Loading...
HomeMy WebLinkAbout2024 50th Street and Grange Road ReconstructionContact: Brittany Bader, Digital Communications Coordinator Phone 952-826-0396 • BBader@EdinaMN.gov • EdinaMN.gov  Summer Street Reconstruction Near Edina City Hall Begins June 10  Project area includes Grange Road and Part of West 50th Street Edina, Minn., June 5, 2024 – Street reconstruction of Grange Road and West 50th Street around Edina City Hall is scheduled to begin Monday, June 10, and continue until the third week of August. The project includes two work zones: Grange Road from the Minnesota Highway 100 northbound (Hwy 100 N) on- and off-ramps to West 50th Street and West 50th from Grange to just east of Dale Drive. Improvements being made include: New traffic signal system and two additional crosswalks at the intersection of Grange and West 50th New accessible pedestrian signals that provide audible crossing information Medians on West 50th to narrow lanes and slow traffic Protected left-turn lane from West 50th onto Grange Designated left-turn lane from West 50th onto Dale Addition of wide sidewalks (ranging from 8 to 10 feet wide) along both sides of West 50th in the project area Completing the first section of a new wide 10-foot-wide sidewalk on Grange from West 50th that will eventually connect to Eden Avenue after a subsequent project in 2025 The reconstruction project is part of the larger plan to improve safety for all modes of transportation in the Grandview District area, as outlined in the Grandview East Area Transportation Study. It builds on the work the City did last year when two roundabouts were added along Eden Avenue.   “The goal of this project is to improve safety for both vehicles and pedestrians within the district. We want to provide safe and comfortable sidewalks for people walking and biking in the area, in addition to slowing traffic and protecting left turns on West 50th Street,” said Engineering Director Chad Millner. Traffic Impacts and Detours Hwy100 N On- and Off-Ramps at Grange: Access to and from the Hwy 100 N on- and off-ramps at Grange will be limited during the project. Drivers should plan for the ramps to be closed, although depending on the phase of work, the contractor may have them open at certain times. When the ramps are closed, designated signage will be posted to inform drivers of detours. Detour for Accessing Hwy 100 N: If the on-ramp at Grange is closed, drivers can instead access Hwy 100 N from the on-ramp from West 50th, located after the Vernon Avenue bridge when traveling eastbound. Detour for Exiting Hwy 100 N: If the off-ramp at Grange is closed (Vernon and West 50th Exit), drivers will need to continue northbound to the next exit at Excelsior Boulevard. From there, the official detour is France Avenue southbound to West 50th or Hwy 100 S to the West 50th and Vernon exit. West 50th Street: A portion of West 50th Street will be closed spanning from Grange to just east of Dale. The local detour will be Eden. Traffic heading westbound in this area on West 50th will be diverted at City Hall onto Eden Avenue. Traffic heading eastbound in this area on West 50th will be diverted onto Hwy 100 N just before Grange. Visiting Edina City Hall: Visitors to City Hall will need to use the Eden entrance and exit until the project is complete. Dale Drive: To access residential areas off Dale, drivers will need to use East Sunnyslope Road. Detour maps and ongoing information about the project can be found on BetterTogetherEdina.org. For more information, contact Millner, 952-826-0318 or cmillner@EdinaMN.gov. -30-   Project area includes Grange Road and Part of West 50th Street Edina, Minn., June 5, 2024 – Street reconstruction of Grange Road and West 50th Street around Edina City Hall is scheduled to begin Monday, June 10, and continue until the third week of August. The project includes two work zones: Grange Road from the Minnesota Highway 100 northbound (Hwy 100 N) on- and off-ramps to West 50th Street and West 50th from Grange to just east of Dale Drive. Improvements being made include: New traffic signal system and two additional crosswalks at the intersection of Grange and West 50th New accessible pedestrian signals that provide audible crossing information Medians on West 50th to narrow lanes and slow traffic Protected left-turn lane from West 50th onto Grange Designated left-turn lane from West 50th onto Dale Addition of wide sidewalks (ranging from 8 to 10 feet wide) along both sides of West 50th in the project area Completing the first section of a new wide 10-foot-wide sidewalk on Grange from West 50th that will eventually connect to Eden Avenue after a subsequent project in 2025 The reconstruction project is part of the larger plan to improve safety for all modes of transportation in the Grandview District area, as outlined in the Grandview East Area Transportation Study. It builds on the work the City did last year when two roundabouts were added along Eden Avenue.   “The goal of this project is to improve safety for both vehicles and pedestrians within the district. We want to provide safe and comfortable sidewalks for people walking and biking in the area, in addition to slowing traffic and protecting left turns on West 50th Street,” said Engineering Director Chad Millner. Traffic Impacts and Detours Hwy100 N On- and Off-Ramps at Grange: Access to and from the Hwy 100 N on- and off-ramps at Grange will be limited during the project. Drivers should plan for the ramps to be closed, although depending on the phase of work, the contractor may have them open at certain times. When the ramps are closed, designated signage will be posted to inform drivers of detours. Detour for Accessing Hwy 100 N: If the on-ramp at Grange is closed, drivers can instead access Hwy 100 N from the on-ramp from West 50th, located after the Vernon Avenue bridge when traveling eastbound. Detour for Exiting Hwy 100 N: If the off-ramp at Grange is closed (Vernon and West 50th Exit), drivers will need to continue northbound to the next exit at Excelsior Boulevard. From there, the official detour is France Avenue southbound to West 50th or Hwy 100 S to the West 50th and Vernon exit. West 50th Street: A portion of West 50th Street will be closed spanning from Grange to just east of Dale. The local detour will be Eden. Traffic heading westbound in this area on West 50th will be diverted at City Hall onto Eden Avenue. Traffic heading eastbound in this area on West 50th will be diverted onto Hwy 100 N just before Grange. Visiting Edina City Hall: Visitors to City Hall will need to use the Eden entrance and exit until the project is complete. Dale Drive: To access residential areas off Dale, drivers will need to use East Sunnyslope Road. Detour maps and ongoing information about the project can be found on BetterTogetherEdina.org. For more information, contact Millner, 952-826-0318 or cmillner@EdinaMN.gov. -30-