Loading...
HomeMy WebLinkAbout2024-08-20 Work Session Meeting Packet Meeting location: Edina City Hall Community Room 4801 W. 50th St. Edina, MN City Council Work Session Meeting Agenda Tuesday, August 20, 2024 Accessibility Support: The City of Edina wants all residents to be comfortable being part of the public process. If you need assistance in the way of hearing amplification, an interpreter, large-print documents or something else, please call 952-927-8861 at least 72 hours in advance of the meeting. 1. Call to Order 2. Roll Call 3. Meeting Topics 3.1. 2025-2030 CIP and 2025 Budget 4. Adjournment Page 1 of 299 d ITEM REPORT Date: August 20, 2024 Item Activity: Discussion Meeting: City Council Agenda Number: 3.1 Prepared By: Pa Thao, Finance Director Item Type: Other Department: Finance Item Title: 2025-2030 CIP and 2025 Budget Action Requested: Discussion only. Information/Background: Staff will present information regarding 2025-2030 CIP and 2025 budget for the Council to consider and to provide input. The 2025 budget is based off the approved 2024-2025 biennial budget. Staff will review the current capital status of our facilities and infrastructure focusing on projects requiring levy support. Staff has put together a financial management plan and some projections shown in the attached presentation. The projections are based off multiple financial assumptions and decisions the City Council would need to make regarding a variety of projects and are subject to change. For the 2025 fiscal year, the most important decisions would be regarding the Aquatic center and Art center. Bonding would need to take place in 2025 and the bond payments would be scheduled to begin in 2026. No action is required at this meeting. Based on input received, staff will prepare the preliminary levy information for the Council to set the preliminary (maximum) property tax levies on September 17th. The final levies are set for December 3rd (tentatively) and can be equal to or lower than the preliminary levies. Resources/Financial Impacts: Relationship to City Policies: Supporting Documentation: 1. 2025-2030 CIP and Budget 8-20-24 Council Work Session Presentation 2. 2025-2030 CIP Project Detail Pages 3. 2025-2030 Projects by Funding Source Page 2 of 299 EdinaMN.gov 2025 Draft CIP, Budget and Preliminary Levy August 20, 2024 City Council Work Session Page 3 of 299 Agenda •Background •2025 Preliminary Budget and Levies •2025-2030 Preliminary Capital Improvement Plan Page 4 of 299 Timeline ActionEventDate Adopted 2024-2025 Budget and WorkplanCouncil MeetingDec 19, 2023 Council RetreatGoal SettingApril 29th Departments submit CIP requestsFinance DeadlineMay 10th Committee ReviewCIP PrioritizationJune 20th Committee + Council ToursCIP PrioritizationJune 25th Community EngagementCIP PrioritizationJune 21 –August 1st ELT review and prioritizationELT MeetingJuly 9 – 17 th City Manager ReviewFinalize Draft CIPJuly 18th Draft CIP presented to CouncilWork SessionAugust 20th Adopt preliminary 2025 levyCouncil MeetingSept. 17th Public hearing and adopt final CIP and 2025 levy Council MeetingDec. 3rd Publish detail CIP book to websiteFinance DeadlineJanuary 2025 Page 5 of 299 EdinaMN.gov Background Page 6 of 299 Page 7 of 299 Biennial Budget Process 2024 (Even Year) First year of 2024-2025 Budget Review/approve of 2025-2030 CIP 2025 (Odd Year) Second year of 2024-2025 Budget Approve 2026-2027 budget, including CIP levy Page 8 of 299 2025 Tax Levy 202520252024 ProposedOriginalAdopted *12/19/2023 $48,858,215 $48,535,573 $43,744,165 General Fund $5,377,639 $5,785,900 $3,471,700 Debt Service $4,910,000 $5,010,000 $4,470,000 Construction $1,762,000 $1,762,000 $1,481,000 Special Street $400,000 $400,000 $1,000,000 Special Park $259,300 $259,300 $251,700 HRA $61,567,154 $61,752,773 $54,418,565 Total Tax Levy 13.14%13.48%9.15%% Increase 5.46% of Increase for Public Safety Expansion (FS2 & PD/FF) Page 9 of 299 Priorities received from Council 1.Maintenance & Preservation 2.Accessibility & Inclusion 3.Flexibility for future use Page 10 of 299 Criteria Review Criteria 1: Project Justification & Urgency •Health, safety & regulatory compliance, asset functionality, expansion/level of service Criteria 2: Values Impact Equity: Celebrating the diversity of the community and proactively working together to eliminate systemic and institutional barriers. Health: Collaborative approach to improving people's health by including health considerations into decision-making across policy areas. Sustainability: Those who live and work in Edina can imagine and achieve a future where the earth and all who live on it thrive. Community Engagement: Foster an inclusive, informed and engaged community. Stewardship: Make wise investments that focus on the best long-term value for residents. Page 11 of 299 CIP Story Map Page 12 of 299 EdinaMN.gov 2025 – 2030 Capital Improvement Plan Page 13 of 299 History of CIP Levy $0 $327,000 $2,000,000 $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 CIP Levy Projected CIP Levy Page 14 of 299 On Demand Maintenance •2023 •$46.2M •2027 •$53.0M •FCI (Facility Condition Index) •.38--City Wide •.67--Edinborough •.37--Braemar Page 15 of 299 FS#2 Major Maintenance • Interior Finishes 5 year • FA & Sprinkler • AV & BAS Systems • Interior Finishes 10 Year • Water Heaters • HVAC Equipment • Interior Finishes 15Year • FA & Sprinkler • AV & BAS Systems • Interior Finishes • HVAC & Electrical Service Equipment • PV System Replacement 20 Year •$15,000 •$50,000 •$1,000,000 •$3,000,000 * 2024 dollars Page 16 of 299 0 50 100 150 200 250 300 350 400 450 $- $2 $4 $6 $8 $10 $12 $14 $16 $18 $20 <1964 1965-74 1975-84 1985-94 1995-04 2005-14 2015-24 3 11 4 6 18 10 2 Sq. Ft. (Thousands)Delayed Maintenance (Millions)Decade & Number of Buildings Maintenance Needs by Building Age Sum of Delayed Maintenance Sum of Sq. Ft. Page 17 of 299 Tools •Construction & Equipment Levy •Bonding & Equipment Certificates Page 18 of 299 Construction Fund CIP Levy: 2025 2026 Annual Deferred Retaining Wall Replacements 50,000$ 100,000$ Asset Preservation Funding 650,000 700,000 City Hall HVAC Equipment Replacement 500,000 City Wide ADA Facility Improvements Level 2 50,000 City Wide Card Reader & Fire Alarm Updates 100,000 CLP Maintenance Fiber 30,000 Grandview Parking Ramp ADA Access Route* 200,000 Increase Fiber Capacity to SLP 60,000 Lewis Park Shelter Building Replacement 900,000 Normandale Park Playground Equipment 200,000 Park Pathways and Parking Project Improvements 25,000 100,000 Parks Accessibility Improvements 25,000 100,000 Public Works Cold Storage Building Replacement 200,000 Public Works Space Reconfiguration 75,000 Yorktown Park Master Plan 40,000 Total 1,900,000$ 2,205,000$ Levy Total 1,900,000$ 2,205,000$ Variance Over/(Under)-$ -$ Page 19 of 299 Construction Fund CIP Levy: 2027 2028 Annual Deferred Retaining Wall Replacements 200,000$ -$ Arneson Acres Park Facility Improvements 700,000 Arneson Park Shelter Replacement 75,000 Asset Preservation Funding 700,000 700,000 Athletic Field Improvements 350,000 Centennial Lakes Entrance Fountain Repair 150,000 City Wide ADA Facility Improvements Level 2 100,000 Grandview Parking Ramp ADA Access Route to Gus Yng 2,000,000 Heights Park Playground Equipment 175,000 Normandale Park Shelter Building Replacement 40,000 Pamela Park Facility Maintenance 210,000 Park Pathways and Parking Project Improvements 100,000 100,000 Parks Accessibility Improvements 100,000 100,000 Public Works Access Gates 300,000 Public Works BAS & Lighting Upgrades 125,000 700,000 Utley Park Shelter Replacement 60,000 Total 2,995,000$ 3,990,000$ Levy Total 3,000,000$ 4,000,000$ Variance Over/(Under)5,000$ 10,000$ Page 20 of 299 Construction Fund CIP Levy: 2029 2030 Annual Deferred Retaining Wall Replacements 200,000$ 200,000$ Asset Preservation Funding 750,000 800,000 Athletic Field Improvements 350,000 350,000 Centennial Lakes Improvements 800,000 Centennial Lakes Park Public Wi-Fi 40,000 Chowen Park Playground Improvement 350,000 City Wide ADA Facility Improvements Level 2 50,000 100,000 City Wide ADA Facility Improvements Level 3&4 1,336,000 Countryside Playground Replacement 315,000 Fire Station #1 Living Quarters 500,000 Highlands Park Shelter Replacement 1,250,000 Normandale Park Shelter Building Replacement 1,000,000 Park Pathways and Parking Project Improvements 100,000 100,000 Parks Accessibility Improvements 100,000 100,000 Public Works Space Reconfiguration 775,000 Yorktown Park Master Plan 750,000 Total 5,016,000$ 5,300,000$ Levy Total 5,000,000$ 6,000,000$ Variance Over/(Under)(16,000)$ 700,000$ Page 21 of 299 Projection of CIP Levy $0 $327,000 $2,000,000 $1,900,000 $2,205,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $- $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 CIP Levy Projected CIP Levy Page 22 of 299 Bonding •2026 •Aquatic & Art Center $5.94 •Highway 100 Interchange (FS 3) $4M •2027 •Citywide Roof $2.7M •Public Works Cold Storage $2.3M •2028 •City Hall/PD Improvement – Phase 1 $6.3M •Edinborough $30M •2029 •Public Works Improvement $4.2M Subject to change: This slide presents a potential projects that require City Council direction. Page 23 of 299 Debt Service Discussion - 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 9,000,000 2023 2024 2025 2026 2027 2028 2029 2030 Gymnasium Fire Station Public Works Facility Sports Dome Community Health & Safety Center Aquatic & Art Center Citywide Roof Public Works Cold Storage Highway 100 Interchange (FS 3)City Hall/PD Improvement Phase 1 Edinborough Improvements *Subject to change: This slide presents a potential projection based on various financial assumptions and decisions that the City Council would need to make regarding a variety of projects. Page 24 of 299 Financial Management Plan (FMP) Projections 5.46% in 2025 and 6.73% in 2026 for Public Safety Expansion (FS2 & PD/FF) 2023 2024 2025 2026 2027 2028 2029 2030 Actual Budget Budget Projected Projected Projected Projected Projected GENERAL FUND LEVY 39,820,200$ 43,744,165$ 48,858,215$ 54,672,959$ 58,760,380$ 63,395,401$ 68,324,045$ 73,357,475$ EXISTING DEBT SERVICE LEVIES Debt Service Levies Total 3,230,000 3,471,700 5,377,639 6,987,064 7,455,451 7,779,287 7,469,096 7,013,025 CONSTRUCTION FUND LEVIES Capital Improvement Plan Levy 2,000,000 2,000,000 1,900,000 2,205,000 3,000,000 4,000,000 5,000,000 6,000,000 Equipment Levy 2,350,000 2,470,000 3,010,000 2,660,000 3,832,485 4,417,279 4,373,850 4,000,000 Street Special Levy 1,210,400 1,481,000 1,762,000 2,053,000 2,355,400 2,669,000 2,994,200 3,331,400 Special Park Improvement Levy 1,000,000 1,000,000 400,000 400,000 400,000 400,000 1,000,000 1,000,000 Construction Levies Total 6,560,400 6,951,000 7,072,000 7,318,000 9,587,885 11,486,279 13,368,050 14,331,400 HRA Fund Levies HRA Operating Levy 244,400 251,700 259,300 267,100 275,100 283,400 291,900 300,700 HRA Levies Total 244,400 251,700 259,300 267,100 275,100 283,400 291,900 300,700 TOTAL PROPERTY TAX LEVIED 49,855,000$ 54,418,565$ 61,567,154$ 69,245,123$ 76,078,815$ 82,944,366$ 89,453,090$ 95,002,600$ Increase from Prior Year 9.89% 9.15% 13.14% 12.47% 9.87% 9.02% 7.85% 6.20% *Community Health & Safety Center & PS 5.46% 6.73% *Subject to change: This slide presents a potential projection based on various financial assumptions and decisions that the City Council would need to make regarding a variety of projects. Page 25 of 299 Next Steps •Based on Council input, continue to refine CIP recommendation •Certify Preliminary Tax Levy on Sept. 17 •Refining of budget for adoption •Public Hearing for 2025 Budget & Tentative Adoption on Dec. 3 Page 26 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Sharon Allison 2025 2030thru Department Administration Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as furniture and election equiment, among other items. 2025: Furniture - Voter Registration 2026: Furniture - Administration 2027: Furniture - Planning & Assessing Furniture - General Project #ADM23200 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of furniture and election equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Useful LifeProject Name Administration Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$325,000 Total20252026202720282029Expenditures2030 325,00030,000 85,000 210,000Vehicles and Equipment 30,000 85,000 210,000 325,000Total Total20252026202720282029Funding Sources 2030 325,00030,000 85,000 210,000Construction Fund: Equipment Levy 30,000 85,000 210,000 325,000Total 1 Page 27 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description The Edina Promenade, a dedicated route for pedestrians and bicyclists on public right-of-way currently terminates at 70th Street. It is intended to be extended incrementally when individual properties are redeveloped. Ultimately, the North Extension will create a non-motorized route from 70th Street to Highway 62. It may be necessary to acquire public easements on some private properties to complete this project. ENVIRONMENTAL CONSIDERATIONS: The purpose of the Promenade and the North Extension is to provide a safe and convenient route for bicyclists and pedestrians. The route can be used for both recreational and commuting purposes as a healthier and cleaner alternative than driving. Project #15-225 Justification The Edina Promenade pathway originated in the 2007 Promenade Urban Design Plan. The North Extension supports Objective #2 (Transportation Options) in Vision Edina. This project will provide new alternatives to better connect the residential neighborhoods and employment center located north of 66th Street and north of Highway 62 to commercial businesses in the Greater Southdale area. Useful LifeProject Name HRA - Promenade Phase V Category Land Type Expand or enhance Budget Goal Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000500,000Construction 500,000 500,000Total Total20252026202720282029Funding Sources 2030 500,000500,000HRA Fund: Centennial Lakes TIF 500,000 500,000Total 2 Page 28 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Cary Teague 2025 2030thru Department Comm. Dev. and HRA Description Replacement of equipment according to the equipment replacement schedule. This includes essential departmental vehicles and other miscellanous equipment. 2030: 2010 Focus 2020 Chevrolet Bolt 2018 Toyota Prius II Project #DEV23100 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of department vehicles and other equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Development Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$97,000 Total20252026202720282029Expenditures2030 97,000Vehicles and Equipment 97,000 97,000Total97,000 Total20252026202720282029Funding Sources 2030 97,000Construction Fund: Equipment Levy 97,000 97,000Total97,000 3 Page 29 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Develop a brand for the district. Borders of the district would be 70th on the north, Cahill Road on the west, the City border on the south and Highway 100 on the east. Project #DEV25100 Justification Asset Functionality Community Engagement: Would involve businesses within the district. Useful LifeProject Name HRA Cahill Business District Branding Category Land Type New Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Construction 300,000 300,000Total Total20252026202720282029Funding Sources 2030 300,000300,000HRA Fund: Centennial Lakes TIF 300,000 300,000Total 4 Page 30 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Install entrance markers at key entrances to the City. Project #DEV25101 Justification Asset Functionality Useful LifeProject Name HRA City Entrance Markers Category Land Type Expand or enhance Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000100,000Construction 100,000 100,000Total Total20252026202720282029Funding Sources 2030 100,000100,000HRA Fund: Centennial Lakes TIF 100,000 100,000Total 5 Page 31 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Provide a safe pedestrian crossing either under or above France Avenue in the 7200 Block of France. Project #DEV25102 Justification Health, Safety & Regulatory Compliance Stewardship, Race & Equity: Provides a safe crossing across France Avenue. Community Engagement: Better together Useful LifeProject Name France Avenue Pedestrian/Bike Crossing Category Infrastructure Type New Budget Goal Total Project Cost:$12,000,000 Total20252026202720282029Expenditures2030 12,000,00012,000,000Construction 12,000,000 12,000,000Total Total20252026202720282029Funding Sources 2030 12,000,00012,000,000HRA Fund: 72nd and France TIF 12,000,000 12,000,000Total 6 Page 32 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Work with the business to develop branding along France Avenue. Project #DEV25103 Justification Justification - Asset Functionality Community Engagement - Work with businesses and property owners that will fund the project. Health in All Policies - Create a more walkable France Avenue. Stewardship - Creates a more walkable area in the future. Contributes to the economic viability in the area. Useful LifeProject Name France Avenue Branding/Lighting Category Infrastructure Type New Budget Goal Total Project Cost:$2,000,000 Total20252026202720282029Expenditures2030 2,000,0002,000,000Construction 2,000,000 2,000,000Total Total20252026202720282029Funding Sources 2030 2,000,0002,000,000Special Street Levy 2,000,000 2,000,000Total 7 Page 33 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Improvements and ongoing maintenance of landscaping areas in the Grandview District. Cost assessed to property owners. Project #DEV25110 Justification Asset Functionality Useful LifeProject Name HRA Grandview Maintenance District Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$545,000 Total20252026202720282029Expenditures2030 545,000300,000 40,000 45,000 50,000 55,000Construction 55,000 300,000 40,000 45,000 50,000 55,000 545,000Total55,000 Total20252026202720282029Funding Sources 2030 545,000300,000 40,000 45,000 50,000 55,000Special Street Levy 55,000 300,000 40,000 45,000 50,000 55,000 545,000Total55,000 8 Page 34 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as cameras, broadcasting equipment, and graphics systems, among other items. 2026: Tightrope Server 2028: Council Chamber Cameras - Sony HD PTZ Replacement Chambers Cameras - 2 Sony HD PTZ Project #COM23100 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of communications technology, broadcasting equipment and other miscellaneous equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Communications Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$110,000 Total20252026202720282029Expenditures2030 110,00070,000 40,000Vehicles and Equipment 70,000 40,000 110,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Construction Fund: Equipment Levy 70,00070,000Construction Fund: Cable PEG 70,000 40,000 110,000Total 9 Page 35 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of robotic cameras in the Council Chambers due to end of useful life. Project #COM25100 Justification Asset Functionality Sustainability - This replacement equipment is not anticipated to increase energy and resource usage over what we currently use. Community Engagement - This equipment is used for a lot of community engagement-related projects. The videos produced with the equipment support community engagement and help to inform people in and around Edina. Health in all policies - This equipment will not have a negative impact on health-related items, and could certainly be used to help promote health and wellness initiatives in the future. Race & Equity - This equipment is used to promote and support race & equity initiatives of the City. Stewardship - This replacement equipment will help the City continue to provide useful, high-quality video content that benefits all who live and work in Edina. Useful LifeProject Name Replacement of Council Chambers Cameras Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Construction Fund: Cable PEG 40,000 40,000Total 10 Page 36 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of Tightrope Cablecast server. This server send the Edina TV video content to Comcast cable. Project #COM25101 Justification Asset Functionality Sustainability - It is not anticipated that this replacement server will negatively impact energy efficiency or usage. Community Engagement - This equipment is used to produce and deliver community engagement-related content. Health in all policies - This equipment could be used used to produce and deliver health-related content. Race & Equity - This equipment is used to produce and deliver race & equity-related content. Stewardship - This equipment benefits all who live and work in Edina by delivering valuable information via the Edina TV cable channel. Useful LifeProject Name Cable TV Broadcast Server Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$70,000 Total20252026202720282029Expenditures2030 70,00070,000Vehicles and Equipment 70,000 70,000Total Total20252026202720282029Funding Sources 2030 70,00070,000Construction Fund: Cable PEG 70,000 70,000Total 11 Page 37 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Design and construction of a new video production studio space within a City facility. Project #COM25102 Justification Expansion and/or Level of Service Sustainable - This project would be designed and built in a way that promotes energy efficiency where possible. Community Engagement - This project would enhance community engagement efforts by providing a high-quality space to produce video content that will engage and educate community members about a variety of topics. Health in alll policies - This project could be used to create video content that promotes health-related initiatives. Race & Equity - This project could be used to create video content that promotes race & equity-related initiatives. Stewardship - This project would significantly streamline and improve the City's video production work, allowing for more content to be created, which would benefit those who live and work in Edina. Useful LifeProject Name Video Production Studio Space Category Equipment and Vehicles Type New Budget Goal Total Project Cost:$350,000 Total20252026202720282029Expenditures2030 350,000350,000Vehicles and Equipment 350,000 350,000Total Total20252026202720282029Funding Sources 2030 350,000350,000Construction Fund: Cable PEG 350,000 350,000Total 12 Page 38 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project includes the design of Southdale Water Plant. This plant will filter water from wells 5, 18, and potentially future well 21. ENVIRONMENTAL CONSIDERATIONS: Consideration is made in the design for overall operating costs from energy and chemicals. Stormwater features will provide aesthetics, treatment and recharge. Project #15-162 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name New Water Treatment Plant 5 - Southdale Category Infrastructure Type Horizon Budget Goal Total Project Cost:$18,000,000 Total20252026202720282029Expenditures2030 18,000,00018,000,000Construction 18,000,000 18,000,000Total Total20252026202720282029Funding Sources 2030 18,000,00018,000,000Utility Fund: Water 18,000,000 18,000,000Total 13 Page 39 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project continues to update and improve our current asset management system software and associated equipment to be more interactive with the public and mobile with City Staff. The current system contains map and condition assessment information on all infrastructure assets such as water, sanitary, storm, transportation, traffic and electrical systems. Software systems connect the EdinaToGo citizen request application with Cityworks asset management software and ESRI geographical information system software. Public works crews use tablets to assess and record infrastructure condition, create and fulfill service requests and work orders. ENVIRONMENTAL CONSIDERATIONS: Efficiency in management and operations allows more work with less trips and effort. Project #15-173 Justification Expansion and/or Level of Service The need is emphasized in the 2018 Edina Comprehensive Plan to "evaluate and employ technological advancements to provide city services" and to "provide a level of City services that sets Edina apart from other communities." Useful LifeProject Name Asset Management Software and Equipment Category Technology Type Replace or repair Budget Goal Total Project Cost:$140,000 Total20252026202720282029Expenditures2030 140,00035,000 35,000 35,000 35,000Software 35,000 35,000 35,000 35,000 140,000Total Total20252026202720282029Funding Sources 2030 60,00015,000 15,000 15,000 15,000Utility Fund: Storm 40,00010,000 10,000 10,000 10,000Utility Fund: Water 40,00010,000 10,000 10,000 10,000Utility Fund: Sewer 35,000 35,000 35,000 35,000 140,000Total 14 Page 40 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Engineering Description A gateway sign is often the first impression people have of a city, development, business park or other public place. A well planned and executed gateway sign is important because it gives an immediate sense of a brand and denotes a sense of pride and caring, and makes visitors feel welcome. One entrance sign was installed at the 66th and York Intersection. This project would develop a plan on locations to continue installing gateway signs. The City’s Branding Committee and the Communications Department recommend the placement of "Welcome to Edina" gateway signs. ENVIRONMENTAL CONSIDERATIONS: Gateway signs need to be lighted to continue communicating the brand 24-hours a day. Solar lights could be considered to reduce electrical load. Project #15-189 Justification Expansion and/or Level of Service One of the City Leadership Priorities in the 2012 Work Plan was "Improve Communications Tools." One of the objectives toward meeting that goal is to implement branding standards. One of the City Leadership Priorities in the 2014 Work Plan is "Development and renewal of commercial and residential areas is essential to the on- going health of the city." Gateway signs that better reflect the City's brand will contribute to the renewal of those places. Useful LifeProject Name Gateway Signs Category Infrastructure Type New Budget Goal Total Project Cost:$150,000 Total20252026202720282029Expenditures2030 150,00050,000 50,000 50,000Construction 50,000 50,000 50,000 150,000Total Total20252026202720282029Funding Sources 2030 150,00050,000 50,000 50,000HRA Fund: Centennial Lakes TIF 50,000 50,000 50,000 150,000Total 15 Page 41 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The scope of this project is to construct a roundabout on W 69th Street to allow vehicles to turn left into Southdale Center at its westerly entrance from 69th Street. Currently left turns at this location are prohibited. Other related intersection improvements, such as improved geometric design at the entrances to Southdale Center and The Galleria along with pedestrian and bicycle improvements, are also anticipated as part of this project. Project #17-011 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name 69th Street Roundabout Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$1,000,000 Total20252026202720282029Expenditures2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total20252026202720282029Funding Sources 2030 450,000450,000Construction Fund: MSA 450,000450,000HRA Fund: Centennial Lakes TIF 100,000100,000Utility Fund: Storm 1,000,000 1,000,000Total 16 Page 42 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description The project involves the installation of buffered bike lanes on Valley View Road between West 64th Street and West 66th Street. This facility was proposed in the 2018 Pedestrian and Bicycle Master Plan and the work will be coordinated with MnDOT ENVIROMENTAL CONISDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #17-018 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Valley View Rd Bicycle Facility Improvements Category Infrastructure Type New Budget Goal Total Project Cost:$350,000 Total20252026202720282029Expenditures2030 350,000Construction350,000 350,000Total350,000 Total20252026202720282029Funding Sources 2030 350,000HRA Fund: Centennial Lakes TIF 350,000 350,000Total350,000 17 Page 43 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of shared-use paths on the East Frontage Road of Highway 169 between Valley View Road and West 78th Street and on Braemar Boulevard between the East Frontage Road and Hilary Lane. These new paths will connect to existing facilities on Valley View Road and West 78th Street, a proposed facility on Hilary Lane, and will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONISDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #17-072 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Hwy 169 Frontage Rd/Braemar Blvd Shared-Use Paths Category Infrastructure Type New Budget Goal Total Project Cost:$658,420 Total20252026202720282029Expenditures2030 658,420Construction658,420 658,420Total658,420 Total20252026202720282029Funding Sources 2030 658,420PACS Fund: Utility Franchise Fees 658,420 658,420Total658,420 18 Page 44 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Wooddale Avenue Bridge over Minnehaha Creek is a Historic Bridge in need of rehabilitation. Specifically the wing walls and the bridge railings are deteriorating and need replacement. Because of the historic designation, the State Historic Preservation Office and HPC need to approve a plan of treatment. ENVIRONMENTAL CONSIDERATIONS: The plan of treatment will be reviewed with a sustainability lens. Project #19-301 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the structure, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Wooddale Ave Bridge Historic Rehab Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$2,500,000 Total20252026202720282029Expenditures2030 2,500,0002,100,000 400,000Construction 2,100,000 400,000 2,500,000Total Total20252026202720282029Funding Sources 2030 400,000400,000Construction Fund: MSA 400,000400,000Utility Fund: Storm 1,500,0001,500,000Construction Fund: Grants/Donations 200,000200,000PACS Fund: Utility Franchise Fees 2,100,000 400,000 2,500,000Total 19 Page 45 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Lee Valley Circle, Fleetwood Drive, Lanham Lane, Kemrich Drive, Tara Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-308 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls C Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$4,889,716 Total20252026202720282029Expenditures2030 4,889,7164,889,716Construction 4,889,716 4,889,716Total Total20252026202720282029Funding Sources 2030 1,091,2681,091,268Construction Fund: Special Assess 1,386,9361,386,936Utility Fund: Storm 854,576854,576Utility Fund: Water 573,550573,550Utility Fund: Sewer 983,386983,386Special Street Levy 4,889,716 4,889,716Total 20 Page 46 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Weston Circle and Village Drive(public only?)) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-309 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls D Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,488,175 Total20252026202720282029Expenditures2030 1,488,1751,488,175Construction 1,488,175 1,488,175Total Total20252026202720282029Funding Sources 2030 332,125332,125Construction Fund: Special Assess 422,111422,111Utility Fund: Storm 260,088260,088Utility Fund: Water 174,559174,559Utility Fund: Sewer 299,292299,292Special Street Levy 1,488,175 1,488,175Total 21 Page 47 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (2nd Street South, Belmore Lane, Van Buren Avenue, Harrison Avenue, Tyler Avenue, Tyler Court) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-310 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Presidents B Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$5,669,221 Total20252026202720282029Expenditures2030 5,669,2215,669,221Construction 5,669,221 5,669,221Total Total20252026202720282029Funding Sources 2030 1,129,5461,129,546Construction Fund: Special Assess 1,305,0781,305,078Utility Fund: Storm 1,413,4941,413,494Utility Fund: Water 998,443998,443Utility Fund: Sewer 822,660822,660Special Street Levy 5,669,221 5,669,221Total 22 Page 48 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West Trail, Samuel Road, Sioux Trail, Sally Lane and Iroquois Circle) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-314 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Indian Trails A Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$3,434,377 Total20252026202720282029Expenditures2030 3,434,3773,434,377Construction 3,434,377 3,434,377Total Total20252026202720282029Funding Sources 2030 671,785671,785Construction Fund: Special Assess 1,038,4751,038,475Utility Fund: Storm 584,530584,530Utility Fund: Water 392,308392,308Utility Fund: Sewer 747,279747,279Special Street Levy 3,434,377 3,434,377Total 23 Page 49 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of Olinger Boulevard between Vernon Avenue and Tracy Avenue. This sidewalk will connect to existing sidewalks on Vernon Avenue, Olinger Road, Sun Road, Colonial Way, and Tracy Avenue. This project was proposed in the 2014 Active Routes to School Plan and the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #19-334 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name Olinger Boulevard Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$883,500 Total20252026202720282029Expenditures2030 883,500418,800 464,700Construction 418,800 464,700 883,500Total Total20252026202720282029Funding Sources 2030 883,500418,800 464,700PACS Fund: Utility Franchise Fees 418,800 464,700 883,500Total 24 Page 50 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017). The project builds off CIP 15-147 that included two phases, one in 2017 and in 2020. The project area includes York Avenue north of the Promenade. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Project #19-335 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goal. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Sanitary Trunk Capacity Expansion York Segs 2-3 Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$3,800,000 Total20252026202720282029Expenditures2030 3,800,0003,800,000Construction 3,800,000 3,800,000Total Total20252026202720282029Funding Sources 2030 3,800,0003,800,000Utility Fund: Sewer 3,800,000 3,800,000Total 25 Page 51 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) The project builds off of CIP 15-147 that included two phases, one in 2017 and another planned for 2019. The project area includes York Avenue north of 66th, and 69th Street between Barrie Rd and York. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. COST CONSIDERATIONS: This project qualifies for potential TIF/HRA funding. If Southdale TIF generates additional revenue, in its closing years, funding could be directed to this project. Project #19-336 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Seg 4 & Fairview Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$4,700,000 Total20252026202720282029Expenditures2030 4,700,0004,700,000Construction 4,700,000 4,700,000Total Total20252026202720282029Funding Sources 2030 4,700,0004,700,000Utility Fund: Sewer 4,700,000 4,700,000Total 26 Page 52 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will use flow metering and groundwater data to target areas with high potential for groundwater infiltration and flood inflow for investigation and elimination of cross connections and leak points. Inflow of storm and ground water into the sanitary sewer system uses up system capacity, increases the risk of back flow, and wastes money and natural resources to convey and treat. A variety of methods such as in-home inspection, smoke testings, dye testing, and video will be used to identify and eliminate sources of inflow in the targeted area. Cost effective interventions will be designed and implemented in the following year. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. COST CONSIDERATIONS: Reduction of inflow and infiltration reduces metered flow which determines the City share of Met Council regional system expense. Project #19-340 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Sanitary Targeted Inflow Reduction Project Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$130,000 Total20252026202720282029Expenditures2030 130,000Construction130,000 130,000Total130,000 Total20252026202720282029Funding Sources 2030 130,000Utility Fund: Sewer 130,000 130,000Total130,000 27 Page 53 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This CIP item includes development of the Clean Water Strategy as well as subsequent implementation of clean water activities for Lake Cornelia. ENVIRONMENTAL CONSIDERATIONS: The strategy development is an investigation and planning effort which will result in a report. Implementation items will be defined through the strategy development and environmental considerations will be determined as further defined improvements are scheduled. Project #19-342 Justification The 2018 Comprehensive Water Resources Management Plan (CWRMP) sets out a framework for a detailed strategy to address clean water issues in the City. The CWRMP defines Lake Cornelia as focus geography for the Clean Water Strategy. Useful LifeProject Name Clean Wtr Strat & Lake Cornelia Clean Water Proj Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$750,000 Total20252026202720282029Expenditures2030 750,000750,000Planning and Design 750,000 750,000Total Total20252026202720282029Funding Sources 2030 750,000750,000Utility Fund: Storm 750,000 750,000Total 28 Page 54 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description A major update to the Comprehensive Water Resources Management Plan (CWRMP) is required to incorporate the Flood Risk Reduction Strategy (CIP item 19-341) and Clean Water Strategy (CIP item 19-342). The Flood Risk Reduction Strategy and corresponding major amendment are complete. This CIP item in 2024 would be for the Clean Water Strategy piece ENVIRONMENTAL CONSIDERATIONS: This would incorporate the aforementioned strategies into the existing CWRMP. Project #19-346 Justification The CWRMP lays out a framework for developing the Flood Risk Reduction Strategy and Clean Water Strategy. These would be considered major amendments to the plan. Useful LifeProject Name CWRMP Model Update Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$200,000 Total20252026202720282029Expenditures2030 200,000200,000Planning and Design 200,000 200,000Total Total20252026202720282029Funding Sources 2030 200,000200,000Utility Fund: Storm 200,000 200,000Total 29 Page 55 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description Since September 2014, it has been standard practice to assess water main pipe conditions in project areas of future street reconstruction. The non- invasive water main testing provides us with more data about the condition of our water main system similar to closed circuit televising does for sanitary sewer trunk pipes. This data, plus water main break data proves to be a powerful tool in determining where to spend our water main funds to get the greatest value to our water main system. Assessments typically occur two years in advance of a neighborhood reconstruction project and include approximately 20,000 linear feet of watermain per year. ENVIRONMENTAL CONSIDERATIONS: The watermain condition data allows us to only replace the pipes that need it with this infrastructure replacement cycle. By getting the most life out of the existing watermain pipes, we are reducing the need for new resources where they are not needed. This lowers our potential carbon footprint and uses only the necessary resources to provide the level of service required. Project #19-351 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Water Main Condition Assessment Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,120,000 Total20252026202720282029Expenditures2030 955,000150,000 160,000 160,000 165,000 160,000Planning and Design 160,000 150,000 160,000 160,000 165,000 160,000 955,000Total160,000 Future 165,000 Total Total20252026202720282029Funding Sources 2030 955,000150,000 160,000 160,000 165,000 160,000Utility Fund: Water 160,000 150,000 160,000 160,000 165,000 160,000 955,000Total160,000 Future 165,000 Total 30 Page 56 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a shared-use path on the east side of McCauley Trail between Indian Hills Road and Gleason Road. This facility will connect to existing pedestrian and bicycle infrastructure on Gleason Road and will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21004 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name McCauley Trail Shared-Use Path Phase 2 Category Infrastructure Type New Budget Goal Total Project Cost:$392,731 Total20252026202720282029Expenditures2030 392,731392,731Construction 392,731 392,731Total Total20252026202720282029Funding Sources 2030 392,731392,731PACS Fund: Utility Franchise Fees 392,731 392,731Total 31 Page 57 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will support Hennepin County's France Avenue at I-494 improvement project. This project includes the construction of new shared- use paths on both sides of France Avenue between Minnesota Drive and West 76th Street. These facilities will connect to existing sidewalks on France Avenue, Minnesota drive and West 76th Street. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21006 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name France Avenue Shared-Use Paths Category Infrastructure Type New Budget Goal Total Project Cost:$1,541,300 Total20252026202720282029Expenditures2030 1,541,300762,900 778,400Construction 762,900 778,400 1,541,300Total Total20252026202720282029Funding Sources 2030 1,541,300762,900 778,400PACS Fund: Utility Franchise Fees 762,900 778,400 1,541,300Total 32 Page 58 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of sidewalks on Lincoln Drive between Maloney Avenue and 7th Street, 7th Street between Lincoln Drive and Highway 169, and Malibu Drive between Lincoln Drive and Park Terrace. These sidewalks will connect to the existing sidewalk on Maloney Avenue and will provide residents in the Presidents and Parkwood Knolls neighborhoods with a safe walking connection to Van Valkenburg Park. These sidewalks were proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21007 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Lincoln Drive/7th Street/Malibu Drive Sidewalks Category Infrastructure Type New Budget Goal Total Project Cost:$419,600 Total20252026202720282029Expenditures2030 419,600419,600Construction 419,600 419,600Total Total20252026202720282029Funding Sources 2030 419,600419,600PACS Fund: Utility Franchise Fees 419,600 419,600Total 33 Page 59 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of Vernon Avenue between Blake Road and Highwood Drive. This sidewalk will connect to existing sidewalks on Blake Road and Vernon Avenue and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21009 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Vernon Avenue Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$131,600 Total20252026202720282029Expenditures2030 131,600131,600Construction 131,600 131,600Total Total20252026202720282029Funding Sources 2030 131,600131,600PACS Fund: Utility Franchise Fees 131,600 131,600Total 34 Page 60 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the west side of Gleason Road between McCauley Trail and Vernon Avenue. This sidewalk will connect to existing sidewalks on Vernon Avenue and Gleason Road, as well as the Nine Mile Creek Regional Trail. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21010 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Gleason Road Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$295,885 Total20252026202720282029Expenditures2030 295,885295,885Construction 295,885 295,885Total Total20252026202720282029Funding Sources 2030 295,885295,885PACS Fund: Utility Franchise Fees 295,885 295,885Total 35 Page 61 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involve the construction of a sidewalk on the east side of Metro Boulevard between West 70th Street and Edina Industrial Boulevard. This sidewalk will connect to existing sidewalks on West 70th Street, West 72nd Street, West 74th Street and Edina Industrial Boulevard, and will support transit riders along Metro Boulevard. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21011 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Metro Boulevard Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$444,329 Total20252026202720282029Expenditures2030 444,329444,329Construction 444,329 444,329Total Total20252026202720282029Funding Sources 2030 444,329444,329PACS Fund: Utility Franchise Fees 444,329 444,329Total 36 Page 62 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on West 60th Street between France Avenue and Xerxes Avenue. This sidewalk will connect to existing sidewalks on France Avenue, Beard Avenue and Xerxes Avenue and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21013 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name West 60th Street Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$710,500 Total20252026202720282029Expenditures2030 710,500Construction710,500 710,500Total710,500 Total20252026202720282029Funding Sources 2030 710,500PACS Fund: Utility Franchise Fees 710,500 710,500Total710,500 37 Page 63 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on the north side of West 77th Street between Normandale Road and Parklawn Avenue. This sidewalk will connect to the existing sidewalk on Parklawn Avenue and will support transit riders along West 77th Street. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21014 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name West 77th Street Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$483,100 Total20252026202720282029Expenditures2030 483,100483,100Construction 483,100 483,100Total Total20252026202720282029Funding Sources 2030 483,100483,100PACS Fund: Utility Franchise Fees 483,100 483,100Total 38 Page 64 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves construction of a shared-use path on Benton Avenue between Hansen Road and Normandale Road. This path will connect to existing sidewalks on Normandale Road, Hansen Road and Benton Avenue, and will support transit riders along Benton Avenue. This path will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21015 Justification The City strives to improve mobility for residents, visitors and businesses through a multi-modal transportation system that accommodates pedestrians, bicyclists, transit users and motorists. This ideal is reflected in the Comprehensive Plan, the Living Streets Plan, the Active Routes to School Plan and the Pedestrian and Bicycle Master Plan. Walking and biking infrastructure promotes equity, safety and convenience and provides meaningful opportunities for active living and better health. Useful LifeProject Name Benton Avenue Shared-Use Path Category Infrastructure Type New Budget Goal Total Project Cost:$730,400 Total20252026202720282029Expenditures2030 730,400730,400Construction 730,400 730,400Total Total20252026202720282029Funding Sources 2030 730,400730,400PACS Fund: Utility Franchise Fees 730,400 730,400Total 39 Page 65 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves construction of a shared-use path on the south side of West 64th Street between West Shore Drive and West 66th Street. This path will connect to existing sidewalks on West 66th Street, the Edina Aquatic Center, the Edina Art House, Rosland Park, and the pedestrian bridge over Highway 62. This path will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21016 Justification The City strives to improve mobility for residents, visitors and businesses through a multi-modal transportation system that accommodates pedestrians, bicyclists, transit users and motorists. This ideal is reflected in the Comprehensive Plan, the Living Streets Plan, the Active Routes to School Plan and the Pedestrian and Bicycle Master Plan. Walking and biking infrastructure promotes equity, safety and convenience and provides meaningful opportunities for active living and better health. Useful LifeProject Name West 64th Street Shared-Use Path Category Infrastructure Type New Budget Goal Total Project Cost:$422,654 Total20252026202720282029Expenditures2030 422,654Construction422,654 422,654Total422,654 Total20252026202720282029Funding Sources 2030 422,654PACS Fund: Utility Franchise Fees 422,654 422,654Total422,654 40 Page 66 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on the south side of Valley View Road between Chapel Lane and Antrim Road. This sidewalk will connect to existing sidewalks on Valley View Road and Antrim Road, and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21017 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Valley View Road Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$109,100 Total20252026202720282029Expenditures2030 109,100109,100Construction 109,100 109,100Total Total20252026202720282029Funding Sources 2030 109,100109,100PACS Fund: Utility Franchise Fees 109,100 109,100Total 41 Page 67 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on Amundson Avenue between Cahill Road and West 70th Street. This sidewalk will connect to existing sidewalks on the Cahill Road and West 70th Street, to the Nine Mile Creek Regional Trail and to the future Canadian Pacific Rail Regional Trail. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21018 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Amundson Avenue Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$156,100 Total20252026202720282029Expenditures2030 156,100Construction156,100 156,100Total156,100 Total20252026202720282029Funding Sources 2030 156,100PACS Fund: Utility Franchise Fees 156,100 156,100Total156,100 42 Page 68 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a shared-use path on Interlachen Boulevard between Blake Road and Mirror Lakes Drive. This path will connect to existing pedestrian and bicycle infrastructure on Blake Road, Interlachen Boulevard and Mirror Lakes Drive, and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21019 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Interlachen Boulevard Shared-Use Path Category Infrastructure Type New Budget Goal Total Project Cost:$381,600 Total20252026202720282029Expenditures2030 381,600381,600Construction 381,600 381,600Total Total20252026202720282029Funding Sources 2030 381,600381,600PACS Fund: Utility Franchise Fees 381,600 381,600Total 43 Page 69 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Washington Avenue South, Adams Avenue, Jefferson Ave South, Madison Avenue South, Monroe Avenue South, Jackson Avenue South, Van Buren Avenue South, Harrison Avenue South, Tyler Avenue South, Tyler Court, 2nd Street South, Belmore Lane, 3rd Street South) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21021 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Presidents A Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$10,002,281 Total20252026202720282029Expenditures2030 10,002,28110,002,281Construction 10,002,281 10,002,281Total Total20252026202720282029Funding Sources 2030 1,946,4511,946,451Construction Fund: Special Assess 2,248,9282,248,928Utility Fund: Storm 2,435,7532,435,753Utility Fund: Water 1,720,5301,720,530Utility Fund: Sewer 233,000233,000PACS Fund: Utility Franchise Fees 1,417,6191,417,619Special Street Levy 10,002,281 10,002,281Total 44 Page 70 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Parklawn Court from Parklawn Avenue to the cul-de-sac. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21023 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Parklawn (Parklawn Ct) Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$403,404 Total20252026202720282029Expenditures2030 403,404403,404Construction 403,404 403,404Total Total20252026202720282029Funding Sources 2030 265,583265,583Construction Fund: Special Assess 54,32954,329Utility Fund: Storm 54,74554,745Utility Fund: Water 28,74728,747Utility Fund: Sewer 403,404 403,404Total 45 Page 71 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Annaway Drive, Bywood West, Crescent Terrace, Mait Lane, Merilane, Paddock Road, Rolling Green Parkway) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21024 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Rolling Green Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$11,258,861 Total20252026202720282029Expenditures2030 11,258,86111,258,861Construction 11,258,861 11,258,861Total Total20252026202720282029Funding Sources 2030 2,505,0502,505,050Construction Fund: Special Assess 4,009,2434,009,243Utility Fund: Storm 1,676,6781,676,678Utility Fund: Water 281,326281,326Utility Fund: Sewer 2,786,5642,786,564Special Street Levy 11,258,861 11,258,861Total 46 Page 72 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Halifax Lane, Woodland Circle) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21025 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Minnehaha Woods D Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$3,716,209 Total20252026202720282029Expenditures2030 3,716,2093,716,209Construction 3,716,209 3,716,209Total Total20252026202720282029Funding Sources 2030 456,609456,609Construction Fund: Special Assess 946,760946,760Utility Fund: Storm 897,902897,902Utility Fund: Water 342,836342,836Utility Fund: Sewer 288,600288,600PACS Fund: Utility Franchise Fees 783,502783,502Special Street Levy 3,716,209 3,716,209Total 47 Page 73 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Andover Road, Claremore Drive, Dunham Drive, Ellsworth Drive, Fondell Drive, Gilford Drive, Kellogg Avenue, Oaklawn Avenue, West 72nd Street, West Shore Drive, Wooddale Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21026 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name South Cornelia B Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$8,543,895 Total20252026202720282029Expenditures2030 8,543,8958,543,895Construction 8,543,895 8,543,895Total Total20252026202720282029Funding Sources 2030 3,447,2973,447,297Construction Fund: Special Assess 2,049,8752,049,875Utility Fund: Storm 1,530,6691,530,669Utility Fund: Water 1,071,9041,071,904Utility Fund: Sewer 444,150444,150PACS Fund: Utility Franchise Fees 8,543,895 8,543,895Total 48 Page 74 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Cornelia Drive, Glouchester Avenue, Heatherton Trail, Bristol Boulevard, Lynmar Lane, Mavelle Drive, Sandell Avenue, Hazelton Road, West 72nd Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21027 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name South Cornelia D Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$8,313,293 Total20252026202720282029Expenditures2030 8,313,293Construction8,313,293 8,313,293Total8,313,293 Total20252026202720282029Funding Sources 2030 3,182,394Construction Fund: Special Assess 3,182,394 1,830,277Utility Fund: Storm 1,830,277 2,343,549Utility Fund: Water 2,343,549 957,073Utility Fund: Sewer 957,073 8,313,293Total8,313,293 49 Page 75 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Hilary Lane from Braemar Boulevard to Gleason Road. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG21028 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Hilary Lane Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$6,317,053 Total20252026202720282029Expenditures2030 6,317,053190,400 6,126,653Construction 190,400 6,126,653 6,317,053Total Total20252026202720282029Funding Sources 2030 3,387,9783,387,978Construction Fund: MSA 302,453302,453Construction Fund: Special Assess 1,009,2451,009,245Utility Fund: Storm 786,652786,652Utility Fund: Water 303,883303,883Utility Fund: Sewer 190,400190,400PACS Fund: Utility Franchise Fees 336,442336,442Special Street Levy 190,400 6,126,653 6,317,053Total 50 Page 76 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated West 76th Street from Parklawn Avenue to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG21030 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name West 76th Street A Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$2,008,524 Total20252026202720282029Expenditures2030 2,008,5242,008,524Construction 2,008,524 2,008,524Total Total20252026202720282029Funding Sources 2030 968,276968,276Construction Fund: MSA 200,919200,919Construction Fund: Special Assess 385,207385,207Utility Fund: Storm 247,724247,724Utility Fund: Water 165,248165,248Utility Fund: Sewer 41,15041,150PACS Fund: Utility Franchise Fees 2,008,524 2,008,524Total 51 Page 77 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will replace the aging well house by creating an underground well vault at the current location of the structure in the 69th Street median. The existing structure is dated and does not meet the Southdale District Design Guidelines. Project #ENG21034 Justification This improvement replaces an aging well building, improves traffic sight lines increasing safety and and adds to area aesthetics. Useful LifeProject Name Well #5 69th Street Construct Underground Wellhead Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$350,000 Total20252026202720282029Expenditures2030 350,000Construction350,000 350,000Total350,000 Total20252026202720282029Funding Sources 2030 350,000Utility Fund: Water 350,000 350,000Total350,000 52 Page 78 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Engineering Description This project will continue to build electric vehicle charging infrastructure and provide support for fleet improvements to change to electric vehicles. Electrification of vehicles is happening as costs lower and mileage range continues to grow. Electric vehicles provide to lower GHG emissions and improve air quality with zero tailpipe emissions. One of the top hurdles to EV adoption is the lack of charging infrastructure to "fuel" up the vehicle. To support EV adoption, the City will need to make investments in EV infrastructure. ENVIRONMENTAL CONSIDERATIONS: Supporting electric vehicle infrastructure and fleet replacements provides an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21040 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained facilities provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goal. Useful Life 10Project Name Electric Vehicle Infrastructure & Vehicle Upgrades Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$600,000 Total20252026202720282029Expenditures2030 600,000100,000 100,000 100,000 100,000 100,000Vehicles and Equipment 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 Total20252026202720282029Funding Sources 2030 600,000100,000 100,000 100,000 100,000 100,000CAS Fund: Utility Franchise Fees 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 53 Page 79 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Engineering Description In our continuing efforts to provide an accessible environment for residents, visitors and employees, the City completed an ADA inventory to understand areas of need. The inventory conducted an evaluation for compliance with applicable laws, codes and design guidelines pertaining to accessibility. ENVIRONMENTAL CONSIDERATIONS: Facility improvements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21045 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project is the implementation of the mission statement and the budget work plan goal. Useful LifeProject Name City Wide ADA Facility Improvements Level 3&4 Category Buildings Type Replace or repair Budget Goal Total Project Cost:$1,336,000 Total20252026202720282029Expenditures2030 1,336,0001,336,000Construction 1,336,000 1,336,000Total Total20252026202720282029Funding Sources 2030 1,336,0001,336,000Construction Fund: CIP Levy 1,336,000 1,336,000Total 54 Page 80 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs near Lift Station #6 along 72nd Street. The pipe is undersized and requires more capacity. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21055 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multimodal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. Useful LifeProject Name 72nd Street Sewer Line Upsize Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,600,000 Total20252026202720282029Expenditures2030 1,600,0001,600,000Construction 1,600,000 1,600,000Total Total20252026202720282029Funding Sources 2030 1,600,0001,600,000Utility Fund: Sewer 1,600,000 1,600,000Total 55 Page 81 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description Regular inspection and maintenance of stormwater infrastructure including structure clean outs, stormwater pond sediment assessment, dredging, and disposal, infrastructure repairs, and other activities to ensure existing systems are operating as designed. This item is a continuation of CIP project 19-347 Stormwater Best Management Practices Maintenance. ENVIRONMENTAL CONSIDERATIONS: Properly maintained stormwater infrastructure is necessary to provide flood protection and clean water services. Project #ENG21056 Justification To protect the infrastructure investments that have already been made. The Comprehensive Water Resources Management Plan flood inundation modeling assumes that the stormwater network is operating effectively - proper maintenance is required to continue to provide the desired level of service. Useful LifeProject Name Stormwater Infrastructure Maintenance Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$820,000 Total20252026202720282029Expenditures2030 820,000190,000 200,000 210,000 220,000Construction 190,000 200,000 210,000 220,000 820,000Total Total20252026202720282029Funding Sources 2030 820,000190,000 200,000 210,000 220,000Utility Fund: Storm 190,000 200,000 210,000 220,000 820,000Total 56 Page 82 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This item combines two project types from the 2019-23 CIP, 19-343 Shoreline Naturalization and 19-344 Natural Areas Maintenance. Project #ENG21057 Justification Naturalization and restoration of shoreland, prairie, savannah, and woodland promote clean air, clean water, and wildlife habitat. This item will continue to maintain the existing restored areas at Braemar, Pamela, Bredesen, and Arden parks and add more acres under restoration in other parks. Useful LifeProject Name Natural Areas Management Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$710,000 Total20252026202720282029Expenditures2030 710,000170,000 175,000 180,000 185,000Construction 170,000 175,000 180,000 185,000 710,000Total Total20252026202720282029Funding Sources 2030 710,000170,000 175,000 180,000 185,000Utility Fund: Storm 170,000 175,000 180,000 185,000 710,000Total 57 Page 83 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description The project is included in the Water Supply Plan to better distribute water out from Water Treatment Plant #6. This project will install new watermain along Vernon Avenue connecting to 52nd Street. The project will start near the Grandview Parking Ramp. Project #ENG21058 Justification The City’s mission statement "is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Water Supply Grandview Area PH 3 Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$2,500,000 Total20252026202720282029Expenditures2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total20252026202720282029Funding Sources 2030 2,500,0002,500,000Utility Fund: Water 2,500,000 2,500,000Total 58 Page 84 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description The project is included in the Water Supply Plan to improve fire flows and circulation in the northeast area of the City Project #ENG21059 Justification Useful LifeProject Name Water Supply 50th and France Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$2,000,000 Total20252026202720282029Expenditures2030 2,000,000Construction2,000,000 2,000,000Total2,000,000 Total20252026202720282029Funding Sources 2030 2,000,000Utility Fund: Water 2,000,000 2,000,000Total2,000,000 59 Page 85 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description Project #ENG21060 Justification Useful LifeProject Name Water Supply Pentagon Park Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,000,000 Total20252026202720282029Expenditures2030 1,000,000Construction1,000,000 1,000,000Total1,000,000 Total20252026202720282029Funding Sources 2030 1,000,000Utility Fund: Water 1,000,000 1,000,000Total1,000,000 60 Page 86 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The multi-tiered retaining wall has a history of small area failures. Each failure requires a small contract with a vendor to patch together at the location of the failure. This project will remove and replace the entire wall with a large modular block wall system. ENVIRONMENTAL CONSIDERATIONS: The retaining wall is due for a complete replacement. A complete replacement with a more structurally sound retaining wall system will greatly reduce time and resources needed to complete small, frequent repairs to the existing wall. Project #ENG21061 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, retaining walls, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goals. Useful LifeProject Name 6520 Belmore Lane Multi-Tiered Retaining Wall Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$400,000 Total20252026202720282029Expenditures2030 400,000400,000Construction 400,000 400,000Total Total20252026202720282029Funding Sources 2030 400,000400,000Bridge Maintenance 400,000 400,000Total 61 Page 87 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 70th Street, Antrim Court, Antrim Road, Antrim Terrace, Down Road, Dublin Circle, Dublin Road, Kerry Road, Lee Valley Road, Shannon Drive, Tralee Drive, Wexford Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23001 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls A Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$6,650,793 Total20252026202720282029Expenditures2030 6,650,7936,650,793Construction 6,650,793 6,650,793Total Total20252026202720282029Funding Sources 2030 1,632,1581,632,158Construction Fund: Special Assess 1,583,4181,583,418Utility Fund: Storm 1,278,1481,278,148Utility Fund: Water 686,265686,265Utility Fund: Sewer 1,470,8041,470,804Special Street Levy 6,650,793 6,650,793Total 62 Page 88 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Gate Park Road, Johnson Drive, Ridge Park Road, Warden Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23002 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Countryside E Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$3,479,516 Total20252026202720282029Expenditures2030 3,479,516Construction3,479,516 3,479,516Total3,479,516 Total20252026202720282029Funding Sources 2030 782,328Construction Fund: Special Assess 782,328 850,851Utility Fund: Storm 850,851 584,093Utility Fund: Water 584,093 391,999Utility Fund: Sewer 391,999 870,245Special Street Levy 870,245 3,479,516Total3,479,516 63 Page 89 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 48th Street, West 49th Street, Edinbrook Lane, Millpond Place, Westbrook Lane) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23003 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Todd Park B Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$3,153,546 Total20252026202720282029Expenditures2030 3,153,5463,153,546Construction 3,153,546 3,153,546Total Total20252026202720282029Funding Sources 2030 523,709523,709Construction Fund: Special Assess 826,220826,220Utility Fund: Storm 783,583783,583Utility Fund: Water 299,187299,187Utility Fund: Sewer 720,847720,847Special Street Levy 3,153,546 3,153,546Total 64 Page 90 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Benton Avenue from Tracy Avenue to Hansen Road. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG23004 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Benton Avenue A Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$2,834,512 Total20252026202720282029Expenditures2030 2,834,512Construction2,834,512 2,834,512Total2,834,512 Total20252026202720282029Funding Sources 2030 1,475,297Construction Fund: MSA 1,475,297 108,997Construction Fund: Special Assess 108,997 434,318Utility Fund: Storm 434,318 369,875Utility Fund: Water 369,875 186,198Utility Fund: Sewer 186,198 109,800PACS Fund: Utility Franchise Fees 109,800 150,027Special Street Levy 150,027 2,834,512Total2,834,512 65 Page 91 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project rehabilitates sanitary sewer adjacent to the Braemar Golf Course. This area of sanitary sewer has high levels in inflow and infiltration (I & I) or unnecessary clean water entering the system. Pipe and manholes will be lined where needed to reduce I & I. ENVIRONMENTAL CONSIDERATIONS: Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG23009 Justification The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts. Useful LifeProject Name Hilary Lane Sanitary Sewer Lining Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Construction 300,000 300,000Total Total20252026202720282029Funding Sources 2030 300,000300,000Utility Fund: Sewer 300,000 300,000Total 66 Page 92 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Concord and Golf Terrace Neighborhoods, This project follows the 2022(Draft) Local Surface Water Management Plan. Project #ENG23010 Justification ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Useful LifeProject Name Concord Flood Infrastrucure Project #2 area Category Infrastructure Type New Budget Goal Total Project Cost:$10,650,000 Total20252026202720282029Expenditures2030 10,650,000200,000 950,000 9,500,000Construction 200,000 950,000 9,500,000 10,650,000Total Total20252026202720282029Funding Sources 2030 10,650,000200,000 950,000 9,500,000Utility Fund: Storm 200,000 950,000 9,500,000 10,650,000Total 67 Page 93 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Arden Park and Country Club Neighborhoods, This project need is discussed in the 2022(Draft) Local Surface Water Management Plan and informed by further staff evaluation of options to divert and add capacity for flood flow on 50th Street. Other opportunities for flood risk reduction will be evaluated. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23011 Justification This project is included in the 2022 Local water management plan in concept. 2027 and 2028 costs are placeholders for review and design work ahead of a 2029+ construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Arden & 50th Flood Infrastructure Project #3 Area Category Infrastructure Type New Budget Goal Total Project Cost:$5,150,000 Total20252026202720282029Expenditures2030 650,000200,000 450,000Construction 200,000 450,000 650,000Total Future 4,500,000 Total Total20252026202720282029Funding Sources 2030 650,000200,000 450,000Utility Fund: Storm 200,000 450,000 650,000Total Future 4,500,000 Total 68 Page 94 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Lake Cornelia and Normandale Park Neighborhoods, This project follows the 2022(Draft) Local Surface Water Management Plan and will require further evaluation of options to reduce flood risk. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23012 Justification Useful LifeProject Name Lake Cornelia and Normandale Park Flood Infras Category Infrastructure Type Horizon Budget Goal Total Project Cost:$16,000,000 Total20252026202720282029Expenditures2030 16,000,00016,000,000Construction 16,000,000 16,000,000Total Total20252026202720282029Funding Sources 2030 16,000,00016,000,000Utility Fund: Storm 16,000,000 16,000,000Total 69 Page 95 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Minnehaha Woods and Pamela Park Neighborhoods, This project proposes the increase in flood carrying capacity of the France Avenue Minnehaha crossing that drives flood risk in very large storm events. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Project #ENG23013 Justification 2027 and 2028 costs are placeholders for review and design work ahead of a 2029+ construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name France Avenue Crossing (Minnehaha Creek)Category Infrastructure Type New Budget Goal Total Project Cost:$6,800,000 Total20252026202720282029Expenditures2030 800,000200,000 600,000Construction 200,000 600,000 800,000Total Prior 0 Total Future 6,000,000 Total Total20252026202720282029Funding Sources 2030 800,000200,000 600,000Utility Fund: Storm 200,000 600,000 800,000Total Future 6,000,000 Total 70 Page 96 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing flood control smart infrastructure into existing lift station and flow control features across a part of the City. ENVIRONMENTAL CONSIDERATIONS: Adaptive Level management retrofits take minimal materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23014 Justification This project is included in the 2022 Local water management plan in concept and follows the flood risk reduction strategy. 2025 costs are placeholders for review and design work ahead of a 2027 construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Adaptive Level Management Project Ph 2 Minnehaha Category Infrastructure Type New Budget Goal Total Project Cost:$2,700,000 Total20252026202720282029Expenditures2030 2,700,000200,000 2,500,000Construction 200,000 2,500,000 2,700,000Total Total20252026202720282029Funding Sources 2030 2,700,000200,000 2,500,000Utility Fund: Storm 200,000 2,500,000 2,700,000Total 71 Page 97 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing flood control smart infrastructure into existing lift station and flow control features across a part of the City. ENVIRONMENTAL CONSIDERATIONS: Adaptive Level management retrofits take minimal materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23015 Justification This project is included in the 2022 Local water management plan in concept and follows the flood risk reduction strategy. 2023 cost is for review and design work ahead of a 2025 construction. Capital estimates will be further evaluated and included in the next CIP. Useful LifeProject Name Adaptive Level Management Project Nine Mile Creek Category Infrastructure Type New Budget Goal Total Project Cost:$2,500,000 Total20252026202720282029Expenditures2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total20252026202720282029Funding Sources 2030 2,500,0002,500,000Utility Fund: Storm 2,500,000 2,500,000Total 72 Page 98 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing pipe and graded overflows to better pass flow waters where there are minor downstream tradeoffs. Project #ENG23016 Justification This project bundles a variety of minor grading and pipe projects from the 2022 Local water management plan. The 2024 costs are for review and design work ahead of a 2026 construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Minor Pipe and Grading Project (Citywide)Category Infrastructure Type New Budget Goal Total Project Cost:$2,500,000 Total20252026202720282029Expenditures2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total20252026202720282029Funding Sources 2030 2,500,0002,500,000Utility Fund: Storm 2,500,000 2,500,000Total 73 Page 99 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Chowen Park and Strachauer Park Neighborhoods, This project need is discussed in the 2022 Local Surface Water Management Plan and informed by further staff evaluation of options to divert and add capacity for flood flow on 60th and France Avenue Project #ENG23017 Justification Useful LifeProject Name Chowen and 60th Flood Project Category Infrastructure Type Horizon Budget Goal Total Project Cost:$1,100,000 Total20252026202720282029Expenditures2030 1,100,000Construction1,100,000 1,100,000Total1,100,000 Total20252026202720282029Funding Sources 2030 1,100,000Utility Fund: Storm 1,100,000 1,100,000Total1,100,000 74 Page 100 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) and the York Avenue Sanitary Sewer Extension (SEH Engineering 2019) Project #ENG23033 Justification ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Avenue Hazelton Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$14,400,000 Total20252026202720282029Expenditures2030 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000Construction 200,000 2,000,000 500,000 5,000,000 1,200,000 8,900,000Total Future 5,500,000 Total Total20252026202720282029Funding Sources 2030 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000Utility Fund: Sewer 200,000 2,000,000 500,000 5,000,000 1,200,000 8,900,000Total Future 5,500,000 Total 75 Page 101 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) and the York Avenue Sanitary Sewer Extension (SEH Engineering 2019) Project #ENG23034 Justification ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Avenue 69th St W Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$1,400,000 Total20252026202720282029Expenditures2030 1,400,0001,400,000Construction 1,400,000 1,400,000Total Total20252026202720282029Funding Sources 2030 1,400,0001,400,000Utility Fund: Sewer 1,400,000 1,400,000Total 76 Page 102 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will replace, repair and rehabilitate watermain, gate valves,hydrants or service lines in areas that experience high reported breaks or component failure or are found to be near the end of their expected lifespan though maintenance records and nondestructive testing. One project area meeting this criteria for a standalone water main rehabilitation is the Heights Neighborhood. Project scope and limits to be determined based on scale of issue and current construction costs ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce water leaks reduce pumping costs and associated energy use, and reduce future capital and infrastructure need both locally and in the regional production system. Project #ENG23035 Justification The City’s mission statement "is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Watermain Rehabilitation (Citywide)Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,400,000 Total20252026202720282029Expenditures2030 1,400,0001,400,000Construction 1,400,000 1,400,000Total Total20252026202720282029Funding Sources 2030 1,400,0001,400,000Utility Fund: Water 1,400,000 1,400,000Total 77 Page 103 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description As part of the 2012 Water Treatment Plant #6 design and construction and the 2018 Water Plan Update, the water distribution system in the Grandview Area is in need of improvements. The WTP #6 is unable to produce at full capacity because of a lack of pipe size in the distribution system. The project would install new watermain pipe from Arcadia Avenue to Grange Road along Vernon Avenue and 50th Street. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce water leaks reduce pumping costs and associated energy use, and reduce future capital and infrastructure need both locally and in the regional production system. Project #ENG23036 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Grandview Area Watermain Improvements PH 2 Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$240,000 Total20252026202720282029Expenditures2030 240,000240,000Construction 240,000 240,000Total Total20252026202720282029Funding Sources 2030 240,000240,000Utility Fund: Water 240,000 240,000Total 78 Page 104 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as vehicles, surveying and inspection tools, and technology, among other items. 2025: 2013 Nissan Leaf 2013 Ford F150 2012 GMC Sierra 2500 HD 2026: 2016 GMC Sierra Pickup 1500 4x4 2019 Mitsubishi Outlander 2027: Department Furniture 2017 GMC Sierra WT 2006 JLG PSESLIFT 2017 Ford Explorer 2028: 2016 Tennant M30 or S30 Power Sweeper 2029: 2017 Toyota Prius II 2017 GMC Sierra Pickup 2030: GS18i and CS20 GPS Unit and Controller Project #ENG23200 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of department vehicles, surveying and inspection tools, and technology allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Engineering Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$631,331 Total20252026202720282029Expenditures2030 631,331150,000 102,631 191,500 64,700 92,500Vehicles and Equipment 30,000 150,000 102,631 191,500 64,700 92,500 631,331Total30,000 Total20252026202720282029Funding Sources 2030 631,331150,000 102,631 191,500 64,700 92,500Construction Fund: Equipment Levy 30,000 150,000 102,631 191,500 64,700 92,500 631,331Total30,000 79 Page 105 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Engineering Description The project is the city’s first, city-owned fast charging station. The station will be located at Edina Public Works and Park Maintenance Facility, providing support for Edina’s growing electric fleet. Project #ENG25001 Justification Expansion and/or Level of Service Sustainability:Adding more electric vehicles to the City’s fleet is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emissions. Fast charging supports electric vehicle adoption by providing quick, convenient charging. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of electric vehicle charging infrastructure. Focusing on city fleet, this project does not contain an engagement component. Health in All Policies: Electric vehicles are zero-emission vehicles, meaning there are no harmful tailpipe emissions that negatively impact air quality. Race & Equity: Charging stations located across the community create equitable access to infrastructure. Stewardship: The cost to charge vehicles is decreasing and is already more cost-effective per mile to charge a vehicle when compared to gas- powered vehicles. Useful Life 10Project Name DC Fast Charger Category Equipment and Vehicles Type New Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Vehicles and Equipment 300,000 300,000Total Total20252026202720282029Funding Sources 2030 150,000150,000Construction Fund: Grants/Donations 150,000150,000CAS Fund: Utility Franchise Fees 300,000 300,000Total 80 Page 106 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Parklawn Avenue from West 76th Street to West 77th Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG25002 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Parklawn Avenue A Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,360,247 Total20252026202720282029Expenditures2030 1,360,2471,360,247Construction 1,360,247 1,360,247Total Total20252026202720282029Funding Sources 2030 524,385524,385Construction Fund: MSA 48,27048,270Construction Fund: Special Assess 226,673226,673Utility Fund: Storm 201,768201,768Utility Fund: Water 103,924103,924Utility Fund: Sewer 172,400172,400PACS Fund: Utility Franchise Fees 82,82782,827Special Street Levy 1,360,247 1,360,247Total 81 Page 107 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated West 77th Street from Parklawn Avenue to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG25003 Justification Expansion and/or Level of Service Sustainability:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name W 77th Street D Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$2,408,348 Total20252026202720282029Expenditures2030 2,408,3482,408,348Construction 2,408,348 2,408,348Total Total20252026202720282029Funding Sources 2030 987,078987,078Construction Fund: MSA 90,86190,861Construction Fund: Special Assess 426,678426,678Utility Fund: Storm 379,800379,800Utility Fund: Water 195,622195,622Utility Fund: Sewer 172,400172,400PACS Fund: Utility Franchise Fees 155,909155,909Special Street Levy 2,408,348 2,408,348Total 82 Page 108 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 55th Street, West 56th Street, West 57th Street, Abbott Avenue, York Avenue, Zenith Avenue) within the project area. This includes replacing the entire pavement surface, repair / replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25005 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Chowen Park C Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$9,237,718 Total20252026202720282029Expenditures2030 9,237,7189,237,718Construction 9,237,718 9,237,718Total Total20252026202720282029Funding Sources 2030 1,414,9911,414,991Construction Fund: Special Assess 2,460,7762,460,776Utility Fund: Storm 2,434,7052,434,705Utility Fund: Water 929,616929,616Utility Fund: Sewer 50,00050,000PACS Fund: Utility Franchise Fees 1,947,6301,947,630Special Street Levy 9,237,718 9,237,718Total 83 Page 109 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 57th Street, Beard Avenue, Chowen Avenue, Drew Avenue, Ewing Avenue) within the project area. This includes replacing the entire pavement surface, repair / replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25006 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Chowen Park E Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$5,860,721 Total20252026202720282029Expenditures2030 5,860,7215,860,721Construction 5,860,721 5,860,721Total Total20252026202720282029Funding Sources 2030 878,270878,270Construction Fund: Special Assess 1,527,3781,527,378Utility Fund: Storm 1,511,1961,511,196Utility Fund: Water 577,003577,003Utility Fund: Sewer 158,000158,000PACS Fund: Utility Franchise Fees 1,208,8741,208,874Special Street Levy 5,860,721 5,860,721Total 84 Page 110 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Brookview Avenue, Park Place, Woodcrest Drive, Woodland Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25009 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Minnehaha Woods B Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$4,119,420 Total20252026202720282029Expenditures2030 4,119,4204,119,420Construction 4,119,420 4,119,420Total Total20252026202720282029Funding Sources 2030 618,632618,632Construction Fund: Special Assess 1,282,7071,282,707Utility Fund: Storm 692,075692,075Utility Fund: Water 464,487464,487Utility Fund: Sewer 1,061,5191,061,519Special Street Levy 4,119,420 4,119,420Total 85 Page 111 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description Pamela Park B (Peacedale Avenue) This project involves the reconstruction and rehabilitation of local street Peacedale Avenue from the Highway 62 frontage road to West 62nd Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25010 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Pamela Park B (Peacdale Avenue) Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,815,098 Total20252026202720282029Expenditures2030 1,815,0981,815,098Construction 1,815,098 1,815,098Total Total20252026202720282029Funding Sources 2030 250,399250,399Construction Fund: Special Assess 454,631454,631Utility Fund: Storm 492,398492,398Utility Fund: Water 188,007188,007Utility Fund: Sewer 429,663429,663Special Street Levy 1,815,098 1,815,098Total 86 Page 112 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Halifax Avenue from the Highway 62 frontage road to West 62nd Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25011 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Pamela Park C (Halifax Avenue) Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,388,016 Total20252026202720282029Expenditures2030 1,388,0161,388,016Construction 1,388,016 1,388,016Total Total20252026202720282029Funding Sources 2030 191,481191,481Construction Fund: Special Assess 347,659347,659Utility Fund: Storm 376,540376,540Utility Fund: Water 143,770143,770Utility Fund: Sewer 328,566328,566Special Street Levy 1,388,016 1,388,016Total 87 Page 113 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Washington Avenue from Valley View Road to the City limits north of Valley View Road, which is a shared street with the City of Eden Prairie. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25012 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Braemar Hills E (Washington Avenue) Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$964,181 Total20252026202720282029Expenditures2030 964,181Construction964,181 964,181Total964,181 Total20252026202720282029Funding Sources 2030 172,485Construction Fund: Special Assess 172,485 332,148Utility Fund: Storm 332,148 51,164Utility Fund: Water 51,164 34,339Utility Fund: Sewer 34,339 374,045Special Street Levy 374,045 964,181Total964,181 88 Page 114 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 66th Street, Cahill Lane, Cahill Road, Galway Drive, Hillside Lane, Limerick Lane) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25013 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name The Heights A Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$9,343,836 Total20252026202720282029Expenditures2030 9,343,836Construction9,343,836 9,343,836Total9,343,836 Total20252026202720282029Funding Sources 2030 1,127,030Construction Fund: Special Assess 1,127,030 2,370,717Utility Fund: Storm 2,370,717 2,248,376Utility Fund: Water 2,248,376 858,472Utility Fund: Sewer 858,472 295,200PACS Fund: Utility Franchise Fees 295,200 2,444,041Special Street Levy 2,444,041 9,343,836Total9,343,836 89 Page 115 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 66th Street, West 68th Street, Grace Terrace, Hillside Circle, Hillside Court, Lois Lane, Susan Avenue, Tracy Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25014 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name The Heights C Reconstruction Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$7,590,070 Total20252026202720282029Expenditures2030 7,590,070Construction7,590,070 7,590,070Total7,590,070 Total20252026202720282029Funding Sources 2030 939,192Construction Fund: Special Assess 939,192 1,729,936Utility Fund: Storm 1,729,936 1,873,647Utility Fund: Water 1,873,647 715,394Utility Fund: Sewer 715,394 295,200PACS Fund: Utility Franchise Fees 295,200 2,036,701Special Street Levy 2,036,701 7,590,070Total7,590,070 90 Page 116 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description The multi-tiered retaining wall has a history of small area failures. Each failure requires a small contract with a vendor to patch together at the location of the failure. This project will remove and replace the entire wall with a large modular block wall system. Project #ENG25018 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name 6932 Valley View Road Multi-Tiered Retaining Wall Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$360,000 Total20252026202720282029Expenditures2030 360,000360,000Construction 360,000 360,000Total Total20252026202720282029Funding Sources 2030 360,000360,000Bridge Maintenance 360,000 360,000Total 91 Page 117 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The material around the railroad tracks along Dewey Hill Road that provides a smooth transition from the street pavement over the railroad tracks is starting to fail. The city is responsible for providing the materials to CP Rail for their crews to install. Project #ENG25020 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Dewey Hill Road CP Rail Crossing Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$35,000 Total20252026202720282029Expenditures2030 35,00035,000Construction 35,000 35,000Total Total20252026202720282029Funding Sources 2030 35,00035,000Bridge Maintenance 35,000 35,000Total 92 Page 118 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create an ADA pedestrian access route from the new Grandview Pedestrian Bridge across the top level of the Grandview Parking Ramp. It will create a route for users to access Jerry’s Tower that has an elevator. The elevator would be accessible during normal business hours. Coordination with Jerry’s Enterprise is needed to discuss the impact of losing 16 parking stalls and maintenance and operations responsibilities. Project #ENG25021 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Grandview Parking Ramp ADA Access Route Category Infrastructure Type New Budget Goal Total Project Cost:$200,000 Total20252026202720282029Expenditures2030 200,000200,000Construction 200,000 200,000Total Total20252026202720282029Funding Sources 2030 200,000200,000Construction Fund: CIP Levy 200,000 200,000Total 93 Page 119 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create an ADA pedestrian access route from the new Grandview Pedestrian Bridge across the top level of the Grandview Parking Ramp. It will create a route for users to access Jerry’s Tower that has an elevator. The elevator would be accessible during normal business hours. Coordination with Jerry’s Enterprise is needed to discuss the impact of losing 16 parking stalls and maintenance and operations responsibilities. Project #ENG25022 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Grandview Parking Ramp ADA Access Route to Gus Yng Category Infrastructure Type New Budget Goal Total Project Cost:$2,000,000 Total20252026202720282029Expenditures2030 2,000,0002,000,000Construction 2,000,000 2,000,000Total Total20252026202720282029Funding Sources 2030 2,000,0002,000,000Construction Fund: CIP Levy 2,000,000 2,000,000Total 94 Page 120 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace 2,500 linear feet of 8-ft tall wood fence that is at the end of its useful life. The fence was installed in 1994. It has many trees, shrubs and other vegetation growing in and around it that increases the difficulty of replacement. Project #ENG25023 Justification Expansion and/or Level of Service Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects continue to provide a physical barrier between private property and the vehicle traveled way. This separation creates a safter environment for the individual property owners. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 25Project Name Valley View Rd Fence Replace Sdale Neighborhood Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000100,000Construction 100,000 100,000Total Total20252026202720282029Funding Sources 2030 100,000100,000Construction Fund: MSA 100,000 100,000Total 95 Page 121 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project will change the water source of the Promenade Brook from storm water to distribution water. The current pump system filter is blocked with leaves, garbage, and fish multiple times a week. This takes lots of staff time to maintain. Project #ENG25024 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Promenade Brook Pumping Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Construction 300,000 300,000Total Total20252026202720282029Funding Sources 2030 100,000100,000Utility Fund: Storm 100,000100,000Utility Fund: Water 100,000100,000Utility Fund: Sewer 300,000 300,000Total 96 Page 122 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create a pedestrian connection under France Avenue between Gallagher Drive and 72nd Street. It will extend into potential development projects on both the east and west sides of France Avenue. It will provide much safer pedestrian access on the east and west sides of France Avenue to Centennial Lakes Park and the Cornelia Neighborhood. Project #ENG25025 Justification Expansion and/or Level of Service Sustainability:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name France Avenue Crossing Gallagher & 72nd Category Infrastructure Type New Budget Goal Total Project Cost:$5,000,000 Total20252026202720282029Expenditures2030 5,000,0005,000,000Construction 5,000,000 5,000,000Total Total20252026202720282029Funding Sources 2030 5,000,0005,000,000HRA Fund: Centennial Lakes TIF 5,000,000 5,000,000Total 97 Page 123 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Project #ENG25026 Justification Health, Safety & Regulatory Compliance Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Rosland Park Pedestrian Bridge Category Infrastructure Type New Budget Goal Total Project Cost:$6,000,000 Total20252026202720282029Expenditures2030 6,000,0006,000,000Construction 6,000,000 6,000,000Total Total20252026202720282029Funding Sources 2030 6,000,0006,000,000Construction Fund: Grants/Donations 6,000,000 6,000,000Total 98 Page 124 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace 1,300 linear feet of concrete curb and gutter in the 50th and France District along 50th Street between Halifax Avenue and France Avenue. The curb is at the end of its useful life. This work will be coordinated with a mill and overlay project. Project #ENG25027 Justification Expansion and/or Level of Service Sustainability:The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name 50th St Concrete Curb and Gutter Replacement Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$55,000 Total20252026202720282029Expenditures2030 55,00055,000Construction 55,000 55,000Total Total20252026202720282029Funding Sources 2030 55,00055,000Utility Fund: Storm 55,000 55,000Total 99 Page 125 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The traffic signal poles and bolt connections to the structural foundations are rusting and are nearing the end of their useful life. This project will install a new traffic control signal system. Project #ENG25028 Justification Health, Safety, and Regulatory Compliance Sustainability:The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Traffic Signal at Halifax and 50th St Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$400,000 Total20252026202720282029Expenditures2030 400,000400,000Construction 400,000 400,000Total Total20252026202720282029Funding Sources 2030 400,000400,000Construction Fund: MSA 400,000 400,000Total 100 Page 126 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The retaining wall along the north side of the 50th Street Bridge over Minnehaha Creek is starting to separate from the structure. This project will remove and replace the retaining wall. Project #ENG25029 Justification Health, Safety and Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name 50th over Minnehaha Creek North Retaining Wall Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$275,000 Total20252026202720282029Expenditures2030 275,000275,000Construction 275,000 275,000Total Total20252026202720282029Funding Sources 2030 275,000275,000Construction Fund: MSA 275,000 275,000Total 101 Page 127 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Benton Ave Bridge over CP Rail has maintenance needs. The beams under the deck are due for painting to extend the life of the structure. Project #ENG25030 Justification Health, Safety & Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Benton Avenue Over CP Rail Beam Painting Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,000Construction250,000 250,000Total250,000 Total20252026202720282029Funding Sources 2030 250,000Construction Fund: MSA 250,000 250,000Total250,000 102 Page 128 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Valley View Bridge over CP Rail has maintenance needs. The beams under the deck are due for painting to extend the life of the structure. Project #ENG25031 Justification Health, Safety & Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Valley View Road Bridge over CP Rail Beam Painting Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,000Construction250,000 250,000Total250,000 Total20252026202720282029Funding Sources 2030 250,000Construction Fund: MSA 250,000 250,000Total250,000 103 Page 129 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will cure in place line 3,400 linear feet of clay sanitary sewer pipe. This type of trenchless rehabilitation technology only needs access to the manholes for installation. It does not require large scale open cutting operations. It builds a long-term structural pipe within the existing pipe. Project #ENG25033 Justification Expansion and/or Level of Service Sustainability: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Nine Mile Village Sanitary Sewer Lining Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$175,000 Total20252026202720282029Expenditures2030 175,000175,000Construction 175,000 175,000Total Total20252026202720282029Funding Sources 2030 175,000175,000Utility Fund: Sewer 175,000 175,000Total 104 Page 130 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace approximately 130 linear feet of sanitary sewer pipe that has settled and created a sag in the pipe. The sag slows flow and collects debris. The pipe will be replaced by open cut method and along with impacted street pavements Project #ENG25034 Justification Expansion and/or Level of Service Sustainability: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Olinger Road Sanitary Sewer Replacement Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000100,000Construction 100,000 100,000Total Total20252026202720282029Funding Sources 2030 100,000100,000Utility Fund: Sewer 100,000 100,000Total 105 Page 131 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description "This project will use iron and aluminum chemical additions to sequester the sediment phosphorus that causes algae blooms and fuels lake and creek water quality impairments. The project will work citywide in priority watersheds. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. Decades of urban development and runoff have lead to waterbodies with nutrient rich sediment. The sediment phosphorus fuels aerobic and anerobic decay of accumulated biomass and leads to low oxygen levels and phosphorus release into the water column that impairing waters. This project begins restore ecological processes by resetting the sequestering the sediment phosphorus. " Project #ENG25036 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 1 - Lake & Pond Sediment Phosphorus Sequest Category Infrastructure Type New Budget Goal Total Project Cost:$550,000 Total20252026202720282029Expenditures2030 550,00050,000 100,000 100,000 100,000 100,000Installation/Maintenance 100,000 50,000 100,000 100,000 100,000 100,000 550,000Total100,000 Total20252026202720282029Funding Sources 2030 550,00050,000 100,000 100,000 100,000 100,000Utility Fund: Storm 100,000 50,000 100,000 100,000 100,000 100,000 550,000Total100,000 106 Page 132 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description "This project will prevent pollution at and near their source on the roads draining to priority waters. Targeted intensive street sweeping is one of the most effective interventions cities can make to promote clean waters. Cleaner streets = cleaner water. The project will work citywide in priority watersheds. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. Urban development with curb and gutter speeds water and accumulated pollutants like sediment, phosphorus and nitrogen downstream to waters where it accumulates causing water quality impairments. Sweeping removes the pollutants at and near their source before they have a chance to break down and make their way into waters. " Project #ENG25037 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 2 - Targeted Intensive Street Sweeping Category Infrastructure Type New Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,00010,000 20,000 70,000Installation/Maintenance 10,000 20,000 70,000 100,000Total Total20252026202720282029Funding Sources 2030 100,00010,000 20,000 70,000Utility Fund: Storm 10,000 20,000 70,000 100,000Total 107 Page 133 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This project will coordinate with local watersheds and/or the Met Council to expand the network of monitoring for trends in waterbody health. The work is an implementation step of the Clean Water Strategy (CWS) the values and goals of which include; City actions align to do the most good towards measurable, desirable clean water outcomes leveraging creativity and innovation. • The city uses an iterative ‘build, test, learn’ model to make progress. • The city uses a systems approach in its implementation to consider cumulative benefits. • Clean water goals are pursued with consideration for multiple benefits and available resources. By tracking trends in close partnership with local water agencies, the City can better align and target its work for greater effect. Project #ENG25038 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 3 - Assurance, Monitoring, Lakegrades Category Infrastructure Type New Budget Goal Total Project Cost:$215,000 Total20252026202720282029Expenditures2030 215,00040,000 35,000 35,000 35,000 35,000Installation/Maintenance 35,000 40,000 35,000 35,000 35,000 35,000 215,000Total35,000 Total20252026202720282029Funding Sources 2030 215,00040,000 35,000 35,000 35,000 35,000Utility Fund: Storm 35,000 40,000 35,000 35,000 35,000 35,000 215,000Total35,000 108 Page 134 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This project will control rough fish like carp and hybrid goldfish to reduce their harmful effects on clean water. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. Rough fish feed and stir up bottom sediments releasing accumulated pollutants into the water column causing algae blooms and water quality impairments. Project #ENG25039 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 4 - Rough Fish Management Category Infrastructure Type New Budget Goal Total Project Cost:$190,000 Total20252026202720282029Expenditures2030 190,00030,000 40,000 40,000 40,000Installation/Maintenance 40,000 30,000 40,000 40,000 40,000 190,000Total40,000 Total20252026202720282029Funding Sources 2030 190,00030,000 40,000 40,000 40,000Utility Fund: Storm 40,000 30,000 40,000 40,000 40,000 190,000Total40,000 109 Page 135 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will mitigate pollution in the stormwater systems draining to priority waters. While not as cost competitive as some of the in- waterbody and pollution control work in CWS 1,2, and 4, Clean water infrastructure can work in combination with these practices to further reduce water pollutants. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. The project will work citywide in priority watersheds. Urban development with curb and gutter speeds water and accumulated pollutants like sediment, phosphorus and nitrogen downstream to waters where it accumulates causing water quality impairments. Clean water infrastructure intercepts the water, and filters, settles, or adsorbs pollutants to sequester them so they can be removed by a maintenance action and properly disposes or reuses them. Project #ENG25040 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 5 - New Clean Water Infrastructure Category Infrastructure Type New Budget Goal Total Project Cost:$150,000 Total20252026202720282029Expenditures2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total20252026202720282029Funding Sources 2030 150,000150,000Utility Fund: Storm 150,000 150,000Total 110 Page 136 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will rehabilitate approximately 1,200 linear feet of watermain pipe along Chapel Drive between Chapel Lane and Antrim Road. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. Project #ENG25043 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Chapel Drive Watermain Rehabilitation Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Construction 300,000 300,000Total Total20252026202720282029Funding Sources 2030 300,000300,000Utility Fund: Water 300,000 300,000Total 111 Page 137 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description The project will rehabilitate approximately 4,000 linear feet of watermain pipe along Maloney Avenue between Washington Avenue and Blake Road. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. This work may be combined with the Presidents Neighborhood Street Reconstruction Project. Project #ENG25044 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Maloney Ave Watermain Rehabilitation Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$1,000,000 Total20252026202720282029Expenditures2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total20252026202720282029Funding Sources 2030 1,000,0001,000,000Utility Fund: Water 1,000,000 1,000,000Total 112 Page 138 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Project #ENG25045 Justification The project will replace approximately 175 linear feet of watermain pipe under Nine Mile Creek between residential properties on the north and commercial properties on the south. The pipe is failing and needs replacement. The adjacent properties will need to provide access for the project. Useful LifeProject Name Watermain Replacement under NMC at 5901 Lincoln Dr Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$50,000 Total20252026202720282029Expenditures2030 50,00050,000Construction 50,000 50,000Total Total20252026202720282029Funding Sources 2030 50,00050,000Utility Fund: Water 50,000 50,000Total 113 Page 139 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace approximately 1150 linear feet of watermain pipe between Long Brake Trail, Shannon Drive and Coventry Way. The pipes are located behind residential properties in green space and storm water management areas. The pipes are failing and need replacement. The adjacent properties will need to provide access for the project. Project #ENG25046 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Watermain Replcmnt LB Tr/Shannon Dr/Coventry Way Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$225,000 Total20252026202720282029Expenditures2030 225,000225,000Construction 225,000 225,000Total Total20252026202720282029Funding Sources 2030 225,000225,000Utility Fund: Water 225,000 225,000Total 114 Page 140 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will rehabilitate approximately 25,000 linear feet of watermain pipe within the Heights Neighborhood. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. Project #ENG25047 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement : These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Heights Neighborhood Watermain Rehabilitation Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$6,250,000 Total20252026202720282029Expenditures2030 6,250,0006,250,000Construction 6,250,000 6,250,000Total Total20252026202720282029Funding Sources 2030 6,250,0006,250,000Utility Fund: Water 6,250,000 6,250,000Total 115 Page 141 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will include repair or replacement of public sidewalks and pedestrian curb ramps maintained by the City of Edina. This project supports the City’s ADA Transition Plan. Project #ENG25050 Justification Health, Safety & Regulatory Compliance Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Sidewalk Inspection Program Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$350,000 Total20252026202720282029Expenditures2030 300,00050,000 50,000 50,000 50,000 50,000Installation/Maintenance 50,000 50,000 50,000 50,000 50,000 50,000 300,000Total50,000 Future 50,000 Total Total20252026202720282029Funding Sources 2030 300,00050,000 50,000 50,000 50,000 50,000PACS Fund: Utility Franchise Fees 50,000 50,000 50,000 50,000 50,000 50,000 300,000Total50,000 Future 50,000 Total 116 Page 142 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will provide funding for roadway improvements that seek to reduce vehicle speeds and improve safety for pedestrians and cyclists. Such improvements may include curb extensions, medians, refuge islands, or dynamic display speed signs. Specific projects will be determined by staff based on observed data, traffic safety requests, and with input from the Traffic Safety Committee and the Transportation Commission. Project #ENG25051 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Drive 25 Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$120,000 Total20252026202720282029Expenditures2030 120,00020,000 20,000 20,000 20,000 20,000Construction 20,000 20,000 20,000 20,000 20,000 20,000 120,000Total20,000 Total20252026202720282029Funding Sources 2030 120,00020,000 20,000 20,000 20,000 20,000PACS Fund: Utility Franchise Fees 20,000 20,000 20,000 20,000 20,000 20,000 120,000Total20,000 117 Page 143 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves implementing a road diet on Normandale Road between 77th Street and Viking Drive and on Viking Drive between Normandale Road and Computer Avenue. The reallocation of right-of-way will provide space to add on-street bicycle facilities. This work will be implemented as part of a scheduled pavement maintenance project. Project #ENG25052 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Normandale Road/Viking Drive Bike Lanes Category Infrastructure Type New Budget Goal Total Project Cost:$28,200 Total20252026202720282029Expenditures2030 28,20028,200Construction 28,200 28,200Total Total20252026202720282029Funding Sources 2030 28,20028,200PACS Fund: Utility Franchise Fees 28,200 28,200Total 118 Page 144 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves updating the City’s Pedestrian and Bicycle Master Plan, which guides the development of the Edina’s multi-modal transportation network. This project will involve hiring a consultant to assist with community engagement, coordinating meetings with staff and officials, reviewing existing policies and best-practices, and developing recommendations. Project #ENG25053 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Pedestrian and Bicycle Master Plan Update Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000100,000Construction 100,000 100,000Total Total20252026202720282029Funding Sources 2030 100,000100,000PACS Fund: Utility Franchise Fees 100,000 100,000Total 119 Page 145 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves upgrading the existing bike lanes on Wooddale Avenue between 50th Street and Valley View Road. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Valley View Road and Wooddale Avenue. Project #ENG25054 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Wooddale Avenue Bike Lanes Category Infrastructure Type New Budget Goal Total Project Cost:$111,100 Total20252026202720282029Expenditures2030 111,10091,600 19,500Construction 91,600 19,500 111,100Total Total20252026202720282029Funding Sources 2030 111,10091,600 19,500PACS Fund: Utility Franchise Fees 91,600 19,500 111,100Total 120 Page 146 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a shared-use path on McCauley Trail between Post Lane and Indian Hills Trail. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on McCauley Trail and proposed facilities on McCauley Trail and Indian Hills Trail. Project #ENG25055 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name McCauley Trail Shared-Use Path Category Infrastructure Type New Budget Goal Total Project Cost:$503,000 Total20252026202720282029Expenditures2030 503,000503,000Construction 503,000 503,000Total Total20252026202720282029Funding Sources 2030 503,000503,000PACS Fund: Utility Franchise Fees 503,000 503,000Total 121 Page 147 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves implementing a road diet on 69th Street between France Avenue and York Avenue. The reallocation of right-of-way will provide space to add on-street bicycle facilities. This work will be implemented as part of a scheduled pavement maintenance project. Project #ENG25056 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name 69th Street Bike Lanes Category Infrastructure Type New Budget Goal Total Project Cost:$24,400 Total20252026202720282029Expenditures2030 24,40024,400Construction 24,400 24,400Total Total20252026202720282029Funding Sources 2030 24,40024,400PACS Fund: Utility Franchise Fees 24,400 24,400Total 122 Page 148 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a bike boulevard on West Shore Drive between 66th Street and 70th Street. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 70th Street and proposed facilities on 66th Street and West Shore Drive. Project #ENG25057 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name West Shore Drive Bike Boulevard Category Infrastructure Type New Budget Goal Total Project Cost:$35,100 Total20252026202720282029Expenditures2030 35,10035,100Construction 35,100 35,100Total Total20252026202720282029Funding Sources 2030 35,10035,100PACS Fund: Utility Franchise Fees 35,100 35,100Total 123 Page 149 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of bike lanes on 44th Street between France Avenue and Grimes Avenue. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 44th Street and Grimes Avenue. Project #ENG25058 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name W 44th St Bike Lanes Category Infrastructure Type New Budget Goal Total Project Cost:$18,100 Total20252026202720282029Expenditures2030 18,10018,100Construction 18,100 18,100Total Total20252026202720282029Funding Sources 2030 18,10018,100PACS Fund: Utility Franchise Fees 18,100 18,100Total 124 Page 150 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of bike lanes on Metro Boulevard between 70th Street and Edina Industrial Boulevard. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 70th Street and 72nd Street. Project #ENG25059 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Metro Boulevard Bike Lanes Category Infrastructure Type New Budget Goal Total Project Cost:$60,900 Total20252026202720282029Expenditures2030 60,90060,900Construction 60,900 60,900Total Total20252026202720282029Funding Sources 2030 60,90060,900PACS Fund: Utility Franchise Fees 60,900 60,900Total 125 Page 151 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the replacement of an existing pedestrian bridge over Minnehaha Creek between Beard Avenue and Beard Court. This project will create a fully accessible pedestrian and bicycle bridge connecting the Creek Knoll and Chowen Park neighborhoods. Project #ENG25060 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Minnehaha Creek Pedestrian Bridge Category Infrastructure Type New Budget Goal Total Project Cost:$1,200,000 Total20252026202720282029Expenditures2030 1,200,0001,200,000Construction 1,200,000 1,200,000Total Total20252026202720282029Funding Sources 2030 1,200,0001,200,000PACS Fund: Utility Franchise Fees 1,200,000 1,200,000Total 126 Page 152 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of Edina Industrial Boulevard between Bush Lake Road and Metro Boulevard. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Metro Boulevard and Edina Industrial Boulevard. Project #ENG25061 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Edina Industrial Boulevard Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$297,500 Total20252026202720282029Expenditures2030 297,500297,500Construction 297,500 297,500Total Total20252026202720282029Funding Sources 2030 297,500297,500PACS Fund: Utility Franchise Fees 297,500 297,500Total 127 Page 153 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of 66th Street between Ridgeview Drive and Josephine Avenue. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Ridgeview Drive, 66th Street and Normandale Road. Project #ENG25062 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternative - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name W 66th Street Sidewalk Category Infrastructure Type New Budget Goal Total Project Cost:$476,000 Total20252026202720282029Expenditures2030 476,000476,000Construction 476,000 476,000Total Total20252026202720282029Funding Sources 2030 476,000476,000PACS Fund: Utility Franchise Fees 476,000 476,000Total 128 Page 154 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves hiring a consultant to design bicycle facilities on Valley View Road between 64th Street and 66th Street underneath the Highway 62 overpass. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Valley View Road and proposed facilities on 66th Street. Project #ENG25063 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Valley View Road Bike Lane Design Category Infrastructure Type New Budget Goal Total Project Cost:$50,000 Total20252026202720282029Expenditures2030 50,000Construction50,000 50,000Total50,000 Total20252026202720282029Funding Sources 2030 50,000PACS Fund: Utility Franchise Fees 50,000 50,000Total50,000 129 Page 155 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This proejct would provide for the lining of a neighborhood that experiences a significant amount of inflow and infiltration into the sanitary sewer system ENVIRONMENTAL CONSIDERATIONS: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Project #PW23010 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Nine Mile Village Sewer Lining Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$175,000 Total20252026202720282029Expenditures2030 175,000175,000Construction 175,000 175,000Total Total20252026202720282029Funding Sources 2030 175,000175,000Utility Fund: Sewer 175,000 175,000Total 130 Page 156 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project will replace 130 LF of sewer main on Olinger Boulevard. This dip in the sewer line collects debris and does not allow the sewer to flow properly which leads to potential blockages of the sewer. ENVIRONMENTAL CONSIDERATIONS: As mentioned in the description, there is a large dip in the sewer at this location. Since there is not free flowing sewage at this location, solids tend to settle out and create potential for blockages. This section of sewer needs to cleaned more frequently thereby creating addition trips and fuel usage. Project #PW23011 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Olinger Road Dip Replacement: 130 LF + Road Repair Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$80,000 Total20252026202720282029Expenditures2030 80,00080,000Construction 80,000 80,000Total Total20252026202720282029Funding Sources 2030 80,00080,000Utility Fund: Sewer 80,000 80,000Total 131 Page 157 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description A portion of the current CIP levy will be held in reserve at the beginning of each year to address unforeseen or unplanned repairs that must be made. The intent is that the money will be used to lessen the impact on facilities and enterprise sites operating funds, better helping those responsible for the site to make sound decisions on proper repairs vs. band-aid solutions. The CIP committee will meet periodically each year to review the available funds against any items that may have come up, or when possible how those funds can be used to expand other programs or projects that didn’t make the initial funding list. Project #ENG21000 Justification See Summary of Facilities Improvements. Useful LifeProject Name Asset Preservation Funding Category Buildings Type Replace or repair Budget Goal Total Project Cost:$4,300,000 Total20252026202720282029Expenditures2030 4,300,000650,000 700,000 700,000 700,000 750,000Construction 800,000 650,000 700,000 700,000 700,000 750,000 4,300,000Total800,000 Total20252026202720282029Funding Sources 2030 4,300,000650,000 700,000 700,000 700,000 750,000Construction Fund: CIP Levy 800,000 650,000 700,000 700,000 700,000 750,000 4,300,000Total800,000 132 Page 158 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description In our continuing efforts to provide an accessible environment for residents, visitors and employees, the City completed an ADA inventory to understand areas of need. The inventory conducted an evaluation for compliance with applicable laws, codes and design guidelines pertaining to accessibility. This project will begin to address the recommendations prioritized for completion in 3-8 years. ENVIRONMENTAL CONSIDERATIONS: Facility improvements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21044 Justification See Summary of Facilities Improvements. Useful LifeProject Name City Wide ADA Facility Improvements Level 2 Category Buildings Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,00050,000 100,000 50,000Construction 100,000 50,000 100,000 50,000 300,000Total100,000 Total20252026202720282029Funding Sources 2030 300,00050,000 100,000 50,000Construction Fund: CIP Levy 100,000 50,000 100,000 50,000 300,000Total100,000 133 Page 159 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals. Project #ENG21051 Justification See Summary of Facilities Improvements. Useful LifeProject Name Pamela Park Facility Maintenance Category Buildings Type Replace or repair Budget Goal Total Project Cost:$210,000 Total20252026202720282029Expenditures2030 210,000210,000Construction 210,000 210,000Total Total20252026202720282029Funding Sources 2030 210,000210,000Construction Fund: CIP Levy 210,000 210,000Total 134 Page 160 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Facilities Description This project will create funding to build new buildings more sustainable and replace failing mechanical systems with more energy efficient systems. These actions reduce energy use and greenhouse gas emissions. ENVIRONMENTAL CONSIDERATIONS: Major facility mechanical equipment replacements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21062 Justification See Summary of Facilities Improvements Useful Life 50Project Name Facility Efficiency Upgrades Category Buildings Type Replace or repair Budget Goal Total Project Cost:$3,000,000 Total20252026202720282029Expenditures2030 3,000,000500,000 500,000 500,000 500,000 500,000Construction 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000Total500,000 Total20252026202720282029Funding Sources 2030 3,000,000500,000 500,000 500,000 500,000 500,000CAS Fund: Utility Franchise Fees 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000Total500,000 135 Page 161 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description Kitchen cabinets and remodel, exterior doors, gas furnace, swinging doors, painting, carpeting, new greenhouse, interior doors museum, museum carpet, mau maintence area, museum exterior windows and doors, museum stucco ceiling, museum roof, and basement wall paint, museum lights, maintenance roof, walls, casework and lights, painting, restroom accessories, ceramic tile, wood treatments, vct, concrete sealing, plaster, ceiling tile, exhst systems, electric controls, pa system, OH doors, partitions, water htrs, fire alarm system, security system, exit signs, batteries, restroom accessories, frp walls, 2025 - Museum Sprinkler, staining, 2026 - Museum restroom fixture, water distribution,cooler,maintenance bldg,custodial sinks, and restroom plumbing, electric feeder, exit signs, concrete sealing, water distribution Project #FAC23109 Justification See Summary of Facilities Improvements. Useful LifeProject Name Arneson Acres Park Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$700,000 Total20252026202720282029Expenditures2030 700,000700,000Installation/Maintenance 700,000 700,000Total Total20252026202720282029Funding Sources 2030 700,000700,000Construction Fund: CIP Levy 700,000 700,000Total 136 Page 162 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project will provide upgrades to fire alarm systems for planned centralized monitoring and location services to 911 dispatch. This project will expand card reader access devices to additional buildings and spaces." Project #FAC25101 Justification Expansion and/or Level of Service Useful LifeProject Name City Wide Card Reader & Fire Alarm Updates Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000100,000Construction 100,000 100,000Total Total20252026202720282029Funding Sources 2030 100,000100,000Construction Fund: CIP Levy 100,000 100,000Total 137 Page 163 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project would renovate and update the living quarters in Fire Station 231. Project #FAC25108 Justification Asset Functionality Useful LifeProject Name Fire Station #1 Living Quarters Category Buildings Type Replace or repair Budget Goal Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000Installation/Maintenance 500,000 500,000Total500,000 Total20252026202720282029Funding Sources 2030 500,000Construction Fund: CIP Levy 500,000 500,000Total500,000 138 Page 164 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Zuly Marquez 2025 2030thru Department Facilities Description This project involves the demolition of Fire Station #2, York Ave, and assumes the building is removed and site left as pad ready. No other modifications to building or site amenities are included. Project #FAC25109 Justification Asset Functionality Useful LifeProject Name Fire Station #2 York Ave. Building Demo Category Buildings Type Replace or repair Budget Goal Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000500,000Installation/Maintenance 500,000 500,000Total Total20252026202720282029Funding Sources 2030 500,000500,000Utility Fund: Water 500,000 500,000Total 139 Page 165 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project involves the replacement of software used to track the overall condition of city owned facilities. In addition to indexing the buildings this software would allow the city to process work orders for planned preventative maintenance, routine and emergency repairs to building components and other areas of the city like utility and infrastructure components, park playground structures, natural resource areas and enterprise sites. The software used to conduct the study in 2018 no longer meets the operational requirements of buildings as it does allow for tracking of resources spent on maintenance and repairs. Purchase of software is a lump sum price and will require an annual maintenance agreement. " Project #FAC25110 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. Useful LifeProject Name Facility Asset Maintenance Software Category Technology Type Replace or repair Budget Goal Total Project Cost:$1,044,000 Total20252026202720282029Expenditures2030 1,044,000300,000 135,000 142,000 150,000 155,000Installation/Maintenance 162,000 300,000 135,000 142,000 150,000 155,000 1,044,000Total162,000 Total20252026202720282029Funding Sources 2030 1,044,000300,000 135,000 142,000 150,000 155,000Construction Fund: Equipment Levy 162,000 300,000 135,000 142,000 150,000 155,000 1,044,000Total162,000 140 Page 166 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "A structural engineering review in 2020 of the existing cold storage discovered damage to the building structure. Repairs were made to extend the useful life, but the extent was deemed temporary, the reviewing consultant recommended complete replacement in 2-5 years. $200,000 for planning $2,300,000 for new building " Project #FAC25113 Justification Asset Functionality Useful LifeProject Name Public Works Cold Storage Building Replacement Category Buildings Type Replace or repair Budget Goal Total Project Cost:$2,500,000 Total20252026202720282029Expenditures2030 200,000200,000Planning and Design 2,300,0002,300,000Installation/Maintenance 200,000 2,300,000 2,500,000Total Total20252026202720282029Funding Sources 2030 200,000200,000Construction Fund: CIP Levy 2,300,0002,300,000CIP Bonds 200,000 2,300,000 2,500,000Total 141 Page 167 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Reconfigure office spaces within Public Works to meet current and future staffing needs. As staffing increases to meet the needs of essential functions for the City, the office spaces for staff will require updates and reconfiguration as well. Many of these building are over-occupied with multiple staff using spaces that were once designed for storage or ancillary functions like copy rooms. Renovations allows the city to maximize within spaces while also providing flexible work spaces to attract prospective employees and align with current trends in work-flex and office policies. Expansion of Parking Lot also needed. " Project #FAC25114 Justification Expansion and/or Level of Service Useful LifeProject Name Public Works Space Reconfiguration Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$850,000 Total20252026202720282029Expenditures2030 75,00075,000Planning and Design 775,000775,000Construction 75,000 775,000 850,000Total Total20252026202720282029Funding Sources 2030 850,00075,000 775,000Construction Fund: CIP Levy 75,000 775,000 850,000Total 142 Page 168 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace access gates in 2 locations at Public Works Building. Existing gates have reached the end of their useful life and require extensive maintenance and financial resources. These gates provide essential security and access control to the complex, when broken can affect the cities ability to provide essential services like utility repairs, snow management and ice-treatments and fueling services for public safety equipment of police and fire. " Project #FAC25115 Justification Asset Functionality Useful LifeProject Name Public Works Access Gates Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Installation/Maintenance 300,000 300,000Total Total20252026202720282029Funding Sources 2030 300,000300,000Construction Fund: CIP Levy 300,000 300,000Total 143 Page 169 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description Existing Building Automation System (BAS) components has reached the end of its useful life. These systems provide control over the HVAC systems in the building and allow for building optimization during heat and cooling events. In addition the lighting systems in the building also need to be replaced as they are also nearing end of life. Project #FAC25117 Justification Asset Functionality Sustainability - Updated BAS & Lighting systems will reduce energy consumption and loss throughout the building. Thus lowering the carbon footprint of the building. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Public Works BAS & Lighting Upgrades Category Buildings Type Replace or repair Budget Goal Total Project Cost:$825,000 Total20252026202720282029Expenditures2030 125,000125,000Planning and Design 700,000700,000Installation/Maintenance 125,000 700,000 825,000Total Total20252026202720282029Funding Sources 2030 825,000125,000 700,000Construction Fund: CIP Levy 125,000 700,000 825,000Total 144 Page 170 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace existing AV equipment throughout space. Equipment is used for programming in space by city staff, residents and paid programming. Quote produced in 2023" Project #FAC25118 Justification Expansion and/or Level of Service Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Senior Center AV Equipment Category Technology Type Replace or repair Budget Goal Total Project Cost:$55,000 Total20252026202720282029Expenditures2030 55,00055,000Installation/Maintenance 55,000 55,000Total Total20252026202720282029Funding Sources 2030 55,00055,000Construction Fund: Cable PEG 55,000 55,000Total 145 Page 171 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project involves the design and replacement of the Audio Visual Systems at Braemar Golf Course. Includes both meeting rooms in basement and minor changes to banquet area. Project #FAC25120 Justification Asset Functionality Useful LifeProject Name Golf Course Audio Visual Replacement Category Equipment and Vehicles Type New Budget Goal Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,000250,000Vehicles and Equipment 250,000 250,000Total Total20252026202720282029Funding Sources 2030 250,000250,000Golf Course Fund 250,000 250,000Total 146 Page 172 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project involves the replacement of the emergency radio repeater/booster in the Public Works Building. The system provides signal boost to emergency services personal inside the building during an emergency and is vital to their ability to communicate. The existing system was damaged a number of years ago and is no longer functioning. " Project #FAC25121 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name PW Building Emergency Services Radio Repeater Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,000250,000Installation/Maintenance 250,000 250,000Total Total20252026202720282029Funding Sources 2030 250,000250,000Public Safety Aid 250,000 250,000Total 147 Page 173 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Design Services to replace existing studio lighting in City Council Chambers. System is standalone from rest of building lighting and will remain so. Project includes design fees only to allow for a budget to be set in subsequent CIP. Facilities would lead project with support from Communications. " Project #FAC25122 Justification Asset Functionality Justification - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall Council Chambers Studio Lighting Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Installation/Maintenance 300,000 300,000Total Total20252026202720282029Funding Sources 2030 300,000300,000Construction Fund: Cable PEG 300,000 300,000Total 148 Page 174 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jon Darsow 2025 2030thru Department Facilities Description "This project will install a new comfort station facility near hole 6. Facilities along with Braemar staff identified an area in the front 9 portion of the golf course where a much needed comfort station could be easily located. The amount included in the CIP is meant to be a match to funding from the Golf Course. " Project #FAC25124 Justification Expansion and/or Level of Service Sustainability - The new comfort station will possibly utilize solar power for all electrical and water heating needs. Useful LifeProject Name Golf Course Restroom Front 9 Category Capital > $20k Type Expand or enhance Budget Goal Total Project Cost:$400,000 Total20252026202720282029Expenditures2030 400,000400,000Construction 400,000 400,000Total Total20252026202720282029Funding Sources 2030 400,000400,000Golf Course Fund 400,000 400,000Total 149 Page 175 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace 2 existing HVAC condensing units servicing city hall. These units provide necessary refrigeration to keep the building comfortable during cooling season. The existing units have reached the end of their useful life and need replacement. Preparations for the replacement will happen concurrently with the re-roofing of the building in 2024. " Project #FAC25125 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall HVAC Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000500,000Installation/Maintenance 500,000 500,000Total Total20252026202720282029Funding Sources 2030 500,000500,000Construction Fund: CIP Levy 500,000 500,000Total 150 Page 176 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description A roof photovoltaic (PV) feasibility study was conducted in 2023 researching possible solar arrays and Electric Vehicle (EV) charging stations for both private and public use. The study reviewed all city buildings, parking ramps, and large parking surface lots taking into consideration possible array size, energy generation, and required infrastructure upgrades and made recommendations on ideal sites. The installation of the PV & EV systems should align with the replacement of any roofing or parking lots to minimize disruption and avoid costly retrofitting of systems. PV 2026 #1 York Ave Liquor $225,000 2026 #2 Pamela Park $300,000 2028 #3 Senior Center $500,000 2029 #4 SMPSTF $500,000 EV 2030 #1 City Hall $600,000 Lvl. 3 Fast Charger 2030 #2 SMPSTF $500,000 Lvl 2 chargers Project #FAC25126 Justification Expansion and/or Level of Service Sustainability:This project supports Climate Action Plan Strategy BE 7: Achieve 25% municipal building thermal “fuel switching"" from on-site fossil fuel combustion to less carbon intensive, or carbon neutral sources by 2030. Adding more electric vehicles to the City’s fleet is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emissions. Fast charging supports electric vehicle adoption by providing quick, convenient charging. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of electric vehicle charging infrastructure. Focusing on city fleet, this project does not contain an engagement component. Health in All Policies: Electric vehicles are zero-emission vehicles, meaning there are no harmful tailpipe emissions that negatively impact air quality. Race & Equity: Charging stations located across the community create equitable access to infrastructure. Stewardship: The cost to charge vehicles is decreasing and is already more cost-effective per mile to charge a vehicle when compared to gas- powered vehicles Useful LifeProject Name Photovoltaic & EV Charger Installation Category Equipment and Vehicles Type Expand or enhance Budget Goal Total Project Cost:$2,225,000 Total20252026202720282029Expenditures2030 2,225,000575,000 50,000 500,000Vehicles and Equipment 1,100,000 575,000 50,000 500,000 2,225,000Total1,100,000 Total20252026202720282029Funding Sources 2030 2,225,000575,000 50,000 500,000CAS Fund: Utility Franchise Fees 1,100,000 575,000 50,000 500,000 2,225,000Total1,100,000 151 Page 177 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description The project will continue the process of making our buildings more efficient by conducting an evaluation of entire building systems across the cities portfolio. These studies review performance or MEP systems as well as those of that create the building envelope replacing inefficient system with newer technology. These types of projects are co-led by Facilities and Sustainability and work directly with building occupants and staff involved in the operations of the space. Project #FAC25127 Justification Asset Functionality Useful LifeProject Name Fire Station #1 Energy Management Study Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000500,000Planning and Design 500,000 500,000Total Total20252026202720282029Funding Sources 2030 500,000500,000CAS Fund: Utility Franchise Fees 500,000 500,000Total 152 Page 178 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as fire trucks, ambulances, safety equipment, emergency medical equipment and technology, among other items. 2025 Equipment Levy: 2016 Ford F350 Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Mobile Air Cart Response Ambulance/Fire Truck Debt Payment 2019A GO Bond 2015 Toyota Prius C 2015 Toyota Prius C 2015 Toyota Prius C 2015 Toyota Prius C 2025 Public Safety Aid: LUCAS 2 Chest Compression Device Respirator Fit Tester Machine Thermal Imager EOC IT Equipment Hub 2026 Equipment Levy: Equip Cert Payment Ultrasound Devices Ambulance/Fire Truck Debt Payment 2019A GO Bond 2027 Equipment Levy: 2018 Chevrolet Tahoe 2018 Chevrolet Tahoe Equip Cert Payment Fire Protective Gear Dryer Ambulance/Fire Truck Debt Payment 2019A GO Bond Warning Siren #6 - Gleason/Dewey Hill Warning Siren #9 -7235 France Ave. Warning Siren #4 - 5300 Blake Rd Warning Siren #5 - 6250 Hansen Rd Warning System Siren (#2 - 4201 W.44th St.) 2028 Equipment Levy: 2018 Chevrolet Tahoe 2018 Chevrolet Tahoe Equip Cert Payment Station Alerting Ambulance/Fire Truck Debt Payment 2019A GO Bond 2016 Toyota Prius C 2016 Toyota Prius C 2018 Toyota Prius C 2018 Toyota Prius C 2029 Equipment Levy: Project #FIR23200 Useful LifeProject Name Fire Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$6,675,492 153 Page 179 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire LUCAS 2 Chest Compression Device LUCAS 2 Chest Compression Device LUCAS 2 Chest Compression Device Equip Cert Payment Station 1 &2 Floor Scrubber Ambulance/Fire Truck Debt Payment 2019A GO Bond Warning Siren #3 - 7200 Metro Blvd 2030 Equipment Levy: Equip Cert Payment Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of fire safety equipment, emergency and medical equipment and vehicles allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenenace costs low. Total20252026202720282029Expenditures2030 6,675,492890,500 1,044,845 1,258,995 1,403,395 1,112,350Vehicles and Equipment 965,407 890,500 1,044,845 1,258,995 1,403,395 1,112,350 6,675,492Total965,407 Total20252026202720282029Funding Sources 2030 6,567,292782,300 1,044,845 1,258,995 1,403,395 1,112,350Construction Fund: Equipment Levy 965,407 108,200108,200Public Safety Aid 890,500 1,044,845 1,258,995 1,403,395 1,112,350 6,675,492Total965,407 154 Page 180 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Amy Murray 2025 2030thru Department Human Resources Description Correct the following identified hazards: machine guarding, dust collection, industrial spray hood, area carbon monoxide monitoring. Project #HR25100 Justification Health, Safety & Regulatory Compliance Sustainability - Each of the items listed will improve the functioning environment for the safety of staff. Health in all policies - Each of the items listed will improve the functioning environment for the safety of staff. Stewardship - By providing a healthy and safe work environment for staff, this will positively impact both current and future staff. Useful LifeProject Name Centennial Lakes Garage Safety Equip Improvements Category Equipment and Vehicles Type New Budget Goal Total Project Cost:$25,000 Total20252026202720282029Expenditures2030 25,00025,000Installation/Maintenance 25,000 25,000Total Total20252026202720282029Funding Sources 2030 25,00025,000Construction Fund: Equipment Levy 25,000 25,000Total 155 Page 181 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project involves replacement of the Normandale Park shelter building with a more modern design similar to Countryside and Pamela Park. Normandale Park is a 10 acre neighborhood park. Staff would complete a master plan of Normandale Park is 2027 and recommends the replacement of the playground in 2028. ENVIRONMENTAL CONSIDERATIONS: Replacing this building will upgrade the lighting and heating systems with more energy efficient equipment. Project #15-048 Justification The Normandale Park shelter building was designed and build in the 1970ss and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. Useful LifeProject Name Normandale Park Shelter Building Replacement Category Buildings Type Replace or repair Budget Goal Total Project Cost:$1,040,000 Total20252026202720282029Expenditures2030 1,040,00040,000 1,000,000Construction 40,000 1,000,000 1,040,000Total Total20252026202720282029Funding Sources 2030 1,040,00040,000 1,000,000Construction Fund: CIP Levy 40,000 1,000,000 1,040,000Total 156 Page 182 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Replacement of the Lewis Park shelter building based on space needs and community engagement. Evaluation of programming and space needs will be included to determine required square footage. Design will be driven by city goals and values. " Project #15-049 Justification The Lewis Park shelter building was designed and built in the 1970's and no longer meets residents' needs. The building requires extensive maintenance and is recommended for scheduled replacement. Useful LifeProject Name Lewis Park Shelter Building Replacement Category Buildings Type Replace or repair Budget Goal Total Project Cost:$900,000 Total20252026202720282029Expenditures2030 900,000900,000Construction 900,000 900,000Total Total20252026202720282029Funding Sources 2030 900,000900,000Construction Fund: CIP Levy 900,000 900,000Total 157 Page 183 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Creek Valley park is an active park within our parks system, with two soccer fields that are utilized by private athletic leagues and the Edina Public School system. The current system is 35 years old, and is due for replacement. We are unable to secure parts for this system, uses an excess amount of water and is not efficient. It is important to note that the athletic fields are on school district property but we maintain them. Project #17-143 Justification This is a part of our City Work plan to maintain optimum field operations. Useful LifeProject Name Creek Valley Irrigation Category Parks Type Replace or repair Budget Goal Total Project Cost:$50,000 Total20252026202720282029Expenditures2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total20252026202720282029Funding Sources 2030 50,00050,000Special Park Improvement Levy 50,000 50,000Total 158 Page 184 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Tingdale Park. Project #19-763 Justification See Summary of Playground Improvements Useful LifeProject Name Tingdale Park Playground Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$155,000 Total20252026202720282029Expenditures2030 155,000155,000Vehicles and Equipment 155,000 155,000Total Total20252026202720282029Funding Sources 2030 155,000155,000Special Park Improvement Levy 155,000 155,000Total 159 Page 185 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project includes the repair and replacement of general park and recreation park assets and infrastructure. Final evaluation of the amenity will be made in order to continue replacement of park equipment prior to scheduled replacement to ensure improvements are made as needed. This includes items such as tennis, basketball and other hard court repair and replacement; fencing for tennis, softball and baseball; replacement of hockey rinks, basketball standards as well as other property in the open such as benches, tables, drinking fountains and trash receptacles. Regular repair and replacement of these amenities will extend the life of these facilities. ENVIRONMENTAL CONSIDERATIONS: Per city policy staff will incorporate the use of recycled materials in products as available to offset these replacements. Project #P&R21001 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. This is part of our City Work Plan to maintain optimum facility operations. Useful LifeProject Name General Park Asset Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,00050,000 50,000 50,000 50,000Construction 50,000 50,000 50,000 50,000 50,000 250,000Total50,000 Total20252026202720282029Funding Sources 2030 250,00050,000 50,000 50,000 50,000Construction Fund: Equipment Levy 50,000 50,000 50,000 50,000 50,000 250,000Total50,000 160 Page 186 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project schedules the repair and replacement of existing outdoor athletic lighting for fields and rinks. This project does not expand lighting to areas that currently does not have lights. Project #P&R21003 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. This is part of our City Work Plan to maintain optimum facility operations. Useful LifeProject Name Outdoor Athletic Field Lighting Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$900,000 Total20252026202720282029Expenditures2030 900,000180,000 180,000 180,000 180,000Installation/Maintenance 180,000 180,000 180,000 180,000 180,000 900,000Total180,000 Total20252026202720282029Funding Sources 2030 900,000180,000 180,000 180,000 180,000Special Park Improvement Levy 180,000 180,000 180,000 180,000 180,000 900,000Total180,000 161 Page 187 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project would improve the field condition and enhancements for programmed athletic fields in Edina Parks. Improvements would increase field drainage, field health, player safety, and sustainability. Improvement would increase field reliability for associations and users as well as improved participant experience. Project #P&R21006 Justification This field could support more youth athletics activities if the conditions are improved. Useful LifeProject Name Athletic Field Improvements Category Parks Type Replace or repair Budget Goal Total Project Cost:$1,400,000 Total20252026202720282029Expenditures2030 1,050,000350,000 350,000Construction 350,000 350,000 350,000 1,050,000Total350,000 Future 350,000 Total Total20252026202720282029Funding Sources 2030 1,050,000350,000 350,000Construction Fund: CIP Levy 350,000 350,000 350,000 1,050,000Total350,000 Future 350,000 Total 162 Page 188 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project includes master planning for Strachauer Park, a 4.5 acre neighborhood park. This project is the second phase of implementation for the Strachauer Park Master Plan. This phase includes the removal and relocation of the park shelter. Design for this phase will incorporate park and programming requirements as well as community feedback. Project #P&R21039 Justification The shelter building was assessed to be in poor condition. The building requires extensive maintenance. Useful LifeProject Name Strachauer Park Master Plan Phase II Category Parks Type Expand or enhance Budget Goal Total Project Cost:$1,100,000 Total20252026202720282029Expenditures2030 1,100,0001,100,000Construction 1,100,000 1,100,000Total Total20252026202720282029Funding Sources 2030 1,100,0001,100,000Special Park Improvement Levy 1,100,000 1,100,000Total 163 Page 189 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Normandale Park. Project #P&R21046 Justification See Summary of Playground Improvements Useful LifeProject Name Normandale Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$200,000 Total20252026202720282029Expenditures2030 200,000200,000Vehicles and Equipment 200,000 200,000Total Total20252026202720282029Funding Sources 2030 200,000200,000Construction Fund: CIP Levy 200,000 200,000Total 164 Page 190 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Heights Park. Project #P&R21047 Justification See Summary of Playground Improvements Useful LifeProject Name Heights Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$175,000 Total20252026202720282029Expenditures2030 175,000175,000Vehicles and Equipment 175,000 175,000Total Total20252026202720282029Funding Sources 2030 175,000175,000Construction Fund: CIP Levy 175,000 175,000Total 165 Page 191 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Sherwood Park. Project #P&R21048 Justification See Summary of Playground Improvements Useful LifeProject Name Sherwood Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$150,000 Total20252026202720282029Expenditures2030 150,000150,000Vehicles and Equipment 150,000 150,000Total Total20252026202720282029Funding Sources 2030 150,000150,000Special Park Improvement Levy 150,000 150,000Total 166 Page 192 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Kojetin Park. Project #P&R21049 Justification See Summary of Playground Improvements Useful LifeProject Name Kojetin Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$165,000 Total20252026202720282029Expenditures2030 165,000165,000Vehicles and Equipment 165,000 165,000Total Total20252026202720282029Funding Sources 2030 165,000165,000Special Park Improvement Levy 165,000 165,000Total 167 Page 193 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Replacement of and update to outdoor and indoor public facing furniture. Many of the amenities are outdated, mismatched and have no draw to users. Earlier this year, new outdoor furniture was installed at the Golf Course and at the Aquatic Center and was welcomed and positively received. $40,000 for furniture at Centennial Lakes Park and $25,000 for furniture at Edinborough Park. Project #P&R23100 Justification Replacement of and update to outdoor and indoor public facing furniture at these two locations will benefit users and visitors to each location. Useful LifeProject Name CLP & EP Interior and Exterior Public Furniture Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Federal ARPA 40,000 40,000Total 168 Page 194 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Replace equipment according to the equipment replacement schedule. The Parks Maintenance Department has almost $2 million of equipment covered under this program. Types of equipment include small machinery, mowers, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025: 2008 Ford Ranger 2013 GMC Sierra 60" turf Sweeper 2010 Terex Track Loader 2011 Ford XLT Ranger 4x4 2013 Chevrolet Silverado 2500HD 2026: 2013 Chevrolet Silverado 2500HD Toro Groundsmaster 5910 2015 John Deere 1570 Mower 2011 Ford Ranger 2013 F-450 2015 Ford F250 2010 Farm King Snowblower 2014 John Deere X540 Tractor 2015 Toro 2Master 2027: 2016 Toro SandPro 2040Z 2009 Silverado 1500 2017 Exmark Lazer Mower 2017 Bobcat 5600 2016 Toro GTX Workman 2006 Jacovsen Truck Cart 2028: GPS Line Marking System Toro Groundmaster 3500 Mower 2016 Chevrolet Colorado 2016 Polaris Ranger ATV 2004 John Deere Tractor 2029: 2015 Land Pride Mower 4216 2011 Freightliner M2106 2030: 2010 Vermeer Brush Chipper 2015 John Deere 5115M Tractor Groundsmaster 3280-D Mower Groundsmaster 3280-D Mower 2020 Ford F550 Project #P&R23120 Useful LifeProject Name Park Maintenance Equip Replacement - Vehicles Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$1,693,750 169 Page 195 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs low but most importantly allows us to keep maintaining our parks to high standards. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of the Park Maintenance division without a reliable fleet. Total20252026202720282029Expenditures2030 1,693,750329,300 411,700 234,250 223,500 191,000Vehicles and Equipment 304,000 329,300 411,700 234,250 223,500 191,000 1,693,750Total304,000 Total20252026202720282029Funding Sources 2030 1,693,750329,300 411,700 234,250 223,500 191,000Construction Fund: Equipment Levy 304,000 329,300 411,700 234,250 223,500 191,000 1,693,750Total304,000 170 Page 196 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project replaces the existing playground structure and safety surface at Alden Park. Project #P&R23203 Justification See Summary of Playground Improvements. Useful LifeProject Name Alden Park Playground Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$185,000 Total20252026202720282029Expenditures2030 185,000185,000Vehicles and Equipment 185,000 185,000Total Total20252026202720282029Funding Sources 2030 185,000185,000Special Park Improvement Levy 185,000 185,000Total 171 Page 197 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at McGuire Park. Project #P&R23206 Justification See Summary of Playground Improvements Useful LifeProject Name McGuire Park Playground Equipment Replacement.Category Parks Type Replace or repair Budget Goal Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,000250,000Vehicles and Equipment 250,000 250,000Total Total20252026202720282029Funding Sources 2030 250,000250,000Special Park Improvement Levy 250,000 250,000Total 172 Page 198 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project will provide for infrastructure enhancements at the Van Valenburg dog park. Project #P&R23207 Justification The dog park at Van Valkenburg is in need of repairs and for the provision of water for park users. Useful LifeProject Name Off Leash Dog Park Investments Category Parks Type Expand or enhance Budget Goal Total Project Cost:$10,000 Total20252026202720282029Expenditures2030 10,00010,000Construction 10,000 10,000Total Total20252026202720282029Funding Sources 2030 10,00010,000Special Park Improvement Levy 10,000 10,000Total 173 Page 199 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Pamela Park. Project #P&R23208 Justification See Summary of Playground Improvements Useful LifeProject Name Pamela Park Playground Equipment Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000300,000Vehicles and Equipment 300,000 300,000Total Total20252026202720282029Funding Sources 2030 300,000300,000Special Park Improvement Levy 300,000 300,000Total 174 Page 200 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at York Park. Project #P&R23212 Justification See summary of Playground Improvements. Useful LifeProject Name York Park Playground Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$175,000 Total20252026202720282029Expenditures2030 175,000175,000Vehicles and Equipment 175,000 175,000Total Total20252026202720282029Funding Sources 2030 175,000175,000Special Park Improvement Levy 175,000 175,000Total 175 Page 201 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description "Fred Richards Park, 4400 Parklawn Ave., is being created from the former Fred Richards Executive Golf Course, which closed in 2014. It also includes what was formerly known as Lake Edina Park. The 43-acre site, almost double the size of Centennial Lakes Park, will become a multi-use park for a variety of year-round activities. Fred Richards Park will subtly divide into sections, providing different experiences for people and nature: (1) Central Green with pickleball courts, basketball courts, lawn games area, stage/pavilion area, clubhouse renovation, landscaping, turf and walkways, parking and access via West 77th Street, lighting, signs and infrastructure. (2) The Nature Bank with native vegetation restoration and establishment, trees and shrubs, play nodes, wildlife habitat structures, boardwalk and trail, seating, signs and infrastructure. (3) Great Lawn and Loop with a pedestrian bridge restoration and new trail, great lawn area with high-quality drainage, picnic pavilion, traditional and bike playgrounds, lighting, seating, signs and infrastructure. " Project #P&R25100 Justification Expansion and/or Level of Service Useful LifeProject Name Fred Richards Park Category Parks Type Expand or enhance Budget Goal Total Project Cost:$16,255,000 Total20252026202720282029Expenditures2030 16,255,0005,500,000 9,250,000 805,000 700,000Construction 5,500,000 9,250,000 805,000 700,000 16,255,000Total Total20252026202720282029Funding Sources 2030 16,255,0005,500,000 9,250,000 805,000 700,000Local Option Sales Tax 5,500,000 9,250,000 805,000 700,000 16,255,000Total 176 Page 202 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description "At 500 acres, Braemar Park, 6364 John Harris Drive, is the largest recreational space in Edina. It is home to Braemar Golf Course, Braemar Golf Dome, Braemar Arena, Braemar Field, Courtney Fields and the South Metro Public Safety Training Facility. While most of the land in Braemar Park already is in use, several opportunities for improvements were identified and explored starting in 2017 with the help of resident input at community meetings and through online surveys. The Braemar Park Master Plan balances the most-sought amenities with the park's environmental and natural resource needs. It includes an estimated $8.1 million in improvements, including: walking trails, mountain biking trails, cross-country skiing trails, pickleball and platform tennis courts, baseball complex improvements, wayfinding signs and trail connections, natural resource restoration, improved parking and access to Braemar Golf Course, Braemar Arena and Courtney Fields. Braemar Arena is home to Edina High School, the Edina Hockey Association, Breakaway Academy and the Braemar-City of Lakes Figure Skating Club. Braemar Arena is one of the busiest ice arenas in the entire state; approximately 500,000 annual visits are recorded there from residents of 158 Minnesota communities, 12 states and one other country. The project covers $13.5 million in capital rehabilitation improvements in Braemar Arena’s operating infrastructure, including: dasherboard and glass safety system replacements, flooring replacements, ice refrigeration system and delivery replacements, heat and boiler replacements for all rinks, electrical system replacements for all rinks, window and roofing replacements and repairs, hot water system replacements, domestic water distribution system replacements, sanitary system and fixture replacements, locker room rehabilitation, restroom rehabilitation, permafrost removal in East Rink, energy efficiency improvements and insulation, ADA route and walkway improvements, ADA door and access improvements, ADA restroom improvements, ADA viewing and seating improvements, waterproofing and moisture control, fire protection and security improvement. " Project #P&R25101 Justification Expansion and/or Level of Service Useful LifeProject Name Braemar Park & Arena Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$47,140,000 Total20252026202720282029Expenditures2030 47,140,00011,850,000 17,320,000 15,820,000 2,150,000Planning and Design 11,850,000 17,320,000 15,820,000 2,150,000 47,140,000Total Total20252026202720282029Funding Sources 2030 47,140,00011,850,000 17,320,000 15,820,000 2,150,000Local Option Sales Tax 11,850,000 17,320,000 15,820,000 2,150,000 47,140,000Total 177 Page 203 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project involves the replacement of Highland Park shelter building. Highlands Park was the city's first implemented park improvement project. Fields and landscaping were completed in 1960 and the shelter facility was built in the 1970s. This shelter is in poor condition and no longer meets resident's needs. This building is poorly insulated, and lacks windows, making it unwelcoming, therefore serving limited functions. Project #P&R25102 Justification Asset Functionality","Expansion and/or Level of Service Sustainability - New shelter would exceed sustainability goals and initiatives. Stewardship - Replacing the shelter reduces future costs of maintenance. Useful LifeProject Name Highlands Park Shelter Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$1,250,000 Total20252026202720282029Expenditures2030 1,250,000Installation/Maintenance 1,250,000 1,250,000Total1,250,000 Total20252026202720282029Funding Sources 2030 1,250,000Construction Fund: CIP Levy 1,250,000 1,250,000Total1,250,000 178 Page 204 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Yorktown Park located in the Promenade neighborhood bordering Richfield is one of Edina's smallest parks. With the relocation of Fire Station 2, currently house on this parkland, this small area park requires a study to determine vision and future needs. This study would evaluate existing recreational features including skate park, community gardens, and regional trail link. This would require collaboration with Three Rivers and City of Richfield to incorporate trail needs and recreational linkages to Adams Hill Park. Project #P&R25103 Justification Expansion and/or Level of Service Sustainability - Master Plan process ensures sustainability and project longevity by reducing project waste. This process promotes smart and strategic growth. Community Engagement - This project would engage community on collaboration level to create park infrastructure and amenities that support community needs. Useful LifeProject Name Yorktown Park Master Plan Category Parks Type Expand or enhance Budget Goal Total Project Cost:$790,000 Total20252026202720282029Expenditures2030 790,00040,000Planning and Design 750,000 40,000 790,000Total750,000 Total20252026202720282029Funding Sources 2030 790,00040,000Construction Fund: CIP Levy 750,000 40,000 790,000Total750,000 179 Page 205 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Chowen Park. Project #P&R25104 Justification Asset Functionality Stewardship - Replacing the playground equipment will reduce staff time spent on repairs and improve safety. Useful LifeProject Name Chowen Park Playground Improvement Category Parks Type Replace or repair Budget Goal Total Project Cost:$350,000 Total20252026202720282029Expenditures2030 350,000Installation/Maintenance 350,000 350,000Total350,000 Total20252026202720282029Funding Sources 2030 350,000Construction Fund: CIP Levy 350,000 350,000Total350,000 180 Page 206 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Countryside Park. Project #P&R25105 Justification Expansion and/or Level of Service","Asset Functionality Stewardship - Replacing the playground equipment will reduce staff time spent on repairs and improve safety. Useful LifeProject Name Countryside Playground Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$315,000 Total20252026202720282029Expenditures2030 315,000315,000Vehicles and Equipment 315,000 315,000Total Total20252026202720282029Funding Sources 2030 315,000315,000Construction Fund: CIP Levy 315,000 315,000Total 181 Page 207 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Pathway and parking replacement and enhancements for park projects. These projects will evaluate capacity, site conditions, and accessibility needs for parks. Project #P&R25106 Justification Expansion and/or Level of Service","Asset Functionality Useful LifeProject Name Park Pathways and Parking Project Improvements Category Parks Type Replace or repair Budget Goal Total Project Cost:$525,000 Total20252026202720282029Expenditures2030 525,00025,000 100,000 100,000 100,000 100,000Construction 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 Total20252026202720282029Funding Sources 2030 525,00025,000 100,000 100,000 100,000 100,000Construction Fund: CIP Levy 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 182 Page 208 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Continue to evaluate and identify accessibility barriers within parks and recreational programming. Improvements may include surfacing, pathways, signage, and other needs. Project #P&R25107 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name Parks Accessibility Improvements Category Parks Type Expand or enhance Budget Goal Total Project Cost:$525,000 Total20252026202720282029Expenditures2030 525,00025,000 100,000 100,000 100,000 100,000Planning and Design 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 Total20252026202720282029Funding Sources 2030 525,00025,000 100,000 100,000 100,000 100,000Construction Fund: CIP Levy 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 183 Page 209 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Project includes replacement and enhancement of existing picnic shelter to accommodate user needs and accessibility. Project #P&R25108 Justification Asset Functionality Useful LifeProject Name Utley Park Shelter Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$60,000 Total20252026202720282029Expenditures2030 60,00060,000Installation/Maintenance 60,000 60,000Total Total20252026202720282029Funding Sources 2030 60,00060,000Construction Fund: CIP Levy 60,000 60,000Total 184 Page 210 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Replacement of existing Picnic Pavilion and garden gathering space. Maintenance and repairs have extended useful life of exiting shelter but a new structure would increase accessibility and useful functions. Design and accommodations will include integration of community, garden council, and historic society needs. Project #P&R25110 Justification Asset Functionality Useful LifeProject Name Arneson Park Shelter Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$75,000 Total20252026202720282029Expenditures2030 75,00075,000Installation/Maintenance 75,000 75,000Total Total20252026202720282029Funding Sources 2030 75,00075,000Construction Fund: CIP Levy 75,000 75,000Total 185 Page 211 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Rosland Park located off crosstown in the heart of Edina embodies the profile of a special use park. Home of the Edina Aquatic Center and Edina Art Center it provides vital services to Edina and the community as a whole. With changes to the Art Center and identified upgrades for the Aquatic Center, this park requires evaluation and community input for its long term goals and vision. This park contains one of a kind Edina offering such as an inclusive playground, disc golf course, fishing pier, pickleball courts, and sand volleyball. A study would help determine how community and recreational trends can be incorporated into future project plans. Project #P&R25111 Justification Expansion and/or Level of Service Sustainability - The most recent park plan was done in 1958 and project and amenities have been added beyond these features. To ensure park sustainability and longevity it is important to assess existing needs and incorporate future needs. Planning helps eliminate waste in the form of both materials and time, reducing disturbances to residents and natural resources. Community Engagement - This project allow for a full community engagement and full collaboration on the future of Rosland Park. Engagement would include neighbors, residents, users, commissioners, and city council. Engagement will ensure features meet needs and are accessible. Health in all policies - A long term plan for Rosland Park will help to maximize its recreational potential as well as its health benefits. Features that maximize physical and mental health can be incorporated, as well as natural resource benefits. Race & Equity - This plan will review and evaluate all barriers to the current Rosland Park programming and also integrate opportunities in a new design. Stewardship - This projects plan will allow for long term growth and decision making within the park. It will accommodate phasing and smart growth. Useful LifeProject Name Rosland Park Master Plan Category Parks Type Expand or enhance Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000100,000Planning and Design 100,000 100,000Total Total20252026202720282029Funding Sources 2030 100,000100,000Local Option Sales Tax 100,000 100,000Total 186 Page 212 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This project includes the replacement of the picnic shelter for Fox Meadow Park. The existing structure will need to be removed and a new structure installed that meet community and site needs. Project #P&R25113 Justification Asset Functionality Useful LifeProject Name Fox Meadow Shelter Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$55,000 Total20252026202720282029Expenditures2030 55,00055,000Construction 55,000 55,000Total Total20252026202720282029Funding Sources 2030 55,00055,000Special Park Improvement Levy 55,000 55,000Total 187 Page 213 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Aquatic Center Description "Existing user feature require refurbishment and replacement. These features are unique to the Edina Aquatic Center and used to draw visitors to the park. Replace Shipwreck Zipline & Diving boards $500,000 Site User Amenities $470,000 Flow-rider Surf Simulator $100,000 Slide Tower Stairs Painting $75,000 Water Slide repainting--gel coating $150,000 Site User Amenities $470,000 Replace Zero Depth Play Structure $1,500,000" Project #P&R25115 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Aquatic Center User Feature Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$2,795,000 Total20252026202720282029Expenditures2030 2,795,000500,000 470,000 75,000 150,000 100,000Installation/Maintenance 1,500,000 500,000 470,000 75,000 150,000 100,000 2,795,000Total1,500,000 Total20252026202720282029Funding Sources 2030 2,795,000500,000 470,000 75,000 150,000 100,000Local Option Sales Tax 1,500,000 500,000 470,000 75,000 150,000 100,000 2,795,000Total1,500,000 188 Page 214 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Arena Description New zambonis for Braemar Arena. The renovation and expansion will provide for one but the arena has multiple zambonis that are well beyond their useful life. ENVIRONMENTAL CONSIDERATIONS: The Zamboni is powered by a lithium ion battery. This is the most green technology in the ice resurfacing business. In addition, a self leveling system would be included that would reduce the amount of ice thus reducing the energy used to freeze the ice. Project #17-028 Justification Zamboni's are a necessity to ice arena operations. When a Zamboni ages you will start to see imperfections in the ice due to the machine not operating properly. During the winter months and the Backyard Rink is in operation we use all four Zamboni's, therefore it is very important that all machines are in proper working condition. Useful LifeProject Name Braemar Arena Zamboni Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$400,000 Total20252026202720282029Expenditures2030 400,000200,000 200,000Vehicles and Equipment 200,000 200,000 400,000Total Total20252026202720282029Funding Sources 2030 400,000200,000 200,000Construction Fund: Equipment Levy 200,000 200,000 400,000Total 189 Page 215 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Arena Description Purchase Bobcats with attachments-dirt and snow buckets, snow box, snow blower. this piece of equipment is critical for moving large items as well as snowplowing 3 large lots. Project #P&R25121 Justification Asset Functionality Sustainability: Current bobcat is 2012 and has had significant maintenance issues Community Engagement Facility cannot be utilized safely when not plowed correctly for users and guests. Health in All Policies Without the proper equipment to maintain the arena grounds and paved surface areas, access becomes unsafe. Race & Equity Having safe access points allows for great accessibility by users and guests. Stewardship: The current bobcat has high gas use and is inefficient to use. The maintenannce is also costly and time-consuming Useful LifeProject Name Braemar Arena Bobcats & Attachments Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$330,000 Total20252026202720282029Expenditures2030 330,000200,000 130,000Vehicles and Equipment 200,000 130,000 330,000Total Total20252026202720282029Funding Sources 2030 330,000200,000 130,000Construction Fund: Equipment Levy 200,000 130,000 330,000Total 190 Page 216 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description Replace sports turf and dome fabric shell at Braemar Field. The existing turf is experiencing issues due to stormwater managemennt design and turf is having to be replaced in sections due to this. This will shorten the useful life of the turf. Project #P&R25125 Justification Asset Functionality Sustainability - New turf and fabric shell would provide energy efficiencies. Community Engagement - Field surface and structure will be safe for users. Health in all policies - Safe turf and building envelope will allow users of all ages, youth athletic associations, adults and others to continue to utilize the space for physical activity, community and socialization. Race and equity - Space would be inclusive for all users and continue to be a high-use facility for all of the community. Stewardship - A new turf field and shell allows for efficiencies in maintenance and provide another 15-20 years of use for the facility. Useful LifeProject Name Braemar Field Turf & Shell Replacement Category Land Type Replace or repair Budget Goal Total Project Cost:$2,300,000 Total20252026202720282029Expenditures2030 2,300,0002,300,000Installation/Maintenance 2,300,000 2,300,000Total Total20252026202720282029Funding Sources 2030 2,300,0002,300,000Braemar Field Fund 2,300,000 2,300,000Total 191 Page 217 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description Purchase and install a second coiled heater for Braemar Field. The existing insulation had to be discarded. In order to maintain a comfortable user temp and to provide a backup, a second coiled heater is recommended. The existing heater is not adequate for the space and is undersized for our dome size. Project #P&R25126 Justification Asset Functionality Sustainability: Adding a second coiled heater would provide a more comfortable environmennt for users and be more energy efficient. Community Engagement: During the winter months, the temp for users and guests would allow for a better overall experience Health in All Policies: A more comfortable temperature inside the dome would provide more opportunities and access for use. The community's older demographic would feel safer in a better temp controlled environment. Race & Equity: A warmer and safer space would allow for great accessiblity and use for walkers, renters, guests and program participants. Stewardship: A second heater would provide a backup if we had a failure with the existing heater and also provide for savings in service and maintenance. Useful LifeProject Name Braemar Field Heater Category Equipment and Vehicles Type Expand or enhance Budget Goal Total Project Cost:$400,000 Total20252026202720282029Expenditures2030 400,000400,000Vehicles and Equipment 400,000 400,000Total Total20252026202720282029Funding Sources 2030 200,000200,000Construction Fund: Grants/Donations 200,000200,000Braemar Field Fund 400,000 400,000Total 192 Page 218 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description The Braemar Field Turf is experiencing numerous sink holes due to the design of the stormwater management system below the field surface. Turf is getting comprised and has been non-usable for weeks at a time due to these issues. A redesign of the system is needed to continue to have safe and playable surface at this site. Project #P&R25127 Justification Asset Functionality, Health, Safety & Regulatory Compliance Sustainability: Stormwater needs to be rerouted so as not to impede underlying system for drainage. Community Engagement: Turf needs to be level and safe for users to be able to utilize. A redesign of the sub surface stormwater system allows the city to continue to provide a year-round facility for play and physical activity. Health in All Policies: Turf surface is needed in order to be able to provide a year-round facility for exercise, play and programming. Race & Equity: Braemar Field provides a community location for all ages and abilities to exercise, play and socialize on a safe surface Stewardship: Providing a long-term solution to the stormwater issue will allow the city to keep a synthetic turf facility available to the public and users on a year-round basis for years to come. Useful LifeProject Name Braemar Field Stormwater Design Category Capital > $20k Type New Budget Goal Total Project Cost:$75,000 Total20252026202720282029Expenditures2030 75,00075,000Planning and Design 75,000 75,000Total Total20252026202720282029Funding Sources 2030 75,00075,000Braemar Field Fund 75,000 75,000Total 193 Page 219 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description The 2005 Chevrolet pickup truck at Centennial Lakes was originally scheduled to be replaced in 2015 and again in 2018 but was removed due to funding constraints. Under the vehicle scoring criteria used by the Public Works mechanics, this vehicle is due for replacement. This vehicle is used for plowing the park pathways and ice skating rink in the winter months and for general hauling in the other months. ENVIRONMENTAL CONSIDERATIONS: A new vehicle would offer lower emissions which would help to achieve the City goal of a 25% reduction in emissions by 2025. We would consider both an electric vehicle as well as a hybrid vehicle for this replacement. Project #17-039 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Useful LifeProject Name Centennial Lakes Vehicle Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Construction Fund: Equipment Levy 40,000 40,000Total 194 Page 220 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Add free public Wi-Fi in center portion of Centennial Lakes Park. Project #P&R25130 Justification Expansion and/or Level of Service Race and Equity - Provide free service to public in highly populated, diverse area of City Stewardship - Contributes to a better connected society. Useful LifeProject Name Centennial Lakes Park Public Wi-Fi Category Parks Type Expand or enhance Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Construction Fund: CIP Levy 40,000 40,000Total 195 Page 221 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park has a large artistic fountain (seasonal) that greats visitors to the park. The fountain has suffered damaged to its internal components and needs repairs and cleaning to make it operational. Project #P&R25145 Justification Asset Functionality Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Centennial Lakes Entrance Fountain Repair Category Parks Type Replace or repair Budget Goal Total Project Cost:$150,000 Total20252026202720282029Expenditures2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total20252026202720282029Funding Sources 2030 150,000150,000Construction Fund: CIP Levy 150,000 150,000Total 196 Page 222 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park improvements as needed. Project #P&R25147 Justification The upkeep of City infrastructure is a key component of the Vision Edina document. Useful LifeProject Name Centennial Lakes Improvements Category Parks Type Expand or enhance Budget Goal Total Project Cost:$800,000 Total20252026202720282029Expenditures2030 800,000Construction800,000 800,000Total800,000 Total20252026202720282029Funding Sources 2030 800,000Construction Fund: CIP Levy 800,000 800,000Total800,000 197 Page 223 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The track is an area with cardio and strength training equipment that is not air conditioned. It is surrounded by windows that can't be opened. Air conditioning is a basic expectation in this type of space and the lack of air conditioning presents a health and safety concern. Project #15-069 Justification When Edinborough Park was built more than 30 years ago, air conditioning was not installed in the track area. The track is surrounded by windows that cannot be opened. During the summer months temperatures can exceed 90 degrees. Air conditioning in an exercise area is a basic expectation of anyone working out indoors. As noted in Vision Edina one of the strategic actions is "to continue to prioritize amenities that meet the needs of residents of all ages." Exercising at these temperatures can become a safety and health issue for anyone, especially senior citizens using the area. The addition of air conditioning to the track will make the facility a more appealing alternative for the community to enjoy year round. Useful LifeProject Name Edinborough Park Track Air Conditioning Category Buildings Type New Budget Goal Total Project Cost:$81,000 Total20252026202720282029Expenditures2030 81,00081,000Vehicles and Equipment 81,000 81,000Total Total20252026202720282029Funding Sources 2030 81,00081,000Edinborough Fund 81,000 81,000Total 198 Page 224 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Edinborough Park has 15 pieces of fitness equipment that are in need of replacement. The treadmills, ellipticals, rowers and strength equipment is out of date. Parts and service for these old machines is becoming much more expensive and difficult to find. The track is used by our association partners (Corporate Center, Brookdale Senior Living, Marriott Residence Inn, and Edinborough Townhomes) as well as the Edina Swim Club, our annual members and guests who purchase a daily admission. To maximize the impact of this project, it should be coordinated with replacing the track flooring. Project #P&R21012 Justification Replacing the fitness equipment at Edinborough Park is needed because the equipment is beyond useful life and requires constant maintenance. Marketing Pool & Track memberships at this time is difficult due to the lack of equipment. The Marriott Residence Inn is one of our association partners that pays park maintenance fees and they do not have exercise equipment or a swimming pool. Our agreement with them includes pool and track privileges for their guests. Currently, the selection, condition and availability of the equipment does not meet our standards for quality. In addition, our other association partners also have privileges to use this equipment. With Brookdale Senior Living as another association partner, we could better serve their residents with updated equipment specifically geared towards older adults. Useful LifeProject Name Edinborough Park Fitness Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$26,000 Total20252026202720282029Expenditures2030 26,00026,000Vehicles and Equipment 26,000 26,000Total Total20252026202720282029Funding Sources 2030 26,00026,000Edinborough Fund 26,000 26,000Total 199 Page 225 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The project would replace the original track surface that is from 1986. The surface is worn down and has areas that are tripping hazards. Project #P&R25148 Justification Health, Safety & Regulatory Compliance, Asset Functionality Health in All Policies: The track provides a safe place for exercise and attracts many senior citizens. Keeping the integrity of the surface is important to reduce trips and falls. Useful LifeProject Name Edinborough Park Track Surface Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$90,000 Total20252026202720282029Expenditures2030 90,00090,000Construction 90,000 90,000Total Total20252026202720282029Funding Sources 2030 90,00090,000Edinborough Fund 90,000 90,000Total 200 Page 226 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The project will replace exterior landscaping that is 38 years old and is esthetically unattractive. It does not represent the first impression that is expected of a City of Edina Facility Project #P&R25149 Justification Expansion and/or Level of Service Useful LifeProject Name Edinborough Park Replace Exterior Landscaping Category Parks Type Replace or repair Budget Goal Total Project Cost:$75,000 Total20252026202720282029Expenditures2030 75,00075,000Construction 75,000 75,000Total Total20252026202720282029Funding Sources 2030 75,00075,000Edinborough Fund 75,000 75,000Total 201 Page 227 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Edinborough Park Description Expand loading dock area for additional trash enclosure space. Includes repairs to loading dock surfaces. Repairs to exterior lighting at South entrance- $50,000 Project #P&R25150 Justification Asset Functionality Sustainability: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment Useful LifeProject Name Edinborough Park Loading Dock Category Parks Type Expand or enhance Budget Goal Total Project Cost:$125,000 Total20252026202720282029Expenditures2030 125,00050,000 75,000Construction 50,000 75,000 125,000Total Total20252026202720282029Funding Sources 2030 50,00050,000Edinborough Fund 75,00075,000Funding TBD 50,000 75,000 125,000Total 202 Page 228 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace aging concession equipment to improve operational efficiency and reduce energy costs. Project #P&R25151 Justification Asset Functionality Useful LifeProject Name Edinborough Park Concession Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$24,000 Total20252026202720282029Expenditures2030 24,00024,000Construction 24,000 24,000Total Total20252026202720282029Funding Sources 2030 24,00024,000Edinborough Fund 24,000 24,000Total 203 Page 229 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace sound and lighting systems for performances. Blue tooth connectivity is an expectation for most performers and we do not have that. The lighting gets extremely hot, making it uncomfortable for performers. Project #P&R25152 Justification Asset Functionality Sustainability: Replacing current lighting with LED would realize energy cost savings. Community Engagement: Performances are well attended and upgrading the sounds and lighting would improve the patron experience. Stewardship: The Amphitheater has a long history of community performances and keeping up with modern technology is expected at a City facility. Useful LifeProject Name Edinborough Park Amphitheater Upgrades Category Parks Type Replace or repair Budget Goal Total Project Cost:$23,500 Total20252026202720282029Expenditures2030 23,50023,500Construction 23,500 23,500Total Total20252026202720282029Funding Sources 2030 23,50023,500Edinborough Fund 23,500 23,500Total 204 Page 230 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Temporary concrete was installed during the plaza reconstruction project and it needs to be replaced with permanent concrete. Project #P&R25153 Justification Health, Safety & Regulatory Compliance Community Engagement: Replacing the concrete ensures the integrity of the walkway and safety for everyone entering the facility. Health in All Policies: Replacing the concrete ensures the integrity of the walkway and safety for everyone entering the facility. Stewardship: This is the main entry to our facility and will ensure safety for everyone entering the facility. Useful LifeProject Name Edinborough Park SE Entry Concrete Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$27,000 Total20252026202720282029Expenditures2030 27,00027,000Construction 27,000 27,000Total Total20252026202720282029Funding Sources 2030 27,00027,000Edinborough Fund 27,000 27,000Total 205 Page 231 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace all lockers in locker room and in the playpark to ensure patrons can safely secure their personal belongings while they are using the facility. Existing lockers do not lock properly and are rusty on the inside leaving residue on patrons belongings. Project #P&R25154 Justification Asset Functionality Health in All Policies: Replacing the locker will provide patrons with a sense of security and safety for their belongings while they are using the facility. Stewardship: The lockers are so old, it's difficult to find replacement parts to make them operational. It tis frustrating to patrons that we have an asset doesn't work. Replacing the metal existing lockers with plastic lockers will increase their useful life. Useful LifeProject Name Edinborough Park Locker Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$31,000 Total20252026202720282029Expenditures2030 31,00031,000Construction 31,000 31,000Total Total20252026202720282029Funding Sources 2030 31,00031,000Edinborough Fund 31,000 31,000Total 206 Page 232 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replacing the 2008 Chevy Silverado (with Tommy Gate) vehicle allows staff to navigate the Edinborough Park campus, as well as hauling items for projects and trips for supplies. Project #P&R25155 Justification Asset Functionality Sustainability: New vehicle will be more fuel efficient than the 2008 model. Community Enagagement: The vehicle will represent the City in a positive and professional manner. Useful LifeProject Name Edinborough Park Truck Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$50,000 Total20252026202720282029Expenditures2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total20252026202720282029Funding Sources 2030 50,00050,000Edinborough Fund 50,000 50,000Total 207 Page 233 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description To continue to meet Health Code requirements, the pool filter needs to be replaced. The pool filter was installed in 2004 and has exceeded its useful life. Parts are no longer available for the model we have. Project #P&R25156 Justification Asset Functionality Sustainability: A new filter could use regenerative media, reducing the frequency of backwashing and saves water. Community Engagement: Replacing the filter ensures that the water will be clean and safe for community members to swim in. Health In All Policies: Replacing the filter ensures that the water will be clean and safe for community members to swim in. Race & Equity: Everyone will benefit from swimming in a clean, safe pool. Stewardship: The filter replacement ensures ongoing operations for our members, community members, swim clubs and other rental groups. Useful LifeProject Name Edinborough Park Pool Filter Replacement Category Parks Type Replace or repair Budget Goal Total Project Cost:$70,000 Total20252026202720282029Expenditures2030 70,00070,000Construction 70,000 70,000Total Total20252026202720282029Funding Sources 2030 70,00070,000Edinborough Fund 70,000 70,000Total 208 Page 234 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The Braemar Clubhouse Lower Level is presently under-utilized because of its floor plan as well as its condition. Restrooms and shower facilities as well as the plumbing infrastructure need to be repaired and renovated. Project #17-031 Justification Renovation is needed to keep facility up to acceptable standards for a premier facility. National Golf Foundation (NGF) reports golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system. Useful LifeProject Name Braemar Golf Clubhouse Lower Level Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000Construction100,000 100,000Total100,000 Total20252026202720282029Funding Sources 2030 100,000Golf Course Fund 100,000 100,000Total100,000 209 Page 235 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description A second sprayer to help spray fairways and greens. Spraying fairways with the one sprayer we have can take one full week to complete. Ideally, when spraying you want to get it done in two days or less. Would like to be able to spray growth regulator on the fairways to help out with seedheads and slow the growth rate down to possibly mow once a week only. Not only to slow the vertical growth but it also helps horizontal growth to help fill in thinner areas. This smaller sprayer would be better on greens as well with less weight with the tire marks across the greens. ENVIRONMENTAL CONSIDERATIONS: Getting everything sprayed in one or two days rather than a week, the perception would be more ideal not seeing the sprayer out there all the time for a week straight. Project #P&R21028 Justification A visual by the customers not seeing the sprayer out there for a week straight and also better for the consistency of the way the golf course plays. Useful LifeProject Name Toro 300 Gal Sprayer Category Equipment and Vehicles Type Expand or enhance Budget Goal Total Project Cost:$85,000 Total20252026202720282029Expenditures2030 85,00085,000Vehicles and Equipment 85,000 85,000Total Total20252026202720282029Funding Sources 2030 85,00085,000Golf Course Fund 85,000 85,000Total 210 Page 236 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Addition of cart paths on holes #6 and #11. This will complete the continuous loop of the 18-hole golf course. Project #P&R21043 Justification In strategic alignment with Edina’s mission statement to "offer premier public facilities". Useful LifeProject Name Cart Path Addition Hole #6 & #11 Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$150,000 Total20252026202720282029Expenditures2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total20252026202720282029Funding Sources 2030 150,000150,000Golf Course Fund 150,000 150,000Total 211 Page 237 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The netting that protects the Golf Dome fabric is in disrepair due to the high volume of golf balls that are hit on a daily basis. We have made repairs to the netting each of the last three years. Cost of repairs have ranged between $5,000 and $8,500. A new net design is required to alleviate the constant repairs. Replacement needed to keep facility up to acceptable standards for a premier facility. In strategic alignment with Edina’s mission statement to ""offer premier public facilities"". The National Golf Foundation (NGF) report also confirms justification ""NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are ""living and breathing"" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system Project #P&R25160 Justification Asset Functionality Useful LifeProject Name Golf Dome Netting Repairs Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,000100,000 150,000Construction 100,000 150,000 250,000Total Total20252026202720282029Funding Sources 2030 250,000100,000 150,000Golf Course Fund 100,000 150,000 250,000Total 212 Page 238 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replace existing gas mowers for tees and approaches with Hybrid model. Mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. Existing 4 Workman’s are reaching the end of their useful lifespan. Existing 4 Workman’s are reaching the end of their useful lifespan. Kubota or a John Deere tractor with a front end loader would be used year round by removing snow in the winter and other projects throughout the course and in the summer it could be used daily with loading topdressing sand or divot mix and other projects. These tractors are ideal for tractor mounted aerators and we have two of those for only one tractor at the present. With the construction of the new golf course there are many areas that are compacted and these machines could be running spring and fall yearly. Replace fairway mower. Fairway mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. Replace large rough mower. Rough mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. 2025 - Toro 4500 Rough Mower 2026 - Kubota or John Deere Tractor, Toro 3555 Fairway Mowers (2), Toro 4500 Rough Mower 2027 - Toro 3320 Hybrid Triplex Mowers (2), Toro Workman 2028 - Toro Workman 2029 - Toro Workman Project #P&R25162 Justification Asset Functionality. By adding an additional tractor we will be able to save money in the long run. It will also add to the efficiency of golf course operations. Lots of acreage to mow with not much time to stay ahead of play. Adding this mower would help to dedicate one of our older mowers for the practice areas and Academy 9. Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the Useful LifeProject Name Golf Course Tractor & Mower Replacements Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$705,000 213 Page 239 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Total20252026202720282029Expenditures2030 705,000100,000 295,000 160,000 50,000 100,000Vehicles and Equipment 100,000 295,000 160,000 50,000 100,000 705,000Total Total20252026202720282029Funding Sources 2030 705,000100,000 295,000 160,000 50,000 100,000Golf Course Fund 100,000 295,000 160,000 50,000 100,000 705,000Total 214 Page 240 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Add irrigation to areas of the course that were not irrigated in the Master Plan Project. These areas are heavily trafficked and require staff to manually pull around hoses and sprinkler bases which eliminates other tasks needed to be accomplished. Project #P&R25164 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Irrigation Upgrade Category Capital > $20k Type Expand or enhance Budget Goal Total Project Cost:$225,000 Total20252026202720282029Expenditures2030 225,000225,000Construction 225,000 225,000Total Total20252026202720282029Funding Sources 2030 225,000225,000Golf Course Fund 225,000 225,000Total 215 Page 241 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replacement of 6 utility carts. Existing carts are at the end of their useful lifespan. Project #P&R25166 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Club Car Utility Carts Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$78,000 Total20252026202720282029Expenditures2030 78,00026,000 26,000 26,000Vehicles and Equipment 26,000 26,000 26,000 78,000Total Total20252026202720282029Funding Sources 2030 78,00026,000 26,000 26,000Golf Course Fund 26,000 26,000 26,000 78,000Total 216 Page 242 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replace existing lift table. The current one continues to leak hydraulic fluid even after the cylinders have been replaced a few years back. Used daily. Project #P&R25167 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Maintenance Facility Lift Table Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$20,000 Total20252026202720282029Expenditures2030 20,00020,000Vehicles and Equipment 20,000 20,000Total Total20252026202720282029Funding Sources 2030 20,00020,000Golf Course Fund 20,000 20,000Total 217 Page 243 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Comfort station located on hole #15 requires painting, siding replacement and roof repairs. Project #P&R25168 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Restroom Renovation Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Construction 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 218 Page 244 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Insulate the cold storage building that is connected to the main shop to keep it warmer during the winter months so more work can be done out there and also help with longevity of equipment Project #P&R25169 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Cold Storage Insulation Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$60,000 Total20252026202720282029Expenditures2030 60,00060,000Construction 60,000 60,000Total Total20252026202720282029Funding Sources 2030 60,00060,000Golf Course Fund 60,000 60,000Total 219 Page 245 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Tear down and rebuild. The walls are rotting and have holes in them. Could be used for more storage as well for accessories during the winter months. Project #P&R25170 Justification Asset Functionality Useful LifeProject Name Update Well House #2 on Hole #13 Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$75,000 Total20252026202720282029Expenditures2030 75,00075,000Construction 75,000 75,000Total Total20252026202720282029Funding Sources 2030 75,00075,000Golf Course Fund 75,000 75,000Total 220 Page 246 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The existing practice green is too small for the number of Juniors and Academy 9 players. The plan is to rebuild and enlarge the green. Also, build a pavilion in the area for people waiting to pick up their children as well as a gathering point for the Academy 9. Project #P&R25171 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Practice Green Enlargement / Academy 9 Pavilion Category Capital > $20k Type Expand or enhance Budget Goal Total Project Cost:$75,000 Total20252026202720282029Expenditures2030 75,00075,000Construction 75,000 75,000Total Total20252026202720282029Funding Sources 2030 75,00075,000Golf Course Fund 75,000 75,000Total 221 Page 247 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Driving Range Safety Netting is needed to protect golfers on hole #9 of the Championship Golf Course and hole #1 of the Academy 9 Golf Course from errant shots coming from the driving range. Project #P&R25172 Justification Health, Safety & Regulatory Compliance Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Driving Range Safety Netting Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$200,000 Total20252026202720282029Expenditures2030 200,000200,000Construction 200,000 200,000Total Total20252026202720282029Funding Sources 2030 200,000200,000Golf Course Fund 200,000 200,000Total 222 Page 248 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description To be more sustainable and environmentally friendly, we are proposing to add native areas that would save water and enhance wildlife and the use of less emissions. Project #P&R25175 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Additional Native Areas Category Land Type Expand or enhance Budget Goal Total Project Cost:$65,000 Total20252026202720282029Expenditures2030 65,00065,000Construction 65,000 65,000Total Total20252026202720282029Funding Sources 2030 65,00065,000Golf Course Fund 65,000 65,000Total 223 Page 249 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Build a new nursery green that has the same USGA specs that the existing greens have. Project #P&R25176 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course New Nursery Green Category Land Type New Budget Goal Total Project Cost:$100,000 Total20252026202720282029Expenditures2030 100,000100,000Construction 100,000 100,000Total Total20252026202720282029Funding Sources 2030 100,000100,000Golf Course Fund 100,000 100,000Total 224 Page 250 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Fill in gaps in cart path to make a continuous loop. Project #P&R25178 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Cart Path Addition Academy 9 Category Capital > $20k Type Expand or enhance Budget Goal Total Project Cost:$150,000 Total20252026202720282029Expenditures2030 150,000150,000Construction 150,000 150,000Total Total20252026202720282029Funding Sources 2030 150,000150,000Golf Course Fund 150,000 150,000Total 225 Page 251 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Utilize the Braemar property just south of John Harris Drive (Old #21) to create an Academy Training Facility. Short Course, Teaching Bays, Practice Greens and Instruction area. Project #P&R25180 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Academy Training Facility Category Buildings Type New Budget Goal Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000500,000Construction 500,000 500,000Total Total20252026202720282029Funding Sources 2030 500,000500,000Golf Course Fund 500,000 500,000Total 226 Page 252 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description As planned in the Braemar Park Master Plan, reconfigure and replace asphalt to make ADA accessible. Project #P&R25181 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Parking Lot Upgrade Category Capital > $20k Type Replace or repair Budget Goal Total Project Cost:$1,000,000 Total20252026202720282029Expenditures2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total20252026202720282029Funding Sources 2030 1,000,0001,000,000Local Option Sales Tax 1,000,000 1,000,000Total 227 Page 253 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Drainage upgrades on fairways #6, #11 and #16. Drainage lines to be installed to move water from low laying areas. Project #P&R25182 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Drainage Upgrade Category Capital > $20k Type Expand or enhance Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Construction 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 228 Page 254 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Re-Grass and add irrigation system to the Academy 9 Clubhouse. Project #P&R25183 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Academy 9 Re-Grass & Irrigation Category Capital > $20k Type Expand or enhance Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Construction 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 229 Page 255 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The drainage underneath the green on hole #8 sits lower than the pond so water has a really hard time exiting the green. Also, there is a large bird bath where water can’t exit the surface of the green. When you cut a cup, you can notice the difference in the greens mix compared to other greens. Propose to move the green on the other side of the pond to make it a true par 5. All this work can be completed without disrupting play. You could build the green then once you close in the fall, remove existing green and base and sod it with fairway grass and add fairway to the right of the pond leading up to green. Project #P&R25184 Justification Asset Functionality Useful LifeProject Name Green Renovation/Relocation Hole #8 Category Capital > $20k Type Expand or enhance Budget Goal Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000500,000Construction 500,000 500,000Total Total20252026202720282029Funding Sources 2030 500,000500,000Golf Course Fund 500,000 500,000Total 230 Page 256 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Dome Description Upgrade electrical capacity at Golf Dome. In future operations, this will facilitate offering an enhanced experience for the golf dome customers including the addition of television monitors to each bay. Project #P&R21036 Justification In strategic alignment with Edina’s mission statement to "offer premier public facilities". Useful LifeProject Name Dome Electrical Update Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$25,000 Total20252026202720282029Expenditures2030 25,00025,000Installation/Maintenance 25,000 25,000Total Total20252026202720282029Funding Sources 2030 25,00025,000Golf Course Fund 25,000 25,000Total 231 Page 257 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Dome Description Expand the Golf Dome building to include enhanced Food & Beverage offerings. Project #P&R25185 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Dome Building Expansion Category Buildings Type Expand or enhance Budget Goal Total Project Cost:$3,000,000 Total20252026202720282029Expenditures2030 3,000,0003,000,000Construction 3,000,000 3,000,000Total Total20252026202720282029Funding Sources 2030 3,000,0003,000,000Golf Course Fund 3,000,000 3,000,000Total 232 Page 258 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Liquor Stores Description Each building component was evaluated to determine needed maintenance and replacements to extend the buildings lifespan. The funding will be used for project design and planning, roof, electrical system repairs, exterior envelope repairs, interior finishes repairs, plumbing system repairs, and replacement of furniture, fixtures and equipment at the three liquor stores. Project #FAC23110 Justification This is a part of our City Work plan to maintain optimum facility operations. Useful LifeProject Name Liquor Stores Facility Improvements Category Buildings Type Replace or repair Budget Goal Total Project Cost:$901,600 Total20252026202720282029Expenditures2030 57,60029,600 28,000Planning and Design 71,00071,000Vehicles and Equipment 773,000197,000 296,000 280,000Installation/Maintenance 297,600 324,000 280,000 901,600Total Total20252026202720282029Funding Sources 2030 901,600297,600 324,000 280,000Liquor Fund 297,600 324,000 280,000 901,600Total 233 Page 259 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replacement of E911 Call Handling System. Project #POL21005 Justification Between 2014-2016 Edina partnered with Hennepin County, Minneapolis, HCMC, and Allina to deploy a state of the art shared E911 call handling system. The system was forecast to have a service life of approximately 10 years. While it is hoped that ongoing upgrades will extend the service life of this system it is important we plan for potential replacement in 2026. A major system refresh is being completed in 2022 so this replacement has been deferred until 2027. This was previously funded split between both E911 and Equipment Replacement. Useful LifeProject Name Dispatch E911 Call Handling System Category Technology Type Replace or repair Budget Goal Total Project Cost:$550,000 Total20252026202720282029Expenditures2030 550,000550,000Software 550,000 550,000Total Total20252026202720282029Funding Sources 2030 550,000550,000E911 550,000 550,000Total 234 Page 260 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as squads, safety equipment and technology, among other items. 2025 Equipment Levy: Mobile Pro Defender Camera System 2018 Dodge Durango 2018 Dodge Durango 2018 Chevrolet Traverse 2018 Jeep Grand Cherokee 2018 Jeep Grand Cherokee Ford Interceptor AWD K8A S 26-215 2025 Public Safety Aid: License Plate Readers (ALPR/2017-2020) 2026 Equipment Levy: Speed Measurement Radar Equipment (Stalker Radar) SWAT Team Rifles 2019 Ford Interceptor Utility - Black/Ebony 2019 Toyota RAV4 2019 Toyota Highlander LE Hybrid - Model 6964 2021 Ford F-150 Hybrid 2021 Ford F-150 Hybrid 2026 E911: Dispatch Radio Consoles 2027 Equipment Levy: Computer Forensics Analysis Workstation StarChase Pursuit Intervention System 2020 Ford Explorer 2018 Dodge Grand Caravan 2022 Ford Interceptor Utility 2022 Ford Interceptor Utility 2022 Ford Lightning EV 2020 Ford Explorer (Unmarked) 2020 Toyota Rav4 Hybrid XLE (Unmarked) 2023 Ford Lightning 2023 Ford Lightning 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2027 E911: E911 Call Handling System (CHS-1) 2028 Equipment Levy: License Plate Readers (ALPR/2021) StarChase Pursuit Intervention System 2017 Harley Davidson Motorcycle 2017 Harley Davidson Motorcycle Project #POL23200 Useful LifeProject Name Police Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$4,215,300 235 Page 261 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Chevy Blazer PPV EV 2024 Chevy Blazer PPV EV 2028 E911: 911 Logging System 2029 Equipment Levy: Patrol Rifles Tasers 2022 Ford Mach E - EV 2022 Toyota Rav4 Hybrid 2022 Toyota Highlander Hybrid 2022 Toyota Highlander Hybrid 2024 Ford Explorer Utility 2024 Dodge Durango Squad 2030 Equipment Levy: Tasers Replacement Program SWAT Vests 2023 Hyundai Santa Fe Hybrid Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of police safety equipment,technology and vehicles allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Total20252026202720282029Expenditures2030 4,215,300440,000 833,000 1,417,800 616,000 690,000Vehicles and Equipment 218,500 440,000 833,000 1,417,800 616,000 690,000 4,215,300Total218,500 Total20252026202720282029Funding Sources 2030 3,102,300380,000 358,000 867,800 588,000 690,000Construction Fund: Equipment Levy 218,500 1,053,000475,000 550,000 28,000E911 60,00060,000Public Safety Aid 440,000 833,000 1,417,800 616,000 690,000 4,215,300Total218,500 236 Page 262 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description This will add a fully marked patrol squad to the police fleet. A total of (4) patrol officers are being added to the department between 2024-25. An additional squad car is required to accommodate this increased staffing. The cost includes the vehicle, emergency equipment, and upfitting costs. Costs are higher for the initial build of this squad car due to systems that are typically purchased for the entire fleet under other projects. This build includes a mobile radio, radar/LIDAR, first aid/AED equipment, mobile computer, squad mounted weapons, and the in squad video system. ***May be eligible for Public Safety Grant Funding*** Project #POL25101 Justification Expansion and/or Level of Service Sustainability: The Police Department continues to incorporate fully electric (EV) and hybrid vehicles into our fleet. Vehicle procurement for police squads has become very difficult in recent years and the final selection will be based on vehicle availability and balancing the fleet appropriately to assure maximum availability of emergency response vehicles. Community Engagement: Fully marked police vehicles are a highly visible and provide a sense of safety and security in the community. Health in All Policies: An adequate and reliable fleet of emergency response vehicles is essential for our police officers to carry out their job duties. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The police department continues to responsibly manage our fleet to maximize efficiency and minimize cost while prioritizing public safety and employee safety. Useful LifeProject Name Patrol Squad Car Addition Category Equipment and Vehicles Type New Budget Goal Total Project Cost:$130,000 Total20252026202720282029Expenditures2030 130,00070,000 60,000Vehicles and Equipment 70,000 60,000 130,000Total Total20252026202720282029Funding Sources 2030 60,00060,000Construction Fund: Equipment Levy 70,00070,000Public Safety Aid 70,000 60,000 130,000Total 237 Page 263 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Purchase (4) rifle-rated ballistic shields for Police operations. Police Officers are facing an unprecedented number of threats involving firearms. This continues to evolve to include rifle fire including tragic incidents in 2024 in Burnsville and Minnetonka. Police body armor and existing ballistic shields are not rated to protect against rifle threats. This is essential equipment to protect Police Officers responding to active shooter situations and other firearm threats. Two shields will be placed in our SWAT vehicle and two shields will be deployed in our Patrol Sergeant squads to assure rapid availability in the field. ***May be eligible for Public Safety Grant Funding*** Project #POL25103 Justification Health, Safety & Regulatory Compliance, Expansion and/or Level of Service Sustainability: This project has no immediate sustainability impacts. Community Engagement: The community expects Police Officers to be equipped to immediately respond to violent acts including active shooters and other armed threats that have unfortunately become more common. This equipment assures our officers will be better equipped to intervene more quickly and safely when encountering rifle threats. Health in All Policies: We have an obligation to our employees to provide the equipment necessary to keep them safe. Technology, tactics, and threats rapidly evolve and this investment is critical to keep us properly equipped. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: This is a direct investment in officer safety and wellness as our staff faces increasing hazards in their work. Useful LifeProject Name Rifle-Rated Ballistic Shields Category Equipment and Vehicles Type New Budget Goal Total Project Cost:$40,000 Total20252026202720282029Expenditures2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total20252026202720282029Funding Sources 2030 40,00040,000Public Safety Aid 40,000 40,000Total 238 Page 264 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace the bi-directional amplifier (BDA) system installed in City Hall. The BDA allows ARMER portable radios used by Police, Fire, and Public Works to function inside of City Hall / Police Department. These systems are critical for public safety and required by code. ARMER radios do not function in several areas of City Hall/Police without an operational BDA. The current BDA was installed in 2016 and is reaching the end of it's useful life. The original infrastructure used by this system including coaxial cables and antennas dates back to 2004. This project will replace the BDA device and replace any antenna/cable infrastructure that does not meet current standards. Project #POL25107 Justification Asset Functionality, Health, Safety & Regulatory Compliance Sustainability: Existing electronic equipment will be recycled properly. Community Engagement: This equipment allows public safety personnel to operate safely and efficiently. This includes protection of City staff and assets. Health in All Policies: This project replaces critical life safety equipment in City Hall/Police Department that is required by code. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: When the original ARMER BDA system (2004) failed in 2016 the department was able to repurpose infrastructure from an abandoned system for legacy cellular devices to significantly reduce the project cost by over $60,000. Proper maintenance has provided a longer than expected service life for the 2016 system. This investment maintains a critical system while continuing to minimize cost. Useful LifeProject Name PS Radio Bi-Directional Amplifier (BDA) Rplcmt Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$25,000 Total20252026202720282029Expenditures2030 25,00025,000Vehicles and Equipment 25,000 25,000Total Total20252026202720282029Funding Sources 2030 25,00025,000Public Safety Aid 25,000 25,000Total 239 Page 265 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well # 7 by repairing or replacing the well pump, motor, and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-913 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #7 Rehabilitation Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$300,000 Total20252026202720282029Expenditures2030 300,000180,000 120,000Installation/Maintenance 180,000 120,000 300,000Total Total20252026202720282029Funding Sources 2030 300,000180,000 120,000Utility Fund: Water 180,000 120,000 300,000Total 240 Page 266 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well # 11 by repairing or replacing the well pump, motor, and other worn equipment. It would also inlcude replacing: 2023 - Exterior doors and Interior doors, roof replacement, painting, gas unit heaters, controls, lighting fixtures, crackfilling/ sealing stucco walls, fire alarm system and sprinklers. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-915 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #11 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$240,000 Total20252026202720282029Expenditures2030 240,000120,000Construction 120,000 120,000 240,000Total120,000 Total20252026202720282029Funding Sources 2030 240,000120,000Utility Fund: Water 120,000 120,000 240,000Total120,000 241 Page 267 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #20 by repairing or replacing the well pump, motor, and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-918 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #20 Rehabilitation Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$180,000 Total20252026202720282029Expenditures2030 180,000180,000Construction 180,000 180,000Total Total20252026202720282029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 242 Page 268 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Public Works Description A fiber connection is required to replace the existing wireless connection. This new fiber connection will improve the speed and reliability allowing improvements for computer use and security in the building. Project #ITS25100 Justification Expansion and/or Level of Service Sustainability: This connection will require less network hardware replacement and less power. Stewardship: This connection will cost less over its lifetime and provide better service than the existing wireless connection Useful LifeProject Name CLP Maintenance Fiber Category Technology Type New Budget Goal Total Project Cost:$30,000 Total20252026202720282029Expenditures2030 30,00030,000Construction 30,000 30,000Total Total20252026202720282029Funding Sources 2030 30,00030,000Construction Fund: CIP Levy 30,000 30,000Total 243 Page 269 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Public Works Description We are nearly out of fiber strands heading north from City Hall to St. Louis Park. Additional strands will be needed for fiber projects in the north end of town as well as projects that need to connect to LOGIS or Hennepin County. This would install a new fiber optic cable with plenty of strands to support operations well into the future. Project #ITS25101 Justification Expansion and/or Level of Service Sustainability: Fiber connections are often the network backbone that supports many types of projects. Stewardship: Fiber connections offer speed and security to all sorts of City projects. Fiber also offers a long service life. Useful LifeProject Name Increase Fiber Capacity to SLP Category Technology Type New Budget Goal Total Project Cost:$60,000 Total20252026202720282029Expenditures2030 60,00060,000Construction 60,000 60,000Total Total20252026202720282029Funding Sources 2030 60,00060,000Construction Fund: CIP Levy 60,000 60,000Total 244 Page 270 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replacing larger retaining walls citywide. We have a list of needed improvements. Project #PW22002 Justification Retaining wall failures for larger walls completely exhaust our budget and often need to be funded by our bridge maintenance budget causing significant deferred maintenance on our bridges Useful LifeProject Name Annual Deferred Retaining Wall Replacements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$750,000 Total20252026202720282029Expenditures2030 750,00050,000 100,000 200,000 200,000Construction 200,000 50,000 100,000 200,000 200,000 750,000Total200,000 Total20252026202720282029Funding Sources 2030 750,00050,000 100,000 200,000 200,000Construction Fund: CIP Levy 200,000 50,000 100,000 200,000 200,000 750,000Total200,000 245 Page 271 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #15 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23002 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #15 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$140,000 Total20252026202720282029Expenditures2030 140,000Construction140,000 140,000Total140,000 Total20252026202720282029Funding Sources 2030 140,000Utility Fund: Water 140,000 140,000Total140,000 246 Page 272 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #10 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23004 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #10 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$120,000 Total20252026202720282029Expenditures2030 120,000Construction120,000 120,000Total120,000 Total20252026202720282029Funding Sources 2030 120,000Utility Fund: Water 120,000 120,000Total120,000 247 Page 273 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #12 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23005 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #12 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$180,000 Total20252026202720282029Expenditures2030 180,000180,000Construction 180,000 180,000Total Total20252026202720282029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 248 Page 274 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #20 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23006 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #13 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$180,000 Total20252026202720282029Expenditures2030 180,000180,000Construction 180,000 180,000Total Total20252026202720282029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 249 Page 275 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #2 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23007 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #2 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$170,000 Total20252026202720282029Expenditures2030 170,000170,000Construction 170,000 170,000Total Total20252026202720282029Funding Sources 2030 170,000170,000Utility Fund: Water 170,000 170,000Total 250 Page 276 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #6 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23008 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #6 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$180,000 Total20252026202720282029Expenditures2030 180,000180,000Construction 180,000 180,000Total Total20252026202720282029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 251 Page 277 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the annual rehabilitation of a Lift Station by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23009 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Lift Station Pump and VFD Renewal Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$180,000 Total20252026202720282029Expenditures2030 180,00030,000 30,000 30,000 30,000 30,000Construction 30,000 30,000 30,000 30,000 30,000 30,000 180,000Total30,000 Total20252026202720282029Funding Sources 2030 180,00030,000 30,000 30,000 30,000 30,000Utility Fund: Sewer 30,000 30,000 30,000 30,000 30,000 30,000 180,000Total30,000 252 Page 278 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replace equipment according to the equipment replacement schedule. The Public Works Department has almost $10 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025 Equipment Levy: 2013 GMC Sierra 2013 GMC Sierra 2004 Clark C25C 51" SnoQuip XX Blower Patch King 6 Ton Patch Box 2015 Ford F350 7433S Case Loader 2026 Equipment Levy: Used 2010 TR MT6 Trackless Tractor L8500 Sterling MT6 Trackless 2027 Equipment Levy: Weiler TT500 Tack Trailer 2028 Equipment Levy: PS Aid Cert Payment CAT SW345B 3" Wheel Saw Crafco SS125 Diesel Melter 2002 Allu SM3-23 2018 Ford F550 2016 Ford F550 2017 Ford F350 2029 Equipment Levy: PS Aid Cert Payment Towmaster T14DT Trailer 2014 Caterpillar 272D Skid Steer MT6 Trackless Sidewalk Machine 2017 Western Star Tandem Axle Truck Hypac C747 Roller 2030 Equipment Levy: PS Aid Cert Payment Gilcrest Asphalt Tailgate Paver 2017 Caterpillar Skid Steer 2017 Ford F350 2020 Kenworth K370 Truck w/Velocity Patcher Asphalt Trailer Project #PWK23200 Useful LifeProject Name Public Works Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$4,214,107 253 Page 279 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs low but most importantly allows us to keep maintaining our snow removal in an efficient manner. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of a Public Works Department without a reliable fleet. Total20252026202720282029Expenditures2030 4,214,107583,500 830,000 23,000 767,684 1,089,000Vehicles and Equipment 920,923 583,500 830,000 23,000 767,684 1,089,000 4,214,107Total920,923 Total20252026202720282029Funding Sources 2030 4,214,107583,500 830,000 23,000 767,684 1,089,000Construction Fund: Equipment Levy 920,923 583,500 830,000 23,000 767,684 1,089,000 4,214,107Total920,923 254 Page 280 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replace equipment according to the equipment replacement schedule. The Public Works and Parks maintenance Department has almost $10 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025: 2005 Kohler 300REOZVW 2015 Ford F250 2026: 1996 Towmaster T12DD Trailer 2006 Thompson 6" water pump 2016 Ford F550 2027: 2007 Bluestar 175 Kw generator 2007 Multiquip Light Plant 2016 Westernstar 4700 Vaccon 2017 Ford F250 2028: 2018 Volvo ECR88D 2017 Ford F350 2002 Speco easment machine 2013 Ford F550 2017 GMC Serri 2018 F150 2018 F150 2029: 2004 Katolight D300FJ4 2004 Cat 3456 2003 Cat 400Kw generator 2006 Bluestar BSJ300 300KW generator 2009 Cat 80Kw generator 2019 Ford F150 2019 Ford F150 2030: 2005 Kohler 300 kW generator 2020 Dulevo Sweeper 2020 F150 Project #PWK23201 Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs lower but most importantly allows us to keep maintaining our snow removal in an efficient manner. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of a Public Works Department without a reliable fleet. Useful LifeProject Name Utilities Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$2,735,000 255 Page 281 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Total20252026202720282029Expenditures2030 2,735,000165,000 200,000 677,000 487,000 642,000Vehicles and Equipment 564,000 165,000 200,000 677,000 487,000 642,000 2,735,000Total564,000 Total20252026202720282029Funding Sources 2030 2,735,000165,000 200,000 677,000 487,000 642,000Utility Fund 564,000 165,000 200,000 677,000 487,000 642,000 2,735,000Total564,000 256 Page 282 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description This for water meter reading migration from AMR to AMI(drive by reading vs. push button real-time). We will be focusing on replacing commercial meters 1 1/2" and bigger in years 1 and 2, as these meters have the most potential for water lost. Years 2-5 will include replacement of residential meters. The replacement of these meters will allow us to fully utilize the AMI system. Project #PWK25101 Justification Expansion and/or Level of Service Sustainability: No fuel consumption for driving meter reading routes. Community Engagement: Expansion/upgrade of existing meter reading network allows for real-time monitoring and control of utility assets. Health in All Policies: Provide the City’s water customers with safe, reliable, high quality potable water supply Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Water Meter Radio Receivers Category Technology Type Expand or enhance Budget Goal Total Project Cost:$4,970,000 Total20252026202720282029Expenditures2030 4,970,0001,300,000 880,000 900,000 930,000 960,000Construction 1,300,000 880,000 900,000 930,000 960,000 4,970,000Total Total20252026202720282029Funding Sources 2030 4,970,0001,300,000 880,000 900,000 930,000 960,000Utility Fund: Water 1,300,000 880,000 900,000 930,000 960,000 4,970,000Total 257 Page 283 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description Inspect and evaluate existing filter media for possible replacement at Water Treatment Plants #2, #3 and #4. Project #PWK25102 Justification Asset Functionality Sustainability: Proper media depths and material are crucial for efficient water filtration. Health In All Policies: Provide the City’s water customers with safe, reliable, high quality potable water supply Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Filter Media Replacement Category Infrastructure Type Replace or repair Budget Goal Total Project Cost:$450,000 Total20252026202720282029Expenditures2030 450,000450,000Construction 450,000 450,000Total Total20252026202720282029Funding Sources 2030 450,000450,000Utility Fund: Water 450,000 450,000Total 258 Page 284 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description Extend Fiber network to Van Valkenburg Water Tower(4949 Malibu Dr) Project #PWK25103 Justification Expansion and/or Level of Service Sustainability: Fiber expansion would eliminate the use of current radio communication, lessening electrical load. Community Engagement: Expansion of existing fiber network allows for real-time monitoring and control of utility assets. Health in All Policies: This project will help provide the City’s water customers with safe, reliable, high quality potable water supply. Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Fiber Installation, Van Valkenburg Tower Category Infrastructure Type Expand or enhance Budget Goal Total Project Cost:$160,000 Total20252026202720282029Expenditures2030 160,000160,000Construction 160,000 160,000Total Total20252026202720282029Funding Sources 2030 160,000160,000Utility Fund: Water 160,000 160,000Total 259 Page 285 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Public Works Description This project will support Edina’s Climate Action Plan by introducing a dedicated 100 percent biodiesel fueling system to support the city’s heavy- duty fleet. The new fuel will require the acquisition of a containment vessel and distribution pumps that will be located at Public Works near existing fuel islands. Modifications to the site including concrete pad and bollards to support the system and electrical infrastructure upgrades. Project #PWK25104 Justification Expansion and/or Level of Service Sustainability: Converting heavy-duty fleet to biodiesel is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emission for city operations. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of biodiesel. Focusing on city fleet, this project does not contain an engagement component but provides the community an opportunity to see the city lead by example. Health in All Policies: Biodiesel vehicles are low-emission vehicles, meaning they have lower harmful tailpipe emissions that negatively impact air quality. This project will result in the consumption of B100 fuel, which has no tailpipe emissions. Race & Equity: Lowering or removing tailpipe emissions from our heavy-duty fleet improves tailpipe emissions which negatively impact low- income and under-served communities at a higher rate. Stewardship: The fueling tank and vehicle retrofit systems will be used by existing heavy-duty vehicles, removing the need to purchase new replacement vehicles, and prolonging the useful life of our existing heavy-duty fleet. Useful LifeProject Name Public Works Fleet - Bio Diesel Storage Tanks Category Equipment and Vehicles Type Expand or enhance Budget Goal Total Project Cost:$375,000 Total20252026202720282029Expenditures2030 375,000375,000Vehicles and Equipment 375,000 375,000Total Total20252026202720282029Funding Sources 2030 375,000375,000CAS Fund: Utility Franchise Fees 375,000 375,000Total 260 Page 286 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Technology Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as copiers and printers, servers, camera systems and switch batches, among other items. 2025: Citywide Switch Batch 2 IT Storage Replacement Server Replacements ESX 2026: Fire Control Systems at City Hall and PW Ricoh MFP - Building Cisco Access Points Batch 2 (25) 2027: PD & CH Surveillance Cameras City Hall UPS System - Full Replacement Citywide Switch Batch 3 Ricoh MFP - Admin Ricoh MFP - P&R Citywide Switch Batch 4 Squad Car Technology Upgrades City Hall UPS System (Batteries Only) Server Replacements ESX 2028: Cisco Phone System Cisco Access Point batch 3 (21) Citywide Switch Batch 5 Fire Apparatus Tech (TB, iPad & Install) PW UPS (Batteries Only) Cisco Access Point batch 3 (21) Citywide Switch Batch 5 2029: Fire Station 1 Security Fire Station 2 Security Fire Station Camera System Ricoh MFP - Police (1st Floor and 2nd Floor) Citywide Switch Batch 1 (Core and FW) Citywide Access Point Batch 1 (50) 2030: Ricoh MFP - PW Citywide Switch Batch 2 IT Storage Replacement Project #ITS23100 Useful LifeProject Name IT Equipment Replacement Category Equipment and Vehicles Type Replace or repair Budget Goal Total Project Cost:$2,340,000 261 Page 287 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Technology Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of copiers and printers, servers, camera systems and other technology equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Total20252026202720282029Expenditures2030 2,340,000440,000 95,000 633,000 500,000 294,000Vehicles and Equipment 378,000 440,000 95,000 633,000 500,000 294,000 2,340,000Total378,000 Total20252026202720282029Funding Sources 2030 2,340,000440,000 95,000 633,000 500,000 294,000Construction Fund: Equipment Levy 378,000 440,000 95,000 633,000 500,000 294,000 2,340,000Total378,000 262 Page 288 of 299 Draft - Capital Improvement Plan City of Edina, Minnesota PROJECTS BY FUNDING SOURCE 2025 2030thru Total20252026202720282029Source2030Project #Priority Braemar Field Fund P&R25125Braemar Field Turf & Shell Replacement 2,300,0002,300,000 P&R25126Braemar Field Heater 200,000200,000 P&R25127Braemar Field Stormwater Design 75,00075,000 Braemar Field Fund Total 2,575,00075,000 200,000 2,300,000 Bridge Maintenance ENG210616520 Belmore Lane Multi-Tiered Retaining Wall 400,000400,000 ENG250186932 Valley View Road Multi-Tiered Retaining Wall 360,000360,000 ENG25020Dewey Hill Road CP Rail Crossing 35,00035,000 Bridge Maintenance Total 795,000395,000 400,000 CAS Fund: Utility Franchise Fees ENG21040Electric Vehicle Infrastructure & Vehicle Upgrades 600,000100,000 100,000 100,000 100,000 100,000 100,000 ENG21062Facility Efficiency Upgrades 3,000,000500,000 500,000 500,000 500,000 500,000 500,000 ENG25001DC Fast Charger 150,000150,000 FAC25126Photovoltaic & EV Charger Installation 2,225,000575,000 50,000 500,000 1,100,000 FAC25127Fire Station #1 Energy Management Study 500,000500,000 PWK25104Public Works Fleet - Bio Diesel Storage Tanks 375,000375,000 CAS Fund: Utility Franchise Fees Total 6,850,0001,625,000 1,175,000 600,000 650,000 1,100,000 1,700,000 Construction Fund: Cable PEG COM23100Communications Equipment Replacement 70,00070,000 COM25100Replacement of Council Chambers Cameras 40,00040,000 COM25101Cable TV Broadcast Server Replacement 70,00070,000 COM25102Video Production Studio Space 350,000350,000 FAC25118Senior Center AV Equipment 55,00055,000 FAC25122City Hall Council Chambers Studio Lighting 300,000300,000 Construction Fund: Cable PEG Total 885,000355,000 140,000 350,000 40,000 Construction Fund: CIP Levy 15-048Normandale Park Shelter Building Replacement 1,040,00040,000 1,000,000 15-049Lewis Park Shelter Building Replacement 900,000900,000 ENG21000Asset Preservation Funding 4,300,000650,000 700,000 700,000 700,000 750,000 800,000 Page 289 of 299 Total20252026202720282029Source2030Project #Priority ENG21044City Wide ADA Facility Improvements Level 2 300,00050,000 100,000 50,000 100,000 ENG21045City Wide ADA Facility Improvements Level 3&4 1,336,0001,336,000 ENG21051Pamela Park Facility Maintenance 210,000210,000 ENG25021Grandview Parking Ramp ADA Access Route 200,000200,000 ENG25022Grandview Parking Ramp ADA Access Route to Gus Yng 2,000,0002,000,000 FAC23109Arneson Acres Park Facility Improvements 700,000700,000 FAC25101City Wide Card Reader & Fire Alarm Updates 100,000100,000 FAC25108Fire Station #1 Living Quarters 500,000500,000 FAC25113Public Works Cold Storage Building Replacement 200,000200,000 FAC25114Public Works Space Reconfiguration 850,00075,000 775,000 FAC25115Public Works Access Gates 300,000300,000 FAC25117Public Works BAS & Lighting Upgrades 825,000125,000 700,000 FAC25125City Hall HVAC Equipment Replacement 500,000500,000 ITS25100CLP Maintenance Fiber 30,00030,000 ITS25101Increase Fiber Capacity to SLP 60,00060,000 P&R21006Athletic Field Improvements 1,050,000350,000 350,000 350,000 P&R21046Normandale Park Playground Equipment 200,000200,000 P&R21047Heights Park Playground Equipment 175,000175,000 P&R25102Highlands Park Shelter Replacement 1,250,0001,250,000 P&R25103Yorktown Park Master Plan 790,00040,000 750,000 P&R25104Chowen Park Playground Improvement 350,000350,000 P&R25105Countryside Playground Replacement 315,000315,000 P&R25106Park Pathways and Parking Project Improvements 525,00025,000 100,000 100,000 100,000 100,000 100,000 P&R25107Parks Accessibility Improvements 525,00025,000 100,000 100,000 100,000 100,000 100,000 P&R25108Utley Park Shelter Replacement 60,00060,000 P&R25110Arneson Park Shelter Replacement 75,00075,000 P&R25130Centennial Lakes Park Public Wi-Fi 40,00040,000 P&R25145Centennial Lakes Entrance Fountain Repair 150,000150,000 P&R25147Centennial Lakes Improvements 800,000800,000 PW22002Annual Deferred Retaining Wall Replacements 750,00050,000 100,000 200,000 200,000 200,000 Construction Fund: CIP Levy Total 21,406,0001,900,000 2,205,000 2,995,000 3,990,000 5,016,000 5,300,000 Construction Fund: Equipment Levy 17-028Braemar Arena Zamboni 400,000200,000 200,000 17-039Centennial Lakes Vehicle Replacement 40,00040,000 ADM23200Administration Equipment Replacement 325,00030,000 85,000 210,000 COM23100Communications Equipment Replacement 40,00040,000 DEV23100Development Equipment Replacement 97,00097,000 ENG23200Engineering Equipment Replacement 631,331150,000 102,631 191,500 64,700 92,500 30,000 FAC25110Facility Asset Maintenance Software 1,044,000300,000 135,000 142,000 150,000 155,000 162,000 FIR23200Fire Equipment Replacement 6,567,292782,300 1,044,845 1,258,995 1,403,395 1,112,350 965,407 HR25100Centennial Lakes Garage Safety Equip Improvements 25,00025,000 ITS23100IT Equipment Replacement 2,340,000440,000 95,000 633,000 500,000 294,000 378,000 Page 290 of 299 Total20252026202720282029Source2030Project #Priority P&R21001General Park Asset Equipment Replacement 250,00050,000 50,000 50,000 50,000 50,000 P&R23120Park Maintenance Equip Replacement - Vehicles 1,693,750329,300 411,700 234,250 223,500 191,000 304,000 P&R25121Braemar Arena Bobcats & Attachments 330,000200,000 130,000 POL23200Police Equipment Replacement 3,102,300380,000 358,000 867,800 588,000 690,000 218,500 POL25101Patrol Squad Car Addition 60,00060,000 PWK23200Public Works Equipment Replacement 4,214,107583,500 830,000 23,000 767,684 1,089,000 920,923 Construction Fund: Equipment Levy Total 21,159,7803,070,100 3,302,176 3,810,545 3,977,279 3,873,850 3,125,830 Construction Fund: Grants/Donations 19-301Wooddale Ave Bridge Historic Rehab 1,500,0001,500,000 ENG25001DC Fast Charger 150,000150,000 ENG25026Rosland Park Pedestrian Bridge 6,000,0006,000,000 P&R25126Braemar Field Heater 200,000200,000 Construction Fund: Grants/Donations Total 7,850,000150,000 7,700,000 Construction Fund: MSA 17-01169th Street Roundabout 450,000450,000 19-301Wooddale Ave Bridge Historic Rehab 400,000400,000 ENG21028Hilary Lane Reconstruction 3,387,9783,387,978 ENG21030West 76th Street A Reconstruction 968,276968,276 ENG23004Benton Avenue A Reconstruction 1,475,2971,475,297 ENG25002Parklawn Avenue A Reconstruction 524,385524,385 ENG25003W 77th Street D Reconstruction 987,078987,078 ENG25023Valley View Rd Fence Replace Sdale Neighborhood 100,000100,000 ENG25028Traffic Signal at Halifax and 50th St 400,000400,000 ENG2502950th over Minnehaha Creek North Retaining Wall 275,000275,000 ENG25030Benton Avenue Over CP Rail Beam Painting 250,000250,000 ENG25031Valley View Road Bridge over CP Rail Beam Painting 250,000250,000 Construction Fund: MSA Total 9,468,014400,000 500,000 3,662,978 2,929,739 1,975,297 Construction Fund: Special Assess 19-308Prospect Knolls C Reconstruction 1,091,2681,091,268 19-309Prospect Knolls D Reconstruction 332,125332,125 19-310Presidents B Reconstruction 1,129,5461,129,546 19-314Indian Trails A Reconstruction 671,785671,785 ENG21021Presidents A Reconstruction 1,946,4511,946,451 ENG21023Parklawn (Parklawn Ct) Reconstruction 265,583265,583 ENG21024Rolling Green Reconstruction 2,505,0502,505,050 ENG21025Minnehaha Woods D Reconstruction 456,609456,609 ENG21026South Cornelia B Reconstruction 3,447,2973,447,297 ENG21027South Cornelia D Reconstruction 3,182,3943,182,394 ENG21028Hilary Lane Reconstruction 302,453302,453 ENG21030West 76th Street A Reconstruction 200,919200,919 Page 291 of 299 Total20252026202720282029Source2030Project #Priority ENG23001Prospect Knolls A Reconstruction 1,632,1581,632,158 ENG23002Countryside E Reconstruction 782,328782,328 ENG23003Todd Park B Reconstruction 523,709523,709 ENG23004Benton Avenue A Reconstruction 108,997108,997 ENG25002Parklawn Avenue A Reconstruction 48,27048,270 ENG25003W 77th Street D Reconstruction 90,86190,861 ENG25005Chowen Park C Reconstruction 1,414,9911,414,991 ENG25006Chowen Park E Reconstruction 878,270878,270 ENG25009Minnehaha Woods B Reconstruction 618,632618,632 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 250,399250,399 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 191,481191,481 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 172,485172,485 ENG25013The Heights A Reconstruction 1,127,0301,127,030 ENG25014The Heights C Reconstruction 939,192939,192 Construction Fund: Special Assess Total 24,310,2833,075,997 3,321,134 6,624,132 3,119,423 1,857,171 6,312,426 E911 POL21005Dispatch E911 Call Handling System 550,000550,000 POL23200Police Equipment Replacement 1,053,000475,000 550,000 28,000 E911 Total 1,603,000475,000 550,000 578,000 Edinborough Fund 15-069Edinborough Park Track Air Conditioning 81,00081,000 P&R21012Edinborough Park Fitness Equipment Replacement 26,00026,000 P&R25148Edinborough Park Track Surface Replacement 90,00090,000 P&R25149Edinborough Park Replace Exterior Landscaping 75,00075,000 P&R25150Edinborough Park Loading Dock 50,00050,000 P&R25151Edinborough Park Concession Replacement 24,00024,000 P&R25152Edinborough Park Amphitheater Upgrades 23,50023,500 P&R25153Edinborough Park SE Entry Concrete Replacement 27,00027,000 P&R25154Edinborough Park Locker Replacement 31,00031,000 P&R25155Edinborough Park Truck Replacement 50,00050,000 P&R25156Edinborough Park Pool Filter Replacement 70,00070,000 Edinborough Fund Total 547,500332,500 215,000 Federal ARPA P&R23100CLP & EP Interior and Exterior Public Furniture 40,00040,000 Federal ARPA Total 40,00040,000 Golf Course Fund 17-031Braemar Golf Clubhouse Lower Level 100,000100,000 FAC25120Golf Course Audio Visual Replacement 250,000250,000 Page 292 of 299 Total20252026202720282029Source2030Project #Priority FAC25124Golf Course Restroom Front 9 400,000400,000 P&R21028Toro 300 Gal Sprayer 85,00085,000 P&R21036Dome Electrical Update 25,00025,000 P&R21043Cart Path Addition Hole #6 & #11 150,000150,000 P&R25160Golf Dome Netting Repairs 250,000100,000 150,000 P&R25162Golf Course Tractor & Mower Replacements 705,000100,000 295,000 160,000 50,000 100,000 P&R25164Golf Course Irrigation Upgrade 225,000225,000 P&R25166Club Car Utility Carts 78,00026,000 26,000 26,000 P&R25167Golf Maintenance Facility Lift Table 20,00020,000 P&R25168Golf Course Restroom Renovation 40,00040,000 P&R25169Golf Course Cold Storage Insulation 60,00060,000 P&R25170Update Well House #2 on Hole #13 75,00075,000 P&R25171Practice Green Enlargement / Academy 9 Pavilion 75,00075,000 P&R25172Driving Range Safety Netting 200,000200,000 P&R25175Golf Course Additional Native Areas 65,00065,000 P&R25176Golf Course New Nursery Green 100,000100,000 P&R25178Cart Path Addition Academy 9 150,000150,000 P&R25180Academy Training Facility 500,000500,000 P&R25182Golf Course Drainage Upgrade 40,00040,000 P&R25183Academy 9 Re-Grass & Irrigation 40,00040,000 P&R25184Green Renovation/Relocation Hole #8 500,000500,000 P&R25185Golf Dome Building Expansion 3,000,0003,000,000 Golf Course Fund Total 7,133,0001,581,000 571,000 1,151,000 3,630,000 100,000 100,000 HRA Fund: 72nd and France TIF DEV25102France Avenue Pedestrian/Bike Crossing 12,000,00012,000,000 HRA Fund: 72nd and France TIF Total 12,000,00012,000,000 HRA Fund: Centennial Lakes TIF 15-189Gateway Signs 150,00050,000 50,000 50,000 15-225HRA - Promenade Phase V 500,000500,000 17-01169th Street Roundabout 450,000450,000 17-018Valley View Rd Bicycle Facility Improvements 350,000350,000 DEV25100HRA Cahill Business District Branding 300,000300,000 DEV25101HRA City Entrance Markers 100,000100,000 ENG25025France Avenue Crossing Gallagher & 72nd 5,000,0005,000,000 HRA Fund: Centennial Lakes TIF Total 6,850,000450,000 5,550,000 50,000 450,000 350,000 Liquor Fund FAC23110Liquor Stores Facility Improvements 901,600297,600 324,000 280,000 Liquor Fund Total 901,600297,600 324,000 280,000 Local Option Sales Tax P&R25100Fred Richards Park 16,255,0005,500,000 9,250,000 805,000 700,000 P&R25101Braemar Park & Arena 47,140,00011,850,000 17,320,000 15,820,000 2,150,000 Page 293 of 299 Total20252026202720282029Source2030Project #Priority P&R25111Rosland Park Master Plan 100,000100,000 P&R25115Aquatic Center User Feature 2,795,000500,000 470,000 75,000 150,000 100,000 1,500,000 P&R25181Golf Course Parking Lot Upgrade 1,000,0001,000,000 Local Option Sales Tax Total 67,290,00017,850,000 27,040,000 17,800,000 3,000,000 100,000 1,500,000 PACS Fund: Utility Franchise Fees 17-072Hwy 169 Frontage Rd/Braemar Blvd Shared-Use Paths 658,420658,420 19-301Wooddale Ave Bridge Historic Rehab 200,000200,000 19-334Olinger Boulevard Sidewalk 883,500418,800 464,700 ENG21004McCauley Trail Shared-Use Path Phase 2 392,731392,731 ENG21006France Avenue Shared-Use Paths 1,541,300762,900 778,400 ENG21007Lincoln Drive/7th Street/Malibu Drive Sidewalks 419,600419,600 ENG21009Vernon Avenue Sidewalk 131,600131,600 ENG21010Gleason Road Sidewalk 295,885295,885 ENG21011Metro Boulevard Sidewalk 444,329444,329 ENG21013West 60th Street Sidewalk 710,500710,500 ENG21014West 77th Street Sidewalk 483,100483,100 ENG21015Benton Avenue Shared-Use Path 730,400730,400 ENG21016West 64th Street Shared-Use Path 422,654422,654 ENG21017Valley View Road Sidewalk 109,100109,100 ENG21018Amundson Avenue Sidewalk 156,100156,100 ENG21019Interlachen Boulevard Shared-Use Path 381,600381,600 ENG21021Presidents A Reconstruction 233,000233,000 ENG21025Minnehaha Woods D Reconstruction 288,600288,600 ENG21026South Cornelia B Reconstruction 444,150444,150 ENG21028Hilary Lane Reconstruction 190,400190,400 ENG21030West 76th Street A Reconstruction 41,15041,150 ENG23004Benton Avenue A Reconstruction 109,800109,800 ENG25002Parklawn Avenue A Reconstruction 172,400172,400 ENG25003W 77th Street D Reconstruction 172,400172,400 ENG25005Chowen Park C Reconstruction 50,00050,000 ENG25006Chowen Park E Reconstruction 158,000158,000 ENG25013The Heights A Reconstruction 295,200295,200 ENG25014The Heights C Reconstruction 295,200295,200 ENG25050Sidewalk Inspection Program 300,00050,000 50,000 50,000 50,000 50,000 50,000 ENG25051Drive 25 Improvements 120,00020,000 20,000 20,000 20,000 20,000 20,000 ENG25052Normandale Road/Viking Drive Bike Lanes 28,20028,200 ENG25053Pedestrian and Bicycle Master Plan Update 100,000100,000 ENG25054Wooddale Avenue Bike Lanes 111,10091,600 19,500 ENG25055McCauley Trail Shared-Use Path 503,000503,000 ENG2505669th Street Bike Lanes 24,40024,400 ENG25057West Shore Drive Bike Boulevard 35,10035,100 ENG25058W 44th St Bike Lanes 18,10018,100 ENG25059Metro Boulevard Bike Lanes 60,90060,900 ENG25060Minnehaha Creek Pedestrian Bridge 1,200,0001,200,000 ENG25061Edina Industrial Boulevard Sidewalk 297,500297,500 ENG25062W 66th Street Sidewalk 476,000476,000 Page 294 of 299 Total20252026202720282029Source2030Project #Priority ENG25063Valley View Road Bike Lane Design 50,00050,000 PACS Fund: Utility Franchise Fees Total 13,735,4192,458,645 1,665,000 3,220,650 2,085,700 1,537,550 2,767,874 Public Safety Aid FAC25121PW Building Emergency Services Radio Repeater 250,000250,000 FIR23200Fire Equipment Replacement 108,200108,200 POL23200Police Equipment Replacement 60,00060,000 POL25101Patrol Squad Car Addition 70,00070,000 POL25103Rifle-Rated Ballistic Shields 40,00040,000 POL25107PS Radio Bi-Directional Amplifier (BDA) Rplcmt 25,00025,000 Public Safety Aid Total 553,200528,200 25,000 Special Park Improvement Levy 17-143Creek Valley Irrigation 50,00050,000 19-763Tingdale Park Playground Replacement 155,000155,000 P&R21003Outdoor Athletic Field Lighting 900,000180,000 180,000 180,000 180,000 180,000 P&R21039Strachauer Park Master Plan Phase II 1,100,0001,100,000 P&R21048Sherwood Park Playground Equipment 150,000150,000 P&R21049Kojetin Park Playground Equipment 165,000165,000 P&R23203Alden Park Playground Replacement 185,000185,000 P&R23206McGuire Park Playground Equipment Replacement. 250,000250,000 P&R23207Off Leash Dog Park Investments 10,00010,000 P&R23208Pamela Park Playground Equipment Replacement 300,000300,000 P&R23212York Park Playground Replacement 175,000175,000 P&R25113Fox Meadow Shelter Replacement 55,00055,000 Special Park Improvement Levy Total 3,495,000405,000 305,000 1,940,000 485,000 180,000 180,000 Special Street Levy 19-308Prospect Knolls C Reconstruction 983,386983,386 19-309Prospect Knolls D Reconstruction 299,292299,292 19-310Presidents B Reconstruction 822,660822,660 19-314Indian Trails A Reconstruction 747,279747,279 DEV25103France Avenue Branding/Lighting 2,000,0002,000,000 DEV25110HRA Grandview Maintenance District 545,000300,000 40,000 45,000 50,000 55,000 55,000 ENG21021Presidents A Reconstruction 1,417,6191,417,619 ENG21024Rolling Green Reconstruction 2,786,5642,786,564 ENG21025Minnehaha Woods D Reconstruction 783,502783,502 ENG21028Hilary Lane Reconstruction 336,442336,442 ENG23001Prospect Knolls A Reconstruction 1,470,8041,470,804 ENG23002Countryside E Reconstruction 870,245870,245 ENG23003Todd Park B Reconstruction 720,847720,847 ENG23004Benton Avenue A Reconstruction 150,027150,027 ENG25002Parklawn Avenue A Reconstruction 82,82782,827 ENG25003W 77th Street D Reconstruction 155,909155,909 ENG25005Chowen Park C Reconstruction 1,947,6301,947,630 ENG25006Chowen Park E Reconstruction 1,208,8741,208,874 Page 295 of 299 Total20252026202720282029Source2030Project #Priority ENG25009Minnehaha Woods B Reconstruction 1,061,5191,061,519 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 429,663429,663 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 328,566328,566 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 374,045374,045 ENG25013The Heights A Reconstruction 2,444,0412,444,041 ENG25014The Heights C Reconstruction 2,036,7012,036,701 Special Street Levy Total 24,003,4424,540,279 2,793,482 3,578,843 4,263,793 2,896,986 5,930,059 Utility Fund PWK23201Utilities Equipment Replacement 2,735,000165,000 200,000 677,000 487,000 642,000 564,000 Utility Fund Total 2,735,000165,000 200,000 677,000 487,000 642,000 564,000 Utility Fund: Sewer 15-173Asset Management Software and Equipment 40,00010,000 10,000 10,000 10,000 19-308Prospect Knolls C Reconstruction 573,550573,550 19-309Prospect Knolls D Reconstruction 174,559174,559 19-310Presidents B Reconstruction 998,443998,443 19-314Indian Trails A Reconstruction 392,308392,308 19-335Sanitary Trunk Capacity Expansion York Segs 2-3 3,800,0003,800,000 19-336Sanitary Trunk Capacity Exp York Seg 4 & Fairview 4,700,0004,700,000 19-340Sanitary Targeted Inflow Reduction Project 130,000130,000 ENG21021Presidents A Reconstruction 1,720,5301,720,530 ENG21023Parklawn (Parklawn Ct) Reconstruction 28,74728,747 ENG21024Rolling Green Reconstruction 281,326281,326 ENG21025Minnehaha Woods D Reconstruction 342,836342,836 ENG21026South Cornelia B Reconstruction 1,071,9041,071,904 ENG21027South Cornelia D Reconstruction 957,073957,073 ENG21028Hilary Lane Reconstruction 303,883303,883 ENG21030West 76th Street A Reconstruction 165,248165,248 ENG2105572nd Street Sewer Line Upsize 1,600,0001,600,000 ENG23001Prospect Knolls A Reconstruction 686,265686,265 ENG23002Countryside E Reconstruction 391,999391,999 ENG23003Todd Park B Reconstruction 299,187299,187 ENG23004Benton Avenue A Reconstruction 186,198186,198 ENG23009Hilary Lane Sanitary Sewer Lining 300,000300,000 ENG23033Sanitary Trunk Capacity Exp York Avenue Hazelton 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000 ENG23034Sanitary Trunk Capacity Exp York Avenue 69th St W 1,400,0001,400,000 ENG25002Parklawn Avenue A Reconstruction 103,924103,924 ENG25003W 77th Street D Reconstruction 195,622195,622 ENG25005Chowen Park C Reconstruction 929,616929,616 ENG25006Chowen Park E Reconstruction 577,003577,003 ENG25009Minnehaha Woods B Reconstruction 464,487464,487 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 188,007188,007 Page 296 of 299 Total20252026202720282029Source2030Project #Priority ENG25011Pamela Park C (Halifax Avenue) Reconstruction 143,770143,770 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 34,33934,339 ENG25013The Heights A Reconstruction 858,472858,472 ENG25014The Heights C Reconstruction 715,394715,394 ENG25024Promenade Brook Pumping Improvements 100,000100,000 ENG25033Nine Mile Village Sanitary Sewer Lining 175,000175,000 ENG25034Olinger Road Sanitary Sewer Replacement 100,000100,000 PW23009Lift Station Pump and VFD Renewal 180,00030,000 30,000 30,000 30,000 30,000 30,000 PW23010Nine Mile Village Sewer Lining 175,000175,000 PW23011Olinger Road Dip Replacement: 130 LF + Road Repair 80,00080,000 Utility Fund: Sewer Total 34,464,6907,508,973 3,683,121 8,585,538 7,149,689 4,233,894 3,303,475 Utility Fund: Storm 15-173Asset Management Software and Equipment 60,00015,000 15,000 15,000 15,000 17-01169th Street Roundabout 100,000100,000 19-301Wooddale Ave Bridge Historic Rehab 400,000400,000 19-308Prospect Knolls C Reconstruction 1,386,9361,386,936 19-309Prospect Knolls D Reconstruction 422,111422,111 19-310Presidents B Reconstruction 1,305,0781,305,078 19-314Indian Trails A Reconstruction 1,038,4751,038,475 19-342Clean Wtr Strat & Lake Cornelia Clean Water Proj 750,000750,000 19-346CWRMP Model Update 200,000200,000 ENG21021Presidents A Reconstruction 2,248,9282,248,928 ENG21023Parklawn (Parklawn Ct) Reconstruction 54,32954,329 ENG21024Rolling Green Reconstruction 4,009,2434,009,243 ENG21025Minnehaha Woods D Reconstruction 946,760946,760 ENG21026South Cornelia B Reconstruction 2,049,8752,049,875 ENG21027South Cornelia D Reconstruction 1,830,2771,830,277 ENG21028Hilary Lane Reconstruction 1,009,2451,009,245 ENG21030West 76th Street A Reconstruction 385,207385,207 ENG21056Stormwater Infrastructure Maintenance 820,000190,000 200,000 210,000 220,000 ENG21057Natural Areas Management 710,000170,000 175,000 180,000 185,000 ENG23001Prospect Knolls A Reconstruction 1,583,4181,583,418 ENG23002Countryside E Reconstruction 850,851850,851 ENG23003Todd Park B Reconstruction 826,220826,220 ENG23004Benton Avenue A Reconstruction 434,318434,318 ENG23010Concord Flood Infrastrucure Project #2 area 10,650,000200,000 950,000 9,500,000 ENG23011Arden & 50th Flood Infrastructure Project #3 Area 650,000200,000 450,000 ENG23012Lake Cornelia and Normandale Park Flood Infras 16,000,00016,000,000 ENG23013France Avenue Crossing (Minnehaha Creek)800,000200,000 600,000 ENG23014Adaptive Level Management Project Ph 2 Minnehaha 2,700,000200,000 2,500,000 ENG23015Adaptive Level Management Project Nine Mile Creek 2,500,0002,500,000 Page 297 of 299 Total20252026202720282029Source2030Project #Priority ENG23016Minor Pipe and Grading Project (Citywide)2,500,0002,500,000 ENG23017Chowen and 60th Flood Project 1,100,0001,100,000 ENG25002Parklawn Avenue A Reconstruction 226,673226,673 ENG25003W 77th Street D Reconstruction 426,678426,678 ENG25005Chowen Park C Reconstruction 2,460,7762,460,776 ENG25006Chowen Park E Reconstruction 1,527,3781,527,378 ENG25009Minnehaha Woods B Reconstruction 1,282,7071,282,707 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 454,631454,631 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 347,659347,659 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 332,148332,148 ENG25013The Heights A Reconstruction 2,370,7172,370,717 ENG25014The Heights C Reconstruction 1,729,9361,729,936 ENG25024Promenade Brook Pumping Improvements 100,000100,000 ENG2502750th St Concrete Curb and Gutter Replacement 55,00055,000 ENG25036CWS 1 - Lake & Pond Sediment Phosphorus Sequest 550,00050,000 100,000 100,000 100,000 100,000 100,000 ENG25037CWS 2 - Targeted Intensive Street Sweeping 100,00010,000 20,000 70,000 ENG25038CWS 3 - Assurance, Monitoring, Lakegrades 215,00040,000 35,000 35,000 35,000 35,000 35,000 ENG25039CWS 4 - Rough Fish Management 190,00030,000 40,000 40,000 40,000 40,000 ENG25040CWS 5 - New Clean Water Infrastructure 150,000150,000 Utility Fund: Storm Total 72,840,5747,579,006 7,301,794 11,602,593 16,968,619 20,565,315 8,823,247 Utility Fund: Water 15-162New Water Treatment Plant 5 - Southdale 18,000,00018,000,000 15-173Asset Management Software and Equipment 40,00010,000 10,000 10,000 10,000 19-308Prospect Knolls C Reconstruction 854,576854,576 19-309Prospect Knolls D Reconstruction 260,088260,088 19-310Presidents B Reconstruction 1,413,4941,413,494 19-314Indian Trails A Reconstruction 584,530584,530 19-351Water Main Condition Assessment 955,000150,000 160,000 160,000 165,000 160,000 160,000 19-913Well #7 Rehabilitation 300,000180,000 120,000 19-915Well #11 Rehabilitation and Facility Improvements 240,000120,000 120,000 19-918Well #20 Rehabilitation 180,000180,000 ENG21021Presidents A Reconstruction 2,435,7532,435,753 ENG21023Parklawn (Parklawn Ct) Reconstruction 54,74554,745 ENG21024Rolling Green Reconstruction 1,676,6781,676,678 ENG21025Minnehaha Woods D Reconstruction 897,902897,902 ENG21026South Cornelia B Reconstruction 1,530,6691,530,669 ENG21027South Cornelia D Reconstruction 2,343,5492,343,549 ENG21028Hilary Lane Reconstruction 786,652786,652 ENG21030West 76th Street A Reconstruction 247,724247,724 ENG21034Well #5 69th Street Construct Underground Wellhead 350,000350,000 ENG21058Water Supply Grandview Area PH 3 2,500,0002,500,000 ENG21059Water Supply 50th and France 2,000,0002,000,000 Page 298 of 299 Total20252026202720282029Source2030Project #Priority ENG21060Water Supply Pentagon Park 1,000,0001,000,000 ENG23001Prospect Knolls A Reconstruction 1,278,1481,278,148 ENG23002Countryside E Reconstruction 584,093584,093 ENG23003Todd Park B Reconstruction 783,583783,583 ENG23004Benton Avenue A Reconstruction 369,875369,875 ENG23035Watermain Rehabilitation (Citywide)1,400,0001,400,000 ENG23036Grandview Area Watermain Improvements PH 2 240,000240,000 ENG25002Parklawn Avenue A Reconstruction 201,768201,768 ENG25003W 77th Street D Reconstruction 379,800379,800 ENG25005Chowen Park C Reconstruction 2,434,7052,434,705 ENG25006Chowen Park E Reconstruction 1,511,1961,511,196 ENG25009Minnehaha Woods B Reconstruction 692,075692,075 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 492,398492,398 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 376,540376,540 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 51,16451,164 ENG25013The Heights A Reconstruction 2,248,3762,248,376 ENG25014The Heights C Reconstruction 1,873,6471,873,647 ENG25024Promenade Brook Pumping Improvements 100,000100,000 ENG25043Chapel Drive Watermain Rehabilitation 300,000300,000 ENG25044Maloney Ave Watermain Rehabilitation 1,000,0001,000,000 ENG25045Watermain Replacement under NMC at 5901 Lincoln Dr 50,00050,000 ENG25046Watermain Replcmnt LB Tr/Shannon Dr/Coventry Way 225,000225,000 ENG25047Heights Neighborhood Watermain Rehabilitation 6,250,0006,250,000 FAC25109Fire Station #2 York Ave. Building Demo 500,000500,000 PW23002Well #15 Rehabilitation and Facility Improvements 140,000140,000 PW23004Well #10 Rehabilitation and Facility Improvements 120,000120,000 PW23005Well #12 Rehabilitation and Facility Improvements 180,000180,000 PW23006Well #13 Rehabilitation and Facility Improvements 180,000180,000 PW23007Well #2 Rehabilitation and Facility Improvements 170,000170,000 PW23008Well #6 Rehabilitation and Facility Improvements 180,000180,000 PWK25101Water Meter Radio Receivers 4,970,0001,300,000 880,000 900,000 930,000 960,000 PWK25102Filter Media Replacement 450,000450,000 PWK25103Fiber Installation, Van Valkenburg Tower 160,000160,000 Utility Fund: Water Total 68,543,7287,119,247 5,402,557 5,041,877 27,891,136 11,728,207 11,360,704 GRAND TOTAL 412,035,23061,501,547 74,394,264 81,357,178 84,278,617 57,210,712 53,292,912 Page 299 of 299