HomeMy WebLinkAbout2010-2014 Capital Improvement PlanCity of Edina, Minnesota
2010-2014 Capital Improvement Plan
CITY OF EDINA, MINNESOTA
CAPITAL IMPROVEMENT PROGRAM
2010-2014
EDINA CITY COUNCIL
Mayor James Hovland
Councilmember Joni Bennett
Councilmember Mary Brindle
Councilmember Scot Housh
Councilmember Ann Swenson
CITY OF EDINA, MINNESOTA
TABLE OF CONTENTS
CAPITAL IMPROVEMENT PROGRAM
DESCRIPTION PAGE
POLICY 1
FINANCING 2
FINANCIAL TABLES
z Construction Fund Balance 7
z Capital Improvement Program Summary 11
DETAIL PROJECT DESCRIPTIONS
z Aquatic Center 21
z Arena 23
z Art Center 34
z Communications 35
z Edinborough/Centennial Lakes 43
z General Government 87
z Golf Course 90
z Liquor Stores 93
z Park & Recreation 102
z Public Safety 119
z Public Works 124
z Utilities 143
This page left blank intentionally.
CITY OF EDINA, MINNESOTA
FINANCIAL MANAGEMENT POLICY
CAPITAL IMPROVEMENT PROGRAM
Page 1
Capital Improvement Plan (CIP). The goal of the City’s CIP is to develop a
comprehensive program for use by decision makers to guide capital investments
based on an assessment of the community’s needs, taking into account the best use
of limited resources while providing efficient and effective municipal services.
The City will develop a five-year plan for capital improvements and update it
annually. The CIP process includes analyzing projects contributing to the public
health and welfare, projects helping to maintain and improve the efficiency of the
existing systems, and projects that define a future need within the community.
The City will identify the estimated cost and potential funding sources for each
capital project proposal in the CIP. Purchase contracts for equipment and projects
included in the CIP must still be properly authorized according to the City’s
Purchasing Policy.
The CIP will include equipment and projects from any City fund.
Adopted by City Council February 20, 2007
Revisions: March 20, 2007
December 15, 2009
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 2
INTRODUCTION
Planning for capital improvements requires sound and economical financing. The
City of Edina is able to utilize several financing mechanisms ranging from cash
reserves to special-purpose funds as well as borrowing through bond sales. The
exact financing method for each improvement is based on the general policies,
jurisdictions and legal requirements. The final selection and scheduling of proposed
capital improvements is then based on the ability of the City to draw upon various
funds. The total cost for each project includes construction costs, administration
costs and interest.
In analyzing the financial viability of the capital improvements in the current program,
the following methods of financing were examined:
INTERNAL METHODS: Special Assessments – Special assessments are based
on the concept that when land is benefited from a
particular improvement, all or part of the costs of the
improvement should be levied against those properties to
finance such improvements.
Since it often takes several years for the City to collect
special assessments, the City may decide to issue bonds
for cash flow purposes. See Public Improvement
Revolving Bonds for further description of this financing
tool.
Enterprise Funds – The City’s enterprise funds include
the Aquatic Center, Arena, Art Center, Edinborough &
Centennial Lakes Parks, Golf Course, Liquor Stores, and
Utilities.
Capital Improvements and equipment purchased in the
enterprise funds may be financed through enterprise fund
revenues derived from user charges for the respective
services, when available. Enterprise funds are designed
for self-sustaining operations.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 3
When an enterprise fund does not have enough cash to
pay for a specific project, the City may decide to use
money from another City source (usually the
Construction Fund) or the City may decide to issue
Enterprise Revenue Bonds. See below for further
description of these financing methods.
Tax Increment (TIF) Funds – These funds are derived
from tax increment districts including 50th and France,
Southeast Edina, Grandview, and 70th Street and Cahill
Road. In tax increment districts, property owners pay ad
valorem taxes at the full rate levied by the units of local
government within the taxing jurisdiction.
At the time the tax increment district is created, property
values are “frozen”. The units of local government
receive taxes based on the frozen property values. Any
additional taxes paid by property owners based on the
increase in property values since the district was created
is known as the “increment”. The increment revenue is
then used to finance physical improvements within the
district.
The City may decide to issue Tax Increment Bonds for
cash flow purposes, see below for further description of
these bonds.
Construction Fund – This fund is designed to provide
financing for capital improvements. Revenues for this
fund may be derived from such sources as investment
income, rental income and transfers from other funds.
Other – Other internal funding options available include
tax levies, income on City investments, and reserves.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 4
EXTERNAL METHODS: Municipal State Aid (MSA) – The Minnesota
Department of Transportation (MnDOT) provides funding
assistance for improvements to those municipal streets
which are designated as part of its MSA system. Money
for this fund is supplied with a dedicated portion of
revenues collected from road use and gasoline taxes.
Funds are released for improvements on those streets on
the system whose design and construction meet MSA
standards. Funds may be expended for any street on the
MSA system at any time, and MSA funds may be
accumulated over several years.
Minnesota Department of Transportation - MnDOT
provides financing assistance for maintenance and
improvements on those highways included in the MnDOT
trunk highway system and federal interstate system.
These improvements could include intersecting local or
county streets.
In the City of Edina, these highways are Nos. 62, 100,
169 and 494. Improvements on these highways must
meet State trunk highway standards before MnDOT
releases funds.
Other - Other external sources of financing include
grants, donations, and other local governments.
DEBT: Public Improvement Revolving (PIR) Bonds – PIR
bonds are issued to provide immediate liquidity to
complete public improvement projects and are repaid
with special assessment receipts over a ten-year period.
These bonds are supported through special
assessments, therefore no levy is required.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 5
Enterprise Revenue Bonds – Most of the Enterprise
Revenue Bonds that the City issues pay for Utility Fund
project costs, but the City may issue Enterprise Revenue
Bonds for any of our enterprises. These bonds are repaid
with revenues from the enterprise facilities that benefit
from the projects financed, therefore no levy is required.
Tax Increment Bonds – The City may issue Tax
Increment Bonds to pay project costs when the district
does not have sufficient cash. These bonds are repaid
with the Tax Increment revenue that is generated by the
district; therefore no additional levy is required.
Public Project Lease Revenue Bonds – This debt is
issued through the Housing and Redevelopment
Authority to procure capital equipment or facilities
supported with a lease purchase relationship agreement
with the City. These bonds are backed by the full faith
and credit of the City and supported through an ad
valorem special levy by an annual appropriation.
Capital Improvement Bonds - Capital Improvement
bonds may be issued only for certain projects, including
city halls, public safety buildings, public works facilities
and libraries. These bonds are backed by the full faith
and credit of the City and supported through the property
tax levy.
Other General Obligation (GO) – There are several
other types of GO debt available for the City to use.
Although no new issues are included in this plan, the City
currently has park & recreation bonds and equipment
certificates outstanding. Both of these types of GO debt
require a levy.
CITY OF EDINA, MINNESOTA
FINANCING
CAPITAL IMPROVEMENT PROGRAM
Page 6
$-
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
200620072008200920102011201220132014
City of Edina Debt
Current and Projected (In Thousands)
Enterprise Revenue
Tax Increment
Public Imp Revolving
Public Project
General Obligation
This chart shows the projected effect on the City as a whole if future debt is issued
according to this capital improvement plan. The General Obligation bonds category
shown here includes Capital Improvement bonds, park and recreation bonds and
equipment certificates
CITY OF EDINA, MINNESOTA
CONSTRUCTION FUND BALANCE
CAPITAL IMPROVEMENT PROGRAM
Page 7
Projected Construction Fund Unreserved Fund Balance
EstimateBudget
2009 2010 2011 2012 2013 2014
Revenues
Intergovernmental1,134,000$ 2,132,000$ 1,500,000$ 1,666,000$ 1,130,000$ 828,200$
Special Assessment1,524,333 417,469 346,052 309,758 239,902 199,307
Interest (2.5%)106,761 106,218 102,611 95,377 84,255 74,059
Total Revenues 2,765,094 2,655,687 1,948,663 2,071,135 1,454,157 1,101,566
Expenditures
General Government22,035,000 110,000 110,000 110,000 110,000 110,000
Park & Rec 595,000 370,000 495,000 440,000 505,000 400,000
Public Safety - 35,000 - - - -
Public Works 6,454,000 6,261,000 6,583,000 6,253,000 5,006,000 5,422,000
Total Expenditures 29,084,000 6,776,000 7,188,000 6,803,000 5,621,000 5,932,000
Other Financing Sources/(Uses)
Transfers In/(Out)(106,000) (103,000) (83,000) (250,000) (7,000) (132,000)
CIP Bonds 22,000,000 - - - - -
PIR Bonds 4,403,200 4,079,000 5,033,000 4,537,000 3,766,000 4,543,800
Total Other Sources 26,297,200 3,976,000 4,950,000 4,287,000 3,759,000 4,411,800
Increase (Decrease)(21,706)$ (144,313)$ (289,337)$ (444,865)$ (407,843)$ (418,634)$
Beginning Balance 4,270,440$ 4,248,734$ 4,104,421$ 3,815,084$ 3,370,219$ 2,962,376$
Ending Balance 4,248,734$ 4,104,421$ 3,815,084$ 3,370,219$ 2,962,376$ 2,543,742$
Forecast
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
200020012002200320042005200620072008200920102011201220132014
Construction Fund Unreserved Balance Trend
Last Ten Fiscal Years (Actual) and Next Five Fiscal Years (Estimate)
The charts above show the projected impact this CIP will have on the Construction
Fund along with a ten-year history of Construction Fund balances. The 2002 balance
was abnormally high due to a bond issue for City Hall, the majority of which wasn’t
spent until 2003.
CITY OF EDINA, MINNESOTA
ENTERPRISE FUND CASH BALANCES
CAPITAL IMPROVEMENT PROGRAM
Page 8
Projected Enterprise Fund Cash Balances
EstimateBudget
Aquatic Center 200920102011201220132014
Cash - January 1 1,179,383$ 1,252,768$ 651,827$ 43,255$ 135,812$ 245,248$
Operating Income 39,538 8,614 (24,934) 73,200 81,342 90,048
CIP Expenditures (11,400) (650,000) (650,000) (50,000) (50,000) (50,000)
Transfer Cash In/(Out)- - - - - -
Other Miscellaneous a 45,247 40,445 66,362 69,357 78,094 151,954
Cash - December 311,252,768$ 651,827$ 43,255$ 135,812$ 245,248$ 437,250$
Arena200920102011201220132014
Cash - January 1 (17,170)$ (95,699)$ (22,381)$ 44,502$ 129,745$ 243,129$
Operating Income (249,366) (226,682) (283,117) (284,757) (286,616) (288,706)
CIP Expenditures (131,000) (1,900,000) (100,000) (155,000) (85,000) (155,000)
Transfer Cash In/(Out)211,000 80,000 220,000 305,000 260,000 330,000
Other Miscellaneous a 90,837 2,120,000 230,000 220,000 225,000 230,000
Cash - December 31(95,699)$ (22,381)$ 44,502$ 129,745$ 243,129$ 359,423$
Art Center200920102011201220132014
Cash - January 145,785$ 35,080$ 26,274$ 40,714$ 53,467$ 89,607$
Operating Income (205,705) (208,806) (211,280) (213,716) (216,108) (218,452)
CIP Expenditures (25,000) (20,000) (20,000) (20,000) (20,000) (20,000)
Transfer Cash In/(Out)170,000 170,000 195,000 195,000 220,000 220,000
Other Miscellaneous a 50,000 50,000 50,720 51,469 52,248 53,057
Cash - December 31 35,080$ 26,274$ 40,714$ 53,467$ 89,607$ 124,212$
Plan
CITY OF EDINA, MINNESOTA
ENTERPRISE FUND CASH BALANCES
CAPITAL IMPROVEMENT PROGRAM
Page 9
Projected Enterprise Fund Cash Balances
EstimateBudget
Edinborough/Centennial200920102011201220132014
Cash - January 1 3,948,520$ 3,037,443$ 2,708,929$ 2,612,926$ 2,541,310$ 2,494,091$
Operating Income (666,577) (543,514) (569,860) (597,408) (626,210) (656,320)
CIP Expenditures (739,500) (333,000) (213,000) (325,000) (152,000) (207,000)
Transfer Cash In/(Out)250,000 333,000 463,000 625,000 502,000 607,000
Other Miscellaneous a 245,000 215,000 223,857 225,792 228,991 233,470
Cash - December 313,037,443$ 2,708,929$ 2,612,926$ 2,541,310$ 2,494,091$ 2,471,241$
Golf Course200920102011201220132014
Cash - January 1(1,091,870)$ (1,181,802)$ (1,111,914)$ (1,008,510)$ (804,134)$ (596,582)$
Operating Income147,982 112,621 120,448 128,615 137,134 146,014
CIP Expenditures (253,000) (260,000) (265,000) (195,000) (205,000) (205,000)
Transfer Cash In/(Out)170,000 100,000 100,000 100,000 100,000 100,000
Other Miscellaneous a (154,914) 117,267 147,956 170,761 175,418 512,944
Cash - December 31 (1,181,802)$ (1,111,914)$ (1,008,510)$ (804,134)$ (596,582)$ (42,624)$
Liquor Stores 200920102011201220132014
Cash - January 1 1,118,440$ 866,001$ 822,549$ 620,882$ 686,526$ 805,314$
Operating Income 1,122,690 1,221,538 1,309,519 1,402,873 1,501,902 1,606,927
CIP Expenditures (156,000) (115,000) (300,000) (100,000) (100,000) (100,000)
Transfer Cash In/(Out)(1,311,261) (1,245,100) (1,310,100) (1,340,100) (1,390,100) (1,390,100)
Other Miscellaneous a 92,132 95,110 98,914 102,871 106,986 111,265
Cash - December 31 866,001$ 822,549$ 620,882$ 686,526$ 805,314$ 1,033,406$
Plan
a. Other miscellaneous adjustments include nonoperating income and losses. Other miscellaneous
adjustments also include differences between the full accrual basis of accounting used for enterprise
funds under generally accepted accounting procedures (GAAP) and the cash basis of accounting used
here to provide useful projections. Other miscellaneous adjustments may include investment income,
bond proceeds and payments, depreciation, donations, and other items.
Page 10
This page left bank intentionally.
Capital Improvement Program
City of Edina, MN
PROJECTS & FUNDING SOURCES BY DEPARTMENT
20102014thru
Total20102011201220132014DepartmentProject#Priority
Aquatic Center
1,450,000650,000650,00050,00050,00050,000Aquatic Center Fund
1,450,000650,000650,00050,00050,00050,000Aquatic Center Total
AQC-03-001 1,200,000600,000600,000Flowridern/a
AQC-10-001 250,00050,00050,00050,00050,00050,000Upgrades and Replacements n/a
1,450,000650,000650,00050,00050,00050,000Aquatic Center Total
Arena
495,000100,000155,00085,000155,000Construction Fund
220,000220,000Grant
1,680,0001,680,000Revenue Bonds
2,395,0001,900,000100,000155,00085,000155,000Arena Total
A-04-001 1,200,0001,200,000Refurbish West Arena n/a
A-07-002 300,000300,000Dehumidification System n/a
A-08-004 100,000100,000Parking Lot Repair n/a
A-08-005 100,000100,000Install Underground Irrigation n/a
A-08-006 100,000100,000Building Façade n/a
A-08-007 100,000100,000Replace Building Skate Tile n/a
A-09-002 130,000130,000Replace Zamboni n/a
A-10-001 100,00025,00025,00025,00025,000Repairs & Maintenance n/a
A-10-002 75,00075,000Evaporative Condenser n/a
A-10-003 60,00060,000Water System Repairs n/a
A-10-004 130,000130,000Replace Zamboni n/a
2,395,0001,900,000100,000155,00085,000155,000Arena Total
Art Center
100,00020,00020,00020,00020,00020,000Construction Fund
ART-10-001 100,00020,00020,00020,00020,00020,000Repairs & Maintenancen/a
100,00020,00020,00020,00020,00020,000Art Center Total
Page 11
Total20102011201220132014DepartmentProject#Priority
100,00020,00020,00020,00020,00020,000Art Center Total
Communications
294,00046,50014,00034,50070,000129,000Communications Fund
294,00046,50014,00034,50070,000129,000Communications Total
COM-10-001 30,00030,000Mobile switcher system n/a
COM-10-002 29,00029,000Council Chambers Audio System n/a
COM-10-003 17,50017,500Council Chambers Document Camera n/a
COM-10-004 14,00014,000Scala System n/a
COM-10-005 34,50034,500Remote Production Capability n/a
COM-10-006 70,00070,000Graphicsn/a
COM-10-007 70,00070,000Council Chambers Camera System n/a
COM-10-008 29,00029,000Council Chambers Monitors n/a
294,00046,50014,00034,50070,000129,000Communications Total
Edinborough/Centennial
ECL-00-017 70,00070,000EP Replaster Pool n/a
ECL-06-004 40,00040,000CL Paver Replacement n/a
ECL-06-005 25,00025,000CL Replace HVAC Units n/a
ECL-06-006 26,00026,000EP Theater Curtain and Rigging n/a
ECL-06-007 12,00012,000EP Replace Carpeting n/a
ECL-07-003 16,00016,000CL Paint Amphitheater Structure n/a
ECL-07-004 20,00020,000CL Signage improvement n/a
ECL-07-006 25,00025,000EP Adventure Peak Renovation n/a
ECL-07-007 7,0007,000EP Floor Scrubber n/a
ECL-08-003 28,00028,000CL Paint South Park Railings n/a
ECL-08-004 40,00040,000CL Renovate Putting Greens n/a
ECL-08-005 12,00012,000CL Replace Cracked/Broken Concrete n/a
ECL-08-007 12,00012,000EP Security Camera System n/a
ECL-08-009 8,0008,000EP Torrent Floor Machine n/a
ECL-08-011 30,00030,000EP Soft Play for Great Hall n/a
ECL-08-016 27,00027,000EP Park Sound System n/a
ECL-08-019 6,0006,000EP Weight & Aerobic Equipment n/a
ECL-08-021 80,00080,000EP Pool and Wall Tile n/a
ECL-09-003 10,00010,000CL Replace Ice Resurfacer n/a
ECL-09-004 14,00014,000CL Amphitheater Speakers n/a
ECL-09-005 16,00016,000CL Centrum Planter Beds n/a
ECL-09-007 120,000120,000CL Add Restroom Facility n/a
ECL-09-008 32,00032,000CL Replace Park Sound System n/a
ECL-09-009 15,00015,000CL Replace Concrete n/a
ECL-09-011 24,00024,000EP Theater Floor n/a
Page 12
Total20102011201220132014DepartmentProject#Priority
1,230,000333,000213,000325,000152,000207,000Construction Fund
1,230,000333,000213,000325,000152,000207,000Edinborough/Centennial Total
ECL-09-012 20,00020,000EP Exterior Arch Brickworkn/a
ECL-09-013 15,00015,000EP Outdoor Storage Shedn/a
ECL-09-014 30,00030,000EP Lift to Birthday Party Area n/a
ECL-09-015 60,00060,000EP Track Floor n/a
ECL-09-016 28,00028,000EP Parking Ramp Concrete & Drain Tile n/a
ECL-09-019 25,00025,000EP Portable Concession Stand n/a
ECL-09-020 10,00010,000EP Upper Commons Seating Area n/a
ECL-09-021 25,00025,000EP Adventure Peak Remodel n/a
ECL-10-001 10,00010,000CL Replace Concrete n/a
ECL-10-002 15,00015,000CL Centrum Building Wall n/a
ECL-10-003 10,00010,000CL SP Irrigation n/a
ECL-10-004 12,00012,000CL Floating Dock n/a
ECL-10-005 25,00025,000CL Security Camera System n/a
ECL-10-006 20,00020,000CL Centrum Planter Beds n/a
ECL-10-007 75,00075,000EP Driveway - Cul De Sac n/a
ECL-10-008 40,00040,000EP NE & SE Doors n/a
ECL-10-009 40,00040,000EP NW & SW Doors n/a
ECL-10-010 25,00025,000EP West Sidewalk Replacement n/a
ECL-10-011 30,00030,000EP North Sidewalk n/a
1,230,000333,000213,000325,000152,000207,000Edinborough/Centennial Total
General Government
550,000110,000110,000110,000110,000110,000Construction Fund
15,00015,000Equipment Replacement Program
565,000125,000110,000110,000110,000110,000General Government Total
CW-02-001 375,00075,00075,00075,00075,00075,000Citywide Fiber Optic Cabling2
GG-10-001 175,00035,00035,00035,00035,00035,000City Hall/Public Works Building n/a
GG-10-002 15,00015,000Assessing Department Equipment Replacement n/a
565,000125,000110,000110,000110,000110,000General Government Total
Golf Course
GC-06-001 150,00075,00075,000Braemar & Braemar Exec: Parking Lot Resurfacingn/a
GC-10-001 760,000145,000150,000155,000155,000155,000Braemar: Maintenance Equipment n/a
GC-10-002 220,00040,00040,00040,00050,00050,000Braemar: Miscellaneous Equipment n/a
1,130,000260,000265,000195,000205,000205,000Golf Course Total
Page 13
Total20102011201220132014DepartmentProject#Priority
1,130,000260,000265,000195,000205,000205,000Golf Course Fund
1,130,000260,000265,000195,000205,000205,000Golf Course Total
Liquor Stores
715,000115,000300,000100,000100,000100,000Liquor Fund
715,000115,000300,000100,000100,000100,000Liquor Stores Total
LIQ-02-005 95,00095,00050th: Store Remodeln/a
LIQ-09-002 300,000300,000York: Store Remodel n/a
LIQ-09-003 20,00020,00050th: Replace Entrance Door n/a
LIQ-10-001 175,00080,00035,00060,000All Stores: Repairs and Maintenance n/a
LIQ-10-002 20,00020,000All Stores: Video Upgrades n/a
LIQ-10-003 20,00020,000York: Replace Entrance Door n/a
LIQ-10-004 50,00025,00025,000York: Replace Rooftop HVAC n/a
LIQ-10-005 20,00020,000York: LED Signage n/a
LIQ-10-006 15,00015,000Vernon: Replace Load Leveler Dock n/a
715,000115,000300,000100,000100,000100,000Liquor Stores Total
Park & Recreation
2,210,000370,000495,000440,000505,000400,000Construction Fund
924,600596,50062,00095,10021,400149,600Equipment Replacement Program
PK-00-033 330,000330,000Pamela Park: Renovate senior athletic field n/a
PK-02-041 120,000120,000Chowen Park: Playground n/a
PK-04-003 60,00060,000Walnut Ridge Park: Hockey rink n/a
PK-05-009 45,00045,000Todd Park: Pathway renovation n/a
PK-07-004 400,000400,000Pamela Park: New athletic field n/a
PK-08-006 30,00030,000Lewis Park: Pathway lighting n/a
PK-09-002 250,000250,000Bredesen Park: Pathway renovations n/a
PK-09-005 100,00050,00050,000Natural resources inventory assessment n/a
PK-09-006 250,000250,000Garden Park: Parking lot renovation n/a
PK-10-001 60,00060,000Pamela Park: Hockey Rink Replacement n/a
PK-10-002 30,00030,000Veterans Memorial n/a
PK-10-003 60,00060,000Countryside Park: West Parking Lot Renovation n/a
PK-10-004 330,000330,000Countryside Park: Playground & Pathway n/a
PK-10-005 40,00040,000Pamela Park: South Parking Lot Expansion n/a
PK-10-006 45,00045,000Pamela Park: North Parking Lot Expansion n/a
PK-10-007 60,00060,000Pamela Park: West Parking Lot Expansion n/a
PK-10-008 924,600596,50062,00095,10021,400149,600Parks Department Equipment Replacement n/a
3,134,600966,500557,000535,100526,400549,600Park & Recreation Total
Page 14
Total20102011201220132014DepartmentProject#Priority
3,134,600966,500557,000535,100526,400549,600Park & Recreation Total
Public Safety
35,00035,000Construction Fund
4,294,299832,8231,261,433660,911237,5531,301,579Equipment Replacement Program
4,329,299867,8231,261,433660,911237,5531,301,579Public Safety Total
BD-06-001 35,00035,000Complaint Administration Softwaren/a
PS-10-001 1,554,000404,000430,000350,000195,000175,000Fire Department Equipment Replacement n/a
PS-10-002 2,695,299413,823831,433310,91142,5531,096,579Police Department Equipment Replacement n/a
PS-10-003 30,00015,000 15,000Inspections Department Equipment Replacement n/a
PS-10-004 15,00015,000Health Department Equipment replacement n/a
4,329,299867,8231,261,433660,911237,5531,301,579Public Safety Total
Public Works
310,00050,00050,00050,000110,00050,000Construction Fund
3,029,800605,960605,960605,960605,960605,960Equipment Replacement Program
7,256,2002,132,0001,500,0001,666,0001,130,000828,200Municipal State Aid
21,958,8004,079,0005,033,0004,537,0003,766,0004,543,800Public Improvement Revolving Bonds
32,554,8006,866,9607,188,9606,858,9605,611,9606,027,960Public Works Total
PW-00-004 180,000180,000Mill & Overlay: Benton Ave. (Hansen - Hwy 100)n/a
PW-00-012 900,000900,000Reconstruct: 44th Ave. (TH 100 - France)n/a
PW-00-015 600,000600,000Concrete Rehab: Tracy Ave. (Vernon - TH62)n/a
PW-00-017 1,200,0001,200,000Reconstruct: W. 70th St. (TH100 - France)n/a
PW-00-074 450,000450,000Concrete Rehab: Parklawn Ave. (France to W 77)n/a
PW-01-011 520,000520,000Reconstruct: W 62nd St. (Oaklawn - France)n/a
PW-01-012 850,000850,000Reconstruct: W 54th St. (Wooddale to France)n/a
PW-03-005 629,000629,000Reconstruct: W 58th St (France to Xerxes)n/a
PW-04-001 900,000900,000Reconstruct: W 58th St (Wooddale to France)n/a
PW-05-003 520,000520,000Bridge: 54th Street Bridge n/a
PW-05-006 275,000275,000Mill & Overlay: Olinger Blvd (Vernon - Tracy)n/a
PW-07-004 82,00082,000Northeast Edina Traffic Calming n/a
PW-08-005 60,00060,000Skid Steer n/a
PW-08-006 700,000700,000Reconstruct / Sidewalk: VV Rd at Braemar Blvd n/a
PW-09-004 550,000550,000Mill & Overlay: W 69th St (France to York)n/a
PW-10-001 20,609,0003,579,0004,853,0004,263,0003,496,0004,418,000Neighborhood Street Recon. Program n/a
PW-10-002 250,00050,00050,00050,00050,00050,000Sidewalks/Pathways (MSA)n/a
PW-10-003 250,00050,00050,00050,00050,00050,000Sidewalks/Pathways: City Costs n/a
PW-10-004 3,029,800605,960605,960605,960605,960605,960Public Works Equipment Replacement n/a
32,554,8006,866,9607,188,9606,858,9605,611,9606,027,960Public Works Total
Page 15
Total20102011201220132014DepartmentProject#Priority
Utility Department
5,672,7501,060,750869,0002,439,000563,000741,000Utility Funds - San Swr
13,156,2502,532,2502,706,0003,424,0001,966,0002,528,000Utility Funds - Stm Swr
19,654,0002,788,0005,550,0004,590,0003,020,0003,706,000Utility Funds - Wtr
UT-03-012 170,000170,0001998 Cat Backhoe Replacement n/a
UT-03-016 30,00030,000GPS System 3
UT-04-005 200,000200,000Public Works: Braemar Work Site - Lead Removal n/a
UT-05-008 300,000300,000Lift Station #2 (4200 Grimes Ave)2
UT-05-009 200,000200,000Lift Station #7 (4021 Grimes Ave)2
UT-05-010 200,000200,000Lift Station #8 (4023 Monterey Ave)2
UT-05-013 120,000120,000Well #6 (5849 Ruth St)2
UT-07-002 4,100,0001,600,0002,500,000New Water Treatment Plant (#5)2
UT-07-003 6,500,000500,0003,000,0003,000,000New Water Treatment Plant (#6)2
UT-07-007 10,00010,000Water Meter Reading System Replacement 1
UT-07-008 300,000300,000Sewer Jetter Replacement 3
UT-07-009 500,000500,000Gleason Water Tower (paint)2
UT-08-008 100,000100,000Piping Wells #5 and #18 to WTP #5 2
UT-08-009 100,000100,000Well #5 (West 69th Street)2
UT-08-010 1,950,0001,200,000750,000Piping Wells #2, #7, #15 and #9 to WTP #6 2
UT-08-012 60,00060,000Lift Station #6 Redundent 70 HP pump and VFD 2
UT-08-014 1,200,0001,200,000Trunk Sanitary Sewer Lining Project n/a
UT-09-006 100,00050,00050,000SCADA Upgrades 2
UT-09-007 35,00035,000SCADA Computer Equipment Replacement 2
UT-09-008 100,000100,000Well #4 Rehab Project 2
UT-09-009 120,000120,000Well #12 Rehab Project 2
UT-09-010 120,000120,000Well # 2 Rehab Project 2
UT-10-001 3,490,000604,000830,000720,000590,000746,000Water Main Improvements n/a
UT-10-002 2,767,000495,000589,000589,000483,000611,000Sanitary Sewer Main Improvements 1
UT-10-003 11,301,0002,017,0002,646,0002,324,0001,906,0002,408,000Storm Sewer - Pipe and Grading Improvements n/a
UT-10-004 1,400,00060,00060,0001,100,00060,000120,000Pond & Lake Dredging 3
UT-10-005 270,00050,00050,00070,00050,00050,000Annual Vehicle Replacements 3
UT-10-006 1,200,000240,000240,000240,000240,000240,000Water Meter Replacement Project 1
UT-10-007 200,000200,000Well # 7 Rehab Project 2
UT-10-008 150,000150,000Well #9 Rehab Project 2
UT-10-009 120,000120,000Well # 11 Rehab Project 1
UT-10-010 400,00080,00080,00080,00080,00080,000Manhole Repair Project 2
UT-10-011 110,000110,000W 69th Street and York Ave Water Main Loop 2
UT-10-012 110,000110,000San Sewer Improv at W44th Street and Brookside Ave 2
UT-10-013 450,000450,000Culvert Replacement - W 56th Street Bridge 1
38,483,0006,381,0009,125,00010,453,0005,549,0006,975,000Utility Department Total
Page 16
Total20102011201220132014DepartmentProject#Priority
38,483,0006,381,0009,125,00010,453,0005,549,0006,975,000Utility Department Total
86,380,69918,531,78319,804,39319,497,47112,716,91315,830,139Grand Total
Page 17
Page 18
This page left bank intentionally.
Page 19
Detail Project
Descriptions
Page 20
This page left bank intentionally.
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Purchase and installation of a flowrider on the south side of the Aquatic Center.
Project #AQC-03-001
Priority n/a
Justification
To continue to diversify the Edina Aquatic Center's offerings staff is recommending the addition of a Flowrider. This
amenity would not only help further diversify the facility, it would bring the aquatic industries hottest new amenity to
the Edina Aquatic Center. The constant uphill flow of water will provide a surfing sensation that is not otherwise
found in the Midwest. In addition to providing the patrons with a challenging new amenity, it will draw spectators to
watch those brave enough perfect their skills. It should also be noted that this new amenity would not be included in
the daily admission fee or season ticket pass, but will be used as an additional revenue source. This amenity will
complete the Aquatic Center master plan.
Useful Life Unassigned
Project Name Flowrider
Category Park Development
Type Improvement
Contact Park & Recreation
Department Aquatic Center
Total20102011201220132014Expenditures
1,200,000600,000 600,000Construction/Maintenance
600,000 600,000 1,200,000Total
Total20102011201220132014Funding Sources
1,200,000600,000 600,000Aquatic Center Fund
600,000 600,000 1,200,000Total
Page 21
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
These are upgrades and replacements of mechanical and small capital items that unexpectedly fail or become worn or
damaged and in need of replacement, repair, or upgrade. Equipment could include bath house water heaters, pumps,
lifeguard chairs, funbrellas, chaise lounges, etc.
Project #AQC-10-001
Priority n/a
Justification
Mechanical and small capital items can unexpectedly fail or wear out before their scheduled time for replacement.
This replacement budget will help serve as a rainy day fund for those unexpected failures or losses.
Useful Life Unassigned
Project Name Upgrades and Replacements
Category Park Development
Type Improvement
Contact Park & Recreation
Department Aquatic Center
Total20102011201220132014Expenditures
250,00050,000 50,000 50,000 50,000 50,000Equip/Vehicles/Furnishings
50,000 50,000 50,000 50,000 50,000 250,000Total
Total20102011201220132014Funding Sources
250,00050,000 50,000 50,000 50,000 50,000Aquatic Center Fund
50,000 50,000 50,000 50,000 50,000 250,000Total
Page 22
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace all existing refrigeration piping from arena to mechanical room .
Project #A-04-001
Priority n/a
Justification
The current piping was installed in 1964 and will reach the end of it's useful life. The new technology is better
insulated and therefore, more efficient to operate.
Useful Life 15 years
Project Name Refurbish West Arena
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
1,200,0001,200,000Construction/Maintenance
1,200,000 1,200,000Total
Total20102011201220132014Funding Sources
1,200,0001,200,000Revenue Bonds
1,200,000 1,200,000Total
Page 23
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the HVAC dehumidification system in the West and East arenas.
Project #A-07-002
Priority n/a
Justification
The dehumidification systems will have reached their life expectancy and will be in need of replacement.
Dehumidification system failure could result in significant business interruption and loss of revenues.
Useful Life
Project Name Dehumidification System
Category Building Maintenance
Type Equipment
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
300,000300,000Equip/Vehicles/Furnishings
300,000 300,000Total
Total20102011201220132014Funding Sources
220,000220,000Grant
80,00080,000Revenue Bonds
300,000 300,000Total
Page 24
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Perform maintenance on and restripe the arena parking lot.
Project #A-08-004
Priority n/a
Justification
Periodic sealcoats will keep lots in good condition.
Useful Life
Project Name Parking Lot Repair
Category Park Development
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20102011201220132014Funding Sources
100,000100,000Revenue Bonds
100,000 100,000Total
Page 25
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Install irrigation sprinklers to keep the boulevard grass green in the summer.
Project #A-08-005
Priority n/a
Justification
Current islands are full of weeds. Irrigation will help maintain grass and trees.
Useful Life
Project Name Install Underground Irrigation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20102011201220132014Funding Sources
100,000100,000Revenue Bonds
100,000 100,000Total
Page 26
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Resurface west arena exterior.
Project #A-08-006
Priority n/a
Justification
Resurface to aesthetically match newer arena and entryway.
Useful Life
Project Name Building Façade
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20102011201220132014Funding Sources
100,000100,000Revenue Bonds
100,000 100,000Total
Page 27
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace lower level of existing 3 arenas skate tile.
Project #A-08-007
Priority n/a
Justification
Floor tile is at the end of its 15 year useful life expectancy.
Useful Life 15 years
Project Name Replace Building Skate Tile
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20102011201220132014Funding Sources
100,000100,000Revenue Bonds
100,000 100,000Total
Page 28
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the 1997 south arena ice resurfacing machine.
Project #A-09-002
Priority n/a
Justification
This is a routine equipment replacement purchase. The 1997 zamboni will be 16 years old in 2013 and due to be
replaced.
Useful Life
Project Name Replace Zamboni
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
130,000130,000Equip/Vehicles/Furnishings
130,000 130,000Total
Total20102011201220132014Funding Sources
130,000130,000Construction Fund
130,000 130,000Total
Page 29
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Miscellaneous building repairs and maintenance.
Project #A-10-001
Priority n/a
Justification
Miscellaneous repairs and maintenance are necessary every year to keep the Arena in operating condition.
Useful Life Unassigned
Project Name Repairs & Maintenance
Category Park Development
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
100,00025,000 25,000 25,000 25,000Equip/Vehicles/Furnishings
25,000 25,000 25,000 25,000 100,000Total
Total20102011201220132014Funding Sources
100,00025,000 25,000 25,000 25,000Construction Fund
25,000 25,000 25,000 25,000 100,000Total
Page 30
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace east arena evaporative condenser.
Project #A-10-002
Priority n/a
Justification
Current system is 22 years old and is showing signs of failure. Life expectancy is less than 20 years.
Useful Life 20 years
Project Name Evaporative Condenser
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total20102011201220132014Funding Sources
75,00075,000Construction Fund
75,000 75,000Total
Page 31
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Reverse osmosis system.
Project #A-10-003
Priority n/a
Justification
Current water softener systems are old and outdated. Reverse osmosis system would save costs in salt.
Useful Life
Project Name Water System Repairs
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
60,00060,000Construction/Maintenance
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Construction Fund
60,000 60,000Total
Page 32
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the 2001 east arena ice resurfacing machine.
Project #A-10-004
Priority n/a
Justification
This is a routine equipment replacement purchase. The 2001 zamboni will be 13 years old in 2014 and due to be
replaced.
Useful Life
Project Name Replace Zamboni
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Arena
Total20102011201220132014Expenditures
130,000130,000Equip/Vehicles/Furnishings
130,000 130,000Total
Total20102011201220132014Funding Sources
130,000130,000Construction Fund
130,000 130,000Total
Page 33
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Project #ART-10-001
Priority n/a
Justification
Useful Life
Project Name Repairs & Maintenance
Category Building Maintenance
Type Unassigned
Contact Park & Recreation
Department Art Center
Total20102011201220132014Expenditures
100,00020,000 20,000 20,000 20,000 20,000Construction/Maintenance
20,000 20,000 20,000 20,000 20,000 100,000Total
Total20102011201220132014Funding Sources
100,00020,000 20,000 20,000 20,000 20,000Construction Fund
20,000 20,000 20,000 20,000 20,000 100,000Total
Page 34
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Ross CrossOver mobile switcher system. Includes Ross CrossOver 6 mobile switcher and Mobile Studios mini-flypack
system which encloses switcher, LCD display, intercom system, and audio mixer into portable case.
Project #COM-10-001
Priority n/a
Justification
Useful Life
Project Name Mobile switcher system
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
30,00030,000Equip/Vehicles/Furnishings
30,000 30,000Total
Total20102011201220132014Funding Sources
30,00030,000Communications Fund
30,000 30,000Total
Page 35
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Biamp Audia system with sufficient inputs and outputs as well as I/O configurations types.
There are currently two Sound Tube speakers in the council chamber for sound reinforcement. It is highly
recommended that new speakers be considered as part of the overall improvement package for the council and
broadcast audio. It may also be necessary to replace the existing amplifiers if the speakers are changed.
Project #COM-10-002
Priority n/a
Justification
The audio system currently in use is inadequate and cumbersome. There are issues with being able to properly balance
the audio both for council chamber use and for broadcast use. This is due to inadequacies in the original equipment. It
simply isn't capable of proper balance between the two. The new system must be able to independently adjust the level
available to the council chamber and to the broadcast feed. The microphones currently in use will remain and be
replaced at the end of a 15 year life cycle. Any new system must be compatible with these microphones.
Useful Life
Project Name Council Chambers Audio System
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
29,00029,000Equip/Vehicles/Furnishings
29,000 29,000Total
Total20102011201220132014Funding Sources
29,00029,000Communications Fund
29,000 29,000Total
Page 36
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Lens should be a teleconference style lens so as to be controlled by the Crestron system. Special attention should be
paid to the current mounting location as the new camera needs to mount to the same mount, and at the same height.
The lens should be capable of focusing to a single 8.5X11 page on the document table as well as going to a wide shot
that will view the entire document table. The camera must also be able to flip the image 180 degrees for presentation
from the opposite side of the document talb.e Mechanical or electronic methods are acceptable.
Project #COM-10-003
Priority n/a
Justification
The current document camera is older than the rest of the current system as it was repurposed from the old council
chambers at the time of construction of the new building. The new camera and its subsequent cabling must be HD
compatible. The current production switcher is SD so there must also be conversion equipment supplied that will down
convert the HD signal. It is unclear at this time when the production switcher will be upgraded to HD. The switcher
will be upgraded to a Ross Vision QMD system or a Ross Synergy MD system. It is highly recommended that the up
conversion be Ross UDC-XXXX with the appropriate Open Gear frame so the cards can be repurposed to Smart
Conversion cards when the switcher is upgraded. Acceptable systems from Wolfvision, Panasonic, JVC, Sony,
Hitachi, and Ikegami. Lens functions (Zoom, Focus, Iris) must be remotely controlled from the existing Crestron
Automation system.
Useful Life
Project Name Council Chambers Document Camera
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
17,50017,500Equip/Vehicles/Furnishings
17,500 17,500Total
Total20102011201220132014Funding Sources
17,50017,500Communications Fund
17,500 17,500Total
Page 37
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
There are two options for replacing this system. First, simply update the existing hardware to new. Second, replace the
system and service with a Tightrope Carousel system. The new system must continue to meet the use needs and the
remote functionality that the City currently has with our Scala system.
Project #COM-10-004
Priority n/a
Justification
The current Scala messaging system is reaching the end of it's electronic life cycle. While the service continues to be
improved the hardware is aging.
Useful Life
Project Name Scala System
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
14,00014,000Equip/Vehicles/Furnishings
14,000 14,000Total
Total20102011201220132014Funding Sources
14,00014,000Communications Fund
14,000 14,000Total
Page 38
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Ross CrossOver Mobile Switcher System. Includes Ross CrossOver 6 mobile switcher and Mobile Studios Mini-
Flypack system which encloses switcher, LCD display, intercom system, and audio mixer into portable case.
Project #COM-10-005
Priority n/a
Justification
Useful Life
Project Name Remote Production Capability
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
34,50034,500Equip/Vehicles/Furnishings
34,500 34,500Total
Total20102011201220132014Funding Sources
34,50034,500Communications Fund
34,500 34,500Total
Page 39
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace current Character Generator with HD ready system. Acceptable manufacturers: Harris, Chyron, Avid, Vizrt,
Compix, and Ross Video.
Project #COM-10-006
Priority n/a
Justification
Useful Life
Project Name Graphics
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
70,00070,000Equip/Vehicles/Furnishings
70,000 70,000Total
Total20102011201220132014Funding Sources
70,00070,000Communications Fund
70,000 70,000Total
Page 40
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace cameras in Council Chambers with HD compatible equipment with SD outputs available at the CCU. All
cable should be HD ready so the connection to the Switcher will be plug and play at the time the switcher is upgraded
to HD. Acceptable systems from Panasonic, JVC, Sony, Hitachi, and Ikegami. Camera systems should be from the
same manufacturer as the document camera. All cameras must be able to be painted to match visually for color and
luminance. Lenses must be modified by Telemetrics to work with the current Robotic systems as the robotics are not
due to be replaced at this time.
Project #COM-10-007
Priority n/a
Justification
Cameras will be outdated and should be replaced with HD equipment.
Useful Life
Project Name Council Chambers Camera System
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
70,00070,000Equip/Vehicles/Furnishings
70,000 70,000Total
Total20102011201220132014Funding Sources
70,00070,000Communications Fund
70,000 70,000Total
Page 41
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace all monitors, including Council Chambers plasma monitors, all of the dais monitors, the lobby plasma, and all
control room monitors. These can all be straight replacements with the exception of the control room monitors. The
city would like to move to a multi-image viewer system to reduce clutter and conserve space. Currently the program
and preview monitors are CRT type monitors. It is desireable to move to LCD technology. One monitor may be split
for program and preview, or they may be discreet monitors. Program and preview monitors must be HD compatible.
All incoming sources should be on a MIV type system, with auto sensing composite/SDI inputs. It is not required that
these monitors support HD.
Project #COM-10-008
Priority n/a
Justification
Monitors will be at the end of their useful life and due for replacement.
Useful Life
Project Name Council Chambers Monitors
Category Equipment Replacement
Type Equipment
Contact Communications
Department Communications
Total20102011201220132014Expenditures
29,00029,000Equip/Vehicles/Furnishings
29,000 29,000Total
Total20102011201220132014Funding Sources
29,00029,000Communications Fund
29,000 29,000Total
Page 42
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replaster and restore pool shell at Edinborough Park.
Project #ECL-00-017
Priority n/a
Justification
The pool shell at Edinborough Park has deteriorated over the past 22 years and needs a new surface coat of gunite.
Useful Life Unassigned
Project Name EP Replaster Pool
Category Unassigned
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
70,00070,000Equip/Vehicles/Furnishings
70,000 70,000Total
Total20102011201220132014Funding Sources
70,00070,000Construction Fund
70,000 70,000Total
Page 43
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace brick pavers in Centennial Lakes park.
Project #ECL-06-004
Priority n/a
Justification
Brick pavers are disintegrating and are causing safety concerns.
Useful Life Unassigned
Project Name CL Paver Replacement
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total20102011201220132014Funding Sources
40,00040,000Construction Fund
40,000 40,000Total
Page 44
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace 2 of the 4 HVAC units for the Park Centrum Building.
Project #ECL-06-005
Priority n/a
Justification
Two of the HVAC units will be at the end of their 25-year life expectancy.
Useful Life Unassigned
Project Name CL Replace HVAC Units
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
25,00025,000Construction/Maintenance
25,000 25,000Total
Total20102011201220132014Funding Sources
25,00025,000Construction Fund
25,000 25,000Total
Page 45
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the theater curtain and rigging at Edinborough Park amphitheater.
Project #ECL-06-006
Priority n/a
Justification
Theater curtain is becoming worn and tattered and was originally installed in 1987.
Useful Life Unassigned
Project Name EP Theater Curtain and Rigging
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
26,00026,000Construction/Maintenance
26,000 26,000Total
Total20102011201220132014Funding Sources
26,00026,000Construction Fund
26,000 26,000Total
Page 46
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace common area carpeting at Edinborough Park.
Project #ECL-06-007
Priority n/a
Justification
Carpeting in Great Hall, stairways, and elevator will be 8 years old and past its prime.
Useful Life Unassigned
Project Name EP Replace Carpeting
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
12,00012,000Construction/Maintenance
12,000 12,000Total
Total20102011201220132014Funding Sources
12,00012,000Construction Fund
12,000 12,000Total
Page 47
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Repaint the exterior metal structure on the Dennis Maetzold Amphitheater.
Project #ECL-07-003
Priority n/a
Justification
By the year 2011, the Dennis Maetzold Amphitheater will need to be painted.
Useful Life
Project Name CL Paint Amphitheater Structure
Category Unassigned
Type Unassigned
Contact
Department Edinborough/Centennial
Total20102011201220132014Expenditures
16,00016,000Construction/Maintenance
16,000 16,000Total
Total20102011201220132014Funding Sources
16,00016,000Construction Fund
16,000 16,000Total
Page 48
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Letter and repaint existing signage plus add new signage at Centennial Lakes Park.
Project #ECL-07-004
Priority n/a
Justification
The original signs for Centennial Lakes Park need to be updated as part of routine maintenance by the year 2011 plus
new signs will be needed to identify changes and additions to the park since its inception.
Useful Life
Project Name CL Signage improvement
Category Unassigned
Type Unassigned
Contact
Department Edinborough/Centennial
Total20102011201220132014Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20102011201220132014Funding Sources
20,00020,000Construction Fund
20,000 20,000Total
Page 49
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace soft events, worn pads, foam and netting throughout Adventure Peak.
Project #ECL-07-006
Priority n/a
Justification
The structure has many "soft" features that will wear out over time due to heavy use. Adventure Peak opened in 9/03.
Useful Life
Project Name EP Adventure Peak Renovation
Category Unassigned
Type Unassigned
Contact
Department Edinborough/Centennial
Total20102011201220132014Expenditures
25,00025,000Construction/Maintenance
25,000 25,000Total
Total20102011201220132014Funding Sources
25,00025,000Construction Fund
25,000 25,000Total
Page 50
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace Tennant floor scrubber.
Project #ECL-07-007
Priority n/a
Justification
Scrubber is a 2005 model that we purchased used in 2006. Scrubber is used every day to scrub Great Hall floor, pool
deck and aggregate walkways.
Useful Life
Project Name EP Floor Scrubber
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
7,0007,000Equip/Vehicles/Furnishings
7,000 7,000Total
Total20102011201220132014Funding Sources
7,0007,000Construction Fund
7,000 7,000Total
Page 51
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Paint the ornamental metal railings in south park.
Project #ECL-08-003
Priority n/a
Justification
The railings were last painted in 2006 and will need to be stripped and repainted by then.
Useful Life
Project Name CL Paint South Park Railings
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
28,00028,000Construction/Maintenance
28,000 28,000Total
Total20102011201220132014Funding Sources
28,00028,000Construction Fund
28,000 28,000Total
Page 52
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace sod, re-grade greens and improve drainage on putting course.
Project #ECL-08-004
Priority n/a
Justification
Greens will be 15 years old and in need of renovation. We can get more play at a higher quality level if the tees and
pin areas are well maintained.
Useful Life
Project Name CL Renovate Putting Greens
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total20102011201220132014Funding Sources
40,00040,000Construction Fund
40,000 40,000Total
Page 53
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace broken concrete on park walkways.
Project #ECL-08-005
Priority n/a
Justification
Concrete on our walkways cracks and heaves over time and needs to be replaced.
Useful Life
Project Name CL Replace Cracked/Broken Concrete
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
12,00012,000Construction/Maintenance
12,000 12,000Total
Total20102011201220132014Funding Sources
12,00012,000Construction Fund
12,000 12,000Total
Page 54
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Security camera system for Edinborough Park.
Project #ECL-08-007
Priority n/a
Justification
Provide additional security cameras on upper level of the park and in the playpark. This will offer extra safety for our
customers and staff.
Useful Life
Project Name EP Security Camera System
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
12,00012,000Construction/Maintenance
12,000 12,000Total
Total20102011201220132014Funding Sources
12,00012,000Construction Fund
12,000 12,000Total
Page 55
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Torrent hard floor cleaning machine for Edinborough Park.
Project #ECL-08-009
Priority n/a
Justification
Original Torrent was purchased in 2006 and is used daily to clean locker room, restrooms, walkways and hallways at
Edinborough. Life expectancy is 5-7 years.
Useful Life 6 years
Project Name EP Torrent Floor Machine
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
8,0008,000Equip/Vehicles/Furnishings
8,000 8,000Total
Total20102011201220132014Funding Sources
8,0008,000Construction Fund
8,000 8,000Total
Page 56
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Themed soft foam play area for Great Hall.
Project #ECL-08-011
Priority n/a
Justification
Additional play equipment is needed for kids ages 1-5. Adventure Peak has a very small play area designated for
toddlers but the majority of the structure is geared for kids 4-11. This would provide quality safe-play space for
toddlers while further establishing ourselves in the 1-5 year-old market.
Useful Life
Project Name EP Soft Play for Great Hall
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
30,00030,000Construction/Maintenance
30,000 30,000Total
Total20102011201220132014Funding Sources
30,00030,000Construction Fund
30,000 30,000Total
Page 57
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace original sound equipment and speakers in the park.
Project #ECL-08-016
Priority n/a
Justification
This system is used primarily for making closing and emergency announcements. Controls, amps and speakers will be
replaced.
Useful Life
Project Name EP Park Sound System
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
27,00027,000Equip/Vehicles/Furnishings
27,000 27,000Total
Total20102011201220132014Funding Sources
27,00027,000Construction Fund
27,000 27,000Total
Page 58
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Weight machines and/or aerobic equipment.
Project #ECL-08-019
Priority n/a
Justification
This will replace a heavily used multi station weight machine which will be 11 years old.
Useful Life
Project Name EP Weight & Aerobic Equipment
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
6,0006,000Equip/Vehicles/Furnishings
6,000 6,000Total
Total20102011201220132014Funding Sources
6,0006,000Construction Fund
6,000 6,000Total
Page 59
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace pool deck and wall tile.
Project #ECL-08-021
Priority n/a
Justification
Tile is original and has cracked and shifted. Exact replacements are not available and we have been patching as
needed. This is a safety as well as cosmetic issue.
Useful Life
Project Name EP Pool and Wall Tile
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
80,00080,000Construction/Maintenance
80,000 80,000Total
Total20102011201220132014Funding Sources
80,00080,000Construction Fund
80,000 80,000Total
Page 60
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace Champion ice resurfacer.
Project #ECL-09-003
Priority n/a
Justification
The current ice resurfacer was purchased in 1986 and is scheduled for replacement.
Useful Life
Project Name CL Replace Ice Resurfacer
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
10,00010,000Equip/Vehicles/Furnishings
10,000 10,000Total
Total20102011201220132014Funding Sources
10,00010,000Construction Fund
10,000 10,000Total
Page 61
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
New speakers for amphitheater.
Project #ECL-09-004
Priority n/a
Justification
Current speakers were purchased in 1996. Replacement will allow better sound coverage for the audience and
performers.
Useful Life
Project Name CL Amphitheater Speakers
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
14,00014,000Equip/Vehicles/Furnishings
14,000 14,000Total
Total20102011201220132014Funding Sources
14,00014,000Construction Fund
14,000 14,000Total
Page 62
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Renovate planter beds in front of the Centrum building. The 16 planter beds will be redone with new trees, shrubs, soil
and mulch. Lighting and sound will also be redone.
Project #ECL-09-005
Priority n/a
Justification
Many of the current trees are struggling and the beds look dated.
Useful Life
Project Name CL Centrum Planter Beds
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
16,00016,000Equip/Vehicles/Furnishings
16,000 16,000Total
Total20102011201220132014Funding Sources
16,00016,000Construction Fund
16,000 16,000Total
Page 63
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Build a new restroom facility just south of the existing Centrum restrooms.
Project #ECL-09-007
Priority n/a
Justification
This new facility would give park patrons access to restrooms when the Centrum is closed and would also give the
park additional restrooms for larger events.
Useful Life
Project Name CL Add Restroom Facility
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
120,000120,000Construction/Maintenance
120,000 120,000Total
Total20102011201220132014Funding Sources
120,000120,000Construction Fund
120,000 120,000Total
Page 64
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace park sound system and speakers. Includes complete replacement of the inground speakers as well as eight
amplifiers.
Project #ECL-09-008
Priority n/a
Justification
Useful Life
Project Name CL Replace Park Sound System
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
32,00032,000Equip/Vehicles/Furnishings
32,000 32,000Total
Total20102011201220132014Funding Sources
32,00032,000Construction Fund
32,000 32,000Total
Page 65
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace worn and cracked concrete.
Project #ECL-09-009
Priority n/a
Justification
Concrete has areas that are worn, cracked & broken.
Useful Life
Project Name CL Replace Concrete
Category Sidewalk - Pathways
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
15,00015,000Construction/Maintenance
15,000 15,000Total
Total20102011201220132014Funding Sources
15,00015,000Construction Fund
15,000 15,000Total
Page 66
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the original wood stage floor in the amphitheater.
Project #ECL-09-011
Priority n/a
Justification
The floor has become warped and discolored in spots.
Useful Life
Project Name EP Theater Floor
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
24,00024,000Construction/Maintenance
24,000 24,000Total
Total20102011201220132014Funding Sources
24,00024,000Construction Fund
24,000 24,000Total
Page 67
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace/repair brickwork.
Project #ECL-09-012
Priority n/a
Justification
The brick arches at the three park entrances have become cracked and have loose bricks and mortar. This is a cosmetic
and potentially a safety issue if more settling should occur.
Useful Life
Project Name EP Exterior Arch Brickwork
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20102011201220132014Funding Sources
20,00020,000Construction Fund
20,000 20,000Total
Page 68
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
New storage building to provide safe and secure storage for gas and equipment.
Project #ECL-09-013
Priority n/a
Justification
Edinborough was designed with little indoor storage space and no outdoor storage for maintenance equipment such as
mowers, power brooms, gas, snow blowers, etc.
Useful Life
Project Name EP Outdoor Storage Shed
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
15,00015,000Construction/Maintenance
15,000 15,000Total
Total20102011201220132014Funding Sources
15,00015,000Construction Fund
15,000 15,000Total
Page 69
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Lift from the great hall floor to the Birthday Party Plateau - the old tot lot area.
Project #ECL-09-014
Priority n/a
Justification
This area was not designed to be handicapped accessible. We are currently providing two other birthday party sites in
different locations with accessibility.
Useful Life
Project Name EP Lift to Birthday Party Area
Category Building Improvements
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
30,00030,000Construction/Maintenance
30,000 30,000Total
Total20102011201220132014Funding Sources
30,00030,000Construction Fund
30,000 30,000Total
Page 70
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace track floor with a similar rubber surface.
Project #ECL-09-015
Priority n/a
Justification
The track floor was originally installed in 1987 and has experienced significant wear over the years.
Useful Life
Project Name EP Track Floor
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
60,00060,000Construction/Maintenance
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Construction Fund
60,000 60,000Total
Page 71
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the concrete at the southeast entrance to the park.
Project #ECL-09-016
Priority n/a
Justification
Drainage in the area needs to be improved to prevent water from coming into the entryway and also from seeping into
the loading dock entrance/hallway underneath.
Useful Life
Project Name EP Parking Ramp Concrete & Drain Tile
Category Building Maintenance
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
28,00028,000Construction/Maintenance
28,000 28,000Total
Total20102011201220132014Funding Sources
28,00028,000Construction Fund
28,000 28,000Total
Page 72
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Purchase a portable concession stand to sell hot dogs, pizza, cookies, etc. to park patrons and birthday parties.
Project #ECL-09-019
Priority n/a
Justification
This would probide a needed service as well as provide additional revenue for the park.
Useful Life
Project Name EP Portable Concession Stand
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
25,00025,000Equip/Vehicles/Furnishings
25,000 25,000Total
Total20102011201220132014Funding Sources
25,00025,000Construction Fund
25,000 25,000Total
Page 73
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Remove 2 small planters on the walls adjacent to the Corporate Center entrance from the park. Fill in areas with
aggregate flooring.
Project #ECL-09-020
Priority n/a
Justification
These areas would be used for seating for a concession stand.
Useful Life
Project Name EP Upper Commons Seating Area
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
10,00010,000Construction/Maintenance
10,000 10,000Total
Total20102011201220132014Funding Sources
10,00010,000Construction Fund
10,000 10,000Total
Page 74
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the triple wave slide.
Project #ECL-09-021
Priority n/a
Justification
The triple wave slide is an original component and one of the most heavily used events in the structure. It is starting to
wear out.
Useful Life
Project Name EP Adventure Peak Remodel
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
25,00025,000Equip/Vehicles/Furnishings
25,000 25,000Total
Total20102011201220132014Funding Sources
25,00025,000Construction Fund
25,000 25,000Total
Page 75
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace and repair concrete in NP.
Project #ECL-10-001
Priority n/a
Justification
Broken/cracked concrete.
Useful Life
Project Name CL Replace Concrete
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
10,00010,000Construction/Maintenance
10,000 10,000Total
Total20102011201220132014Funding Sources
10,00010,000Construction Fund
10,000 10,000Total
Page 76
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace removable wall in Centrum.
Project #ECL-10-002
Priority n/a
Justification
Headers on current wall have broken and cannot be repaired.
Useful Life
Project Name CL Centrum Building Wall
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
15,00015,000Construction/Maintenance
15,000 15,000Total
Total20102011201220132014Funding Sources
15,00015,000Construction Fund
15,000 15,000Total
Page 77
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
South Park irrigation.
Project #ECL-10-003
Priority n/a
Justification
Replace zones of south park irrigation that have broken.
Useful Life
Project Name CL SP Irrigation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
10,00010,000Construction/Maintenance
10,000 10,000Total
Total20102011201220132014Funding Sources
10,00010,000Construction Fund
10,000 10,000Total
Page 78
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
New dock for paddleboats.
Project #ECL-10-004
Priority n/a
Justification
Current rolling dock is wearing out.
Useful Life
Project Name CL Floating Dock
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
12,00012,000Construction/Maintenance
12,000 12,000Total
Total20102011201220132014Funding Sources
12,00012,000Construction Fund
12,000 12,000Total
Page 79
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Security camera system.
Project #ECL-10-005
Priority n/a
Justification
Install security camera system for security in park.
Useful Life
Project Name CL Security Camera System
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
25,00025,000Equip/Vehicles/Furnishings
25,000 25,000Total
Total20102011201220132014Funding Sources
25,00025,000Construction Fund
25,000 25,000Total
Page 80
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Landscape planter beds around Centrum.
Project #ECL-10-006
Priority n/a
Justification
Centrum planter beds are dated.
Useful Life
Project Name CL Centrum Planter Beds
Category Park Development
Type Equipment
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
20,00020,000Equip/Vehicles/Furnishings
20,000 20,000Total
Total20102011201220132014Funding Sources
20,00020,000Construction Fund
20,000 20,000Total
Page 81
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Asphalt circle and sidewalk north of track.
Project #ECL-10-007
Priority n/a
Justification
Cul-de-sac and sidewalks in main entrance have deteriorated causing tripping hazards.
Useful Life
Project Name EP Driveway - Cul De Sac
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total20102011201220132014Funding Sources
75,00075,000Construction Fund
75,000 75,000Total
Page 82
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Exterior lockable doors - NE & SE entryways.
Project #ECL-10-008
Priority n/a
Justification
Doors are original to Park and have corroded components and don't lock well. Also faded and look bad.
Useful Life
Project Name EP NE & SE Doors
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total20102011201220132014Funding Sources
40,00040,000Construction Fund
40,000 40,000Total
Page 83
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Exterior lockable doors - NW & SW entryways.
Project #ECL-10-009
Priority n/a
Justification
Doors are original to Park and have corroded components and don't lock well. Also faded and look bad.
Useful Life
Project Name EP NW & SW Doors
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total20102011201220132014Funding Sources
40,00040,000Construction Fund
40,000 40,000Total
Page 84
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Sidewalk replacement on North and West sides of Park.
Project #ECL-10-010
Priority n/a
Justification
Sidewalks are deteriorating causing tripping hazards.
Useful Life
Project Name EP West Sidewalk Replacement
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
25,00025,000Construction/Maintenance
25,000 25,000Total
Total20102011201220132014Funding Sources
25,00025,000Construction Fund
25,000 25,000Total
Page 85
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace concrete sidewalks.
Project #ECL-10-011
Priority n/a
Justification
Useful Life
Project Name EP North Sidewalk
Category Park Development
Type Improvement
Contact Park & Recreation
Department Edinborough/Centennial
Total20102011201220132014Expenditures
30,00030,000Construction/Maintenance
30,000 30,000Total
Total20102011201220132014Funding Sources
30,00030,000Construction Fund
30,000 30,000Total
Page 86
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Joint Fiber Optic Cabling Project with Edina School District - By leveraging some of the existing fiber infrastructure
from the school district, the City would provide some missing links that would allow us to make connections to Edina
Fire 1 & 2, York Liquor and the Art Center. In return, the City would allow the school to utilize some of the City's
existing fiber for their needs. This allows us to accelerate our connections at a much reduced cost versus running
separate cable for our facilities exclusively.
Project #CW-02-001
Priority 2 Very Important
Justification
Currently, we connect to many of our facilities through the use of T1 phone lines which cost us around $3,000 per T1
line. Some of our facilities have multiple T1 lines to accommodate both voice and data transmissions. By running
fiber optic cabling to these facilites, the City could remove the operating expense of the T1 lines from the offsite
budgets. There would be a small offset of annual costs associated with service contracts on the equipment needed at
each end of the cabling. It would also allow us to look at Voice over IP for our telecommunications in the long run.
Most of the larger facilities (Fire and Public Works) have a 3-4 year payback of the capital costs in operating cost
reductions.
Useful Life Unassigned
Project Name Citywide Fiber Optic Cabling
Category Computer Network
Type Improvement
Contact Deputy City Manager
Department General Government
Total20102011201220132014Expenditures
375,00075,000 75,000 75,000 75,000 75,000Equip/Vehicles/Furnishings
75,000 75,000 75,000 75,000 75,000 375,000Total
Total20102011201220132014Funding Sources
375,00075,000 75,000 75,000 75,000 75,000Construction Fund
75,000 75,000 75,000 75,000 75,000 375,000Total
Page 87
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
These funds will cover any changes/additions to file areas, workstations and record storage.
Project #GG-10-001
Priority n/a
Justification
Useful Life Unassigned
Project Name City Hall/Public Works Building
Category Building Improvements
Type Unassigned
Contact Deputy City Manager
Department General Government
Total20102011201220132014Expenditures
175,00035,000 35,000 35,000 35,000 35,000Equip/Vehicles/Furnishings
35,000 35,000 35,000 35,000 35,000 175,000Total
Total20102011201220132014Funding Sources
175,00035,000 35,000 35,000 35,000 35,000Construction Fund
35,000 35,000 35,000 35,000 35,000 175,000Total
Page 88
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace equipment according to the equipment replacement schedule.
Project #GG-10-002
Priority n/a
Justification
Regular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Name Assessing Department Equipment Replacement
Category Equipment Replacement
Type Equipment
Contact
Department General Government
Total20102011201220132014Expenditures
15,00015,000Equip/Vehicles/Furnishings
15,000 15,000Total
Total20102011201220132014Funding Sources
15,00015,000Equipment Replacement Progr
15,000 15,000Total
Page 89
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Resurface parking lot.
Project #GC-06-001
Priority n/a
Justification
The resurfacing of the asphalt parking lot is routine maintenance needed to extend the life of the parking lot and avoid
a more costly replacement.
Useful Life
Project Name Braemar & Braemar Exec: Parking Lot Resurfacing
Category Street Mill & Overlay
Type Improvement
Contact Park & Recreation
Department Golf Course
Total20102011201220132014Expenditures
150,00075,000 75,000Construction/Maintenance
75,000 75,000 150,000Total
Total20102011201220132014Funding Sources
150,00075,000 75,000Golf Course Fund
75,000 75,000 150,000Total
Page 90
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Routine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment.
Project #GC-10-001
Priority n/a
Justification
These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that
are on a 10-15 year replacement schedule.
Useful Life Unassigned
Project Name Braemar: Maintenance Equipment
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Golf Course
Total20102011201220132014Expenditures
760,000145,000 150,000 155,000 155,000 155,000Equip/Vehicles/Furnishings
145,000 150,000 155,000 155,000 155,000 760,000Total
Total20102011201220132014Funding Sources
760,000145,000 150,000 155,000 155,000 155,000Golf Course Fund
145,000 150,000 155,000 155,000 155,000 760,000Total
Page 91
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Routine equipment replacement purchases for driving range equipment and small utility vehicles.
Project #GC-10-002
Priority n/a
Justification
These are routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that
are on a 10 year replacement schedule.
Useful Life 10 years
Project Name Braemar: Miscellaneous Equipment
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Golf Course
Total20102011201220132014Expenditures
220,00040,000 40,000 40,000 50,000 50,000Equip/Vehicles/Furnishings
40,000 40,000 40,000 50,000 50,000 220,000Total
Total20102011201220132014Funding Sources
220,00040,000 40,000 40,000 50,000 50,000Golf Course Fund
40,000 40,000 40,000 50,000 50,000 220,000Total
Page 92
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace current lighting with brighter and more efficient lighting. Replace all wood shelving on liquor wall with
Lozier metal shelving. Replace wood interior with lighter material.
Project #LIQ-02-005
Priority n/a
Justification
Store was last remodeled in 1998. We need to brighten up the interior and get better lighting for how the store is
currently laid out.
Useful Life Unassigned
Project Name 50th: Store Remodel
Category Building Improvements
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
95,00095,000Construction/Maintenance
95,000 95,000Total
Total20102011201220132014Funding Sources
95,00095,000Liquor Fund
95,000 95,000Total
Page 93
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This will be a major interior remodel. Possible changes include realignment of shelving, changes to coolers, and
enhanced security.
Project #LIQ-09-002
Priority n/a
Justification
The York store was built in 1996 and is due for a remodel. Redesign will better utilize space and improve traffic flow.
Useful Life 15 years
Project Name York: Store Remodel
Category Building Improvements
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
300,000300,000Construction/Maintenance
300,000 300,000Total
Total20102011201220132014Funding Sources
300,000300,000Liquor Fund
300,000 300,000Total
Page 94
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace entrance door.
Project #LIQ-09-003
Priority n/a
Justification
Current door was installed in 1998 and will need replacement.
Useful Life
Project Name 50th: Replace Entrance Door
Category Building Maintenance
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20102011201220132014Funding Sources
20,00020,000Liquor Fund
20,000 20,000Total
Page 95
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Repairs and maintenance.
Project #LIQ-10-001
Priority n/a
Justification
Useful Life
Project Name All Stores: Repairs and Maintenance
Category Building Maintenance
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
175,00080,000 35,000 60,000Construction/Maintenance
80,000 35,000 60,000 175,000Total
Total20102011201220132014Funding Sources
175,00080,000 35,000 60,000Liquor Fund
80,000 35,000 60,000 175,000Total
Page 96
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Computer and POS software upgrades and video upgrades.
Project #LIQ-10-002
Priority n/a
Justification
POS last updated in 2007. Increase video capabilities, add cameras and software.
Useful Life
Project Name All Stores: Video Upgrades
Category Computer Software
Type Equipment
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
20,00020,000Equip/Vehicles/Furnishings
20,000 20,000Total
Total20102011201220132014Funding Sources
20,00020,000Liquor Fund
20,000 20,000Total
Page 97
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace entrance door.
Project #LIQ-10-003
Priority n/a
Justification
Current door was installed in 1996 and will need replacement.
Useful Life
Project Name York: Replace Entrance Door
Category Building Maintenance
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20102011201220132014Funding Sources
20,00020,000Liquor Fund
20,000 20,000Total
Page 98
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace 2 rooftop HVAC units on the York store.
Project #LIQ-10-004
Priority n/a
Justification
Current HVAC units were installed in 1996 and need to be replaced.
Useful Life
Project Name York: Replace Rooftop HVAC
Category Building Maintenance
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
50,00025,000 25,000Construction/Maintenance
25,000 25,000 50,000Total
Total20102011201220132014Funding Sources
50,00025,000 25,000Liquor Fund
25,000 25,000 50,000Total
Page 99
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace current neon signage with LED.
Project #LIQ-10-005
Priority n/a
Justification
Current signage needs updating. LED is more energy efficient than neon.
Useful Life
Project Name York: LED Signage
Category Building Improvements
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20102011201220132014Funding Sources
20,00020,000Liquor Fund
20,000 20,000Total
Page 100
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace load leveler dock.
Project #LIQ-10-006
Priority n/a
Justification
Current load leveler dock was installed in 2002 and will need maintenance/repairs.
Useful Life
Project Name Vernon: Replace Load Leveler Dock
Category Building Maintenance
Type Improvement
Contact Liquor Stores
Department Liquor Stores
Total20102011201220132014Expenditures
15,00015,000Construction/Maintenance
15,000 15,000Total
Total20102011201220132014Funding Sources
15,00015,000Liquor Fund
15,000 15,000Total
Page 101
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Regrade the soccer field turf and provide new sand and peat mixture sub-soils and re-install the underground irrigation
system.
Project #PK-00-033
Priority n/a
Justification
This soccer field is in need of re-grading for proper drainage purposes and to correct uneven turf conditions. The
irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow
for reduced use of herbicides.
Useful Life Unassigned
Project Name Pamela Park: Renovate senior athletic field
Category Ballfield Improvements
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
330,000330,000Construction/Maintenance
330,000 330,000Total
Total20102011201220132014Funding Sources
330,000330,000Construction Fund
330,000 330,000Total
Page 102
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Meet with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired
bid. Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant
concrete border and adding new playground equipment with accessible path to transfer stations.
Project #PK-02-041
Priority n/a
Justification
The current playground equipment was installed in 1991. Playground equipment is currently on a 15 year replacement
schedule. In 2009 the equipment will be 18 years old. In some cases, even if equipment appears to be structurally
sound after 15 years, the equipment will likely no longer conform to current safety standards and will need a new look.
Useful Life 15 years
Project Name Chowen Park: Playground
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
120,000120,000Construction/Maintenance
120,000 120,000Total
Total20102011201220132014Funding Sources
120,000120,000Construction Fund
120,000 120,000Total
Page 103
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This is for replacement of the hockey rink and lights at Walnut Ridge Park.
Project #PK-04-003
Priority n/a
Justification
The hockey rink lights and hockey rink boards are aged and worn and in need of replacement.
Useful Life Unassigned
Project Name Walnut Ridge Park: Hockey rink
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
60,00060,000Construction/Maintenance
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Construction Fund
60,000 60,000Total
Page 104
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Routine maintenance renovation of the Todd Park asphalt pathway.
Project #PK-05-009
Priority n/a
Justification
In the year 2011, the Todd Park asphalt pathway will be over 13 years old and in need of routine maintenance
renovation, which includes regrading, new base, and repaving.
Useful Life
Project Name Todd Park: Pathway renovation
Category Sidewalk - Pathways
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
45,00045,000Construction/Maintenance
45,000 45,000Total
Total20102011201220132014Funding Sources
45,00045,000Construction Fund
45,000 45,000Total
Page 105
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Develop a new multi-purpose athletic field adjacent to the senior athletic field on the south end of Pamela Park.
Project #PK-07-004
Priority n/a
Justification
There is more demand for multi-purpose athletic fields than there is supply. The same multi-purpose athletic fields are
used to support the games of football, soccer, lacrosse, rugby and ultimate frisbee.
Useful Life
Project Name Pamela Park: New athletic field
Category Unassigned
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
400,000400,000Construction/Maintenance
400,000 400,000Total
Total20102011201220132014Funding Sources
400,000400,000Construction Fund
400,000 400,000Total
Page 106
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project would include decorative pathway lighting fixtures along the pathway at Lewis Park.
Project #PK-08-006
Priority n/a
Justification
The pathway around the perimeter of Lewis Park receives a tremendous amount of use on a year around basis. There
are many elderly adults that enjoy walking on the pathway year around. During the late fall through early spring the
park pathway receives a lot of use during hours of darkness. Pathway lighting would enhance safety and further
promote walking on the pathway on a year around basis.
Useful Life
Project Name Lewis Park: Pathway lighting
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
30,00030,000Construction/Maintenance
30,000 30,000Total
Total20102011201220132014Funding Sources
30,00030,000Construction Fund
30,000 30,000Total
Page 107
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This is for renovation of the asphalt walking path in 2009 and the biking path in 2010.
Project #PK-09-002
Priority n/a
Justification
By the year 2009, the interior asphalt walking path will be in need of total renovation due to deterioration from tree
root growth under the pathway and normal wear and tear cause by use and freeze/thaw cycles. The same reasons are
cause to renovate the biking path in 2010.
Useful Life
Project Name Bredesen Park: Pathway renovations
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
250,000250,000Construction/Maintenance
250,000 250,000Total
Total20102011201220132014Funding Sources
250,000250,000Construction Fund
250,000 250,000Total
Page 108
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
A natural resources inventory assessment is intended to identify rare plant and animal species, and exotic non-native
plant species assessment. The assessment can also include other important information such as soil types, existing
infrastructures, and areas of significant historical and cultural values.
Project #PK-09-005
Priority n/a
Justification
A resource inventory assessment must first be conducted to identify Edina’s prairies, woods and wetlands and produce
a landscape comprehensive resource map. The survey is needed to assess ecological functions.
Once a resource inventory assessment is completed, a Natural Resources Conservation and Management Plan will be
established. At that time, natural resource management policies will be proposed and adopted. For example, exotic or
invasive plants may be controlled to protect native habitats for the health and safety of the public.
This is an important step in the process to ultimately identify a master landscape plantings plan for all Edina parks,
which is the final phase of park development that has yet to be completed.
Useful Life
Project Name Natural resources inventory assessment
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
100,00050,000 50,000Planning/Design
50,000 50,000 100,000Total
Total20102011201220132014Funding Sources
100,00050,000 50,000Construction Fund
50,000 50,000 100,000Total
Page 109
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This is for total renovation of the large 7,237 square yards of asphalt parking lot.
Project #PK-09-006
Priority n/a
Justification
By the year 2011, the 7,237 square yards of asphalt parking lot will need to be totally renovated due to normal
deterioration.
Useful Life
Project Name Garden Park: Parking lot renovation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
250,000250,000Construction/Maintenance
250,000 250,000Total
Total20102011201220132014Funding Sources
250,000250,000Construction Fund
250,000 250,000Total
Page 110
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project calls for replacing the worn outdoor hockey rink boards and fencing and moving the hockey rink from its
current location 30 feet to the west and 30 feet to the south. The existing hockey rink lights and standards will be used
and relocated.
Project #PK-10-001
Priority n/a
Justification
Pamela Park's outdoor hockey rink boards and fencing are aged and worn and in need of replacement. Park
Maintenance staff do the construction and installation of the new replacement boards and support posts. The fencing
replacement is awarded to the lowest bid fencing contractor. The light poles and fixtures can be relocated. As long as
the boards are in need of replacement, it makes sense to move the rink slightly to the west and south onto more stable
soils further from wetlands which will also allow for the nature path to have more room to be routed to the east of the
hockey rink.
Useful Life
Project Name Pamela Park: Hockey Rink Replacement
Category Unassigned
Type Unassigned
Contact
Department Park & Recreation
Total20102011201220132014Expenditures
60,00060,000Construction/Maintenance
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Construction Fund
60,000 60,000Total
Page 111
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Project #PK-10-002
Priority n/a
Justification
Useful Life
Project Name Veterans Memorial
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
30,00030,000Construction/Maintenance
30,000 30,000Total
Total20102011201220132014Funding Sources
30,00030,000Construction Fund
30,000 30,000Total
Page 112
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This is for a mill and overlay of the west parking lot that serves Countryside Park.
Project #PK-10-003
Priority n/a
Justification
The asphalt surface of Countryside Park's west parking lot is in need of complete renovation. The asphalt needs to be
removed and rebuilt due to age and wear.
Useful Life
Project Name Countryside Park: West Parking Lot Renovation
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
60,00060,000Construction/Maintenance
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Construction Fund
60,000 60,000Total
Page 113
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This calls for replacement of the existing Kompan (company brand name) creative play playground equipment at
Countryside Park and placing new equipment in the west location as drawn on the new Countryside Park master plan.
This project also includes significant grading work and development of a partial section of the pathway as proposed in
the master plan. This would be consider Phase I of the master plan development.
Project #PK-10-004
Priority n/a
Justification
The Countryside Park master plan calls for removal of the aged and outdated playground equipment and placing new
more modern equipment in the southwest corner of the park. A portion of the pathway system including in the master
plan would then be needed to create better access to the new playground location.
Useful Life
Project Name Countryside Park: Playground & Pathway
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
330,000330,000Construction/Maintenance
330,000 330,000Total
Total20102011201220132014Funding Sources
330,000330,000Construction Fund
330,000 330,000Total
Page 114
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
The project involves expansion of the parking lot on the south end of Pamela Park. The redesign will include striping
of the parking lot to make more efficient use of existing parking. 20-23 additional parking stalls are proposed to be
added to the south parking lot. .
Project #PK-10-005
Priority n/a
Justification
On occasional evenings, there is not enough parking capacity to serve scheduled programs and as a result, park users
are parking on the grass. The new additional small rectangular athletic field is also expected to require some
additional parking capacity.
Useful Life
Project Name Pamela Park: South Parking Lot Expansion
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total20102011201220132014Funding Sources
40,00040,000Construction Fund
40,000 40,000Total
Page 115
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project proposes to improve the flow of traffic into the north parking lot (near the park shelter building), create
more parking capacity where possible and stripe the lot to make parking safer and more efficient.
Project #PK-10-006
Priority n/a
Justification
The existing north parking lot does not have well defined parking stalls, which leads to an inefficient and unsafe
parking lot. As a result, park users park unlawfully on the grass. During high peak scheduled activities, there are not
enough parking stalls to accommodate the demand. Additional parking stalls will make the lot safer, more efficient
and keep park patrons from parking on neighborhood streets.
Useful Life
Project Name Pamela Park: North Parking Lot Expansion
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
45,00045,000Construction/Maintenance
45,000 45,000Total
Total20102011201220132014Funding Sources
45,00045,000Construction Fund
45,000 45,000Total
Page 116
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Pamela Park's west parking lot renovation includes removal of existing asphalt surface, developing a new sub-base,
installing a new wear-course of asphalt followed by a finish coat of asphalt and adding concrete curbing around the
perimeter. The plan calls for an expansion opportunity to add 37 more parking stalls to the west lot.
Project #PK-10-007
Priority n/a
Justification
The west parking lot will be in need of total renovation in 2013. Concrete curbing is needed to deter people from
parking on the grass or driving through the park. Additional parking is needed to keep visitors from parking on the
grass during peak use periods.
Useful Life
Project Name Pamela Park: West Parking Lot Expansion
Category Park Development
Type Improvement
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
60,00060,000Construction/Maintenance
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Construction Fund
60,000 60,000Total
Page 117
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace equipment according to the equipment replacement schedule.
Project #PK-10-008
Priority n/a
Justification
Regular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Name Parks Department Equipment Replacement
Category Equipment Replacement
Type Equipment
Contact Park & Recreation
Department Park & Recreation
Total20102011201220132014Expenditures
924,600596,500 62,000 95,100 21,400 149,600Equip/Vehicles/Furnishings
596,500 62,000 95,100 21,400 149,600 924,600Total
Total20102011201220132014Funding Sources
924,600596,500 62,000 95,100 21,400 149,600Equipment Replacement Progr
596,500 62,000 95,100 21,400 149,600 924,600Total
Page 118
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Purchase and/or develop complaint administration software to be used by Building Inspections, Health, and Planning
departments.
Project #BD-06-001
Priority n/a
Justification
Software will eliminate multiple staff/departments working on the same complaint. Encourage faster and more
accurate response. Provides the ability for multiple departments to work on multiple complaints.
Useful Life
Project Name Complaint Administration Software
Category Computer Software
Type Equipment
Contact Chief Building Official
Department Public Safety
Total20102011201220132014Expenditures
35,00035,000Equip/Vehicles/Furnishings
35,000 35,000Total
Total20102011201220132014Funding Sources
35,00035,000Construction Fund
35,000 35,000Total
Page 119
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace equipment according to the equipment replacement schedule.
Project #PS-10-001
Priority n/a
Justification
Regular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Name Fire Department Equipment Replacement
Category Equipment Replacement
Type Equipment
Contact Fire Department
Department Public Safety
Total20102011201220132014Expenditures
1,554,000404,000 430,000 350,000 195,000 175,000Equip/Vehicles/Furnishings
404,000 430,000 350,000 195,000 175,000 1,554,000Total
Total20102011201220132014Funding Sources
1,554,000404,000 430,000 350,000 195,000 175,000Equipment Replacement Progr
404,000 430,000 350,000 195,000 175,000 1,554,000Total
Page 120
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace equipment according to the equipment replacement schedule.
Project #PS-10-002
Priority n/a
Justification
Regular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Name Police Department Equipment Replacement
Category Equipment Replacement
Type Equipment
Contact Police Department
Department Public Safety
Total20102011201220132014Expenditures
2,695,299413,823 831,433 310,911 42,553 1,096,579Equip/Vehicles/Furnishings
413,823 831,433 310,911 42,553 1,096,579 2,695,299Total
Total20102011201220132014Funding Sources
2,695,299413,823 831,433 310,911 42,553 1,096,579Equipment Replacement Progr
413,823 831,433 310,911 42,553 1,096,579 2,695,299Total
Page 121
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace equipment according to the equipment replacement schedule.
Project #PS-10-003
Priority n/a
Justification
Regular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Name Inspections Department Equipment Replacement
Category Equipment Replacement
Type Equipment
Contact Chief Building Official
Department Public Safety
Total20102011201220132014Expenditures
30,00015,000 15,000Equip/Vehicles/Furnishings
15,000 15,000 30,000Total
Total20102011201220132014Funding Sources
30,00015,000 15,000Equipment Replacement Progr
15,000 15,000 30,000Total
Page 122
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace equipment according to the equipment replacement schedule.
Project #PS-10-004
Priority n/a
Justification
Regular updates to equipment helps to keep maintenance costs low.
Useful Life 10 years
Project Name Health Department Equipment replacement
Category Equipment Replacement
Type Equipment
Contact
Department Public Safety
Total20102011201220132014Expenditures
15,00015,000Equip/Vehicles/Furnishings
15,000 15,000Total
Total20102011201220132014Funding Sources
15,00015,000Equipment Replacement Progr
15,000 15,000Total
Page 123
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project involves the milling of distressed surface and the repaving of a new surface on Benton Ave. from Hansen
Rd. to Hwy 100.
Project #PW-00-004
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life Unassigned
Project Name Mill & Overlay: Benton Ave. (Hansen - Hwy 100)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
N
WILLSON RD
WILLSON
HANSEN RD
HANSEN RD
DALE AVE
HANSEN RD
GROVE ST
BENTON AVE
BERNARD PL
CODE AVE
BIRCHCREST DR
60TH ST W
59TH ST W
CODE AVE
58TH ST W
E
AS
TVIEW
DR
TINGDALE AVE
TINGDALE AVE
VALLEY VIE W RD
JOSEPHINE AVE
N
OR
MA
ND
ALE CT
HANSEN RD
HANSEN RD
BENTON AVE
GARDEN AVE
DR
AVE
BENTON
RIDGECLOVER
WIL
R
Y
A
N A
V
E
LA
PORTER
FORSLIN
WST61ST
DR
LA
M
EL
O
D
Y
BENTON AVEHANSEN ROAD
TH 100
PROJECT AREA
Total20102011201220132014Expenditures
180,000180,000Construction/Maintenance
180,000 180,000Total
Total20102011201220132014Funding Sources
180,000180,000Municipal State Aid
180,000 180,000Total
Page 124
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for the reconstruction of W. 44th Street from Hwy 100 to France Avenue. This project will
provide new concrete curb and gutters, pavement, and sidewalks along the northerly side.
Project #PW-00-012
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible.
Useful Life Unassigned
Project Name Reconstruct: 44th Ave. (TH 100 - France)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
44TH ST W
ALDEN
DR
GRIMES
AVE
42 1/2 ST W
TOWNES CIR
FRANCE AVE S
49TH ST W
TOWNES RD
MAPLE RD
TOW
NES RD
BRIDGE LA
48TH ST W
FRANCE AVE S
47TH ST W
BRIDGE LA
BRIDGE LA
COOLIDGE AVE
BROOK AVE
STATE HWY NO 100
WST44TH
EDGEBROOK RD
CLUB
AVE
MACKEY
RDSUNNYSIDE
RIDGESUNNYSLOPE
W
RD
WOODHILL
WAY
E
RD
SUNNYSLOPE
BROWNDALE MOORLAND
EDINA
WOODDALE
AVE
AVE
BLVD AVE
RD
SUNNYSIDE
44TH ST W
RD
MEADOW
RD
M
EADOW
RD
OAKS
WHITE
RD
TOW
NES
RD
SUNNYSIDE
AVE
AVE
AVE
AVE
DREXEL
CASCO BRUCE
ARDEN
RD
CLUBCOUNTRY
FRANCE AVE S
SUNNYSIDE AVE
FRANCE AVE S
(CO RD NO 17)
WAV ELAN D TER
NATCHEZ AVE S
ST
W
S
AVE
GRIMES
44TH
MORNINGSIDE RD
FRANCE AVE S
RDMEADO W
ST
BRANSON
SCOTT TER
AVE
CROCKER
AVE
LYNN
OAKDALE AVE
LITTLE ST
45TH ST W
AVE
CURVE
SU NNYSIDE RD
NATCHEZ AVE S (UNDEVELOPED)
O
AKDALE AVE
42ND ST WWST42ND
MOTOR ST
WESTBROOK LA
MILLPOND PL
48TH ST W
CASCADE LA
LAURA AVEMOORE AVE
NORTH AVE
44TH ST W
THIELEN AVE
STATE HWY NO 100
AVE
VERNON
LA
N
PROJECT AREA
W E S T 4 4 T H S T R E E T
TH 100
FRANCE AVE
Total20102011201220132014Expenditures
900,000900,000Construction/Maintenance
900,000 900,000Total
Total20102011201220132014Funding Sources
720,000720,000Municipal State Aid
180,000180,000Public Improvement Revolving
900,000 900,000Total
Page 125
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for the rehabilitation of concrete pavement along Tracy Avenue from Vernon Avenue to TH 62.
The existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of the
roadway.
Project #PW-00-015
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life Unassigned
Project Name Concrete Rehab: Tracy Ave. (Vernon - TH62)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
WILLSON RD
EIVEKAL
WIND RD
60TH ST W
RYAN AVE
RUTH DR
59TH ST W
STATE HWY NO 62
RYAN AVE
62ND
64TH
RYAN AVE
AVE
SCHOOL
VALLEY
AVE
PARNELL
RD
WILLSON
WILLSON
GOLF
DR
LAKEVIEW
LAKEVIEW
SOUTHVIEW LA
JOSEPHINE AVE
65TH ST W
WILRYAN AVE
TINGDALE AVE
MILDRED AVE
ROLF AVE
WARREN AVE
JOSEPHINE AVEWILRYAN AVE
STATE HWY NO 62
TINGDALE AVE
ROLF AVE
64TH ST W
MILDRED AVE
63RD ST W
WARREN AVE
HOLBORN AVE
MADDOX LA
ST W
WILRYAN AVECODE AVE
62ND ST W
AVE
TRACY
TRACY AVE
WAY
COLONIAL
OLINGER BLVD
STATE HWY NO 62
DR
CRESCENT
VIEW
VALLEY
HILLSIDE
COLONIAL CT
VALLEY
64TH ST W
LA
RD
STATE HWY NO 62
WHITING AVE
PARK LA
CREST LA
LADARCY
LIMERICK DR
DR
DORON
RD
VALLEY VIEW RD
DORON LA
DORON LA
VALLEY LA
LA
LIMERICK
LIMERICK DR CIR
RIDGEVIEW
DR
RIDGEVIEW
64TH ST W
WHITING AVE
RIDGEVIEW DR
WST63RD
WYMAN AVE
62ND ST W
MADDOX LA
RD
HANSEN
BLVD
WESTRIDGE
DRCRESCENT
HILLS
IDE RD
62ND
PLROBERTSAVE
ROLFAVE
MILDRED RD
VALLEY VIEW
OLINGER BLVD
HANSEN RD
OLINGER RD
HANSEN RD
DALE AVE
HANSEN RD
WINDSOR AVE
DALE AVE BERNARD AVE
57TH ST W
CODE AVE
GROVE ST
BENTON AVE
BERNARD PL
BIRCHCREST DR
CODE AVE BIRCHCREST DR
60TH ST W
59TH ST W
CODE AVE
58TH ST W
56TH ST W
WARWICK PL
WARWICK PL
YVONNE TER
EASTVIEW DR
TINGDALE AVE
TINGDALE AVE
VALLEY VIEW RD
JOSEPHINE AVE
NORMANDALE CT
57TH ST W
KENT AVE
WINDSOR AVE
IDYLWOOD PL
DYLWOOD DR
LESLEE LA
KAYMAR DR
VERNON AVE
SHERMAN CIR
OLINGER RD
OLINGER RD
GROVE CIR
OLINGER RD
HIGHWOOD DR
HIGHWOOD DR
HEATHER LA
GROVE ST
AMY DR
SUN RD
61ST ST
OLINGER BLVD
JEFF PL
61ST ST W
ARBOUR AVE
ARBOUR AVE
GROVE ST
MEROLD DR
DUNDEE RD
MIRROR LAKES DR
EDEN PRAIRIE RD
HAWKES TER
WARDEN AVE
GROVE ST
STUART AVE
ARBOUR LA
BENTON AVE
TRACY AVE
LYLE CIR
JOHNSON DR
GROVE ST
WARDEN AVE
TRACY AVE
JOHNSON DR
MERRITT CIR
GOYA LA
WARDEN AVE
OAK LA
OAK LA
CRESCENT DR
COUNTRYSIDE RD
HIGHLAND RD
HANSEN RD
HANSEN RD
BENTON AVE
GARDEN AVE
GARDEN AVE
HANSEN RD
VERNON AVE
WYMAN AVE
WESTRIDGE
DR
AVE
BENTON
RIDGECLOVER
WILRYAN AVE
LA
PORTERFORSLIN
WST61ST
AVE
CODE
WST
56TH
RICHMOND LA
AVEWINDSOR
PL
DR
LAKE
MELODY
LA
MELODY
RIDGEWAY
LA
ARBOUR
AVE
TRACY
RD
BLVD
WESTRIDGE
DR
CRESCENT
STHUNTER
AVEBENTON
BLVD
OLINGER
CIR
OLINGER
WYCLIFFE RD
AVE
ARBOUR
W
CIR
OLINGER
BERNECIR
W
DR
HIGHWOOD
DR
HIGHWOOD
RD
DUNDEE
CHANTREY
RD
PRAIRIE
EDEN
RD
WYCLIFFE
AVEVERNON
DR
HAW
KES
RD
PARKRIDGE
GATE PARK RD
WAY
DONCASTER
GLENGARRY
RD
N
TRACY AVE
VERNON AVE
TH 62
PROJECT AREA
Total20102011201220132014Expenditures
600,000600,000Construction/Maintenance
600,000 600,000Total
Total20102011201220132014Funding Sources
480,000480,000Municipal State Aid
120,000120,000Public Improvement Revolving
600,000 600,000Total
Page 126
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for the rehabilitation of concrete pavement along W. 70th Street from Hwy 100 to France
Avenue. The existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of
the roadway.
Project #PW-00-017
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life Unassigned
Project Name Reconstruct: W. 70th St. (TH100 - France)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
Total20102011201220132014Expenditures
1,200,0001,200,000Construction/Maintenance
1,200,000 1,200,000Total
Total20102011201220132014Funding Sources
960,000960,000Municipal State Aid
240,000240,000Public Improvement Revolving
1,200,000 1,200,000Total
Page 127
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab existing concrete roadway.
Project #PW-00-074
Priority n/a
Justification
This roadway is over 30 years old and is in need of concrete repair.
Useful Life Unassigned
Project Name Concrete Rehab: Parklawn Ave. (France to W 77)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
Total20102011201220132014Expenditures
450,000450,000Construction/Maintenance
450,000 450,000Total
Total20102011201220132014Funding Sources
360,000360,000Municipal State Aid
90,00090,000Public Improvement Revolving
450,000 450,000Total
Page 128
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for the reconstruction of West 62nd Street from Oaklawn Avenue to France Avenue. This
project will provide a new roadway section and will bring this road into compliance with State-Aid Standards.
Sidewalks will also be proposed with this reconstruction.
Project #PW-01-011
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State-Aid Standards as set by the Minnesota Department of Transportation.
Useful Life Unassigned
Project Name Reconstruct: W 62nd St. (Oaklawn - France)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
520,000520,000Construction/Maintenance
520,000 520,000Total
Total20102011201220132014Funding Sources
416,000416,000Municipal State Aid
104,000104,000Public Improvement Revolving
520,000 520,000Total
Page 129
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for the reconstruction of West 54th Street from Wooddale Avenue to France Avenue. This
project will provide a new roadway section and will bring this road into compliance with State-Aid Standards.
Sidewalks will also be analyzed with this reconstruction.
Project #PW-01-012
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State-Aid Standards as set by the Minnesota Department of Transportation.
Useful Life Unassigned
Project Name Reconstruct: W 54th St. (Wooddale to France)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
850,000850,000Construction/Maintenance
850,000 850,000Total
Total20102011201220132014Funding Sources
680,000680,000Municipal State Aid
170,000170,000Public Improvement Revolving
850,000 850,000Total
Page 130
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for the reconstruction of West 58th Street from France Avenue to Xerxes Avenue. This project
will provide a new roadway section and will bring this road into compliance with State-Aid Standards. Sidewalks will
also be analyzed with this reconstruction.
Project #PW-03-005
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State-Aid Standards as set by the Minnesota Department of Transportation.
Useful Life Unassigned
Project Name Reconstruct: W 58th St (France to Xerxes)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
629,000629,000Construction/Maintenance
629,000 629,000Total
Total20102011201220132014Funding Sources
503,200503,200Municipal State Aid
125,800125,800Public Improvement Revolving
629,000 629,000Total
Page 131
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for the reconstruction of West 58th Street from Wooddale Avenue to France Avenue. This
project will provide a new roadway section and will bring this road into compliance with State-Aid Standards.
Sidewalks will also be analyzed with this reconstruction.
Project #PW-04-001
Priority n/a
Justification
This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of
failure. Maintenance of the roadway such as overlays or seal-coats are no longer feasible. The roadway section is also
considered inadequate per the Municipal State-Aid Standards as set by the Minnesota Department of Transportation.
Useful Life Unassigned
Project Name Reconstruct: W 58th St (Wooddale to France)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
900,000900,000Construction/Maintenance
900,000 900,000Total
Total20102011201220132014Funding Sources
720,000720,000Municipal State Aid
180,000180,000Public Improvement Revolving
900,000 900,000Total
Page 132
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for reconstructing this bridge and abutments and adding sidewalks over the Minnehaha Creek.
Project #PW-05-003
Priority n/a
Justification
The need to rehabilitate this bridge was determined by the annual bridge certification program.
Useful Life 100 years
Project Name Bridge: 54th Street Bridge
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
520,000520,000Construction/Maintenance
520,000 520,000Total
Total20102011201220132014Funding Sources
520,000520,000Municipal State Aid
520,000 520,000Total
Page 133
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project involves the milling of distressed surface and the repaving of a new surface on Olinger Boulevard from
Vernon Avenue to Tracy Avenue.
Project #PW-05-006
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life
Project Name Mill & Overlay: Olinger Blvd (Vernon - Tracy)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
275,000275,000Construction/Maintenance
275,000 275,000Total
Total20102011201220132014Funding Sources
275,000275,000Municipal State Aid
275,000 275,000Total
Page 134
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
The Edina City Council Approved the Northeast Edina Transportation Study on November 6, 2006. The Study
included arterial improvements at Vernon Avenue and Interlachen Boulevard, West 44th Street and France Avenue,
and 50th & France Business Area. The Study also included neighborhood improvements within the Northeast Edina
local neighborhoods. The neighborhood improvements were removed by the City Council during the Spring of 2008.
Staff anticipates the improvements to the 50th and France and the 44th and France issues to be finalized by 2010.
Project #PW-07-004
Priority n/a
Justification
Per approved Northeast Edina Transportation Study.
Useful Life
Project Name Northeast Edina Traffic Calming
Category Street Reconstruction
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
82,00082,000Construction/Maintenance
82,000 82,000Total
Total20102011201220132014Funding Sources
82,00082,000Municipal State Aid
82,000 82,000Total
Page 135
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This is a skid steer loader for the street department to be used in the concrete pavement rahbilitation program.
Project #PW-08-005
Priority n/a
Justification
This skid steer will be used to remove pavement within the street department when repairing concrete roadways in the
City. Staff can work more efficiently with an additional skid steer.
Useful Life
Project Name Skid Steer
Category Equipment Replacement
Type Equipment
Contact Public Works
Department Public Works
Total20102011201220132014Expenditures
60,00060,000Equip/Vehicles/Furnishings
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Construction Fund
60,000 60,000Total
Page 136
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Reconstruct Valley View Road from McCauley Trail to Braemar Boulevard.
Project #PW-08-006
Priority n/a
Justification
This reconstruction will provide a safety enhancement at the "hair pin curve" while also providing a sidewalk along the
north and east side of the roadway.
Useful Life
Project Name Reconstruct / Sidewalk: VV Rd at Braemar Blvd
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
700,000700,000Construction/Maintenance
700,000 700,000Total
Total20102011201220132014Funding Sources
560,000560,000Municipal State Aid
140,000140,000Public Improvement Revolving
700,000 700,000Total
Page 137
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project involves the milling of distressed surface and the repaving of a new surface on West 69th Street from
France Avenue to York Avenue.
Project #PW-09-004
Priority n/a
Justification
The need to rehabilitate this segment of roadway was determined by the Pavement Management System.
Useful Life
Project Name Mill & Overlay: W 69th St (France to York)
Category Municipal State Aid
Type Improvement
Contact Engineering
Department Public Works
Total20102011201220132014Expenditures
550,000550,000Construction/Maintenance
550,000 550,000Total
Total20102011201220132014Funding Sources
550,000550,000Municipal State Aid
550,000 550,000Total
Page 138
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost
effective manner.
Project #PW-10-001
Priority n/a
Justification
The need to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based
on condition and age of pavement, and also ratings compared with other local neighborhoods.
The potential future roadway reconstruction projects are:
2010: Interlachen Circle, Parkwood Knolls, Braemar Hills, Fairfax
2011: Carsons Hill, Golf Terrace Heights, South Harriet Park, McCauley Heights, Valley Estates
2013: Golf Terrace, Oscar Roberts, Indian Hills
2014: Rolling Green, Birchcrest Addition, Valley Vista, Lake Edina
2015: Harriet Manor, Arrow Head, Edina Valley Estates, Lake Edina
Useful Life 50 years
Project Name Neighborhood Street Recon. Program
Category Local Streets
Type Improvement
Contact Public Works
Department Public Works
Total20102011201220132014Expenditures
20,609,0003,579,000 4,853,000 4,263,000 3,496,000 4,418,000Construction/Maintenance
3,579,000 4,853,000 4,263,000 3,496,000 4,418,000 20,609,000Total
Total20102011201220132014Funding Sources
20,609,0003,579,000 4,853,000 4,263,000 3,496,000 4,418,000Public Improvement Revolving
3,579,000 4,853,000 4,263,000 3,496,000 4,418,000 20,609,000Total
Page 139
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Construct sidewalks along MSAS designated streets as petitioned from residents.
Project #PW-10-002
Priority n/a
Justification
These projects will provide separation of pedestrians and vehicles along the designated routes.
Useful Life Unassigned
Project Name Sidewalks/Pathways (MSA)
Category Municipal State Aid
Type Improvement
Contact Public Works
Department Public Works
Total20102011201220132014Expenditures
250,00050,000 50,000 50,000 50,000 50,000Construction/Maintenance
50,000 50,000 50,000 50,000 50,000 250,000Total
Total20102011201220132014Funding Sources
250,00050,000 50,000 50,000 50,000 50,000Municipal State Aid
50,000 50,000 50,000 50,000 50,000 250,000Total
Page 140
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
These projects will provide separation of pedestrians and vehicles along the designated routes.
Project #PW-10-003
Priority n/a
Justification
These projects are initiated by petitions from residents only.
Useful Life Unassigned
Project Name Sidewalks/Pathways: City Costs
Category Sidewalk - Pathways
Type Improvement
Contact Public Works
Department Public Works
Total20102011201220132014Expenditures
250,00050,000 50,000 50,000 50,000 50,000Construction/Maintenance
50,000 50,000 50,000 50,000 50,000 250,000Total
Total20102011201220132014Funding Sources
250,00050,000 50,000 50,000 50,000 50,000Construction Fund
50,000 50,000 50,000 50,000 50,000 250,000Total
Page 141
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace equipment according to the equipment replacement schedule.
Project #PW-10-004
Priority n/a
Justification
Regular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Name Public Works Equipment Replacement
Category Equipment Replacement
Type Equipment
Contact Fire Department
Department Public Works
Total20102011201220132014Expenditures
3,029,800605,960 605,960 605,960 605,960 605,960Equip/Vehicles/Furnishings
605,960 605,960 605,960 605,960 605,960 3,029,800Total
Total20102011201220132014Funding Sources
3,029,800605,960 605,960 605,960 605,960 605,960Equipment Replacement Progr
605,960 605,960 605,960 605,960 605,960 3,029,800Total
Page 142
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Backhoe replacement
Project #UT-03-012
Priority n/a
Justification
This backhoe will be 12 to 15 years old and at the end of its life expectancy
Useful Life 10 years
Project Name 1998 Cat Backhoe Replacement
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
170,000170,000Equip/Vehicles/Furnishings
170,000 170,000Total
Total20102011201220132014Funding Sources
170,000170,000Utility Funds - Wtr
170,000 170,000Total
Page 143
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Global Positioning System to locate utility distribution and collection system.
Project #UT-03-016
Priority 3 Important
Justification
This Global Positioning System combined with the Robotic Total Station in Engineering will provide an efficient
means to locate the utility infrastructure system; ie: water, storm and sanitary sewers. Many times important gate
valves and pipes cannot be found during emergencies. This will provide another tool to find these items when they are
either covered with snow or vegetation.
The main GPS Unit was purchased in 2006. This will provide two individual handheld units to help emergency locate
gate valves and pipes throughout the winter months.
Useful Life 10 years
Project Name GPS System
Category Water Main System
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
30,00030,000Equip/Vehicles/Furnishings
30,000 30,000Total
Total20102011201220132014Funding Sources
30,00030,000Utility Funds - Wtr
30,000 30,000Total
Page 144
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Remove existing stabilized lead contaminated soil located at Braemar Public Works Site.
Project #UT-04-005
Priority n/a
Justification
The lead abatement project for the Brian Wipperman Gun Range left approximately 2000 cubic yards of stabilized
lead soil at this location. The construction of the Braemar Public Safety Training Facility has drastically reduced the
amount of space needed for the Public Works and Parks maintenance operation. This soil removal will free-up
approximately 15,000 square feet of working area. This area is used for sorting soils and debris from watermain
breaks, construction projects, leaf storage, etc.
Useful Life Unassigned
Project Name Public Works: Braemar Work Site - Lead Removal
Category Water Main System
Type Improvement
Contact Utility Supt
Department Utility Department
Total20102011201220132014Expenditures
200,000200,000Construction/Maintenance
200,000 200,000Total
Total20102011201220132014Funding Sources
200,000200,000Utility Funds - Wtr
200,000 200,000Total
Page 145
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab Lift Station and move across the street to the NE cirner.
Project #UT-05-008
Priority 2 Very Important
Justification
This lift station is one of the oldest lift stations in the City and was converted from a can lift station to a submersible
lift station and is now in need of a new wet well.
Useful Life 30 years
Project Name Lift Station #2 (4200 Grimes Ave)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
300,000300,000Construction/Maintenance
300,000 300,000Total
Total20102011201220132014Funding Sources
300,000300,000Utility Funds - San Swr
300,000 300,000Total
Page 146
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab Lift Station including new pumps. The other option is to eliminate the lift station and install a new gravity line
to liftstation #2.
Project #UT-05-009
Priority 2 Very Important
Justification
This will eliminate future operating costs.
Useful Life 30 years
Project Name Lift Station #7 (4021 Grimes Ave)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
200,000200,000Construction/Maintenance
200,000 200,000Total
Total20102011201220132014Funding Sources
200,000200,000Utility Funds - San Swr
200,000 200,000Total
Page 147
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab Lift Station including new pumps. The other option that we may have is to elliminate the lift station and install
a new gravity line to lift station #2.
Project #UT-05-010
Priority 2 Very Important
Justification
Useful Life 30 years
Project Name Lift Station #8 (4023 Monterey Ave)
Category Lift Stations
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
200,000200,000Construction/Maintenance
200,000 200,000Total
Total20102011201220132014Funding Sources
200,000200,000Utility Funds - San Swr
200,000 200,000Total
Page 148
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab well
Project #UT-05-013
Priority 2 Very Important
Justification
Useful Life 10 years
Project Name Well #6 (5849 Ruth St)
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
120,000120,000Construction/Maintenance
120,000 120,000Total
Total20102011201220132014Funding Sources
120,000120,000Utility Funds - Wtr
120,000 120,000Total
Page 149
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
An additional 2000 gallon per minute iron removal filter plant to be built near the Southdale water tower.
Project #UT-07-002
Priority 2 Very Important
Justification
Improve water quality and remove radium in wells #5 and 18. With out this filter plant well #18 may become
unusable. Costs for this project includes land acquisition costs.
Useful Life 50 years
Project Name New Water Treatment Plant (#5)
Category Filter Plants
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
4,100,0001,600,000 2,500,000Construction/Maintenance
1,600,000 2,500,000 4,100,000Total
Total20102011201220132014Funding Sources
4,100,0001,600,000 2,500,000Utility Funds - Wtr
1,600,000 2,500,000 4,100,000Total
Page 150
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
New 3000 gallon per minute water treatment plant to treat wells #2, 7,15 and well #9. This treatment plant could at
the public works site in the exsting Dannens building.
Project #UT-07-003
Priority 2 Very Important
Justification
Improve water quality and regain the pumping capacity of well #9 and #7. Costs for this project include land
acquisition costs if the treatment plant is not located on City property.
Useful Life 50 years
Project Name New Water Treatment Plant (#6)
Category Filter Plants
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
6,500,000500,000 3,000,000 3,000,000Construction/Maintenance
500,000 3,000,000 3,000,000 6,500,000Total
Total20102011201220132014Funding Sources
6,500,000500,000 3,000,000 3,000,000Utility Funds - Wtr
500,000 3,000,000 3,000,000 6,500,000Total
Page 151
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
New water meter radio reading system equipment.
Project #UT-07-007
Priority 1 Urgent
Justification
Existing equipment and software needs to be updated to provide better information and improved reading accuracy.
Old equipment is at the end of it's useful life. The City meter reading system is out dated and no longer being
supported.
Useful Life 20 years
Project Name Water Meter Reading System Replacement
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
10,00010,000Equip/Vehicles/Furnishings
10,000 10,000Total
Total20102011201220132014Funding Sources
10,00010,000Utility Funds - Wtr
10,000 10,000Total
Page 152
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace the 1992 Sanitary Sewer Jetter with a new Jet/Vacuum Unit
Project #UT-07-008
Priority 3 Important
Justification
This unit has reached it's useful life.
Useful Life 20 years
Project Name Sewer Jetter Replacement
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
300,000300,000Equip/Vehicles/Furnishings
300,000 300,000Total
Total20102011201220132014Funding Sources
300,000300,000Utility Funds - San Swr
300,000 300,000Total
Page 153
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab and paint the Gleason Water Tower
Project #UT-07-009
Priority 2 Very Important
Justification
Painting surface has reached it's useful life.
Useful Life 20 years
Project Name Gleason Water Tower (paint)
Category Water Towers
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
500,000500,000Construction/Maintenance
500,000 500,000Total
Total20102011201220132014Funding Sources
500,000500,000Utility Funds - Wtr
500,000 500,000Total
Page 154
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Installing water main from wells #5 and #18 to be treated at WTP #5.
Project #UT-08-008
Priority 2 Very Important
Justification
Improving water quality from wells #5 and #18 for the Southdale area.
Useful Life 100 years
Project Name Piping Wells #5 and #18 to WTP #5
Category Water Main System
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20102011201220132014Funding Sources
100,000100,000Utility Funds - Wtr
100,000 100,000Total
Page 155
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
With the construction of WTP #5 well #5 will be converted to a submersible well and the building will be torn down.
Project #UT-08-009
Priority 2 Very Important
Justification
Electrical equipment will be moved to WTP #5 and the ugly building on the median can be torn down.
Useful Life 15 years
Project Name Well #5 (West 69th Street)
Category Wells
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20102011201220132014Funding Sources
100,000100,000Utility Funds - Wtr
100,000 100,000Total
Page 156
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
New piping from wells #9, #15, and #21 to WTP #6 so water can be treated.
Project #UT-08-010
Priority 2 Very Important
Justification
Improve water quality in the north central part of the city. To bring well#9 back on line with the City's water system.
Useful Life 100 years
Project Name Piping Wells #2, #7, #15 and #9 to WTP #6
Category Water Main System
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
1,950,0001,200,000 750,000Construction/Maintenance
1,200,000 750,000 1,950,000Total
Total20102011201220132014Funding Sources
1,950,0001,200,000 750,000Utility Funds - Wtr
1,200,000 750,000 1,950,000Total
Page 157
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace an existing 20 hp pump with a 70 hp pump and VFD.
Project #UT-08-012
Priority 2 Very Important
Justification
Lower operation cost, pumping efficiency and redundancy.
Useful Life 30 years
Project Name Lift Station #6 Redundent 70 HP pump and VFD
Category Lift Stations
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
60,00060,000Equip/Vehicles/Furnishings
60,000 60,000Total
Total20102011201220132014Funding Sources
60,00060,000Utility Funds - San Swr
60,000 60,000Total
Page 158
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project will provide a lining to the aging trunk sanitary sewer pipes.
Project #UT-08-014
Priority n/a
Justification
The majority of the trunk sanitary sewer pipes are adjacent to low lying areas or creeks. Some of these lines are
known for infiltration of clear water into the sanitary sewer system. The lining will prohibit clear water from entering
the system.
Useful Life
Project Name Trunk Sanitary Sewer Lining Project
Category Sanitary Sewer Improvements
Type Unassigned
Contact Engineering
Department Utility Department
Total20102011201220132014Expenditures
1,200,0001,200,000Construction/Maintenance
1,200,000 1,200,000Total
Total20102011201220132014Funding Sources
1,200,0001,200,000Utility Funds - San Swr
1,200,000 1,200,000Total
Page 159
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Make improvement and add additional information to the system that wasn't included in the system.
Project #UT-09-006
Priority 2 Very Important
Justification
Reduces time and operating cost of the Utility system.
Useful Life 15 years
Project Name SCADA Upgrades
Category Utility Equipment Replacement
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
100,00050,000 50,000Equip/Vehicles/Furnishings
50,000 50,000 100,000Total
Total20102011201220132014Funding Sources
100,00050,000 50,000Utility Funds - Wtr
50,000 50,000 100,000Total
Page 160
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace Existing SCADA computer equipment. This includes 3 servers, 2 laptops, and 3 work stations along with
some miscellaneous equipment.
Project #UT-09-007
Priority 2 Very Important
Justification
The existing equipment is reaching it life expectancy. The service agreement will no longer available after 2009. In
2008 we had one major server failure server
Useful Life 6 years
Project Name SCADA Computer Equipment Replacement
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
35,00035,000Equip/Vehicles/Furnishings
35,000 35,000Total
Total20102011201220132014Funding Sources
15,75015,750Utility Funds - San Swr
5,2505,250Utility Funds - Stm Swr
14,00014,000Utility Funds - Wtr
35,000 35,000Total
Page 161
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Well rehab for well #4 which is on a 7 year rehab program.
Project #UT-09-008
Priority 2 Very Important
Justification
Remove and rebuild or replace well pump, remove sand from well hole, and conduct other repairs needed.
Useful Life 6 years
Project Name Well #4 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20102011201220132014Funding Sources
100,000100,000Utility Funds - Wtr
100,000 100,000Total
Page 162
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Well rehab for well #12 on a 7 year program.
Project #UT-09-009
Priority 2 Very Important
Justification
After 7 years the well pump is warn out. Repair or replace well pump, remove sand from well hole, and make other
needed repairs.
Useful Life 6 years
Project Name Well #12 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
120,000120,000Construction/Maintenance
120,000 120,000Total
Total20102011201220132014Funding Sources
120,000120,000Utility Funds - Wtr
120,000 120,000Total
Page 163
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Repair or replace well pump, remove sand from well hole, and make other repairs needed.
Project #UT-09-010
Priority 2 Very Important
Justification
Improve water production.
Useful Life 6 years
Project Name Well # 2 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
120,000120,000Construction/Maintenance
120,000 120,000Total
Total20102011201220132014Funding Sources
120,000120,000Utility Funds - Wtr
120,000 120,000Total
Page 164
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Update water system when constructing neighborhood streets. See Project No. PW-10-001 for potential
neighborhoods.
These costs also include the "looping" of the watermain from mid-way between W 69th St and W 70th St on Xerxes
Ave southerly to W 70th St, westerly on W. 70th St to York Ave and W 70th St, in 2011.
Project #UT-10-001
Priority n/a
Justification
The majority of the existing water system consists of unlined cast iron pipes. These pipes are more susceptible to
failure than a lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide
better water quality and water pressure.
Useful Life Unassigned
Project Name Water Main Improvements
Category Water Main System
Type Improvement
Contact Utility Supt
Department Utility Department
Total20102011201220132014Expenditures
3,490,000604,000 830,000 720,000 590,000 746,000Construction/Maintenance
604,000 830,000 720,000 590,000 746,000 3,490,000Total
Total20102011201220132014Funding Sources
3,490,000604,000 830,000 720,000 590,000 746,000Utility Funds - Wtr
604,000 830,000 720,000 590,000 746,000 3,490,000Total
Page 165
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
The repair and replacement of sanitary sewer mains in the street reconstruction projects
Project #UT-10-002
Priority 1 Urgent
Justification
Most of the sanitary sewer system consists of clay pipe that was installed up to the 1970's. This type of pipe is more
prone to failure than the current poly-vinyl-chloride and concrete pipes. The clay pipe is typically more susceptible to
root intrusion, which decreases the capacity of a pipe.
The upgrade to the sanitary sewer system will help reduce inflow and infiltration into the system due to deteriorating
sanitary manholes, leaking joints in pipes, and leaking covers.
Useful Life 100 years
Project Name Sanitary Sewer Main Improvements
Category Sanitary Sewer Improvements
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
2,767,000495,000 589,000 589,000 483,000 611,000Construction/Maintenance
495,000 589,000 589,000 483,000 611,000 2,767,000Total
Total20102011201220132014Funding Sources
2,767,000495,000 589,000 589,000 483,000 611,000Utility Funds - San Swr
495,000 589,000 589,000 483,000 611,000 2,767,000Total
Page 166
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Provide replacement storm sewer for aging system. This also includes new drain tiles for roof drains and sump pump
discharges.
These costs also include the storm sewer upgrade at the southerly end of Oaklawn Ave in 2010.
Project #UT-10-003
Priority n/a
Justification
As roadways are reconstructed within the City storm sewers will require updating. See Project No. PW-10-001 for
potential neighborhoods. Drainage swales also need to be regraded. Drain tiles where needed should also be included
with these projects.
In 1998 the City undertook a sump pump inspection program that included inspections of all properties in the City to
eliminate any clear water connections into the City's sanitary sewer system. The program identified all homes in the
City that have sump pumps and other easement water problems. These new storm sewer improvements will provide a
place for clear water discharges especially during the winter months.
Useful Life Unassigned
Project Name Storm Sewer - Pipe and Grading Improvements
Category Storm Sewer Improvements
Type Improvement
Contact Engineering
Department Utility Department
Total20102011201220132014Expenditures
11,301,0002,017,000 2,646,000 2,324,000 1,906,000 2,408,000Construction/Maintenance
2,017,000 2,646,000 2,324,000 1,906,000 2,408,000 11,301,000Total
Total20102011201220132014Funding Sources
11,301,0002,017,000 2,646,000 2,324,000 1,906,000 2,408,000Utility Funds - Stm Swr
2,017,000 2,646,000 2,324,000 1,906,000 2,408,000 11,301,000Total
Page 167
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Dredge ponds as necessary. The first major project is anticipated to take place in 2012. An update to the surface
water management plan will identify the pond or lake that will be brought forward for dredging. The delay in start
date is due to the extensive permitting involved with a project like this.
Project #UT-10-004
Priority 3 Important
Justification
These projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling in
from sediment into the system and natural life of organic material.
Useful Life 30 years
Project Name Pond & Lake Dredging
Category Storm Sewer Improvements
Type Improvement
Contact Utility Supt
Department Utility Department
Total20102011201220132014Expenditures
1,400,00060,000 60,000 1,100,000 60,000 120,000Construction/Maintenance
60,000 60,000 1,100,000 60,000 120,000 1,400,000Total
Total20102011201220132014Funding Sources
1,400,00060,000 60,000 1,100,000 60,000 120,000Utility Funds - Stm Swr
60,000 60,000 1,100,000 60,000 120,000 1,400,000Total
Page 168
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replacement of small vehicles and equipment that are 10 years old or 100,000 miles.
Project #UT-10-005
Priority 3 Important
Justification
Vehicles have reached their life expectancy.
Useful Life 10 years
Project Name Annual Vehicle Replacements
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt
Department Utility Department
Total20102011201220132014Expenditures
270,00050,000 50,000 70,000 50,000 50,000Equip/Vehicles/Furnishings
50,000 50,000 70,000 50,000 50,000 270,000Total
Total20102011201220132014Funding Sources
120,00070,000 50,000Utility Funds - San Swr
150,00050,000 50,000 50,000Utility Funds - Wtr
50,000 50,000 70,000 50,000 50,000 270,000Total
Page 169
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Replace residential water meters to match the new meter reading system. Old meter are in need of replacement
because of there age. They are worn out.
Project #UT-10-006
Priority 1 Urgent
Justification
increased water revenue.
Useful Life 20 years
Project Name Water Meter Replacement Project
Category Utility Equipment Replacement
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
1,200,000240,000 240,000 240,000 240,000 240,000Equip/Vehicles/Furnishings
240,000 240,000 240,000 240,000 240,000 1,200,000Total
Total20102011201220132014Funding Sources
1,200,000240,000 240,000 240,000 240,000 240,000Utility Funds - Wtr
240,000 240,000 240,000 240,000 240,000 1,200,000Total
Page 170
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab well #7 by installing a new pump and motor, electrical and mechanical equipment.
Project #UT-10-007
Priority 2 Very Important
Justification
With the addition of water treatment plant #6 the City can now treat this well for the vinyl chlorides and pump this
well rather than drill a new one.
Useful Life 30 years
Project Name Well # 7 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
200,000200,000Construction/Maintenance
200,000 200,000Total
Total20102011201220132014Funding Sources
200,000200,000Utility Funds - Wtr
200,000 200,000Total
Page 171
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Rehab well #9 with new electrical and mechanical equipment, building modifacations and new motor.
Project #UT-10-008
Priority 2 Very Important
Justification
lower operating costs
Useful Life 15 years
Project Name Well #9 Rehab Project
Category Wells
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
150,000150,000Construction/Maintenance
150,000 150,000Total
Total20102011201220132014Funding Sources
150,000150,000Utility Funds - Wtr
150,000 150,000Total
Page 172
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Wells that run all year long need to be rehabed every 7 years.
Project #UT-10-009
Priority 1 Urgent
Justification
Wear on equipment
Useful Life 6 years
Project Name Well # 11 Rehab Project
Category Wells
Type Equipment
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
120,000120,000Equip/Vehicles/Furnishings
120,000 120,000Total
Total20102011201220132014Funding Sources
120,000120,000Utility Funds - Wtr
120,000 120,000Total
Page 173
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Repair the sanitary sewer manholes that were found to be defective during the 2007 and 08 inspection project.
Project #UT-10-010
Priority 2 Very Important
Justification
Reduce inflow and infiltration in the sanitary sewer system as required by the MCES and make repair that could cause
failures in the City's sanitary sewer system.
Useful Life 30 years
Project Name Manhole Repair Project
Category Sanitary Sewer Improvements
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
400,00080,000 80,000 80,000 80,000 80,000Construction/Maintenance
80,000 80,000 80,000 80,000 80,000 400,000Total
Total20102011201220132014Funding Sources
400,00080,000 80,000 80,000 80,000 80,000Utility Funds - San Swr
80,000 80,000 80,000 80,000 80,000 400,000Total
Page 174
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Complete the water main loop from behind the new apartments.
Project #UT-10-011
Priority 2 Very Important
Justification
Loop water main for better flows for fire and water quality.
Useful Life 100 years
Project Name W 69th Street and York Ave Water Main Loop
Category Water Main System
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
110,000110,000Construction/Maintenance
110,000 110,000Total
Total20102011201220132014Funding Sources
110,000110,000Utility Funds - Wtr
110,000 110,000Total
Page 175
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
Sanitary Sewer main repairs and/or replacement
Project #UT-10-012
Priority 2 Very Important
Justification
Existing sanitary sewer has a major sag in line below rail road right-of-way.
Useful Life 50 years
Project Name San Sewer Improv at W44th Street and Brookside Ave
Category Sanitary Sewer Improvements
Type Improvement
Contact Utility Supt.
Department Utility Department
Total20102011201220132014Expenditures
110,000110,000Construction/Maintenance
110,000 110,000Total
Total20102011201220132014Funding Sources
110,000110,000Utility Funds - San Swr
110,000 110,000Total
Page 176
Capital Improvement Program
City of Edina, MN
2010 2014thru
Description
This project provides for reconstructing the West 56th Street Bridge. The proposed bridge will be a box culvert,
therefore the use of storm water funding.
Project #UT-10-013
Priority 1 Urgent
Justification
The need to rehabilitate this bridge was determined by the annual bridge certification program.
Useful Life 100 years
Project Name Culvert Replacement - W 56th Street Bridge
Category Storm Sewer Improvements
Type Improvement
Contact Public Works
Department Utility Department
Total20102011201220132014Expenditures
450,000450,000Construction/Maintenance
450,000 450,000Total
Total20102011201220132014Funding Sources
450,000450,000Utility Funds - Stm Swr
450,000 450,000Total
Page 177