HomeMy WebLinkAbout2009-2013 Capital Improvement PlanCITY OF EDINA, MINNESOTA
2009-2013 Capital Improvement Program
CITY OF EDINA, MINNESOTA
CAPITAL IMPROVEMENT PROGRAM
2009-2013
EDINA CITY COUNCIL
Mayor James Hovland
Councilmember Joni Bennett
Councilmember Scot Housh
Councilmember Linda Masica
Councilmember Ann Swenson
Councilmember-elect Mary Brindle
CITY OF EDINA, MINNESOTA
TABLE OF CONTENTS
CAPITAL IMPROVEMENT PROGRAM
DESCRIPTION PAGE
POLICY 1
FINANCING 2
FINANCIAL TABLES 7
z Construction Fund Balance 9
z Enterprise Fund Cash Balances 10
z Capital Improvement Program
• Projects by Department 13
• Projects by Funding Source 17
DETAIL PROJECT DESCRIPTIONS 23
z Aquatic Center 25
z Arena 27
z Art Center 37
z Building Inspections 41
z Citywide 42
z Edinborough/Centennial Lakes 43
z Golf Course 91
z Liquor Stores 97
z Municipal Buildings 102
z Park & Recreation 104
z Public Safety 122
z Public Works 123
z Utilities 144
This page left blank intentionally.
CITY OF EDINA, MINNESOTA
FINANCIAL MANAGEMENT POLICY
CAPITAL IMPROVEMENT PROGRAM
Page 1
Capital Improvement Plan (CIP). The goal of the City’s CIP is to develop a
comprehensive program for use by decision makers to guide capital investments
based on an assessment of the community’s needs, taking into account the best use
of limited resources while providing efficient and effective municipal services.
The City will develop a five-year plan for capital improvements and update it
annually. The CIP process includes analyzing projects contributing to the public
health and welfare, projects helping to maintain and improve the efficiency of the
existing systems, and projects that define a future need within the community.
The City will identify the estimated cost and potential funding sources for each
capital project proposal in the CIP. Purchase contracts for equipment and projects
included in the CIP must still be properly authorized according to the City’s
Purchasing Policy.
The CIP will include equipment and projects from any City fund, other than the
equipment that falls under the Equipment Replacement Program.
Adopted by City Council February 20, 2007
Revisions: March 20, 2007
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 2
INTRODUCTION
Planning for capital improvements requires sound and economical financing. The
City of Edina is able to utilize several financing mechanisms ranging from cash
reserves to special-purpose funds as well as borrowing through bond sales. The
exact financing method for each improvement is based on the general policies,
jurisdictions and legal requirements. The final selection and scheduling of proposed
capital improvements is then based on the ability of the City to draw upon various
funds. The total cost for each project includes construction costs, administration
costs and interest.
In analyzing the financial viability of the capital improvements in the current program,
the following methods of financing were examined:
INTERNAL METHODS: Special Assessments – Special assessments are based
on the concept that when land is benefited from a
particular improvement, all or part of the costs of the
improvement should be levied against those properties to
finance such improvements.
Since it often takes several years for the City to collect
special assessments, the City may decide to issue bonds
for cash flow purposes. See Public Improvement
Revolving Bonds for further description of this financing
tool.
Enterprise Funds – The City’s enterprise funds include
the Aquatic Center, Arena, Art Center, Edinborough &
Centennial Lakes Parks, Golf Course, Liquor Stores, and
Utilities.
Capital Improvements and equipment purchased in the
enterprise funds may be financed through enterprise fund
revenues derived from user charges for the respective
services, when available. Enterprise funds are designed
for self-sustaining operations.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 3
When an enterprise fund does not have enough cash to
pay for a specific project, the City may decide to use
money from another City source (usually the
Construction Fund) or the City may decide to issue
Enterprise Revenue Bonds. See below for further
description of these financing methods.
Tax Increment (TIF) Funds – These funds are derived
from tax increment districts including 50th and France,
Southeast Edina, Grandview, and 70th Street and Cahill
Road. In tax increment districts, property owners pay ad
valorem taxes at the full rate levied by the units of local
government within the taxing jurisdiction.
At the time the tax increment district is created, property
values are “frozen”. The units of local government
receive taxes based on the frozen property values. Any
additional taxes paid by property owners based on the
increase in property values since the district was created
is known as the “increment”. The increment revenue is
then used to finance physical improvements within the
district.
The City may decide to issue Tax Increment Bonds for
cash flow purposes, see below for further description of
these bonds.
Construction Fund – This fund is designed to provide
financing for capital improvements. Revenues for this
fund may be derived from such sources as investment
income, rental income and transfers from other funds.
Other – Other internal funding options available include
tax levies, income on City investments, and reserves.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 4
EXTERNAL METHODS: Municipal State Aid (MSA) – The Minnesota
Department of Transportation (MnDOT) provides funding
assistance for improvements to those municipal streets
which are designated as part of its MSA system. Money
for this fund is supplied with a dedicated portion of
revenues collected from road use and gasoline taxes.
Funds are released for improvements on those streets on
the system whose design and construction meet MSA
standards. Funds may be expended for any street on the
MSA system at any time, and MSA funds may be
accumulated over several years.
Minnesota Department of Transportation - MnDOT
provides financing assistance for maintenance and
improvements on those highways included in the MnDOT
trunk highway system and federal interstate system.
These improvements could include intersecting local or
county streets.
In the City of Edina, these highways are Nos. 62, 100,
169 and 494. Improvements on these highways must
meet State trunk highway standards before MnDOT
releases funds.
Other - Other external sources of financing include
grants, donations, and other local governments.
DEBT: Public Improvement Revolving (PIR) Bonds – PIR
bonds are issued to provide immediate liquidity to
complete public improvement projects and are repaid
with special assessment receipts over a ten-year period.
These bonds are supported through special
assessments, therefore no levy is required.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 5
Enterprise Revenue Bonds – Most of the Enterprise
Revenue Bonds that the City issues pay for Utility Fund
project costs, but the City may issue Enterprise Revenue
Bonds for any of our enterprises. These bonds are repaid
with revenues from the enterprise facilities that benefit
from the projects financed, therefore no levy is required.
Tax Increment Bonds – The City may issue Tax
Increment Bonds to pay project costs when the district
does not have sufficient cash. These bonds are repaid
with the Tax Increment revenue that is generated by the
district; therefore no additional levy is required.
Public Project Lease Revenue Bonds – This debt is
issued through the Housing and Redevelopment
Authority to procure capital equipment or facilities
supported with a lease purchase relationship agreement
with the City. These bonds are backed by the full faith
and credit of the City and supported through an ad
valorem special levy by an annual appropriation.
Capital Improvement Bonds - Capital Improvement
bonds may be issued only for certain projects, including
city halls, public safety buildings, public works facilities
and libraries. These bonds are backed by the full faith
and credit of the City and supported through the property
tax levy.
Other General Obligation (GO) – There are several
other types of GO debt available for the City to use.
Although no new issues are included in this plan, the City
currently has park & recreation bonds and equipment
certificates outstanding. Both of these types of GO debt
require a levy.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 6
$-
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
200520062007200820092010201120122013
City of Edina Debt
Current and Projected (In Thousands)
Enterprise Revenue
Tax Increment
Public Imp Revolving
Public Project
General Obligation
This chart shows the projected effect on the City as a whole if future debt is issued
according to this capital improvement plan. The General Obligation bonds category
shown here includes Capital Improvement bonds, park and recreation bonds and
equipment certificates
Page 7
Financial Tables
Page 8
This page left bank intentionally.
CITY OF EDINA, MINNESOTA
CONSTRUCTION FUND BALANCE
CAPITAL IMPROVEMENT PROGRAM
Page 9
Projected Construction Fund Unreserved Fund Balance
EstimateBudget
2008 2009 2010 2011 2012 2013
Revenues
Intergovernmental1,664,440$ 1,134,000$ 2,382,000$ 1,500,000$ 1,546,000$ 1,130,000$
Special Assessment3,101,944 446,757 439,856 363,044 327,034 252,780
Interest (4.5%)263,399 377,140 210,934 195,534 193,580 179,883
Total Revenues 5,029,783 1,957,897 3,032,790 2,058,578 2,066,614 1,562,663
Expenditures
General Government585,000 22,035,000 110,000 110,000 110,000 110,000
Park & Rec 544,800 595,000 715,000 600,000 630,000 530,000
Public Safety 50,000 35,000 40,000 - - -
Public Works 8,792,800 6,454,000 7,432,000 7,560,000 7,370,000 6,950,000
Total Expenditures 9,972,600 29,119,000 8,297,000 8,270,000 8,110,000 7,590,000
Other Financing Sources/(Uses)
Transfers In/(Out)200,000 (106,000) (18,000) (92,000) (960,000) (1,987,000)
CIP Bonds - 22,000,000 - - - -
PIR Bonds 7,270,380 1,573,630 4,940,000 6,010,000 5,774,000 5,770,000
Unidentified Funding - - - 250,000 925,000 2,020,000
Total Other Sources 7,470,380 23,467,630 4,922,000 6,168,000 5,739,000 5,803,000
Increase (Decrease)2,527,563$ (3,693,473)$ (342,210)$ (43,422)$ (304,386)$ (224,337)$
Beginning Balance 5,853,322$ 8,380,885$ 4,687,412$ 4,345,202$ 4,301,780$ 3,997,394$
Ending Balance 8,380,885$ 4,687,412$ 4,345,202$ 4,301,780$ 3,997,394$ 3,773,057$
Forecast
Construction Fund Unreserved Balance Trend
Last Ten Fiscal Years (Actual) and Next Five Fiscal Years (Estimate)
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
199920002001200220032004200520062007200820092010201120122013
The charts above show the projected impact this CIP will have on the Construction
Fund along with a ten-year history of Construction Fund balances. The 2002 balance
was abnormally high due to a bond issue for City Hall, the majority of which wasn’t
spent until 2003.
CITY OF EDINA, MINNESOTA
ENTERPRISE FUND CASH BALANCES
CAPITAL IMPROVEMENT PROGRAM
Page 10
Projected Enterprise Fund Cash Balances
EstimateBudget
Aquatic Center200820092010201120122013
Cash - January 1960,538$ 1,148,319$ 593,637$ 18,490$ 113,665$ 228,989$
Operating Income157,108 50,071 15,055 85,146 94,256 103,992
CIP Expenditures- (640,000) (640,000) (50,000) (50,000) (50,000)
Transfer Cash In/(Out)- - - - - -
Other Miscellaneous a 30,673 35,247 49,798 60,029 71,068 82,975
Cash - December 311,148,319$ 593,637$ 18,490$ 113,665$ 228,989$ 365,956$
Arena200820092010201120132013
Cash - January 193,949$ 83,467$ 27,266$ 448,695$ 118,380$ 36,096$
Operating Income(177,006) (227,038) (238,171) (249,803) (261,957) (274,655)
CIP Expenditures(75,000) (131,000) (1,650,000) (250,000) (25,000) (155,000)
Transfer Cash In/(Out)155,000 211,000 80,000 80,000 105,000 235,000
Other Miscellaneous a 86,524 90,837 2,229,600 89,488 99,673 110,163
Cash - December 3183,467$ 27,266$ 448,695$ 118,380$ 36,096$ (48,396)$
Art Center200820092010201120132013
Cash - January 156,162$ 68,740$ 62,035$ 53,873$ 49,333$ 43,501$
Operating Income(167,422) (197,705) (199,722) (201,682) (203,580) (205,409)
CIP Expenditures(25,000) (25,000) (10,000) (10,000) (10,000) (870,000)
Transfer Cash In/(Out)160,000 170,000 155,000 160,000 160,000 155,000
Other Miscellaneous a 45,000 46,000 46,560 47,142 47,748 918,378
Cash - December 3168,740$ 62,035$ 53,873$ 49,333$ 43,501$ 41,470$
Plan
CITY OF EDINA, MINNESOTA
ENTERPRISE FUND CASH BALANCES
CAPITAL IMPROVEMENT PROGRAM
Page 11
Projected Enterprise Fund Cash Balances
EstimateBudget
Edinborough/Centennial200820092010201120132013
Cash - January 14,185,149$ 3,436,388$ 2,536,190$ 2,112,575$ 1,899,120$ 1,903,281$
Operating Income(458,761) (655,698) (635,313) (663,721) (693,355) (724,266)
CIP Expenditures(572,000) (739,500) (318,000) (152,000) (330,000) (152,000)
Transfer Cash In/(Out)- 250,000 318,000 152,000 330,000 152,000
Other Miscellaneous a 282,000 245,000 211,698 450,266 697,516 703,760
Cash - December 313,436,388$ 2,536,190$ 2,112,575$ 1,899,120$ 1,903,281$ 1,882,775$
Golf Course200820092010201120132013
Cash - January 1(1,133,538)$ (1,080,739)$ (1,106,766)$ (860,298)$ (611,955)$ (279,450)$
Operating Income180,146 211,887 224,209 237,075 250,505 264,519
CIP Expenditures(126,504) (253,000) (260,000) (265,000) (620,000) (845,000)
Transfer Cash In/(Out)170,000 170,000 150,000 125,000 100,000 75,000
Other Miscellaneous a (170,843) (154,914) 132,259 151,268 602,000 851,158
Cash - December 31(1,080,739)$ (1,106,766)$ (860,298)$ (611,955)$ (279,450)$ 66,227$
Liquor Stores200820092010201120132013
Cash - January 11,121,149$ 781,444$ 452,359$ 275,380$ 299,328$ 119,400$
Operating Income947,371 1,046,625 1,124,015 1,206,182 1,293,396 1,385,945
CIP Expenditures(95,000) (156,000) (95,000) - (320,000) (20,000)
Transfer Cash In/(Out)(1,277,800) (1,310,100) (1,300,000) (1,280,000) (1,255,000) (1,235,000)
Other Miscellaneous a 85,724 90,390 94,006 97,766 101,676 105,744
Cash - December 31781,444$ 452,359$ 275,380$ 299,328$ 119,400$ 356,089$
Plan
a. Other miscellaneous adjustments include nonoperating income and losses. Other miscellaneous
adjustments also include differences between the full accrual basis of accounting used for enterprise
funds under generally accepted accounting procedures (GAAP) and the cash basis of accounting used
here to provide useful projections. Other miscellaneous adjustments may include investment income,
bond proceeds and payments, depreciation, and other items.
Page 12
This page left bank intentionally.
Capital Improvement Program
City of Edina, MN
PROJECTS BY DEPARTMENT
20092013thru
Total20092010201120122013DepartmentProject#Priority
Aquatic Center
AQC-03-001 1,200,000600,000600,000Flowridern/a
AQC-09-001 230,00040,00040,00050,00050,00050,000Upgrades and Replacements n/a
1,430,000640,000640,00050,00050,00050,000Aquatic Center Total
Arena
A-00-006 105,000105,000Replace Zamboni n/a
A-04-001 1,200,0001,200,000Refurbish West Arena n/a
A-07-002 300,000150,000150,000Dehumidification System n/a
A-08-003 26,00026,000Truck with Plow n/a
A-08-004 100,000100,000Parking Lot Repair n/a
A-08-005 100,000100,000Install Underground Irrigation n/a
A-08-006 100,000100,000Building Façade n/a
A-08-007 100,000100,000Replace Building Skate Tile n/a
A-09-001 50,00025,00025,000Repairs & Maintenance n/a
A-09-002 130,000130,000Replace Zamboni n/a
2,211,000131,0001,650,000250,00025,000155,000Arena Total
Art Center
ART-01-001 70,00070,000Parking Lot Expansion n/a
ART-07-002 800,000800,000Building Expansion n/a
ART-08-001 15,00015,000Replace Phone System n/a
ART-09-001 40,00010,00010,00010,00010,000Repairs & Maintenance n/a
925,00025,00010,00010,00010,000870,000Art Center Total
Building Inspections
BD-06-001 35,00035,000Complaint Administration Softwaren/a
35,00035,000Building Inspections Total
Citywide
CW-02-001 300,00075,00075,00075,00075,000Citywide Fiber Optic Cabling 2
300,00075,00075,00075,00075,000Citywide Total
Edinborough/Centennial
ECL-00-017 70,00070,000EP Replaster Pool n/a
ECL-03-008 15,00015,000CL Park Storage Building n/a
ECL-04-004 12,00012,000CL Replace Utility Vehicle n/a
ECL-04-005 40,00040,000CL Bridge to Clubhouse n/a
Page 13
Total20092010201120122013DepartmentProject#Priority
ECL-04-006 8,0008,000CL Fountainn/a
ECL-06-004 40,00040,000CL Paver Replacement n/a
ECL-06-005 22,00022,000CL Replace HVAC Units n/a
ECL-06-006 14,00014,000EP Theater Curtain and Rigging n/a
ECL-06-007 12,00012,000EP Replace Carpeting n/a
ECL-07-003 16,00016,000CL Paint Amphitheater Structure n/a
ECL-07-004 20,00020,000CL Signage improvement n/a
ECL-07-006 25,00025,000EP Adventure Peak Renovation n/a
ECL-07-007 7,0007,000EP Floor Scrubber n/a
ECL-07-008 8,0008,000EP Replace Gym Curtain n/a
ECL-08-003 28,00028,000CL Paint South Park Railings n/a
ECL-08-004 40,00040,000CL Renovate Putting Greens n/a
ECL-08-005 12,00012,000CL Replace Cracked/Broken Concrete n/a
ECL-08-007 12,00012,000EP Security Camera System n/a
ECL-08-008 25,00025,000EP Concrete - Main Entrance n/a
ECL-08-009 8,0008,000EP Torrent Floor Machine n/a
ECL-08-011 30,00030,000EP Soft Play for Great Hall n/a
ECL-08-012 60,00060,000EP Convert Kitchen to Restrooms n/a
ECL-08-015 20,00020,000EP Office Security Cameras n/a
ECL-08-016 25,00025,000EP Park Sound System n/a
ECL-08-017 24,00024,000EP Water Heater & Holding Tanks n/a
ECL-08-018 500,000500,000EP HVAC Rooftop Units n/a
ECL-08-019 6,0006,000EP Weight & Aerobic Equipment n/a
ECL-08-021 80,00080,000EP Pool and Wall Tile n/a
ECL-09-001 8,5008,500CL Centrum Building Counter Remodel n/a
ECL-09-002 10,00010,000CL Replace Walkway Lights n/a
ECL-09-003 10,00010,000CL Replace Ice Resurfacer n/a
ECL-09-004 14,00014,000CL Amphitheater Speakers n/a
ECL-09-005 16,00016,000CL Centrum Planter Beds n/a
ECL-09-006 30,00030,000CL Centrum Fountain Remodel n/a
ECL-09-007 120,000120,000CL Add Restroom Facility n/a
ECL-09-008 32,00032,000CL Replace Park Sound System n/a
ECL-09-009 15,00015,000CL Replace Concrete n/a
ECL-09-011 22,00022,000EP Theater Floor n/a
ECL-09-012 20,00020,000EP Exterior Arch Brickwork n/a
ECL-09-013 15,00015,000EP Outdoor Storage Shed n/a
ECL-09-014 45,00045,000EP Lift to Birthday Party Area n/a
ECL-09-015 35,00035,000EP Track Floor n/a
ECL-09-016 28,00028,000EP Parking Ramp Concrete & Drain Tile n/a
ECL-09-017 9,0009,000EP Used Scissors Lift n/a
ECL-09-018 25,00025,000EP Cul-de-sac Sidewalk Replacement n/a
ECL-09-019 25,00025,000EP Portable Concession Stand n/a
ECL-09-020 8,0008,000EP Upper Commons Seating Area n/a
ECL-09-021 25,00025,000EP Adventure Peak Remodel n/a
1,691,500739,500318,000152,000330,000152,000Edinborough/Centennial Total
Golf Course
GC-00-011 50,00050,000Braemar: Expand Cart Storage n/a
GC-06-001 225,00075,00075,00075,000Braemar & Braemar Exec: Parking Lot Resurfacing n/a
GC-07-004 600,000600,000Braemar: Replacement Irrigation System Phase I n/a
GC-09-001 745,000140,000145,000150,000155,000155,000Braemar: Maintenance Equipment n/a
GC-09-002 198,00038,00040,00040,00040,00040,000Braemar: Miscellaneous Equipment n/a
GD-08-001 425,000425,000Dome: Upgrade Building/Restrooms n/a
Page 14
Total20092010201120122013DepartmentProject#Priority
2,243,000253,000260,000265,000620,000845,000Golf Course Total
Liquor Stores
LIQ-01-002 16,00016,00050th: Replace 2 Compressorsn/a
LIQ-02-002 140,000140,000York: Enclose Loading Dock n/a
LIQ-02-005 95,00095,00050th: Store Remodel n/a
LIQ-09-002 320,000320,000York: Store Remodel n/a
LIQ-09-003 20,00020,00050th: Replace Entrance Door n/a
591,000156,00095,000 320,00020,000Liquor Stores Total
Municipal Buildings
MB-04-001 22,000,00022,000,000Public Works Buildingn/a
MB-09-001 175,00035,00035,00035,00035,00035,000City Hall/Public Works Building n/a
22,175,00022,035,00035,00035,00035,00035,000Municipal Buildings Total
Park & Recreation
PK-00-033 330,000330,000Pamela Park: Renovate senior athletic field n/a
PK-00-039 150,000150,000Pamela Park: Playground n/a
PK-02-041 120,000120,000Chowen Park: Playground n/a
PK-04-001 30,00030,000Pamela Park: Batting/pitching cages n/a
PK-04-003 90,00090,000Walnut Ridge Park: Hockey rink relocation n/a
PK-05-009 45,00045,000Todd Park: Pathway renovation n/a
PK-07-002 20,00020,000Arneson Acres Park: Window replacement n/a
PK-07-004 400,000400,000Pamela Park: New athletic field with lights n/a
PK-08-006 30,00030,000Lewis Park: Pathway lighting n/a
PK-09-001 55,00055,000Normandale Park: Rebuild tennis courts n/a
PK-09-002 500,000250,000250,000Bredesen Park: Pathway renovations n/a
PK-09-003 50,00050,000Highlands Park: Parking lot renovation n/a
PK-09-004 150,000150,000Pamela Park: West parking lot/entrance renovation n/a
PK-09-005 100,00050,00050,000Natural resources inventory assessment n/a
PK-09-006 250,000250,000Garden Park: Parking lot renovation n/a
PK-09-007 500,000500,000Countryside Park: Master plan development n/a
PK-09-008 220,000220,000Pamela Park: Park shelter Improvements n/a
PK-09-009 30,00030,000Pamela Park: Softball pitching tunnel & scoreboard n/a
3,070,000595,000715,000600,000630,000530,000Park & Recreation Total
Public Safety
PS-02-004 40,00040,000Outdoor Warning System n/a
40,00040,000Public Safety Total
Public Works
PW-00-004 180,000180,000Mill & Overlay: Benton Ave. (Hansen - Hwy 100)n/a
PW-00-012 900,000900,000Reconstruct: 44th Ave. (TH 100 - France)n/a
PW-00-015 600,000600,000Concrete Rehab: Tracy Ave. (Vernon - TH62)n/a
PW-00-017 1,200,0001,200,000Reconstruct: W. 70th St. (TH100 - France)n/a
PW-00-029 250,000250,000Bridge: 56th Street Bridge n/a
PW-00-074 450,000450,000Concrete Rehab: Parklawn Ave. (France to W 77)n/a
PW-01-011 520,000520,000Reconstruct: W 62nd St. (Oaklawn - France)n/a
PW-01-012 850,000850,000Reconstruct: W 54th St. (Wooddale to France)n/a
Page 15
Total20092010201120122013DepartmentProject#Priority
PW-03-003 319,000319,000Mill & Overlay: Blake Rd (Vernon to Interlachen)n/a
PW-04-001 900,000900,000Reconstruct: W 58th St (Wooddale to France)n/a
PW-05-003 400,000400,000Bridge: 54th Street Bridge n/a
PW-07-004 197,000115,00082,000Northeast Edina Traffic Calming n/a
PW-08-004 70,00070,000Braemar Cold Storage - Fire Suppression n/a
PW-08-005 60,00060,000Skid Steer n/a
PW-08-006 700,000700,000Reconstruct / Sidewalk: VV Rd at Braemar Blvd n/a
PW-09-001 26,470,0005,200,0004,440,0005,830,0005,500,0005,500,000Neighborhood Street Recon. Program n/a
PW-09-002 250,00050,00050,00050,00050,00050,000Sidewalks/Pathways (MSA)n/a
PW-09-003 250,00050,00050,00050,00050,00050,000Sidewalks/Pathways: City Costs n/a
PW-09-004 550,000550,000Mill & Overlay: W 69th St (France to York)n/a
PW-09-005 250,000250,000Sidewalk: France Ave (48 to 49)n/a
PW-09-006 400,000400,000Mill and Overlay: West 70th Street and Metro Blvd n/a
35,766,0006,454,0007,432,0007,560,0007,370,0006,950,000Public Works Total
Utility Department
UT-00-020 3,553,0003,553,000Watermain/Sanitary: Country Club Area 1
UT-02-003 75,00075,000Storm water Lift Station (Highlands Lake)n/a
UT-03-010 130,000130,000Lift Station #1 (4041 Sunnyside Road)n/a
UT-03-012 160,000160,0001998 Cat Backhoe Replacement n/a
UT-03-015 50,00050,000Well #2 (4521 West 50th Street)n/a
UT-04-005 200,000200,000Public Works: Braemar Work Site - Lead Removal n/a
UT-05-008 100,000100,000Lift Station #2 (4200 Grimes Ave)2
UT-05-009 120,000120,000Lift Station #7 (4021 Grimes Ave)2
UT-05-010 120,000120,000Lift Station #8 (4023 Monterey Ave)2
UT-05-011 100,000100,000Lift Station #20 (5901 West 62nd St)2
UT-05-012 150,000150,000Well #13 (6721 2nd St.)2
UT-05-013 120,000120,000Well #6 (5849 Ruth St)2
UT-07-002 6,000,0002,500,0003,500,000New Water Treatment Plant (#5)2
UT-07-003 7,800,000600,0003,600,0003,600,000New Water Treatment Plant (#6)2
UT-07-005 350,000350,000New Well (#21)2
UT-07-007 10,00010,000Water Meter Reading System Replacement 1
UT-07-008 300,000300,000Sewer Jetter Replacement 3
UT-07-009 500,000500,000Gleason Water Tower (paint)2
UT-08-009 100,000100,000Well #5 (West 69th Street)2
UT-08-010 1,200,0001,200,000Piping Wells #9, #15, and #21 to WTP #6 2
UT-08-012 60,00060,000Lift Station #6 Redundent 70 HP pump and VFD 2
UT-08-014 1,200,0001,200,000Trunk Sanitary Sewer Lining Project n/a
UT-09-001 5,000,0001,000,0001,000,0001,000,0001,000,0001,000,000Water and Sanitary Sewer Improvements n/a
UT-09-003 1,740,00060,00060,00060,0001,500,00060,000Pond & Lake Dredging 3
UT-09-004 7,644,0002,100,0001,644,0002,200,000800,000900,000Storm Sewer - Pipe and Grading Improvements n/a
UT-09-005 600,00050,00050,00050,000400,00050,000Annual Vehicle Replacements 3
UT-09-006 250,00050,00050,00050,00050,00050,000SCADA Upgrades 2
UT-09-007 35,00035,000SCADA Computer Equipment Replacement 2
UT-09-008 120,000120,000Well #4 Rehab Project 2
UT-09-009 120,000120,000Well #12 Rehab Project 2
UT-09-010 120,000120,000Well # 2 Rehab Project 2
38,027,0009,813,0006,974,0006,130,0009,030,0006,080,000Utility Department Total
GRAND TOTAL 108,504,50040,876,50018,244,00015,127,00018,495,00015,762,000
Page 16
Capital Improvement Program
City of Edina, MN
PROJECTS BY FUNDING SOURCE
20092013thru
TotalSourceProject#Priority 20092010201120122013
Aquatic Center Fund
AQC-03-001 1,200,000600,000600,000Flowridern/a
AQC-09-001 230,00040,00040,00050,00050,00050,000Upgrades and Replacements n/a
1,430,000640,000640,00050,00050,00050,000Aquatic Center Fund Total
Capital Improvement Bonds
MB-04-001 22,000,00022,000,000Public Works Buildingn/a
22,000,00022,000,000Capital Improvement Bonds Total
Construction Fund
A-00-006 105,000105,000Replace Zamboni n/a
A-08-003 26,00026,000Truck with Plow n/a
A-09-001 50,00025,00025,000Repairs & Maintenance n/a
A-09-002 130,000130,000Replace Zamboni n/a
ART-08-001 15,00015,000Replace Phone System n/a
ART-09-001 40,00010,00010,00010,00010,000Repairs & Maintenance n/a
BD-06-001 35,00035,000Complaint Administration Software n/a
CW-02-001 300,00075,00075,00075,00075,000Citywide Fiber Optic Cabling 2
ECL-00-017 70,00070,000EP Replaster Pool n/a
ECL-06-004 40,00040,000CL Paver Replacement n/a
ECL-06-005 22,00022,000CL Replace HVAC Units n/a
ECL-06-006 14,00014,000EP Theater Curtain and Rigging n/a
ECL-06-007 12,00012,000EP Replace Carpeting n/a
ECL-07-003 16,00016,000CL Paint Amphitheater Structure n/a
ECL-07-004 20,00020,000CL Signage improvement n/a
ECL-07-006 25,00025,000EP Adventure Peak Renovation n/a
ECL-07-007 7,0007,000EP Floor Scrubber n/a
ECL-08-003 28,00028,000CL Paint South Park Railings n/a
ECL-08-004 40,00040,000CL Renovate Putting Greens n/a
ECL-08-005 12,00012,000CL Replace Cracked/Broken Concrete n/a
ECL-08-007 12,00012,000EP Security Camera System n/a
ECL-08-009 8,0008,000EP Torrent Floor Machine n/a
ECL-08-011 30,00030,000EP Soft Play for Great Hall n/a
ECL-08-016 25,00025,000EP Park Sound System n/a
ECL-08-018 250,000250,000EP HVAC Rooftop Units n/a
ECL-08-019 6,0006,000EP Weight & Aerobic Equipment n/a
ECL-08-021 80,00080,000EP Pool and Wall Tile n/a
ECL-09-003 10,00010,000CL Replace Ice Resurfacer n/a
ECL-09-004 14,00014,000CL Amphitheater Speakers n/a
ECL-09-005 16,00016,000CL Centrum Planter Beds n/a
ECL-09-006 30,00030,000CL Centrum Fountain Remodel n/a
ECL-09-007 120,000120,000CL Add Restroom Facility n/a
Page 17
TotalSourceProject#Priority 20092010201120122013
ECL-09-008 32,00032,000CL Replace Park Sound Systemn/a
ECL-09-009 15,00015,000CL Replace Concrete n/a
ECL-09-011 22,00022,000EP Theater Floor n/a
ECL-09-012 20,00020,000EP Exterior Arch Brickwork n/a
ECL-09-013 15,00015,000EP Outdoor Storage Shed n/a
ECL-09-014 45,00045,000EP Lift to Birthday Party Area n/a
ECL-09-015 35,00035,000EP Track Floor n/a
ECL-09-016 28,00028,000EP Parking Ramp Concrete & Drain Tile n/a
ECL-09-018 25,00025,000EP Cul-de-sac Sidewalk Replacement n/a
ECL-09-019 25,00025,000EP Portable Concession Stand n/a
ECL-09-020 8,0008,000EP Upper Commons Seating Area n/a
ECL-09-021 25,00025,000EP Adventure Peak Remodel n/a
MB-09-001 175,00035,00035,00035,00035,00035,000City Hall/Public Works Building n/a
PK-00-033 330,000330,000Pamela Park: Renovate senior athletic field n/a
PK-00-039 150,000150,000Pamela Park: Playground n/a
PK-02-041 120,000120,000Chowen Park: Playground n/a
PK-04-001 30,00030,000Pamela Park: Batting/pitching cages n/a
PK-04-003 90,00090,000Walnut Ridge Park: Hockey rink relocation n/a
PK-05-009 45,00045,000Todd Park: Pathway renovation n/a
PK-07-002 20,00020,000Arneson Acres Park: Window replacement n/a
PK-07-004 400,000400,000Pamela Park: New athletic field with lights n/a
PK-08-006 30,00030,000Lewis Park: Pathway lighting n/a
PK-09-001 55,00055,000Normandale Park: Rebuild tennis courts n/a
PK-09-002 500,000250,000250,000Bredesen Park: Pathway renovations n/a
PK-09-003 50,00050,000Highlands Park: Parking lot renovation n/a
PK-09-004 150,000150,000Pamela Park: West parking lot/entrance renovation n/a
PK-09-005 100,00050,00050,000Natural resources inventory assessment n/a
PK-09-006 250,000250,000Garden Park: Parking lot renovation n/a
PK-09-007 500,000500,000Countryside Park: Master plan development n/a
PK-09-008 220,000220,000Pamela Park: Park shelter Improvements n/a
PK-09-009 30,00030,000Pamela Park: Softball pitching tunnel & scoreboard n/a
PS-02-004 40,00040,000Outdoor Warning System n/a
PW-08-004 70,00070,000Braemar Cold Storage - Fire Suppression n/a
PW-08-005 60,00060,000Skid Steer n/a
PW-09-003 250,00050,00050,00050,00050,00050,000Sidewalks/Pathways: City Costs n/a
5,568,0001,191,0001,303,000922,0001,155,000997,000Construction Fund Total
Edinborough/Centennial Fund
ECL-03-008 15,00015,000CL Park Storage Building n/a
ECL-04-004 12,00012,000CL Replace Utility Vehicle n/a
ECL-04-005 40,00040,000CL Bridge to Clubhouse n/a
ECL-04-006 8,0008,000CL Fountain n/a
ECL-07-008 8,0008,000EP Replace Gym Curtain n/a
ECL-08-008 25,00025,000EP Concrete - Main Entrance n/a
ECL-08-012 60,00060,000EP Convert Kitchen to Restrooms n/a
ECL-08-015 20,00020,000EP Office Security Cameras n/a
ECL-08-017 24,00024,000EP Water Heater & Holding Tanks n/a
ECL-08-018 250,000250,000EP HVAC Rooftop Units n/a
ECL-09-001 8,5008,500CL Centrum Building Counter Remodel n/a
ECL-09-002 10,00010,000CL Replace Walkway Lights n/a
ECL-09-017 9,0009,000EP Used Scissors Lift n/a
489,500489,500Edinborough/Centennial Fund Total
Page 18
TotalSourceProject#Priority 20092010201120122013
Golf Course Fund
GC-06-001 225,00075,00075,00075,000Braemar & Braemar Exec: Parking Lot Resurfacingn/a
GC-09-001 745,000140,000145,000150,000155,000155,000Braemar: Maintenance Equipment n/a
GC-09-002 198,00038,00040,00040,00040,00040,000Braemar: Miscellaneous Equipment n/a
1,168,000253,000260,000265,000195,000195,000Golf Course Fund Total
Liquor Fund
LIQ-01-002 16,00016,00050th: Replace 2 Compressors n/a
LIQ-02-002 140,000140,000York: Enclose Loading Dock n/a
LIQ-02-005 95,00095,00050th: Store Remodel n/a
LIQ-09-002 320,000320,000York: Store Remodel n/a
LIQ-09-003 20,00020,00050th: Replace Entrance Door n/a
591,000156,00095,000 320,00020,000Liquor Fund Total
Municipal State Aid
PW-00-004 180,000180,000Mill & Overlay: Benton Ave. (Hansen - Hwy 100)n/a
PW-00-012 720,000720,000Reconstruct: 44th Ave. (TH 100 - France)n/a
PW-00-015 480,000480,000Concrete Rehab: Tracy Ave. (Vernon - TH62)n/a
PW-00-017 960,000960,000Reconstruct: W. 70th St. (TH100 - France)n/a
PW-00-074 360,000360,000Concrete Rehab: Parklawn Ave. (France to W 77)n/a
PW-01-011 416,000416,000Reconstruct: W 62nd St. (Oaklawn - France)n/a
PW-01-012 680,000680,000Reconstruct: W 54th St. (Wooddale to France)n/a
PW-03-003 319,000319,000Mill & Overlay: Blake Rd (Vernon to Interlachen)n/a
PW-04-001 720,000720,000Reconstruct: W 58th St (Wooddale to France)n/a
PW-05-003 400,000400,000Bridge: 54th Street Bridge n/a
PW-07-004 197,000115,00082,000Northeast Edina Traffic Calming n/a
PW-08-006 560,000560,000Reconstruct / Sidewalk: VV Rd at Braemar Blvd n/a
PW-09-002 250,00050,00050,00050,00050,00050,000Sidewalks/Pathways (MSA)n/a
PW-09-004 550,000550,000Mill & Overlay: W 69th St (France to York)n/a
PW-09-005 250,000250,000Sidewalk: France Ave (48 to 49)n/a
PW-09-006 400,000400,000Mill and Overlay: West 70th Street and Metro Blvd n/a
7,442,0001,134,0002,132,0001,500,0001,546,0001,130,000Municipal State Aid Total
Public Improvement Revolving Bonds
PW-00-012 180,000180,000Reconstruct: 44th Ave. (TH 100 - France)n/a
PW-00-015 120,000120,000Concrete Rehab: Tracy Ave. (Vernon - TH62)n/a
PW-00-017 240,000240,000Reconstruct: W. 70th St. (TH100 - France)n/a
PW-00-074 90,00090,000Concrete Rehab: Parklawn Ave. (France to W 77)n/a
PW-01-011 104,000104,000Reconstruct: W 62nd St. (Oaklawn - France)n/a
PW-01-012 170,000170,000Reconstruct: W 54th St. (Wooddale to France)n/a
PW-04-001 180,000180,000Reconstruct: W 58th St (Wooddale to France)n/a
PW-08-006 140,000140,000Reconstruct / Sidewalk: VV Rd at Braemar Blvd n/a
PW-09-001 26,470,0005,200,0004,440,0005,830,0005,500,0005,500,000Neighborhood Street Recon. Program n/a
27,694,0005,200,0004,940,0006,010,0005,774,0005,770,000Public Improvement Revolving Bonds
Total
Revenue Bonds
A-04-001 1,200,0001,200,000Refurbish West Arena n/a
Page 19
TotalSourceProject#Priority 20092010201120122013
A-07-002 300,000150,000150,000Dehumidification System n/a
A-08-004 100,000100,000Parking Lot Repair n/a
A-08-005 100,000100,000Install Underground Irrigation n/a
A-08-006 100,000100,000Building Façade n/a
A-08-007 100,000100,000Replace Building Skate Tile n/a
1,900,0001,650,000250,000Revenue Bonds Total
State Bridge Bond
PW-00-029 250,000250,000Bridge: 56th Street Bridge n/a
250,000250,000State Bridge Bond Total
Unfunded
ART-01-001 70,00070,000Parking Lot Expansionn/a
ART-07-002 800,000800,000Building Expansion n/a
GC-00-011 50,00050,000Braemar: Expand Cart Storage n/a
GC-07-004 600,000600,000Braemar: Replacement Irrigation System Phase I n/a
GD-08-001 425,000425,000Dome: Upgrade Building/Restrooms n/a
1,945,000425,0001,520,000Unfunded Total
Utility Funds - San Swr
UT-00-020 1,394,0001,394,000Watermain/Sanitary: Country Club Area1
UT-03-010 130,000130,000Lift Station #1 (4041 Sunnyside Road)n/a
UT-05-008 100,000100,000Lift Station #2 (4200 Grimes Ave)2
UT-05-009 120,000120,000Lift Station #7 (4021 Grimes Ave)2
UT-05-010 120,000120,000Lift Station #8 (4023 Monterey Ave)2
UT-05-011 100,000100,000Lift Station #20 (5901 West 62nd St)2
UT-07-008 300,000300,000Sewer Jetter Replacement 3
UT-08-012 60,00060,000Lift Station #6 Redundent 70 HP pump and VFD 2
UT-08-014 1,200,0001,200,000Trunk Sanitary Sewer Lining Project n/a
UT-09-001 2,100,000450,000450,000400,000400,000400,000Water and Sanitary Sewer Improvements n/a
UT-09-007 15,75015,750SCADA Computer Equipment Replacement 2
5,639,7502,194,000745,750400,0001,600,000700,000Utility Funds - San Swr Total
Utility Funds - Stm Swr
UT-02-003 75,00075,000Storm water Lift Station (Highlands Lake)n/a
UT-09-003 1,740,00060,00060,00060,0001,500,00060,000Pond & Lake Dredging 3
UT-09-004 7,644,0002,100,0001,644,0002,200,000800,000900,000Storm Sewer - Pipe and Grading Improvements n/a
UT-09-007 5,2505,250SCADA Computer Equipment Replacement 2
9,464,2502,160,0001,784,2502,260,0002,300,000960,000Utility Funds - Stm Swr Total
Utility Funds - Wtr
UT-00-020 2,159,0002,159,000Watermain/Sanitary: Country Club Area1
UT-03-012 160,000160,0001998 Cat Backhoe Replacement n/a
UT-03-015 50,00050,000Well #2 (4521 West 50th Street)n/a
UT-04-005 200,000200,000Public Works: Braemar Work Site - Lead Removal n/a
UT-05-012 150,000150,000Well #13 (6721 2nd St.)2
UT-05-013 120,000120,000Well #6 (5849 Ruth St)2
Page 20
TotalSourceProject#Priority 20092010201120122013
UT-07-002 6,000,0002,500,0003,500,000New Water Treatment Plant (#5)2
UT-07-003 7,800,000600,0003,600,0003,600,000New Water Treatment Plant (#6)2
UT-07-005 350,000350,000New Well (#21)2
UT-07-007 10,00010,000Water Meter Reading System Replacement 1
UT-07-009 500,000500,000Gleason Water Tower (paint)2
UT-08-009 100,000100,000Well #5 (West 69th Street)2
UT-09-001 2,900,000550,000550,000600,000600,000600,000Water and Sanitary Sewer Improvements n/a
UT-09-005 600,00050,00050,00050,000400,00050,000Annual Vehicle Replacements 3
UT-09-006 250,00050,00050,00050,00050,00050,000SCADA Upgrades 2
UT-09-007 14,00014,000SCADA Computer Equipment Replacement 2
UT-09-008 120,000120,000Well #4 Rehab Project 2
UT-09-009 120,000120,000Well #12 Rehab Project 2
UT-09-010 120,000120,000Well # 2 Rehab Project 2
21,723,0005,459,0004,444,0002,270,0005,130,0004,420,000Utility Funds - Wtr Total
Watershed District
UT-08-010 1,200,0001,200,000Piping Wells #9, #15, and #21 to WTP #6 2
1,200,0001,200,000Watershed District Total
108,504,50040,876,50018,244,00015,127,00018,495,00015,762,000GRAND TOTAL
Page 21
Page 22
This page left bank intentionally.
Page 23
Detail Project
Descriptions
Page 24
This page left bank intentionally.
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Purchase and installation of a flowrider on the south side of the Aquatic Center.
Project #AQC-03-001
Priority n/a
Justification
In an attempt to reach out to the missing demographic of children ages 12 through 18, staff recommends the addition of
a flowrider. This amenity would greatly appeal to the teenagers who all too early seem to grow out of the facility. In
addition to attracting the teenage patron, it would be a great entertainment site and we would plan seating to
accommodate those of all ages who would like to watch bathers perfect west coast surfing skills. It is also planned that
this would be a revenue source as a separate fee would be charged to use the amenity. This compact water feature would
complete the Aquatic Center master plan.
Useful Life Unassigned
Project Name Flowrider
Category Park Development
Type Improvement
Contact Park & Recreation
Department Aquatic Center
Total20092010201120122013Expenditures
1,200,000600,000600,000Construction/Maintenance
600,000600,0001,200,000Total
Total20092010201120122013Funding Sources
1,200,000600,000600,000Aquatic Center Fund
600,000600,0001,200,000Total
Page 25
Capital Improvement Program
City of Edina, MN
20092013thru
Description
These are upgrades and replacements of mechanical and small capital items that unexpectedly fail or become worn or
damaged and in need of replacement, repair, or upgrade. Equipment could include bath house water heaters, pumps,
lifeguard chairs, funbrellas, chaise lounges, etc.
Project #AQC-09-001
Priority n/a
Justification
Mechanical and small capital items can unexpectedly fail or wear out before their scheduled time for replacement. This
replacement budget will help serve as a rainy day fund for those unexpected failures or losses.
Useful Life Unassigned
Project Name Upgrades and Replacements
Category Park Development
Type Improvement
Contact Park & Recreation
Department Aquatic Center
Total20092010201120122013Expenditures
230,00040,00040,00050,00050,00050,000Equip/Vehicles/Furnishings
40,00040,00050,00050,00050,000230,000Total
Total20092010201120122013Funding Sources
230,00040,00040,00050,00050,00050,000Aquatic Center Fund
40,00040,00050,00050,00050,000230,000Total
Page 26
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the 1997 west ice resurfacing machine.
Project #A-00-006
Priority n/a
Justification
This is a routine equipment replacement purchase. The 1997 Zamboni will be 12 years old in 2009.
Useful Life 10 years
Project Name Replace Zamboni
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
105,000105,000Equip/Vehicles/Furnishings
105,000105,000Total
Total20092010201120122013Funding Sources
105,000105,000Construction Fund
105,000105,000Total
Page 27
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace all existing refrigeration piping from arena to mechanical room .
Project #A-04-001
Priority n/a
Justification
The current piping was installed in 1964 and will reach the end of it's useful life. The new technology is better insulated
and therefore, more efficient to operate.
Useful Life 15 years
Project Name Refurbish West Arena
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
1,200,0001,200,000Construction/Maintenance
1,200,0001,200,000Total
Total20092010201120122013Funding Sources
1,200,0001,200,000Revenue Bonds
1,200,0001,200,000Total
Page 28
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the dehumidification system in the West and East arenas.
Project #A-07-002
Priority n/a
Justification
The dehumidification systems will have reached their life expectancy and will be in need of replacement.
Dehumidification system failure could result in significant business interruption and loss of revenues.
Useful Life
Project Name Dehumidification System
Category Building Maintenance
Type Equipment
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
300,000150,000150,000Equip/Vehicles/Furnishings
150,000150,000300,000Total
Total20092010201120122013Funding Sources
300,000150,000150,000Revenue Bonds
150,000150,000300,000Total
Page 29
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Truck with snowplow.
Project #A-08-003
Priority n/a
Justification
To help public works and golf course in plowing responsibilities, so the Arena can be plowed in a more timely fashion.
Useful Life 10 years
Project Name Truck with Plow
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
26,00026,000Equip/Vehicles/Furnishings
26,00026,000Total
Total20092010201120122013Funding Sources
26,00026,000Construction Fund
26,00026,000Total
Page 30
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Perform maintenance on and restripe the arena parking lot.
Project #A-08-004
Priority n/a
Justification
Periodic sealcoats will keep lots in good condition.
Useful Life
Project Name Parking Lot Repair
Category Park Development
Type Improvement
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
100,000100,000Construction/Maintenance
100,000100,000Total
Total20092010201120122013Funding Sources
100,000100,000Revenue Bonds
100,000100,000Total
Page 31
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Install irrigation sprinklers to keep the boulevard grass green in the summer.
Project #A-08-005
Priority n/a
Justification
Current islands are full of weeds. Irrigation will help maintain grass and trees.
Useful Life
Project Name Install Underground Irrigation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
100,000100,000Construction/Maintenance
100,000100,000Total
Total20092010201120122013Funding Sources
100,000100,000Revenue Bonds
100,000100,000Total
Page 32
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Resurface west arena exterior.
Project #A-08-006
Priority n/a
Justification
Resurface to aesthetically match newer arena and entryway.
Useful Life
Project Name Building Façade
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
100,000100,000Construction/Maintenance
100,000100,000Total
Total20092010201120122013Funding Sources
100,000100,000Revenue Bonds
100,000100,000Total
Page 33
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace lower level of existing 3 arenas skate tile.
Project #A-08-007
Priority n/a
Justification
Floor tile is at the end of its 15 year useful life expectancy.
Useful Life 15 years
Project Name Replace Building Skate Tile
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
100,000100,000Construction/Maintenance
100,000100,000Total
Total20092010201120122013Funding Sources
100,000100,000Revenue Bonds
100,000100,000Total
Page 34
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Miscellaneous building repairs and maintenance.
Project #A-09-001
Priority n/a
Justification
Miscellaneous repairs and maintenance are necessary every year to keep the Arena in operating condition.
Useful Life Unassigned
Project Name Repairs & Maintenance
Category Park Development
Type Improvement
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
50,00025,00025,000Equip/Vehicles/Furnishings
25,00025,00050,000Total
Total20092010201120122013Funding Sources
50,00025,00025,000Construction Fund
25,00025,00050,000Total
Page 35
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the 1997 south ice resurfacing machine.
Project #A-09-002
Priority n/a
Justification
This is a routine equipment replacement purchase. The 1997 zamboni will be 16 years old in 2013 and due to be
replaced.
Useful Life
Project Name Replace Zamboni
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Arena
Total20092010201120122013Expenditures
130,000130,000Equip/Vehicles/Furnishings
130,000130,000Total
Total20092010201120122013Funding Sources
130,000130,000Construction Fund
130,000130,000Total
Page 36
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Expand existing parking lot to accommodate 55 cars. Pave and improve entry. Extend lot to the west side and create a
double entrance driveway and drop-off area.
Project #ART-01-001
Priority n/a
Justification
Student base has grown to the point where on occasion they must park as far away as the tennis courts at night. Curbs at
entry are worn away and our current on-site parking stall count is significantly short of the need.
Useful Life Unassigned
Project Name Parking Lot Expansion
Category Park Development
Type Improvement
Contact Park & Recreation
Department Art Center
Total20092010201120122013Expenditures
70,00070,000Construction/Maintenance
70,00070,000Total
Total20092010201120122013Funding Sources
70,00070,000Unfunded
70,00070,000Total
Page 37
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Expand Art Center building to the west to enlarge the pottery area.
Project #ART-07-002
Priority n/a
Justification
The Edina Art Center's pottery department serves more than 2,000 students each year in its current undersized space.
More space is needed to remain a premier pottery studio. This will include rental studios for a continuing source of
revenue.
Useful Life
Project Name Building Expansion
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Art Center
Total20092010201120122013Expenditures
800,000800,000Construction/Maintenance
800,000800,000Total
Total20092010201120122013Funding Sources
800,000800,000Unfunded
800,000800,000Total
Page 38
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Project #ART-08-001
Priority n/a
Justification
Useful Life 10 years
Project Name Replace Phone System
Category Equipment Replacement
Type Equipment
Contact IT Manager
Department Art Center
Total20092010201120122013Expenditures
15,00015,000Equip/Vehicles/Furnishings
15,00015,000Total
Total20092010201120122013Funding Sources
15,00015,000Construction Fund
15,00015,000Total
Page 39
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Project #ART-09-001
Priority n/a
Justification
Useful Life
Project Name Repairs & Maintenance
Category Building Maintenance
Type Unassigned
Contact Park & Recreation
Department Art Center
Total20092010201120122013Expenditures
40,00010,00010,00010,00010,000Construction/Maintenance
10,00010,00010,00010,00040,000Total
Total20092010201120122013Funding Sources
40,00010,00010,00010,00010,000Construction Fund
10,00010,00010,00010,00040,000Total
Page 40
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Purchase and/or develop complaint administration software to be used by Building Inspections, Health, and Planning
departments.
Project #BD-06-001
Priority n/a
Justification
Software will eliminate multiple staff/departments working on the same complaint. Encourage faster and more accurate
response. Provides the ability for multiple departments to work on multiple complaints.
Useful Life
Project Name Complaint Administration Software
Category Computer Software
Type Equipment
Contact Chief Building Official
Department Building Inspections
Total20092010201120122013Expenditures
35,00035,000Equip/Vehicles/Furnishings
35,00035,000Total
Total20092010201120122013Funding Sources
35,00035,000Construction Fund
35,00035,000Total
Page 41
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Joint Fiber Optic Cabling Project with Edina School District - By leveraging some of the existing fiber infrastructure
from the school district, the City would provide some missing links that would allow us to make connections to Edina
Fire 1 & 2, York Liquor and the Art Center. In return, the City would allow the school to utilize some of the City's
existing fiber for their needs. This allows us to accelerate our connections at a much reduced cost versus running
separate cable for our facilities exclusively.
Project #CW-02-001
Priority 2 Very Important
Justification
Currently, we connect to many of our facilities through the use of T1 phone lines which cost us around $3,000 per T1
line. Some of our facilities have multiple T1 lines to accommodate both voice and data transmissions. By running fiber
optic cabling to these facilites, the City could remove the operating expense of the T1 lines from the offsite budgets.
There would be a small offset of annual costs associated with service contracts on the equipment needed at each end of
the cabling. It would also allow us to look at Voice over IP for our telecommunications in the long run. Most of the
larger facilities (Fire and Public Works) have a 3-4 year payback of the capital costs in operating cost reductions.
Useful Life Unassigned
Project Name Citywide Fiber Optic Cabling
Category Computer Network
Type Improvement
Contact Deputy City Manager
Department Citywide
Total20092010201120122013Expenditures
300,00075,00075,00075,00075,000Equip/Vehicles/Furnishings
75,00075,00075,00075,000300,000Total
Total20092010201120122013Funding Sources
300,00075,00075,00075,00075,000Construction Fund
75,00075,00075,00075,000300,000Total
Page 42
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replaster and restore pool shell at Edinborough Park.
Project #ECL-00-017
Priority n/a
Justification
The pool shell at Edinborough Park has deteriorated over the past 22 years and needs a new surface coat of gunite.
Useful Life Unassigned
Project Name EP Replaster Pool
Category Unassigned
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
70,00070,000Equip/Vehicles/Furnishings
70,00070,000Total
Total20092010201120122013Funding Sources
70,00070,000Construction Fund
70,00070,000Total
Page 43
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Add a storage building for the putting course and lawn games area at Centennial Lakes Park. The new building would
be approximately 16' X 12' and would allow us to keep the mowers, weed whips, etc. at the course instead of across the
lake in the garage.
Project #ECL-03-008
Priority n/a
Justification
Centennial Lakes Park needs a storage facility to provide secure storage for putting course and lawn games area
supplies. This project was originally scheduled in the 2006 CIP but was delayed.
Useful Life Unassigned
Project Name CL Park Storage Building
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
15,00015,000Construction/Maintenance
15,00015,000Total
Total20092010201120122013Funding Sources
15,00015,000Edinborough/Centennial Fund
15,00015,000Total
Page 44
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace a 1992 Cushman utility vehicle at Centennial Lakes.
Project #ECL-04-004
Priority n/a
Justification
The 1992 utility Cushman vehicle has reached its life expectancy and is need of replacement.
Useful Life Unassigned
Project Name CL Replace Utility Vehicle
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
12,00012,000Equip/Vehicles/Furnishings
12,00012,000Total
Total20092010201120122013Funding Sources
12,00012,000Edinborough/Centennial Fund
12,00012,000Total
Page 45
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the steep pedestrian bridge at the Clubhouse with a ramped, accessible bridge.
Project #ECL-04-005
Priority n/a
Justification
The bridge next to the clubhouse should be replaced with a more accessible bridge that would be a welcomed
improvement for our customers, many whom are senior citizen age and for those who have mobility issues.
Useful Life Unassigned
Project Name CL Bridge to Clubhouse
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
40,00040,000Construction/Maintenance
40,00040,000Total
Total20092010201120122013Funding Sources
40,00040,000Edinborough/Centennial Fund
40,00040,000Total
Page 46
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace one of the fountains in the Centennial Lakes pond.
Project #ECL-04-006
Priority n/a
Justification
One of the fountains on Centennial Lake needs to be replaced with a more energy efficient and more reliable fountain,
which will save money in the long run and provide more reliable service.
Useful Life Unassigned
Project Name CL Fountain
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
8,0008,000Equip/Vehicles/Furnishings
8,000 8,000Total
Total20092010201120122013Funding Sources
8,0008,000Edinborough/Centennial Fund
8,000 8,000Total
Page 47
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace brick pavers in Centennial Lakes park.
Project #ECL-06-004
Priority n/a
Justification
Brick pavers are disintegrating and are causing safety concerns.
Useful Life Unassigned
Project Name CL Paver Replacement
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
40,00040,000Construction/Maintenance
40,00040,000Total
Total20092010201120122013Funding Sources
40,00040,000Construction Fund
40,00040,000Total
Page 48
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace 2 of the 4 HVAC units for the Park Centrum Building.
Project #ECL-06-005
Priority n/a
Justification
Two of the HVAC units will be at the end of their 20-year life expectancy.
Useful Life Unassigned
Project Name CL Replace HVAC Units
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
22,00022,000Construction/Maintenance
22,00022,000Total
Total20092010201120122013Funding Sources
22,00022,000Construction Fund
22,00022,000Total
Page 49
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the theater curtain and rigging at Edinborough Park amphitheater.
Project #ECL-06-006
Priority n/a
Justification
Theater curtain is becoming worn and tattered and was originally installed in 1987.
Useful Life Unassigned
Project Name EP Theater Curtain and Rigging
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
14,00014,000Construction/Maintenance
14,00014,000Total
Total20092010201120122013Funding Sources
14,00014,000Construction Fund
14,00014,000Total
Page 50
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace common area carpeting at Edinborough Park.
Project #ECL-06-007
Priority n/a
Justification
Carpeting in Great Hall, stairways, and elevator will be 8 years old and past its prime.
Useful Life Unassigned
Project Name EP Replace Carpeting
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
12,00012,000Construction/Maintenance
12,00012,000Total
Total20092010201120122013Funding Sources
12,00012,000Construction Fund
12,00012,000Total
Page 51
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Repaint the exterior metal structure on the Dennis Maetzold Amphitheater.
Project #ECL-07-003
Priority n/a
Justification
By the year 2011, the Dennis Maetzold Amphitheater will need to be painted.
Useful Life
Project Name CL Paint Amphitheater Structure
Category Unassigned
Type Unassigned
Contact
Department Edinborough/Centennial
Total20092010201120122013Expenditures
16,00016,000Construction/Maintenance
16,00016,000Total
Total20092010201120122013Funding Sources
16,00016,000Construction Fund
16,00016,000Total
Page 52
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Letter and repaint existing signage plus add new signage at Centennial Lakes Park.
Project #ECL-07-004
Priority n/a
Justification
The original signs for Centennial Lakes Park need to be updated as part of routine maintenance by the year 2011 plus
new signs will be needed to identify changes and additions to the park since its inception.
Useful Life
Project Name CL Signage improvement
Category Unassigned
Type Unassigned
Contact
Department Edinborough/Centennial
Total20092010201120122013Expenditures
20,00020,000Construction/Maintenance
20,00020,000Total
Total20092010201120122013Funding Sources
20,00020,000Construction Fund
20,00020,000Total
Page 53
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace soft events, worn pads, foam and netting throughout Adventure Peak.
Project #ECL-07-006
Priority n/a
Justification
The structure has many "soft" features that will wear out over time due to heavy use. Adventure Peak opened in 9/03.
Useful Life
Project Name EP Adventure Peak Renovation
Category Unassigned
Type Unassigned
Contact
Department Edinborough/Centennial
Total20092010201120122013Expenditures
25,00025,000Construction/Maintenance
25,00025,000Total
Total20092010201120122013Funding Sources
25,00025,000Construction Fund
25,00025,000Total
Page 54
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace Tennant floor scrubber.
Project #ECL-07-007
Priority n/a
Justification
Scrubber is a 2005 model that we purchased used in 2006. Scrubber is used every day to scrub Great Hall floor, pool
deck and aggregate walkways.
Useful Life
Project Name EP Floor Scrubber
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
7,0007,000Equip/Vehicles/Furnishings
7,0007,000Total
Total20092010201120122013Funding Sources
7,0007,000Construction Fund
7,0007,000Total
Page 55
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Vinyl and net gym curtain that divides the Great Hall in half.
Project #ECL-07-008
Priority n/a
Justification
Gym divider was installed in 2003. The inflatable jumper is on one side of the hall and the other side is more active
with scooters, balls and basketball hoops. The divider is used every day and creates a more safe and controlled
environment.
Useful Life
Project Name EP Replace Gym Curtain
Category Unassigned
Type Unassigned
Contact
Department Edinborough/Centennial
Total20092010201120122013Expenditures
8,0008,000Equip/Vehicles/Furnishings
8,000 8,000Total
Total20092010201120122013Funding Sources
8,0008,000Edinborough/Centennial Fund
8,000 8,000Total
Page 56
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Paint the ornamental metal railings in south park.
Project #ECL-08-003
Priority n/a
Justification
The railings were last painted in 2006 and will need to be stripped and repainted by then.
Useful Life
Project Name CL Paint South Park Railings
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
28,00028,000Construction/Maintenance
28,00028,000Total
Total20092010201120122013Funding Sources
28,00028,000Construction Fund
28,00028,000Total
Page 57
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace sod, re-grade greens and improve drainage on putting course.
Project #ECL-08-004
Priority n/a
Justification
Greens will be 15 years old and in need of renovation. We can get more play at a higher quality level if the tees and pin
areas are well maintained.
Useful Life
Project Name CL Renovate Putting Greens
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
40,00040,000Construction/Maintenance
40,00040,000Total
Total20092010201120122013Funding Sources
40,00040,000Construction Fund
40,00040,000Total
Page 58
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace broken concrete on park walkways.
Project #ECL-08-005
Priority n/a
Justification
Concrete on our walkways cracks and heaves over time and needs to be replaced.
Useful Life
Project Name CL Replace Cracked/Broken Concrete
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
12,00012,000Construction/Maintenance
12,00012,000Total
Total20092010201120122013Funding Sources
12,00012,000Construction Fund
12,00012,000Total
Page 59
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Security camera system for Edinborough Park.
Project #ECL-08-007
Priority n/a
Justification
Provide additional security cameras on upper level of the park and in the playpark. This will offer extra safety for our
customers and staff.
Useful Life
Project Name EP Security Camera System
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
12,00012,000Construction/Maintenance
12,00012,000Total
Total20092010201120122013Funding Sources
12,00012,000Construction Fund
12,00012,000Total
Page 60
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Concrete replacement at Edinborough's main cul-de-sac entrance.
Project #ECL-08-008
Priority n/a
Justification
Most of the concrete in the cul-de-sac entrance is 25 years old. Parts have been patched or replaced, but the large section
in front of the doors needs complete replacement.
Useful Life
Project Name EP Concrete - Main Entrance
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
25,00025,000Construction/Maintenance
25,00025,000Total
Total20092010201120122013Funding Sources
25,00025,000Edinborough/Centennial Fund
25,00025,000Total
Page 61
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Torrent hard floor cleaning machine for Edinborough Park.
Project #ECL-08-009
Priority n/a
Justification
Original Torrent was purchased in 2006 and is used daily to clean locker room, restrooms, walkways and hallways at
Edinborough. Life expectancy is 5-7 years.
Useful Life 6 years
Project Name EP Torrent Floor Machine
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
8,0008,000Equip/Vehicles/Furnishings
8,0008,000Total
Total20092010201120122013Funding Sources
8,0008,000Construction Fund
8,0008,000Total
Page 62
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Themed soft foam play area for Great Hall.
Project #ECL-08-011
Priority n/a
Justification
Additional play equipment is needed for kids ages 1-5. Adventure Peak has a very small play area designated for
toddlers but the majority of the structure is geared for kids 4-11. This would provide quality safe-play space for toddlers
while further establishing ourselves in the 1-5 year-old market.
Useful Life
Project Name EP Soft Play for Great Hall
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
30,00030,000Construction/Maintenance
30,00030,000Total
Total20092010201120122013Funding Sources
30,00030,000Construction Fund
30,00030,000Total
Page 63
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Convert existing catering kitchen in Great Hall to restrooms.
Project #ECL-08-012
Priority n/a
Justification
Our only restrooms are on the upper level of the park, just past the park office. These restrooms are too small and are
located too far away from play areas and birthday party areas.
Useful Life
Project Name EP Convert Kitchen to Restrooms
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
60,00060,000Construction/Maintenance
60,00060,000Total
Total20092010201120122013Funding Sources
60,00060,000Edinborough/Centennial Fund
60,00060,000Total
Page 64
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Security camera system for park office.
Project #ECL-08-015
Priority n/a
Justification
Replacement of aging camera and access system for the park office, upper commons, pool and track.
Useful Life
Project Name EP Office Security Cameras
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
20,00020,000Equip/Vehicles/Furnishings
20,00020,000Total
Total20092010201120122013Funding Sources
20,00020,000Edinborough/Centennial Fund
20,00020,000Total
Page 65
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace original sound equipment and speakers in the park.
Project #ECL-08-016
Priority n/a
Justification
This system is used primarily for making closing and emergency announcements. Controls, amps and speakers will be
replaced.
Useful Life
Project Name EP Park Sound System
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
25,00025,000Equip/Vehicles/Furnishings
25,00025,000Total
Total20092010201120122013Funding Sources
25,00025,000Construction Fund
25,00025,000Total
Page 66
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Water heater and hot water holding tanks.
Project #ECL-08-017
Priority n/a
Justification
This system provides hot water for all areas of the park, including locker rooms and restrooms, except for catering
kitchen. Current system was purchased in 2000 and nearing the end of its life expectancy. Holding tanks are rusted and
corroded.
Useful Life
Project Name EP Water Heater & Holding Tanks
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
24,00024,000Equip/Vehicles/Furnishings
24,00024,000Total
Total20092010201120122013Funding Sources
24,00024,000Edinborough/Centennial Fund
24,00024,000Total
Page 67
Capital Improvement Program
City of Edina, MN
20092013thru
Description
HVAC units for Edinborough.
Project #ECL-08-018
Priority n/a
Justification
These rooftop units that provide heat and air conditioning to the park were installed in 1987 and are very energy
inefficient. These units have exceeded their life expectancy and are experiencing mechanical failure.
Useful Life
Project Name EP HVAC Rooftop Units
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
500,000500,000Equip/Vehicles/Furnishings
500,000500,000Total
Total20092010201120122013Funding Sources
250,000250,000Construction Fund
250,000250,000Edinborough/Centennial Fund
500,000500,000Total
Page 68
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Weight machines and/or aerobic equipment.
Project #ECL-08-019
Priority n/a
Justification
This will replace a heavily used multi station weight machine which will be 11 years old.
Useful Life
Project Name EP Weight & Aerobic Equipment
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
6,0006,000Equip/Vehicles/Furnishings
6,0006,000Total
Total20092010201120122013Funding Sources
6,0006,000Construction Fund
6,0006,000Total
Page 69
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace pool deck and wall tile.
Project #ECL-08-021
Priority n/a
Justification
Tile is original and has cracked and shifted. Exact replacements are not available and we have been patching as needed.
This is a safety as well as cosmetic issue.
Useful Life
Project Name EP Pool and Wall Tile
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
80,00080,000Construction/Maintenance
80,00080,000Total
Total20092010201120122013Funding Sources
80,00080,000Construction Fund
80,00080,000Total
Page 70
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Remodel front counters in the Centrum building. Remove the existing countertops at the concessions/rental counters and
remodel the counters to improve aesthetics and storage.
Project #ECL-09-001
Priority n/a
Justification
Current counters were installed in 1990 and are heavily worn.
Useful Life
Project Name CL Centrum Building Counter Remodel
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
8,5008,500Construction/Maintenance
8,500 8,500Total
Total20092010201120122013Funding Sources
8,5008,500Edinborough/Centennial Fund
8,500 8,500Total
Page 71
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace series of 9 original walkway lights along a pathway behind OfficeMax. They will be replaced with the type of
bollard lights that are now standard in the park.
Project #ECL-09-002
Priority n/a
Justification
These lights are in need of replacement due to vandalism and normal wear.
Useful Life
Project Name CL Replace Walkway Lights
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
10,00010,000Equip/Vehicles/Furnishings
10,00010,000Total
Total20092010201120122013Funding Sources
10,00010,000Edinborough/Centennial Fund
10,00010,000Total
Page 72
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace Champion ice resurfacer.
Project #ECL-09-003
Priority n/a
Justification
The current ice resurfacer was purchased in 1986 and is scheduled for replacement.
Useful Life
Project Name CL Replace Ice Resurfacer
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
10,00010,000Equip/Vehicles/Furnishings
10,00010,000Total
Total20092010201120122013Funding Sources
10,00010,000Construction Fund
10,00010,000Total
Page 73
Capital Improvement Program
City of Edina, MN
20092013thru
Description
New speakers for amphitheater.
Project #ECL-09-004
Priority n/a
Justification
Current speakers were purchased in 1996. Replacement will allow better sound coverage for the audience and
performers.
Useful Life
Project Name CL Amphitheater Speakers
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
14,00014,000Equip/Vehicles/Furnishings
14,00014,000Total
Total20092010201120122013Funding Sources
14,00014,000Construction Fund
14,00014,000Total
Page 74
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Renovate planter beds in front of the Centrum building. The 16 planter beds will be redone with new trees, shrubs, soil
and mulch. Lighting and sound will also be redone.
Project #ECL-09-005
Priority n/a
Justification
Many of the current trees are struggling and the beds look dated.
Useful Life
Project Name CL Centrum Planter Beds
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
16,00016,000Equip/Vehicles/Furnishings
16,00016,000Total
Total20092010201120122013Funding Sources
16,00016,000Construction Fund
16,00016,000Total
Page 75
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Remodel Centrum fountain.
Project #ECL-09-006
Priority n/a
Justification
The fountain needs new piping and electrical components. It will be reworked to make it operate more reliably.
Useful Life
Project Name CL Centrum Fountain Remodel
Category Park Development
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
30,00030,000Equip/Vehicles/Furnishings
30,00030,000Total
Total20092010201120122013Funding Sources
30,00030,000Construction Fund
30,00030,000Total
Page 76
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Build a new restroom facility just south of the existing Centrum restrooms.
Project #ECL-09-007
Priority n/a
Justification
This new facility would give park patrons access to restrooms when the Centrum is closed and would also give the park
additional restrooms for larger events.
Useful Life
Project Name CL Add Restroom Facility
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Construction Fund
120,000120,000Total
Page 77
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace park sound system and speakers. Includes complete replacement of the inground speakers as well as eight
amplifiers.
Project #ECL-09-008
Priority n/a
Justification
Useful Life
Project Name CL Replace Park Sound System
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
32,00032,000Equip/Vehicles/Furnishings
32,00032,000Total
Total20092010201120122013Funding Sources
32,00032,000Construction Fund
32,00032,000Total
Page 78
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace worn and cracked concrete.
Project #ECL-09-009
Priority n/a
Justification
Concrete has areas that are worn, cracked & broken.
Useful Life
Project Name CL Replace Concrete
Category Sidewalk - Pathways
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
15,00015,000Construction/Maintenance
15,00015,000Total
Total20092010201120122013Funding Sources
15,00015,000Construction Fund
15,00015,000Total
Page 79
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the original wood stage floor in the amphitheater.
Project #ECL-09-011
Priority n/a
Justification
The floor has become warped and discolored in spots.
Useful Life
Project Name EP Theater Floor
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
22,00022,000Construction/Maintenance
22,00022,000Total
Total20092010201120122013Funding Sources
22,00022,000Construction Fund
22,00022,000Total
Page 80
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace/repair brickwork.
Project #ECL-09-012
Priority n/a
Justification
The brick arches at the three park entrances have become cracked and have loose bricks and mortar. This is a cosmetic
and potentially a safety issue if more settling should occur.
Useful Life
Project Name EP Exterior Arch Brickwork
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
20,00020,000Construction/Maintenance
20,00020,000Total
Total20092010201120122013Funding Sources
20,00020,000Construction Fund
20,00020,000Total
Page 81
Capital Improvement Program
City of Edina, MN
20092013thru
Description
New storage building to provide safe and secure storage for gas and equipment.
Project #ECL-09-013
Priority n/a
Justification
Edinborough was designed with little indoor storage space and no outdoor storage for maintenance equipment such as
mowers, power brooms, gas, snow blowers, etc.
Useful Life
Project Name EP Outdoor Storage Shed
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
15,00015,000Construction/Maintenance
15,00015,000Total
Total20092010201120122013Funding Sources
15,00015,000Construction Fund
15,00015,000Total
Page 82
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Lift from the great hall floor to the Birthday Party Plateau - the old tot lot area.
Project #ECL-09-014
Priority n/a
Justification
This area was not designed to be handicapped accessible. We are currently providing two other birthday party sites in
different locations with accessibility.
Useful Life
Project Name EP Lift to Birthday Party Area
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
45,00045,000Construction/Maintenance
45,00045,000Total
Total20092010201120122013Funding Sources
45,00045,000Construction Fund
45,00045,000Total
Page 83
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace track floor with a similar rubber surface.
Project #ECL-09-015
Priority n/a
Justification
The track floor was originally installed in 1987 and has experienced significant wear over the years.
Useful Life
Project Name EP Track Floor
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
35,00035,000Construction/Maintenance
35,00035,000Total
Total20092010201120122013Funding Sources
35,00035,000Construction Fund
35,00035,000Total
Page 84
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the concrete at the southeast entrance to the park.
Project #ECL-09-016
Priority n/a
Justification
Drainage in the area needs to be improved to prevent water from coming into the entryway and also from seeping into
the loading dock entrance/hallway underneath.
Useful Life
Project Name EP Parking Ramp Concrete & Drain Tile
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
28,00028,000Construction/Maintenance
28,00028,000Total
Total20092010201120122013Funding Sources
28,00028,000Construction Fund
28,00028,000Total
Page 85
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Buy a used 2002 Skyjack 3226 to replace our 10 year old Skyjack personal lift.
Project #ECL-09-017
Priority n/a
Justification
A newer lift will provide a more stable platform for changing lights, trimming trees and cleaning windows. New models
cost $15,000.
Useful Life
Project Name EP Used Scissors Lift
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
9,0009,000Equip/Vehicles/Furnishings
9,000 9,000Total
Total20092010201120122013Funding Sources
9,0009,000Edinborough/Centennial Fund
9,000 9,000Total
Page 86
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Project #ECL-09-018
Priority n/a
Justification
The sidewalk is deteriorating and cracking posing a safety concern. We have patched where possible.
Useful Life
Project Name EP Cul-de-sac Sidewalk Replacement
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
25,00025,000Construction/Maintenance
25,00025,000Total
Total20092010201120122013Funding Sources
25,00025,000Construction Fund
25,00025,000Total
Page 87
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Purchase a portable concession stand to sell hot dogs, pizza, cookies, etc. to park patrons and birthday parties.
Project #ECL-09-019
Priority n/a
Justification
This would probide a needed service as well as provide additional revenue for the park.
Useful Life
Project Name EP Portable Concession Stand
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
25,00025,000Equip/Vehicles/Furnishings
25,00025,000Total
Total20092010201120122013Funding Sources
25,00025,000Construction Fund
25,00025,000Total
Page 88
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Remove 2 small planters on the walls adjacent to the Corporate Center entrance from the park. Fill in areas with
aggregate flooring.
Project #ECL-09-020
Priority n/a
Justification
These areas would be used for seating for a concession stand.
Useful Life
Project Name EP Upper Commons Seating Area
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
8,0008,000Construction/Maintenance
8,0008,000Total
Total20092010201120122013Funding Sources
8,0008,000Construction Fund
8,0008,000Total
Page 89
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the triple wave slide.
Project #ECL-09-021
Priority n/a
Justification
The triple wave slide is an original component and one of the most heavily used events in the structure. It is starting to
wear out.
Useful Life
Project Name EP Adventure Peak Remodel
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20092010201120122013Expenditures
25,00025,000Equip/Vehicles/Furnishings
25,00025,000Total
Total20092010201120122013Funding Sources
25,00025,000Construction Fund
25,00025,000Total
Page 90
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Build an additional storage facility for golf cars.
Project #GC-00-011
Priority n/a
Justification
With the addition of the new nine holes, Braemar has had to increase its fleet of golf cars and needs more secured
indoor storage to house these investments.
Useful Life Unassigned
Project Name Braemar: Expand Cart Storage
Category
Type Improvement
Contact Park & Recreation
Department Golf Course
Total20092010201120122013Expenditures
50,00050,000Equip/Vehicles/Furnishings
50,00050,000Total
Total20092010201120122013Funding Sources
50,00050,000Unfunded
50,00050,000Total
Page 91
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Resurface parking lot.
Project #GC-06-001
Priority n/a
Justification
The resurfacing of the asphalt parking lot is routine maintenance needed to extend the life of the parking lot and avoid a
more costly replacement.
Useful Life
Project Name Braemar & Braemar Exec: Parking Lot Resurfacing
Category Street Mill & Overlay
Type Improvement
Contact Park & Recreation
Department Golf Course
Total20092010201120122013Expenditures
225,00075,00075,00075,000Construction/Maintenance
75,00075,00075,000225,000Total
Total20092010201120122013Funding Sources
225,00075,00075,00075,000Golf Course Fund
75,00075,00075,000225,000Total
Page 92
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace 1/2 of the irrigation system including the pipe, wire and control system.
Project #GC-07-004
Priority n/a
Justification
The majority of the irrigation system will be more than 30 years old in 2011. The system is becoming less reliable
every season (broken pipes, wires and controls). New irrigation systems are more efficient using less water and energy
and significantly more reliable.
Useful Life
Project Name Braemar: Replacement Irrigation System Phase I
Category Unassigned
Type Unassigned
Contact Park & Recreation
Department Golf Course
Total20092010201120122013Expenditures
600,000600,000Equip/Vehicles/Furnishings
600,000600,000Total
Total20092010201120122013Funding Sources
600,000600,000Unfunded
600,000600,000Total
Page 93
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Routine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment.
Project #GC-09-001
Priority n/a
Justification
These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that
are on a 10-15 year replacement schedule.
Useful Life Unassigned
Project Name Braemar: Maintenance Equipment
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Golf Course
Total20092010201120122013Expenditures
745,000140,000145,000150,000155,000155,000Equip/Vehicles/Furnishings
140,000145,000150,000155,000155,000745,000Total
Total20092010201120122013Funding Sources
745,000140,000145,000150,000155,000155,000Golf Course Fund
140,000145,000150,000155,000155,000745,000Total
Page 94
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Routine equipment replacement purchases for driving range equipment and small utility vehicles.
Project #GC-09-002
Priority n/a
Justification
These are routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that
are on a 10 year replacement schedule.
Useful Life 10 years
Project Name Braemar: Miscellaneous Equipment
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Golf Course
Total20092010201120122013Expenditures
198,00038,00040,00040,00040,00040,000Equip/Vehicles/Furnishings
38,00040,00040,00040,00040,000198,000Total
Total20092010201120122013Funding Sources
198,00038,00040,00040,00040,00040,000Golf Course Fund
38,00040,00040,00040,00040,000198,000Total
Page 95
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replacement of golf dome building.
Project #GD-08-001
Priority n/a
Justification
The building attached to the dome is a 25 year old wood structure (one of the first in the country) that has been
subjected to great stress as the dome cable system is attached to it. This would now be considered a structural design
error. The building has been damaged during storms and been repaired several times. The cabling stress has caused
structural shifting. There is a concern in regard to potential income loss if a storm would cause damage to the building
beyond repair.
Useful Life
Project Name Dome: Upgrade Building/Restrooms
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Golf Course
Total20092010201120122013Expenditures
425,000425,000Construction/Maintenance
425,000425,000Total
Total20092010201120122013Funding Sources
425,000425,000Unfunded
425,000425,000Total
Page 96
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace both cooler compressors in basement.
Project #LIQ-01-002
Priority n/a
Justification
Need to replace due to age. Replace before they break down.
Useful Life Unassigned
Project Name 50th: Replace 2 Compressors
Category Building Maintenance
Type Improvement
Contact Unassigned
Department Liquor Stores
Total20092010201120122013Expenditures
16,00016,000Equip/Vehicles/Furnishings
16,00016,000Total
Total20092010201120122013Funding Sources
16,00016,000Liquor Fund
16,00016,000Total
Page 97
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Take existing loading dock and enclose it by adding walls and roof. Will also install mechanical leveling gate.
Project #LIQ-02-002
Priority n/a
Justification
Need bigger opening and area for checking in merchandise. Wastes energy by always having door open for deliveries.
Useful Life Unassigned
Project Name York: Enclose Loading Dock
Category Building Improvements
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20092010201120122013Expenditures
140,000140,000Construction/Maintenance
140,000140,000Total
Total20092010201120122013Funding Sources
140,000140,000Liquor Fund
140,000140,000Total
Page 98
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace current lighting with brighter and more efficient lighting. Replace all wood shelving on liquor wall with Lozier
metal shelving. Replace wood interior with lighter material.
Project #LIQ-02-005
Priority n/a
Justification
Store was last remodeled in 1998. We need to brighten up the interior and get better lighting for how the store is
currently laid out.
Useful Life Unassigned
Project Name 50th: Store Remodel
Category Building Improvements
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20092010201120122013Expenditures
95,00095,000Construction/Maintenance
95,00095,000Total
Total20092010201120122013Funding Sources
95,00095,000Liquor Fund
95,00095,000Total
Page 99
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This will be a major interior remodel. Possible changes include realignment of shelving, changes to coolers, new
entrance door and enhanced security.
Project #LIQ-09-002
Priority n/a
Justification
The York store was built in 1996 and is due for a remodel.
Useful Life 15 years
Project Name York: Store Remodel
Category Building Improvements
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20092010201120122013Expenditures
320,000320,000Construction/Maintenance
320,000320,000Total
Total20092010201120122013Funding Sources
320,000320,000Liquor Fund
320,000320,000Total
Page 100
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Project #LIQ-09-003
Priority n/a
Justification
Useful Life
Project Name 50th: Replace Entrance Door
Category Building Maintenance
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20092010201120122013Expenditures
20,00020,000Construction/Maintenance
20,00020,000Total
Total20092010201120122013Funding Sources
20,00020,000Liquor Fund
20,00020,000Total
Page 101
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Relocate the Public Works building.
Project #MB-04-001
Priority n/a
Justification
Useful Life Unassigned
Project Name Public Works Building
Category Building Improvements
Type Improvement
Contact Public Works
Department Municipal Buildings
Total20092010201120122013Expenditures
22,000,00022,000,000Construction/Maintenance
22,000,00022,000,000Total
Total20092010201120122013Funding Sources
22,000,00022,000,000Capital Improvement Bonds
22,000,00022,000,000Total
Page 102
Capital Improvement Program
City of Edina, MN
20092013thru
Description
These funds will cover any changes/additions to file areas, workstations and record storage.
Project #MB-09-001
Priority n/a
Justification
Useful Life Unassigned
Project Name City Hall/Public Works Building
Category Building Improvements
Type Unassigned
Contact Deputy City Manager
Department Municipal Buildings
Total20092010201120122013Expenditures
175,00035,00035,00035,00035,00035,000Equip/Vehicles/Furnishings
35,00035,00035,00035,00035,000175,000Total
Total20092010201120122013Funding Sources
175,00035,00035,00035,00035,00035,000Construction Fund
35,00035,00035,00035,00035,000175,000Total
Page 103
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Regrade the soccer field turf and provide new sand and peat mixture sub-soils and re-install the underground irrigation
system.
Project #PK-00-033
Priority n/a
Justification
This soccer field is in need of re-grading for proper drainage purposes and to correct uneven turf conditions. The
irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow
for reduced use of herbicides.
Useful Life Unassigned
Project Name Pamela Park: Renovate senior athletic field
Category Ballfield Improvements
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
330,000330,000Construction/Maintenance
330,000330,000Total
Total20092010201120122013Funding Sources
330,000330,000Construction Fund
330,000330,000Total
Page 104
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Meet with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid.
Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
border and adding new playground equipment with accessible path to transfer stations.
Project #PK-00-039
Priority n/a
Justification
The current playground equipment was installed in 1990 and is becoming worn from age and use. Playground
equipment is currently on a 15 year replacement schedule. In 2008, Pamela Park's equipment will be 18 years old. The
current equipment does not meet current ADA standards.
Useful Life 15 years
Project Name Pamela Park: Playground
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
150,000150,000Construction/Maintenance
150,000150,000Total
Total20092010201120122013Funding Sources
150,000150,000Construction Fund
150,000150,000Total
Page 105
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Meet with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid.
Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete
border and adding new playground equipment with accessible path to transfer stations.
Project #PK-02-041
Priority n/a
Justification
The current playground equipment was installed in 1991. Playground equipment is currently on a 15 year replacement
schedule. In 2009 the equipment will be 18 years old. In some cases, even if equipment appears to be structurally
sound after 15 years, the equipment will likely no longer conform to current safety standards and will need a new look.
Useful Life 15 years
Project Name Chowen Park: Playground
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Construction Fund
120,000120,000Total
Page 106
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for construction of two additional chain link fence cages for fast-pitch softball batting and pitching practice at
Pamela Park.
Project #PK-04-001
Priority n/a
Justification
Useful Life Unassigned
Project Name Pamela Park: Batting/pitching cages
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
30,00030,000Construction/Maintenance
30,00030,000Total
Total20092010201120122013Funding Sources
30,00030,000Construction Fund
30,00030,000Total
Page 107
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for relocating the hockey rink and lights at Walnut Ridge Park.
Project #PK-04-003
Priority n/a
Justification
The existing hockey rink at Walnut Ridge Park is currently in close proximity to resident homes, which becomes a
sound nuisance during early morning maintenance hours. Residents have requested relocating the rink for several
years. The hockey rink lights and hockey rink boards are in need of replacement.
Useful Life Unassigned
Project Name Walnut Ridge Park: Hockey rink relocation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
90,00090,000Construction/Maintenance
90,00090,000Total
Total20092010201120122013Funding Sources
90,00090,000Construction Fund
90,00090,000Total
Page 108
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Routine maintenance renovation of the Todd Park asphalt pathway.
Project #PK-05-009
Priority n/a
Justification
In the year 2010, the Todd Park asphalt pathway will be over 12 years old and in need of routine maintenance
renovation, which includes regrading, new base, and repaving.
Useful Life
Project Name Todd Park: Pathway renovation
Category Sidewalk - Pathways
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
45,00045,000Construction/Maintenance
45,00045,000Total
Total20092010201120122013Funding Sources
45,00045,000Construction Fund
45,00045,000Total
Page 109
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project is intended to replace the windows on the north and east sides of the Arneson Acres Park museum building.
Project #PK-07-002
Priority n/a
Justification
The north and east side windows of Arneson Acres Park are the original windows, some of which are broken; however,
all are energy inefficient and need to be replaced similar to the windows on the opposite sides of the house that have
already been replaced.
Useful Life
Project Name Arneson Acres Park: Window replacement
Category Unassigned
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
20,00020,000Construction/Maintenance
20,00020,000Total
Total20092010201120122013Funding Sources
20,00020,000Construction Fund
20,00020,000Total
Page 110
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Develop a new multi-purpose athletic field adjacent to the senior athletic field on the south end of Pamela Park.
Project #PK-07-004
Priority n/a
Justification
There is more demand for multi-purpose athletic fields than there is supply. The same multi-purpose athletic fields are
used to support the games of football, soccer, lacrosse, rugby and ultimate frisbee.
Useful Life
Project Name Pamela Park: New athletic field with lights
Category Unassigned
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
400,000400,000Construction/Maintenance
400,000400,000Total
Total20092010201120122013Funding Sources
400,000400,000Construction Fund
400,000400,000Total
Page 111
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project would include decorative pathway lighting fixtures along the pathway at Lewis Park.
Project #PK-08-006
Priority n/a
Justification
The pathway around the perimeter of Lewis Park receives a tremendous amount of use on a year around basis. There
are many elderly adults that enjoy walking on the pathway year around. During the late fall through early spring the
park pathway receives a lot of use during hours of darkness. Pathway lighting would enhance safety and further
promote walking on the pathway on a year around basis.
Useful Life
Project Name Lewis Park: Pathway lighting
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
30,00030,000Construction/Maintenance
30,00030,000Total
Total20092010201120122013Funding Sources
30,00030,000Construction Fund
30,00030,000Total
Page 112
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for total renovation (new base, asphalt surface, paint and lines) of the outdoor tennis courts at Normandale Park.
Project #PK-09-001
Priority n/a
Justification
In the year 2009, the Normandale Park outdoor tennis courts will be in need of total renovation because they will be
worn beyond what resurfacing can repair.
Useful Life
Project Name Normandale Park: Rebuild tennis courts
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
55,00055,000Construction/Maintenance
55,00055,000Total
Total20092010201120122013Funding Sources
55,00055,000Construction Fund
55,00055,000Total
Page 113
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for renovation of the asphalt walking path in 2009 and the biking path in 2010.
Project #PK-09-002
Priority n/a
Justification
By the year 2009, the interior asphalt walking path will be in need of total renovation due to deterioration from tree root
growth under the pathway and normal wear and tear cause by use and freeze/thaw cycles. The same reasons are cause
to renovate the biking path in 2010.
Useful Life
Project Name Bredesen Park: Pathway renovations
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
500,000250,000250,000Construction/Maintenance
250,000250,000500,000Total
Total20092010201120122013Funding Sources
500,000250,000250,000Construction Fund
250,000250,000500,000Total
Page 114
Capital Improvement Program
City of Edina, MN
20092013thru
Description
The asphalt parking lot closest to the warming house at Highlands Park will be completely renovated in the year 2010.
Project #PK-09-003
Priority n/a
Justification
The asphalt parking lot closes to the warming house in Highlands Park will need complete renovation in the year 2010.
Useful Life
Project Name Highlands Park: Parking lot renovation
Category Park Development
Type Improvement
Contact Liquor Stores
Department Park & Recreation
Total20092010201120122013Expenditures
50,00050,000Construction/Maintenance
50,00050,000Total
Total20092010201120122013Funding Sources
50,00050,000Construction Fund
50,00050,000Total
Page 115
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for renovation of the west asphalt parking lot at Pamela Park.
Project #PK-09-004
Priority n/a
Justification
The entire west end asphalt parking lot and its entrances will need complete renovation by the year 2011.
Useful Life
Project Name Pamela Park: West parking lot/entrance renovation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
150,000150,000Construction/Maintenance
150,000150,000Total
Total20092010201120122013Funding Sources
150,000150,000Construction Fund
150,000150,000Total
Page 116
Capital Improvement Program
City of Edina, MN
20092013thru
Description
A natural resources inventory assessment is intended to identify rare plant and animal species, and exotic non-native
plant species assessment. The assessment can also include other important information such as soil types, existing
infrastructures, and areas of significant historical and cultural values.
Project #PK-09-005
Priority n/a
Justification
A resource inventory assessment must first be conducted to identify Edina’s prairies, woods and wetlands and produce a
landscape comprehensive resource map. The survey is needed to assess ecological functions.
Once a resource inventory assessment is completed, a Natural Resources Conservation and Management Plan will be
established. At that time, natural resource management policies will be proposed and adopted. For example, exotic or
invasive plants may be controlled to protect native habitats for the health and safety of the public.
This is an important step in the process to ultimately identify a master landscape plantings plan for all Edina parks,
which is the final phase of park development that has yet to be completed.
Useful Life
Project Name Natural resources inventory assessment
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
100,00050,00050,000Planning/Design
50,00050,000100,000Total
Total20092010201120122013Funding Sources
100,00050,00050,000Construction Fund
50,00050,000100,000Total
Page 117
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for total renovation of the large 7,237 square yards of asphalt parking lot.
Project #PK-09-006
Priority n/a
Justification
By the year 2012, the 7,237 square yards of asphalt parking lot will need to be totally renovated due to normal
deterioration.
Useful Life
Project Name Garden Park: Parking lot renovation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
250,000250,000Construction/Maintenance
250,000250,000Total
Total20092010201120122013Funding Sources
250,000250,000Construction Fund
250,000250,000Total
Page 118
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project includes the development of the Countryside Park master plan in phases. The plan includes development of
a new replacement park shelter building, a new outdoor hockey rink in a north/south orientation, the addition of a new
pathway within the interior of the park that connects to all park amenities, renovation of the large baseball field and
replacement of the playground equipment.
Project #PK-09-007
Priority n/a
Justification
The Park & Recreation Department conducted a lengthy process that involved meeting with neighbors from Countryside
Park and architects and the Park Board to determine the desired long-range plan needs and desires for Countryside
Park. The park shelter building is old and outdated and gets very minimal use. The outdoor hockey rink deteriorated
due to age and was removed and not replaced. The results of the comprehensive neighborhood input process and study
sessions validated the needs and desires to upgrade the park to include the amenities shown in the description.
Useful Life
Project Name Countryside Park: Master plan development
Category Park Development
Type Unassigned
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
500,000500,000Construction/Maintenance
500,000500,000Total
Total20092010201120122013Funding Sources
500,000500,000Construction Fund
500,000500,000Total
Page 119
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for renovation of the existing park shelter building at Pamela Park to update the bathrooms to ADA standards,
install the keyless entry locking system on the exterior doors and expand the building footprint to include more storage
for a variety athletic equipment and add an extended roof to cover picnic tables.
Project #PK-09-008
Priority n/a
Justification
The Pamela Park shelter building is over 40 years old and in need of some enhancements including updating the
bathrooms and making them more accessible. The exterior doors need to be part of the keyless entry system which
automatically locks and unlocks doors automatically on a timed basis. Athletic associations are in need of more on site
storage for their athletic equipment such as bats, balls, portable outfield fencing, down markers and pitching machines
and vending machines. Residents have also requested a sheltered area for picnic tables. This is also the home site of
the Edina High School girls varsity fast pitch softball team who need storage of supplies and equipment.
Useful Life
Project Name Pamela Park: Park shelter Improvements
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
220,000220,000Construction/Maintenance
220,000220,000Total
Total20092010201120122013Funding Sources
220,000220,000Construction Fund
220,000220,000Total
Page 120
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is for purchase and installation of pitching tunnels (or cages) for the girls fast pitch softball program. This is also
intended to fund electronic scoreboards for each of three softball fields.
Project #PK-09-009
Priority n/a
Justification
The three softball fields at Pamela Park are used by the Edina Varsity girls fast pitch softball team, the Edina Girls Fast
Pitch Softball Association and the Edina Youth Softball Association (girls slow pitch). Pitching tunnels are needed as a
safe venue for girls fastpitch players to practice pitching so it can be done without risk to the public and other players
and also deters players from throwing practice pitch balls into the field fencing, which ruins the fencing.
Useful Life
Project Name Pamela Park: Softball pitching tunnel & scoreboard
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20092010201120122013Expenditures
30,00030,000Construction/Maintenance
30,00030,000Total
Total20092010201120122013Funding Sources
30,00030,000Construction Fund
30,00030,000Total
Page 121
Capital Improvement Program
City of Edina, MN
20092013thru
Description
A network of ten sirens and radio controlled decoders are used to alert the public of impending or an existing emergency
such as severe weather, floods or national attack. The sirens are activated from the Hennepin County Sheriff's Radio
Center in Golden Valley via the radio controller. The sirens have an expected life span of 25 years and are on a
staggered replacement schedule. The oldest siren is 23 years old. The current replacement cost per siren is $15,000.
The radio control units were purchased in 1986. The manufacturer is not in the siren control business any more and
replacement parts are nonexistent for both the sending and receiving units. The control system will be replaced on a
countywide basis in the next 2-5 years. There have been no cost estimates yet for the replacement system. The
replacement cost for the current units was $3,875.
Project #PS-02-004
Priority n/a
Justification
The outdoor warning system is an integral part of the City's emergency response plan. The ability to warn the public of
impending disaster allows people to take immediate action to reduce their risk of harm. The primary use of the warning
system has been for severe weather emergencies, such as tornado warnings, in which prompt warning can mean the
difference between life and death.
Useful Life Unassigned
Project Name Outdoor Warning System
Category Warning System
Type Equipment
Contact Police Department
Department Public Safety
Total20092010201120122013Expenditures
40,00040,000Equip/Vehicles/Furnishings
40,00040,000Total
Total20092010201120122013Funding Sources
40,00040,000Construction Fund
40,00040,000Total
Page 122
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project involves the milling of distressed surface and the repaving of a new surface on Benton Ave. from Hansen
Rd. to Hwy 100.
Project #PW-00-004
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life Unassigned
Project Name Mill & Overlay: Benton Ave. (Hansen - Hwy 100)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
N
WILLSON RD
WILLSON
HANSE
HANSEN RD
DALE AVE
H
GROVE ST
BENTON AVE
BERNARD PL
CODE AVE
BIRCHCREST DR
60TH ST W
59TH ST W
CODE AVE
58TH ST W
EAS
T
VIEW
DR
TINGDALE AVE
TINGDALE AVE
VALLEY VIE W RD
JOSEPHINE AVE
MANDALE CT
N RD
HANSEN RD
NTON AVE
GARDEN AVE
DR
AVE
BENTON
RIDGECLOVER
WILR
Y
AN AVE
LA
PORTER
FORSLIN
WST61ST
DR
LA
M
E
L
O
D
Y
BENTON AVEHA
N
S
E
N
R
O
A
D
TH
1
0
0
PROJECT AREA
Total20092010201120122013Expenditures
180,000180,000Construction/Maintenance
180,000180,000Total
Total20092010201120122013Funding Sources
180,000180,000Municipal State Aid
180,000180,000Total
Page 123
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for the reconstruction of W. 44th Street from Hwy 100 to France Avenue. This project will
provide new concrete curb and gutters, pavement, and sidewalks along the northerly side.
Project #PW-00-012
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible.
Useful Life Unassigned
Project Name Reconstruct: 44th Ave. (TH 100 - France)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
44TH ST W
ALDEN
DR
GRIMES
AVE
42 1/2 ST W
TOWNES CIR
FRANCE AVE S
49TH ST W
TOWNES RD
MAPLE RD
TOW
NES RD
BRIDGE LA
48TH ST W
FRANCE AVE S
47TH ST W
BRIDGE LA
BRIDGE LA
COOLIDGE AVE
BROOK AVE
STATE HWY NO 100
WST44TH
EDGEBROOK RD
CLUB
AVE
MACKEY
RD
SUNNYSIDE
RIDGESUNNYSLOPE
W
RD
WOODHILL
WAY
E
RD
SUNNYSLOPE
BROWNDALE MOORLAND
EDINA WOODDALE
AVE
AVE
BLVD AVE
RD
SUNNYSIDE
44TH ST W
RD
MEADOW
RD
MEADOW
RD
OAKS
WHITE
RD
TOWNES
RD
SUNNYSIDE
AVE
AVE
AVE
AVE
DREXEL
CASCO BRUCE
ARDEN
RD
CLUBCOUNTRY
FRANCE AVE S
SUN NYSID E AV E
FRAN
C
E
A
V
E S
(CO RD NO 17)
WAVELAND TE R
NAT
C
H
E
Z
A
V
E
S
ST
W
S
AVE
GRIMES
44TH
MORNINGSIDE RD
FRANCE AVE S
RDMEADOW
ST
BRANSON
SCOTT TER
AVE
CROCKER
AVE
LYNN
OAKDALE AVE
LITTLE ST
45TH ST W
AVE
CURVE
SUNNYSIDE R D
NATCHEZ AVE S (UNDEVELOPED)
OAKDALE AVE
42ND ST WWST42ND
MOTOR ST
WESTBROOK LA
MILLPOND PL
48TH ST W
CASCADE LA
LAURA AVEMOORE AVE
NORTH AVE
44TH ST W
THIELEN AVE
STATE HWY NO 100
AVE
VERNON
LA
N
PROJECT AREA
W E S T 4 4 T H S T R E E T
TH
1
0
0
FR
A
N
C
E
A
V
E
Total20092010201120122013Expenditures
900,000900,000Construction/Maintenance
900,000900,000Total
Total20092010201120122013Funding Sources
720,000720,000Municipal State Aid
180,000180,000Public Improvement Revolving
900,000900,000Total
Page 124
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for the rehabilitation of concrete pavement along Tracy Avenue from Vernon Avenue to TH 62.
The existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of the
roadway.
Project #PW-00-015
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life Unassigned
Project Name Concrete Rehab: Tracy Ave. (Vernon - TH62)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
WILLSON RD
EIVEKAL
WIND RD
60TH ST W
RYAN AVE
RUTH DR
59TH ST W
STATE HWY NO 62
RYAN AVE
62ND
64TH
YAN AVE
AVE
SCHOOL
VALLEY
AVE
PARNELL
RD
WILLSON
WILL
S
O
N
GOLF
DR
LAKEV
IEW
LAKEVIEW
SOUTHVIEW LA
SEPHINE AVE
65TH ST W
ILRYAN AVE
GDALE AVE
MILDRED AVE
ROLF AVE
RREN AVE
JOSEPHINE AVEWILRYAN AVE
STATE HWY NO 62
TINGDALE AVE
ROLF AVE
64TH ST W
MILDRED AVE
63RD ST W
WARREN AVE
HOLBORN AVE
MADDOX LA
ST W
WILRYAN AVECODE AVE
62ND ST W
AVE
TRACY
TRACY AVE
WAY
COLONIAL
OLINGER BLVD
STATE HWY NO 62
DR
CRESCENT
VIEW
VALLEY
HILLSIDE
COLONIAL CT
VALLEY
64TH ST W
LA
RD
STATE HWY NO 62
WHITING AVE
PARK LA
CREST LA
LADARCY
LIMERICK DR
DR
DORON
RD
VIEW RD
DORON LA
DORON LA
VALLEY LA
LA
LIMERICK
LIMERICK DR CIR
RIDGEVIEW
DR
RIDGEVIEW
64TH ST W
WHITING AVE
RIDGEVIEW DR
WST63RD
WYMAN AVE
62ND ST W
MADDOX LA
RD
HANSEN
BLVD
WESTRIDGE
DRCRESCENT
HILLSIDE RD
62ND
PLROBERTSAVE
ROLFAVE
MILDRED RD
VALLEY VIEW
OLINGER BLVD
HANSEN RD
OLINGER RD
HANSEN RD
DALE AVE
HANSEN RD
WINDSOR AVE
DALE AVE BERNARD AVE
57TH ST W
CODE AVE
GROVE ST
BENTON AVE
BERNARD PL
BIRCHCREST DR
CODE AVE
BIRCHCREST DR
60TH ST W
59TH ST W
CODE AVE
58TH ST W
56TH ST W
WARWICK PL
WARWICK PL
YVONNE TER
EASTV
IEW DR
TINGDALE AVE
TINGDALE AVE
VALLEY VIEW RD
JOSEPHINE AVE
NORMANDALE CT
57TH ST W
KENT AVE
WINDSOR AVE
IDYLWOOD PL
DYLWOOD DR
LESLEE LA
KAYMAR DR
VERNON AVE
SHERMAN CIR
OLINGER RD
OLINGER RD
GROVE CIR
OLINGER RD
HIGHWOOD DR
HIGHWOOD DR
HEATHER LA
GROVE ST
AMY DR
SUN RD
61ST ST
OLINGER BLVD
JEFF PL
61ST ST W
ARBOUR AVE
ARBOUR AVE
GROVE ST
MEROLD DR
DUNDEE RD
MIRROR LAKES
EDEN PRAIRIE RD
HAWKES TER
WARDEN AVE
GROVE ST
STUART AVE
ARBOUR LA
BENTON AVE
TRACY AVE
LYLE CIR
JOHNSON DR
GROVE ST
WARDEN AVE
TRACY AVE
JOHNSON DR
MERRITT CIR
GOYA LA
WARDEN AVE
OAK LA
OAK LA
CRESCENT DR
COUNTRYSIDE RD
HIGHLAND RD
HANSEN RD
HANSEN RD
BENTON AVE
GARDEN AVE
GARDEN AVE
HANSEN RD
VERNON AVE
WYMAN AVE
WESTRIDGE
DR
AVE
BENTON
RIDGECLOVER
WILRYAN AVE
LA
PORTERFORSLIN
WST61ST
AVE
CODE
WST
56TH
MOND LA
AVEWINDSOR
PL
DR
LAKE
MELODY
LA
MELODY
RIDGEWAY
LA
ARBOUR
AVE
TRACY
RD
BLVD
WESTRIDGE
DR
CRESCENT
ST
HUNTER
AVEBENTON
BLVD
OLINGER
CIR
OLINGER
WYCLIFFE RD
AVE
ARBOUR
W
CIR
OLINGER
BERNECIR
W
DR
HIGHWOOD
DR
HIGHWOOD
RD
DUNDEE
CHANTREY
RD
PRAIRIE
EDEN
RD
WYCLIFFE
AVEVERNON
DR
HAWKES
RD
PARKRIDGE
GATE PARK RD
WAY
DONCASTER
GLENGARR
RD
N
TR
A
C
Y
A
V
E
VERNON AVE
TH 62
PROJECT AREA
Total20092010201120122013Expenditures
600,000600,000Construction/Maintenance
600,000600,000Total
Total20092010201120122013Funding Sources
480,000480,000Municipal State Aid
120,000120,000Public Improvement Revolving
600,000600,000Total
Page 125
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for the rehabilitation of concrete pavement along W. 70th Street from Hwy 100 to France
Avenue. The existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of
the roadway.
Project #PW-00-017
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life Unassigned
Project Name Reconstruct: W. 70th St. (TH100 - France)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
Total20092010201120122013Expenditures
1,200,0001,200,000Construction/Maintenance
1,200,0001,200,000Total
Total20092010201120122013Funding Sources
960,000960,000Municipal State Aid
240,000240,000Public Improvement Revolving
1,200,0001,200,000Total
Page 126
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for reconstructing this bridge and possible abutments.
Project #PW-00-029
Priority n/a
Justification
The need to rehabilitate this bridge was determined by the annual bridge certification program.
Useful Life Unassigned
Project Name Bridge: 56th Street Bridge
Category Local Streets
Type Improvement
Contact Public Works
Department Public Works
EWING CIRT W
BROO
OAKLA
PARK PL
DNALDOOW
FRANCE AVE S
LA
WOODLAND
DREND
WOOD
D
R
DEVER
56TH
ST W
DR
WOODCREST
DR
RD
WOODLAND
CIR
CIR
WOODLAND
HALIFAX
N
W 56TH ST
WEST 56TH STREET BRIDGE
FR
A
N
C
E
A
V
E
N
U
E
Total20092010201120122013Expenditures
250,000250,000Construction/Maintenance
250,000250,000Total
Total20092010201120122013Funding Sources
250,000250,000State Bridge Bond
250,000250,000Total
Page 127
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab existing concrete roadway.
Project #PW-00-074
Priority n/a
Justification
This roadway is over 30 years old and is in need of concrete repair.
Useful Life Unassigned
Project Name Concrete Rehab: Parklawn Ave. (France to W 77)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
Total20092010201120122013Expenditures
450,000450,000Construction/Maintenance
450,000450,000Total
Total20092010201120122013Funding Sources
360,000360,000Municipal State Aid
90,00090,000Public Improvement Revolving
450,000450,000Total
Page 128
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for the reconstruction of West 62nd Street from Oaklawn Avenue to France Avenue. This project
will provide a new roadway section and will bring this road into compliance with State-Aid Standards. Sidewalks will
also be proposed with this reconstruction.
Project #PW-01-011
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State-Aid Standards as set by the Minnesota Department of Transportation.
Useful Life Unassigned
Project Name Reconstruct: W 62nd St. (Oaklawn - France)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
520,000520,000Construction/Maintenance
520,000520,000Total
Total20092010201120122013Funding Sources
416,000416,000Municipal State Aid
104,000104,000Public Improvement Revolving
520,000520,000Total
Page 129
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for the reconstruction of West 54th Street from Wooddale Avenue to France Avenue. This project
will provide a new roadway section and will bring this road into compliance with State-Aid Standards. Sidewalks will
also be analyzed with this reconstruction.
Project #PW-01-012
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State-Aid Standards as set by the Minnesota Department of Transportation.
Useful Life Unassigned
Project Name Reconstruct: W 54th St. (Wooddale to France)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
850,000850,000Construction/Maintenance
850,000850,000Total
Total20092010201120122013Funding Sources
680,000680,000Municipal State Aid
170,000170,000Public Improvement Revolving
850,000850,000Total
Page 130
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project involves the milling of distressed surface and the repaving of a new surface on Blake Road from Vernon
Avenue to Interlachen Boulevard.
Project #PW-03-003
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life Unassigned
Project Name Mill & Overlay: Blake Rd (Vernon to Interlachen)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
319,000319,000Construction/Maintenance
319,000319,000Total
Total20092010201120122013Funding Sources
319,000319,000Municipal State Aid
319,000319,000Total
Page 131
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for the reconstruction of West 58th Street from Wooddale Avenue to France Avenue. This project
will provide a new roadway section and will bring this road into compliance with State-Aid Standards. Sidewalks will
also be analyzed with this reconstruction.
Project #PW-04-001
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State-Aid Standards as set by the Minnesota Department of Transportation.
Useful Life Unassigned
Project Name Reconstruct: W 58th St (Wooddale to France)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
900,000900,000Construction/Maintenance
900,000900,000Total
Total20092010201120122013Funding Sources
720,000720,000Municipal State Aid
180,000180,000Public Improvement Revolving
900,000900,000Total
Page 132
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project provides for reconstructing this bridge and abutments and adding sidewalks over the Minnehaha Creek.
Project #PW-05-003
Priority n/a
Justification
The need to rehabilitate this bridge was determined by the annual bridge certification program.
Useful Life 100 years
Project Name Bridge: 54th Street Bridge
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
400,000400,000Construction/Maintenance
400,000400,000Total
Total20092010201120122013Funding Sources
400,000400,000Municipal State Aid
400,000400,000Total
Page 133
Capital Improvement Program
City of Edina, MN
20092013thru
Description
The Edina City Council Approved the Northeast Edina Transportation Study on November 6, 2006. The Study
included arterial improvements at Vernon Avenue and Interlachen Boulevard, West 44th Street and France Avenue, and
50th & France Business Area. The Study also included neighborhood improvements within the Northeast Edina local
neighborhoods. The neighborhood improvements were removed by the City Council during the Spring of 2008.
Project #PW-07-004
Priority n/a
Justification
Per approved Northeast Edina Transportation Study.
Useful Life
Project Name Northeast Edina Traffic Calming
Category Street Reconstruction
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
197,000115,00082,000Construction/Maintenance
115,00082,000197,000Total
Total20092010201120122013Funding Sources
197,000115,00082,000Municipal State Aid
115,00082,000197,000Total
Page 134
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Provide a fire protection for the Braemar Cold Storage Building.
Project #PW-08-004
Priority n/a
Justification
This building is approximately 17,000 SF and stores off-season public works and park maintenance equipment. The
building is not fire protected. This will provide a fire protection system in case of fire within the building.
Useful Life
Project Name Braemar Cold Storage - Fire Suppression
Category Building Improvements
Type Improvement
Contact Public Works
Department Public Works
Total20092010201120122013Expenditures
70,00070,000Construction/Maintenance
70,00070,000Total
Total20092010201120122013Funding Sources
70,00070,000Construction Fund
70,00070,000Total
Page 135
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This is a skid steer loader for the street department to be used in the concrete pavement rahbilitation program.
Project #PW-08-005
Priority n/a
Justification
This skid steer will be used to remove pavement within the street department when repairing concrete roadways in the
City. Staff can work more efficiently with an additional skid steer.
Useful Life
Project Name Skid Steer
Category Equipment Replacement
Type Equipment
Contact Public Works
Department Public Works
Total20092010201120122013Expenditures
60,00060,000Equip/Vehicles/Furnishings
60,00060,000Total
Total20092010201120122013Funding Sources
60,00060,000Construction Fund
60,00060,000Total
Page 136
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Reconstruct Valley View Road from McCauley Trail to Braemar Boulevard.
Project #PW-08-006
Priority n/a
Justification
This reconstruction will provide a safety enhancement at the "hair pin curve" while also providing a sidewalk along the
north and east side of the roadway.
Useful Life
Project Name Reconstruct / Sidewalk: VV Rd at Braemar Blvd
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
700,000700,000Construction/Maintenance
700,000700,000Total
Total20092010201120122013Funding Sources
560,000560,000Municipal State Aid
140,000140,000Public Improvement Revolving
700,000700,000Total
Page 137
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost
effective manner.
Project #PW-09-001
Priority n/a
Justification
The need to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based
on condition and age of pavement, and also ratings compared with other local neighborhoods.
The potential future roadway reconstruction projects are:
2009: Mirror Lakes South Neighborhood, St. Johns Park Neighborhood, Andover Road Neighborhood, Country Club
Phase 2.
2010: Pamela Park West Neighborhood, Parkwood Knolls East Neighborhood, Braemar Hills Neighborhood,
Interlachen Circle
2011: Idylwood Neighborhood, Lake Harvey Neighborhood, Valley Estates Neighborhood, Kellogg Place
Neighborhood
2012: Golf Terrace Heights, Philbrook Lane, Indian Hills East Neighborhood, Cornelia South
2013: Rolling Green Neighborhood, Forslin Neighborhood, South Lake Edina Neighborhood
Useful Life 50 years
Project Name Neighborhood Street Recon. Program
Category Local Streets
Type Improvement
Contact Public Works
Department Public Works
Total20092010201120122013Expenditures
26,470,0005,200,0004,440,0005,830,0005,500,0005,500,000Construction/Maintenance
5,200,0004,440,0005,830,0005,500,0005,500,00026,470,000Total
Total20092010201120122013Funding Sources
26,470,0005,200,0004,440,0005,830,0005,500,0005,500,000Public Improvement Revolving
5,200,0004,440,0005,830,0005,500,0005,500,00026,470,000Total
Page 138
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Construct sidewalks along MSAS designated streets as petitioned from residents.
Project #PW-09-002
Priority n/a
Justification
These projects will provide separation of pedestrians and vehicles along the designated routes.
Useful Life Unassigned
Project Name Sidewalks/Pathways (MSA)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
Total20092010201120122013Expenditures
250,00050,00050,00050,00050,00050,000Construction/Maintenance
50,00050,00050,00050,00050,000250,000Total
Total20092010201120122013Funding Sources
250,00050,00050,00050,00050,00050,000Municipal State Aid
50,00050,00050,00050,00050,000250,000Total
Page 139
Capital Improvement Program
City of Edina, MN
20092013thru
Description
These projects will provide separation of pedestrians and vehicles along the designated routes.
Project #PW-09-003
Priority n/a
Justification
These projects are initiated by petitions from residents only.
Useful Life Unassigned
Project Name Sidewalks/Pathways: City Costs
Category Sidewalk - Pathways
Type Improvement
Contact Public Works
Department Public Works
Total20092010201120122013Expenditures
250,00050,00050,00050,00050,00050,000Construction/Maintenance
50,00050,00050,00050,00050,000250,000Total
Total20092010201120122013Funding Sources
250,00050,00050,00050,00050,00050,000Construction Fund
50,00050,00050,00050,00050,000250,000Total
Page 140
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project involves the milling of distressed surface and the repaving of a new surface on West 69th Street from
France Avenue to York Avenue.
Project #PW-09-004
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life
Project Name Mill & Overlay: W 69th St (France to York)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
550,000550,000Construction/Maintenance
550,000550,000Total
Total20092010201120122013Funding Sources
550,000550,000Municipal State Aid
550,000550,000Total
Page 141
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Construct a sidewalk along France Avenue from West 48th Street to West 46th Street.
Project #PW-09-005
Priority n/a
Justification
This provides the missing link of sidewalk along the westerly side of France Avenue between West 50th Street and
West 44th Street.
Useful Life
Project Name Sidewalk: France Ave (48 to 49)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
250,000250,000Construction/Maintenance
250,000250,000Total
Total20092010201120122013Funding Sources
250,000250,000Municipal State Aid
250,000250,000Total
Page 142
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Mill and overlay the bituminous pavement at Metro Boulevard and West 70th Street. Also, add a south-bound to west-
bound right turn lane at this intersection.
Project #PW-09-006
Priority n/a
Justification
This intersection was previously scheduled for a complete reconstruction in 2008. However, due to funding constraints
and a re-review of the pavement we feel that the intersection could be milled and overlayed and then a complete
reconstruction could occur in 2017, which at that time can include the Three Rivers trail system if so desired.
Useful Life
Project Name Mill and Overlay: West 70th Street and Metro Blvd
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20092010201120122013Expenditures
400,000400,000Construction/Maintenance
400,000400,000Total
Total20092010201120122013Funding Sources
400,000400,000Municipal State Aid
400,000400,000Total
Page 143
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace water mains, services and sanitary sewers.
Project #UT-00-020
Priority 1 Urgent
Justification
Sanitary sewer and water mains are deteriorating due to age. This is a high maintenance area of the City utility system.
Sanitary sewer pipes should be upgraded.
Useful Life 100 years
Project Name Watermain/Sanitary: Country Club Area
Category Water Main System
Type Improvement
Contact Utility Supt
Department Utility Department
Total20092010201120122013Expenditures
3,553,0003,553,000Construction/Maintenance
3,553,0003,553,000Total
Total20092010201120122013Funding Sources
1,394,0001,394,000Utility Funds - San Swr
2,159,0002,159,000Utility Funds - Wtr
3,553,0003,553,000Total
Page 144
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace lift station with one that has two larger pumps and automatic controls.
Project #UT-02-003
Priority n/a
Justification
Existing station collects dirt and debris which affects its operation. Larger pumping capabilities are needed to prevent
flooding of public and private property.
Useful Life 20 years
Project Name Storm water Lift Station (Highlands Lake)
Category Storm Sewer Improvements
Type Improvement
Contact Utility Supt
Department Utility Department
Total20092010201120122013Expenditures
75,00075,000Construction/Maintenance
75,00075,000Total
Total20092010201120122013Funding Sources
75,00075,000Utility Funds - Stm Swr
75,00075,000Total
Page 145
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Pump, Motor, and Wet Well Rehab.
Project #UT-03-010
Priority n/a
Justification
Replace worn-out pumps and rehab concrete wet well.
Useful Life 20 years
Project Name Lift Station #1 (4041 Sunnyside Road)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
130,000130,000Construction/Maintenance
130,000130,000Total
Total20092010201120122013Funding Sources
130,000130,000Utility Funds - San Swr
130,000130,000Total
Page 146
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Backhoe replacement
Project #UT-03-012
Priority n/a
Justification
This backhoe will be 12 to 15 years old and at the end of its life expectancy
Useful Life 10 years
Project Name 1998 Cat Backhoe Replacement
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
160,000160,000Equip/Vehicles/Furnishings
160,000160,000Total
Total20092010201120122013Funding Sources
160,000160,000Utility Funds - Wtr
160,000160,000Total
Page 147
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Well rehab
Project #UT-03-015
Priority n/a
Justification
Continue to produce required water supply.
Useful Life 6 years
Project Name Well #2 (4521 West 50th Street)
Category Wells
Type Improvement
Contact Utility Supt
Department Utility Department
Total20092010201120122013Expenditures
50,00050,000Construction/Maintenance
50,00050,000Total
Total20092010201120122013Funding Sources
50,00050,000Utility Funds - Wtr
50,00050,000Total
Page 148
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Remove existing stabilized lead contaminated soil located at Braemar Public Works Site.
Project #UT-04-005
Priority n/a
Justification
The lead abatement project for the Brian Wipperman Gun Range left approximately 2000 cubic yards of stabilized lead
soil at this location. The construction of the Braemar Public Safety Training Facility has drastically reduced the amount
of space needed for the Public Works and Parks maintenance operation. This soil removal will free-up approximately
15,000 square feet of working area. This area is used for sorting soils and debris from watermain breaks, construction
projects, leaf storage, etc.
Useful Life Unassigned
Project Name Public Works: Braemar Work Site - Lead Removal
Category Water Main System
Type Improvement
Contact Utility Supt
Department Utility Department
Total20092010201120122013Expenditures
200,000200,000Construction/Maintenance
200,000200,000Total
Total20092010201120122013Funding Sources
200,000200,000Utility Funds - Wtr
200,000200,000Total
Page 149
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab Lift Station
Project #UT-05-008
Priority 2 Very Important
Justification
Useful Life 30 years
Project Name Lift Station #2 (4200 Grimes Ave)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
100,000100,000Construction/Maintenance
100,000100,000Total
Total20092010201120122013Funding Sources
100,000100,000Utility Funds - San Swr
100,000100,000Total
Page 150
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab Lift Station and move across the street to the NE corner.
Project #UT-05-009
Priority 2 Very Important
Justification
Useful Life 30 years
Project Name Lift Station #7 (4021 Grimes Ave)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Utility Funds - San Swr
120,000120,000Total
Page 151
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab Lift Station
Project #UT-05-010
Priority 2 Very Important
Justification
Useful Life 30 years
Project Name Lift Station #8 (4023 Monterey Ave)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Utility Funds - San Swr
120,000120,000Total
Page 152
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab Lift Station
Project #UT-05-011
Priority 2 Very Important
Justification
Useful Life 30 years
Project Name Lift Station #20 (5901 West 62nd St)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
100,000100,000Construction/Maintenance
100,000100,000Total
Total20092010201120122013Funding Sources
100,000100,000Utility Funds - San Swr
100,000100,000Total
Page 153
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab Well
Project #UT-05-012
Priority 2 Very Important
Justification
Useful Life 10 years
Project Name Well #13 (6721 2nd St.)
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
150,000150,000Construction/Maintenance
150,000150,000Total
Total20092010201120122013Funding Sources
150,000150,000Utility Funds - Wtr
150,000150,000Total
Page 154
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab well
Project #UT-05-013
Priority 2 Very Important
Justification
Useful Life 10 years
Project Name Well #6 (5849 Ruth St)
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Utility Funds - Wtr
120,000120,000Total
Page 155
Capital Improvement Program
City of Edina, MN
20092013thru
Description
An additional 2000 gallon per minute iron removal filter plant to be built near the Southdale water tower.
Project #UT-07-002
Priority 2 Very Important
Justification
Improve water quality and remove radium in wells #5 and 18. With out this filter plant well #18 may become unusable.
Costs for this project includes land acquisition costs.
Useful Life 50 years
Project Name New Water Treatment Plant (#5)
Category Filter Plants
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
6,000,0002,500,0003,500,000Construction/Maintenance
2,500,0003,500,0006,000,000Total
Total20092010201120122013Funding Sources
6,000,0002,500,0003,500,000Utility Funds - Wtr
2,500,0003,500,0006,000,000Total
Page 156
Capital Improvement Program
City of Edina, MN
20092013thru
Description
New 3000 gallon per minute water treatment plant to treat wells #9, 15, and future well #21. This treatment plant could
either be located at Garden Park or adjacent to Well #9 located at Benton Road and Hanson Road.
Project #UT-07-003
Priority 2 Very Important
Justification
Improve water quality and regain the pumping capacity of well #9. Costs for this project include land acquisition costs
if the treatment plant is not located on City property.
Useful Life 50 years
Project Name New Water Treatment Plant (#6)
Category Filter Plants
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
7,800,000600,0003,600,0003,600,000Construction/Maintenance
600,0003,600,0003,600,0007,800,000Total
Total20092010201120122013Funding Sources
7,800,000600,0003,600,0003,600,000Utility Funds - Wtr
600,0003,600,0003,600,0007,800,000Total
Page 157
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Develop and build a new well (#21) to replace Well #14 at Braemar Golf Course. This well would pump to water
treatment plant #6.
Project #UT-07-005
Priority 2 Very Important
Justification
Well #14 has high levels of radium in it and can only be used 1 week out of a year with out notifying residents that we
are delivering them higher levels of radium than the Safe Drinking Water Act allows. Well #14 can be used for
irrigating the golf course and the new well will replace it in the drinking water system.
Useful Life 100 years
Project Name New Well (#21)
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
350,000350,000Construction/Maintenance
350,000350,000Total
Total20092010201120122013Funding Sources
350,000350,000Utility Funds - Wtr
350,000350,000Total
Page 158
Capital Improvement Program
City of Edina, MN
20092013thru
Description
New water meter radio reading system equipment.
Project #UT-07-007
Priority 1 Urgent
Justification
Existing equipment and software needs to be updated to provide better information and improved reading accuracy. Old
equipment is at the end of it's useful life. The City meter reading system is out dated and no longer being supported.
Useful Life 20 years
Project Name Water Meter Reading System Replacement
Category Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
10,00010,000Equip/Vehicles/Furnishings
10,00010,000Total
Total20092010201120122013Funding Sources
10,00010,000Utility Funds - Wtr
10,00010,000Total
Page 159
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace the 1992 Sanitary Sewer Jetter with a new Jet/Vacuum Unit
Project #UT-07-008
Priority 3 Important
Justification
This unit has reached it's useful life.
Useful Life 20 years
Project Name Sewer Jetter Replacement
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
300,000300,000Equip/Vehicles/Furnishings
300,000300,000Total
Total20092010201120122013Funding Sources
300,000300,000Utility Funds - San Swr
300,000300,000Total
Page 160
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Rehab and paint the Gleason Water Tower
Project #UT-07-009
Priority 2 Very Important
Justification
Painting surface has reached it's useful life.
Useful Life 20 years
Project Name Gleason Water Tower (paint)
Category Water Towers
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
500,000500,000Construction/Maintenance
500,000500,000Total
Total20092010201120122013Funding Sources
500,000500,000Utility Funds - Wtr
500,000500,000Total
Page 161
Capital Improvement Program
City of Edina, MN
20092013thru
Description
With the construction of WTP #5 well #5 will be converted to a submersible well and the building will be torn down.
Project #UT-08-009
Priority 2 Very Important
Justification
Electrical equipment will be moved to WTP #5 and the ugly building on the median can be torn down.
Useful Life 15 years
Project Name Well #5 (West 69th Street)
Category Wells
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
100,000100,000Construction/Maintenance
100,000100,000Total
Total20092010201120122013Funding Sources
100,000100,000Utility Funds - Wtr
100,000100,000Total
Page 162
Capital Improvement Program
City of Edina, MN
20092013thru
Description
New piping from wells #9, #15, and #21 to WTP #6 so water can be treated.
Project #UT-08-010
Priority 2 Very Important
Justification
Improve water quality in the north central part of the city. To bring well#9 back on line with the City's water system.
Useful Life 100 years
Project Name Piping Wells #9, #15, and #21 to WTP #6
Category Water Main System
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
1,200,0001,200,000Construction/Maintenance
1,200,0001,200,000Total
Total20092010201120122013Funding Sources
1,200,0001,200,000Watershed District
1,200,0001,200,000Total
Page 163
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace an existing 20 hp pump with a 70 hp pump and VFD.
Project #UT-08-012
Priority 2 Very Important
Justification
Lower operation cost, pumping efficiency and redundancy.
Useful Life 30 years
Project Name Lift Station #6 Redundent 70 HP pump and VFD
Category Lift Stations
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
60,00060,000Equip/Vehicles/Furnishings
60,00060,000Total
Total20092010201120122013Funding Sources
60,00060,000Utility Funds - San Swr
60,00060,000Total
Page 164
Capital Improvement Program
City of Edina, MN
20092013thru
Description
This project will provide a lining to the aging trunk sanitary sewer pipes.
Project #UT-08-014
Priority n/a
Justification
The majority of the trunk sanitary sewer pipes are adjacent to low lying areas or creeks. Some of these lines are known
for infiltration of clear water into the sanitary sewer system. The lining will prohibit clear water from entering the
system.
Useful Life
Project Name Trunk Sanitary Sewer Lining Project
Category Sanitary Sewer Improvements
Type Unassigned
Contact Engineering
Department Utility Department
Total20092010201120122013Expenditures
1,200,0001,200,000Construction/Maintenance
1,200,0001,200,000Total
Total20092010201120122013Funding Sources
1,200,0001,200,000Utility Funds - San Swr
1,200,0001,200,000Total
Page 165
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Update water and sanitary sewer system when constructing neighborhood streets. See Project No. PW-09-001 for
potential neighborhoods.
Project #UT-09-001
Priority n/a
Justification
The majority of the existing water system consists of unlined cast iron pipes. These pipes are more susceptible to
failure than a lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide
better water quality and water pressure.
Most of the sanitary sewer system consists of clay pipe that was installed up to the 1970's. This type of pipe is more
prone to failure than the current poly-vinyl-chloride and concrete pipes. The clay pipe is typically more susceptible to
root intrusion, which decreases the capacity of a pipe.
The upgrade to the sanitary sewer system will help reduce inflow and infiltration into the system due to deteriorating
sanitary manholes, leaking joints in pipes, and leaking covers.
Useful Life Unassigned
Project Name Water and Sanitary Sewer Improvements
Category Water Main System
Type Improvement
Contact Utility Supt
Department Utility Department
Total20092010201120122013Expenditures
5,000,0001,000,0001,000,0001,000,0001,000,0001,000,000Construction/Maintenance
1,000,0001,000,0001,000,0001,000,0001,000,0005,000,000Total
Total20092010201120122013Funding Sources
2,100,000450,000450,000400,000400,000400,000Utility Funds - San Swr
2,900,000550,000550,000600,000600,000600,000Utility Funds - Wtr
1,000,0001,000,0001,000,0001,000,0001,000,0005,000,000Total
Page 166
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Dredge ponds as necessary.
Project #UT-09-003
Priority 3 Important
Justification
These projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling in
from sediment into the system and natural life of organic material.
Useful Life 30 years
Project Name Pond & Lake Dredging
Category Storm Sewer Improvements
Type Improvement
Contact Utility Supt
Department Utility Department
Total20092010201120122013Expenditures
1,740,00060,00060,00060,0001,500,00060,000Construction/Maintenance
60,00060,00060,0001,500,00060,0001,740,000Total
Total20092010201120122013Funding Sources
1,740,00060,00060,00060,0001,500,00060,000Utility Funds - Stm Swr
60,00060,00060,0001,500,00060,0001,740,000Total
Page 167
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Provide replacement storm sewer for aging system. This also includes new drain tiles for roof drains and sump pump
discharges.
Project #UT-09-004
Priority n/a
Justification
As roadways are reconstructed within the City storm sewers will require updating. See Project No. PW-08-001 for
potential neighborhoods. Drainage swales also need to be regraded. Drain tiles where needed should also be included
with these projects.
In 1998 the City undertook a sump pump inspection program that included inspections of all properties in the City to
eliminate any clear water connections into the City's sanitary sewer system. The program identified all homes in the City
that have sump pumps and other easement water problems. These new storm sewer improvements will provide a place
for clear water discharges especially during the winter months.
Useful Life Unassigned
Project Name Storm Sewer - Pipe and Grading Improvements
Category Storm Sewer Improvements
Type Improvement
Contact Engineering
Department Utility Department
Total20092010201120122013Expenditures
7,644,0002,100,0001,644,0002,200,000800,000900,000Construction/Maintenance
2,100,0001,644,0002,200,000800,000900,0007,644,000Total
Total20092010201120122013Funding Sources
7,644,0002,100,0001,644,0002,200,000800,000900,000Utility Funds - Stm Swr
2,100,0001,644,0002,200,000800,000900,0007,644,000Total
Page 168
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replacement of small vehicles and equipment that are 10 years old or 100,000 miles.
Project #UT-09-005
Priority 3 Important
Justification
Vehicles have reached their life expectancy.
Useful Life 10 years
Project Name Annual Vehicle Replacements
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt
Department Utility Department
Total20092010201120122013Expenditures
600,00050,00050,00050,000400,00050,000Equip/Vehicles/Furnishings
50,00050,00050,000400,00050,000600,000Total
Total20092010201120122013Funding Sources
600,00050,00050,00050,000400,00050,000Utility Funds - Wtr
50,00050,00050,000400,00050,000600,000Total
Page 169
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Make improvement and add additional information to the system that wasn't included in the system.
Project #UT-09-006
Priority 2 Very Important
Justification
Reduces time and operating cost of the Utility system.
Useful Life 15 years
Project Name SCADA Upgrades
Category Utility Equipment Replacement
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
250,00050,00050,00050,00050,00050,000Equip/Vehicles/Furnishings
50,00050,00050,00050,00050,000250,000Total
Total20092010201120122013Funding Sources
250,00050,00050,00050,00050,00050,000Utility Funds - Wtr
50,00050,00050,00050,00050,000250,000Total
Page 170
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Replace Existing SCADA computer equipment. This includes 3 servers, 2 laptops, and 3 work stations along with some
miscellaneous equipment.
Project #UT-09-007
Priority 2 Very Important
Justification
The existing equipment is reaching it life expectancy. The service agreement will no longer available after 2009. In
2008 we had one major server failure server
Useful Life 6 years
Project Name SCADA Computer Equipment Replacement
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
35,00035,000Equip/Vehicles/Furnishings
35,00035,000Total
Total20092010201120122013Funding Sources
15,75015,750Utility Funds - San Swr
5,2505,250Utility Funds - Stm Swr
14,00014,000Utility Funds - Wtr
35,00035,000Total
Page 171
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Well rehab for well #4 which is on a 7 year rehab program.
Project #UT-09-008
Priority 2 Very Important
Justification
Remove and rebuild or replace well pump, remove sand from well hole, and conduct other repairs needed.
Useful Life 6 years
Project Name Well #4 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Utility Funds - Wtr
120,000120,000Total
Page 172
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Well rehab for well #12 on a 7 year program.
Project #UT-09-009
Priority 2 Very Important
Justification
After 7 years the well pump is warn out. Repair or replace well pump, remove sand from well hole, and make other
needed repairs.
Useful Life 6 years
Project Name Well #12 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Utility Funds - Wtr
120,000120,000Total
Page 173
Capital Improvement Program
City of Edina, MN
20092013thru
Description
Repair or replace well pump, remove sand from well hole, and make other repairs needed.
Project #UT-09-010
Priority 2 Very Important
Justification
Improve water production.
Useful Life 6 years
Project Name Well # 2 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20092010201120122013Expenditures
120,000120,000Construction/Maintenance
120,000120,000Total
Total20092010201120122013Funding Sources
120,000120,000Utility Funds - Wtr
120,000120,000Total
Page 174