Description 109197 109259 T100135B 1553.6530 REPAIR PARTS 109260 T100135C 1553.6530 REPAIR PARTS 109195 307433 5842.5514 100720 109196 306791 5862.5515 YORK SELLING 109197 307420 5842.5514 BAKERY 109198 306790 5862.5514 5421.5510 109326 307902 5842.5514 109327 307477 5842.5513 109328 307901 5822.5514 101947 270966 411412005 COST OF GOODS SOLD BEER 100720 DENNYS 5TH AVE. BAKERY YORK SELLING COST OF GOODS SOLD MIX YORK SELLING COST OF GOODS SOLD BEER YORK SELLING 16.02 BAKERY 109261 187386 5421.5510 16.02 270967 4114/2005 101947 DEPARTMENT OF PUBLIC SAFETY 660.00 1 ST QTR CHARGES 109262 P07MN027060051 1400.6204 1,260.00 MDTS CHARGE 109426 P07MN027060M5J 1400.6160 1,920.00 270968 4/14/2005 101473 DEXTER SHOE CO. 74.58 SHOES 109427 550384 5440.5511 44.62 SHOES 109428 553366 5440.5511 84.90 SHOES 109429 555908 5440.5511 204.10 270969 4/14/2005 100739 EAGLE WINE 558.81 109329 214810 5842.5513 247.57 109553 214808 5822.5513 806.38 270970 4114/2005 100741 EAST SIDE BEVERAGE 8,191.85 109199 325540 5842.5514 4,377.45 109200 325532 5862.5514 691.20 109330 325549 5842.5514 15.40 109331 325615 5842.5515 4,615.80 109332 325616 5842.5514 COST OF GOODS SOLD BEER COST OF GOODS SOLD MIX COST OF GOODS SOLD BEER COST OF GOODS SOLD BEER COST OF GOODS SOLD BEER COST OF GOODS SOLD WINE COST OF GOODS SOLD BEER COST OF GOODS SOLD TELETYPE SERVICE DATA PROCESSING 4/13/2005 12:43:35 Page - 5 Business Unit EQUIPMENT OPERATION GEN EQUIPMENT OPERATION GEN YORK SELLING VERNON SELLING YORK SELLING VERNON SELLING YORK SELLING YORK SELLING 50TH ST SELLING GRILL POLICE DEPT. GENERAL POLICE DEPT. GENERAL COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES COST OF GOODS SOLD WINE YORK SELLING COST OF GOODS SOLD WINE 50TH ST SELLING COST OF GOODS SOLD BEER YORK SELLING COST OF GOODS SOLD BEER VERNON SELLING COST OF GOODS SOLD BEER YORK SELLING COST OF GOODS SOLD MIX YORK SELLING COST OF GOODS SOLD BEER YORK SELLING CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 6 4/8/2005 - 4/14/2005 Check # Dale Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 1,899.20 109333 325531 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 911.85 109334 325594 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 20,702.75 270971 4/14/2005 100748 ELVIN SAFETY SUPPLY 25.28 FIT TEST SOLUTION 109503 227406 -00 1470.6406 GENERAL SUPPLIES FIRE DEPT. GENERAL 25.28 270972 4/14/2005 105758 EMERGENCY AUTOMOTIVE 203.50 STROBE BAR REPAIR 109430 RP033105 -4 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 203.50 270973 4/14/2005 105339 ENRGI 422.50 WEBSITE CONSULTING 109431 2633 2210.6124 WEB DEVELOPMENT COMMUNICATIONS 422.50 270974 4114/2005 100297 FAST FOTO & DIGITAL 15.24 PHOTO FINISHING 109504 T2- 201543 _ 1470.6408 PHOTOGRAPHIC SUPPLIES FIRE DEPT. GENERAL 37.28, PHOTO FINISHING 109505 T2- 200511 2210.6408 PHOTOGRAPHIC SUPPLIES COMMUNICATIONS 52.52 270975 4/1412005 113720 FASTENER PLACE 12.12 ANCHOR SLEEVES 109134 15011 1646.6530 REPAIR PARTS BUILDING MAINTENANCE 45.93 ANCHOR ADHESIVE KITS 109135 15044 1646.6530 REPAIR'PARTS BUILDING MAINTENANCE 58.05 270976 4/14/2005 100756 FEDERAL EXPRESS 21.74 SHIPPING CHARGES 109263 5-448 -05248 1400.6406 GENERAL SUPPLIES POLICE DEPT. GENERAL 21.74 270977 4114/2005 116189 FILTRATION SYSTEMS INC. 1,699.41 RANGE FILTERS 109432 5598 7411.6406 GENERAL SUPPLIES PSTF OCCUPANCY 1,699.41 270978 411412005 101475 FOOTJOY 117.11 SHOES 109264 3309756 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 117.11 270979 4/14/2005 104071 FREUND, JEFF 30.00 PETTY CASH 109136 040505 5610.6104 CONFERENCES & SCHOOLS ED ADMINISTRATION 37.00 PETTY CASH 109136 040505 5610.6235 POSTAGE ED ADMINISTRATION 232.10 PETTY CASH 109136 040505 5620.6406 GENERAL SUPPLIES EDINBOROUGH PARK 109335 00015505 270987 4/1412005 102217 GRAPE BEGINNINGS INC 1,491.00 109201 71666 242.50 109336 71811 431 75 109337 71810 5862.5513 5842.5513 5862.5513 5822.5513 4/13/2005 12:43:35 Page - 7 Business Unit FIRE DEPT. GENERAL POLICE DEPT. GENERAL BUILDING MAINTENANCE MAINT OF COURSE & GROUNDS EQUIPMENT OPERATION GEN CENTRAL SERVICES GENERAL CENT SVC PW BUILDING EQUIPMENT OPERATION GEN COST OF GOODS SOLD WINE VERNON SELLING COST OF GOODS SOLD WINE YORK SELLING COST OF GOODS SOLD WINE VERNON SELLING COST OF GOODS SOLD WINE 50TH ST SELLING 270988 4/1412005 100783 GRAYBAR ELECTRIC CO. INC. 9,098.30 LIGHT POLES 109434 908081184 5311.6406 GENERAL SUPPLIES POOL OPERATION 199.50 LIGHT DIMMER 109435 908091275 5111.6406 GENERAL SUPPLIES ART CENTER BLDG / MAINT 323.57 CIRCUIT BREAKERS 109436 908081185 5210.6406 GENERAL SUPPLIES GOLF DOME PROGRAM CITY OF EDINA R55CKREG LOG20000 Council Check Register 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 299.10 270980 4/14/2005 108632 GALLES CORPORATION 423.34 VEHICLE CLEANER 109137 108822 1470.6511 CLEANING SUPPLIES 423.34 270981 411412005 102419 GARDEN & ASSOCIATES INC 110.00 INTERPRETER 109265 40557 1400.6103 PROFESSIONAL SERVICES 110.00 270982 4/14/2005 105508 GEMPLER'S INC. 80.80 SAFETY GLASS 109266 1006100599 1646.6610 SAFETY EQUIPMENT 56.20 GOOSE CONTROL 109433 1006120464 5422.6406 GENERAL SUPPLIES 137.00 270983 4/14/2005 100920 GENUINE PARTS COMPANY • MINNEA 1,144.30 PARTS 109267 033105 1553.6530 REPAIR PARTS 1,144.30 270984 4/1412005 101464 GIRARD'S BUSINESS SOLUTIONS IN 145.00 CHECK SIGNER REPAIR 109138 079351 1550.6406 GENERAL SUPPLIES 145.00 270985 4/14/2005 101103 GRAINGER 4.39 SWITCH 109268 495 - 707135 -2 1552.6406 GENERAL SUPPLIES 203.11 SPRAY PAINT, BATTERIES 109269 495- 725462 -8 1553.6406 GENERAL SUPPLIES 207.50 270986 4/14/2005 102670 GRAND PERE WINES INC 109335 00015505 270987 4/1412005 102217 GRAPE BEGINNINGS INC 1,491.00 109201 71666 242.50 109336 71811 431 75 109337 71810 5862.5513 5842.5513 5862.5513 5822.5513 4/13/2005 12:43:35 Page - 7 Business Unit FIRE DEPT. GENERAL POLICE DEPT. GENERAL BUILDING MAINTENANCE MAINT OF COURSE & GROUNDS EQUIPMENT OPERATION GEN CENTRAL SERVICES GENERAL CENT SVC PW BUILDING EQUIPMENT OPERATION GEN COST OF GOODS SOLD WINE VERNON SELLING COST OF GOODS SOLD WINE YORK SELLING COST OF GOODS SOLD WINE VERNON SELLING COST OF GOODS SOLD WINE 50TH ST SELLING 270988 4/1412005 100783 GRAYBAR ELECTRIC CO. INC. 9,098.30 LIGHT POLES 109434 908081184 5311.6406 GENERAL SUPPLIES POOL OPERATION 199.50 LIGHT DIMMER 109435 908091275 5111.6406 GENERAL SUPPLIES ART CENTER BLDG / MAINT 323.57 CIRCUIT BREAKERS 109436 908081185 5210.6406 GENERAL SUPPLIES GOLF DOME PROGRAM R55CKREG LOG20000 CITY OF EDINA Council Check Register 4/8/2005 -- 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 4/13/2005 12:43:35 Page - a Business Unit COST OF GOODS SOLD LIQUOR 9,621.37 COST OF GOODS SOLD LIQUOR 50TH ST SELLING COST OF GOODS SOLD MIX YORK SELLING 270989 4114/2005 YORK SELLING 100782 GRIGGS COOPER & CO. VERNON SELLING COST OF GOODS SOLD LIQUOR VERNON SELLING COST OF GOODS SOLD MIX 604.77 COST OF GOODS SOLD LIQUOR 109202 213142 5822.5512 COST OF GOODS SOLD LIQUOR 155.60- COST OF GOODS SOLD LIQUOR 109203 663448 5822.5512 COST OF GOODS SOLD MIX 21.55- 109204 663447 5842.5515 37.95- 109205 663203 5842.5513 1,152.55 109338 213143 5862.5512 854.46 109339 213141 5862.5512 3.40 109340 197755 5862.5515 .85 109341 197546 5862.5512 2.55 109342 214555 5862.5512 2.55 109343 214554 5842.5512 3,446.86 109344 213144 5842.5512 4,955.99 109345 213145 5842.5512 152,79 109554 215595 5842.5515 10,961.67 270990 4/14/2005 100787 GRUBER'S POWER EQUIPMENT 252.22 BELTS, SCREWS, WASHERS 109139 18789 1553.6530 21.07 BELT -DRIVE 109140 18817 1553.6530 273.29 270991 4/14/2005 101964 GUSTAVE A. LARSON CO. 716.59 OIL, REFRIGERANT 109437 BLM0088170 1301.6556 61.24 RELAY, START CAP 109438 BLM0088152 5430.6406 777.83 270992 4/14/2005 103359 HANSON PIPE & PRODUCTS INC. 325.89 ADJUSTING RINGS 109439 477005378266 5932.6536 325.89 270993 4/1412005 102301 HARTLAND FUEL PRODUCTS LLC 13,229.10 GAS 109270 650615 1553.6581 13,229.10 270994 4/1412005 101255 HASLER INC. 1,046.57 ANNUAL METER RENTAL 109506 5040961 1550.6151 1,046.57 270995 4/14/2005 105436 HENNEPIN COUNTY INFORMATION 52.02 TRANSACTION PROCESSING 109507 25037173 1190.6105 4/13/2005 12:43:35 Page - a Business Unit COST OF GOODS SOLD LIQUOR 50TH ST SELLING COST OF GOODS SOLD LIQUOR 50TH ST SELLING COST OF GOODS SOLD MIX YORK SELLING COST OF GOODS SOLD WINE YORK SELLING COST OF GOODS SOLD LIQUOR VERNON SELLING COST OF GOODS SOLD LIQUOR VERNON SELLING COST OF GOODS SOLD MIX VERNON SELLING COST OF GOODS SOLD LIQUOR VERNON SELLING COST OF GOODS SOLD LIQUOR VERNON SELLING COST OF GOODS SOLD LIQUOR YORK SELLING COST OF GOODS SOLD LIQUOR YORK SELLING COST OF GOODS SOLD LIQUOR YORK SELLING COST OF GOODS SOLD MIX YORK SELLING REPAIR PARTS EQUIPMENT OPERATION GEN REPAIR PARTS EQUIPMENT OPERATION GEN TOOLS GENERAL MAINTENANCE GENERAL SUPPLIES RICHARDS GOLF COURSE CASTINGS GENERAL STORM SEWER GASOLINE EQUIPMENT OPERATION GEN EQUIPMENT RENTAL CENTRAL SERVICES GENERAL DUES 8 SUBSCRIPTIONS ASSESSING R55CKREG LOG20000 109206 355582 5862.5514 CITY OF EDINA VERNON SELLING 1,276.10 109207 355579 5842.5514 COST OF GOODS SOLD BEER Council Check Register 77.85 109208 355580 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 4/8/2005 - 4/14/2005 109346 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 5822.5514 COST OF GOODS SOLD BEER 54.17 TRANSACTION PROCESSING 109507 25037173 1400.6160 DATA PROCESSING SEASON TICKETS EB /CL REVENUES 1,706.42 RADIO LEASE 109508 25038010 1470.6151 EQUIPMENT RENTAL 1,812.61 271001 4/14/2005 270996 4/14/2005 101717 HENNEPIN COUNTY TREASURER 571.91 215.00 UTILITY PERMIT 109271 UTIL00532 5913.6260 LICENSES & PERMITS TANKS TOWERS & RESERVOIR 215.00 571.91 270997 4/14/2005 116680 HEWLETT - PACKARD COMPANY 4114/2005 102664 IKON OFFICE SOLUTIONS 990.45 PC 109440 37754392 1495.6710 EQUIPMENT REPLACEMENT 240.39 COPIER MAINTENANCE 990.45 PC 109440 37754392 1260.6710 EQUIPMENT REPLACEMENT 1,980.90 270998 4114/2005 271003 104375 HOHENSTEINS INC. 101732 INDUSTRIAL DOOR CO. INC. 4/13/2005 12:43:35 Page - 9 Business Unit POLICE DEPT. GENERAL FIRE DEPT. GENERAL DISTRIBUTION INSPECTIONS ENGINEERING GENERAL 426.00 109206 355582 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 1,276.10 109207 355579 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 77.85 109208 355580 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 32.10 109346 355583 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 31850 109347 355581 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 2,130.55 270999 4/14/2005 102114 HUEBSCH 101.93 TOWEL /RUG CLEANING 109141 230921 5620.6230 SERVICE CONTRACTS EQUIPMENT EDINBOROUGH PARK 101.93 271000 4/14/2005 118074 HUSSEY, JUNE 250.00 SEASON PASS REFUND 109142 040505 5601.4532 SEASON TICKETS EB /CL REVENUES 250.00 271001 4/14/2005 100811 HYDRO METERING TECHNOLOGY 571.91 METER & FLANGE SET 109272 0029339 -IN 5914.5516 COST OF GOODS SOLD METERS TANKS TOWERS & RESERVOIR 571.91 271002 4114/2005 102664 IKON OFFICE SOLUTIONS 240.39 COPIER MAINTENANCE 109441 23656116 1628.6103 PROFESSIONAL SERVICES SENIOR CITIZENS 240.39 271003 4/14/2005 101732 INDUSTRIAL DOOR CO. INC. 140.00 GARAGE DOOR REPAIR 109442 0101276 -IN 1551.6180 CONTRACTED REPAIRS CITY HALL GENERAL 140.00 271004 4114/2005 101183 INSPECTRON INC. CITY OF EDINA 4/1312005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 10 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 6,437.50 MARCH INSPECTIONS 109443 040405 1495.6103 PROFESSIONAL SERVICES INSPECTIONS 6,437.50 271005 4/14/2005 104696 INT'L SECURITY PRODUCTS 10,383.75 REPLACE CHAIN LINK FENCE 109273 17885 1647.6103 PROFESSIONAL SERVICES PATHS & HARD SURFACE 10,383.75 271006 4/14/2005 105530 ISO #271 1,500.00 GRANT TRANSFER TIPS 109509 040505 1600.4390.15 GEN ADAPTIVE REC PARK ADMIN. GENERAL 1,500.00 271007 4/1412005 101861 J.H. LARSON COMPANY 172.87 POWER CORD 109143 4470376 -01 1470.6406 GENERAL SUPPLIES FIRE DEPT. GENERAL 5.86 CONNECTORS 109444 4470786 -02 1551.6530 REPAIR PARTS CITY HALL GENERAL 57.67 ELBOWS, DRILL BIT 109445 4470786 -01 1551.6530 REPAIR PARTS CITY HALL GENERAL 236.40 271008 4/1412005 100828 JERRY'S FOODS 16.64 109446 033105 1628.6406 GENERAL SUPPLIES SENIOR CITIZENS 52.05 109446 033105 1190.6106 MEETING EXPENSE ASSESSING 61.56 109446 033105 5421.5510 COST OF GOODS SOLD GRILL 89.52 109446 033105 1624.6406 GENERAL SUPPLIES PLAYGROUND & THEATER 219.77 271009 4114/2005 100829 JERRY'S HARDWARE 2.59 109274 033105 5820.6406 GENERAL SUPPLIES 50TH STREET GENERAL 3.49 109274 _ 033105 5840.6406 GENERAL SUPPLIES LIQUOR YORK GENERAL 4.49 109274 033105 2210.6406 GENERAL SUPPLIES COMMUNICATIONS 7,79 109274 033105 7411.6406 GENERAL SUPPLIES PSTF OCCUPANCY 11,38 109274 033105 1322.6406 GENERAL SUPPLIES STREET LIGHTING ORNAMENTAL 17.25 109274 033105 1495.6406 GENERAL SUPPLIES INSPECTIONS 21.01 109274 033105 5511.6406 GENERAL SUPPLIES ARENA BLDG /GROUNDS 30.94 109274 033105 4090.6406 GENERAL SUPPLIES STREET REVOLVING 37.56 109274 033105 1553.6406 GENERAL SUPPLIES EQUIPMENT OPERATION GEN 63.92 109274 033105 5210.6406 GENERAL SUPPLIES GOLF DOME PROGRAM 87.22 109274 033105 5630.6406 GENERAL SUPPLIES CENTENNIAL LAKES 89,96 109274 033105 5913.6406 GENERAL SUPPLIES DISTRIBUTION 96.97 109274 033105 5422.6406 GENERAL SUPPLIES MAINT OF COURSE & GROUNDS 102,21 109274 033105 5620.6406 GENERAL SUPPLIES EDINBOROUGH PARK 104.62 109274 033105 1325.6406 GENERAL SUPPLIES STREET NAME SIGNS 111,77 109274 033105 5420.6406 GENERAL SUPPLIES CLUB HOUSE 150.66 109274 033105 1400.6406 GENERAL SUPPLIES POLICE DEPT. GENERAL R55CKREG LOG20000 CITY OF EDINA 4/13/2005 12:43:35 Council Check Register Page - 11 4/8/2005 - 4114/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 252.57 109274 033105 1301.6406 GENERAL SUPPLIES GENERAL MAINTENANCE 463.62 109274 033105 1470.6406 GENERAL SUPPLIES FIRE DEPT. GENERAL 798,11 109274 033105 1552.6406 GENERAL SUPPLIES CENT SVC PW BUILDING 930.22 109274 033105 1646.6406 GENERAL SUPPLIES BUILDING MAINTENANCE 1,101.11 109274 033105 1646.6556 TOOLS BUILDING MAINTENANCE 2,817.32 109274 033105 1301.6556 TOOLS GENERAL MAINTENANCE 7,306.78 271010 4114/2005 100830 JERRY'S PRINTING 258.80 REGISTRATION FORMS 109447 32550 1600.6575 PRINTING PARK ADMIN. GENERAL 258.80 271012 4/1412005 100835 JOHNSON BROTHERS LIQUOR CO. 1,163.75 109209 1876607 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 177,70 109210 1876594 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 422.80 109211 1876602 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 1,041.60 109212 187726 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 571.14 109213 1876611 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 46.45 109214 1876613 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 211.40 109215 1876615 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 2,537.71 109215 1876615 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,545.44 109216 1876609 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 1,260.55 109217 1876610 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 3,475.76 109218 1876612 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 30.20 109219 1876614 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 949.18 109220 1876597 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 550.90 109348 1876595 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 1,264.59 109349 1880333 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 473.70 109350 1880329 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,242.43 109351 1880317 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 770.63 109352 1880318 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 65.40 109353 1880319 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING 447.20 109354 1880320 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 340.04 109355 1880316 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 109.45 109356 1880315 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 644.75 109357 1878384 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 66.00- 109358 277925 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 25.37- 109359 277924 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 1.721.82 109555 1880323 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 1,786.20 109556 1880321 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 394.95 109557 1880327 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 2,644.69 109558 1880328 5842.5513 COST OF GOODS SOLD WINE YORK SELLING CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 12 4/8/2005 - 4/14/2005 Check # Date Amount Vendor I Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 4,891.62 109559 1880324 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 24.00 109560 1880325 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 30.20 109561 1880326 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 3,879.85 109562 1880322 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 34,624.73 271013 4/14/2005 106186 KAEDING & ASSOCIATES INC. 224.00 ENGINEERING SERVICES 109144 490408D 05448.1705.21 CONSULTING INSPECTION WM448 WELL #16 6301 GLEASON 224.00 271014 4114/2005 111018 KEEPRS INC. 527.71 UNIFORM BADGES 109145 34931 1470.6558 DEPT UNIFORMS FIRE DEPT. GENERAL 329.70 UNIFORM 109146 34854 1470.6558 DEPT UNIFORMS FIRE DEPT. GENERAL 857.41 271015 4/14/2005 100841 KEPRIOS, JOHN 134.94 VETERINARY EXPENSE 109583 28375 5422.6103 PROFESSIONAL SERVICES. MAINT OF COURSE & GROUNDS 134.94 271016 4/14/2005 103078 KOMAREK, VIRGINIA 68.51 DRY CLEAN CUSHIONS 109448 040505 5421.6201 LAUNDRY GRILL 68.51 271017 4/14/2005 101502 KONTERS, VIK 236.12 UNIFORM EXPENSE 109275 040505 1400.6203 UNIFORM ALLOWANCE POLICE DEPT. GENERAL 236.12 _ 271018 4/14/2005 100846 KUETHER DISTRIBUTING CO 2,169.90 109221 431713 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 616.00 109222 431723 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 16.00 109360 431616 5822.5515 COST OF GOODS SOLD MIX 50TH ST SELLING 344.00 109361 431615 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 3,145.90 271019 4/14/2005 101935 KUSTOM SIGNALS INC. 36.86 FRONT BUMPER 109276 228828 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL 36.86 271020 4/1412005 101552 LEAGUE OF MINNESOTA CITIES 75.00 LMC CONFERENCE 109581 1 -000021076 1100.6104 CONFERENCES & SCHOOLS CITY COUNCIL 75.00 LMC CONFERENCE 109582 1 -000021079 1120.6104 CONFERENCES & SCHOOLS ADMINISTRATION 150.00 R55CKREG LOG20000 Check # Date Amount Vendor / Explanation 271021 4114/2005 118091 LEE, DAVID 4/812005 - 40.00 LOGO T- SHIRTS PO # Doc No I 40.00 Account No S 271022 4/14/2005 109449 2 100853 LEEF SERVICES 1400.6203 U UNIFORM ALLOWANCE P 33.44 SHOP TOWELS 367542 5 5422.6201 L 33.44 MAINT OF COURSE & GROUNDS 271023 4/14/2005 5100.1720 B 112619 LES JONES ROOFING INC ART CENTER BALANCE SHEET 109511 3 5,732.00 FINAL PAYMENT FIRST AID SUPPLIES F FIRE DEPT. GENERAL 5,732.00 040805 5 271024 4/14/2005 AQUATIC CENTER BALANCE SHEET 117026 LIFE- ASSIST INC. 040805 5 5301.4532 S 124.95 AMBULANCE SUPPLIES 109147 2 2050866 1 124.95 REPAIR PARTS E 271025 4/14/2005 56089 5 118093 LOHANI, UDAY GENERAL SUPPLIES P POOL OPERATION 4.88 SEASON TICKET REFUND 5311.6406 G GENERAL SUPPLIES P 75.12 SEASON TICKET REFUND 80.00 271026 4/14/2005 100864 MAC QUEEN EQUIP INC. 2,169.11 BEARING CONES, CYLINDER KITS 2,169.11 271027 4/14/2005 100865 MAGNUSON SOD 21.19 CEMENT MIX 141.35 CEMENT MIX 162.54 271028 4/14/2005 114699 MANAGED SERVICES IN 420.68 APRIL 2005 SERVICE 420.68 271029 4/14/2005 118081 MANFRED, FREYA 46.80 ART WORK SOLD AT EAC 46.80 271030 4/14/2005 102237 MANGEN, DEBRA 30.90 CONFERENCE EXPENSE 272.92 CONFERENCE EXPENSE C. 109453 607186 7411.6103 PROFESSIONAL SERVICES PSTF OCCUPANCY 109277 033005 5101.4413 ART WORK SOLD ART CENTER REVENUES 109580 2005 -01 1120.6406 GENERAL SUPPLIES ADMINISTRATION 109580 2005 -01 1120.6107 MILEAGE OR ALLOWANCE ADMINISTRATION CITY OF EDINA 4 4/13/2005 12:43:35 Council Check Register P Page - 13 4/812005 - - 4/14/2005 PO # Doc No I Inv No A Account No S Subledger Account Description B Business Unit 109449 2 203 1 1400.6203 U UNIFORM ALLOWANCE P POLICE DEPT. GENERAL 109450 3 367542 5 5422.6201 L LAUNDRY M MAINT OF COURSE & GROUNDS 109510 5 512553BAL 5 5100.1720 B BUILDINGS A ART CENTER BALANCE SHEET 109511 3 374267 1 1470.6510 F FIRST AID SUPPLIES F FIRE DEPT. GENERAL 109512 0 040805 5 5300.2039 S SALES & USE TAX PAYABLE A AQUATIC CENTER BALANCE SHEET 109512 0 040805 5 5301.4532 S SEASON TICKETS A AQUATIC CENTER REVENUES 109147 2 2050866 1 1553.6530 R REPAIR PARTS E EQUIPMENT OPERATION GEN 109451 5 56089 5 5311.6406 G GENERAL SUPPLIES P POOL OPERATION 109452 5 56088 5 5311.6406 G GENERAL SUPPLIES P POOL OPERATION R55CKREG LOG20000 Check # Date 271031 4/14/2005 271032 4/14/2005 271033 4/14/2005 271034 4/14/2005 271035 4114/2005 271036 4/14/2005 CITY OF EDINA 4113/2005 12:43:35 Council Check Register Page - 14 4/8/2005 -4/14/2005 Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 303.82 100868 MARK VII SALES .03 . 109223 , 781167 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 4,007.25 109224 781068 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 3,437.75 109225 781287 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 186.50 109226 781289 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 24.80 109227 781288 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 3,344.00 109228 781054 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 1,785.50 109229 778474 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 45.98 CORRECTION 109230 000178 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 1,489.75. 109362 781025 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 58.80 109363 .781026 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 14,380.36 101030 MATHISON CO. 130.48 OILS, PAPER 109278 597183-0 COST OF GOODS SOLD ART SUPPLY GIFT GALLERY SHOP 42.82 CANVAS TACKS 109279 595202 -1 5120.5510 COST OF GOODS SOLD ART SUPPLY GIFT GALLERY SHOP 266.34 WATER COLORS 109513 596462 -0: 5120.5510 COST OF GOODS SOLD ART SUPPLY GIFT GALLERY SHOP 38.64 BRUSHES 109514 592462 -2 5120.5510 COST OF GOODS SOLD ART SUPPLY GIFT GALLERY SHOP 76.91 OILS, WATER COLORS 109515 595767-0 5120.5510 COST OF GOODS SOLD ART SUPPLY GIFT GALLERY SHOP 555.19 100870 MATRX 294.00 AMBULANCE SUPPLIES 109516 886801 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 15.00 AMBULANCE SUPPLIES 109517 886964 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 800.00 AMBULANCE SUPPLIES 109518 886701 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 354.32 AMBULANCE SUPPLIES 109519 886713 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 77.70 AMBULANCE SUPPLIES 109520 886595 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 1.541.02 103944 MED COMPASS 180.00 FACE MASK TESTING 109148 7933 5311.6103 PROFESSIONAL SERVICES POOL OPERATION 180.00 101483 MENARDS 126.38 CONCRETE MIX, TOOLS 109280 12376 1646.6406 GENERAL SUPPLIES, BUILDING MAINTENANCE 75.91 SHELF, BRACKETS 109454 13498 1646.6406 GENERAL SUPPLIES BUILDING MAINTENANCE 202.29 101987 MENARDS 22.34 FOIL TAPE, CRIMPER 109149 77663 5620.6406 GENERAL SUPPLIES EDINBOROUGH PARK R55CKREG LOG20000 CITY OF EDINA Council Check Register 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 18.47 INSULATED VENTING 109150 77576 5620.6406 GENERAL SUPPLIES 16 50- RETURN 109151 75179 5630.6406 GENERAL SUPPLIES CLEANING SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES SAC CHARGES 4/13/2005 12:43:35 Page - 15 Business Unit EDINBOROUGH PARK CENTENNIAL LAKES CENT SVC PW BUILDING FIELD MAINTENANCE FIELD MAINTENANCE VERNON LIQUOR GENERAL ART CENTER BLDG / MAINT PUBLIC HEALTH BUILDING MAINTENANCE CLUB HOUSE INSPECTIONS OFFICE SUPPLIES ART CENTER ADMINISTRATION EQUIPMENT REPLACEMENT CENT SVC PW BUILDING COST OF GOODS SOLD ART SUPPLY GIFT GALLERY SHOP COST OF GOODS SOLD MIX VERNON SELLING COST OF GOODS SOLD MIX 50TH ST SELLING DUES & SUBSCRIPTIONS ASSESSING 24.31 271037 4/14/2005 100882 MERIT SUPPLY 460.08 ROLL TOWELS, SOAP 109455 66620 1552.6511 460.08 271038 4/1412005 101891 METRO ATHLETIC SUPPLY 85.09 MARKING PAINT 109152 81581 1642.6406 271.31 SCREEN SECTIONS 109456 81819 1642.6406 356.40 271039 4/14/2005 100410 METROCALL 11.64 PAGERS 109281 02182194 5860.6406 11.64 PAGERS 109281 02182194 5111.6406 23.28 PAGERS 109281 02182194 1490.6406 34.92 PAGERS 109281 02182194 1646.6406 46.48 PAGERS 109281 02182194 5420.6406 127.96 271040 4114/2005 100886 METROPOLITAN COUNCIL 89,001.00 MARCH 2005 109457 040805 1495.4307 89,001.00 271041 4114/2005 104650 MICRO CENTER 95.84 HARDDRIVE 109458 869026 5110.6513 127.79 LAPTOP HDD 109458 869026 1552.6710 223.63 271042 411412005 100019 MIDWEST ART FAIRS 47.70 CONSIGNMENT SALES 109282 3481 5120.5510 47.70 271043 4114/2005 100692 MIDWEST COCA -COLA EAGAN 451.40 109364 82501185 5862.5515 114.50 109365 82501110 5822.5515 565.90 271044 4/14/2005 101320 MINNEAPOLIS AREA ASSOC OF REAL 162.00 MLS ACCESS FEES 109521 1282635,36 1190.6105 162.00 CLEANING SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES GENERAL SUPPLIES SAC CHARGES 4/13/2005 12:43:35 Page - 15 Business Unit EDINBOROUGH PARK CENTENNIAL LAKES CENT SVC PW BUILDING FIELD MAINTENANCE FIELD MAINTENANCE VERNON LIQUOR GENERAL ART CENTER BLDG / MAINT PUBLIC HEALTH BUILDING MAINTENANCE CLUB HOUSE INSPECTIONS OFFICE SUPPLIES ART CENTER ADMINISTRATION EQUIPMENT REPLACEMENT CENT SVC PW BUILDING COST OF GOODS SOLD ART SUPPLY GIFT GALLERY SHOP COST OF GOODS SOLD MIX VERNON SELLING COST OF GOODS SOLD MIX 50TH ST SELLING DUES & SUBSCRIPTIONS ASSESSING 4/1312005 12:43:35 Page - 16 Business Unit STREET LIGHTING ORNAMENTAL GRILL DISTRIBUTION DISTRIBUTION 96.09. APRIL SERVICE 109153 CITY OF EDINA 5620.6230 R55CKREG LOG20000 EDINBOROUGH PARK 96.09 271048 Council Check Register 100899 MINNESOTA STATE TREASURER 4/8/2005 -- 4/14/2005 Check # Date Amount Vendor I Explanation PO # Doc No Inv No Account No Subledger Account Description 271045 4114/2005 102174 MINNEAPOLIS OXYGEN COMPANY 271049 4/14/2005 5.61 PROPANE 109460 R103051481 1322.6406 GENERAL SUPPLIES 32.28 CO2 STMT 109461 GUST 30220 5421.6406 GENERAL SUPPLIES GENERAL SUPPLIES BUILDING MAINTENANCE 37.89 51.12 271046 4/14/2005 100913 MINNEAPOLIS SUBURBAN SEWER 8 W 100898 MINVALCO 850.00 WATER SERVICE REPAIR 109283 32647 5913.6180 CONTRACTED REPAIRS 109156 484648 1,360.00 WATER SERVICE REPAIR 109459 32649 5913.6180 CONTRACTED REPAIRS 2,210.00 271051 4114/2005 271047 4/1412005 100903 MINNESOTA ELEVATOR INC 4/1312005 12:43:35 Page - 16 Business Unit STREET LIGHTING ORNAMENTAL GRILL DISTRIBUTION DISTRIBUTION / . 96.09. APRIL SERVICE 109153 71107 5620.6230 SERVICE CONTRACTS EQUIPMENT EDINBOROUGH PARK 96.09 271048 4/14/2005 100899 MINNESOTA STATE TREASURER 8,324.40 MARCH 2005 109462 040605 1495.4380 SURCHARGE INSPECTIONS 8,324.40 271049 4/14/2005 100908 MINNESOTA WANNER 51.12 MACHINE LOCK 109155 0063435 -IN 1646.6406 GENERAL SUPPLIES BUILDING MAINTENANCE 51.12 271050 411412005 100898 MINVALCO 83.87 REFRIGERANT 109156 484648 5430.6406 GENERAL SUPPLIES RICHARDS GOLF COURSE 83.87 271051 4114/2005 101917 MN FIRE SERVICE CERTIFICATION 220.00 FFI CERTIFICATION FEES 109154 040105 1470.6104 CONFERENCES & SCHOOLS FIRE DEPT. GENERAL 220.00 271052 4/14/2005 100159 MOOERS PRINTING INC. 434.52 EMS REPORT FORMS 109522 3946 .1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 434.52 271053 4114/2005 100789 MOORE MEDICAL CORP. 110.90 MEDICAL BAG SUPPLIES 109284 9368931BRI 1552.6406 GENERAL SUPPLIES CENT SVC PW BUILDING 79.09 MEDICAL BAG 109463 93694673RI 1552.6406 GENERAL SUPPLIES CENT SVC PW BUILDING 189.99 271054 4114/2005 100092 MPSA 60.00 APR 21 MEETING 109464 040805 1640.6104 CONFERENCES 8 SCHOOLS PARK MAINTENANCE GENERAL / . 4/1312005 12:43:35 Page - 17 Business Unit MAINT OF COURSE & GROUNDS ADAPTIVE RECREATION 1,680.00 109366 30694 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 716 00 109367 30693 5822 5513 COST OF GOODS SOLD WINE 50TH ST SELLING 2,396.00 CITY OF EDINA R55CKREG LOG20000 271058 4/14/2005 104672 NEXTEL COMMUNICATIONS Council Check Register 825.01 109157 4/8/2005 — 4/14/2005 1470.6151 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 60.00 271059 4114/2005 271055 4/1412005 100906 MTI DISTRIBUTING INC. 25.97 268.68 MOWER LIGHTS 109465 453915 -00 5422.6530 REPAIR PARTS GENERAL SUPPLIES 268.68 25.97 271056 4/14/2005 103224 NELSON, LARRY 411412005 103133 NORTHERN TOOL & EQUIPMENT 450.00 ADAPTIVE GOLF INSTRUCTOR 109523 040805 1629.6103 PROFESSIONAL SERVICES 1,273.78 450.00 109524 13642337 5422.6530 271057 4/14/2005 100076 NEW FRANCE WINE CO. 4/1312005 12:43:35 Page - 17 Business Unit MAINT OF COURSE & GROUNDS ADAPTIVE RECREATION 1,680.00 109366 30694 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 716 00 109367 30693 5822 5513 COST OF GOODS SOLD WINE 50TH ST SELLING FIRE DEPT. GENERAL FIELD MAINTENANCE MAINT OF COURSE & GROUNDS ART SUPPLY GIFT GALLERY SHOP ART SUPPLY GIFT GALLERY SHOP COLLECTION SYSTEMS POOL ADMINISTRATION 460.00 ANTENNA 109468 10658 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL 2,396.00 271058 4/14/2005 104672 NEXTEL COMMUNICATIONS 825.01 109157 757391129028 1470.6151 EQUIPMENT RENTAL 825.01 271059 4114/2005 101886 NICHOLS NET & TWINE INC. 25.97 TWINE 109158 30339 1642.6406 GENERAL SUPPLIES 25.97 271060 411412005 103133 NORTHERN TOOL & EQUIPMENT 1,273.78 PUMP PART 109524 13642337 5422.6530 REPAIR PARTS 1,273.78 271061 4114/2005 100933 NORTHWEST GRAPHIC SUPPLY 53.46 PAPER 109525 31205600 5120.5510 COST OF GOODS SOLD 137.62 PRISMACOLOR PENCILS 109526 31213600 5120.5510 COST OF GOODS SOLD 191.08 271062 4/1412005 100936 OLSEN COMPANIES 25.34 SLEDGE HAMMER 109466 330374 5923.6406 GENERAL SUPPLIES 25.34 271063 4/14/2005 118089 OPPORTUNITY PARTNERS 1,631.39 BROCHURE PACKAGING 109467 102157 5310.6103 PROFESSIONAL SERVICES 1,631.39 271064 4/1412005 117993 P & H SERVICES FIRE DEPT. GENERAL FIELD MAINTENANCE MAINT OF COURSE & GROUNDS ART SUPPLY GIFT GALLERY SHOP ART SUPPLY GIFT GALLERY SHOP COLLECTION SYSTEMS POOL ADMINISTRATION 460.00 ANTENNA 109468 10658 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 18 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 460.00 271065 4/14/2005 100347 PAUSTIS & SONS. 136.00 109231 8064961 -IN 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 59.85 109232 8065196 -IN 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 26.00 109233 8065191 -IN 5862.5514 COST OF GOODS SOLD BEER- VERNON SELLING 369.50 109233 8065191 -IN 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,471.49 109368 8065880 -IN 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 2,008.70 109369 8065878 -IN 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 781.40 109563 8065879 -IN 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 4,852.94 271066 4114/2005 102963 PELUF, JIM 24.95 UNIFORM PURCHASE 109159 040105 1301.6201 LAUNDRY GENERAL MAINTENANCE 24.95 271067 4114/2005 100946 PERA 78,725.20 PPEND 415/05 109469 040805 1000.2023 P.E.R.A. PAYABLE GENERAL FUND BALANCE SHEET 78,725.20 271069 4/14/2005 100743 PHILLIPS WINE & SPIRITS 5,148.12 109234 2181322 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 47.20 109235 2181317 5842.5515 COST OF GOODS SOLD MIX YORK SELLING 7,228.35 109236 2181318 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 1,345.15 109237 2181314 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 1,161.56 109238 2181320 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,557.51 109239 2181321 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 100.95 109240 2181319 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 94.40 109370 2183991 5862.5515 COST OF GOODS SOLD MIX VERNON SELLING 601.05 109371 2183989 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 3,904.49 109372 2183990 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 349.20 109373 2183980 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 311.40 109374 2183982 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 416.25 109375 2183983 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING ,95 109376 2181309 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 138.35 109377. 2180994 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 67.45- 109378 3315831 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 11.09- 109379 .3316032 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 67.10- 109380 3315960 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 2,833.10 109564 2183981 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 637.39 109565 2183984 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 35.70 109566 2183987 5842.5515 COST OF GOODS SOLD MIX YORK SELLING CITY OF EDINA 4/1312005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 19 41812005 - 4/14/2005 Check # Date Amount Vendor I Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 2,517.90 109567 2183985 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 28,283.38 271070 4/14/2005 102748 PIRTEK PLYMOUTH 600.82 HOSE, FLANGE, ASSEMBLY 109285 PL27157 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 600.82 271071 4114/2005 101110 POLLY NORMAN PHOTOGRAPHY 50.00 ABOUT BUSINESS PHOTOS 109160 033105 2210.6123 MAGAZINE/NEWSLETTER EXPENSE COMMUNICATIONS 50.00 271072 411412005 101934 POSITIVE PROMOTIONS 87.38 PENS 109470 02008176 1628.6406 GENERAL SUPPLIES SENIOR CITIZENS 87.38 271073 4114/2005 100961 POSTMASTER 350.00 NEWSLETTER POSTAGE 109527 041105 1628.6235 POSTAGE SENIOR CITIZENS 350.00 271074 4/14/2005 101032 PRINT SHOP, THE 610.72 NEWSLETTER 109471 IPIO0919 1628.6575 PRINTING SENIOR CITIZENS 610.72 271075 4/1412005 100968 PRIOR WINE COMPANY 2,579.85 109241 211534 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 33.91- 109242 663439 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 384.24 109381 214809 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 765.30 109382 213071 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 1,244.94 109383 214807 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 5,370.30 109384 211532 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 815.54 109385 214811 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 514.25 109568 216660 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 11,640.51 271076 411412005 106322 PROSOURCE SUPPLY 378.52 ROLL TOWEL, TISSUE 109161 3524 5620.6511 CLEANING SUPPLIES EDINBOROUGH PARK 378.52 271077 4114/2005 100971 QUALITY WINE 32.61- 109386 535809 -00 5860.5518 VENDOR DISCOUNTS VERNON LIQUOR GENERAL 1,645.51 109386 535809 -00 5862.5512 COST OF GOODS SOLD LIQUOR VERNON SELLING 65.84- 109387 533200 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 20 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 13.11- 109388 535706 -00 5840.5518 VENDOR DISCOUNTS LIQUOR YORK GENERAL 1,321.71 109388 535706 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 4.56- 109389 535685 -00 5840.5518 VENDOR DISCOUNTS LIQUOR YORK GENERAL 463.44 109389 535685 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 68.11- 109390 535827 -00 5840.5518 VENDOR DISCOUNTS LIQUOR YORK GENERAL 3,431.97 109390 535827 -00 5842.5512 COST OF GOODS SOLD LIQUOR YORK SELLING 5.64- 109391 535684 -00 5860.5518 VENDOR DISCOUNTS VERNON LIQUOR GENERAL 572.34 109391 535684 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 7.52- 109392 535707 -00 5860.5518 VENDOR DISCOUNTS VERNON LIQUOR GENERAL 759.71 109392 535707 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 37.30- 109393 535810 -00 5820.5518 VENDOR DISCOUNTS 50TH STREET GENERAL 1,876.87 109393 535810 -00 5822.5512 COST OF GOODS SOLD LIQUOR 50TH ST SELLING 5.88- 109569 534803 -00 5820.5518 VENDOR DISCOUNTS 50TH STREET GENERAL 594.46 109569 534803 -00 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING ' 11.01- 109570 534986 -00 5820.5518 VENDOR DISCOUNTS 50TH STREET GENERAL 1,112.92 109570 534986 -00 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 11,527.35 271078 4/14/2005 118088 QUINN, MARGARET 52.00 TRIP REFUND 109472 040705 1628.4392.07 SENIOR TRIPS SENIOR CITIZENS 52.00 271079 4/14/2005 101965 QWEST 51.19 952 926 -0092 109573 0092 -4/05 5913.6188 TELEPHONE DISTRIBUTION 283.97 612 E24 -8661 109574 8661 -4/05 1550.6188 TELEPHONE CENTRAL SERVICES GENERAL 876.00 612 E01 -0426 109575 0426 -4/05 1550.6188 TELEPHONE CENTRAL SERVICES GENERAL 567.94 612 E24 -8659 109576 8659 -4105 1470.6188 TELEPHONE FIRE DEPT. GENERAL 506.42 612 E24 -8657 109577 8657 - 4/05 5420.6188 TELEPHONE CLUB HOUSE 283.97 612 E24 -8656 109578 8656 -4/05 1550.6188 TELEPHONE CENTRAL SERVICES GENERAL 91.13 952 926 -0419 109579 0419 -4/05 1646.6188 TELEPHONE BUILDING MAINTENANCE 2,660.62 271080 411412005 117692 R & B CLEANING INC. 447.30 FEB RAMP CLEANING 109286 1199 1375.6103 PROFESSIONAL SERVICES PARKING RAMP 447.30 APRIL RAMP CLEANING 109287 1202 1375.6103 PROFESSIONAL SERVICES PARKING RAMP 894.60 271081 4114/2005 113422 RAKE PUBLISHING INC. 153.33 MAGAZINE ADVERTISING 109473 5795 5822.6122 ADVERTISING OTHER 50TH ST SELLING 153.33 MAGAZINE ADVERTISING 109473 5795 5862.6122 ADVERTISING OTHER VERNON SELLING 153.34 MAGAZINE ADVERTISING 109473 5795 5842.6122 ADVERTISING OTHER YORK SELLING 460.00 CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 21 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 271082 4114/2005 101111 REED BUSINESS INFORMATION 92.92 AD FOR BID 109529 2831423 1120.6120 ADVERTISING LEGAL ADMINISTRATION 101.00 AD FOR BID 109530 2846059 1120.6120 ADVERTISING LEGAL ADMINISTRATION 92.92 AD FOR BID 109531 2846058 1120.6120 ADVERTISING LEGAL ADMINISTRATION 101.00 AD FOR BID 109532 2850208 1120.6120 ADVERTISING LEGAL ADMINISTRATION 92.92 AD FOR BID 109533 2850207 1120.6120 ADVERTISING LEGAL ADMINISTRATION 480.76 271083 4114/2005 102011 RIVER CITY JAZZ ORCHESTRA 150.00 PERFORMANCE 4/26/05 109528 040105 5610.6136 PROFESSIONAL SVC - OTHER ED ADMINISTRATION 150.00 271084 4/14/2005 117408 RJ MARCO CONSTRUCTION INC. 26,600.00 POOL RENOVATION 109162 032905 5300.1705 CONSTR. IN PROGRESS AQUATIC CENTER BALANCE SHEET 26,600.00 271085 4/14/2005 105534 ROTARY CLUB OF EDINA/MORNINGSI 195.00 DUES 109474 336 1120.6105 DUES & SUBSCRIPTIONS ADMINISTRATION 195.00 271086 4/1412005 118001 ROZEBOOM MILLER ARCHITECTS INC 20,986.19 ARCHITECT /ENG SERVICES 109288 2 1500.6103 PROFESSIONAL SERVICES CONTINGENCIES 20,986.19 271087 4114/2005 118087 RUSSELL, MARGARET 52.00 TRIP REFUND 109475 040705 1628.4392.07 SENIOR TRIPS SENIOR CITIZENS 52.00 271088 4/1412005 101562 SAWYER, CHERYL 100.00 PERFORMANCE 4/28/05 109534 040105 5610.6136 PROFESSIONAL SVC - OTHER ED ADMINISTRATION 100.00 271089 4/14/2005 100990 SCHARBER & SONS 15.18 O- RINGS, GASKET 109289 331180 1553.6530 REPAIR PARTS EQUIPMENT OPERATION GEN 15.18 271090 411412005 105442 SCHERER BROS. LUMBER CO. 62.88 PLYWOOD 109290 40061030 1552.6406 GENERAL SUPPLIES CENT SVC PW BUILDING 204.48 PAINT 109291 40061136 1646.6406 GENERAL SUPPLIES BUILDING MAINTENANCE 108.63 BENCH BOARDS 109476 40057603 5431.6406 GENERAL SUPPLIES RICHARDS GC MAINTENANCE 375.99 l CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 22 4/8/2005 -- 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 271091 4/14/2005 118092 SCHMIDT, JIM 19.00 UPGRADE LICENSE 109477 040805 1553.6260 LICENSES & PERMITS EQUIPMENT OPERATION GEN 19.00 271092 4/1412005 118080 SCHUVEILLER, MAREN 79.00 CLASS REFUND 109292 040505 5101.4607 CLASS REGISTRATION ART CENTER REVENUES 79.00 271093 4/1412005 116905 SCREENING AND SELECTION SERVIC 76.00 DRUG TESTING 109163 825502 1550.6121 ADVERTISING PERSONNEL CENTRAL SERVICES GENERAL 76.00 271094 4/14/2005 102644 SEABOARD PENCIL COMPANY 540.40 PENCILS 109478 4183 5410.6406 GENERAL SUPPLIES GOLF ADMINISTRATION 540.40 271095 4/14/2005 104689 SERIGRAPHICS SIGN SYSTEMS INC. 242.50 SIGN CHARGE 109535 36587 1551.6406 GENERAL SUPPLIES CITY HALL GENERAL 242.50 271096 4114/2005 116910 SHARP IMPRESSIONS 1,219.43 EVENT BROCHURES 109164 05 -158 2210.6575 PRINTING COMMUNICATIONS 1,219.43 271097 4/1412005 101383 SIITARI, MICHAEL 72.00 VOLUNTEER DINNER 109293 040405 1400.6106 MEETING EXPENSE POLICE DEPT. GENERAL 18.23 REIMBURSEMENT 109479 040805 1400.6106 MEETING EXPENSE POLICE DEPT. GENERAL 50.23 PLAQUE 109479 040805 1400.6406 GENERAL SUPPLIES POLICE DEPT. GENERAL 140.46 271098 4/14/2005 105286 SMITH & WESSON 159.79 TRAINING ITEMS 109480 0613277 1400.6104 CONFERENCES & SCHOOLS POLICE DEPT. GENERAL 159.79 271099 4/1412005 100629 SMITH, AMY 281.76 MILEAGE REIMBURSEMENT 109481 040705 5410.6107 MILEAGE OR ALLOWANCE GOLF ADMINISTRATION 281.76 271100 4/14/2005 101002 SOUTHSIDE DISTRIBUTORS INC 1,970.35 109394 ' 163050 5842.5514 COST OF GOODS SOLD BEER YORK SELLING 60.85 109395 163051 5842.5515 COST OF GOODS SOLD MIX YORK SELLING l CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 23 4/8/2005 — 4114/2005 Check # Date Amount Vendor! Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 18.30 109396 163047 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 998.45 109397 163046 5822.5514 COST OF GOODS SOLD BEER 50TH ST SELLING 3,047.95 271101 411412005 105193 SPAIN, MARK 1,995.00 TREE REMOVAL 109294 PO 5488 4088.6103 PROFESSIONAL SERVICES TREE REMOVAL 2,350.00 TREE WORK 109482 040805 5422.6541 PLANTINGS & TREES MAINT OF COURSE & GROUNDS 4,345.00 271102 4/14/2005 118082 SPECTRUM CUSTOM DESIGNS INC. 2,400.00 GARBAGE BINS 109295 13421 4090.6406 GENERAL SUPPLIES STREET REVOLVING 2,400.00 271103 4/14/2005 118079 SPENCER, JAN 158.00 CLASS REFUND 109296 040505 5101.4607 CLASS REGISTRATION ART CENTER REVENUES 158.00 271104 4114/2005 101004 SPS COMPANIES 94.70 ACETYLENE TIPS 109165 S1209094.001 1646.6556 TOOLS BUILDING MAINTENANCE 6.56 PIPE, NIPPLE, CAP 109297 51210537.001 1646.6530 REPAIR PARTS BUILDING MAINTENANCE 36.98 NIPPLES 109298 S1210400.001 1646.6530. REPAIR PARTS BUILDING MAINTENANCE 303.72 PLUMBING SUPPLIES 109483 S1211827.001 1646.6530 REPAIR PARTS BUILDING MAINTENANCE 441.96 271105 411412005 118090 SRIXON SPORTS USA INC. 162.00 MERCHANDISE 109484 40012497 5440.5511 COST OF GOODS - PRO SHOP PRO SHOP RETAIL SALES 162.00 271106 4114/2005 116175 ST. CROIX HARLEY - DAVIDSON 112.78 EQUIPMENT INSTALLATION 109299 353762 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL 1,258.90 EQUIPMENT INSTALLATION 109300 353244 1400.6215 EQUIPMENT MAINTENANCE POLICE DEPT. GENERAL 1,371.68 271107 4114/2005 103658 ST. LOUIS PARK COMMUNITY BAND 100.00 PERFORMANCE 4/17/05 109536 040105 5610.6136 PROFESSIONAL SVC - OTHER ED ADMINISTRATION 100.00 271108 4/14/2005 101007 STAR TRIBUNE 681.84 WANT AD 109301 033105 1550.6121 ADVERTISING PERSONNEL CENTRAL SERVICES GENERAL 681.84 271109 4114/2005 106030 STRATEGIC EQUIPMENT & SUPPLY 1400.6104 CONFERENCES & SCHOOLS 4/13/2005 12:43:35 Page - 24 Business Unit ART CENTER BLDG /MAINT POLICE DEPT. GENERAL POLICE DEPT. GENERAL POLICE DEPT. GENERAL 1120.6120 128.66 ADMINISTRATION CITY OF EDINA ADVERTISING LEGAL R55CKREG LOG20000 1120.6120 101765 STROH, STEVE ADMINISTRATION 1120.6120 ADVERTISING LEGAL 487.00 TUITION REIMBURSEMENT Council Check Register 040505 1120.6120 487.00 ADMINISTRATION 4/8/2005 - 4/14/2005 ADVERTISING LEGAL Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 14.23 COFFEE FILTERS 109537 578863 5111.6406 GENERAL SUPPLIES 14.23 101.89 AD FOR BID 109539 762754 271110 4/14/2005 101015 STREICHERS AD FOR BID 109540 762755 86.11 INTOX MOUTHPIECES 109302 1258177 1400.6610 SAFETY EQUIPMENT 42.55 DRESS BELT 109485 1259227 1400.6203 UNIFORM ALLOWANCE 1400.6104 CONFERENCES & SCHOOLS 4/13/2005 12:43:35 Page - 24 Business Unit ART CENTER BLDG /MAINT POLICE DEPT. GENERAL POLICE DEPT. GENERAL POLICE DEPT. GENERAL 1120.6120 128.66 ADMINISTRATION 1120.6120 ADVERTISING LEGAL 271111 4/14/2005 1120.6120 101765 STROH, STEVE ADMINISTRATION 1120.6120 ADVERTISING LEGAL 487.00 TUITION REIMBURSEMENT 109303 040505 1120.6120 487.00 ADMINISTRATION 1120.6120 ADVERTISING LEGAL 271112 4/14/2005 1120.6120 100900 SUN NEWSPAPERS ADMINISTRATION 1120.6120, ADVERTISING LEGAL 135.85 ENG DEPT AFB 109538 761486 1120.6120 101.89 AD FOR BID 109539 762754 ADMINISTRATION 91.15 AD FOR BID 109540 762755 SERVICE CONTRACTS EQUIPMENT 39.33 2005 BD OF REVIEW 109541 764400 57.20 SOUTHDALE PH 109542 764402 46.48 50TH&FRANCE TEMP LIC 109543 765908 68.78 PH NOTICE 109544 768045 75.08 PH NOTICE 109545 768031 69.71 PH NOTICE 109546 768033 85.80 PH NOTICE 109547 768037 101.89 PH NOTICE 109548 768040 60.78 ORD 2005 -02 109549 768043 933.94 271113 4/14/2005 114800 SUPERIOR WILDLIFE MANAGEMENT I 4,240.00 REMOVAL OF DEER 109166 B2040405 4,240.00 271114 4/1412005 111616 T.D. ANDERSON INC. 35.00 BEERLINE CLEANING 109304 743229 35.00 271115 4/14/2005 117686 TECHNA GRAPHICS 601.73 TIMECARDS 109486 500631 -01 601.73 271116 4/14/2005 118083 THOMAS TOOL AND SUPPLY INC. 372.74 IMPACT WRENCH 109305 893497 372.74 1400.6104 CONFERENCES & SCHOOLS 4/13/2005 12:43:35 Page - 24 Business Unit ART CENTER BLDG /MAINT POLICE DEPT. GENERAL POLICE DEPT. GENERAL POLICE DEPT. GENERAL 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120, ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1120.6120 ADVERTISING LEGAL ADMINISTRATION 1509.6103 PROFESSIONAL SERVICES DEER CONTROL 5421.6230 SERVICE CONTRACTS EQUIPMENT GRILL 1550.6406 GENERAL SUPPLIES 1301.6556 TOOLS CENTRAL SERVICES GENERAL GENERAL MAINTENANCE CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 25 418/2005 — 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 271117 4/14/2005 101035 THORPE DISTRIBUTING COMPANY 321.60 109243 367989 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 1,108.90 109244 367636 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 30.80- 109245 365429CR 5862.5514 COST OF GOODS SOLD BEER VERNON SELLING 1,399.70 271118 4114/2005 104347 TIERNEY BROTHERS INC. 42.60 OVERHEAD BULBS 109487 470483 -1 1628.6513 OFFICE SUPPLIES SENIOR CITIZENS 42.60 271119 4/14/2005 101038 TOLL GAS & WELDING SUPPLY 19.35 WELDING DEMURRAGE 109488 471014 5913.6580 WELDING SUPPLIES DISTRIBUTION 83.82 WELDING SUPPLIES 109489 471012 1553.6406 GENERAL SUPPLIES EQUIPMENT OPERATION GEN 103.17 271120 4114/2005 117992 TOSHIBA BUSINESS SOLUTIONS 23.66 COPIER MAINTENANCE 109490 CNIN022887 1400.6230 SERVICE CONTRACTS EQUIPMENT POLICE DEPT. GENERAL 23.66 271121 4/14/2005 103982 TRAFFIC CONTROL CORPORATION 367.90 AMBER LENSES 109306 15521 1330.6530 REPAIR PARTS TRAFFIC SIGNALS 367.90 271122 4/14/2005 104064 TRANS UNION LLC 49.24 CREDIT CHECK 109307 03551521 1400.6103 PROFESSIONAL SERVICES POLICE DEPT. GENERAL 49.24 271123 4/1412005 101045 TURF SUPPLY COMPANY 1,076.93 GOLF COURSE ACCESSORIES 109491 095960 5422.6406 GENERAL SUPPLIES MAINT OF COURSE & GROUNDS 1,076.93 271124 4/14/2005 101047 TWIN CITY GARAGE DOOR CO 435.10 DOOR REPAIR 109167 234204 5630.6180 CONTRACTED REPAIRS CENTENNIAL LAKES 435.10 271125 4/1412005 101360 TWIN CITY HARDWARE 51.32 BLADE MARATHON 109168 105392 5311.6406 GENERAL SUPPLIES POOL OPERATION 505.50 DOOR FRAME MATERIALS 109169 105391 5311.6406 GENERAL SUPPLIES POOL OPERATION 556.82 271126 4/14/2005 102255 TWIN CITY OXYGEN CO CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 26 4/8/2005 - 4/1412005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 80.35 OXYGEN 109170 819949 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 43.02 OXYGEN 109550 820990 1470.6510 FIRST AID SUPPLIES FIRE DEPT. GENERAL 123.37 271127 4/14/2005 101172 TWIN CITY SAW CO. 391.30 SAW REPAIR 109492 A11119 5422.6530 REPAIR PARTS MAINT OF COURSE & GROUNDS 391.30 271128 4114/2005 .101908 US FOODSERVICE INC 115.17 CUST 114300 109494 040105STMT 5421.6406 GENERAL SUPPLIES GRILL 1,101.71 CUST 114300 109494 040105STMT 5421.5510 COST OF GOODS SOLD GRILL 1,216.88 271129 4/14/2005. 114236 USA BLUE BOOK 549.98 PROBE 109493 954891 5913.6406 GENERAL SUPPLIES DISTRIBUTION 549.98 271130 4/1412005 101058 VAN PAPER CO. 596.40 CAN LINERS 109171 575580 1645.6406 GENERAL SUPPLIES LITTER REMOVAL 117.88 CAN LINERS, TOWELS 109308 575582 5111.6511 CLEANING SUPPLIES ART CENTER BLDG /MAINT 714.28 271131 4/1412005 101060 VANTAGE ELECTRIC 683.00 REPLACE TRANSFORMER, BALLASTS 109172 18150 5620.6180 CONTRACTED REPAIRS EDINBOROUGH PARK 683.00 271132 4/1412005 101063 VERSATILE VEHICLES INC. 32.67 DECALS 109495 18206 5423.6406 GENERAL SUPPLIES GOLF CARS 32.67 271133 4/14/2005 101066 VIKING ELECTRIC SUPPLY 667.21 STRUTS, ELBOWS, CONDUIT 109173 8906080 1551.6530 REPAIR PARTS CITY HALL GENERAL 437.72 PANELBOARD 109174 8906339 1551.6530 REPAIR PARTS CITY HALL GENERAL 1,953.21 PANELBOARD 109175 8906273 1551.6530 _ REPAIR PARTS CITY HALL GENERAL 221.53 STRUTS, CLAMPS, HANGERS 109176 8908157 1551.6530 REPAIR PARTS CITY HALL GENERAL 3,279.67 271134 4/14/2005 104820 VOELKER, JAMES 189.00 CLASS FEES 109496 040605 1281.6104 CONFERENCES & SCHOOLS TRAINING 189.00 271115 4114/2005 103466 WASTE MANAGEMENT - SAVAGE MN CITY OF EDINA 4/13/2005 12:43:35 R55CKREG LOG20000 Council Check Register Page - 27 4/8/2005 - 4/14/2005 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description Business Unit 34.86 RUBBISH REMOVAL 109309 303948222821 5620.6182 RUBBISH REMOVAL EDINBOROUGH PARK 2,976.80 REFUSE 109310 304438122828 4095.6103 PROFESSIONAL SERVICES 50TH STREET RUBBISH 2,939.54 REFUSE 109311 30388482282-4 4095.6103 PROFESSIONAL SERVICES 50TH STREET RUBBISH 5,951.20 271136 4114/2005 101075 WEIGLE, SUE 90.00 CONFERENCE REGISTRATION 109497 040705 1600.6104 CONFERENCES & SCHOOLS PARK ADMIN. GENERAL 90.00 271137 4/14/2005 101078 WESTSIDE EQUIPMENT 134.50 TANK LEAK REPAIR 109177 0027908 -IN 1552.6530 REPAIR PARTS CENT SVC PW BUILDING 134.50 271138 4/1412005 101033 WINE COMPANY, THE 629.20 109246 112475 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 893.20 109398 112801 -00 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 510.40 109399 112853 -00 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 617.75 109571 112800 -00 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 2,650.55 271139 4/14/2005 101312 WINE MERCHANTS 684.67 109247 120812 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 1,074.89 109400 121355 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 408.37 109401 121353 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 20.00- 109402 24099 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 919.94 109572 121354 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 3,067.87 271140 4/14/2005 101086 WORLD CLASS WINES INC 68.00 109248 162884 5822.5513 COST OF GOODS SOLD WINE 50TH ST SELLING 1,004.75 109403 163077 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 813.00 109404 163019 5842.5513 COST OF GOODS SOLD WINE YORK SELLING 605.00 109405 163138 5862.5513 COST OF GOODS SOLD WINE VERNON SELLING 2,490.75 271141 4/14/2005 101726 XCEL ENERGY 114.62 109178 21945686 5932.6185 LIGHT & POWER GENERAL STORM SEWER 201.56 109179 21954190 5422.6185 LIGHT & POWER MAINT OF COURSE & GROUNDS 140.90 109180 21957729 1481.6185 LIGHT & POWER YORK FIRE STATION 734.37 109180 21957729 1470.6185 LIGHT & POWER FIRE DEPT. GENERAL 93.78 109181 21957455 5933.6185 LIGHT & POWER PONDS & LAKES 148.69 109182 21958758 4086.6185 LIGHT & POWER AQUATIC WEEDS 32,103.06 EQUIPMENT RENTAL CITY OF EDINA 271142 4114/2005 R55CKREG LOG20000 1550.6151 EQUIPMENT RENTAL 326.28 MARCH USAGE - BLDG 109317 008931379 Council Check Register MARCH USAGE - ADMIN 109318 008931377 4/8/2005 - 4/14/2005 109319 Check # Date Amount Vendor / Explanation PO # Doc No Inv No Account No Subledger Account Description 4,024.07 109183 22099292 1330.6185 LIGHT & POWER 37.90 109184 22198528 5311.6185 LIGHT & POWER 258.57 109312 22055628 5913.6185 LIGHT & POWER 592.64 109313 22093915 5821.6185 LIGHT & POWER - 937.81 109313 22093915 5841.6185 LIGHT & POWER 2,129.96 109313 22093915 5861.6185 LIGHT & POWER 2,748.97 109314 22365423 5913.6185 LIGHT & POWER 2,701.14 _ 109315 22339030 7411.6185 LIGHT & POWER 3,794.76 109316 22099291 1330.6185 LIGHT & POWER 6,594.86 109584 22560545 5913.6185 LIGHT & POWER 334.12 109585 22560522 5913.6185 LIGHT & POWER 6 514 34 109586 22560542 5913.6185 LIGHT & POWER 32,103.06 EQUIPMENT RENTAL CENTRAL SERVICES GENERAL 1550.6151 271142 4114/2005 100568 XEROX CORPORATION 1550.6151 EQUIPMENT RENTAL 326.28 MARCH USAGE - BLDG 109317 008931379 439.55 MARCH USAGE - ADMIN 109318 008931377 176.20 MARCH USAGE -P & R 109319 008931380 108.41 MARCH USAGE 109320 008931543 376.62 MARCH USAGE 109498 008931378 1,427.06 271143 4/14/2005 118028 YAHOOI CUSTODIAN OF RECORDS 20.37 COST OF ADMIN SUBPOENA 109499 040705 20.37 271144 411412005 106424 YELLOW BOOK USA 4/13/2005 12:43:35 Page - 28 Business Unit TRAFFIC SIGNALS POOL OPERATION DISTRIBUTION 50TH ST OCCUPANCY YORK OCCUPANCY VERNON OCCUPANCY DISTRIBUTION PSTF OCCUPANCY TRAFFIC SIGNALS DISTRIBUTION DISTRIBUTION DISTRIBUTION 1550.6151 EQUIPMENT RENTAL CENTRAL SERVICES GENERAL 1550.6151 EQUIPMENT RENTAL CENTRAL SERVICES GENERAL 1550.6151 EQUIPMENT RENTAL CENTRAL SERVICES GENERAL 5110.6151 EQUIPMENT RENTAL ART CENTER ADMINISTRATION 1400.6230 SERVICE CONTRACTS EQUIPMENT POLICE DEPT. GENERAL 1400.6103 PROFESSIONAL SERVICES POLICE DEPT. GENERAL 345.00 612- 915 -6600 109551 ID 276515 5110.6122 345.00 271145 4114/2005 101091 ZIEGLER INC 345.00 GENERATOR CONTRACT 109500 E3809713 345.00 631,236.46 Grand Total ADVERTISING OTHER 1551.6180 CONTRACTED REPAIRS Payment Instrument Totals Check Total 631,236.46 Total Payments 631,236.46 ART CENTER ADMINISTRATION CITY HALL GENERAL R55CKSUM LOG20000 Company Amount 01000 GENERAL FUND 308,511.80 02200 COMMUNICATIONS FUND 1,733.70 04000 WORKING CAPITAL FUND 21,558.97 05100 ART CENTER FUND 10,332.66 05200 GOLF DOME FUND 11,853.33 05300 AQUATIC CENTER FUND 38,346.95 05400 GOLF COURSE FUND 12,066.83 05500 ICE ARENA FUND 9,875.00 05600 EDINBOROUGH /CENT LAKES FUND 4,634.68 05800 LIQUOR FUND 180,229.01 05900 UTILITY FUND 26,083.67 05930 STORM SEWER FUND 534.29 07400 PSTF AGENCY FUND 5,475.57 Report Totals 631,236.46 CITY OF EDINA 4/13/2005 12:46:08 Council Check Summary Page - 1 4/8/2005 - 411412005 We confirm to the best of our knowledge and belief, that these claims comply in all material respects with the requirements of the City of Edina purchasing tides and procedures d Fi City oe •���0ap ,aaa REPORT/RECOMMENDATION To: Mayor & City Council Agenda Item # VIII. A. From: Debra Mangen Consent City Clerk Information Only Date: April 19, 2005 Mgr. Recommends F] To HRA ®. To- Council Subject: Receive petition Action ® Motion . F1Resolution Ordinance 0 Discussion Recommendation: Refer the petition received to Engineering for processing as to. feasibility. Info/Background: The City received a petition circulated by Nancy Hopf and Manchilo Vucenich requesting street lighting be installed at 5900 Vernon Avenue. There were nineteen property owners from Vernon Avenue and Vernon Lane signing the petition. The City's normal procedure is to refer the petition to the Engineering Department for processing as to feasibility. D 0 0 s AN r�i. o _ @ �, City of Edina, Minnesota CITY COUNCIL fro a� 4801 West 50th Street • Edina, Minnesota 55424 (612) 927 -8861 • (612) 927 - 7645 -FAX • (612) 927 - 5461 -TDD •PETITION TO THE CITY COUNCIL ❑ SIDEWALK ❑ STORM SEWER ❑ ALLEY PAVING El SANITARY SEWER ❑ CURB AND GUTTER ONLY ❑ PERMANENT STREET SURFACING WITH CURB AND GUTTER To the Mayor and City Council: Apr, - 7 iii ❑ WATERMAIN STREET LIGHTING ❑ OTHER: The persons who have signed this petition ask the City Council to consider the improvements listed above to the locations listed below. ���C �(J�► "�'lu�% between and LOCATION OF IMPROVEMENT BY STREET NAME ADDRESS ADDRESS between and LOCATION OF IMPROVEMENT BY STREET NAME ADDRESS ADDRESS between LOCATION OF IMPROVEMENT BY STREET NAME between LOCATION OF IMPROVEMENT BY STREET NAME ADDRESS ADDRESS and ADDRESS and ADDRESS IMPORTANT NOTE: THE PERSONS WHO HAVE SIGNED THIS PETITION UNDERSTAND THAT THE CITY COUNCIL MAY ASSESS THE COSTS OF THESE IMPROVEMENTS AGAINST THE PROPERTIES BENEFITING FROM THE IMPROVEMENTS IN AMOUNTS DETERMINED BY THE COUNCIL AS AUTHORIZED BY CHAPTER 429, MINNESOTA STATUTES. PROPERTY OWNER'S OWNER'S NAME PROPERTY ADDRESS OWNER'S SIGNATURE (PRINTED) PHONE {7 U This petition was circulated by: ssa i�Cn�/o,�� 1 -.t►✓� 9s�� ad's =��a6 NAME ADDRESS PHONE There is space for more signatures on the back or you may attach extra pages. SEPTEMMM 1990 PROPERTY-,OWNER S OWNER'S NAME SIGNA (PATE ) akf 6Al PROPERTY ADDRESS S J, 1 OWNER'S PHONE C I evgokj Vev Acm -d.c Alhlx- y,of .3-�iC�` �J�nrfar C�• 9 a- �r�s- ? f�� o 5`nc C(-9 5 si _v rm C� F,37V- 9a2-c;); 7- : 77', v 1 :5-? r/ 1J —mc,,-i �n 9&a -,S � b ;SAW ET Fo L1, s N s &i� EDINA PARK BOARD 7:00 P.M. EDINA COMMUNITY ROOM EDINA CITY HALL MARCH 8, 2005 MEMBERS PRESENT: George Klus, Jeff Johnson, Mike Weiss, Mike Damman, Linda Presthus, Jessica Selleck, Todd Fronek, Jeff Sorem MEMBERS ABSENT: Karla Sitek, Andy Finsness STAFF PRESENT: John Keprios, Ed MacHolda, Janet Canton OTHERS PRESENT: Idelle Longman, Paul Selcke I. ALICE HULBERT Mr. Klus informed the Park Board that he asked Dr. Hulbert if she would attend the first part of the Park Board so that everyone can thank her and let her know that they appreciate everything she has done this past year. He pointed out that Dr. Hulbert has contributed a lot and has helped to cultivate some very good discussion. Dr. Hulbert commented that the Park Board has been a wonderful group of people to work with and has very much enjoyed her time on the Park Board. She noted that her only regret is that she cannot serve on both the City Council and Park Board. Dr. Hulbert indicated that she really appreciates all of the mentoring into the ways of the city that she has received since being on the Park Board. She added that the Park Board was her inspiration for deciding to run for City Council. Dr. Hulbert stressed that she is so amazed at the amount of time and volunteerism that everyone has put into this and how they have brought something before the board, prioritized it and did something about it. She stated she has learned a lot and it has been a lot of fun. Mr. Keprios congratulated Dr. Hulbert on being appointed to the City Council and thanked her for all of the support she has given the Park Board and knows that she will carry that out on the City Council. Mr. Klus asked the Park Board members to e-mail him any names of people that they would like Mayor Hovland to consider before he makes his appointment of the Park Board member. H. APPROVAL OF THE FEBRUARY 8, 2005 PARK BOARD MINUTES Linda Presthus MOVED TO APPROVE THE FEBRUARY 8, 2005 PARK BOARD MINUTES. Mike Weiss SECONDED THE MOTION. MINUTES APPROVED III. "PARKS AND RECREATION — YOUR BEST INVESTMENT" 12- MINUTE VIDEO Mr. Keprios showed the Park Board a video on parks and recreation. IV. ADVENTURE PEAK KARE 11 NEWS STORY Mr. Keprios showed the Park Board a news story that was recently aired on KARE 11 news talking about Adventure Peak. V.' UPDATES A. Braemar Athletic Field Project — Mr. Keprios informed the Park Board that bids were opened on February 24`h to renovate the Braemar athletic fields, and there is $312,000 in the budget for this as part of the capital improvement plan. He noted there were four bids submitted to which the low bid was Veit Companies whose bid came in at $277,700. Mr. Keprios commented this is a good company who has experience and they hope to begin the project in June and if all goes well it will be done around August Is' after which they will start seeding. He noted that we would probably be able to use the field by mid to late June of 2006 and added that it will be the premier field in Minnesota when it's done. B. Koietin Park Plavgound Equipment — Mr. MacHolda informed the Park Board that Kojetin Park is currently being advertised in the Sun Current to which the bid opening will be held.on Tuesday, March 22 °d at 2:00 p.m. C. Gymnasiums Proposal — Mr. Keprios handed out to the Park Board six different plans of the construction that is going on at the South View gym and the Community Center gym. He pointed out that they have had several meetings already with the "Community Input Committee" which consists primarily of members from the Edina Basketball Association, the Edina Girls Athletic Association as well as they have received some input from the Edina Baseball Association. He noted that. the committee has contributed a tremendous amount of quality input into the design. Mr. Keprios commented that the project is moving along at a very fast pace. D. Gold Medal Award — Mr. Keprios informed the Park Board that the "Gold Medal Award" is the National Recreation Park Association's highest and most prestigious award that is given out to municipal park and recreation departments in five different classes based on population. He noted that Edina is considered a Class 4 community (under 50,000 population) and they have submitted a multi -page application form to which the Park and Recreation staff had the opportunity to contribute to. Mr. Keprios stated that Jennifer Bennerotte, Communications Director, was given all of the documents of 2 information and wrote the application to which she did a wonderful job. He noted that during the week of April 19`h they would find out who the finalists are. Mr. Keprios commented that he thinks Edina has a very good shot, however, he has heard that it is almost unheard of for a community to win on its first try. It usually takes two to three years of applying before receiving it. Mr. Sorem asked what does it mean if they win the Gold Medal Award to which Mr. Keprios replied it means Edina receives national recognition and puts us on the map. Mr. Klus added that it's a really nice honor to the city and the staff for what they've done. E. Senior Center Kitchen Project — Mr. Keprios informed the Park Board that the kitchen project at the Senior Center is now complete. He noted that the Rotary Club contributed almost $20,000 and the Masica family contributed $500.00 towards the project. Mr. Keprios stated that it turned out beautiful. Ms. Presthus asked if the rates would change for rentals to which Mr. Keprios replied it will stay the same but noted that it will now be more attractive to renters. F. Grandview Square Park Development — Mr. Keprios informed the Park Board that they are on track with the development of the Grandview Square Park project. He noted that the quote they received is around $40,000 to which they are a little shy of what has been donated to date. However, that effort is still moving forward because they still need to come up with the rest of the funds to make it work. Mr. Klus informed the Park Board that there has been some miscommunication because the residents claim they were promised a park by Ron Clark and not by the City. Mr. Klus commented that he doesn't think the city should recommend or move ahead on something like this unless the money has already been raised. He added that he doesn't think the city should be putting extra money into the project without involvement from the people who live in that area. Mr. Keprios pointed out that the city attorney has drawn up a contract that Ron Clark will have to sign since they are going to serve as the general contractor and will use a lot of their own sub - contractors. He noted that all of the dollars received so far that have been deposited with the Edina Foundation have come from the Friends of the Library, the Edina Senior Citizen Center Advisory Board, and a few people who live in the Grandview Square condominiums. The city again paid for the architect fees; however, we are not planning to contribute any additional dollars towards the project. VI. PARK BOARD COMMUNITY INVOLVEMENT PROJECTS Mr. Klus indicated that at the last Park Board meeting Mr. Weiss suggested that the Park Board maybe do something together in the community outside of the Park Board meeting. Mr. Klus noted that he has asked Mr. Keprios to develop a list of potential things the Park Board could discuss and possibly come to an agreement on what would be good for them as a group to go out and do in the community. Mr. Keprios went through the list he prepared. Mr. Keprios informed the Park Board that he met with Mr. MacHolda, Ms. Tilsner and Ms. Miller to come up with a few ideas on different projects that the Park Board may be 3 interested in being involved with. He noted that one thought is to have the Park Board be involved with the spring.clean up that is done every year by the maintenance staff that takes place in early spring. He stated this is an opportunity where they really clean the parks, boulevards and side street areas that otherwise do not get a lot of attention later in the year. Another thought was to have the Park Board adopt a park that hasn't already been adopted through the Adopt -A -Park program. Some other ideas they came up with were some of the shelter buildings need painting from time to time. Also, this year the Edina Conservation League is going to be heavily involved with the Arbor Day tree planting project which possibly the Park Board could help out with. Mr. Keprios stated that they could also do their own Needs Assessment Survey to which they could do a mailing and invite people to come to their park on a Saturday or weekday evening and ask them for their input as well as hand out a survey. This event could also be turned into an ice cream social or something like that. Other thoughts were to have a buckthorn abatement day or perhaps sponsor a special walk in the park day and meet your Park Board members. Mr. Keprios stated that these were some of the ideas they came up with. Mr. Weiss indicated that he thinks having a buckthorn abatement day would be a wonderful thing to do because there is so much of it and if everyone brought along another person they could get a lot done. Mr. Johnson suggested that they hold one of their summer Park Board meetings at one of the newer shelter buildings and post it so that neighbors can attend the meeting and give them their input and share their concerns. Mr. Sorem stated that he thinks it's a wonderful idea to have the Park Board go out into the community and show them the commitment on our part. He noted that he's not sure what project they should do but rather maybe do a couple of different projects a year. Ms. Selleck commented that she thinks they are all good ideas and thinks it would be really nice for the Park Board to get out into the community. Mr. Fronek indicated that he thinks it's very important for the Park Board to get out and meet people. He stated that if the city puts on some type of festival or something that maybe the Park Board should be present at that. He noted that he thinks a lot of people don't necessarily know that this avenue is available to them and commented that by them being out in front of the people is the best way to go about accomplishing that goal. Ms. Presthus noted that she brought this up to the Park Board a long time ago that she would be in favor of having some sort of a neighborhood night out that the Park Board would sponsor. Each Park Board member could be at a specific park. She commented that she has already taken out enough of her own buckthorn that she isn't too excited about chopping down more. Ms. Presthus stated that having a night out is something that would be visible and would be sponsored all over the community. Mr. Damman indicated that quite often he goes to the parks and gets input from the residents. He stated that he would like for the Park Board to do something formal and 4 maybe hand out a survey to them while they are there. He noted that it doesn't have to be on one certain day, however, they could do it in one day at the parks or they could do it throughout the year. Mr. Klus asked what events are held at the parks where the Park Board could volunteer. He noted that there is the Fourth of July Fireworks as well as the Art Center has some events but what do we do in the parks. Mr. Keprios replied that that there is the Iron Kids Triathlon, the Fall Into Arts Festival at Centennial Lakes, the Summer Beach Party in the middle of winter at Edinborough, the Parade of Boats, concerts throughout the summer at the amphitheatre and Lighthouse Night where they do a little fireworks display at the John Phillip Sousa's Band concert at Centennial Lakes. Ms. Presthus pointed out that most of those events center around Centennial Lakes or the pool and commented that she was thinking more of an ice cream social one night and open up 11 parks where each Park Board member is at a park. Mr. Klus stated that he thinks it would be good if the Park Board did something together where they are visible as a group at one thing whether it be painting a park shelter that needs work or cleaning up a pathway or a walkway at a park just so it's something that's visible that they can put PR out there to let people know that this is what we are going to be doing and come and join us. Mr. Keprios stated that they could take on an Arbor Day project by planting trees at a particular park. Mr. Klus asked Mr. Keprios to put together a list of projects based on what was just discussed and e-mail it to all Park Board members so everyone can rank them. At the April meeting they will decide what it is that they want to do. VII. COUNTRYSIDE PARK HOCKEY RINK Mr. Keprios informed the Park Board that in his staff report he stated there were 10 hockey rinks when actually there are 11 hockey rinks. Mr. Keprios handed out a report that shows what the current use is for the hockey rinks as well as the general skating areas. He commented that the average hours used versus the total numbers available shows that the hockey rinks for the most part are used on Mondays, Tuesdays and Thursdays. He noted that the hockey rinks are heavily booked on Tuesdays and Thursdays; however, there are times available pretty much on even the heaviest days. Mr. Keprios commented that they can't build enough hockey rinks or gymnasiums to ever accommodate the Tuesday and Thursday night need because people will always want more of the 6:00, 7:00 and 8:00 times. He pointed out that the problem is there is a lot of time left over on the weekends. Mr. Keprios added that the rinks are not just there for organized hockey but are also there for general skating. Mr. Johnson informed the Park Board that the only times the mites get to play inside are on Saturday and Sunday mornings. Mr. Keprios stated that he thinks his staff report speaks for itself in that the dilemma they are in: they need to make a wise decision about what to do with the hockey boards at Countryside Park. He noted that he thinks it would be unwise to spend a lot of money to put in new boards and lights in the wrong orientation over bad soils at Countryside Park. He commented that Countryside Park could still be left open as a nice skating area as well as a separate area for "shinny hockey ". Mr. Keprios noted that his recommendation would be to put another hockey rink in at Lewis Park. Mr. Fronek noted that he sent out a few a -mails regarding the situation and the responses were mostly from the under age 30 crowd and a lot depended on where they lived. He noted that he thinks a lot of people feel that the ice at Countryside Park is bad and it is totally dependent on the weather. If it's cold then the ice is good which makes Countryside Park an ideal location because it has easy access. Mr. Fronek pointed out that access and parking is a big issue at Todd Park, however, there is a new warming house there that probably should be getting a lot more use. He indicated that he grew up close to Lewis Park, however, it does get overrun with a lot of Bloomington residents. Therefore, if they put in a second rink at Lewis Park does that mean it just opens it up for more Bloomington residents rather than providing a neighborhood hockey rink for the people who live by Todd Park and Countryside Park. Mr. Sorem stated that it's no secret that Edina probably has the best ice in Minnesota if not the entire country for outdoor rinks and therefore Edina gets an incredible amount of non - resident use. He commented that he doesn't know how they can stop it but his theory is the more parks you can get hidden the better because the non - residents won't know how to find them. Parks like Lewis and Countryside are right out in the open and everyone knows where they are and they are easy access for people who are coming from outside the city. Mr. Sorem indicated that he thinks a place like Todd Park is tough to get to and that's a benefit to our community because the people in Edina are going to know how to find, it. He added that there are a group of older guys who use the Lewis Park hockey rink on Saturday mornings, they are all nice guys, however, he knows that not one of them lives in Edina. He noted that they get there early, chew up the ice and it's pretty much unusable for the rest of the day. Mr. Sorem noted that he thinks maybe they should try to schedule the mites for Saturday mornings at the rinks that are out in the open like Lewis and Creek Valley in an effort to try and keep the non - residents away. He noted they should leave the parks open that are hard to find like Walnut Ridge and Todd and by doing this maybe it would help. Mr. Sorem pointed out that he thinks having two rinks at one location would be phenomenal and Lewis Park would be a great spot for it as long as they are renting it out. He noted that he would hate to see non - residents use the ice for an hour and chew it up and then go and do the same thing at the second rink. Mr. Johnson indicated that he thinks they can kill two birds with one stone by putting in an outdoor sheet of ice at Braemar between the golf dome and the south rink. He noted that they could put in a.refrigeration system with a pole barn roof over it and it would be sheltered by the hill. He added that there already is a Zamboni there and this way they could have ice from approximately the middle of October to the end of March. He noted that by doing this they would always have an extra sheet of ice even with the unpredictable weather. Mr. Johnson stated that he thinks it should be primarily used for the youth program. He commented that the mites are constantly looking for ice because they get shut out at least four or five weekends a year. He noted that he would guarantee that the Edina Hockey Association would come up with some funding for that. Mr. Sorem asked if the city currently charges a rental fee to reserve an outdoor rink to which Mr. Keprios. explained that the Hockey Association pays the same fee that the facility M users pay, which is $8.00 per participant per season. He added that it does get rented out to other users at an hourly rental fee. Mr. Klus asked if the neighborhood at Countryside Park would miss not having a neighborhood rink to which Mr. Johnson replied that Creek Valley is not that far away for them to use. Mr. Sorem commented that he's sure they would, however, there are only a few houses that are there and he doesn't feel like it's truly a neighborhood park like some of the others. Mr. MacHolda indicated that he agrees he doesn't really see Countryside as a neighborhood and thinks the group that would miss it the most would be the church and any high school programs. Ms. Presthus asked would all of the ice go or just the hockey rink to which Mr. MacHolda replied it would just be the boards. Mr. Sorem commented that the nice thing about Todd Park is there is already a nice facility there as well as lights. Mr. Keprios stated that they have the money for one rink and they can either put it at Lewis Park, Countryside Park or Todd Park. Ms. Presthus asked Mr. Keprios what he thinks of an outdoor rink at Braemar versus an indoor rink to which he replied that if they were to refrigerate an outside rink he thinks they would still need to put up a roof and walls. Mr. Johnson stated that he thinks it would only need a roof. Mr. Keprios indicated that he. needs to find out more about the refrigeration system but he suspects it's pretty expensive. Mr. Sorem commented that he thinks people would be surprised at how much use a rink like that would get. Mr. Keprios noted that he would do a little analysis on this and crunch some numbers and at least get some rough figures on it. Mr. Damman asked when they do eventually revamp Countryside Park and put in a parking lot would they be able to put the hockey rink back but into a better position? Mr. Keprios replied that's a great question and at that point he would like to have a neighborhood meeting, hire a professional architect and draw up some concept designs with the neighborhood's input. He noted that some master plan ideas could include a centrally located parking lot immediately adjacent to a new replacement park shelter building with a new hockey rink in the proper orientation and reorient the west baseball field. And there are probably a lot of ideas that we haven't even thought about yet. Mr. Damman asked how would open skating be affected at Lewis Park if they just took it away from them. Mr. Keprios replied that they could literally set aside and schedule times that are designated for open skating only. Unfortunately, they do not have enough real estate to put in a decent general skating area outside of the hockey boards and added that they can't put one on the new athletic field because it would kill the grass. Mr. Damman asked if there are normally a lot of people who use Lewis Park for general skating to which Mr. Keprios replied it's a pretty small skating area and he doesn't believe it gets a lot of use. Ms. Selleck commented that she has frequented both Countryside Park and Todd Park and feels that Countryside Park does have the little bit of a lack of community. She noted that she does have some friends who live over there and they do use the skating rink. 7 Mr. Keprios stressed that as they debate the money that's available everyone needs to understand that the money they are talking about is not capital improvement dollars which carry over from year to .year. We are talking about operational dollars that do not carry over to the following year. He explained that our own internal staff builds these rinks and that is how they are able to get the job done at such a reasonable expense otherwise they would cost close to $50,000 or more. Therefore, if they are going to do something with that $25,000 they need to do it this year because they cannot bankroll that money. Mr. Johnson asked if there is enough room and would it be possible to make the parking lot bigger at Todd Park to which Mr. Keprios replied he thinks that could physically be done. Mr. Keprios pointed out that the problem they are going to have is facing the neighborhood. He noted that they would have to send out a mailing and have a hearing because they can't just go down there and put in a parking lot. Mr. Keprios commented that he thinks that is a good idea but the challenge is dealing with. neighborhood opposition. Mr. Johnson noted that he would think the neighborhood would want a bigger parking lot rather than having all of the cars park on the street. Mr. Keprios replied that he was disappointed and surprised that some neighbors are strongly opposed to a parking lot. Mr. MacHolda indicated that he believes there is higher senior population by Todd Park and that those people might not be looking for boards and a hockey rink, they wanted a pathway, which they now have. Mr. Keprios stated that whatever we decide to do, we should send notices first to inform people about what we are thinking about doing and solicit their input. Mr. Sorem commented that maybe the Edina Hockey Association could raise some money for a second rink at Lewis Park and we can take the $25,000 we have now and put in a hockey rink at Todd Park. He noted that Todd Park already has a nice warming house and an attendant and that way we would then have 12 hockey rinks. Todd Fronek MOVED TO RECOMMEND THAT A HOCKEY RINK BE PUT IN AT TODD PARK. Jeff Sorem SECONDED THE MOTION. Mr. Klus stated that the only thing he would like to see added to the motion is the caveat that we publicize this however Mr. Keprios would deem necessary and allow the neighbors to comment at the next Park Board meeting. He noted that this way it would still give the staff plenty of time to build it this summer. Mr. Fronek replied that he is okay with that caveat. IN FAVOR — George Klus, Jeff Sorem, Todd Fronek, Jeff Johnson, Jessica Selleck, Mike Weiss, Mike Damman. OPPOSED — Linda Presthus. MOTION CARRIED. Mr. Weiss asked does that mean that we are not putting in a hockey rink at Countryside Park, which Mr. Klus replied that is correct. VIII. OTHER A. Pathways — Mr. Keprios indicated that the pedestrian and bicycle pathways / trails was on the list to put on future agenda items. He noted that there is no update at this point but showed a master plan of where they currently are. Mr. Klus commented that they would talk about the progress of this at a future Park Board meeting. B. Tobacco Free Park Policy — Mr. Keprios handed out a newsletter from the Tobacco Free Youth Recreation organization. Mr. Johnson commented that this is not being followed at the arena and people are still smoking in front of the arena. C. Skate Park - Mr. Keprios indicated that he heard there was a request for shade at the skate park at the February Park Board meeting. He pointed out that he has found a couple of vendors who have given him quotes on what it would cost to put in some shade at the park. He noted that for an area of 40x60 the cost would be approximately $4,000 and our own staff could put it in the ground. Mr. Keprios stated that for $4,000 he thinks that between the three cities and the YMCA they would be able to find that within their operating budget. He noted that he doesn't think they would have to touch the money that is currently being set aside for the concessions building. D. Athletic Association Presidents - Mr. Keprios informed the Park Board they have scheduled a meeting with the Presidents of the Athletic Association on Wednesday, April 13th at 6:00 p.m. in the Mayor's conference room. He added that the Park Board members are more than welcome to attend. He stated that the agenda would cover facilities, overlapping seasons and background checks. Mr. Klus asked Mr. Keprios to send out an e -mail to the Park Board members with all of the information. E. The Perfect Show — Mr. Keprios informed the Park Board that the Adaptive Recreation Learning Exchange has put together a wonderful performance called "The Perfect Show ". He noted that it's the same type of performance they did three years ago called "Totally Talent and Tunes" to which they received a lot of recognition. He noted that the performance will be held on March 12t at 3:00 pm and 7:00 pm at Richfield High School and tickets cost $5.00. Mr. Keprios pointed out that the Edina Rotary Club has been very supportive of this and have funded a good share of the expenses. Mr. Klus commented that if you get a chance it's definitely worth going to. Susie Miller and the other director from Richfield have done a great job putting it together. Mr. Keprios stated that it's very heartwarming to see the people who have disabilities feel so proud of themselves for their accomplishments and is very proud of Susie Miller for her passion and efforts. F. May - Ms. Selleck informed the Park Board that for "May Term" a few of her friends have applied to do buckthorn abatement at Highlands Park. She noted that they would find out whether or not they've been accepted on Friday. 0 G. Conservation League of Edina — A member in the audience, Paul Selcke, indicated to the Park Board that the Conservation League of Edina would like to have an Arbor Day event this year at Wooddale Park. He noted that the reason they chose Wooddale Park is because it's one of the premiere parks in the City of Edina. He indicated that they would like to plant some trees and possibly have a free tree distribution activity. Mr. Selcke stated that this would be a great opportunity for the Park Board members to join them and noted that it will be held on April 30`h. He pointed out that Mr. Keprios has already said it's okay for them to plant the trees. Mr. Selcke explained that last year they held their first Arbor Day event at Van Valkenburg Park and their hope is to go to a different park each year. He noted that it's not just about planting trees in a park, it's also about trying to get residents involved with planting trees. Mr. Keprios commented that he has been very supportive of the Conservation League of Edina's efforts and he is always supportive of programs that give the city more trees. He noted that they would need to know what species they are planting as well as where because the. law requires that Gopher One be called to mark locations of underground utilities before any holes are dug. Mr. Keprios explained that they would need to be .careful :that, it doesn't get too large because Wooddale is a small park and they may want to think about going to Garden Park instead because the parking lot is much larger. Mr. Selcke asked if the Park Department could update their website regarding Arbor Day because the information is two years old. Mr. Keprios stated that he would look into it. IX. ADJOURNMENT Linda Presthus MOVED TO ADJOURN THE MEETING AT 8:45 P.M. Mike Damman SECONDED THE MOTION. MEETING ADJOURNED. 10 1r MINUTES OF THE ANNUAL MEETING OF THE EDINA HERITAGE PRESERVATION BOARD TUESDAY, MARCH 8, 2005, AT 7:00 P.M. EDINA CITY HALL — MAYOR'S CONFERENCE ROOM 4801 WEST 50T" STREET MEMBERS PRESENT: Chairman Gary Nyberg, Bill Crawford, Peggy Jennings, Marie Thorpe, Lou Blemaster, and Karen Ferrara MEMBERS ABSENT: Vice Chairman Bob Kojetin, David Runyan and Ian Yue STAFF PRESENT: Joyce Repya, Associate Planner OTHERS PRESENT: Robert Vogel, Heritage Preservation Consultant Chairman Nyberg opened the meeting with words of welcome and introductions for Lou Blemaster and Karen Ferrara, new members joining the Board. Additionally, he announced that not in attendance are David Runyan representing the Planning Commission and Ian Yue a student member. I. APPROVAL OF THE MINUTES: Member Jennings moved for approval of the minutes from the February 8, 2005 meeting. Member Crawford seconded the motion. All voted aye. The motion carried. II. 2004 ACCOMPLISHMENTS: Planner Repya referred to the 2004 Annual Report submitted to the Minnesota State Historical Society as a requirement for being a Certified Local Government. The report identifies the heritage landmark designated properties and highlights the Board activities for the year. She pointed out that a majority of the Board's time was spent reviewing Certificates of Appropriateness for detached garages in the Country Club District. Board members agreed that after reviewing 11 plans for garages it has been helpful to compare size and heights of the structures to gain perspective on the type of accessory structures that meet the modern needs of homeowners as well as what new construction is appropriate to impose in the historic district. Minutes — March 8, 2005 Edina Heritage Preservation Board Member Jennings stated that she finds the statistic sheet comparing the square footage, heights and roof pitches of all the garages addressed thus far to be most helpful. She added that the additional guidelines provided for the detached garages should be a useful tool for those proposing new garages as well as for the Board when reviewing the proposals. Board members agreed that 2004 was a very busy, productive year. All indicated that they looked forward to continuing the advancement of Edina's heritage preservation efforts. No formal action was taken. III. 2005 GOALS & OBJECTIVES: Consultant Vogel provided the following list of suggested goals and objectives to consider for the coming year: 1. Carry out reconnaissance survey of the Minnehaha Creek corridor to identify historic structures and landscapes worthy of preservation. 2. Nominate a minimum of two properties for designation as Edina Heritage Landmarks. r 3. Prepare a draft comprehensive historic preservation plan for adoption by the City Council in 2006. 4. Increase efforts to provide city officials with information, education, and training in historic preservation. 5. Apply for inclusion in the Preserve America Program. 6. Work with the City Engineer and other city departments to ensure that historic properties are taken into account in planning for public works improvements. Mr. Vogel pointed out that it is not uncommon for Board's to "bite off more than they can chew ", and it is important to be realistic relative to amount of work staff can accomplish in a given year. He added that the items listed have been identified in the Historic Context Study and should fit in well with reviewing the Certificates of Appropriateness applications from the Country Club District. Board members discussed the goals and agreed that next year when reviewing the year's activities, the list will be helpful. Mr. Vogel pointed out that in keeping with the comprehensive historic preservation plan they are working on, it is a good idea for the Board to get into the habit of establishing outcome or performance based activities. Member Crawford then moved to adopt the 2005 goals and objectives provided by Consultant Vogel. Member Jennings seconded the motion. All voted aye. The motion carried. FA /f Minutes — March 8, 2005 Edina Heritage Preservation Board IV. ELECTION OF OFFICERS: Member Jennings moved to nominate Gary Nyberg to continue serving as Chairman and Bob Kojetin as Vice Chairman of the Board. Member Crawford seconded the motion. Chairman Nyberg stated that he would be happy to continue serving as chairman. Planner Repya explained that although Member Kojetin is not in attendance, she had asked him if he would be willing to continue serving the Board in a leadership position if nominated, and he indicated he would. All voted aye. The motion carried. V. OTHER BUSINESS: A. Edina Heritage Award Planner Repya presented the press release inviting nominations for the 2005 Edina Heritage Award. She indicated that the notice will appear in the Edina Sun Current, Edina Chamber of Commerce, Edina Magazine, EpiCenter Business Journal, Edina Resource Center and Edina Public Schools publications. Board members agreed that they are hopeful to receive several nominations from which to choose. The deadline for applications is April 15th. Chairman Nyberg, Member Jennings and Member Kojetin had agreed to meet on April 18th to review the applications and make a recommendation for the recipient. No further action was taken. B. Edina Theater Sign Planner Repya reminded the Board that she and Mr. Vogel had met with Gene Haugland, owner of the theater and discussed the possibility of pursuing heritage landmark designation for the theater sign. Mr. Haugland indicated that he would be interested in pursuing the designation and asked staff to put together a proposed plan of treatment for him to review. Chairman Nyberg asked if the marquee is included when talking about the theater sign. Discussion ensued regarding whether the marquee should be included. Mr. Nyberg pointed out that the marquee helps to identify the theater sign and gives it purpose. He stated that he would like the marquee to be included in the designation — Board members agreed. Consultant Vogel explained that a landmark designation takes at least two months on the short side, but more likely three months to go from beginning to end. Once the Heritage Preservation Board has approved the nomination study, it is sent on to the Minnesota State Historical Society who has 60 days to submit their comments. Keeping the time schedule in mind, the nomination study could be 3 Minutes — March 8, 2005 Edina Heritage Preservation Board ready for the next meeting in April, and it would, be realistic to consider taking the landmark designation to the City Council in June or July C. Hennepin County Historical Society Membership Consultant Vogel reminded the Board that at least one member of the Heritage Preservation Board must serve on the Hennepin County Historical Society. Chairman Nyberg advised Mr. Vogel that he is a member of the County's Historical. Society. D. Morningside Centennial Event Planner Repya announced that the Morningside Centennial Planning Committee has organized an event in which Barbara Bezat of the Northwest Architectural Archives at the University of Minnesota will teach a class entitled "How to Research the History of Your House ". The class will take place on Saturday, March 12th from 10 to 11:30 a.m. at the Edina - Morningside Community Church, 4201 Morningside Road. The class is open to all for a $5.00 fee per person. VI. . NEXT MEETING DATE: April 12,2005 VII. ADJOURNMENT: 8:00 P.M. Respectfully submitted, Joyce Repya . 4 April 8, 2005 Council members, I am writing to voice my disappointment at the declining of a variance request for lot coverage by Brad and Amy Spartz on April 7, 2005. Brad and Amy have a handicapped child and are hoping to renovate a home on Concord Terrace to accommodate handicap accessibility. They found the perfect home near Concord Elementary School and quickly earned the approval of all of their neighbors for their planned renovation. Because of an error on the original listing documents, the lot size was misstated as being slightly larger than it actually is. Consequently they needed to request a small variance to the lot coverage requirements, in addition to two other variances, which I understand were not opposed. I live in the Country Club neighborhood. Anyone who has listened to Brad and Amy's story has had a hard time understanding how lot coverage variances are routinely granted in the Country Club neighborhood (for no apparent hardship) while a request for a very small variance, for a great reason, supported by the neighborhood, gets declined. Brad is an Edina native and his parents are long -time Edina residents. Brad grew up in the Country Club neighborhood and is looking forward to finding a home in our community that he can afford and can accommodate his handicapped son. As a community, I feel it is important that we embrace diversity. City codes are written to accommodate an average home. A handicapped accessible home needs to be 10 -20% larger than an average home to accommodate larger doorframes, roll -in showers, elevators, and other needed features for the handicapped. City code should reflect this reality, and the variance board should recognize these special needs when making their decisions. Sincerely, Dan Kraft 4607 Bruce Ave Edina, MN 55424 952- 922 -5563 Sidney B. Rebers 6916 Dakota Trail Edina, Minnesota 55349 952- 941 -4355 April 15, 2005 James B. Hovland, Mayor Scot A. Housh Alice Hulbert Linda Masica Ann Swenson 4801 West 501' Street Edina, Minnesota 55424 Re: Meeting on April 5, 2005 via television Dear City Council Members: I watched the council meeting discussing the Wallingford development with interest on April 5'. At that meeting, Mr. Vasco Bernardi stated that in an effort to keep the initial costs down, they would not be using Andersen or Pella windows. I was a general contractor for 39 years. In recent years, there have been many claims for rotting and leaking windows and related mold issues due to moisture. In my opinion, Andersen are the most trouble free windows, and Pella are the second most trouble free windows. I congratulate the Council and the Mayor for not approving Mr. Bernardi's revision to what had been approved. Sincerely, i e . Rebers Rebers Construction Company o DJI(iES) T_& March 2005 A digest of actions taken by the Metropolitan Council, Metropolitan Airports Commission, Metropolitan Parks & Open Space Commission and Metropolitan Sports Facilities Commission. Minutes of all Council and Commission meetings are filed with the Legislative Reference Library, 645 State Office Building, 6th Floor, in St. Paul for a period of up to two years and can be viewed by the public. Call the appropriate commission or operations area for meeting information and/or specific questions. Metropolitan Council The Metropolitan Council is located at Mears Park Centre, 230 E. Fifth St., St. Paul, MN, 55101. For further information regarding the contents of this publication, contact Pat Curtiss at (651) 602 -1390. The Council's general number is (651) 602- 1000, TDD: (651) 291 -0904. Recent Council publications can be found at major public libraries in the Metro Area. Publications can be ordered by e-mail. The address is: data. center @metc.state.mn.us Comments can be made to that address as well as (651) 602 -1500, the Metro Council Public Comment Line. Check the internet web site at hup.11www.metrocouncil org. The Council... Community Development • Amended its prior approval of 15 units of project based rental assistance for Brandes Place in Fridley to 16 units. • Approved the Empire Wetlands Area Regional Park acquisition master plan (Referral No. 19362 -1). • Encouraged Dakota County to continue to coordinate trail planning and other issues that affect the Empire WasteWater Treatment Plant with the Metropolitan Council Environmental Services staff. • Encouraged Dakota County to continue to be involved with Empire Township and others in the environmental review and permitting of the proposed expansion of mining to the west of the proposed park. Their efforts should ensure that the surface and ground water resources of the park and the Vermillion River are protected. They should also ensure that there is an appropriate buffer between the park and the mining activity area located to the west of the park. March 2005 Adopted the Guidelines and following implementation criteria for the Planning Assistance Fund: 1. That priority is given to applications for work involving comprehensive plan updates or elements of comprehensive plan updates required by the 2005 System Statements. 2. That the loan be a maximum of $40,000, for.a two -year term, with the requirement for a 25% local match of funds or in kind services. 3. That favorable consideration be given to applicants that are implementing their 2020 plan updates, adhering to conditions place by the Council on their 2020 updates, or conditions placed on review of subsequent comprehensive amendments. • Allowed the City of Andover to put comp plan amendment, Sewer Staging Plan Update, Review File 18158 -22, into effect with no plan modification. • Adopted the following recommendations relating to the SE Scott County — Elko/New Market, New Market Township Comprehensive Plan Update, Review File 19360: a) allowed the cities of Elko and New Market and Scott County to place the Plan into effect. DlEiES i ' JL.i. b) classified the cities of Elko and New • Authorized the transfer of $511,000 from Market as Rural Growth Centers as 'the Transit Capital Fund to the provided for in the 2030 Regional Environmental Services Capital Fund. Development Framework. c) added Credit River, North Cannon and • Amended the 2005 Unified Operating Sand Creek to the Shared Goal #13 that Budget as follows: would incorporate greenways along Adopted Revised these waterways. 2005 2005 Budget Budget d) required the Cities to require Revenues infiltration measures for future Operating $ 431,906,623 $ 432,341,112 developments to aid in reductions of Pass Through 77,634,819 77,717,611 peak flow, volume, and temperature Debt Service 117,869,800 117,869,800 from new sources of runoff. Total $ 627,411,242 $ 627,928,523 • Identified the provision of wastewater to the Expenditures Woodcrest/Ptarmigan Heights area of the Operating $ 429,882,003 $ 430,642,933 City of Elko as a priority. Pass Through 76,610,519 79,422,497 Debt Service 122,163,712 122,198,712 Total $:628,656,234 $ 632,264,142 Environment Balance/Deficit $ (1,M,992) $ (4,335,619) • Authorized the Regional Administrator to negotiate and execute a Cooperative • Authorized the Chief Financial Officer and Construction Agreement with the State of her designee(s) to proceed with the public Minnesota Department of Transportation sale of: (MnDOT) for relocation of a part of the Elm 1. General Obligation Wastewater Creek Interceptor in Maple Grove and a Revenue and Refunding Bonds, Series portion of the Dayton -Hassan extension 2005B, Resolution 2005 -05 with MnDOT's CSAH 81 and TH 610 2. General Obligation Transit and improvements. MCES Project 900450 Refunding Bonds, Series 2005C, Resolution 2005 -06 and • Authorized the General Manager of 3. General Obligation Parks Bonds, Series Environmental Services to hold a public 2005D, Resolution 2005 -07 hearing for the Draft Facility Plan for the St. Paul Lift Station L -12 Improvements, • Approved the following committee MCES Project 8022. assignments recommended by the Chair Pursuant to Council Bylaws, Article III.I: Management Transportation: M. H. Smith - Chair, • Amended the 2005 Authorized Capital Aguilar, Georgacas, Hilker, Leppik, Program (multi -year authorization) by McDaniel, Steffen, Meeks, Susag, Wolter adding authority as follows: Community Development: Georgacas - - Metro Transportation Services Bus $ 1,628,822 Chair, Aguilar, Kinkie, Fawcett, McDaniel, - Metro Transit Bus 783,925 Meeks, Pistilli, Steffen Total $ 2,412.747 Environment: Leppik - Chair, Hilker, • Amended the 2005 Capital Budget by Scherer, J. Smith, Susag, Wittsack, Wolter . adding annual budget appropriations as Management: Scherer - Chair, Fawcett,. follows: Krinkie, Pistilli, J. Smith, M.H. Smith, - Metro Transportation Services Bus $ 1,222,729 Wittsack - Metro Transit Bus 783,925 Total $ 2,006,654 March 2005 M I 'T Dl(iESv • Appointed the following members to serve as the Metropolitan Parks and Open Space Commission (MPOSC) Appointments Committee: Peggy Leppik (chair), Natalie Steffen, and Dan Wolter. Authorized the Regional Administrator to issue purchase orders to Hawkins Inc. to purchase Chlorine (Bulk Liquid and 1 -Ton Cylinders), Sodium Hydroxide, Sodium Hypochlorite, Sodium Bisulfite, and Nitric Acid. Authorized the Regional Administrator: 1) to issue a purchase order to Polydyne Incorporated to provide Clarifloc CE -600 Polymer to the Blue Lake Plant at a unit price of $0.82 per pound, and 2) to negotiate and execute appropriate documents to release the apparent low bidder, Nalco Company, from any obligations under its bid for its polymer product, for the amount of its bid bond. Increased the delegated construction change order authority of its Regional Administrator from $50,000 to $338,994 for the Asbestos Removal — 390 North Robert Street building, Metropolitan Council Project No. 04P134 Adopted Resolutions 2005 -08, 2005 -09 and 2005 -10 authorizing the Chief Financial Officer and her designee(s) to proceed with the public sale on March 30, 2005 of: 1. $99,935,000 in General Obligation Wastewater Revenue and Refunding Bonds, Series 2005B, (Resolution 2005 -08) 2. $45,685,000 in General Obligation Transit and Refunding Bonds, Series 2005C, (Resolution 2005 -09) and 3. $6,000,000 in General Obligation Parks Bonds, Series 2005D (Resolution 2005- 10) and, authorized the Regional Administrator and Chief Financial Officer, in consultation March 2005 with the Chair and Treasurer of the Council to award bid on the sale of the bonds in accordance with the terms and conditions as shown in the resolution. Transportation Authorized the Regional Administrator to initiate a contract for the operation of regular route and paratransit bus service in the East Metro area from June 5, 2005, to May 31, 2010, in an amount not to exceed $3,780,756. Authorized the Regional Administrator to initiate a contract for the operation of regular route transit service in the West Metro area from May 21, 2005, to May 31, 2010, in an amount not to exceed $6,109,964. • Authorized the Regional Administrator to initiate a contract for the operation of regular route transit service in the Hopkins area from May 7, 2005, to May 31, 2010, in an amount not to exceed $3,107,849. Authorized the Regional Administrator to negotiate and execute an interagency agreement and lease with the City of St. Paul for design, construction and operation of the Smith Avenue Transit Center. Authorized the Regional Administrator to negotiate and execute a contract with Scott County in the amount of $250,000 for the operation of Americans with Disabilities Act (ADA) paratransit services within Scott County for the remaining months of calendar year 2005. • Concurred with the Transportation Advisory Board's action (pending) to amend the 2004- 2006 TIP by adding SP# 70- 621 -22, Scott Co. CSAH 21 from CSAH 18 to CSAH 42, Right of Way Acquisition. Authorized the Regional Administrator to negotiate and execute a contract amendment with URS Corporation, the Hiawatha LRT Project Management Consultant (PMC), to adjust the amended contract total from $21.15 million to an amount not to exceed $21.55 million and extend the term six months to December 31, 2005. • Approved a package of potential fare and service adjustments, that is to be presented at public hearings for the purpose of public comment and input prior to adoption of any required adjustments. DlEiEST,. New Publications Council publications are available from the Council's Regional Data, Center. For a free and complete list of publications, write the Metropolitan Council Data Center, 230 E. Fifth St., St. Paul, MN 55.101, or call (651) 602 -1140. E -mail address is: data. center @metc.state.mn.us There is a charge for some publications. The bimonthly Council Directions newsletter provides information on regional issues and Council Programs. If you wish to subscribe to Council Directions at no charge, call Dawn Hoffner at (651) 602 -1447. Metropolitan Commission Activities Metropolitan Airports Commission Metropolitan Airports Commission offices are located at 6040 28th Av. S., Minneapolis, MN 55450. For more information, call Lynn Sorensen at (612) 726 -8186. The Commission: • Approved a public parking rate adjustment for the General Parking Lots of the Lindbergh and Humphrey Terminal Buildings. • Authorized staff to enter into negotiations with the Anoka County - Blaine Airport Development Partners with regard to a lease arrangement for development at Anoka County - Blaine Airport. Received the following awards: 2005 Seven Wonders of Engineering Award, National Award for Excellence in Concrete Pavement, Minnesota Concrete and Masonry Contractors Association 2005 Honor Award for Outstanding Usage of Poured -in -Place Concrete, Mn/DOT Concrete Paving Association of Minnesota March 2005 Merit Award and the 27th Annual Minnesota Public Relations Society of America Classics Award. Metropolitan Parks & Open Space Commission (MP &OSC) Metropolitan Parks & Open Space Commission offices are located at Mears Park Centre, 230 E. Fifth St., St. Paul, 55101. For more information, call Sandi Dingle at (651) 602 -1312. The Commission: • Recommended that the Metropolitan Council authorize a grant of $950,000 of acquisition opportunity funds to Anoka County to acquire the 115 -acre property in Rice Creek Chain of Lakes Park Reserve. Recommended that the Metropolitan Council authorize a grant of $348,231 to partially finance the acquisition of a 1 -acre parcel (8200 E. Bush Lake Road) for Hyland- Bush - Anderson Lakes Park Reserve and to allow the remaining costs to acquire the parcel (up to $522,347) be eligible for reimbursement consideration in a future i •' D I C!i EES-) regional parks capital improvement people of the Metropolitan Area as program. required under MN Statute 473.147 and does not meet the applicable • Recommended the following language for land acquisition funding policy inclusion in the 2006 -2011 regional parks conditions of the Regional CIP policy: Recreation Open Space Policy Plan. C. That the acquisition opportunity 1. That the 2006 -2011 regional parks CEP grant finance up to 40% of the funding request consist of $7 million appraised market value /negotiated per year of Metropolitan Council bonds purchase price of the land, property proposed to match $10.5 million per tax equivalency payment, relocation year of State funds. Since the CIP is costs borne by the park agency as divided into a two -year biennium, the required by law, and appraisal and biennial amount recommended is $14 legal costs borne by the park million of Council bonds and $21 agency. Reductions in the final million of State funds. Furthermore, purchase due to a partial donation non -State and non -Metro. Council bond by the seller shall count as part of funds such as TEA -21 grants should be the 60% match to the total costs. included in the CIP. D. That a park agency is limited in 2. A portion of the Council bonds (up to receiving no more than $1 million 33 %) may be issued for 10 years and the total from the acquisition remainder issued for 5 years to stay opportunity fund per biennial period within the Council's property tax (July 1 of odd numbered year to constraint on bond debt service. The June 30 of next odd numbered 10 -year bonds may only be used for year)• land acquisition. No more than $7 E. That any money remaining in the million will be issued per year. fund 45 days prior to the end of the 3. That the park land acquisition biennial period be granted to park opportunity fund be financed with agencies in proportion to the unmatched Council bonds from the amount of Council approved parks CIP up to the limit set per year by outstanding acquisition the Council to stay within its property reimbursement debt at that time. tax constraints on Council bond debt. 4. The following conditions should be • That park agencies be permitted to submit applied for awarding land acquisition funding requests that total the biennial opportunity grants: allocation amount shown in Table 3, with A. That an agency must use up its the amount for unfunded 2004 -05 CIP existing land acquisition grants projects adjusted based on what the 2005 before it can apply for an Legislature appropriates. acquisition opportunity grant. B. That the acquisition proposed is Metropolitan Sports Facilities Commission consistent with a Council approved (MSFC) master plan, but that the Council retains the right to deny a grant if it Metropolitan Sports Facilities Commission offices are located at 900 South 5th St., Minneapolis, MN 55415. For finds that the acquisition would not more information, call Nancy Matowitz at (612) 335 -3310. be needed to reasonably meet the outdoor recreation needs of the The Commission: No Report this month. March 2005 705 INDEPENDENT SCHOOL DISTRICT 273 Regular Meeting, April 18, 2005 Room 349, Edina Community Center AGENDA Determination of Quorum and Call to Order Approval of Minutes of Meeting of March 21, 2005 HEARINGS OF INDIVIDUALS, DELEGATIONS, AND PRESENTATION OF PETITIONS FROM THE PUBLIC REGARDING ITEMS BEFORE THE BOARD FOR ACTION OR ON ANY OTHER ISSUE ( *SEE ATTACHED DETAIL.) PRESENTATIONS ➢ Wive Les Beaux Arts!" — Normandale Elementary School Teachers Evelyn Emerson, Music; Marie Moilanen, Physical Education; and Jill Bisping, Art; and 4th and 5th Grade Students ➢ "Every Kid Needs the Arts" — Diana Leland, Teaching & Learning Specialist/Art, Music, & Theatre; and Teachers Kay Wagner, Art; Bill Webb, Instrumental Music; and Tony Matthes, Theatre Arts REPORT ➢ CBOC — Peyton Robb, Board of Education ACTION 408 Personnel Recommendations 409 Termination /Nonrenewal Recommendations 410 Structural Balance 411 Master Agreement — Independent School District 273 and the School Service Employees Union Local 284, appended 412 Community Education Services Fund (04) Budget for 2005 -2006 413 2004 -2005 General Fund (01) Budget Adjustments, appended 414 2004 -2005 Transportation Fund (03) Budget Adjustments 415 2004 -2005 Capital Fund (05) Budget Adjustments 416 Purchase of Buses 417 Revised Policy 1600 — Community Relations: Relations Between Nonpublic and Other Educational Organizations and the-Schools 418 Revised Policy 1610.620 — Community Relations: Relations with Parochial /Private Schools 419 Revised Policy 2000.1 — Administration: Equal Opportunity 420 Revised Policy 2000.2 — Administration: Commitment to Diversity 421 Revised Policy 5139 — Students: Hazing Prohibition 706 -708 709 710 -714 715 716 -717 718 719 -721 722 -725 726 727 -728 729 -731 732 -734 735 -736 737 -740 422 Revised Policy 6200 — Instruction: Community Education Services 741 -742 429 Statement of Mission 754 423 Revised Policy 6210 — Instruction: Community Education Services 743 -744 424 Revised Policy 6216 — Instruction: Community Education Financial 745 -746 432 Support 757 425 Revised Policy 7430 — New Construction: Change Orders 747 -748 426 Deleted Policy 6216.1 — Instruction: Fees for Community Education 749 -750 427 New Policy 3519 - Non - Instructional Operations: Turf 751 -752 436 Management Plan 761 CONSENT 428 Community Education Services Personnel Recommendations 753 429 Gift from Linda and Daniel Olson 754 430 Gift from Dianne Blake 755 431 Gift from Perry Larson 756 432 Gift from Dr. Michael Burke 757 433 Gift from Target 758 434 Gift from Normandale Elementary PTO 759 435 Gift from Edina High School Parent Council 760 436 Gift from Edina Vocal Music Booster Club 761 437 Gift from International Dairy Queen 762 438 Gift from Darcy Dahnert 763 439 Gift from Target 764 DISCUSSION 440 2006 -2007 Early Childhood Through Grade 12 School Calendar 765 -767 441 Board of Education Meeting Dates for 2005 -2006 768 442 Proposed 2005 -2006 Capital Fund (05) Budget 769 -770 INFORMATION 443 Expenditures Payable on March 28, 2005, appended 771 444 Expenditures Payable on April 11, 2005, appended 772 445 Bond Fund Expenditures Payable on March 31, 2005 773 446 Bond Fund Expenditures Payable on April 14, 2005 774 447 Enrollment as of March 25, 2005 775 448 New Procedure 3519 — Non - Instructional Operations: Turf 776 -778 Management Plan 449 Recognition of Staff 779 Adjournment *Persons who wish to address the Board are requested to complete and submit an appropriate form to the Board Secretary prior to the designated hearing time. When recognized, each individual shall identify himself /herself and the group represented, if any. He /She shall then state the reason for addressing the Board and shall be limited in time at the discretion of the Board Chair. Individual employees of the School District or representatives of employee organizations shall have utilized administrative procedures before making a request to address the Board. Page 1 of 2 Subject: Sun Current Article 4/14/2005 ne"Papeam Neighborhood association will ask city leaders to halt gymnasium project By James, Zwilling Sun Newspapers' (Created 4/14/2005 9:04:42 AM) Members of the Edina Community Center Neighborhood Association (ECCNA) are preparing for the final round with the city Tuesday, April 19, over a proposed gymnasium project. Neighborhood . association leaders have been critical of two proposed gyms at the Edina Community Center campus and will ask the City Council on Tuesday to derail the $5 million project. The council has been misled about the neighbors' feelings about the gyms, the safety concerns of residents have not been addressed and the proposed location of the gyms is not designed for commercial use, said Maria Fesenmaier, president of the ECCNA. She and her neighbors have requested to be placed on the agenda at Tuesday's meeting to discuss their concerns. Fesenmaier said the neighborhood supports additional gymnasiums in Edina, but will not support the proposed construction at the Community Center campus. We've said all along that we support more gyms," she said. "But they don't belong here. This is about safety, safety, safety." Fesenmaier said the joint committee of city and school district leaders that worked on the proposal has not addressed the neighborhood's concerns about traffic safety. A traffic study undertaken by the developers has traffic volumes that come up hundreds of cars short, she said. Those claims will be part of the neighborhood association's presentation Tuesday, and Fesenmaier said she is more than confident that.her group's numbers will ring true. "We want to address this problem now, not after the gyms are already built," she said. The ECCNA claims the traffic study completed by the Howard R. Green Co. does not include alliour gyms that would exist at the campus or the additional construction already taking place, including a n ew performing arts facility, at the site. The Edina Transportation Commission echoed #hose concerns last month when it unanimously agreed that the transportation report was insufflciert.:An addendum to the'transportation study Was .for warded to city staff by Steve Ma nhart from the Howard R. Green Co. after the commission's rejection of the report, but Fesenmaier said the study remains`insufficient even with the addendum. The current construction at the ECC campus, which includes additions at Normandale Elementary School and South View Middle schools, will not produce or attract additional trips, according to the addendum. "Traffic safety is the biggest issue," Fesenmaier said. "The city needs to quit making this about parking. It's not about parking. It's safety." Dan Rectenwald, another neighbor who has expressed opposition to the gyms at the ECC site, had the opportunity to participate in planning for the gyms. His participation was lauded earlier this month by Councilmember Scot Housh who told fellow council members that he believed the neighborhood's concerns had been met. Rectenwald said his participation in the gym project does not mean the plan has earned his support. "I have participated in the process, but our neighborhood's concern for safety has not been met," he said. "In general, the ECCNA still feels that traffic and safety on the streets have been treated in a half- hearted manner. It is Page 2 of 2 clear that our city's priority is to create a mega - tournament complex, not simply add gyms to the city's inventory or, most importantly, advocate public safety." While the proposed facilities would allow for some tournament play, gym proposals calling for more space have been floating around the city for more than a decade. Linda Presthus, a member of the Edina Parks Board, has been working toward creating additional gym space in Edina for about 15 years, she estimated. Presthus, a former president of the Edina Boys' Basketball Association, became involved when her sons were athletes. She has continued the fight for gyms because she has watched as the sports utilizing gyms grew in popularity while their space remained unchanged. "I think that the city leaders and most residents have supported gyms all along," she said. "Unfortunately, for many reasons we haven't been able to get them built." Gyms were part of a citywide referendum that failed May 16, 2001. A special election was held for a $35.8 million city referendum that proposed a 20 -year bond that would have funded improvements at 27 city parks and other city-owned facilities, as well as additions and upgrades to gymnasiums, swimming pools, playing fields and theaters at Edina Public Schools. Presthus said it has long been her opinion — and that of many others in the community — that new gyms need to be a part of school facilities. That's why she supports the proposed gyms for the ECC campus. "The only solution that ever really made sense was putting gyms at the school sites," she said. "This is the best opportunity we have in Edina for new gyms." The ECCNA disagrees. Association members say Braemar Park would be the best alternative for city gyms, and will again make that case at next week's City Council meeting. The ECCNA expects that they could be facing off against the athletic associations at the meeting — something they have become accustomed to doing — but Fesenmaier said they are prepared. The ECCNA could benefit from the absence of Housh as well. He has been the council's most outspoken supporter of the gyms, but is expected to be absent from the meeting. Presthus said she feels like the gym proposal will move forward, but she added that she won't start celebrating early. "I've been at this too long to start celebrating early," she said. The City Council will meet at 7 p.m. Tuesday at City Hall, 4801 W. 50th St. Page 1 of 2 Subject: Sun Current Article 4/14/2005 viewspapFws Neighborhood association will ask city leaders to halt gymnasium project By James Zwilling Sun`'Newspapers (Created 4/14/2005 9:04:42 AM) Members of the Edina Community Center Neighborhood Association (ECCNA) are preparing for the final .round with the city Tuesday, April 19, over a proposed gymnasium project. Neighborhood association leaders have been critical of two proposed gyms at the Edina Community Center campus and will ask the City Council on Tuesday to derail the $5 million project. The council has been misled about the neighbors' feelings about the gyms, the safety concerns of residents have not been addressed and the proposed location of the gyms is not designed for commercial use, said Maria Fesenmaier, president of the ECCNA. She and her neighbors have requested to be placed on the agenda at Tuesday's meeting to discuss their concerns. Fesenmaier said the neighborhood supports additional gymnasiums in Edina, but will not support the proposed construction at the Community Center campus. We've said all along that we support more gyms," she said. "But they don't belong here. This is about safety, safety, safety." Fesenmaier said the joint committee of city and school district leaders that worked on the proposal has not addressed the neighborhood's concerns about traffic safety. A traffic study undertaken by the developers has traffic volumes that come up hundreds of cars short, she said. Those claims will be part of ihe.neighborhood association's presentation Tuesday, and Fesenmaier said she is more than confident that her group's numbers will ring true. "We want to address this problem now, not after the gyms are already built," she said. The ECCNA claims the traffic study completed by the Howard R. Green Co. does not include all four gyms that would exist at the campus or the additional construction already taking place, including a new performing.,arts facility, at the site. The Edina Transportation Corn mission: echoed those concerns last month when it unanimously agreed that the transportation report was insufficient. An addendum to the transportation study was forwarded to city staff by Steve Manhart from the Howard R. Green Co. after the commission's rejection of the report, but Fesenmaier said the study remains insufficient even with the addendum. The current construction at the ECC campus, which includes additions at Normandale Elementary Scliool and South View Middle schools, will not produce or attract additional trips, according to the addendum. "Traffic safety is the biggest issue," Fesenmaier said. "The city needs to quit making this about parking. It's not about parking. It's safety." Dan Rectenwald, another neighbor who has expressed opposition to the gyms at the ECC site, had the opportunity to participate in planning for the gyms. His participation was lauded earlier this month by Councilmember Scot Housh who told fellow council members that he believed the neighborhood's concerns had been met. Rectenwald said his participation in the gym project does not mean the plan has earned his support. "I have participated in the process, but our neighborhood's concern for safety has not been met," he said. "In general, the ECCNA still feels that traffic and safety on the streets have been treated in a half - hearted manner. It is Page 2 of 2 clear that our city's priority is to create a mega- tournament complex, not simply add gyms to the city's inventory or, most importantly, advocate public safety." While the proposed facilities would allow for some tournament play, gym proposals calling for more space have been floating around the city for more than a decade. Linda Presthus, a member of the Edina Parks Board, has been working toward creating additional gym space in Edina for about 15 years, she estimated. Presthus, a former president of the Edina Boys' Basketball Association, became involved when her sons were athletes. She has continued the fight for gyms because she has watched as the sports utilizing gyms grew in popularity while their space remained unchanged. "I think that the city leaders and most residents have supported gyms all along," she said. "Unfortunately, for many reasons we haven't been able to get them built." Gyms were part of a citywide referendum that failed May 16, 2001. A special election was held for a $35.8 million city referendum that proposed a 20 -year bond that would have funded improvements at 27 city parks and other city-owned facilities, as well as additions and upgrades to gymnasiums, swimming pools, playing fields and theaters at Edina Public Schools. Presthus said it has long been her opinion — and that of many others in the community — that new gyms need to be a part of school facilities. That's why she supports the proposed gyms for the ECC campus. "The only solution that ever really made sense was putting gyms at the school sites," she said. "This is the best opportunity we have in Edina for new gyms." The ECCNA disagrees. Association members say Braemar Park would be the best alternative for city gyms, and will again make that case at next week's City Council meeting. The ECCNA expects that they could be facing off against the athletic associations at the meeting — something they have become accustomed to doing — but Fesenmaier said they are prepared. The ECCNA could benefit from the absence of Housh as well. He has been the council's most outspoken supporter of the gyms, but is expected to be absent from the meeting. Presthus said she feels like the gym proposal will move forward, but she added that she won't start celebrating early. "I've been at this too long to start celebrating early," she said. The City Council will meet at 7 p.m. Tuesday at City Hall, 4801 W. 50th St PUBLIC HEARING SCHAEFER ROAD ROADWAY IMPROVEMENTS IMPROVEMENT NO. A -216 `1 -51 Improvement No. A -216 Project Area aa, an mw m eom m,a m „i_ eam m„ mm MM m], gpy,�yry em, mn am, _ eaa aro °01e mn s,n my mm 51O 01^ ene a— a, mu m,s aas mn mas .a, mn mn m„ am em sn. ea, eaa mas ams ma mxa r�je y ,�. 1O �.:..� Improvement No. A -216 ➢1 U Project History / Initiation • Project initiated by staff - at request of residents: o Sump pump water along roadway. • Neighborhood meeting held on November 15, 2004. • Survey of residents conducted. • Roadway constructed in 1971. • Utilities constructed in 1965 & 1993. • Existing roadway width: 27 -ft to 30 -ft. 'i i Improvement No. A -216 Survey Results •50% returned —11 of 22 surveys • 10 - no to decorative street lights • 6 — yes to some type of traffic calming • Staff recommendation: • No decorative street lighting • Refer residents to Transportation Commission for traffic calming issues Improvement No. A -216 Project Scope •Reconstruct roadway to include: • Width of 27 -ft. • No concrete curb and gutter. • Extend Storm Sewer to accommodate sump pumps. • Provide sanitary sewer repairs. `l Improvement No. A -216 ➢3 Y ' Plan view, Y ir4 # 1�1 Ell, `xt- 111 Proposed storm `sewer �. Improvement No. A -216 Plan: view 10 F OpD ��� fir. .,�.. ny �._ -4T .. � a¢ Y•"I T. � ,� �`! �. q A •���amvW ■... swommud• SCfHAUER RD] _ Proposed storm.sewer Improvement No. A -216 , . .' ➢4 Project Costs • Roadway Project Cost: $188,000 Does not include storm sewer cost • Utility Cost: Utility Costs are not included in roadway costs. These costs will be funded by the respective utility fund (e.g. water, storm sewer and sanitary sewer) Assessments Methodology - Improvement No. A -216 Neighborhood reconstruction: • Based on residential equivalent unit (REU) • Single family home is 1 REU • Adjacent properties with side or rear yards are assessed 1/3 REU (Based on address of property). le J Improvement No. A -216 ➢5 Preliminary Assessments • $ 9,400 per REU • 10 year assessment • 6.5 % interest ° - m B-d., Improvement No. A -216 Project Schedule Neighborhood Informational Mtg.....Nov 15, 2004 Council Orders Public Hearing ....March 15, 2005 Receive Feasibility Report ...............April 5, 2005 Public Hearing .... ..........................April 19, 2005 Bid Opening ....... .........................Summer 2005 Award Contract ........................... Summer 2005 Begin Construction ....................... Summer 2005 Complete Construction .... Fall 2005 /Summer 2006 00' Improvement No. A -216 i6 Staff Recommendation AUTHORIZE: IMPROVEMENT NO. A -216 _) J Improvement No. A -216 ➢7 PUBLIC HEARING SCHAEFER CIRCLE ROADWAY IMPROVEMENTS IMPROVEMENT NO. A -217 � Improvement No. A -217 Project Area 5704 OS 5704 5709 5706 it 5708 5708 5713 5710 a,ry 5712 g 5714 5712 � 5717 716 6208 6204 5718 716 6216 8212 CAt 8201 SC p 800 6217 6209 8213 5804 0 5810 09- 11 IEJ� Improvement No. A -217 ➢1 Project History / Initiation • Project initiated by staff - at request of residents. • Neighborhood meeting held on November 15, 2004. • Survey of residents conducted. • Roadway constructed in 1962. • Existing roadway width: 26 -ft to 29 -ft. Improvement No. A -217 Project History / Initiation • No curb and gutter. • Utilities installed: o Sanitary —1959. o Water services from Vernon Avenue and Schaefer Road — No water main. //le J 1r�C7� Improvement No. A -217 i2 Existing Conditions • Pavement in very poor condition. • Landscaping in boulevard. - rvrrr z; •„+si,,, a.... ,F Improvement No. A -217 Project Survey Results • 100% returned — 8 surveys •7 - no to curb & gutter 96 - no to decorative street lights • Staff recommendation: • No decorative street lighting • No concrete curb and gutter e [-n ��P) Improvement No. A -217 ➢3 Project Scope •Reconstruct roadway to include: o Width of 27 -ft. o No concrete. curb and gutter. •Loop watermain through Schaefer Circle for future hook -ups: o Will provide services.to property line. o New Hydrant • Provide sanitary & storm sewer repairs Improvement No. A -217 ➢4 Project Costs • Roadway Project Cost: $ 68,000 • Utility Cost: Utility Costs are not included in roadway costs. These costs will be funded by the respective utility fund (e.g. water, storm sewer and sanitary sewer) l Improvement No. A -217 Assessments Methodology - • Neighborhood reconstruction: oBased on residential equivalent unit (REU) oSingle family home is 1 REU • $ 8,500 per residential equivalent unit. • 10 year assessment. • 6.5 % interest on unpaid balance. Improvement No. A -217 ➢5 Preliminary 05 I 5709 5706 Assessments 5704 5708 5708 5713 5710 5712 5712 5717 5716 5714 d� 6208 620 5718 716 6216 6212 Cot I 6201 800 6217 6209 6213 9 5804 0 5810 809- 11 0 Improvement No. A -217 Project Schedule Neighborhood Informational Mtg.....Nov 15, 2004 Council Orders Public Hearing ....March 15, 2005 Receive Feasibility Report ...............April 5, 2005 Public Hearing .... ..........................April 19, 2005 Bid Opening ....... .........................Summer 2005 Award Contract ........................... Summer 2005 Begin Construction ....................... Summer 2005 Complete Construction .... Fall 2005 /Summer 2006 Le�J Improvement No. A -217 M. Staff Recommendation AUTHORIZE: IMPROVEMENT NO. A -217 (le Jj 1r` ") Improvement No. A -217 i7 PUBLIC HEARING WEST 58TH STREET ROADWAY IMPROVEMENTS IMPROVEMENT NO. BA -328 �tl,r11 �• Improvement No. BA-328 ➢1 Project Area Sete sets x10 J5' 5518 . pp �e701616 X0001001 i 1518!517 �� i ♦__ 01 5R3 -._ � �y ; T l g ypf�� e701 4505 6700 i f 67M 57M 5705 5701 �0 570O � _ = 4� 5713 5700 5705 1 � ^ORQiR _ 6713 3 5712 R 5713 1e0 � � 5717 tieuntllry 7 67N = 5717 a $ 6771 5721 5720 5]21 n 5775 5751 w tp31N er y scot seol seas t� 5eoo ae5e Sew SB09 seop seoe 5eoe ypg Seop 5817 ee19 Set? 5513 5912 5e13 SO17 fiele IY Set] 5016 � Se17 5e17 b13 � 5973 Se17 < SRf 5820 < 5521 5520 < 5571 5570 < SR1 .� S21 SRS SRS ra�c SRp 6Re SRS � 5R5 � SO2D 5575 5525 6Rp SRO 6 SRD 5574 SBQS Seip $033 SWi 56]3 5972 SO73 6097 < 5537 5737 � �� u 5ea1 5637 fine 6537 SO9e 60,97 6530 5837 5535 6011 6M0 6911 6e10 58/1 SON 5511 SBN 5697 5011 6e1A 6M5 5OM 5615 66N 5515 5e14 3017 5e0f SODO 6001 5e00 6001 6000 bpOt Sp00 SOOt fip03 ` I SW6 6YW �5 • 1 SY05 5001 epee Improvement No. BA -328 ➢1 3017 5e0f SODO 6001 5e00 6001 6000 bpOt Sp00 SOOt fip03 ` I SW6 6YW �5 • 1 SY05 5001 epee ➢1 Project History / Initiation • Project initiated by staff: o 2005 -2009 Capital Improvement Program. • Roadway and utilities originally constructed in 1950s. • Storm sewer improvements in 1979. • Neighborhood meeting held November 22, 2004. Improvement No. BA -328 Existing Conditions • Existing roadway width: I. .t. 30 -ft. • Intermittent curb and gutter. • Pavement deteriorated. • Band -aid patchwork. • Drainage problems on edge of roadway. Improvement No. BA -328 ➢2 Project Scope Reconstruct roadways to Municipal State - Aid standards to include: • Roadway width: o 28 -ft no- parking o 32 -ft with parking lane • New concrete curb and gutter — B618 • New concrete driveway aprons. • Protect trees along roadway. • Concrete sidewalk (north side) Project Scope • Concrete sidewalk (north side): • 5 -ft boulevard between St. Johns and Wooddale. • Behind curb with parking lane / bay between Concord and St. Johns. Improvement No. BA -328 Improvement No. BA -328 r3 Survey Results • 63% returned —12 of 19 surveys • 7 — yes to decorative street lights • 10 —no to on- street parking • Staff recommendation: • Decorative street lighting • On- street parking e (gip)';. Improvement No. BA-328 ➢4 Project Costs • Roadway Project Cost: $357,000 State Aid Funding (80 %) $ 285,600 • Special Assessment (20 %) $ 71,400 • Utility Cost: Utility Costs are not included in roadway costs. These costs will be funded by the respective utility fund (e.g. water, storm sewer and sanitary sewer) 1e�01/ Improvement No. BA -328 ➢5 Plan view ,' • y �- : k w ' J 29 "1 ] 725 54 r t- R W W 58TH ST 777, .1. h O M60 0 :Fc :dam• Improvement No. BA -328 Project Costs • Roadway Project Cost: $357,000 State Aid Funding (80 %) $ 285,600 • Special Assessment (20 %) $ 71,400 • Utility Cost: Utility Costs are not included in roadway costs. These costs will be funded by the respective utility fund (e.g. water, storm sewer and sanitary sewer) 1e�01/ Improvement No. BA -328 ➢5 Municipal State Aid Assessment Policy Methodology — Municipal State Aid reconstruction: • Assess 20% of project cost. • Based on assessable front footage. • Adjacent properties with side or rear yards are assessed at 1/3 the rate (Based on address of property). Improvement No. BA -328 Preliminary Assessments • $ 68 per assessable front foot. • 10 year assessment. Assessments $2,620 - $3,070 • 6.5 % interest. $5,320 - $5,430 �(0 — W � — _ W _ o 5717 5720 5717 5716 v W v 5717 -- - - — - 0 CO o o °c 5721 5724 5721 5720 5721 v v 5725 5728 5725 5754 W 58TH ST 5801 5800 5801 1 5800 5801 1 5800 5801 1 5800 a 5805 5804 5805 5804 a 5805 5804 5805 5804 rc 5808 0 5809 5808 s 5809 5808 5809 5808 a z 5809 5812 v 5813 5812 ° 5813 5812 a 5813 a° 5817 5816 a 5817 5816 5817 5816 LL 5817 5812 8 �r;'�' - - -- - -- — - -- - Improvement No. BA-328 ➢6 Project Schedule Neighborhood Informational Mtg.....Nov 22, 2004 Council Orders Public Hearing ....March 15, 2005 Receive Feasibility Report ...............April 5, 2005 Public Hearing .... ..........................April 19, 2005 Bid Opening ....... .........................Summer 2005 Award Contract ........................... Summer 2005 Begin Construction ....................... Summer 2005 Complete Construction .... Fall 2005 /Summer 2006 i Improvement No. BA -328 Staff Recommendation AUTHORIZE: IMPROVEMENT NO. BA -328 r /(e 1f 7G/ Improvement No. BA-328 ➢%