HomeMy WebLinkAbout2022-04-13 Planning Commission Regular MeetingAg enda
Planning Commission
City Of E dina, Minnesota
City H all, Council Cham ber s
Wednesday, Apr il 13, 2022
7:00 PM
Watch the m eeting on cable TV or at EdinaMN.gov/LiveMeeting s or
Facebook.com /EdinaMN.
To participate in Public H ear ings:
Call 800-374-0221.
E nter Conference ID 4964144.
Give the operator your nam e, street address and telephone number.
Press *1 on your telephone keypad when you would like to get in the queue to speak.
A City sta8 m em ber will introduce you when it is your tur n.
I.Ca ll To Ord er
II.Roll Ca ll
III.Approva l Of Meeting Agenda
IV.Approva l Of Meeting Min u tes
A.Draft March 9, 2022 Meetin g Minutes
V.Special Recogn ition s An d Presentation s
A.W elcom e New Com m ission Mem b ers- Lori Olson , Bonnie
Pa d illa , and Quin cy Sm ith
VI.Com m u n ity Com m ent
During "Community Comment," the Board/Commission will invite residents to share relevant issues
or concerns. Individuals must limit their comments to three minutes. The Chair may limit the
number of speakers on the same issue in the interest of time and topic. G enerally speaking, items
that are elsewhere on tonight's agenda may not be addressed during Community Comment.
Individuals should not expect the Chair or Board/Commission Members to respond to their
comments tonight. Instead, the Board/Commission might refer the matter to sta% for
consideration at a future meeting.
VII.Pu b lic Hea rings
A.Site Plan Review - 4931 77th Street W est
VIII.Rep orts/Recom m en d ation s
A.Sketch Plan Review – St. Peter's Ch u rch Site (5421 & 5425 Fra n ce
Aven u e)
B.Sketch Plan Review – 7200 & 7250 France Aven u e
IX.Cha ir An d Mem ber Com m ents
X.Sta< Com m ents
XI.Adjournm en t
The City of Edina wants all residents to be comfortable being part of the public
process. If you need assistance in the way of hearing ampli?cation, an
interpreter, large-print documents or something else, please call 952-927-8861
72 hours in advance of the meeting.
Date: April 13, 2022 Agenda Item #: I V.A.
To:P lanning C ommission Item Type:
Minutes
F rom:Liz O ls on, Administrative S upport S pecialist
Item Activity:
Subject:Draft Marc h 9, 2022 Meeting Minutes Ac tion
C ITY O F E D IN A
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
A C TI O N R EQ U ES TED:
Approve the March 9, 2022 minutes.
I N TR O D U C TI O N:
AT TAC HME N T S:
Description
Draft Minutes March 9, 2022
Draft Minutes☒
Approved Minutes☐
Approved Date: ___, 2022
Page 1 of 3
Minutes
City Of Edina, Minnesota
Planning Commission
Edina City Hall Council Chambers
March 9, 2022
I. Call To Order
Chair Agnew called the meeting to order at 7:00 PM.
II. Roll Call
Answering the roll call were: Commissioners Miranda, Smith, Hayward, Strauss, Bennett, Olsen, and
Chair Agnew. Staff Present: Cary Teague, Community Development Director, Bill Neuendorf, Economic
Development Manager, Liz Olson, Administrative Support Specialist.
Absent from the roll call: Commissioner Barberot, Alkire, Olson, and Padilla.
III. Approval Of Meeting Agenda
Commissioner Strauss moved to approve the March 9, 2022, agenda. Commissioner
Miranda seconded the motion. Motion carried unanimously.
IV. Approval Of Meeting Minutes
A. Minutes: Planning Commission, February 9, 2022
Commissioner Strauss moved to approve the February 9, 2022, meeting minutes.
Commissioner Olsen seconded the motion. Motion carried unanimously.
V. Special Recognitions and Presentations
A. Welcome New Commission Members – Lori Olson, Bonnie Padilla, and Quincy Smith
Chair Agnew introduced the three new Commissioners. Commissioner Smith reviewed his background
with the Commission.
B. Annual Election
Commissioner Olsen moved to elect Agnew as Chair of the Planning Commission.
Commissioner Smith seconded the motion. Motion carried unanimously.
Commissioner Olsen moved to elect Bennett as Vice-Chair of the Planning Commission.
Commissioner Agnew seconded the motion. Motion carried unanimously.
Commissioner Olsen moved to elect Miranda as Secretary of the Planning Commission.
Commissioner Smith seconded the motion. Motion carried unanimously.
Draft Minutes☒
Approved Minutes☐
Approved Date: ___, 2022
Page 2 of 3
VI. Community Comment
None.
VII. Reports/Recommendations
A. Resolution B-22-06 – 70th and France TIF Plan
Economic Development Manager Neuendorf presented the request for a TIF Plan at 70 th and France. Staff
recommended approval of the TIF Plan, as requested subject to the findings and conditions listed in the
staff report.
Staff answered Commission questions.
The Commission reviewed the development plans within the TIF Plan and made the following comments:
Concern with how the development plan fits in with the City’s goals and Climate Action Plan.
Concern with changes made in the development plans to include a freestanding parking ramp.
Parts of the development plan does not seem to align to the Comprehensive Plan
Questioned the amount of parking in the project
Economic Development Manager Neuendorf reviewed the concerns and parking with the Commission.
Motion
Commissioner Olsen moved that the Planning Commission recommend denial of Resolution B-
22-06 - TIF Plan at 70th and France as presented, due to not meeting certain goals and policies of
the Comprehensive Plan, does not meet certain goals of the Design Experience Guidelines as well
as the Climate Action Plan. Commissioner Bennett seconded the motion. Motion carried 5 ayes,
1 nay (Strauss). Staff will draft a revised resolution to state that the development plan for the 70 th
and France tax increment financing district does not conform to the general plans for the
development and redevelopment of the City of Edina, to be signed by the Chair and Secretary of
the Commission.
B. Sketch Plan Review – 4404 Valley View Road
Director Teague presented the request for a Sketch Plan review.
Staff answered Commission questions.
Appearing for the Applicant
Ms. Rebecca Remick, City Homes, addressed the Commission.
The Commission asked questions of the applicant.
The Commission reviewed the sketch plan and offered the following comments:
Draft Minutes☒
Approved Minutes☐
Approved Date: ___, 2022
Page 3 of 3
The layout and townhomes proposed are favorable to the development.
Continue the sidewalk throughout the development.
Provide monument signage to mark the entrance to this commercial node.
This type of housing is needed in Edina, and this is a perfect spot for it.
Like how the massing of the proposal is broken up.
Likes the amount of greenspace.
VIII. Correspondence and Petitions
None.
IX. Chair and Member Comments
Received.
X. Staff Comments
Received.
XI. Adjournment
Commissioner Smith moved to adjourn the March 9, 2022, Meeting of the Edina Planning
Commission at 8:44 PM. Commissioner Bennett seconded the motion. Motion carried
unanimously.
Date: April 13, 2022 Agenda Item #: V.A.
To:P lanning C ommission Item Type:
F rom:
Item Activity:
Subject:Welc ome New C ommission Members - Lori O lson,
Bonnie P adilla, and Q uinc y S mith
C ITY O F E D IN A
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
A C TI O N R EQ U ES TED:
I N TR O D U C TI O N:
Date: April 13, 2022 Agenda Item #: VI I.A.
To:P lanning C ommission Item Type:
R eport and R ecommendation
F rom:C ary Teague, C ommunity Development Director
Item Activity:
Subject:S ite P lan R eview - 4931 77th S treet Wes t Ac tion
C ITY O F E D IN A
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
A C TI O N R EQ U ES TED:
R ecommend the C ity C ouncil approve the Site P lan subject to the findings and conditions in the staff report.
I N TR O D U C TI O N:
William B auer, S E H on behalf of P rince Bhakta, J R H ospitality is requesting a Site P lan review for a project
within the P entagon P ark South (P U D -17) known as P entagon Village. P entagon Village was approved in 2019.
T he site at 4931 77th Street received a Site P lan approval to construct a five-story 235-room hotel. Construction
of the hotel was delayed in 2020 due to Covid-19. T he Site P lan approvals therefore have expired. T he applicant
is proposing to construct the same hotel that was approved in 2019.
AT TAC HME N T S:
Description
Staff Report
Engineering Memo
Site Location, Zoning, & Comp. Plan
Better Together Public Hearing Comment Report
Applicant Narrative
Proposed Plans
Traffic and Parking Study
Updated Traffic and Parking Study
2018 Approved Site Plan & Hotel
2018 Pentagon Village Approved Overall Plan
William Bauer, SEH on behalf of Prince Bhakta, JR Hospitality is requesting a Site Plan review
for a project within the Pentagon Park South (PUD-17) known as Pentagon Village. Pentagon
Village was approved in 2019. The site at 4931 77th Street received a Site Plan approval to
construct a five-story 235-room hotel. Construction of the hotel was delayed in 2020 due to
Covid-19. The Site Plan approvals therefore have expired. The applicant is proposing to
construct the same hotel that was approved in 2019; the proposal is City Code compliant.
(See attached plans and narrative.)
The overall development site for PUD-17 is 12.5 acres. The uses approved for the PUD
include retail space, a 235-room hotel, a 200-unit apartment, a parking ramp, and office
buildings. (See approved Overall PUD-17 Plans.)
The request requires the following:
1. Site Plan review.
The proposed site plan has not changed from the original approval. Internal drive aisles/road
and parking lots have not changed. The footprint of the building, building height and building
materials proposed have not changed. Landscaping has slightly increased, and the number of
rooms within the structure has increased by four.
SUPPORTING INFORMATION
Surrounding Land Uses
Northerly: Multi-family residential and retail; zoned MDD-6, Mixed Development District and
guided OR, Office Residential.
April 13, 2022
Planning Commission
Cary Teague, Community Development Director
Site Plan Review – 4931 77th Street West
Information / Background:
STAFF REPORT Page 2
Easterly: Office/light industrial uses; zoned PID, Planned Industrial District and guided OR,
Office Residential.
Southerly: City of Bloomington.
Westerly: Highway 100.
Existing Site Features
The subject site within the PUD is vacant and relatively flat.
Planning
Guide Plan designation: Office/Residential (20-75 residential units per acre)
Zoning: PUD-17, Planned Unit Development District-17
Site Circulation/Traffic
The proposal would not change the vehicular or pedestrian circulation of the overall
development plan for Pentagon Village. Vehicle access would be by the interior roadway. There
would be sidewalks provided on all three sides of the building.
WSB and Wenck Associates conducted traffic studies for this development. The studies
concluded that the existing roadways can be supported by the project, and no roadway
improvements are necessary. (See attached traffic studies.)
Parking
When the project was approved in 2019, a parking study was done by WSB. The study
determined that the amount of parking proposed within this project is adequate. There are
1,422 parking stalls in the existing ramp and surface parking areas. The study concluded that
1,359 spaces is adequate for the overall development. (See attached study.) The ramp and
adjacent surface parking lot would serve the hotel.
Landscaping
The landscape plan is consistent with the previously approved landscape plan for the site. (See
the approved overall development plan.) There would be overstory trees planted near the front
entrance and along the back of the hotel. A full complement of understory shrubs and bushes
are proposed.
Grading/Drainage/Utilities
There have been no changes to the approved plans from 2019. The city engineer has reviewed
the proposed plans and found them to be acceptable subject to the comments and conditions
outlined in the attached engineering memo. (See attached memo.)
STAFF REPORT Page 3
Building/Building Material
The building materials would be a combination Ledgestone with Nichiha fiber cement siding and
EIFS. These materials are consistent with the approved 2019 Plans. (See attached renderings
and building materials and the previously approved building material plan.)
Mechanical Equipment/Trash Enclosures
Any rooftop and/or ground level equipment and trash enclosures would have to be screened if
visible from adjacent property lines. Mechanical equipment and the trash enclosure would be
located at the southeast corner of the building. The enclosures must match the building.
Compliance Table
STAFF RECOMMENDATION
Recommend the City Council approve the Site Plan request for 4931 77th Street West.
Approval is based on the following findings:
1. The proposed land uses, and development meet all city code requirements.
2. The proposed plans are consistent with plans approved for this site in 2019.
Approval is subject to the following Conditions:
1. The Plan must be consistent with the Plans date stamped March 11, 2022.
PUD-17 Proposed
Setbacks - Buildings
77th Street
Computer Avenue
Normandale Boulevard
Viking Drive
15 feet
15 feet
50 feet
10 Feet
75+ feet
100+ feet
NA
100+ feet
Building Height 12 stories & 144 feet per the height
overlay district
6 stories and 68 feet
Parking lot and drive aisle
setback
20 feet 20+ feet
Maximum Floor Area
Ratio (FAR)
1.5% 1.5%
STAFF REPORT Page 4
2. The Final Landscape Plan must meet all minimum landscaping requirements per Chapter
36 of the Zoning Ordinance. A performance bond, letter-of-credit, or cash deposit must
be submitted for one and one-half times the cost amount for completing the required
landscaping, screening, or erosion control measures at the time of any building permit.
3. Provision of code compliant bike racks for each use near the building entrances.
4. The Final Lighting Plan must meet all minimum requirements per Section 36-1260 of the
City Code.
5. Roof-top mechanical equipment and ground level equipment must be screened per
Section 36-1459 of the City Code.
6. Submit a copy of the Nine Mile Creek Watershed District permit. The City may require
revisions to the approved plans to meet the district’s requirements.
7. Compliance with the conditions outlined in the director of engineering’s memo and
transportation planner dated April 8, 2022.
8. Hours of construction must be consistent with City Code.
Staff Recommendation
Staff recommends approval of the request subject to the findings listed above.
Deadline for a city decision: June 21, 2022
DATE: April 8, 2022
TO: 4931 77th Street, Owner and Development Team
FROM: Chad Millner PE – Director of Engineering
RE: 4931 77th Street – Lot 2, Hotel Pentagon Park South
The Engineering Department has reviewed the subject property for pedestrian facilities, utility connections,
grading, and storm water. Plans reviewed were; Preliminary Plat, Site and Utilities, Grading and Erosion
Control, Landscape, and Survey drawings dated 08/13/2020.
Review Comment Required For
General
1. Deliver as-built records of public and private utility infrastructure
post construction Certificate of Occupancy
2. Provide MPCA NPDES Construction permit Grading/Building Permit
Living Streets
3. Design sidewalks to meet ADA requirements. Grading/Building Permit
Sanitary and Water Utilities
4. Verify fire demand and hydrant locations. Grading/Building Permit
5. Domestic water shall be sized by the developer’s engineer. Grading/Building Permit
6. Domestic sanitary shall be sized by the developer’s engineer. Grading/Building Permit
7. Apply for a sewer and water connection permit with public
works. Prior to Starting Utility Work
8. Meter required for building service line and combined lines. No
meter required for fire only service line. Grading/Building Permit
Public works to determine acceptable installation methods. Grading/Building Permit
9. A SAC determination will be required by the Metropolitan
Council. The SAC determination will be used by the city to
calculate sewer and water connection charges
Grading/Building Permit
Storm Water Utility
10. Provide geotechnical report with soil borings. Grading/Building Permit
11. Provide hydraulic and hydrologic report meeting watershed and
state construction site permit requirements.
• Report should reference prior master development
stormwater management plan and describe how this site
changes and modifies the prior assumptions for
stormwater.
Grading/Building Permit
12. Submit watershed district permit and copies of private
maintenance agreement in favor of watershed. Grading/Building Permit
13. Lowest opening required at no less than 824.4’. Grading/Building Permit
14. Provide net cut/fill calculations to ensure no net fill below 822.4’. Grading/Building Permit
Grading Erosion and Sediment Control
15. A SWPPP consistent with the state general construction site
stormwater permit is required to be issued and followed. The
city will enforce these permit requirements.
Grading/Building Permit
Constructability and Safety
16. Construction staging, traffic control, and pedestrian access plans
will be required for public roadway work. Grading/Building Permit
Sustainability
17. Staff recommends installing EV chargers for a minimum of 5%
of proposed parking in addition to wiring 10% for EV
conversion in the future.
General Comment
18. The Metropolitan Council's Extreme Heat map shows that
during an extreme heat event (when air temperatures are 90 or
above), this area of Edina can be 10-30 degrees F hotter than
surrounding areas. Green roofs reduce the urban heat island
effect, reducing amount of greenhouse gas emissions trapped in
the atmosphere and energy needs to cool a building. Staff
recommends adding a green roof or garden to reduce this
urban heat island effect and energy costs to cool the building.
General Comment
19. The University of Minnesota's Solar Suitability map rates this
site as "good" for solar roof installations with a grade of 83 out
of 100. Staff recommends considering rooftop solar panels to
maximize benefits of renewable energy.
General Comment
20. The City of Edina is committed to increasing its tree canopy in
areas experiencing high heat and low vegetation, and has
General Comment
identified the southeast quadrant of Edina as an opportunity
area. Staff recommends planting native and climate-adaptive
plants and trees to increase the healthy tree canopy in this area.
21. See Sustainable Design Questionnaire for additional
considerations.
General Comment
Other Agency Coordination
22. Nine Mile Creek Watershed District permits are required. Grading/Building Permit
EdinaMN.gov 5
S
i
t
e
EdinaMN.gov 6
S
i
t
e
Survey Responses
30 January 2019 - 06 April 2022
Public Hearing Comments-4931 77th St
Pentagon Park South
Better Together Edina
Project: Public Hearing: 4931 77th Street for Pentagon Park South
VISITORS
3
CONTRIBUTORS
1
RESPONSES
1
1
Registered
0
Unverified
0
Anonymous
1
Registered
0
Unverified
0
Anonymous
Respondent No:1
Login:Ryan S
Email:rps.collaborative@gmail.co
m
Responded At:Apr 04, 2022 07:47:56 am
Last Seen:Apr 04, 2022 14:51:05 pm
IP Address:75.168.223.225
Q1.First and Last Name Ryan Siemers
Q2.Address 5821 Wooddale Ave Edina MN
Q3.Comment
From the ONE rendering I can see of this main facade, I like the breakdown of scale and massing. I would hope to see that
carry through around the building and not just on the main entrance. Simple but contemporary materials. It doesn't appear to
be trying TOO hard to make the faced just a bunch of visual busyness.
Fairfield Inn and Suites and TownePlace Inn and Suites Edina, MN
Intended Use Statement
The proposed hotel will provide lodging accommodations for both leisure and business travelers
visiting the area. The dual branded hotel will provide larger shared amenities (pool, breakfast,
fitness, etc.), while also giving guests the option to choose between two hotel brands that each
offer their own unique amenities. JR Hospitality and Hawkeye Hotels both have decades of
hotel experience. The current members are all 3rd generation hotel owners that grew up in the
hotel business. Our group has recently constructed and opened the Holiday Inn Express in
Bloomington, MN. We also fully remodeled the Courtyard Hotel that is in close vicinity to this
property.
c;ly cr
MAR 1 1 2022
Fairfield Inn and Suites and TownePlace Inn and Suites Edina, MN
Intended Use Statement
The proposed hotel will provide lodging accommodations for both leisure and business travelers
visiting the area. The dual branded hotel will provide larger shared amenities (pool, breakfast,
fitness, etc.), while also giving guests the option to choose between two hotel brands that each
offer their own unique amenities. JR Hospitality and Hawkeye Hotels both have decades of
hotel experience. The current members are all 3rd generation hotel owners that grew up in the
hotel business. Our group has recently constructed and opened the Holiday Inn Express in
Bloomington, MN. We also fully remodeled the Courtyard Hotel that is in close vicinity to this
property.
File #227702810
July 7, 2021
DRAFT
Prepared by:
Stantec Consulting
Services Inc.
1800 Pioneer Creek Center
Maple Plain, MN 55359
Phone: 7963-479-4200
Fax: 763-479-4242
Prepared for:
City of Edina
4801 W. 50th Street
Edina, MN 55424
Traffic and Parking Study for
4911 77th Street W
in Edina, MN
July 2021 i
DRAFT
Table of Contents
TABLE OF CONTENTS ..................................................................................... I
1.0 EXECUTIVE SUMMARY ...................................................................... 1-1
2.0 PURPOSE AND BACKGROUND ........................................................... 2-1
3.0 EXISTING CONDITIONS .................................................................... 3-1
4.0 TRAFFIC FORECASTS ........................................................................ 4-1
5.0 TRAFFIC ANALYSIS ........................................................................... 5-1
6.0 PARKING ANALYSIS ......................................................................... 6-1
7.0 CONCLUSIONS AND RECOMMENDATIONS ......................................... 7-1
8.0 APPENDIX ........................................................................................ 8-1
FIGURES
FIGURE 1 PROJECT LOCATION .................................................................. 2-2
FIGURE 2 SITE PLAN ................................................................................ 2-3
FIGURE 3 EXISTING CONDITIONS ............................................................. 3-3
FIGURE 4 WEEKDAY PEAK HOUR VOLUMES ................................................ 4-3
FIGURE 5 WEEKDAY PEAK HOUR LOS RESULTS .......................................... 5-5
I hereby certify that this report was prepared by me or under
my direct supervision and that I am a duly Licensed Professional
Engineer under the laws of the State of Minnesota.
__________________________________ DATE: July 7, 2021
Edward F. Terhaar
License No. 24441
July 2021 1-1
DRAFT
1.0 Executive Summary
The purpose of this Traffic and Parking Study is to evaluate the impacts of the proposed
new residential building located at 4911 77th Street W. in Edina, MN. The project site is
located in the northwest quadrant of the Computer Avenue/Viking Drive intersection. The
proposed project location is currently vacant land within the previously approved Pentagon
South development.
This study examined weekday a.m. and p.m. peak hour traffic impacts of the proposed
development at the following intersections:
• 77th Street W./Parklawn Avenue
• 77th Street W./Computer Avenue
• 77th Street/development access
• 77th Street W./TH 100 NB ramp
• Edina Industrial Blvd/TH 100 SB ramp
• Computer Avenue/development access
The proposed project will involve constructing a new apartment building with 200 dwelling
units. The project is expected to include 157 on-site parking stalls. The project will also
use stalls in the adjacent parking ramp. As shown in the site plan, the site has access to
the internal street system within the Pentagon South development. The project is expected
to be completed in 2023.
The conclusions drawn from the information and analyses presented in this report are as
follows:
• The proposed development is expected to add 72 net trips during the a.m. peak
hour, 88 net trips during the p.m. peak hour, and 1,088 net trips daily. Net trips
account for new trips generated by the development and trips eliminated by removal
of the existing office space.
• The net trips added to the roadway system by the proposed development are
expected to have minimal impact on traffic operations on the surrounding street
system. No improvements are needed at the subject intersections to accommodate
the proposed project.
• Traffic volume data collected for previous studies in this area was used at all
intersections to avoid traffic volume reductions that have occurred due to the
COVID-19 pandemic impacts. This process resulted in reasonable estimates for the
weekday peak hours that would occur under non-pandemic conditions.
• Future plans for this area include a new primary sidewalk on 77th Street. Future
plans for this area also include a conventional bike lane on 77th Street. The proposed
project will benefit from the existing and proposed sidewalk and bicycle facilities in
this area.
• The project owner is encouraged to provide bicycle parking spaces to promote
bicycle use by residents. Long-term spaces for residents within the building and
outside racks for short-term parking are recommended. The provision of a bicycle
July 2021 1-2
DRAFT
maintenance station will also help encourage bicycle use by residents.
• Based on the ITE data, the peak weekday parking demand for the overall site 2 62
spaces. The 157 spaces on-site are 105 spaces less than the expected peak parking
demand.
• The current City parking ordinance is 2 stalls per unit, which equates to 400 stalls.
The proposed draft parking ordinance that is in front of the City Council is 1.25 stalls
per unit, which equates to 250 stalls.
• The expected parking demand for the first phase of office space (19,000 square feet)
and a 235 room hotel within Pentagon South was calculated to be 177 spaces from
6-8 a.m. Combining this peak demand with the portion of the apartment peak
demand that would use the parking ramp (105 spaces) results in a total demand of
282 spaces. This peak demand is 141 spaces less than the total 423 spaces in the
parking ramp.
• The project owner is encouraged to implement Travel Demand Management
strategies for this site with the goal of reducing vehicular trips during peak hours and
reducing carbon emissions from vehicles. Potential strategies for this site include:
o Providing maps that show the area bus routes, bus schedules, and bicycle and
pedestrian facilities.
o Providing information on starting and joining commuter programs.
o Providing charging stations for electric vehicles in the resident parking areas.
o Providing long-term and short-term bicycle parking spaces for apartment
residents.
o Offering a pre-paid Metro Transit Go-To Card to all new residents.
July 2021 2-1
DRAFT
2.0 Purpose and Background
The purpose of this Traffic and Parking Study is to evaluate the impacts of the proposed
new residential building located at 4911 77th Street W. in Edina, MN. The project site is
located in the northwest quadrant of the Computer Avenue/Viking Drive intersection. The
proposed project location is currently vacant land within the previously approved Pentagon
South development. The project location is shown in Figure 1.
This study examined weekday a.m. and p.m. peak hour traffic impacts of the proposed
development at the following intersections:
• 77th Street W./Parklawn Avenue
• 77th Street W./Computer Avenue
• 77th Street/development access
• 77th Street W./TH 100 NB ramp
• Edina Industrial Blvd/TH 100 SB ramp
• Computer Avenue/development access
Proposed Development Characteristics
The proposed project will involve constructing a new apartment building with 200 dwelling
units. The project is expected to include 157 on-site parking stalls. The project will also
use stalls in the adjacent parking ramp. As shown in the site plan, the site has access to
the internal street system within the Pentagon South development.
The project is expected to be completed in 2023. The current site plan is shown in
Figure 2.
July 2021 2-2
DRAFT
July 2021 2-3
DRAFT
July 2021 3-1
DRAFT
3.0 Existing Conditions
The project site is currently vacant land within the previously approved Pentagon South
development. The site is bounded by Computer Avenue on the east, Viking Drive on the
south, and the Pentagon South development on the north and west.
Near the site location, 77th Street is a five-lane roadway with a center left turn lane.
Computer Avenue and Parklawn Avenue are two-lane roadways. To the west of the site,
77th Street intersects with TH 100 at a full grade separated interchange. The speed limit on
all local streets in the study area is 30 miles per hour.
Existing conditions at the proposed project location are shown in Figure 3 and described
below.
77th Street W./Parklawn Avenue
This four-way intersection is controlled with a traffic signal. The eastbound approach
provides two left turn lanes and one through/right turn lane. The westbound approach
provides one left turn lane, one through lane, and one through/right turn lane. The
southbound approach provides one left turn/through lane and two right turn lanes. The
northbound approach provides one left turn/through/right turn lane. The south leg provides
access a commercial use on the south side of 77th Street.
77th Street W./Computer Avenue
This four-way intersection is controlled with a traffic signal. The eastbound approach
provides one left turn lane, two through lanes, and one right turn lane. The westbound
approach provides one left turn lane, one through lane, and one through/right turn lane.
The northbound approach provides one left turn lane, one left turn/through lane, and one
right turn lane. The southbound approach provides one left turn/through/right turn lane.
The north leg provides access to an office use on the north side of 77 th Street.
77th Street W./development access
This four-way intersection is controlled with a traffic signal. The eastbound approach
provides one left turn lane, two through lanes, and one right turn lane. The westbound
approach provides one left turn lane, one through lane, and one through/right turn lane.
The northbound approach provides one left turn lane, one left turn/through lane, and one
right turn lane. The southbound approach provides one left turn/through/right turn lane.
The north leg provides access to an office use on the north side of 77th Street.
77th Street W./TH 100 NB ramp
This four-way intersection is controlled with a traffic signal. The eastbound approach
provides on left turn lane, one through lane, and one through/right turn lane. The
westbound approach provides one left turn lane, two through lanes, and one right turn lane.
The northbound approach provides two left turn lanes and one through/right turn lane. The
southbound approach provides two left turn lanes, one through lane, and one channelized
right turn lane.
July 2021 3-2
DRAFT
Edina Industrial Blvd/TH 100 SB ramp
This four-way intersection is controlled with a traffic signal. The eastbound app roach
provides on left turn lane, one through lane, and one through/right turn lane. The
westbound approach provides one left turn lane, two through lane s, and one channelized
right turn lane. The northbound approach provides one left turn lane, one through lane,
and one right turn lane. The southbound approach provides two left turn lanes, one
through lane, and one right turn lane.
Computer Avenue/development access
This three-way intersection is controlled with a stop sign on the eastbound developmen t
access approach. The eastbound approach provides one left/right turn lane. The
northbound approach provides one left turn/through lane. The southbound approach
provides one through/right turn lane.
Traffic Volume Data
Existing turn movement data previously collected for other studies in the area was obtained
from City staff for the following intersections:
• 77th Street W./Parklawn Avenue
• 77th Street W./Computer Avenue
• 77th Street W./development access
• 77th Street W./TH 100 NB ramp
• Edina Industrial Blvd/TH 100 SB ramp
July 2021 3-3
DRAFT
July 2021 4-1
DRAFT
4.0 Traffic Forecasts
Traffic Forecast Scenarios
To adequately address the impacts of the proposed project, forecasts and analyses were
completed for the year 2024. Specifically, weekday a.m. and p.m. peak hour traffic
forecasts were completed for the following scenarios:
• 2021 Existing. Existing volumes were determined through traffic counts at the subject
intersections. The existing volume information includes trips generated by the uses
near the project site.
• 2024 No-Build. Existing volumes at the subject intersections were increased by 1.0
percent per year to determine 2024 No-Build volumes. The 1.0 percent per year
growth rate was calculated based on both recent growth experienced near the site and
projected growth due to additional development in the area.
• 2024 Build. Trips generated by the proposed development were added to the 2024
No-Build volumes to determine 2024 Build volumes.
Estimation of Existing Volumes Due to COVID-19 Impacts
The impacts of COVID-19 have resulted in significant reductions in traffic volumes due to
changes in work and travel habits. Traffic volume data collected for studies completed prior
to the pandemic were used for the traffic forecasts presented in this report.
Trip Generation for Proposed Project
Weekday a.m. and p.m. peak hour trip generation for the proposed development were
calculated based on data presented in the tenth edition of Trip Generation, published by the
Institute of Transportation Engineers (ITE). The resultant trip generation estimates are
shown in Table 4-1.
Table 4-1
Trip Generation for Proposed Project
Land Use
Size
Weekday AM Peak Hour
Weekday PM Peak Hour
Weekday
Daily
In Out Total In Out Total Total
Proposed use
Apartments 200 DU 19 53 72 54 34 88 1088
DU=dwelling unit
As shown, the project adds 72 net trips during the a.m. peak hour, 88 net trips during the
p.m. peak hour, and 1,088 net trips daily.
July 2021 4-2
DRAFT
Trip Distribution Percentages
Trip distribution percentages for the subject development trips were established based on
the nearby roadway network, existing and expected future traffic patterns, and location of
the subject development in relation to major attractions and population concentrations.
The distribution percentages for trips generated by the proposed development are as
follows:
• 25 percent to/from the north on TH 100
• 25 percent to/from the south on TH 100
• 25 percent to/from the west on Edina Industrial Boulevard
• 2 percent to/from the south on Computer Avenue
• 11 percent to/from the north on Parklawn Avenue
• 12 percent to/from the east on 77th Street
Traffic Volumes
Development trips were assigned to the surrounding roadway network using the preceding
trip distribution percentages. Traffic volumes were established for all the forecasting
scenarios described earlier during the weekday a.m. and p.m. peak hours. The resultant
traffic volumes are presented in Figure 4.
July 2021 4-3
DRAFT
July 2021 5-1
DRAFT
5.0 Traffic Analysis
Intersection Level of Service Analysis
Traffic analyses were completed for the subject intersections for all scenarios described
earlier during the weekday a.m. and p.m. peak hours using Synchro/SimTraffic software.
Initial analysis was completed using existing geometrics and intersection control.
Capacity analysis results are presented in terms of level of service (LOS), which is defined in
terms of traffic delay at the intersection. LOS ranges from A to F. LOS A represents the
best intersection operation, with little delay for each vehicle using the intersection. LOS F
represents the worst intersection operation with excessive delay. The follow ing is a detailed
description of the conditions described by each LOS designation:
• Level of service A corresponds to a free flow condition with motorists virtually
unaffected by the intersection control mechanism. For a signalized or an
unsignalized intersection, the average delay per vehicle would be approximately 10
seconds or less.
• Level of service B represents stable flow with a high degree of freedom, but with
some influence from the intersection control device and the traffic volumes. For a
signalized intersection, the average delay ranges from 10 to 20 seconds. An
unsignalized intersection would have delays ranging from 10 to 15 seconds for this
level.
• Level of service C depicts a restricted flow which remains stable, but with significant
influence from the intersection control device and the traffic volumes. The general
level of comfort and convenience changes noticeably at this level. The delay ranges
from 20 to 35 seconds for a signalized intersection and from 15 to 25 seconds for an
unsignalized intersection at this level.
• Level of service D corresponds to high-density flow in which speed and freedom are
significantly restricted. Though traffic flow remains stable, reductions in comfort and
convenience are experienced. The control delay for this level is 35 to 55 seconds for
a signalized intersection and 25 to 35 seconds for an unsignalized intersection.
• Level of service E represents unstable flow of traffic at or near the capacity of the
intersection with poor levels of comfort and con venience. The delay ranges from 55
to 80 seconds for a signalized intersection and from 35 to 50 seconds for an
unsignalized intersection at this level.
• Level of service F represents forced flow in which the volume of traffic approaching
the intersection exceeds the volume that can be served. Characteristics often
experienced include long queues, stop-and-go waves, poor travel times, low comfort
and convenience, and increased accident exposure. Delays over 80 seconds for a
signalized intersection and over 50 seconds for an unsignalized intersection
correspond to this level of service.
July 2021 5-2
DRAFT
The LOS results for the study intersections are shown in Figure 5 and are discussed below.
77th Street W./Parklawn Avenue (traffic signal control)
During the a.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS B or better. The overall intersection operates at LOS B for all
scenarios.
During the p.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS C or better. The overall intersection operates at LOS B for all
scenarios.
77th Street W./Computer Avenue (traffic signal control)
During the a.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS C or better. The overall intersection operates at LOS B for all
scenarios.
During the p.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS D or better. The overall intersection operates at LOS D or
better for all scenarios.
77th Street W./development access (traffic signal control)
During the a.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS D or better. The overall intersection operates at LOS C for all
scenarios.
During the p.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS D or better. The overall intersection operates at LOS C for all
scenarios.
77th Street W./TH 100 NB ramp (traffic signal control)
During the a.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS D or better. The overall intersection operates at LOS A for all
scenarios.
During the p.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS E or better. The overall intersection operates at LOS C or better
for all scenarios.
Edina Industrial Blvd/TH 100 SB ramp (traffic signal control)
During the a.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS C or better. The overall intersection operates at LOS C for all
scenarios.
During the p.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS E or better. The overall intersection operates at LOS C for all
scenarios.
July 2021 5-3
DRAFT
Computer Avenue/access (minor street stop control)
During the a.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS B or better. The overall intersection operates at LOS A for all
scenarios.
During the p.m. peak hour under 2021, 2024 No-Build, and 2024 Build conditions, all
movements operate at LOS B or better. The overall intersection operates at LOS A for all
scenarios.
Overall Traffic Impact
The net trips added to the roadway system by the proposed development are expected to
have minimal impact on traffic operations on the surrounding street system. No
improvements are needed at the subject intersections to accommodate the proposed
project.
Comparison to Pentagon South Traffic Study
The traffic volume forecasts for the current project were compared to forecasts presented in
the Pentagon South traffic study dated May 2, 2018. The Pentagon South traffic study
accounted for full development of the site assuming a 153 room hotel on the current project
site. A comparison of the trip generation for the previous hotel use to the current
apartment use is shown in Table 5-1.
Table 5-1
Trip Generation Comparison for Proposed Project and Previous Use
Land Use
Size
Weekday AM Peak Hour
Weekday PM Peak Hour
Weekday
Daily
In Out Total In Out Total Total
Proposed use
Apartments 200 DU 19 53 72 54 34 88 1088
Previous study use
Hotel 153 rooms 42 30 72 47 45 92 1279
DU=dwelling unit
As shown, the proposed apartment use generates the same number of trips during the a.m.
peak hour, 4 fewer trips during the p.m. peak hour, and 191 fewer daily trips.
Overall, the proposed apartment use has less impact to traffic operations than the
previously assumed hotel use. Therefore, the results and recommendations from the
Pentagon South traffic study are not impacted and are still valid.
Bicycle and Pedestrian Facilities
Under existing conditions, sidewalk is provided on the south side of 77th Street, the west
side of Parklawn Avenue, and the west side of Computer Avenue. The Nine Mile Creek
Regional Trail is located north of the project site.
All intersections in the study have crosswalks across all or a portion of the approaches.
Bicycles are allowed on all the surrounding streets.
July 2021 5-4
DRAFT
Future plans for this area include a new primary sidewalk on 77th Street. Future plans for
this area also include a conventional bike lane on 77th Street. The proposed project will
benefit from the existing and proposed sidewalk and bicycle facilities in this area.
The project owner is encouraged to provide bicycle parking spaces to promote bicycle use
by residents. Long-term spaces for residents within the building and outside racks for
short-term parking are recommended. The provision of a bicycle maintenance station will
also help encourage bicycle use by residents.
Transit Facilities
The subject site presently is served by the Metro Transit bus routes 6 and 540. Bus stops
exist on 77th Street at the development access and at Computer Avenue.
Potential Travel Demand Management Measures
The project owner is encouraged to implement Travel Demand Management strategies for
this site with the goal of reducing vehicular trips during peak hours and reducing carbon
emissions from vehicles. Potential strategies for this site include:
• Providing maps that show the area bus routes, light rail and bus schedules, and
bicycle and pedestrian facilities.
• Providing information on starting and joining commuter programs.
• Providing charging stations for electric vehicles in the resident parking areas.
• Providing long-term and short-term bicycle parking spaces for apartment residents.
• Offering a pre-paid Metro Transit Go-To Card to all new residents.
July 2021 5-5
DRAFT
July 2021 6-1
DRAFT
6.0 Parking Analysis
As described earlier, the project is expected to include 157 on-site parking stalls. The
project will also use stalls in the adjacent parking ramp which has 423 stalls. The proposed
amount of parking was compared to industry standards to determine adequacy.
Parking data from the Institute of Transportation Engineers (ITE) was used to determine the
expected parking demand for the proposed land uses. Data provided in the ITE publication
Parking Generation, 5th Edition, indicates the various proposed uses peak at different times
during the day. The ITE data was adjusted to account for the expected modal split for the
site.
Based on the ITE data, the peak weekday parking demand for the overall site 262 spaces.
The 157 spaces on-site are 105 spaces less than the expected peak parking demand.
The current City ordinance is 2 stalls per unit, which equates to 400 stalls. The proposed
draft parking ordinance that is in front of the City Council is 1.25 stalls per unit , which
equates to 250 stalls.
The expected parking demand was also calculated for additional development within the
Pentagon South development. The parking demand was calculated for the first phase of
office space of 19,000 square feet and a 235 room hotel. The peak parking demand for
these uses is 177 spaces from 6-8 a.m. Combining this peak demand with the portion of
the apartment peak demand that would use the parking ramp (105 spaces) results in a total
demand of 282 spaces. This peak demand is 141 spaces less than the total 423 spaces in
the parking ramp.
July 2021 7-1
DRAFT
7.0 Conclusions and Recommendations
The conclusions drawn from the information and analyses presented in this report are as
follows:
• The proposed development is expected to add 72 net trips during the a.m. peak
hour, 88 net trips during the p.m. peak hour, and 1,088 net trips daily. Net trips
account for new trips generated by the development and trips eliminated by removal
of the existing office space.
• The net trips added to the roadway system by the proposed development are
expected to have minimal impact on traffic operations on the surrounding street
system. No improvements are needed at the subject intersections to accommodate
the proposed project.
• Traffic volume data collected for previous studies in this area was used at all
intersections to avoid traffic volume reductions that have occurred due to the
COVID-19 pandemic impacts. This process resulted in reasonable estimates for the
weekday peak hours that would occur under non-pandemic conditions.
• Future plans for this area include a new primary sidewalk on 77th Street. Future
plans for this area also include a conventional bike lane on 77th Street. The proposed
project will benefit from the existing and proposed sidewalk and bicycle facilities in
this area.
• The project owner is encouraged to provide bicycle parking spaces to promote
bicycle use by residents. Long-term spaces for residents within the building and
outside racks for short-term parking are recommended. The provision of a bicycle
maintenance station will also help encourage bicycle use by residents.
• Based on the ITE data, the peak weekday parking demand for the overall site 262
spaces. The 157 spaces on-site are 105 spaces less than the expected peak parking
demand.
• The current City parking ordinance is 2 stalls per unit, which equates to 400 stalls.
The proposed draft parking ordinance that is in front of the City Council is 1.25 stalls
per unit, which equates to 250 stalls.
• The expected parking demand for the first phase of office space (19,000 square feet)
and a 235 room hotel within Pentagon South was calculated to be 177 spaces from
6-8 a.m. Combining this peak demand with the portion of the apartment peak
demand that would use the parking ramp (105 spaces) results in a total demand of
282 spaces. This peak demand is 141 spaces less than the total 423 spaces in the
parking ramp.
• The project owner is encouraged to implement Travel Demand Management
strategies for this site with the goal of reducing vehicular trips during peak hours and
reducing carbon emissions from vehicles. Potential strategies for this site include:
July 2021 7-2
DRAFT
o Providing maps that show the area bus routes, bus schedules, and bicycle and
pedestrian facilities.
o Providing information on starting and joining commuter programs.
o Providing charging stations for electric vehicles in the resident parking areas.
o Providing long-term and short-term bicycle parking spaces for apartment
residents.
o Offering a pre-paid Metro Transit Go-To Card to all new residents.
July 2021 8-1
DRAFT
8.0 Appendix
• Level of Service Worksheets
MASTER PLAN UPDATE
PROPOSED UPDATED MASTER PLAN
FUTURE
OFFICE
DEVELOPMENT
FUTURE
RETAIL
DEVELOPMENT
PENTAGON VILLAGE APARTMENTS
Edina, Minnesota July 29, 2021 | PAGE 421-0068 development
VIEW FROM THE NW
PENTAGON VILLAGE - RENDER
PENTAGON VILLAGE APARTMENTS
Edina, Minnesota July 29, 2021 | PAGE 221-0068 development
Date: April 13, 2022 Agenda Item #: VI I I.A.
To:P lanning C ommission Item Type:
O ther
F rom:C ary Teague, C ommunity Development Director
Item Activity:
Subject:S ketch P lan R eview – S t. P eter's C hurch S ite (5421
& 5425 F rance Avenue)
Disc ussion
C ITY O F E D IN A
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
A C TI O N R EQ U ES TED:
No action requested.
I N TR O D U C TI O N:
P rovide the applicant non-binding feedback on a potential future development application.
AT TAC HME N T S:
Description
Staff Memo
Memo - Affordable Hous ing Development Manager
Site Location, Zoning, & Comp. Plan
Proposed Plans
City of Edina • 4801 W. 50th St. • Edina, MN 55424
City Hall • Phone 952-927-8861
Fax 952-826-0389 • www.CityofEdina.com
Date: April 13, 2022
To:
Planning Commission
From: Cary Teague, Community Development Director
Re:
Sketch Plan Review – St. Peter’s Church Site (5421 & 5425 France Avenue)
The Planning Commission is asked to consider a sketch plan request to redevelop the St.
Peter’s Church site located at the intersection of France Avenue and Fuller Street. (5421 &
5425 France Avenue) The applicant is proposing to remodel and expand the existing church
at 5421 France Avenue. The expansion would be a three -story 48-unit apartment. Twelve
(12) of the units (25%) would be considered affordable housing and designated for young
adults with intellectual and developmental disab ilities. The proposal includes a subdivision to
build four single family homes. (See attached applicant narrative and plans.)
The properties are currently zoned R-1, Single Dwelling Unit District and guided LDR, Low
Density Residential in the Comprehensive Plan, which allows between 1-5 units per acre.
The proposed density at the church site is 22 units per acre; therefore, would require a
Comprehensive Plan amendment.
The request would require the following:
A Comprehensive Plan Amendment to re-guide the site from LDR, Low Density
Residential to HD, High Density Residential.
Rezoning from R-1, Single-Dwelling Unit District to PUD, Planned Unit Residential
District. Flexibility from R-1 zoning district standards would be requested for
building setbacks, height, parking stalls and building coverage.
Subdivision with Lot Area and Lot Width Variances for the creation of the single-
family lots on the south and north side of Fuller Street.
City of Edina • 4801 W. 50th St. • Edina, MN 55424
Highlights/Issues:
Density. The development density proposed for the site (22 units per acre) would
require a Comprehensive Plan Amendment from Low Density (1-5 units per acre) to
High Density Residential (12-60 units per acre). The density would be 33 units per
acre using just the parcel on the north side of Fuller. Staff has concern regarding the
proposed density given its proximity to Low Density Residential land uses to the north
and south. Typically, there is a transition in land uses from Low Density Residential
to High Density, with a Low Density Attached Residential (4 -8 units per acre) or
Medium Density Residential (5-12 units per acre) development in between.
Proposed Use. The twelve affordable housing units for adults with disabilities would
be an asset to the City of Edina. This would be a housing type that is needed within
the City of Edina.
Setbacks & Height. The proposed building would require flexibility through the PUD
for setbacks along Fuller Street, building height and lot coverage.
Pedestrian Connections/boulevard sidewalks. Demonstrate how the project fits into the
neighborhood, and how pedestrians would move through the site. Sidewalks must be
boulevard style sidewalks. Sidewalk on France Ave would be maintained by the City;
sidewalks along Fuller Street, Drew Avenue and on-site would be privately maintained
(including snow-plowing).
Traffic and parking study. A traffic and parking study would be required as part of any
formal application to determine the appropriate number of parking stalls needed for the site
for each of the uses. Bicycle parking stalls should be provided at a minimum rate of 5% the
automobile parking requirement. Applicant should also consider long-term bike parking
either within the underground garage or with a bike shelter.
Sustainability. Any submittal for a rezoning will require compliance with the City’s
Sustainability Policy.
The table on the following page demonstrates how the proposed addition would comply with
the R-1 Zoning District standards, and the designated future land use plan in the
Comprehensive Plan. Please note that several variances would be required. Flexibility from
these standards would be requested through the PUD, Planned Unit Development .
City of Edina • 4801 W. 50th St. • Edina, MN 55424
Compliance Table
City Standard
(R-1)
Comp. Plan Proposed
Front – Fuller Street
Front – France Avenue
Side – East
Side – North
35 feet
35 feet
10 feet
35 feet
6 feet*
15 feet**
30 feet
15** and 62
Building Height 2.5 stories
3 stories*
Building Coverage .30 .48*
Density 1-5 units per acre 22 units per***
Single-Family Lot Size 9,000 s.f. 8,100 s.f.*
Single-Family Lot Width 75 feet 60 feet*
Single-Family Lot Depth 135 feet 135 feet
Parking – Church
Parking – Residential
Parking – Day Care
1/3 seats = 33
2 per unit = 96
1 /employee+1/20
students = 17
46 spaces
48 spaces*
46 spaces
*Variances required
**Existing Condition
***Comprehensive Plan Amendment Required
TO: Cary Teague, Community Development Director
FROM: Stephanie Hawkinson, Affordable Housing Development Manager
DATE: March 24, 2022
RE: Cornerstone Village Sketch Plan
Thank you for sharing the sketch plan for the proposed development at St. Peter’s Church along France
Avenue.
The proposed development aligns with the three principles that the Edina Housing Strategy Task Force
identified as being foundational to maintain Edina’s strength as a residential community:
1. Addresses the need to accommodate projected growth that is also outlined in the 2040
Comprehensive Plan;
2. Provides housing choice to meet the diverse needs within the community with regards to
income, ability, and age; and
3. Provides an income mix to address the need for more affordable units.
Although not all of these pertain to the request for a change in land use, I wanted to add additional
context.
The proposed development also aligns with the Housing Strategy Task Force Report in other ways:
Goal 1: Promote Life-Cycle Housing
o Promote Affordable and Attainable Housing. Although not included in the site plan study,
Cornerstone Village will have some units set aside for affordability. These units will be
included within the multifamily building. There is also discussion on whether a single
family house or two will provide affordable homeownership opportunities.
o Promote Special Needs Housing, including a range of housing options for people with special
needs. Cornerstone Village will have units set aside for adults with special needs. This is
being promoted by a group of Edina moms who have aging children with disabilities.
Able Light has been successful with this type of mixed used developments in other
communities, which is why they were selected to develop this site.
Goal 2: Amend Land Use Regulation to Enable a More Diverse Housing Mix
o Consider amending current R1 zoning to allow for higher density along transit corridors
including France Avenue. Cornerstone Village is on France Avenue, across the street
from multifamily developments. The plan includes a cushion between the existing single
family houses and the increased density by including single family housing and setbacks
with play areas.
EdinaMN.gov 2
Site
EdinaMN.gov 3
Site
EdinaMN.gov 4
Site
Comprehensive Plan
EdinaMN.gov 5
AERIAL PHOTO
W FULLER ST
FRANCE AVE SDREW AVE SEDINA, MN / 03.22.2022 / 21-0015
AbleLight - Edina
1
EXISTING RESIDENTIAL DENSITY
FRANCE AVE S10 - 15 D.U. / Acre
- Brownstones on France
15 - 20 D.U. / Acre
- France Way Condos 1
20 - 30 D.U. / Acre
- France Way Condos 2
- The Henley at Edina
- The Edina Regency
30 - 40 D.U. / Acre
- The Lanterns
- Ewing Place
40 - 50 D.U. / Acre
- Terrace Apartments
- Xerxes Manor Apartments
Edina / Minneapolis Border
W 50TH ST
W 54TH ST
Site
EDINA, MN / 03.22.2022 / 21-0015
AbleLight - Edina
2
21.0
20.0
14.5
23.6
24.3
32.6 40.5
49.5
43.9
PRE-SCHOOL /
SCHOOL AGE
PLAY AREA
TODDLER
PLAY AREA
RESIDENT
COURTYARD
MULTIFAMILY
3 LEVELS
COMMON ENTRY
DROP-OFF
45 PARKING STALLS
RAMP
DOWN
SITE PLAN
W FULLER ST
FRANCE AVE SDREW AVE SEDINA, MN / 03.22.2022 / 21-0015
AbleLight - Edina
3
6’-10’62’-4”152’-6’
SHADOW STUDY - MARCH/SEPTEMBER
9:00 AM 3:00 PM12:00PM
9:00 AM 3:00 PM12:00PM
SHADOW STUDY - DECEMBER
EDINA, MN / 03.22.2022 / 21-0015
AbleLight - Edina
4
EXISTING SHADOW STUDY - MARCH/SEPTEMBER
9:00 AM 3:00 PM12:00PM
9:00 AM 3:00 PM12:00PM
EXISTING SHADOW STUDY - DECEMBER
EDINA, MN / 03.22.2022 / 21-0015
AbleLight - Edina
5
DEVELOPMENT SUMMARY: Ablelight Edina - New construction Updated 2022-03-22
DESCRIPTION Parking GSF Structured
Parking
Surface
Parking
Total
Parking Amenity NLSF Efficiency Residential
Parking
Residential
Units
S1 Sublevel Parking 17,723 17,723 48 48 17,723 13,824 369 48
1 Lobby / Common / Commercial 17,723 46 46 17,723 4,600 10,236 58%16
2 Units / Amenity 17,723 17,723 13,824 78%16
3 Units 17,723 17,723 13,824 78%16
70,892 17,723 48 46 94 0 70,892 4,600 51,708 73% 48 48
Gross SF Parking GSF Structured
Parking
Surface
Parking
Total
Parking
Commercial GSF Residential GSF Amenity NLSF Efficiency Residential
Parking
Residential
Units
METRICS
North and South Site Totals Single Family Lots UUnniitt TTyyppee MMiixx QQttyy TToottaall BBeeddss AAvvgg UUnniitt NNLLSSFF TToottaall NNLLSSFF
Site SF 120,131 SF 30,000 1 BR 38%18 18 700 12,600
Site Acreage 2.76 Acres 0.69 2 BR 52%25 50 1,025 32,108
Dwelling Units 52 DU 4 3 BR 10%5 15 1,400 7,000
Dwelling Unit per Acre 18.9 DU/Acre 5.8
Residential Parking Ratio Per Unit 1.00 Stalls/Unit 2
Residential Parking Ratio Per Bedroom 0.58 Stalls/Bed 100%48 83 939 51,708
RESIDENTIAL MIX
TOTAL PARKING RESIDENTIAL
Gross SF Residential GSF
COMMERCIAL
Commercial GSF
EDINA, MN / 03.22.2022 / 21-0015
AbleLight - Edina
6
Date: April 13, 2022 Agenda Item #: VI I I.B.
To:P lanning C ommission Item Type:
O ther
F rom:C ary Teague, C ommunity Development Director
Item Activity:
Subject:S ketch P lan R eview – 7200 & 7250 F rance Avenue Disc ussion
C ITY O F E D IN A
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
A C TI O N R EQ U ES TED:
No action requested.
I N TR O D U C TI O N:
P rovide the applicant non-binding comments and feedback on a potential future development application.
AT TAC HME N T S:
Description
Staff Memo
Site Location, Zoning, & Comp. Plan
Proposed Plans and Narrative
2018 Approved Plans for the Site
AFO Review (Mic Johns on)
Key Pages from the Southdale Des ign Experience Guidelines
EdinaMN.gov 2
Site
Site
EdinaMN.gov 3
Site
SKETCH PLAN SUBMISSION7200 FRANCE
EDINA, MN
2 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 TABLE OF CONTENTS
SITE CONTEXTA.
PROJECT NARRATIVE + GUIDELINESB.
C.SITE PLANS + MASSING INFO
SITE FORCES + IMPROVEMENTSD.
E.CONCEPTUAL RENDERINGS + VISUALS
3 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 EXISTING SITE CONDITIONS
4 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 EXISTING BIRD’S EYE VIEWS
5 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 EXISTING SITE PHOTOS
6 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 STATEMENT + NARRATIVE
PROJECT OVERVIEW:
The team envisions this site as an opportunity to create an iconic development
along the France corridor that will be a catalyst for growth.
• Project Team includes Orion Investments, ESG, and others to advance the
development, entitlement and design of our redevelopment concept
• The Greater Southdale District Plan and District Design Experience Guidelines
serve as the main planning and design criteria for this stage.
PROJECT PROGRAM:
• Consistent with the City of Edina’s vision to create a street grid system
• Two sites to be developed at a newly-established grade along France Ave.
• Excavates site to create two levels of parking below newly-established grade
• Stormwater retention pond and rain garden included to manage local rainfall on
site and provide public amenity when not active
7 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SOUTHDALE VISION
Architecture Field Office
DRAFT for review –May 18, 2017 8
the vision:build upon existing assets
8DRAFT for review –May 18, 2017
Architecture Field Office
DRAFT for review –May 18, 2017 9
the vision: improve access
9DRAFT for review –May 18, 2017
the vision: walkable the vision: human-scaled
8 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SOUTHDALE VISION
Architecture Field Office
DRAFT for review –May 18, 2017 12
the vision: architecturally varied
12DRAFT for review –May 18, 2017
Architecture Field Office
DRAFT for review –May 18, 2017 14
the vision: family friendly
14DRAFT for review –May 18, 2017
the vision: green
the vision: mixed-use
9 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
UP
DN
853.5'
GROCER BUILDING ABOVE
ESCALATOR
CORE
OFFICE BUILDING ABOVE
OFFICE
CORE
18
23
RAMP
DOWN TO
P2
RAMP UP
TO L1
46
28 26
32
50
18
24 6
28
10
PLAN
NORTH
Scale:1" = 30'-0"
FRANCE AVE RETAIL MEDICAL
3/1/2022
SITE AND PARKING
GROCER
44,365 GSF
7250 BUILDING
25,000 GSF/FLOOR 1-4
10-30,000 GSF/FLOOR 5
110,000-130,000 GSF
N
STREET LEVEL & LEVEL 1 PLAN
10 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
SITE A (SOUTHEAST)
• 110,000-130,000 GSF Office building
• 4 stories at 25,000 GSF + 1 amenity floor at
10,000-30,000 GSF
• 65’-75’ overall building height
• 74 Surface parking stalls on parcel; 214
parking spaces across two parking levels
below grade
• Strong street presence
• Pedestrian access along internal streets
and entry plaza
• Large amenity floor and deck
• Activates public-facing facades.
AXONOMETRIC NORTHWEST
11 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
SITE B (NORTHEAST):
• 40,000-45,000 SF National Grocer on corner
• 25’-30’ building height with equipment
screening
• 58 Surface parking stalls on parcel; 412
parking spaces across two parking levels
below grade
• Desirable location on easily-navigable
corner of 72nd and France
• Surrounded by planted setbacks off of 72nd
and France for pedestrian experience
• Building entry points are along internal
streets
AXONOMETRIC NORTHWEST
12 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
SITE PLAN:
• Green and hardscape elements
• 132 Surface parking stalls; 626 parking
stalls across two levels of underground
parking
• 4.55 Parking Stalls per 1000 SF across the
Site.
• Human-scaled, comfortable pedestrian
experience
• Native and low maintenance plantings at
stormwater retention pond
• Generous setback at France Ave frontage
• Activate façades facing the public realm
• Major building entry points to occcur on
new internal streets adjacent to formal
pedestrian plaza
AXONOMETRIC NORTHWEST
13 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE SECTIONS
EAST - WEST
NORTH - SOUTH
14 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE ACCESS
SITE ENTRANCE SITE EGRESS
15 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE CONDITIONS
EXISTING CONDITIONS POTENTIAL CONDITIONS
16 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE CONNECTIONS
PROPOSED SITE CONNECTIONS SOUTHDALE DESIGN GUIDELINES DISTRICTS
SOUTHDALE DESIGN GUIDELINES FUTURE MASSING
17 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 PEDESTRIAN CONNECTIONS
18 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
Gallagher DriveFrance Ave(A Public R/W)(A Public R/W)Edge of
Woods
Edge of
Woods
Edge of
Woods Edge of
WoodsWood
Wall
W 72nd St(A Public R/W)Lyman Ln(A Public R/W)France Ave S(A Public R/W)6" CIPProject Number:
Issue Date:
Revision Number:
Revision Date:
5000 GLENWOOD AVE
GOLDEN VALLEY, MN 55422
612-615-0060
www.CivilSiteGroup.com
N
7200-7250 FRANCE AVENUE SOUTH, EDINA, MN 55435 GRADING PLAN
.21419
3/7/2022
.
.
7200-7250 FRANCE PROPOSED TOPO + DRAINAGE
19 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
Gallagher DriveFrance Ave(A Public R/W)(A Public R/W)Conc. Walk
Wood
Wall
W 72nd St(A Public R/W)Lyman Ln(A Public R/W)France Ave S(A Public R/W)6" CIPSANITARY STUB
CONNECTION TO
GARAGE LEVEL
SANITARY TIE IN TO
EXISTING SANITARY
MANHOLE
44 LF PIPE
SANITARY STUB
CONNECTION TO
GARAGE LEVEL
CORE DRILL AND SADDLE
TEE CONNECTION TO
EXISTING SANITARY PIPE
45 LF PIPE
STORM WATER OUTLET
LOCATION AND TIE IN TO
CITY SYSTEM, PUMP
STATION TO BE UTILIZED
COMBINED WATER
SERVICE, STUB TO
WITHIN 5' OF BLDG
CONNECT TO EXISTING
WATER STUB
WET TAP CONNECTION
W/ VALVE TO EXISTING
CITY WATER MAIN
PROPOSED FIRE
HYDRANT WITH
GATE VALVE
COMBINED WATER
SERVICE, STUB TO
GARAGE LEVEL
Project Number:
Issue Date:
Revision Number:
Revision Date:
5000 GLENWOOD AVE
GOLDEN VALLEY, MN 55422
612-615-0060
www.CivilSiteGroup.com
N
7200-7250 FRANCE AVENUE SOUTH, EDINA, MN 55435 UTILITY PLAN
.21419
3/7/2022
.
.
7200-7250 FRANCE
UTILITY PLAN
20 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 LANDSCAPE PLAN
21 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE VEGETATION - BEFORE
22 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE VEGETATION - AFTER
23 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROM SOUTHWEST
24 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROM NORTHEAST
25 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROM SOUTHEAST
26 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROM NORTHWEST
27 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROM WEST
VIEW FROM EAST
28 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROM SOUTH
VIEW FROM NORTH
29 ESG | ARCHITECTURE & DESIGN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
THANK YOU!
QUESTIONS?
Edina, MN
December 4, 2018
17-124.01
7200 - 7250 France Avenue
Edina, MN
December 4, 2018
17-124.01
7200 - 7250 France Avenue Height Diagram Comparison
Height Diagram - CurrentEdina, MN
November 7, 2018
17-124.01
7200 - 7250 France Avenue Height Diagram
56'
56'
45'-5"
24'-5"
24'-5"
14'
14'
67'-5"
24'-5"
56'
24'
56'45'-5"
67'-5"
56'
APPARENT HEIGHT 65'-5"
DUE TO FIRST LEVEL
BEING 2' BELOW FRANCE
AVE AND GALLAGHER DR.
Edina, MN
December 4, 2018
17-124.01
7200 - 7250 France Avenue North East View
•6th Floor @ 67’-5”
•Full step back on 6th floor
•Stone on street level
•Brick added on upper levels
CITY COUNCIL MEETING, DECEMBER 4TH
56'-0"
67'-5"
56'-0"
67'-5"
56'-0"
Edina, MN
December 4, 2018
17-124.01
7200 - 7250 France Avenue South East View
•6th Floor @ 67’-5”
•Full step back on 6th floor
•Stone on street level
•Brick added on upper levels
CITY COUNCIL MEETING, DECEMBER 4TH
56'-0"
67'-5"
56'-0"
67'-5"
56'-0"
Edina, MN
December 4, 2018
17-124.01
7200 - 7250 France Avenue
•6th Floor @ 67’-5”
•Full step back on 6th floor
•Stone on street level
•partial Brick on upper levels
South West View
CITY COUNCIL MEETING, DECEMBER 4TH
67'-5"
67'-5"
67'-5"
56'-0"
56'-0"
56'-0"
56'-0"
Edina, MN
December 4, 2018
17-124.01
7200 - 7250 France Avenue
•6th Floor @ 67’-5”
•Full step back on 6th floor
•Stone on street level
•Brick added on upper levels
North West View
67'-5"
67'-5"
67'-5"
67'-5"
56'-0"
56'-0"
CITY COUNCIL MEETING, DECEMBER 4TH
Edina, MN
December 4, 2018
17-124.01
7200 - 7250 France Avenue South East View
•6th Floor @ 67’-5”
•Full step back on 6th floor
•Stone on street level
•Brick added on upper levels
CITY COUNCIL MEETING, DECEMBER 4TH
Cary:
At your request, we reviewed the most recent Sketch Plan submission for the proposed
redevelopment of 7200-7250 France Avenue South based on our experience working with the
Greater Southdale Work Group to craft a physical vision for how their guiding principles may translate
to the built environment. The resulting vision for development in the district is to create an enhanced
human experience along existing major and new connector streets, with overall experience shaped
via landscape setbacks, building step backs, a hierarchy of street typologies, transparency at street
level, minimizing the impact of the car, and managing storm water as an amenity. The outcome of our
collaborations with the Work Group is described in the urban design chapter of the Greater Southdale
District Plan and resulted in the Greater Southdale District Design Experience Guidelines.
There are a few attributes of the proposal that adhere to the Design Experience Guidelines, notably:
1. The setback along France Avenue meets the intent of the guidelines in providing an active
landscape that would encourage people to walk along a very busy and noisy street, and
integrates stormwater management.
2. The setback along W est 72nd and Gallagher meets the setback requirements, although truck
loading/deliveries are not addressed in the current proposal.
3. Buildings at the corners of West 72nd and France and Gallagher and France are important
transitions. In particular, having a grocery store as a gateway building to the residential
neighborhoods could take on particular importance.
4. Much of the site’s parking is below grade.
However, we do have several concerns with the proposal as presented. The project does not adhere
to the Street Room Typology 1A as outlined in the Design Experience Gu idelines – which applies to
this particular site within the District – but rather defers to a ‘future’ development strategy (presumably
to be devised by a future landowner) as the means to achieve those goals. From a building massing
and fenestration strategy, it does not meet the goals of the City. In addition, the overall organization of
the building program on the site could impact the single family residential context of the Cornelia
neighborhood – a primary consideration in the development of the Greater Southdale District vision
framework, comprehensive plan, and Design Experience Guidelines.
The development team has not addressed the proposed development’s potential impact on the
overall character of the neighborhood, or its impact on pedestrian movement, nor have they
demonstrated how the specific West Promenade street typology would shape and respect the
To
City of Edina
Cary Teague, Community Development Director
4801 W. 50th Street
Edina, MN 55424
From Mic Johnson, FAIA
Date April 6, 2022
Page 2 of 7
existing neighborhood. It is intended in the Guidelines that the specific implementation of the street
typologies would also encourage redevelopment of marginal underutilized land and the
transformation of existing parking lots to integrated neighborhood assets over time. In this particular
location, the woonerf typology could become a catalyst for the adjacent multi-family residential
development to the west to re-think their parking lots and bring new uses to the west side of the West
Promenade.
Specific Comments
West Promenade
The DEG Street Room Typology 1 is concerned with Promenades and Transition Zones, where new
woonerf-type streets are located on the west side of France Avenue and on the east side of York
Avenue.
Within this typology, there are several different variations for new building development in these
important transition zones, responding to and respecting the context of adjacent multi-family and
single family neighborhoods. Typology 1A, as illustrated on page 21 of the Design Experience
Guidelines (above) describe the scale and dimensional characteristics for the west side of the
proposed site and on the site itself. The current proposal does not meet these guidelines.
West 72½ Street
There are several references to green streets in the Design Experience Guidelines . We encourage
the design team to refer to the diagram on page 9 which describes the Space Between Buildings as a
result of the 200’ x 200’ block pattern. The space between buildings becomes an important asset in
shaping the overall sense of landscape and continuity of public realm throughout the district. Because
the superblocks have primary responsibility for serving the vehicular traffic needs of the district,
access to the smaller blocks for drop-off, service and parking can be planned to stay at the perimeter
of a block (in this case, through the woonerf) allowing for the spaces between the remaining block to
be used for a network of green spaces that support the health and wellbeing of the community. This
site, albeit a small superblock, still has responsibility for the larger traffic needs of the district in how it
provides access to the 2 smaller blocks for drop off, service and parking. In this case, 72½ Street
could be defined as an access point for vehicular access or pedestrian-only access, in a sense
leaving other space on the site for larger purposeful community needs such as stormwater retention
and actual usable landscape.
Page 3 of 7
Building Scale and Fenestration
Street Rooms are the one of the most significant characteristics of the Design Experience Guidelines.
They define Street Rooms not as passages for vehicles but as places for people come to and stay,
because of the quality of the personal experience rather than impersonal experience of a car oriented
street. Some of the important considerations related to building design within the context of the street
room are:
• Seventy five percent (75%) of the face of building walls need to be at the setback line to
support the creation of a street room.
• All new building façades in the district must have seventy five percent (75%) transparency at
the ground level.
• All building façades are prime (including parking) and must be designed accordingly. There is
no back side of a building.
• All facades on the first vertical 60 feet of a building (above grade) shall use natural materials
facing the public realm.
In particular the grocery store needs to meet this criteria in that it is not just a storage facility for
groceries but an important social and physical attr ibute of a sustainable community. The transparency
of its façade should show the value of what’s inside and also be reflected on its exterior. Recognizing
that all walls on the inside of grocery cannot be open, at least a rhythm of openings whether
transparent or not can demonstrate a public-oriented façade and create an experience that can serve
the nature of pedestrian activity.
Site Organization and Future Evolution
As stated on page 20 of the Design Experience Guidelines, “The sub-district to the west side of
France between 69th and Parklawn is a unique transition zone within the Greater Southdale District.
Any proposed developments within this zone should be approached with special sensitivity. This
means that the street experience within that zone should be perceived as connected to the Cornelia
neighborhood through landscaping and trees, and buildings that gradually transition in both height
and function and use between lower intensity neighborhoods to the more commercially-focused
district on the east side of France Avenue.” While this proposal references a future woonerf that
would become part of a broader West Promenade, it only addresses development on one side of that
woonerf and offers no demonstration of how the site could evolve over time to meet this important
district and neighborhood goal.
Since the proposal does not meet the Typology 1A criteria, this stage would be an ideal time to
demonstrate how flexibility for future program, building structure, and site planning can be addressed
and extended to meet long term community needs. For example, if the parking lots as currently
shown in the proposal were designated to eventually transform to 2- and 3-story row houses
matching the DEG goals for transition zones, then the “Future W oonerf” indicated in the proposal
should address the alignment of the West Promenade, and there should be assurances that the
structural design of the parking structure would be development ready – able to support those future
townhouses. The proposal would illustrate the planning approach for the West Promenade, including
pedestrian movement and access, and the quality of the landscaping along the promenade and
throughout the development. This would give evaluators confidence that the Design Experience
Guidelines were being considered in the development of the overall proposal.
The pages that follow provide a series of diagrams and narrative that illustrate how the site could
evolve over time to better adhere to the Guidelines.
Page 4 of 7
The driving intent behind the West Promenade
was to assure a gradual transition between the
lower scale mostly residential buildings in the
Cornelia neighborhood to the higher scale and
density of buildings along France Avenue and
within the Greater Southdale District. The
Guidelines take into consideration the challenge
of access from France Avenue for service
functions, public building drop off, and access to
below grade parking. But they also recognize that
a street between France and the Cornelia
neighborhood must be more than another
vehicular street. The woonerf typology meets the
criteria of providing vehicular access to of the
aforementioned needs of buildings along France,
but also, by making a street where pedestrians
and bicycles are first to be considered and
vehicles last, it strikes a balance between France
Avenue and the neighborhood. Even though a
grocery store is planned for the corner of 72nd
and France, it is also assumed that the woonerf
for the movement between cars and the front
entrance to the grocery will be safe enough for
child on a bicycle could go to the store on an
errand for her mom or dad.
The landscape of the West Promenade should
reinforce the characteristics of the neighborhood:
tree lined to make sidewalks pleasant and safe to
be on, creating a green vertical street room that is
always pleasant to walk down, even on a cold
Minnesota winter day when the leaves are gone.
The quality of the landscape, representing the
single and multi-family character of the
neighborhoods—flowering shrubs, flowers and
grasses native to our region, suitable for any
house in the neighborhood—should be
complimentary to the notion of community
placemaking.
The diagram at lower left, creates a modified
woonerf as the primary North/South street through
the development in the first phase of construction.
Instead of creating parking lots, the woonerf
combines 90 degree parking with 12-foot-wide tree lined sidewalks for its entire length. 72½ Street is
narrowed with no parking to adjust for the width of the grocery store so there is pedestrian continuity
on sidewalks lining sides of the street. Plazas for the office building and the grocery store are located
at the intersection of the woonerf and 72½ Street to create a combined public place within the
development.
Page 5 of 7
The diagrams above illustrate how the site could evolve to meet District goals over time. The diagram
at left above creates a modified woonerf as a part of the West Promenade and serves as the primary
North/South street through the development in the first phase of construction. Adj usting the access
street to go around surface parking and being designed as a woonerf style street creates an
opportunity for future development of the parking lots. Obviously this is not ideal but it can eventually
meet the intent of making street rooms throughout the district to enhance the pedestrian experience
and sense of community for residents. Instead of just creating parking lots as shown in the current
proposal, the modified woonerf combines 90 degree parking with 12-foot wide tree lined sidewalks
that access both north and south parking through the entire length of the development. The plan
narrows 72½ Street with no parking to adjust for the width of the grocery store while still maintaining
pedestrian connection to France Avenue. Plazas for the office building and the grocery store are
located at the intersection of the woonerf and 72½ Street to create a combined public place within the
development. Traffic patterns remain the same as outlined in the proposal.
The diagram above right shows a future planning scenario, where townhouses infill the current
parking lots. This would mean that structural frame and slab adjustments would need to be made in
the first phase of construction to accommodate the site’s future evolution, and those modifications
would need to be built in to the overall development.
Page 6 of 7
The diagram at left takes the idea
outlined on the previous page and
flips the organization of the program,
moving the grocery store to the south
parcel at Gallagher and France,
where there is a light controlled
intersection, allowing for access for
vehicles in all four directions. This will
naturally move the majority of traffic
from the Cornelia neighborhood by
moving the primary access to parking
and the grocery store to the south end
of the site. The parking layout with 90
degree parking along the length of the
woonerf, although not ideal, matches
parking patterns found in many small
town main streets. Plazas for the
office building and the grocery store
are located at the intersection of the
woonerf and 72½ Street to create a
combined public place within the
development. The opportunity in this
approach is adding a townhouse
development at the north end of the
site. As a lower building of 2 to 3
stories this would meet the Guideline typology for the site, providing a more sensitive transition to the
neighborhood to the west. The overall plan parti also creates opportunities for the Cedars of Edina
housing development to evolve in the future with its own townhouse development.
The diagram at left illustrates the primary
pedestrian circulation from the Nine Mile
Regional Trail, which intersects the
Promenade and culminates at the light at
Gallagher. This lighted intersection could
become even more important with the
introduction of a grocery store that would
be in easy walking distance from the high
density, medium density, and single
family neighborhoods east of France
Avenue and the multi- and single family
neighborhoods west of France Avenue.
Although there are other grocery stores in
the district, this would reinforce
pedestrian movement throughout the
neighborhood without residents having to
cross France from the west. A second
important part of the grocery store
location is the lighted intersection at
Gallagher and France would be the natural access point into the development, lessening traffic into
the neighborhood.
Page 7 of 7
Obviously there are many planning considerations and design options that can be pursued, however,
defining the woonerf as a generic or undefined future option as it is described in the current proposal
means it will not be built any time soon – if ever. By ignoring the important districtwide organizing
principle of the West Promenade in the Design Experienc e Guidelines, we believe this proposal does
not meet the basic goals of providing community-based streets that are active and safe, and providing
for the community’s health and wellbeing.
Thank you for the opportunity to review. Please let me know if you have any questions.
Mic
Greater Southdale District
Design Experience Guidelines
March 5, 2019
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page c
APreface
What are Design Experience Guidelines?
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page A1
For nearly four years, a Work Group comprised of Edina residents and
business leaders contemplated the future evolution of the Greater
Southdale District, using the notion of “experience” as the foundational
element from which to shape the district over the next 50 years. The
first phase of the Work Group’s efforts consisted of developing Working
Principles that would guide the group’s efforts into subsequent stages
as well as suggest a dialog for considering new introductions within
the district. Phase Two translated these principles into an urban design
framework plan that proposed enhanced connections across existing major
streets, introduced a new block framework to encourage walkability, and
posed design strategies to create an improved public realm and promote
higher quality, pedestrian-oriented development.
The broader experience the urban design framework strives to achieve
is the creation of a Greater Southdale District that connects seamlessly
between the existing urban and residential fabric, maximizes the
development potential of each site, enhances walkability and livability, and
encourages interaction among current and future residents, businesses, and
institutions. The urban design framework is the foundation to the Greater
Southdale District Plan, a part of the City of Edina 2018 Comprehensive
Plan. The Greater Southdale District Design Experience Guidelines is a
companion to those documents, outlining high-level planning and design
strategies for public realm, site, and building design supporting the desired
experience outcomes.
The Design Experience Guidelines sets baseline guidance for
developers, designers, City of Edina staff, Planning Commissioners
and members of the City Council when proposing, designing or
evaluating proposed introductions within the Greater Southdale
District.
Use of the Design Experience Guidelines
The Design Experience Guidelines apply to proposed development within
the Greater Southdale District and former Pentagon Park, and should be
referred to when embarking on new development or redevelopment.
The Design Experience Guidelines also offer direction for new public
realm features and the reimagining of existing public infrastructure. The
document does not stand alone; it must be considered as part of a larger
set of district goals, urban design framework and patterns, and policy
guidance outlined in the Greater Southdale District Plan and the 2018
City of Edina Comprehensive Plan. Together, these documents set forth
A. Preface
What are Design Experience Guidelines?
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page A2
City expectations for the future form of the Greater Southdale District, and
inform all potential projects within the district.
The Design Experience Guidelines are not a substitute for City of Edina
zoning codes and ordinances, but instead provide substantial background
for developers and design teams and a framework from which to approach
proposed projects within the district. The Design Experience Guidelines
clarify the dimensional characteristics of eight different Street Room
typologies that together form the experience within the district. The
physical qualities of each street room’s height and width, and shaped by
the architecture of the district, informs the design of the public realm on
streets that connect and bind the human experience of the district. These
physical characteristics also shape the experience of transition – transitions
from existing single-family neighborhoods and transitions into and out of
the district, outlining gradual changes in building scale within these critical
transition areas to bridge between one- and two-story residences and the
greater intensity of the Greater Southdale District.
In conjunction with the Urban Design chapter of the Greater Southdale
District Plan, this document provides both a philosophical and practical
framework to facilitate discussion among the City, development teams, and
the community when considering proposals for change within the district.
During the recommended Sketch Plan review process (described on page
70 of the Greater Southdale District Plan), the Design Experience Guidelines
are intended to facilitate dialog about broader district goals, patterns and
connections, building massing, programmatic opportunities and shared
public realm connectivity. Dialog at this point in the review of a proposal
requires imagination, looking beyond the immediate site to imagine the
creation of a consistently positive human experience, requiring a proposal
to recognize the ways in which it influences that experience on adjacent
and nearby sites. Once a proposal progresses beyond the Sketch Plan, the
document is used as a test of outcomes and touchstone to measure how
every proposal meets the desired district experience.
Further specific design details related to landscaping, curb and intersection
design, stormwater management and daylighting, lighting standards, street
furniture, and a host of other factors related to the experience of the district
will be described in future versions of this or a similar document as the
need for direction related to those features becomes better understood.
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 2
2 The Vision
Aspirations for the Greater Southdale District
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 3
Background and Context
Collectively, for nearly four years, the Greater Southdale Area Work Group has focused on building upon our
community’s history of innovation, engagement and community commitment to create a vision for the possibilities
of the Greater Southdale District. This work has culminated in the Greater Southdale District Plan (adopted
December 2018) and the Greater Southdale District Design Experience Guidelines.
Change is inevitable within the district. In the past five years alone, over 1,500 new housing units have been
constructed or are underway, along with myriad other commercial projects. This is a tremendous opportunity
in time, and in the broader evolution of our community. We can transform the physical environment of the
Greater Southdale District from a traditional car-oriented suburban commercial district with its sea of surface
parking lots and ‘superblocks,’ into a vibrant place whose character is neither urban nor suburban, but blends
the best characteristics of both to create a place that is uniquely of Edina. This new model will support all modes
of transportation (cars, buses, bikes, scooters, and pedestrians) and serve future generations of Edina residents,
employers, and visitors. It will complement, not compete with, the single family neighborhoods that have historically
defined much of the community’s fabric.
Within the broader 750+ acre Greater Southdale District, and the former Pentagon Park, there exist a remarkable
variety of assets. This plan connects those assets with a new street grid that overlays a human scale and allows
access via a variety of transportation options. The plan sets forth a strategy to bridge between adjacent single family
neighborhoods and the more commercially focused areas of the district. And, it uses public realm infrastructure—
including parks, plazas, green streets, woonerfs, and waterways that manage stormwater—as the connective
tissue that gives the district its unique identity. Together, these attributes will set the stage for a remarkable daily
experience for those who live, work and play within the Greater Southdale District.
Aspirations for the Future Greater Southdale District
The Greater Southdale Work Group summarized the overall districtwide vision and land use strategies as part of
the District Plan. These aspirations, which follow, are at the foundation of design policy parameters and the overall
experience we are striving to shape as the Greater Southdale Area evolves over the next 50 years.
1. Imagine Greater Southdale District evolution organized around human activity, with vibrant
pedestrian-focused streets, beautiful parks and public spaces, and endearing and enduring
buildings where:
• A sense of invention is expected from new introductions, both public and private, that build on the
district’s spirit of innovation.
• Its role as regional and local center for living, shopping, working, learning, entertainment, hospitality, and
medical services is enhanced.
• Other Edina neighborhoods, near and distant, benefit from investment in the district and the evolution of
each parcel.
• Investment in the public realm is reflected by a commensurate investment as private parcels evolve.
• Public and civic services accommodate a growing and diverse district and community population.
• Transitions at the district’s edges recognize compatible use and scale and neighboring uses are
perpetuated on their terms.
2. The Vision
The Greater Southdale District Experience
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 4
2. Make the Greater Southdale District the model of healthy urban living where:
• The district’s form encourages healthy living habits, particularly through walking.
• The design of buildings and spaces, both public and private, attract the widest possible range of the
district’s population.
• Storm water is a valued resource by making it part of the experience of the district.
• Emissions and pollutants are mitigated through the introduction of significant tree canopy and limiting
idling vehicles on streets, creating a more inviting walking experience along the district’s streets.
• Sustainable solutions result in a stock of healthy buildings that compel healthy activity for their occupants.
• Public features mitigate impacts of non-local infrastructure, especially to contain the ill effects of adjacent
highways.
3. Invent sustainable infrastructure matching the district’s sense of innovation where:
• Mutually-supportive and forward-looking infrastructure is the norm, looking beyond baseline utilitarian
functions of a single site to create a broadly supportive district infrastructure.
• Infrastructure aligns with the creation of public space in the district, sharing space and resources that result
in compelling, attractive and high-functioning civic spaces.
• Care for and perpetuation of public infrastructure anticipates daily human activity in all seasons.
4. Create neighborhoods of activity within the broader mixed-use patterns of the district where:
• Logical boundaries based on reasonable walking distances are established, with major streets as seams
binding the activity of each side into an inviting and accessible public space.
• Focal points of public activity are found within each neighborhood.
• Key community services and facilities are present and help define the fabric of the District.
• Core services are delivered within each neighborhood or in an adjacent neighborhood.
• Neighborhoods are linked along street and park corridors highlighted by visible human activity.
5. Offer a spectrum of living opportunities integrated through the district where:
• Housing orients to a variety of income levels and household types.
• Ownership options constitute a significant portion of the living opportunities in the area.
• “Missing Middle” living opportunities (duplexes, triplexes, side-by-side or stacked townhouses, rowhouses
with multiple units, and small buildings with four to six apartments) allow a broader range of Edina
residents, workforce members and others to consider relocating to the District.
• Buildings for living strongly orient to the public spaces of each neighborhood within the District.
6. Expand significantly the number and extent of parks and public spaces where:
• Opportunities for the introduction of another large signature public space complement the programming
and activities available at Centennial Lakes.
• An extension of the Promenade to Strachauer Park links neighbors and activity to the district.
• New promenades on the East and West edges of the District create movement corridors for pedestrians
and bicyclists and serve as vital places for a transition between neighborhoods and the District.
• Parks and publicly accessible spaces are clearly visible and directly accessible from the public realm.
• Spaces for visible human activity and occupation, either public or publicly accessible, occur on every block.
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 5
7. Encourage district evolution based on incremental change and the creation of a great pedestrian
experience where:
• A basic framework of streets and blocks encourages pedestrian activity and well-considered buildings.
• A rich variety of public or publicly accessible spaces are woven into the experience of the district.
• Sites and buildings support a pedestrian experience first, with storage of cars not a focus.
• Development on each site links to adjacent streets and to neighboring sites to create continuous, safe, and
inviting pedestrian experiences.
8. Build (or plan for) a street network encouraging pedestrian movement across and through the district
where:
• Walkable block lengths (200 feet) are the baseline framework for development.
• Enhanced and more frequent street crossings facilitates pedestrian movement.
• Wide landscaped boulevards encourage pedestrian activity and create a distinct district signature.
• Community corridors within and extending well beyond the district enhance bicycle and pedestrian access
while accommodating vehicle traffic on pedestrian terms.
9. Imagine transportation in the district where:
• Cars are not the focus and streets accommodate more than vehicles.
• Major streets balance access and mobility.
• Some streets serve as community corridors, linking to other community destinations with features that allow for
movement in addition to cars.
• Transit is a baseline service, both within the district and to non-Edina locations.
• Transportation recognizes trends, including autonomous vehicles and a time when parking structures aren’t
needed for public parking
10. Expect the delivery of high quality, well-designed buildings and sites where:
• Spaces on sites are considered for people first, including connections between sites; then the ways structures
are placed; and then places to store cars are found.
• Visible human activity is prominent and integrated at every site.
• People are brought to the streets via major building entries oriented to major streets.
• Storm water remains visible as an amenity, allowing it to become a central part of the experience of each site.
11. Frame development guidance for evolution where:
• Development review includes the desired experience, not solely quantitative thresholds.
• Accommodation of adjacent and near parcels are considered in the evolution of a single parcel.
• Early reviews focus on ideas, patterns and relationships, not specific and engineered plans, with that part of the
review process based in dialog, not presentation and reaction.
• Demonstrations of quality and especially quality from a long-term perspective are baseline considerations.
• Collaboration leads to a superior result, with the community’s expectations clearly framed as part of the
deliberation.
• Flexibility is not a right, but rather the natural by-product of a fair exchange for benefits, collaboration, and
quality in development.
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 18
STREET ROOM TYPOLOGIES
A hierarchy of streets and pathways within the district is the framework for public realm development and related
building form. Each street across the district has a role in how it serves pedestrians, bicycles and vehicles in
connecting sub-districts, adjacent single family neighborhoods, and the overall Greater Southdale District and
creating a unified sense of place. It is the intent that street typologies define the public realm experience: the space
between buildings, dimensions of building setbacks from the street, heights of facades at the building face at the
street and building step backs, where the façade of the building steps back from the volume of the street room.
Street Room Typology 1: Promenades and Transition Zones
Promenades are new woonerf-type streets on the west side of France Avenue and on the east side of York Avenue.
Within this typology, there are several different variations for new building development in these important
transition zones, responding to and respecting the context of adjacent single family neighborhoods.
Street Room Typology 2: Cornelia Overlay Zone
With the understanding that there is special sensitivity related to new building development near the Cornelia
neighborhood, this is a special zone governing the design of the public realm/street room on the east side of
France Avenue between the north side of 69th Street and Gallagher Drive. Buildings within this zone will be
expected to maintain the east side of the France Avenue street room, but will be of a lower overall scale than new
Transition Zones
1A West Promenade
1B West Promenade (South)
1C East Promenade
2 Cornelia Overlay
3 New Local Streets
4 Primary East-West Streets
5 Boulevards
6 Central Promenade Spine 66TH STREETVALLEY VIEW RD.66TH STREET69TH STREET70TH STREETHAZELTON RD.GALLAGHER DRPARKLAWN AVE76TH STREET77TH STREETMINNESOTA DR72ND STREETEDINBOROUGH WAY
YORK AVENUE
FRANCE AVENUE
XERXES AVENUE
BARRIE RD78TH STREETN
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 20
The sub-district to the west side of France between
69th and Parklawn is a unique transition zone within the
Greater Southdale District. Any proposed developments
within this zone should be approached with special
sensitivity. This means that the street experience within
that zone should be perceived as connected to the
Cornelia neighborhood through landscaping and
trees, and buildings that gradually transition in both
height and function and use between lower intensity
neighborhoods to the more commercially-focused
district on the east side of France Avenue.
The West Promenade, a new north-south pedestrian,
bike and vehicle street/woonerf that accommodates
service access, is envisioned between France Avenue
and the Cornelia neighborhood. This new shared
street is intended to provide service access to new
developments along France (keeping vehicular traffic
out of single family neighborhoods), and providing
a new framework to support the transition from
townhouses and lower-scale residential buildings on
the west side of the West Promenade, to slightly taller
buildings on the east side of the West Promenade.
Street Room Typology 1A
West Promenade / Transition to Cornelia Neighborhood
Transition Zones
1A West Promenade
1B West Promenade (South)
1C East Promenade
2 Cornelia Overlay
3 New Local Streets
4 Primary East-West Streets
5 Boulevards
6Central Promenade Spine
NPARKLAWN AVE.76TH STREETMINNESOTA DR.GALLAGHER DR.72ND STREETHAZELTON RD.70TH STREET69TH STREET66TH STREET65TH STREETFRANCE AVE.
YORK AVE.
VALLEY VIEW RD.
BARRIE RD.
XERXES AVE.
EDINBOROUGH WAY77TH STREET78TH STREET
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 21
Dimensional Characteristics of Street Room Typology 1A
West Promenade / Transition to Cornelia Neighborhood
As illustrated in the section above, within this transition zone, building heights will step up incrementally, from
those that are adjacent to single family homes to those that are facing France Avenue to provide a more gradual
transition from the residential neighborhood to the more commercially-oriented Southdale District.
The street room experience within Typology 1A will be shaped by the following experience guidelines:
• New buildings that are adjacent to single family residential properties, on the west side of the West
Promenade, should not exceed 36 feet in height. Townhomes are the preferred residential typology in this area
of the transition zone.
• All ground level space east of the West Promenade should have 20-foot floor-to-floor height. This dimension
allows for flexibility to accommodate one level of retail space along the street, or two-story townhomes facing
the West Promenade.
• All parking, other than short-term retail or guest parking, and building services need to be located below
grade or hidden within the building. If on ground level or above, parking and/or building services must be
surrounded on all sides by program space such as commercial or housing.
• On the east side of the West Promenade, building faces should not exceed 50’ in height. Any height above that
limit should step back 20 feet from the facade of the building.
• On France Avenue, a 50 foot setback is required from curb to face of building with a maximum building height
of 60 feet.
• On individual developments, should the City choose to permit height above the 60-foot height limit, it is
recommended that additional height above 60 feet step back from the face of the building by a minimum of
10 feet in depth and 12 feet in height.
Street Typologies West Promenade
Transition to the Cornelia Neighborhood
A “Woonerf” reallocates the public right-of-way to create a place for people and plantings while accommodating slow-moving vehicles. The street is elevated so it is
flush with the sidewalk, allowing for a continuous walking surface. When the street is closed for public events such as a fes tival, the area becomes a public plaza. The
proposed building setbacks and building step-backs are intended to create a gradual transition in use and scale from the existing Cornelia Neighborhood on the west to
France Avenue to the east. Between a transitional Street “Woonerf” is used as both a collector for neighborhood needs and a barrier against additional vehicular traffic
flowing into the neighborhood.
This street-park hybrid is considered as public open space and needs to be programmed. With a perpetual festival permit in place, the street becomes a venue for
community events such as salsa dancing, a wine crush or a pop-up playground.
Within the district it is the intention to define a series of street rooms each having their own characteristics and connections to the existing neighborhoods and other
parts of the district to enhance the experience of the pedestrian creating both a sense of place and safe environment to be in. The West Promenade is intended to be a
pedestrian and bicycle collector between the existing residential neighborhood.
A1
Traffic Lanes 50 Foot Setback
France Avenue
50 Feet
West Promenade
“Woonerf”
(60’ wide Street)
Single Family ResidenceTownhouses
36 Feet maximum
20 Foot
Step Back
Mixed Use Buildings
60 Feet Maximum
Neighborhood
Street
15 Foot
Front Yard
Setback60 Feet Maximum
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 22
Street Room Typology 1B
West Promenade Between Parklawn and Minnesota Drive
South of the zone designated as Street Room Typology
1A (where the Cornelia transition area immediately
abuts single family neighborhoods), the Street Room
experience shifts to respond to its changing context.
It becomes one that is more commercial in nature and
in concert with the expected higher intensity in the
southwest quadrant the Greater Southdale District.
As the West Promenade extends south into Typology
1B, it continues to serve pedestrian, vehicular and
service access. Uniform building heights on each side
of the West Promenade are intended to support the
transition from existing multi-family housing to taller
buildings at the south end of France Avenue near the
gateway from 494.
Transition Zones
1A West Promenade
1B West Promenade (South)
1C East Promenade
2 Cornelia Overlay
3 New Local Streets
4 Primary East-West Streets
5 Boulevards
6Central Promenade Spine
NPARKLAWN AVE.76TH STREETMINNESOTA DR.GALLAGHER DR.72ND STREETHAZELTON RD.70TH STREET69TH STREET66TH STREET65TH STREETFRANCE AVE.
YORK AVE.
VALLEY VIEW RD.
BARRIE RD.
XERXES AVE.
EDINBOROUGH WAY77TH STREET78TH STREET
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 23
Dimensional Characteristics of Street Room Typology 1B
West Side of France Between Parklawn and Minnesota Drive
Within this zone, existing buildings are more commercial in nature and do not immediately abut single family
neighborhoods. This unique condition lends itself to new development along the West Promenade that is still
lower in scale, without the preference for townhomes or smaller scale buildings along one edge, as in Typology 1A.
The street room experience within Typology 1B will be shaped by the following experience guidelines:
• Building faces at the West Promenade within Typology 1B shall not exceed 50 feet in height. Any height above
that limit should step back 20 feet from the facade of the building.
• All street level space shall be 20 feet, floor-to-floor in height. This dimension allows for flexibility for retail space
(on France) and two-story townhomes facing the West Promenade.
• All parking, other than short-term retail or guest parking, and building services need to be located below
grade or hidden within the building. If on ground level or above, parking and/or building services must be
surrounded on all sides by program space such as commercial or housing.
• Building faces on the east side of the West Promenade are intended to provide continuity in scale and
experience from Street Room Typology 1A and from one side of the street to another.
West Promenade
“Woonerf”
(60’ wide Street)
20 Foot
Step Back
50 Feet
20 Foot
Step Back
Street TypologiesWest Promenade A2
A “Woonerf” reallocates
the public right-of-way to
create a place for people
and plantings while
accommodating slow-
moving vehicles.
The street is elevated so it
is flush with the sidewalk,
allowing for a continuous
walking surface. When the
street is closed for public
events such as a festival,
the area becomes a public
plaza.
This street-park hybrid is
considered as public open
space and needs to be
programmed. With a
perpetual festival permit in
place, the street becomes a
venue for community
events such as salsa
dancing, a wine crush or a
pop-up playground.
60 Feet
105 Feet
20 Foot
Step Back
2 Foot Step Back
Traffic Lanes 50 Foot Setback
France Avenue
60 Feet
Maximum
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 32
Street Room Typology 5
The Boulevards
Streets that are included in this typology include the
primary district boulevards such as France Avenue, York
Avenue, W 66th Street and W 77th Street. In addition
to being the widest streets in the district, they also
currently carry a high volume of vehicular traffic. The
intent of this typology is to create streets that connect
the Greater Southdale District to the larger Edina
community. These commercially-focused streets will
reinforce the district’s unique role in serving Edina’s
neighborhoods, while at the same time, recognizing
that the district has a role in the broader metropolitan
region—providing employment, health, retail,
entertainment, and a wide range of housing options.
The streets that fall into Typology 5 will have the
greatest impact in conveying the overall identity of
the district, with wide, multi-use streetscapes lined
with a double row of trees within a consistent 50-foot
setback. Medians may also be present in the boulevard
streetscape to accommodate plantings and/or mass
transit lines and stations. In many cases, boulevards will
be adjacent to the tallest buildings in the district and
will be the locations for transit stops.
Transition Zones
1A West Promenade
1B West Promenade (South)
1C East Promenade
2 Cornelia Overlay
3 New Local Streets
4 Primary East-West Streets
5 Boulevards
6Central Promenade Spine
NPARKLAWN AVE.76TH STREETMINNESOTA DR.GALLAGHER DR.72ND STREETHAZELTON RD.70TH STREET69TH STREET66TH STREET65TH STREETFRANCE AVE.
YORK AVE.
VALLEY VIEW RD.
BARRIE RD.
XERXES AVE.
EDINBOROUGH WAY77TH STREET78TH STREET
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 33
Dimensional Characteristics of Street Room Typology 5
The Boulevards
On these wide streets, a sense of scale is maintained by creating a uniform street wall of 60 feet, with taller
structures stepping back from this 60-foot datum. This consistency in building heights along the street will form
the edge of the street room—bridging between lower intensity and transitional areas, and the higher intensity
zones within the Greater Southdale District.
The street room experience within Typology 5 will be shaped by the following experience guidelines:
• On France Avenue, a 50 foot setback is required from curb to face of building with a minimum building height
of 60 feet (diagram at left). Above that 60 foot height, the building face should step back two feet to create a
cornice line, and can then extend to 105 feet. Above 105 feet, building faces must step back an additional 10
feet (as illustrated in diagram at right, above.)
• Building podiums along these streets need to maintain as closely as possible the 60-foot height limit while still
adhering to the guidance of 75% of building face at the setback line to create the fundamental experience of
the street room.
• All parking, other than short-term retail or guest parking, and building services need to be located below
grade or hidden within the building. If on ground level or above, parking and/or building services must be
surrounded on all sides by program space such as commercial or housing.
• Parking and building services should not be accessed via these streets.
• Incorporate 10- to 12-foot wide sidewalks that create opportunities for gathering, outdoor cafes, pavilions, etc.
• Within the 50-foot setback, trees should be planted in a double row to add a strong canopy for pedestrian
activity.
Street Typologies Boulevards
France Avenue, York Avenue, W 66th
Streetand W 76th and W 77th: multi-
modal thoroughfares within the Greater
Southdale District. They have wide, multi-
use streetscapes lined with a double row of
trees. Medians may also be present in the
Boulevard streetscape to accommodate
plantings as well as mass transit lines and
stations. In many cases, Boulevards will be
adjacent to the tallest buildings in the
district and will be the locations for transit
stops.
D
A 50 feet setback is required from curb to
face of building with minimum building
height of 60 feet with a maximum
building height of 105 feet. Any part of
the building above 105 feet requires a 20
foot step back.
Preferred building materials: Concrete,
steel or heavy timber structural frame.
60 Feet
105 Feet
10 Foot
Step Back
2 Foot Step Back
Traffic Lanes50 Foot Setback
France AvenueFrance Avenue
60 Feet
Traffic Lanes50 Foot Setback
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 36
5 Implementing and Measuring the
Guidance
Ten Things to Remember
Greater Southdale District | Design Experience Guidelines
March 5, 2019
page 37
1. Every new development begins with the 200’ x 200’ block, or some variation based on
context.
2. Every block or building in a development will need streets to connect between
buildings. Not all of these streets will need to accommodate vehicles, providing the
opportunity for parks, plazas or courtyards—important parts of the public realm.
3. Buildings will not be greater than 200 feet in length, thereby minimizing the negative
impact continuous walls can have on a comfortable pedestrian experience.
4. All streets are not equal. The plan outlines a hierarchy that is driven by the kind of
experiences that are expected on these streets and how they facilitate an enlivened
public realm.
5. Designated transition zones are about maintaining the quality of life in these areas
without restricting growth in other parts of the district.
6. Promenades and East-West Streets are the bridge between single family
neighborhoods, such as the Cornelia neighborhood of Edina and the west side of
Richfield, to more intense parts of the district.
7. Street Rooms will intersect and overlap each other in many circumstances. At these
intersections, lower building heights should prevail, giving the smaller scaled building
precedence over larger scale buildings.
8. Building footprints above 60 feet in height are limited to 12,000 SF for residential uses,
and 24,000 SF for commercial.
9. Within the first 60 vertical feet of a building, primary materials systems that are
more traditional like brick, stone, glass wall systems are preferred. Above 60 feet,
other materials such as metal wall systems within a larger curtainwall system, can
be introduced. These baseline parameters should not be a deterrent to architectural
innovation but rather are intended to serve as a measure of quality and continuity
throughout the district
10. Transparency at the ground level facing the public realm is key to the individual
experience and is a catalyst for how to activate and maintain a community-based
approach to daily life and experience.
5. Implementing and Measuring the Guidance
Ten Things to Remember
The CITYofEDINASite Plan Review – Pentagon Village Hotel
The CITYofEDINAEdinaMN.gov2
The CITYofEDINAEdinaMN.gov3Site
The CITYofEDINAEdinaMN.gov4Site
The CITYofEDINAEdinaMN.gov5Approved PUD –Pentagon Park South
The CITYofEDINAEdinaMN.gov6Approved PUD –Pentagon Park South
The CITYofEDINAEdinaMN.gov72018 Approved Hotel for the site
The CITYofEDINAEdinaMN.gov8
The CITYofEDINAPlanning & Zoning Discretion PyramidBldgPermitSite Plan ReviewConditional Use PermitZoning, RezoningComprehensive PlanSubdivisions/PlatsVariancesMore Discretion Less Discretion
The CITYofEDINAThis Request Requires:EdinaMN.gov10A Site Plan Review
The CITYofEDINAEdinaMN.gov11
The CITYofEDINAEdinaMN.gov12
The CITYofEDINAEdinaMN.gov13
The CITYofEDINAEdinaMN.gov14
The CITYofEDINABetter Together EdinaEdinaMN.gov15
The CITYofEDINARecommendationEdinaMN.gov16
The CITY of
EDINA
Sketch Plan Review – 5421 & 5425 France
Avenue (St. Peter’s Church)
The CITY of
EDINA
EdinaMN.gov 2
Site
The CITY of
EDINA
EdinaMN.gov 3
Site
Site
The CITY of
EDINA
EdinaMN.gov 4
The CITY of
EDINA
EdinaMN.gov 5
Site
Comprehensive Plan
The CITY of
EDINA
EdinaMN.gov 6
The CITY of
EDINA
EdinaMN.gov 7
The CITY of
EDINAThis Request Requires:
EdinaMN.gov 8
A Comprehensive Plan Amendment to re-guide the site from LDR, Low Density
Residential to HD, High Density Residential.
Rezoning from R-1, Single-Dwelling Unit District to PUD, Planned Unit
Residential District. Flexibility from R-1 zoning district standards would be
requested for building setbacks, parking standards, height, and building
coverage.
Subdivision with Lot Area and Lot Width Variances for the creation of the
single-family lots on the south and north side of Fuller Street.
The CITY of
EDINA
Planning & Zoning
DiscretionPyramid Bldg
Permit
Site Plan
Review
Conditional Use
Permit
Zoning, Rezoning
Comprehensive Plan
Subdivisions/Plats
Variances
More
Discretion
Less
Discretion
The CITY of
EDINA
EdinaMN.gov 10
The CITY of
EDINA
EdinaMN.gov 11
City Standard
(R-1)
Comp. Plan Proposed
Front – Fuller Street
Front – France Avenue
Side – East
Side – North
35 feet
35 feet
10 feet
35 feet
6 feet*
15 feet**
30 feet
15** and 62
Building Height 2.5 stories 3 stories*
Building Coverage .30 .48*
Density 1-5 units per acre 22 units per***
Single-Family Lot Size 9,000 s.f.8,100 s.f.*
Single-Family Lot Width 75 feet 60 feet*
Single-Family Lot Depth 135 feet 135 feet
Parking – Church
Parking – Residential
Parking – Day Care
1/3 seats = 33
2 per unit = 96
1 /employee+1/20
students = 17
46 spaces
48 spaces*
46 spaces
The CITY of
EDINADiscussion/Sketch Plan Review
EdinaMN.gov 12
Density. The development density proposed for the site (22 units per acre) would require a
Comprehensive Plan Amendment from Low Density (1-5 units per acre) to High Density
Residential (12-60 units per acre). The density would be 33 units per acre using just the
parcel on the north side of Fuller. Staff has concern regarding the proposed density given its
proximity to Low Density Residential land uses to the north and south. Typically, there is a
transition in land uses from Low Density Residential to High Density, with a Low Density
Attached Residential (4-8 units per acre) or Medium Density Residential (5-12 units per acre)
development in between.
Proposed Use. The twelve affordable housing units for adults with disabilities would be an
asset to the City of Edina. This would be a housing type that is needed within the City of
Edina.
The CITY of
EDINADiscussion/Sketch Plan Review
EdinaMN.gov 13
Setbacks & Height. The proposed building would require flexibility through the PUD for setbacks along Fuller
Street, building height and lot coverage.
Pedestrian Connections/boulevard sidewalks. Demonstrate how the project fits into the neighborhood, and how
pedestrians would move through the site. Sidewalks must be boulevard style sidewalks. Sidewalk on France Ave
would be maintained by the City; sidewalks along Fuller Street, Drew Avenue and on-site would be privately
maintained (including snow-plowing).
Traffic and parking study. A traffic and parking study would be required as part of any formal application. Bicycle
parking stalls should be provided at a minimum rate of 5% the automobile parking requirement. Applicant should
also consider long-term bike parking either within the underground garage or with a bike shelter.
Sustainability. Any submittal for a rezoning will require compliance with the City’s Sustainability Policy.
The CITY of
EDINA
EdinaMN.gov 14
The CITY of
EDINA
EdinaMN.gov 15
AERIAL PHOTO
W FULLER ST
FRANCE AVE SDREW AVE SEDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
1
EXISTING RESIDENTIAL DENSITY
FRANCE AVE S10 - 15 D.U. / Acre
- Brownstones on France
15 - 20 D.U. / Acre
- France Way Condos 1
20 - 30 D.U. / Acre
- France Way Condos 2
- The Henley at Edina
- The Edina Regency
30 - 40 D.U. / Acre
- The Lanterns
- Ewing Place
40 - 50 D.U. / Acre
- Terrace Apartments
- Xerxes Manor Apartments
Edina / Minneapolis Border
W 50TH ST
W 54TH ST
Site
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
2
21.0
20.0
14.5
23.6
24.3
32.6 40.5
49.5
43.9
VICINITY PHOTOS
FRANCE AVE SW 54TH ST
W FULLER ST
1 4
2 5
3 6
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
3
1
3
2
5
4
6
PRE-SCHOOL /
SCHOOL AGE
PLAY AREA
TODDLER
PLAY AREA
RESIDENT
COURTYARD
MULTIFAMILY
3 LEVELS
COMMON ENTRY
DROP-OFF
45 PARKING STALLS
RAMP
DOWN
SITE PLAN
W FULLER ST
FRANCE AVE SDREW AVE SEDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
4
6’-10’62’-4”152’-6’
SHADOW STUDY - MARCH/SEPTEMBER
9:00 AM 3:00 PM12:00PM
9:00 AM 3:00 PM12:00PM
SHADOW STUDY - DECEMBER
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
5
EXISTING SHADOW STUDY - MARCH/SEPTEMBER
9:00 AM 3:00 PM12:00PM
9:00 AM 3:00 PM12:00PM
EXISTING SHADOW STUDY - DECEMBER
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
6
DEVELOPMENT SUMMARY: Ablelight Edina - New construction Updated 2022-03-22
DESCRIPTION Parking GSF Structured
Parking
Surface
Parking
Total
Parking Amenity NLSF Efficiency Residential
Parking
Residential
Units
S1 Sublevel Parking 17,723 17,723 48 48 17,723 13,824 369 48
1 Lobby / Common / Commercial 17,723 46 46 17,723 4,600 10,236 58%16
2 Units / Amenity 17,723 17,723 13,824 78%16
3 Units 17,723 17,723 13,824 78%16
70,892 17,723 48 46 94 0 70,892 4,600 51,708 73% 48 48
Gross SF Parking GSF Structured
Parking
Surface
Parking
Total
Parking
Commercial GSF Residential GSF Amenity NLSF Efficiency Residential
Parking
Residential
Units
METRICS
North and South Site Totals Single Family Lots UUnniitt TTyyppee MMiixx QQttyy TToottaall BBeeddss AAvvgg UUnniitt NNLLSSFF TToottaall NNLLSSFF
Site SF 120,131 SF 30,000 1 BR 38%18 18 700 12,600
Site Acreage 2.76 Acres 0.69 2 BR 52%25 50 1,025 32,108
Dwelling Units 52 DU 4 3 BR 10%5 15 1,400 7,000
Dwelling Unit per Acre 18.9 DU/Acre 5.8
Residential Parking Ratio Per Unit 1.00 Stalls/Unit 2
Residential Parking Ratio Per Bedroom 0.58 Stalls/Bed 100%48 83 939 51,708
RESIDENTIAL MIX
TOTAL PARKING RESIDENTIAL
Gross SF Residential GSF
COMMERCIAL
Commercial GSF
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
7
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
8
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
9
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
10
EDINA, MN / 04.13.2022 / 21-0015
AbleLight - Edina
11
The CITY of
EDINA
Sketch Plan Review – 7200 & 7250 France
Avenue
The CITY of
EDINA
EdinaMN.gov 2
Site
The CITY of
EDINA
EdinaMN.gov 3
Site
Site
The CITY of
EDINA
EdinaMN.gov 4
The CITY of
EDINA
EdinaMN.gov 5
The CITY of
EDINA
EdinaMN.gov 6
2018 Approved Overall
Development Plan
The CITY of
EDINA
EdinaMN.gov 7
2018 Approved Overall
Development Plan
The CITY of
EDINA
EdinaMN.gov 8
Site
2018 Approved Overall
Development Plan
The CITY of
EDINA
EdinaMN.gov 9
2018 Approved Overall
Development Plan
Site
The CITY of
EDINA
EdinaMN.gov 10
Sketch Plan Proposal
The CITY of
EDINA
EdinaMN.gov 11
The CITY of
EDINA
EdinaMN.gov 12
The CITY of
EDINA
EdinaMN.gov 13
The CITY of
EDINA
EdinaMN.gov 14
The CITY of
EDINA
EdinaMN.gov 15
The CITY of
EDINAThis Request Requires:
EdinaMN.gov 16
A Rezoning to revise the existing Planned Unit Development District
The CITY of
EDINA
Planning & Zoning
DiscretionPyramid Bldg
Permit
Site Plan
Review
Conditional Use
Permit
Zoning, Rezoning
Comprehensive Plan
Subdivisions/Plats
Variances
More
Discretion
Less
Discretion
The CITY of
EDINA
EdinaMN.gov 18
City Standard
(PUD-16) (Measured
to the curb)
POD District
(Measured to the
curb)
Proposed (Measured to
the curb)
Front – 72nd Street
Front – France Ave.
Front – Galagher Drive
Side – West (north half)
Side – West (south half
Front – Loading Facility
on 72nd Street
35 feet
39 feet
20 feet
90 feet
45 feet
30 feet
50 feet
30 feet
20 feet
20 feet
30 feet
35 feet
50 feet
35 feet
150+ feet
100+ feet
15 feet*
Building Height 6 stories and 67 feet 4 stories and 48 feet 5 stories and 75 feet*
Floor Area Ratio (FAR) 1.8 .50 .77*
Building Coverage .30 .31*
Parking Office – 605 spaces
Retail – 242 spaces
Total – 847 spaces
758 spaces*
*Requires Variance for the original zoning requirement
The CITY of
EDINADiscussion/Sketch Plan Review
EdinaMN.gov 19
Current Zoning, PUD-16, Planned Unit Development. As mentioned above, the current zoning
of the site is PUD. The existing zoning would allow two six-story buildings with 299 unit of
housing and 30,000 square feet of retail/restaurants and 10 owner occupied townhomes. The
PUD was granted largely due to the dedication of public space on the property with the
construction of a woonerf (public pedestrian and vehicular paths north south and east west
though the site, the provision of 20% of the units affordable
Previous Zoning, POD, Planned Office District. The underlying, or previous zoning on the site
is POD, Planned Office District. The previous POD district would allow 113,000 square feet
of office/medical office use. A freestanding retail use would not be allowed in a POD, Planned
Office District. The proposed square footage of this development is 175,000 square feet.
The CITY of
EDINADiscussion/Sketch Plan Review
EdinaMN.gov 20
OR, Office Residential Designation. The following is the land use description for OR, Office
Residential (which this site is guided) in the Comprehensive Plan: “Transitional areas along major
thoroughfares or between higher-intensity districts and residential districts. Many existing highway-
oriented commercial areas are anticipated to transition to this more mixed-use character. Primary
uses are offices, attached or multifamily housing. Secondary uses: Limited retail and service uses (not
including “big box" retail), limited industrial (fully enclosed), institutional uses, parks and open space.
Vertical mixed-use should be encouraged and may be required on larger sites.”
•“Big box” retail is not defined in the Comprehensive Plan. General definitions of big box retail,
usually describe big box and a single-use structure larger than 50,000 s.f. Examples of a big box
store are often cited as Walmart, Kmart, Target, Home Depot, Ikea and Best Buy. The proposed
grocery store is 45,000 square feet.
The CITY of
EDINADiscussion/Sketch Plan Review
EdinaMN.gov 21
Future Woonerf (West Promenade) Suggested in the Southdale Design Experience Guidelines. While the
proposed plans show a future woonerf, the development plans do not provide any north-south pedestrian
connection at this time,and only provides a traditional driveway. The plans also don’t provide an indication
of how the site would transition to a woonerf in the future. The future woonerf on the southern half of the
site is partially located on the adjacent property. At a minimum, easements would need to be obtained for
future construction at the expense of the property owners.
Building Materials & Facades. Buildings must be made of natural materials (stone, brick) on the first vertical
60 feet of a building, and first floor ceiling heights must be 20 feet tall. As suggested in the Southdale Design
Experience Guidelines and by City Code; all new front building facades that face the public realm must have
75 percent transparency (ability to see inside the building) at the ground level. When designing the final
plans, the “street typologies” suggested in the Design Experience Guidelines should be more closely
considered.
The CITY of
EDINADiscussion/Sketch Plan Review
EdinaMN.gov 22
Truck Entrance on 72nd Street. The proposed loading facility on 72nd Street does not meet the
setback requirements. Per Section 36-1382 of the Zoning Ordinance, “no loading facility shall
be located within the required front street or side street setback for the principal building or
within ten feet of an interior side lot line or a rear lot line.” A “loading facility” is defined as
“the dock to or from which the transport vehicle is being loaded or unloaded, the berth for
the vehicle while it is being loaded or unloaded and the areas needed to maneuver the vehicle
into or out of the berth.”
The CITY of
EDINADiscussion/Sketch Plan Review
EdinaMN.gov 23
Truck Entrance on 72nd Street. The proposed loading facility on 72nd Street does not meet the
setback requirements. Per Section 36-1382 of the Zoning Ordinance, “no loading facility shall
be located within the required front street or side street setback for the principal building or
within ten feet of an interior side lot line or a rear lot line.” A “loading facility” is defined as
“the dock to or from which the transport vehicle is being loaded or unloaded, the berth for
the vehicle while it is being loaded or unloaded and the areas needed to maneuver the vehicle
into or out of the berth.”
SKETCH P LAN SUBMISSION
7 200 FRANCE
EDINA, MN
2 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 TABLE OFCONTENTS
A. SITECONTEXT
B. PROJECT NARRATIVE + GUIDELINES
C. SITE PLANS + MASSINGINFO
D. SITE FORCES + IMPROVEMENTS
E. CONCEPTUAL RENDERINGS +VISUALS
3 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 EXISTING SITECONDITIONS
4 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 EXISTING BIRD’S EYEVIEWS
5 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 EXISTING SITE PHOTOS
6 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 STATEMENT +NARRATIVE
PROJECTOVERVIEW:
The team envisions this site as an opportunity to create an iconic development along
the France corridor that will be a catalyst for growth.
• Project Team includes Orion Investments, ESG, and others to advance the
development, entitlement and design of our redevelopment concept
• The Greater Southdale District Plan and District Design Experience Guidelines serve
as the main planning and design criteria for this stage.
PROJECTPROGRAM:
• Consistent with the City of Edina’s vision to create a street grid system
• Two sites to be developed at a newly-established grade along France Ave.
• Excavates site to create two levels of parking below newly-established grade
• Stormwater retention pond and rain garden included to manage local rainfall on site
and provide public amenity when not active
7 E S G | A R C H I T E C T U R E & D E S I GN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SOUTHDALEVISION
Architecture FieldOffice
DRAFT for review – May 18, 2017
8
the vision: build upon existing assets
8DRAFT for review – May 18, 2017
Architecture FieldOffice
DRAFT for review – May 18, 2017
9
the vision: improve access
9DRAFT for review – May 18, 2017
the vision:walkable the vision:human-scaled
8 E S G | A R C H I T E C T U R E & D E S I GN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SOUTHDALEVISION
Architecture FieldOffice
DRAFT for review – May 18, 2017
12
the vision: architecturally varied
12DRAFT for review – May 18, 2017
Architecture FieldOffice
DRAFT for review – May 18, 2017
14
the vision: family friendly
14DRAFT for review – May 18, 2017
the vision:green
the vision:mixed-use
9 E S G | A R C H I T E C T U R E & D E S I GN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
UP
DN
853.5'
GROCER BUILDING ABOVE
ESCALATOR
CORE
OFFICE BUILDING ABOVE
OFFICE
CORE
18
23
RAMP
DOWNTO
P2
RAMPUP
TOL1
46
28 26
32
50
18
24 6
28
10
GROCER
44,365 GSF
7250 BUILDING
25,000 GSF/FLOOR 1-4
10-30,000 GSF/FLOOR 5
110,000-130,000 GSF
N
STREET LEVEL & LEVEL 1PLAN
10 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
SITE A (SOUTHEAST)
•110,000-130,000 GSF Office building
• 4 stories at 25,000 GSF + 1 amenity floorat
10,000-30,000 GSF
•65’-75’ overall building height
•74 Surface parking stalls on parcel; 214
parking spaces across two parking levels
below grade
• Strong street presence
• Pedestrian access along internal streets and
entry plaza
• Large amenity floor and deck
• Activates public-facing facades.
AXONOMETRICNORTHWEST
11 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
SITE B(NORTHEAST):
•40,000-45,000 SF National Grocer on corner
•25’-30’ building height with equipment
screening
•58 Surface parking stalls on parcel; 412
parking spaces across two parking levels
below grade
• Desirable location on easily-navigable
corner of 72nd and France
• Surrounded by planted setbacks off of 72nd
and France for pedestrian experience
• Building entry points are along internal
streets
AXONOMETRICNORTHWEST
12 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
SITEPLAN:
• Green and hardscape elements
•132 Surface parking stalls;626 parking
stalls across two levels of underground
parking
•4.55 Parking Stalls per 1000 SF across the
Site.
• Human-scaled, comfortable pedestrian
experience
• Native and low maintenance plantings at
stormwater retention pond
• Generous setback at France Ave frontage
• Activate façades facing the public realm
• Major building entry points to occcur on
new internal streets adjacent to formal
pedestrian plaza
AXONOMETRICNORTHWEST
D E S I GN | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITESECTIONS
EAST - WEST
13 E S G | A R C H I T E C T U R E &
NORTH - SOUTH
| SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITEACCESS
SITE ENTRANCE
14 E S G | A R C H I T E C T U R E & D E S I G N
SITEEGRESS
| SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITECONDITIONS
EXISTING CONDITIONS
15 E S G | A R C H I T E C T U R E & D E S I G N
POTENTIALCONDITIONS
| SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITECONNECTIONS
PROPOSED SITE CONNECTIONS
16 E S G | A R C H I T E C T U R E & D E S I G N
SOUTHDALE DESIGN GUIDELINES DISTRICTS
SOUTHDALE DESIGN GUIDELINES FUTURE MASSING
17 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 PEDESTRIANCONNECTIONS
18 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 AveG(aA PlulbalicgR/Wh)er DriveF(ArPaubnliccR/We)Edge of
Woods
Edge of
Woods
Edge of
Woods
Edge of
WWoooodds
Wall
d St
W(A Pub7lic2R/Wn)Fr(AaPubnlic6"LCI(PAyPublN
PROPOSED TOPO + DRAINAGE
19 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
Galla gher DriveAve(A Public R/W)F(ArPaubnliccR/We)Conc. Walk
Wood
Wall
d St
W(A Pub7lic2R/Wn)Fr(AaPubnlic6"LCI(PAyPublSANITARYSTUB
CONNECTION TO
GARAGELEVEL
SANITARY TIE IN TO
EXISTING SANITARY
MANHOLE
44 LFPIPE
SANITARY STUB
CONNECTION TO
GARAGELEVEL
CORE DRILL AND SADDLE
TEE CONNECTION TO
EXISTING SANITARYPIPE
45 LFPIPE
STORMWATEROUTLET
LOCATION AND TIEINTO
CITYSYSTEM,PUMP
STATION TO BEUTILIZED
COMBINED WATER
SERVICE, STUB TO
WITHIN5' OFBLDG
CONNECT TOEXISTING
WATERSTUB
WETTAPCONNECTION
W/ VALVE TOEXISTING
CITY WATERMAIN
PROPOSEDFIRE
HYDRANT WITH
GATE VALVE
COMBINED WATER
SERVICE, STUB TO
GARAGELEVEL
N
UTILITYPLAN
20 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 LANDSCAPEPLAN
21 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE VEGETATION - BEFORE
22 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 SITE VEGETATION - AFTER
23 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROMSOUTHWEST
24 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROMNORTHEAST
25 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROMSOUTHEAST
26 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROMNORTHWEST
27 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROMWEST
VIEW FROMEAST
GALLAGHER DRIVE72NDSTREET
GALLAGHER
DRIVE
72ND STREET
28 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022 VIEW FROMSOUTH
VIEW FROMNORTH
FRANCE AVE
FRANCE AVE
29 E S G | A R C H I T E C T U R E & D E S I G N | SKETCH PLAN PC MEETING - 7200 & 7250 FRANCE - EDINA, MN | 3.8.2022
THANK YOU!
QUESTIONS?