Loading...
HomeMy WebLinkAboutENG - Hazelton Construction1 City of Edina • 4801 W. 50th St. • Edina, MN 55424 Contact: Jordan Gilgenbach, Communications Coordinator Phone 952-826-0396 • jgilgenbach@EdinaMN.gov • www.EdinaMN.gov FOR IMMEDIATE RELEASE Construction to Begin on Edina’s Hazelton Road Edina, Minn., May 1, 2014 – On Tuesday, May 6, the City of Edina will start preparing Hazelton Road between France Avenue and the Edina Promenade crossing for reconstruction. “With the new Byerly’s store and additional apartments, we anticipate an increase in traffic which necessitates modifications to Hazelton Road,” said Andrew Plowman, the City’s on-site representative of the project. “Trying to cross Hazelton Road – whether by car or by foot – is difficult, and this will help alleviate those safety issues.” As part of this project, Hazelton Road will be modified to two lanes and a roundabout will be constructed just west of the Promenade crossing, at the entrances of Guitar Center and the east entrance to the new Byerly’s, apartments and Think Bank. Hazelton Road was designed with bicyclists and pedestrians in mind. While sidewalks exist along the road today, there is little or no boulevard space between vehicle traffic and pedestrians. With the addition of a landscaped median and the roundabout, the goal is to make Hazelton Road more pedestrian friendly while still accommodating vehicular traffic. “This project will fit nicely with the France Avenue pedestrian improvement project that started in April,” Plowman said. “The Hazelton Road project is a continuation of the same theme, which is to make it easier for pedestrians to travel up and down and to France Avenue, and around the greater Southdale area.” Construction activities will begin in early May. To minimize the duration and cost of the project, a partial closure of Hazelton at France will take place from early June to early July. Businesses along Hazelton Road will remain open during construction and a detour will be posted. For additional information on this project, visit www.EdinaMN.gov/hazelton_roadway or contact Plowman at 763-287-7149 or aplowman@wsbeng.com. -30-