HomeMy WebLinkAbout2013-2017 Capital Improvement PlanThe Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business community with several major shopping centers, more than a dozen financial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a variety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. Taxes are comparatively low thanks to high property values and a fiscally conservative government. The City of Edina is proud of its Standard and Poor’s AAA and Moody’s Investors Services Aaa bond ratings. Edina is one of only a few Minnesota cities to have the top rating from both agencies. The Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business com- munity with several major shopping centers, more than a dozen financial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a variety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. Taxes are comparatively low thanks to high property values and a fiscally con- servative government. The City of Edina is proud of its Standard and Poor’s AAA and Moody’s Investors Services Aaa bond ratings. Edina is one of only a few Minnesota cities to have the top rating from both agencies. The Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business community with several major shopping centers, more than a dozen financial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a va- riety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. Taxes are comparatively low thanks to high property values and a fiscally conservative government. The City of Edina is proud of its Standard and Poor’s AAA and Moody’s Investors Services Aaa bond ratings. Edina is one of only a few Minnesota cities to have the top rating from both agencies. The Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business community with several major shopping centers, more than a dozen fi- nancial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a variety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. Taxes are comparatively low thanks to high property values and a fiscally conservative government. The City of Edina is proud of its Standard and Poor’s AAA and Moody’s Investors Services Aaa bond ratings. Edina is one of only a few Minnesota cities to have the top rating from both agencies. The Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business community with several major shopping centers, more than a dozen financial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a variety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. Taxes are comparatively low thanks to high property values and a fiscally conservative government. The City of Edina is proud of its Standard and Poor’s AAA and Moody’s Investors Services Aaa bond ratings. Edina is one of only a few Minnesota cities to have the top rating from both agencies. The Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business com- munity with several major shopping centers, more than a dozen financial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a variety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. Taxes are comparatively low thanks to high property values and a fiscally con- servative government. The City of Edina is proud of its Standard and Poor’s AAA and Moody’s Investors Services Aaa bond ratings. Edina is one of only a few Minnesota cities to have the top rating from both agencies. The Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business community with several major shopping centers, more than a dozen financial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a va- riety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. Taxes are comparatively low thanks to high property values and a fiscally conservative government. The City of Edina is proud of its Standard and Poor’s AAA and Moody’s Investors Services Aaa bond ratings. Edina is one of only a few Minnesota cities to have the top rating from both agencies. The Irish and Scot families who settled Edina in the mid-1800s would not recognize the city that 100 years ago boasted a profitable Minnehaha Creek gristmill and a grange hall. Today, Edina – named for that gristmill – boasts a population of more than 47,000 residents, a nationally renowned school district, a thriving business community with several major shopping centers, more than a dozen fi- nancial institutions and about 30 award-winning public parks. Edina’s 16 square miles are dotted with glacial ponds, streams and wetlands that add to the oasis-like atmosphere of this first-ring suburb. Most of the City is within minutes of other “hot spots” in the Twin Cities and outlying suburbs. Though there are still signs of the Irish and Scot heritage of Edina’s founders, today’s residents come from a variety of backgrounds. Volunteerism thrives in Edina and most of the community’s success is due to its extraordinary volunteers. On the financial side, residents of Edina are well served. e·di·na / ĭ-dī-nə / noun1. The preeminent place for living, learning, raising families & doing business 2013-2017CAPITAL IMPROVEMENTPLAN City of Edina, Minnesota CITY OF EDINA, MINNESOTA CAPITAL IMPROVEMENT PLAN 2013-2017 EDINA CITY COUNCIL Mayor James Hovland Councilmember Joni Bennett Councilmember Mary Brindle Councilmember Josh Sprague Councilmember Ann Swenson CITY OF EDINA, MINNESOTA TABLE OF CONTENTS CAPITAL IMPROVEMENT PLAN DESCRIPTION PAGE INTRODUCTION  Organization 1  Policy 2  Process 2  Priorities 3  Financing 3  Use of estimates 7 CIP SUMMARY  Construction Fund Balance 8  Capital Improvement Plan Summary 9 DETAIL PROJECT DESCRIPTIONS  Administration – Liquor Store 17  Community Development & HRA 25  Engineering 30  General Government Functions 61  Park & Recreation 70  Parks – Aquatic Center 90  Parks – Arena 97  Parks – Art Center 108  Parks – Centennial Lakes Park 111  Parks – Edinborough Park 115  Parks – Golf Course 135  Public Safety Functions 143  Public Works 152 This page left blank intentionally. CITY OF EDINA, MINNESOTA INTRODUCTION CAPITAL IMPROVEMENT PLAN Page 1 ORGANIZATION The City of Edina operates under a "Plan B" council-manager form of government. The City Council determines all matters of policy and appoints the City Manager. The City Manager is responsible for implementing policies and carrying out the business of City government. City services are provided by a staff that includes about 270 regular full-time employees, nearly 100 regular part-time employees and several hundred seasonal workers (mostly in parks and recreation programs). Many volunteers assist the staff. The customer service-oriented City is divided into the following departments and offices: Administration, Communications & Technology Services, Community Development, Engineering, Finance, Fire, Human Resources, Parks & Recreation, Police and Public Works. Staff work is guided by Edina Vision 20/20, the City’s long-range strategic plan. According to Vision 20/20, the City’s mission is to provide effective and valued services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the uncommonly high quality of life enjoyed by our residents and businesses. The City’s vision is to be the preeminent place for living, learning, raising families and doing business distinguished by:  A livable environment  Effective and valued city services  A sound public infrastructure  A balance of land uses, and  Innovation CITY OF EDINA, MINNESOTA INTRODUCTION CAPITAL IMPROVEMENT PLAN Page 2 CAPITAL IMPROVEMENT PLAN (CIP) POLICY The goal of the City’s CIP is to develop a comprehensive program for use by decision makers to guide capital investments based on an assessment of the community’s needs, taking into account the best use of limited resources while providing efficient and effective municipal services. The City will develop a five-year plan for capital improvements and update it annually. The CIP process includes analyzing projects contributing to the public health and welfare, projects helping to maintain and improve the efficiency of the existing systems, and projects that define a future need within the community. The City will identify the estimated cost and potential funding sources for each capital project proposal in the CIP. Purchase contracts for equipment and projects included in the CIP must still be properly authorized according to the City’s Purchasing Policy. The CIP will include equipment and projects from any City fund. Adopted by City Council February 20, 2007 Revisions: March 20, 2007 December 15, 2009 PROCESS The City implemented a two-year budget cycle process beginning with the 2012- 2013 operating budget. The objective is to take an alternating year approach to the operating budget and CIP processes. While both the operating budget and CIP will be reviewed every year, the majority of the planning, focus and effort will alternate between the two. During odd-numbered years, the City’s focus will be on the operating budget. Extra efforts are dedicated to citizen engagement processes and a two-year operating budget, which will take effect on January 1 of the following even-numbered year. The CIP is reviewed but only updated if necessary. During even-numbered years, the City’s focus will be on the CIP. Extra efforts are dedicated to reviewing the projects in the CIP and prioritizing them based on information available at the time. The operating budget is reviewed but only updated if necessary. CITY OF EDINA, MINNESOTA INTRODUCTION CAPITAL IMPROVEMENT PLAN Page 3 PRIORITIES While prioritization has always been part of the CIP process, the City implemented a formal process that standardizes priorities across functions and departments, beginning with the 2013-2017 CIP. The prioritization process considers strategic goals and objectives, which are set by the City Council and interpreted by City staff. The recommended CIP and priorities are then submitted back to the City Council for consideration, modification, and adoption. The City uses a 7-point prioritization scale that is represented as follows: 1. Critical 2. 3. Significant 4. 5. Important 6. 7. Desirable The CIP prioritization process is completed once every two years, as described in the preceding “Process” section. Typically most higher-priority projects are scheduled to be completed in the first couple years of the CIP with the lower-priority projects scheduled later in the 5-year CIP timeline. However, the City recognizes that circumstances and priorities can change over time and in some cases may cause the timing of some projects to be moved forward or back after adoption of the CIP. These changes are considered by the Council on a case-by-case basis. FINANCING Planning for capital improvements requires sound and economical financing. The City of Edina is able to utilize several financing mechanisms ranging from cash reserves to special-purpose funds as well as borrowing through bond sales. The exact financing method for each improvement is based on the general policies, jurisdictions and legal requirements. The final selection and scheduling of proposed capital improvements is then based on the ability of the City to draw upon various funds. The total cost for each project includes construction costs, administration costs and interest. CITY OF EDINA, MINNESOTA INTRODUCTION CAPITAL IMPROVEMENT PLAN Page 4 In analyzing the financial viability of the capital improvements in the current plan, the following methods of financing were examined: 1. Construction Fund – This fund is designed to provide a funding source for capital improvements that otherwise would not have financing available. Revenues for this fund are derived from such sources as investment income and transfers from other funds. The City’s Fund Balance Policy specifies that this is the preferred destination for any unassigned fund balance in the General Fund at the end of each year. Continuing this practice will provide money for high-priority projects to move forward. 2. Equipment Replacement Program – This program is designed to provide a funding source to replace all the equipment currently used by General Fund departments when it is time to be replaced. This revolving fund is replenished by a tax levy and allows the City to buy needed equipment without the additional costs of issuing debt. Equipment purchased under this program includes squad cars, fire trucks, plows, passenger cars and trucks, and even lawn mowers, among other items. 3. Enterprise Funds – The City’s enterprise funds include Utilities, Liquor, Aquatic Center, Golf Course, Arena, Art Center, Edinborough Park, and Centennial Lakes. Capital Improvements and equipment purchased in the enterprise funds may be financed through revenues derived from user charges for the respective services, when available. When an enterprise fund does not have enough cash to pay for a specific project, the City may decide to use money from another source (usually the Construction Fund) or the City may decide to issue Enterprise Revenue Bonds. See below for further description of these financing methods. 4. Tax Increment (TIF) Funds – These funds are derived from tax increment districts including 50th and France, Southeast Edina, Grandview, and 70th Street and Cahill Road. In tax increment districts, property owners pay ad valorem taxes at the full rate levied by the units of local government within the taxing jurisdiction. CITY OF EDINA, MINNESOTA INTRODUCTION CAPITAL IMPROVEMENT PLAN Page 5 At the time the tax increment district is created, property values are “frozen”. The units of local government receive taxes based on the frozen property values. Any additional taxes paid by property owners based on the increase in property values since the district was created is known as the “increment”. The increment revenue is then used to finance physical improvements within the district. 5. Pedestrian Bike Safety Fund – The City is considering setting up a new fund for 2013 that would collect money from a utility franchise fee to be used for projects that promote pedestrian and bike safety. 6. Special Assessments – Special assessments are based on the concept that when land is benefited from a particular improvement, all or part of the costs of the improvement should be levied against those properties to finance such improvements. Since it often takes several years for the City to collect special assessments, the City may decide to issue bonds for cash flow purposes. See Public Improvement Revolving Bonds for further description of this financing tool. 7. Municipal State Aid (MSA) – The Minnesota Department of Transportation (MnDOT) provides funding assistance for improvements to those municipal streets which are designated as part of its MSA system. Money for this fund is supplied with a dedicated portion of revenues collected from road use and gasoline taxes. Funds are released for improvements on those streets on the system whose design and construction meet MSA standards. Funds may be expended for any street on the MSA system at any time, and MSA funds may be accumulated over several years. 8. Grants and Donations – The City sometimes receives external sources of financing including grants and donations from the Federal, State, and other local governments. We also may receive donations from local residents, businesses or community organizations. Minnesota Statute 465.03 allows cities to accept grants and donations of real or personal property for the benefit of its citizens provided the City Council authorizes such acceptance via resolution adopted by a two thirds majority of its members. CITY OF EDINA, MINNESOTA INTRODUCTION CAPITAL IMPROVEMENT PLAN Page 6 9. Bonds – The City may decide to sell bonds to pay the upfront costs of a project when cash on hand is not sufficient for a project. There are many different bond programs that the City uses, each with slightly different names. A few of the programs the City uses most often are listed below.  Enterprise Revenue Bonds – Most of the Enterprise Revenue Bonds that the City issues pay for Utility Fund project costs, but the City may issue Enterprise Revenue Bonds for any of our enterprises. These bonds are designed to be repaid with revenues from the enterprise facilities that benefit from the projects financed, therefore no levy is required.  Tax Increment Bonds – The City has previously issued Tax Increment bonds to pay TIF project costs. The bonds are repaid with the tax increment revenue that is generated by the district; therefore no additional levy is required.  Public Project Lease Revenue Bonds – These bonds are backed by the full faith and credit of the City through an annual appropriation.  Public Improvement Revolving (PIR) Bonds – PIR bonds are generally issued for street improvement projects and are repaid with special assessment receipts over a ten-year period. These bonds are supported through special assessments, therefore no levy is required.  General Obligation (GO) – There are several types of GO debt available for the City to use. Although no new issues are included in this plan, the City currently has park & recreation bonds and equipment certificates outstanding. Both of these types of GO debt require a levy. CITY OF EDINA, MINNESOTA INTRODUCTION CAPITAL IMPROVEMENT PLAN Page 7 $- $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 $70,000 $80,000 $90,000 $100,000 200920102011201220132014201520162017 City of Edina Debt Current and Projected (In Thousands) Enterprise Revenue Tax Increment Public Imp Revolving Public Project General Obligation This chart shows the projected effect on the City as a whole if future debt is issued according to this capital improvement plan. The General Obligation bonds category shown here includes Capital Improvement bonds, park and recreation bonds and equipment certificates ESTIMATES The preparation of a 5 year CIP requires City staff to make material estimates about project scope, costs of labor and materials, future interest rates and other items. Many times these estimates come from staff experience, projections published in other sources, vendor estimates, or a combination of several sources. Generally the estimates for earlier years are more precise than later years. Actual results could differ from such estimates. CITY OF EDINA, MINNESOTA CONSTRUCTION FUND BALANCE CAPITAL IMPROVEMENT PLAN Page 8 Projected Construction Fund Unreserved Fund Balance Estimate 2012 2013 2014 2015 2016 2017 Revenues Property taxes992,072$ 992,072$ 992,072$ 992,072$ 992,072$ 992,072$ Special Assessment1,723,765 1,652,039 1,237,872 1,361,088 1,344,038 1,259,338 License and permits25,000 25,000 25,000 25,000 25,000 25,000 Intergovernmental50,000 1,290,000 2,680,000 880,000 1,050,000 1,260,000 Charges for service50,000 50,000 50,000 50,000 50,000 50,000 Interest (1.5%)151,600 110,700 88,300 62,900 (4,100) (33,000) Total Revenues 2,992,437 4,119,811 5,073,244 3,371,060 3,457,010 3,553,410 Expenditures General Government259,500 381,000 396,900 1,368,900 587,900 255,000 Park & Rec997,500 700,000 333,000 1,742,325 983,255 931,600 Public Safety1,041,809 906,916 1,361,845 721,925 284,760 70,000 Public Works7,454,236 10,645,254 7,385,395 6,443,842 6,918,420 6,511,415 Total Expenditures 9,753,045 12,633,170 9,477,140 10,276,992 8,774,335 7,768,015 Other Financing Sources/(Uses) Transfers In/(Out)822,395 2,770,700 (205,500) (1,181,600) (273,400) (1,524,600) PIR Bonds3,131,700 4,251,000 2,917,200 3,619,200 3,662,100 3,361,800 Total Other Sources 3,954,095 7,021,700 2,711,700 2,437,600 3,388,700 1,837,200 Increase (Decrease)(2,806,513)$ (1,491,659)$ (1,692,196)$ (4,468,332)$ (1,928,625)$ (2,377,405)$ Beginning Balance 10,186,483$ 7,379,970$ 5,888,311$ 4,196,115$ (272,217)$ (2,200,842)$ Ending Balance 7,379,970$ 5,888,311$ 4,196,115$ (272,217)$ (2,200,842)$ (4,578,247)$ ForecastBudget $(8,000,000) $(4,000,000) $- $4,000,000 $8,000,000 $12,000,000 $16,000,000 20072008200920102011201220132014201520162017 Construction Fund Assigned Balance Trend Last Five Fiscal Years (Actual) and Next Five Fiscal Years (Estimate) Assigned for Construction Assigned for Equipment The charts above show the projected impact this CIP will have on the Construction Fund along with a five-year history of Construction Fund balances. The current plan is affordable for 2013-2014, after that the projection shows the Construction Fund balance turning negative sometime during 2015. The City intends to reassess and reprioritize during the next CIP planning process scheduled to occur in fall 2014 and issue a new CIP for the years 2015-2019. Capital Improvement Plan City of Edina, MN PROJECTS & FUNDING SOURCES BY DEPARTMENT 20132017thru Total20132014201520162017DepartmentProject#Priority Administration - Liquor Stores 425,00080,000215,000130,000Liquor Fund 425,00080,000215,000130,000Administration - Liquor Stores Total LIQ-02-005 150,000150,00050th: Store Remodel1 LIQ-10-004 40,00040,000York: Replace Rooftop HVAC2 LIQ-10-006 15,00015,000Vernon: Replace Load Leveler Dock5 LIQ-11-004 60,00060,000All Stores: Video & Software Upgrades5 LIQ-11-005 25,00025,000Vernon: Replace Rooftop HVAC5 LIQ-11-006 30,00030,000Vernon: Replace Entrance & Exit Doors5 LIQ-13-001 25,00025,000Vernon Tasting Area5 LIQ-13-002 80,00080,000Liquor Signage-Interior/Exterior3 425,00080,000215,000130,000Administration - Liquor Stores Total Community Development & HRA 1,090,0001,090,000Grants & Donations - Mn/DOT 8,800,0003,200,0005,600,000Tax Increment Funds 9,890,0004,290,0005,600,000Community Development & HRA Total HRA-11-002 2,000,0002,000,000Promenade Phase III5 HRA-11-003 600,000600,000France Ave and TH62 Reconstruction1 HRA-13-001 200,000200,000Greater Southdale Area Transportation Study2 HRA-13-002 3,000,0003,000,000Pedestrian Bridge over TH621 HRA-13-003 4,090,0004,090,000France Ave Intersection Enhancementsn/a 9,890,0004,290,0005,600,000Community Development & HRA Total Engineering ENG-13-001 21,900,0005,300,0003,500,0004,500,0004,500,0004,100,000Neighborhood Street Reconstruction Program1 ENG-13-002 8,375,0001,375,0001,200,0002,000,0002,000,0001,800,000Water Main Improvments1 ENG-13-003 4,872,0001,451,000690,000931,000700,0001,100,000Sanitary Sewer Main Improvements1 ENG-13-004 11,200,0001,200,0002,200,0002,600,0002,600,0002,600,000Storm Sewer - Pipe and Grading Improvements1 ENG-13-005 1,100,0001,100,000Piping Wells #15 and #9 to Treatment Plant No. 64 ENG-13-006 5,200,000800,0001,100,0001,100,0001,100,0001,100,000Pedestrian and Bicyclist Safety Projects2 ENG-13-007 150,000150,000Bridge Rehabilitation: 78th St W and Gus Young Ln1 Friday, December 21, 2012Page 9 Total20132014201520162017DepartmentProject#Priority 370,000150,000100,00050,00070,000Bonds - Public Improvement Revolving Bonds 120,000120,000Construction Fund 139,00041,00045,00025,00028,000Equipment Replacement Program 5,770,0002,580,000880,000 1,050,0001,260,000Municipal State Aid 5,200,000800,0001,100,0001,100,0001,100,0001,100,000Pedestrian Bike Safety Fund 22,465,0005,300,0003,640,0004,640,0004,645,0004,240,000Special Assessments 6,617,0002,166,0001,470,000971,000890,0001,120,000Utility Fund - Sewer 12,925,0001,330,0002,495,0003,400,0003,000,0002,700,000Utility Fund - Storm 17,450,0001,650,0002,350,0002,260,0002,350,0008,840,000Utility Fund - Water 71,056,00011,557,00013,735,00013,296,00013,110,00019,358,000Engineering Total ENG-13-008 150,000150,000Reconstruct: 2nd Street South1 ENG-13-009 1,100,000100,0001,000,000Reconstruct: Valley View Road4 ENG-13-010 1,300,000200,0001,100,000Reconstruct: Tracy Avenue5 ENG-13-011 315,00030,00035,000250,0002013-2014 Flood Protection and Water Improvements4 ENG-13-012 325,00050,000275,0002014-2015 Flood Protection and Water Improvements4 ENG-13-013 325,00050,000275,0002015-2016 Flood Protection and Water Improvements5 ENG-13-014 300,000200,000100,000Morningside Neighborhood Water Main Relining5 ENG-13-015 450,000450,000Mill and Overlay: Benton Avenue5 ENG-13-016 45,00045,000Comprehensive Water Resource Management Plan5 ENG-13-017 45,00045,000Storm Water Pollution Prevention Plan4 ENG-13-018 320,000180,000140,000NMWD Petition Projects - Phase 14 ENG-13-019 139,00041,00045,00025,00028,000Engineering Department Equipment Replacementn/a PW-00-074 450,000450,000Concrete Rehab: Parklawn Ave. (France to W 77)4 PW-01-012 1,100,000150,000950,000Reconstruct: W 54th St. (Wooddale to France)1 PW-04-001 1,100,000150,000950,000Reconstruct: W 58th St (Wooddale to France)4 PW-05-003 1,000,000180,000820,000Bridge: 54th Street Bridge1 PW-05-006 800,000800,000Mill & Overlay: Olinger Blvd (Vernon - Tracy)4 UT-03-010 150,000150,000Remove Lift Station No. 13 UT-07-002 7,150,000150,0007,000,000New Water Treatment Plant (#5)4 UT-08-008 100,000100,000Piping Wells #5 and #18 to WTP #51 UT-08-014 1,140,000540,000600,000Trunk Sanitary Sewer Lining5 UT-10-011 150,000150,000W 69th Street and York Ave Water Main Loop5 UT-12-008 225,00075,00030,00060,00060,000Asset Management Update4 UT-12-009 80,00080,000Cooper Circle Pond Outlet5 71,056,00011,887,00013,505,00013,396,00013,060,00019,208,000Engineering Total General Government Functions COM-13-001 375,00075,00075,00075,00075,00075,000City of Edina Wireless Network3 COM-13-002 1,315,000935,000380,000Gateway Signs7 COM-13-003 489,700186,000136,90053,90032,90080,000Communications and IT Equipment Replacementn/a CW-02-001 375,000225,00075,00075,000Citywide Fiber Optic Cabling6 Friday, December 21, 2012Page 10 Total20132014201520162017DepartmentProject#Priority 2,280,000140,000200,0001,260,000530,000150,000Construction Fund 584,700186,000171,90083,90032,900110,000Equipment Replacement Program 105,00050,00055,000Other - 2010 Unassigned Fund Balance 2,969,700376,000426,9001,343,900562,900260,000General Government Functions Total GG-11-004 155,00065,00065,00025,000Electronic Document Management5 GG-13-001 30,00030,000Assessing Division Equipment Replacementn/a GG-13-002 30,00030,000Election Equipment Replacementn/a HR-13-001 200,00050,000150,000HRIS/Payroll2 2,969,700376,000426,9001,343,900562,900260,000General Government Functions Total Park & Recreation 3,830,000430,000100,0001,650,000800,000850,000Construction Fund 310,18020,00083,00042,325133,25531,600Equipment Replacement Program 300,000200,000100,000Grants & Donations 4,440,180650,000283,0001,692,325933,255881,600Park & Recreation Total PK-00-033 330,000330,000Pamela Park: Renovate senior athletic field7 PK-07-004 400,000400,000Pamela Park: New athletic field6 PK-08-006 30,00030,000Lewis Park: Pathway lighting5 PK-10-005 40,00040,000Pamela Park: South Parking Lot Expansion6 PK-10-006 45,00045,000Pamela Park: North Parking Lot Expansion6 PK-10-007 60,00060,000Pamela Park: West Parking Lot Expansion6 PK-11-006 75,00075,000Bredesen Park: Comfort Station Renovation5 PK-11-007 650,000650,000Normandale Park: Replace Warming House/Shelter6 PK-12-002 600,000600,000VanValkenburg Park construction7 PK-13-001 310,18020,00083,00042,325133,25531,600Parks Department Equipment Replacementn/a PK-13-002 80,00080,000Utley Park: Bathrooms Renovation1 PK-13-003 85,00085,000Lake Edina Park: Pathway5 PK-13-004 25,00025,000Highlands Park: Basketball Court7 PK-13-005 300,000300,000Garden Park: Baseball Field5 PK-13-006 200,000200,000Wooddale Park: Playground Equipment5 PK-13-007 200,000200,000Weber Park: Playground Equipment5 PK-13-008 650,000650,000Arden Park: Replace Shelter Building5 PK-13-009 200,000200,000Strachauer Park: Playground Equipment5 PK-13-010 100,000100,000Parks Comprehensive Master Plan7 PK-13-011 60,00060,000Park Planning and Designn/a 4,440,180650,000283,0001,692,325933,255881,600Park & Recreation Total Parks - Aquatic Center AQC-12-002 40,00040,000Replace Heaters1 Friday, December 21, 2012Page 11 Total20132014201520162017DepartmentProject#Priority 1,076,00087,000102,00062,000500,000325,000Aquatic Center Fund 1,076,00087,000102,00062,000500,000325,000Parks - Aquatic Center Total AQC-12-003 50,00050,000Pool Deck Repairs2 AQC-12-004 52,00052,000Bathhouse Roof and Other Improvements2 AQC-12-005 62,00062,000Replace Pool Filters4 AQC-12-006 325,000325,000SCS Play Structure5 AQC-13-001 47,00047,000Main Pool Boiler1 AQC-13-002 500,000500,000Large Slide5 1,076,00087,000102,00062,000500,000325,000Parks - Aquatic Center Total Parks - Arena 855,000170,000165,000160,000135,000225,000Construction Fund 855,000170,000165,000160,000135,000225,000Parks - Arena Total A-10-003 80,00080,000Water System Repairs5 A-12-001 140,000140,000Replace Zamboni3 A-12-002 35,00035,000Make-up Water Tanks1 A-13-001 75,00075,000Low E Ceiling Replacement - West Arena4 A-13-002 25,00025,000Painting East Arena4 A-13-003 25,00025,000Ballet Room Remodel3 A-13-004 80,00080,000Low E Ceiling Replacement - East Arena5 A-13-005 100,000100,000Bathroom/Locker Room Upgrades/Remodel5 A-13-006 35,00035,000Rubber Floor Replacement5 A-13-007 225,000225,000Arena Roof5 A-13-008 35,00035,000Parking Lot Resurfacing2 855,000170,000165,000160,000135,000225,000Parks - Arena Total Parks - Art Center 122,80037,80085,000Construction Fund 122,80037,80085,000Parks - Art Center Total ART-11-004 85,00085,000Parking Lot Expansion7 ART-11-005 22,80022,800HVAC3 ART-13-001 15,00015,000MaxSolutions Enterprise Acquisition2 122,80037,80085,000Parks - Art Center Total Parks - Centennial Lakes Park CL-06-005 25,00025,000Replace HVAC Units2 CL-09-008 32,00032,000Replace Park Sound System7 Friday, December 21, 2012Page 12 Total20132014201520162017DepartmentProject#Priority 110,00025,00032,00025,00028,000Construction Fund 110,00025,00032,00025,00028,000Parks - Centennial Lakes Park Total CL-12-001 25,00025,000Replace HVAC Units5 CL-13-001 28,00028,000One-Ton Truck5 110,00025,00032,00025,00028,000Parks - Centennial Lakes Park Total Parks - Edinborough Park 982,100266,600120,600264,700143,500186,700Construction Fund 771,500771,500Edinborough Fund 1,753,600266,600892,100264,700143,500186,700Parks - Edinborough Park Total EP-00-017 71,80071,800Replaster Pool3 EP-08-007 43,10043,100Security Camera System5 EP-08-021 189,500189,500Pool and Wall Tile3 EP-09-014 42,00042,000Lift to Birthday Party Area3 EP-09-015 65,00065,000Track Floor7 EP-09-016 153,800153,800Concrete repairs4 EP-09-021 26,00026,000Adventure Peak Remodel3 EP-10-011 32,30032,300North Sidewalk5 EP-11-005 66,60066,600Track Air Conditioning7 EP-11-006 26,30026,300Adventure Peak Wave Slide3 EP-11-007 90,50090,500Exterior Entryway Doors5 EP-11-008 67,90067,900Interior Entryway Doors5 EP-11-009 30,80030,800Upstairs Restroom Remodel6 EP-11-010 33,10033,100Adventure Peak Renovation5 EP-12-003 26,90026,900Park Boiler5 EP-13-001 28,30028,300POS System5 EP-13-002 41,00041,000Ramp to Track5 EP-13-003 582,000582,000Provide Larger Locker Rooms1 EP-13-004 26,30026,300Window Washing3 EP-13-005 110,400110,400Roof Repairs5 1,753,600266,600892,100264,700143,500186,700Parks - Edinborough Park Total Parks - Golf Course GC-12-005 1,000,00075,000925,000Driving Range Expansion7 GC-12-006 25,00025,000Braemar: Carpeting7 GC-12-007 50,00050,000Braemar: Slit Drainage 3 Fairways7 GC-12-008 160,00080,00080,000Braemar: Clubhouse Roof Replacement5 GC-12-009 200,00025,00025,00075,00075,000Cart Path Repair/Expansion3 GC-13-001 615,000145,000155,000155,000160,000Maintenance Equipment Replacement5 Friday, December 21, 2012Page 13 Total20132014201520162017DepartmentProject#Priority 3,420,000170,000310,0001,055,000 385,0001,500,000Construction Fund 350,00075,000275,000Grants & Donations - Braemar Memorial Fund 3,770,000245,000310,0001,330,000 385,0001,500,000Parks - Golf Course Total GC-13-003 220,00050,00070,000100,000Tee Renovation4 GC-13-004 1,500,0001,500,000Irrigation System Replacement Phase 15 3,770,000245,000310,0001,330,000 385,0001,500,000Parks - Golf Course Total Public Safety Functions 415,000165,000250,000Construction Fund 2,930,446741,9161,111,845721,925284,76070,000Equipment Replacement Program 3,345,446906,9161,361,845721,925284,76070,000Public Safety Functions Total PS-11-005 25,00025,000Police to Community Software3 PS-12-007 50,00050,000PD Alarm Billing Software3 PS-12-008 40,00040,000PD License Plate Reader5 PS-13-001 1,162,000475,000154,000273,000165,00095,000Fire Department Equipment Replacementn/a PS-13-002 1,658,946251,916923,345448,92524,76010,000Police Department Equipment Replacementn/a PS-13-003 93,00015,00018,00060,000Inspections Division Equipment Replacementn/a PS-13-004 16,50016,500Health Division Equipment Replacementn/a PS-13-005 250,000250,000FD Plan Review Software3 PS-13-006 50,00050,000CityWorks Code Enforcement Software3 3,345,446906,9161,361,845721,925189,760165,000Public Safety Functions Total Public Works PW-02-006 50,00050,000Public Works: Braemar Cold Storage: Improvements7 PW-08-004 70,00070,000Braemar Cold Storage - Fire Suppression3 PW-11-006 30,00030,000GPS Electrical System7 PW-13-001 416,000104,000104,000104,000104,000Industrial Park Lighting3 PW-13-002 570,000100,000170,000100,000100,000100,000Bridge Repairs1 PW-13-003 120,00030,00030,00030,00030,000Parking Ramp Repairs3 PW-13-004 2,444,326390,254511,395314,842664,420563,415Public Works Equipment Replacementn/a PW-13-005 1,312,000260,000237,000465,000270,00080,000Utilities Equipment Replacement3 PW-13-006 120,000120,000Well #13 Rehab Project5 PW-13-007 120,000120,000Well #17 Rehab Project5 PW-13-008 120,000120,000Well #6 Rehab Project5 UT-08-009 120,000120,000Well #5 (West 69th Street)4 UT-09-010 120,000120,000Well # 2 Rehab Project1 UT-10-006 2,100,0002,100,000Water Meter Replacement Project1 UT-10-008 200,000200,000Well #9 Rehab Project1 UT-10-009 120,000120,000Well # 11 Rehab Project3 Friday, December 21, 2012Page 14 Total20132014201520162017DepartmentProject#Priority 1,256,000304,000304,000314,000234,000100,000Construction Fund 2,444,326390,254511,395314,842664,420563,415Equipment Replacement Program 757,000173,000440,000104,00040,000Utility Fund - Sewer 563,000103,000397,00063,000Utility Fund - Storm 3,467,0002,539,000160,000145,000463,000160,000Utility Fund - Water 8,487,3263,509,2541,372,3951,213,8421,528,420863,415Public Works Total UT-11-006 120,000120,000Well #10 Rehab Project4 UT-11-007 200,000200,000Storm Water Lift Station #3 Rehab1 UT-11-008 40,00040,000Sewer Camera and Cable Reel3 UT-12-006 35,00035,000Well No. 84 UT-12-007 60,00060,000SCADA Radio System Upgrade4 8,487,3263,509,2541,372,3951,213,8421,528,420863,415Public Works Total 108,301,05222,505,57024,258,24020,431,69217,462,83523,642,715Grand Total Friday, December 21, 2012Page 15 Page 16 This page left bank intentionally. Capital Improvement Plan City of Edina, MN 20132017thru Description Remodel interior of 50th liquor store to bring it up to date with current stores. Last remodeled in 1998. Carpet and liquor shelves are in need of replacement. Lighting needs to be redone to fit needs of current layout. Employee bathroom needs updating. Project #LIQ-02-005 Priority 1 Critical Justification Remodeling the 50th liquor store reflects the Vision 20/20 plan, objective #3, in providing capital investment in public facilities. By remodeling we will align our Edina liquor brand to be more consistent with other stores. Useful Life Unassigned Project Name 50th: Store Remodel Category Buildings Type Replace or repair Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 30,00030,000Planning/Design 100,000100,000Construction/Maintenance 20,00020,000Equip/Vehicles/Furnishings 150,000150,000Total TotalFunding Sources 20132014201520162017FuturePrior 150,000150,000Liquor Fund 150,000150,000Total Friday, December 21, 2012Page 17 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace 2 rooftop HVAC units on the York store. Current units were installed in 1996 and have reached their useful life, which is 15-20 years. New units are more energy efficient and will save on utility expenses right away. Project #LIQ-10-004 Priority 2 Justification By replacing the HVAC units we are aligning the liquor store with the city work plan in promoting environmental health by increasing energy efficiency and working to keep the City of Edina a Green Step city. Useful Life 20 years Project Name York: Replace Rooftop HVAC Category Buildings Type Replace or repair Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 40,00040,000Construction/Maintenance 40,00040,000Total TotalFunding Sources 20132014201520162017FuturePrior 40,00040,000Liquor Fund 40,00040,000Total Friday, December 21, 2012Page 18 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace mechanical leveling dock due to age. Current dock was built in 2001 and repairs are starting to happen on a more regular basis. Project #LIQ-10-006 Priority 5 Important Justification By replacing dock it allows us to be more efficient in our jobs with less down-time with deliveries due to repairs. Useful Life Project Name Vernon: Replace Load Leveler Dock Category Buildings Type Replace or repair Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 15,00015,000Construction/Maintenance 15,00015,000Total TotalFunding Sources 20132014201520162017FuturePrior 15,00015,000Liquor Fund 15,00015,000Total Friday, December 21, 2012Page 19 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace all video equipment with newer IP type technology. Most current equipment will be going on 10 years old. Newer technology will allow for better imaging and better access by liquor management and police. Project #LIQ-11-004 Priority 5 Important Justification Will allow us to better track the day to day activities of the stores and it will align us with other departments within the city using the same technology. Useful Life Project Name All Stores: Video & Software Upgrades Category Equipment Type Replace or repair Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 60,00060,000Equip/Vehicles/Furnishings 60,00060,000Total TotalFunding Sources 20132014201520162017FuturePrior 60,00060,000Liquor Fund 60,00060,000Total Friday, December 21, 2012Page 20 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace rooftop HVAC at Vernon store. It will be going on 15 years and is reaching end of life before costly repairs. Project #LIQ-11-005 Priority 5 Important Justification Replacing the HVAC unit will save us energy and money with a more efficient unit. It shows the community that we are environmentally responsible in having our buildings and equipment run at peak performance. Useful Life 20 years Project Name Vernon: Replace Rooftop HVAC Category Buildings Type Replace or repair Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 25,00025,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Liquor Fund 25,00025,000Total Friday, December 21, 2012Page 21 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace interior and exterior doors at Vernon store due to age. Current doors were installed in 2000 and open and close around 800 times per day 6 days a week. Chemicals used during winter have eaten away at parts of doors over the years and repairs are becoming more frequent. Project #LIQ-11-006 Priority 5 Important Justification Takes advantage of newest technology in doors energy efficiency and safety standards. Less customer interruption with properly working doors. Useful Life Project Name Vernon: Replace Entrance & Exit Doors Category Buildings Type Replace or repair Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 30,00030,000Construction/Maintenance 30,00030,000Total TotalFunding Sources 20132014201520162017FuturePrior 30,00030,000Liquor Fund 30,00030,000Total Friday, December 21, 2012Page 22 Capital Improvement Plan City of Edina, MN 20132017thru Description Redesign tasting area to make it more useful for customers and staff. Store was remodeled 10 years ago and we are looking to utilize the space better for staff and customers. Project #LIQ-13-001 Priority 5 Important Justification Opening space more will allow customers to stop and sample product more easily without clogging main isle. Increasing customer knowledge by sampling will in turn lead to increased sales. Useful Life Project Name Vernon Tasting Area Category Buildings Type Expansion Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 25,00025,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Liquor Fund 25,00025,000Total Friday, December 21, 2012Page 23 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace all interior and exterior signage with redesigned logo and graphics. Replace all outdoor signage with energy efficient LED lighting. Project #LIQ-13-002 Priority 3 Significant Justification By changing the signage we will lower energy usage which is environmentally friendly. It will also lower our energy costs making our stores more fiscally responsible. It will allow us to be consistent in our branding of our three stores to our residents and community. Useful Life Project Name Liquor Signage-Interior/Exterior Category Buildings Type Replace or repair Contact Liquor Stores Department Administration - Liquor Stores Status Active TotalExpenditures20132014201520162017FuturePrior 80,00080,000Construction/Maintenance 80,000 80,000Total TotalFunding Sources 20132014201520162017FuturePrior 80,00080,000Liquor Fund 80,000 80,000Total Friday, December 21, 2012Page 24 Capital Improvement Plan City of Edina, MN 20132017thru Description Complete the westerly Promenade section south of Hazelton Road. The westerly section of pathway was placed as a bituminous pathway until the properties to the west of the Promenade are redeveloped. The plan also includes a substantial water feature along this corridor. Project #HRA-11-002 Priority 5 Important Justification Promenade Phase III supports the following Edina Vision 20/20 objectives: - Maintain strong residential neighborhoods, and - Take an active role in future redevelopment strategies. The greater Southdale area is seeing increasing mixed-use development. Both the Promenade and Centennial Lakes have played a key role in creating an environment that is attractive to both business and residential projects. Promenade Phase III was included in the 2007 Edina Promenade - Urban Design Plan, which states "The Promenade is a vital and key link in Edina's pathway network system, which provides internal circulation within the study area, as well as access from the adjoining neighborhoods and regional trail system." Following through with the Promenade phased plan will support continued redevelopment through this corridor. Useful Life Project Name Promenade Phase III Category Infrastructure Type Expansion Contact Engineering Department Community Development & HR Status Active TotalExpenditures20132014201520162017FuturePrior 2,000,0002,000,000Construction/Maintenance 2,000,0002,000,000Total TotalFunding Sources20132014201520162017FuturePrior 2,000,0002,000,000Tax Increment Funds 2,000,0002,000,000Total Friday, December 21, 2012Page 25 Capital Improvement Plan City of Edina, MN 20132017thru Description Hennepin County has developed an improved design of the interchange system at France Avenue and TH62 Interchange. The improvement will reduce the potential for crashes at this interchange for the next 30 years. Hennepin County currently does not have funding for this improvement programmed in their CIP. Project #HRA-11-003 Priority 1 Critical Justification France Avenue is an important commercial corridor in Edina. Providing adequate and safe access from TH62 to France Ave helps to support Vision 20/20 objectives of: - Accomodating the efficient movement of people and goods in and around Edina and - Taking an active role in future redevelopment strategies The France Avenue and TH62 Interchange is one of the most congested interchanges in the metropolitan area. This congestion leads to many crashes at the intersections to the on ramps to TH62. This project would relieve the congestion at this interchange, therefore creating a safer access through France Avenue and to and from TH62. Useful Life Project Name France Ave and TH62 Reconstruction Category Infrastructure Type Expansion Contact Engineering Department Community Development & HR Status Active TotalExpenditures20132014201520162017FuturePrior 600,000600,000Construction/Maintenance 600,000600,000Total TotalFunding Sources 20132014201520162017FuturePrior 600,000600,000Tax Increment Funds 600,000600,000Total Friday, December 21, 2012Page 26 Capital Improvement Plan City of Edina, MN 20132017thru Description Complete an overall Transportation Study of the Southdale Area to include pedestrian, bicycle and motorized traffic movement within the transportation system. Project #HRA-13-001 Priority 2 Justification The greater Southdale area is an important commercial and residential corridor for both Edina and surrounding communities. Conducting a study of the transportation system will 1) assist the City in planning for future improvements, 2) enable the City to advocate more clearly for improvements at the county, regional and state level, and 3) prepare the City to apply for external funding, should those funding sources become available. The transportation study supports the City's current focus in Living Streets, as well as the following Edina Vision 20/20 objectives: - Accomodating the efficient movement of people and goods in and around Edina and - Taking an active role in future redevelopment strategies Useful Life Project Name Greater Southdale Area Transportation Study Category Infrastructure Type New Contact Engineering Department Community Development & HR Status Active TotalExpenditures20132014201520162017FuturePrior 200,000200,000Planning/Design 200,000 200,000Total TotalFunding Sources 20132014201520162017FuturePrior 200,000200,000Tax Increment Funds 200,000 200,000Total Friday, December 21, 2012Page 27 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace pedestrian bridge over TH62 west of Valley View Road to be ADA compliant. Project #HRA-13-002 Priority 1 Critical Justification The current pedestrian bridge over TH62 is not ADA compliant. The location of this pedestrian bridge provides safe routes to both City park facilities, such as Rosland Park and Aquatic Center and to Edina Schools, such as Southview Middle School. This improvement will enhance the first phase of the Bike Boulevard project that will be implemented in fall of 2012. Providing adequate and safe access for pedestrians and bicyclists helps to support Vision 20/20 objectives of: - Accomodating the efficient movement of people and goods in and around Edina. Useful Life Project Name Pedestrian Bridge over TH62 Category Infrastructure Type Replace or repair Contact Engineering Department Community Development & HR Status Active TotalExpenditures20132014201520162017FuturePrior 3,000,0003,000,000Construction/Maintenance 3,000,0003,000,000Total TotalFunding Sources 20132014201520162017FuturePrior 3,000,0003,000,000Tax Increment Funds 3,000,0003,000,000Total Friday, December 21, 2012Page 28 Capital Improvement Plan City of Edina, MN 20132017thru Description This project includes pedestrian intersection enhancements at France Avenue and 76th Street, 70th Street, and 66th Street. Intersection enhancements include larger median refuge islands, accessible pedestrian signals, pedestrian warning signs, enhanced pedestrian corner treatments. In addition the project will provide missing sidewalk connections on the east side of France Avenue. This is the first step for improving pedestrian and bicycle movements across France Avenue. Project #HRA-13-003 Priority n/a Justification France Avenue is an important commercial corridor in Edina. Providing adequate and safe access across France Avenue helps to support Vision 20/20 objectives of: 1. Accommodate the efficient movement of people and goods in and around Edina and 2. Provide capital investments that balance need and affordability The City of Edina was successful in 2012 to rescope the Federal Transportation Enhancement funding that was secured in 2007 from a pedestrian bridge to improvements to three major intersections along France Avenue. The enhancements stem from Hennepin County’s "France Avenue Corridor Study" that was completed in 2009. Useful Life Project Name France Ave Intersection Enhancements Category Infrastructure Type Expansion Contact Engineering Department Community Development & HR Status Active TotalExpenditures20132014201520162017FuturePrior 4,090,0004,090,000Construction/Maintenance 4,090,000 4,090,000Total TotalFunding Sources 20132014201520162017FuturePrior 1,090,0001,090,000Grants & Donations - Mn/DOT 3,000,0003,000,000Tax Increment Funds 4,090,000 4,090,000Total Friday, December 21, 2012Page 29 Capital Improvement Plan City of Edina, MN 20132017thru Description These projects will provide for the reconstruction and rehabilitation of various local streets throughout the City. The recommended scheduling is based on the age and condition of the watermain, sanitary sewer, storm sewer, and pavements. These ratings are used to rank the local neighborhoods to determine potential future projects, which currently are: 2013: Mendelssohn A, Normandale, Braemar Hills B, St. Patricks Lane, Gleason Circle, and Lake Edina 2014: Clover Lane Addition, Hawkes Addition, Walnut Ridge, Edina Terrace, and Morningside 2015: Glen View Addition, Edina Highlands Lakeside, Holands, and Hyde Park 2016: Edina Bel-Air, Parkwood Knolls B, and Golf Terrace 2017: Townes Road, Birchcrest Addition, Colonial Court, Bekeley Heights, and Edina Valley Estates Please note that the above neighborhood names are reflective of the largest Subdivision Plat name found for that particular area and does not incorporated the neighborhood names that are currently being formulated by the Administration Department. Engineering will rename the projects, once neighborhood names are established. Project #ENG-13-001 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Neighborhood Street Reconstruction Program Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 21,900,0005,300,0003,500,0004,500,0004,500,0004,100,000Construction/Maintenance 5,300,0003,500,0004,500,0004,500,0004,100,00021,900,000Total TotalFunding Sources 20132014201520162017FuturePrior 21,900,0005,300,0003,500,0004,500,0004,500,0004,100,000Special Assessments 5,300,0003,500,0004,500,0004,500,0004,100,00021,900,000Total Friday, December 21, 2012Page 30 Capital Improvement Plan City of Edina, MN 20132017thru Description Update water system when reconstructing local neighborhood streets. See Project No. ENG-13-001 for potential neighborhoods. Project #ENG-13-002 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" by providing clean and adequate water supply and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." The majority of the existing water system consists of unlined cast iron pipes. These pipes are more susceptible to failure than a lined ductile iron pipe or a pvc type pipe. The newer lined ductile iron pipes or pvc pipes will provide better water quality and water pressure. Useful Life Project Name Water Main Improvments Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 8,375,0001,375,0001,200,0002,000,0002,000,0001,800,000Construction/Maintenance 1,375,0001,200,0002,000,0002,000,0001,800,0008,375,000Total TotalFunding Sources 20132014201520162017FuturePrior 8,375,0001,375,0001,200,0002,000,0002,000,0001,800,000Utility Fund - Water 1,375,0001,200,0002,000,0002,000,0001,800,0008,375,000Total Friday, December 21, 2012Page 31 Capital Improvement Plan City of Edina, MN 20132017thru Description The repair and replacement of sanitary sewer mains when reconstructing local neighborhood streets. See Project No. ENG-13-001 for potential neighborhoods. Most of the sanitary sewer system consists of clay pipe that was installed up to the 1970’s. This type of pipe is more prone to failure than the current PVC and concrete pipes. The clay pipe is typically more susceptible to root intrusion that decreases pipe capacity and contribute to backups. Project #ENG-13-003 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Chapter 8 of the 2008 Edina Comprehensive Plan also requires "Improving infrastructure to reduce inflow and infiltration." The upgrade to the sanitary sewer system will help reduce inflow and infiltration into the system due to deteriorating sanitary manholes, leaking pipe joints, and leaking manhole covers. These improvements reduce energy and treatment costs due to pumping and treating excess clear water. Useful Life Project Name Sanitary Sewer Main Improvements Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 4,872,0001,451,000690,000931,000700,0001,100,000Construction/Maintenance 1,451,000690,000931,000700,0001,100,0004,872,000Total TotalFunding Sources 20132014201520162017FuturePrior 4,872,0001,451,000690,000931,000700,0001,100,000Utility Fund - Sewer 1,451,000690,000931,000700,0001,100,0004,872,000Total Friday, December 21, 2012Page 32 Capital Improvement Plan City of Edina, MN 20132017thru Description The repair, replacement, and upgrading of the storm sewer system when reconstructing local neighborhood streets. See Project No. ENG-13- 001 for potential neighborhoods. This includes the addition of sump drain pipe for roof drains and sump pump discharge pipes. Project #ENG-13-004 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Chapter 8 of the 2008 Edina Comprehensive Plan also requires "Improving infrastructure to reduce inflow and infiltration." The City inspected all properties in the late 1990’s and continues to inspect 20% of properties per year. The program identified all homes in the City that have sump pumps and other easement water problems. Inflow and infiltration will continue to be reduced by incorporating maintenance of drainage swales & ponds and installation of sump drain pipes. These storm sewer improvements will provide a conduit for clear water discharges especially during the winter months. This project also furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011 City of Edina Comprehensive Water Resource Management Plan. Useful Life Project Name Storm Sewer - Pipe and Grading Improvements Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 11,200,0001,200,0002,200,0002,600,0002,600,0002,600,000Construction/Maintenance 1,200,0002,200,0002,600,0002,600,0002,600,00011,200,000Total TotalFunding Sources 20132014201520162017FuturePrior 11,200,0001,200,0002,200,0002,600,0002,600,0002,600,000Utility Fund - Storm 1,200,0002,200,0002,600,0002,600,0002,600,00011,200,000Total Friday, December 21, 2012Page 33 Capital Improvement Plan City of Edina, MN 20132017thru Description Install last segment of raw watermain from Wells #15 and #9 to Water Treatment Plant No. 6. This project was bid out in late August of 2012 and the bids were over the estimate in the 2011 to 2015 Capital Improvement Program. Treatment Plant No. 6 is currently operating below the 4,000 GPM design. Connecting to these wells will complete the overall plan for this treatment plant. Project #ENG-13-005 Priority 4 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Piping Wells #15 and #9 to Treatment Plant No. 6 Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 1,100,0001,100,000Construction/Maintenance 1,100,0001,100,000Total TotalFunding Sources 20132014201520162017FuturePrior 1,100,0001,100,000Utility Fund - Water 1,100,0001,100,000Total Friday, December 21, 2012Page 34 Capital Improvement Plan City of Edina, MN 20132017thru Description These projects will provide new sidewalks, bikeways, and lighting throughout the City. An overall study of the system will need to be completed prior to prioritizing individual projects. Project #ENG-13-006 Priority 2 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" by providing clean and adequate water supply and through "A Sound Public Infrastructure." The objectives of Edina’s Vision 20/20 also support this initiative through "Maintain strong residential neighborhoods." This need is also emphasized in Chapter 12: Implementation of the 2008 Edina Comprehensive Plan to "Work in conjunction with infrastructure improvement projects to identify and implement sidewalk and bikeway networks within the City" and also "Diversify types of transportation methods within the City." Useful Life Project Name Pedestrian and Bicyclist Safety Projects Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 650,000250,000100,000100,000100,000100,000Planning/Design 4,550,000550,0001,000,0001,000,000 1,000,0001,000,000Construction/Maintenance 800,0001,100,0001,100,0001,100,0001,100,0005,200,000Total TotalFunding Sources 20132014201520162017FuturePrior 5,200,000800,0001,100,0001,100,000 1,100,0001,100,000Pedestrian Bike Safety Fund 800,0001,100,0001,100,0001,100,0001,100,0005,200,000Total Friday, December 21, 2012Page 35 Capital Improvement Plan City of Edina, MN 20132017thru Description These projects will rehabilitate the 78th Street West bridge and the Gus Young Lane bridge over the Canadian Pacific Railroad. These two bridges were identified in the 2011 bridge inspection as requiring a more in depth repair. Our bridge consultant is performing a feasibility study during the fall of 2012 to identify in detail the work to be completed in 2013. Project #ENG-13-007 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Bridge Rehabilitation: 78th St W and Gus Young Ln Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 20,000Planning/Design 20,000 150,000150,000Construction/Maintenance 150,000 170,000Total20,000 TotalFunding Sources 20132014201520162017FuturePrior 170,000150,000Bonds - Public Improvement Re 20,000 150,000 170,000Total20,000 Friday, December 21, 2012Page 36 Capital Improvement Plan City of Edina, MN 20132017thru Description The City of Hopkins is planning to reconstruct the Hopkins side of 2nd Street South between Monroe Avenue and Harrison Avenue, which the southerly half of this roadway is within the City of Edina. Reconstruction within the Edina side is to rehabilitate the storm sewer catch basins, retain the existing curb and gutter, and replace the roadway section. Project #ENG-13-008 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Reconstruct: 2nd Street South Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 150,000150,000Construction/Maintenance 150,000 150,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,000120,000Construction Fund 30,00030,000Utility Fund - Storm 150,000 150,000Total Friday, December 21, 2012Page 37 Capital Improvement Plan City of Edina, MN 20132017thru Description This project will reconstruct Municipal State Aid designated Valley View Road from McCauley Trail South to Hilary Lane. This roadway will provide for a new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with a sidewalk will be included with this upgrade. Project #ENG-13-009 Priority 4 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Reconstruct: Valley View Road Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 300,000100,000200,000Planning/Design 800,000800,000Construction/Maintenance 100,0001,000,0001,100,000Total TotalFunding Sources 20132014201520162017FuturePrior 880,000880,000Municipal State Aid 140,000140,000Special Assessments 20,00020,000Utility Fund - Sewer 20,00020,000Utility Fund - Storm 40,00040,000Utility Fund - Water 1,100,0001,100,000Total Friday, December 21, 2012Page 38 Capital Improvement Plan City of Edina, MN 20132017thru Description This project will reconstruct Municipal State Aid designated Tracy Avenue from TH62 to Benton Avenue. This roadway will provide for a new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with sidewalk(s) will be included with this upgrade. The bridge over TH62 is not included in this Capital Plan sheet. Project #ENG-13-010 Priority 5 Important Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Reconstruct: Tracy Avenue Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 364,000200,000164,000Planning/Design 936,000936,000Construction/Maintenance 200,0001,100,0001,300,000Total TotalFunding Sources 20132014201520162017FuturePrior 700,000700,000Municipal State Aid 145,000145,000Special Assessments 145,000145,000Utility Fund - Sewer 90,00090,000Utility Fund - Storm 220,000220,000Utility Fund - Water 1,300,0001,300,000Total Friday, December 21, 2012Page 39 Capital Improvement Plan City of Edina, MN 20132017thru Description The Edina Comprehensive Water Resource Management Plan (December 2011) prioritizes 46 construction projects (C1-46) and 16 engineering (E1-16) studies to improve local flood protection and surface water quality. Most engineering studies will result in additional construction project recommendations. This item proposes to study and design projects E1, E3, E5-10, in 2013 and 2014. Estimated construction costs will be programmed into the 2013 Capital Improvement Plan and will be constructed in 2015. Projects are one of, or a mix of the following types: Maintenance and improvement of; conveyance and storage systems that reduce storm runoff peak discharge rates and volumes and provide local flood protection, or treatment systems that remove sediment, phosphorus and nitrogen and other particulate bound pollutants. Projects in this improvement are spread around the City. Improvements such as grading, and plant material can have extremely long useful lives and can partially self-maintain. The project also include durable infrastructure such as pumps, pipes and stone erosion treatments with variable lifespans ranging from 30 to 100 years. Sediment capturing features such as ponds and sediment traps have highly variable useful lives, and depend more on maintenance to extend lifecycle. Project #ENG-13-011 Priority 4 Justification This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011 City of Edina Comprehensive Water Resource Management Plan. Useful Life Project Name 2013-2014 Flood Protection and Water Improvements Category Infrastructure Type Expansion Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 65,00030,00035,000Planning/Design 250,000250,000Construction/Maintenance 30,00035,000250,000315,000Total TotalFunding Sources 20132014201520162017FuturePrior 315,00030,00035,000250,000Utility Fund - Storm 30,00035,000250,000315,000Total Friday, December 21, 2012Page 40 Capital Improvement Plan City of Edina, MN 20132017thru Description The Edina Comprehensive Water Resource Management Plan (December 2011) prioritizes 46 construction projects (C1-46) and 16 engineering (E1-16) studies to improve local flood protection and surface water quality. This item proposes to study project E12 and design projects C3, C13-16 in 2014 and construct them in 2015. This group of projects is in and around Braemar Golf Course. Projects are one of, or a mix of the following types: Maintenance and improvement of; conveyance and storage systems that reduce storm runoff peak discharge rates and volumes and provide local flood protection, or treatment systems that remove sediment, phosphorus and nitrogen and other particulate bound pollutants. Improvements such as grading, and plant material can have extremely long useful lives and can partially self-maintain. The project also include durable infrastructure such as pumps, pipes and stone erosion treatments with variable lifespans ranging from 30 to 100 years. Sediment capturing features such as ponds and sediment traps have highly variable useful lives, and depend more on maintenance to extend lifecycle. Project #ENG-13-012 Priority 4 Justification This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011 City of Edina Comprehensive Water Resource Management Plan. Useful Life Project Name 2014-2015 Flood Protection and Water Improvements Category Infrastructure Type Expansion Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 50,00050,000Planning/Design 275,000275,000Construction/Maintenance 50,000275,000325,000Total TotalFunding Sources20132014201520162017FuturePrior 325,00050,000275,000Utility Fund - Storm 50,000275,000325,000Total Friday, December 21, 2012Page 41 Capital Improvement Plan City of Edina, MN 20132017thru Description The Edina Comprehensive Water Resource Management Plan (December 2011) prioritizes 46 construction projects (C1-46) and 16 engineering (E1-16) studies to improve local flood protection and surface water quality. This item proposes to study project E12 and design projects C1,2,4-6 in 2015 and construct them in 2016. This group of projects is in and around Fred Richards Golf Course and South East Edina. Projects are one of, or a mix of the following types: Maintenance and improvement of; conveyance and storage systems that reduce storm runoff peak discharge rates and volumes and provide local flood protection, or treatment systems that remove sediment, phosphorus and nitrogen and other particulate bound pollutants. Improvements such as grading, and plant material can have extremely long useful lives and can partially self-maintain. The project also include durable infrastructure such as pumps, pipes and stone erosion treatments with variable lifespans ranging from 30 to 100 years. Sediment capturing features such as ponds and sediment traps have highly variable useful lives, and depend more on maintenance to extend lifecycle. Project #ENG-13-013 Priority 5 Important Justification This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011 City of Edina Comprehensive Water Resource Management Plan. Useful Life Project Name 2015-2016 Flood Protection and Water Improvements Category Infrastructure Type Expansion Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 50,00050,000Planning/Design 275,000275,000Construction/Maintenance 50,000275,000325,000Total TotalFunding Sources 20132014201520162017FuturePrior 325,00050,000275,000Utility Fund - Storm 50,000275,000325,000Total Friday, December 21, 2012Page 42 Capital Improvement Plan City of Edina, MN 20132017thru Description This project provides for cement lining of the water mains that have not been lined in the Morningside Neighborhood. These streets include Oakdale Avenue, Lynn Avenue, Crocker Avenue, Grimes Avenue, Morningside Road, and Branson Street. Staff anticipates using the City of Minneapolis’s watermain lining contractor to perform the lining of the water mains. Scott Terrace and Alden Avenue are also scheduled to be lined as part of the Neighborhood Street Reconstruction progam (ENG-13-001). Project #ENG-13-014 Priority 5 Important Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Morningside Neighborhood Water Main Relining Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 300,000200,000100,000Construction/Maintenance 200,000100,000300,000Total TotalFunding Sources 20132014201520162017FuturePrior 300,000200,000100,000Utility Fund - Water 200,000100,000300,000Total Friday, December 21, 2012Page 43 Capital Improvement Plan City of Edina, MN 20132017thru Description This project involves milling 2" of the distressed pavement and repaving a new surface of Municipal State Aid designated Benton Avenue from Hansen Road to TH100. This type of rehabilitation technique along with proper sealcoating will provide approximately 20 additional years to the life of the pavement. Project #ENG-13-015 Priority 5 Important Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Mill and Overlay: Benton Avenue Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 70,00070,000Planning/Design 380,000380,000Construction/Maintenance 450,000450,000Total TotalFunding Sources 20132014201520162017FuturePrior 70,00070,000Bonds - Public Improvement Re 380,000380,000Municipal State Aid 450,000450,000Total Friday, December 21, 2012Page 44 Capital Improvement Plan City of Edina, MN 20132017thru Description Surface water management plans typically are updated on a ten year cycle, with policy and flood prediction and water quality modeling updates happening at a more frequent interval. This item would update the CWRMP through a major amendment that would include revised policy and a revision of the water models used for decision making. Project #ENG-13-016 Priority 5 Important Justification This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011 City of Edina Comprehensive Water Resource Management Plan. Useful Life Project Name Comprehensive Water Resource Management Plan Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 45,00045,000Planning/Design 45,00045,000Total TotalFunding Sources 20132014201520162017FuturePrior 45,00045,000Utility Fund - Storm 45,00045,000Total Friday, December 21, 2012Page 45 Capital Improvement Plan City of Edina, MN 20132017thru Description In 2010 the Minnesota Pollution Control Agency began the process of revising the Municipal Separate Storm Sewer Systems (MS4) general permit. The process is near completion and it is anticipated that the new permit will go into effect in 2013. This project meets the initial requirements of the revised permit by planning and revising the Storm Water Pollution Prevention Plan (SWPPP.) This revision will be prepared by an outside consultant with oversight of the Council, Staff and Advisory Commissions, and will be presented to the Council for consideration. The revised MS4 permit is expected to put significant new regulatory burden on staff time and construction costs as described in the 2011 Utility Rate Study. Project #ENG-13-017 Priority 4 Justification This project meets the requirements of the newly revised state general permit for MS4 permit. Some of the unfunded mandates passed on by the state overlap well with the comprehensive plan and the clean water and flood protection goals articulated in section 8.2 of the 2008 Comprehensive Plan, while many do not. Useful Life Project Name Storm Water Pollution Prevention Plan Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 45,00045,000Planning/Design 45,000 45,000Total TotalFunding Sources 20132014201520162017FuturePrior 45,00045,000Utility Fund - Storm 45,000 45,000Total Friday, December 21, 2012Page 46 Capital Improvement Plan City of Edina, MN 20132017thru Description In 2011 The City of Edina petitioned the Nine Mile Creek Watershed District (WD) to undertake a series of clean water and flood protection projects in and tributary to Nine Mile Creek. The first phase of the project will work in the stream bed and nearby public areas to prevent erosion and sedimentation from upstream area, ensure adequate flood flow capacity, provide resistance to scour and reduce nutrient flow to the stream. The Feasibility report currently estimates this project costs at $2.4 million. The majority of the project costs are borne by the Watershed District, but the City is required to pay 75% of easement acquisition costs and 50% of ancillary (non-water quality related) project costs. Easement acquisition is expected to take place in late 2014, and construction in early 2015. Improvements such as grading, and plant material can have extremely long useful lives and can partially self-maintain. The project also include durable infrastructure such as pipes and stone erosion treatments with variable lifespans ranging from 30 to 100 years. Project #ENG-13-018 Priority 4 Justification This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the 2011 City of Edina Comprehensive Water Resource Management Plan. Useful Life Project Name NMWD Petition Projects - Phase 1 Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 180,000180,000Land Acquisition 140,000140,000Construction/Maintenance 180,000140,000320,000Total TotalFunding Sources20132014201520162017FuturePrior 320,000180,000140,000Utility Fund - Storm 180,000140,000320,000Total Friday, December 21, 2012Page 47 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Engineering department's equipment includes several vehicles, survey equipment and some software. Most of the vehicles have estimated useful lives of 10 years, the survey equipment varies between 7-15 years, and the software is scheduled for 10 years. Project #ENG-13-019 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Engineering Department Equipment Replacement Category Equipment Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 139,00041,00045,00025,00028,000Equip/Vehicles/Furnishings 41,00045,00025,00028,000139,000Total TotalFunding Sources 20132014201520162017FuturePrior 139,00041,00045,00025,00028,000Equipment Replacement Progra 41,00045,00025,00028,000139,000Total Friday, December 21, 2012Page 48 Capital Improvement Plan City of Edina, MN 20132017thru Description This project will rehabilitate the concrete pavement on Parklawn Avenue from 77th Street West to France Avenue. The rehabilitation will include concrete repairs along with a diamond grinding of the surface of the pavement. This will improve the ride ability of the corridor along with extending the life of the pavement. The project may include incorporating the Three Rivers Park District Nine Mile Regional Trail from Gallagher Drive to Fred Richards Golf Course; these costs are not included in this project. Project #PW-00-074 Priority 4 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Unassigned Project Name Concrete Rehab: Parklawn Ave. (France to W 77) Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 50,00050,000Planning/Design 400,000400,000Construction/Maintenance 450,000450,000Total TotalFunding Sources 20132014201520162017FuturePrior 50,00050,000Bonds - Public Improvement Re 350,000350,000Municipal State Aid 25,00025,000Utility Fund - Sewer 15,00015,000Utility Fund - Storm 10,00010,000Utility Fund - Water 450,000450,000Total Friday, December 21, 2012Page 49 Capital Improvement Plan City of Edina, MN 20132017thru Description This project will reconstruct Municipal State Aid designated 54th Street West from Wooddale Avenue to France Avenue. This roadway will provide for a new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with sidewalk(s) will be included with this upgrade. This project will be constructed in conjunction with the reconstruction of the bridge over Minnehaha Creek. Project #PW-01-012 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure". This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Unassigned Project Name Reconstruct: W 54th St. (Wooddale to France) Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 308,000150,000158,000Planning/Design 792,000792,000Construction/Maintenance 150,000950,0001,100,000Total TotalFunding Sources 20132014201520162017FuturePrior 880,000880,000Municipal State Aid 140,000140,000Special Assessments 20,00020,000Utility Fund - Sewer 20,00020,000Utility Fund - Storm 40,00040,000Utility Fund - Water 1,100,0001,100,000Total Friday, December 21, 2012Page 50 Capital Improvement Plan City of Edina, MN 20132017thru Description This project will reconstruct Municipal State Aid designated 58th Street West from Wooddale Avenue to France Avenue. This roadway will provide for a new roadway section and will bring the road into compliance with Municipal State Aid standards. Bike lanes along with sidewalk(s) will be included with this upgrade. Project #PW-04-001 Priority 4 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Unassigned Project Name Reconstruct: W 58th St (Wooddale to France) Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 308,000150,000158,000Planning/Design 792,000792,000Construction/Maintenance 150,000950,0001,100,000Total TotalFunding Sources 20132014201520162017FuturePrior 880,000880,000Municipal State Aid 140,000140,000Special Assessments 20,00020,000Utility Fund - Sewer 20,00020,000Utility Fund - Storm 40,00040,000Utility Fund - Water 1,100,0001,100,000Total Friday, December 21, 2012Page 51 Capital Improvement Plan City of Edina, MN 20132017thru Description This project will reconstruct the bridge over Minnehaha Creek. The bridge will be reconstructed in conjunction with the roadway reconstruction project, see ENG-12-018. Project #PW-05-003 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina's Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina's Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life 100 years Project Name Bridge: 54th Street Bridge Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 280,000180,000100,000Planning/Design 720,000720,000Construction/Maintenance 180,000820,0001,000,000Total TotalFunding Sources 20132014201520162017FuturePrior 1,000,0001,000,000Municipal State Aid 1,000,0001,000,000Total Friday, December 21, 2012Page 52 Capital Improvement Plan City of Edina, MN 20132017thru Description This project involves milling 2" of the distressed pavement and repaving a new surface of Municipal State Aid designated Olinger Road from Vernon Avenue to Tracy Avenue. This type of rehabilitation technique along with proper sealcoating will provide approximately 20 additional years to the life of the pavement. Project #PW-05-006 Priority 4 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." This project also meets the objectives of Edina’s Vision 20/20 of "Maintain strong residential neighborhoods" and "Accommodate the efficient movement of people and goods in and around Edina." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Mill & Overlay: Olinger Blvd (Vernon - Tracy) Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 100,000100,000Planning/Design 700,000700,000Construction/Maintenance 800,000800,000Total TotalFunding Sources 20132014201520162017FuturePrior 100,000100,000Bonds - Public Improvement Re 700,000700,000Municipal State Aid 800,000800,000Total Friday, December 21, 2012Page 53 Capital Improvement Plan City of Edina, MN 20132017thru Description The rehabilitation of Lift Station No. 1, located at 4041 Sunnyside Road, was originally in the 2009 to 2013 Capital Improvement Plan. Staff had determined that the lift station could be eliminated if a gravity line was constructed draining to the south to the gravity line on Meadow Road. The cost difference between reconstructing the lift station and eliminating the lift station by constructing a gravity line is $82,000; total cost over 30 years is $219,000 due to operating and maintenance of the lift station. Project #UT-03-010 Priority 3 Significant Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and "A Sound Public Infrastructure." The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Useful Life Project Name Remove Lift Station No. 1 Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 20,00020,000Land Acquisition 130,000130,000Construction/Maintenance 150,000 150,000Total TotalFunding Sources 20132014201520162017FuturePrior 150,000150,000Utility Fund - Sewer 150,000 150,000Total Friday, December 21, 2012Page 54 Capital Improvement Plan City of Edina, MN 20132017thru Description Conduct feasibility / implementation study to construct Water Treatment Plant No. 5 north of Southdale Water Tower. The feasibility study will provide staff with a timeframe of when this treatment plant needs to be online due to development in the greater Southdale Area. The treatment plant will filter water from Well No. 5 and 18, see UT-08-008. Project #UT-07-002 Priority 4 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" by providing clean and adequate water supply and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." During the summer months, the majority of the water supplied in the City does not treat for iron or manganese. This unfiltered water in part contributes to the aesthetic problems including red and/or brown water complaints. The new treatment plant will help reduce the amount of complaints that we receive from the issue of aesthetic water complaints. Useful Life 50 years Project Name New Water Treatment Plant (#5) Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 150,000150,000Planning/Design 7,000,0007,000,000Construction/Maintenance 150,0007,000,0007,150,000Total TotalFunding Sources 20132014201520162017FuturePrior 7,150,000150,0007,000,000Utility Fund - Water 150,0007,000,0007,150,000Total Friday, December 21, 2012Page 55 Capital Improvement Plan City of Edina, MN 20132017thru Description Install last segment of raw watermain from Wells #5 and #8 to be treated at WTP #5. The first and second segments were installed during West 70th Street Round-about and the Promenade projects. This will provide untreated water to the proposed Water Treatment Plant No. 5, see UT-07-002, located north of the Southdale Water Tower. This project is anticipated to be constructed simultaneously with the France Avenue Intersection Enhancement project. Project #UT-08-008 Priority 1 Critical Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" by providing clean and adequate water supply and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." During the summer months, the majority of the water supplied in the City is not treated for iron or manganese. This unfiltered water in part contributes to the aesthetic problems including red and/or brown water complaints. The new treatment plant will help reduce the amount of complaints that we receive from the issue of aesthetic water complaints. Useful Life 100 years Project Name Piping Wells #5 and #18 to WTP #5 Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 550,000100,000Construction/Maintenance 450,000 100,000 550,000Total450,000 TotalFunding Sources 20132014201520162017FuturePrior 550,000100,000Utility Fund - Water 450,000 100,000 550,000Total450,000 Friday, December 21, 2012Page 56 Capital Improvement Plan City of Edina, MN 20132017thru Description During the fall and winter of 2012 Engineering, with help of a consultant, will have conducted a feasibility/implementation study to line an existing trunk sanitary sewer along the Minnehaha Creek from West 50th Street to Xerxes Avenue and also along Nine Mile Creek. The study will provide a phasing plan for a two year project to line these sanitary sewer trunk lines. Project #UT-08-014 Priority 5 Important Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and through "A Sound Public Infrastructure." This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." Chapter 8 of the 2008 Edina Comprehensive Plan also requires "Improving infrastructure to reduce inflow and infiltration." The upgrade to this sanitary sewer trunk line will help reduce inflow and infiltration into the system. Useful Life Project Name Trunk Sanitary Sewer Lining Category Infrastructure Type Replace or repair Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 1,200,000540,000600,000Construction/Maintenance 60,000 540,000600,0001,200,000Total60,000 TotalFunding Sources 20132014201520162017FuturePrior 1,200,000540,000600,000Utility Fund - Sewer 60,000 540,000600,0001,200,000Total60,000 Friday, December 21, 2012Page 57 Capital Improvement Plan City of Edina, MN 20132017thru Description This project completes the water main loop from the easterly side of the 69th Street Apartments located on 69th Street West and Xerxes Avenue to 70th Street West and York Avenue. Project #UT-10-011 Priority 5 Important Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and through "A Sound Public Infrastructure". This need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City." A goal of every water system is to provide redundancy of the system. This project provides the redundancy, which also provides enhanced fire flows and overall better quality of water. Useful Life 100 years Project Name W 69th Street and York Ave Water Main Loop Category Infrastructure Type New Contact Utility Supt. Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 150,000150,000Construction/Maintenance 150,000150,000Total TotalFunding Sources 20132014201520162017FuturePrior 150,000150,000Utility Fund - Sewer 150,000150,000Total Friday, December 21, 2012Page 58 Capital Improvement Plan City of Edina, MN 20132017thru Description This project provides for updating our current asset management system computer software to be more interactive with the public and mobile with City staff. The current system contains information on all infrastructure assets, such as water system, sanitary sewer system, storm sewer system, traffic signs, street lights, etc. Staff can perform basic functions such as keeping track of the assets, request for service and work orders. The public will be able to report an issue via their smart phone and the issue will be recorded directly into the system. City staff will then be able to receive service requests and create work orders in the field vie smart phones, tablets, or laptops. Therefore becoming more efficient with their daily tasks. These upgrades will also allow for the consolidation of software systems that we currently use to issue permits and the addition of other systems such as fleet services, building management, etc. Project #UT-12-008 Priority 4 Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment," "Effective and Valued City Services," "A Sound Public Infrastructure," and "Innovation." Useful Life Project Name Asset Management Update Category Equipment Type Expansion Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 287,00075,00030,00060,00060,000Equip/Vehicles/Furnishings 62,000 75,00030,00060,00060,000287,000Total62,000 TotalFunding Sources 20132014201520162017FuturePrior 96,00025,00010,00020,00020,000Utility Fund - Sewer 21,000 95,00025,00010,00020,00020,000Utility Fund - Storm 20,000 96,00025,00010,00020,00020,000Utility Fund - Water 21,000 75,00030,00060,00060,000287,000Total62,000 Friday, December 21, 2012Page 59 Capital Improvement Plan City of Edina, MN 20132017thru Description This project provides for a storm sewer outlet from the landlocked Cooper Circle Pond. This storm sewer outlet will eliminate City staff from needing to pump this pond during periods of high water. Therefore, reducing the flooding potential around this pond. Project #UT-12-009 Priority 5 Important Justification The need to improve this infrastructure was initiated by the vision of Edina’s Vision 20/20 - "Livable Environment" and through "A Sound Public Infrastructure." This project also furthers the goal of clean water and flood protection as articulated in Section 8.2 of the 2008 Comprehensive Plan and the City of Edina Comprehensive Water Resource Management Plan. Useful Life Project Name Cooper Circle Pond Outlet Category Infrastructure Type New Contact Engineering Department Engineering Status Active TotalExpenditures20132014201520162017FuturePrior 80,00080,000Construction/Maintenance 80,00080,000Total TotalFunding Sources20132014201520162017FuturePrior 80,00080,000Utility Fund - Storm 80,00080,000Total Friday, December 21, 2012Page 60 Capital Improvement Plan City of Edina, MN 20132017thru Description To meet the demands of our customers, the Communications & Technology Services Department began working with LOGIS to develop a plan to implement free wireless network and internet access (Wi-Fi) in 2012. The goal of the initial Edina wireless project was to establish Wi-Fi coverage to be used by the public and City staff at Edina City Hall, Edina Art Center, Braemar Arena, Braemar Golf Course, Centennial Lakes Park, Edinborough Park, Edina Senior Center and the Public Works & Park Maintenance Facility. Future expansion of the project is planned to include additional City facilities and buildings, including fire stations and some parks. Free wireless internet access has become so commonplace that people visiting City Hall and other City facilities expect it. As Wi-Fi capable devices continue to become increasingly more prevalent in the daily lives of the public and City staff, offering this service adds a significant benefit to the City’s residents, customers and staff, and is in alignment with the City’s Vision 20/20 plan. Project #COM-13-001 Priority 3 Significant Justification One of the City Leadership Priorities in the 2012 Work Plan is "Improve Communications Tools." One of the objectives toward meeting that goal was to implement the "EdinaOpen" Wi-Fi system at City facilities. One of the objectives of Edina’s Vision 20/20 is to "Evaluate and efficiently employ technological advancements to provide City services." Useful Life Project Name City of Edina Wireless Network Category Equipment Type Expansion Contact IT Manager Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 375,00075,00075,00075,00075,00075,000Equip/Vehicles/Furnishings 75,00075,00075,00075,00075,000375,000Total TotalFunding Sources 20132014201520162017FuturePrior 375,00075,00075,00075,00075,00075,000Construction Fund 75,00075,00075,00075,00075,000375,000Total Friday, December 21, 2012Page 61 Capital Improvement Plan City of Edina, MN 20132017thru Description A gateway sign is often the first impression people have of a city, development, business park or other public place. A well planned and executed gateway sign is important because it gives an immediate sense of a brand and denotes a sense of pride and caring, and makes visitors feel welcome. The City’s Branding Committee and Communications & Technology Services Department recommends the placement of "Welcome to Edina" gateway signs. Further, the committee and Communications & Technology Services Department recommends coordinating park and business district signs. Business district signs are recommended for 50th & France (replacing the dated ones there), Southdale and Grandview. They might also be considered for 44th & France and 70th & Cahill. Should this project be approved, a consultant would be hired to design the signs, which would be fabricated and installed over the next few years. Suggested order of implementation is gateway signs, large park signs, regular park signs, business district signs. Stone gateway signs with lighting are estimated to be $125,000 to $175,000 each. Coordinating metal monument entrance signs for large parks such as Arneson Acres, Braemar, Bredesen, Pamela, Rosland and Van Valkenburg parks are estimated to cost $10,000 to $20,000 each. Basic park signs are estimated to cost $3,000 to $10,000 each. Project #COM-13-002 Priority 7 Desirable Justification One of the City Leadership Priorities in the 2012 Work Plan is "Improve Communications Tools." One of the objectives toward meeting that goal is to implement branding standards. Useful Life Project Name Gateway Signs Category Infrastructure Type New Contact Communications Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 20,00020,000Planning/Design 1,295,000915,000380,000Construction/Maintenance 935,000380,0001,315,000Total TotalFunding Sources 20132014201520162017FuturePrior 1,315,000935,000380,000Construction Fund 935,000380,0001,315,000Total Friday, December 21, 2012Page 62 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Communications & Technology department has a variety of equipment including video production equipment, cameras, monitors, servers, switches and routers. Most of this type of electronic equipment has a useful life between 5-10 years. Project #COM-13-003 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Communications and IT Equipment Replacement Category Equipment Type Replace or repair Contact Communications Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 489,700186,000136,90053,90032,90080,000Equip/Vehicles/Furnishings 186,000136,90053,90032,90080,000489,700Total TotalFunding Sources 20132014201520162017FuturePrior 489,700186,000136,90053,90032,90080,000Equipment Replacement Progra 186,000136,90053,90032,90080,000489,700Total Friday, December 21, 2012Page 63 Capital Improvement Plan City of Edina, MN 20132017thru Description The City’s installed fiber optic network provides connectivity from City Hall to remote City facilities and LOGIS, facilitating voice and data communication at very high speeds. Fiber optic technology is secure, reliable and fast, and has a useful life expectancy of approximately 30 years. Nearly all of the City’s staffed facilities are now connected via fiber optic lines. The City has used fiber optic technology to replace traditional copper and leased circuit connections in order to improve bandwidth, consolidate connectivity needs, and reduce or eliminate telephone and data communication expenses. By leveraging a single owned connection method for multiple technology and communication needs, the City has been able to eliminate expensive recurring T-1 voice and data connections, while dramatically improving performance and management of the City’s voice and data network. Following completion of the remaining staffed facilities, the focus of fiber optic installations would be directed toward the Edina Police Department’s precinct at Southdale Center, Fred Richards Executive Golf Course and the City’s various warming house and comfort station locations, replacing slow and costly telephone circuits used for security and access control systems, allowing for eased and consolidated management of these systems. Additionally, fiber is envisioned to run to all of the City’s lift stations, wells, water treatment facilities and water towers. Currently, those Utilities systems operate on SCADA radio systems, which are susceptible to wind, rain and ice storms that make the systems vulnerable. If fiber is run to those facilities, the Public Works Department would have redundancy in place that does not exist today. The City has used fiber optic technology to replace traditional copper and leased circuit connections in order to improve bandwidth, consolidate connectivity needs, and reduce or eliminate telephone and data communication expenses. By leveraging a single owned connection method for multiple technology and communication needs, the City has been able to eliminate expensive recurring T-1 voice and data connections, while dramatically improving performance and management of the City's voice and data network. Project #CW-02-001 Priority 6 Justification One of the City Leadership Priorities in the 2012 Work Plan is "Improve Communications Tools." One of the objectives of Edina's Vision 20/20 is to "Evaluate and efficiently employ technological advancements to provide City services." Useful Life 30 years Project Name Citywide Fiber Optic Cabling Category Infrastructure Type Expansion Contact IT Manager Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 375,000225,00075,00075,000Equip/Vehicles/Furnishings 225,00075,00075,000375,000Total TotalFunding Sources 20132014201520162017FuturePrior 375,000225,00075,00075,000Construction Fund 225,00075,00075,000375,000Total Friday, December 21, 2012Page 64 Capital Improvement Plan City of Edina, MN 20132017thru Description Develop either a Request for Quote (RFQ) or Request for Proposal (RFP) to solicit vendors for implementing an Enterprise Document Management System. Such a system would incorporate the following objects: - Avoid duplication of information and records - Reduce document production costs - Increase productivity due to easy automated access - Control access to sensitive records - Protect vital records against security threats, disasters - Preserve data integrity via controlled storage and delivery - Share information across multiple departments and with the Public - Records Retention and Records Destruction Project #GG-11-004 Priority 5 Important Justification Vision 20/20 Objective 2 states the City provides a level of services that sets Edina apart from other communities. Implementing a city-wide electronic record management program will bring more efficiency to local government and accessibility of public data to the public. In achieving this goal Edina will: - Enhances service to internal and external customers of Edina - Reduce the cost of storage space, supplies and search time - Allow secure document back-up for off-site storage and disaster recovery - Improve workflow efficiency Vision 20/20 Objective 7 states the City will evaluate and efficiently employ technological advancements to provide City services. Implementing an enterprise document management system would enhance communication with constituents by allowing more electronic access to our "archived" records. Useful Life Project Name Electronic Document Management Category Equipment Type New Contact City Clerk Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 130,00065,00065,000Equip/Vehicles/Furnishings 65,00065,00025,000155,000Total TotalFunding Sources 20132014201520162017FuturePrior 155,00065,00065,00025,000Construction Fund 65,00065,00025,000155,000Total Friday, December 21, 2012Page 65 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Assessing division currently has 3 vehicles that are part of the equipment replacement program, each with an estimated useful life of 10 years. Project #GG-13-001 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Assessing Division Equipment Replacement Category Equipment Type Replace or repair Contact Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 30,00030,000Equip/Vehicles/Furnishings 30,00030,000Total TotalFunding Sources 20132014201520162017FuturePrior 30,00030,000Equipment Replacement Progra 30,00030,000Total Friday, December 21, 2012Page 66 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. Elections equipment includes mostly voting stations. Project #GG-13-002 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Election Equipment Replacement Category Equipment Type Replace or repair Contact City Clerk Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 30,00030,000Equip/Vehicles/Furnishings 30,00030,000Total TotalFunding Sources 20132014201520162017FuturePrior 30,00030,000Equipment Replacement Progra 30,00030,000Total Friday, December 21, 2012Page 67 Capital Improvement Plan City of Edina, MN 20132017thru Description Implement an HRIS / Payroll system with the ability to manage employee information including compensation, benefit elections, electronic time card entry, personnel files, performance information, and employee demographic information. Project #HR-13-001 Priority 2 Justification Each year, the City hires approximately 10-30 full-time employees and 500 new and returning seasonal employees. Approximately the same number leaves employment each year. There are also numerous changes to individual compensation, benefits, and other information throughout the year. Our current system has been in place for well over a decade. It does not allow us to easily track, change, and access information in useable formats. One of the goals for the newly created HR Department is to modernize and streamline HR services. Previously, most HR transactions (job applications, time card entry, benefits elections, etc ) required extensive manual tracking. This made the process time consuming and inefficient as well as reduced accuracy due to a lack of centralization of information. In 2012, the City launched an online job application. The City is now working on the second phase which is online completion of new employee paperwork. The benefits to both systems include: - Candidates can apply on line without obtaining and mailing in a paper copy. - Candidates and returning employees will now only need to complete one application for various positions. - Rehires can easily update their information online, instead of completing new application materials each year. - Hiring managers and HR will work off of one system so there will be faster and more streamlined tracking and evaluation of applications. - The Onboarding system will reduce the number of forms required for new employees, and allow hiring managers, HR, and payroll to more quickly and efficiently track and process the many legal and logistical requirements for new employees. In 2013-2014, the City hopes to take the next step in planning for a new HRIS/Payroll system including electronic timecards, compensation administration, benefits administration, performance management and personnel files. Useful Life 10 years Project Name HRIS/Payroll Category Equipment Type Expansion Contact Department General Government Functions Status Active TotalExpenditures20132014201520162017FuturePrior 220,00050,000150,000Equip/Vehicles/Furnishings 20,000 50,000150,000220,000Total20,000 TotalFunding Sources 20132014201520162017FuturePrior 60,00060,000Construction Fund 35,00035,000Equipment Replacement Progra 125,00050,00055,000Other - 2010 Unassigned Fund 20,000 50,000150,000220,000Total20,000 Friday, December 21, 2012Page 68 Capital Improvement Plan City of Edina, MN 20132017thru Friday, December 21, 2012Page 69 Capital Improvement Plan City of Edina, MN 20132017thru Description Re-grade the soccer field turf and provide new sand and peat mixture sub-soils and re-install the underground irrigation system. Project #PK-00-033 Priority 7 Desirable Justification This soccer field is in need of re-grading for proper drainage purposes and to correct uneven turf conditions. The irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced use of herbicides. Upgrading this field will help to improve our facilities which are stressed beyond capacity. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Unassigned Project Name Pamela Park: Renovate senior athletic field Category Parks Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 330,000330,000Construction/Maintenance 330,000330,000Total TotalFunding Sources 20132014201520162017FuturePrior 330,000330,000Construction Fund 330,000330,000Total Friday, December 21, 2012Page 70 Capital Improvement Plan City of Edina, MN 20132017thru Description Develop a new multi-purpose athletic field adjacent to the senior athletic field on the south end of Pamela Park. Project #PK-07-004 Priority 6 Justification There is more demand for multi-purpose athletic fields than there is supply. The same multi-purpose athletic fields are used to support the games of football, soccer, lacrosse, rugby and ultimate frisbee. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Pamela Park: New athletic field Category Parks Type New Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 400,000400,000Construction/Maintenance 400,000400,000Total TotalFunding Sources 20132014201520162017FuturePrior 400,000400,000Construction Fund 400,000400,000Total Friday, December 21, 2012Page 71 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include decorative pathway lighting fixtures along the pathway at Lewis Park. Project #PK-08-006 Priority 5 Important Justification The pathway around the perimeter of Lewis Park receives a tremendous amount of use on a year round basis. There are many elderly adults that enjoy walking on the pathway year round. During the late fall through early spring the park pathway receives a lot of use during the hours of darkness. Pathway lighting would enhance safety and further promote walking on the pathway on a year round basis. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Lewis Park: Pathway lighting Category Parks Type New Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 30,00030,000Construction/Maintenance 30,000 30,000Total TotalFunding Sources 20132014201520162017FuturePrior 30,00030,000Construction Fund 30,000 30,000Total Friday, December 21, 2012Page 72 Capital Improvement Plan City of Edina, MN 20132017thru Description The project involves expansion of the parking lot on the south end of Pamela Park. The redesign will include striping of the parking lot to make more efficient use of existing parking. 20-23 additional parking stalls are proposed to be added to the south parking lot. Project #PK-10-005 Priority 6 Justification On occasional evenings, there is not enough parking capacity to serve scheduled programs and as a result, park users are parking on the grass. The new additional small rectangular athletic field is also expected to require some additional parking capacity. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Pamela Park: South Parking Lot Expansion Category Parks Type Expansion Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 40,00040,000Construction/Maintenance 40,00040,000Total TotalFunding Sources 20132014201520162017FuturePrior 40,00040,000Construction Fund 40,00040,000Total Friday, December 21, 2012Page 73 Capital Improvement Plan City of Edina, MN 20132017thru Description This project proposes to improve the flow of traffic into the north parking lot (near the park shelter building), create more parking capacity where possible and stripe the lot to make parking safer and more efficient. Project #PK-10-006 Priority 6 Justification The existing north parking lot does not have well defined parking stalls, which leads to an inefficient and unsafe parking lot. As a result, park users park unlawfully on the grass. During high peak scheduled activities, there are not enough parking stalls to accommodate the demand. Additional parking stalls will make the lot safer, more efficient and keep park patrons from parking on neighborhood streets. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Pamela Park: North Parking Lot Expansion Category Parks Type Expansion Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 45,00045,000Construction/Maintenance 45,00045,000Total TotalFunding Sources 20132014201520162017FuturePrior 45,00045,000Construction Fund 45,00045,000Total Friday, December 21, 2012Page 74 Capital Improvement Plan City of Edina, MN 20132017thru Description Pamela Park's west parking lot renovation includes removal of existing asphalt surface, developing a new sub-base, installing a new wear- course of asphalt followed by a finish coat of asphalt and adding concrete curbing around the perimeter. The plan calls for an expansion opportunity to add 37 more parking stalls to the west lot. Project #PK-10-007 Priority 6 Justification The west parking lot will be in need of total renovation in 2013. Concrete curbing is needed to deter people from parking on the grass or driving through the park. Additional parking is needed to keep visitors from parking on the grass during peak use periods. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Pamela Park: West Parking Lot Expansion Category Parks Type Expansion Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 60,00060,000Construction/Maintenance 60,00060,000Total TotalFunding Sources 20132014201520162017FuturePrior 60,00060,000Construction Fund 60,00060,000Total Friday, December 21, 2012Page 75 Capital Improvement Plan City of Edina, MN 20132017thru Description This project calls for complete renovation of the plumbing system that serves the mens and womens restroom facilities at the Bredesen Park comfort station. The system will be redesigned which also involves relocating existing interior walls and underground piping. Project #PK-11-006 Priority 5 Important Justification The plumbing system including the sanitary sewer design at the Bredesen Park comfort station has long been in need of a new design that will eliminate the continual and frequent expensive repairs. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Bredesen Park: Comfort Station Renovation Category Buildings Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 75,00075,000Construction/Maintenance 75,000 75,000Total TotalFunding Sources 20132014201520162017FuturePrior 75,00075,000Construction Fund 75,000 75,000Total Friday, December 21, 2012Page 76 Capital Improvement Plan City of Edina, MN 20132017thru Description This project involves replacement of the Normandale Park warming house/shelter building with a more modern design similar to the concept at Weber Park and Cornelia School Park. Project #PK-11-007 Priority 6 Justification The Normandale Park shelter building was designed and built in the 1970’s and no longer meets resident’s needs and expectations. The community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis, similar to the newer shelter buildings at Weber Park and Cornelia School Park. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Normandale Park: Replace Warming House/Shelter Category Buildings Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 650,000650,000Construction/Maintenance 650,000650,000Total TotalFunding Sources 20132014201520162017FuturePrior 650,000650,000Construction Fund 650,000650,000Total Friday, December 21, 2012Page 77 Capital Improvement Plan City of Edina, MN 20132017thru Description This project involves the development of the Van Valkenburg Park playground area that was designed by Brauer and Associates with input from resident neighbors. The plan includes a small playground, park benches, a tennis court, a half-size basketball court, walking path and landscaping. It is the area immediately next to the intersection of Interlachen Boulevard and Park Terrace (just east of the water tower). Project #PK-12-002 Priority 7 Desirable Justification After the completion of the homes and development along Interlachen Boulevard and Park Terrace, residents requested the development of city- owned park land to serve as a mini-park. The next closest playground for neighborhood children is Alden Park which is approximately 1/3 of a mile away from Van Valkenburg Park. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability". Useful Life Project Name VanValkenburg Park construction Category Parks Type New Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 600,000600,000Construction/Maintenance 600,000600,000Total TotalFunding Sources 20132014201520162017FuturePrior 600,000600,000Construction Fund 600,000600,000Total Friday, December 21, 2012Page 78 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Parks department has a wide variety of equipment that includes grass mowers and other parks maintenance equipment, passenger vehicles and heavy equipment. The expected useful life of this equipment ranges from about 7 years for some of the mowers up to 10 years for most of the passenger vehicles. A few pieces of the heavy equipment are expected to last up to 20 years. Project #PK-13-001 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Parks Department Equipment Replacement Category Equipment Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 310,18020,00083,00042,325133,25531,600Equip/Vehicles/Furnishings 20,00083,00042,325133,25531,600310,180Total TotalFunding Sources 20132014201520162017FuturePrior 310,18020,00083,00042,325133,25531,600Equipment Replacement Progra 20,00083,00042,325133,25531,600310,180Total Friday, December 21, 2012Page 79 Capital Improvement Plan City of Edina, MN 20132017thru Description This is for the renovation of the men’s and women’s restrooms at Utley Park to comply with ADA law to make the restroom facilities handicap accessible, updated, more welcoming and user friendly. The renovations will be completed in unison with the renovations scheduled for the adjoining utility well building structure. Project #PK-13-002 Priority 1 Critical Justification The Utley Park bathroom facilities are over 40 years old and thus do not meet ADA requirements and are outdated not user friendly. These undersized restrooms have the original bathroom fixtures, wall coverings, flooring and partitions. There is a non-accessible step to enter the bathrooms that needs to be redesigned. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Utley Park: Bathrooms Renovation Category Buildings Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 80,00080,000Construction/Maintenance 80,000 80,000Total TotalFunding Sources 20132014201520162017FuturePrior 80,00080,000Construction Fund 80,000 80,000Total Friday, December 21, 2012Page 80 Capital Improvement Plan City of Edina, MN 20132017thru Description This is for the construction of a new 10’ wide asphalt pathway in Lake Edina Park that will create a connection for pedestrians and cyclists between Parklawn and Kellogg. Project #PK-13-003 Priority 5 Important Justification There is a much needed safe hard-surface pathway connection for walkers and cyclists to travel between Kellogg and Parklawn Ave. This project is in keeping with our Attitude and Interest Survey results which show the community’s strong interest in more trails. This project also lines up with Objective #1 in the Vision 20/20 Plan where one of the strategies includes "Work to construct sidewalks adjoining State Aid streets and to promote safe pedestrian travel." This new pathway will help connect neighborhoods and also serve as a safe route to school. Useful Life Project Name Lake Edina Park: Pathway Category Parks Type New Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 85,00085,000Construction/Maintenance 85,000 85,000Total TotalFunding Sources 20132014201520162017FuturePrior 85,00085,000Construction Fund 85,000 85,000Total Friday, December 21, 2012Page 81 Capital Improvement Plan City of Edina, MN 20132017thru Description This is for the construction of a new half-size basketball court for the east side of Highlands Park. Project #PK-13-004 Priority 7 Desirable Justification For many years, neighbors of the Highlands Park neighborhood have requested an outdoor basketball court. The majority of the park is consumed with scheduled soccer games and practices. The neighbors have long requested more park amenities for neighboring families and their children for unscheduled play. A basketball court has been the most frequent request. A half-size basketball court is favored over a full- size court to detract from becoming a destination basketball court for adult games in a park that is already heavily used by residents throughout Edina for scheduled athletic play. There are only six outdoor basketball courts within our 40 parks. This park improvement is in keeping with Vision 20/20 that calls for "A Sound Public Infrastructure...Edina streets, utilities, parks and public buildings are the essential components of the foundation of our city." Useful Life Project Name Highlands Park: Basketball Court Category Parks Type New Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 25,00025,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Construction Fund 25,00025,000Total Friday, December 21, 2012Page 82 Capital Improvement Plan City of Edina, MN 20132017thru Description This is a $300,000 project to completely renovate the Garden Park baseball field and add batting cages, dugouts, scoreboards, storage and concessions. The project also requires the replacement of existing fencing and irrigation system. The Edina Baseball Association is offering to donate $100,000 towards the project costs and the proposal is to apply for a $100,000 grant from the Hennepin Youth Sports Grant administered by the Minnesota Amateur Sports Commission. Project #PK-13-005 Priority 5 Important Justification The Garden Park baseball field is in need of renovation mainly because the field has a very poor drainage system. The field remains wet and unplayable for a lengthy period following a rain event. The field has poor sub-soils and was originally filled will street and sidewalk demolition debris (concrete and rebar). The project engineer has designed a financially reasonable solution. This is the only other large baseball field venue for the oldest youth and adult baseball program. There is a strong desire in the baseball community to bring the Garden Park baseball field up to the same standard as the Courtney Field #1 baseball field which hosts the varsity boys baseball program. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Garden Park: Baseball Field Category Parks Type Expansion Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 300,000300,000Construction/Maintenance 300,000 300,000Total TotalFunding Sources 20132014201520162017FuturePrior 100,000100,000Construction Fund 200,000200,000Grants & Donations 300,000 300,000Total Friday, December 21, 2012Page 83 Capital Improvement Plan City of Edina, MN 20132017thru Description This is a $200,000 project to replace the existing playground equipment at Wooddale Park with a primarily barrier free designed playground structure. A neighboring resident has offered to organize a fundraising effort to cover a large share of the replacement cost and also pursue a $100,000 grant from the Hennepin Youth Sports Grant administered by the Minnesota Amateur Sports Commission. The success of fundraising and success of receiving grant monies are unknowns and therefore staff proposes that a not to exceed project fund of $100,000 be set aside from the construction fund as a fallback position for the 2013 Capital Improvement Plan. Project #PK-13-006 Priority 5 Important Justification There has been a past practice of encouraging residents to secure fundraising dollars as a means to place a park improvement higher on the priority list. The construction of Fox Meadow Park and the most recent project at Braemar Arena (the Hornets Nest) are excellent examples of how fundraising efforts have resulted in successful park improvement projects. This project is in keeping with Vision 20/20 as being an "innovative" park improvement project that will result in an "effective and valued city service by providing a sound infrastructure in a park setting that will lead to an enhancement of the sense of quality that Edina has and will enjoy." Useful Life Project Name Wooddale Park: Playground Equipment Category Parks Type Expansion Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 200,000200,000Construction/Maintenance 200,000200,000Total TotalFunding Sources 20132014201520162017FuturePrior 100,000100,000Construction Fund 100,000100,000Grants & Donations 200,000200,000Total Friday, December 21, 2012Page 84 Capital Improvement Plan City of Edina, MN 20132017thru Description This is a $200,000 project to replace the existing playground equipment at Weber Park which was installed in 1997. Project #PK-13-007 Priority 5 Important Justification There are 23 outdoor playground equipment structures throughout the park system and the Weber Park equipment will be 20 years old by the year 2017. A budget of $200,000 is proposed in order to plan for a more accessible and barrier free design which is more costly due to the preferred safety surface. This project is in keeping with Vision 20/20 as being an "innovative" park improvement project that will result in an "effective and valued city service by providing a sound infrastructure in a park setting that will lead to an enhancement of the sense of quality that Edina has and will enjoy." Useful Life Project Name Weber Park: Playground Equipment Category Parks Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 200,000200,000Construction/Maintenance 200,000200,000Total TotalFunding Sources20132014201520162017FuturePrior 200,000200,000Construction Fund 200,000200,000Total Friday, December 21, 2012Page 85 Capital Improvement Plan City of Edina, MN 20132017thru Description This $650,000 project involves replacement of the Arden Park shelter building with a more modern design similar to the concept at Weber Park and Cornelia School Park. Project #PK-13-008 Priority 5 Important Justification The Arden Park shelter building was designed and built in 1974s and no longer meets resident’s needs and expectations. The community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis, similar to the newer shelter buildings at Weber Park and Cornelia School Park. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Arden Park: Replace Shelter Building Category Buildings Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 650,000650,000Construction/Maintenance 650,000650,000Total TotalFunding Sources 20132014201520162017FuturePrior 650,000650,000Construction Fund 650,000650,000Total Friday, December 21, 2012Page 86 Capital Improvement Plan City of Edina, MN 20132017thru Description This is a $200,000 project to replace the existing playground equipment at Strachauer Park which was installed in 1997. Project #PK-13-009 Priority 5 Important Justification There are 23 outdoor playground equipment structures throughout the park system and the Strachauer Park equipment will be almost 20 years old by the year 2016. A budget of $200,000 is proposed in order to plan for a more accessible and barrier free design which is more costly due to the preferred safety surface. This project is in keeping with Vision 20/20 as being an “innovative” park improvement project that will result in an “effective and valued city service by providing a sound infrastructure in a park setting that will lead to an enhancement of the sense of quality that Edina has and will enjoy.” Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Strachauer Park: Playground Equipment Category Parks Type Replace or repair Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 200,000200,000Construction/Maintenance 200,000200,000Total TotalFunding Sources20132014201520162017FuturePrior 200,000200,000Construction Fund 200,000200,000Total Friday, December 21, 2012Page 87 Capital Improvement Plan City of Edina, MN 20132017thru Description This comprehensive process will involve hiring a professional consulting firm to work with neighborhood groups, Park Board, City Council and staff and will take several months to complete. Project #PK-13-010 Priority 7 Desirable Justification Developing a comprehensive master plan for all parks addresses Edina's Vision 20/20 Plan primarily in Objective #3 which is "Provide capital investments that balance need and affordability". The master plan process should result in an assessment of park and recreation needs and how the parks should be renovated to meet those needs. These capital investment plans will balance the need and affordability in a manner that continue to make Edina the preeminent place for living, learning, raising families and doing business. Useful Life Project Name Parks Comprehensive Master Plan Category Parks Type New Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 100,000100,000Planning/Design 100,000100,000Total TotalFunding Sources 20132014201520162017FuturePrior 100,000100,000Construction Fund 100,000100,000Total Friday, December 21, 2012Page 88 Capital Improvement Plan City of Edina, MN 20132017thru Description Plan and design proposed park projects for Lake Edina Park (PK-13-003) and Wooddale Park (PK-13-006). It is possible the planning and design done in this project could change the scope, cost and timing of the related projects. Project #PK-13-011 Priority n/a Justification This project was included in the CIP based on a Council worksession discussion on October 2, 2012. Useful Life Project Name Park Planning and Design Category Parks Type New Contact Park & Recreation Department Park & Recreation Status Active TotalExpenditures20132014201520162017FuturePrior 60,00060,000Planning/Design 60,000 60,000Total TotalFunding Sources 20132014201520162017FuturePrior 60,00060,000Construction Fund 60,000 60,000Total Friday, December 21, 2012Page 89 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the water heaters in the bath house with higher efficiency heaters. Currently, we have two water heaters that heat water for the bath house. The expected useful life for the water heater is 10-12 years. Project #AQC-12-002 Priority 1 Critical Justification This was an approved 2012 CIP project that we moved to 2013. The water heaters were installed in 1997 and have exceeded the expected useful life. We had the water heaters assessed in 2011 and the recommendation was to replace in 1 -2 years. The water heater heats the water for the bath house so is essential for operations. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 10 years Project Name Replace Heaters Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Aquatic Center Status Active TotalExpenditures20132014201520162017FuturePrior 40,00040,000Equip/Vehicles/Furnishings 40,000 40,000Total TotalFunding Sources 20132014201520162017FuturePrior 40,00040,000Aquatic Center Fund 40,000 40,000Total Friday, December 21, 2012Page 90 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace deteriorating concrete in sections of the pool deck and around the area near the north trellis. Project #AQC-12-003 Priority 2 Justification Over the years, we have replaced deteriorating concrete in several sections. Some areas of the pool deck are still original and showing age. We are seeing more cracks each season and are concerned that the deck will become a safety issue if not replaced. We have been patching sections as needed but will eventually have to replace larger portions of the deck. In the area around the north trellis the pressure treated wood on the trellis is shrinking and splitting. Replacing the deteriorating concrete will keep the quality standards that are expected from an Edina facility. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Pool Deck Repairs Category Parks Type Replace or repair Contact Park & Recreation Department Parks - Aquatic Center Status Active TotalExpenditures20132014201520162017FuturePrior 50,00050,000Construction/Maintenance 50,00050,000Total TotalFunding Sources20132014201520162017FuturePrior 50,00050,000Aquatic Center Fund 50,00050,000Total Friday, December 21, 2012Page 91 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the bath house roof, air conditioners and concession equipment. Project #AQC-12-004 Priority 2 Justification The bath house was built in 1997 and the roof is the original. We have not had any leaking but the roof is showing age and starting to wear thin. The air conditioners and concession equipment have most likely reached useful life. We do annual preventative maintenance on all of the concession equipment which has increased useful life. The convection oven, pizza spinner, and freezers are all showing signs of age and costing us more each year to maintain and repair. We generate over $124,000 in revenue from concessions so having this equipment is essential to operations. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Bathhouse Roof and Other Improvements Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Aquatic Center Status Active TotalExpenditures20132014201520162017FuturePrior 52,00052,000Construction/Maintenance 52,00052,000Total TotalFunding Sources 20132014201520162017FuturePrior 52,00052,000Aquatic Center Fund 52,00052,000Total Friday, December 21, 2012Page 92 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the pool filters in the main pool, plunge pool, and zero depth pool. The approximate useful life on a filter is 2-15 years. Project #AQC-12-005 Priority 4 Justification Pool filters are needed to keep the pool water clean and clear. The main job of the filter is to protect the pool pump from any debris that may have been sucked into the main drain or through the skimmer. If this debris were to get into the pump, it could severely damage the motor or potentially ruin the entire unit. The filters were installed in 1997 which exceeds the approximate useful life. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 10 years Project Name Replace Pool Filters Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Aquatic Center Status Active TotalExpenditures20132014201520162017FuturePrior 62,00062,000Equip/Vehicles/Furnishings 62,00062,000Total TotalFunding Sources 20132014201520162017FuturePrior 62,00062,000Aquatic Center Fund 62,00062,000Total Friday, December 21, 2012Page 93 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the SCS play structure located in the zero depth pool. The play structure was installed in 1997 and is a heavily used attraction. Project #AQC-12-006 Priority 5 Important Justification Vision 20/20 Objective 2 states the City provides services that sets Edina apart from other communities. The zero depth play structure is one of the Aquatic Center’s main attractions. This feature attracts people to Edina from all over the Twin Cities Metro area. It is one of the key attractions that drive gate sales. The SCS Zero Depth Pool play structure was installed in 1997 and may need to be replaced due to heavy use. Preventative maintenance has helped increased the longevity of the play structure but will need to be replaced in the next few years. Useful Life Project Name SCS Play Structure Category Parks Type Replace or repair Contact Park & Recreation Department Parks - Aquatic Center Status Active TotalExpenditures20132014201520162017FuturePrior 325,000325,000Construction/Maintenance 325,000325,000Total TotalFunding Sources 20132014201520162017FuturePrior 325,000325,000Aquatic Center Fund 325,000325,000Total Friday, December 21, 2012Page 94 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the main pool boiler. The useful life is expected to be 10 years. Project #AQC-13-001 Priority 1 Critical Justification We have recently replaced the boilers in the plunge pool (2012) and the zero depth pool (2011). All of the boilers were originally purchased around the same time (2002). The boiler is expected to run 10 years with appropriate preventative maintenance. There is slight damage to the tube bundle. Gilbert Mechanical evaluated the condition of the boiler in August of 2012 after we closed the facility for the season. The tube bundle and burners are in very poor condition. The recommendation was to replace the boiler with a dual boiler system. We need a boiler to heat the water in the main pool. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 10 years Project Name Main Pool Boiler Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Aquatic Center Status Active TotalExpenditures20132014201520162017FuturePrior 47,00047,000Equip/Vehicles/Furnishings 47,000 47,000Total TotalFunding Sources20132014201520162017FuturePrior 47,00047,000Aquatic Center Fund 47,000 47,000Total Friday, December 21, 2012Page 95 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the large tube slide. The slide is original and was installed in 2002. This feature is heavily used and starting to show wear and tear. Project #AQC-13-002 Priority 5 Important Justification Vision 20/20 Objective 2 states the City provides services that sets Edina apart from other communities. The slide is one of the Aquatic Center’s main attractions. This feature attracts people to Edina from all over the Twin Cities Metro area. It is one of the key attractions that drive gate sales. The gel coating on the slide is wearing thin from heavy use. There is color deterioration and the surface is increasingly difficult to maintain. Replacing the slide in 2016: -Will keep us competitive with other outdoor pool facilities. -Create excitement in the community to come to the pool to use the improved slide. -Will keep the quality standards that are expected from an Edina facility. Useful Life Project Name Large Slide Category Parks Type Replace or repair Contact Park & Recreation Department Parks - Aquatic Center Status Active TotalExpenditures20132014201520162017FuturePrior 500,000500,000Construction/Maintenance 500,000500,000Total TotalFunding Sources 20132014201520162017FuturePrior 500,000500,000Aquatic Center Fund 500,000500,000Total Friday, December 21, 2012Page 96 Capital Improvement Plan City of Edina, MN 20132017thru Description Our current water softening equipment is outdated. This project would increase energy efficiency by saving in salt and water treatment costs. Project #A-10-003 Priority 5 Important Justification The majority of arenas use tap or sometimes well water to make and maintain ice. In certain regions this has been successful; however it generally results in a poor quality sheet of ice. Untreated source water contains many minerals that are added to provide safe drinking water but are not conducive to the ice making and maintenance process. These same minerals migrate upwards and concentrate at the ice surface as a result of the freezing process. The negative effect this has on the ice surface is compounded further with each additional flood and a phenomenon called 'sublimation' (where ice changes directly from a solid to a gas without first becoming a liquid). During this sublimation process more minerals are deposited on the ice surface resulting in a snowy, scaly and slow ice surface. The Reverse Osmosis process is the most environmentally friendly method of demineralizing water. There are absolutely no chemicals and the end product is potable. The Water Systems Repairs that were included in the 2013 CIP is an item the Arena feels is important, however other projects have been identified by Braemar Arena staff as a higher priority. Therefore we are moving this project to 2015. Water treatment helps keep the scale down in the equipment which also lengthens the life span of the equipment. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Water System Repairs Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 80,00080,000Construction/Maintenance 80,00080,000Total TotalFunding Sources 20132014201520162017FuturePrior 80,00080,000Construction Fund 80,00080,000Total Friday, December 21, 2012Page 97 Capital Improvement Plan City of Edina, MN 20132017thru Description The desired useful life of a Zamboni is 10,000 hours, which equates to about 10 years. Braemar has historically held on to Zambonis for 13-17 years. With the replacement of this Zamboni, our daily use fleet were purchased in 2010, 2012 and 2014. Our "back up" machine was purchased in 2001. The next Zamboni replacement will be in 2020. This will continue to put us on a path to have reliable equipment. This machine will replace the 1997 ice resurfacing machine. Project #A-12-001 Priority 3 Significant Justification This is a routine equipment replacement purchase. The 1997 zamboni will be 17 years old in 2014 and is due to be replaced. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 11-20 years Project Name Replace Zamboni Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 140,000140,000Equip/Vehicles/Furnishings 140,000140,000Total TotalFunding Sources 20132014201520162017FuturePrior 140,000140,000Construction Fund 140,000140,000Total Friday, December 21, 2012Page 98 Capital Improvement Plan City of Edina, MN 20132017thru Description Make Up Water Tanks are a part of the ice refrigeration system. The Make Up Water Tanks hold treated water so when the cooling towers call for water it is ready in the tank. Originally the Make Up Water Tanks were budgeted for 2015, however we need to move them up to 2013 because of a small leak in one, and the other two are also deteriorating. Our preventative maintenance company recommended replacement in 2013 due to current condition. The estimate has also been decreased with more accurate bids. Project #A-12-002 Priority 1 Critical Justification This equipment is critical for the Ice Refrigeration system. The water that is leaking is treated, which means we are also losing chemicals when losing water. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Make-up Water Tanks Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 35,00035,000Equip/Vehicles/Furnishings 35,000 35,000Total TotalFunding Sources 20132014201520162017FuturePrior 35,00035,000Construction Fund 35,000 35,000Total Friday, December 21, 2012Page 99 Capital Improvement Plan City of Edina, MN 20132017thru Description Low E Ceiling is panels that are hung the width of the sheet of ice. The intent of the Low E Ceiling is to provide energy efficiency, brighten the space and provide a more appealing look. It has a life expectancy of approximately 20 years. Project #A-13-001 Priority 4 Justification The Low E Ceiling installed in the West Arena is falling down. Last season we needed to remove 2 of the panels because they were hanging down and pucks were getting stuck in them. Since the West Arena is our main rink for high school games, figure skating show, and large special events, it is important to replace them as soon as possible. The Low E Ceiling panels were installed in 1994. The West Arena went through a major renovation in 2010 and will receive some other valuable improvements as a part of the Hornets Nest project in 2012. This will complete urgent repairs. The estimated annual savings is $17,000 per year. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Low E Ceiling Replacement - West Arena Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 75,00075,000Equip/Vehicles/Furnishings 75,000 75,000Total TotalFunding Sources 20132014201520162017FuturePrior 75,00075,000Construction Fund 75,000 75,000Total Friday, December 21, 2012Page 100 Capital Improvement Plan City of Edina, MN 20132017thru Description Painting East Arena. The East Arena is known as the "barn" at Braemar. The grey concrete blocks make the arena the least desirable. We have received multiple requests from both our figure skating and hockey community to paint the space to make it more welcoming. The East Arena was enclosed in 1987. There have been very few improvements made to the space since that time. Project #A-13-002 Priority 4 Justification This will help meet the goal of making Braemar Arena the premier facility. The East Arena is also where we see the most vandalism. If we brighten the space and make it more desirable, it will receive less vandalism. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Painting East Arena Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 25,000 25,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Construction Fund 25,000 25,000Total Friday, December 21, 2012Page 101 Capital Improvement Plan City of Edina, MN 20132017thru Description The Ballet room is located between the East and the South Arenas. The Ballet room was constructed in 1998. For the past 14 years the Ballet room has been used for the Figure Skating Club. The Arena is opening up the space for multi-purpose use. We will schedule Birthday Parties, team meetings, facilitate dance classes and other fitness classes for our guests. The room is need of significant updates and improvements to the floor, walls, window coverings, furniture and other media components. This will increase fee based use of the space. Project #A-13-003 Priority 3 Significant Justification Braemar Arena has had a goal of providing a high quality on ice experience for our guests. While that is our primary responsibility, we also seek to improve other areas of the facility to increase revenues. We are only estimating $5,000 per year in additional revenues, however this space will be used by tournament coordinators. The Minnesota Hockey Advanced 15’s is an example of one tournament that would utilize this space. We are currently negotiating a 5 year contract. This tournament will generate $8,100 per year. They plan to use this space for coaches and scouts visiting from around the country. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Ballet Room Remodel Category Buildings Type New Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 25,00025,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Construction Fund 25,00025,000Total Friday, December 21, 2012Page 102 Capital Improvement Plan City of Edina, MN 20132017thru Description Low E Ceiling are panels that are strung the width of the sheet of ice. They intent of the Low E Ceiling is to provide energy efficiencies, brighten the space and provide a more appealing look. The Low E Ceiling installed in the East Arena is falling down. For the visual appeal, as well as providing energy efficiencies this project has been included on the CIP and included for 2015. Project #A-13-004 Priority 5 Important Justification The East Arena Low E Ceiling Replacement is due for replacement in 2014. The estimated annual energy savings is $17,000 per year. The replacement of the torn panels also improves the aesthetics of the arena. Vision 20/20, Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Low E Ceiling Replacement - East Arena Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 80,00080,000Construction/Maintenance 80,00080,000Total TotalFunding Sources 20132014201520162017FuturePrior 80,00080,000Construction Fund 80,00080,000Total Friday, December 21, 2012Page 103 Capital Improvement Plan City of Edina, MN 20132017thru Description This project will remodel the West 1 and West 2 locker room rest rooms. Project #A-13-005 Priority 5 Important Justification Many of the bathrooms/locker rooms in Braemar Arena are outdated. They receive significant use on a daily basis and are in need of upgrades and improvements. The project will include re-tiling, new partitions, counter tops, and mirrors. It will also make our lower East restrooms accessible. Currently there are two stalls that are not accessible. The floors are rubber and are difficult to clean. Tiling the floors with skate safe rubber matting would be best. As the facility ages, it is important for us to continue to improve the Arena. Currently the upper West, lower East, lower West and lower South are all needed. The West 1 and West 2 locker rooms are also in need of significant improvements. These are very visible to our users and we need to continue to invest in the improvement of our facilities. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Bathroom/Locker Room Upgrades/Remodel Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 100,000100,000Construction/Maintenance 100,000100,000Total TotalFunding Sources 20132014201520162017FuturePrior 100,000100,000Construction Fund 100,000100,000Total Friday, December 21, 2012Page 104 Capital Improvement Plan City of Edina, MN 20132017thru Description The East and South Arenas need new Rubber Flooring. The replacement would be in the main areas- lower tunnel corridors, locker rooms and players benches/penalty boxes. The rubber floor allows for players to walk throughout the lower level of the facility with their skates on. The rubber flooring throughout the South and East Arenas was installed in 1997. Previously the East Arena only lasted for 10 years and currently the flooring is 15 years old. The flooring for the West arena and locker rooms was replaced in 2010. The flooring is wearing out in high traffic areas and becomes difficult to clean with our floor scrubber. Project #A-13-006 Priority 5 Important Justification This project provides for ongoing maintenance and upkeep of Braemar Arena. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Rubber Floor Replacement Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 35,00035,000Construction/Maintenance 35,00035,000Total TotalFunding Sources 20132014201520162017FuturePrior 35,00035,000Construction Fund 35,00035,000Total Friday, December 21, 2012Page 105 Capital Improvement Plan City of Edina, MN 20132017thru Description The current roof was installed in 1996. It is a rubber membrane roof with rock ballast. With improvements made in 2012, we were able to increase the life of the roof by 5 years. In 2017 the roof will have well exceeded its expected life of 15-18 years. We will be replacing the roof over the main lobby, South Arena, and the East lobby. It is recommended to again replace the roof with the rubber membrane and rock. Since our roof has been installed, there have been significant improvements in this product and it was recommended by two contractors. Project #A-13-007 Priority 5 Important Justification The roof has exceeded its life and is in need of replacement. Currently there are minimal leaks throughout the facility. In 2017 the roof will be 21 years old, far exceeding the 15-18 year expected life. Vision 20/20, Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 11-20 years Project Name Arena Roof Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 225,000225,000Construction/Maintenance 225,000225,000Total TotalFunding Sources 20132014201520162017FuturePrior 225,000225,000Construction Fund 225,000225,000Total Friday, December 21, 2012Page 106 Capital Improvement Plan City of Edina, MN 20132017thru Description This project is to resurface the lower level parking lot near the south arena. The parking lot was installed in 1997 and has not been resurfaced since. It was recommended by the City of Edina engineering department to resurface this lot to avoid more significant repairs in the future. Project #A-13-008 Priority 2 Justification The existing asphalt is deteriorated and at the end of its life. Will avoid more expensive repairs in the future if we resurface in 2013. Vision 20/20, Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects replace aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Unassigned Project Name Parking Lot Resurfacing Category Parks Type Replace or repair Contact Park & Recreation Department Parks - Arena Status Active TotalExpenditures20132014201520162017FuturePrior 35,00035,000Construction/Maintenance 35,000 35,000Total TotalFunding Sources20132014201520162017FuturePrior 35,00035,000Construction Fund 35,000 35,000Total Friday, December 21, 2012Page 107 Capital Improvement Plan City of Edina, MN 20132017thru Description In May 2009, the Edina Engineering Department requested companies to provide bids to remove bituminous pavement and concrete sidewalk and install new curb and gutter and re-pave a newly designed entry and exit system for the Edina Art Center Parking Lot. The bids were in response to a plan to change the Art Center parking lot from a single entry/exit driveway to a dual entry/exit system. In addition, expansion of the Art Center parking lot was proposed with 10 additional parking spaces. The dual entry/exit system would increase safety for persons and vehicular property. Bids from the Engineering Department came in at $25,811.25, with bids from other companies coming in at $36,082.50/ $37,467.50/ $42,597.50/ $36,328.75 / $33,210.50. These figures from May 27, 2009. I am unable to locate information regarding the $85,000 amount request. Useful life is 20+ years. Lines were repainted in March 2012, and are slowly fading. We need painted lines to designate where cars should be parked to optimize the area. Replacement, and concrete repair and replacement for access sidewalks. Project #ART-11-004 Priority 7 Desirable Justification Creation of dual entry/exit driveways and expansion of parking lot with 10 new spots and redesign drop off area would allow for larger patronage usage and allow for easier customer access to the Edina Art Center. A major factor in the re-design is for the safety of patrons of the Center. During openings and receptions, attendees must park along the poorly lit frontage road and walk to the Center. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Parking Lot Expansion Category Parks Type Expansion Contact Department Parks - Art Center Status Active TotalExpenditures20132014201520162017FuturePrior 85,00085,000Construction/Maintenance 85,00085,000Total TotalFunding Sources 20132014201520162017FuturePrior 85,00085,000Construction Fund 85,00085,000Total Friday, December 21, 2012Page 108 Capital Improvement Plan City of Edina, MN 20132017thru Description The Edina Art Center HVAC system is comprised of one boiler, 5 roof top units and one furnace. The boiler on the lower level is 14 years old, was installed in 1998 and has a life expectancy of 25-30 years. The average life of the roof top heating/cooling units is 15 years. Two units are made by York; one installed in 2001 and one in 2002 and are 11 and 10 years old respectively. The remaining three units, two roof top units and one furnace, were made by Carrier and installed in 1998 with the recent addition of the Media Studios. These three units are 14 years old with an average life of 15 years. The ductless split which serves the upper level, or Loft, of the Art Center was installed in 2011 and is less than one year old. Price of the roof top units needing to be replaced in the next year or more is estimated to be between $7,000 - $8,000 per unit, but can go as high as $10,000 per unit with the variance in price due to the cost of metal at time of purchase. Project #ART-11-005 Priority 3 Significant Justification 2013 would be the scheduled replacement of roof top HVAC Carrier systems over the Media Studios at the end of the 15 year life expectancy. The replacement of the HVAC units, upgrade of the ventilation and exhaust systems would be in line with the Comprehensive Plan as a necessity for heating and cooling of the building and comfort of the patrons. In addition, appropriate management of health and safety issues and hazardous material management for participants and visitors is a top priority for a high quality center. Vision 20/20 speaks to the quality of services and quality of life the city provides to its residents. Useful Life 20 years Project Name HVAC Category Buildings Type Replace or repair Contact Department Parks - Art Center Status Active TotalExpenditures20132014201520162017FuturePrior 22,80022,800Construction/Maintenance 22,800 22,800Total TotalFunding Sources 20132014201520162017FuturePrior 22,80022,800Construction Fund 22,800 22,800Total Friday, December 21, 2012Page 109 Capital Improvement Plan City of Edina, MN 20132017thru Description Acquisition of MaxSolutions Enterprise software, terminal and training for Art Center staff. Technology update for Art Center for memberships, point of sale, registration, and reporting. Project #ART-13-001 Priority 2 Justification Alignment with Art Center Consultant study and Art Center work plan. Useful Life 11-20 years Project Name MaxSolutions Enterprise Acquisition Category Equipment Type New Contact Department Parks - Art Center Status Active TotalExpenditures20132014201520162017FuturePrior 15,00015,000Planning/Design 15,000 15,000Total TotalFunding Sources 20132014201520162017FuturePrior 15,00015,000Construction Fund 15,000 15,000Total Friday, December 21, 2012Page 110 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace 2 of the 4 HVAC units for the Centennial Lakes Pavillion. The current heating and air conditioning units were installed in 1990 and are reaching the end of their life expectancy. Newer units will also be more energy efficient than our current models, allowing us to save on energy costs. Project #CL-06-005 Priority 2 Justification New HVAC units will help maintain the interior building at comfortable temperatures for special event clients and other park users. A Sound Public Infrastructure is listed as part of the City Vision Statement; replacement of these HVAC units will align with this goal. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 20 years Project Name Replace HVAC Units Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Centennial Lakes Park Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 25,00025,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Construction Fund 25,00025,000Total Friday, December 21, 2012Page 111 Capital Improvement Plan City of Edina, MN 20132017thru Description The sound system for the Centennial Lakes pathways currently consist of over 160 in-ground speakers, eight pole-mounted speakers, and 10 amplifiers, all connected by several miles of low voltage wire. The majority of this system was installed in 1999 with an anticipated useful life of 8-10 years. The system allows us to play music throughout the park for the enjoyment of park patrons as well as make announcements as needed. We propose to replace all necessary components of the system with new components. Project #CL-09-008 Priority 7 Desirable Justification The park music system is a unique amenity that is important in establishing Centennial Lakes as a premier public facility, which aligns with the Vision 20/20 mission statement. Walking trails were identified as extremely important to Edina residents in the 2006 Community Attitudes and Interest survey. A properly functioning sound system will enhance the park walkways for walkers and runners alike. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 10 years Project Name Replace Park Sound System Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Centennial Lakes Park Status Active TotalExpenditures20132014201520162017FuturePrior 32,00032,000Equip/Vehicles/Furnishings 32,00032,000Total TotalFunding Sources 20132014201520162017FuturePrior 32,00032,000Construction Fund 32,00032,000Total Friday, December 21, 2012Page 112 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace 2 of the four HVAC units for the Centennial Lakes Pavilion. (The other two units are scheduled for replacement in 2014.) The current heating and air conditioning units were installed in 1990 and are nearing the end of their life expectancy. Newer units will be more energy efficient than our current models, allowing us to save on energy costs as well as reduce maintenance expense. Project #CL-12-001 Priority 5 Important Justification New HVAC units will help maintain the building interior at comfortable temperatures for special event clients and other park users. A Sound Public Infrastructure is listed as part of the City Vision Statement; replacement of these HVAC units will align with this goal. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 20 years Project Name Replace HVAC Units Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Centennial Lakes Park Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Construction/Maintenance 25,00025,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Construction Fund 25,00025,000Total Friday, December 21, 2012Page 113 Capital Improvement Plan City of Edina, MN 20132017thru Description Our current one-ton truck will be 20 years old in 2017 and in need of replacement. The one-ton truck, which has beefed up suspension and a heavy duty steel dump box, is used to haul out all of the organic material and debris from the care and maintenance of the plants, trees and grass areas at Centennial Lakes Park. Since we have no dumping area for these types of items at Centennial Lakes, all of this material is trucked over to the main City dump site at Braemar. In addition, it is used to haul mulch, soil and landscape materials back into the park. Project #CL-13-001 Priority 5 Important Justification A reliable vehicle will help in our efforts to provide a premier public facility as desired by the Vision 20/20 mission statement. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging Useful Life 11-20 years Project Name One-Ton Truck Category Vehicles Type Replace or repair Contact Park & Recreation Department Parks - Centennial Lakes Park Status Active TotalExpenditures20132014201520162017FuturePrior 28,00028,000Equip/Vehicles/Furnishings 28,00028,000Total TotalFunding Sources 20132014201520162017FuturePrior 28,00028,000Construction Fund 28,00028,000Total Friday, December 21, 2012Page 114 Capital Improvement Plan City of Edina, MN 20132017thru Description Re-plaster and restore pool shell at Edinborough Park. The pool shell is the original constructed in 1987. Project #EP-00-017 Priority 3 Significant Justification Edina parks and facilities are the essential components of the foundation of our city. The pool needs an update to be considered a premier Edina facility. The original pool shell at Edinborough Park is cracked and badly discolored. Pieces of plaster are coming off of the shell. The pool shell needs a new surface coat of gunite, sprayed applied concrete. Our goal at Edinborough Park is to increase usage of the pool. It is essential to have a comparable pool with other providers in the area. Failure to make this repair will cause cracking or heaving of the pool shell which could compromise the structural integrity. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Unassigned Project Name Replaster Pool Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 71,80071,800Construction/Maintenance 71,800 71,800Total TotalFunding Sources20132014201520162017FuturePrior 71,80071,800Construction Fund 71,800 71,800Total Friday, December 21, 2012Page 115 Capital Improvement Plan City of Edina, MN 20132017thru Description Install a new web based security camera system with the ability for video surveillance. Included in the system are cameras, DVR and monitors. The useful life is anticipated to be 10 years. Project #EP-08-007 Priority 5 Important Justification Vision 20/20 Objective 7 states to evaluate and efficiently employ technological advancements to provide City services. The current system was installed in 2006 and has many limitations. A more efficient system would allow us remote access to view the park, maintain a safe environment for the public, and view clear images of the facility. This system is being used effectively at the Aquatic Center and Public Works buildings. Useful Life 10 years Project Name Security Camera System Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 43,10043,100Equip/Vehicles/Furnishings 43,10043,100Total TotalFunding Sources 20132014201520162017FuturePrior 43,10043,100Construction Fund 43,10043,100Total Friday, December 21, 2012Page 116 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the tile on the walls of the pool along with the deck tile. The tile is original to the park and was installed in 1987. Project #EP-08-021 Priority 3 Significant Justification Edina parks and facilities are the essential components of the foundation of our city. The pool needs an update to be considered a premier Edina facility. The deck and wall tile is original to the park over 26 years old. There are several cracked and damaged pieces along the east wall, and buckled tile along the north wall. We have replaced several larger areas of deck tile that are discolored. The wall tile is fractured in several areas and could potentially become a safety issue. Our goal is to increase usage of the facility with a strong focus on the pool. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Pool and Wall Tile Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 189,500189,500Construction/Maintenance 189,500189,500Total TotalFunding Sources 20132014201520162017FuturePrior 189,500189,500Edinborough Fund 189,500189,500Total Friday, December 21, 2012Page 117 Capital Improvement Plan City of Edina, MN 20132017thru Description Lift from the great hall floor to the Birthday Party Plateau - the old tot lot area. Project #EP-09-014 Priority 3 Significant Justification This area was not designed to be handicapped accessible. We are currently providing two other birthday party sites in different locations with accessibility. We are receiving an increased number of requests for handicapped accessible areas in the park. Useful Life Project Name Lift to Birthday Party Area Category Buildings Type New Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 42,00042,000Construction/Maintenance 42,00042,000Total TotalFunding Sources 20132014201520162017FuturePrior 42,00042,000Construction Fund 42,00042,000Total Friday, December 21, 2012Page 118 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the track floor with a similar rubber surface. The useful life is anticipated to be 20 years. Project #EP-09-015 Priority 7 Desirable Justification Edina parks and facilities are the essential components of the foundation of our city. The Parks and Recreation Facilities and Services Needs Assessment Survey confirmed that having indoor exercise facilities and an indoor running/walking track is important to the residents of Edina. The track surface was originally installed in 1987. The track has experienced significant wear over the years. Portions of the track surface are wearing thin causing potential tripping hazards. The current surface is a deterrent to many people. Improving the surface of the track will help us achieve our goal of increasing usage of the facility. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 20 years Project Name Track Floor Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 65,00065,000Construction/Maintenance 65,00065,000Total TotalFunding Sources20132014201520162017FuturePrior 65,00065,000Construction Fund 65,00065,000Total Friday, December 21, 2012Page 119 Capital Improvement Plan City of Edina, MN 20132017thru Description Repair deteriorated concrete on west sidewalk as well as concrete and drain tile near the parking ramp entrance. Project #EP-09-016 Priority 4 Justification Vision 20/20 Objective 1 states the City maintain strong residential neighborhoods. Maintaining and improving the condition of our neighborhood street and sidewalks is essential. Concrete on the west sidewalk is deteriorating and may become a tripping hazard. This sidewalk is used by many residents accessing the park and other businesses located in the Corporate Center. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Currently, in the parking ramp entrance we have water seeping into the entryway, loading dock entrance, and hallway underneath. Concrete repairs would prevent further deterioration and damage. Useful Life Project Name Concrete repairs Category Infrastructure Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 153,800153,800Construction/Maintenance 153,800 153,800Total TotalFunding Sources 20132014201520162017FuturePrior 153,800153,800Construction Fund 153,800 153,800Total Friday, December 21, 2012Page 120 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace worn events on Adventure Peak. The useful life on most of the events varies depending on use and materials, but most events last less than 10 years. Adventure Peak opened in 2004. Project #EP-09-021 Priority 3 Significant Justification Adventure Peak brings in approximately $600,000 a year in revenue for Edinborough Park. We have one of the largest and most used play structures in the country. Replacing the worn events is critical for maintaining the safety of the play structure. Replacing the events will also refresh the look of the structure and keep it fun and exciting for the enjoyment of our customers. New play structures are opening all over the Twin Cities and it’s critical that we continue to renew and modify the play structure to maintain interest and customer base. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. Useful Life 10 years Project Name Adventure Peak Remodel Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 26,00026,000Equip/Vehicles/Furnishings 26,00026,000Total TotalFunding Sources 20132014201520162017FuturePrior 26,00026,000Construction Fund 26,00026,000Total Friday, December 21, 2012Page 121 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the deteriorating concrete on the sidewalks on the North side of the facility. The concrete is original to the park and was poured in 1987. The useful life on concrete is approximately 20 years but varies depending on use, weight and weather. Project #EP-10-011 Priority 5 Important Justification Vision 20/20 Objective 1 states the City maintain strong residential neighborhoods. Maintaining and improving the condition of our neighborhood street and sidewalks is essential. The concrete on the North sidewalk is deteriorating and may become a tripping hazard. This sidewalk is used by many residents living in the condos to access the park and businesses in the Corporate Center. Over the years, we have patched several sections and even those sections are starting to crumble. Replacing the concrete would decrease the tripping hazard. Useful Life 20 years Project Name North Sidewalk Category Infrastructure Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 32,30032,300Construction/Maintenance 32,30032,300Total TotalFunding Sources 20132014201520162017FuturePrior 32,30032,300Construction Fund 32,30032,300Total Friday, December 21, 2012Page 122 Capital Improvement Plan City of Edina, MN 20132017thru Description Add air conditioning to the track and exercise area. The useful life is anticipated to be 10 years. Project #EP-11-005 Priority 7 Desirable Justification Currently, there is no air conditioning in the track area. The track is surrounded by windows that cannot be opened. During the summer months temperatures can exceed 90 degrees. Exercising at these temperatures can become a safety and health issue for anyone, especially seniors. The addition of air conditioning to the track will make the facility a more appealing alternative for the community to enjoy year round. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 10 years Project Name Track Air Conditioning Category Buildings Type New Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 66,60066,600Construction/Maintenance 66,60066,600Total TotalFunding Sources 20132014201520162017FuturePrior 66,60066,600Construction Fund 66,60066,600Total Friday, December 21, 2012Page 123 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the triple wave slide on Adventure Peak. The useful life is anticipated to be 10-12 years. Project #EP-11-006 Priority 3 Significant Justification Vision 20/20 Objective 2 states the City provides services that sets Edina apart from other communities. Adventure Peak brings in approximately $600,000 a year in revenue for Edinborough Park. We have one of the largest and most used play structures in the area. Each year thousands of children play in Adventure Peak. Adventure Peak attracts people to Edina from all over the Twin Cities metro. The slide is an original play feature and is wearing out. The coating on the slide is wearing thin from heavy use. There is color deterioration and the surface is increasingly difficult to maintain. In order to continue to attract large numbers of users, it is important to continually renew and update the play structure. Our guests notice and appreciate the investment. Useful Life 11-20 years Project Name Adventure Peak Wave Slide Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 26,30026,300Equip/Vehicles/Furnishings 26,30026,300Total TotalFunding Sources 20132014201520162017FuturePrior 26,30026,300Construction Fund 26,30026,300Total Friday, December 21, 2012Page 124 Capital Improvement Plan City of Edina, MN 20132017thru Description The exterior doors are the original doors installed when the park first opened in 1987. They are over 25 years old and have become difficult to lock. The interior components of the doors are also deteriorating and have become expensive to repair. New doors would also be much more energy efficient. Project #EP-11-007 Priority 5 Important Justification Edina parks and public buildings are the essential components of the foundation of our city. The exterior doors are the first thing people see when they enter Edinborough Park. The doors are original to the park and have corroded components. The doors do not lock well which could result in safety issues inside the park. The doors are difficult to open which is a challenge for kids and older adults. The doors are discolored and look poorly to the public using the park. One of our goals is to increase usage of the facility. We are updating the look of the facility by removing overgrown trees and filling in the Grotto. Replacing the doors will create a positive first impression of the facility. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Exterior Entryway Doors Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 90,50090,500Construction/Maintenance 90,50090,500Total TotalFunding Sources20132014201520162017FuturePrior 90,50090,500Construction Fund 90,50090,500Total Friday, December 21, 2012Page 125 Capital Improvement Plan City of Edina, MN 20132017thru Description The interior doors are the original doors installed when the park first opened in 1987. It is my recommendation to replace the interior lockable doors on all four entrances to the park. Project #EP-11-008 Priority 5 Important Justification Edina parks and public buildings are the essential components of the foundation of our city. The interior doors are the first thing people see when they enter Edinborough Park. The doors are original to the park and have corroded components causing instability. New doors would be much more energy efficient. The doors are faded and do not represent the image that we want to portray to our guests. In 2017, Edinborough Park will be 30 years old. Our goal is to update the look of the facility and replacing the interior doors will help us achieve that goal. Useful Life Project Name Interior Entryway Doors Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 67,90067,900Construction/Maintenance 67,90067,900Total TotalFunding Sources 20132014201520162017FuturePrior 67,90067,900Construction Fund 67,90067,900Total Friday, December 21, 2012Page 126 Capital Improvement Plan City of Edina, MN 20132017thru Description Renovate and remodel the upstairs restrooms at Edinborough Park. The useful life is anticipated to be 15-18 years. Project #EP-11-009 Priority 6 Justification Edina parks and facilities are the essential components of the foundation of our city. I recommend replacing the tile, countertops, lighting fixtures, and toilet partitions. These are heavily used restrooms and are showing their age. The tile is chipping in certain areas and could be a safety concern. The restroom facilities look very outdated and do not represent the quality that is expected from an Edina facility. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 11-20 years Project Name Upstairs Restroom Remodel Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 30,80030,800Construction/Maintenance 30,80030,800Total TotalFunding Sources 20132014201520162017FuturePrior 30,80030,800Construction Fund 30,80030,800Total Friday, December 21, 2012Page 127 Capital Improvement Plan City of Edina, MN 20132017thru Description Replacement of deck pads and thick foam pipe covering throughout Adventure Peak. Adventure Peak was built in 2003 and the foam pipe covering is original and is starting to wear out and tear due to heavy use. Project #EP-11-010 Priority 5 Important Justification Each year thousands of children play in Adventure Peak. Adventure Peak attracts people to Edina from all over the Twin Cities metro area. Exterior foam and soft deck pads wear out with use. The thick foam padding covers all of the structural piping throughout Adventure Peak. Kids hang on and bump into the pads. Replacing deck pads and foam pipe covering is essential to maintaining safety standards on the Peak. Edinborough Park has a reputation in the community to be a safe facility for families to enjoy. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 11-20 years Project Name Adventure Peak Renovation Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 33,10033,100Construction/Maintenance 33,10033,100Total TotalFunding Sources 20132014201520162017FuturePrior 33,10033,100Construction Fund 33,10033,100Total Friday, December 21, 2012Page 128 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace the main park boiler at Edinborough Park. The boiler provides heat to most of the park including the entryways, locker rooms, pool and track. The useful life on a boiler is approximately 10 years. Project #EP-12-003 Priority 5 Important Justification The main park boiler was installed in 2004. The boiler provides heat to most of the areas in the park. By 2015, we will have surpassed the useful life of an average boiler. Providing heat in the facility would be necessary for us to operate during the months we experience colder weather. Vision 20/20, Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 10 years Project Name Park Boiler Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 26,90026,900Equip/Vehicles/Furnishings 26,90026,900Total TotalFunding Sources 20132014201520162017FuturePrior 26,90026,900Construction Fund 26,90026,900Total Friday, December 21, 2012Page 129 Capital Improvement Plan City of Edina, MN 20132017thru Description Implement a new Point of Sale system with the ability to manage aspects of daily operations in the park. The current Point of Sale system was installed in 2006. The useful life is anticipated to be 10 years. Project #EP-13-001 Priority 5 Important Justification Vision 20/20 Objective 7 states the City evaluates and efficiently employ technological advancements to provide City services. Implementing a new Point of Sale system will bring more efficiency to accessing information to improve daily operations. The benefits include: -Improved customer tracking -Billing and receivables -Facility scheduling -Marketing tools, reporting, etc Useful Life 10 years Project Name POS System Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 28,30028,300Construction/Maintenance 28,30028,300Total TotalFunding Sources 20132014201520162017FuturePrior 28,30028,300Construction Fund 28,30028,300Total Friday, December 21, 2012Page 130 Capital Improvement Plan City of Edina, MN 20132017thru Description Add a ramp to access the track and exercise area. Currently, an individual who wants to use the track must go up a minimum of four stairs, limiting access for individuals using a walker, wheelchair, or have other physical limitations. Project #EP-13-002 Priority 5 Important Justification Currently, the track is not handicapped accessible. The ramp is needed to make the track and exercise area handicapped accessible to allow more people to utilize the track and exercise area. For Edinborough Park to increase the cost recovery percentage to 90-100% we will need to make updates to the facility to accommodate all user groups. Many people utilizing the track are individuals living in the Condos and in Park Plaza both with aging residents. By adding the ramp to access the track, we will provide an inclusive opportunity for all residents to utilize. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Ramp to Track Category Buildings Type New Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 41,00041,000Construction/Maintenance 41,000 41,000Total TotalFunding Sources 20132014201520162017FuturePrior 41,00041,000Construction Fund 41,000 41,000Total Friday, December 21, 2012Page 131 Capital Improvement Plan City of Edina, MN 20132017thru Description Renovate and expand both the men’s and women’s locker rooms. The locker rooms are original to the park and have always been significantly undersized for the needs of our customers. We would convert a storage area to create a new locker room. The result would be doubling the size of both locker rooms. Project #EP-13-003 Priority 1 Critical Justification The lockers rooms are original to the park. We continually receive feedback that the locker rooms are too small to accommodate our customers. The locker rooms can comfortably accommodate 8-10 people, with the dressing areas only able to accommodate 4 or 5. We have water exercise classes with over 18 participants. The Edina Swim Club has over twenty kids in some levels that will need the locker rooms. We have entered into an agreement with the Edina Swim Club to be the home of their club, hosting approximately 4 hours of practice time daily, a minimum of five days/week. Our goal is to increase the cost recovery percentage for Edinborough Park to 90-100%. To accomplish this goal it’s essential we increase usage of the facility thus requiring adequate facilities to accommodate our customers. Expanding the locker rooms would enable us to accomplish the following, resulting in increased revenue: -Update the look of the locker room facilities to appeal to the public -Improve the comfort of the locker rooms by improving air quality and water drainage -Accommodate larger groups - rentals, group reservations and/or birthday parties -Offer additional programming opportunities - water zumba, zumba, yoga, etc. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Provide Larger Locker Rooms Category Buildings Type Expansion Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 582,000582,000Construction/Maintenance 582,000582,000Total TotalFunding Sources 20132014201520162017FuturePrior 582,000582,000Edinborough Fund 582,000582,000Total Friday, December 21, 2012Page 132 Capital Improvement Plan City of Edina, MN 20132017thru Description Wash the interior and exterior windows in the park. There are several areas in the facility that we do not have access to with our current equipment. Several of the windows in the park have never been washed due to access issues. Project #EP-13-004 Priority 3 Significant Justification Edina parks and facilities are the essential components of the foundation of our city. The windows in certain areas have not been cleaned in twenty five years. There are several interior windows that we cannot reach with current equipment. This project would require special equipment and personnel which explains the high cost. In order to keep the aesthetic appeal of the facility it is recommended that the windows be cleaned. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 20 years Project Name Window Washing Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 26,30026,300Construction/Maintenance 26,30026,300Total TotalFunding Sources 20132014201520162017FuturePrior 26,30026,300Construction Fund 26,30026,300Total Friday, December 21, 2012Page 133 Capital Improvement Plan City of Edina, MN 20132017thru Description Make all necessary repairs to eliminate water leaks in the Park. This includes roof repairs and also window glazing replacement. The windows and glazing are original to the park. Project #EP-13-005 Priority 5 Important Justification Edinborough Park is twenty six years old. It is recommended to make the necessary improvements to the roof. With steady rain we have several areas throughout the park where water is leaking into the facility from the windows and/or roof. Over the years, we have seen an increase in the number of leaks causing more damage to the facility. The location of some of the leaks presents safety concerns for possible slipping when the public is in the park. Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Roof Repairs Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Edinborough Park Status Active TotalExpenditures20132014201520162017FuturePrior 110,400110,400Construction/Maintenance 110,400110,400Total TotalFunding Sources 20132014201520162017FuturePrior 110,400110,400Construction Fund 110,400110,400Total Friday, December 21, 2012Page 134 Capital Improvement Plan City of Edina, MN 20132017thru Description Expansion of Driving Range increasing depth and width. The benefits of expansion are increased capacity for peak times, improved turf quality, and eliminating safety concerns of customers being hit by golf balls while on the Executive Course and "teaching tee". The expansion would include talking the current second and third holes of the Executive Course as part the Driving Range. The two current Par 4’s would turn into four Par 3’s making the Executive Course (now Par 29) into a Par 3 Course (Par 27). Project #GC-12-005 Priority 7 Desirable Justification This was the top priority for CIP improvements by the National Golf Foundation consultant report. The National Golf Foundation (NGF) report also confirms justification: "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system". Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life Project Name Driving Range Expansion Category Parks Type Expansion Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 75,00075,000Planning/Design 925,000925,000Construction/Maintenance 75,000925,0001,000,000Total TotalFunding Sources 20132014201520162017FuturePrior 650,000650,000Construction Fund 350,00075,000275,000Grants & Donations - Braemar 75,000925,0001,000,000Total Friday, December 21, 2012Page 135 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace carpeting in Pro Shop and lower level. Useful life 10 years. Project #GC-12-006 Priority 7 Desirable Justification Replacement needed to keep facility up to acceptable standards for a premier facility. In strategic alignment with Edina’s mission statement to "offer premier public facilities" and Edina’s Vision 20/20 Section 2.2 Vision and Goals of A Sound Public Infrastructure "Edina streets, utilities, parks, and public buildings are the essential components of the foundation of our city". The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system". Useful Life 10 years Project Name Braemar: Carpeting Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Equip/Vehicles/Furnishings 25,00025,000Total TotalFunding Sources20132014201520162017FuturePrior 25,00025,000Construction Fund 25,00025,000Total Friday, December 21, 2012Page 136 Capital Improvement Plan City of Edina, MN 20132017thru Description Slit drainage for fairways will create better surface drainage effectively eliminating the need for cart paths in high traffic areas. This will also improve turf quality playability. The process creates small trenches that are filled with sand to improve drainage with minimal disruption. The effective life 10-15 years. Project #GC-12-007 Priority 7 Desirable Justification The National Golf Foundation’s consultant report recommended to improve the cart path system while improving turf quality/playability. The National Golf Foundation (NGF) report also confirms justification: "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system". Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 11-20 years Project Name Braemar: Slit Drainage 3 Fairways Category Parks Type Expansion Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 50,00050,000Construction/Maintenance 50,00050,000Total TotalFunding Sources20132014201520162017FuturePrior 50,00050,000Construction Fund 50,00050,000Total Friday, December 21, 2012Page 137 Capital Improvement Plan City of Edina, MN 20132017thru Description Replacement of Clubhouse and Pro Shop roof consisting of flat roof and cedar shake areas. The useful life is 20+ years. A number of repairs have been performed over the years, with areas of the roof still leaking. Areas of the roof are over 25 years old. This project would: -Avoid additional ongoing repair costs -Reduce exposure of potential water damage to building, equipment, and merchandise Project #GC-12-008 Priority 5 Important Justification Necessary to keep building up to acceptable standards. Useful Life 20 years Project Name Braemar: Clubhouse Roof Replacement Category Buildings Type Replace or repair Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 160,00080,00080,000Construction/Maintenance 80,00080,000160,000Total TotalFunding Sources 20132014201520162017FuturePrior 160,00080,00080,000Construction Fund 80,00080,000160,000Total Friday, December 21, 2012Page 138 Capital Improvement Plan City of Edina, MN 20132017thru Description Repair/replace existing asphalt and gravel/class 5 cart paths. Expand some asphalt cart paths in addition to gravel/class 5 paths which when combined with improved drainage in some fairway areas would effectively create a "wall to wall" cart path system which would allow cart usage after heavy rains without the ongoing repair/replacement costs of "wall to wall" asphalt paths. Project #GC-12-009 Priority 3 Significant Justification This was the second highest ranked CIP recommendation for Braemar Golf Courses by the National Golf Foundation’s consultant report. In strategic alignment with Edina’s mission statement to "offer premier public facilities" and Edina’s Vision 20/20 Section 2.2 Vision and Goals of a sound public infrastructure "Edina streets, utilities, parks, and public buildings are the essential components of the foundation of our city". The National Golf Foundation (NGF) report also confirms justification: "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system". Useful Life Project Name Cart Path Repair/Expansion Category Parks Type Expansion Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 200,00025,00025,00075,00075,000Construction/Maintenance 25,00025,00075,00075,000200,000Total TotalFunding Sources 20132014201520162017FuturePrior 200,00025,00025,00075,00075,000Construction Fund 25,00025,00075,00075,000200,000Total Friday, December 21, 2012Page 139 Capital Improvement Plan City of Edina, MN 20132017thru Description Replacement of maintenance equipment such as mowers, utility vehicles, and sand pros on an as-needed basis. The equipment has a useful life 10-15 years. Replacement of equipment as needed will increase help improve course conditions, reduce labor and repair costs, in addition to maintaining good trade-in values of used equipment. Project #GC-13-001 Priority 5 Important Justification Replacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system". Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 11-20 years Project Name Maintenance Equipment Replacement Category Equipment Type Replace or repair Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 615,000145,000155,000155,000160,000Equip/Vehicles/Furnishings 145,000155,000155,000160,000615,000Total TotalFunding Sources 20132014201520162017FuturePrior 615,000145,000155,000155,000160,000Construction Fund 145,000155,000155,000160,000615,000Total Friday, December 21, 2012Page 140 Capital Improvement Plan City of Edina, MN 20132017thru Description Renovating existing tee areas including improving soil quality, leveling, and utilizing heartier newer strains of turf. Some new tees areas will also be as needed. Many of the existing tees have become uneven and the soils have compacted over time. The effective life is 20 years. Project #GC-13-003 Priority 4 Justification The National Golf Foundation (NGF) report also confirms justification: "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system". Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 20 years Project Name Tee Renovation Category Parks Type Expansion Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 220,00050,00070,000100,000Construction/Maintenance 50,00070,000100,000220,000Total TotalFunding Sources 20132014201520162017FuturePrior 220,00050,00070,000100,000Construction Fund 50,00070,000100,000220,000Total Friday, December 21, 2012Page 141 Capital Improvement Plan City of Edina, MN 20132017thru Description Replacement of Irrigation system (installed in 1980). This is the first of three planned phases. The useful life is 30+ years. A new system will reduce ongoing repair and labor costs, improve course conditions, and be more efficient and environmentally friendly. Project #GC-13-004 Priority 5 Important Justification This was a recommendation for Braemar Golf Courses by the National Golf Foundation’s consultant report. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system". Vision 20/20, Objective 2 states: "Provide a level of City services that sets Edina apart from other communities" and Objective 3 states: "Provide capital investments that balance need and affordability" and the Comprehensive Plan discusses maintaining Park infrastructure. These projects repurpose aging infrastructure and allow us to provide a level of service that sets Edina apart from other communities. Useful Life 30 years Project Name Irrigation System Replacement Phase 1 Category Parks Type Replace or repair Contact Park & Recreation Department Parks - Golf Course Status Active TotalExpenditures20132014201520162017FuturePrior 1,500,0001,500,000Construction/Maintenance 1,500,0001,500,000Total TotalFunding Sources 20132014201520162017FuturePrior 1,500,0001,500,000Construction Fund 1,500,0001,500,000Total Friday, December 21, 2012Page 142 Capital Improvement Plan City of Edina, MN 20132017thru Description This enhancement to our software suite will enable our agency to utilize the internet to host a portal for citizens to retrieve, enter and print reports. This browser-based solution provides a convenient means for citizens to perform simple searches, download reports and complete applications online. Citizens can search accident reports, view the daily bulletin, view missing persons, view the agency’s event calendar, agency announcements and enter basic, non-emergency incident reports. Project #PS-11-005 Priority 3 Significant Justification P2C (Police To Citizen) enhances accessibility, engages citizens with the agency and provides citizens with convenient access to public information. Additionally, this module will simplify operations, increase efficiency and reduce workload. In 2011, officers spent 708 hours responding to and taking theft reports alone. The entry of even half of those reports by citizens using P2C will increase the time officers are on the street and available for higher priority events. Other reports suitable for P2C include abandoned vehicles, lost property, property damage and traffic complaints. Providing citizens with the means to search and print copies of reports will free records technicians for more critical and beneficial tasks. The acquisition of the P2C module aligns with Objective #7 of Edina Vision 20/20 and is also part of the Police Department’s Work Plan. Useful Life Project Name Police to Community Software Category Equipment Type New Contact Police Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 25,00025,000Equip/Vehicles/Furnishings 25,000 25,000Total TotalFunding Sources 20132014201520162017FuturePrior 25,00025,000Construction Fund 25,000 25,000Total Friday, December 21, 2012Page 143 Capital Improvement Plan City of Edina, MN 20132017thru Description The CryWolf software and interface automates the documentation, processing and billing of alarm calls. The two-way interface exports false alarm call information and billing data from our Computer Aided Dispatch system (CAD) when alarm calls are generated and dispatched. Additionally, the program builds and imports accurate and detailed premise information into CAD, enhancing officer and citizen safety. We currently use an outdated data-entry program (Access) requiring redundant documentation of alarm calls. With an average of over 2400 alarm calls annually, the CryWolf software interface will reduce the amount of time spent by officers, dispatchers and support staff on alarm tracking and billing. Additionally, this interface will improve billing accuracy, enabling us to maximize revenue in this area. Project #PS-12-007 Priority 3 Significant Justification This program would eliminate redundant data-entry for billing purposes. Integrated reports allow for easy tracking of outstanding invoices, repeat offenders and locations with multiple alarms on the same date. Additionally the program maps alarm patterns to determine problem areas. In the event the City adopts an alarm registration/permit program, CryWolf automatically tracks registered and unregistered locations, potentially saving hundreds of clerical hours. Using current technology to increase efficiency and maximize revenue is aligned with Objective #7 of Edina Vision 20/20. In addition, the acquisition of this interface is part of the Police Department Work Plan. Useful Life Project Name PD Alarm Billing Software Category Equipment Type New Contact Police Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 50,00050,000Equip/Vehicles/Furnishings 50,000 50,000Total TotalFunding Sources 20132014201520162017FuturePrior 50,00050,000Construction Fund 50,000 50,000Total Friday, December 21, 2012Page 144 Capital Improvement Plan City of Edina, MN 20132017thru Description License Plate Recognition (LPR) is an image-processing technology used to identify vehicles by their license plates. This technology is used in various security and traffic applications. It is available to "add on" to our current "in-car" video system. The camera finds and initiates license plate checks without the officer taking their eyes of the road and hands off the steering wheel. The LPR’s significant advantage is that the system can keep an image record of the vehicle which is useful in order to fight crime and fraud. This is innovative technology that would assist the police department in locating stolen vehicles; vehicles wanted in other crimes; persons with warrants; and non-valid drivers. It is like having a second officer in the car to complete the computer work needed to "run" license plates in the computer. My recommendation is we purchase two mobile units. The average life expectancy of a LPR is five years. Project #PS-12-008 Priority 5 Important Justification The reason why the police department would like to purchase several LPR units is because it follows Edina’s 20/20 Vision plan. The 20/20 Vision plan talks about innovation and providing technological resources that improve the quality of life for the residences. LPR will provide innovative technology to reduce crime and apprehend violators. Objective #2 in the 20/20 Vision states, "Provide a level of City services that sets Edina apart from other communities." Currently very few of our surrounding cities have implemented LPR technology. With integrating LPR technology into Edina’s patrol fleet, it will set us apart as a premiere police organization. Useful Life Project Name PD License Plate Reader Category Equipment Type New Contact Police Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 40,00040,000Equip/Vehicles/Furnishings 40,000 40,000Total TotalFunding Sources 20132014201520162017FuturePrior 40,00040,000Construction Fund 40,000 40,000Total Friday, December 21, 2012Page 145 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Fire department's equipment list includes passenger vehicles, fire trucks, ambulances and rescue equipment, among other items. We estimate the useful life of this equipment to be around 6 years for an ambulance up to about 20 years for a fire truck. The Fire department also maintains a network of warning sirens located around the city. Project #PS-13-001 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Fire Department Equipment Replacement Category Equipment Type Replace or repair Contact Fire Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 1,162,000475,000154,000273,000165,00095,000Equip/Vehicles/Furnishings 475,000154,000273,000165,00095,0001,162,000Total TotalFunding Sources 20132014201520162017FuturePrior 1,162,000475,000154,000273,000260,000Equipment Replacement Progra 475,000154,000273,000260,0001,162,000Total Friday, December 21, 2012Page 146 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Police department has squad cars, dispatch and communications equipment, and software included on their equipment replacement list. The useful lives of these items ranges from 3 years for a squad car up to 10 or even 15 years for some of the dispatch and communications equipment. Project #PS-13-002 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Police Department Equipment Replacement Category Equipment Type Replace or repair Contact Police Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 1,658,946251,916923,345448,92524,76010,000Equip/Vehicles/Furnishings 251,916923,345448,92524,76010,0001,658,946Total TotalFunding Sources 20132014201520162017FuturePrior 1,658,946251,916923,345448,92524,76010,000Equipment Replacement Progra 251,916923,345448,92524,76010,0001,658,946Total Friday, December 21, 2012Page 147 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Inspections division has several passenger vehicles used to get Inspectors to various work sites around the City. These vehicles have an estimated useful life of 10 years. Project #PS-13-003 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Inspections Division Equipment Replacement Category Equipment Type Replace or repair Contact Fire Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 93,00015,00018,00060,000Equip/Vehicles/Furnishings 15,00018,00060,00093,000Total TotalFunding Sources 20132014201520162017FuturePrior 93,00015,00018,00060,000Equipment Replacement Progra 15,00018,00060,00093,000Total Friday, December 21, 2012Page 148 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Health division has one passenger vehicle with a useful life of about 10 years. Project #PS-13-004 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Health Division Equipment Replacement Category Equipment Type Replace or repair Contact Police Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 16,50016,500Equip/Vehicles/Furnishings 16,50016,500Total TotalFunding Sources 20132014201520162017FuturePrior 16,50016,500Equipment Replacement Progra 16,50016,500Total Friday, December 21, 2012Page 149 Capital Improvement Plan City of Edina, MN 20132017thru Description This request is for Plan Review software for the Building Inspections division. The software is requested by our customers and would improve communications with the customer and reduce the time to approve designs and architectural plans. Currently all plan review is done with very large paper plans. The proposed software would allow for immediate transmissions of questions and results with the customer. The building and fire department personnel that need to work on approving the plans would be notified automatically with the process. Applicants are notified when re-submission is required and the process repeats itself until final approval. Inspectors can also access projects and drawings from any location to make notes for updates to approved plans. Upon completion, plans can be archived electronically. The cost is an estimate. Project #PS-13-005 Priority 3 Significant Justification The purpose of the proposed software is to meet the demands of the customer, improve our plan review accuracy, reduce the length of delay in plan review, and improve approval of changes that occur during the building process. The software would improve the efficiency and reduce the cost of the staff in the building inspections and fire inspections division, which will save taxpayers time and money, dramatically reduce paper consumption, and provide a more transparent and efficient permitting process. Useful Life Project Name FD Plan Review Software Category Equipment Type New Contact Fire Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 250,000250,000Equip/Vehicles/Furnishings 250,000250,000Total TotalFunding Sources 20132014201520162017FuturePrior 250,000250,000Construction Fund 250,000250,000Total Friday, December 21, 2012Page 150 Capital Improvement Plan City of Edina, MN 20132017thru Description Cityworks is a data management software program which empowers GIS to manage both physical infrastructure and land-focused asset management. Cityworks is currently utilized by Engineering and Public Works to manage physical infrastructure assets in Edina. Land focused management will be used by other city departments providing services in conjunction with properties and businesses regarding planning/maintenance/enforcement responsibilities. These responsibilities may include permits, licenses, planning activities and code enforcement cases. The software management system provides a central location for these activities, requests and functions to help city departments coordinate by property address. Service requests, work orders, inspections and projects are used to track citizen concerns and all types of work activities with their associated costs. Combining land-focused asset management with infrastructure asset management enables our organization to complete our asset management system. Building, Health and Planning will be key system users with Fire, Assessing, Licensing, Finance and Administration being secondary. In addition to the original purchase/installation cost, an annual user's fee is required and is estimated to be $11,000 per year. Project #PS-13-006 Priority 3 Significant Justification Expanding our Cityworks Software Program to incorporate the Code Enforcement component provides a comprehensive software management system for our organization by adding land-focused asset management to existing infrastructure asset management. The software system will address needs of various departments to coordinate information tracking and quality customer service response. Useful Life Project Name CityWorks Code Enforcement Software Category Equipment Type New Contact Police Department Department Public Safety Functions Status Active TotalExpenditures20132014201520162017FuturePrior 50,00050,000Planning/Design 50,000 50,000Total TotalFunding Sources 20132014201520162017FuturePrior 50,00050,000Construction Fund 50,000 50,000Total Friday, December 21, 2012Page 151 Capital Improvement Plan City of Edina, MN 20132017thru Description Complete construction of concrete floor at Braemar Public Works Cold Storage Building. This improvement has a 50 year life and will eliminate the need to continuously wash equipment that gets dusty from the dirt floor that exists in this facility. Project #PW-02-006 Priority 7 Desirable Justification The Braemar Public Works Cold Storage Building was constructed in 1998-99 to store off season equipment for both Public Works and Park Maintenance. Public Works Staff has placed concrete on the center drive aisle to reduce dust throughout the building. The remaining storage areas are in need of a hard surface floor. This is a project that was projected to be completed in 2012 but was delayed due to the discussion about the possibility of Sports Dome being located on this site. Useful Life Unassigned Project Name Public Works: Braemar Cold Storage: Improvements Category Buildings Type New Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 90,00050,000Construction/Maintenance 40,000 50,00090,000Total40,000 TotalFunding Sources 20132014201520162017FuturePrior 90,00050,000Construction Fund 40,000 50,00090,000Total40,000 Friday, December 21, 2012Page 152 Capital Improvement Plan City of Edina, MN 20132017thru Description There is no fire protection for the Braemar Public Works Cold Storage Building. This improvement has a 50 year life and will help protect the safety of the equipment and manpower that operate out of this facility. Project #PW-08-004 Priority 3 Significant Justification The Braemar Public Works Cold Storage Building was constructed in 1998-99 to store off season equipment for both Public Works and Park Maintenance. The building is 17,000 SF and is not fire protected. This project would provide fire suppression to the existing building. This is a project that was projected to be completed in 2012 but was delayed due to the discussion about the possibility of Sports Dome being located on this site. Useful Life Project Name Braemar Cold Storage - Fire Suppression Category Buildings Type New Contact Public Works Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 70,00070,000Construction/Maintenance 70,000 70,000Total TotalFunding Sources 20132014201520162017FuturePrior 70,00070,000Construction Fund 70,000 70,000Total Friday, December 21, 2012Page 153 Capital Improvement Plan City of Edina, MN 20132017thru Description The intent of this project is to provide electrical locations for all of the electrical services for over 63 municipal facilities and City owned facilities. Project #PW-11-006 Priority 7 Desirable Justification As a developed community, the city’s infrastructure generally including roads, utilities, and public buildings and electrical equipment is aging and is in need of ongoing maintenance and replacement. Maintaining and replacing infrastructure represents a formidable challenge in the years ahead because of the potential magnitude and cost of probable improvements. Knowing an exact location of these facilities will increase the efficiency of the Public Works Department and will increase the protection of the life safety and welfare of the general public by allowing us to locate these services more accurately. Useful Life Project Name GPS Electrical System Category Equipment Type New Contact Public Works Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 30,00030,000Construction/Maintenance 30,00030,000Total TotalFunding Sources20132014201520162017FuturePrior 30,00030,000Construction Fund 30,00030,000Total Friday, December 21, 2012Page 154 Capital Improvement Plan City of Edina, MN 20132017thru Description The intent of this project is to provide a change out of lighting in the industrial park near the Public Works facility. These poles have deteriorated at rapid pace and need to be replaced. Normal lighting changes can be accomplished during a reconstruction project and normally are assessed back to the adjacent property owners. Due to the irregularity of lot sizes, it is the intent of this project to changout the lighting fixtures and poles with new poles and change the terms of the Contract with Excel to install meters and reduce lighting costs and increase responsiveness of lighting repairs for this area. There are 64 lights and this simply cannot be performed under the current budget. Project #PW-13-001 Priority 3 Significant Justification As a developed community, the city’s infrastructure generally including roads, utilities, and public buildings and electrical equipment is aging and is in need of ongoing maintenance and replacement. Maintaining and replacing infrastructure represents a formidable challenge in the years ahead because of the potential magnitude and cost of probable improvements. This system is over 30 years old and there isn’t a road reconstruction project in this area for years to come. The pole bases are rusted and badly in need of replacement. The total cost of these improvements is estimated at $416,000 including pole replacement, underground wire replacement, and potentially adding LED light fixtures. We determined that it was most fiscally responsible to complete this project over a four 4 year period. As part of Edina’s Vision 20/20, one of the goals is to maintain a sound public infrastructure because it encourages the development of a stable private infrastructure, leading to an enhancement of the sense of quality that Edina has and will enjoy. This project meets that goal. Useful Life Project Name Industrial Park Lighting Category Infrastructure Type Replace or repair Contact Public Works Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 416,000104,000104,000104,000104,000Equip/Vehicles/Furnishings 104,000104,000104,000104,000416,000Total TotalFunding Sources 20132014201520162017FuturePrior 416,000104,000104,000104,000104,000Construction Fund 104,000104,000104,000104,000416,000Total Friday, December 21, 2012Page 155 Capital Improvement Plan City of Edina, MN 20132017thru Description The intent of this funding is to provide additional revenue for bridge rehab and repairs other then the funds currently available in the general fund under bridge repairs (program 1343) There is $10,800 in the budget for 2013. Project #PW-13-002 Priority 1 Critical Justification The city receives an annual bridge report from our certified consultant on 26 bridges in town.This report indicates the need for a more aggressive preventative maintenance program to extend the useful life of these structures. Although most of these bridges are on State Aid Routes. State aid funding is generally used for total reconstruction. This funding also replaces a past project to paint the Centennnial Lake bridge railings that was estimated at $70,000 in 2015. Due to lack of this painting, these railings now need replacement as they are badly rusted and in need of repair. Maintaining a sound infrastructure is a stated goal of Vision 20/20 and a sound bridge infrastructure is critical to the safety and quality of life of its residents. Useful Life Project Name Bridge Repairs Category Infrastructure Type Replace or repair Contact Public Works Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 570,000100,000170,000100,000100,000100,000Construction/Maintenance 100,000170,000100,000100,000100,000570,000Total TotalFunding Sources 20132014201520162017FuturePrior 570,000100,000170,000100,000100,000100,000Construction Fund 100,000170,000100,000100,000100,000570,000Total Friday, December 21, 2012Page 156 Capital Improvement Plan City of Edina, MN 20132017thru Description The intent of these funds is to extend the life of three city owned parking ramps by leveraging private investment and providing a City funding source to jumpstart each of the ramp retrofits. These funds will be used for larger rehab and maintenance projects. ie: major joint repair, deck coating, stairwell repairs or replacement, door replacement, camera system etc. and capitalize on the major reconditioning and/or expansion of these facilities in the upcoming years. The cost of these repairs may be billed back to the 50th & France Association if it is the City Council desire but is designed to leverage private investment for larger renovations. Project #PW-13-003 Priority 3 Significant Justification As part of the 50th & France Business Area there are three parking ramps located in the downtown area. Maintaining sound public infrastructure is essential to offering premium public facilities. It is highly recommended by our consultants to set up a regular scheduled maintenance program. This program will address the ongoing Deterioration and extend the life of these structures. One of the first accomplishments that is mentioned in the original Vision 20/20 is establishing and upgrading the 50th and France commercial neighborhood starting in the 1930s. It also mentions that a sound public infrastructure encourages the development of a stable private infrastructure, leading to an enhancement of the sense of quality that Edina has and will enjoy. Useful Life Project Name Parking Ramp Repairs Category Infrastructure Type Replace or repair Contact Public Works Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,00030,00030,00030,00030,000Construction/Maintenance 30,00030,00030,00030,000120,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,00030,00030,00030,00030,000Construction Fund 30,00030,00030,00030,000120,000Total Friday, December 21, 2012Page 157 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace equipment according to the equipment replacement schedule. The Public Works department has over $6 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. Project #PW-13-004 Priority n/a Justification Regular updates to equipment helps to keep maintenance costs low. Useful Life Project Name Public Works Equipment Replacement Category Equipment Type Replace or repair Contact Public Works Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 2,444,326390,254511,395314,842664,420563,415Equip/Vehicles/Furnishings 390,254511,395314,842664,420563,4152,444,326Total TotalFunding Sources 20132014201520162017FuturePrior 2,444,326390,254511,395314,842664,420563,415Equipment Replacement Progra 390,254511,395314,842664,420563,4152,444,326Total Friday, December 21, 2012Page 158 Capital Improvement Plan City of Edina, MN 20132017thru Description This project includes normal replacement of vehicles that are part of the utilities division fleet. Project #PW-13-005 Priority 3 Significant Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. We cannot perform the functions of a Public Works Department without a reliable fleet. Vehicles are replaced on a minimum of a 10 year schedule and vehicles have reached their life expectancy. This includes a fleet vehicles, (trucks), tandem in 2013, a street sweeper in 2014, replacement jetter truck in 2015 and backhoe replacement in 2016. Useful Life Project Name Utilities Equipment Replacement Category Equipment Type Replace or repair Contact Public Works Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 1,312,000260,000237,000465,000270,00080,000Equip/Vehicles/Furnishings 260,000237,000465,000270,00080,0001,312,000Total TotalFunding Sources 20132014201520162017FuturePrior 717,000133,000440,000104,00040,000Utility Fund - Sewer 323,00063,000197,00063,000Utility Fund - Storm 272,00064,00040,00025,000103,00040,000Utility Fund - Water 260,000237,000465,000270,00080,0001,312,000Total Friday, December 21, 2012Page 159 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 13 by repairing or replacing the well pump, motor, and other worn equipment. Project #PW-13-006 Priority 5 Important Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its municipal water wells. This fits into that work plan as it was last rehabilitated in 2009. This is a well that runs year round. Useful Life 6 years Project Name Well #13 Rehab Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,000120,000Equip/Vehicles/Furnishings 120,000120,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,000120,000Utility Fund - Water 120,000120,000Total Friday, December 21, 2012Page 160 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 17 by repairing or replacing the well pump, motor, and other worn equipment. Project #PW-13-007 Priority 5 Important Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its municipal water wells. This fits into that work plan as it was last rehabilitated in 2007. This is a well that runs year round and is past due for rehabilitation. Useful Life 6 years Project Name Well #17 Rehab Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,000120,000Equip/Vehicles/Furnishings 120,000120,000Total TotalFunding Sources20132014201520162017FuturePrior 120,000120,000Utility Fund - Water 120,000120,000Total Friday, December 21, 2012Page 161 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 6 by repairing or replacing the well pump, motor, and other worn equipment. Project #PW-13-008 Priority 5 Important Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its municipal water wells. This fits into that work plan as it was last rehabilitated in 2007. This is a well that runs year round. Useful Life 6 years Project Name Well #6 Rehab Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,000120,000Equip/Vehicles/Furnishings 120,000120,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,000120,000Utility Fund - Water 120,000120,000Total Friday, December 21, 2012Page 162 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 5 by repairing or replacing the well pump, motor, and other worn equipment. It also includes converting the existing well pump to a submersible pump and removal of the building that is in the median of West 69th Street after it is hooked up to the new water treatment facility. The timing of this work has been pushed back so that it coincides with new water treatment facility in the Southdale area. Project #UT-08-009 Priority 4 Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. This fits into that work plan as it was last rehabilitated in 2002. Useful Life 15 years Project Name Well #5 (West 69th Street) Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,000120,000Construction/Maintenance 120,000120,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,000120,000Utility Fund - Water 120,000120,000Total Friday, December 21, 2012Page 163 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 2 by repairing or replacing the well pump, motor, and other worn equipment. It also includes removal of sand from the well hole as this is a well that now pumps into the new water treatment facility. Project #UT-09-010 Priority 1 Critical Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its municipal water wells. This fits into that work plan as it was last rehabilitated in 2006. This is a well that runs year round. Useful Life 6 years Project Name Well # 2 Rehab Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,000120,000Construction/Maintenance 120,000 120,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,000120,000Utility Fund - Water 120,000 120,000Total Friday, December 21, 2012Page 164 Capital Improvement Plan City of Edina, MN 20132017thru Description This project is a continuation of the project that was initiated in 2012 and under contract with Ferguson Water Works. It includes replacing all of our existing water meters with new radio read meters. Project #UT-10-006 Priority 1 Critical Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. As mentioned above, this is a project that is currently under Contract. Useful Life 20 years Project Name Water Meter Replacement Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 3,700,0002,100,000Equip/Vehicles/Furnishings 1,600,000 2,100,000 3,700,000Total1,600,000 TotalFunding Sources 20132014201520162017FuturePrior 3,700,0002,100,000Utility Fund - Water 1,600,000 2,100,000 3,700,000Total1,600,000 Friday, December 21, 2012Page 165 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 9 by repairing or replacing the well pump, motor, and other worn equipment. It also includes building modifications as this is a well that now pumps into the new water treatment facility. Project #UT-10-008 Priority 1 Critical Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its municipal water wells. This fits into that work plan as it was last rehabilitated in 2006. This is a well that runs year round. Useful Life 15 years Project Name Well #9 Rehab Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 200,000200,000Construction/Maintenance 200,000 200,000Total TotalFunding Sources 20132014201520162017FuturePrior 200,000200,000Utility Fund - Water 200,000 200,000Total Friday, December 21, 2012Page 166 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 11 by repairing the well pump, motor, and other worn equipment. Project #UT-10-009 Priority 3 Significant Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its municipal water wells. This fits into that work plan as it was last rehabilitated in 2007. Useful Life 6 years Project Name Well # 11 Rehab Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,000120,000Equip/Vehicles/Furnishings 120,000120,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,000120,000Utility Fund - Water 120,000120,000Total Friday, December 21, 2012Page 167 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the rehabilitation of Well # 10 by repairing the well pump, motor, and other worn equipment. Project #UT-11-006 Priority 4 Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 year rehabilitation schedule for each of its municipal water wells. This fits into that work plan as it was last rehabilitated in 2008. Useful Life 6 years Project Name Well #10 Rehab Project Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 120,000120,000Construction/Maintenance 120,000120,000Total TotalFunding Sources 20132014201520162017FuturePrior 120,000120,000Utility Fund - Water 120,000120,000Total Friday, December 21, 2012Page 168 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the upgrade of the Melody Lake Lift Station by providing new electrical equipment, new pumps, etc. Project #UT-11-007 Priority 1 Critical Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services. This lift station is located in the Southeast Minnehaha Creek drainage area as referenced in the Comprehensive Water Resources Management Plan. It regulates the elevation of the water level and provides flood protection in Melody Lake and has become unreliable due to its age and condition. It simply needs to be replaced. Useful Life 30 years Project Name Storm Water Lift Station #3 Rehab Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 200,000200,000Construction/Maintenance 200,000200,000Total TotalFunding Sources 20132014201520162017FuturePrior 200,000200,000Utility Fund - Storm 200,000200,000Total Friday, December 21, 2012Page 169 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the purchase of a sewer camera to mount directly on the sewer jetter truck to give the Utility employees the ability to televise the larger sewer mains and storm sewers within the City of Edina. Project #UT-11-008 Priority 3 Significant Justification As outlined in Vision 20/20, it is the mission of the City Council to provide effective and valued City services and maintain a sound public infrastructure. With our current equipment, it is nearly impossible to televise our larger sewer mains and storm sewer system. Televising our system provides an important mechanism to proactively diagnose and correct deficiencies in our infrastructure. Useful Life 15 years Project Name Sewer Camera and Cable Reel Category Equipment Type New Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 40,00040,000Equip/Vehicles/Furnishings 40,000 40,000Total TotalFunding Sources 20132014201520162017FuturePrior 20,00020,000Utility Fund - Sewer 20,00020,000Utility Fund - Storm 40,000 40,000Total Friday, December 21, 2012Page 170 Capital Improvement Plan City of Edina, MN 20132017thru Description This project would include the replacement of the siding, roof, soffits and fascia on the entire building. This wellhouse is located within a residential district and needs maintenance to blend into the adjacent land use. Project #UT-12-006 Priority 4 Justification As outlined in Vision 20/20, it is the goal of the City Council to provide balance of land uses. In order to be a model of urban development, it is the intent of this project to blend into the surrounding land use and provide a more manicured look to this important piece of infrastructure. Useful Life Project Name Well No. 8 Category Infrastructure Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 35,00035,000Construction/Maintenance 35,000 35,000Total TotalFunding Sources 20132014201520162017FuturePrior 35,00035,000Utility Fund - Water 35,000 35,000Total Friday, December 21, 2012Page 171 Capital Improvement Plan City of Edina, MN 20132017thru Description Replace all radios on the Gleason Water Tower leg of the SCADA system. Project #UT-12-007 Priority 4 Justification The Supervisory Control And Data Acquisition is the communication system for our water and sewer systems. It allows the system to alert our employees when there is a problem and creates the backbone of a sound public infrastructure. The SCADA system allows Public Works Staff to provide effective and valued public service to our residents as outlined in the City of Edina’s mission statement. These older radios are outdated, nor repairable and highly unreliable and need to be replaced. Useful Life 30 years Project Name SCADA Radio System Upgrade Category Equipment Type Replace or repair Contact Public Works Coordinator Department Public Works Status Active TotalExpenditures20132014201520162017FuturePrior 60,00060,000Equip/Vehicles/Furnishings 60,000 60,000Total TotalFunding Sources 20132014201520162017FuturePrior 20,00020,000Utility Fund - Sewer 20,00020,000Utility Fund - Storm 20,00020,000Utility Fund - Water 60,000 60,000Total Friday, December 21, 2012Page 172