III.2023 Budget and Preliminary Levy and 2023-2028 Capital
Improvement Plan (CIP)
IV.Overview of Parks & Recreation Enterprises
V.Utility Billing Rate Study Update
VI.Adjournment
The City of Edina wants all residents to be comfortable being part of the public
process. If you need assistance in the way of hearing ampli/cation, an
interpreter, large-print documents or something else, please call 952-927-8861
72 hours in advance of the meeting.
Date: September 20, 2022 Agenda Item #: III.
To:Mayor and City Council Item Type:
Other
From:Alisha McAndrews, Finance Director
Item Activity:
Subject:2023 Budget and Preliminary Levy and 2023-2028
Capital Improvement Plan (CIP)
Discussion
CITY OF EDINA
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
ACTION REQUESTED:
Discussion only.
INTRODUCTION:
The City Manager will provide Council members with the recommendation for the 2023 Budgets and Preliminary
Levy. The presentation will cover the changes that have occurred to the market and the city's operating expenses
since council approved the 2022-2023 Biennial Budget at the December 7, 2021 meeting. Staff will ask for
Council approval of the preliminary 2023 levy later at the Council meeting.
The City Manager will also provide an update on the Capital Improvement Plan recommendation to Council,
which includes a levy increase of $1 million specifically for special park improvements in 2023. The City
Manager will provide a 2023-2028 CIP recommendation at a later Council meeting.
ATTACHMENTS:
Description
Proposed 2023 Budget and Preliminary Levy
CITY OF EDINA
Proposed Tax Levies
Budget Budget
2019 2020 2021 2022 2023
General Fund Levies
General Operating Levy 30,009,121$ 32,021,243$ 33,986,471$ 36,708,036$ 39,820,200$
General Fund Subtotal 30,009,121 32,021,243 33,986,471 36,708,036 39,820,200
Increase From Prior Year (%)5.32%6.71%6.14%8.01%8.48%
Arts and Culture Fund Levies
Arts and Culture 20,000 20,000 20,000 -
Arts and Culture Fund Subtotal 20,000 20,000 20,000 - -
Increase From Prior Year (%)0.00%0.00%0.00%-100.00%
Debt Service Fund Levies
City Hall Debt Service 952,000 952,000 - - -
Gymnasium Debt Service 390,000 391,000 392,000 392,000 392,000
Fire Station Debt Service 406,000 402,000 402,000 403,000 403,000
Public Works Facility Debt Service 1,695,000 1,688,000 1,695,000 1,269,000 1,269,000
Sports Dome 1,168,900 1,163,300 1,162,400 1,168,000 1,166,000
Debt Service Fund Subtotal 4,611,900 4,596,300 3,651,400 3,232,000 3,230,000
Increase From Prior Year (%)0.70%-0.34%-20.56%-11.49%-0.06%
Construction Fund Levies
Capital Improvement Plan Levy 300,000 800,000 2,000,000 2,000,000 2,000,000
Equipment Levy 1,930,000 2,030,000 2,130,000 2,240,000 2,350,000
Street Special Levy 950,000 1,210,400
Weber Woods*400,000 - - - -
Special Park Improvement Levy - - - - 1,000,000
Construction Fund Subtotal 2,630,000 2,830,000 4,130,000 5,190,000 6,560,400
Increase From Prior Year (%)2.45%7.60%45.94%25.67%26.40%
HRA Fund Levies
HRA Operating Levy 160,000 192,000 230,400 237,300 244,400
HRA Fund Subtotal 160,000 192,000 230,400 237,300 244,400
Increase From Prior Year (%)28.00%20.00%20.00%2.99%2.99%
Total Property Tax Levy 37,431,021$ 39,659,543$ 42,018,271$ 45,367,336$ 49,855,000$
Increase From Prior Year (%)4.60%5.95%5.95%7.97%9.89%
Braemar Arts &Debt
General HRA PACS CAS CDBG Police SR Memorial Culture Service Construction
Fund Fund Fund Fund Fund Fund Fund Fund Fund Fund Total
REVENUES AND OTHER FINANCING SOURCES
Property tax levy 39,820,200$ 244,400$ -$ -$ -$ -$ -$ -$ 3,230,000$ 6,560,400$ 49,855,000$
Tax increments - 1,723,245 - - - - - - - - 1,723,245
Franchise fees & other taxes 830,000 - 1,200,000 1,000,000 - - - - - 90,000 3,120,000
Special assessments - - - - - - - - - 3,726,253 3,726,253
Licenses and permits 5,466,160 - - - - - - - - 74,000 5,540,160
Intergovernmental 1,605,100 - - - 135,000 - - - - 2,780,000 4,520,100
Charges for services 5,945,291 - - - - - - - - 195,000 6,140,291
Fines and forfeitures 650,000 - - - - - - - - - 650,000
Investment income 250,000 186,000 - 15,000 - - 1,000 - - 203,000 655,000
Other revenue 376,000 - - - - 289,122 2,500 - - - 667,622
Transfers and contributions 157,500 - - - - - - - 2,816,752 100,000 3,074,252
Loan received - - - - - - - - - - -
Debt issued - - - - - - - - - 2,813,402 2,813,402
Other financing sources - - - - - - - - - - -
TOTAL REVENUES AND OTHER
FINANCING SOURCES 55,100,251 2,153,645 1,200,000 1,015,000 135,000 289,122 3,500 - 6,046,752 16,542,055 82,485,325
EXPENDITURES AND OTHER FINANCING USES - BY DEPARTMENT
Administration 3,134,386 - - - - - - - - 66,000 3,200,386
Communications 1,619,013 - - - - - - - - 113,000 1,732,013
Information technology - - - - - - - - - 30,000 30,000
Human resources 1,548,034 - - - - - - - - - 1,548,034
Finance 1,361,964 - - - - - - - - - 1,361,964
Public works 6,247,075 - - - - - - - - 560,790 6,807,865
Engineering 3,888,188 - 1,257,188 732,345 - - - - - 9,842,506 15,720,227
Police 15,054,036 - - - - 137,000 - - - 809,550 16,000,586
Fire 13,104,428 - - - - - - - - 322,000 13,426,428
Parks & recreation 6,939,479 - - - - - 1,000 - - 1,641,325 8,581,804
Community development 2,203,648 2,405,402 - - 135,000 - - - - - 4,744,050
Loan issued - - - - - - - - - - -
Debt service - 472,250 - - - - - - 6,013,727 - 6,485,977
Transfers - - - - - - - - - 2,816,752 2,816,752
2023 GOVERNMENTAL FUND BUDGETS
TOTAL EXPENDITURES AND OTHER
FINANCING USES 55,100,251 2,877,652 1,257,188 732,345 135,000 137,000 1,000 - 6,013,727 16,201,923 82,456,086
EXPENDITURES AND OTHER FINANCING USES - BY TYPE
Personal services 38,740,041 204,932 129,399 155,688 - - - - - 116,379 39,346,439
Contractual services 8,704,256 2,197,470 75,720 66,020 135,000 129,500 1,000 - - 350,273 11,659,239
Commodities 2,529,570 3,000 13,000 1,200 - 7,500 - - - 58,375 2,612,645
Internal services 5,126,384 - 9,069 9,437 - - - - - 876 5,145,766
Equipment - - - - - - - - - 1,936,665 1,936,665
Capital outlay - - 1,030,000 500,000 - - - - - 10,922,603 12,452,603
Loan issued - - - - - - - - - - -
Debt service - 472,250 - - - - - - 6,013,727 - 6,485,977
Transfers - - - - - - - - - 2,816,752 2,816,752
TOTAL EXPENDITURES AND OTHER
FINANCING USES 55,100,251 2,877,652 1,257,188 732,345 135,000 137,000 1,000 - 6,013,727 16,201,923 82,456,086
CHANGE IN
FUND BALANCE -$ (724,007)$ (57,188)$ 282,655$ -$ 152,122$ 2,500$ -$ 33,025$ 340,132$ 29,239$
CITY OF EDINA
Proposed Budget by Fund Type
Governmental Enterprise Internal Service Governmental Enterprise Internal Service
Funds Funds Funds Total Funds Funds Funds Total
REVENUES AND OTHER FINANCING SOURCES
Property tax levy 45,367,336$ -$ -$ 45,367,336$ 49,855,000$ -$ -$ 49,855,000$
Tax increments 1,670,245 - - 1,670,245 1,723,245 - - 1,723,245
Franchise fees & other taxes 3,120,000 - - 3,120,000 3,120,000 - - 3,120,000
Special assessments 4,624,553 - - 4,624,553 3,726,253 - - 3,726,253
Licenses and permits 5,464,560 - - 5,464,560 5,540,160 - - 5,540,160
Intergovernmental 5,940,309 180,000 - 6,120,309 4,520,100 180,000 - 4,700,100
Charges for services 5,932,905 - - 5,932,905 6,140,291 - - 6,140,291
Fines and forfeitures 650,000 - - 650,000 650,000 - - 650,000
Operating revenue - 54,139,043 6,840,351 60,979,394 - 56,223,559 6,991,192 63,214,751
Investment income 655,000 381,000 - 1,036,000 655,000 381,000 - 1,036,000
Other revenue 667,622 20,000 - 687,622 667,622 20,000 - 687,622
Contributions - - - - - - - -
Transfers 3,229,563 1,191,000 - 4,420,563 3,074,252 1,203,350 - 4,277,602
Loan received - - - - - - - -
Debt issued 1,768,370 - - 1,768,370 2,813,402 - - 2,813,402
Other financing sources 250,000 - - 250,000 - - - -
TOTAL REVENUES AND OTHER
FINANCING SOURCES 79,340,463 55,911,043 6,840,351 142,091,857 82,485,325 58,007,909 6,991,192 147,484,426
EXPENDITURES, EXPENSES AND OTHER FINANCING USES - BY FUNCTION
Administration 3,092,833 - - 3,092,833 3,200,386 - - 3,150,731
Communications 1,829,674 - - 1,829,674 1,732,013 - - 1,706,364
Information technology 50,000 - 2,303,438 2,353,438 30,000 - 2,373,686 2,403,686
Human resources 1,462,010 - 1,101,903 2,563,913 1,548,034 - 1,107,234 2,630,744
Finance 1,297,658 409,281 - 1,706,939 1,361,964 411,968 - 1,752,356
Public works 6,540,413 19,605,891 1,966,101 28,112,405 6,807,865 20,341,298 2,015,368 29,065,564
Engineering 14,470,948 1,362,510 1,356,361 17,189,819 15,720,227 1,295,519 1,379,522 18,333,671
Police 14,886,865 1,738,117 - 16,624,982 16,000,586 1,769,272 - 17,531,371
Fire 12,647,083 - - 12,647,083 13,426,428 - - 13,218,827
Parks & recreation 7,610,321 28,535,275 - 36,145,596 8,581,804 29,262,244 - 36,734,112
2022 Budget 2023 Budget
CITY OF EDINA
Proposed Budget by Fund Type
Community development 7,014,431 - - 7,014,431 4,744,050 - - 4,709,140
Loan issued - - - - - - - -
Debt service 6,004,168 - - 6,004,168 6,485,977 - - 6,485,977
Transfers 2,979,563 1,441,000 - 4,420,563 2,816,752 1,460,850 - 4,277,602
TOTAL EXPENDITURES, EXPENSES AND OTHER
FINANCING USES 79,885,967 53,092,074 6,727,803 139,705,844 80,583,184 54,541,151 6,875,810 142,000,145
EXPENDITURES, EXPENSES AND OTHER FINANCING USES - BY TYPE
Cost of goods sold - 11,027,161 - 11,027,161 - 11,414,891 - 11,414,891
Personal services 36,942,679 11,475,078 2,739,463 51,157,220 38,473,537 11,949,186 2,861,770 53,284,493
Contractual services 13,787,885 14,399,105 2,620,440 30,807,430 11,659,239 14,639,611 2,628,440 28,927,290
Commodities 2,559,719 2,338,650 1,367,900 6,266,269 2,612,645 2,320,850 1,385,600 6,319,095
Internal services 5,027,018 2,948,930 - 7,975,948 5,145,766 3,045,186 - 8,190,952
Equipment 1,728,550 - - 1,728,550 1,936,665 - - 1,936,665
Capital outlay 10,856,385 - - 10,856,385 11,452,603 - - 11,452,603
Depreciation - 8,790,000 - 8,790,000 - 8,985,000 - 8,985,000
Loan issued - - - - - - - -
Debt service 6,004,168 672,150 - 6,676,318 6,485,977 725,577 - 7,211,554
Other expense - - - - - - - -
Contributions - - - - - - - -
Transfers 2,979,563 1,441,000 - 4,420,563 2,816,752 1,460,850 - 4,277,602
TOTAL EXPENDITURES, EXPENSES AND OTHER
FINANCING USES 79,885,967 53,092,074 6,727,803 139,705,844 80,583,184 54,541,151 6,875,810 142,000,145
CHANGE IN FUND BALANCE
OR NET POSITION (545,504) 2,818,969 112,548 2,386,013 29,239 3,466,758 115,382 3,611,379
FUND BALANCE OR NET POSITION -
JANUARY 1 87,461,014 120,309,380 2,837,899 210,608,293 86,915,510 123,128,349 2,950,447 212,994,306
FUND BALANCE OR NET POSITION -
DECEMBER 31 86,915,510$ 123,128,349$ 2,950,447$ 212,994,306$ 86,944,750$ 126,595,107$ 3,065,829$ 216,605,686$
Aquatic Golf Braemar Art
Utilities Liquor Center Course Arena Field Center Edinborough Centennial
Fund Fund Fund Fund Fund Fund Fund Fund Fund Total
REVENUES AND TRANSFERS IN
Operating revenues 28,979,624$ 15,665,239$ 1,089,070$ 4,562,500$ 2,642,739 560,000$ 502,483$ 1,388,904$ 833,000$ 56,223,559$
Intergovernmental 180,000 - - - - - - - - 180,000
Investment income 302,000 21,000 20,000 9,000 3,000 11,000 - 11,000 4,000 381,000
Other revenue 20,000 - - - - - - - - 20,000
Transfers and contributions - 3,750 16,000 53,600 392,000 1,000 300,000 12,000 425,000 1,203,350
TOTAL REVENUES AND
TRANSFERS IN 29,481,624 15,689,989 1,125,070 4,625,100 3,037,739 572,000 802,483 1,411,904 1,262,000 58,007,909
EXPENSES AND TRANSFERS OUT - BY DEPARTMENT
Administration - - - - - - - - - -
Human resources - - - - - - - - - -
Finance 411,968 - - - - - - - - 411,968
Public works 20,341,298 - - - - - - - - 20,341,298
Engineering 1,295,519 - - - - - - - - 1,295,519
Fire 1,769,272 - - - - - - - - 1,769,272
Parks and recreation - 14,738,559 1,227,701 4,720,003 3,475,414 939,788 867,128 1,862,051 1,431,600 29,262,244
Transfers and contributions 460,850 1,000,000 - - - - - - - 1,460,850
TOTAL EXPENSES AND
TRANSFERS OUT 24,278,907 15,738,559 1,227,701 4,720,003 3,475,414 939,788 867,128 1,862,051 1,431,600 54,541,151
EXPENSES AND TRANSFERS OUT - BY TYPE
COGS - 10,970,141 52,250 191,000 111,000 - 500 78,000 12,000 11,414,891
Personal services 3,113,700 2,490,550 532,559 2,047,206 1,248,641 150,689 601,125 947,015 817,701 11,949,186
Contractual services 11,089,188 681,984 190,234 673,050 1,007,222 211,070 115,819 387,676 283,368 14,639,611
Commodities 1,200,700 70,600 114,700 391,000 140,750 25,250 79,000 149,900 148,950 2,320,850
Internal services 1,624,720 408,284 43,183 334,130 244,365 38,779 64,684 154,460 132,581 3,045,186
Depreciation 6,307,000 117,000 290,000 904,000 665,000 514,000 6,000 145,000 37,000 8,985,000
Interest 482,749 - 4,775 179,617 58,436 - - - - 725,577
Transfers and contributions 460,850 1,000,000 - - - - - - - 1,460,850
TOTAL EXPENSES AND
TRANSFERS OUT 24,278,907 15,738,559 1,227,701 4,720,003 3,475,414 939,788 867,128 1,862,051 1,431,600 54,541,151
CHANGE IN NET
POSITION 5,202,717$ (48,570)$ (102,631)$ (94,903)$ (437,675) (367,788)$ (64,645)$ (450,147)$ (169,600)$ 3,466,758$
2023 ENTERPRISE FUND BUDGETS
Risk Equipment Information Facilities
Management Operations Technology Management
Fund Fund Fund Fund Total
REVENUES AND TRANSFERS IN
Operating revenues 1,107,240$ 2,055,684$ 2,421,160$ 1,407,108$ 6,991,192$
Intergovernmental - - - - -
Investment income - - - - -
Other revenue - - - - -
Transfers - - - - -
TOTAL REVENUES AND
TRANSFERS IN 1,107,240 2,055,684 2,421,160 1,407,108 6,991,192
EXPENSES AND TRANSFERS OUT - BY DEPARTMENT
Administration - - - - -
Communications - - - - -
Information technology - - 2,373,686 - 2,373,686
Human resources 1,107,234 - - - 1,107,234
Finance - - - - -
Public works - 2,015,368 - - 2,015,368
Engineering - - - 1,379,522 1,379,522
Police - - - - -
Fire - - - - -
Parks and recreation - - - - -
Community development - - - - -
Transfers - - - - -
TOTAL EXPENSES AND
TRANSFERS OUT 1,107,234 2,015,368 2,373,686 1,379,522 6,875,810
EXPENSES AND TRANSFERS OUT - BY TYPE
COGS - - - - -
Personal services 162,434 797,148 1,328,386 573,802 2,861,770
Contractual services 944,800 205,120 870,300 608,220 2,628,440
Commodities - 1,013,100 175,000 197,500 1,385,600
Capital Outlay - - - - -
Depreciation - - - - -
Interest - - - - -
Transfers - - - - -
TOTAL EXPENSES AND
TRANSFERS OUT 1,107,234 2,015,368 2,373,686 1,379,522 6,875,810
CHANGE IN NET
POSITION 6$ 40,316$ 47,474$ 27,586$ 115,382$
2023 INTERNAL SERVICE FUND BUDGETS
Date: September 20, 2022 Agenda Item #: IV.
To:Mayor and City Council Item Type:
Other
From:Alisha McAndrews, Finance Director
Item Activity:
Subject:Overview of Parks & Recreation Enterprises Discussion
CITY OF EDINA
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
ACTION REQUESTED:
Discussion only.
INTRODUCTION:
Staff will provide a brief presentation with an overview of the City's Parks & Recreation Enterprises for
discussion. The overview will include information on the operations of each enterprise, how they generate
income, the 2021 financial performance, options for financing capital improvements, and the impact of "Edina
Law".
Date: September 20, 2022 Agenda Item #: V.
To:Mayor and City Council Item Type:
Reports / Recommendation
From:Alisha McAndrews, Finance Director
Item Activity:
Subject:Utility Billing Rate Study Update Discussion
CITY OF EDINA
4801 West 50th Street
Edina, MN 55424
www.edinamn.gov
ACTION REQUESTED:
Discussion only.
INTRODUCTION:
Staff will provide an update on the 2022 utility rate study and recommend Council approve staff implementing the
recommendations in the study for 2023. Formal approval of the 2023 rates will be presented to Council
December 2022.
ATTACHMENTS:
Description
2022 Utility Rate Study
Staff Presentation
BUILDING COMMUNITIES. IT’S WHAT WE DO.
September 2022
UTILITY RATE STUDY ANALYSIS FOR 2023 RATES:
City of Edina, MN
Prepared by:
Ehlers
3060 Centre Pointe Drive
Roseville, Minnesota 55113
City of Edina, MN
Utility Rate Study Analysis 1
TABLE OF CONTENTS
I. EXECUTIVE SUMMARY
II. BACKGROUND INFORMATION
III. METHODOLOGY AND ASSUMPTIONS
IV. WATER FUND
V. SEWER FUND
VI. STORM WATER FUND
VII. CONNECTION FEES
VIII. CASH RESERVES
IX. COMMUNITY COMPARISON
X. PUTTING IT ALL TOGETHER: SAMPLE BILLS
XI. SUMMARY
APPENDIX A: CAPITAL IMPROVEMENT PLANS
APPENDIX B: PROJECTIONS
2
3
4
5
9
12
14
16
18
20
21
23
27
City of Edina, MN
Utility Rate Study Analysis 2
I. EXECUTIVE SUMMARY
The goal of a rate study is to ensure the long‐term financial health of the utility enterprise funds.
The City of Edina conducts periodic updates to its utility rate study with the last update being
completed in 2021. The recommendations from the 2021 study were conceptually approved by
the Council in a work session, but implementation was delayed due to billing software
conversion. This rate study revisits the rate structure provided in the 2021 update and seeks to
achieve climate goals, reduce customer complaints, and accommodate updated capital cost
estimates. The utilities are capital intensive operations with over $175 million in capital costs
estimated for 2022‐2031, compared to $149 million estimated in the 2021 update over the same
timeframe. The rate study assumes the City will continue the practice of financing the majority
of capital costs.
This rate study reviews each utility fund to ensure the recommended rates and fees will
support operations, capital costs, capacity expansion projects, address the City’s climate goal
of water conservation, and maintain adequate cash reserves. This report details the findings
and recommendations for each utility, provides an estimated 2023 utility bill for sample
homeowners and businesses, and reviews connection fees. Moreover, the rate study provides
a recommendation for the 2023 user rates and annual increases thereafter for the water,
sanitary sewer, and storm water utilities as well as connection fees for the water and sanitary
sewer utilities.
This rate study aims to find solutions to the increased capital costs and unique challenges each
utility is facing, which is summarized below.
Water Fund – The City’s existing tiered rate structure does not actively promote water
conservation. Under the current structure, 95% of residential accounts have all their water use
fall within the first two tiers of the rates. The current structure thus lacks an adequate price
signal to customers to monitor their usage more closely, and results in similar fees being
collected for irrigation and indoor water use.
Sewer Fund – The single biggest expense in the sewer fund is the Metropolitan Council
Environmental Services (MCES) disposal fees, which is 76% of the 2022 operating budget.
When these fees increase, it puts financial pressure on revenues to keep pace. In addition, the
current rate structure does not promote conservation and winter quarter average billing is
generating complaints from customers.
City of Edina, MN
Utility Rate Study Analysis 3
Storm Water Fund – The City is committed to adequately maintaining its stormwater
infrastructure. In addition, the City needs to undertake flood mitigation projects over the next
20 years to address flooding risk. To balance affordability with capital needs, this rate study
assumes one $10 million flood mitigation project from 2022‐2031, the timeframe of this study.
To address these challenges, Ehlers recommends restructuring water and sewer rates for 2023
and provides the following recommendations for annual increases to utility rates and
connection fees.
Utility Fee 2023 Rate Increases Annual Rate Increases
Beginning in 2024
Water User Rates Rate Restructure 5%
Sewer User Rates Rate Restructure 6%
Storm Water Rates 8% 8%
Water Connection Fee 3% 3%
Sewer Connection Fee 28% 22% in 2024; 5% thereafter
II. BACKGROUND INFORMATION
Most City operations, such as public works, public safety, administration, and parks are
accounted for under governmental funds, primarily embedded in the General Fund. These
operations rely on a variety of revenues including property taxes, intergovernmental aid, and
charges for services.
Municipal utility funds are considered enterprise funds. They are intended to be operated like
a private enterprise in which the fee revenue pays for all operations and capital expenses. City
utility operations include four funds: water, sewer, storm water, and recycling. Together these
utilities are over a $27 million operation. In the City’s Annual Comprehensive Financial Report
(ACFR), enterprise funds are segregated funds, recognizing the unique purpose and revenue
streams of these functions.
In addition to the ACFR segregating the enterprise funds, the City’s Capital Improvement Plan
(CIP) distinguishes between projects that will be funded by the enterprise funds and those to
be funded by governmental funds.
City of Edina, MN
Utility Rate Study Analysis 4
It should be noted that the City currently has one accounting fund for water, sanitary sewer,
storm water and recycling. For this analysis, we segregated the revenues and expenses for
each utility, and treated each as a separate fund. By doing so, we can ensure that each utility
will recover its own costs. For purposes of this study, we refer to each segregated utility as its
own fund.
III. METHODOLOGY AND ASSUMPTIONS
As part of this year’s study, Ehlers prepared a 10‐year cash flow projection for the water,
sewer, and storm water utility funds through the year 2032. This projection examines
anticipated cash flows in future years and estimates the user rate increases necessary to meet
all financial obligations of the utility funds while maintaining adequate cash reserves.
The cash flow analysis method determines future revenue requirements by incorporating
operating and maintenance expenses, transfer payments, current and future debt service and
anticipated future capital projects. We also include future growth estimates in the model for
calculating connection fees. The primary financial inputs in the development of the analysis
were the City’s audited financial statements, budget documents, annual water billing data for
2019, and the City’s latest Capital Improvement Plan. This study assumes approximately 1.96
billion gallons per year of water consumption based on actual consumption over a 12‐month
period spanning 2019 and 2020. The City elected to use billing data from 2019 and 2020
because it reflected “normal” rainfall and excluded the COVID‐19 pandemic which may have
skewed the data.
The cashflow projections include the following assumptions:
3‐5% annual inflation on operating costs.
4% annual inflation on MCES disposal charges.
Growth is 175 and 119 new SAC units per year for the Southdale and Cahill areas
respectively for connection fees.
We did not assume any additional usage from growth for our user revenue calculations.
This is based on previous years’ experience with growth and minimal to no additional
usage being realized city‐wide, likely as the result of more efficient appliances.
City of Edina, MN
Utility Rate Study Analysis 5
Funding capital improvements for a redeveloping community as well as replacing aging utility
infrastructure drive the need for adequate utility revenue. City staff developed a 10‐year
Capital Improvement Plan for each utility (See Appendix A). All capital costs listed in Appendix
A assume historic inflation levels. If current inflation levels continue the costs will be
understated.
IV. WATER FUND
There are three components to the City’s water utility revenues:
Fixed Charges
Usage Fees
WAC Fees (Water Access Charge or connection fees)
Fixed charges are a quarterly fee based on the size of the water meter. The fixed charge is
established to recover certain administration expenses, such as meter reading and billing, plus
a portion of distribution costs. The 2022 fixed charge for single family residential accounts is
$24.72 per quarter for a three‐quarter inch meter and it increases as the size of the meter
increases.
Usage fees are based on the metered use of water. Water is sold in units and currently one
unit represents 1,000 gallons. The billing structure for most Edina residents is tiered so that
the rate per unit depends on the amount of water used per quarter. Water usage in the
Morningside area is charged at a flat rate per unit. The Morningside rate is set at an amount
sufficient to cover the cost of purchasing water from the City of Minneapolis which is the
largest component of the Morningside rate. The other components are a pro‐rata share of the
City of Edina’s water distribution costs not included in the fixed charge. The current and
proposed tier structure can be seen in Table 1.
Water access charges (WAC) are paid by developers of new homes and businesses when a
building permit is pulled. Developers do not pay connection fees when they are replacing an
existing unit, as is the case for residential tear downs and rebuilds. The connection fees help
pay for the capital costs of serving the new properties. The City of Edina currently charges
$2,960 per sewer availability charge (SAC) unit for new development. We recommend the City
increase its WAC fee 3% annually as discussed later in this report.
City of Edina, MN
Utility Rate Study Analysis 6
The rate study proposes making tiers 1 and 2 smaller in 2023 to promote conservation. As
shown in Figure 1, under the current structure, only 17% of residents are outside of the first
tier and as a result are the only users that receive a price signal to monitor their consumption
more closely. As shown in Figure 2, under the proposed 2023 structure, 58% of residents will
receive a price signal. In tandem with the increased rates in tiers 2 and 3, the new structure
will incentivize less consumption.
Figure 1. Current 2022 Tiers and Residential Accounts by Usage
Figure 2. Proposed 2023 Tiers and Residential Accounts by Usage
City of Edina, MN
Utility Rate Study Analysis 7
The proposed changes to the tier structure, as shown in Table 1, are estimated to generate a
3.5% increase in water revenue in 2023 with low volume residential customers paying less and
medium and high volume customers paying more, as shown in Table 2. The recommended
annual rate increase in 2024 and beyond is 5%.
Table 1. Current Water Usage Fees compared to Proposed 2023 Tier Restructure and Rates
WATER 2022 Proposed 2023*
Annual
Increase
Beginning in
2024
Residential
Tier 1 Up to 26,000 gallons $ 2.71 Up to 12,000 gallons $ 2.42 5.0%
Tier 2 26,001 to 49,000 gallons $ 3.60 12,001 to 24,000
gallons $ 3.68 5.0%
Tier 3 Over 49,000 gallons $ 5.63 Over 24,000 gallons $ 6.08 5.0%
Morningside All Usage $ 4.40 All Usage $ 4.62 5.0%
Multifamily
Tier 1 Up to 26,000 gallons $ 2.71
Tier 2 26,001 to 49,000 gallons $ 3.60 All Usage $ 3.62 5.0%
Tier 3 Over 49,000 gallons $ 5.63
Comm/Ind
Tier 1 Up to 26,000 gallons $ 2.71 Up to 50,000 gallons $ 2.42 5.0%
Tier 2 Over 26,000 gallons $ 3.60 50,001 to 200,000
gallons $ 3.02 5.0%
Tier 3 N/A Over 200,000 gallons $ 3.77 5.0%
Irrigation Tier 1 Up to 26,000 gallons $ 3.60 Up to 12,000 gallons $ 3.68 5.0%
Tier 2 Over 26,000 gallons $ 5.63 Over 12,000 gallons $ 6.08 5.0%
*Fixed charges (i.e., meter fees) are proposed to increase 5% annually beginning in 2023.
Water use varies based on personal usage, lot size, irrigation, and weather. In 2019 to 2020
the City’s residential customers used an average of 13,700 gallons in the winter quarter and
27,500 gallons in the summer quarter, with the average quarterly usage being 19,200 gallons.
Table 2 shows sample water bills for customers at three different consumption levels.
Table 2. Residential Customer Comparison ‐ Proposed Tier Restructure
City of Edina, MN
Utility Rate Study Analysis 8
In addition to promoting conservation, the new structure and annual increase in rates will help
pay for the reinvestment in the City’s aging water system as well as the construction of a new
water treatment plant. Between 2022 and 2031, the City plans to spend $62 million on capital
improvements from the water utility fund (see Appendix A). The table below outlines some of
the major water capital projects in the City’s capital improvement plan.
Table 3. Water Utility Major Capital Improvements
Major Projects Year Amount
Street Improvement Program Annual Average $3,100,000
Well Rehab Annual Average $280,000
New Water Treatment Plant 2028‐2029 $18,000,000
New Water Supply 2028‐2029 $6,200,000
Capital and annual debt expenditures comprised 59% of the total cash expenditures in the
Water Fund in 2021 as shown in Figure 3. These are fixed costs that do not fluctuate with
consumption; therefore, the revenue stream needs to be reliable from year to year.
Figure 3. 2021 Water Expenditures (Excluding Depreciation)
Operating
41%
Debt
30%
Capital
29%
Water Expenditures 2021
$13.9 Million
City of Edina, MN
Utility Rate Study Analysis 9
V. SEWER FUND
There are two components to the City’s sewer utility revenues:
Usage Fees
SAC Fees (Sewer Access Charge or connection fees)
Currently, usage fees are based on the metered use of water in the winter quarter, or the
current minimum of 12,000 gallons, whichever is greater.
Winter quarter averaging is used for single‐family residential properties to avoid billing for
irrigation usage. Run‐off due to water used for irrigating is part of the storm water collection
system and should not be part of the sewer charge. In some cases, the winter quarter average
can be greater than the actual usage in the spring and summer months; an example of what
can cause this is heavy usage in the winter with guests in town for the holidays. The City
receives a substantial number of complaints from homeowners who are paying winter quarter
consumption when their actual consumption is less.
The minimum charge provides revenue stability for the sewer fund. In addition, residents who
travel to warmer climates in the winter still incur the minimum charge when no water is used.
In smaller households the minimum is sometimes more than actual usage.
Sewer access charges (SAC) are paid by developers of new homes and businesses when a
building permit is pulled. Developers do not pay connection fees when they are replacing an
existing unit, as is the case for residential tear downs and rebuilds. The connection fees help
pay for the capital costs of serving the new properties. The City of Edina currently charges
$1,810 per sewer availability charge unit for new development. We recommend the City
increase its SAC fee 28% in 2023, 22% in 2024 and 5% annually thereafter as discussed later in
this report.
The rate study proposes two structural changes to address customer complaints:
1. A reduction in the sewer minimum to 8,000 gallons in 2023; and
2. Charging the lesser of the Winter quarter or actual, but not less than the minimum.
City of Edina, MN
Utility Rate Study Analysis 10
The proposed changes maintain a sewer minimum for revenue stability, make sewer charges
more affordable for low volume customers, as seen in Table 5, and charges the winter quarter
average or actual usage, whichever is less. The 6% recommended rate increase in 2024 and
beyond is 1% higher than last year’s rate study to account for increased capital costs and to
assist in funding new infrastructure related to the Cahill expansion. The current and proposed
rates can be seen in Table 4.
Table 4. Current Sewer Utility Rates compared to Proposed 2023 Rates
SEWER 2022 Proposed 2023*
Annual
Increase
Beginning
in 2024
Residential
(including
Morningside)
All Usage $ 6.30 All Usage $ 6.86 6.00%
Minimum of 12,000
gallons Minimum of 8,000 gallons
Winter Quarter
Averaging Lesser of Winter Quarter or
Actual,
but no less than 8,000
gallons
Multifamily
All Usage $ 6.30 All Usage $ 6.86 6.00%
Minimum of $68.05 for
each Minimum of 8,000 gallons
unit over 4 units
Comm/Ind and
Sewer Only
All Usage $ 6.30 All Usage $ 6.86 6.00%
Minimum of 12,000
gallons Minimum of 8,000 gallons
*26% of customers will pay minimum in Winter quarter.
Table 5. Residential Customer Comparison – Proposed Lower Minimum
City of Edina, MN
Utility Rate Study Analysis 11
The City of Edina participates in the Metropolitan Council Environmental Services (MCES)
sewer system. This means that the City’s sanitary sewer system flows to the MCES treatment
plant and the City receives a bill from the MCES for the service. The City does not maintain its
own sanitary sewer treatment plant. MCES allocates the cost of the metro area sanitation
system to user Cities based on their relative percent of flow into the system. Currently the
MCES charge for services is budgeted at $5,906,199 in 2022 and is the single biggest expense
in the City’s sewer fund, comprising almost 76% of budgeted operating expense in 2022,
excluding depreciation. This study assumes future increases to the MCES charge for service
will be 4% per year.
The second biggest expenditure in the sewer fund is capital purchases, most of which are
designated for replacing the sewer mains under road reconstruction projects. Between 2022
and 2031, the City plans to spend $48.5 million on capital improvements from the sewer fund,
including the Cahill capacity expansion project (see Appendix A). The table below outlines
some of the major sewer capital projects in the City’s capital improvement plan.
Table 6. Sewer Utility Major Capital Improvements
Major Projects Year Amount
Street Improvement Program Annual Average $1,400,000
Trunk Capacity Expansion 2023‐2028 $22,900,000
Lift Station 6 Rehabilitation 2022 $8,000,000
72nd Street Sewer Line Upsize 2027 $1,600,000
Capital, MCES, and debt expenditures comprised 92% of the total cash expenditures in the
Sewer Fund in 2021 as shown in Figure 4. These are fixed costs that do not fluctuate with
consumption; therefore, the revenue stream needs to be reliable from year to year.
City of Edina, MN
Utility Rate Study Analysis 12
Figure 4. 2021 Sewer Expenditures (Excluding Depreciation)
VI. STORM WATER FUND
The storm water fund was created to pay for the management of storm water runoff in
concert with the local watershed. City projects include repair and maintenance of storm water
infrastructure such as catch basins, manholes, pipes, and sediment collection devices. Single
family residential properties pay a fixed quarterly fee. Commercial property owners are
charged based on residential equivalency unit, acreage, and the storm water rate. Over time,
capital costs for the storm water system have increased to meet increasingly stringent state
standards intended to improve water quality. In addition, there are storm water related
construction costs in connection with street reconstruction projects and flood mitigation.
To fund the capital improvements and on‐going repairs and maintenance the City will need to
generate more storm water revenue. We propose an annual 8% increase in 2023 and
thereafter as shown in Table 7. The recommended rate increase is consistent with last year’s
rate study.
Table 7. Current Storm Water Utility Rates compared to Proposed 2023 Rates
STORM WATER 2022 Proposed 2023
Annual Increase
Beginning in
2024
Residential
(including
Morningside)
Per Residential Lot $43.85 Per Residential Lot $47.36 8.0%
Operating
8%
Debt
13%
Capital
21%
MCES
58%
Sewer Expenditures 2021
$10.2 Million
City of Edina, MN
Utility Rate Study Analysis 13
When considering increased storm water rates, it is necessary to balance affordability and
capital needs. With the proposed 8% annual increase in storm water rates, the City will be able
to fund approximately $10 million in flooding mitigation projects every eight years. With this
annual increase, it will take approximately 40 years to accomplish the City’s $50 million in
flood projects unless other funding is secured.
The 8% annual increase allows the City to spend $64 million on capital improvements from the
storm water fund in the next ten years, including the aforementioned $10 million in flood
mitigation projects (see Appendix A). The table below outlines some of the major storm water
capital projects in the City’s capital improvement plan.
Table 8. Storm Water Utility Major Capital Improvements
Major Projects Year Amount
Street Improvement Program Annual Average $3,100,000
Flooding Mitigation To be determined $10,000,000
Flooding Protection Strategy ‐ Morningside 2022 $14,000,000
Capital and debt expenditures comprised 78% of the total cash expenditures in the Storm
Water Fund in 2021 as shown in Figure 5. These are fixed costs that do not fluctuate with
consumption; therefore, the revenue stream needs to be reliable from year to year.
Figure 5. 2021 Storm Water Expenditures (Excluding Depreciation)
Operating
22%
Debt
25%
Capital
53%
Storm Water Expenditures 2021
$7.35 Million
City of Edina, MN
Utility Rate Study Analysis 14
VII. CONNECTION FEES
The City of Edina currently charges water and sewer connection fees totaling $4,770 per sewer
availability charge unit for new development. The connection fees help pay for the capital
costs of serving new properties. Growth in the Southdale area and expansion projects in the
Cahill area are requiring an investment in an additional water treatment plant and other water
and sewer infrastructure. The estimated costs and sewer availability charge units are show in
Table 9.
Table 9. Project Areas and Estimated Utilities Expansion Cost and New SAC Units
Project Area Estimated Cost Estimated New SAC Units per Year
Southdale Area $11.4 Million 175
Cahill Area* $13.1 Million 119
*Cahill expansion projects will be constructed in 2023‐2024 with assumed growth in that area
to begin in 2027.
To pay for the improvements needed to accommodate the Cahill area growth from sewer
connection fees alone, the fees would need to increase 50% in 2023, 37% in 2024, and 27% in
2025. This level of fee increase may deter the development needed to pay for the
improvements. Instead, this study recommends increasing sewer usage fees half a percent
more annually than otherwise needed to pay for sewer costs and increasing the water
connections fees 3% annually and sewer connection fees 28% in 2023, 22% in 2024 and 5%
annually thereafter as shown in Table 10.
Table 10. Proposed Connection Fees
WATER SEWER TOTAL
2022 $ 2,960 $ 1,810 $ 4,770
2023 $ 3,049 $ 2,317 $ 5,366
2024 $ 3,140 $ 2,826 $ 5,967
2025 $ 3,234 $ 2,968 $ 6,202
2026 $ 3,332 $ 3,116 $ 6,448
2027 $ 3,431 $ 3,272 $ 6,703
2028 $ 3,534 $ 3,436 $ 6,970
2029 $ 3,640 $ 3,607 $ 7,248
2030 $ 3,750 $ 3,788 $ 7,537
2031 $ 3,862 $ 3,977 $ 7,839
City of Edina, MN
Utility Rate Study Analysis 15
Even with the proposed increases, the City of Edina’s connection fees remain competitive as
shown in Figure 6.
Figure 6. Connection Fees for a 150‐Unit Multifamily Project
City of Edina, MN
Utility Rate Study Analysis 16
VIII. CASH RESERVES
The proposed rate increases will maintain the financial health of the funds. Each graph
compares the projected cash balance in the fund (in orange) with the City’s target cash reserve
(in blue). The target cash reserve for each utility is set at an amount necessary to provide
adequate operating reserves plus fund next year’s debt service and a portion of capital
projects. Figures 7‐9 show the City’s projected ending cash compared to target cash reserves
for each utility. See Appendix B for the full 10‐year cash flow analyses for the City’s utility
funds.
Figure 7. Projected Water Fund Cash Balances
City of Edina, MN
Utility Rate Study Analysis 17
Figure 8. Projected Sewer Fund Cash Balances
Low ending cash in 2022 is the result of paying for lift stations with cash. Lower ending cash in
later years is the result of funding utilities expansion related to Cahill area growth.
Figure 9. Projected Storm Water Fund Cash Balances
City of Edina, MN
Utility Rate Study Analysis 18
IX. COMMUNITY COMPARISON
Each community has different demands on its utility systems that make it unique – different
growth patterns, groundwater sources, soil conditions, usage patterns and infrastructure.
Therefore, one should set rates based on documented need, as the City of Edina does through
its periodic rate studies. Nevertheless, it is helpful to know how the City compares to
surrounding communities because residents and businesses often expect to pay similar rates.
In Edina, water use varies significantly based on personal usage, lot size, irrigation, and
weather. The data used for this analysis shows an average usage range of 13,700 gallons in the
winter quarter to 27,500 gallons in the summer quarter, with the average quarterly usage
being 19,200 gallons. Figures 10‐11 compare utility bills for a low volume and medium volume
residential customer.
Figure 10. Quarterly Bill Comparison of Neighboring Communities – Low Volume Residential
City of Edina, MN
Utility Rate Study Analysis 19
Figure 11. Quarterly Bill Comparison of Neighboring Communities – Medium Volume Residential
Under the current and proposed tier structure the low volume user’s water usage is all being
charged at the tier 1 rate which results in a reduced bill in 2023 due to a reduced tier 1 rate.
Under the current tier structure, the medium volume user’s water usage is all being billed at the
tier 1 rate, and under the proposed 2023 tier structure 12,000 gallons will be billed at the tier 2
rate which results in a higher 2023 bill. The proposed tier structure provides more customers
with a price signal and promotes water conservation while maintaining affordability for essential
indoor water use.
City of Edina, MN
Utility Rate Study Analysis 20
X. PUTTING IT ALL TOGETHER: SAMPLE BILLS
Table 11 shows sample bills for residential and commercial customers with varying usage
throughout the period of the analysis.
Table 11. Sample Quarterly Utility Bills for Residential and Commercial Customers
Actual
2022 2023 2024 2025 2026
Quarterly Low Volume Residential Bill
10,000 gallons water and 8,000 gallons sewer and 3/4" meter
Water 51.82$ 50.16$ 52.66$ 55.30$ 58.06$
Sewer 75.60$ 54.88$ 58.17$ 61.66$ 65.36$
Storm 43.85$ 47.36$ 51.15$ 55.24$ 59.66$
Total 171.27$ 152.39$ 161.98$ 172.20$ 183.08$
Percent Increase 5.8% -11.0% 6.3% 6.3% 6.3%
Amount Increase- per quarter $9.33 ($18.88)$9.59 $10.22 $10.88
Actual
2022 2023 2024 2025 2026
Quarterly Medium Volume Residential Bill
24,000 gallons water and 12,000 gallons sewer and 3/4" meter
Water 89.76$ 99.16$ 104.11$ 109.32$ 114.79$
Sewer 75.60$ 82.32$ 87.26$ 92.49$ 98.04$
Storm 43.85$ 47.36$ 51.15$ 55.24$ 59.66$
Total 209.21$ 228.83$ 242.52$ 257.05$ 272.49$
Percent Increase 1.2% 9.4% 6.0% 6.0% 6.0%
Amount Increase- per quarter $2.58 $19.62 $13.69 $14.53 $15.43
Actual
2022 2023 2024 2025 2026
Quarterly High Volume Residential Bill
95,000 gallons water and 40,000 gallons sewer and 1" meter
Water 445.96$ 540.29$ 567.30$ 595.67$ 625.45$
Sewer 252.00$ 274.40$ 290.86$ 308.32$ 326.81$
Storm 43.85$ 47.36$ 51.15$ 55.24$ 59.66$
Total 741.81$ 862.04$ 909.31$ 959.22$ 1,011.92$
Percent Increase 20.3% 16.2% 5.5% 5.5% 5.5%
Amount Increase- per quarter $125.35 $120.23 $47.27 $49.91 $52.70
Actual
2022 2023 2024 2025 2026
Quarterly Small Commercial Bill
10,000 gallons water and sewer and 3/4" meter
Water 51.82$ 50.16$ 52.66$ 55.30$ 58.06$
Sewer 75.60$ 68.60$ 72.72$ 77.08$ 81.70$
Storm 76.95$ 83.11$ 89.75$ 96.93$ 104.69$
Total 204.37$ 201.86$ 215.13$ 229.31$ 244.46$
Percent Increase 6.1% -1.2% 6.6% 6.6% 6.6%
Amount Increase- per quarter $11.78 ($2.51)$13.27 $14.18 $15.14
Actual
2022 2023 2024 2025 2026
Quarterly Large Commercial Bill
502,000 gallons water and sewer and 1" meter
Water 1,817.78$ 1,747.95$ 1,835.34$ 1,927.11$ 2,023.47$
Sewer 3,162.60$ 3,443.72$ 3,650.34$ 3,869.36$ 4,101.53$
Storm 828.73$ 895.03$ 966.63$ 1,043.96$ 1,127.47$
Total 5,809.11$ 6,086.69$ 6,452.31$ 6,840.43$ 7,252.47$
Percent Increase 5.4% 4.8% 6.0% 6.0% 6.0%
Amount Increase- per quarter $297.90 $277.58 $365.62 $388.12 $412.03
Proposed
Proposed
Proposed
Proposed
Proposed
City of Edina, MN
Utility Rate Study Analysis 21
XI. SUMMARY
The utility funds have been well managed and have adequate cash reserves. However, each
utility is facing unique challenges putting upward pressure on rates, and our analysis indicates
opportunity to change the rate structure to promote water conservation, a key climate action
goal for the City.
To address these challenges, Ehlers proposes the following restructure of water and sewer
rates in 2023 with annual increases in 2024 and beyond.
Table 12. Proposed Utility Rates
Annual Increase
Beginning in 2024
Tier 1 Up to 26,000 gallons 2.71$ Up to 12,000 gallons 2.42$ 5.00%
Tier 2 26,001 to 49,000 gallons 3.60$ 12,001 to 24,000 gallons 3.68$ 5.00%
Tier 3 Over 49,000 gallons 5.63$ Over 24,000 gallons 6.08$ 5.00%
Morningside All Usage 4.40$ All Usage 4.62$ 5.00%
Tier 1 Up to 26,000 gallons 2.71$
Tier 2 26,001 to 49,000 gallons 3.60$ All Usage 3.62$ 5.0%
Tier 3 Over 49,000 gallons 5.63$
Tier 1 Up to 26,000 gallons 2.71$ Up to 50,000 gallons 2.42$ 5.0%
Tier 2 Over 26,000 gallons 3.60$ 50,001 to 200,000 gallons 3.02$ 5.0%
Tier 3 N/A Over 200,000 gallons 3.77$ 5.0%
Irrigation Tier 1 Up to 26,000 gallons 3.60$ Up to 12,000 gallons 3.68$ 5.0%
Tier 2 Over 26,000 gallons 5.63$ Over 12,000 gallons 6.08$ 5.0%
Annual Increase
Beginning in 2024
3/4" 24.72$ 3/4" 25.96$ 5.0%
1" 33.72$ 1" 35.41$ 5.0%
1 1/4" 38.44$ 1 1/4" 40.36$ 5.0%
1 1/2" 43.24$ 1 1/2" 45.40$ 5.0%
2" 69.64$ 2" 73.12$ 5.0%
3" 264.41$ 3" 277.63$ 5.0%
4" 336.56$ 4" 353.39$ 5.0%
6" 426.50$ 6" 447.83$ 5.0%
8" 541.66$ 8" 568.74$ 5.0%
Annual Increase
Beginning in 2024
All Usage 6.30$ All Usage 6.86$ 6.00%
Minimum of 12,000 gallons Minimum of 8,000 gallons
Winter Quarter Averaging Lesser of Winter Quarter or Actual,
but no less than 8,000 gallons
All Usage 6.30$ All Usage 6.86$ 6.00%
Minimum of $68.05 for each Minimum of 8,000 gallons
unit over 4 units
All Usage 6.30$ All Usage 6.86$ 6.00%
Minimum of 12,000 gallons Minimum of 8,000 gallons
Annual Increase
Beginning in 2024
Per Residential Lot $43.85 Per Residential Lot $47.36 8.0%
Proposed 20232022METER CHARGE
Residential (including
Morningside)
All Customers
Residential (including
Morningside)
Multifamily
Comm/Ind and Sewer Only
STORM WATER 2022 Proposed 2023
SEWER 2022 Proposed 2023
Comm/Ind
WATER 2022 Proposed 2023
Residential
Multifamily
City of Edina, MN
Utility Rate Study Analysis 22
Table 13. Proposed Connection Fees
WATER SEWER TOTAL
2022 $ 2,960 $ 1,810 $ 4,770
2023 $ 3,049 $ 2,317 $ 5,366
2024 $ 3,140 $ 2,826 $ 5,967
2025 $ 3,234 $ 2,968 $ 6,202
2026 $ 3,332 $ 3,116 $ 6,448
2027 $ 3,431 $ 3,272 $ 6,703
2028 $ 3,534 $ 3,436 $ 6,970
2029 $ 3,640 $ 3,607 $ 7,248
2030 $ 3,750 $ 3,788 $ 7,537
2031 $ 3,862 $ 3,977 $ 7,839
Water connections fees are proposed to increase 3% annually and sewer connection fees 28%
in 2023, 22% in 2024 and 5% annually thereafter.
The proposed utility rate and connection fee increases accommodate the City’s commitment
to funding street reconstruction projects, expanding and maintaining the systems, achieving
water conservation, and maintaining adequate cash reserves.
City of Edina, MN
Utility Rate Study Analysis 23
Appendix A – Capital Improvement Plans
Water Fund Capital Improvement Plan
Sewer Fund Capital Improvement Plan
Storm Water Fund Capital Improvement Plan
Appendix A ‐ City of Edina Water Capital ImprovementsCapital ProjectProject Number2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Utilities Equipment Replacement 15-108 - - - - - - - - - - New Water Treatment Plant 5 - Southdale 15-162 - - - - - - 9,000,000 - - - New Water Treatment Plant 5 - Southdale 15-162 - - - - - - - 9,000,000 - - Asset Management Software and Equipment 15-173 10,000 - - - - - - - - - Asset Management Software and Equipment 15-173 - 10,000 - - - - - - - - Asset Management Software and Equipment 15-173 - - 10,000 - - - - - - - Asset Management Software and Equipment 15-173 - - - 10,000 - - - - - - Asset Management Software and Equipment 15-173 - - - - 10,000 - - - - - Blake Road Reconstruction 17-020 528,216 - - - - - - - - - Morningside D Reconstruction 17-067 965,336 - - - - - - - - - Watermain Rehabilitation 17-080 - - - - 1,400,000 - - - - - Prospect Knolls A Reconstruction 17-107 - - - - 1,329,679 - - - - - Prospect Knolls C Reconstruction 19-308 - - - - - - 952,351 - - - Prospect Knolls D Reconstruction 19-309 - - - - - - 289,846 - - - Presidents B Reconstruction 19-310 - - - 1,488,943 - - - - - - Morningside C Reconstruction 19-311 - 1,836,618 - - - - - - - - Southdale B Reconstruction 19-312 - - 886,276 - - - - - - - Concord B Reconstruction 19-313 - - 2,055,132 - - - - - - - Indian Trails A Reconstruction 19-314 - - - - 587,533 - - - - - Benton Avenue A - - - - - - 369,875 - - - Todd Park B - - - - - - 463,753 - - - Lincoln Drive A - - - - - - 348,740 - - - W 7th Street - - - - - - 58,123 - - - Eden Avenue Improvements 19-331 - 200,000 - - - - - - - - Morningside E Reconstruction 19-318 437,344 - - - - - - - - - Water Main Condition Assessment 19-351 140,000 140,000 150,000 150,000 160,000 160,000 165,000 - - - Water Treatment Plant 3 Facility Improvements 19-900 231,800 - - - - - - - - - Water Treatment Plant 4 Facility Imp. 19-903 22,900 - - - - - - - - - Water Treatment Plant 2 Facility Imp. 19-904 63,400 - - - - - - - - - Well #2 Rehabilitation and Facility Improvement PW 23007 - - - - - - 170,000 - - - Well #4 Rehab 19-911 - - 130,000 - - - - - - - Well #6 Rehab 19-912 - 120,000 - - - - - - - - Well #6 Rehab 23008- - - - - - 120,000 - - - Well #5 Rehabilitation 19-913 - 120,000 - - - - - - - - Well #7 Rehabilitation 19-913 - - - - 120,000 - - - - - Well #10 Rehabilitation and Facility Improvement 19-914 420,000 - - - - - - - - - Well #10 Rehab PW 23004 - - - - - 120,000 - - - - Well #12 Rehabilitation and Facility Improvements PW 23005 - - - - - 120,000 - - - - Well #13 Rehabilitation and Facility Improvements PW 23006 - - - - - - 120,000 - - - Well #17 Rehabilitation and Facility Improvement 19-917 - 120,000 - - - - - - - - Well #20 Rehabilitation 19-918 - - - 120,000 - - - - - - Well #15 Rehabilitation 19-919 - - 140,000 - - - - - - - Concord C Reconstruction ENG21020 - - 757,830 - - - - - - - Presidents A Reconstruction ENG21021 - - - 2,565,768 - - - - - - Rolling Green Reconstrucion ENG21024 - - - - - 1,744,276 - - - - Countryside E - - - - - 584,092 - - - - Minnehaha Woods D Reconstruction ENG21025 - - - - 853,085 - - - - - Hilary Lane Reconstruction ENG21028 - - - - 700,430 - - - - - Well #5 69th Street Construct Underground Wellhead ENG21034 350,000 - - - - - - - - - Water Treatment Plant #2 Chemical Feed Equipment PWK21001 80,000 - - - - - - - - - Pneumatic Actuator Valve Replacement PW 23012 - 80,000 - - - - - - - - Pneumatic Actuator Valve Replacement PW 23013 - - 70,000 - - - - - - - Grandview Area Watermain Improvements - 110,000 - - - - - - - - Grandview Area Watermain Improvements PH 2 ENG 19‐349- - - - - - 240,000 - - - Water Supply Grandview Area PH 3 ENG20058 (ENG 21‐WM1)- - - - - - 2,500,000 - - - Water Supply 50th and France ENG20059 (ENG 21‐WM2)- - - - - - - 2,500,000 - - Water Supply Pentagon Park ENG20060 (ENG 21‐WM3)- - - - - - - 1,000,000 - - Future water improvements - - - - - - - 4,000,000 4,100,000 4,200,000 Total Capital Projects 3,248,996 2,736,618 4,199,238 4,334,711 5,160,727 2,728,368 14,797,688 16,500,000 4,100,000 4,200,000 Water
Appendix A ‐ City of Edina Sewer Capital ImprovementsSewerCapital ProjectProject Number2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Asset Management Software and Equipment 15-17310,000 10,000 10,000 10,000 10,000 - - - - - Blake Road Reconstruction 17-020352,354 - - - - - - - - - Morningside D Reconstruction 17-067506,897 - - - - - - - - - Prospect Knolls A Reconstruction 19-NX4- - - - 713,905 - - - - - Prospect Knolls C Reconstruction 19-308- - - - - - 639,146 - - - Prospect Knolls D Reconstruction 19-309- - - - - - 194,523 - - - Presidents B Reconstruction 19-310- - - 561,435 - - - - - - Morningside C Reconstruction 19-311- 692,533 - - - - - - - - Southdale B Reconstruction 19-312- - 367,606 - - - - - - - Concord B Reconstruction 19-313- - 774,927 - - - - - - - Indian Trails A Reconstruction 19-314- - - - 394,308 - - - - - Morningside E Reconstruction 19-318178,605 - - - - - - - - - Sanitary Trunk Capacity Expansion York Segs 2 19-335- - 1,700,000 - - - - - - - Sanitary Trunk Capacity Expansion York Segs3 19-335- - - 1,800,000 - - - - - - Sanitary Trunk Capacity Expansion York Segs 4 19-336- - - - - 3,000,000 - - - - Sanitary Trunk Capacity Expansion York Segs 5 19-336- - - - - - 1,100,000 - - - Sanitary Trunk Capacity Expansion Hazelton Seg 21-SS1- - - - - - 995,000 - - - Sanitary Trunk Capacity Expansion York 69th St W 21-SS2- - - - 1,200,000 - - - - - Sanitary Trunk Capacity Expansion LS6 to TH100- 1,100,000 12,000,000 - - - - - - - 72nd Street Sewer Line Upsize ENG2055- - - - - 1,600,000 - - - - Lift Station 6 Rehabilitation 19-3388,000,000 - - - - - - - - - Concord C Reconstruction ENG21020- - 285,754 - - - - - - - Presidents A Reconstruction ENG21021- - - 967,473 - - - - - - Rolling Green ReconstrucionENG20024- - - - - 585,314 - - - - Countryside E- - - - - 391,999 - - - - Todd Park B- - - - - - 311,236 - - - Benton Avenue A- - - - - - 186,198 - - - Lincoln Drive A- - - - - - 175,558 - - - W 7th Street- - - - - - 29,260 - - - Eden Avenue Improvements- 200,000 - - - - - - - - Minnehaha Woods D Reconstruction ENG21025- - - - 321,672 - - - - - Hilary Lane Reconstruction ENG21028- - - - 264,452 - - - - - Sanitary Targeted Inflow Reduction Project- - - - - - - - 130,000 - Lift Station Pump and VFD Renewal- 25,000 25,000 25,000 25,000 25,000 25,000 - - - 9 Mile Village Sewer Lining- - 175,000 - - - - - - Olinger Road Dip Replacement (130 LF + Road Repair)- - - 80,000 - - - - - Hilary Lane Sanitary Sewer Lining ENG21038- - - 450,000 - - - - - - Future Sanitary Sewer improvements- - - - - - - 1,875,000 1,975,000 2,075,000 Total Capital Projects 9,047,856 2,027,533 15,163,287 3,988,908 3,009,337 5,602,313 3,655,921 1,875,000 2,105,000 2,075,000
Appendix A ‐ City of Edina Storm Water Capital ImprovementsCapital ProjectProject Number2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Utilities Equipment Replacement 15-108322,000 - - - - - - - - - Street Sweeper PW 23014310,000 - - - - - - - - Asset Management Software and Equipment 15-17315,000 15,000 15,000 15,000 15,000 - - - - - W 69th Street Eastbound Roundabout 17-H04- - - - - - 50,000 - - - Blake Road Reconstruction 17-020821,366 - - - - - - - - - Morningside D Reconstruction 17-067862,201 - - - - - - - - - Arden Park Restoration Project & Shelter Building 17-08130,000 25,000 - - - - - - - - Prospect Knolls A Reconstruction19-NX4 - - - 968,476 - - - - - Prospect Knolls C Reconstruction19-308 - - - - - - 1,387,295 - - - Prospect Knolls D Reconstruction19-309 - - - - - - 422,220 - - - Presidents B Reconstruction19-310 - - - 1,218,619 - - - - - - Morningside C Reconstruction19-311 - 1,503,173 - - - - - - - - Southdale B Reconstruction19-312 - - 834,174 - - - - - - - Concord B Reconstruction19-313 - - 1,934,316 - - - - - - - Indian Trails A Reconstruction19-314 - - - - 950,007 - - - - - Morningside E Reconstruction19-318 307,403 - - - - - - - - - Clean Wtr Strat & Lake Cornelia Clean Water Proj19-342 250,000 - - - - - - - - - Clean Wtr Strat & Lake Cornelia Clean Water Proj19-342 - - 600,000 - - - - - - - Clean Wtr Strat & Lake Cornelia Clean Water Proj19-342 - - - 750,000 - - - - - - CWRMP Major Amendment and Model Update19-346- - 167,000 - - - - - - - Concord C ReconstructionENG21020- - 620,243 - - - - - - - Presidents A ReconstructionENG21021- - - 2,099,942 - - - - - - Parklawn (Parklawn Ct)ENG21023- - - - - - - - - - Rolling Green ReconstrucionENG21024- - - - - 3,811,347 - - - - Minnehaha Woods D ReconstructionENG21025- - - - 698,204 - - - - - Hilary Lane ReconstructionENG21028- - - - 934,618 - - - - - Countryside E- - - - - 850,851 - - - - Todd Park B- - - - - 776,885 - - - Benton Ave A- - - - - 434,318 - - - Lincoln Drive A- - - - - 372,272 - - - W 7th Street- - - - - 124,091 - - - Wooddale Bridge Rehab - HistoricENG 19-301200,000 - - - - - - - - Valley View Road Bridge over CP Rail RedeckENG 19-303100,000 - - - - - - - - Eden Avenue ImprovementsENG 19-331200,000 - - - - - - - - Brook Drive Structure Rehab & Stream Bank RestoreENG21032100,000 - - - - - - - - - Stormwater Infrastructure MaintenanceENG20056230,000 175,000 180,000 190,000 200,000 210,000 220,000 - - - Flood Protect Strat & Morningside Weber Flood Proj19-341 14,000,000 Lynmar Basin Construction128,500 - - - - - - - - Natural Areas ManagementENG20057180,000 150,000 150,000 170,000 175,000 180,000 185,000 - - - Flooding Mitigation- - - - 10,000,000 - - - - - Future storm improvements - - - - - - - 4,000,000 4,200,000 4,400,000 Total Capital Projects 17,117,970 2,806,673 4,500,733 4,443,561 13,941,305 5,052,198 3,972,081 4,000,000 4,200,000 4,400,000 Storm Water
City of Edina, MN
Utility Rate Study Analysis 27
Appendix B – Projections
Water Fund Projections
Sewer Fund Projections
Storm Water Fund Projections
Appendix B ‐ City of Edina Water ProjectionsActualRevised Budget20202021 2022 2023 2024 2025 2026 2027 2028 20292030 2031Rates Inflation 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%Investment earnings 1.00% 1.00% 1.00%1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%Expense growth - operating 3.00% 3.00%3.00% 3.00% 3.00% 3.00%3.00% 3.00% 3.00% 3.00%Expense growth - personnel 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%Operating Revenues Water revenues 7,968,600 9,611,957 9,231,345 9,581,987 10,061,087 10,564,141 11,092,348 11,646,966 12,229,314 12,840,780 13,482,819 14,156,960 Total Operating Revenues 7,968,600 9,611,957 9,231,345 9,581,987 10,061,087 10,564,141 11,092,34811,646,966 12,229,314 12,840,780 13,482,819 14,156,960Operating ExpensesPersonal services 1,184,350 1,984,738 1,689,426 1,773,897 1,862,592 1,955,722 2,053,508 2,156,183 2,263,9922,377,192 2,496,052 2,620,854Contractual services 2,552,308 2,203,938 1,613,628 1,662,037 1,711,898 1,763,255 1,816,153 1,870,637 1,926,756 1,984,559 2,044,096 2,105,419Commodities 700,754 867,545 904,500 931,635 959,584 988,372 1,018,023 1,048,563 1,080,020 1,112,421 1,145,794 1,180,167Internal services 738,407 617,827 599,580 617,567636,094 655,177 674,833 695,078715,930 737,408 759,530 782,316 Depreciation 2,703,756 2,760,192 2,798,000 2,881,940 2,968,398 3,057,450 3,149,174 3,243,649 3,340,9583,441,187 3,544,423 3,650,755 Total Operating Expenses 7,879,575 8,434,240 7,605,1347,867,077 8,138,567 8,419,976 8,711,689 9,014,110 9,327,657 9,652,767 9,989,89410,339,511Net Operations 89,025 1,177,717 1,626,211 1,714,911 1,922,520 2,144,1662,380,659 2,632,855 2,901,6573,188,013 3,492,925 3,817,448Non operating revenues (expenses) Investment Income (Loss) 316,290(31,902)140,000 81,059 80,647 70,062 65,11857,660 78,116 88,201 64,517 73,043 Intergovemental revenue 3,077 0 0 0 0 0 0 0 0 0 Interest on existing debt(531,306) (474,238) (379,177) (383,623)(313,950) (251,025) (196,675) (144,263)(96,675) (60,475) (33,600) (16,050) Hookups and Miscellaneous Income 1,233,697 665,2371,600,000 533,540 549,546 566,033 583,014600,504 618,519 637,075 656,187 675,873 Other income (expense) 38,511 28,054 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 Transfers out-(232,024) (469,639) (186,400) (186,400)(186,400) (186,400) (186,400) (186,400)(186,400) (186,400) (186,400) (186,400) Bond discount 402,517 429,146 209,369 Total non operating revenue (expenses) 1,230,762146,658 1,403,792 64,576 149,843 218,670 285,057 347,502 433,560 498,401 520,704 566,466Net increase (decrease) in resources 1,319,787 1,324,3753,030,003 1,779,487 2,072,3632,362,836 2,665,716 2,980,357 3,335,217 3,686,414 4,013,629 4,383,914Change in accounting principleEnding net assets 38,910,229 40,234,604 43,264,607 45,044,094 47,116,457 49,479,293 52,145,008 55,125,365 58,460,582 62,146,996 66,160,62570,544,539ActualProjectedWater
Appendix B ‐ City of Edina Water ProjectionsActualRevised Budget20202021 2022 2023 2024 2025 2026 2027 2028 20292030 2031Rates Inflation 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%Investment earnings 1.00% 1.00% 1.00%1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%Expense growth - operating 3.00% 3.00%3.00% 3.00% 3.00% 3.00%3.00% 3.00% 3.00% 3.00%Expense growth - personnel 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%ActualProjectedWaterCIP Funding Purchase of Capital Assets(4,047,271) (3,248,996) (2,736,618) (4,199,238) (4,334,711) (5,160,727) (2,728,368) (14,797,688) (16,500,000) (4,100,000) (4,200,000) Bond Proceeds 876,1863,000,000 9,000,000 0 Bond Proceeds - Expansion Projects 0 0 0 0 0 7,240,000 0 0 0 Unspent bond proceeds(1,600,000) Bond P&I - Future(1,135,989) (1,135,989) (1,135,989) Bond P&I - Future(809,470) (809,470) Bond Prin - Existing(2,540,000) (3,673,000) (3,104,000)(1,966,000) (1,900,000) (1,580,000) (1,400,000) (1,450,000) (1,110,000) (860,000) (660,000) (405,000)Beginning Cash 9,875,353 11,093,424 7,754,702 8,105,895 8,064,704 7,006,227 6,511,802 5,765,964 7,811,602 8,820,089 6,451,702 7,304,295 Add net operations 89,025 1,177,7171,626,211 1,714,911 1,922,520 2,144,166 2,380,659 2,632,855 2,901,657 3,188,013 3,492,925 3,817,448 Add back depreciation 2,703,756 2,760,192 2,798,000 2,881,940 2,968,3983,057,450 3,149,174 3,243,649 3,340,958 3,441,187 3,544,423 3,650,755 Add net non operating 1,230,762(282,488)1,403,792 64,576 149,843 218,670 285,057347,502 433,560 498,401 520,704 566,466 Add capital and bond (2,540,000) (7,828,549) (5,476,810)(4,702,618) (6,099,238) (5,914,711)(6,560,727) (4,178,368) (5,667,688)(9,495,989) (6,705,458) (6,550,458) Net change in balance sheet items 136,076 0 0 0 0 0 0 0 0 Net change in investments 698,330Ending Cash 11,093,424 7,754,7028,105,895 8,064,704 7,006,227 6,511,802 5,765,964 7,811,602 8,820,089 6,451,702 7,304,295 8,788,506 Other investments 3,053,498 2,409,485 809,485 809,485 809,485 809,485809,485 809,485 809,485 809,485 809,485 809,485Ending net assets 38,910,229 40,234,604 43,264,607 45,044,094 47,116,457 49,479,293 52,145,008 55,125,365 58,460,582 62,146,996 66,160,62570,544,539Target minimum working capital 8,662,531 8,512,988 7,070,477 7,089,945 6,867,491 6,799,135 6,968,442 6,758,5087,792,101 8,564,877 8,489,119 8,379,716Actual working capital-cash balance 11,093,424 10,164,187 8,915,3808,874,189 7,815,712 7,321,287 6,575,449 8,621,087 9,629,574 7,261,1878,113,780 9,597,991Over (Under) target working capital 2,430,893 1,651,199 1,844,903 1,784,244 948,222 522,152(392,993)1,862,579 1,837,473(1,303,690) (375,339)1,218,275
Appendix B ‐ City of Edina Sewer ProjectionsRates Inflation Investment earningsExpense growth - operatingExpense growth - personnelOperating Revenues Sanitary sewer revenues Total Operating RevenuesOperating ExpensesPersonal servicesContractual servicesCommoditiesInternal services MCES Depreciation Total Operating ExpensesNet OperationsNon operating revenues (expenses) Investment Income (Loss) Interest on existing debt Hookups and Miscellaneous Income Transfers out- Bond discount Total non operating revenue (expenses)Net increase (decrease) in resourcesChange in accounting principleEnding net assetsAcutalRevised Budget2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 20316.00% 6.00% 6.00% 6.00%6.00% 6.00% 6.00% 6.00%1.00%1.00% 1.00% 1.00% 1.00% 1.00%1.00% 1.00% 1.00% 1.00% 1.00%3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00%` 5.00% 5.00% 5.00% 5.00% 5.00%5.00% 5.00% 5.00% 5.00% 5.00%9,870,280 10,325,315 10,310,67610,090,607 10,696,044 11,337,80612,018,075 12,739,159 13,503,50914,313,719 15,172,542 16,082,8959,870,280 10,325,315 10,310,67610,090,607 10,696,044 11,337,80612,018,075 12,739,159 13,503,50914,313,719 15,172,542 16,082,895614,418 42,000 513,969 539,667 566,651 594,983624,733 655,969 688,768 723,206 759,366 797,335484,762 215,944 666,090 686,073 706,655 727,855749,690 772,181 795,346 819,207 843,783 869,09669,196 62,651 101,500 104,545 107,681 110,912114,239 117,666 121,196 124,832 128,577 132,434587,831 460,129 575,555 592,822 610,606 628,924647,792 667,226 687,243 707,860 729,096 750,9695,696,164 5,925,378 5,906,1996,142,447 6,388,145 6,643,6716,909,417 7,185,794 7,473,2267,772,155 8,083,041 8,406,3631,372,812 1,439,388 1,535,0001,581,050 1,628,482 1,677,3361,727,656 1,779,486 1,832,8701,887,856 1,944,492 2,002,8278,825,183 8,145,490 9,298,3139,646,604 10,008,220 10,383,68110,773,528 11,178,322 11,598,64912,035,116 12,488,355 12,959,0241,045,097 2,179,825 1,012,363444,003 687,824 954,126 1,244,547 1,560,837 1,904,860 2,278,603 2,684,187 3,123,871145,464(32,718)72,000 15,023 77,680 85,742 81,73277,469 77,491 96,149 97,465 100,600(246,175) (236,864) (205,132) (187,816)(158,725) (129,975) (100,875) (71,213)(44,450) (25,200) (10,475) (1,450)752,130 406,878 1,000,000 405,440 494,637 519,369 545,337 962,109 1,010,2141,060,725 1,113,761 1,169,449(132,024) (119,443) (186,400) (186,400)(186,400) (186,400) (186,400) (186,400)(186,400) (186,400) (186,400) (186,400)(96,846)231,516 107,600422,549 249,369 788,068 46,247 227,192 288,736 339,794 781,966 856,855 945,2741,014,351 1,082,1991,467,646 2,429,194 1,800,431490,250 915,016 1,242,862 1,584,341 2,342,802 2,761,715 3,223,877 3,698,538 4,206,07028,001,863 30,431,057 32,231,48832,721,738 33,636,754 34,879,61636,463,957 38,806,760 41,568,47444,792,351 48,490,889 52,696,959ActualProjectedSewer
Appendix B ‐ City of Edina Sewer ProjectionsRates Inflation Investment earningsExpense growth - operatingExpense growth - personnelCIP Funding Purchase of Capital Assets Bond Proceeds Bond Proceeds - Expansion Projects Unspent bond proceeds Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond Prin - ExistingBeginning Cash Add net operations Add back depreciation Add net non operating Add capital and bond Net change in balance sheet items Net change in investmentsEnding Cash Other investmentsEnding net assetsTarget minimum working capital Actual working capital-cash balanceOver (Under) target working capitalAcutalRevised Budget2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 20316.00% 6.00% 6.00% 6.00%6.00% 6.00% 6.00% 6.00%1.00%1.00% 1.00% 1.00% 1.00% 1.00%1.00% 1.00% 1.00% 1.00% 1.00%3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00%` 5.00% 5.00% 5.00% 5.00% 5.00%5.00% 5.00% 5.00% 5.00% 5.00%ActualProjectedSewer(2,108,551) (9,047,856) (2,027,533) (15,163,287) (3,988,908) (3,009,337) (5,602,313) (3,655,921) (1,875,000) (2,105,000) (2,075,000)7,000,000 10,300,000 2,100,0003,000,000 1,000,000 3,400,0001,875,000 2,000,000 2,000,0000 4,700,000 1,800,0000 4,600,000 2,095,000(900,000)(829,011) (829,011) (829,011) (829,011)(829,011) (829,011) (829,011) (829,011)(1,628,328) (1,628,328) (1,628,328) (1,628,328) (1,628,328) (1,628,328) (1,628,328)(466,581) (466,581) (466,581)(466,581) (466,581) (466,581)(358,908) (358,908) (358,908) (358,908) (358,908)(669,962) (669,962) (669,962) (669,962)(657,400) (657,400) (657,400)(224,318) (224,318)(239,272)(580,000) (1,138,000) (886,000) (778,000)(745,000) (775,000) (805,000) (835,000)(615,000) (370,000) (390,000) (145,000)(13,313,594)5,865,969 8,181,860 1,502,2717,768,038 8,574,238 8,173,188 7,746,927 7,749,074 9,614,947 9,746,489 10,060,0101,045,097 2,179,825 1,012,363444,003 687,824 954,126 1,244,547 1,560,837 1,904,860 2,278,603 2,684,187 3,123,8711,372,812 1,439,388 1,535,0001,581,050 1,628,482 1,677,3361,727,656 1,779,486 1,832,8701,887,856 1,944,492 2,002,827422,549 17,853 788,068 46,247 227,192 288,736 339,794 781,966 856,855 945,2741,014,351 1,082,199(580,000) (2,818,195) (10,015,020)4,194,467(1,737,298) (3,321,248) (3,738,257) (4,120,142) (2,728,712) (4,980,191) (5,329,509) (5,293,781)902,355 0 0 0 0 0 0 0 0594,6655,865,969 8,181,860 1,502,2717,768,038 8,574,238 8,173,1887,746,927 7,749,074 9,614,9479,746,489 10,060,010 10,975,1261,404,334 818,836 0 0 0 0 0 0 0 0 0 028,001,863 30,431,057 32,231,48832,721,738 33,636,754 34,879,61636,463,957 38,806,760 41,568,47444,792,351 48,490,889 52,696,9595,728,624 5,212,961 5,606,1416,540,008 8,342,691 8,989,6699,535,046 10,151,261 10,744,57311,181,744 11,382,268 11,698,3597,270,303 9,000,696 1,502,2717,768,038 8,574,238 8,173,1887,746,927 7,749,074 9,614,9479,746,489 10,060,010 10,975,1261,541,679 3,787,735(4,103,870)1,228,031 231,546(816,482) (1,788,119) (2,402,187) (1,129,626) (1,435,255) (1,322,258) (723,232)
Appendix B ‐ City of Edina Storm Water ProjectionsRates Inflation Investment earningsExpense growth - operatingExpense growth - personnelOperating Revenues Storm sewer revenues Total Operating RevenuesOperating ExpensesPersonal servicesContractual servicesCommoditiesInternal services Depreciation Total Operating ExpensesNet OperationsNon operating revenues (expenses) Investment Income (Loss) Intergovemental revenue Interest on existing debt Other income (expense) Transfers out- Bond discount Total non operating revenue (expenses)Net increase (decrease) in resourcesChange in accounting principleEnding net assetsActualRevised Budget20202021 2022 2023 2024 2025 2026 2027 2028 20292030 20318.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00%1.00%1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00%5.00% 5.00% 5.00% 5.00% 5.00%5.00% 5.00% 5.00% 5.00% 5.00%4,747,668 5,203,845 5,420,0705,853,676 6,321,970 6,827,7277,373,945 7,963,861 8,600,9709,289,048 10,032,171 10,834,7454,747,668 5,203,845 5,420,0705,853,676 6,321,970 6,827,7277,373,945 7,963,861 8,600,9709,289,048 10,032,171 10,834,745544,755 503,608 612,169 642,777 674,916 708,662744,095 781,300 820,365 861,383 904,452 949,675947,822 753,315 1,113,642 1,147,051 1,181,463 1,216,907 1,253,414 1,291,016 1,329,747 1,369,639 1,410,728 1,453,050129,168 124,231 165,800 170,774 175,897 181,174186,609 192,208 197,974 203,913 210,030 216,3310 258,622 336,459 346,553 356,949 367,658 378,688 390,048 401,750 413,802 426,216 439,0031,649,279 1,731,602 1,794,0001,847,820 1,903,255 1,960,3522,019,163 2,079,738 2,142,1302,206,394 2,272,586 2,340,7633,271,024 3,371,378 4,022,0704,154,975 4,292,480 4,434,7534,581,969 4,734,310 4,891,9655,055,131 5,224,013 5,398,8221,476,644 1,832,467 1,398,0001,698,700 2,029,489 2,392,9742,791,977 3,229,551 3,709,0054,233,916 4,808,158 5,435,923211,088(32,836)84,000 38,766 49,190 55,895 63,57875,333 74,409 77,261 83,249 92,70021,009(379,094) (337,594) (280,952) (920,004)(820,988) (741,838) (671,056) (603,125)(538,300) (480,325) (426,850) (378,925)4,755 3,450 0 0 0 0 0 0 0 0 0(59,954) (163,169) (68,200) (68,200)(68,200) (68,200) (68,200) (68,200)(68,200) (68,200) (68,200) (68,200)137,906 303,874 148,944(64,290) (226,275) (116,208) (949,438)(839,998) (754,143) (675,678) (595,992)(532,091) (471,264) (411,801) (354,425)1,412,354 1,606,192 1,281,792749,263 1,189,492 1,638,832 2,116,298 2,633,559 3,176,914 3,762,652 4,396,357 5,081,49826,728,488 28,334,680 29,616,47230,365,735 31,555,226 33,194,05835,310,356 37,943,916 41,120,82944,883,482 49,279,839 54,361,336ActualStorm WaterProjected
Appendix B ‐ City of Edina Storm Water ProjectionsRates Inflation Investment earningsExpense growth - operatingExpense growth - personnelCIP Funding Purchase of Capital Assets Bond Proceeds Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond P&I - Future Bond Prin - ExistingBeginning Cash Add net operations Add back depreciation Add net non operating Add capital and bond Net change in balance sheet items Net change in investmentsEnding Cash Other investmentsEnding net assetsTarget minimum working capital Actual working capital-cash balanceOver (Under) target working capitalActualRevised Budget20202021 2022 2023 2024 2025 2026 2027 2028 20292030 20318.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00%1.00%1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00% 3.00% 3.00% 3.00% 3.00%3.00%5.00% 5.00% 5.00% 5.00% 5.00%5.00% 5.00% 5.00% 5.00% 5.00%ActualStorm WaterProjected(3,911,519) (17,117,970) (2,806,673) (4,500,733) (4,443,561) (13,941,305) (5,052,198) (3,972,081) (4,000,000) (4,200,000) (4,400,000)14,418,600 2,800,000 4,500,000 4,400,000 14,000,000 5,000,000 4,000,000 4,000,000 4,200,000 4,400,000(331,605) (331,605) (331,605) (331,605)(331,605) (331,605) (331,605) (331,605)(535,646) (535,646) (535,646) (535,646) (535,646) (535,646) (535,646)(526,399) (526,399) (526,399)(526,399) (526,399) (526,399)(1,674,905) (1,674,905) (1,674,905) (1,674,905) (1,674,905)(598,180) (598,180) (598,180) (598,180)(478,544) (478,544) (478,544)(478,544) (478,544)(502,472)(1,460,000) (2,109,000) (1,767,000)(1,548,000) (2,090,000) (1,920,000)(1,625,000) (1,685,000) (1,395,000)(1,225,000) (1,100,000) (940,000)7,556,960 7,910,998 5,267,2133,876,635 4,919,045 5,589,4546,357,826 7,533,334 7,440,8787,726,107 8,324,874 9,269,9931,476,644 1,832,467 1,398,0001,698,700 2,029,489 2,392,9742,791,977 3,229,551 3,709,0054,233,916 4,808,158 5,435,9231,649,279 1,731,602 1,794,0001,847,820 1,903,255 1,960,3522,019,163 2,079,738 2,142,1302,206,394 2,272,586 2,340,763(64,290) (530,149) (116,208) (949,438)(839,998) (754,143) (675,678) (595,992)(532,091) (471,264) (411,801) (354,425)(1,460,000) (6,136,296) (4,466,370)(1,554,673) (2,422,338) (2,830,811)(2,959,954) (4,805,752) (5,033,815)(5,370,279) (5,723,823) (6,066,295)(292,990)00 00 0 0 00751,5817,910,998 5,267,213 3,876,6354,919,045 5,589,454 6,357,8267,533,334 7,440,878 7,726,1078,324,874 9,269,993 10,625,959587,661(76,973)26,728,488 28,334,680 29,616,47230,365,735 31,555,226 33,194,05835,310,356 37,943,916 41,120,82944,883,482 49,279,839 54,361,3364,744,571 4,435,464 5,153,2326,013,274 6,388,032 6,639,8188,400,964 8,741,601 9,092,6689,496,562 9,898,376 10,437,6797,910,998 5,267,213 3,876,6354,919,045 5,589,454 6,357,8267,533,334 7,440,878 7,726,1078,324,874 9,269,993 10,625,9593,166,427 831,749(1,276,597) (1,094,230) (798,579) (281,991) (867,631) (1,300,723) (1,366,561) (1,171,688) (628,383)188,280
The CITY of
EDINA
2022 Utility Rate Study Update
September 20, 2022
The CITY of
EDINA2022 Utility Rate Study Update
•Study had goals to recover operational and capital costs, incentivize
conservation, support system capacity expansion, and provide
adequate cash reserves.
www.EdinaMN.gov 2
The CITY of
EDINAOther Utility Billing Changes
•Policy changes for billing adjustments for water leak
Onetime
Consumption is 100% more than historical quarterly average
Max adjustment of $500
•New utility billing system, bills will look different
•Action required by those who pay by ACH to update account
information
•Next steps:
•Communicate to residents and rates submitted to Council for formal
approval in December
www.EdinaMN.gov 3